Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4572038B2 - Truss structure - Google Patents
[go: Go Back, main page]

JP4572038B2 - Truss structure - Google Patents

Truss structure Download PDF

Info

Publication number
JP4572038B2
JP4572038B2 JP2001006079A JP2001006079A JP4572038B2 JP 4572038 B2 JP4572038 B2 JP 4572038B2 JP 2001006079 A JP2001006079 A JP 2001006079A JP 2001006079 A JP2001006079 A JP 2001006079A JP 4572038 B2 JP4572038 B2 JP 4572038B2
Authority
JP
Japan
Prior art keywords
concrete
diagonal
floor slab
tensile
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001006079A
Other languages
Japanese (ja)
Other versions
JP2002213017A (en
Inventor
義明 今井
基幸 藤坂
浩樹 岡田
元治 向野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2001006079A priority Critical patent/JP4572038B2/en
Publication of JP2002213017A publication Critical patent/JP2002213017A/en
Application granted granted Critical
Publication of JP4572038B2 publication Critical patent/JP4572038B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、主として橋梁として用いられるトラス構造に関する。
【0002】
【従来の技術】
従来のこの種のトラス構造としては、例えば複合トラス構造であって、上弦材及び下弦材からなるコンクリート部材である弦材と、これらに対して両端部が接合される鋼管部材である斜材とからなり、前記鋼管部材である斜材を前記弦材に定着する定着手段を備えるものがある。
【0003】
ここで、定着手段としては、例えばコンクリート部材である弦材の中まで深く埋め込んだ鋼材たるガセットに対して鋼管部材である斜材を定着してなるものや、鋼管部材の端部に対して膨張性モルタルを用いて固着したPC鋼棒の自由端部をコンクリート部材である弦材の中まで伸ばし込んで定着してなるものが用いられる。
【0004】
【発明が解決しようとする課題】
しかしながら、前者の定着手段を備えるタイプのトラス構造では、コンクリート部材である弦材の内部に斜材定着用の鋼材としてのガセットを埋め込む必要があるので、構造が複雑化し易い欠点があり、迅速かつ容易な施工の実現が困難となる。また、そればかりか、結果的に弾性係数が大きく異なる部材が局部的に配置されるので、ひび割れが発生する等、品質の面から問題となる場合もある。
【0005】
一方、後者の定着手段を備えるタイプのトラス構造では、鋼管部材である斜材をコンクリート部材である弦材に一度定着してしまうと、引き抜けないこととなるので、施工中や供用開始後に斜材が何らかの損傷を受けたような場合でも、もはやこれを交換できないという問題がある。
また、このタイプのトラス構造では、鋼管部材である斜材の取り付けが、必ずコンクリート部材である弦材についてのコンクリートの打設作業に先立ってなされる必要があり、実際上施工手順がかなり拘束されてしまうという問題もある。
ここで、引張材である斜材に限ってみれば、後者の定着手段を備えるタイプのトラス構造では、コンクリート部材である弦材及び鋼管部材である斜材の間に目開きが発生する場合があり、これが防水機能を損なう結果となり、耐久性の面から問題となる場合がある。
【0006】
他方、従来のトラス構造では、橋梁中の適用部位いかんで斜材の軸方向力に違いが生じ、斜材断面が適用部位毎に区々となるので、施工性の面からも問題となる場合が少なくない。また、このような斜材が区々となり断面が不統一となることは、景観性の面からみても望ましいとはいえない。
【0007】
そこで、本発明の課題は、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることができ、引張材である斜材については、耐久性の向上を図ること及び断面の大きさを調整することができるようなトラス構造を提供することにある。
【0008】
【課題を解決するための手段】
すなわち、本発明に係るトラス構造は、上弦材及び下弦材からなる弦材と、これらに対して両端部が接合される斜材と、前記斜材をコンクリート部材である前記弦材に定着する定着手段と、両端部を前記弦材に固定しながら引張材である前記斜材の軸線に沿って配設され、該斜材に発生するはずの引張応力が減少するような緊張力の導入がなされたPC鋼材とを含むことを特徴としている。
【0011】
本発明に係るトラス構造によれば、引張材である斜材をコンクリート部材である弦材に定着する定着手段を有するトラス構造において、引張材である斜材における引張応力を減少させるPC鋼材を備えるので、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることが可能となるのみならず、引張材である斜材に関しては、斜材及び上下弦材の一体化を図ることができるので、結果的に耐久性の向上を図ること及び断面の大きさを調整することが可能となる。
【0012】
これらのような技術的手段において、「トラス構造」としては、弦材及び斜材からなるものに限られず、弦材及び斜材に加えて、鉛直材その他の部材を含むものであっても差し支えない。
【0013】
なお、上弦材及び下弦材は互いに平行な位置関係にあるものに限られない。
【0014】
また、「斜材」としては、上弦材及び下弦材の間に設けられ、これらに対して両端部が接合されるものであればよく、コンクリート部材であるか、鋼管部材であるか等の別を問わない。
【0015】
さらに、「弦材」としては、上弦材及び下弦材からなり、これらの少なくともいずれか一方がコンクリート部材であれば、梁状部材であるか、版状部材であるかなどの構造形式や形状の別を問わず、例えば複合部材からなるトラス構造であっても差し支えない。
【0016】
さらにまた、ここにいう「定着」とは、斜材と一体に設けられ、定着手段の主要部材としての鉄筋、アンカーその他の部材をコンクリート部材である弦材中に埋め込んで引き抜けないようにすることを意味する。
【0017】
ここで、「定着手段」としては、前記斜材のコンクリート部材である前記弦材への定着を可能とするものであれば、どのような構造のもの、形式のものを採用するかなどの別を問わない。
【0018】
また、「アンカー」としては、エンドプレートの弦材への定着をある程度の定着長さでもって可能とするものであれば、どのような構成のものを用いるか、どのような材料のものを用いるかの別を問わない。
【0019】
それゆえ、例えばアンカー、鉄筋やPC鋼材などに限られず、スタッドや凸形鋳鋼なども適宜選定して用いることができる。
【0020】
【発明の実施の形態】
以下、添付図面に基づいて本発明の実施の形態を詳細に説明する。
【0021】
図1は本発明の一実施の形態に係るトラス構造の全体構成を示す側面図、図2は該トラス構造の部分構成を示す側面図、図3は該トラス構造の部分構成を示す図2におけるA方向の矢視図、図4は該トラス構造における斜材の部分構成を示す断面図である。
【0022】
本実施の形態において、トラス構造は、図1に示すように、コンクリート部材である弦材としてのコンクリート床版1と鋼管部材である斜材2とを含むトラス構造において、定着手段3と、PC鋼材としてのPC鋼より線4とを備えるものである。
すなわち、本実施の形態におけるトラス構造は、鉛直材を含まない複合部材からなるトラス構造、言い換えれば複合トラス構造である。以下、各構成要素について詳細に説明する。
【0023】
(1)コンクリート床版1
コンクリート床版1は、図1に示すように、上弦材たるコンクリート上床版1a及び下弦材たるコンクリート下床版1bとからなっている。
【0024】
コンクリート上床版1a及びコンクリート下床版1bは、同図に示すように、互いに略平行な位置関係にある。
そして、コンクリート上床版1a及びコンクリート下床版1bは、双方とも、前記したように、コンクリート部材であって、より具体的には場所打ち鉄筋コンクリートからなっている。
【0025】
コンクリート床版1は、同図に示すように、略全体を占める版状を呈する平行部11と、平行部11以外の部分であって斜材2及びコンクリート床版1の接合部として機能する突出部12とからなる。
突出部12は、同図に示すように、平行部11から斜材2側に突出するような側面形状である略三角形形状を呈する部分である。
ここで、突出部12を略三角形形状とした理由は、斜材2の軸線と直交する接合面を形成させることとしたためである。
ただし、略三角形形状の突出部12を形成させたことにより、当該部分のせん断抵抗力を増大させたという意味や、さらには、当該部分において溜水ができない状況とすることにより、防水上望ましい環境を実現させたというような二次的な意味もある。
なお、突出部12の裏側には、PC鋼より線4を固定する定着装置41を取り付けるための切り欠き部が形成されているが、この切り欠き部は、防錆の必要性からコンクリートにより後埋めされることになる。
【0026】
(2)斜材2
斜材2は、同図に示すように、コンクリート上床版1a及びコンクリート下床版1bの間に設けられ、これらに対して両端部が接合される。
すなわち、斜材2の上端部は、同図に示すように、コンクリート上床版1aに対して接合され、斜材2の下端部は、コンクリート下床版1bに対して接合される。
斜材2には、引張材である斜材(以下「引張斜材」という)2aと、圧縮材である斜材(以下「圧縮斜材」という)2bとがある。
なお、防錆対策の観点から、斜材2として耐候性鋼板を採用することとした。
ただし、これに限られるものではなく、例えば通常の鋼板に重防食する方法などであっても差し支えない。
【0027】
(3)定着手段3
定着手段3は、引張斜材2a及び圧縮斜材2bをコンクリート床版1に定着する役割を果たすものである。
【0028】
定着手段3は、図2に示すように、引張斜材2aの端部に対して固着されるエンドプレート21と、エンドプレート21をコンクリート床版1に定着するアンカー22とからなっている。
【0029】
ここで、引張斜材2aの端部に対するエンドプレート21の固着は、図4に示すように、開先角度を45゜とした完全溶け込み溶接による溶接継目21aと、溶接作業上の便宜から用いられる裏当て金21bとからなっている。なお、エンドプレート21の固着は、本実施の形態に係るような溶接方法に限定されるものではなく、他の溶接方法や接合方法の中から適宜選定して用いることができる。
【0030】
また、アンカー22は、図2に示すように、突出部12の範囲に埋め込まれる埋込ナット22aと、埋込ナット22aに螺合するPC鋼棒22bと、コンクリート床版1の硬化後にPC鋼棒22bを埋込ナット22aへ装着するための空洞領域を確保するシース22cと、埋込ナット22aに螺合するPC鋼棒22bによりエンドプレート21を突出部12に締結するための締結ナット22dからなっている。
【0031】
ここで、エンドプレート21には、図3に示すように、PC鋼棒22bの締結用としての孔である締結用孔22eが設けられている。
これにより、施工中又は供用開始後において、斜材2が何らかの損傷を受けたような場合にあっても、容易に斜材2を交換できることとなる。また、コンクリート床版1の施工を終えた後に斜材2を取り付けるようなことも可能となる。
なお、図示しないが、PC鋼棒22bのうち外部に露出する部分については、防水キャップで被覆することとし、これにより、耐久性の向上を図ることとした。
ただし、耐久性の向上を図る方法としては、これに限られるものではなく、例えばPC鋼棒22bに防錆仕様のもの(例えばダクロタイズド処理を施したもの)を用いるなどしてもよい。また、PC鋼棒22bのうち外部に露出する部分のみをカプラーを利用して着脱可能に構成してもよい。
【0032】
なお、本実施の形態では、突出部12及びエンドプレート21の間には、不陸により隙間があくのを防ぐため、無収縮モルタル31を打設することとした(図2参照)。なお、無収縮モルタル31の打設は、施工手順により、斜材2をセットしてから、突出部12のコンクリートを打設するような場合には、無収縮モルタル31の打設をする必要はない。
【0033】
(4)PC鋼より線4
PC鋼より線4は、図1に示すように、両端部をコンクリート床版1に固定しながら引張斜材2aの軸線に沿って配設されるものである。
ここで、コンクリート床版1に対するPC鋼より線4の固定は、図2に示すように、コンクリート下床版1bについては、突出部12の裏側の切り欠き部において定着装置41を用いて実現されることとなっている。一方、コンクリート上床版1aについては、耐久性の向上を図る観点から、突出部12の裏側に切り欠き部を設けていない。なお、コンクリート下床版1bの切り欠き部についても、コンクリートで後埋めされ、防錆の確保により耐久性の向上が図られる。
なお、突出部12の裏側には、PC鋼より線4を固定する定着装置41を取り付けるための切り欠き部が形成されているが、この切り欠き部は、ることになる。
また、PC鋼より線4は、具体的には、図3に示すように、鋼管部材としての引張斜材2aの内側においてその軸線に沿って配設されることになっている。なお、PC鋼より線4は、引張斜材2aの軸線に沿って配設されていればよく、引張斜材2aの内側において配設されているものに限定されるものではない。
【0034】
ここで、PC鋼より線4には、引張斜材2aに発生するはずの引張応力が減少するような緊張力の導入がなされている。これにより、コンクリート床版1におけるアンカー22の定着長さを短くすることが可能となる。本実施の形態においては、突出部12及びエンドプレート1の間での引張力が発生しないような設計とした。
なお、PC鋼より線4による緊張力の導入によって、コンクリート床版1及び斜材2の間で目開きが発生させないこととなり、防水効果の向上、ひいては耐久性の向上を図ることが可能となる。
【0035】
次に、図5を用いて、本実施の形態に係るトラス構造の構築方法について説明する。
【0036】
(1)施工開始前(図5(a)参照)
今、トラス構造は、前日までの施工が終了した状態におかれている。
すなわち、既設の引張斜材2a及び既設のコンクリート下床版1bの設置が完了した状態にある。
また、型枠支保工台車(図示外)は、次に施工するはずの新設のコンクリート上床版1aに対応する位置において固定された状態にある。
【0037】
(2)コンクリート上床版1aの施工(図5(b)参照)
このような状態において、新設の圧縮斜材2bが仮設として設置される。
【0038】
そして、新設のコンクリート上床版1aについて、コンクリートの打設を行うために型枠が設置される。
続いて、新設の圧縮斜材2bが本設として設置される。
次いで、新設の圧縮斜材2bの下側の隙間領域に対して無収縮モルタル31の打設がなされる。
【0039】
そして、新設のコンクリート上床版1aについて、鉄筋の組立が行われるとともに、次に施工すべき引張斜材2aの固定用としてのアンカー22の一部が設置される。
【0040】
そして、新設のコンクリート上床版1aについて、コンクリートの打設が行われるとともに、打設後において養生期間がとられる。
養生期間の経過後、新設の圧縮斜材2bの固定用としてのアンカー22について、PC鋼棒22bに対して緊張力が導入される。
続いて、PC鋼より線4に対して緊張力が導入されることになる。
【0041】
これにより、新設のコンクリート上床版1aの施工が完了することになる。
なお、型枠支保工台車は、次に施工するはずのコンクリート下床版1bに対応する位置まで移動し、固定状態となる。
【0042】
(3)コンクリート下床版1bの施工(図5(c)参照)
このような状態において、新設の引張斜材2aが仮設として設置される。このとき、PC鋼より線4が新設の引張斜材2aの内側に挿入される。
【0043】
そして、新設のコンクリート下床版1bについて、コンクリートの打設を行うために型枠が設置される。
続いて、新設の引張斜材2aが本設として設置される。
次いで、新設の引張斜材2aの上側領域に無収縮モルタル31の打設がなされる。
【0044】
そして、新設のコンクリート下床版1bについて、鉄筋の組立が行われるとともに、次に施工すべき圧縮斜材2bの固定用としてのアンカー22の一部が設置される。
【0045】
そして、新設のコンクリート下床版1bについて、コンクリートの打設が行われるとともに、打設後において養生期間がとられる。
養生期間の経過後、新設の引張斜材2aの固定用としてのアンカー22について、PC鋼棒22bに対して仮設的に緊張力が導入される。
続いて、PC鋼より線4に緊張力の導入がなされる。これにより、引張斜材2aに発生するはずの引張応力を減少させることが可能となる。
次いで、新設の引張斜材2aの固定用としてのアンカー22について、PC鋼棒22bに対して本設的に緊張力が導入される。
【0046】
これにより、新設のコンクリート下床版1bの施工が完了することになる。
なお、型枠支保工台車は、次に施工するはずのコンクリート下床版1bに対応する位置まで移動し、固定状態となる。
【0047】
したがって、本実施の形態に係るトラス構造によれば、鋼管部材である斜材2をコンクリート床版1にエンドプレート21及びアンカー22を介して定着する定着手段3を備えるので、簡易な構造に基づく施工の迅速化及び容易化を図ることが可能となり、これに伴い高品質化を担保することも可能となるとともに、斜材2の交換及びこれに基づく自由度の高い施工の実施をすることが可能となる。
【0048】
しかも、引張斜材2aにおける引張応力を減少させるPC鋼より線4を備えるので、特に引張斜材2aについては、耐久性の向上を図ること及び断面の大きさを調整することが可能となる。
【0049】
【発明の効果】
本発明に係るトラス構造によれば、以上のように構成したため、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることができ、引張材である斜材については、耐久性の向上を図ること及び断面の大きさを調整することができることになる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係るトラス構造の全体構成を示す側面図である。
【図2】本発明の一実施の形態に係るトラス構造の部分構成を示す側面図、図3は該トラス構造の部分構成を示すである。
【図3】本発明の一実施の形態に係るトラス構造の部分構成を示す図2におけるA方向の矢視図である。
【図4】本発明の一実施の形態に係るトラス構造における斜材の部分構成を示す断面図である。
【図5】本発明の一実施の形態に係るトラス構造の構築方法を説明する施工図である。
【符号の説明】
1…コンクリート床版(弦材)
1a…コンクリート上床版(上弦材)
1b…コンクリート下床版(下弦材)
2…斜材
2a…引張斜材(引張材である斜材)
2b…圧縮斜材(圧縮材である斜材)
3…定着手段
4…PC鋼より線(PC鋼材)
11…平行部
12…突出部
21…エンドプレート
21a…溶接継目
21b…裏当て金
22…アンカー
22a…埋込ナット
22b…PC鋼棒
22c…シース
22d…締結ナット
22e…締結用孔
31…無収縮モルタル
41…定着装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a truss structure mainly used as a bridge.
[0002]
[Prior art]
As this type of conventional truss structure, for example, a composite truss structure, a chord material that is a concrete member made of an upper chord material and a lower chord material, and a diagonal material that is a steel pipe member to which both end portions are joined. And a fixing means for fixing the diagonal member, which is the steel pipe member, to the string member.
[0003]
Here, as the fixing means, for example, a diagonal member as a steel pipe member is fixed to a gusset which is a steel material deeply embedded into a chord material which is a concrete member, or the end of the steel pipe member is expanded. For example, a PC steel bar fixed using a mortar is fixed by extending the free end of the steel bar into a chord material, which is a concrete member.
[0004]
[Problems to be solved by the invention]
However, in the truss structure of the type provided with the former fixing means, it is necessary to embed a gusset as an oblique material fixing steel material inside the chord material, which is a concrete member. Realizing easy construction becomes difficult. In addition, as a result, members having greatly different elastic coefficients are locally arranged, so that there may be a problem in terms of quality such as cracking.
[0005]
On the other hand, in the truss structure with the latter fixing means, once the diagonal member, which is a steel pipe member, is fixed to the chord member, which is a concrete member, it cannot be pulled out. Even if the material is damaged in some way, there is a problem that it can no longer be replaced.
In addition, in this type of truss structure, it is necessary to attach the diagonal member, which is a steel pipe member, prior to the concrete placement work for the chord member, which is a concrete member. There is also the problem of end up.
Here, as far as the diagonal material, which is a tensile material, in the truss structure of the type provided with the latter fixing means, there is a case where an opening occurs between the chord material, which is a concrete member, and the diagonal material, which is a steel pipe member. Yes, this results in a loss of the waterproof function, which may cause a problem in terms of durability.
[0006]
On the other hand, in the conventional truss structure, there is a difference in the axial force of the diagonal material depending on the application site in the bridge, and the cross section of the diagonal material varies depending on the application site. There are many. In addition, it is not desirable from the viewpoint of scenery that such diagonal materials are divided into sections and the cross-sections are not uniform.
[0007]
Therefore, the problem of the present invention is that it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, and replacement of diagonal materials and a high degree of freedom based thereon. An object of the present invention is to provide a truss structure capable of carrying out the construction and improving the durability and adjusting the cross-sectional size of the diagonal material which is a tensile material.
[0008]
[Means for Solving the Problems]
That is, the truss structure according to the present invention includes a chord material composed of an upper chord material and a lower chord material, an oblique material joined at both ends thereof, and fixing the oblique material to the chord material that is a concrete member. The tension force is introduced so as to reduce the tensile stress that is to be generated in the diagonal member and is arranged along the axis of the diagonal member that is the tensile member while fixing both ends to the chord member. PC steel material.
[0011]
According to the truss structure of the present invention , in the truss structure having fixing means for fixing the diagonal material as the tensile material to the chord material as the concrete member, the PC steel material for reducing the tensile stress in the diagonal material as the tensile material is provided. Therefore, it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, and exchanging diagonal materials and implementing construction with a high degree of freedom based on this. In addition to the diagonal material that is a tensile material, the diagonal material and the upper and lower chord materials can be integrated, resulting in improved durability and adjusting the cross-sectional size. It becomes possible to do.
[0012]
In such technical means, the “truss structure” is not limited to those made of string material and diagonal material, and may include vertical material and other members in addition to string material and diagonal material. Absent.
[0013]
Note that the upper chord material and the lower chord material are not limited to being in a parallel positional relationship.
[0014]
In addition, the “diagonal material” may be any material provided between the upper chord material and the lower chord material and having both end portions joined thereto, whether it is a concrete member or a steel pipe member. It doesn't matter.
[0015]
Furthermore, the “string material” is composed of an upper chord material and a lower chord material, and if at least one of them is a concrete member, it has a structural type or shape such as a beam member or a plate member. For example, a truss structure made of a composite member may be used.
[0016]
Furthermore, the term “fixing” here is provided integrally with the diagonal member so that the reinforcing bars, anchors and other members as the main members of the fixing means are embedded in the chord material which is a concrete member so as not to be pulled out. Means that.
[0017]
Here, as the “fixing means”, as long as it can fix the diagonal material to the chord material, which is a concrete member, the structure and type of the fixing material may be different. It doesn't matter.
[0018]
In addition, as an “anchor”, what kind of structure is used and what kind of material is used as long as it can fix the end plate to the string material with a certain fixing length. Whether or not.
[0019]
Therefore, it is not limited to, for example, an anchor, a reinforcing bar, or a PC steel material, and a stud, a convex cast steel, or the like can be appropriately selected and used.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0021]
1 is a side view showing an overall configuration of a truss structure according to an embodiment of the present invention, FIG. 2 is a side view showing a partial configuration of the truss structure, and FIG. 3 is a partial configuration of the truss structure in FIG. FIG. 4 is a cross-sectional view showing a partial configuration of the diagonal member in the truss structure.
[0022]
In the present embodiment, as shown in FIG. 1, the truss structure is a truss structure including a concrete floor slab 1 as a chord material that is a concrete member and an oblique member 2 that is a steel pipe member. PC steel stranded wire 4 as a steel material is provided.
That is, the truss structure in the present embodiment is a truss structure composed of a composite member not including a vertical member, in other words, a composite truss structure. Hereinafter, each component will be described in detail.
[0023]
(1) Concrete floor slab 1
As shown in FIG. 1, the concrete floor slab 1 is composed of a concrete upper floor slab 1a as an upper chord material and a concrete lower floor slab 1b as a lower chord material.
[0024]
The concrete upper floor slab 1a and the concrete lower floor slab 1b are substantially parallel to each other as shown in FIG.
The concrete upper floor slab 1a and the concrete lower floor slab 1b are both concrete members, more specifically, cast-in-place reinforced concrete as described above.
[0025]
As shown in the figure, the concrete floor slab 1 has a parallel portion 11 that occupies substantially the whole plate shape, and a protrusion that functions as a joint between the diagonal member 2 and the concrete floor slab 1 except for the parallel portion 11. Part 12.
As shown in the figure, the protruding portion 12 is a portion having a substantially triangular shape that is a side surface shape protruding from the parallel portion 11 toward the diagonal member 2 side.
Here, the reason why the protruding portion 12 has a substantially triangular shape is that a joining surface orthogonal to the axis of the diagonal member 2 is formed.
However, by forming the substantially triangular protrusion 12, it means that the shear resistance of the part is increased, and further, it is a desirable environment for waterproofing due to the situation where water cannot be accumulated in the part. There is also a secondary meaning that has been realized.
In addition, a notch for attaching a fixing device 41 for fixing the wire 4 made of PC steel is formed on the back side of the projecting part 12, but this notch is made of concrete by the necessity of rust prevention. Will be buried.
[0026]
(2) Diagonal material 2
As shown in the figure, the diagonal member 2 is provided between the concrete upper floor slab 1a and the concrete lower floor slab 1b, and both ends are joined to these.
That is, the upper end portion of the diagonal member 2 is joined to the concrete upper floor slab 1a, and the lower end portion of the diagonal member 2 is joined to the concrete lower floor slab 1b, as shown in FIG.
The oblique material 2 includes an oblique material (hereinafter referred to as “tensile oblique material”) 2a which is a tensile material and an oblique material (hereinafter referred to as “compressed oblique material”) 2b which is a compressed material.
In addition, from the viewpoint of rust prevention measures, a weather resistant steel plate was adopted as the diagonal member 2.
However, it is not restricted to this, For example, the method of heavy-corrosion-proofing to a normal steel plate etc. may be sufficient.
[0027]
(3) Fixing means 3
The fixing means 3 serves to fix the tensile diagonal material 2 a and the compression diagonal material 2 b to the concrete slab 1.
[0028]
As shown in FIG. 2, the fixing means 3 includes an end plate 21 fixed to the end of the tensile diagonal member 2 a and an anchor 22 that fixes the end plate 21 to the concrete floor slab 1.
[0029]
Here, as shown in FIG. 4, the fixing of the end plate 21 to the end of the tensile diagonal member 2a is used for the welding seam 21a by complete penetration welding with a groove angle of 45 °, and for the convenience of welding work. It consists of a backing metal 21b. The fixing of the end plate 21 is not limited to the welding method according to the present embodiment, and can be appropriately selected from other welding methods and joining methods.
[0030]
Further, as shown in FIG. 2, the anchor 22 includes an embedded nut 22 a embedded in the range of the protruding portion 12, a PC steel bar 22 b screwed into the embedded nut 22 a, and a PC steel after the concrete floor slab 1 is hardened. From a sheath 22c for securing a hollow area for mounting the rod 22b to the embedded nut 22a, and a fastening nut 22d for fastening the end plate 21 to the protruding portion 12 by a PC steel rod 22b screwed into the embedded nut 22a. It has become.
[0031]
Here, as shown in FIG. 3, the end plate 21 is provided with a fastening hole 22e which is a hole for fastening the PC steel rod 22b.
Thereby, even if the diagonal member 2 is damaged in some way during construction or after starting operation, the diagonal member 2 can be easily replaced. It is also possible to attach the diagonal member 2 after the construction of the concrete floor slab 1 is finished.
Although not shown in the figure, the portion of the PC steel bar 22b that is exposed to the outside is covered with a waterproof cap, thereby improving durability.
However, the method for improving the durability is not limited to this, and for example, a PC steel rod 22b having a rust-proof specification (for example, a product subjected to dacrotized treatment) may be used. Moreover, you may comprise only the part exposed to the exterior among PC steel bars 22b so that attachment or detachment is possible using a coupler.
[0032]
In the present embodiment, the non-shrink mortar 31 is placed between the protruding portion 12 and the end plate 21 in order to prevent a gap from being caused by unevenness (see FIG. 2). The non-shrinking mortar 31 is placed when the concrete 2 of the projecting portion 12 is placed after setting the diagonal member 2 according to the construction procedure. Absent.
[0033]
(4) PC steel strand 4
As shown in FIG. 1, the PC steel stranded wire 4 is disposed along the axis of the tensile diagonal member 2 a while fixing both ends to the concrete floor slab 1.
Here, the fixation of the PC steel strand 4 to the concrete floor slab 1 is realized by using the fixing device 41 at the notch portion on the back side of the protruding portion 12 for the concrete lower floor slab 1b as shown in FIG. It is supposed to be. On the other hand, the concrete upper floor slab 1a is not provided with a notch on the back side of the protruding portion 12 from the viewpoint of improving durability. Note that the notched portion of the concrete lower floor slab 1b is also backfilled with concrete, and durability is improved by ensuring rust prevention.
In addition, although the notch part for attaching the fixing device 41 which fixes the wire 4 from PC steel is formed in the back side of the protrusion part 12, this notch part will be different.
Further, specifically, the PC steel stranded wire 4 is arranged along the axis thereof inside the tensile diagonal member 2a as a steel pipe member, as shown in FIG. In addition, the PC steel strand 4 should just be arrange | positioned along the axis line of the tensile diagonal 2a, and is not limited to what is arrange | positioned inside the tensile diagonal 2a.
[0034]
Here, a tensile force is introduced into the PC steel strand 4 so as to reduce the tensile stress that should be generated in the tensile diagonal member 2a. Thereby, the anchoring length of the anchor 22 in the concrete floor slab 1 can be shortened. In the present embodiment, the design is such that no tensile force is generated between the protrusion 12 and the end plate 1.
In addition, the introduction of the tension force by the PC steel strand 4 prevents the mesh floor from being generated between the concrete floor slab 1 and the diagonal member 2, and it is possible to improve the waterproof effect and consequently the durability. .
[0035]
Next, the construction method of the truss structure according to the present embodiment will be described with reference to FIG.
[0036]
(1) Before start of construction (see Fig. 5 (a))
Now, the truss structure is in a state where the construction up to the previous day has been completed.
That is, the installation of the existing tensile diagonal member 2a and the existing concrete lower floor slab 1b is completed.
Further, the formwork support cart (not shown) is fixed at a position corresponding to the newly installed concrete upper floor slab 1a to be constructed next.
[0037]
(2) Construction of concrete upper slab 1a (see Fig. 5 (b))
In such a state, the new compression diagonal material 2b is installed as a temporary installation.
[0038]
And a formwork is installed in order to place concrete for the newly installed concrete upper floor slab 1a.
Subsequently, a new compression diagonal member 2b is installed as a main installation.
Next, the non-shrink mortar 31 is placed in the lower clearance area of the newly-compressed diagonal member 2b.
[0039]
Then, as for the new concrete upper floor slab 1a, rebar assembly is performed, and a part of the anchor 22 for fixing the tensile diagonal member 2a to be constructed next is installed.
[0040]
And about the new concrete upper floor slab 1a, while concrete placement is performed, the curing period is taken after placement.
After the curing period, a tension force is introduced to the PC steel rod 22b with respect to the anchor 22 for fixing the new compression slant 2b.
Subsequently, tension is introduced to the wire 4 from the PC steel.
[0041]
Thereby, the construction of the new concrete upper floor slab 1a is completed.
In addition, a formwork support trolley | bogie moves to the position corresponding to the concrete lower floor slab 1b which should be constructed next, and will be in a fixed state.
[0042]
(3) Construction of concrete floor slab 1b (see Fig. 5 (c))
In such a state, the newly installed tensile diagonal member 2a is installed as a temporary installation. At this time, the strand 4 of PC steel is inserted inside the newly installed tensile diagonal 2a.
[0043]
And a formwork is installed in order to place concrete for the newly installed concrete lower floor slab 1b.
Subsequently, the newly installed tensile diagonal member 2a is installed as a permanent installation.
Next, the non-shrink mortar 31 is placed in the upper region of the newly installed tensile diagonal 2a.
[0044]
Then, as for the newly installed concrete lower floor slab 1b, rebar assembly is performed, and a part of the anchor 22 for fixing the compression diagonal material 2b to be constructed next is installed.
[0045]
And about concrete newly placed floor slab 1b, while placing concrete, a curing period is taken after placement.
After the curing period, a tension force is temporarily introduced into the PC steel rod 22b for the anchor 22 for fixing the newly installed tensile diagonal member 2a.
Subsequently, tension is introduced into the wire 4 from the PC steel. This makes it possible to reduce the tensile stress that should occur in the tensile diagonal material 2a.
Next, a tension force is permanently introduced into the PC steel rod 22b for the anchor 22 for fixing the newly installed tensile diagonal member 2a.
[0046]
Thereby, the construction of the new concrete lower floor slab 1b is completed.
In addition, a formwork support trolley | bogie moves to the position corresponding to the concrete lower floor slab 1b which should be constructed next, and will be in a fixed state.
[0047]
Therefore, according to the truss structure according to the present embodiment, since the diagonal member 2, which is a steel pipe member, is provided with the fixing means 3 for fixing to the concrete floor slab via the end plate 21 and the anchor 22, it is based on a simple structure. It is possible to speed up and facilitate the construction, and as a result, it is possible to guarantee high quality, and it is possible to replace the diagonal member 2 and to carry out construction with a high degree of freedom based on this. It becomes possible.
[0048]
In addition, since the PC steel strand 4 for reducing the tensile stress in the tensile diagonal member 2a is provided, it is possible to improve the durability and adjust the size of the cross section, particularly for the tensile diagonal member 2a.
[0049]
【The invention's effect】
According to the truss structure according to the present invention, since it is configured as described above, it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, It is possible to carry out the replacement and construction with a high degree of freedom based on this, and for the diagonal material which is a tensile material, the durability can be improved and the size of the cross section can be adjusted.
[Brief description of the drawings]
FIG. 1 is a side view showing an overall configuration of a truss structure according to an embodiment of the present invention.
FIG. 2 is a side view showing a partial configuration of a truss structure according to an embodiment of the present invention, and FIG. 3 shows a partial configuration of the truss structure.
3 is a view in the direction of arrow A in FIG. 2 showing a partial configuration of the truss structure according to the embodiment of the present invention.
FIG. 4 is a cross-sectional view showing a partial configuration of a diagonal member in a truss structure according to an embodiment of the present invention.
FIG. 5 is a construction diagram illustrating a method for constructing a truss structure according to an embodiment of the present invention.
[Explanation of symbols]
1 ... Concrete floor slab (string material)
1a: Concrete upper floor slab (upper chord material)
1b: Concrete lower floor slab (lower chord material)
2 ... diagonal material 2a ... tensile diagonal material (diagonal material which is tensile material)
2b ... Compressed diagonal material (an oblique material which is a compressed material)
3 ... Fixing means 4 ... PC steel strand (PC steel)
DESCRIPTION OF SYMBOLS 11 ... Parallel part 12 ... Protruding part 21 ... End plate 21a ... Welding seam 21b ... Backing metal 22 ... Anchor 22a ... Embedded nut 22b ... PC steel rod 22c ... Sheath 22d ... Fastening nut 22e ... Fastening hole 31 ... No contraction Mortar 41. Fixing device

Claims (1)

上弦材及び下弦材からなる弦材と、これらに対して両端部が接合される斜材と、前記斜材をコンクリート部材である前記弦材に定着する定着手段と、両端部を前記弦材に固定しながら引張材である前記斜材の軸線に沿って配設され、該斜材に発生するはずの引張応力が減少するような緊張力の導入がなされたPC鋼材とを含むことを特徴とする、トラス構造。  A chord material composed of an upper chord material and a lower chord material, a diagonal material joined to both ends thereof, a fixing means for fixing the diagonal material to the chord material, which is a concrete member, and both end portions of the chord material A PC steel material that is disposed along the axis of the diagonal material that is a tensile material while being fixed, and into which a tensile force is introduced so that a tensile stress that should be generated in the diagonal material is reduced. Truss structure.
JP2001006079A 2001-01-15 2001-01-15 Truss structure Expired - Fee Related JP4572038B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001006079A JP4572038B2 (en) 2001-01-15 2001-01-15 Truss structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001006079A JP4572038B2 (en) 2001-01-15 2001-01-15 Truss structure

Publications (2)

Publication Number Publication Date
JP2002213017A JP2002213017A (en) 2002-07-31
JP4572038B2 true JP4572038B2 (en) 2010-10-27

Family

ID=18874031

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001006079A Expired - Fee Related JP4572038B2 (en) 2001-01-15 2001-01-15 Truss structure

Country Status (1)

Country Link
JP (1) JP4572038B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561508A (en) * 2012-02-09 2012-07-11 清华大学 Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4588542B2 (en) * 2005-06-03 2010-12-01 東京電力株式会社 Member replacement method for truss structure
KR100724999B1 (en) 2006-09-04 2007-06-04 현대건설주식회사 Abdominal truss composite girder with displacement permitting structure by slit plate and its connecting point
JP4944679B2 (en) * 2007-06-18 2012-06-06 大成建設株式会社 Truss construction method
JP6836873B2 (en) * 2016-10-05 2021-03-03 株式会社竹中工務店 Brace mounting structure and brace mounting method
JP7365867B2 (en) * 2019-11-18 2023-10-20 株式会社竹中工務店 frame
CN115075562B (en) * 2022-06-29 2024-06-11 浙江精工钢结构集团有限公司 Method for releasing additional stress of large-span truss structure partition phased construction

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2520777A1 (en) * 1982-01-29 1983-08-05 Bouygues Sa METHOD AND DEVICES FOR REALIZING A BRIDGE APRON AND SIMILAR STRUCTURES, AND ARTICLES OBTAINED
JPH07119500B2 (en) * 1991-11-07 1995-12-20 住友建設株式会社 Joining method for precast concrete members

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561508A (en) * 2012-02-09 2012-07-11 清华大学 Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings
CN102561508B (en) * 2012-02-09 2014-09-24 清华大学 Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings

Also Published As

Publication number Publication date
JP2002213017A (en) 2002-07-31

Similar Documents

Publication Publication Date Title
KR100704874B1 (en) Prefabricated concrete pier structure reinforced with shear by steel pipe
KR101886345B1 (en) CONSTRUCTION METHOD OF HYBRID RAILWAY BRIDGE USING PRESTRESSED CONCRETE FILLED TUBE and TRANSVERSE PRESTRESSED CONCRETE BLOCK
JP4572038B2 (en) Truss structure
JPH094118A (en) Precast concrete plate
JP4107452B2 (en) Joint structure of pile and foundation concrete slab
JP2003138523A (en) Construction method for tension string girder bridge
KR100530025B1 (en) Section enlargement repairing and reinforcing apparatus for reinforcing earing power of reinforced concrete structures by introducing prestress to entended section and repairing and reinforcing construction method using the apparatus
JP2012132251A (en) Closing part construction method of bridge
JP7186669B2 (en) Concrete floor slab and method for repairing concrete floor slab
JP2004116060A (en) Construction method of corrugated steel web bridge
JP3929006B2 (en) Construction method for expanded seismic walls
JP3068757B2 (en) Slope protection method
JP2005256430A (en) Joining structure of steel main girder and precast pc floor slab of steel composite girder bridge by high strength stud dowel and spiral reinforcement
JPH05340031A (en) Prestressed concrete girder and its manufacture
KR100596072B1 (en) Precast concrete panel composite beam with embedded bottom flange and integral connection structure
JP3849234B2 (en) Reinforced concrete underground outer wall construction method
JP2000038797A (en) Semi-precast floor slab
JP2004011300A (en) PC composite structure, PC bridge and method for introducing prestress
KR20020020315A (en) Continuous Preflex Beam Structures Using External Tendon and Constructing Method thereof
JP2004162455A (en) Pile head joint structure
JP2521644B2 (en) Reinforcement method of concrete structure
JP3000445B2 (en) Connection structure of frame members in PC hollow pile
JP2000087313A (en) Construction method of composite slab bridge and composite slab bridge
JP2002138415A (en) Cross girder member for girder member in pc bridge and girder member
CN115584683B (en) A wire rope connection structure for anchoring curved plates in wet joints

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070906

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100202

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100511

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100706

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100803

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100816

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4572038

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees