JP4560955B2 - Failure diagnosis device for evaporative fuel treatment equipment - Google Patents
[go: Go Back, main page]

JP4560955B2 - Failure diagnosis device for evaporative fuel treatment equipment - Google Patents

Failure diagnosis device for evaporative fuel treatment equipment Download PDF

Info

Publication number
JP4560955B2
JP4560955B2 JP2000379899A JP2000379899A JP4560955B2 JP 4560955 B2 JP4560955 B2 JP 4560955B2 JP 2000379899 A JP2000379899 A JP 2000379899A JP 2000379899 A JP2000379899 A JP 2000379899A JP 4560955 B2 JP4560955 B2 JP 4560955B2
Authority
JP
Japan
Prior art keywords
diagnosis
time
diagnostic
evaporative fuel
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000379899A
Other languages
Japanese (ja)
Other versions
JP2002180917A (en
Inventor
真悟 鴫浜
猛 川嶋
勝彦 坂本
成治 牧本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mazda Motor Corp
Original Assignee
Mazda Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mazda Motor Corp filed Critical Mazda Motor Corp
Priority to JP2000379899A priority Critical patent/JP4560955B2/en
Publication of JP2002180917A publication Critical patent/JP2002180917A/en
Application granted granted Critical
Publication of JP4560955B2 publication Critical patent/JP4560955B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Engines (AREA)
  • Supplying Secondary Fuel Or The Like To Fuel, Air Or Fuel-Air Mixtures (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、内燃機関の蒸発燃料を処理する装置の異常を診断する故障診断装置に関する技術分野に属する。
【0002】
【従来の技術】
近年、自然環境の保護に寄与する技術が重要視されており、例えば、内燃機関を有する自動車等については、燃料タンク等で発生する蒸発燃料が大気中へ放出されないようにして大気の汚染を防止する技術が必要不可欠である。この技術として、従来より、例えば特開平5−215020号公報に示されるような内燃機関の蒸発燃料処理装置が知られている。
【0003】
このものでは、燃料タンク等で発生する蒸発燃料をキャニスタに一時的に吸着し、この吸着した蒸発燃料を所定の機関運転条件でキャニスタから離脱させてパージ用空気と混合させ、このパージ混合気をパージ制御弁で流量制御しつつ機関の吸気系へ吸引処理することによって、蒸発燃料の大気への蒸散を防止するようにしている。
【0004】
ところで、上記装置では、万一、蒸発燃料配管の途中に亀裂が生じたり、蒸発燃料配管の接合部にシール不良が生じたりすると、前記リーク部分から蒸発燃料が大気中に放散されることになってしまい、本来の放散防止効果を十分に発揮させることができなくなる。
【0005】
そこで、従来、このような蒸発燃料のリークの有無を診断(以降、リーク診断とも称する)する故障診断装置が種々提案されており、その1つとして、機関運転停止後に密閉された蒸発燃料供給系内を加圧したときの系内の圧力変化に基づいてリークの有無を診断する方式が知られている。この方式は、例えば電動ポンプから基準口径を有する基準オリフィスを経由させて空気を圧送したときの電動ポンプの駆動電流に基づいて判定レベルを設定した後、基準オリフィスをバイパスして前記蒸発燃料処理装置のリーク診断対象となる配管に電動ポンプにより空気を圧送したときの電動ポンプの駆動電流を前記設定された判定レベルと比較することによって、蒸発燃料のリークの有無を診断するものである。具体的には、前記駆動電流が判定レベルより小さいときに蒸発燃料のリークを生じていると診断する。即ち、前記基準オリフィス相当の孔を生じたときのリーク量より大きなリーク量が発生すると、空気の圧送負荷の減少により電動ポンプの駆動電流が判定レベルより減少するので、この判定レベルとの比較でリークの有無を診断できる。
【0006】
【発明が解決しようとする課題】
ところで、例えば蒸発燃料供給装置を製造する場合において、その蒸発燃料供給装置は、既に検査されて異常がないことが確認されている複数の構成部品を組み付けることにより製造されているので、製造後の検査工程ではその組み付け時の欠陥の有無が検査できれば十分であり、厳格な検査は必要ではない。
【0007】
しかし、このような検査の場合にも、その他の通常の場合と同じ故障診断装置によって高精度にリークの有無の診断を実行した場合、その診断に比較的長い時間を要し、また診断を実行するために比較的厳しい条件を要することになり、故障診断の作業性を効率化することが困難となる。さらに、蒸発燃料供給装置を製造するときにその生産性を向上させることが難しい。
【0008】
本発明は斯かる諸点に鑑みてなされたものであり、その主たる目的とするところは、上記の如き蒸発燃料供給装置の故障診断装置について、その装置構成を改良することによって、故障診断の作業性を効率化することにある。
【0009】
【課題を解決するための手段】
上記の目的を達成するために、この発明では、検査工程であることが検出されたときに、所定の診断条件を変更するようにした。
【0010】
具体的には、請求項1の発明では、所定の診断条件が成立したときに燃料タンクから燃料タンク及び内燃機関の間に設けられたパージ弁へ至る蒸発燃料供給系を加圧する加圧手段と、上記加圧手段により蒸発燃料供給系を加圧したときに、該加圧手段による加圧時間及び蒸発燃料供給系からの蒸発燃料のリークの有無により変化する診断パラメータに基づいて蒸発燃料供給系の異常状態を診断する診断手段と、上記蒸発燃料供給系の異常状態を検査する検査工程であることを検出する検出手段と、上記検出手段により検査工程であることが検出されたときには、上記所定の診断条件を変更する診断条件変更手段とを備える。
【0011】
上記の構成により、検査工程では診断条件を緩和して、従来では診断しない条件下においても診断するので、検査の作業性を効率化して、蒸発燃料供給装置の生産性を向上させることができる。
【0012】
請求項の発明では、請求項の蒸発燃料処理装置の故障診断装置において、診断条件には内燃機関が運転停止状態であることが含まれており、診断条件変更手段は、上記診断条件を内燃機関が運転状態であることをも含むように変更するものとする。また、請求項の発明では、上記診断条件変更手段により変更される診断条件である内燃機関の運転状態は、アイドル運転状態であることとする。
【0013】
ところで、車両の蒸発燃料供給装置は、その製造時の検査工程の前後の工程において内燃機関が運転状態とされるが、その故障診断の診断条件は内燃機関が運転停止状態であることとしているため、検査工程においては内燃機関を運転停止状態にしなければならない。
【0014】
しかし、上述したように、検査工程では、使用に伴って発生するリークの有無を診断する場合のように厳格なリーク診断は必要ではない。そこで、上記本発明の構成により、検査工程においても内燃機関が運転状態とするので、検査工程とその前後の工程との間の移行をそれぞれスムーズにして、製造工程における作業効率及び生産性を向上させることができる。
【0015】
請求項の発明では、上記加圧手段は電動ポンプであって、診断パラメータは上記電動ポンプの電流値又は回転数の少なくとも1つであることを特徴とする。また、請求項の発明では、上記診断パラメータは燃料タンク内の圧力であることを特徴とする。
【0016】
これら請求項及びの発明により、望ましい診断パラメータを具体的に得ることができる。
【0017】
【発明の実施の形態】
(実施形態1)
以下、本発明の実施形態1を図面に基づいて説明する。図1は、内燃機関に設けられる蒸発燃料処理装置及びその故障診断装置の概略を模式的に示している。
【0018】
2はガソリン等の燃料が貯留される燃料タンクであり、蒸発燃料処理装置は、燃料タンク2内で発生した燃料の蒸発燃料を蒸発燃料導入通路6を介して吸着手段としてのキャニスタ4内に充填された活性炭などの吸着剤に吸着捕集させ、この吸着剤に吸着された燃料をパージ通路7を介してスロットル弁(図示省略)下流側の吸気通路(図示省略)に供給するように構成されている。
【0019】
そして、パージ通路7には、マイクロコンピュータ内蔵のコントロールユニット8からの制御信号に基づいて制御される電磁駆動式のパージ制御弁5が介装されている。また、蒸発燃料処理装置における蒸発燃料のリークの有無を診断するリーク診断のため、以下のような配管システムが構成される。即ち、キャニスタ4底部に開口されたの空気導入口に、第1通路11の一端が接続され、他端が切換バルブ15を介して第2〜4通路12,13,14に分岐接続されている。そして、この第2通路12及び第3通路13は再び合流してエアフィルタ17が介装されたエア導入通路18に連通している。また、燃料タンク2からこの燃料タンク2及び内燃機関の間に設けられた上述のパージ制御弁5へ至る蒸発燃料供給系と後述の電動ポンプ20との間の第2通路12には基準口径例えば0.5mm口径を有する基準オリフィス16が介装された第4通路14の一端が接続されており、他端が上記のように切換バルブ15に接続されている。
【0020】
切換バルブ15は、コントロールユニット8からの制御信号に基づいて制御される電磁駆動式のバルブであり、バルブの開状態で第2通路12を閉鎖して第1通路11、第3通路13及び第4通路14を連通状態とする一方、閉状態で第3通路13を閉鎖して第1通路11、第2通路12及び第4通路14を連通状態とするようになされている。
【0021】
さらに第2通路12における第4通路14との接続部よりもエアフィルタ17側にはモータにより作動する電動ポンプ20が介装されている。この電動ポンプ20はコントロールユニット8からの制御信号に基づいて制御されて、エアフィルタ17及びエア導入通路18を介して導入された外気を第2通路12を介して切換バルブ15側へ送るようになされており、所定の診断条件が成立したときに蒸発燃料供給系を加圧するように構成されている。
【0022】
また、図示は省略するが、機関回転速度を検出する回転速度センサ、水温を検出する水温センサ、排気中の酸素濃度等に基づいて空燃比を検出する空燃比センサなどが設けられ、コントロールユニット8は、これらの各種センサからの信号に基づいて、燃料噴射弁(図示省略)による燃料噴射量を制御することによる空燃比フィードバック制御を行うと共に、所定の運転条件でパージ制御弁5を制御することにより蒸発燃料を吸気系にパージする処理を行う。
【0023】
そして、本発明の故障診断装置は、所定のリーク診断実行条件が成立したときに蒸発燃料供給系を加圧する上述の電動ポンプ20と、この電動ポンプ20により蒸発燃料供給系を加圧したときに、その電動ポンプ20による加圧時間及び蒸発燃料供給系からの蒸発燃料のリークの有無により変化する診断パラメータに基づいて蒸発燃料供給系の異常状態を診断する診断手段とを備えている。
【0024】
具体的には、診断パラメータは、所定の時間における電動ポンプ20の負荷電流値Imと蒸発燃料系の加圧開始時における電動ポンプ20の負荷電流値である負荷電流初期値Ioとの差Im−Ioとする。そして、診断手段は、コントロールユニット8及び電動ポンプ20等から構成されている。
【0025】
そして、診断手段は、診断パラメータIm−Ioと、電動ポンプ20によりこの電動ポンプ20から基準オリフィス16へ至る系を加圧して得られる基準パラメータとを比較することによって蒸発燃料供給系の異常状態を診断するように構成されている。ここで、基準パラメータは、その電動ポンプ20から基準オリフィス16へ至る系を所定時間加圧したときの電動ポンプ20の負荷電流値Irefに所定値を乗算して得られる電流値Is1とする。
【0026】
また、リーク診断実行条件は、内燃機関が運転停止状態であることという条件を含んでおり、その他に例えば、外気温が所定の温度範囲内にあること、タンク内の燃料残量が所定の範囲内にあること等の条件を含んでいる。
【0027】
さらに、本実施形態の故障診断装置は、蒸発燃料供給系の異常状態を検査する検査工程であることを検出する検出手段と、この検出手段により検査工程であることが検出されたときには、電動ポンプ20による加圧開始から診断手段による診断終了までの加圧診断時間を短縮する時間短縮手段とを備えている。
【0028】
ここで、検出手段はコントロールユニット8等からなり、外部のテスタから出力されて検査工程であることを知らせるテスタコマンドが入力されることにより、検査工程を検出している。
【0029】
また、時間短縮手段は、具体的には、コントロールユニット8等からなり、検査工程であることを検出したときには、電動ポンプ20から基準オリフィス16へ至る系に対する電動ポンプ20による加圧開始から加圧終了までの加圧時間と、電動ポンプ20による蒸発燃料供給系に対する加圧開始から診断手段による診断終了までの診断時間とを短縮するように構成されている。すなわち、本実施形態では、上記加圧診断時間は、加圧時間及び診断時間の合計時間となっている。
【0030】
さらに、故障診断装置は、検出手段により検査工程であることが検出されたときには、リーク診断実行条件を、内燃機関がアイドル運転状態であることをも含むように変更する診断条件変更手段を備えており、この診断条件変更手段はコントロールユニット8及び内燃機関の運転状態を検出する例えばクランク角センサ25等から構成される。すなわち、故障診断装置は、内燃機関がアイドル運転状態である場合、検査工程以外の通常時であるときにはリーク診断を禁止する一方、検査工程であるときにはリーク診断を行うようになされている。
【0031】
次に、コントロールユニット8による蒸発燃料のリーク診断ルーチンを図2のフローチャート及び図3のタイムチャートを参照して説明する。図2のステップS1では、燃料タンク2内の燃料の残量ftlや機関の回転速度及び車速等の車両状態を検出する。
【0032】
その後、ステップS2へ進んで、車両が例えば車両を製造する製造工程にあって、その製造工程のうちの蒸発燃料供給系の異常状態を検査する検査工程にあるかどうかを判断する。このとき、車載されたコントロールユニット8と例えば製造ライン等に設けられた外部のテスタとが通信して、テスタから出力されるテスタコマンドをコントロールユニット8に入力されることによって検査工程を検出している。そして、検査工程でないと判断されたときは、ステップS3へ進む。
【0033】
ステップS3では、所定のリーク診断実行条件が成立しているかどうかを判断する。リーク診断実行条件は、内燃機関が運転停止状態であることという条件を含んでおり、内燃機関が運転状態であることが検出されたときは、リーク診断実行条件が成立していないと判断されてリーク診断を実行せずに処理を終了する。一方、内燃機関の運転停止状態が検出されかつその他の条件の満足が検出されたときは、リーク診断実行条件が成立していると判断されて通常のリーク診断を実行する。
【0034】
ここで、通常のリーク診断の一例を図1及び図3(a)を参照して以下に説明する。まず、図1に示す切換バルブ15を開状態として所定の加圧時間だけ電動ポンプ20により加圧して、そのときの電動ポンプ20の負荷電流しきい値Irefを検出する。その後、切換バルブ15を閉状態として電動ポンプ20の負荷電流初期値Ioを検出する。
【0035】
そして、故障判定タイマTmのタイマ値を増加させつつ、そのタイマ値がT(1)になったときに、そのときの電動ポンプ20の負荷電流値Imと負荷電流初期値Ioとの差である診断パラメータIm−Ioが、比較的大きなリークが生じていると判断するしきい値であるfA(ftl,Iref−Io)よりも大きいかどうかを判断する。
【0036】
このとき、診断パラメータIm−Ioが、しきい値fA(ftl,Iref−Io)よりも小さいときには、故障判定タイマ値Tmのタイマ値を増加させて、そのタイマ値がT(2)になったときに、そのときの診断パラメータIm−Ioが、径が1.0mm程度の孔が存在する場合に相当するリークが生じていると判断するしきい値であるfB(ftl,Iref−Io)よりも大きいかどうかを判断する。このとき、診断パラメータIm−Ioが、しきい値fB(ftl,Iref−Io)以下であるときには、蒸発燃料供給系に大きなリークが有るとの判定をして処理を終了する。尚、このしきい値fA(ftl,Iref−Io)及びfB(ftl,Iref−Io)は、それぞれ燃料タンク内の燃料残量ftlと、負荷電流しきい値Iref及び負荷電流初期値Ioの差とに基づいて決定される。
【0037】
一方、図2のステップS2において検査工程であると判断されたときは、ステップS5へ移行する。ステップS5では、診断条件変更手段によりリーク診断実行条件を変更して、リーク診断実行条件を、内燃機関がアイドル運転状態であることをも含むようにする。
【0038】
引き続いて、ステップS6において、そのリーク診断実行条件が成立しているかどうかを判断する。尚、このとき、リーク診断実行条件は変更されているので、内燃機関がアイドル運転状態であっても、その他の条件を満足しているときには、リーク診断実行条件が成立していると判断される。そして、このステップS6でその診断条件が成立していないと判断されたときは、リーク診断を実行せずに処理を終了する。一方、診断条件が成立していると判断されたときは、ステップS7へ移行する。
【0039】
ステップS7では、故障判定タイマTmの値をリセットして0に設定する。引き続きステップS8において、コントロールユニット8により電動ポンプ20を作動させてON状態とし、さらにステップS9において切換バルブ15を開状態とし、電動ポンプ20から空気を基準オリフィス16へ圧送して、そのときの電動ポンプ20の負荷電流しきい値Irefを測定する。
【0040】
ところで、電動ポンプ20によるこの電動ポンプ20から基準オリフィス16へ至る系の圧力及び電動ポンプ20の負荷電流値が略一定である定常状態とするためには、その系の加圧開始から加圧終了までの加圧時間として所定時間Toが必要であるので、検査工程以外の通常時のリーク診断処理の場合は、その所定時間Toだけその系を加圧して負荷電流しきい値Irefを計測するようにしている。
【0041】
これに対して本発明では、時間短縮手段によりその系に対する電動ポンプ20による加圧時間を短縮するようにしている。すなわち、図3(a)及び(b)に示すように、加圧時間を所定時間Toよりも時間ΔTだけ短い時間To′としている。
【0042】
そして、次にステップS10に進んで、切換バルブ15を開状態から閉状態としてそのときの電動ポンプ20の負荷電流初期値Ioを検出する。その後、ステップS11では、故障判定タイマTmが判定しきい値Th以上であるかどうかを判断する。判定しきい値Thよりも小さい場合は、ステップS12へ進んでタイマ値を1増加させて再びステップS11へ進む。すなわち、故障判定タイマ値TmがTh以上になるまでステップS11でタイマ値をインクリメントして、ステップS11でこのタイマ値TmがTh以上になるとステップS13へ進む。そして、ステップS13でそのとき(故障判定タイマTmのタイマ値がThであるとき)の負荷電流値Imを検出した後、ステップS14へ移行する。
【0043】
ステップS14では、負荷電流値Imと負荷電流初期値Ioとの差である診断パラメータIm−Ioが、燃料タンク残量ftlとしきい値Iref及び初期値Ioとの差Iref−Ioとに基づいて決定されて比較的大きなリークが生じていると判断するしきい値であるf1(ftl,Iref−Io)よりも大きいかどうかを判断する。この診断パラメータは、電動ポンプ20により蒸発燃料供給系を加圧したときに、この蒸発燃料供給系からのリークの有無により変化する。そして、例えばリークが有るときには、リークが無いときに比べて電動ポンプ20の負荷が小さくなるので、負荷電流値は小さくなり、リークが大きくなるほど負荷電流値は小さくなる。
【0044】
この診断パラメータIm−Ioがf1(ftl,Iref−Io)よりも大きいと判断されたときはステップS15へ進んで蒸発燃料供給系にリークは無く正常であるとの判定をしてステップS17へ移行する一方、診断パラメータIm−Ioがf1(ftl,Iref−Io)以下であると判断されたときはステップS16へ進んで蒸発燃料供給系にリークがあるとの判定をしてステップS17へ移行する。そして、ステップS17で切換バルブ15を閉状態から開状態とし、電動ポンプ20をoff状態として処理を終了する。
【0045】
すなわち、上記判定しきい値Thが電動ポンプ20による蒸発燃料供給系に対する加圧開始から診断手段による診断終了までの時間である診断時間であって、この診断時間Thは時間短縮手段により通常時のリーク診断処理における診断時間T(2)よりも短縮されている。
【0046】
そのとき、一般に、診断のための時間を長くすることにより、精度の高い診断を行うことができるが、蒸発燃料供給装置は、既に検査されて異常がないことが確認されている複数の構成部品を組み付けることにより製造されるので、製造後の検査工程では、その組み付け時の欠陥の有無が検査できれば十分であり、使用に伴って発生するリークの有無を診断する検査工程以外の通常の場合のように厳格な検査は必要ではない。
【0047】
そこで、図3(a)及び(b)に示すように、検査工程では、加圧時間を通常時のToからΔT小さいTo′に短縮している。さらに、リーク診断のために、通常時では2つのしきい値fA(ftl,Iref−Io)及びfB(ftl,Iref−Io)の各々と診断パラメータとを比較するのに対して、検査工程時では1つのしきい値f1(ftl,Iref−Io)と診断パラメータとを比較するようになされているので、診断時間を短縮することができ、その診断時間を通常時のT(2)から所定時間短縮したThとしている。
【0048】
従って、検査工程時には、加圧時間及び診断時間の合計時間である加圧診断時間をTo+T(2)からTo′+Thに短縮することができるので、検査工程以外の通常時には加圧診断時間を長くしてリーク診断を高精度に行う一方、検査工程であるときには加圧診断時間を短縮して、検査時の作業性を効率的にすることができ、さらに蒸発燃料供給装置の製造時の生産性を向上させることができる。
【0049】
また、検査工程では診断条件を緩和して、従来ではリーク診断を禁止する内燃機関がアイドル運転状態であるときにおいても診断するようにするので、アイドル運転状態で行うリーク診断以外の検査をリーク診断と同時に行うことができるため、検査の作業性を効率化して、蒸発燃料供給装置の生産性を向上させることができる。
【0050】
さらに、一般に、車両の製造時では、蒸発燃料供給装置のリーク診断を行う検査工程においては内燃機関を運転停止状態とする一方、検査工程の前後の工程においては内燃機関を運転状態としていたが、本発明の構成により、診断条件変更手段によってリーク診断実行条件を変更して検査工程で内燃機関をアイドル運転状態とするので、検査工程とその前後の工程との間の移行をそれぞれスムーズにして、製造工程における作業効率及び生産性を向上させることができる。
【0051】
(実施形態2)
図3(c)及び図4は、本発明の実施形態2を示し(尚、図1〜図3(a)及び(b)と同じ部分については同じ符号を付してその詳細な説明は省略する)、実施形態1では、検査工程において時間短縮手段が加圧時間をToからTo′へ短縮するようにしたのに対して、その時間短縮手段が加圧時間をToから零へ短縮するように変更したものである。
【0052】
すなわち、本実施形態では、電動ポンプ20から基準オリフィス16へ至る系の加圧を行わず、負荷電流しきい値Irefを計測しないようにして加圧診断時間を短縮する。そのため、比較的大きなリークが生じていると判断するしきい値であるf2(ftl)を燃料タンク残量ftlのみに基づいて決定するようにする。
【0053】
図4のフローチャートに示すように、本実施形態では、ステップS1〜S7では、上記実施形態1と同じ処理を行う。そして、その後ステップS8′において切換バルブ15を閉状態として、引き続きステップS9′において電動ポンプ20を作動させてON状態としてステップS10′へ進む。ステップS10′ではそのときの電動ポンプ20の負荷電流初期値Ioを検出する。その後、ステップS11〜S13において上記実施形態1と同じ処理を行う。すなわち、ステップS11では、故障判定タイマTmが判定しきい値Th以上であるかどうかを判断する。判定しきい値Thよりも小さい場合は、ステップS12へ進んでタイマ値を1増加させて再びステップS11へ進む。そして、ステップS11でこのタイマ値TmがTh以上になるとステップS13へ進んでそのとき(故障判定タイマTmのタイマ値がThであるとき)の負荷電流値Imを検出した後、ステップS14′へ移行する。
【0054】
ステップS14′では、負荷電流値Imと負荷電流初期値Ioとの差である診断パラメータIm−Ioが、燃料タンク残量ftlのみに基づいて決定されて比較的大きなリークが生じていると判断するしきい値であるf2(ftl)よりも大きいかどうかを判断する。
【0055】
この診断パラメータIm−Ioがf2(ftl)よりも大きいと判断されたときはステップS15へ進んで蒸発燃料供給系にリークは無く正常であるとの判定をしてステップS17へ移行する一方、診断パラメータIm−Ioがf2(ftl)以下であると判断されたときはステップS16へ進んで蒸発燃料供給系にリークがあるとの判定をしてステップS17へ移行する。そして、ステップS17で切換バルブ15を閉状態から開状態とし、電動ポンプ20をoff状態として処理を終了する。
【0056】
そのとき、図3(c)に示すように、加圧時間は零であり、診断時間は上記実施形態1と同様に通常時の診断時間T(2)よりも所定時間短縮されたThであるので、リーク診断に要する時間をさらに短縮することができる。従って、検査の作業性をさらに効率化して、蒸発燃料供給装置の生産性を向上させることができる。
【0057】
尚、上記各実施形態では、診断パラメータを電動ポンプ20の電流値としたが、診断パラメータは電動ポンプ20の電流値又は回転数の少なくとも1つであるようにしてもよい。すなわち、診断パラメータを電動ポンプ20の回転数としてもよく、また電動ポンプ20の電流値と回転数の双方としてもよい。そして、診断パラメータは、燃料タンク内の圧力であるようにしてもよい。このようにすることによっても、上記各実施形態と同様に、蒸発燃料供給系のリークの有無を診断する故障診断装置を有効に具体化することができる。
【0058】
また、本発明はこれらに限らず、蒸発燃料系からの蒸発燃料のリークの有無により変化するその他のパラメータを診断パラメータとしてもよい。
【0059】
そして、上記各実施形態では、加圧診断時間の短縮として、加圧時間及び診断時間の双方をそれぞれ短縮するようにしたが、加圧時間又は診断時間のいずれか1つを短縮するような構成としてもよい。
【0060】
さらに、診断条件変更手段によりリーク診断実行条件を、内燃機関がアイドル運転状態であることを含むように変更したが、その運転状態をアイドル運転状態でないその他の運転状態としてもよく、その他のリーク診断実行条件に変更するようにしてもよい。
【0061】
【発明の効果】
以上説明したように、請求項1の発明によると、所定の診断条件が成立したときに燃料タンクから燃料タンク及び内燃機関の間に設けられたパージ弁へ至る蒸発燃料供給系を加圧する加圧手段と、加圧手段により蒸発燃料供給系を加圧したときに、加圧手段による加圧時間及び蒸発燃料供給系からの蒸発燃料のリークの有無により変化する診断パラメータに基づいて蒸発燃料供給系の異常状態を診断する診断手段と、蒸発燃料供給系の異常状態を検査する検査工程であることを検出する検出手段と、検出手段により検査工程であることが検出されたときには、所定の診断条件を変更する診断条件変更手段とを備えることにより、検査工程では、従来診断しない条件下においても診断することができ、蒸発燃料供給装置の生産性を向上させることができる。
【0062】
請求項の発明によると、上記診断条件には内燃機関が運転停止状態であることが含まれており、診断条件変更手段は、診断条件を内燃機関が運転状態であることをも含むように変更するものとする。また、請求項の発明によると、診断条件変更手段により変更される診断条件である内燃機関の運転状態は、アイドル運転状態であることとすることにより、検査工程とその前後の工程との間の移行をそれぞれスムーズにすることができ、製造工程における作業効率及び生産性を向上させることができる。
【図面の簡単な説明】
【図1】 本実施形態に係る蒸発燃料供給装置の故障診断装置を模式的に示す図である。
【図2】 実施形態1に係るリーク診断の処理を説明するフローチャート図である。
【図3】 リーク診断時の時間と負荷電流値との関係を示すタイムチャート図である。
【図4】 実施形態2に係るリーク診断の処理を説明するフローチャート図である。
【符号の説明】
2 燃料タンク(蒸発燃料供給系)
5 パージ弁(蒸発燃料供給系)
6 蒸発燃料導入通路(蒸発燃料供給系)
7 パージ通路(蒸発燃料供給系)
8 コントロールユニット(診断手段、検出手段、時間短縮手段、診断条件変更手段)
16 基準オリフィス
20 電動ポンプ(加圧手段、診断手段)
25 クランク角センサ(診断条件変更手段)
Is1 基準パラメータ
Im 電動ポンプの電流値
Im−Io 診断パラメータ
T(2),Th 診断時間
To,To′ 加圧時間
To+T(2),To′+Th 加圧診断時間
[0001]
BACKGROUND OF THE INVENTION
The present invention belongs to a technical field related to a failure diagnosis device for diagnosing an abnormality of a device for processing evaporated fuel of an internal combustion engine.
[0002]
[Prior art]
In recent years, technology that contributes to the protection of the natural environment has been emphasized. For example, for automobiles with internal combustion engines, the evaporation of fuel generated in fuel tanks and the like is prevented from being released into the atmosphere to prevent air pollution. Technology to do is essential. As this technique, an evaporative fuel processing apparatus for an internal combustion engine as disclosed in, for example, Japanese Patent Laid-Open No. 5-215020 has been known.
[0003]
In this device, the evaporated fuel generated in the fuel tank or the like is temporarily adsorbed to the canister, and the adsorbed evaporated fuel is separated from the canister under a predetermined engine operating condition and mixed with the purge air. By performing a suction process to the intake system of the engine while controlling the flow rate with a purge control valve, evaporation of evaporated fuel to the atmosphere is prevented.
[0004]
By the way, in the above apparatus, if a crack occurs in the middle of the evaporated fuel pipe or a seal failure occurs at the joint of the evaporated fuel pipe, the evaporated fuel is diffused into the atmosphere from the leaked portion. As a result, the original effect of preventing radiation cannot be fully exhibited.
[0005]
In view of this, various failure diagnosis apparatuses for diagnosing the presence or absence of such a leak of evaporated fuel (hereinafter also referred to as a leak diagnosis) have been proposed, and one of them is an evaporated fuel supply system that is sealed after the engine operation is stopped. There is known a system for diagnosing the presence or absence of leakage based on a pressure change in the system when the inside is pressurized. In this method, for example, the determination level is set based on the drive current of the electric pump when air is pumped from the electric pump through the reference orifice having the reference diameter, and then the evaporated fuel processing device bypasses the reference orifice. By comparing the drive current of the electric pump when the air is pumped to the pipe to be subjected to leak diagnosis with the electric pump with the set determination level, the presence or absence of leak of evaporated fuel is diagnosed. Specifically, it is diagnosed that the fuel vapor leaks when the drive current is smaller than the determination level. That is, if a leak amount larger than the leak amount when the hole corresponding to the reference orifice is generated, the drive current of the electric pump is reduced from the judgment level due to the reduction of the air pressure load. Diagnose the presence or absence of leaks.
[0006]
[Problems to be solved by the invention]
By the way, in the case of manufacturing an evaporative fuel supply device, for example, the evaporative fuel supply device is manufactured by assembling a plurality of components that have already been inspected and confirmed to be normal. In the inspection process, it is sufficient to be able to inspect the presence or absence of defects at the time of assembly, and strict inspection is not necessary.
[0007]
However, even in the case of such inspections, if a diagnosis of the presence or absence of leaks is performed with high accuracy using the same failure diagnosis device as in other normal cases, the diagnosis takes a relatively long time and the diagnosis is executed. Therefore, relatively strict conditions are required, and it becomes difficult to improve the efficiency of failure diagnosis. Furthermore, it is difficult to improve the productivity when manufacturing the fuel vapor supply apparatus.
[0008]
The present invention has been made in view of such various points, and the main object of the present invention is to improve the workability of the fault diagnosis apparatus for the evaporated fuel supply apparatus as described above, thereby improving the workability of the fault diagnosis. Is to improve efficiency.
[0009]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides: When it is detected that it is an inspection process, the predetermined diagnosis condition is changed. I did it.
[0010]
Specifically, in the invention of claim 1, , Place Pressurizing means for pressurizing the evaporated fuel supply system from the fuel tank to a purge valve provided between the fuel tank and the internal combustion engine when a certain diagnosis condition is satisfied, and the evaporative fuel supply system is added by the pressurizing means. A diagnostic means for diagnosing an abnormal state of the evaporated fuel supply system based on a diagnostic parameter that varies depending on the pressurization time by the pressurizing means and the presence or absence of leakage of the evaporated fuel from the evaporated fuel supply system, and the evaporation Detection means for detecting that the inspection process is an inspection process for inspecting an abnormal state of the fuel supply system, and diagnostic condition changing means for changing the predetermined diagnosis condition when the detection means detects the inspection process. Prepare.
[0011]
With the above configuration, the diagnosis conditions are relaxed in the inspection process, and diagnosis is performed even under conditions that are not diagnosed conventionally, so that the efficiency of the inspection can be improved and the productivity of the evaporated fuel supply device can be improved.
[0012]
Claim 2 In the invention of claim 1 In the failure diagnosis apparatus for the evaporative fuel processing apparatus, the diagnosis condition includes that the internal combustion engine is in a stopped state, and the diagnosis condition changing means may be configured so that the internal combustion engine is in the operation state. It shall be changed to include. Claims 3 In the present invention, the operating state of the internal combustion engine, which is the diagnostic condition changed by the diagnostic condition changing means, is an idle operating state.
[0013]
By the way, the evaporative fuel supply device for a vehicle has the internal combustion engine in an operation state before and after the inspection process at the time of manufacture, but the diagnosis condition for the failure diagnosis is that the internal combustion engine is in an operation stop state. In the inspection process, the internal combustion engine must be stopped.
[0014]
However, as described above, the inspection process does not require strict leak diagnosis as in the case of diagnosing the presence or absence of leaks that occur with use. Therefore, since the internal combustion engine is in the operating state even in the inspection process by the configuration of the present invention, the transition between the inspection process and the processes before and after it is smoothed, and the work efficiency and productivity in the manufacturing process are improved. Can be made.
[0015]
Claim 4 In the invention, the pressurizing means is an electric pump, and the diagnostic parameter is at least one of a current value or a rotation speed of the electric pump. Claims 5 In the present invention, the diagnostic parameter is a pressure in the fuel tank.
[0016]
These claims 4 as well as 5 According to the present invention, desirable diagnostic parameters can be obtained specifically.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
(Embodiment 1)
Hereinafter, Embodiment 1 of the present invention will be described with reference to the drawings. FIG. 1 schematically shows an outline of an evaporative fuel processing device provided in an internal combustion engine and a failure diagnosis device thereof.
[0018]
Reference numeral 2 denotes a fuel tank in which fuel such as gasoline is stored, and the evaporative fuel processing device fills evaporative fuel generated in the fuel tank 2 into the canister 4 as an adsorbing means through the evaporative fuel introduction passage 6. The adsorbent such as activated carbon is adsorbed and collected, and the fuel adsorbed by the adsorbent is supplied to the intake passage (not shown) downstream of the throttle valve (not shown) via the purge passage 7. ing.
[0019]
The purge passage 7 is provided with an electromagnetically driven purge control valve 5 that is controlled based on a control signal from a control unit 8 built in the microcomputer. Moreover, the following piping system is comprised for the leak diagnosis which diagnoses the presence or absence of the leak of the evaporated fuel in an evaporated fuel processing apparatus. That is, one end of the first passage 11 is connected to the air introduction port opened at the bottom of the canister 4, and the other end is branched and connected to the second to fourth passages 12, 13, and 14 via the switching valve 15. . The second passage 12 and the third passage 13 join again and communicate with an air introduction passage 18 in which an air filter 17 is interposed. In addition, the second passage 12 between the evaporative fuel supply system from the fuel tank 2 to the purge control valve 5 provided between the fuel tank 2 and the internal combustion engine and the electric pump 20 described later has a reference diameter, for example, One end of the fourth passage 14 in which the reference orifice 16 having a diameter of 0.5 mm is interposed is connected, and the other end is connected to the switching valve 15 as described above.
[0020]
The switching valve 15 is an electromagnetically driven valve that is controlled based on a control signal from the control unit 8, and closes the second passage 12 in the open state of the valve to close the first passage 11, the third passage 13, and the second passage. While the four passages 14 are in a communication state, the third passage 13 is closed in a closed state so that the first passage 11, the second passage 12, and the fourth passage 14 are in a communication state.
[0021]
Further, an electric pump 20 that is operated by a motor is interposed on the air filter 17 side of the connection portion of the second passage 12 with the fourth passage 14. The electric pump 20 is controlled based on a control signal from the control unit 8 so that the outside air introduced through the air filter 17 and the air introduction passage 18 is sent to the switching valve 15 side through the second passage 12. The fuel vapor supply system is pressurized when a predetermined diagnostic condition is satisfied.
[0022]
Although not shown, a control unit 8 includes a rotation speed sensor that detects the engine rotation speed, a water temperature sensor that detects the water temperature, an air-fuel ratio sensor that detects the air-fuel ratio based on the oxygen concentration in the exhaust gas, and the like. Performs air-fuel ratio feedback control by controlling the fuel injection amount by a fuel injection valve (not shown) based on signals from these various sensors, and controls the purge control valve 5 under predetermined operating conditions. Thus, the process of purging the evaporated fuel into the intake system is performed.
[0023]
The failure diagnosis apparatus according to the present invention is configured such that when the predetermined leak diagnosis execution condition is satisfied, the electric pump 20 that pressurizes the evaporated fuel supply system, and when the evaporated fuel supply system is pressurized by the electric pump 20. And diagnostic means for diagnosing an abnormal state of the evaporated fuel supply system based on a diagnostic parameter that changes depending on the pressurization time by the electric pump 20 and the presence or absence of leakage of evaporated fuel from the evaporated fuel supply system.
[0024]
Specifically, the diagnostic parameter is a difference Im− between a load current value Im of the electric pump 20 at a predetermined time and a load current initial value Io that is a load current value of the electric pump 20 at the start of pressurization of the evaporated fuel system. Let Io. And the diagnostic means is comprised from the control unit 8 and the electric pump 20 grade | etc.,.
[0025]
The diagnostic means compares the diagnostic parameter Im-Io with the reference parameter obtained by pressurizing the system from the electric pump 20 to the reference orifice 16 by the electric pump 20 to thereby determine the abnormal state of the evaporated fuel supply system. Configured to diagnose. Here, the reference parameter is a current value Is1 obtained by multiplying the load current value Iref of the electric pump 20 when the system from the electric pump 20 to the reference orifice 16 is pressurized for a predetermined time by a predetermined value.
[0026]
Further, the leak diagnosis execution condition includes a condition that the internal combustion engine is in an operation stop state. In addition, for example, the outside air temperature is in a predetermined temperature range, and the fuel remaining amount in the tank is in a predetermined range. It includes conditions such as being within.
[0027]
Furthermore, the failure diagnosis apparatus of the present embodiment includes a detection unit that detects an inspection process for inspecting an abnormal state of the evaporated fuel supply system, and an electric pump when the detection unit detects that the inspection process is in progress. Time shortening means for shortening the pressurization diagnosis time from the start of pressurization by 20 to the end of diagnosis by the diagnosis means.
[0028]
Here, the detection means includes the control unit 8 and the like, and the inspection process is detected by inputting a tester command that is output from an external tester to notify the inspection process.
[0029]
Further, the time shortening means is specifically composed of the control unit 8 or the like, and when it is detected that it is an inspection process, the pressurization from the start of pressurization by the electric pump 20 to the system from the electric pump 20 to the reference orifice 16 is performed. The pressurization time until the end and the diagnosis time from the start of pressurization to the evaporated fuel supply system by the electric pump 20 until the end of the diagnosis by the diagnosis means are shortened. That is, in the present embodiment, the pressurization diagnosis time is a total time of the pressurization time and the diagnosis time.
[0030]
Further, the failure diagnosis device includes a diagnosis condition changing means for changing the leak diagnosis execution condition to include that the internal combustion engine is in an idling operation state when the detection means detects that the inspection process is in progress. The diagnostic condition changing means includes a control unit 8 and, for example, a crank angle sensor 25 for detecting the operating state of the internal combustion engine. That is, when the internal combustion engine is in an idling operation state, the failure diagnosis device prohibits leak diagnosis during normal times other than the inspection process, and performs leak diagnosis during the inspection process.
[0031]
Next, an evaporative fuel leak diagnosis routine by the control unit 8 will be described with reference to the flowchart of FIG. 2 and the time chart of FIG. In step S1 of FIG. 2, the vehicle state such as the remaining amount of fuel ftl in the fuel tank 2, the rotational speed of the engine, and the vehicle speed is detected.
[0032]
Then, it progresses to step S2 and it is judged whether the vehicle is in the manufacturing process which manufactures a vehicle, for example, and it exists in the inspection process which test | inspects the abnormal state of the evaporative fuel supply system in the manufacturing process. At this time, the in-vehicle control unit 8 communicates with, for example, an external tester provided in a production line or the like, and a tester command output from the tester is input to the control unit 8 to detect an inspection process. Yes. And when it is judged that it is not an inspection process, it progresses to step S3.
[0033]
In step S3, it is determined whether a predetermined leak diagnosis execution condition is satisfied. The leak diagnosis execution condition includes a condition that the internal combustion engine is in an operation stopped state. When it is detected that the internal combustion engine is in an operation state, it is determined that the leak diagnosis execution condition is not satisfied. The process ends without executing the leak diagnosis. On the other hand, when the operation stop state of the internal combustion engine is detected and satisfaction of other conditions is detected, it is determined that the leak diagnosis execution condition is satisfied, and normal leak diagnosis is executed.
[0034]
Here, an example of a normal leak diagnosis will be described below with reference to FIG. 1 and FIG. First, the switching valve 15 shown in FIG. 1 is opened and pressurized by the electric pump 20 for a predetermined pressurizing time, and the load current threshold value Iref of the electric pump 20 at that time is detected. Thereafter, the load valve initial value Io of the electric pump 20 is detected by closing the switching valve 15.
[0035]
When the timer value reaches T (1) while increasing the timer value of the failure determination timer Tm, the difference between the load current value Im of the electric pump 20 and the load current initial value Io at that time. It is determined whether or not the diagnostic parameter Im-Io is larger than a threshold fA (ft1, Iref-Io) that is a threshold for determining that a relatively large leak has occurred.
[0036]
At this time, when the diagnostic parameter Im-Io is smaller than the threshold value fA (ftl, Iref-Io), the timer value of the failure determination timer value Tm is increased and the timer value becomes T (2). Sometimes, the diagnostic parameter Im-Io at that time is fB (ftl, Iref-Io), which is a threshold value for determining that a leak corresponding to a hole having a diameter of about 1.0 mm exists. To determine whether it is too large. At this time, when the diagnostic parameter Im-Io is equal to or less than the threshold value fB (ft1, Iref-Io), it is determined that there is a large leak in the evaporated fuel supply system, and the process is terminated. The threshold values fA (ftl, Iref-Io) and fB (ftl, Iref-Io) are the differences between the remaining fuel amount ftl in the fuel tank, the load current threshold value Iref, and the load current initial value Io, respectively. It is determined based on.
[0037]
On the other hand, when it is determined in step S2 of FIG. 2 that the inspection process is performed, the process proceeds to step S5. In step S5, the diagnosis condition changing means changes the leak diagnosis execution condition so that the leak diagnosis execution condition includes that the internal combustion engine is in an idling state.
[0038]
Subsequently, in step S6, it is determined whether or not the leak diagnosis execution condition is satisfied. At this time, since the leak diagnosis execution condition has been changed, it is determined that the leak diagnosis execution condition is satisfied if the other conditions are satisfied even when the internal combustion engine is in the idling state. . If it is determined in step S6 that the diagnosis condition is not satisfied, the process ends without executing the leak diagnosis. On the other hand, when it is determined that the diagnosis condition is satisfied, the process proceeds to step S7.
[0039]
In step S7, the value of the failure determination timer Tm is reset and set to zero. Subsequently, in step S8, the electric pump 20 is operated by the control unit 8 to be in the ON state, and in step S9, the switching valve 15 is opened, and air is pumped from the electric pump 20 to the reference orifice 16, and the electric motor at that time is The load current threshold value Iref of the pump 20 is measured.
[0040]
By the way, in order to obtain a steady state in which the pressure of the system from the electric pump 20 to the reference orifice 16 and the load current value of the electric pump 20 by the electric pump 20 are substantially constant, the pressurization from the start of pressurization of the system is completed. Since the predetermined time To is required as the pressurizing time until the normal time, the leak current diagnosis process other than the inspection process is to pressurize the system for the predetermined time To and measure the load current threshold value Iref. I have to.
[0041]
On the other hand, in the present invention, the pressurization time by the electric pump 20 for the system is shortened by the time shortening means. That is, as shown in FIGS. 3A and 3B, the pressurizing time is set to a time To ′ that is shorter than the predetermined time To by a time ΔT.
[0042]
Then, the process proceeds to step S10, where the switching valve 15 is changed from the open state to the closed state, and the load current initial value Io of the electric pump 20 at that time is detected. Thereafter, in step S11, it is determined whether or not the failure determination timer Tm is greater than or equal to the determination threshold value Th. When it is smaller than the determination threshold value Th, the process proceeds to step S12, the timer value is increased by 1, and the process proceeds again to step S11. That is, the timer value is incremented in step S11 until the failure determination timer value Tm is equal to or greater than Th, and when the timer value Tm is equal to or greater than Th in step S11, the process proceeds to step S13. Then, after detecting the load current value Im at that time (when the timer value of the failure determination timer Tm is Th) in step S13, the process proceeds to step S14.
[0043]
In step S14, the diagnostic parameter Im-Io, which is the difference between the load current value Im and the load current initial value Io, is determined based on the fuel tank remaining amount ftl and the difference Iref-Io between the threshold value Iref and the initial value Io. It is determined whether or not the threshold value is larger than f1 (ft1, Iref-Io), which is a threshold value for determining that a relatively large leak has occurred. This diagnostic parameter changes depending on the presence or absence of a leak from the evaporated fuel supply system when the electric pump 20 pressurizes the evaporated fuel supply system. For example, when there is a leak, the load of the electric pump 20 becomes smaller than when there is no leak, so the load current value becomes smaller, and the load current value becomes smaller as the leak becomes larger.
[0044]
When it is determined that the diagnostic parameter Im-Io is larger than f1 (ftl, Iref-Io), the process proceeds to step S15, where it is determined that there is no leak in the evaporated fuel supply system and the process proceeds to step S17. On the other hand, when it is determined that the diagnostic parameter Im-Io is less than or equal to f1 (ftl, Iref-Io), the process proceeds to step S16, where it is determined that there is a leak in the evaporated fuel supply system, and the process proceeds to step S17. . In step S17, the switching valve 15 is changed from the closed state to the open state, and the electric pump 20 is turned off to complete the process.
[0045]
That is, the determination threshold Th is a diagnosis time which is a time from the start of pressurization to the evaporated fuel supply system by the electric pump 20 until the diagnosis is completed by the diagnosis means, and this diagnosis time Th is the normal time by the time shortening means. It is shorter than the diagnosis time T (2) in the leak diagnosis process.
[0046]
At that time, in general, it is possible to make a highly accurate diagnosis by lengthening the time for diagnosis, but the evaporated fuel supply device is a plurality of components that have already been inspected and confirmed to be normal. Since it is sufficient to be able to inspect the presence or absence of defects at the time of assembly in the inspection process after manufacture, it is sufficient for normal cases other than the inspection process to diagnose the presence or absence of leaks that occur with use. So strict inspection is not necessary.
[0047]
Therefore, as shown in FIGS. 3A and 3B, in the inspection process, the pressurization time is shortened from To at the normal time to To ′ smaller by ΔT. Furthermore, for the leak diagnosis, each of the two threshold values fA (ftl, Iref-Io) and fB (ftl, Iref-Io) is compared with the diagnostic parameter at the normal time, whereas in the inspection process, Since one threshold value f1 (ftl, Iref-Io) is compared with a diagnosis parameter, the diagnosis time can be shortened, and the diagnosis time is determined from T (2) at the normal time. The time is reduced by Th.
[0048]
Accordingly, during the inspection process, the pressurization diagnosis time, which is the total time of the pressurization time and the diagnosis time, can be shortened from To + T (2) to To ′ + Th. While performing leak diagnosis with high accuracy, it is possible to shorten the pressurization diagnosis time during the inspection process, making the workability at the time of inspection more efficient, and the productivity at the time of manufacturing the evaporated fuel supply device Can be improved.
[0049]
In the inspection process, the diagnosis conditions are relaxed, and the diagnosis is performed even when the internal combustion engine, which has conventionally been prohibited from leak diagnosis, is in an idle operation state. Since it can be performed at the same time, the efficiency of inspection can be improved and the productivity of the evaporated fuel supply device can be improved.
[0050]
Furthermore, in general, at the time of manufacturing the vehicle, the internal combustion engine is in an operation stop state in the inspection process for performing the leakage diagnosis of the evaporated fuel supply device, while the internal combustion engine is in the operation state in the processes before and after the inspection process. According to the configuration of the present invention, the diagnostic condition changing means changes the leak diagnosis execution condition to set the internal combustion engine in the idle operation state in the inspection process, so that the transition between the inspection process and the processes before and after it is smoothed, Work efficiency and productivity in the manufacturing process can be improved.
[0051]
(Embodiment 2)
3 (c) and 4 show Embodiment 2 of the present invention (note that the same parts as those in FIGS. 1 to 3 (a) and 3 (b) are denoted by the same reference numerals and detailed description thereof is omitted). In the first embodiment, the time shortening means shortens the pressurization time from To to To ′ in the inspection process, whereas the time shortening means shortens the pressurization time from To to zero. It has been changed to.
[0052]
That is, in this embodiment, the pressurization diagnosis time is shortened by not pressurizing the system from the electric pump 20 to the reference orifice 16 and not measuring the load current threshold Iref. Therefore, f2 (ft1), which is a threshold value for determining that a relatively large leak has occurred, is determined based only on the fuel tank remaining amount ftl.
[0053]
As shown in the flowchart of FIG. 4, in the present embodiment, in steps S1 to S7, the same processing as in the first embodiment is performed. Then, in step S8 ′, the switching valve 15 is closed, and in step S9 ′, the electric pump 20 is operated to turn it on, and the process proceeds to step S10 ′. In step S10 ′, the load current initial value Io of the electric pump 20 at that time is detected. Thereafter, in steps S11 to S13, the same processing as in the first embodiment is performed. That is, in step S11, it is determined whether or not the failure determination timer Tm is greater than or equal to the determination threshold value Th. When it is smaller than the determination threshold value Th, the process proceeds to step S12, the timer value is increased by 1, and the process proceeds again to step S11. When the timer value Tm becomes equal to or greater than Th in step S11, the process proceeds to step S13, and the load current value Im at that time (when the timer value of the failure determination timer Tm is Th) is detected, and then the process proceeds to step S14 '. To do.
[0054]
In step S14 ', the diagnostic parameter Im-Io, which is the difference between the load current value Im and the load current initial value Io, is determined based only on the fuel tank remaining amount ftl, and it is determined that a relatively large leak has occurred. It is determined whether or not the threshold value is larger than f2 (ftl).
[0055]
When it is determined that the diagnostic parameter Im-Io is larger than f2 (ftl), the process proceeds to step S15, where it is determined that there is no leak in the evaporated fuel supply system and the process proceeds to step S17. When it is determined that the parameter Im-Io is equal to or less than f2 (ftl), the process proceeds to step S16, where it is determined that there is a leak in the evaporated fuel supply system, and the process proceeds to step S17. In step S17, the switching valve 15 is changed from the closed state to the open state, and the electric pump 20 is turned off to complete the process.
[0056]
At that time, as shown in FIG. 3C, the pressurization time is zero, and the diagnosis time is Th shortened by a predetermined time from the normal diagnosis time T (2) as in the first embodiment. Therefore, the time required for leak diagnosis can be further shortened. Therefore, the workability of the inspection can be further improved, and the productivity of the evaporated fuel supply device can be improved.
[0057]
In each of the above embodiments, the diagnostic parameter is the current value of the electric pump 20, but the diagnostic parameter may be at least one of the current value or the rotational speed of the electric pump 20. That is, the diagnostic parameter may be the rotational speed of the electric pump 20, or both the current value and the rotational speed of the electric pump 20. The diagnostic parameter may be a pressure in the fuel tank. Also in this way, as in the above embodiments, a failure diagnosis device that diagnoses the presence or absence of leakage in the evaporated fuel supply system can be effectively embodied.
[0058]
In addition, the present invention is not limited to these, and other parameters that change depending on the presence or absence of leakage of evaporated fuel from the evaporated fuel system may be used as diagnostic parameters.
[0059]
In each of the above embodiments, both the pressurization time and the diagnosis time are shortened as the pressurization diagnosis time. However, either the pressurization time or the diagnosis time is shortened. It is good.
[0060]
Furthermore, the diagnosis condition changing means has changed the leak diagnosis execution condition to include that the internal combustion engine is in the idle operation state, but the operation state may be other operation states other than the idle operation state. You may make it change into an execution condition.
[0061]
【The invention's effect】
As explained above, according to the invention of claim 1 , Place Pressurizing means for pressurizing the evaporative fuel supply system from the fuel tank to the purge valve provided between the fuel tank and the internal combustion engine, and pressurizing the evaporative fuel supply system by the pressurizing means A diagnostic means for diagnosing an abnormal state of the evaporated fuel supply system based on a diagnostic parameter that changes depending on a pressurizing time by the pressurizing means and whether or not there is a leak of evaporated fuel from the evaporated fuel supply system, and an evaporated fuel supply system By providing a detecting means for detecting an inspection process for inspecting an abnormal state of the apparatus, and a diagnostic condition changing means for changing a predetermined diagnostic condition when the detecting means detects the inspection process. In the process, diagnosis can be performed even under conditions that are not conventionally diagnosed, and the productivity of the evaporated fuel supply device can be improved.
[0062]
Claim 2 According to the invention, the diagnostic condition includes that the internal combustion engine is in an operation stop state, and the diagnosis condition changing means changes the diagnosis condition to include that the internal combustion engine is in an operation state. And Claims 3 According to the invention, the operation state of the internal combustion engine, which is the diagnosis condition changed by the diagnosis condition changing means, is the idle operation state, so that the transition between the inspection process and the process before and after the check process is smooth. It is possible to improve the work efficiency and productivity in the manufacturing process.
[Brief description of the drawings]
FIG. 1 is a diagram schematically showing a failure diagnosis apparatus for an evaporated fuel supply apparatus according to an embodiment.
FIG. 2 is a flowchart illustrating a leak diagnosis process according to the first embodiment.
FIG. 3 is a time chart showing a relationship between a time at the time of leak diagnosis and a load current value.
FIG. 4 is a flowchart illustrating a leak diagnosis process according to the second embodiment.
[Explanation of symbols]
2 Fuel tank (evaporated fuel supply system)
5 Purge valve (evaporated fuel supply system)
6 Evaporated fuel introduction passage (evaporated fuel supply system)
7 Purge passage (evaporated fuel supply system)
8 Control unit (diagnosis means, detection means, time reduction means, diagnosis condition change means)
16 Reference orifice
20 Electric pump (pressurizing means, diagnostic means)
25 Crank angle sensor (diagnosis condition changing means)
Is1 standard parameters
Im Current value of electric pump
Im-Io diagnostic parameters
T (2), Th Diagnosis time
To, To 'Pressurization time
To + T (2), To '+ Th Pressurized diagnosis time

Claims (5)

定の診断条件が成立したときに燃料タンクから燃料タンク及び内燃機関の間に設けられたパージ弁へ至る蒸発燃料供給系を加圧する加圧手段と、
上記加圧手段により蒸発燃料供給系を加圧したときに、該加圧手段による加圧時間及び蒸発燃料供給系からの蒸発燃料のリークの有無により変化する診断パラメータに基づいて蒸発燃料供給系の異常状態を診断する診断手段と、
上記蒸発燃料供給系の異常状態を検査する検査工程であることを検出する検出手段と、
上記検出手段により検査工程であることが検出されたときには、上記所定の診断条件を変更する診断条件変更手段とを備えることを特徴とする蒸発燃料処理装置の故障診断装置。
And pressurizing means for pressurizing the evaporative fuel supply system leading to the provided purge valve between the fuel tank and the internal combustion engine from the fuel tank when the diagnosis condition of Jo Tokoro is satisfied,
When the evaporative fuel supply system is pressurized by the pressurizing means, the evaporative fuel supply system is changed based on the time of pressurization by the pressurizing means and the diagnostic parameters that change depending on the presence or absence of evaporative fuel leakage from the evaporative fuel supply system. Diagnostic means for diagnosing abnormal conditions;
Detecting means for detecting an inspection process for inspecting the abnormal state of the evaporated fuel supply system;
A failure diagnosis apparatus for an evaporated fuel processing apparatus, comprising: a diagnosis condition changing means for changing the predetermined diagnosis condition when the detection means detects that the inspection process is in progress.
請求項の蒸発燃料処理装置の故障診断装置において、
診断条件には内燃機関が運転停止状態であることが含まれており、
診断条件変更手段は、上記診断条件を内燃機関が運転状態であることをも含むように変更するものであることを特徴とする蒸発燃料処理装置の故障診断装置。
In the failure diagnosis apparatus for an evaporated fuel processing apparatus according to claim 1 ,
The diagnostic conditions include that the internal combustion engine is in a shutdown state,
The diagnostic condition changing means changes the diagnostic condition so as to include that the internal combustion engine is in an operating state.
請求項の蒸発燃料処理装置の故障診断装置において、
診断条件変更手段により変更される診断条件である内燃機関の運転状態は、アイドル運転状態であることを特徴とする蒸発燃料処理装置の故障診断装置。
In the failure diagnosis apparatus for an evaporated fuel processing apparatus according to claim 2 ,
A failure diagnosis apparatus for an evaporative fuel processing system, wherein an operating state of an internal combustion engine, which is a diagnosis condition changed by a diagnosis condition changing means, is an idle operation state.
請求項1〜のいずれか1つの蒸発燃料処理装置の故障診断装置において、
加圧手段は電動ポンプであって、
診断パラメータは上記電動ポンプの電流値又は回転数の少なくとも1つであることを特徴とする蒸発燃料処理装置の故障診断装置。
In the failure diagnostic apparatus of any one of Claims 1-3 , the evaporative fuel processing apparatus,
The pressurizing means is an electric pump,
A failure diagnosis apparatus for an evaporative fuel processing apparatus, wherein the diagnosis parameter is at least one of a current value or a rotation speed of the electric pump.
請求項1〜のいずれか1つの蒸発燃料処理装置の故障診断装置において、
診断パラメータは燃料タンク内の圧力であることを特徴とする蒸発燃料処理装置の故障診断装置。
In the failure diagnosis apparatus of any one of the evaporative fuel processing apparatuses in any one of Claims 1-4 ,
A failure diagnosis apparatus for an evaporative fuel processing apparatus, wherein the diagnosis parameter is a pressure in the fuel tank.
JP2000379899A 2000-12-14 2000-12-14 Failure diagnosis device for evaporative fuel treatment equipment Expired - Fee Related JP4560955B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000379899A JP4560955B2 (en) 2000-12-14 2000-12-14 Failure diagnosis device for evaporative fuel treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000379899A JP4560955B2 (en) 2000-12-14 2000-12-14 Failure diagnosis device for evaporative fuel treatment equipment

Publications (2)

Publication Number Publication Date
JP2002180917A JP2002180917A (en) 2002-06-26
JP4560955B2 true JP4560955B2 (en) 2010-10-13

Family

ID=18848181

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000379899A Expired - Fee Related JP4560955B2 (en) 2000-12-14 2000-12-14 Failure diagnosis device for evaporative fuel treatment equipment

Country Status (1)

Country Link
JP (1) JP4560955B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3501207B2 (en) * 1997-12-25 2004-03-02 三菱自動車工業株式会社 Failure diagnosis device for fuel evaporative gas treatment system
JP3516599B2 (en) * 1998-11-16 2004-04-05 株式会社日立ユニシアオートモティブ Leak diagnosis device for evaporative fuel treatment equipment

Also Published As

Publication number Publication date
JP2002180917A (en) 2002-06-26

Similar Documents

Publication Publication Date Title
JP3516599B2 (en) Leak diagnosis device for evaporative fuel treatment equipment
US6220229B1 (en) Apparatus for detecting evaporative emission control system leak
JP3073010B2 (en) Vehicle tank ventilation system and method for checking its functional normality
JP3711841B2 (en) In-tank canister system leak diagnosis device
US5575265A (en) Diagnostic method for evaporated fuel gas purging system
US6161423A (en) Apparatus and method for diagnosing leaks of fuel vapor treatment unit
US6321728B1 (en) Apparatus and method for diagnosing faults of fuel vapor treatment unit
CN109281759A (en) A system and method for diagnosing fuel tank leaks using pressure sensors
US6119663A (en) Method and apparatus for diagnosing leakage of fuel vapor treatment unit
US7441549B2 (en) Fuel supply apparatus for and pressure control method of internal combustion engine
US8365706B2 (en) Method and device for testing the tightness of a fuel tank of an internal combustion engine
JP2001012319A (en) Leak diagnosis device for evaporative fuel treatment equipment
US20080264156A1 (en) Procedure for diagnosing a fuel tank ventilation system of a vehicle and device for implementing the procedure
KR20220049511A (en) Method and device for diagnosing leakage in crankcase ventilation line of crankcase ventilation device for internal combustion engine
US8958941B2 (en) Diagnostic method and device for a purge valve of a hybrid motor vehicle
JP3412678B2 (en) Leak diagnosis device for evaporative fuel treatment equipment
JP4560955B2 (en) Failure diagnosis device for evaporative fuel treatment equipment
JP3326113B2 (en) Leak diagnosis device for evaporative fuel treatment equipment
CN107476892B (en) Engine control method and system and vehicle
JP2001152975A (en) Leak diagnosis device for evaporative fuel treatment equipment
JP2745966B2 (en) Failure diagnosis device for evaporation purge system
JP3888287B2 (en) Failure diagnosis apparatus for fuel vapor purge system and failure diagnosis method for fuel vapor purge system
JP3412683B2 (en) Leak diagnosis device for evaporative fuel treatment equipment
KR100385750B1 (en) Evaperative system leak check by underpressure after engine stop
JPH05180101A (en) Fault diagnosis device for evapo-purge system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100303

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100309

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100506

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100706

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100719

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130806

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees