JP4572038B2 - Truss structure - Google Patents
Truss structure Download PDFInfo
- Publication number
- JP4572038B2 JP4572038B2 JP2001006079A JP2001006079A JP4572038B2 JP 4572038 B2 JP4572038 B2 JP 4572038B2 JP 2001006079 A JP2001006079 A JP 2001006079A JP 2001006079 A JP2001006079 A JP 2001006079A JP 4572038 B2 JP4572038 B2 JP 4572038B2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- diagonal
- floor slab
- tensile
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、主として橋梁として用いられるトラス構造に関する。
【0002】
【従来の技術】
従来のこの種のトラス構造としては、例えば複合トラス構造であって、上弦材及び下弦材からなるコンクリート部材である弦材と、これらに対して両端部が接合される鋼管部材である斜材とからなり、前記鋼管部材である斜材を前記弦材に定着する定着手段を備えるものがある。
【0003】
ここで、定着手段としては、例えばコンクリート部材である弦材の中まで深く埋め込んだ鋼材たるガセットに対して鋼管部材である斜材を定着してなるものや、鋼管部材の端部に対して膨張性モルタルを用いて固着したPC鋼棒の自由端部をコンクリート部材である弦材の中まで伸ばし込んで定着してなるものが用いられる。
【0004】
【発明が解決しようとする課題】
しかしながら、前者の定着手段を備えるタイプのトラス構造では、コンクリート部材である弦材の内部に斜材定着用の鋼材としてのガセットを埋め込む必要があるので、構造が複雑化し易い欠点があり、迅速かつ容易な施工の実現が困難となる。また、そればかりか、結果的に弾性係数が大きく異なる部材が局部的に配置されるので、ひび割れが発生する等、品質の面から問題となる場合もある。
【0005】
一方、後者の定着手段を備えるタイプのトラス構造では、鋼管部材である斜材をコンクリート部材である弦材に一度定着してしまうと、引き抜けないこととなるので、施工中や供用開始後に斜材が何らかの損傷を受けたような場合でも、もはやこれを交換できないという問題がある。
また、このタイプのトラス構造では、鋼管部材である斜材の取り付けが、必ずコンクリート部材である弦材についてのコンクリートの打設作業に先立ってなされる必要があり、実際上施工手順がかなり拘束されてしまうという問題もある。
ここで、引張材である斜材に限ってみれば、後者の定着手段を備えるタイプのトラス構造では、コンクリート部材である弦材及び鋼管部材である斜材の間に目開きが発生する場合があり、これが防水機能を損なう結果となり、耐久性の面から問題となる場合がある。
【0006】
他方、従来のトラス構造では、橋梁中の適用部位いかんで斜材の軸方向力に違いが生じ、斜材断面が適用部位毎に区々となるので、施工性の面からも問題となる場合が少なくない。また、このような斜材が区々となり断面が不統一となることは、景観性の面からみても望ましいとはいえない。
【0007】
そこで、本発明の課題は、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることができ、引張材である斜材については、耐久性の向上を図ること及び断面の大きさを調整することができるようなトラス構造を提供することにある。
【0008】
【課題を解決するための手段】
すなわち、本発明に係るトラス構造は、上弦材及び下弦材からなる弦材と、これらに対して両端部が接合される斜材と、前記斜材をコンクリート部材である前記弦材に定着する定着手段と、両端部を前記弦材に固定しながら引張材である前記斜材の軸線に沿って配設され、該斜材に発生するはずの引張応力が減少するような緊張力の導入がなされたPC鋼材とを含むことを特徴としている。
【0011】
本発明に係るトラス構造によれば、引張材である斜材をコンクリート部材である弦材に定着する定着手段を有するトラス構造において、引張材である斜材における引張応力を減少させるPC鋼材を備えるので、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることが可能となるのみならず、引張材である斜材に関しては、斜材及び上下弦材の一体化を図ることができるので、結果的に耐久性の向上を図ること及び断面の大きさを調整することが可能となる。
【0012】
これらのような技術的手段において、「トラス構造」としては、弦材及び斜材からなるものに限られず、弦材及び斜材に加えて、鉛直材その他の部材を含むものであっても差し支えない。
【0013】
なお、上弦材及び下弦材は互いに平行な位置関係にあるものに限られない。
【0014】
また、「斜材」としては、上弦材及び下弦材の間に設けられ、これらに対して両端部が接合されるものであればよく、コンクリート部材であるか、鋼管部材であるか等の別を問わない。
【0015】
さらに、「弦材」としては、上弦材及び下弦材からなり、これらの少なくともいずれか一方がコンクリート部材であれば、梁状部材であるか、版状部材であるかなどの構造形式や形状の別を問わず、例えば複合部材からなるトラス構造であっても差し支えない。
【0016】
さらにまた、ここにいう「定着」とは、斜材と一体に設けられ、定着手段の主要部材としての鉄筋、アンカーその他の部材をコンクリート部材である弦材中に埋め込んで引き抜けないようにすることを意味する。
【0017】
ここで、「定着手段」としては、前記斜材のコンクリート部材である前記弦材への定着を可能とするものであれば、どのような構造のもの、形式のものを採用するかなどの別を問わない。
【0018】
また、「アンカー」としては、エンドプレートの弦材への定着をある程度の定着長さでもって可能とするものであれば、どのような構成のものを用いるか、どのような材料のものを用いるかの別を問わない。
【0019】
それゆえ、例えばアンカー、鉄筋やPC鋼材などに限られず、スタッドや凸形鋳鋼なども適宜選定して用いることができる。
【0020】
【発明の実施の形態】
以下、添付図面に基づいて本発明の実施の形態を詳細に説明する。
【0021】
図1は本発明の一実施の形態に係るトラス構造の全体構成を示す側面図、図2は該トラス構造の部分構成を示す側面図、図3は該トラス構造の部分構成を示す図2におけるA方向の矢視図、図4は該トラス構造における斜材の部分構成を示す断面図である。
【0022】
本実施の形態において、トラス構造は、図1に示すように、コンクリート部材である弦材としてのコンクリート床版1と鋼管部材である斜材2とを含むトラス構造において、定着手段3と、PC鋼材としてのPC鋼より線4とを備えるものである。
すなわち、本実施の形態におけるトラス構造は、鉛直材を含まない複合部材からなるトラス構造、言い換えれば複合トラス構造である。以下、各構成要素について詳細に説明する。
【0023】
(1)コンクリート床版1
コンクリート床版1は、図1に示すように、上弦材たるコンクリート上床版1a及び下弦材たるコンクリート下床版1bとからなっている。
【0024】
コンクリート上床版1a及びコンクリート下床版1bは、同図に示すように、互いに略平行な位置関係にある。
そして、コンクリート上床版1a及びコンクリート下床版1bは、双方とも、前記したように、コンクリート部材であって、より具体的には場所打ち鉄筋コンクリートからなっている。
【0025】
コンクリート床版1は、同図に示すように、略全体を占める版状を呈する平行部11と、平行部11以外の部分であって斜材2及びコンクリート床版1の接合部として機能する突出部12とからなる。
突出部12は、同図に示すように、平行部11から斜材2側に突出するような側面形状である略三角形形状を呈する部分である。
ここで、突出部12を略三角形形状とした理由は、斜材2の軸線と直交する接合面を形成させることとしたためである。
ただし、略三角形形状の突出部12を形成させたことにより、当該部分のせん断抵抗力を増大させたという意味や、さらには、当該部分において溜水ができない状況とすることにより、防水上望ましい環境を実現させたというような二次的な意味もある。
なお、突出部12の裏側には、PC鋼より線4を固定する定着装置41を取り付けるための切り欠き部が形成されているが、この切り欠き部は、防錆の必要性からコンクリートにより後埋めされることになる。
【0026】
(2)斜材2
斜材2は、同図に示すように、コンクリート上床版1a及びコンクリート下床版1bの間に設けられ、これらに対して両端部が接合される。
すなわち、斜材2の上端部は、同図に示すように、コンクリート上床版1aに対して接合され、斜材2の下端部は、コンクリート下床版1bに対して接合される。
斜材2には、引張材である斜材(以下「引張斜材」という)2aと、圧縮材である斜材(以下「圧縮斜材」という)2bとがある。
なお、防錆対策の観点から、斜材2として耐候性鋼板を採用することとした。
ただし、これに限られるものではなく、例えば通常の鋼板に重防食する方法などであっても差し支えない。
【0027】
(3)定着手段3
定着手段3は、引張斜材2a及び圧縮斜材2bをコンクリート床版1に定着する役割を果たすものである。
【0028】
定着手段3は、図2に示すように、引張斜材2aの端部に対して固着されるエンドプレート21と、エンドプレート21をコンクリート床版1に定着するアンカー22とからなっている。
【0029】
ここで、引張斜材2aの端部に対するエンドプレート21の固着は、図4に示すように、開先角度を45゜とした完全溶け込み溶接による溶接継目21aと、溶接作業上の便宜から用いられる裏当て金21bとからなっている。なお、エンドプレート21の固着は、本実施の形態に係るような溶接方法に限定されるものではなく、他の溶接方法や接合方法の中から適宜選定して用いることができる。
【0030】
また、アンカー22は、図2に示すように、突出部12の範囲に埋め込まれる埋込ナット22aと、埋込ナット22aに螺合するPC鋼棒22bと、コンクリート床版1の硬化後にPC鋼棒22bを埋込ナット22aへ装着するための空洞領域を確保するシース22cと、埋込ナット22aに螺合するPC鋼棒22bによりエンドプレート21を突出部12に締結するための締結ナット22dからなっている。
【0031】
ここで、エンドプレート21には、図3に示すように、PC鋼棒22bの締結用としての孔である締結用孔22eが設けられている。
これにより、施工中又は供用開始後において、斜材2が何らかの損傷を受けたような場合にあっても、容易に斜材2を交換できることとなる。また、コンクリート床版1の施工を終えた後に斜材2を取り付けるようなことも可能となる。
なお、図示しないが、PC鋼棒22bのうち外部に露出する部分については、防水キャップで被覆することとし、これにより、耐久性の向上を図ることとした。
ただし、耐久性の向上を図る方法としては、これに限られるものではなく、例えばPC鋼棒22bに防錆仕様のもの(例えばダクロタイズド処理を施したもの)を用いるなどしてもよい。また、PC鋼棒22bのうち外部に露出する部分のみをカプラーを利用して着脱可能に構成してもよい。
【0032】
なお、本実施の形態では、突出部12及びエンドプレート21の間には、不陸により隙間があくのを防ぐため、無収縮モルタル31を打設することとした(図2参照)。なお、無収縮モルタル31の打設は、施工手順により、斜材2をセットしてから、突出部12のコンクリートを打設するような場合には、無収縮モルタル31の打設をする必要はない。
【0033】
(4)PC鋼より線4
PC鋼より線4は、図1に示すように、両端部をコンクリート床版1に固定しながら引張斜材2aの軸線に沿って配設されるものである。
ここで、コンクリート床版1に対するPC鋼より線4の固定は、図2に示すように、コンクリート下床版1bについては、突出部12の裏側の切り欠き部において定着装置41を用いて実現されることとなっている。一方、コンクリート上床版1aについては、耐久性の向上を図る観点から、突出部12の裏側に切り欠き部を設けていない。なお、コンクリート下床版1bの切り欠き部についても、コンクリートで後埋めされ、防錆の確保により耐久性の向上が図られる。
なお、突出部12の裏側には、PC鋼より線4を固定する定着装置41を取り付けるための切り欠き部が形成されているが、この切り欠き部は、ることになる。
また、PC鋼より線4は、具体的には、図3に示すように、鋼管部材としての引張斜材2aの内側においてその軸線に沿って配設されることになっている。なお、PC鋼より線4は、引張斜材2aの軸線に沿って配設されていればよく、引張斜材2aの内側において配設されているものに限定されるものではない。
【0034】
ここで、PC鋼より線4には、引張斜材2aに発生するはずの引張応力が減少するような緊張力の導入がなされている。これにより、コンクリート床版1におけるアンカー22の定着長さを短くすることが可能となる。本実施の形態においては、突出部12及びエンドプレート1の間での引張力が発生しないような設計とした。
なお、PC鋼より線4による緊張力の導入によって、コンクリート床版1及び斜材2の間で目開きが発生させないこととなり、防水効果の向上、ひいては耐久性の向上を図ることが可能となる。
【0035】
次に、図5を用いて、本実施の形態に係るトラス構造の構築方法について説明する。
【0036】
(1)施工開始前(図5(a)参照)
今、トラス構造は、前日までの施工が終了した状態におかれている。
すなわち、既設の引張斜材2a及び既設のコンクリート下床版1bの設置が完了した状態にある。
また、型枠支保工台車(図示外)は、次に施工するはずの新設のコンクリート上床版1aに対応する位置において固定された状態にある。
【0037】
(2)コンクリート上床版1aの施工(図5(b)参照)
このような状態において、新設の圧縮斜材2bが仮設として設置される。
【0038】
そして、新設のコンクリート上床版1aについて、コンクリートの打設を行うために型枠が設置される。
続いて、新設の圧縮斜材2bが本設として設置される。
次いで、新設の圧縮斜材2bの下側の隙間領域に対して無収縮モルタル31の打設がなされる。
【0039】
そして、新設のコンクリート上床版1aについて、鉄筋の組立が行われるとともに、次に施工すべき引張斜材2aの固定用としてのアンカー22の一部が設置される。
【0040】
そして、新設のコンクリート上床版1aについて、コンクリートの打設が行われるとともに、打設後において養生期間がとられる。
養生期間の経過後、新設の圧縮斜材2bの固定用としてのアンカー22について、PC鋼棒22bに対して緊張力が導入される。
続いて、PC鋼より線4に対して緊張力が導入されることになる。
【0041】
これにより、新設のコンクリート上床版1aの施工が完了することになる。
なお、型枠支保工台車は、次に施工するはずのコンクリート下床版1bに対応する位置まで移動し、固定状態となる。
【0042】
(3)コンクリート下床版1bの施工(図5(c)参照)
このような状態において、新設の引張斜材2aが仮設として設置される。このとき、PC鋼より線4が新設の引張斜材2aの内側に挿入される。
【0043】
そして、新設のコンクリート下床版1bについて、コンクリートの打設を行うために型枠が設置される。
続いて、新設の引張斜材2aが本設として設置される。
次いで、新設の引張斜材2aの上側領域に無収縮モルタル31の打設がなされる。
【0044】
そして、新設のコンクリート下床版1bについて、鉄筋の組立が行われるとともに、次に施工すべき圧縮斜材2bの固定用としてのアンカー22の一部が設置される。
【0045】
そして、新設のコンクリート下床版1bについて、コンクリートの打設が行われるとともに、打設後において養生期間がとられる。
養生期間の経過後、新設の引張斜材2aの固定用としてのアンカー22について、PC鋼棒22bに対して仮設的に緊張力が導入される。
続いて、PC鋼より線4に緊張力の導入がなされる。これにより、引張斜材2aに発生するはずの引張応力を減少させることが可能となる。
次いで、新設の引張斜材2aの固定用としてのアンカー22について、PC鋼棒22bに対して本設的に緊張力が導入される。
【0046】
これにより、新設のコンクリート下床版1bの施工が完了することになる。
なお、型枠支保工台車は、次に施工するはずのコンクリート下床版1bに対応する位置まで移動し、固定状態となる。
【0047】
したがって、本実施の形態に係るトラス構造によれば、鋼管部材である斜材2をコンクリート床版1にエンドプレート21及びアンカー22を介して定着する定着手段3を備えるので、簡易な構造に基づく施工の迅速化及び容易化を図ることが可能となり、これに伴い高品質化を担保することも可能となるとともに、斜材2の交換及びこれに基づく自由度の高い施工の実施をすることが可能となる。
【0048】
しかも、引張斜材2aにおける引張応力を減少させるPC鋼より線4を備えるので、特に引張斜材2aについては、耐久性の向上を図ること及び断面の大きさを調整することが可能となる。
【0049】
【発明の効果】
本発明に係るトラス構造によれば、以上のように構成したため、簡易な構造に基づく施工の迅速化及び容易化を図ることができ、これにより高品質化を担保することができ、斜材の交換及びこれに基づく自由度の高い施工の実施をすることができ、引張材である斜材については、耐久性の向上を図ること及び断面の大きさを調整することができることになる。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係るトラス構造の全体構成を示す側面図である。
【図2】本発明の一実施の形態に係るトラス構造の部分構成を示す側面図、図3は該トラス構造の部分構成を示すである。
【図3】本発明の一実施の形態に係るトラス構造の部分構成を示す図2におけるA方向の矢視図である。
【図4】本発明の一実施の形態に係るトラス構造における斜材の部分構成を示す断面図である。
【図5】本発明の一実施の形態に係るトラス構造の構築方法を説明する施工図である。
【符号の説明】
1…コンクリート床版(弦材)
1a…コンクリート上床版(上弦材)
1b…コンクリート下床版(下弦材)
2…斜材
2a…引張斜材(引張材である斜材)
2b…圧縮斜材(圧縮材である斜材)
3…定着手段
4…PC鋼より線(PC鋼材)
11…平行部
12…突出部
21…エンドプレート
21a…溶接継目
21b…裏当て金
22…アンカー
22a…埋込ナット
22b…PC鋼棒
22c…シース
22d…締結ナット
22e…締結用孔
31…無収縮モルタル
41…定着装置[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a truss structure mainly used as a bridge.
[0002]
[Prior art]
As this type of conventional truss structure, for example, a composite truss structure, a chord material that is a concrete member made of an upper chord material and a lower chord material, and a diagonal material that is a steel pipe member to which both end portions are joined. And a fixing means for fixing the diagonal member, which is the steel pipe member, to the string member.
[0003]
Here, as the fixing means, for example, a diagonal member as a steel pipe member is fixed to a gusset which is a steel material deeply embedded into a chord material which is a concrete member, or the end of the steel pipe member is expanded. For example, a PC steel bar fixed using a mortar is fixed by extending the free end of the steel bar into a chord material, which is a concrete member.
[0004]
[Problems to be solved by the invention]
However, in the truss structure of the type provided with the former fixing means, it is necessary to embed a gusset as an oblique material fixing steel material inside the chord material, which is a concrete member. Realizing easy construction becomes difficult. In addition, as a result, members having greatly different elastic coefficients are locally arranged, so that there may be a problem in terms of quality such as cracking.
[0005]
On the other hand, in the truss structure with the latter fixing means, once the diagonal member, which is a steel pipe member, is fixed to the chord member, which is a concrete member, it cannot be pulled out. Even if the material is damaged in some way, there is a problem that it can no longer be replaced.
In addition, in this type of truss structure, it is necessary to attach the diagonal member, which is a steel pipe member, prior to the concrete placement work for the chord member, which is a concrete member. There is also the problem of end up.
Here, as far as the diagonal material, which is a tensile material, in the truss structure of the type provided with the latter fixing means, there is a case where an opening occurs between the chord material, which is a concrete member, and the diagonal material, which is a steel pipe member. Yes, this results in a loss of the waterproof function, which may cause a problem in terms of durability.
[0006]
On the other hand, in the conventional truss structure, there is a difference in the axial force of the diagonal material depending on the application site in the bridge, and the cross section of the diagonal material varies depending on the application site. There are many. In addition, it is not desirable from the viewpoint of scenery that such diagonal materials are divided into sections and the cross-sections are not uniform.
[0007]
Therefore, the problem of the present invention is that it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, and replacement of diagonal materials and a high degree of freedom based thereon. An object of the present invention is to provide a truss structure capable of carrying out the construction and improving the durability and adjusting the cross-sectional size of the diagonal material which is a tensile material.
[0008]
[Means for Solving the Problems]
That is, the truss structure according to the present invention includes a chord material composed of an upper chord material and a lower chord material, an oblique material joined at both ends thereof, and fixing the oblique material to the chord material that is a concrete member. The tension force is introduced so as to reduce the tensile stress that is to be generated in the diagonal member and is arranged along the axis of the diagonal member that is the tensile member while fixing both ends to the chord member. PC steel material.
[0011]
According to the truss structure of the present invention , in the truss structure having fixing means for fixing the diagonal material as the tensile material to the chord material as the concrete member, the PC steel material for reducing the tensile stress in the diagonal material as the tensile material is provided. Therefore, it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, and exchanging diagonal materials and implementing construction with a high degree of freedom based on this. In addition to the diagonal material that is a tensile material, the diagonal material and the upper and lower chord materials can be integrated, resulting in improved durability and adjusting the cross-sectional size. It becomes possible to do.
[0012]
In such technical means, the “truss structure” is not limited to those made of string material and diagonal material, and may include vertical material and other members in addition to string material and diagonal material. Absent.
[0013]
Note that the upper chord material and the lower chord material are not limited to being in a parallel positional relationship.
[0014]
In addition, the “diagonal material” may be any material provided between the upper chord material and the lower chord material and having both end portions joined thereto, whether it is a concrete member or a steel pipe member. It doesn't matter.
[0015]
Furthermore, the “string material” is composed of an upper chord material and a lower chord material, and if at least one of them is a concrete member, it has a structural type or shape such as a beam member or a plate member. For example, a truss structure made of a composite member may be used.
[0016]
Furthermore, the term “fixing” here is provided integrally with the diagonal member so that the reinforcing bars, anchors and other members as the main members of the fixing means are embedded in the chord material which is a concrete member so as not to be pulled out. Means that.
[0017]
Here, as the “fixing means”, as long as it can fix the diagonal material to the chord material, which is a concrete member, the structure and type of the fixing material may be different. It doesn't matter.
[0018]
In addition, as an “anchor”, what kind of structure is used and what kind of material is used as long as it can fix the end plate to the string material with a certain fixing length. Whether or not.
[0019]
Therefore, it is not limited to, for example, an anchor, a reinforcing bar, or a PC steel material, and a stud, a convex cast steel, or the like can be appropriately selected and used.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
[0021]
1 is a side view showing an overall configuration of a truss structure according to an embodiment of the present invention, FIG. 2 is a side view showing a partial configuration of the truss structure, and FIG. 3 is a partial configuration of the truss structure in FIG. FIG. 4 is a cross-sectional view showing a partial configuration of the diagonal member in the truss structure.
[0022]
In the present embodiment, as shown in FIG. 1, the truss structure is a truss structure including a
That is, the truss structure in the present embodiment is a truss structure composed of a composite member not including a vertical member, in other words, a composite truss structure. Hereinafter, each component will be described in detail.
[0023]
(1)
As shown in FIG. 1, the
[0024]
The concrete
The concrete
[0025]
As shown in the figure, the
As shown in the figure, the protruding
Here, the reason why the protruding
However, by forming the substantially
In addition, a notch for attaching a fixing
[0026]
(2)
As shown in the figure, the
That is, the upper end portion of the
The
In addition, from the viewpoint of rust prevention measures, a weather resistant steel plate was adopted as the
However, it is not restricted to this, For example, the method of heavy-corrosion-proofing to a normal steel plate etc. may be sufficient.
[0027]
(3) Fixing means 3
The fixing means 3 serves to fix the tensile
[0028]
As shown in FIG. 2, the fixing means 3 includes an
[0029]
Here, as shown in FIG. 4, the fixing of the
[0030]
Further, as shown in FIG. 2, the
[0031]
Here, as shown in FIG. 3, the
Thereby, even if the
Although not shown in the figure, the portion of the
However, the method for improving the durability is not limited to this, and for example, a
[0032]
In the present embodiment, the
[0033]
(4)
As shown in FIG. 1, the PC steel stranded
Here, the fixation of the
In addition, although the notch part for attaching the fixing
Further, specifically, the PC steel stranded
[0034]
Here, a tensile force is introduced into the
In addition, the introduction of the tension force by the
[0035]
Next, the construction method of the truss structure according to the present embodiment will be described with reference to FIG.
[0036]
(1) Before start of construction (see Fig. 5 (a))
Now, the truss structure is in a state where the construction up to the previous day has been completed.
That is, the installation of the existing tensile
Further, the formwork support cart (not shown) is fixed at a position corresponding to the newly installed concrete
[0037]
(2) Construction of concrete
In such a state, the new compression
[0038]
And a formwork is installed in order to place concrete for the newly installed concrete
Subsequently, a new compression
Next, the
[0039]
Then, as for the new concrete
[0040]
And about the new concrete
After the curing period, a tension force is introduced to the
Subsequently, tension is introduced to the
[0041]
Thereby, the construction of the new concrete
In addition, a formwork support trolley | bogie moves to the position corresponding to the concrete
[0042]
(3) Construction of
In such a state, the newly installed tensile
[0043]
And a formwork is installed in order to place concrete for the newly installed concrete
Subsequently, the newly installed tensile
Next, the
[0044]
Then, as for the newly installed concrete
[0045]
And about concrete newly placed
After the curing period, a tension force is temporarily introduced into the
Subsequently, tension is introduced into the
Next, a tension force is permanently introduced into the
[0046]
Thereby, the construction of the new concrete
In addition, a formwork support trolley | bogie moves to the position corresponding to the concrete
[0047]
Therefore, according to the truss structure according to the present embodiment, since the
[0048]
In addition, since the
[0049]
【The invention's effect】
According to the truss structure according to the present invention, since it is configured as described above, it is possible to speed up and facilitate construction based on a simple structure, thereby ensuring high quality, It is possible to carry out the replacement and construction with a high degree of freedom based on this, and for the diagonal material which is a tensile material, the durability can be improved and the size of the cross section can be adjusted.
[Brief description of the drawings]
FIG. 1 is a side view showing an overall configuration of a truss structure according to an embodiment of the present invention.
FIG. 2 is a side view showing a partial configuration of a truss structure according to an embodiment of the present invention, and FIG. 3 shows a partial configuration of the truss structure.
3 is a view in the direction of arrow A in FIG. 2 showing a partial configuration of the truss structure according to the embodiment of the present invention.
FIG. 4 is a cross-sectional view showing a partial configuration of a diagonal member in a truss structure according to an embodiment of the present invention.
FIG. 5 is a construction diagram illustrating a method for constructing a truss structure according to an embodiment of the present invention.
[Explanation of symbols]
1 ... Concrete floor slab (string material)
1a: Concrete upper floor slab (upper chord material)
1b: Concrete lower floor slab (lower chord material)
2 ...
2b ... Compressed diagonal material (an oblique material which is a compressed material)
3 ... Fixing means 4 ... PC steel strand (PC steel)
DESCRIPTION OF
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001006079A JP4572038B2 (en) | 2001-01-15 | 2001-01-15 | Truss structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001006079A JP4572038B2 (en) | 2001-01-15 | 2001-01-15 | Truss structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002213017A JP2002213017A (en) | 2002-07-31 |
| JP4572038B2 true JP4572038B2 (en) | 2010-10-27 |
Family
ID=18874031
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001006079A Expired - Fee Related JP4572038B2 (en) | 2001-01-15 | 2001-01-15 | Truss structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4572038B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102561508A (en) * | 2012-02-09 | 2012-07-11 | 清华大学 | Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4588542B2 (en) * | 2005-06-03 | 2010-12-01 | 東京電力株式会社 | Member replacement method for truss structure |
| KR100724999B1 (en) | 2006-09-04 | 2007-06-04 | 현대건설주식회사 | Abdominal truss composite girder with displacement permitting structure by slit plate and its connecting point |
| JP4944679B2 (en) * | 2007-06-18 | 2012-06-06 | 大成建設株式会社 | Truss construction method |
| JP6836873B2 (en) * | 2016-10-05 | 2021-03-03 | 株式会社竹中工務店 | Brace mounting structure and brace mounting method |
| JP7365867B2 (en) * | 2019-11-18 | 2023-10-20 | 株式会社竹中工務店 | frame |
| CN115075562B (en) * | 2022-06-29 | 2024-06-11 | 浙江精工钢结构集团有限公司 | Method for releasing additional stress of large-span truss structure partition phased construction |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2520777A1 (en) * | 1982-01-29 | 1983-08-05 | Bouygues Sa | METHOD AND DEVICES FOR REALIZING A BRIDGE APRON AND SIMILAR STRUCTURES, AND ARTICLES OBTAINED |
| JPH07119500B2 (en) * | 1991-11-07 | 1995-12-20 | 住友建設株式会社 | Joining method for precast concrete members |
-
2001
- 2001-01-15 JP JP2001006079A patent/JP4572038B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102561508A (en) * | 2012-02-09 | 2012-07-11 | 清华大学 | Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings |
| CN102561508B (en) * | 2012-02-09 | 2014-09-24 | 清华大学 | Steel tube concrete poling type truss mixed structure for high-rise and super high-rise buildings |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002213017A (en) | 2002-07-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100704874B1 (en) | Prefabricated concrete pier structure reinforced with shear by steel pipe | |
| KR101886345B1 (en) | CONSTRUCTION METHOD OF HYBRID RAILWAY BRIDGE USING PRESTRESSED CONCRETE FILLED TUBE and TRANSVERSE PRESTRESSED CONCRETE BLOCK | |
| JP4572038B2 (en) | Truss structure | |
| JPH094118A (en) | Precast concrete plate | |
| JP4107452B2 (en) | Joint structure of pile and foundation concrete slab | |
| JP2003138523A (en) | Construction method for tension string girder bridge | |
| KR100530025B1 (en) | Section enlargement repairing and reinforcing apparatus for reinforcing earing power of reinforced concrete structures by introducing prestress to entended section and repairing and reinforcing construction method using the apparatus | |
| JP2012132251A (en) | Closing part construction method of bridge | |
| JP7186669B2 (en) | Concrete floor slab and method for repairing concrete floor slab | |
| JP2004116060A (en) | Construction method of corrugated steel web bridge | |
| JP3929006B2 (en) | Construction method for expanded seismic walls | |
| JP3068757B2 (en) | Slope protection method | |
| JP2005256430A (en) | Joining structure of steel main girder and precast pc floor slab of steel composite girder bridge by high strength stud dowel and spiral reinforcement | |
| JPH05340031A (en) | Prestressed concrete girder and its manufacture | |
| KR100596072B1 (en) | Precast concrete panel composite beam with embedded bottom flange and integral connection structure | |
| JP3849234B2 (en) | Reinforced concrete underground outer wall construction method | |
| JP2000038797A (en) | Semi-precast floor slab | |
| JP2004011300A (en) | PC composite structure, PC bridge and method for introducing prestress | |
| KR20020020315A (en) | Continuous Preflex Beam Structures Using External Tendon and Constructing Method thereof | |
| JP2004162455A (en) | Pile head joint structure | |
| JP2521644B2 (en) | Reinforcement method of concrete structure | |
| JP3000445B2 (en) | Connection structure of frame members in PC hollow pile | |
| JP2000087313A (en) | Construction method of composite slab bridge and composite slab bridge | |
| JP2002138415A (en) | Cross girder member for girder member in pc bridge and girder member | |
| CN115584683B (en) | A wire rope connection structure for anchoring curved plates in wet joints |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070906 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100202 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100511 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100706 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100803 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100816 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130820 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4572038 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|