JP4536503B2 - Concrete structure and construction method thereof - Google Patents
[go: Go Back, main page]

JP4536503B2 - Concrete structure and construction method thereof - Google Patents

Concrete structure and construction method thereof Download PDF

Info

Publication number
JP4536503B2
JP4536503B2 JP2004362137A JP2004362137A JP4536503B2 JP 4536503 B2 JP4536503 B2 JP 4536503B2 JP 2004362137 A JP2004362137 A JP 2004362137A JP 2004362137 A JP2004362137 A JP 2004362137A JP 4536503 B2 JP4536503 B2 JP 4536503B2
Authority
JP
Japan
Prior art keywords
rail means
rail
concrete
concrete structure
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004362137A
Other languages
Japanese (ja)
Other versions
JP2006169779A (en
Inventor
智一 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2004362137A priority Critical patent/JP4536503B2/en
Publication of JP2006169779A publication Critical patent/JP2006169779A/en
Application granted granted Critical
Publication of JP4536503B2 publication Critical patent/JP4536503B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

この発明は、コンクリート構造体及びその施工方法に関し、特に複数の硬球を介してコンクリートブロックを設置するためのコンクリート構造体及びその施工方法に関するものである。   The present invention relates to a concrete structure and a construction method thereof, and more particularly to a concrete structure for installing a concrete block via a plurality of hard balls and a construction method thereof.

図14は、従来の基礎コンクリートの概略構成を示した平面図であり、図15は、図14で示したXV−XVラインから見た図である。   FIG. 14 is a plan view showing a schematic configuration of conventional foundation concrete, and FIG. 15 is a view seen from the XV-XV line shown in FIG.

これらの図を参照して、基礎コンクリート61のガイドレール5a及び5b上に複数の硬球8を介して、ボックスカルバート2が設置されている。この基礎コンクリート61は、硬球8によるベアリング効果を利用して、図のように配置されたボックスカルバート2をガイドレール5a及び5bの伸びる方向へと所定位置まで移動させ、据え付けるための基礎構造として用いられるものである。   With reference to these drawings, the box culvert 2 is installed on the guide rails 5 a and 5 b of the foundation concrete 61 via a plurality of hard balls 8. The foundation concrete 61 is used as a foundation structure for moving and installing the box culvert 2 arranged as shown in the figure in the direction in which the guide rails 5a and 5b extend by utilizing the bearing effect of the hard ball 8. It is what

この基礎コンクリート61は、転圧された砕石65上に打設された捨コンクリート64と、捨コンクリート64上に取り付けられたレール受部材62a〜62dと、各々がほぼ平行に配置され、レール受部材62a及び62cと、レール受部材62b及び62dとの上方をそれぞれ架け渡すように取り付けられた一対のガイドレール5a及び5bと、ガイドレール5a及び5bの上面より下方の部分と、レール受部材62a〜62dとを埋め込むように打設されたコンクリート66とから主に構成されている。   The foundation concrete 61 includes a discarded concrete 64 cast on the crushed crushed stone 65, and rail receiving members 62a to 62d attached on the discarded concrete 64, each of which is arranged substantially in parallel. 62a and 62c and a pair of guide rails 5a and 5b attached so as to cross over the rail receiving members 62b and 62d, respectively, portions below the upper surfaces of the guide rails 5a and 5b, and rail receiving members 62a to 62d 62d is mainly composed of concrete 66 placed so as to be embedded.

ここで、このガイドレール及びレール受部材の取り付け状態について更に説明する。   Here, the mounting state of the guide rail and the rail receiving member will be further described.

図16は、図15で示したXVI−XVIラインの断面図であり、更に図17は、図16で示した”Z”部分の拡大図である。   16 is a cross-sectional view taken along the line XVI-XVI shown in FIG. 15, and FIG. 17 is an enlarged view of the “Z” portion shown in FIG.

これらの図を参照して、砕石65上に打設された捨コンクリート64には、例えば異型鉄筋よりなる差筋67a及び67bの一部が埋め込まれ、この差筋67a及び67bに例えば断面逆U字形となるように配置された溝形鋼よりなるレール受部材62dの側壁部分が溶接されている。そして、レール受部材62dの上面には、例えば鋼板よりなる複数の平板63a〜63cが積み重ねた状態で配置され、最も上方の平板63cの上面にガイドレール5bが設置されている。尚、これらのレール受部材62dと、平板63a〜63cの各々と、ガイドレール5bとは、例えば点溶接によって互いに接合され固定されている。また、他方のガイドレール5aについても同様に、レール受部材62bに積み重ねられた複数の平板上に取り付けられている。   With reference to these drawings, in the discarded concrete 64 placed on the crushed stone 65, for example, part of the differential bars 67a and 67b made of deformed reinforcing bars are embedded, and the differential bars 67a and 67b have, for example, an inverted cross section U. A side wall portion of a rail receiving member 62d made of channel steel arranged so as to have a letter shape is welded. A plurality of flat plates 63a to 63c made of, for example, steel plates are arranged on the upper surface of the rail receiving member 62d, and the guide rail 5b is installed on the upper surface of the uppermost flat plate 63c. The rail receiving member 62d, each of the flat plates 63a to 63c, and the guide rail 5b are joined and fixed to each other, for example, by spot welding. Similarly, the other guide rail 5a is mounted on a plurality of flat plates stacked on the rail receiving member 62b.

尚、ガイドレール5bは、図17に示されるように、例えば溝形鋼よりなり、その上面に平坦面を有する水平部材9と、水平部材9の外方側の端縁に沿って溶接された丸棒6と、水平部材9の内方側の端縁に沿って溶接された丸棒7とから構成されている。丸棒6の寸法は、その上端の水平レベルが平板4bの下面と上面との間に位置するように設定され、丸棒7の寸法は硬球8の直径より小さく設定されている。また、他方のガイドレール5aは、ガイドレール5bと対称となるように形成されている。このように構成されたガイドレール5a及び5bの上面には、配置された複数の硬球8が配置され、配置された複数の硬球8上に平板4a及び4bを介してボックスカルバート2が載置されている。したがって、複数の硬球8の転動によって、ボックスカルバート2をスムーズに移動させることが可能となると共に、丸棒6が平板4bに対するガイドとして機能し、ボックスカルバート2をガイドレール5a及び5bに沿って移動させることが可能となる。   As shown in FIG. 17, the guide rail 5 b is made of, for example, channel steel, and is welded along the horizontal member 9 having a flat surface on the upper surface thereof and the outer edge of the horizontal member 9. It is comprised from the round bar 6 and the round bar 7 welded along the inner edge of the horizontal member 9. The dimension of the round bar 6 is set so that the horizontal level of the upper end is located between the lower surface and the upper surface of the flat plate 4 b, and the dimension of the round bar 7 is set smaller than the diameter of the hard sphere 8. The other guide rail 5a is formed so as to be symmetrical with the guide rail 5b. A plurality of arranged hard balls 8 are arranged on the upper surfaces of the guide rails 5a and 5b thus configured, and the box culvert 2 is placed on the arranged plurality of hard balls 8 via the flat plates 4a and 4b. ing. Accordingly, the rolling of the plurality of hard balls 8 enables the box culvert 2 to move smoothly, the round bar 6 functions as a guide for the flat plate 4b, and the box culvert 2 is moved along the guide rails 5a and 5b. It can be moved.

図18は、従来の基礎コンクリートの施工過程を示した概略工程図である。   FIG. 18 is a schematic process diagram showing a construction process of a conventional foundation concrete.

まず、図18の(1)を参照して、上記のような基礎コンクリート61の施工時には、転圧して平坦化した砕石65上に所定間隔を開けて角材68a及び68bを配置し、これらを型枠として捨コンクリート64を打設する。このとき、例えば異型鉄筋よりなる差筋67a〜67dを、硬化前の捨コンクリート64の所定位置にほぼ垂直方向に差し込んでおく。   First, referring to (1) of FIG. 18, at the time of construction of the basic concrete 61 as described above, square bars 68a and 68b are arranged at predetermined intervals on the crushed stone 65 which has been rolled and flattened, and these are used as molds. Discard concrete 64 is placed as a frame. At this time, for example, the difference bars 67a to 67d made of deformed reinforcing bars are inserted into a predetermined position of the discarded concrete 64 before hardening in a substantially vertical direction.

次に、図18の(2)を参照して、捨コンクリート64の硬化後、角材68a及び68bを取り外し、差筋67a及び67b、差筋67c及び67dにレール受部材62d及び62bをそれぞれ溶接する。   Next, referring to (2) of FIG. 18, after the discarded concrete 64 is hardened, the square members 68a and 68b are removed, and the rail receiving members 62d and 62b are welded to the differential bars 67a and 67b and the differential bars 67c and 67d, respectively. .

次に、図18の(3)を参照して、溶接されたレール受部材62dの上面に、例えば鋼板よりなる複数の平板63a〜63cを、その最上面の位置が所定の高さとなるまで積み重ねて点溶接等で接合する。他方のレール受部材62bについても同様に、厚さの異なる複数の平板が積み重ねられている。   Next, referring to (3) of FIG. 18, a plurality of flat plates 63a to 63c made of, for example, steel plates are stacked on the upper surface of the welded rail receiving member 62d until the position of the uppermost surface reaches a predetermined height. Join by spot welding. Similarly, a plurality of flat plates having different thicknesses are stacked on the other rail receiving member 62b.

次に、図18の(4)を参照して、レール受部材62dの上面に重ねられた平板63cの上面にガイドレール5bを設置し、例えば点溶接によってガイドレール5bと平板63cとを接合する。他方のガイドレール5aについても同様にレール受部材62b上に重ねられた平板上に取り付けた後、コンクリートを打設するための型枠69a及び69bを組み立てる。   Next, referring to (4) of FIG. 18, the guide rail 5b is installed on the upper surface of the flat plate 63c superimposed on the upper surface of the rail receiving member 62d, and the guide rail 5b and the flat plate 63c are joined by, for example, spot welding. . Similarly, after the other guide rail 5a is mounted on a flat plate overlaid on the rail receiving member 62b, the molds 69a and 69b for placing concrete are assembled.

そして、図18の(5)に示すように、ガイドレール5a及び5bの上面より下方の部分と、レール受部材62d及び62bとが埋め込まれるようにコンクリート66を打設し、コンクリート66の硬化後、型枠69a及び69bを取り外すと、基礎コンクリート61の施工が完了する。   Then, as shown in FIG. 18 (5), the concrete 66 is placed so that the portions below the upper surfaces of the guide rails 5a and 5b and the rail receiving members 62d and 62b are embedded. When the molds 69a and 69b are removed, the construction of the foundation concrete 61 is completed.

上記のような従来の基礎コンクリートの構造では、ガイドレールの幅方向の水平レベルと、軸方向の勾配とを複数の平板の積み重ねによって行うため、ガイドレールの取り付け及びそのレベル調整を容易に行うことができず、基礎コンクリートの施工が非効率的となっていた。   In the conventional foundation concrete structure as described above, since the horizontal level in the width direction of the guide rail and the gradient in the axial direction are performed by stacking a plurality of flat plates, it is easy to install the guide rail and adjust its level. The foundation concrete construction was inefficient.

また、上記のような従来の基礎コンクリートは、その内部に鉄筋が配されない、いわゆる無筋構造として形成されている。コンクリートブロックの設置基礎は、無筋構造での施工が認められているものの、内部に鉄筋を配した有筋構造の基礎の方が強度の面で好ましい。   Moreover, the conventional basic concrete as described above is formed as a so-called unreinforced structure in which no reinforcing bars are arranged. Although the installation foundation of the concrete block is permitted to be constructed in an unreinforced structure, the foundation of the reinforced structure in which the reinforcing bars are arranged is preferable in terms of strength.

この発明は、上記のような課題を解決するためになされたもので、硬球を介してコンクリートブロックを設置するためのガイドレールのレベル調整を容易に行うことができると共に、強固な有筋構造を有するコンクリート構造体及びその施工方法を提供することを目的とする。   The present invention was made to solve the above-described problems, and can easily adjust the level of a guide rail for installing a concrete block via a hard ball, and has a strong reinforced structure. It aims at providing the concrete structure which has, and its construction method.

上記の目的を達成するために、請求項1記載の発明は、支持基盤上に形成され、その上部に複数の硬球を介してコンクリートブロックを設置するためのコンクリート構造体であって、支持基盤上に設置され、ネジ機構によってその軸方向の長さを増減することができる少なくとも一対の高さ調整手段と、金属材料よりなり、各々の軸方向がほぼ平行に位置すると共に高さ調整手段の各々に取り付けられ、各々の上面に硬球が配置される一対のレール手段と、金属材料よりなり、その軸方向がレール手段の各々の軸方向と平面視において交差するように、レール手段の各々の上面より下方の部分に取り付けられる少なくとも1つの横部材と、レール手段の上面より下方の部分と、横部材と、高さ調整手段とが埋め込まれるように打設されたコンクリートとを備え、高さ調整手段は、レール手段の各々の幅方向にレール手段の幅より長く配置され、レール手段を支持する部材と、部材の下部であってレール手段の外方側における両側の部分に固定された一対の高さ調整具と、高さ調整具の下部が固定された1枚の平板とを含むものである。   In order to achieve the above object, the invention according to claim 1 is a concrete structure for forming a concrete block formed on a support base via a plurality of hard balls on the support base. And at least a pair of height adjusting means that can be increased or decreased in the axial direction by a screw mechanism, and each of the height adjusting means is made of a metal material and each axial direction is located substantially in parallel. A pair of rail means, each of which is made of a metal material and has an axial direction that intersects each axial direction of the rail means in plan view. At least one transverse member attached to the lower part, a part below the upper surface of the rail means, the transverse member, and the height adjustment means are embedded so as to be embedded. The height adjusting means is disposed longer than the width of the rail means in each width direction of the rail means, and a member that supports the rail means, and both sides on the outer side of the rail means at the lower part of the member A pair of height adjusters fixed to the portion and a single flat plate to which the lower portion of the height adjuster is fixed.

このように構成すると、高さ調整手段によってレール手段の高さが調整自在となると共に、コンクリートに埋め込まれるレール手段と横部材とが平面視において交差した状態となる。又、レール手段を設置した状態で、レール手段の各々の幅方向の両端側の高さをそれぞれ独立に調整自在となる。   If comprised in this way, while the height of a rail means will be adjustable by a height adjustment means, the rail means embedded in concrete and a horizontal member will be in the state which cross | intersected in planar view. In addition, in the state in which the rail means is installed, the heights of both end sides in the width direction of each rail means can be independently adjusted.

請求項2記載の発明は、請求項1記載の発明の構成において、高さ調整手段は、レール手段の各々の軸方向に複数配置されるものである。   According to a second aspect of the present invention, in the configuration of the first aspect of the present invention, a plurality of height adjusting means are arranged in the axial direction of each rail means.

このように構成すると、レール手段の各々の軸方向の複数の部分において、高さが調整自在となる。   If comprised in this way, height will become adjustable in the some part of each axial direction of a rail means.

請求項3記載の発明は、請求項1又は請求項2記載の発明の構成において、横部材は、その軸方向がレール手段の各々の軸方向と平面視においてほぼ直交するように複数取り付けられ、金属材料よりなり、レール手段の各々の軸方向とほぼ平行に配置され、横部材の各々に取り付けられた少なくとも1つの縦部材を更に備え、縦部材はコンクリートによって埋め込まれるものである。   According to a third aspect of the present invention, in the configuration of the first or second aspect of the present invention, a plurality of lateral members are attached such that the axial direction thereof is substantially orthogonal to the axial direction of each rail means in plan view, Further comprising at least one longitudinal member made of a metallic material and arranged substantially parallel to the axial direction of each of the rail means and attached to each of the transverse members, the longitudinal member being embedded with concrete.

このように構成すると、コンクリートが打設される部分に、横部材と縦部材とが縦横に配置された状態となる。   If comprised in this way, it will be in the state by which the horizontal member and the vertical member are arrange | positioned vertically and horizontally in the part in which concrete is laid.

請求項4記載の発明は、支持基盤上に形成され、複数の硬球を介してコンクリートブロックを設置するためのコンクリート構造体の施工方法であって、その上面に硬球が配置されるレール手段を、上下方向の長さを増減することができる少なくとも1つの高さ調整手段を介して、支持基盤上に配置する第1工程と、配置された高さ調整手段を操作して、レール手段の上面の水平レベルを調整する第2工程と、調整されたレール手段の上面より下方の部分と高さ調整手段とが埋め込まれるようにコンクリートを打設する第3工程とを備え、高さ調整手段は、レール手段の各々の幅方向に前記レール手段の幅より長く配置され、レール手段を支持する部材と、部材の下部であってレール手段の外方側における両側の部分に固定された一対の高さ調整具と、高さ調整具の下部が固定されると共に、支持基盤に接するように配置された1枚の平板とを含むものである。   The invention according to claim 4 is a construction method of a concrete structure that is formed on a support base and installs a concrete block via a plurality of hard balls, and rail means on which hard balls are arranged, The first step of arranging on the support base via at least one height adjusting means capable of increasing or decreasing the length in the vertical direction, and operating the arranged height adjusting means, A second step of adjusting the horizontal level, and a third step of placing concrete so that the portion below the upper surface of the adjusted rail means and the height adjusting means are embedded, the height adjusting means, A pair of heights that are longer than the width of the rail means in each width direction of the rail means and that are fixed to a member that supports the rail means, and a lower part of the member and on both sides on the outer side of the rail means Key And ingredients are those which comprise together with the lower is fixed height adjuster, and a single flat plate is disposed in contact with the support base.

このように構成すると、第1工程でレール手段を配置した後、第2工程でレール手段の水平レベルが調整自在となる。又、レール手段を設置した状態でレール手段の各々の両側の高さが調整自在となる。   If comprised in this way, after arrange | positioning a rail means at a 1st process, the horizontal level of a rail means will become adjustable in a 2nd process. Further, the height of both sides of each rail means can be adjusted in a state where the rail means is installed.

請求項5記載の発明は、請求項4記載の発明の構成において、第1工程は、高さ調整手段を所定間隔を開けて少なくとも一対配置する工程と、レール手段を各々の軸方向がほぼ平行となるように一対配置し、各々を高さ調整手段の各々の上部に取り付ける工程とを含み、第2工程は、レール手段の各々と平面視において交差するように、レール手段の各々の上面より下方の部分に少なくとも1つの横部材を取り付ける工程を含むものである。   According to a fifth aspect of the present invention, in the configuration of the fourth aspect of the invention, in the first step, at least a pair of height adjusting means are arranged at a predetermined interval and the rail means are substantially parallel to each other in the axial direction. And a step of attaching each of them to the top of each of the height adjusting means, and the second step is from the upper surface of each of the rail means so as to intersect with each of the rail means in plan view. Attaching at least one cross member to the lower portion.

このように構成すると、レール手段を利用して横部材が取り付けられる。   If comprised in this way, a transverse member will be attached using a rail means.

請求項6記載の発明は、請求項5記載の発明の構成において、横部材は複数取り付けられ、第2工程は、その軸方向がレール手段の各々の軸方向と平行となるように配置され、取り付けられた横部材の各々と平面視において交差するように、横部材の各々に少なくとも1つの縦部材を取り付ける工程を更に含むものである。   According to a sixth aspect of the present invention, in the configuration of the fifth aspect of the invention, a plurality of lateral members are attached, and the second step is arranged such that the axial direction thereof is parallel to the axial direction of each rail means, The method further includes the step of attaching at least one longitudinal member to each of the transverse members so as to intersect each of the attached transverse members in plan view.

このように構成すると、レール部材に取り付けられた複数の横部材を介して縦部材が取り付けられる。   If comprised in this way, a vertical member will be attached via the some horizontal member attached to the rail member.

以上説明したように、請求項1記載の発明は、高さ調整手段によってレール手段の高さが調整自在となるため、レール手段の水平レベルの調整が容易となる。また、コンクリートに埋め込まれるレール手段と横部材とが平面視において交差した状態となるため、コンクリート構造体が有筋構造となり、その強度が向上する。又、レール手段を設置した状態で、レール手段の各々の幅方向の両端側の高さをそれぞれ独立に調整自在となるため、レール手段の各々の幅方向の水平レベルの調整が容易となる。   As described above, in the first aspect of the present invention, the height of the rail means can be adjusted by the height adjusting means, so that the horizontal level of the rail means can be easily adjusted. Moreover, since the rail means and the transverse member embedded in the concrete are in a state of intersecting in plan view, the concrete structure has a reinforced structure and the strength is improved. In addition, since the height of both end sides in the width direction of each rail means can be adjusted independently with the rail means installed, the horizontal level in the width direction of each rail means can be easily adjusted.

請求項2記載の発明は、請求項1記載の発明の効果に加えて、レール手段の各々の軸方向の複数の部分において、高さが調整自在となるため、レール手段の軸方向の勾配の調整が容易となる。   According to the second aspect of the invention, in addition to the effect of the first aspect of the invention, the height can be adjusted at a plurality of portions in the axial direction of the rail means, so that the gradient of the axial direction of the rail means is reduced. Adjustment is easy.

請求項3記載の発明は、請求項1又は請求項2記載の発明の効果に加えて、コンクリートが打設される部分に、横部材と縦部材とが縦横に配置された有筋構造となるため、コンクリート構造体の強度がより向上する。   In addition to the effect of the invention of claim 1 or 2, the invention described in claim 3 has a reinforced structure in which a horizontal member and a vertical member are arranged vertically and horizontally in a portion where concrete is placed. Therefore, the strength of the concrete structure is further improved.

請求項4記載の発明は、第1工程でレール手段を配置した後、第2工程でレール手段の水平レベルが調整自在となるため、効率的なコンクリート構造体の施工が可能となる。又、レール手段を設置した状態でレール手段の各々の両側の高さが調整自在となるため、一対のレール手段の幅方向の水平レベルの調整が容易に行える施工方法となる。   In the invention according to claim 4, since the rail means is arranged in the first step and the horizontal level of the rail means becomes adjustable in the second step, it is possible to efficiently construct the concrete structure. In addition, since the heights of both sides of each rail means can be adjusted with the rail means installed, the construction method can easily adjust the horizontal level in the width direction of the pair of rail means.

請求項5記載の発明は、請求項4記載の発明の効果に加えて、レール手段を利用して横部材が取り付けられるため、有筋構造を有する強固なコンクリート構造体の形成が容易となる。   According to the fifth aspect of the invention, in addition to the effect of the fourth aspect of the invention, since the transverse member is attached using the rail means, it is easy to form a strong concrete structure having a reinforced structure.

請求項6記載の発明は、請求項5記載の発明の効果に加えて、レール部材に取り付けられた複数の横部材を介して縦部材が取り付けられるため、より強固なコンクリート構造体を形成することが可能となる。   In addition to the effect of the invention of claim 5, the invention according to claim 6 forms a stronger concrete structure because the vertical member is attached via a plurality of horizontal members attached to the rail member. Is possible.

図1は、この発明の第1の実施の形態によるコンクリート構造体の概略構成を示した平面図であり、図2は、図1で示したII−IIラインから見た図であり、図3は、図2で示したIII−IIIラインの断面図であり、更に図4は、図3で示した”Y”部分の拡大図である。   FIG. 1 is a plan view showing a schematic configuration of a concrete structure according to a first embodiment of the present invention, and FIG. 2 is a view seen from the line II-II shown in FIG. FIG. 4 is a cross-sectional view taken along line III-III shown in FIG. 2, and FIG. 4 is an enlarged view of a “Y” portion shown in FIG.

これらの図を参照して、支持基盤3上に形成されたコンクリート構造体1のガイドレール5a及び5b上に複数の鋼球等よりなる硬球8を介して、ボックスカルバート2が設置されている。このコンクリート構造体1は、硬球8によるベアリング効果を利用して、図のように配置されたボックスカルバート2等のコンクリートブロックをガイドレール5a及び5bの伸びる方向へと所定位置まで移動させ、据え付けるための基礎構造として用いられるものである。   With reference to these drawings, the box culvert 2 is installed on the guide rails 5a and 5b of the concrete structure 1 formed on the support base 3 via hard balls 8 made of a plurality of steel balls or the like. This concrete structure 1 uses a bearing effect of the hard ball 8 to move and install a concrete block such as a box culvert 2 arranged as shown in the figure in a direction in which the guide rails 5a and 5b extend to a predetermined position. It is used as the basic structure of

コンクリート構造体1は、複数の高さ調整具10a〜10jと、各々の軸方向がほぼ平行に位置するように配置され、高さ調整具10a〜10jの上部に取り付けられた一対のガイドレール5a及び5bと、ガイドレール5a及び5bに取り付けられた複数の横鉄筋18a〜18dと、これらが埋め込まれるように打設されたコンクリート19とから構成されている。   The concrete structure 1 is arranged such that each of the height adjusters 10a to 10j is positioned substantially in parallel with each other, and a pair of guide rails 5a attached to the top of the height adjusters 10a to 10j. And 5b, a plurality of horizontal reinforcing bars 18a to 18d attached to the guide rails 5a and 5b, and a concrete 19 placed so as to be embedded therein.

高さ調整具10a〜10jは、例えば地盤上に転圧された砕石よりなる支持基盤3の上に、一対の平行線上に整列した状態で配置されている。すなわち、高さ調整具10a〜10eは、ほぼ等間隔で直線状に整列して配置され、残りの高さ調整具10f〜10jの各々は、高さ調整具10a〜10eの各々と対応する位置に、直線状に整列して配置されている。尚、高さ調整具10a〜10jは全て同一の構成であるので、以下では高さ調整具10cについてのみ詳細に説明する。   The height adjusters 10a to 10j are arranged in a state of being aligned on a pair of parallel lines, for example, on the support base 3 made of crushed stone that has been rolled onto the ground. That is, the height adjusters 10a to 10e are arranged in a straight line at substantially equal intervals, and the remaining height adjusters 10f to 10j are positions corresponding to the height adjusters 10a to 10e. Are arranged in a straight line. Since the height adjusters 10a to 10j all have the same configuration, only the height adjuster 10c will be described in detail below.

高さ調整具10cは、図4に示されるように、ターンバックル式ナット14を中心に構成され、ターンバックル式ナット14の上方に平頭ボルト12がねじ込まれ、平頭ボルト12とは反対方向のネジ山が切られた平頭ボルト13がターンバックル式ナット14の下方にねじ込まれている。そして、下方の平頭ボルト13の下面には、例えば鋼板よりなる平板11が点溶接により固定されている。このように構成されているため、高さ調整具10cの使用時には、ターンバックル式ナット14をいずれか一方方向に回転させることによって、平頭ボルト12の上面と平頭ボルト14の下面との距離、すなわち、高さ調整具10cの軸方向の長さを増減させることができる。   As shown in FIG. 4, the height adjuster 10 c is configured around a turnbuckle nut 14, a flat head bolt 12 is screwed above the turnbuckle nut 14, and a screw in a direction opposite to the flat head bolt 12. A flat-head bolt 13 with a mountain cut is screwed under the turnbuckle nut 14. A flat plate 11 made of, for example, a steel plate is fixed to the lower surface of the lower flat head bolt 13 by spot welding. Thus, when the height adjuster 10c is used, the distance between the upper surface of the flat head bolt 12 and the lower surface of the flat head bolt 14, that is, by rotating the turnbuckle nut 14 in either direction, that is, The length in the axial direction of the height adjuster 10c can be increased or decreased.

ガイドレール5a及び5bは、各々の軸方向がほぼ平行に位置するように配置され、上記のように設置された高さ調整具10a〜10e及び高さ調整具10f〜10jの上面を、それぞれ架け渡すように取り付けられている。   The guide rails 5a and 5b are arranged so that their axial directions are substantially parallel to each other, and hang the upper surfaces of the height adjusters 10a to 10e and the height adjusters 10f to 10j installed as described above. Installed to pass.

ガイドレール5aは、図4に示されるように、例えば溝形鋼よりなり、その上面に平坦面を有する水平部材9と、水平部材9の外方側の端縁に沿って水平部材9の上面に溶接された丸棒6と、水平部材の内方側の端縁に沿って溶接された丸棒7とから構成されている。水平部材9の側壁部28a及び28bの各々には、側面視において重なり合う位置に開口30a及び30bが形成されている。そして、水平部材9の上面に複数の硬球8が配置され、更に配置された複数の硬球8の上に配置された平板4aを介して、ボックスカルバート2が載置されている。   As shown in FIG. 4, the guide rail 5 a is made of, for example, channel steel and has a horizontal member 9 having a flat surface on the upper surface thereof, and an upper surface of the horizontal member 9 along an outer edge of the horizontal member 9. And a round bar 7 welded along the inner edge of the horizontal member. Opening 30a and 30b are formed in the side wall part 28a and 28b of the horizontal member 9 in the position which overlaps in side view, respectively. A plurality of hard balls 8 are arranged on the upper surface of the horizontal member 9, and the box culvert 2 is placed via a flat plate 4 a arranged on the plurality of arranged hard balls 8.

また、丸棒6の直径は硬球8の直径より大きく、且つ硬球8の直径と平板4aの厚さとの合計より小さく設定され、丸棒7の直径は硬球8の直径より小さく設定されている。したがって、丸棒6はボックスカルバート2の移動時における平板4aに対するガイドとして機能することができる。   The diameter of the round bar 6 is set to be larger than the diameter of the hard ball 8 and smaller than the sum of the diameter of the hard ball 8 and the thickness of the flat plate 4 a, and the diameter of the round bar 7 is set to be smaller than the diameter of the hard ball 8. Therefore, the round bar 6 can function as a guide for the flat plate 4 a when the box culvert 2 is moved.

尚、他方のガイドレール5bは、ガイドレール5aと幅方向において左右対称となるように形成されている。   The other guide rail 5b is formed to be symmetrical with the guide rail 5a in the width direction.

横鉄筋18a〜18dは、例えば丸鋼や異型鉄筋等の金属材料よりなり、一対のガイドレール5a及び5bの各々の軸方向と平面視において直交するように配置されている。そして、図4に示されるように、横鉄筋18cは、水平部材9の側壁部28a及び28bに形成された開口30a及び30bを挿通するように取り付けられ、ガイドレール5aの上面より下方の部分に溶接により固定されている。横鉄筋18cの他方側の部分についても同様に、ガイドレール5bに取り付けられている。また、他の横鉄筋18a、18b及び18dもまた、横鉄筋18cと同様にガイドレール5a及び5bの各々に取り付けられている。   The horizontal reinforcing bars 18a to 18d are made of, for example, a metal material such as a round steel bar or a deformed reinforcing bar, and are arranged so as to be orthogonal to the axial direction of each of the pair of guide rails 5a and 5b in a plan view. As shown in FIG. 4, the horizontal reinforcing bar 18 c is attached so as to pass through the openings 30 a and 30 b formed in the side wall portions 28 a and 28 b of the horizontal member 9, and is provided at a portion below the upper surface of the guide rail 5 a. It is fixed by welding. Similarly, the other side portion of the horizontal reinforcing bar 18c is attached to the guide rail 5b. The other horizontal reinforcing bars 18a, 18b and 18d are also attached to the guide rails 5a and 5b, respectively, in the same manner as the horizontal reinforcing bars 18c.

そして、コンクリート19は、ガイドレール5a及び5bの各々の上面より下方の部分と、横鉄筋18a〜18dの各々と、高さ調整具10a〜10jとが埋め込まれるように打設されている。   The concrete 19 is placed so that portions below the upper surfaces of the guide rails 5a and 5b, the horizontal reinforcing bars 18a to 18d, and the height adjusters 10a to 10j are embedded.

このように、横鉄筋18a〜18dがガイドレール5a及び5bと平面視において交差した状態でコンクリート19に埋め込まれているため、コンクリート構造体1は有筋構造となり、その強度を向上させることが可能となる。   Thus, since the horizontal reinforcing bars 18a to 18d are embedded in the concrete 19 in a state of intersecting with the guide rails 5a and 5b in a plan view, the concrete structure 1 has a reinforced structure and can improve its strength. It becomes.

また、ガイドレール5a及び5bを支持する高さ調整具10a〜10jはそれぞれ、ネジ機構によってその軸方向の長さが調整自在となるため、コンクリート19の打設前にあっては、ガイドレール5a及び5bの上面の水平レベルの調整を容易に行うことが可能となる。同様に、高さ調整具10a〜10jは、ガイドレール5a及び5bの各々の軸方向に複数配置されているため、ガイドレール5a及び5bは各々の軸方向における複数の部分において高さが調整自在となる。よって、この実施の形態によるコンクリート構造体1の構成においては、コンクリート19の打設前にガイドレール5a及び5bの軸方向の勾配を容易に調整することも可能となる。   In addition, since the height adjustment tools 10a to 10j supporting the guide rails 5a and 5b can be adjusted by the screw mechanism in the axial direction, the guide rail 5a before the concrete 19 is placed. And the horizontal level of the upper surface of 5b can be easily adjusted. Similarly, since the plurality of height adjusting tools 10a to 10j are arranged in the axial direction of each of the guide rails 5a and 5b, the height of the guide rails 5a and 5b can be adjusted in a plurality of portions in each of the axial directions. It becomes. Therefore, in the configuration of the concrete structure 1 according to this embodiment, the gradient in the axial direction of the guide rails 5a and 5b can be easily adjusted before the concrete 19 is placed.

ここで、上記のようなコンクリート構造体1の施工方法について説明する。   Here, the construction method of the above concrete structures 1 is demonstrated.

図5は、この発明の第1の実施の形態によるコンクリート構造体の施工過程を示した概略工程図であり、図6は、図5に続くコンクリート構造体の施工過程と、その後のコンクリートブロックの設置過程とを示した概略工程図である。尚、これらの図は、先の図3に対応する部分について示したものである。   FIG. 5 is a schematic process diagram showing the construction process of the concrete structure according to the first embodiment of the present invention. FIG. 6 shows the construction process of the concrete structure following FIG. 5 and the subsequent concrete block. It is the schematic process drawing which showed the installation process. These drawings show the portions corresponding to the previous FIG.

まず、図5の(1)を参照して、転圧された砕石等の支持基盤3上におけるガイドレールの配置位置と対応する位置に、一対の高さ調整具10c及び10hを設置する。尚、同様にして、複数対の高さ調整具を先の図1に示した状態に整列するように設置する。   First, with reference to (1) of FIG. 5, a pair of height adjustment tools 10c and 10h are installed in the position corresponding to the arrangement position of the guide rail on the support base | substrates 3, such as a crushed crushed stone. Similarly, a plurality of pairs of height adjustment tools are installed so as to be aligned in the state shown in FIG.

次に、配置された高さ調整具10c及び10hの各々の上部に、一対のガイドレール5a及び5bの各々を仮置きする。これにより、高さ調整具10c及び10hを介してガイドレール5a及び5bが支持基盤3上に配置された状態となる。その後、配置された高さ調整手段10c及び10hの各々のターンバックル式ナットを回転させて、ガイドレール5a及び5bの上面の水平レベルを調整する。このとき、幅方向の一対の高さ調整具10c及び10hを操作して、ガイドレール5a及び5bの幅方向の水平レベルが一致するように調整すると共に、ガイドレール5a及び5bの軸方向に配置された他の複数対の高さ調整具を操作して、ガイドレール5a及び5bの各々が軸方向において所定の勾配となるように調整する。そして、ガイドレール5a及び5bの通りを確認した後、高さ調整具10c及び10hの上面と、ガイドレール5a及び5bの水平部分の下面とを溶接して固定する。   Next, each of the pair of guide rails 5a and 5b is temporarily placed on top of each of the arranged height adjusters 10c and 10h. Accordingly, the guide rails 5a and 5b are arranged on the support base 3 via the height adjusters 10c and 10h. Thereafter, the turnbuckle nuts of the arranged height adjusting means 10c and 10h are rotated to adjust the horizontal level of the upper surfaces of the guide rails 5a and 5b. At this time, the pair of height adjusting tools 10c and 10h in the width direction are operated to adjust the horizontal levels in the width direction of the guide rails 5a and 5b, and are arranged in the axial direction of the guide rails 5a and 5b. The other plural pairs of height adjusting tools are operated to adjust each of the guide rails 5a and 5b to have a predetermined gradient in the axial direction. Then, after confirming the way of the guide rails 5a and 5b, the upper surfaces of the height adjusters 10c and 10h and the lower surfaces of the horizontal portions of the guide rails 5a and 5b are fixed by welding.

次に、図5の(3)を参照して、ガイドレール5a及び5bの各々の側壁部に形成された図示しない開口を挿通させるようにして、横鉄筋18cを取り付ける。横鉄筋18cの取り付け後、図5の(4)に示されるように、横鉄筋18cとガイドレール5a及び5bとを溶接して、横鉄筋18cをガイドレール5a及び5bに固定する。   Next, with reference to (3) of FIG. 5, the horizontal rebar 18c is attached so that the opening which is not shown in figure formed in each side wall part of the guide rails 5a and 5b may be inserted. After the horizontal reinforcing bar 18c is attached, as shown in FIG. 5 (4), the horizontal reinforcing bar 18c and the guide rails 5a and 5b are welded to fix the horizontal reinforcing bar 18c to the guide rails 5a and 5b.

尚、ここではガイドレール5a及び5bと高さ調整具10c及び10hとを溶接した後に横鉄筋18cを取り付けているが、図5の(2)でレベル調整が完了したガイドレール5a及び5bに横鉄筋18を挿通させてから、横鉄筋18cと高さ調整具10c及び10hとをガイドレール5a及び5bに溶接して、図5の(4)の状態となるように施工しても良い。   In this case, the horizontal reinforcing bar 18c is attached after welding the guide rails 5a and 5b and the height adjusting tools 10c and 10h. However, the guide rails 5a and 5b whose level adjustment has been completed in FIG. After the reinforcing bar 18 is inserted, the horizontal reinforcing bar 18c and the height adjusting tools 10c and 10h may be welded to the guide rails 5a and 5b so that the state shown in (4) of FIG.

続いて、図6の(1)を参照して、横鉄筋18cの両端部の外方に型枠20a及び20bを組んだ後、ガイドレール5a及び5bの上面より下方部分と、横鉄筋18cと、高さ調整具10c及び10hとが埋め込まれるように、コンクリート19を打設する。コンクリート19の硬化後、型枠20a及び20bを取り外せば、コンクリート構造体1の施工が完了する。   Subsequently, referring to (1) of FIG. 6, after assembling the molds 20 a and 20 b outside the both ends of the horizontal reinforcing bar 18 c, a portion below the upper surfaces of the guide rails 5 a and 5 b, the horizontal reinforcing bar 18 c, The concrete 19 is placed so that the height adjusters 10c and 10h are embedded. After the concrete 19 is hardened, if the molds 20a and 20b are removed, the construction of the concrete structure 1 is completed.

次に、図6の(2)を参照して、上記のように形成されたコンクリート構造体1のガイドレール5a及び5b上に複数の硬球8を配置し、更に配置された複数の硬球8上に、ガイドレール5a及び5bの各々の上面と対向するように平板4a及び4bを設置する。そして、クレーン等を用いてボックスカルバート2を吊下げ、図6の(3)に示すように、平板4a及び4bの上面にボックスカルバート2を載置する。この状態において、複数の硬球8のベアリング効果によって、ボックスカルバート2をガイドレール5a及び5bの伸びる方向へとスムーズに移動させることが可能となる。   Next, referring to (2) of FIG. 6, a plurality of hard balls 8 are arranged on the guide rails 5a and 5b of the concrete structure 1 formed as described above, and further on the plurality of hard balls 8 arranged. The flat plates 4a and 4b are installed so as to face the upper surfaces of the guide rails 5a and 5b. Then, the box culvert 2 is suspended using a crane or the like, and the box culvert 2 is placed on the upper surfaces of the flat plates 4a and 4b as shown in FIG. In this state, the box culvert 2 can be smoothly moved in the extending direction of the guide rails 5a and 5b by the bearing effect of the plurality of hard balls 8.

ボックスカルバート2を所定位置まで移動させた後、図6の(4)に示すように、ボックスカルバート2の幅方向の外方側に型枠21a及び21bを組み立て、ガイドレール5a及び5bの上面より上方の部分と、平板4a及び4bと、ボックスカルバート2の下面部分とが埋め込まれるようにコンクリート22またはセメントミルク等を打設または充填する。そして、コンクリート22の硬化後に型枠21a及び21bを取り外すと、コンクリート構造体1と一体化した状態で、ボックスカルバート2の据え付けが完了する。   After the box culvert 2 is moved to a predetermined position, as shown in FIG. 6 (4), the mold frames 21a and 21b are assembled on the outer side in the width direction of the box culvert 2, and from the upper surfaces of the guide rails 5a and 5b. Concrete 22 or cement milk or the like is placed or filled so that the upper portion, the flat plates 4a and 4b, and the lower surface portion of the box culvert 2 are embedded. Then, when the molds 21 a and 21 b are removed after the concrete 22 is hardened, the installation of the box culvert 2 is completed in a state of being integrated with the concrete structure 1.

以上のような方法によれば、高さ調整具10c及び10hを介してガイドレール5a及び5bを配置した後に、ガイドレール5a及び5bの水平レベルが調整自在となるので、効率的なコンクリート構造体1の施工が可能となる。   According to the above method, the horizontal level of the guide rails 5a and 5b can be adjusted after the guide rails 5a and 5b are arranged via the height adjusters 10c and 10h. 1 construction is possible.

また、ガイドレール5a及び5bを利用して横鉄筋18cが取り付けられるため、有筋構造を有する強固なコンクリート構造体1を容易に形成することが可能となる。更に、横鉄筋18cによって、ガイドレール5a及び5bの間隔は一定に維持されているため、コンクリート19の打設時にガイドレール5a及び5bの配置がずれてしまうことが防止されている。   Moreover, since the horizontal reinforcing bar 18c is attached using the guide rails 5a and 5b, it is possible to easily form a strong concrete structure 1 having a barbed structure. Further, since the distance between the guide rails 5a and 5b is kept constant by the horizontal reinforcing bar 18c, the arrangement of the guide rails 5a and 5b is prevented from being shifted when the concrete 19 is placed.

更に、この実施の形態においては、高さ調整具10c及び10hの下端部分には、支持基盤3の上面に接した状態で配置される平板11が取り付けられている。これにより、図5の(1)の段階での高さ調整手段10c及び10hの配置が安定するため、図5の(2)の段階でガイドレール5a及び5bの設置がより一層容易となり、コンクリート構造体1の施工が更に効率的となる。   Furthermore, in this embodiment, the flat plate 11 arrange | positioned in the state which contact | connected the upper surface of the support base 3 is attached to the lower end part of the height adjustment tools 10c and 10h. As a result, the arrangement of the height adjusting means 10c and 10h at the stage (1) in FIG. 5 is stabilized, so that the guide rails 5a and 5b can be more easily installed at the stage (2) in FIG. Construction of the structure 1 becomes more efficient.

図7は、この発明の第2の実施の形態によるコンクリート構造体の概略構成を示した平面図であり、図8は、図7で示したVIII−VIIIラインの断面図であり、図9は、図8で示したIX−IXラインの拡大断面図である。   FIG. 7 is a plan view showing a schematic configuration of a concrete structure according to a second embodiment of the present invention, FIG. 8 is a cross-sectional view of the VIII-VIII line shown in FIG. 7, and FIG. FIG. 9 is an enlarged cross-sectional view of the IX-IX line shown in FIG. 8.

これらの図を参照して、この実施の形態によるコンクリート構造体1の基本的な構成は先の第1の実施の形態によるものと同様であるが、ガイドレール5a及び5bの形状と、縦鉄筋24a〜24cを更に備えている点とが先の第1の実施の形態とは異なっている。   Referring to these drawings, the basic structure of the concrete structure 1 according to this embodiment is the same as that according to the first embodiment, but the shape of the guide rails 5a and 5b, and the vertical reinforcing bars. The point which is further provided with 24a-24c differs from previous 1st Embodiment.

ガイドレール5aは、図9に示されるように、上面が平坦な水平部26と、水平部26の外方側の端縁から垂直上方に立ち上がる垂直部27とを有する断面L字型の水平部材9と、水平部26の内方側の端縁に溶接された丸棒25とから構成されている。垂直部27の水平部26の上面からの高さは、硬球8の直径と平板4aの厚さとの合計より大きく設定されているため、ボックスカルバート2及び平板4aの移動時におけるガイドとして機能する。一方、丸棒25の直径は硬球8の直径より小さく設定されているため、平板4aの図の右方向への大きさは制限されず、ボックスカルバート2の大きさに合わせて適切なサイズの平板4aを使用することができる。   As shown in FIG. 9, the guide rail 5 a is an L-shaped horizontal member having a horizontal portion 26 with a flat upper surface and a vertical portion 27 that rises vertically upward from an outer edge of the horizontal portion 26. 9 and a round bar 25 welded to the inner edge of the horizontal portion 26. Since the height of the vertical portion 27 from the upper surface of the horizontal portion 26 is set larger than the sum of the diameter of the hard sphere 8 and the thickness of the flat plate 4a, it functions as a guide when the box culvert 2 and the flat plate 4a move. On the other hand, since the diameter of the round bar 25 is set smaller than the diameter of the hard sphere 8, the size of the flat plate 4 a in the right direction in the drawing is not limited, and a flat plate having an appropriate size according to the size of the box culvert 2. 4a can be used.

また、ガイドレール5aはこのような断面L字型形状を有しているため、この実施の形態では横鉄筋18cは、ガイドレール5aの水平部26の下面に直接溶接されている。尚、他方のガイドレール5bは、ガイドレール5aと幅方向において左右対称に形成されており、その水平部の下面に同様にして横鉄筋18cが溶接されている。   Further, since the guide rail 5a has such an L-shaped cross section, in this embodiment, the horizontal reinforcing bar 18c is directly welded to the lower surface of the horizontal portion 26 of the guide rail 5a. The other guide rail 5b is formed symmetrically in the width direction with respect to the guide rail 5a, and a horizontal reinforcing bar 18c is welded to the lower surface of the horizontal portion in the same manner.

縦鉄筋24a〜24cは、例えば丸鋼や異型鉄筋等の金属材料よりなり、その軸方向がガイドレール5a及び5bの各々の軸方向とほぼ平行となるように配置され、横鉄筋18a〜18dの各々の下端部分に溶接によって固定されている。そして、これらの縦鉄筋24a〜24cもまた、他の部材と同様にコンクリート19に埋め込まれている。   The vertical reinforcing bars 24a to 24c are made of, for example, a metal material such as round steel or a deformed reinforcing bar, and are arranged so that the axial direction thereof is substantially parallel to the axial direction of each of the guide rails 5a and 5b. Each lower end portion is fixed by welding. And these vertical rebars 24a-24c are also embedded in the concrete 19 like other members.

尚、この実施の形態では、ガイドレール5a及び5bの形状に応じて、横鉄筋24a〜24cの各々を横鉄筋18a及び18dの各々の下端に取り付けているが、先の第1の実施の形態で示したように溝形鋼を中心に構成されたガイドレールの場合には、縦鉄筋の各々を横鉄筋の上部に配置して取り付けるのがより好ましい。   In this embodiment, the horizontal reinforcing bars 24a to 24c are attached to the lower ends of the horizontal reinforcing bars 18a and 18d according to the shapes of the guide rails 5a and 5b. In the case of the guide rail configured mainly with the channel steel as shown in Fig. 8, it is more preferable that each of the vertical reinforcing bars is arranged and attached to the upper part of the horizontal reinforcing bar.

この実施の形態では、コンクリート19が打設される部分に横鉄筋18a〜18dと縦鉄筋24a〜24cとが縦横に配置された有筋構造となるため、コンクリート構造体1の強度を更に向上させることが可能となる。また、施工するコンクリート構造体1の大きさや用途に応じて、横鉄筋及び縦鉄筋の数を増やして、これらの配置間隔を小さく設定すれば、更に強固なコンクリート構造体1を形成することができる。   In this embodiment, since it becomes the barbed structure by which the horizontal reinforcement 18a-18d and the vertical reinforcement 24a-24c are arrange | positioned vertically and horizontally in the part in which the concrete 19 is laid, the intensity | strength of the concrete structure 1 is improved further. It becomes possible. Further, if the number of horizontal reinforcing bars and vertical reinforcing bars is increased according to the size and use of the concrete structure 1 to be constructed, and the interval between these bars is set to be small, a stronger concrete structure 1 can be formed. .

尚、この実施の形態によるコンクリート構造体1の施工は、先の第1の実施の形態と同様の工程を経て取り付けられた横鉄筋18a〜18dに、ガイドレール5a及び5bの各々の軸方向と平行に配置された縦鉄筋24a〜24cを取り付ける工程を更に追加すれば良い。このような施工方法によれば、ガイドレール5a及び5bに取り付けられた横鉄筋18a〜18dを介して縦鉄筋24a〜24cが取り付けられるため、より強固な有筋構造のコンクリート構造体1を容易に形成することが可能となる。   In addition, the construction of the concrete structure 1 according to this embodiment is performed on each of the guide bars 5a and 5b in the axial direction of the horizontal reinforcing bars 18a to 18d attached through the same process as the first embodiment. What is necessary is just to add the process of attaching the vertical reinforcing bars 24a-24c arrange | positioned in parallel. According to such a construction method, since the vertical reinforcing bars 24a to 24c are attached via the horizontal reinforcing bars 18a to 18d attached to the guide rails 5a and 5b, the concrete structure 1 having a stronger reinforcing structure can be easily obtained. It becomes possible to form.

図10は、この発明の第3の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した平面図であり、図11は、図10で示したXI−XIラインの断面図である。   FIG. 10 is a plan view showing a schematic configuration of a guide rail and a height adjuster used in a concrete structure according to a third embodiment of the present invention, and FIG. 11 is an XI-XI shown in FIG. It is sectional drawing of a line.

これらの図を参照して、この実施の形態によるコンクリート構造体には、先の第1の実施の形態と同様のガイドレール5aが用いられるが、ガイドレール5aの幅方向の両側の部分にそれぞれ高さ調整具10a及び10bが配置されている点が、先の第1の実施の形態とは異なっている。   Referring to these drawings, the concrete structure according to this embodiment uses guide rails 5a similar to those of the first embodiment, but the guide rails 5a are respectively provided on both sides in the width direction. The point where the height adjusters 10a and 10b are arranged is different from that of the first embodiment.

ガイドレール5aには、水平部材9の側壁部28a及び28bに形成された開口30a及び30bを挿通した状態で、ガイドレール5aの幅より長い丸棒29が取り付けられている。そして、この丸棒29における側壁部28a及び28bより外方側の部分は、円筒形状の支持パイプ33a及び33bに挿通されている。   A round bar 29 longer than the width of the guide rail 5a is attached to the guide rail 5a in a state where the openings 30a and 30b formed in the side walls 28a and 28b of the horizontal member 9 are inserted. And the part of this round bar 29 outside the side walls 28a and 28b is inserted into cylindrical support pipes 33a and 33b.

この実施の形態による高さ調整具10aは、ターンバックル式ナット14を中心に構成され、その下方に平頭ボルト13がねじ込まれている点は、先の第1の実施の形態と同様であるが、その上方には全ネジボルト31がねじ込まれている点が異なっている。そして、全ネジボルト31の上方部分が、支持パイプ33aに接続された円筒形状の収納パイプ32aの内部に収納されて固定されている。また、他方の高さ調整具10bも同様に形成され、その全ネジボルトの上方部分が支持パイプ33bに接続された収納パイプ32bに収納されて固定されている。   The height adjuster 10a according to this embodiment is configured around a turnbuckle nut 14, and the flat head bolt 13 is screwed below the same, as in the first embodiment. Above this, all screw bolts 31 are screwed. And the upper part of all the screw volt | bolts 31 is accommodated in the inside of the cylindrical storage pipe 32a connected to the support pipe 33a, and is being fixed. The other height adjuster 10b is formed in the same manner, and the upper part of all the screw bolts is housed and fixed in the housing pipe 32b connected to the support pipe 33b.

そして、これらの高さ調整具10a及び10bの各々の下端は、平板11に例えば点溶接されて固定されている。これによって、ガイドレール5aと高さ調整具10a及び10bの位置関係が固定されるため、高さ調整具10a及び10bを介した支持基盤3上へのガイドレール5aの配置をより安定させることが可能となる。   And the lower end of each of these height adjusters 10a and 10b is fixed to the flat plate 11 by, for example, spot welding. As a result, the positional relationship between the guide rail 5a and the height adjusters 10a and 10b is fixed, so that the arrangement of the guide rail 5a on the support base 3 via the height adjusters 10a and 10b can be further stabilized. It becomes possible.

尚、ここでは一方のガイドレール5aについてのみ示したが、ガイドレール5aと幅方向において左右対称に形成される他方のガイドレールについても同様に、幅方向の両側に一対の高さ調整具がそれぞれ取り付けられている。   Although only one guide rail 5a is shown here, a pair of height adjusters are also provided on both sides in the width direction for the other guide rail formed symmetrically with the guide rail 5a in the width direction. It is attached.

このようにガイドレール5aの幅方向の両側に高さ調整具10a及び10bの各々が接続されていることにより、ガイドレール5aの幅方向の両端側の高さはそれぞれ独立に調整自在となる。したがって、一対のガイドレールの各々の幅方向の水平レベルを、より容易に且つ迅速に調整することが可能となる。尚、ガイドレール5aの軸方向の水平レベルも当然調整することが可能である。   Thus, by connecting the height adjusters 10a and 10b to both sides in the width direction of the guide rail 5a, the heights on both ends in the width direction of the guide rail 5a can be independently adjusted. Therefore, the horizontal level in the width direction of each of the pair of guide rails can be adjusted more easily and quickly. Of course, the horizontal level of the guide rail 5a in the axial direction can also be adjusted.

また、先の第1の実施の形態によるコンクリート構造体の施工方法において、この実施の形態のように、一対のガイドレールの各々の幅方向の両側に一対の高さ調整具を配置すれば、その後にガイドレールの各々の両側の高さが調整自在となるため、一対のレール手段の幅方向の水平レベルが更に容易に調整できる施工方法となる。この場合、支持基盤3の平坦度にかかわらず、ガイドレールの水平度を確保できるので、コンクリート構造体の施工がより容易となる。   Moreover, in the construction method of the concrete structure according to the previous first embodiment, as in this embodiment, if a pair of height adjusters are arranged on both sides in the width direction of each of the pair of guide rails, Since the heights on both sides of each of the guide rails can be adjusted thereafter, the construction method can more easily adjust the horizontal level in the width direction of the pair of rail means. In this case, since the level of the guide rail can be ensured regardless of the flatness of the support base 3, the concrete structure can be constructed more easily.

図12は、この発明の第4の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した断面図であって、先の第3の実施の形態の図11に対応する図である。   FIG. 12 is a cross-sectional view showing a schematic configuration of a guide rail and a height adjuster used in a concrete structure according to a fourth embodiment of the present invention, and is a diagram of the third embodiment shown in FIG. It is a figure corresponding to.

図を参照して、この実施の形態における高さ調整具10a及び10bは、先の第3の実施の形態におけるものと同様に、各々のターンバックル式ナットの上方に全ネジボルト31a及び31bの各々がねじ込まれている。そして、全ネジボルト31a及び31bの上端の外周壁部分と、ガイドレール5aの側壁部28a及び28bの外面の各々とが直接溶接されている。尚、高さ調整具10a及び10bの下端部分が平板11の上面に溶接されている点については、先の第3の実施の形態と同様である。   Referring to the drawing, the height adjusters 10a and 10b in this embodiment are similar to those in the third embodiment, and each of the full screw bolts 31a and 31b is placed above each turnbuckle nut. Is screwed. And the outer peripheral wall part of the upper end of all the screw volt | bolts 31a and 31b and each of the outer surface of the side wall parts 28a and 28b of the guide rail 5a are welded directly. It should be noted that the lower end portions of the height adjusters 10a and 10b are welded to the upper surface of the flat plate 11 as in the third embodiment.

この実施の形態においても、ガイドレール5aの幅方向の両側にそれぞれ高さ調整具10a及び10bが配置されているため、ガイドレール5aの軸方向の水平レベルのみならず、幅方向の水平レベルも容易に調整することが可能となる。   Also in this embodiment, since the height adjusters 10a and 10b are respectively disposed on both sides in the width direction of the guide rail 5a, not only the horizontal level in the axial direction of the guide rail 5a but also the horizontal level in the width direction is provided. It can be easily adjusted.

図13は、この発明の第5の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した断面図であって、先の第3の実施の形態の図11に対応する図である。   FIG. 13 is a cross-sectional view showing a schematic configuration of a guide rail and a height adjuster used in a concrete structure according to a fifth embodiment of the present invention, and FIG. 11 of the previous third embodiment. It is a figure corresponding to.

図を参照して、この実施の形態における高さ調整具10aは、先の第1の実施の形態におけるものと同様に、ターンバックル式ナット14と、その上方にねじ込まれた平頭ボルト12aと、その下方にねじ込まれた平頭ボルト13aとから構成されている。尚、他方の高さ調整具10bは、高さ調整具10aと同一形状に形成されている。そして、平頭ボルト12a及び12bの上面に、ガイドレール5aの側壁部28a及び28bの下端部分が直接溶接されている。   Referring to the drawing, the height adjuster 10a in this embodiment is similar to that in the first embodiment, and includes a turnbuckle nut 14 and a flat head bolt 12a screwed above the nut 14a. It consists of a flat head bolt 13a screwed below. The other height adjuster 10b is formed in the same shape as the height adjuster 10a. The lower end portions of the side wall portions 28a and 28b of the guide rail 5a are directly welded to the upper surfaces of the flat head bolts 12a and 12b.

この実施の形態においても、ガイドレール5aの幅方向の両側にそれぞれ高さ調整具10a及び10bが配置されているため、ガイドレール5aの軸方向の水平レベルのみならず、幅方向の水平レベルも容易に調整することが可能となる。   Also in this embodiment, since the height adjusters 10a and 10b are respectively disposed on both sides in the width direction of the guide rail 5a, not only the horizontal level in the axial direction of the guide rail 5a but also the horizontal level in the width direction is provided. It can be easily adjusted.

尚、上記の各実施の形態では、ボックスカルバートを移動させて据え付けるためのコンクリートの構造体に適用しているが、アーチカルバートや、貯水槽、ガレージ、L形擁壁、水路、側溝、擁壁ブロック等の他の形状のコンクリートブロックの設置基礎となるコンクリート構造体にも同様に適用できることは言うまでもない。   In each of the above embodiments, the box culvert is applied to a concrete structure for moving and installing, but an arch culvert, a water tank, a garage, an L-shaped retaining wall, a water channel, a gutter, and a retaining wall. Needless to say, the present invention can be similarly applied to a concrete structure as a foundation for installing concrete blocks of other shapes such as blocks.

また、上記の各実施の形態では、横部材である横鉄筋は、ガイドレールの軸方向と平面視において直交するように取り付けられているが、必ずしも直交方向である必要はなく、平面視において交差していれば良い。   Further, in each of the above-described embodiments, the horizontal reinforcing bar, which is a horizontal member, is attached so as to be orthogonal to the axial direction of the guide rail in a plan view, but is not necessarily in the orthogonal direction and intersects in a plan view. If you do.

更に、上記の各実施の形態では、ガイドレールの形状を特定しているが、硬球の上方に配置される平板及びコンクリートブロックの少なくとも一方をガイドできるものであれば、他の形状のガイドレールを使用しても良い。   Furthermore, in each of the above-described embodiments, the shape of the guide rail is specified. However, as long as at least one of a flat plate and a concrete block arranged above the hard sphere can be guided, guide rails of other shapes are used. May be used.

更に、上記の各実施の形態では、高さ調整具は平板を備えているが、必ずしも平板は必要なものではなく、なくても良い。また、幅方向の一対の高さ調整具や、ガイドレールの軸方向に整列する複数の高さ調整具を一枚の平板に一体的に接続しても良い。   Furthermore, in each said embodiment, although the height adjustment tool is provided with the flat plate, a flat plate is not necessarily required and does not need to be. Further, a pair of height adjusting tools in the width direction and a plurality of height adjusting tools aligned in the axial direction of the guide rail may be integrally connected to one flat plate.

更に、上記の各実施の形態では、ガイドレールは高さ調整具の上部に取り付けられているが、必ずしもこのように構成する必要はなく、高さ調整具の他の部分に取り付けても良い。また、必ずしもガイドレールと高さ調整具とを直接接続する必要はなく、例えば平板やL形鋼、溝形鋼等の部材を介してこれらを接続しても良い。   Further, in each of the above-described embodiments, the guide rail is attached to the upper portion of the height adjuster. However, the guide rail is not necessarily configured in this manner, and may be attached to other portions of the height adjuster. Moreover, it is not always necessary to directly connect the guide rail and the height adjuster. For example, they may be connected via a member such as a flat plate, L-shaped steel, or grooved steel.

更に、上記の各実施の形態においてコンクリート構造体を構成するための高さ調整具は、ターンバックル式ナットと一対のボルトとからなるが、必ずしもこのような高さ調整具を用いる必要はなく、ネジ機構によって軸方向の長さを増減できるものであれば、他の構造の高さ調整具を用いても良い。また、ガイドレールのレベル調整が容易になるという施工方法の利点の面では、必ずしもネジ機構に限らず、ガイドレールの配置後に上下方向の長さを増減することができる高さ調整具であれば良い。   Furthermore, although the height adjuster for configuring the concrete structure in each of the above embodiments includes a turnbuckle nut and a pair of bolts, it is not always necessary to use such a height adjuster. As long as the length in the axial direction can be increased or decreased by the screw mechanism, a height adjuster having another structure may be used. Moreover, in terms of the advantage of the construction method that the level adjustment of the guide rail becomes easy, the height adjustment tool is not necessarily limited to the screw mechanism, and any height adjustment tool that can increase or decrease the length in the vertical direction after the guide rail is arranged. good.

更に、上記の各実施の形態において、ガイドレールとして、その上面から下方に伸びる部材を備えた形状のものを使用し、当該下方に伸びる部材を介して横鉄筋や縦鉄筋を取り付けても良い。   Further, in each of the above embodiments, a guide rail having a shape having a member extending downward from the upper surface thereof may be used, and a horizontal reinforcing bar or a vertical reinforcing bar may be attached via the member extending downward.

更に、上記の各実施の形態において、更に捨コンクリートを打設し、これを支持基盤として高さ調整具を設置すれば、更に施工がしやすくなる。   Furthermore, in each of the above-described embodiments, further disposal can be performed, and if a height adjuster is installed using this as a support base, the construction becomes easier.

更に、上記の各実施の形態において、高さ調整具同志を接続するように、横鉄筋または縦鉄筋を取り付けても良い。   Furthermore, in each of the above-described embodiments, horizontal reinforcing bars or vertical reinforcing bars may be attached so as to connect the height adjusting tools.

更に、上記の第1及び第2の各実施の形態では、ガイドレール上に配置された硬球上に平板を介してコンクリートブロックが載置されているが、コンクリートブロックの形状や重量によっては、硬球上に直接コンクリートブロックを載置しても良い。   Furthermore, in each of the first and second embodiments, the concrete block is placed on the hard ball disposed on the guide rail via a flat plate. Depending on the shape and weight of the concrete block, the hard ball A concrete block may be placed directly on the top.

更に、上記の第3から第5の各実施の形態では、ガイドレールと高さ調整具のみを示したが、上記の第1及び第2の実施の形態と同様にして、横鉄筋及び縦鉄筋を取り付けると共に、コンクリートを打設すれば良い。   Further, in each of the third to fifth embodiments, only the guide rail and the height adjusting tool are shown. However, in the same manner as in the first and second embodiments, the horizontal reinforcing bar and the vertical reinforcing bar are used. You can install concrete and cast concrete.

更に、上記の第1の実施の形態では、ガイドレールの下方部分に形成された開口を挿通させた状態で横鉄筋を取り付けているが、必ずしもこのように構成する必要はなく、直接ガイドレールの下方部分に固定しても良い。   Furthermore, in the first embodiment described above, the horizontal reinforcing bar is attached in a state where the opening formed in the lower portion of the guide rail is inserted. You may fix to a lower part.

更に、上記の第1の実施の形態による施工方法では、支持基盤上に高さ調整具を設置してからガイドレールを配置しているが、予め高さ調整具を一体的に取り付けたガイドレールを支持基盤上に配置しても良い。   Furthermore, in the construction method according to the first embodiment, the guide rail is disposed after the height adjuster is installed on the support base. However, the guide rail in which the height adjuster is integrally attached in advance. May be disposed on the support base.

更に、上記の第3の実施の形態において、ガイドレールと一対の高さ調整具とを接続するように取り付けられている丸棒の長さを更に長くして、横鉄筋として使用しても良い。   Furthermore, in the third embodiment, the length of the round bar attached to connect the guide rail and the pair of height adjusters may be further increased and used as a horizontal reinforcing bar. .

この発明の第1の実施の形態によるコンクリート構造体の概略構成を示した平面図である。It is the top view which showed schematic structure of the concrete structure by 1st Embodiment of this invention. 図1で示したII−IIラインから見た図である。It is the figure seen from the II-II line shown in FIG. 図2で示したIII−IIIラインの断面図である。It is sectional drawing of the III-III line shown in FIG. 図3で示した”Y”部分の拡大図である。FIG. 4 is an enlarged view of a “Y” portion shown in FIG. 3. この発明の第1の実施の形態によるコンクリート構造体の施工過程を示した概略工程図である。It is the schematic process drawing which showed the construction process of the concrete structure by 1st Embodiment of this invention. 図5に続くコンクリート構造体の施工過程と、その後のコンクリートブロックの設置過程とを示した概略工程図である。FIG. 6 is a schematic process diagram showing a concrete structure construction process following FIG. 5 and a concrete block installation process thereafter. この発明の第2の実施の形態によるコンクリート構造体の概略構成を示した平面図である。It is the top view which showed schematic structure of the concrete structure by 2nd Embodiment of this invention. 図7で示したVIII−VIIIラインの断面図である。It is sectional drawing of the VIII-VIII line shown in FIG. 図8で示したIX−IXラインの拡大断面図である。It is an expanded sectional view of the IX-IX line shown in FIG. この発明の第3の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した平面図である。It is the top view which showed schematic structure of the guide rail used for the concrete structure by the 3rd Embodiment of this invention, and a height adjustment tool. 図10で示したXI−XIラインの断面図である。It is sectional drawing of the XI-XI line shown in FIG. この発明の第4の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した断面図である。It is sectional drawing which showed schematic structure of the guide rail used for the concrete structure by 4th Embodiment of this invention, and a height adjuster. この発明の第5の実施の形態によるコンクリート構造体に用いられるガイドレール及び高さ調整具の概略構成を示した断面図である。It is sectional drawing which showed schematic structure of the guide rail and height adjustment tool which are used for the concrete structure by 5th Embodiment of this invention. 従来のコンクリート構造体の概略構成を示した平面図である。It is the top view which showed schematic structure of the conventional concrete structure. 図14で示したXV−XVラインから見た図である。It is the figure seen from the XV-XV line shown in FIG. 図15で示したXVI−XVIラインの断面図である。It is sectional drawing of the XVI-XVI line shown in FIG. 図16で示した”Z”部分の拡大図である。FIG. 17 is an enlarged view of a “Z” portion shown in FIG. 16. 従来の基礎コンクリートの施工過程を示した概略工程図である。It is the schematic process figure which showed the construction process of the conventional foundation concrete.

符号の説明Explanation of symbols

1…コンクリート構造体
2…ボックスカルバート
3…支持基盤
5…ガイドレール
8…硬球
10…高さ調整具
11…平板
18…横鉄筋
19…コンクリート
24…縦鉄筋
尚、各図中同一符号は同一または相当部分を示す。
DESCRIPTION OF SYMBOLS 1 ... Concrete structure 2 ... Box culvert 3 ... Support base 5 ... Guide rail 8 ... Hard ball 10 ... Height adjuster 11 ... Flat plate 18 ... Horizontal reinforcement 19 ... Concrete 24 ... Vertical reinforcement In addition, the same code | symbol in each figure is the same or The corresponding part is shown.

Claims (6)

支持基盤上に形成され、その上部に複数の硬球を介してコンクリートブロックを設置するためのコンクリート構造体であって、
前記支持基盤上に設置され、ネジ機構によってその軸方向の長さを増減することができる少なくとも一対の高さ調整手段と、
金属材料よりなり、各々の軸方向がほぼ平行に位置すると共に前記高さ調整手段の各々に取り付けられ、各々の上面に前記硬球が配置される一対のレール手段と、
金属材料よりなり、その軸方向が前記レール手段の各々の軸方向と平面視において交差するように、前記レール手段の各々の前記上面より下方の部分に取り付けられる少なくとも1つの横部材と、
前記レール手段の前記上面より下方の部分と、前記横部材と、前記高さ調整手段とが埋め込まれるように打設されたコンクリートとを備え、
前記高さ調整手段は、
前記レール手段の各々の幅方向に前記レール手段の幅より長く配置され、前記レール手段を支持する部材と、
前記部材の下部であって前記レール手段の外方側における両側の部分に固定された一対の高さ調整具と、
前記高さ調整具の下部が固定された1枚の平板とを含む、コンクリート構造体。
A concrete structure formed on a support base and for installing a concrete block via a plurality of hard balls on the upper part,
At least a pair of height adjusting means installed on the support base and capable of increasing / decreasing its axial length by a screw mechanism;
A pair of rail means made of a metal material, each axial direction being positioned substantially parallel and attached to each of the height adjusting means, and the hard sphere being disposed on each upper surface;
At least one cross member made of a metal material and attached to a portion below each upper surface of each of the rail means so that its axial direction intersects with each axial direction of the rail means in plan view;
A portion below the upper surface of the rail means, the transverse member, and concrete placed so that the height adjusting means is embedded,
The height adjusting means is
A member that is longer than the width of the rail means in the width direction of each of the rail means, and that supports the rail means;
A pair of height adjusters fixed to both side portions on the outer side of the rail means at the bottom of the member;
A concrete structure including a flat plate to which a lower portion of the height adjuster is fixed.
前記高さ調整手段は、前記レール手段の各々の軸方向に複数配置される、請求項1記載のコンクリート構造体。 The concrete structure according to claim 1, wherein a plurality of the height adjusting means are arranged in the axial direction of each of the rail means. 前記横部材は、その軸方向が前記レール手段の各々の軸方向と平面視においてほぼ直交するように複数取り付けられ、
金属材料よりなり、前記レール手段の各々の軸方向とほぼ平行に配置され、前記横部材の各々に取り付けられた少なくとも1つの縦部材を更に備え、
前記縦部材は前記コンクリートによって埋め込まれる、請求項1又は請求項2記載のコンクリート構造体。
A plurality of the lateral members are attached such that the axial direction thereof is substantially orthogonal to the axial direction of each of the rail means in plan view,
Further comprising at least one longitudinal member made of a metallic material, disposed substantially parallel to the axial direction of each of the rail means and attached to each of the transverse members;
The concrete structure according to claim 1, wherein the longitudinal member is embedded with the concrete.
支持基盤上に形成され、複数の硬球を介してコンクリートブロックを設置するためのコンクリート構造体の施工方法であって、
その上面に前記硬球が配置されるレール手段を、上下方向の長さを増減することができる少なくとも1つの高さ調整手段を介して、前記支持基盤上に配置する第1工程と、
前記配置された高さ調整手段を操作して、前記レール手段の前記上面の水平レベルを調整する第2工程と、
前記調整されたレール手段の前記上面より下方の部分と前記高さ調整手段とが埋め込まれるようにコンクリートを打設する第3工程とを備え、
前記高さ調整手段は、
前記レール手段の各々の幅方向に前記レール手段の幅より長く配置され、前記レール手段を支持する部材と、
前記部材の下部であって前記レール手段の外方側における両側の部分に固定された一対の高さ調整具と、
前記高さ調整具の下部が固定されると共に、前記支持基盤に接するように配置された1枚の平板とを含む、コンクリート構造体の施工方法。
A method of constructing a concrete structure for forming a concrete block formed on a support base via a plurality of hard balls,
A first step of arranging rail means on which the hard sphere is arranged on the support base via at least one height adjusting means capable of increasing or decreasing the length in the vertical direction;
A second step of adjusting the horizontal level of the upper surface of the rail means by operating the arranged height adjusting means;
A third step of placing concrete so that a portion below the upper surface of the adjusted rail means and the height adjusting means are embedded;
The height adjusting means is
A member that is longer than the width of the rail means in the width direction of each of the rail means, and that supports the rail means;
A pair of height adjusters fixed to both side portions on the outer side of the rail means at the bottom of the member;
A method for constructing a concrete structure, comprising: a lower plate fixed to the height adjustment tool; and a single flat plate arranged in contact with the support base.
前記第1工程は、前記高さ調整手段を所定間隔を開けて少なくとも一対配置する工程と、前記レール手段を各々の軸方向がほぼ平行となるように一対配置し、各々を前記高さ調整手段の各々の上部に取り付ける工程とを含み、
前記第2工程は、前記レール手段の各々と平面視において交差するように、前記レール手段の各々の上面より下方の部分に少なくとも1つの横部材を取り付ける工程を含む、請求項4記載のコンクリート構造体の施工方法。
The first step includes a step of arranging at least a pair of the height adjusting means at a predetermined interval, a pair of the rail means so that their axial directions are substantially parallel, and each of the height adjusting means. Attaching to the top of each of the
5. The concrete structure according to claim 4, wherein the second step includes a step of attaching at least one cross member to a portion below the upper surface of each of the rail means so as to intersect with each of the rail means in a plan view. Body construction method.
前記横部材は複数取り付けられ、
前記第2工程は、その軸方向が前記レール手段の各々の軸方向と平行となるように配置され、前記取り付けられた横部材の各々と平面視において交差するように、前記横部材の各々に少なくとも1つの縦部材を取り付ける工程を更に含む、請求項5記載のコンクリート構造体の施工方法。
A plurality of the transverse members are attached,
In the second step, each of the transverse members is arranged so that the axial direction thereof is parallel to the axial direction of each of the rail means, and intersects each of the attached transverse members in plan view. The method for constructing a concrete structure according to claim 5, further comprising a step of attaching at least one longitudinal member.
JP2004362137A 2004-12-15 2004-12-15 Concrete structure and construction method thereof Expired - Fee Related JP4536503B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004362137A JP4536503B2 (en) 2004-12-15 2004-12-15 Concrete structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004362137A JP4536503B2 (en) 2004-12-15 2004-12-15 Concrete structure and construction method thereof

Publications (2)

Publication Number Publication Date
JP2006169779A JP2006169779A (en) 2006-06-29
JP4536503B2 true JP4536503B2 (en) 2010-09-01

Family

ID=36670822

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004362137A Expired - Fee Related JP4536503B2 (en) 2004-12-15 2004-12-15 Concrete structure and construction method thereof

Country Status (1)

Country Link
JP (1) JP4536503B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009002026A (en) * 2007-06-21 2009-01-08 Tomokazu Okuda Height regulating tool
JP6120403B2 (en) * 2013-05-01 2017-04-26 株式会社Build Life Material lock silencer

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2517822B2 (en) * 1992-08-06 1996-07-24 ミサワホーム株式会社 Precast concrete basics
JP2000073380A (en) * 1998-09-02 2000-03-07 Misawa Homes Co Ltd Bar arrangement for mat foundation work execution, bar arrangement structure of mat foundation work execution, and work execution method of the mat foundation
JP3598071B2 (en) * 2001-03-19 2004-12-08 智一 奥田 Concrete block installation method and installation equipment
JP2004232305A (en) * 2003-01-29 2004-08-19 Nippon Yusoki Co Ltd Bolster laying structure of hollow rail
JP3854280B2 (en) * 2004-04-07 2006-12-06 智一 奥田 Concrete block installation equipment

Also Published As

Publication number Publication date
JP2006169779A (en) 2006-06-29

Similar Documents

Publication Publication Date Title
CN102016195B (en) Grid type supporting plate structure and its construction method
KR101866466B1 (en) Bridge structure comprising cantilever type stay-in-place panel
KR102144400B1 (en) Psc girder for precast slab and construction method thereof
KR101302520B1 (en) Constuction structure of rc wall
KR20160039855A (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
US20150027076A1 (en) Sleeve Device For Increasing Shear Capacity
KR102319792B1 (en) 2-way precast pannel and structure construction method using the same
JP6644600B2 (en) Integrated foundation and integrated foundation method
JP4536503B2 (en) Concrete structure and construction method thereof
JP2006322215A (en) Equipment foundation
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
JP7554660B2 (en) How to build a foundation beam
KR200414349Y1 (en) Connection structure of precast concrete structure
KR101298399B1 (en) Support for a upper reinforcing bar of footings
KR102002429B1 (en) Sandwich precast concrete wall and construction method using the same
JP2003239435A (en) Reinforced-concrete void slab structure and its building method
CN105908705B (en) Prefabricated pretensioned prestressed underground diaphragm wall and construction method thereof
KR20200019807A (en) Inverse Tee PSC Girder Prefabricated With Top Saddle PC blocks And Slab Construction Method Using Thereof
KR20160000005A (en) reinforcing expansion joint for wide concrete slab by using steel plate and reinforcing method of construction using the same for wide concrete slab
KR20190131213A (en) Bridge construction method using manufactured pc slab
JP7264690B2 (en) METHOD FOR MANUFACTURING CONCRETE WALL STRUCTURE AND BUILDING STRUCTURE
KR100837831B1 (en) Unsupported retro-casting system for underground construction
KR102016133B1 (en) Variable Shape Form for Concrete Girder, and Manufacturing Method of Concrete Girder using such Form
KR20110006225U (en) Combination reinforcement
KR20210128110A (en) Precast slab using 2-way grid reinforcing member and structure construction method using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100107

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100608

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100616

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130625

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4536503

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees