JP4580107B2 - Construction method of falling partition wall of unit housing - Google Patents
Construction method of falling partition wall of unit housing Download PDFInfo
- Publication number
- JP4580107B2 JP4580107B2 JP2001003351A JP2001003351A JP4580107B2 JP 4580107 B2 JP4580107 B2 JP 4580107B2 JP 2001003351 A JP2001003351 A JP 2001003351A JP 2001003351 A JP2001003351 A JP 2001003351A JP 4580107 B2 JP4580107 B2 JP 4580107B2
- Authority
- JP
- Japan
- Prior art keywords
- partition wall
- core material
- falling
- construction method
- units
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、建物ユニット同士の接合部を跨ぐ下がり間仕切り壁の施工方法に関する。
【0002】
【背景の技術】
ユニット工法による住宅では、ユニット同士の接合部(ジョイント部分)が存在する。例えば鉄骨系ユニット住宅では、図2に示すように、四隅に鉄骨柱1を配置したユニット2を使用するため、ユニット2,2同士の接合部3に加えて、ユニットの建て込みに必要な隙間も生じる。従って、この接合部3に相当する領域の内装工事等は一部が現場施工となる。
【0003】
図3は、ユニット同士の接合部3を跨ぐ構造となる下がり間仕切り壁5の従来の施工例を示す図である。この例では、下がり間仕切り壁5の一部が床に達する通常間仕切り壁部分6を有するもので、施工後は全体として門型構造となる例を示している。
【0004】
この下がり間仕切り壁5を施工する場合、従来は次のような方法が採用されていた。予め、工場等において下がり間仕切り壁5の芯材5a、通常間仕切り壁部分6の芯材6aを図2に示すように双方のユニット2、2内にそれぞれ施工しておく。さらに、通常間仕切り壁部分6の芯材6a上に石膏ボード7を施工しておく。
【0005】
そして、ユニット2、2同士を現場で接合した後に、双方の下がり間仕切り壁用の芯材5a、5a上に石膏ボード(図示せず)を貼り付けて固定する。この際、接合部3を跨ぐ長さの石膏ボードを用いて芯材5a、5a同士を一体化させる。したがって、石膏ボードの現場施工範囲は、図3においてWで示される範囲となる。ここで、石膏ボードの艤装貼りは斜線で示す範囲となる。
【0006】
【発明が解決しようとする課題】
このような従来の施工法では、以下のような問題がある。下がり間仕切り壁5の芯材5a、5aを、双方のユニット2,2内に予め工場等にて施工しておくことにより生じる問題である。即ち、下がり間仕切り壁5の芯材5a,5aは、双方のユニット2,2内に個別に施工されるため、ユニット2,2の接合時において、それらの芯材5a,5a同士が正確に合致せず、位置ずれが生じる問題である。
【0007】
この位置ずれの問題は、芯材5a,5aの施工精度、芯材5a,5aに使用される木材の経時的な変形、作業者の熟練度等によって左右されやすい。位置ずれが大きくなった場合には、これを現場にて調整する必要があり、現場での施工性が著しく低下することになる。
【0008】
よって、本発明の課題は、ユニット工法での接合部を跨ぐ下がり間仕切り壁の施工性を向上させることができ、施工後の強度等も充分に確保できる技術を提供することにある。
【0009】
【課題を解決するための手段】
本発明を、図面を参照して説明すると、ユニット2,2同士の接合部3を跨ぐ下がり間仕切り壁5の施工方法において、接合される両ユニット2,2の双方に、工場等において前記下がり間仕切り壁5の芯材51、52の一部の芯材51をそれぞれ施工しておく第1工程と、前記ユニット2,2の接合後に、前記下がり間仕切り壁5の残りの芯材52を施工する第2工程と、その第2行程の後に、前記芯材51,52上に下がり間仕切り壁用の石膏ボードを貼る第3工程とを行うことを特徴とする。
【0010】
このような本発明によれば、残りの芯材52を現場施工とすることで、ユニット2,2接合時に、予め工場等で施工してある艤装済み芯材51,51同士に位置ずれが生じた場合でも、この残りの芯材52にて調整することができる。これにより、ユニット工法における下がり間仕切り壁の施工性を向上させることができる。
【0011】
上記施工法において、前記下がり間仕切り壁5の前記残りの芯材52は、ユニット2,2同士の接合部3を跨ぐ形態で施工される長尺の芯材52であることが望ましい。このようにすれば、艤装済み芯材51,51同士の位置合わせ調整がさらに容易になるだけでなく、この長尺の芯材52により艤装済み芯材51,51の一体化を図ることができる。
【0012】
また、前記残りの芯材52は、通し芯材としての長さを有することが望ましい。このように通し芯材とした場合、下がり間仕切り壁5の芯材全体の位置合わせ調整をさらに容易にすることができる。
【0013】
また、前記残りの芯材52は、前記下がり間仕切り壁5の最下段に設ける芯材であることが望ましい。最下段の芯材は低い位置になるため、現場施工が容易になるからである。
【0014】
また、前記第1工程の中で、前記残りの芯材52を取り付けるための支持材53を施工しておくことが望ましい。そうすれば、残りの芯材52の現場施工をさらに容易にすることができる。
【0015】
前記下がり間仕切り壁5の一部が床に達する通常間仕切り壁部分6を有し、その通常間仕切り壁部分6に貼る石膏ボード7を前記第1工程の中で施工してあることも望ましい。このようにすれば、残りの芯材52の施工以外では、従来と同様の施工法を採用することができるからである。
【0016】
【発明の実施の形態】
本発明の好適な実施の形態について、図1及び図2を参照して説明する。なお、図1において、従来と基本的に同一の構成要素については、説明の便宜上同一の符号を付してある。
【0017】
この実施の形態に係る下がり間仕切り壁の施工方法では、以下の第1〜第3の工程を行うことで施工する。
【0018】
(第1工程)
まず、接合される両ユニット2,2の双方に、工場等において下がり間仕切り壁5の芯材51及び通常間仕切り壁部分6の芯材6a,6aをそれぞれ施工し、通常間仕切り壁部分6、6の芯材6a,6a上に石膏ボード7,7をそれぞれ貼り付けておく。その際、下がり間仕切り壁5の芯材51、52の一部の芯材51のみをそれぞれ施工しておく。
【0019】
ここでは、下がり間仕切り壁5の最下段に設ける芯材のみを残りの芯材52として残し、それ以外の芯材51は全て施工する。この残りの芯材52は長尺の芯材であり、ユニット2,2同士の接合部3を跨ぐ形態で施工される長さを有している。図1に示す例では、通し芯材としての長さを有している。
【0020】
(第2工程)
次に、図2に示すように、ユニット2,2の接合後に、下がり間仕切り壁5の残りの芯材52を現場施工する。その前に、残りの芯材52を取り付けるためのL形アングル等からなる支持材533,53を施工しておく。この支持材53,53は現場施工でも良いが、工場等で予め施工しておくことが望ましい。
【0021】
なお、残りの芯材52は長尺の通し芯材であるため、その両端を支持材53,53に対してビス止めあるいはスクリュー釘等を使用して固定する。この際、両ユニット2,2の艤装済み芯材51、51を位置合わせしつつ、それらの艤装済み芯材51、51と現場施工の芯材52との釘打ちによる固定も行う。
【0022】
(第3工程)
このようにして下がり間仕切り壁5の芯材の施工を終えたら、芯材51,52上に下がり間仕切り壁用の石膏ボード(図示せず)を貼る工程を行う。
【0023】
この実施の形態によれば、残りの芯材52を現場施工とすることで、ユニット2,2接合時に、予め工場等で施工してある艤装済み芯材51,51同士に位置ずれが生じた場合でも、この残りの芯材52にて調整することができる。これにより、ユニット工法における下がり間仕切り壁の施工性を向上させることができる。
【0024】
また、下がり間仕切り壁5の残りの芯材52は、ユニット2,2同士の接合部3を跨ぐ形態で施工される長尺の芯材52とすることで、艤装済み芯材51,51同士の位置合わせ調整がさらに容易になるだけでなく、この長尺の芯材52により艤装済み芯材51,51の一体化を図ることができる。
【0025】
また、残りの芯材52は、通し芯材としての長さを有するものを用いることによって、下がり間仕切り壁5の芯材全体の位置合わせ調整をさらに容易にすることができる。
【0026】
なお、上記実施の形態では、本発明を鉄骨ユニット式住宅に適用した例を示したが、木質系ユニット住宅、あるいはアパートやマンション等の集合住宅においても適用することができる。
【0027】
【発明の効果】
以上のように、本発明に係るユニット住宅の下がり間仕切り壁の施工方法によれば、現場での施工性を格段に向上させることができる。また、ユニット同士の接合部を跨ぐ長尺の芯材を用いて現場施工することで、施工後における芯材の一体化及び石膏ボードと芯材との良好な一体化を図ることができる。
【図面の簡単な説明】
【図1】本発明の実施の形態を示す正面図である。
【図2】本発明の実施の形態を示す平面図である。
【図3】従来の施工例を示す正面図である。
【符号の説明】
1 鋼製柱
2 ユニット(鉄骨ユニット)
3 接合部
5 下がり間仕切り壁
51 芯材(艤装済み芯材)
52 残りの芯材(現場施工の芯材)
53 支持材
6 通常間仕切り壁部分
6a 芯材
7 石膏ボード[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for constructing a falling partition wall straddling a joint portion between building units.
[0002]
[Background technology]
In the housing by the unit method, there is a joint part (joint part) between the units. For example, in a steel-based unit house, as shown in FIG. 2, since a unit 2 having steel columns 1 arranged at the four corners is used, in addition to the
[0003]
FIG. 3 is a diagram showing a conventional construction example of the falling
[0004]
When constructing the falling
[0005]
And after unit 2 and 2 are joined on-site, a gypsum board (not shown) is affixed and fixed on the core materials 5a and 5a for both falling partition walls. At this time, the core materials 5a and 5a are integrated using a gypsum board having a length straddling the
[0006]
[Problems to be solved by the invention]
Such conventional construction methods have the following problems. This is a problem that occurs when the core members 5a and 5a of the falling
[0007]
This misalignment problem is easily affected by the construction accuracy of the core members 5a, 5a, the temporal deformation of the wood used for the core members 5a, 5a, the skill level of the operator, and the like. When the positional deviation becomes large, it is necessary to adjust this at the site, and the workability at the site will be significantly reduced.
[0008]
Therefore, the subject of this invention is providing the technique which can improve the workability of the falling partition wall straddling the junction part by a unit construction method, and can fully ensure the intensity | strength etc. after construction.
[0009]
[Means for Solving the Problems]
The present invention will be described with reference to the drawings. In the construction method of the falling
[0010]
According to the present invention, the
[0011]
In the construction method, the
[0012]
The
[0013]
The
[0014]
In the first step, it is desirable to construct a
[0015]
It is also desirable that a part of the falling
[0016]
DETAILED DESCRIPTION OF THE INVENTION
A preferred embodiment of the present invention will be described with reference to FIGS. In FIG. 1, components that are basically the same as those in the related art are denoted by the same reference numerals for convenience of explanation.
[0017]
In the construction method of the falling partition wall which concerns on this embodiment, it constructs by performing the following 1st-3rd processes.
[0018]
(First step)
First, the
[0019]
Here, only the core material provided at the lowest stage of the falling
[0020]
(Second step)
Next, as shown in FIG. 2, after the units 2 and 2 are joined, the remaining
[0021]
Since the remaining
[0022]
(Third step)
After finishing the construction of the core of the
[0023]
According to this embodiment, the remaining
[0024]
Moreover, the remaining
[0025]
Further, the remaining
[0026]
In the above embodiment, an example in which the present invention is applied to a steel unit type house has been shown. However, the present invention can also be applied to a wooden unit house or an apartment house such as an apartment or an apartment.
[0027]
【The invention's effect】
As mentioned above, according to the construction method of the falling partition wall of the unit house which concerns on this invention, the workability on the spot can be improved markedly. Moreover, the construction of the core material after construction and the good integration of the gypsum board and the core material can be achieved by performing the construction on site using a long core material straddling the joint portion between the units.
[Brief description of the drawings]
FIG. 1 is a front view showing an embodiment of the present invention.
FIG. 2 is a plan view showing an embodiment of the present invention.
FIG. 3 is a front view showing a conventional construction example.
[Explanation of symbols]
1 Steel pillar 2 unit (steel frame unit)
3
52 Remaining core material (core material for on-site construction)
53
Claims (6)
接合される両ユニットの双方に、工場等において前記下がり間仕切り壁の芯材の一部をそれぞれ施工しておく第1工程と、
前記ユニットの接合後に、前記下がり間仕切り壁の残りの芯材を施工する第2工程と、
その第2行程の後に、前記芯材上に下がり間仕切り壁用の石膏ボードを貼る第3工程とを行うことを特徴とするユニット住宅の下がり間仕切り壁の施工方法。In the construction method of the falling partition wall straddling the joint part between units,
A first step in which both of the units to be joined are each constructed with a part of the core material of the falling partition wall in a factory or the like;
After joining the units, a second step of constructing the remaining core material of the falling partition wall;
After the 2nd process, the 3rd process of sticking the gypsum board for falling partition walls on the said core material is performed, The construction method of the falling partition wall of a unit house characterized by the above-mentioned.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001003351A JP4580107B2 (en) | 2001-01-11 | 2001-01-11 | Construction method of falling partition wall of unit housing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001003351A JP4580107B2 (en) | 2001-01-11 | 2001-01-11 | Construction method of falling partition wall of unit housing |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002206297A JP2002206297A (en) | 2002-07-26 |
| JP4580107B2 true JP4580107B2 (en) | 2010-11-10 |
Family
ID=18871706
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001003351A Expired - Fee Related JP4580107B2 (en) | 2001-01-11 | 2001-01-11 | Construction method of falling partition wall of unit housing |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4580107B2 (en) |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08105154A (en) * | 1994-10-05 | 1996-04-23 | Misawa Homes Co Ltd | Architectural panel |
| JP2602207Y2 (en) * | 1996-12-27 | 2000-01-11 | ミサワホーム株式会社 | Gate type panel |
| JP2000213089A (en) * | 1999-01-28 | 2000-08-02 | Misawa Homes Co Ltd | Partitioning wall |
| JP3521806B2 (en) * | 1999-07-26 | 2004-04-26 | 松下電工株式会社 | Installation structure of partition opening panel |
| JP3893000B2 (en) * | 1999-11-08 | 2007-03-14 | 積水化学工業株式会社 | Unit building |
| JP2002088951A (en) * | 2000-09-13 | 2002-03-27 | Sekisui Chem Co Ltd | Opening forming panel and unit building |
-
2001
- 2001-01-11 JP JP2001003351A patent/JP4580107B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002206297A (en) | 2002-07-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4580107B2 (en) | Construction method of falling partition wall of unit housing | |
| JP2005098078A (en) | Building unit and its joint structure | |
| JP3886750B2 (en) | How to build a wooden house | |
| JP3854106B2 (en) | How to build a wooden house | |
| JP2836448B2 (en) | Wooden building | |
| JPH053636Y2 (en) | ||
| JPH10252146A (en) | Joint metal fittings for building | |
| JP2000356024A (en) | Mounting bracket for exterior trim material, furring strips for vertical sticking, and mounting construction method | |
| JP2878630B2 (en) | Floor construction method | |
| JP2504613B2 (en) | Anchor bolt positioning plate | |
| JP2839844B2 (en) | Construction method of partition wall and base panel for partition wall | |
| JP3943444B2 (en) | Steel frame one-story building and its construction method | |
| JP2001317156A (en) | Wood panel for building house in framework panel construction method | |
| JP2005127045A (en) | Wall panel construction method for wooden houses | |
| JPH10266380A (en) | Construction method of heat insulation inner wall foundation | |
| JP2529428B2 (en) | Decorative eaves roof unit | |
| JPH1122066A (en) | Bearing wall panel body | |
| JPH0579024U (en) | Architectural fixture | |
| JPH05222790A (en) | External wall structure for building | |
| JP2003247275A (en) | Framework structure for wooden building | |
| JP2688304B2 (en) | Building unit | |
| JPH06146423A (en) | Room unit with ceiling | |
| JP2002054304A (en) | Method for executing wall | |
| JPH0539643A (en) | Wooden prefabricated building | |
| JPH11247302A (en) | Ceiling structure in jointing part of building unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20071221 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20071227 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20071228 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20080115 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20080130 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20080204 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090501 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100824 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100827 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130903 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4580107 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |