Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4568656B2 - Steel synthetic concrete precast slab - Google Patents
[go: Go Back, main page]

JP4568656B2 - Steel synthetic concrete precast slab - Google Patents

Steel synthetic concrete precast slab Download PDF

Info

Publication number
JP4568656B2
JP4568656B2 JP2005228527A JP2005228527A JP4568656B2 JP 4568656 B2 JP4568656 B2 JP 4568656B2 JP 2005228527 A JP2005228527 A JP 2005228527A JP 2005228527 A JP2005228527 A JP 2005228527A JP 4568656 B2 JP4568656 B2 JP 4568656B2
Authority
JP
Japan
Prior art keywords
steel plate
haunch
concrete
stud bolt
notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2005228527A
Other languages
Japanese (ja)
Other versions
JP2007046238A (en
Inventor
康文 小野
和彦 関川
浩之 三浦
健作 上村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sho Bond Corp
Original Assignee
Sho Bond Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sho Bond Corp filed Critical Sho Bond Corp
Priority to JP2005228527A priority Critical patent/JP4568656B2/en
Publication of JP2007046238A publication Critical patent/JP2007046238A/en
Application granted granted Critical
Publication of JP4568656B2 publication Critical patent/JP4568656B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、コンクリート下面に底鋼板を合成した橋梁用のプレキャスト床版、特に、ハンチ相当個所にハンチ形状の用心鉄筋を利用した鋼合成プレキャスト床版に関する。   The present invention relates to a precast slab for a bridge in which a bottom steel plate is synthesized on a concrete lower surface, and more particularly, to a steel synthetic precast slab using a haunch-shaped core reinforcing bar at a portion corresponding to a haunch.

コンクリート下面に底鋼板を合成したプレキャスト床版は、良く知られている(特許文献1)。   A precast floor slab in which a bottom steel plate is synthesized on a concrete lower surface is well known (Patent Document 1).

床版には、主桁上でハンチを設けるのを原則とし、ハンチにはハンチ下面に沿って桁直角方向に用心鉄筋を配置するのが好ましいとされている(非特許文献1)が、プレキャスト床版の場合は設けなくてもよい(非特許文献2)とされている。   In principle, the floor slab is provided with a haunch on the main girder, and it is preferable to arrange the core rebar in the direction perpendicular to the girder along the lower surface of the haunch (Non-Patent Document 1). In the case of a floor slab, it is not necessary (Non-Patent Document 2).

プレキャスト床版の場合にハンチにハンチ下面に沿った用心鉄筋を設けなくても良いとされているのは、ハンチ構造によるところのものと思われる。   In the case of a precast floor slab, it is thought that the haunch structure does not need to be provided on the haunch along the lower surface of the haunch due to the haunch structure.

特許第2832522号特許公報Japanese Patent No. 2832522

道路橋示方書・同解説書 日本道路協会 252頁〜253頁Road Bridge Specification / Explanation Japan Road Association 252-253 鋼構造物設計指針 土木学会 62頁〜63頁Steel Structure Design Guidelines Japan Society of Civil Engineers 62-63

ちなみに、鋼合成プレキャスト床版における幾つかのハンチ構造を例示する。   Incidentally, several haunch structures in the steel composite precast slab are illustrated.

図11は、コンクリート2下面に予め逆台形状のハンチ12を形成した鋼合成プレキャスト床版1の例を示す。この床版1は予め底鋼板3をハンチ12に沿って折り曲げ加工をしてコンクリート2と合成してある。この床版は、主桁9のフランジ9a上のスタッドボルト11相当位置が適宜の間隔で箱抜き41されており、スタッドボルト11個所に位置合わせをして主桁9に載置され、箱抜き41個所に無収縮モルタル13が打設されて設置される。   FIG. 11 shows an example of the steel composite precast slab 1 in which the inverted trapezoidal haunch 12 is formed on the lower surface of the concrete 2 in advance. The floor slab 1 is synthesized with concrete 2 by bending the bottom steel plate 3 along the haunch 12 in advance. In this floor slab, the positions corresponding to the stud bolts 11 on the flange 9a of the main girder 9 are boxed 41 at an appropriate interval. Non-shrink mortar 13 is placed and installed at 41 locations.

図12は、コンクリート2下面に予めハンチを形成していない鋼合成プレキャスト床版1の例を示す。この床版1は、主桁9上を連続抜き42されて、主桁9のフランジ9aの両側に取り付けられたハンチ高の型鋼14上に載置され、連続抜き42個所に無収縮モルタル13が打設して設置される。   FIG. 12 shows an example of a steel composite precast floor slab 1 in which a haunch is not formed in advance on the lower surface of the concrete 2. This floor slab 1 is continuously punched 42 on the main girder 9 and placed on a haunch-height die steel 14 attached to both sides of the flange 9a of the main girder 9. It will be installed.

図13は、同じくコンクリート2下面に予めハンチを形成していない鋼合成プレキャスト床版1の例を示す。この床版1は、主桁9上を連続抜き42されて、主桁9のフランジ9a上面両側から延伸して取り付けられたハンチ形成用の型枠鋼板15上に載置され、連続抜き42個所に直状の用心鉄筋71を配置し、無収縮モルタル13を打設して設置される。   FIG. 13 shows an example of a steel composite precast slab 1 in which a haunch is not formed on the lower surface of the concrete 2 in advance. This floor slab 1 is continuously punched 42 on the main girder 9 and placed on a mold steel plate 15 for forming a haunch that is extended from both sides of the upper surface of the flange 9a of the main girder 9 and has 42 consecutive punches. A straight core rebar 71 is placed on the non-shrink mortar 13 and installed.

なお、これらの図中、5は橋軸方向に配置された鉄筋、6は橋軸直角方向に配置された鉄筋である。   In these drawings, 5 is a reinforcing bar arranged in the bridge axis direction, and 6 is a reinforcing bar arranged in the direction perpendicular to the bridge axis.

しかしながら、これらの構造のいずれにもハンチ部に用心鉄筋を利用することができないばかりでなく、別の課題も有する。   However, not all of these structures are able to utilize a scissor rebar in the hunch, but have other challenges.

図11のものは、底鋼板を床版ハンチ形状に沿った曲げ加工を施すため、加工費が甚大であり、コストアップにつながる。   In the case of FIG. 11, since the bottom steel plate is bent along the floor slab haunch shape, the processing cost is enormous, leading to an increase in cost.

図12のものは、主桁上面位置を連続的にコンクリート打ちするため、部分的な箱抜きよりプレキャスト部との一体化に合成的な問題がある。ハンチ形状が矩形となるため応力集中が発生する。型枠用形鋼に上下設置位置が主桁の縦断面により全個所異なり、工程、コストとも問題となる。   The thing of FIG. 12 has a synthetic | combination problem in integration with a precast part rather than partial box extraction, since the upper part position of a main girder is concrete-placed continuously. Stress concentration occurs because the haunch shape is rectangular. In the shape steel for formwork, the vertical installation position differs depending on the longitudinal section of the main girder, which causes problems in terms of process and cost.

図13のものは、プレキャストの底鋼板に型枠用鋼板を溶接にて取り付け、現況ハンチ高さに合わせられるようになっているが、主桁方向に連続しての型枠用鋼板は3次元的な変化に追随できないので、主桁上面と型枠用鋼板に隙間が生じる。   In the case of FIG. 13, the formwork steel plate is attached to the precast bottom steel plate by welding and can be adjusted to the current haunch height. However, the formwork steel plate continuous in the main girder direction is three-dimensional. Since the change cannot be followed, a gap is generated between the upper surface of the main girder and the steel plate for formwork.

本発明は、上記の課題、特に逆台形状のハンチ部と一体となる鋼合成プレキャスト床版において、ハンチ部にハンチ形状に沿う形状の用心鉄筋を挿入することができないという課題及び幾つかの課題を以下述べるところにより解決しようとするものである。   In the steel composite precast floor slab integrated with the inverted trapezoidal shape haunch part, the present invention has problems and several problems that a central reinforcing bar having a shape along the haunch shape cannot be inserted into the haunch part. Is to be solved as described below.

本発明は上記課題を解決するためつぎの手段を提供する。   The present invention provides the following means for solving the above problems.

底鋼板を一辺とする逆台形状のハンチが形成される個所の底鋼板に、橋軸方向に適宜の間隔で逆台形状のハンチのハンチ形状の山部に沿う用心鉄筋の山部を突出する用心鉄筋嵌挿用切り欠き部と主桁フランジに固設したスタッドボルトを嵌挿するスタッドボルト嵌挿用切り欠き部を形成し、この底鋼板上に橋軸方向鉄筋と橋軸直角方向鉄筋と逆台形状のハンチ形状に沿う用心鉄筋とを配置し、用心鉄筋の両端橋軸直角方向支持、山部底鋼板の用心鉄筋の嵌挿用切り欠き部から突出する状態で配置するとともに底鋼板に形成したスタッドボルト嵌挿用切り欠き部に連通するスタッドボルト嵌挿用孔を残してコンクリートを打設してなるコンクリート下面に底鋼板を合成してなる鋼合成コンクリートプレキャスト床版を提供する。 On the bottom steel plate where the inverted trapezoidal haunch with one side of the bottom steel plate is formed , the peak portion of the central reinforcing bar along the haunch-shaped peak portion of the inverted trapezoidal haunch protrudes at an appropriate interval in the bridge axis direction. A notch part for inserting a core reinforcing bar and a notch part for inserting a stud bolt for inserting a stud bolt fixed to the main girder flange are formed, and a bridge axis direction reinforcing bar and a bridge axis perpendicular direction reinforcing bar are formed on the bottom steel plate. a precaution rebar along the haunches inverted trapezoidal shape arranged, the ends of precaution rebar is supported by the bridge axis perpendicular, placing in a state of protruding from the fitting interpolating notch precaution rebar bottom steel plates Yamabe In addition, a steel composite concrete precast floor slab formed by synthesizing the bottom steel plate on the bottom surface of the concrete is formed by leaving the stud bolt insertion hole communicating with the stud bolt insertion notch formed on the bottom steel plate. provide.

好ましくは、底鋼板は、床版が載置される主桁フランジ面の対向面に、スタッドボルトが橋軸方向に適宜の間隔で取り付けられている鋼合成コンクリートプレキャスト床版を提供する。 Preferably, the bottom steel plate provides a steel composite concrete precast floor slab in which stud bolts are attached at an appropriate interval in the bridge axis direction on the opposite surface of the main girder flange surface on which the floor slab is placed .

鋼合成コンクリートプレキャスト床版にあって、逆台形状のハンチに桁直角方向にハンチに沿う用心鉄筋を入れることができるので、土木学会の鋼構造物設計指針に沿うことができる。   In the steel composite concrete precast slab, since the core reinforcement along the haunch can be put in the inverted trapezoidal haunch in the direction perpendicular to the girders, the steel structure design guidelines of the Japan Society of Civil Engineers can be met.

鋼合成コンクリートプレキャスト床版にあって、逆台形状のハンチに桁直角方向にハンチに沿う用心鉄筋を入れることができるので、ハンチ下面に沿うように底鋼板を折り曲げ加工する必要がなくなり、コストを押さえることがてき、かつ、プレキャスト床版と切り欠き部と主桁との一体性を計ることができる。   In the steel composite concrete precast slab, since the core rebar along the haunch can be inserted into the inverted trapezoidal haunch in the direction perpendicular to the girders, it is not necessary to bend the bottom steel plate along the lower surface of the haunch, reducing the cost. In addition, it is possible to measure the integrity of the precast floor slab, the notch and the main girder.

図1乃至図5は、本発明の一実施の形態を示し、図1は、底鋼板の平面図、図2は、底鋼板を合成してなる鋼合成コンクリートプレキャスト床版の平面図、図3は、図2のA−A断面図、図4は、図2のB−B断面図、図5は、図2のC−C断面図である。   1 to 5 show an embodiment of the present invention, FIG. 1 is a plan view of a bottom steel plate, FIG. 2 is a plan view of a steel synthetic concrete precast slab formed by synthesizing the bottom steel plate, and FIG. FIG. 4 is a sectional view taken along line AA in FIG. 2, FIG. 4 is a sectional view taken along line BB in FIG. 2, and FIG. 5 is a sectional view taken along line CC in FIG.

まず、図1に基づき、本発明を形成する底鋼板の説明をする。   First, based on FIG. 1, the bottom steel plate which forms this invention is demonstrated.

底鋼板3は平板状にしてなり、橋軸方向に切り欠き部4が適宜の間隔で複数切り欠かれてなる。この切り欠き部4は、底鋼板3が主桁に載置されたときのフランジ相当個所すなわちハンチ部が形成される個所に橋軸方向に適宜の間隔で逆台形状のハンチ形状に沿う用心鉄筋の山部を突出する用心鉄筋嵌挿用切り欠き部4aと主桁フランジに固設するスタッドボルトを嵌挿するスタッドボルト嵌挿用切り欠き部4bとからなっている。   The bottom steel plate 3 has a flat plate shape, and a plurality of cutout portions 4 are cut out at appropriate intervals in the bridge axis direction. This notch portion 4 is a core reinforcing bar along the inverted trapezoidal haunch shape at an appropriate interval in the bridge axis direction at the portion corresponding to the flange when the bottom steel plate 3 is placed on the main girder, that is, where the haunch portion is formed. And a stud bolt insertion notch 4b for fitting a stud bolt fixed to the main girder flange.

切り欠き部4の形状は、図1に示すように用心鉄筋を嵌挿するに必要な長さの切り欠き部4aとスタッドボルト嵌挿用切り欠き部4bを形を異ならしめて組み合せたものでも、図9に示すように同一形状内で両者兼用の切り欠き部4a、4bとするものでも、図10に示すように用心鉄筋嵌挿用切り欠き部4a、スタッドボルト嵌挿用切り欠き部4bとするものであってもよく、限定されるものではない。   As shown in FIG. 1, the shape of the notch portion 4 may be a combination of a notch portion 4a having a length necessary for inserting a precautionary reinforcing bar and a notch portion 4b for inserting stud bolts with different shapes. As shown in FIG. 9, both of the cutout portions 4a and 4b are used in the same shape, and as shown in FIG. 10, the cutout portion 4a for inserting the core reinforcing bar, the cutout portion 4b for inserting the stud bolt, It may be what it does and is not limited.

つぎに、図2乃至図5に基づき本発明に係るプレキャスト床版の構造を説明する。   Next, the structure of the precast slab according to the present invention will be described with reference to FIGS.

底鋼板3上に橋軸方向鉄筋5、橋軸直角方向鉄筋6、用心鉄筋7を配置する。なお、図において、橋軸方向鉄筋5、橋軸直角方向鉄筋6は用心鉄筋7付近以外は省略した。用心鉄筋7は、主桁フランジ上に形成される逆台形状のハンチの形状にほぼ沿った形状をしており、プレキャスト床版1の切り欠き部4の用心鉄筋嵌挿用切り欠き部4aに嵌挿されて山部7aを底鋼板下面から外に突出させ、両端7b、7bを橋軸直角方向鉄筋6に添接させて配置する。両端7b、7bの橋軸直角方向鉄筋への添接は、たとえば所定の重ね継手長をとり結束線を巻き付けて一体化することにより行う。   On the bottom steel plate 3, a bridge axis direction reinforcing bar 5, a bridge axis perpendicular direction reinforcing bar 6 and a core reinforcing bar 7 are arranged. In the figure, the bridge axis direction reinforcing bars 5 and the bridge axis perpendicular direction reinforcing bars 6 are omitted except for the vicinity of the guard bars 7. The core rebar 7 has a shape substantially in line with the shape of the inverted trapezoidal haunch formed on the main girder flange. The ridges 7a are inserted and protruded from the bottom surface of the bottom steel plate, and both ends 7b and 7b are arranged so as to be in contact with the reinforcing bars 6 perpendicular to the bridge axis. The both ends 7b and 7b are attached to the bridge axis perpendicular reinforcing bar by, for example, taking a predetermined lap joint length and winding and tying a binding wire.

底鋼板3上にコンクリート2を底鋼板3に切り欠かれたスタッドボルト嵌挿用切り欠き部4bからプレキャスト床版1上面にかけてのスタッドボルト嵌挿用孔14を残して打設する。スタッドボルト嵌挿用孔14とスタッドボルト嵌挿用切り欠き部とは連通する。   The concrete 2 is placed on the bottom steel plate 3 while leaving the stud bolt insertion hole 14 extending from the stud bolt insertion notch 4b cut out in the bottom steel plate 3 to the top surface of the precast floor slab 1. The stud bolt insertion hole 14 communicates with the stud bolt insertion notch.

コンクリートの打設に当っては、図示してないが、底鋼板3の周囲に型枠を設置するとともにスタッドボルト嵌挿用切り欠き部4bからプレキャスト床版1上面にかけてスタッドボルト嵌挿用孔14が形成されるようにこの部分に型枠15を設置する。   In placing concrete, although not shown, a mold is installed around the bottom steel plate 3 and the stud bolt insertion hole 14 extends from the stud bolt insertion notch 4b to the upper surface of the precast floor slab 1. The mold 15 is placed in this portion so that is formed.

スタッドボルト嵌挿用孔14は、プレキャスト床版1が主桁9のフランジ9a上にあって、ハンチが形成されるときのコンクリート流入孔となる。   The stud bolt insertion hole 14 becomes a concrete inflow hole when the precast floor slab 1 is on the flange 9a of the main girder 9 and a haunch is formed.

養生後に底鋼板3の周囲に設置した型枠及び型枠15は除去される。   The mold and the mold 15 installed around the bottom steel plate 3 after curing are removed.

8は、ズレ止め用のスタッドボルトで底鋼板3の主桁フランジ相当個所で切り欠きのない下面に主桁方向に適宜の間隔で固設されている。   8 is a stud bolt for preventing misalignment, and is fixed at an appropriate interval in the main girder direction on the bottom surface of the bottom steel plate 3 corresponding to the main girder flange without a notch.

図6乃至図8は、主桁上に載置した底鋼板を合成してなる鋼合成コンクリート床版の設置の態様を示し、図6は、図3対応図、図7は図4対応図、図8は図5対応図である。   6 to 8 show an aspect of installation of a steel composite concrete slab formed by synthesizing a bottom steel plate placed on the main girder, FIG. 6 is a diagram corresponding to FIG. 3, FIG. 7 is a diagram corresponding to FIG. FIG. 8 corresponds to FIG.

まず、主桁9のフランジ9aの橋軸方向上面に上述したプレキャスト床版1に形成されたスタッドボルト嵌挿用切り欠き部4bに嵌挿されるスタッドボルト11を固設する。   First, the stud bolt 11 to be inserted into the notch portion 4b for stud bolt insertion formed in the precast floor slab 1 is fixed on the upper surface of the flange 9a of the main girder 9 in the bridge axis direction.

プレキャスト床版1を、現場に搬出して、主桁9のフランジ9aに固設されているスタッドボルト11をスタッドボルト嵌挿用孔14に嵌挿して仮設置し、設置位置・設置レベル調整・各種接合後、主桁9のフランジ9aの両側にその両側からプレキャスト床版1の底鋼板3にかけて逆台形状のハンチ12を形成するための型枠10を固設する。   The precast floor slab 1 is carried out to the site, and the stud bolt 11 fixed to the flange 9a of the main girder 9 is temporarily inserted into the stud bolt insertion hole 14 to adjust the installation position and installation level. After various joining, the formwork 10 for forming the inverted trapezoidal haunch 12 is fixed on both sides of the flange 9a of the main girder 9 from the both sides to the bottom steel plate 3 of the precast floor slab 1.

ついで、プレキャスト床版1に形成したコンクリート2表面から底鋼板3に下面に貫通するスタッドボルト嵌挿用孔14から、プレキャスト床版1の底鋼板3の下面と主桁9のフランジ9a上面間に無収縮モルタル13等のコンクリートを打設し、プレキャスト床版1と主桁9のフランジ9aの間にハンチ12を形成する。   Subsequently, from the stud bolt insertion hole 14 penetrating from the surface of the concrete 2 formed on the precast floor slab 1 to the bottom surface of the bottom steel plate 3, between the bottom surface of the bottom steel plate 3 of the precast floor slab 1 and the top surface of the flange 9 a of the main girder 9. Concrete such as a non-shrink mortar 13 is placed, and a haunch 12 is formed between the precast floor slab 1 and the flange 9 a of the main girder 9.

現場で打設された無収縮モルタル13等のコンクリートとプレキャスト床版1と主桁10とは、主桁10の上面に固設されているスタッドボルト11とプレキャスト床版1の底鋼板3の下面に固設したズレ止め用のスタッドボルト8により強固に一体となる。   The concrete such as non-shrink mortar 13 placed on site, the precast floor slab 1 and the main girder 10 are stud bolts 11 fixed on the upper surface of the main girder 10 and the bottom surface of the bottom steel plate 3 of the precast floor slab 1. Are firmly integrated with a stud bolt 8 for preventing misalignment.

型枠10はコンクリート養生後に撤去する。   The formwork 10 is removed after concrete curing.

本発明に係る鋼合成コンクリートプレキャスト床版に用いられる底鋼板の実施の態様を示す平面図である。It is a top view which shows the aspect of implementation of the bottom steel plate used for the steel synthetic concrete precast floor slab which concerns on this invention. 本発明の実施の態様を示す底鋼板を合成してなる鋼合成コンクリートプレキャスト床版の平面図である。It is a top view of the steel synthetic concrete precast slab formed by synthesize | combining the bottom steel plate which shows the embodiment of this invention. 図2のA−A断面図である。It is AA sectional drawing of FIG. 図2のB−B断面図である。It is BB sectional drawing of FIG. 図2のC−C断面図である。It is CC sectional drawing of FIG. 本発明に係る底鋼板を合成してなる鋼合成コンクリート床版の主桁上への設置の態様を示す図2対応個所を示す断面図である。It is sectional drawing which shows the part corresponding to FIG. 2 which shows the aspect of the installation on the main girder of the steel synthetic concrete floor slab formed by synthesize | combining the bottom steel plate which concerns on this invention. 同図3対応個所を示す断面図である。It is sectional drawing which shows the part corresponding to the same FIG. 同図4対応個所を示す断面図である。It is sectional drawing which shows the location corresponding to FIG. 図1に示した切り欠き部の別の形状の実施例を示す平面図である。It is a top view which shows the Example of another shape of the notch part shown in FIG. 図1に示した切り欠き部の別の形状の実施例を示す平面図である。It is a top view which shows the Example of another shape of the notch part shown in FIG. 従来の鋼合成コンクリート鋼板のハンチ施工部を示す断面図である。It is sectional drawing which shows the haunch construction part of the conventional steel synthetic concrete steel plate. 従来の鋼合成コンクリート鋼板のハンチ施工部を示す断面図である。It is sectional drawing which shows the haunch construction part of the conventional steel synthetic concrete steel plate. 従来の鋼合成コンクリート鋼板のハンチ施工部を示す断面図である。It is sectional drawing which shows the haunch construction part of the conventional steel synthetic concrete steel plate.

符号の説明Explanation of symbols

1 プレキャスト床版
2 コンクリート
3 底鋼板
4 切り欠き部
4a 用心鉄筋嵌挿用切り欠き部
4b スタッドボルト嵌挿用切り欠き部
5 橋軸方向に配置された鉄筋
6 橋軸直角方向に配置された鉄筋
7 用心鉄筋
8 ズレ止め用のスタッドボルト
9 主桁
9a フランジ
10 型枠
11 スタッドボルト
12 ハンチ
13 無収縮モルタル
14 スタッドボルト嵌挿用孔
15 型枠
DESCRIPTION OF SYMBOLS 1 Precast floor slab 2 Concrete 3 Bottom steel plate 4 Notch part 4a Notch part for insertion of core rebar for 4a Notch part for stud bolt insertion 5 Reinforcing bar arranged in the bridge axis direction 6 Reinforcing bar arranged in the direction perpendicular to the bridge axis 7 Stud Reinforcement 8 Stud Bolt for Displacement 9 Main Girder 9a Flange 10 Mold 11 Stud Bolt 12 Haunch 13 Non-Shrink Mortar 14 Stud Bolt Insertion Hole 15 Mold

Claims (2)

コンクリート下面に底鋼板を合成してなる鋼合成コンクリートプレキャスト床版において、底鋼板を一辺とする逆台形状のハンチが形成される個所の底鋼板に、橋軸方向に適宜の間隔で逆台形状のハンチのハンチ形状の山部に沿う用心鉄筋の山部を突出する用心鉄筋嵌挿用切り欠き部と主桁フランジに固設したスタッドボルトを嵌挿するスタッドボルト嵌挿用切り欠き部を形成し、この底鋼板上に橋軸方向鉄筋と橋軸直角方向鉄筋と逆台形状のハンチ形状に沿う用心鉄筋とを配置し、用心鉄筋の両端橋軸直角方向支持、山部底鋼板の用心鉄筋の嵌挿用切り欠き部から突出する状態で配置するとともに底鋼板に形成したスタッドボルト嵌挿用切り欠き部に連通するスタッドボルト嵌挿用孔を残してコンクリートを打設してなることを特徴とするコンクリート下面に底鋼板を合成してなる鋼合成コンクリートプレキャスト床版。 In a steel composite concrete precast slab formed by synthesizing a bottom steel plate on the bottom surface of the concrete , an inverted trapezoidal shape is formed at an appropriate interval in the bridge axis direction on the bottom steel plate where an inverted trapezoidal haunch with the bottom steel plate as one side is formed. A notch for inserting a core rebar that protrudes from the peak of the core rebar along the haunch-shaped peak of the haunch, and a notch for inserting a stud bolt that fits a stud bolt fixed to the main girder flange are formed. and, this bottom a steel sheet arranged and precautions rebar along the haunches shape of Hashijiku direction reinforcing bar and Hashijiku perpendicular rebar and inverted trapezoidal shape, and supports both ends of precaution rebar bridge axis perpendicular, bottom and crest Placing the concrete with the stud bolt insertion hole communicating with the notch for stud bolt insertion formed in the bottom steel plate while being arranged in a state protruding from the notch for insertion of the steel bar core reinforcement Special to be Steel synthetic concrete precast slab formed by combining the bottom steel plate concrete underside to. 底鋼板は、床版が載置される主桁フランジ面の対向面にスタッドボルトが橋軸方向に適宜の間隔で取り付けられていることを特徴とする請求項1に記載のコンクリート下面に底鋼板を合成してなる鋼合成コンクリートプレキャスト床版。 2. The bottom steel plate has a bottom steel plate attached to the bottom surface of the concrete according to claim 1, wherein stud bolts are attached to the opposite surface of the main girder flange surface on which the floor slab is placed at an appropriate interval in the bridge axis direction. A steel synthetic concrete precast floor slab.
JP2005228527A 2005-08-05 2005-08-05 Steel synthetic concrete precast slab Expired - Lifetime JP4568656B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005228527A JP4568656B2 (en) 2005-08-05 2005-08-05 Steel synthetic concrete precast slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005228527A JP4568656B2 (en) 2005-08-05 2005-08-05 Steel synthetic concrete precast slab

Publications (2)

Publication Number Publication Date
JP2007046238A JP2007046238A (en) 2007-02-22
JP4568656B2 true JP4568656B2 (en) 2010-10-27

Family

ID=37849291

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005228527A Expired - Lifetime JP4568656B2 (en) 2005-08-05 2005-08-05 Steel synthetic concrete precast slab

Country Status (1)

Country Link
JP (1) JP4568656B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5852315B2 (en) * 2011-03-28 2016-02-03 公益財団法人鉄道総合技術研究所 Precast concrete member connection structure
JP6609815B2 (en) * 2016-09-07 2019-11-27 株式会社横河ブリッジ Precast slab, composite structure of steel girder and precast slab, and method of synthesizing steel girder and precast slab
CN111137788B (en) * 2018-11-06 2024-05-03 河南绿建建筑科技有限公司 Convenient vertical alignment positioning device for hoisting steel concrete composite pipe by tower crane
CN110306706B (en) * 2019-07-23 2024-07-05 南昌航空大学 Integrated floor plate in assembled building and connection structure with wall body
KR102325276B1 (en) * 2021-01-29 2021-11-11 (주)렉스코 Half Precast Concrete continuous slab and construction method of the same

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0645448Y2 (en) * 1988-10-06 1994-11-24 石川島播磨重工業株式会社 Bridge structure
JPH0522611U (en) * 1991-08-30 1993-03-23 石川島播磨重工業株式会社 Joint structure of precast floor slab and girder
JPH083935A (en) * 1994-06-20 1996-01-09 Ishikawajima Constr Materials Co Ltd Joint structure of precast slab for bridge substructure and bridge girder
JP2618839B2 (en) * 1994-11-28 1997-06-11 ショーボンド建設株式会社 Manufacturing method of precast slab
JP2859158B2 (en) * 1995-03-30 1999-02-17 住友建設株式会社 Structure of mounting part of concrete wall railing
JP3575564B2 (en) * 1995-08-10 2004-10-13 戸田工業株式会社 End face formwork for PC plate manufacturing
JPH11222814A (en) * 1998-02-06 1999-08-17 Fuji Ps Corp Steel composite composite bridge using precast prestressed concrete slab
JPH11264115A (en) * 1998-03-19 1999-09-28 Hitachi Zosen Corp Bridge
JP2002013108A (en) * 2000-06-28 2002-01-18 Hitachi Zosen Corp Synthetic floor slab
JP2003027505A (en) * 2001-07-17 2003-01-29 Takeshige Shimonohara Structure and structure of crossing part of structural members

Also Published As

Publication number Publication date
JP2007046238A (en) 2007-02-22

Similar Documents

Publication Publication Date Title
JP5406563B2 (en) Composite beam, building, and composite beam construction method
JP6108595B2 (en) Ribbed precast concrete plate and method of placing concrete floor slab and beam using it
JP5723235B2 (en) Slab construction method and deck plate structure
JP4568656B2 (en) Steel synthetic concrete precast slab
KR102014418B1 (en) Beam bridge having beam support block and its construction method
JP5912664B2 (en) Concrete assembly structure
JP2009052197A (en) Synthetic steel deck bridge
KR101212259B1 (en) Composite slab using corrugated plate and making method therewith
JP4568657B2 (en) Steel synthetic concrete precast slab
JP2004116060A (en) Construction method of corrugated steel web bridge
KR101447537B1 (en) Precast slab connection method using connection module
JP5729566B2 (en) Method for forming shear reinforcement of concrete slab, road slab and flat slab
JP6625146B2 (en) Concrete member connection method
KR20170040022A (en) Hybrid beam with wide PSC lower flange and enlarged section upper flange and structure frame using the same
KR20060038665A (en) Shear reinforcement of slab and column joint and shear reinforcement structure using same
KR101707942B1 (en) Precast concrete hollow core slab and manufacturing method of the same
JP6679261B2 (en) Reinforcement structure of steel beam support of slab
KR100653283B1 (en) Connection method of reinforced concrete structures
JP2019203331A (en) Reinforcement joint structure of reinforced concrete beam
KR101070650B1 (en) Shear connecting structure between PSC beam and concrete deck
KR101355147B1 (en) Shear reinforcement device for junctional region of column-slab
JP4411654B2 (en) Synthetic floor slab with reinforcement
JP4500209B2 (en) Synthetic floor slab bridge
KR20080004752U (en) Steel composite bridge for ultra-easy construction
JP6934294B2 (en) Equipment structure unit and floor construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080710

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100625

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100714

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100809

R150 Certificate of patent or registration of utility model

Ref document number: 4568656

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130813

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term