JP4591933B2 - Painting system - Google Patents
[go: Go Back, main page]

JP4591933B2 - Painting system - Google Patents

Painting system Download PDF

Info

Publication number
JP4591933B2
JP4591933B2 JP2000217559A JP2000217559A JP4591933B2 JP 4591933 B2 JP4591933 B2 JP 4591933B2 JP 2000217559 A JP2000217559 A JP 2000217559A JP 2000217559 A JP2000217559 A JP 2000217559A JP 4591933 B2 JP4591933 B2 JP 4591933B2
Authority
JP
Japan
Prior art keywords
workpiece
coating
painting
chamber
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000217559A
Other languages
Japanese (ja)
Other versions
JP2002059046A (en
Inventor
浩之 高井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yamaha Motor Co Ltd
Original Assignee
Yamaha Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yamaha Motor Co Ltd filed Critical Yamaha Motor Co Ltd
Priority to JP2000217559A priority Critical patent/JP4591933B2/en
Publication of JP2002059046A publication Critical patent/JP2002059046A/en
Application granted granted Critical
Publication of JP4591933B2 publication Critical patent/JP4591933B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coating Apparatus (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Spray Control Apparatus (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、塗装システムに関する。
【0002】
【従来の技術】
従来の塗装システムは、例えば図12に示すように工場建屋99内において、主搬送ラインの軌道に沿ってコンベア100を移動し、コンベア100に設けられたワーク保持具101にワークKを保持させ、塗装ケーシング102によりコンベア100を囲むように設けられた塗装室103内で塗装装置104によりワークKに塗装を行なっている。
【0003】
この塗装室103の入口102aと出口102bには、それぞれワークKが通過できる開口105a,105bが設けられている。
【0004】
【発明が解決しようとする課題】
このように工場建屋99内において、コンベア100を囲むように塗装室103を設けているので、塗装工場において、主搬送ライン設置工事を行ない、その後に塗装設備の工事をする必要があり、工期が長くなり設備投資費が嵩む等の問題がある。
【0005】
さらに、コンベア100が通過する塗装室103内で塗装装置104によりワークKに塗装を行なっているため、コンベア100やワーク保持具101に塗料が付着し、大規模なコンベア100やワーク保持具1の全てを洗浄する必要があり、メンテナンスの作業が面倒で、コストも嵩む。
【0006】
さらに、塗装室103にはコンベア100の通過部となる常時開放されている開口105a,105bが設けられているので、塗装中塗装装置103から吹き出される塗料がワーク表面や、その他のものに衝突し飛散し、開口105a,105bから工場建屋99内に流出する可能性があった。工場建屋99内に塗料が飛散すると、さらに別のものに衝突して微細化しミスト状となり工場建屋99内に浮遊し、塗料から溶剤成分が揮発するので、工場建屋99内の環境を悪化する問題があった。
【0007】
さらに、従来技術では塗装装置104から開口105a、105bまでの距離をそれぞれ大きく取ることが行われ、塗装室103の空気を工場建屋99の外に直接排出する排気装置106が塗装ケーシング102に設けられていた。これにより、塗装装置103から吹き出される塗料がワーク表面や、その他のものに衝突し微細化して微小ミスト状となり塗装室103内に浮遊する塗料や、さらに、吹き出される塗料から揮発し塗装室103内の濃度が高まる揮発溶剤が、常時開放されている開口105a,105bから工場建屋99内に流出しようとするが、これらを工場建屋99外に排出でき、工場建屋99内の環境を悪化させないことができる。
【0008】
しかしながら、塗装装置104から開口105bまでの間に直近のワーク保持具101を除いてワーク保持具101が4個あるいはそれ以上位置させるようになっていたため、塗料を変更して違う色を塗装する色変を行う場合、前の色での塗装完のワークが開口105bを通って塗装室103の外に出るまで別の色の塗料による塗装ができない。すなわち塗装装置104から開口105bまでの間に直近のワーク保持具101を除いて位置する4個あるいはそれ以上のワーク保持具101にはワークのない欠品状態とする必要があり、その分色変えにより塗装の効率が低下する問題があった。
【0009】
この発明は、かかる実情に鑑みてなされたもので、第1の目的は、塗装工場での設置が容易で工期短縮可能でかつ設備投資費を節約できることであり、第2の目的は、主搬送ライン側に塗料が付着するのを防止できるようにすることであり、第3の目的は、工場建屋内の環境を悪化させないことであり、さらに第4の目的は、塗装の色変えによる塗装効率の低下を防止することである。
【0010】
【課題を解決するための手段】
前記課題を解決し、かつ目的を達成するために、この発明は、以下のように構成した。
【0011】
請求項1に記載の発明は、
『【請求項1】 ワークを軌道に沿って移動可能とする主搬送ラインと、
前記主搬送ラインに隣接配置され、前記主搬送ラインと独立の塗装室を構成する塗装ケーシングと、
前記塗装室内の塗装装置と、
塗装中塗装装置近傍の塗装位置においてワークを保持するワーク保持装置と、
前記主搬送ライン上のワークを前記ワーク保持装置に移動可能とするとともに、前記ワーク保持装置のワークを前記主搬送ライン上に移動可能とするワーク移動装置と、を備え、
前記塗装ケーシングには、前記塗装室内と前記主搬送ラインとの間のワークの移動通路となる単一の開口を設け、かつ塗装室内に前記ワーク保持装置を配置し、
前記ワーク保持装置は、室内主回転台と、その長手方向両端部に配置された所定の腕の長さの副回転台と、この副回転台の端部に設けられたワーク保持部を有し、
前記副回転台は、前記開口部を介して前記塗装位置からワーク載せ替え位置へ移動させる途中位置と前記ワーク載せ替え位置間を回動し、
前記ワーク移動装置は、前記主搬送ライン上のワークを、前記ワーク載せ替え位置において前記ワーク保持部に移動可能とするとともに、前記ワーク保持部のワークを前記主搬送ライン上に移動可能とし、
前記単一の開口にエアーカーテンあるいは移動可能壁からなる開閉扉を設け、
前記塗装中の一部期間あるいは全部期間、前記開閉扉を閉じるようにし、
前記途中位置を、前記塗装ケーシングの内とし、
前記ワーク載せ替え位置を、前記塗装ケーシングの外とし、塗装と載せ替えを同時に行うことを特徴とする塗装システム。』である。
【0012】
請求項1に記載の発明によれば、主搬送ラインの工事中、平行して塗装ケーシング、塗装装置、ワーク保持装置、ワーク移動装置の設置工事が可能であり、工事短縮が可能で、設備投資費を節約できる。また、塗装室の外に主搬送ラインが位置することになり、塗装装置から主搬送ラインが離間し且つ間に単一の開口があるので、塗装装置から吹き付けられる塗料がワーク等に衝突して飛散しても、飛散塗料が主搬送ラインに到達しにくくなり、塗料が付着しにくくできる。また、塗装装置から吹き付けられる塗料がワーク等に衝突して飛散しても、塗装中の一部期間あるいは全部期間、開閉扉を閉じるようにしたので、主搬送ライン側に塗料が付着しにくくできる。また、ワーク載せ替え位置を、塗装ケーシングの外とし、塗装と載せ替えを同時に行うことで、塗装を短時間に行なうことができる。
【0025】
請求項に記載の発明は、
『前記ワーク保持装置は、塗装が完了したワークを次の塗装前に前記塗装位置から前記塗装室の外へ移動させるようにしたことを特徴とする請求項1記載の塗装システム。』である。
【0026】
請求項に記載の発明によれば、塗装完了待機位置を設けないので、色変えのための欠品状態をつくる必要がなくなり色変えによる塗装効率の低下をより確実に防止することができる。
【0029】
請求項に記載の発明は、
『前記ワーク保持装置は、塗装前のワークを直前の塗装完了後に前記塗装室の外から前記塗装位置へ移動させるようにしたことを特徴とする請求項1または請求項に記載の塗装システム。』である。
【0030】
請求項に記載の発明によれば、塗装待機位置を設けず、塗装前のワークを塗装室の外から塗装位置に移動するので、塗装待機位置を設けることで形成されることのある塗装完成後の塗装面に微妙な凹凸を、より確実に形成防止することができる。塗装完成後の塗装面に微妙な凹凸は、塗装位置のワークヘ吹き付けられる塗料の一部が飛散し、塗装待機位置にある塗装前のワークに不規則に付着するからである。
【0031】
請求項に記載の発明は、
『前記塗装ケーシングの内壁に沿って洗浄水を流下させるようにしたことを特徴とする請求項1乃至請求項のいずれか1項に記載の塗装システム。』である。
【0032】
請求項に記載の発明によれば、塗装ケーシングの内壁に沿って洗浄水を流下させるようにしたから、塗料が塗装ケーシングの内壁に付着することを防止し、メンテナンスが容易である。また、吹きつけられる塗料の一部が内壁に衝突しても飛散しにくくできる。
【0033】
請求項に記載の発明は、
『前記主搬送ラインを収容する収容室を構成する搬送ケーシングを有し、前記収容室の空気を大気中に排出する換気装置を備えることを特徴とする請求項1乃至請求項のいずれか1項に記載の塗装システム。』である。
【0034】
請求項に記載の発明によれば、主搬送ラインを収容する収容室を構成する搬送ケーシングを有し、収容室の空気を大気中に排出する排気装置を備えることで、塗装中に揮発して発生する溶剤や収容室に飛散浮遊する微小塗料ミストを簡単且つ確実に処理でき、搬送ケーシング内でのクリーン化が可能である。
【0041】
【発明の実施の形態】
以下、この発明の塗装システムの実施の形態を図面に基づいて詳細に説明するが、この発明はこの実施の形態に限定されない。
【0042】
まず、図1乃至図3に基づいて塗装システムの第1の実施の形態を説明する。図1は塗装システムの斜視図、図2は塗装システムの主搬送ライン、塗装モジュール、ワーク移動装置の動作を示す概略構成図、図3は塗装システムの作動のタイミングチャートである。
【0043】
塗装システム1には、主搬送ライン10と、塗装モジュール20と、塗装モジュール20の一部を構成するワーク移動装置30とが備えられている。主搬送ライン10は、ワークKを軌道に沿って移動可能とするものである。この実施の形態では、軌道に沿ってコンベア11を移動可能とし、このコンベア11にワーク保持具12を載置し、このワーク保持具12にワークKが保持される。ワーク保持具12は、コンベア11に固定しても良く、着脱可能であってもよい。また、主搬送ライン10は、コンベア11によらず、軌道に沿って独立のワーク保持具12が自走あるいは押されて移動するものであっても良い。
【0044】
主搬送ライン10は、搬送ケーシング13により構成される収容室14内に収容され、この収容室14には換気装置15が備えられている。換気装置15は、排気ダクト15a、排気ファン15b及び処理装置15cを有し、排気ファン15bの駆動により収容室14内の空気が処理装置15cを介して排気ダクト15aから屋外に排気される。処理装置15cには、浮遊する微小ミスト状の塗料を捕捉分離するフィルタ15dが備えられている。
【0045】
塗装モジュール20は、主搬送ライン10に隣接し、かつ主搬送ライン10に沿って複数配置されている。この塗装モジュール20は、主搬送ライン10の上流側を下塗り塗装用、下流側を上塗り塗装用としている。
【0046】
塗装モジュール20には、塗装ケーシング21と、塗装装置22と、ワーク保持装置23と、下記する洗浄装置とが備えられている。塗装ケーシング21により主搬送ライン10と独立の塗装室25が構成され、この塗装室25内に、塗装装置22、ワーク保持装置23、洗浄装置が配置されている。ワーク保持装置23とワーク移動装置30とで塗装用ワーク搬送装置を構成する。
【0047】
また、塗装ケーシング21の下記する床部材21aには、換気装置26が収容室14の換気装置15と独立に設けられている。換気装置26は、排気ダクト26a、排気ファン26b及び処理装置26cを有し、排気ファン26bの駆動により塗装室25内の空気が床部材21aに設けられる換気口26iを通り処理装置26cを介して排気ダクト26aから屋外に排気される。処理装置26cには、浮遊する微小ミスト状の塗料を捕捉分離するフィルタ26dが備えられている。
【0048】
塗装室25を換気装置26により換気することで、収容室14の換気装置15は、塗装ケーシング21から下記する開口28を通って漏れ出るミスト状の塗料を減らすことができる分、塗料による目詰まりが防止され、本来の吸着能いっぱいまで使用できる。なお、塗装ケーシング21の天井から温度及び湿度の調整された外気が導入される。
【0049】
塗装装置22は、塗装室25内に配置され、塗装ロボット22aにより塗装位置に位置するワーク保持装置23に保持されたワークKに塗料を塗布する。
【0050】
ワーク保持装置23は、塗装用ワーク搬送装置の一部を構成する塗装室25内のワーク移動装置となり、室内主回転台23aと、室内主回転台23aの両端部に配置した副回転台23b,23cと、この副回転台23b、23cの端部に設けたワーク保持部23b1,23c1とで構成されている。
【0051】
塗装ケーシング21には、塗装室25と主搬送ライン10を区画する開閉扉27が設けられ、不図示の扉開閉装置の駆動で塗装中は開閉扉27により開口部28を閉じるようになっている。
【0052】
ワーク移動装置30は、塗装用ワーク搬送装置の一部を構成する塗装室25外のワーク移動装置となり、ロボットとし、室外回転台31と、この室外回転台31の両端部に配置したローダー31a,31bから構成されている。ワーク保持装置23とワーク移動装置30とで塗装用ワーク搬送装置Aを構成し、この塗装用ワーク搬送装置Aで主搬送ライン10上のワークKを開口28を通して塗装室25内に導き、塗装中ワークKを塗装装置22近傍に保持し、塗装後塗装室25内のワークKを開口28を通して主搬送ライン10上に戻す。
【0053】
また、塗装ケーシング21は、床部材21aと、この床部材21aを覆うカバー部材21bで形成し、床部材21aにカバー部材21bを接合して形成している。この床部材21aとカバー部材21bは独立に製造可能となり、主搬送ライン10に床部材21aを隣接配置した後、塗装装置22、ワーク保持装置23とワーク移動装置30を床部材21a上に配置し、しかる後カバー部材21bを床部材21aに接合することにより、あるいは塗装装置22、ワーク保持装置23とワーク移動装置30を主搬送ライン10からは離れた場所で塗装モジュール20を配置し、その後床部材21aを主搬送ライン10に隣接配置し、さらにカバー部材21bを床部材21aに接合することにより、塗装システム1の設備期間を短くできる。
【0054】
次に、この実施の形態の塗装システムの動作を、図2及び図3に基づいて説明する。
【0055】
図2(A)において、塗装ケーシング21の開口28が開閉扉27により閉じられ、塗装室25内で塗装装置22が駆動し、塗装ロボット22aによりワーク保持装置23の副回転台23cに保持されて塗装位置P1に位置するワークK3に塗料を塗布する塗装を開始する。塗装は、所定のタイミングで副回転台23cのワーク保持部23c1によりワークK3を90度づつ回転させ、ワークK3全体に塗料を塗布する。
【0056】
一方、ローダー31a,31bを有する室外回転台31が90度旋回するとともに、閉じた開閉扉27の外側のワーク載せ替え位置P2に位置するワーク保持部23b1の塗装済みのワークK1にローダー31aが伸長し上昇(リフトアップ)し係合(ハンガーチャック)する一方、主搬送ライン10上のワーク保持具(パレット)12に保持される未塗装のワークK2にローダー31bが伸長し上昇(リフトアップ)し係合(ハンガーチャック)する。
【0057】
この後室外回転台31が180度旋回し、ワーク載せ替え位置P2に位置するワーク保持部23b1に未塗装のワークK2が、ローダー31bが下降(リフトダウン)し、係合解除(ハンガーアンチャック)することでローダー31bから受け渡される一方、ワーク保持具(パレット)12に塗装済みのワークK1が同様にしてローダー31aから受け渡される。さらにこの後室外回転台31が90度旋回して、図2(B)に図示の状態となる。
【0058】
図2(B)において、塗装済みのワークK1が保持されたワーク保持具(パレット)12が次工程部署方向に移動(パレット位置決めリリース及びパレット送り)されるとともに、開閉扉27が開とされるとともに、図2(A)から続く塗装がやがて完了する。
【0059】
未塗装のワークK2が保持されたワーク保持具(パレット)12が前工程部署から所定の位置まで送られ(パレット位置決め)て、図2(C)に図示の状態となる。図2(C)において、未塗装のワークK2を保持する副回転台(サブアーム)23bが90度旋回せられ、ワーク保持部23b1に保持される未塗装のワークK2が開口28を通過してワーク載せ替え位置P2から途中位置P3に移動して、図2(D)に図示の状態となる。
【0060】
図2(D)において、主回転台(インデックス)23aが180度旋回し、未塗装のワークK2を保持する副回転台23bと塗装済みのワークK3を保持する副回転台23cの位置が入れ替わる。すなわち、塗装済みのワークK3が塗中位置P3に、未塗装のワークK2が塗装位置P1にそれぞれ移動し、図2(E)の図示の状態となる。
【0061】
図2(E)において、副回転台23cが180度旋回し、塗装済みのワークK3が途中位置P3からワーク載せ替え位置P2に移動し、この後、開閉扉27が閉とされ、塗装が開始されて図2(A)の図示の状態に戻る。
【0062】
なお、塗装位置P1に位置することになるワーク保持部23b1あるいはワーク保持部23c1は、それぞれ塗装中に3回旋回して保持するワークを90度づつ回転させる。これにより、ワークを4回に分け90度づつ4面の塗装を経て360度の全周の塗装を可能としている。塗装、旋回、塗装、旋回、塗装、旋回、塗装により全周の塗装を終えた後、図2(C)に示す未塗装のワークK2を開口部28を通過してワーク載せ替え位置P2から途中位置P3に移動するための副回転台(サブアーム)23bの90度の旋回と同時あるいは主回転台23の180度の旋回中に、他方の副回転台(サブアーム)23cのワーク保持部23c1も90度回転させられる。
【0063】
図3のタイミングチャートは以上の内容を図示したものである。ワーク保持装置23とワーク移動装置30は、請求項1に記載のワーク移動装置を構成し、主搬送ライン10上の塗装前のワークK2をワーク載せ替え位置P2及び途中位置P3を経て塗装位置P1まで移動し、塗装位置P1の塗装完了のワークK3を途中位置P3及びワーク載せ替え位置P2を経て主搬送ライン10上まで移動する。
【0064】
なお、開口28に、常時開口28を閉にするか、ワークKの通過時のみに閉とするエアーカーテンを開閉扉27の替わりに配置しても良い。
【0065】
図4は参考形態第1の実施形態の塗装システムを示す概略構成図、図5はその作動のタイミングチャートである。図4の塗装モジュールの構成は、図1のものと同じものであり、副回転台23bが室内塗装側に位置し、副回転台23cが室内待機側に位置し、ワーク保持部23b1,23c1はワーク載せ替え位置P2と、塗装室内となる塗装位置P1との間を移動可能となっている。
【0066】
ワーク移動装置30のローダー31aは、塗装室側に位置し、ローダー31bは搬送ライン側に位置している。このワーク移動装置30は、主搬送ライン10上のワークKを塗装モジュール20のワーク保持装置23に移動可能とするとともに、ワーク保持装置23のワークKを主搬送ライン10上に移動可能としている。
【0067】
洗浄装置24は、塗装ケーシング21の4面の内壁に沿って洗浄水を流下させるようにしたウォーターカーテン24aを有し、塗料が塗装ケーシング21の内壁に付着することを防止し、メンテナンスが容易であり、塗装が内壁に衝突して飛散するのを防止できる。
【0068】
この参考形態第1の実施の形態の塗装システムは、図2、図3に示す各装置の動作のタイミングと異なった動作のタイミングを取る。次に、図4及び図5に基づいてこの参考形態第1の実施の形態の塗装システムの作動を説明する。
【0069】
塗装装置22の塗装ロボット22aが塗装を行ない、塗装が終了すると開閉扉27を開き、塗装室25内の室内主回転台23aが90度回転し、室内塗装側に位置する副回転台23bを180度回転し、ワーク保持部23b1を塗装ケーシング21の開口部28から塗装されたワークKを主搬送ライン10側に送出す。このように、塗装位置P1に位置するワーク保持部23b1をワーク載せ替え位置P2に移動する。
【0070】
一方、室内待装側に位置する副回転台23cを180度回転し、ワーク保持部23c1は未塗装のワークKを内側に移動させる。このように、塗装待機位置P3に位置するワーク保持部23c1を中間位置P4に移動し、ワーク保持部23c1が未塗装のワークKを内側に移動させることで、その分塗装ケーシング21の幅を小さくし、コンパクトにすることができる。
【0071】
ワーク移動装置30は、室外回転台31が90度回転し、ローダー31aがワーク保持部23b1に対向するワーク載せ替え位置P2に移動し、この塗装室側に位置するローダー31aが伸長して塗装が完成したワークKを荷受けする。
【0072】
一方、室外回転台31が90度回転することで、ローダー31bが搬送ライン側に移動し、この搬送ライン側に位置するローダー31bが伸長して主搬送ライン10上に設けられたワーク保持具12から未塗装のワークKを荷受けする。
【0073】
室外回転台31が180度回転し、塗装室側に位置するローダー31aが搬送ライン側に移動すると共に、搬送ライン側に位置するローダー31bが塗装室側に移動し、ローダー31aから塗装が完成したワークKを主搬送ライン10上に設けられたワーク保持具12に荷卸しし、ローダー31bから未塗装のワークKを副回転台23bのワーク保持部23b1に荷卸しし、ローダー31a,31bを縮め、室外回転台31を90度回転し、主搬送ライン10がワーク1台分移動する。
【0074】
次に、ワーク保持装置23の室内主回転台23aを90度回転し、未塗装のワークKを荷受けした副回転台23bが180度回転し、塗装待機位置P3に移動すると共に、中間位置P4に位置する副回転台23cが180度回転し、ワーク保持部23c1が塗装位置P1に移動する。
【0075】
その後に、開閉扉27が閉動作して開口部28を閉じ、塗装位置P1で塗装装置22が作動して、ワーク保持部23c1に保持されたワークKを塗装し、塗装が終了すると、前記した作動を繰り返す。開閉扉27が閉動作して開口部28を閉じる時点は、未塗装のワークKを荷受けした後で、塗装装置22が作動する前ならば特に限定されない。
【0076】
このようにワーク保持装置23は、ワーク保持部23b1,23c1をワーク載せ替え位置P2と、塗装室内となる塗装位置P1との間を移動可能とし、塗装ケーシング21に、塗装室25と主搬送ライン10を区画する開閉扉27を設け、塗装中閉じるようにしたから、主搬送ライン側に塗料が付着することを防止することができる。
【0077】
また、塗装の色変えは、塗装モジュール20の内部のワークKを主搬送ライン10に送出し、開閉扉27を閉じて塗装ケーシング21の塗装ロボット22aの不図示の塗料噴射系路を洗浄すればよく、塗装の色変えが簡単である。
【0078】
また、塗装ケーシング21内に、塗装位置P1、塗装待機位置P3を設け、塗装中にワークKを待機させるようにしたから、塗装を短時間に行なうことができる。
【0079】
次に、図6及び図7に基づいて塗装システムの参考形態第2の実施の形態を説明する。図6は塗装システムの概略構成図、図7は洗浄装置の概略構成図である。
【0080】
この実施の形態の塗装システム1は、図1乃至図5と同じ符号を付したものは、同様に構成されるから説明を省略する。
【0081】
主搬送ライン10は、軌道10aと、軌道10a上を移動可能な車台10bと、車台10bに設けたワーク保持具12で構成され、ワーク保持具12にワークKが保持される。搬送ケーシング13には、塗装モジュール20が配置される位置に対応して換気装置15が備えられ、収容室14内の空気が屋外に排気される。
【0082】
洗浄装置24は、塗装ケーシング21の4面の内壁に沿って洗浄水を流下させるようにしたウォーターカーテン24aを有しており、この滝状に流下する洗浄水は、排出溝24bに集められる。排出溝24bは塗装ケーシング21の下側に形成され、排出溝24bに集められた洗浄水は、排出管24cを介して沈殿槽24dに導かれる。沈殿槽24dに溜る洗浄水は、循環ポンプ24eの駆動により供給管24fから塗装ケーシング21の4面の内壁の上部に送られ、水溜め用堰24gから溢れて4面の内壁に沿って洗浄水を流下させるようになっている。
【0083】
沈殿槽24dには、洗浄水の水面検出センサS1が設けられ、水面検出センサS1により洗浄水の水面が所定以下になると、電磁弁24hが開き、補充管24iから補充用の新鮮水が補充される。
【0084】
塗装ケーシング21の塗装室25の開口部28に、塗装室25と主搬送ライン10を区画する開閉扉27を設け、開閉扉27を塗装中閉じるようにしているが、ウォーターカーテン24aで開口部28を塗装中閉じるようにしてもよい。
【0085】
ワーク保持装置23は、室内主回転台23aが回転テーブルで構成され、この室内主回転台23aの3箇所に120°間隔で副回転台23b,23c,23dが設けられている。この副回転台23b、23c,23dには、ワーク保持部23b1,23c1,23d1が設けられている。
【0086】
塗装装置22は、開閉扉27により開閉される開口部28より離れた位置に配置され、塗料のミストが極力開閉扉27の隙間等から漏れることがないようにしているが、塗装装置22を2点鎖線で示すように室内主回転台23aの回転方向下流側に配置すると、塗装が完成したワークKを主搬送ライン10上に迅速に送出すことができる。
【0087】
次に、図8に基づいて塗装システムの参考形態第3の実施の形態を説明する。図8は塗装システムの概略構成図である。
【0088】
この実施の形態の塗装システム1は、図1乃至図7と同じ符号を付したものは、同様に構成されるから説明を省略する。
【0089】
主搬送ライン10は、搬送ケーシング13が建屋の壁を兼ねている。ワーク保持装置23は、室内主回転台23aが回転テーブルで構成され、この室内主回転台23aの2箇所に180°間隔で副回転台23b,23cが設けられている。
この副回転台23b、23cには、ワーク保持部23b1,23c1が設けられている。
【0090】
この実施の形態では、ワーク載せ替え位置P2を、塗装ケーシング21の外とし、開閉扉27により開口部28を閉じることで、塗装装置22による塗装と、ワーク移動装置30による載せ替えを同時に行うことで、塗装を短時間に行なうことができる。
【0091】
また、扉開閉装置29を主搬送ライン10側に移動させて2点鎖線で示すW1の位置に設け、ワーク載せ替え位置P2を、塗装ケーシング21の内としてもよく、この場合には塗装装置22による塗装と塗装の間に、ワーク移動装置30による載せ替えを行うことで、より確実に塗料のミストが外部に漏れることを防止することができる。また、扉開閉装置29を2点鎖線で示すW2の位置に設け、ワーク載せ替え位置P2を、塗装ケーシング21の境界部としてもよい。
【0092】
次に、図9に基づいて塗装システムの第2の実施の形態を説明する。図9は塗装システムの概略構成図である。
【0093】
この実施の形態の塗装システム1は、図1乃至図7と同じ符号を付したものは、同様に構成されるから説明を省略する。
【0094】
この実施の形態では、2台の塗装装置22,22´が備えられ、この塗装ロボット22a,22a´を塗装仕様に応じて切り換えて使用するようになっている。
【0095】
次に、図10及び図11に基づいて塗装システムの参考形態第4の実施の形態を説明する。図10は塗装システムの概略構成図、図11は洗浄装置及び換気装置の概略構成図である。この実施の形態の塗装システム1は、図1乃至図7と同じ符号を付したものは、同様に構成されるから説明を省略する。
【0096】
この実施の形態の塗装システム1では、主搬送ラインに隣接配置可能とされる塗装モジュール20が、塗装室25を形成し開口28を有する塗装ケーシング21と、塗装室25に配置される塗装装置22と、主搬送ライン上のワークKを開口28を通して塗装室25内に導き、塗装中ワークKを塗装装置22近傍に保持し、塗装後塗装室25内のワークKを開口28を通して主搬送ライン上に戻す塗装用ワーク搬送装置Aからなる。
【0097】
塗装ケーシング21は、床部材21aと、この床部材21aを覆うカバー部材21bで形成され、床部材21aにカバー部材21bを接合して形成している。このカバー部材21bにより4面の側壁21b1及び天井21b2が形成される。
【0098】
塗装用ワーク搬送装置Aを構成するワーク保持装置23は、塗装ケーシング21の天井21b2に吊り下げて設けられている。ワーク保持装置23は、駆動部23f、主アーム23a、副アーム23b,23c、ワーク保持具23b1,23c1を有している。
【0099】
駆動部23fには、主アーム23aがワーク保持具23b1,23c1から離間した軸回りに回動あるいは回転可能とされている。副アーム23b,23cは、主アーム23aに対して軸回りに回動あるいは回転可能に連結されている。ワーク保持具23b1,23c1は、主アーム23aと副アーム23b,23cとの連結中心軸から離間した位置において副アーム23b,23cに設けられ、電磁石式カップリングによりワークKが脱着可能とされている。
【0100】
駆動部23fには、主アーム23aを駆動する主モータM1が備えられ、この主モータM1により主アーム23aが支持軸23gを支点に回動あるいは回転する。主アーム23aの両端部には、主モータM1とは独立に、副アーム23b,23cを駆動する第1の副モータM2が配置されている。この第1の副モータM2の駆動により主アーム23aの回動あるいは回転の動きに制約されることなく、支持軸23hを支点に自由に副アーム23b,23cを動作することができる。
【0101】
また、主アーム23aの両端部には、主アーム23aを駆動する主モータM1とは独立に、ワーク保持具23b1,23c1を駆動する第2の副モータM3が配置されている。第2の副モータM3の駆動により主アーム23aの回動あるいは回転の動きに制約されることなく、ベルト23i,23jを介して自由にワーク保持具23b1,23c1を動作することができる。
【0102】
また、ワーク保持具23b1,23c1を、副アーム23b,23cに対して支持軸23hの軸回りに回動あるいは回転可能に副アーム23b,23cに連結し、ワーク保持具23b1,23c1を回動あるいは回転させることにより、ワークの外周を容易にかつ確実に塗装することができる。
【0103】
また、ワーク保持装置23は、主アーム23aに対して支持軸23hの軸回りに回動あるいは回転可能に連結される副アーム23b,23cと、主アーム23aと副アーム23b,23cとの連結中心軸から離間した位置において副アーム23b,23cに設けられ、ワークが脱着可能とされるワーク保持具23b,23cからなり、主アーム23aの回動あるいは回転時、副アーム23b,23cを主回転中心軸寄りに回動移動して置くことにより、主回転中心軸回りの慣性マスを小さくできるので、迅速に主アーム23aの回動あるいは回転の開始及び停止をすることができる。
【0104】
また、主アーム23aは、回転中心軸から略同一の円周上複数の位置において、それぞれワーク保持具23b1,23c1を有し、主アーム23a上に複数のワークを保持できるので、主搬送ライン10上でのワーク保管量を減らすことができる。
【0105】
このように塗装ケーシング21は、床部材21aと、この床部材21aを覆うカバー部材21bで形成し、床部材21aにカバー部材21bを接合して形成しており、床部材21aとカバー部材21bを独立に製造可能となり、主搬送ラインに床部材21aを隣接配置した後、塗装装置22を床部材21a上に配置し、しかる後カバー部材21bを床部材21aに接合することにより、あるいは塗装装置22を主搬送ラインからは離れた場所で塗装モジュール20を配置し、その後床部材21aを主搬送ラインに隣接配置し、さらにカバー部材21bを床部材21aに接合することにより、塗装システム1の設備期間を短くできる。
【0106】
また、カバー部材21bに、塗装装置22及び塗装用ワーク搬送装置Aを構成するワーク保持装置23を固定しており、塗装室25内の床スペースを広く取れ、かつ床に洗浄水を流すことも可能になる。
【0107】
塗装モジュール20には、洗浄装置24が備えられている。洗浄装置24の水溜め用堰24gは、塗装ケーシング21の4面の側壁21b1の内壁に沿って洗浄水を流下させるようにしたウォーターカーテン24aを有しており、この滝状に流下する洗浄水は、床部材21aを流れて洗浄水排出口24bに集められる。洗浄水排出口24bは塗装ケーシング21の下側に形成され、洗浄水排出口24bに集められた洗浄水は、排出管24cを介して分離槽24dに導かれる。
【0108】
分離槽24dに溜る洗浄水は、循環ポンプ24eの駆動により供給管24fから塗装ケーシング21の4面の内壁の上部に送られ、水溜め用堰24gから溢れて4面の内壁に沿って洗浄水を流下させるようになっている。塗装装置22から噴射され、四方の内壁に到達したミスト状の塗料は洗浄水で洗い流される。
【0109】
分離槽24dには、分散剤90が添加され、この分散剤90により洗浄水中の塗料の不粘着、分散化が行なわれる。分離槽24dの洗浄水は分離ポンプ91の駆動により循環パイプ92を介して遠心分離機93に供給され、遠心分離機93により塗料カス94が分離される。
【0110】
また、塗装モジュール20には、換気装置26が備えられている。換気装置26は、床部材21aの床面に換気口26i、床部材21aの床面を除く外表面に換気出口26g、床部材21bの内部に塗料ミスト分離室26e及び換気口26iから塗料ミスト分離室26eを介して換気出口26gに到る換気通路26k、換気出口26gに端部が大気に開放される排気管路26lを接続し、塗料ミスト分離室26eより下流となる換気通路26kかあるいは及び排気管路26lに、塗装室25内の空気を大気中に排出する排気ファン26bを配設している。
【0111】
塗料ミスト分離室26eには、水切り板26hが配置され、排気ファン26bの駆動によって水分が排気管路26l内に入ることを防止している。塗料ミスト分離室26eを設けることにより塗料ミストが大気中に放出されるのを防止できるとともに、床部材21aを有効に活用できる。
【0112】
排気管路26lには、処理装置26cが設けられ、排気ファン26bの駆動により塗装室25内の空気が処理装置26cを介して排気管路26lから屋外に排気される。処理装置26cには、浮遊する微小ミスト状の塗料を捕捉分離するフィルタ26dが備えられている。
【0113】
【発明の効果】
前記したように、請求項1に記載の発明では、主搬送ラインの工事中、平行して塗装ケーシング、塗装装置、ワーク保持装置、ワーク移動装置の設置工事が可能であり、工事短縮が可能で、設備投資費を節約できる。また、塗装室の外に主搬送ラインが位置することになり、塗装装置から主搬送ラインが離間し且つ間に単一の開口があるので、塗装装置から吹き付けられる塗料がワーク等に衝突して飛散しても、飛散塗料が主搬送ラインに到達しにくなり、塗料が付着しにくくできる。また、塗装装置から吹き付けられる塗料がワーク等に衝突して飛散しても、塗装中の一部期間あるいは全部期間、開閉扉を閉じるようにしたので、主搬送ライン側に塗料が付着しにくくできる。また、ワーク載せ替え位置を、塗装ケーシングの外とし、塗装と載せ替えを同時に行うことで、塗装を短時間に行なうことができる。
【0120】
請求項に記載の発明では、塗装完了待機位置を設けないので、色変えのための欠品状態をつくる必要がなくなり色変えによる塗装効率の低下をより確実に防止することができる。
【0122】
請求項に記載の発明では、塗装待機位置を設けず、塗装前のワークをワーク載せ替え位置から塗装位置に移動するので、塗装待機位置を設けることで形成されることのある塗装完成後の塗装面に微妙な凹凸を、より確実に形成防止することができる。塗装完成後の塗装面の微妙な凹凸は、塗装位置のワークヘ吹き付けられる塗料の一部が飛散し、塗装待機位置にある塗装前のワークに不規則に付着するからである。
【0123】
請求項に記載の発明では、塗装ケーシングの内壁に沿って洗浄水を流下させるようにしたから、塗料が塗装ケーシングの内壁に付着することを防止し、メンテナンスが容易である。また、吹きつけられる塗料の一部が内壁に衝突しても飛散しにくくできる。
【0124】
請求項に記載の発明では、主搬送ラインを収容する収容室を構成する搬送ケーシングを有し、収容室の空気を大気中に排出する排気装置を備えることで、塗装中に揮発して発生する溶剤や収容室に飛散浮遊する微小塗料ミストを簡単且つ確実に処理でき、搬送ケーシング内でのクリーン化が可能である。
【0125】
請求項13に記載の発明では、床部材とカバー部材を独立に製造可能となり、主搬送ラインに床部材を隣接配置した後、塗装装置、ワーク移動装置を床部材上に配置し、しかる俊カバー部材を床部材に接合することにより、あるいは塗装装置、ワーク移動装置を主搬送ラインからは離れた場所で塗装モジュールを配置し、その後床部材を主搬送ラインに隣接配置し、さらにカバー部材を床部材に接合することにより、塗装システムの設備期間を短くできる。
【図面の簡単な説明】
【図1】第1の実施形態の塗装システムの斜視図である。
【図2】第1の実施形態の塗装システムの主搬送ライン、塗装モジュール、ワーク移動装置を示す概略構成図である。
【図3】第1の実施形態の塗装システムの作動のタイミングチャートである。
【図4】参考形態第1の実施形態の塗装システムを示す概略構成図である。
【図5】参考形態第1の実施形態の作動のタイミングチャートである
【図6】参考形態第2の実施形態の塗装システムの概略構成図である。
【図7】洗浄装置の概略構成図である。
【図8】参考形態第3の実施形態の塗装システムの概略構成図である。
【図9】第2の実施の形態の塗装システムの概略構成図である。
【図10】参考形態第4の実施形態の塗装システムの概略構成図である。
【図11】洗浄装置及び換気装置の概略構成図である。
【図12】従来の塗装システムの概略構成図である。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a coating system.
[0002]
[Prior art]
For example, as shown in FIG. 12, the conventional coating system moves the conveyor 100 along the track of the main conveyance line in the factory building 99, holds the workpiece K on the workpiece holder 101 provided on the conveyor 100, The workpiece K is coated by the coating device 104 in the coating chamber 103 provided so as to surround the conveyor 100 by the coating casing 102.
[0003]
Openings 105a and 105b through which the workpiece K can pass are provided at the entrance 102a and the exit 102b of the coating chamber 103, respectively.
[0004]
[Problems to be solved by the invention]
Thus, since the painting chamber 103 is provided in the factory building 99 so as to surround the conveyor 100, it is necessary to carry out the construction of the main transfer line in the painting factory, and then to work on the painting equipment. There is a problem that it becomes longer and capital investment costs increase.
[0005]
Further, since the workpiece K is coated by the coating device 104 in the coating chamber 103 through which the conveyor 100 passes, the paint adheres to the conveyor 100 and the workpiece holder 101, and the large-scale conveyor 100 and workpiece holder 1 are attached. It is necessary to clean everything, and the maintenance work is cumbersome and costly.
[0006]
In addition, since the coating chamber 103 is provided with openings 105a and 105b that are always open to serve as a passing portion of the conveyor 100, the paint blown from the coating apparatus 103 during coating collides with the workpiece surface and other objects. There is a possibility that it will scatter and flow into the factory building 99 from the openings 105a and 105b. When paint scatters in the factory building 99, it collides with another object, becomes fine and mist, floats in the factory building 99, and the solvent component volatilizes from the paint, thus deteriorating the environment in the factory building 99. was there.
[0007]
Further, in the prior art, the distance from the coating device 104 to the openings 105a and 105b is increased, and an exhaust device 106 that directly discharges the air in the coating chamber 103 to the outside of the factory building 99 is provided in the coating casing 102. It was. As a result, the paint blown out from the coating apparatus 103 collides with the workpiece surface and other objects and becomes fine mist to form a fine mist, and further floats in the paint chamber 103. Although the volatile solvent whose concentration in 103 increases tends to flow into the factory building 99 through the openings 105a and 105b that are always open, these can be discharged out of the factory building 99, and the environment inside the factory building 99 is not deteriorated. be able to.
[0008]
However, since four or more workpiece holders 101 are positioned between the coating apparatus 104 and the opening 105b except for the nearest workpiece holder 101, a color in which a different color is applied by changing the paint. In the case of changing, it is impossible to paint with another color of paint until a work that has been painted in the previous color passes through the opening 105b and goes out of the painting chamber 103. That is, four or more workpiece holders 101 except for the nearest workpiece holder 101 between the coating apparatus 104 and the opening 105b need to be in a missing part state without a workpiece, and the color change accordingly. As a result, there is a problem that the efficiency of painting is lowered.
[0009]
The present invention has been made in view of such circumstances, and a first object is that it is easy to install in a paint factory, the work period can be shortened, and capital investment costs can be saved. The third purpose is to prevent the environment inside the factory building from being deteriorated, and the fourth purpose is to improve the painting efficiency by changing the color of the paint. It is to prevent the decrease of.
[0010]
[Means for Solving the Problems]
In order to solve the above-described problems and achieve the object, the present invention is configured as follows.
[0011]
  The invention described in claim 1
  “[Claim 1] A main transfer line that allows a workpiece to move along a track,
  A coating casing disposed adjacent to the main transfer line and constituting a coating chamber independent of the main transfer line;
  A coating device in the coating chamber;
  A workpiece holding device that holds the workpiece at the coating position in the vicinity of the coating device during coating;
  A workpiece moving device that enables the workpiece on the main transfer line to move to the workpiece holding device, and allows the workpiece of the workpiece holding device to move on the main transfer line,
  In the painted casing,SaidPainting room andSaidIt becomes the movement path of the workpiece between the main transfer linesingleOpeningPartProvided,And the work holding device is arranged in the painting chamber,
  The workpiece holding device isAn indoor main turntable, a sub turntable with a predetermined arm length disposed at both ends in the longitudinal direction, and a work holding part provided at the end of the sub turntable,
  The sub-rotation table rotates between the workpiece replacement position and the intermediate position for moving from the coating position to the workpiece replacement position via the opening,
  The workpiece moving device enables the workpiece on the main transfer line to move to the workpiece holding unit at the workpiece transfer position, and allows the workpiece of the workpiece holding unit to move on the main transfer line,
  AbovesingleOpeningPartAn air curtain or an open / close door made of a movable wall
  To close the door for a part or all period during the paintingAnd
  The intermediate position is the inside of the paint casing,
  A painting system characterized in that the workpiece replacement position is outside the coating casing, and coating and replacement are performed simultaneously. ].
[0012]
  According to the first aspect of the present invention, it is possible to install the painting casing, the painting device, the workpiece holding device, and the workpiece moving device in parallel during the construction of the main transfer line. You can save money. In addition, the main transfer line is located outside the coating chamber, and the main transfer line is separated from the coating apparatus and in between.singleOpeningPartTherefore, even if the paint sprayed from the coating apparatus collides with a workpiece or the like and is scattered, the scattered paint does not easily reach the main conveyance line, and the paint can hardly adhere.In addition, even if the paint sprayed from the coating equipment collides with a workpiece or the like and scatters, the doors are closed for part or all of the painting, so that the paint can hardly adhere to the main transfer line side. . In addition, it is possible to perform the coating in a short time by setting the workpiece replacement position outside the coating casing and performing the coating and the replacement simultaneously.
[0025]
  Claim2The invention described in
  “The workpiece holding device can be used to apply a finished workpiece before the next painting.SaidFrom the painting positionSaid2. The apparatus as claimed in claim 1, wherein the movement is made outside the painting chamber.InThe described coating system. ].
[0026]
  Claim2According to the invention described in (1), since no paint completion standby position is provided, it is not necessary to create a shortage state for color change, and it is possible to more reliably prevent a reduction in paint efficiency due to color change.
[0029]
  Claim3The invention described in
“The work holding device will remove the work before painting after the last painting.SaidFrom outside the painting roomSaid2. The apparatus according to claim 1, wherein the paint is moved to a painting position.OrClaim2The coating system described in. ].
[0030]
  Claim3According to the invention described in (2), since the workpiece before painting is moved from the outside of the painting chamber to the painting position without providing the painting standby position, the painting after the completion of painting that may be formed by providing the painting standby position is performed. Subtle irregularities can be more reliably prevented from forming on the surface. This is because subtle unevenness on the painted surface after the coating is completed, a part of the paint sprayed onto the workpiece at the painting position is scattered and irregularly adheres to the workpiece before painting at the painting standby position.
[0031]
  Claim4The invention described in
  “Washing water is allowed to flow down along the inner wall of the coating casing.3The coating system according to any one of the above. ].
[0032]
  Claim4According to the invention described in (5), since the washing water is allowed to flow down along the inner wall of the paint casing, the paint is prevented from adhering to the inner wall of the paint casing, and maintenance is easy. Further, even if a part of the sprayed paint collides with the inner wall, it can be hardly scattered.
[0033]
  Claim5The invention described in
  The apparatus further comprises a ventilator that includes a transport casing that configures a storage chamber that stores the main transfer line, and discharges air from the storage chamber to the atmosphere.4The coating system according to any one of the above. ].
[0034]
  Claim5According to the invention described in the above, it is generated by volatilizing during coating by including a transfer casing that constitutes a storage chamber that stores the main transfer line, and having an exhaust device that discharges the air in the storage chamber to the atmosphere. The solvent and the minute paint mist scattered and suspended in the storage chamber can be treated easily and reliably, and can be cleaned in the transfer casing.
[0041]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the coating system of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to these embodiments.
[0042]
First, a first embodiment of a coating system will be described with reference to FIGS. FIG. 1 is a perspective view of the coating system, FIG. 2 is a schematic configuration diagram showing operations of the main transfer line, the coating module, and the workpiece moving device of the coating system, and FIG. 3 is a timing chart of the operation of the coating system.
[0043]
The painting system 1 includes a main transfer line 10, a painting module 20, and a workpiece moving device 30 that constitutes a part of the painting module 20. The main transfer line 10 enables the workpiece K to move along the track. In this embodiment, the conveyor 11 can be moved along the track, the workpiece holder 12 is placed on the conveyor 11, and the workpiece K is held by the workpiece holder 12. The workpiece holder 12 may be fixed to the conveyor 11 or may be detachable. In addition, the main transfer line 10 may be one in which the independent workpiece holder 12 moves along the track, by itself, or by being pushed, without depending on the conveyor 11.
[0044]
The main transfer line 10 is accommodated in a storage chamber 14 constituted by a transfer casing 13, and the storage chamber 14 is provided with a ventilation device 15. The ventilation device 15 includes an exhaust duct 15a, an exhaust fan 15b, and a processing device 15c, and the air in the accommodation chamber 14 is exhausted from the exhaust duct 15a to the outside through the processing device 15c by driving the exhaust fan 15b. The processing device 15c is provided with a filter 15d that captures and separates the floating fine mist-like paint.
[0045]
A plurality of coating modules 20 are arranged adjacent to the main transport line 10 and along the main transport line 10. The coating module 20 uses the upstream side of the main transport line 10 for undercoating and the downstream side for top coating.
[0046]
The painting module 20 includes a painting casing 21, a painting device 22, a work holding device 23, and a cleaning device described below. The painting casing 21 constitutes a painting chamber 25 independent of the main transfer line 10, and a painting device 22, a work holding device 23, and a cleaning device are arranged in the painting chamber 25. The workpiece holding device 23 and the workpiece moving device 30 constitute a coating workpiece transfer device.
[0047]
In addition, a ventilator 26 is provided independently of the ventilator 15 in the storage chamber 14 on a floor member 21 a described below of the paint casing 21. The ventilation device 26 includes an exhaust duct 26a, an exhaust fan 26b, and a processing device 26c. When the exhaust fan 26b is driven, the air in the painting chamber 25 passes through the ventilation port 26i provided in the floor member 21a and passes through the processing device 26c. Exhaust air is exhausted from the exhaust duct 26a. The processing device 26c is provided with a filter 26d that captures and separates the floating fine mist-like paint.
[0048]
  By ventilating the painting chamber 25 with the ventilation device 26, the ventilation device 15 of the storage chamber 14 becomes a painting casing.21Since the amount of mist-like paint leaking through the opening 28 described below can be reduced, clogging by the paint is prevented, and it can be used up to its original adsorption capacity. In addition, the outside air whose temperature and humidity are adjusted is introduced from the ceiling of the paint casing 21.
[0049]
The coating device 22 is disposed in the coating chamber 25 and applies a paint to the workpiece K held by the workpiece holding device 23 located at the coating position by the coating robot 22a.
[0050]
The work holding device 23 serves as a work moving device in the painting chamber 25 that constitutes a part of the coating work transfer device, and includes an indoor main turntable 23a and sub turntables 23b disposed at both ends of the indoor main turntable 23a. 23c and work holding portions 23b1 and 23c1 provided at the end portions of the sub-rotation tables 23b and 23c.
[0051]
The painting casing 21 is provided with an opening / closing door 27 that partitions the painting chamber 25 and the main transfer line 10, and the opening 28 is closed by the opening / closing door 27 during painting by driving a door opening / closing device (not shown). .
[0052]
The workpiece moving device 30 is a workpiece moving device outside the coating chamber 25 that constitutes a part of the coating workpiece transfer device. The workpiece moving device 30 is a robot, and includes an outdoor rotary table 31 and loaders 31a disposed at both ends of the outdoor rotary table 31. 31b. The workpiece holding device 23 and the workpiece moving device 30 constitute a coating workpiece transfer device A, and the coating workpiece transfer device A guides the workpiece K on the main transfer line 10 into the coating chamber 25 through the opening 28 and is painting. The workpiece K is held in the vicinity of the coating apparatus 22, and the workpiece K in the coating chamber 25 after painting is returned onto the main transport line 10 through the opening 28.
[0053]
The coating casing 21 is formed by a floor member 21a and a cover member 21b that covers the floor member 21a, and the cover member 21b is joined to the floor member 21a. The floor member 21a and the cover member 21b can be manufactured independently. After the floor member 21a is disposed adjacent to the main transfer line 10, the coating device 22, the workpiece holding device 23, and the workpiece moving device 30 are disposed on the floor member 21a. Thereafter, the coating module 20 is disposed by joining the cover member 21b to the floor member 21a, or the coating device 22, the workpiece holding device 23 and the workpiece moving device 30 at a place away from the main transfer line 10, and then the floor The equipment period of the coating system 1 can be shortened by arranging the member 21a adjacent to the main transport line 10 and further joining the cover member 21b to the floor member 21a.
[0054]
Next, operation | movement of the coating system of this embodiment is demonstrated based on FIG.2 and FIG.3.
[0055]
In FIG. 2 (A), the opening 28 of the coating casing 21 is closed by the open / close door 27, the coating device 22 is driven in the coating chamber 25, and is held by the auxiliary rotating base 23c of the work holding device 23 by the coating robot 22a. The painting for applying the paint to the workpiece K3 located at the painting position P1 is started. The coating is performed by rotating the workpiece K3 by 90 degrees by the workpiece holding portion 23c1 of the sub-rotation table 23c at a predetermined timing, and coating the entire workpiece K3.
[0056]
On the other hand, the outdoor turntable 31 having the loaders 31a and 31b turns 90 degrees, and the loader 31a extends to the painted work K1 of the work holding portion 23b1 located at the work transfer position P2 outside the closed door 27. While being lifted (lifted up) and engaged (hanger chuck), the loader 31b is extended and lifted (lifted up) to the unpainted workpiece K2 held by the workpiece holder (pallet) 12 on the main transfer line 10. Engage (hanger chuck).
[0057]
The rear outdoor turntable 31 turns 180 degrees, the unpainted work K2 is lowered to the work holding part 23b1 located at the work transfer position P2, the loader 31b is lowered (lifted down), and the engagement is released (hanger unchuck). Thus, the workpiece K1 that has been painted on the workpiece holder (pallet) 12 is similarly delivered from the loader 31a. Further, the rear outdoor turntable 31 turns 90 degrees to be in the state shown in FIG.
[0058]
In FIG. 2B, the work holder (pallet) 12 holding the painted work K1 is moved in the direction of the next process department (pallet positioning release and pallet feed), and the open / close door 27 is opened. At the same time, the coating that continues from FIG.
[0059]
The workpiece holder (pallet) 12 holding the unpainted workpiece K2 is sent from the previous process department to a predetermined position (pallet positioning), and the state shown in FIG. In FIG. 2C, the sub-rotation table (sub-arm) 23b that holds the unpainted workpiece K2 is turned 90 degrees, and the unpainted workpiece K2 held by the workpiece holding portion 23b1 passes through the opening 28 and moves to the workpiece. It moves from the repositioning position P2 to the middle position P3, and the state shown in FIG.
[0060]
In FIG. 2D, the main turntable (index) 23a turns 180 degrees, and the positions of the sub turntable 23b holding the unpainted work K2 and the sub turntable 23c holding the painted work K3 are switched. That is, the painted workpiece K3 is moved to the painting position P3, and the unpainted workpiece K2 is moved to the painting position P1, and the state shown in FIG.
[0061]
In FIG. 2 (E), the sub turn table 23c turns 180 degrees, and the painted workpiece K3 moves from the midway position P3 to the workpiece transfer position P2, and then the door 27 is closed and painting starts. Then, the state returns to the state shown in FIG.
[0062]
In addition, the workpiece holding part 23b1 or the workpiece holding part 23c1, which is to be located at the painting position P1, respectively rotates the workpiece held by turning three times during the painting by 90 degrees. As a result, the work is divided into four times, and the entire surface of 360 degrees can be painted through four faces of 90 degrees. After painting all around by painting, turning, painting, turning, painting, turning, and painting, the unpainted workpiece K2 shown in FIG. 2C passes through the opening 28 and is halfway from the workpiece repositioning position P2. Simultaneously with the 90-degree turning of the sub-rotation table (sub-arm) 23b for moving to the position P3 or during the 180-degree rotation of the main rotation table 23, the work holding portion 23c1 of the other sub-turn table (sub-arm) 23c is also 90. Rotated degrees.
[0063]
The timing chart of FIG. 3 illustrates the above contents. The workpiece holding device 23 and the workpiece moving device 30 constitute the workpiece moving device according to claim 1, and the coating position P <b> 1 passes through the workpiece replacement position P <b> 2 and the intermediate position P <b> 2 for the workpiece K <b> 2 before painting on the main transfer line 10. To the main transfer line 10 through the intermediate position P3 and the workpiece transfer position P2.
[0064]
Note that an air curtain that is always closed when the workpiece K passes or an air curtain that is closed only when the workpiece K passes may be disposed in place of the opening / closing door 27.
[0065]
  4 is the first reference form.The schematic block diagram which shows the coating system of this embodiment, FIG. 5 is the timing chart of the action | operation. The configuration of the coating module in FIG. 4 is the same as that in FIG. 1, the sub turntable 23 b is located on the indoor painting side, the sub turntable 23 c is located on the indoor standby side, and the work holding parts 23 b 1 and 23 c 1 are It can move between the workpiece transfer position P2 and the painting position P1 which is the painting chamber.
[0066]
The loader 31a of the workpiece moving device 30 is located on the coating chamber side, and the loader 31b is located on the transfer line side. The workpiece moving device 30 can move the workpiece K on the main conveyance line 10 to the workpiece holding device 23 of the coating module 20 and can move the workpiece K of the workpiece holding device 23 onto the main conveyance line 10.
[0067]
The cleaning device 24 has a water curtain 24a that allows the cleaning water to flow down along the four inner walls of the paint casing 21, prevents the paint from adhering to the inner wall of the paint casing 21, and facilitates maintenance. Yes, it can prevent the paint from colliding with the inner wall and scattering.
[0068]
  thisReference form 1The coating system of the embodiment takes an operation timing different from the operation timing of each apparatus shown in FIGS. Next, based on FIG. 4 and FIG.Reference form 1The operation of the coating system of the embodiment will be described.
[0069]
The painting robot 22a of the painting apparatus 22 performs painting. When painting is completed, the door 27 is opened, the indoor main turntable 23a in the painting chamber 25 rotates 90 degrees, and the sub turntable 23b located on the indoor painting side is turned 180. The workpiece K coated with the workpiece holding portion 23b1 from the opening 28 of the coating casing 21 is sent to the main conveyance line 10 side. In this way, the work holding part 23b1 located at the painting position P1 is moved to the work transfer position P2.
[0070]
On the other hand, the auxiliary turntable 23c located on the indoor waiting side is rotated 180 degrees, and the work holding part 23c1 moves the unpainted work K inward. In this way, the workpiece holding portion 23c1 located at the painting standby position P3 is moved to the intermediate position P4, and the workpiece holding portion 23c1 moves the unpainted workpiece K inward, thereby reducing the width of the coating casing 21 accordingly. And it can be made compact.
[0071]
In the workpiece moving device 30, the outdoor turntable 31 rotates 90 degrees, the loader 31a moves to the workpiece transfer position P2 facing the workpiece holding portion 23b1, and the loader 31a located on the coating chamber side extends to perform coating. Receive the completed work K.
[0072]
On the other hand, when the outdoor turntable 31 rotates by 90 degrees, the loader 31b moves to the transfer line side, and the loader 31b positioned on the transfer line side extends and the workpiece holder 12 provided on the main transfer line 10 is extended. Receive unpainted work K from
[0073]
The outdoor turntable 31 rotates 180 degrees, the loader 31a located on the coating chamber side moves to the transfer line side, and the loader 31b located on the transfer line side moves to the coating chamber side, and the coating is completed from the loader 31a. The workpiece K is unloaded to the workpiece holder 12 provided on the main transfer line 10, the unpainted workpiece K is unloaded from the loader 31b to the workpiece holding portion 23b1 of the auxiliary turntable 23b, and the loaders 31a and 31b are contracted. The outdoor turntable 31 is rotated 90 degrees, and the main transfer line 10 is moved by one workpiece.
[0074]
Next, the indoor main turntable 23a of the work holding device 23 is rotated 90 degrees, the sub turntable 23b receiving the unpainted work K is rotated 180 degrees and moved to the coating standby position P3, and at the intermediate position P4. The sub-rotation table 23c that is positioned rotates 180 degrees, and the work holder 23c1 moves to the painting position P1.
[0075]
Thereafter, the opening / closing door 27 is closed to close the opening 28, the coating device 22 is operated at the coating position P1, and the workpiece K held by the workpiece holding portion 23c1 is coated. Repeat operation. The time point when the opening / closing door 27 closes and the opening 28 is closed is not particularly limited as long as it is after the unpainted workpiece K is received and before the coating apparatus 22 is activated.
[0076]
As described above, the work holding device 23 enables the work holding portions 23b1 and 23c1 to move between the work transfer position P2 and the painting position P1 serving as the painting chamber, and the painting casing 21 and the main transfer line are provided in the painting casing 21. Since the open / close door 27 that divides 10 is provided and closed during painting, it is possible to prevent the paint from adhering to the main conveyance line side.
[0077]
The paint color can be changed by sending the work K inside the paint module 20 to the main transfer line 10, closing the door 27 and washing the paint injection path (not shown) of the paint robot 22 a of the paint casing 21. Well, it is easy to change the color of the paint.
[0078]
Moreover, since the painting position P1 and the painting standby position P3 are provided in the painting casing 21 and the workpiece K is made to wait during painting, painting can be performed in a short time.
[0079]
  Next, based on FIG. 6 and FIG.Reference form 2The embodiment will be described. FIG. 6 is a schematic configuration diagram of the coating system, and FIG. 7 is a schematic configuration diagram of the cleaning apparatus.
[0080]
  The coating system 1 of this embodiment is given the same reference numerals as in FIGS.NohaSince the configuration is the same, the description is omitted.
[0081]
The main transfer line 10 includes a track 10a, a chassis 10b that can move on the track 10a, and a workpiece holder 12 provided on the chassis 10b, and the workpiece K is held by the workpiece holder 12. The transport casing 13 is provided with a ventilation device 15 corresponding to the position where the coating module 20 is disposed, and the air in the storage chamber 14 is exhausted to the outdoors.
[0082]
The cleaning device 24 includes a water curtain 24a that allows the cleaning water to flow down along the four inner walls of the coating casing 21, and the cleaning water that flows down in a waterfall shape is collected in the discharge groove 24b. The discharge groove 24b is formed on the lower side of the coating casing 21, and the wash water collected in the discharge groove 24b is guided to the settling tank 24d through the discharge pipe 24c. The washing water accumulated in the settling tank 24d is sent to the upper part of the four inner walls of the coating casing 21 from the supply pipe 24f by driving the circulation pump 24e, overflows from the water weir 24g and is washed along the four inner walls. Is supposed to flow down.
[0083]
The settling tank 24d is provided with a cleaning water level detection sensor S1, and when the cleaning water level falls below a predetermined level by the water level detection sensor S1, the electromagnetic valve 24h is opened, and replenishment fresh water is replenished from the replenishment pipe 24i. The
[0084]
An opening / closing door 27 that partitions the coating chamber 25 and the main transfer line 10 is provided at the opening 28 of the coating chamber 25 of the coating casing 21 so that the opening / closing door 27 is closed during painting. May be closed during painting.
[0085]
In the work holding device 23, the indoor main turntable 23a is constituted by a rotary table, and the sub turntables 23b, 23c, and 23d are provided at three intervals of the indoor main turntable 23a at intervals of 120 °. Workpiece holding parts 23b1, 23c1, and 23d1 are provided on the sub-rotation tables 23b, 23c, and 23d.
[0086]
The coating device 22 is arranged at a position away from the opening 28 opened and closed by the opening / closing door 27 so that the mist of the paint does not leak from the gap of the opening / closing door 27 as much as possible. If it arrange | positions in the rotation direction downstream of the indoor main turntable 23a as shown with a dashed-dotted line, the workpiece | work K in which coating was completed can be rapidly sent out on the main conveyance line 10. FIG.
[0087]
  Next, based on FIG.Reference form 3The embodiment will be described. FIG. 8 is a schematic configuration diagram of the coating system.
[0088]
The coating system 1 according to this embodiment is the same as that shown in FIGS.
[0089]
As for the main conveyance line 10, the conveyance casing 13 serves as the wall of a building. In the work holding device 23, the indoor main turntable 23a is constituted by a rotary table, and the sub turntables 23b and 23c are provided at two positions of the indoor main turntable 23a at intervals of 180 °.
Workpiece holding parts 23b1 and 23c1 are provided on the sub turntables 23b and 23c.
[0090]
In this embodiment, the workpiece replacement position P2 is outside the coating casing 21, and the opening 28 is closed by the opening / closing door 27, so that the coating by the coating device 22 and the replacement by the workpiece moving device 30 are simultaneously performed. Thus, painting can be performed in a short time.
[0091]
Further, the door opening / closing device 29 may be moved to the main conveying line 10 side and provided at a position W1 indicated by a two-dot chain line, and the workpiece repositioning position P2 may be within the coating casing 21. In this case, the coating device 22 It is possible to prevent the paint mist from leaking to the outside more reliably by performing the transfer by the work moving device 30 between the two coatings. Further, the door opening / closing device 29 may be provided at a position W2 indicated by a two-dot chain line, and the workpiece placement position P2 may be set as a boundary portion of the coating casing 21.
[0092]
  Next, based on FIG.SecondThe embodiment will be described. FIG. 9 is a schematic configuration diagram of the coating system.
[0093]
The coating system 1 according to this embodiment is the same as that shown in FIGS.
[0094]
In this embodiment, two coating devices 22 and 22 'are provided, and the coating robots 22a and 22a' are switched and used in accordance with the coating specifications.
[0095]
  Next, based on FIG. 10 and FIG.Reference form 4The embodiment will be described. FIG. 10 is a schematic configuration diagram of the coating system, and FIG. 11 is a schematic configuration diagram of the cleaning device and the ventilation device. The coating system 1 according to this embodiment is the same as that shown in FIGS.
[0096]
In the coating system 1 of this embodiment, a coating module 20 that can be disposed adjacent to the main transfer line includes a coating casing 21 that forms a coating chamber 25 and has an opening 28, and a coating device 22 that is disposed in the coating chamber 25. Then, the workpiece K on the main transfer line is guided into the coating chamber 25 through the opening 28, the workpiece K being painted is held in the vicinity of the coating apparatus 22, and the workpiece K in the coating chamber 25 after coating is passed through the opening 28 on the main transfer line. It consists of the workpiece transfer apparatus A for coating to return to.
[0097]
The coating casing 21 is formed by a floor member 21a and a cover member 21b that covers the floor member 21a, and is formed by joining the cover member 21b to the floor member 21a. The cover member 21b forms four side walls 21b1 and a ceiling 21b2.
[0098]
The workpiece holding device 23 that constitutes the coating workpiece transfer device A is provided suspended from the ceiling 21 b 2 of the coating casing 21. The work holding device 23 includes a drive unit 23f, a main arm 23a, sub-arms 23b and 23c, and work holders 23b1 and 23c1.
[0099]
In the drive unit 23f, the main arm 23a can be rotated or rotated about an axis separated from the work holders 23b1 and 23c1. The sub arms 23b and 23c are connected to the main arm 23a so as to be rotatable or rotatable about an axis. The work holders 23b1 and 23c1 are provided on the sub-arms 23b and 23c at positions separated from the connection center axis of the main arm 23a and the sub-arms 23b and 23c, and the work K can be attached and detached by an electromagnetic coupling. .
[0100]
The drive unit 23f is provided with a main motor M1 for driving the main arm 23a, and the main motor M1 rotates or rotates the main arm 23a around the support shaft 23g as a fulcrum. At both ends of the main arm 23a, a first sub motor M2 for driving the sub arms 23b and 23c is disposed independently of the main motor M1. By driving the first sub motor M2, the sub arms 23b and 23c can be freely operated using the support shaft 23h as a fulcrum without being restricted by the rotation or rotation of the main arm 23a.
[0101]
In addition, a second sub motor M3 for driving the work holders 23b1 and 23c1 is disposed at both ends of the main arm 23a independently of the main motor M1 for driving the main arm 23a. The work holders 23b1 and 23c1 can be freely operated via the belts 23i and 23j without being restricted by the rotation or rotation of the main arm 23a by the driving of the second sub motor M3.
[0102]
Further, the work holders 23b1 and 23c1 are connected to the sub arms 23b and 23c so as to be rotatable or rotatable about the support shaft 23h with respect to the sub arms 23b and 23c, and the work holders 23b1 and 23c1 are rotated or rotated. By rotating, the outer periphery of the workpiece can be easily and reliably painted.
[0103]
Further, the work holding device 23 is connected to the main arm 23a so that the main arm 23a can be rotated or rotated around the support shaft 23h, and the connection center between the main arm 23a and the sub arms 23b, 23c. It is provided with sub-arms 23b and 23c provided at sub-arms 23b and 23c at positions separated from the shafts, and allows workpieces to be attached / detached. By rotating and moving closer to the axis, the inertia mass around the main rotation center axis can be reduced, so that the main arm 23a can be quickly rotated or started and stopped.
[0104]
Further, the main arm 23a has workpiece holders 23b1 and 23c1 at a plurality of positions on the same circumference from the rotation center axis, respectively, and can hold a plurality of workpieces on the main arm 23a. The amount of workpiece storage can be reduced.
[0105]
Thus, the coating casing 21 is formed by the floor member 21a and the cover member 21b that covers the floor member 21a, and is formed by joining the cover member 21b to the floor member 21a, and the floor member 21a and the cover member 21b are formed. After the floor member 21a is disposed adjacent to the main conveyance line, the coating device 22 is disposed on the floor member 21a, and then the cover member 21b is joined to the floor member 21a or the coating device 22 Of the coating system 1 by disposing the coating module 20 at a location away from the main conveyance line, and then arranging the floor member 21a adjacent to the main conveyance line and joining the cover member 21b to the floor member 21a. Can be shortened.
[0106]
  Moreover, the work holding device 23 which comprises the coating apparatus 22 and the workpiece conveying apparatus A for coating to the cover member 21b.FixedIn addition, the floor space in the painting chamber 25 can be widened, and washing water can be allowed to flow on the floor.
[0107]
The coating module 20 is provided with a cleaning device 24. The water weir 24g of the cleaning device 24 includes a water curtain 24a that allows the cleaning water to flow along the inner walls of the four side walls 21b1 of the coating casing 21, and the cleaning water that flows down in a waterfall shape. Flows through the floor member 21a and is collected in the washing water discharge port 24b. The cleaning water discharge port 24b is formed on the lower side of the coating casing 21, and the cleaning water collected in the cleaning water discharge port 24b is guided to the separation tank 24d through the discharge pipe 24c.
[0108]
The wash water collected in the separation tank 24d is sent from the supply pipe 24f to the upper part of the four inner walls of the coating casing 21 by the drive of the circulation pump 24e, overflows from the water weir 24g and is washed along the four inner walls. Is supposed to flow down. The mist-like paint sprayed from the coating device 22 and reaching the four inner walls is washed away with washing water.
[0109]
A dispersing agent 90 is added to the separation tank 24d, and the dispersing agent 90 performs non-adhesion and dispersion of the paint in the washing water. The washing water in the separation tank 24 d is supplied to the centrifuge 93 through the circulation pipe 92 by driving the separation pump 91, and the paint residue 94 is separated by the centrifuge 93.
[0110]
The painting module 20 is provided with a ventilation device 26. The ventilation device 26 separates the paint mist from the ventilation outlet 26i on the floor surface of the floor member 21a, the ventilation outlet 26g on the outer surface excluding the floor surface of the floor member 21a, and the paint mist separation chamber 26e and the ventilation opening 26i inside the floor member 21b. A ventilation passage 26k reaching the ventilation outlet 26g through the chamber 26e, an exhaust pipe 26l having an end opened to the atmosphere, connected to the ventilation outlet 26g, and a ventilation passage 26k downstream of the paint mist separation chamber 26e or An exhaust fan 26b for discharging the air in the painting chamber 25 to the atmosphere is disposed in the exhaust pipe line 26l.
[0111]
A draining plate 26h is disposed in the paint mist separation chamber 26e to prevent moisture from entering the exhaust pipe line 26l by driving the exhaust fan 26b. By providing the paint mist separation chamber 26e, the paint mist can be prevented from being released into the atmosphere, and the floor member 21a can be effectively utilized.
[0112]
The exhaust pipe line 26l is provided with a processing device 26c, and the air in the coating chamber 25 is exhausted from the exhaust pipe line 26l to the outside through the processing device 26c by driving the exhaust fan 26b. The processing device 26c is provided with a filter 26d that captures and separates the floating fine mist-like paint.
[0113]
【The invention's effect】
  As described above, in the invention according to the first aspect, during the construction of the main transfer line, it is possible to install the painting casing, the painting device, the workpiece holding device, and the workpiece moving device in parallel, and the construction can be shortened. , You can save capital investment. In addition, the main transfer line is located outside the coating chamber, and the main transfer line is separated from the coating apparatus and in between.singleOpeningPartTherefore, even if the paint sprayed from the coating apparatus collides with a workpiece or the like and scatters, the scattered paint does not easily reach the main transport line, and the paint can hardly adhere.In addition, even if the paint sprayed from the coating equipment collides with a workpiece or the like and scatters, the doors are closed for part or all of the painting, so that the paint can hardly adhere to the main transfer line side. . In addition, it is possible to perform the coating in a short time by setting the workpiece replacement position outside the coating casing and performing the coating and the replacement simultaneously.
[0120]
  Claim2In the invention described in (1), since the standby position for completion of painting is not provided, it is not necessary to create an out-of-stock state for changing the color, and it is possible to more reliably prevent a reduction in painting efficiency due to the color change.
[0122]
  Claim3In the invention described in (2), the workpiece before painting is moved from the workpiece replacement position to the painting position without providing a painting standby position. Subtle irregularities can be prevented more reliably. This is because the subtle unevenness of the painted surface after the coating is completed, a part of the paint sprayed onto the workpiece at the painting position is scattered and irregularly adheres to the workpiece before painting at the painting standby position.
[0123]
  Claim4In the invention described in, since the washing water is allowed to flow down along the inner wall of the paint casing, the paint is prevented from adhering to the inner wall of the paint casing, and maintenance is easy. Further, even if a part of the sprayed paint collides with the inner wall, it can be hardly scattered.
[0124]
  Claim5In the invention described in the above, a solvent is generated by volatilizing during coating by having a transfer casing that constitutes a storage chamber that stores the main transfer line, and having an exhaust device that discharges the air in the storage chamber to the atmosphere. The minute paint mist scattered and floating in the storage chamber can be easily and reliably processed, and can be cleaned in the transfer casing.
[0125]
In the invention according to claim 13, the floor member and the cover member can be manufactured independently. After the floor member is disposed adjacent to the main transfer line, the coating device and the workpiece moving device are disposed on the floor member, and the appropriate cover is provided. Place the coating module by joining the member to the floor member, or place the painting device and workpiece moving device away from the main transfer line, then place the floor member adjacent to the main transfer line, and then the cover member to the floor By joining to the member, the equipment period of the coating system can be shortened.
[Brief description of the drawings]
FIG. 1 is a perspective view of a coating system according to a first embodiment.
FIG. 2 is a schematic configuration diagram illustrating a main transfer line, a coating module, and a workpiece moving device of the coating system according to the first embodiment.
FIG. 3 is a timing chart of the operation of the coating system of the first embodiment.
[Fig. 4]Reference form 1It is a schematic block diagram which shows the coating system of embodiment.
[Figure 5]Reference form 1It is a timing chart of operation of an embodiment of
[Fig. 6]Reference form 2It is a schematic block diagram of the coating system of embodiment.
FIG. 7 is a schematic configuration diagram of a cleaning apparatus.
[Fig. 8]Reference form 3It is a schematic block diagram of the coating system of embodiment.
FIG. 9Of the second embodimentIt is a schematic block diagram of a coating system.
FIG. 10Reference form of the fourth embodimentIt is a schematic block diagram of a coating system.
FIG. 11 is a schematic configuration diagram of a cleaning device and a ventilation device.
FIG. 12 is a schematic configuration diagram of a conventional coating system.

Claims (5)

ワークを軌道に沿って移動可能とする主搬送ラインと、
前記主搬送ラインに隣接配置され、前記主搬送ラインと独立の塗装室を構成する塗装ケーシングと、
前記塗装室内の塗装装置と、
塗装中塗装装置近傍の塗装位置においてワークを保持するワーク保持装置と、
前記主搬送ライン上のワークを前記ワーク保持装置に移動可能とするとともに、前記ワーク保持装置のワークを前記主搬送ライン上に移動可能とするワーク移動装置と、を備え、
前記塗装ケーシングには、前記塗装室内と前記主搬送ラインとの間のワークの移動通路となる単一の開口を設け、かつ塗装室内に前記ワーク保持装置を配置し、
前記ワーク保持装置は、室内主回転台と、その長手方向両端部に配置された所定の腕の長さの副回転台と、この副回転台の端部に設けられたワーク保持部を有し、
前記副回転台は、前記開口部を介して前記塗装位置からワーク載せ替え位置へ移動させる途中位置と前記ワーク載せ替え位置間を回動し、
前記ワーク移動装置は、前記主搬送ライン上のワークを、前記ワーク載せ替え位置において前記ワーク保持部に移動可能とするとともに、前記ワーク保持部のワークを前記主搬送ライン上に移動可能とし、
前記単一の開口にエアーカーテンあるいは移動可能壁からなる開閉扉を設け、
前記塗装中の一部期間あるいは全部期間、前記開閉扉を閉じるようにし、
前記途中位置を、前記塗装ケーシングの内とし、
前記ワーク載せ替え位置を、前記塗装ケーシングの外とし、塗装と載せ替えを同時に行うことを特徴とする塗装システム。
A main transfer line that allows the workpiece to move along the track,
A coating casing disposed adjacent to the main transfer line and constituting a coating chamber independent of the main transfer line;
A coating device in the coating chamber;
A workpiece holding device that holds the workpiece at the coating position in the vicinity of the coating device during coating;
A workpiece moving device that enables the workpiece on the main transfer line to move to the workpiece holding device, and allows the workpiece of the workpiece holding device to move on the main transfer line,
Wherein the coating casing, said single opening as the path of travel of the workpiece between the coating chamber and the main conveyor line is provided, and the workpiece holding device is arranged in painting chamber,
The work holding device has an indoor main turntable, a sub turntable having a predetermined arm length disposed at both ends in the longitudinal direction, and a work holding portion provided at an end of the sub turntable. ,
The sub-rotation table rotates between the workpiece replacement position and the intermediate position for moving from the coating position to the workpiece replacement position via the opening,
The workpiece moving device enables the workpiece on the main transfer line to move to the workpiece holding unit at the workpiece transfer position, and allows the workpiece of the workpiece holding unit to move on the main transfer line,
The door consisting of air curtain or movable wall provided in the single opening,
The door is closed for a part or all period during the painting ,
The intermediate position is the inside of the paint casing,
A coating system characterized in that the workpiece replacement position is outside the coating casing, and coating and replacement are performed simultaneously.
前記ワーク保持装置は、塗装が完了したワークを次の塗装前に前記塗装位置から前記塗装室の外へ移動させるようにしたことを特徴とする請求項1記載の塗装システム。Painting system according to claim 1 wherein the workpiece holding device being characterized in that so as to move out of the paint chamber workpieces painting has been completed from the painting position before the next coating. 前記ワーク保持装置は、塗装前のワークを直前の塗装完了後に前記塗装室の外から前記塗装位置へ移動させるようにしたことを特徴とする請求項1または請求項に記載の塗装システム。The workpiece holding device, coating system of claim 1 or claim 2, characterized in from outside the painting chamber before painting work after completion just prior to coating it has be moved to the coating position. 前記塗装ケーシングの内壁に沿って洗浄水を流下させるようにしたことを特徴とする請求項1乃至請求項のいずれか1項に記載の塗装システム。The coating system according to any one of claims 1 to 3 , wherein washing water is allowed to flow along the inner wall of the coating casing. 前記主搬送ラインを収容する収容室を構成する搬送ケーシングを有し、前記収容室の空気を大気中に排出する換気装置を備えることを特徴とする請求項1乃至請求項のいずれか1項に記載の塗装システム。Has a conveyor casing constituting the accommodating chamber for accommodating the main transport line, any one of claims 1 to 4 the air in the storage chamber, characterized in that it comprises a ventilator for discharging into the atmosphere The coating system described in.
JP2000217559A 2000-06-07 2000-07-18 Painting system Expired - Fee Related JP4591933B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000217559A JP4591933B2 (en) 2000-06-07 2000-07-18 Painting system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2000-170697 2000-06-07
JP2000170697 2000-06-07
JP2000217559A JP4591933B2 (en) 2000-06-07 2000-07-18 Painting system

Publications (2)

Publication Number Publication Date
JP2002059046A JP2002059046A (en) 2002-02-26
JP4591933B2 true JP4591933B2 (en) 2010-12-01

Family

ID=26593492

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000217559A Expired - Fee Related JP4591933B2 (en) 2000-06-07 2000-07-18 Painting system

Country Status (1)

Country Link
JP (1) JP4591933B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002035658A (en) * 2000-07-24 2002-02-05 Yamaha Motor Co Ltd Painting system
JP2003024846A (en) * 2001-07-18 2003-01-28 Takubo Engineering Co Ltd Work feed apparatus used for coating system
JP4522766B2 (en) * 2004-07-02 2010-08-11 株式会社シンク・ラボラトリー Photosensitive film coating apparatus and plate making factory
JP5176031B2 (en) * 2007-10-01 2013-04-03 東洋ゴム工業株式会社 Adhesive application equipment
KR101562531B1 (en) * 2015-02-24 2015-10-23 지금강 주식회사 Clean coating method of injection parts
JP2025152884A (en) * 2024-03-28 2025-10-10 川崎重工業株式会社 Painting System

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0294829U (en) * 1989-01-11 1990-07-27
JPH0576559U (en) * 1992-03-31 1993-10-19 トリニティ工業株式会社 Grating cover
JPH06121948A (en) * 1992-08-31 1994-05-06 Taikisha Ltd Method for installing coating booth
JPH0930877A (en) * 1995-07-14 1997-02-04 Inax Corp Glazing equipment
JP3568750B2 (en) * 1997-09-29 2004-09-22 トリニティ工業株式会社 Washing type painting booth

Also Published As

Publication number Publication date
JP2002059046A (en) 2002-02-26

Similar Documents

Publication Publication Date Title
KR101594172B1 (en) Powder coating apparatus
TWI503265B (en) Method for operating substrate storage device, substrate processing device, and substrate storage device
TWI381982B (en) Substrate processing method
TWI399329B (en) Storage container for housing substrate
JP6432982B2 (en) Repainting equipment
CN101616856A (en) Be used to clean equipment and method with the drying of semiconductor workpiece container
JP4591933B2 (en) Painting system
CN115178435B (en) Automatic wafer glue spreader
WO1998019333A1 (en) Processor and processing method, and robot device
JPH09148294A (en) Substrate processing equipment
US20040081756A1 (en) Workpiece coating apparatus
JPH1034094A (en) Washing method for substrate cassette rack
JP2002035658A (en) Painting system
JP2002035659A (en) Painting system
JPH1147710A (en) Automatic cleaning equipment for objects to be cleaned such as various containers
JP3384666B2 (en) Substrate processing equipment
JP2002035675A (en) Painting method
JPH07213966A (en) Coating booth
JP2002057137A (en) Wafer washing device and water treatment device
JP2002035672A (en) Coating system and arrangement structure of coating system
JP2002001174A (en) Work moving device and coating system
JP2940667B2 (en) Cleaning equipment for building materials
JP2000093860A (en) painting booth
JPH0614472Y2 (en) Processing system
JP2006075770A (en) Cylinder head cleaning device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070614

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091120

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100706

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100909

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100909

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130924

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees