JP4587413B2 - Jib crane - Google Patents
Jib crane Download PDFInfo
- Publication number
- JP4587413B2 JP4587413B2 JP36293499A JP36293499A JP4587413B2 JP 4587413 B2 JP4587413 B2 JP 4587413B2 JP 36293499 A JP36293499 A JP 36293499A JP 36293499 A JP36293499 A JP 36293499A JP 4587413 B2 JP4587413 B2 JP 4587413B2
- Authority
- JP
- Japan
- Prior art keywords
- plate
- concrete structure
- jib crane
- guide
- backing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Description
【0001】
【発明が属する技術分野】
本発明は、コンクリート構造物の上部に仮設されるジブクレーンに関するものである。
【0002】
【従来の技術】
プラントやビルの建設にあたって、資材を取り込むためにジブクレーンを仮設して利用することが多い。ジブクレーンをコンクリート構造物の上に仮設する場合には、コンクリート構造物に多数のアンカーボルトを仮に打設し、それを用いてジブクレーンの基礎部をコンクリート構造物に固定する。資材を吊ったときジブクレーンの基礎部にかかるモーメントに対抗するためには、アンカーボルトを広い範囲に打設する必要があるが、コンクリート構造物の形状が壁状である場合などには、その上面のみでは強度的に不足し、その側面にもアンカーボルトを配することが必要となる。
【0003】
しかし、多数の、しかも、上面と両側面では90゜あるいは180゜方向の異なるアンカーボルトに、基礎部を正確に合わせるのは困難であり、ジブクレーンの仮設作業は長時間と多くの人手を要する作業であった。しかも、高所における作業であるため、安全上も問題となることが多かった。また、仮設されたジブクレーンは工事終了後に撤去されるが、その際多数のアンカーボルトを切断し、跡を残さないようにコンクリート面の養生をするのも大変であった。
【0004】
一般的に工事用機材を取り付け取り外し容易に仮設する方法として、基礎部をクランプ方式として、そこに設けたボルトで固定対象物を挟みつけて固定する方法があるが、上述のようなケースでは、表面が十分に平滑でないコンクリート面を固定対象物としてボルトで挟みつけて、ジブクレーンが必要とする反力や摩擦力が十分得られるかが疑問であり、実用に供されていなかった。
【0005】
【発明が解決しようとする課題】
本発明が解決しようとする課題は、コンクリート構造物の上部に取り付け取り外し容易に仮設できるジブクレーンを提供することにある。
【0006】
【課題を解決するための手段】
本発明は、コンクリート構造物の上部をまたぐ門型の基礎部を持ち、門型を構成する両脚に、球面ブッシュを介して当て板でコンクリート構造物を両面から挟みつけて固定する押しボルトを設けたジブクレーンである。
【0007】
一般にコンクリート構造物の上部にジブクレーンを仮設して資材を取り込む場合には、コンクリート構造物が壁状を成し、その壁を乗り越える形で資材を取り込むことが多い。
ジブクレーンの基礎部を、そのコンクリート壁をまたぐ門型に形成し、その門型を形成する両脚の部分に内側に向かって押す押しボルトを設け、各押しボルトは球面ブッシュを介して当て板を持ち、その当て板でコンクリート壁面を押して、コンクリート構造物を両側から挟みつけることにより固定するジブクレーンである。
【0008】
押しボルトで直接コンクリート壁面を押すのではなく、各押しボルトに球面ブッシュを介して当て板を設け、その当て板でコンクリート壁面を押すことにより、表面が必ずしも十分に平滑でないコンクリート面に対しても各押しボルトの当たり面が順応し、コンクリートの支圧応力とコンクリート壁面と当て板間の摩擦力をフルに活用できる。
したがって、押しボルトの締め付けトルク管理さえ確実に行えば、各押しボルトが負担すべき反力および摩擦力が十分に確保できる。
【0009】
本発明により、▲1▼ コンクリート構造物にアンカーボルトを仮に打設する必要が無いので、打設作業および撤去時の切断や養生作業が必要無くなり、▲2▼ ジブクレーンの基礎部をアンカーボルトに合わせる作業、それも、90゜あるいは180゜方向の異なるアンカーボルトに合わせる長時間の人手がかかる作業が無くなり、▲3▼ 結果的にジブクレーンの仮設作業が取り付け、取り外しの両面でより容易になり、かつ、▲4▼ 安全に作業ができるという効果が得られる。
【0010】
また、本発明は、コンクリート構造物の上部をまたぐ門型の基礎部を持ち、門型を構成する両脚に、球面ブッシュを介して当て板でコンクリート構造物を両面から挟みつけて固定する押しボルトを設けたジブクレーンであって、押しボルトがコンクリート構造物を挟みつける方向と直角方向に配したアンカーボルトを有するジブクレーンである。
【0011】
上述の通り、一般にコンクリート構造物の上部にジブクレーンを仮設して資材を取り込む場合には、コンクリート構造物が壁状を成していることが多い。
このような壁状のコンクリート構造物の上面にのみアンカーボルトを打設してジブクレーンを固定しようとするとき、壁厚方向にはジブクレーンのポストの中心からアンカーボルトまで十分な距離が取れないため、上面に立てたアンカーボルトのみでは基礎部にかかるモーメントに抗しきれないので従来は側面にまでアンカーボルトを打っていたが、壁の長手方向には十分な距離を取れるのでその必要が無い場合が多い。このような場合に、壁厚方向のみ押しボルトで挟みつけて必要な反力を持たせ、長手方向はコンクリート構造物上面に打設したアンカーボルトにより、基礎部にかかるモーメントを受ける。アンカーボルトの位置は、ジブクレーンのポストの中心から見て、コンクリート壁の長手方向、すなわち、押しボルトがコンクリート構造物を挟みつける方向に対し直角方向になる。
【0012】
本発明により、▲5▼ アンカーボルトは押しボルトがコンクリート構造物を挟みつける方向と直角方向にのみ配されるので、すべての方向に配する従来の方法に比べ大幅に数が減少し、それだけ打設作業および撤去時の切断や養生作業が少なくなり、▲6▼ アンカーボルトはコンクリート構造物の上面のみにあるので、ジブクレーンの基礎部をアンカーボルトに合わせる作業は、従来の90゜あるいは180゜方向の異なるアンカーボルトに合わせる場合に比べきわめて容易になると言う効果が得られ、その結果、上述の▲3▼と▲4▼の効果が得られる。
【0013】
また、本発明は,柱状のコンクリート構造物の上部をまたぐ直交する二つの門型を組み合わせた基礎部,あるいは,その四つの脚部を隣同士連結してなる柱状コンクリート構造物の上部を覆う四角の鞘状の基礎部を持ち,四つの脚部に、球面ブッシュを介して当て板でコンクリート構造物を四面から挟みつけて固定する押しボルトを設けたジブクレーンである。
【0014】
コンクリート構造物が壁状ではなく柱状の場合,そのコンクリート構造物の上部にジブクレーンを仮設する場合には、基礎部を2個の門型が直交する形に構成し、あるいは、その四つの脚部を隣同士連結して柱状コンクリートの上端部を覆う四角の鞘状に構成し、それら四つの脚部に押しボルトを設け、四方向から球面ブッシュを介し当て板を有する押しボルトでコンクリート構造物を挟みつけて固定する構成をとることにより、上述の▲1▼から▲4▼の効果が得られる。
【0015】
さらに本発明は、上述の各種ジブクレーンにおいて、各当て板に、脚部から突出するガイドを設け、当て板がそのガイドに当たることなく自由に傾けるように、その厚さ方向で大きさを変えた当て板を有するジブクレーンである。
【0016】
球面ブッシュを介して当て板でコンクリート構造物を両面から挟みつけて固定する押しボルトを設けた上述の各種ジブクレーンにおいて、資材を吊ったとき基礎部にかかるモーメントにより、脚部から突き出て球面ブッシュに至る押しボルトの先端部分には上向きあるいは下向きの曲げモーメントが生じ、押しボルトと脚部に刻まれた雌ねじ部との間でかじりや膠着を生じ、以後の締め付けトルクの管理やジブクレーンの解体に支障を生じることがある。脚部から突き出している長さを短くすれば曲げモーメントの影響は緩和できるが、基礎部やコンクリート構造物の製作精度を考えれば、短くするには限度がある。
【0017】
そこで、当て板の寸法にピッタリの合った大きさのガイドを脚部から突出させ、そのガイドに十分な強度を持たせて、押しボルトの先端部分を曲げる力、すなわち、当て板の中心を押しボルトの中心からずらすような力がかかったときにその力を当て板からガイドを介して脚部に直接伝えることにより、資材を吊ったときに押しボルトにかかる曲げモーメントを減少させる。
そのためには、当て板が押しボルトにより前進あるいは後進するときは抵抗にならぬように、また、曲げモーメントが生じて当て板の中心がわずかに変位したときに当て板に接触して荷重を受け止めるように、ガイドの内法は当て板の寸法にわずかな隙間分を加算して決められる。
【0018】
一方、当て板は球面ブッシュを介して押しボルトに接続され、コンクリート構造物の表面に順応して傾かなければならない。また、当て板はその強度上の要求から相当の厚さを有している。従って、当て板の厚さ方向の寸法を一定とすれば、傾いたときにその角部がわずかな隙間しかないガイドの内面に当たり、傾く動作が阻害される。そこで、当て板が傾いてもガイドの内面に当たらぬように当て板の厚さ方向の寸法を変える、すなわち、当て板の厚さ方向において、球面ブッシュによる回転の中心に最も近いところの当て板の寸法をガイドの内法にピッタリ合わせ、それ以外のところは傾いても当たらない範囲で寸法を小さくすることにより、自由な傾きと当て板のわずかな変化による接触と言う二つの要求を満たすことができる。
【0019】
本発明により、▲7▼ 押しボルトと脚部の雌ねじ部のかじりや膠着を防ぎ、かつ、▲8▼ 当て板の自由な傾きを保証して、押しボルトが負担すべき反力および摩擦力が十分確保できるという効果が得られる。
【0020】
【発明の実施の形態】
本発明の実施の形態について、図面を参照しながら以下に説明する。なお、本発明は、かかる実施に形態に限定されず、本発明の範囲内でその具体的構造に種々の変更を加えて良いことは言うまでも無い。
【0021】
図1は、本発明の実施の一形態の側面図である。ジブクレーン1は、チェーンブロック等の揚重機器11を支持するジブ12とそれを支えるポスト13、及び、基礎部2からなり、チェーンブロック等の揚重機器11で吊り上げられた資材(図示せず)は、揚重機器11がジブ12に沿って走行することにより、また、ポスト13に設けられた旋回機構14によりジブ12を回転することにより手繰り寄せられ、所定の位置に吊り降ろされる。
【0022】
基礎部2の構成を明確にするために、図1のA−A矢視図を図2に、図2のB−B矢視図を図3に示す。基礎部2は天井部21とその両端から下に伸びる脚部22よりなり、コンクリート構造物15をまたぐように門型に形成された板23とその強度を補強する補強板24、及び、基礎部2とポスト13をつなぐ天板25の組み合わせで構成される。門型に形成された板23の両脚部には、基礎部に必要な反力と摩擦力を生み出すに十分な数の押しボルト3が配される。押しボルト3を締め付けたときの反力に応じて板23を補強する補強版24の形状、板厚及び枚数が決められる。これら押しボルト3には、球面ブッシュ(図2、図3には、表示されていない。)を介して当て板4が取り付けられており、締め付けトルクを管理しながら押しボルト3を締め付けることにより、当て板4がコンクリート構造物15の壁面に順応した形で両側からコンクリート構造物15を挟みつけて、ジブクレーン1を固定させる。
【0023】
押しボルト3と球面ブッシュ、当て板4の組み合わせの一例を図4に示す。球面ブッシュは球面の一部を切り出した形からなる雄32とその球面部分にピッタリ合った凹面部分を有する雌35の組み合わせからなり、両者は容易に摺動することにより軸方向のずれを吸収しつつ,一方から押す力を他方に伝え合う部品である。ここに、押しボルト3の先端部31には、球面ブッシュの雄32が押え板33及び止めネジ34により固定され、一方、当て板4には球面ブッシュの雌35が固定されている。球面ブッシュの雄32と雌35がバラバラにならないように、はずれ止め板37が球面ブッシュの雄32を取り囲む形で押えネジ38により当て板4に取り付けられている。
【0024】
この構成をとることにより、コンクリート構造物の表面が、例え、押しボルト3の軸方向に対し直角な平面でなくても、その表面に順応して当て板4は方向を変え、押しボルト3を締め付けることにより発生する力は当て板4を通して、無駄なくコンクリート構造物に伝えられる。
【0025】
図5は、本発明の他の実施の一形態の側面図の基礎部を取り出した図面である。図5のC−C矢視図を図6に示す。本実施の形態の基礎部5は、コンクリート構造物15をまたぐように門型に形成された板51とその強度を補強する補強板52、及び、基礎部5とポスト13をつなぐ天板53の組み合わせで構成され、門型に形成された板51の両脚部には、基礎部に必要な反力と摩擦力を生み出すに十分な数の押しボルト3が配され、これら押しボルト3には、球面ブッシュを介して当て板4が取り付けられているところは、前述のケースの基礎部2と同様である。
これら構成要素に加えて、本実施例の基礎部5では、押しボルト3がコンクリート構造物15を挟みつける方向と直角方向、すなわち、コンクリート構造物15の壁の長手方向にアンカーボルト6を配され、上記門型部からアンカーボルト6に向かって受け板55を有する側板54を伸ばし、アンカーボルト6にナット61で受け板55を締め付けて基礎部5を固定する。
【0026】
本実施例に拠れば、アンカーボルトを基礎部の固定に使用するものの、アンカーボルトのみに頼った従来工法に比べ、アンカーボルトの数は大幅に減り、かつ、その数少ないアンカーボルトがコンクリート構造物の上面という一つの面のみに植えられるので、基礎部をアンカーボルトに合わせるのが格段に容易になる。
【0027】
図7は、本発明のさらに別の実施の一形態の基礎部の側面図、図8はそのD−D矢視図である。この実施の形態では、コンクリート構造物16は柱状をなし、ジブクレーンの基礎部7はその上部を覆う鞘状の板71とその強度を補強する補強板72、及び、基礎部7とポスト13をつなぐ天板73の組み合わせで構成され、鞘上に形成された板71の脚部には、基礎部に必要な反力と摩擦力を生み出すに十分な数の押しボルト3が配されている。これら押しボルト3には、球面ブッシュ(図示省略)を介して当て板4が取り付けられているところは、前述のケースの基礎部と同様である。
このケースは、固定対象物であるコンクリート構造物が柱状であったため、その上部をまたぐ二つの門型の基礎部を互いに直交して配してその隣同士の脚部を連結し、各脚部の強度を連結により強化した場合とも考えられる。
【0028】
四面に設けられた押しボルト3をトルク管理しながら締め付けることにより、アンカーボルトを用いずに容易にジブクレーンの固定ができる。
【0029】
当て板にガイドを設けた場合のガイドと当て板の組み合わせの一例を図9に示す。(a)図は正面図を示し、(b)図はそのE−E矢視図を示す。
押しボルトの先端部分31には球面ブッシュの雄32が固定され、それと組み合わさる雌35が当て板40に固定されている。押しボルトと当て板40がバラバラにならないようにはずれ止め板39が押えネジ38により当て板40に取り付けられている。
当て板40に近接してガイド45が門型に形成された板23に固定されている。ガイドの形状は、当て板40の中心が押しボルトの中心からずれるような変位があったときに接触して、その力を受け止めるものであるから、当て板の形状に合わせて決められる。一般には、この例のように当て板は円盤状に形成されるので、ガイドはそれを取り囲む円環の形状を採る。資材を吊ったとき基礎部にかかるモーメントにより生ずる当て板の変位は、上向き、又は、下向きのいずれかであるから、ガイドは、完全な円環ではなくて図のように円環の上下の部分のみ取り出した形状でもその効果としては同じであり、ガイドを設置するときの作業の容易性を考えると、このように上下に分割するのが望ましい。
【0030】
当て板40が、押し当てられるコンクリート構造物の表面に従って傾いた状態を、二点鎖線43で示す。ガイドを設ける目的から、当て板40とガイド45の隙間は、両者が触れない範囲で加工上可能な限り狭くすべきであるが、狭くすると、当て板が傾いた状態43では、当て板の側面がガイドに接触してしまう可能性がある。そこで、接触を避け自由な傾きを保証するため、当て板40の厚さ方向にその形状を変化させる。
この図の場合には、球面ブッシュによる当て板の回転の中心は、当て板の背面側、すなわち、はずれ止め板39がついている側にあるので、当て板40の背面部の外径をベースとして、わずかな隙間を持たせるようにガイド45の内径を設定し、当て板40の板厚の中間部分には円周状のくぼみ42を設けて、傾いた状態43においてガイド45との接触を回避する。さらに、傾いてもガイドと接触しない当て板40の表面部は背面部の外径と同じにしている。当て板を円盤状とすることにより、側面のくぼみの加工も容易である。
【0031】
本実施の形態を採用することにより、上述の▲7▼、▲8▼の効果に加えて、▲9▼ 当て板の製作およびガイドの取り付けが容易であると言う効果が得られる。
【0032】
【発明の効果】
本発明により、コンクリート構造物にアンカーボルトを仮に打設する必要が無くなり、あるいは、打設するにしてもその本数が大幅に減少するので、打設作業および撤去時の切断や養生作業が無くなり、あるいは、減少し、ジブクレーンの基礎部をアンカーボルトに合わせる作業、特に、90゜あるいは180゜方向の異なるアンカーボルトに合わせる長時間の人手がかかる作業が無くなり、結果的にジブクレーンの仮設作業が取り付け取り外しの両面でより容易になり、かつ、安全に作業ができるという効果が得られる。
また、本発明により、押しボルトと脚部の雌ねじ部のかじりや膠着を防ぎ、かつ、当て板の自由な傾きを保証して押しボルトが負担すべき反力および摩擦力が十分確保できるという効果が得られる。
【図面の簡単な説明】
【図1】本発明の実施の一形態の側面図である。
【図2】図1のA−A矢視図である。
【図3】図2のB−B矢視図である。
【図4】押しボルト3と球面ブッシュ、当て板4の組み合わせの一例を示す図面である。
【図5】本発明の他の実施の一形態の基礎部の側面図である。
【図6】図5のC−C矢視図である。
【図7】本発明のさらに別の実施の一形態の基礎部の側面図である。
【図8】図7のD−D矢視図である。
【図9】ガイドを設けた場合のガイドと当て板の組み合わせの一例を示す図面である。
【符号の説明】
1 ジブクレーン
2 基礎部
3 押しボルト
4 当て板
5 基礎部
6 アンカーボルト
7 基礎部
11 揚重機器
12 ジブ
13 ポスト
14 旋回機構
15 コンクリート構造物
16 柱状のコンクリート構造物
21 天井部
22 脚部
23 門型に形成された板
24 補強板
25 天板
31 押しボルトの先端部
32 球面ブッシュの雄
33 押え板
34 止めネジ
35 球面ブッシュの雌
37 はずれ止め板
38 押えネジ
39 はずれ止め板
40 厚さ方向に寸法を変えた当て板
42 同当て板の円周状のくぼみ
43 同当て板が傾いた状態
45 ガイド
51 門型に形成された板
52 補強板
53 天板
54 側板
55 受け板
61 ナット
71 鞘状に形成された板
72 補強板
73 天板[0001]
[Technical field to which the invention belongs]
The present invention relates to a jib crane temporarily installed on an upper part of a concrete structure.
[0002]
[Prior art]
When constructing a plant or a building, a jib crane is often used temporarily to take in materials. When a jib crane is temporarily installed on a concrete structure, a number of anchor bolts are temporarily placed on the concrete structure, and the foundation of the jib crane is fixed to the concrete structure using the anchor bolt. In order to resist the moment applied to the foundation of the jib crane when the material is hung, it is necessary to drive anchor bolts over a wide range, but when the concrete structure is wall-like, the top surface However, it is necessary to place anchor bolts on the side surfaces.
[0003]
However, it is difficult to accurately align the foundation with a large number of anchor bolts that are 90 ° or 180 ° in different directions on the top and both sides, and the temporary work of the jib crane is a long and labor-intensive operation. Met. Moreover, since it is a work at a high place, there are many problems in terms of safety. Temporary jib cranes were removed after the completion of the work, but it was also difficult to cure the concrete surface so that many anchor bolts were cut and no traces were left.
[0004]
In general, as a method of temporarily attaching and detaching construction equipment, there is a method of clamping the fixed part with a bolt provided there as a clamp method, but in the case as described above, It was doubtful that the reaction force and frictional force required by the jib crane could be obtained by clamping a concrete surface whose surface was not smooth enough with a bolt as a fixed object, and was not put into practical use.
[0005]
[Problems to be solved by the invention]
The problem to be solved by the present invention is to provide a jib crane that can be easily attached to and detached from the upper part of a concrete structure.
[0006]
[Means for Solving the Problems]
The present invention has a gate-type foundation that straddles the upper part of a concrete structure, and is provided with push bolts that sandwich and fix the concrete structure from both sides with a backing plate via a spherical bush on both legs constituting the gate type Jib crane.
[0007]
In general, when a jib crane is temporarily installed at the top of a concrete structure and the material is taken in, the concrete structure often forms a wall shape, and the material is often taken in over the wall.
The foundation part of the jib crane is formed in a gate shape that straddles the concrete wall, and push bolts that push inward are provided on the parts of both legs that form the gate shape, and each push bolt has a backing plate through a spherical bush. It is a jib crane that fixes a concrete structure by pressing the concrete wall surface with the pad and sandwiching the concrete structure from both sides.
[0008]
Rather than pushing concrete walls directly with push bolts, each push bolt is provided with a backing plate via a spherical bush, and by pressing the concrete wall surface with that backing plate, even against a concrete surface whose surface is not necessarily smooth enough The contact surface of each push bolt adapts, making it possible to fully utilize the bearing stress of concrete and the frictional force between the concrete wall and the backing plate.
Therefore, as long as the tightening torque management of the push bolts is performed reliably, the reaction force and friction force that each push bolt should bear can be sufficiently secured.
[0009]
According to the present invention, (1) there is no need to temporarily place anchor bolts on the concrete structure, so there is no need for placing work, cutting or curing work when removing, and (2) matching the foundation part of the jib crane to the anchor bolts. There is no longer work that requires long manpower to fit different anchor bolts in 90 ° or 180 ° directions, and as a result, temporary work of jib cranes is easier to install and remove, and , (4) The effect of being able to work safely is obtained.
[0010]
In addition, the present invention has a gate-shaped foundation that straddles the upper part of the concrete structure, and a push bolt that fixes the concrete structure by sandwiching the concrete structure from both sides with a contact plate via a spherical bush on both legs constituting the gate shape Is a jib crane having anchor bolts arranged in a direction perpendicular to the direction in which the push bolt sandwiches the concrete structure.
[0011]
As described above, in general, when a jib crane is temporarily installed on an upper portion of a concrete structure and materials are taken in, the concrete structure often has a wall shape.
When anchor bolts are placed only on the top surface of such a wall-like concrete structure to fix the jib crane, a sufficient distance from the center of the jib crane post to the anchor bolt cannot be taken in the wall thickness direction. Since only the anchor bolt standing on the upper surface can not resist the moment applied to the foundation part, hitherto, the anchor bolt was hit to the side, but there is a case where it is not necessary because a sufficient distance can be taken in the longitudinal direction of the wall. Many. In such a case, only the wall thickness direction is clamped with a push bolt to give a necessary reaction force, and the longitudinal direction receives a moment applied to the foundation portion by an anchor bolt placed on the upper surface of the concrete structure. The position of the anchor bolt is perpendicular to the longitudinal direction of the concrete wall, that is, the direction in which the push bolt sandwiches the concrete structure, as viewed from the center of the jib crane post.
[0012]
According to the present invention, (5) the anchor bolts are arranged only in the direction perpendicular to the direction in which the push bolts sandwich the concrete structure, so the number of anchor bolts is greatly reduced compared to the conventional method of arranging in all directions. Cutting and curing work during installation and removal is reduced. (6) Since the anchor bolt is only on the top surface of the concrete structure, the work of aligning the foundation part of the jib crane with the anchor bolt is the conventional 90 ° or 180 ° direction. As compared with the case of fitting to different anchor bolts, the effect that it becomes extremely easy is obtained, and as a result, the above-mentioned effects (3) and (4) are obtained.
[0013]
In addition, the present invention provides a base that combines two orthogonal gates straddling the upper part of a columnar concrete structure, or a square that covers the upper part of a columnar concrete structure formed by connecting the four legs next to each other. This is a jib crane that has a sheath-like base part, and is provided with push bolts that clamp and fix a concrete structure from four sides with a backing plate via spherical bushes on four leg parts.
[0014]
When the concrete structure is columnar rather than wall-like, and the jib crane is temporarily installed on the top of the concrete structure, the foundation is constructed so that the two gates are orthogonal to each other, or the four legs Are connected to each other to form a rectangular sheath covering the upper end of the columnar concrete, and a push bolt is provided on each of these four legs, and the concrete structure is formed with a push bolt having a backing plate from four directions through a spherical bush. By adopting the structure of being clamped and fixed, the effects (1) to (4) described above can be obtained.
[0015]
Further, according to the present invention, in each of the above-described various jib cranes, the guide plate is provided with a guide protruding from the leg portion, and the size is changed in the thickness direction so that the contact plate can be freely tilted without hitting the guide. A jib crane having a plate.
[0016]
In the above-mentioned various jib cranes that are provided with push bolts that sandwich and fix a concrete structure from both sides with a backing plate via a spherical bushing, when the material is hung, it protrudes from the leg portion due to the moment applied to the base portion, and into the spherical bushing An upward or downward bending moment is generated at the tip of the push bolt that reaches it, causing galling or sticking between the push bolt and the female thread carved in the leg, which hinders subsequent tightening torque management and jib crane disassembly. May occur. If the length protruding from the leg is shortened, the influence of the bending moment can be mitigated, but considering the manufacturing accuracy of the foundation and concrete structure, there is a limit to shortening.
[0017]
Therefore, a guide with a size that fits the dimensions of the backing plate is projected from the leg, and the guide is strong enough to bend the tip of the push bolt, that is, press the center of the backing plate. When a force that shifts from the center of the bolt is applied, the force is transmitted directly from the contact plate to the leg through the guide, thereby reducing the bending moment applied to the push bolt when the material is suspended.
For that purpose, when the backing plate is moved forward or backward by the push bolt, it does not become a resistance, and when the bending moment occurs and the center of the backing plate is slightly displaced, it contacts the backing plate and receives the load. Thus, the inner method of the guide is determined by adding a slight gap to the size of the backing plate.
[0018]
On the other hand, the contact plate is connected to the push bolt via the spherical bush and must be inclined in conformity with the surface of the concrete structure. Further, the backing plate has a considerable thickness due to its strength requirements. Accordingly, if the dimension of the contact plate in the thickness direction is constant, the corner portion of the contact plate hits the inner surface of the guide having a slight gap when tilted, and the tilting operation is hindered. Therefore, change the dimension in the thickness direction of the backing plate so that it does not hit the inner surface of the guide even if it tilts, that is, the backing plate closest to the center of rotation by the spherical bush in the thickness direction of the backing plate To meet the two requirements of free tilting and contact by slight change of the backing plate by matching the dimensions of the guide to the guide's inner method and reducing the dimensions within the range where it does not hit otherwise. Can do.
[0019]
According to the present invention, (7) the push bolt and the female threaded portion of the leg are prevented from being galled and stuck, and (8) the free inclination of the backing plate is ensured, and the reaction force and frictional force to be borne by the push bolt are reduced. The effect that it can secure enough is acquired.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings. Needless to say, the present invention is not limited to such embodiments, and various modifications may be made to the specific structure within the scope of the present invention.
[0021]
FIG. 1 is a side view of an embodiment of the present invention. The jib crane 1 includes a
[0022]
In order to clarify the configuration of the
[0023]
An example of a combination of the
[0024]
By adopting this configuration, even if the surface of the concrete structure is not a plane perpendicular to the axial direction of the
[0025]
FIG. 5 is a drawing in which a basic part of a side view of another embodiment of the present invention is taken out. The CC arrow line view of FIG. 5 is shown in FIG. The
In addition to these components, in the
[0026]
According to this embodiment, although anchor bolts are used for fixing the foundation portion, the number of anchor bolts is greatly reduced compared to the conventional method that relies only on anchor bolts, and the few anchor bolts are used in concrete structures. Since it is planted on only one surface, the upper surface, it is much easier to match the base to the anchor bolt.
[0027]
FIG. 7 is a side view of a base part according to still another embodiment of the present invention, and FIG. 8 is a DD arrow view thereof. In this embodiment, the
In this case, the concrete structure that is the object to be fixed was columnar, so the two gate-shaped foundations straddling the upper part were placed perpendicular to each other, and the adjacent legs were connected to each other. It is also considered that the strength of the is strengthened by connection.
[0028]
By tightening the
[0029]
An example of a combination of a guide and a backing plate when a guide is provided on the backing plate is shown in FIG. (A) A figure shows a front view, (b) A figure shows the EE arrow line view.
A male 32 of a spherical bush is fixed to the
A
[0030]
A state in which the
In the case of this figure, the center of rotation of the contact plate by the spherical bush is on the back side of the contact plate, that is, the side to which the slip-off preventing
[0031]
By adopting the present embodiment, in addition to the effects (7) and (8) described above, (9) the effect that it is easy to manufacture the backing plate and attach the guide can be obtained.
[0032]
【The invention's effect】
According to the present invention, there is no need to temporarily lay anchor bolts on the concrete structure, or the number of the bolts is greatly reduced even when laid. Alternatively, the work of fitting the base part of the jib crane to the anchor bolt, especially the work that takes a long time to fit the anchor bolt of different 90 ° or 180 ° direction is eliminated, and the temporary work of the jib crane is attached and removed as a result. It becomes easier on both sides, and the effect of being able to work safely is obtained.
Further, according to the present invention, it is possible to prevent galling and sticking between the push bolt and the female thread portion of the leg, and to ensure a sufficient inclination force of the push bolt by guaranteeing a free inclination of the contact plate. Is obtained.
[Brief description of the drawings]
FIG. 1 is a side view of an embodiment of the present invention.
FIG. 2 is a view taken in the direction of arrows AA in FIG.
FIG. 3 is a view taken along arrow BB in FIG. 2;
4 is a view showing an example of a combination of a
FIG. 5 is a side view of a base part according to another embodiment of the present invention.
6 is a view taken along the line CC of FIG. 5;
FIG. 7 is a side view of a base portion according to still another embodiment of the present invention.
FIG. 8 is a view taken along the line DD in FIG.
FIG. 9 is a drawing showing an example of a combination of a guide and a backing plate when a guide is provided.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP36293499A JP4587413B2 (en) | 1999-12-21 | 1999-12-21 | Jib crane |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP36293499A JP4587413B2 (en) | 1999-12-21 | 1999-12-21 | Jib crane |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001171976A JP2001171976A (en) | 2001-06-26 |
| JP4587413B2 true JP4587413B2 (en) | 2010-11-24 |
Family
ID=18478103
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP36293499A Expired - Fee Related JP4587413B2 (en) | 1999-12-21 | 1999-12-21 | Jib crane |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4587413B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006032321A1 (en) * | 2006-07-11 | 2008-01-17 | Wolffkran Gmbh | Method for assembling a tower crane |
| CN102118085A (en) * | 2009-12-31 | 2011-07-06 | 肖功宽 | Coil inserting device of simple mechanical hoisting motor stator |
| CN103738648A (en) * | 2013-12-23 | 2014-04-23 | 柳州乘龙专用车有限公司 | Oscillating arm type special wire feeder hanger |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4882656U (en) * | 1972-01-11 | 1973-10-08 | ||
| JPS556798Y2 (en) * | 1976-07-05 | 1980-02-15 | ||
| JPS58152794A (en) * | 1982-03-06 | 1983-09-10 | 東芝プラント建設株式会社 | Post type crane |
-
1999
- 1999-12-21 JP JP36293499A patent/JP4587413B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001171976A (en) | 2001-06-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6647674B1 (en) | Erection anchor for concrete panel | |
| KR20040022138A (en) | Joining structure of pile | |
| KR101047809B1 (en) | Mold support for easy assembly and disassembly | |
| JP4587413B2 (en) | Jib crane | |
| CN112459468A (en) | Template for building pouring construction | |
| KR102116934B1 (en) | Pressurized type Pre-embedded Anchor by Pressurized for Bridge Inspection Facility and Method for constructing this same | |
| JP5412307B2 (en) | Installation method of bridge support device and fixing jig used in the method | |
| JPH08151675A (en) | Oblique prestressed box culvert and its prestress introducing method | |
| CN201433342Y (en) | T beam bottom web steel bar binding mould | |
| JP4211906B2 (en) | Laying structure of precast floor slab and laying method of precast floor slab | |
| KR20200041503A (en) | Clamping device for panel form | |
| KR101575091B1 (en) | Bracing for system support | |
| CN108589542A (en) | A kind of superelevation steel pipe support adjustable-angle formula cable wind system | |
| JP4563243B2 (en) | Column base foundation construction method and positioning device | |
| JP5282721B2 (en) | Rigid floor structure and method | |
| JP7459674B2 (en) | Foundation formwork structure and fixing pin for use in foundation formwork structure | |
| JPH0645463Y2 (en) | Back-filling camber of mountain stop wall | |
| CN217268361U (en) | Axial line self-adaptive prestress carbon fiber plate tensioning anchorage | |
| JP7496782B2 (en) | Earth retaining structure construction tool and earth retaining structure construction method | |
| CN217752006U (en) | Positioning assembly for controlling elevation of embedded sleeve and connecting device thereof | |
| CN221646404U (en) | Template pull tab for shear wall pouring | |
| CN220487122U (en) | Quick installing and removing fastening device for templates | |
| JP2020105766A (en) | Anchor bolt construction jig and basic formwork structure | |
| CN215368739U (en) | Building construction is anchor clamps for stereotype | |
| CN222009618U (en) | A template clamp for building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061206 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20091015 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20091110 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091222 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091222 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100408 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100415 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100903 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100906 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4587413 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130917 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |