Semiconductor device test apparatus control method / semiconductor device test apparatus Download PDF

Info

Publication number
JP4585685B2
JP4585685B2 JP2000372553A JP2000372553A JP4585685B2 JP 4585685 B2 JP4585685 B2 JP 4585685B2 JP 2000372553 A JP2000372553 A JP 2000372553A JP 2000372553 A JP2000372553 A JP 2000372553A JP 4585685 B2 JP4585685 B2 JP 4585685B2
Authority
JP
Japan
Prior art keywords
test
tester
handler
under test
semiconductor device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000372553A
Other languages
Japanese (ja)
Other versions
JP2002174660A (en
Inventor
晃 ▲高▼木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Advantest Corp
Original Assignee
Advantest Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Advantest Corp filed Critical Advantest Corp
Priority to JP2000372553A priority Critical patent/JP4585685B2/en
Publication of JP2002174660A publication Critical patent/JP2002174660A/en
Application granted granted Critical
Publication of JP4585685B2 publication Critical patent/JP4585685B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)
  • Tests Of Electronic Circuits (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は半導体集積回路(以下半導体デバイスと称す)によって構成される、例えばメモリのような半導体デバイスを試験する半導体デバイス試験装置の制御方法に関する。
【0002】
【従来の技術】
図3に半導体デバイス試験装置の概略の構成を示す。半導体デバイス試験装置は大きく分けてテスタ100とテストヘッド200及びハンドラ400とによって構成される。テストヘッド200にはパフォーマンスボード300が着脱自在に装着される。このパフォーマンスボード300にはICソケットSKが実装され、このICソケットSKに被試験デバイスをハンドラ400が自動搬送して接触させ試験を実行する。
【0003】
テスタ100は主制御器101に格納したテストプログラムに従って動作し、パフォーマンスボード300に装着される被試験デバイスを試験する。つまり、テスタ100とテストヘッド200はケーブルKBによって接続され、テスタ100からケーブルKBを通じてICソケットSKに接触した被試験デバイスに試験パターン信号を送り込み、その応答信号を再びケーブルKBを通じてテスタ100に取り込み、その応答信号をテスタ100側で期待値パターンと比較し、不一致の発生を検出して被試験デバイスの不良個所を特定する等の判定動作を実行する。
【0004】
ハンドラ400にも制御器401が搭載され、この制御器401によって、被試験半導体デバイスの搬送動作の制御、試験に要する制御等が実行される。
図4にテスタ100とハンドラ400の動作順序をフローチャートとして示す。
ステップSP0は1回の試験工程で試験する数の被試験デバイスをハンドラ400によりテストヘッド200に向って搬送している状態を示す。この状態をここではデバイス搬入工程と表記することにする。
【0005】
ステップSP1はハンドラ400から被試験デバイスをテストヘッド200に設けたICソケットSKに落とし込み、被試験デバイスのピンとICソケットのピンを互いに接触させてセットするデバイスセット工程を示す。
ステップSP2はハンドラ400からテスタ100に向って試験開始を要求する試験開始要求信号SRQを発信する試験開始要求信号SRQ発信工程。
ステップSP3は試験開始に先立って、例えばテスタ100側からハンドラ400にデバイス搬入工程SP0で搬入した被試験デバイスの数と、被試験デバイスの搬送中の配置(例えばトレイ上のデバイスの配置)を問い合わせ、そのデータの授受を行う。このデータの授受によりテスタ100はテストヘッド200に設けたICソケットSKの数と搬送された被試験デバイスの数を照合し、全てのICソケットSKに被試験デバイスが装着されたか、或いは一部のICソケットが空になるかを識別する。このデータの授受を第1通信工程と称し、ICソケットの全てに被試験デバイスが装着されるか或いは被試験デバイスが装着されないICソケットが発生するかを判定する処理を第1データ処理工程と称することにする。
【0006】
ステップSP4ではテスタ100からテストヘッド200に試験パターンを送信し、被試験デバイスの動作試験を行う。試験中はテスタ100から試験パターン信号を順次送信し、テストヘッド200からはその応答信号をテスタ100に返送することを繰返す。テスタ100ではテストヘッド200から返送されてくる応答信号と期待値とを比較し、良否の判定を下す。
ステップSP5では試験の結果に従って、良否判定マップを作成する。以下この区間を第2データ処理工程と称することにする。
【0007】
これと共にテスタ100で作成した良否判定マップをハンドラ400に送り込む。以下この工程を第2通信工程と称する。
ステップSP6ではハンドラ400はICソケットSKから被試験デバイスを取り外す動作を実行する。この工程をデバイス除去工程と称することにする。
ステップSP7ではハンドラ400はテスタ100から送り込まれた良否判定結果に従って被試験デバイスを良品と不良品に仕分けし、良品と不良品の収納部に分類しながら被試験デバイスをテストヘッド200から搬出する。以下この工程をデバイス搬出工程と称する。
【0008】
ステップSP7のデバイス搬出工程が終了すると、ステップSP0に戻り、新たな被試験デバイスの搬入工程に入る。
【0009】
【発明が解決しようとする課題】
半導体デバイスの試験は製造された半導体デバイスの全量を試験するため、その量は膨大な量となる。このために一度に試験を行う被試験デバイスの数を可及的に多く採ったり、ステップSP4で行う試験工程を可及的に高速化し、短時間に多量の半導体デバイスを試験しようとする試みが各種行われている。
ステップSP4で実行される試験工程を高速化し、試験時間を短縮しようとする試みは既に限界に近づきつつあり、試験時間を短縮するための手法が他に求められている。
【0010】
図4に示した各工程において、被試験デバイスの試験を行う試験工程は電気的な信号の授受で済むため、既に高速化されている。これに対し、被試験デバイスをテストヘッド200のICソケットSKに搬送し、このICソケットSKに装着する作業、及び試験の終了後にICソケットSKから半導体デバイスを取り外し、良品と不良品に分類しながら、被試験デバイスを搬出する作業は機械が実行する工程であるため、高速化は難しい。然し乍ら、ハンドラ400における被試験デバイスの搬送作業を高速化すると被試験デバイスの数が多いほど、その搬送回数も多くなるため、搬送に要する時間をわずかに短縮するだけでも半導体デバイスの試験時間を大幅に短縮できる効果が得られる。
【0011】
この発明の目的は半導体デバイスの試験時間を短縮することを可能とした半導体デバイス試験装置の制御方法を提案しようとするものである。
【0012】
【課題を解決するための手段】
この発明の請求項1では、テスタとハンドラとの間でデータの授受を行ってテスタとハンドラとを動作させて半導体デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置において、
ハンドラのデバイス搬送工程中にテスタとハンドラ間のデータの授受を行う通信工程を実行させる半導体デバイス試験装置の制御方法を提案する。
【0013】
この発明の請求項2では、テスタとハンドラとの間でデータの授受を行ってテスタとハンドラとを動作させ半導体デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置において、
ハンドラのデバイス搬送工程中にテスタとハンドラ間のデータの授受を行う通信工程と、テスタにおけるデータ処理工程の双方を実行させる半導体デバイス試験装置の制御方法を提案する。
【0014】
この発明の請求項3では、請求項1記載の半導体デバイス試験装置の制御方法において、デバイス搬送工程と共に実行する通信工程は試験工程の前と試験工程の後の双方で実行する半導体デバイス試験装置の制御方法を提案する。
この発明の請求項4では、請求項2記載の半導体デバイス試験装置の制御方法において、デバイス搬送工程と共に実行する通信工程及びデータ処理工程は試験工程の前と試験工程の後の双方で実行する半導体デバイス試験装置の制御方法を提案する。
【0015】
この発明の請求項5では、テスタとハンドラとの間でデータの授受を行ってテスタとハンドラとを動作させ半導体デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置において、
ハンドラのデバイス搬送工程中にテスタとハンドラ間のデータの授受を行う通信工程と、テスタにおけるデータ処理工程の双方を実行する構成とした半導体デバイス試験装置を提案する。
【0016】
【作用】
この発明の制御方法によれば、ハンドラの半導体デバイスの搬送工程中に、テスタとハンドラ間のデータの授受を行う通信工程又はテスタ側のデータ処理工程或いはこれらの双方を実行させるから、半導体デバイスの試験に要する時間を短縮することができる。この結果、単位時間当たりの試験可能な半導体デバイスの個数を増加させることができるため、試験の効率を向上できる利点が得られる。
【0017】
【発明の実施の形態】
図1にこの発明による半導体デバイス試験装置の最も望ましい制御方法を説明するためのフローチャートを示す。この発明の特徴とする点はステップSP0及びSP5に示すデバイス搬入工程及びデバイス搬出工程において、これらの工程と同時に第1通信工程と第1データ処理工程、及び第2データ処理工程と第2通信工程を実行させる制御方法とした点である。第1通信工程はこれから試験を行う被試験デバイスの数がテストヘッド200に設けているICソケットSKの数に一致しているか否かをハンドラ400からテスタ100に通知することを主な目的としている。このため、デバイス搬入工程において、テストヘッド200に向って搬送している被試験デバイスの数を搬送中に計数し、その搬送中の被試験半導体デバイスの数及び被試験デバイスの配列状況をテスタ100に通知することにより第1通信工程が達成される。
【0018】
テスタ100は第1通信工程によりテストヘッド200に向って搬送している被試験デバイスの数が通知されることにより、第1データ処理工程を実行する。第1データ処理工程ではテストヘッド200に設けられているICソケットSKの全てのソケットに被試験デバイスが装着されるか、或いは被試験デバイスの数がソケットの数より少ない場合は搬送中の被試験デバイスの配列からどのICソケットSKに被試験デバイスが装着され、どのICソケットに被試験デバイスが装着されないかを識別する。
【0019】
これらの第1通信工程及び第1データ処理工程はデバイス搬入工程の実動中に実行されデバイス搬入工程が完了する時点では、第1データ処理工程も終了させることができる。
デバイス搬入工程が完了した時点で各被試験デバイスが位置合わせされてICソケットSKに落とし込まれ、正確にコンタクトしたか否かを確認した後、被試験デバイスに圧接子が接触し、圧接子の圧接により被試験デバイスのピンとICソケットSKのピンとが電気的に接触し、その接触状態が安定した状態に維持される。この状態がステップSP1に示すデバイスセット工程である。
【0020】
被試験デバイスのICソケットSKに対して安定して接触した状態でステップSP2で示す試験開始要求信号SRQがハンドラ400から発信され、テスタ100に送り込まれる。
テスタ100はハンドラ400から試験開始要求信号SRQを設けると、ステップSP3で示す試験工程を実行する。
試験工程が終了すると、ハンドラ400はステップSP4で示すデバイス除去工程を実行する。デバイス除去工程とはテストヘッド200上のICソケットSKから被試験デバイスを排除し、テストヘッド200から被試験デバイスを搬送装置に受け渡す状況を指す。
【0021】
搬送装置に被試験デバイスが引き渡され、被試験デバイスの搬出が開始されるとステップSP5が実行されている状況となる。
この発明ではこのデバイス搬出工程の実行中に第2データ処理工程と、第2通信工程とを実行する。第2データ処理工程ではテスタ100に設けられた論理比較器で判定した良否判定結果を第2通信工程でハンドラ400に送り届ける。
ハンドラ400はテスタ100から送り込まれた良否判定結果を元に、被試験半導体デバイスを搬送期間中に良品と不良品に仕分けしながらそれぞれの格納部に格納する。
【0022】
このように、試験工程の前に実行するステップSP0で示すデバイス搬入工程と、ステップSP3に示す試験工程の後に実行するデバイス搬送工程SP5と平行して第1通信工程と第1データ処理工程及び第2データ処理工程と第2通信工程をそれぞれ実行したから、ステップSP0〜SP5に至る所要時間を第1通信工程と第1データ処理工程を実行するに要する時間T1と、第2データ処理工程と第2通信手段を実行するのに要する時間T2に相当する時間分だけ短縮することができることになる。実際上T1+T2は約0.1〜0.2秒程度となる。
【0023】
この結果半導体デバイスを試験するに必要な時間が従来は、例えば1秒であったとすると、1秒−0.2秒=0.8秒となり、従来の80%程度の時間で被試験デバイスを試験することができることになる。短縮する時間が高々0.2秒であったとしても試験の回数を重ねるごとに、その効果は大きく現れてくることは容易に理解することができよう。
図1に示した実施例では最も望ましい実施例を示したが、図2に示す制御方法を採ることもできる。図2に示す制御方法はデバイス搬入工程で第1通信工程のみを実行し、第1データ処理工程はデバイス搬入工程後に実行させ、更にデバイス除去工程の後に第2データ処理工程を実行し、更にその後にデバイス搬出工程と第2通信通信工程とを同時に並行して実行させる制御方法とした例を示す。
【0024】
このように、制御した場合でも第1通信工程と、第2通信工程で必要な時間分は短縮することができる。
【0025】
【発明の効果】
以上説明したように、この発明によればデバイス搬送工程の最中に他の工程を実行させるから、この同時に実行した工程に要する時間分は全体の試験時間から差し引くことができる。よって試験に要する時間を短縮することができるから、試験の繰返し周期を速めることができ、短時間に多量の半導体デバイスを試験することができることになり、その効果は実用に供して頗る大である。
【図面の簡単な説明】
【図1】この発明による半導体デバイス試験装置の制御方法を説明するためのフローチャート。
【図2】この発明の変形実施例を説明するためのフローチャート。
【図3】半導体デバイス試験装置の概要を説明するためのブロック図。
【図4】従来の半導体デバイス試験装置の制御方法を説明するためのフローチャート。
【符号の説明】
100 テスタ
101 主制御器
200 テストヘッド
300 パフォーマンスボード
400 ハンドラ
401 制御器
SK ICソケット
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a control method of a semiconductor device test apparatus configured to test a semiconductor device such as a memory, which is constituted by a semiconductor integrated circuit (hereinafter referred to as a semiconductor device).
[0002]
[Prior art]
FIG. 3 shows a schematic configuration of the semiconductor device test apparatus. The semiconductor device test apparatus is roughly composed of a tester 100, a test head 200, and a handler 400. A performance board 300 is detachably attached to the test head 200. An IC socket SK is mounted on this performance board 300, and the device under test is automatically conveyed and brought into contact with the IC socket SK to execute a test.
[0003]
The tester 100 operates according to a test program stored in the main controller 101 and tests a device under test mounted on the performance board 300. That is, the tester 100 and the test head 200 are connected by the cable KB, the test pattern signal is sent from the tester 100 to the device under test that is in contact with the IC socket SK through the cable KB, and the response signal is again taken into the tester 100 through the cable KB. The response signal is compared with an expected value pattern on the tester 100 side, and a determination operation such as detecting the occurrence of inconsistency and identifying a defective portion of the device under test is executed.
[0004]
A controller 401 is also mounted on the handler 400, and the controller 401 executes control of the semiconductor device transfer operation, control required for testing, and the like.
FIG. 4 is a flowchart showing the operation sequence of the tester 100 and the handler 400.
Step SP0 shows a state in which the device under test is transported toward the test head 200 by the handler 400 in a single test process. This state is referred to as a device carry-in process here.
[0005]
Step SP1 shows a device setting process in which the device under test is dropped from the handler 400 into the IC socket SK provided in the test head 200, and the pins of the device under test and the pins of the IC socket are set in contact with each other.
Step SP2 is a test start request signal SRQ transmission step of transmitting a test start request signal SRQ requesting the test start from the handler 400 to the tester 100.
Step SP3 inquires the number of devices under test loaded in the device loading step SP0 from the tester 100 side, for example, from the tester 100 side, and the placement of the devices under test during transportation (for example, the placement of devices on the tray) prior to the start of the test. , Send and receive the data. By sending and receiving this data, the tester 100 collates the number of IC sockets SK provided in the test head 200 with the number of devices to be tested, and whether or not all the IC sockets SK are mounted with devices under test or a part of them. Identify whether the IC socket is empty. This exchange of data is referred to as a first communication process, and a process of determining whether a device under test is attached to all of the IC sockets or an IC socket where no device under test is attached is referred to as a first data processing step. I will decide.
[0006]
In step SP4, a test pattern is transmitted from the tester 100 to the test head 200, and an operation test of the device under test is performed. During the test, the test pattern signal is sequentially transmitted from the tester 100, and the response signal is returned from the test head 200 to the tester 100. The tester 100 compares the response signal returned from the test head 200 with the expected value, and determines pass / fail.
In step SP5, a pass / fail judgment map is created according to the test result. Hereinafter, this section is referred to as a second data processing step.
[0007]
At the same time, the pass / fail judgment map created by the tester 100 is sent to the handler 400. Hereinafter, this process is referred to as a second communication process.
In step SP6, the handler 400 executes an operation of removing the device under test from the IC socket SK. This process will be referred to as a device removal process.
In step SP7, the handler 400 sorts the device under test into a non-defective product and a defective product according to the pass / fail judgment result sent from the tester 100, and carries out the device under test from the test head 200 while classifying the device under test into the non-defective product and defective product storage section. Hereinafter, this process is referred to as a device carry-out process.
[0008]
When the device carry-out process of step SP7 is completed, the process returns to step SP0, and a new device under test carry-in process is started.
[0009]
[Problems to be solved by the invention]
Since the test of the semiconductor device tests the whole amount of the manufactured semiconductor device, the amount is enormous. For this reason, there are attempts to increase the number of devices under test to be tested at once as much as possible, or to increase the speed of the test process to be performed at step SP4 as much as possible to test a large number of semiconductor devices in a short time. Various things have been done.
Attempts to speed up the test process executed in step SP4 and reduce the test time are already approaching the limit, and other methods for reducing the test time are required.
[0010]
In each process shown in FIG. 4, the test process for testing the device under test has already been speeded up because it is sufficient to send and receive electrical signals. On the other hand, the device under test is transported to the IC socket SK of the test head 200, and the semiconductor device is removed from the IC socket SK after the operation of attaching to the IC socket SK and after the test is finished, and classifying it into a good product and a defective product. Since the work to carry out the device under test is a process executed by the machine, it is difficult to increase the speed. However, if the speed of transporting the device under test in the handler 400 is increased, the number of devices to be tested increases as the number of devices under test increases. Therefore, even if the time required for transport is slightly reduced, the test time of the semiconductor device is greatly increased. The effect that can be shortened is obtained.
[0011]
An object of the present invention is to propose a control method of a semiconductor device test apparatus that can shorten the test time of a semiconductor device.
[0012]
[Means for Solving the Problems]
According to the first aspect of the present invention, data is exchanged between the tester and the handler, the semiconductor device is tested by operating the tester and the handler, and the device under test is classified and stored on the handler side according to the test result. In the semiconductor device test apparatus that repeats the operation to
A control method of a semiconductor device test apparatus is proposed that executes a communication process for transferring data between a tester and a handler during a device transfer process of a handler.
[0013]
According to the second aspect of the present invention, data is exchanged between the tester and the handler, the tester and the handler are operated to test the semiconductor device, and the device under test is classified and stored on the handler side according to the test result. In a semiconductor device test apparatus that repeats operations,
A control method for a semiconductor device test apparatus is proposed that executes both a communication process for transferring data between a tester and a handler during a device transfer process of a handler and a data processing process in the tester.
[0014]
According to a third aspect of the present invention, in the method for controlling a semiconductor device testing apparatus according to the first aspect, the communication process executed together with the device transporting process is performed before and after the test process. A control method is proposed.
According to a fourth aspect of the present invention, in the method for controlling a semiconductor device test apparatus according to the second aspect, the communication step and the data processing step executed together with the device transfer step are performed both before and after the test step. A control method for device test equipment is proposed.
[0015]
According to the fifth aspect of the present invention, data is exchanged between the tester and the handler, the tester and the handler are operated to test the semiconductor device, and the device under test is classified and stored on the handler side according to the test result. In a semiconductor device test apparatus that repeats operations,
Proposed is a semiconductor device testing apparatus configured to execute both a communication process for transferring data between a tester and a handler during a handler device transfer process and a data processing process in the tester.
[0016]
[Action]
According to the control method of the present invention, the communication process for transferring data between the tester and the handler and / or the data processing process on the tester side or both of them are executed during the transport process of the semiconductor device of the handler. The time required for the test can be shortened. As a result, since the number of testable semiconductor devices per unit time can be increased, there is an advantage that the test efficiency can be improved.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows a flowchart for explaining the most desirable control method of the semiconductor device testing apparatus according to the present invention. A feature of the present invention is that in the device carry-in process and device carry-out process shown in steps SP0 and SP5, the first communication process and the first data processing process, and the second data processing process and the second communication process are performed simultaneously with these processes. This is a control method for executing. The primary purpose of the first communication step is to notify the tester 100 from the handler 400 whether or not the number of devices under test to be tested is equal to the number of IC sockets SK provided in the test head 200. . Therefore, in the device carry-in process, the number of devices under test being transported toward the test head 200 is counted during transport, and the number of semiconductor devices under test being transported and the arrangement status of the devices under test are measured by the tester 100. 1st communication process is achieved by notifying to.
[0018]
The tester 100 executes the first data processing step when the number of devices under test being conveyed toward the test head 200 is notified in the first communication step. In the first data processing step, devices to be tested are attached to all sockets of the IC socket SK provided in the test head 200, or when the number of devices under test is smaller than the number of sockets, the device under test being transported Which IC socket SK is mounted with the device under test and which IC socket is not mounted with the device under test is identified from the device arrangement.
[0019]
These first communication process and first data processing process are executed during actual operation of the device carrying-in process, and when the device carrying-in process is completed, the first data processing process can also be terminated.
When the device carrying-in process is completed, each device under test is aligned and dropped into the IC socket SK. After confirming whether or not the device is correctly contacted, the pressure contactor contacts the device under test. The pins of the device under test and the pins of the IC socket SK are brought into electrical contact by pressure contact, and the contact state is maintained in a stable state. This state is the device setting process shown in step SP1.
[0020]
A test start request signal SRQ shown in step SP2 is transmitted from the handler 400 in a state where the IC socket SK of the device under test is stably in contact with the IC socket SK, and is sent to the tester 100.
When the tester 100 provides the test start request signal SRQ from the handler 400, the tester 100 executes the test process indicated by step SP3.
When the test process is completed, the handler 400 executes a device removal process indicated by step SP4. The device removal step refers to a situation in which the device under test is removed from the IC socket SK on the test head 200 and the device under test is delivered from the test head 200 to the transport apparatus.
[0021]
When the device under test is delivered to the transport device and the carry-out of the device under test is started, step SP5 is being executed.
In the present invention, the second data processing step and the second communication step are executed during the device carry-out step. In the second data processing step, the pass / fail determination result determined by the logical comparator provided in the tester 100 is sent to the handler 400 in the second communication step.
The handler 400 stores the semiconductor devices under test in the respective storage units while sorting the semiconductor devices under test into non-defective products and defective products during the transport period based on the pass / fail judgment results sent from the tester 100.
[0022]
As described above, the first communication step, the first data processing step, and the first data processing step are performed in parallel with the device carry-in step shown at step SP0 executed before the test step and the device transfer step SP5 executed after the test step shown at step SP3. Since the two data processing steps and the second communication step are respectively performed, the time required to execute the first communication step and the first data processing step, the time T1 required for executing the first communication step and the first data processing step, the second data processing step, and the second communication step are determined. The time corresponding to the time T2 required to execute the two communication means can be shortened. Actually, T1 + T2 is about 0.1 to 0.2 seconds.
[0023]
As a result, if the time required for testing a semiconductor device is conventionally 1 second, for example, 1 second−0.2 seconds = 0.8 seconds, and the device under test is tested in about 80% of the conventional time. Will be able to. Even if the time for shortening is 0.2 seconds at most, it can be easily understood that the effect appears as the test is repeated.
Although the most preferable embodiment is shown in the embodiment shown in FIG. 1, the control method shown in FIG. 2 can also be adopted. The control method shown in FIG. 2 executes only the first communication process in the device carry-in process, the first data processing process is executed after the device carry-in process, the second data processing process is executed after the device removal process, and then Shows an example of a control method in which the device carry-out step and the second communication step are simultaneously executed in parallel.
[0024]
Thus, even when controlled, the time required for the first communication step and the second communication step can be shortened.
[0025]
【The invention's effect】
As described above, according to the present invention, other steps are executed during the device transfer step, so the time required for the steps executed simultaneously can be subtracted from the entire test time. Therefore, since the time required for the test can be shortened, the repetition cycle of the test can be accelerated, and a large amount of semiconductor devices can be tested in a short time, and the effect is very practical. .
[Brief description of the drawings]
FIG. 1 is a flowchart for explaining a control method of a semiconductor device test apparatus according to the present invention;
FIG. 2 is a flowchart for explaining a modified embodiment of the present invention.
FIG. 3 is a block diagram for explaining an outline of a semiconductor device testing apparatus.
FIG. 4 is a flowchart for explaining a control method of a conventional semiconductor device test apparatus;
[Explanation of symbols]
100 Tester 101 Main controller 200 Test head 300 Performance board 400 Handler 401 Controller SK IC socket

Claims (5)

複数の被試験デバイスを装着したテストヘッドに接続されたテスタとハンドラとの間で、データの授受を行ってテスタとハンドラとを動作させて上記複数の被試験デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置の制御方法において、
上記ハンドラとテストヘッド間の被試験デバイス搬送工程中に、上記テスタとハンドラ間の上記テストヘッドに向かって搬送している被試験デバイスの数とトレイ上の被試験デバイスの配置、及び上記テスタのデータ処理結果に関するデータの授受を行う通信工程を実行させることを特徴とする半導体デバイス試験装置の制御方法。
Test and test the multiple devices under test by operating the tester and handler between the tester and handler connected to the test head equipped with multiple devices under test and operating the tester and handler. In the control method of the semiconductor device test apparatus that repeats the operation of classifying and storing the device under test on the handler side,
During the process of transporting the device under test between the handler and the test head, the number of devices under test transported toward the test head between the tester and the handler, the arrangement of the devices under test on the tray , and the tester A control method for a semiconductor device test apparatus, characterized in that a communication process for exchanging data related to a data processing result is executed.
複数の被試験デバイスを装着したテストヘッドに接続されたテスタとハンドラとの間で、データの授受を行ってテスタとハンドラとを動作させて上記複数の被試験デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置の制御方法において、
上記ハンドラとテストヘッド間の被試験デバイス搬送工程中に、上記テスタとハンドラ間の上記テストヘッドに向かって搬送している被試験デバイスの数とトレイ上の被試験デバイスの配置、及び上記テスタのデータ処理結果に関するデータの授受を行う通信工程と、上記テスタにおけるデータ処理工程の双方を実行させることを特徴とする半導体デバイス試験装置の制御方法。
Test and test the multiple devices under test by operating the tester and handler between the tester and handler connected to the test head equipped with multiple devices under test and operating the tester and handler. In the control method of the semiconductor device test apparatus that repeats the operation of classifying and storing the device under test on the handler side,
During the process of transporting the device under test between the handler and the test head, the number of devices under test transported toward the test head between the tester and the handler, the arrangement of the devices under test on the tray , and the tester A control method for a semiconductor device test apparatus, characterized in that both a communication process for exchanging data relating to a data processing result and a data processing process in the tester are executed.
請求項1記載の半導体デバイス試験装置の制御方法において、上記デバイス搬送工程と共に実行する通信工程は試験工程の前と試験工程の後の双方で実行することを特徴とする半導体デバイス試験装置の制御方法。2. The method of controlling a semiconductor device test apparatus according to claim 1, wherein the communication process executed together with the device transport process is executed both before the test process and after the test process. . 請求項2記載の半導体デバイス試験装置の制御方法において、上記デバイス搬送工程と共に実行する通信工程及びデータ処理工程は試験工程の前と試験工程の後の双方で実行することを特徴とする半導体デバイス試験装置の制御方法。3. The semiconductor device test apparatus control method according to claim 2, wherein the communication step and the data processing step executed together with the device transport step are executed both before the test step and after the test step. Device control method. 複数の被試験デバイスを装着したテストヘッドに接続されたテスタとハンドラとの間で、データの授受を行ってテスタとハンドラとを動作させて上記複数の被試験デバイスを試験し、その試験結果に従ってハンドラ側で被試験デバイスを分類して格納する動作を繰返す半導体デバイス試験装置において、
上記ハンドラとテストヘッド間の被試験デバイス搬送工程中に、上記テスタとハンドラ間の上記テストヘッドに向かって搬送している被試験デバイスの数とトレイ上の被試験デバイスの配置、及び上記テスタのデータ処理結果に関するデータの授受を行う通信工程と、上記テスタにおけるデータ処理工程の双方を実行する構成としたことを特徴とする半導体デバイス試験装置。
Test and test the multiple devices under test by operating the tester and handler between the tester and handler connected to the test head equipped with multiple devices under test and operating the tester and handler. In a semiconductor device test apparatus that repeats the operation of classifying and storing devices under test on the handler side,
During the process of transporting the device under test between the handler and the test head, the number of devices under test transported toward the test head between the tester and the handler, the arrangement of the devices under test on the tray , and the tester A semiconductor device testing apparatus characterized in that both a communication process for exchanging data relating to a data processing result and a data processing process in the tester are executed.
JP2000372553A 2000-12-07 2000-12-07 Semiconductor device test apparatus control method / semiconductor device test apparatus Expired - Fee Related JP4585685B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000372553A JP4585685B2 (en) 2000-12-07 2000-12-07 Semiconductor device test apparatus control method / semiconductor device test apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000372553A JP4585685B2 (en) 2000-12-07 2000-12-07 Semiconductor device test apparatus control method / semiconductor device test apparatus

Publications (2)

Publication Number Publication Date
JP2002174660A JP2002174660A (en) 2002-06-21
JP4585685B2 true JP4585685B2 (en) 2010-11-24

Family

ID=18842084

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000372553A Expired - Fee Related JP4585685B2 (en) 2000-12-07 2000-12-07 Semiconductor device test apparatus control method / semiconductor device test apparatus

Country Status (1)

Country Link
JP (1) JP4585685B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0695125B2 (en) * 1988-07-22 1994-11-24 三菱電機株式会社 Semiconductor device test equipment
JPH08101251A (en) * 1994-09-30 1996-04-16 Ando Electric Co Ltd Ic tester/ic handler system
DE19680785B4 (en) * 1995-07-28 2005-09-22 Advantest Corp. A semiconductor device test apparatus and semiconductor device test system including a plurality of semiconductor device test equipment
JP4444419B2 (en) * 1999-11-10 2010-03-31 東京エレクトロン株式会社 Data communication method and data communication system

Also Published As

Publication number Publication date
JP2002174660A (en) 2002-06-21

Similar Documents

Publication Publication Date Title
US7042243B2 (en) Device test apparatus and test method including control unit(s) between controller and test units
US7151388B2 (en) Method for testing semiconductor devices and an apparatus therefor
KR101009966B1 (en) Electronic component testing device
JP3226780B2 (en) Test handler for semiconductor devices
US6078188A (en) Semiconductor device transporting and handling apparatus
CN103547934B (en) Parallel concurrent test system and method
US6239396B1 (en) Semiconductor device handling and sorting apparatus for a semiconductor burn-in test process
KR100493058B1 (en) Electrical testing method for semiconductor package detectable a socket defects by realtime operation
US20050168233A1 (en) Test system and method for reduced index time
KR100699866B1 (en) Continuous inspection method of semiconductor device by checking lot and tray
EP0144680B1 (en) Ic device and a system for testing the same
US7825650B2 (en) Automated loader for removing and inserting removable devices to improve load time for automated test equipment
CN108627195A (en) A kind of intelligent detecting method and intelligent checking system that memory body module is detected
JP4585685B2 (en) Semiconductor device test apparatus control method / semiconductor device test apparatus
JPH0720208A (en) Test method and test system for device under test
CN105983538B (en) High-yield test sorting machine system
US6922050B2 (en) Method for testing a remnant batch of semiconductor devices
JP2018159608A (en) Wafer inspection apparatus and diagnostic method for wafer inspection apparatus
US8283940B2 (en) Probe device, processing device, and probe testing method
JPH09318703A (en) IC handler
KR20020047531A (en) System for testing Semi-conductor and method for controling the same
CN112505520B (en) Chip testing method, device and system
KR100835999B1 (en) IC sorting handler and its control method
JPH0943313A (en) Semiconductor test method
KR20070012967A (en) Data processing method of semiconductor test facility

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060329

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091023

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091104

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100223

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100324

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100421

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20100428

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100831

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100906

R150 Certificate of patent or registration of utility model

Ref document number: 4585685

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees