Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4599530B2 - Dividing structure of excavator and method for retracting excavator - Google Patents
[go: Go Back, main page]

JP4599530B2 - Dividing structure of excavator and method for retracting excavator - Google Patents

Dividing structure of excavator and method for retracting excavator Download PDF

Info

Publication number
JP4599530B2
JP4599530B2 JP2005292410A JP2005292410A JP4599530B2 JP 4599530 B2 JP4599530 B2 JP 4599530B2 JP 2005292410 A JP2005292410 A JP 2005292410A JP 2005292410 A JP2005292410 A JP 2005292410A JP 4599530 B2 JP4599530 B2 JP 4599530B2
Authority
JP
Japan
Prior art keywords
cutter
unit
excavator
tail
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2005292410A
Other languages
Japanese (ja)
Other versions
JP2007100408A (en
Inventor
研一 金子
計夫 高見沢
隆良 中村
保成 村上
達 重光
克美 門田
一幸 飛田
裕一 浅井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2005292410A priority Critical patent/JP4599530B2/en
Publication of JP2007100408A publication Critical patent/JP2007100408A/en
Application granted granted Critical
Publication of JP4599530B2 publication Critical patent/JP4599530B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、掘進機の分割構造及び掘進機の引戻し方法に係り、詳しくは、坑を構築した掘進機を回収する技術に関する。   The present invention relates to a division structure of an excavator and a retracting method of the excavator, and more particularly to a technique for recovering an excavator that has built a pit.

地中にトンネル等の坑を掘削するための掘進機は、海中トンネルのように深い場合には掘削終了後であっても回収できないことが多い一方、都市部における比較的浅いトンネルでは掘削終了後に掘進機を回収して再利用することが可能である。
特に最近では、大断面トンネルを構築する際に矩形形状の小断面トンネルを複数構築して最終的に大断面トンネルを形成する手法が採用されつつ有り、このような場合には小断面トンネルを繰り返し構築する必要があり、掘進機の回収は必須である。
The excavator for excavating a tunnel or the like in the ground is often not recovered even after the completion of excavation when it is deep like an underwater tunnel, while in a relatively shallow tunnel in an urban area, The excavator can be recovered and reused.
In particular, recently, when constructing a large-section tunnel, a method of constructing a plurality of rectangular small-section tunnels and finally forming a large-section tunnel is being adopted. It is necessary to construct, and recovery of the excavator is essential.

このようなことから、従来、掘進機の回収方法が種々考案されており、例えば、掘進機を外胴と内胴とで構成し、掘削後に外胴から内胴を離脱させて構築したトンネル内を引き戻す手法や(特許文献1等参照)、トンネルの入口と出口とに立坑を設け、掘削後に掘進機の全部または一部を出口側の立坑から一旦地上に引き上げて移送し、入口側の立坑に戻す手法(特許文献2等参照)が知られている。
特開2001−317285号公報 特開2002−188391号公報
For this reason, various methods for collecting the excavator have been devised in the past. For example, in a tunnel constructed by configuring an excavator with an outer trunk and an inner trunk and detaching the inner trunk from the outer trunk after excavation. (See Patent Document 1, etc.), and a shaft is provided at the entrance and exit of the tunnel. After excavation, all or part of the excavator is temporarily lifted from the shaft on the exit side and transferred to the ground. There is known a method for returning to (see Patent Document 2).
JP 2001-317285 A JP 2002-188391 A

しかしながら、上記特許文献1に開示される技術は、構築したトンネル内を有効に利用できるものの、このような手法では掘進機の一部分しか回収することができないという問題がある。
また、上記特許文献2に開示される技術では、掘進機の全部または一部を一旦地上に引き上げて移送するという作業が発生し、特に都市部において道路の下方に上記小断面トンネルを繰り返し構築するような場合には、掘進機の移送のために頻繁に且つ長時間に亘り地上の交通を妨げるという問題があり好ましいことではない。
However, although the technique disclosed in Patent Document 1 can effectively use the constructed tunnel, there is a problem that only a part of the excavator can be recovered by such a method.
Further, in the technique disclosed in Patent Document 2, all or part of the excavator is temporarily lifted and transferred to the ground, and the small-section tunnel is repeatedly constructed below the road, particularly in urban areas. In such a case, it is not preferable because there is a problem that the ground transportation is obstructed frequently for a long time for transferring the excavator.

本発明はこのような問題点を解決するためになされたもので、その目的とするところは、構築した坑を有効に用いて掘進機の全部を発進位置まで引戻し、掘進機を容易に再利用可能な掘進機の分割構造及び掘進機の引戻し方法を提供することにある。   The present invention has been made to solve such problems, and the object of the present invention is to use the constructed mine effectively to pull the entire excavator back to the starting position and to easily reuse the excavator. It is an object of the present invention to provide a possible excavator division structure and a method of retracting the excavator.

上記した目的を達成するために、請求項1の掘進機の分割構造は、掘進機を、前後寸法が構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと掘進機の掘進方向を制御する後部のテールユニットとを前後方向で着脱自在に分割するとともに、上下寸法が構築した坑の坑内上下寸法より小さくなるよう、前記カッタユニット及び前記テールユニットをそれぞれ上下方向で着脱自在に分割したことを特徴とする In order to achieve the above-described object, the division structure of the excavator according to claim 1 includes a main cutter, a main cutter drive unit, and a sub-cutter so that the excavator has a longitudinal dimension smaller than a built-in pit width dimension. The front cutter unit and the rear tail unit that controls the excavation direction of the excavator are detachably divided in the front-rear direction, and the vertical and vertical dimensions of the cutter unit and the cutter unit and the The tail unit is detachably divided in the vertical direction .

請求項の掘進機の分割構造では、請求項において、前記サブカッタは前記メインカッタ駆動部の周囲に配設されており、前記カッタユニットについては、前記メインカッタを上下方向で着脱自在に分割するとともに、前記メインカッタ駆動部と前記サブカッタの一部とを上下方向で着脱自在に分割したことを特徴とする。
請求項の掘進機の分割構造では、請求項またはにおいて、前記テールユニットは方向制御ジャッキを複数備え、前記テールユニットについては、前記複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で着脱自在に分割したことを特徴とする。
The divided structure of the excavator of claim 2, in claim 1, wherein Sabukatta are disposed around the main cutter drive unit for the cutter unit is detachably dividing said main cutter in the vertical direction In addition, the main cutter driving unit and a part of the sub cutter are detachably divided in the vertical direction.
In the division structure of the excavator according to claim 3 , in claim 1 or 2 , the tail unit includes a plurality of direction control jacks, and all of the plurality of direction control jacks are located on one side of the tail unit. As described above, it is characterized in that it is detachable in the vertical direction.

請求項の掘進機の引戻し方法は、掘進機によって坑を構築した後、該掘進機を前後寸法が前記構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと掘進機の掘進方向を制御する後部のテールユニットとを前後方向で分割解体するとともに上下寸法が前記構築した坑の坑内上下寸法より小さくなるよう、前記カッタユニット及び前記テールユニットを上下方向で分割解体し、該分割解体した掘進機の各部分をそれぞれ前記構築した坑内を通り得る向きに変えて該坑内を発進位置まで引き戻すことを特徴とする。 According to a fourth aspect of the present invention, there is provided a method for retracting the excavator , wherein the main cutter, the main cutter driving unit, and the sub cutter are arranged so that the front and rear dimensions are smaller than the inner pit width of the constructed mine after the mine is constructed by the excavator. the the front of the cutter unit and the rear of the tail unit for controlling the excavation direction of the shield machine with split dismantled in the longitudinal direction consisting of, as the vertical dimension is less than the downhole vertical dimension of pit described above constructs, the cutter unit and The tail unit is divided and disassembled in the vertical direction, and each part of the excavating machine divided and disassembled is changed to a direction in which it can pass through the constructed mine, and the inside of the mine is pulled back to the start position.

請求項の掘進機の引戻し方法では、請求項において、前記サブカッタは前記メインカッタ駆動部の周囲に配設されており、前記カッタユニットについては、前記メインカッタを上下方向で着脱自在に分割するとともに、前記メインカッタ駆動部と前記サブカッタの一部とを上下方向で分割解体することを特徴とする。
請求項の掘進機の引戻し方法では、請求項またはにおいて、前記テールユニットは前記方向制御ジャッキを複数備え、前記テールユニットについては、前記複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で分割解体することを特徴とする。
The retraction method of tunneling machine according to claim 5, in claim 4, wherein Sabukatta are disposed around the main cutter drive unit for the cutter unit is detachably dividing said main cutter in the vertical direction In addition, the main cutter driving unit and a part of the sub cutter are divided and disassembled in the vertical direction.
In the retracting method for an excavator according to claim 6 , in claim 4 or 5 , the tail unit includes a plurality of the direction control jacks, and all of the plurality of direction control jacks are located on one side of the tail unit. As described above, it is divided into pieces in the vertical direction.

請求項の掘進機の引戻し方法では、請求項乃至のいずれかにおいて、前記構築した坑に引戻し用のレールを敷設するとともに、少なくとも前記分割解体したカッタユニット及びテールユニットの一の部分に前記レール用の車輪を仮付けし、該車輪を該レール上で転動させて少なくとも前記分割解体したカッタユニット及びテールユニットの一の部分を発進位置まで引き戻すことを特徴とする。 According to a seventh aspect of the present invention, there is provided a method for retracting the excavator according to any one of the fourth to sixth aspects, wherein a rail for pulling is laid in the constructed mine, and at least a part of the divided and dismantled cutter unit and tail unit. The rail wheel is temporarily attached, and the wheel rolls on the rail to pull back at least one part of the divided and disassembled cutter unit and tail unit to a starting position.

請求項1の掘進機の分割構造によれば、掘進機を、前後寸法が構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと後部のテールユニットとを前後方向で着脱自在に分割し、上下寸法が構築した坑の坑内上下寸法より小さくなるよう、カッタユニット及びテールユニットをそれぞれ上下方向で着脱自在に分割したので、坑を構築した後、分割数を最小限に抑えつつ掘進機を構築した坑の開口寸法よりも小さな大きさの部分に簡単に解体することができ、当該解体した掘進機の部分の全てを上記構築した坑を通って発進位置まで引き戻すことができる。これにより、地上スペースを必要とせず、構築した坑を有効に用いて掘進機の全部を発進位置まで容易に引き戻すことができ、掘進機を容易に再利用でき、工事費用の大幅な削減を図ることができる。 According to the division structure of the excavator according to claim 1, the front cutter unit and the rear portion including the main cutter, the main cutter drive unit, and the sub cutter are arranged so that the front and rear dimensions are smaller than the inner pit width dimension of the constructed mine. The tail unit was detachably divided in the front-rear direction, and the cutter unit and tail unit were each detachably separated in the vertical direction so that the vertical dimension was smaller than the vertical dimension of the built pit. Later, it can be easily dismantled into a portion having a size smaller than the opening size of the well where the excavator was constructed while minimizing the number of divisions , It can be pulled back to the starting position. As a result, it is possible to easily pull back all of the excavator to the starting position by effectively using the constructed mine without requiring ground space, and the excavator can be easily reused, thereby significantly reducing the construction cost. be able to.

請求項の掘進機の分割構造によれば、カッタユニットについては、メインカッタを上下方向で着脱自在に分割するとともに、メインカッタ駆動部とサブカッタの一部とを上下方向で着脱自在に分割したので、メインカッタ駆動部については細分化することなく一体回収でき、掘進機を容易に再組立可能である。
請求項の掘進機の分割構造によれば、テールユニットについては、複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で着脱自在に分割したので、複数の方向制御ジャッキを細分化することなく一体回収でき、方向制御の精度を維持しつつ、掘進機を容易に再組立可能である。
According to the division structure of the excavator of claim 2 , the cutter unit is configured such that the main cutter is detachably divided in the vertical direction, and the main cutter driving unit and a part of the sub cutter are detachably divided in the vertical direction. Therefore, the main cutter driving unit can be recovered in one piece without being subdivided, and the excavator can be easily reassembled.
According to the division structure of the excavator of claim 3 , since the tail unit is detachably divided in the vertical direction so that all of the plurality of direction control jacks are located on one side, the plurality of direction control jacks are It can be collected in one piece without being subdivided, and the excavator can be easily reassembled while maintaining the accuracy of direction control.

請求項の掘進機の引戻し方法によれば、掘進機によって坑を構築した後、前後寸法が構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと後部のテールユニットとを前後方向で分割解体し、上下寸法が構築した坑の坑内上下寸法より小さくなるよう、カッタユニット及びテールユニットを上下方向で分割解体し、該分割解体した掘進機の各部分をそれぞれ構築した坑内を通り得る向きに変えて該坑内を発進位置まで引き戻すようにしたので、坑を構築した後、分割数を最小限に抑えつつ掘進機を構築した坑の開口寸法よりも小さな大きさの部分に簡単に解体することができ、当該解体した掘進機の部分の全てを上記構築した坑を通って発進位置まで坑壁との干渉なく引き戻すことができる。これにより、地上スペースを必要とせず、構築した坑を有効に用いて掘進機の全部を発進位置まで容易に引き戻すことができ、掘進機を容易に再利用でき、工事費用の大幅な削減を図ることができる。 According to the retracting method of the excavator according to claim 4 , after the pit is constructed by the excavator, the front portion including the main cutter, the main cutter drive unit, and the sub-cutter so that the front-rear dimension is smaller than the in-hole width dimension of the constructed mine. The cutter unit and the tail unit of the rear part are divided and disassembled in the front-rear direction, and the cutter unit and tail unit are divided and disassembled in the vertical direction so that the vertical dimension is smaller than the vertical dimension of the built pit. Since each part of the machine was changed to the direction that it can pass through the built mine, and the inside of the mine was pulled back to the starting position, after the mine was built, the opening of the mine where the excavator was built while minimizing the number of divisions It can be easily disassembled into parts smaller than the dimensions, and all the parts of the dismantled excavator will pass through the constructed mine to the starting position and interfere with the mine wall. It can be pulled back clause. This eliminates the need for ground space, makes it possible to easily pull back all the excavator to the starting position by effectively using the constructed mine, and allows the excavator to be easily reused, thereby significantly reducing construction costs. be able to.

請求項の掘進機の引戻し方法によれば、カッタユニットについては、メインカッタを上下方向で着脱自在に分割するとともに、メインカッタ駆動部とサブカッタの一部とを上下方向で分割解体するようにしたので、メインカッタ駆動部については細分化することなく一体回収でき、掘進機を容易に再組立可能である。
請求項の掘進機の引戻し方法によれば、テールユニットについては、複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で分割解体するようにしたので、複数の方向制御ジャッキを細分化することなく一体回収でき、方向制御の精度を維持しつつ、掘進機を容易に再組立可能である。
According to the retracting method of the excavator of claim 5 , with respect to the cutter unit, the main cutter is detachably divided in the vertical direction, and the main cutter driving part and a part of the sub cutter are divided and disassembled in the vertical direction. As a result, the main cutter drive unit can be recovered in one piece without being subdivided, and the excavator can be easily reassembled.
According to the retracting method of the excavator of claim 6 , since the tail unit is divided and disassembled in the vertical direction so that all of the plurality of direction control jacks are located on one side, the plurality of direction control jacks are provided. Can be collected without subdividing, and the excavator can be easily reassembled while maintaining the accuracy of direction control.

請求項の掘進機の引戻し方法によれば、構築した坑に引戻し用のレールを敷設するとともに、少なくとも分割解体したカッタユニット及びテールユニットの一の部分に上記レール用の車輪を仮付けし、当該車輪をレール上で転動させて上記少なくとも分割解体したカッタユニット及びテールユニットの一の部分を発進位置まで引き戻すようにしたので、分割解体した掘進機の各部分を極めて容易に発進位置まで引き戻すことができる。 According to the retracting method of the excavator of claim 7 , the rail for pulling is laid in the constructed pit, and the rail wheel is temporarily attached to at least one part of the cutter unit and the tail unit that are divided and disassembled. The wheel is rolled on the rail so that at least one part of the cutter unit and the tail unit divided and disassembled is pulled back to the start position, so that each part of the divided and dismantled excavator is pulled back to the start position very easily. be able to.

特に、上記小断面トンネルを複数構築する場合には、最初に構築した坑の一箇所にのみレールを設けて当該レールを繰り返し利用するのがよく、これにより分割解体した掘進機の各部分を効率よく発進位置まで引き戻すことができる。
また、上記において掘進機はメインカッタ及びサブカッタが特殊断面(矩形、楕円形、馬蹄形等)の坑を構築可能に構成されているのが好ましい。掘進機がこのような特殊断面を有していると、通常の円形断面に比べて掘進機の分割単位を比較的適切に設定し易い。
In particular, when constructing a plurality of the above-mentioned small-section tunnels, it is preferable to provide a rail only at one location of the first constructed mine and to repeatedly use the rail, thereby making the parts of the excavator divided and disassembled efficient. It can be pulled back to the starting position well.
In the above, the excavator is preferably configured such that the main cutter and the sub cutter can construct a pit having a special cross section (rectangular, elliptical, horseshoe-shaped, etc.). When the excavator has such a special cross section, it is easy to set the division unit of the excavator relatively appropriately as compared with a normal circular cross section.

以下、本発明の実施形態を添付図面に基づいて説明する。
図1は、本発明に係る掘進機の分割構造及び掘進機の引戻し方法に適用される掘進機の縦断面図(部材断面を示す斜線は省略、以下同様)を示し、図2は、図1の矢視A方向から視た掘進機の正面図を示す。
図1、2に示すように、掘進機1は、上述したように大断面トンネルを構築するために小断面トンネルを複数構築する場合に使用される推進式の掘進機であって、例えば矩形断面のトンネル(坑)を掘削可能に構成されている。
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
FIG. 1 is a longitudinal sectional view of an excavator applied to the divided structure of the excavator and the retracting method of the excavator according to the present invention (the hatching indicating the member cross section is omitted, the same applies hereinafter), and FIG. The front view of the excavator seen from the arrow A direction is shown.
As shown in FIGS. 1 and 2, the excavator 1 is a propulsion type excavator used when constructing a plurality of small-section tunnels in order to construct a large-section tunnel as described above. It is configured to be able to excavate the tunnel.

掘進機1は、大きくは、前部に位置するカッタユニット2と後部に位置するテールユニット4とスクリューコンベアユニット6とで構成されている。
先ずカッタユニット2について説明すると、カッタユニット2は、揺動カッタ(メインカッタ)10、揺動カッタ駆動部(メインカッタ駆動部)20及びサブカッタ30から構成されている。
The digging machine 1 is mainly composed of a cutter unit 2 located at the front, a tail unit 4 located at the rear, and a screw conveyor unit 6.
First, the cutter unit 2 will be described. The cutter unit 2 includes a swing cutter (main cutter) 10, a swing cutter driving unit (main cutter driving unit) 20, and a sub cutter 30.

揺動カッタ10は略楕円形状のカッタフレーム12の前面に土石を切削する複数のカッタビット14が固定されて構成されており、カッタフレーム12の中心には揺動軸16が設けられている。そして、揺動軸16は、揺動カッタ駆動部20の軸受部22において揺動可能に支持されている。
揺動カッタ駆動部20において、揺動軸16からは直角方向に天秤状のアーム24が延びており、当該アーム24には、当該アーム24を介して揺動軸16ひいては揺動カッタ10を揺動させる一対の揺動ジャッキ26、26が連結されている。一対の揺動ジャッキ26、26は例えば油圧シリンダであり、互いに伸縮することで揺動カッタ10を揺動自在とする。
The swing cutter 10 is configured by fixing a plurality of cutter bits 14 for cutting earth and stone to the front surface of a substantially elliptic cutter frame 12, and a swing shaft 16 is provided at the center of the cutter frame 12. The swing shaft 16 is swingably supported by the bearing portion 22 of the swing cutter driving unit 20.
In the oscillating cutter driving unit 20, a balance-like arm 24 extends from the oscillating shaft 16 in a direction perpendicular to the oscillating shaft 16, and the oscillating shaft 16 and thus the oscillating cutter 10 are oscillated through the arm 24. A pair of rocking jacks 26, 26 to be moved are connected. The pair of swing jacks 26 and 26 are, for example, hydraulic cylinders, and can swing the swing cutter 10 by extending and contracting each other.

揺動カッタ駆動部20の周囲には、サブカッタ30の一つとしてコーナカッタ32がカッタユニット2の四隅にそれぞれ設けられている。コーナカッタ32は、揺動カッタ10で切削しきれないコーナ部分の土石を切削するためのカッタであり、カッタビット34をモータ36で回転させるよう構成されている。
また、カッタユニット2の外殻は硬度の高い鋼材で構成されており、これによりサブカッタ30の一つとして固定カッタ38が構成されている。固定カッタ38は、揺動カッタ10及びコーナカッタ32で切削しきれずに残った土石を削り取るものであり、これにより最終的に矩形形状のトンネルが形成される。
Around the swing cutter driving unit 20, corner cutters 32 are provided at the four corners of the cutter unit 2 as one of the sub cutters 30. The corner cutter 32 is a cutter for cutting the corner stone that cannot be completely cut by the swing cutter 10, and is configured to rotate the cutter bit 34 by the motor 36.
Further, the outer shell of the cutter unit 2 is made of a steel material having high hardness, and thereby, a fixed cutter 38 is constituted as one of the sub cutters 30. The fixed cutter 38 scrapes off the remaining earth and stone that could not be cut by the swing cutter 10 and the corner cutter 32, and finally a rectangular tunnel is formed.

即ち、揺動カッタ駆動部20の周囲を取り巻くようにしてサブカッタ30(コーナカッタ32及び固定カッタ38)が設けられている。
次にテールユニット4について説明すると、テールユニット4は、前部テール40と後部テール42とが複数の方向制御ジャッキ44で連結されて構成されている。詳しくは、複数の方向制御ジャッキ44は、例えば油圧シリンダであり、テールユニット4の外周近傍に等間隔をなして配設されている。これにより、これら複数の方向制御ジャッキ44を適宜伸縮させることで前部テール40と後部テール42に角度を付け、掘進機1の進行方向を制御することが可能である。
That is, the sub cutter 30 (the corner cutter 32 and the fixed cutter 38) is provided so as to surround the periphery of the swing cutter driving unit 20.
Next, the tail unit 4 will be described. The tail unit 4 is configured by connecting a front tail 40 and a rear tail 42 by a plurality of directional control jacks 44. Specifically, the plurality of directional control jacks 44 are hydraulic cylinders, for example, and are arranged at equal intervals in the vicinity of the outer periphery of the tail unit 4. Accordingly, the front tail 40 and the rear tail 42 can be angled by appropriately expanding and contracting the plurality of direction control jacks 44, and the traveling direction of the excavator 1 can be controlled.

そして、前部テール40と後部テール42との間には、外部から掘進機1内に土石が侵入することを防止すべくシール部材46が全周に亘り介装されている。
なお、ここではテールユニット4に複数の方向制御ジャッキ44を設ける場合を示しているが、掘進機1の進行方向を曲げる必要がない場合には特に方向制御ジャッキ44はなくてもよい。
A seal member 46 is interposed between the front tail 40 and the rear tail 42 over the entire circumference so as to prevent debris from entering the excavator 1 from the outside.
In addition, although the case where the tail unit 4 is provided with a plurality of direction control jacks 44 is shown here, the direction control jack 44 is not particularly necessary when it is not necessary to bend the traveling direction of the excavator 1.

スクリューコンベアユニット6は、カッタユニット2によって切削した土石をモータ52で軸スクリュー50を回転させて外部に搬出する装置である。
図1中の符号54は土石を圧送するための圧送ポンプであり、必要に応じてスクリューコンベアユニット6に連結されるものである。
また、図1中の符号60は、掘進機1で切削したトンネル内に後述の推進装置130によって掘進機1を押圧しながら嵌入されるセグメントを示している。
The screw conveyor unit 6 is a device that rotates the shaft screw 50 by the motor 52 and carries the debris cut by the cutter unit 2 to the outside.
The code | symbol 54 in FIG. 1 is a pressure feed pump for pressure-feeding debris, and is connected with the screw conveyor unit 6 as needed.
Moreover, the code | symbol 60 in FIG. 1 has shown the segment inserted in the tunnel cut with the excavator 1 while pressing the excavator 1 with the propulsion apparatus 130 mentioned later.

以上のように全体構成された掘進機1は、揺動カッタ10の上部10bが本体10aから分割されており、複数のボルトナット(図示せず)で本体10aに締結されている。
さらに、揺動カッタ駆動部20の上方のサブカッタ30の上側の一部とテールユニット4のうちの前部テール40の上部とは一体をなして上部30bを構成し、当該上部30bは揺動カッタ駆動部20及び本体(サブカッタ30の側部及び下部)30a並びに前部テール40の本体40aから分割されており、複数のボルトナット70でこれら揺動カッタ駆動部20及び本体30a並びに本体40aに締結されている。
In the excavator 1 configured as described above, the upper portion 10b of the swing cutter 10 is divided from the main body 10a, and is fastened to the main body 10a by a plurality of bolts and nuts (not shown).
Further, a part of the upper side of the sub cutter 30 above the swing cutter driving unit 20 and the upper part of the front tail 40 of the tail unit 4 are integrated to form an upper part 30b, and the upper part 30b is the swing cutter. The drive unit 20 and the main body (side and lower portions of the sub-cutter 30) 30a and the main body 40a of the front tail 40 are divided, and a plurality of bolts and nuts 70 are fastened to the swinging cutter drive unit 20, the main body 30a, and the main body 40a. Has been.

同様に、後部テール42の上部42bは本体42aから分割されており、複数のボルトナット72で本体42aに締結されている。
そして、揺動カッタ駆動部20及びサブカッタ30の本体30aと前部テール40の本体40aとが複数のボルトナット74で締結され、スクリューコンベアユニット6がサブカッタ30に一体に設けられたスクリューコンベア保持部39にボルトナット76で締結されている。
Similarly, the upper part 42 b of the rear tail 42 is divided from the main body 42 a and is fastened to the main body 42 a by a plurality of bolts and nuts 72.
The main body 30a of the swing cutter driving section 20 and the sub cutter 30 and the main body 40a of the front tail 40 are fastened by a plurality of bolts and nuts 74, and the screw conveyor holding section in which the screw conveyor unit 6 is provided integrally with the sub cutter 30. 39 is fastened with a bolt nut 76.

即ち、図3及び図4に上記図1及び図2にそれぞれ対応して掘進機1の分解図を示すように、掘進機1は、揺動カッタ10の上部10bが本体10aから着脱自在であり、サブカッタ30の上側の一部と前部テール40の上部とを含む上部30bが揺動カッタ駆動部20及び本体30a並びに本体40aから着脱自在であり、後部テール42の上部42bが本体42aから着脱自在である。そして、揺動カッタ10の本体10a、揺動カッタ駆動部20及びサブカッタ30の本体30a、即ちカッタユニット本体2aと、前部テール40の本体40a及び後部テール42の本体42a、即ちテールユニット本体4aとが前後方向で着脱自在であるとともに、スクリューコンベアユニット6が着脱自在である。   That is, as shown in FIGS. 3 and 4 in exploded views corresponding to FIGS. 1 and 2, respectively, the excavator 1 has the upper part 10b of the swing cutter 10 detachable from the main body 10a. The upper portion 30b including a part of the upper side of the sub cutter 30 and the upper portion of the front tail 40 is detachable from the swinging cutter driving unit 20, the main body 30a, and the main body 40a, and the upper portion 42b of the rear tail 42 is detachable from the main body 42a. It is free. Then, the main body 10a of the swinging cutter 10, the main body 30a of the swinging cutter driving unit 20 and the sub cutter 30, that is, the cutter unit main body 2a, the main body 40a of the front tail 40, and the main body 42a of the rear tail 42, that is, the tail unit main body 4a. Are detachable in the front-rear direction, and the screw conveyor unit 6 is detachable.

詳しくは、テールユニット4については、複数の方向制御ジャッキ44の全てが前部テール40の本体40a及び後部テール42の本体42a側、即ちテールユニット本体4a側に位置するように分割されており、上記シール部材46は本体40aと本体42aとの間に介装されている。つまり、テールユニット4はテールユニット本体4aだけで方向制御可能に構成されている。   Specifically, the tail unit 4 is divided so that all of the plurality of directional control jacks 44 are located on the main body 40a of the front tail 40 and the main body 42a side of the rear tail 42, that is, on the tail unit main body 4a side. The sealing member 46 is interposed between the main body 40a and the main body 42a. That is, the tail unit 4 is configured such that the direction can be controlled only by the tail unit body 4a.

また、図3及び図4に示すように、カッタユニット本体2aとテールユニット本体4aとは、最大高さHがセグメント60の上下方向の内寸(坑内上下寸法)よりも小さくなるように設定されており、カッタユニット本体2aの奥行きD1及びテールユニット本体4aの奥行きD2がセグメント60の幅方向の内寸(坑内幅寸法)よりも小さくなるように設定されている。   As shown in FIGS. 3 and 4, the cutter unit main body 2a and the tail unit main body 4a are set so that the maximum height H is smaller than the vertical dimension of the segment 60 (the vertical dimension in the mine). The depth D1 of the cutter unit main body 2a and the depth D2 of the tail unit main body 4a are set so as to be smaller than the inner dimension in the width direction of the segment 60 (downhole width dimension).

以下、このように構成された掘進機1の本発明に係る引戻し方法について説明する。
掘進機1は、例えば小断面トンネルを複数構築して最終的に大断面トンネルを形成する工法に採用される。
図5は、当該工法において、掘進機1で掘削を行うとともにセグメント60を嵌入して一本のトンネル100を構築した後、掘進機1を解体し、当該解体した掘進機1の部分を発進位置まで戻す様子を示したトンネル100の縦断面図である。また、図6は、図5の矢視B方向から視たトンネル100の正面図である。
Hereinafter, the pulling-back method according to the present invention of the excavator 1 configured as described above will be described.
The excavator 1 is employed, for example, in a construction method in which a plurality of small-section tunnels are constructed to finally form a large-section tunnel.
FIG. 5 shows the construction method in which the excavator 1 is excavated and the segment 60 is inserted to construct one tunnel 100, and then the excavator 1 is disassembled, and the disassembled excavator 1 portion is set to the start position. It is the longitudinal cross-sectional view of the tunnel 100 which showed a mode that it returned to. FIG. 6 is a front view of the tunnel 100 as viewed from the direction of arrow B in FIG.

図5及び図6に示すように、トンネル100の前後にはそれぞれ発進位置側の立坑110と到達位置側の立坑120が開削されている。そして、立坑110、120内にはそれぞれ作業用のプレート112、122が配置され、発進位置側の立坑110には、掘進機1やセグメント60を押圧して推進させる推進装置130が配設されており、立坑110、120の開口はそれぞれ蓋体114、124で塞がれている。   As shown in FIGS. 5 and 6, the vertical shaft 110 on the start position side and the vertical shaft 120 on the arrival position side are cut open before and after the tunnel 100, respectively. The working plates 112 and 122 are disposed in the shafts 110 and 120, respectively, and the propulsion device 130 that presses and propels the excavator 1 and the segment 60 is disposed in the shaft 110 on the start position side. The openings of the shafts 110 and 120 are closed with lids 114 and 124, respectively.

図5、6に示すように、掘進機1で掘削をし終えたら、先ず到達位置側の立坑120内において、掘進機1をプレート122上で解体する。この際、上記図3、4に示すように、ボルトナット(図示せず)を外して揺動カッタ10の上部10bを本体10aから脱離させ、ボルトナット70を外してサブカッタ30の上側の一部と前部テール40の上部とを含む上部30bを揺動カッタ駆動部20及び本体30a並びに本体40aから脱離させ、ボルトナット72を外して後部テール42の上部42bを本体42aから脱離させる。さらに、ボルトナット74を外して揺動カッタ10の本体10a、揺動カッタ駆動部20及びサブカッタ30の本体30aからなるカッタユニット本体2aと前部テール40の本体40a及び後部テール42の本体42aからなるテールユニット本体4aとを前後方向で脱離させる。そして、ボルトナット76を外してスクリューコンベアユニット6を脱離させる。なお、図5には、解体部分のうち大きな部分であるカッタユニット本体2aとテールユニット本体4aとを代表として示してある。   As shown in FIGS. 5 and 6, when the excavator 1 completes excavation, the excavator 1 is first disassembled on the plate 122 in the shaft 120 on the arrival position side. At this time, as shown in FIGS. 3 and 4, the bolt nut (not shown) is removed to detach the upper portion 10b of the swinging cutter 10 from the main body 10a, and the bolt nut 70 is removed to remove the upper portion of the sub cutter 30. The upper part 30b including the upper part and the upper part of the front tail 40 is detached from the swinging cutter driving unit 20, the main body 30a, and the main body 40a, and the bolts and nuts 72 are removed to remove the upper part 42b of the rear tail 42 from the main body 42a. . Further, the bolt nut 74 is removed from the cutter unit main body 2a including the main body 10a of the swing cutter 10, the swing cutter driving unit 20 and the main body 30a of the sub cutter 30, the main body 40a of the front tail 40, and the main body 42a of the rear tail 42. The tail unit body 4a is detached in the front-rear direction. Then, the bolt nut 76 is removed and the screw conveyor unit 6 is detached. In FIG. 5, the cutter unit main body 2a and the tail unit main body 4a, which are large parts of the dismantled parts, are shown as representatives.

このように掘進機1を解体したら、上記解体した各部分をトンネル100を通り発進位置側の立坑110まで引き戻すようにする。例えば、比較的小さな部分、即ち上部10b、上部30b、上部42b、スクリューコンベアユニット6を先に戻すようにし、その後に大きな部分であるカッタユニット本体2aとテールユニット本体4aとを戻すようにする。   When the excavator 1 is disassembled in this way, the disassembled parts are pulled back through the tunnel 100 to the shaft 110 on the start position side. For example, the relatively small portions, that is, the upper portion 10b, the upper portion 30b, the upper portion 42b, and the screw conveyor unit 6 are returned first, and then the cutter unit main body 2a and the tail unit main body 4a, which are large portions, are returned.

この際、カッタユニット本体2aとテールユニット本体4aとは、上述したように最大高さHがセグメント60の上下方向の内寸(坑内上下寸法)よりも小さくなるように設定されているため、カッタユニット本体2a及びテールユニット本体4aの上部がトンネル100内でセグメント60の天井部と干渉することはない。
また、カッタユニット本体2aとテールユニット本体4aとは、上述したようにそれぞれカッタユニット本体2aの奥行きD1及びテールユニット本体4aの奥行きD2がセグメント60の幅方向の内寸(坑内幅寸法)よりも小さくなるように設定されているため、これらカッタユニット本体2a及びテールユニット本体4aについては90°回転させることによりトンネル100内でセグメント60の側壁と干渉しないようにできる。
At this time, since the cutter unit main body 2a and the tail unit main body 4a are set so that the maximum height H is smaller than the inner dimension in the vertical direction of the segment 60 (upper and lower dimension) as described above, The upper parts of the unit main body 2 a and the tail unit main body 4 a do not interfere with the ceiling of the segment 60 in the tunnel 100.
Further, as described above, the cutter unit main body 2a and the tail unit main body 4a are such that the depth D1 of the cutter unit main body 2a and the depth D2 of the tail unit main body 4a are larger than the inner dimension in the width direction of the segment 60 (downhole width dimension). Since the cutter unit main body 2a and the tail unit main body 4a are rotated by 90 °, they can be prevented from interfering with the side walls of the segment 60 in the tunnel 100.

従って、カッタユニット本体2aとテールユニット本体4aについては、プレート122上で90°回転させ、このように90°回転した姿勢でトンネル100内を引き戻すようにする。
ところで、カッタユニット本体2aやテールユニット本体4aは重量物であるため、そのままでの搬送は困難である。また、セグメント60の床面は平滑面であればよいが実際には平滑面でない場合が多い。
Therefore, the cutter unit main body 2a and the tail unit main body 4a are rotated by 90 ° on the plate 122, and the tunnel 100 is pulled back in such a posture rotated by 90 °.
Incidentally, since the cutter unit main body 2a and the tail unit main body 4a are heavy, it is difficult to carry them as they are. In addition, the floor surface of the segment 60 may be a smooth surface, but is not actually a smooth surface in many cases.

そこで、セグメント60の床面の中央部にはトンネル100の長手方向に向けて一対のレール(C字鋼等)140、140を敷設するようにし、図7に図6のC部を拡大して示すように、カッタユニット本体2aやテールユニット本体4aの下面にはレール140、140の形状に合わせて複数のローラ(車輪)142を仮付けするようにする。
これにより、ローラ142をレール140、140上で転動させるようにしてカッタユニット本体2a及びテールユニット本体4aを発進位置側の立坑110まで引き戻すことが可能である。
Therefore, a pair of rails (C-shaped steel, etc.) 140 and 140 are laid in the central portion of the floor surface of the segment 60 in the longitudinal direction of the tunnel 100, and FIG. As shown, a plurality of rollers (wheels) 142 are temporarily attached to the lower surfaces of the cutter unit main body 2a and the tail unit main body 4a in accordance with the shapes of the rails 140 and 140.
Accordingly, the cutter unit main body 2a and the tail unit main body 4a can be pulled back to the shaft 110 on the start position side by rolling the roller 142 on the rails 140 and 140.

なお、レール140、140に適合した台車を用いれば、上部10b、上部30b、上部42b、スクリューコンベアユニット6についても当該台車を用いて引き戻すことができる。
上部10b、上部30b、上部42b、スクリューコンベアユニット6、カッタユニット本体2a及びテールユニット本体4aを発進位置側の立坑110まで引き戻したら、プレート112上で掘進機1を再組立し、次のトンネル101の掘削を開始する。以降、トンネル102〜105の構築が全て終了するまで上記作業を繰り返す。
In addition, if the trolley | bogie suitable for the rails 140 and 140 is used, the upper part 10b, the upper part 30b, the upper part 42b, and the screw conveyor unit 6 can also be pulled back using the said trolley | bogie.
When the upper part 10b, the upper part 30b, the upper part 42b, the screw conveyor unit 6, the cutter unit main body 2a and the tail unit main body 4a are pulled back to the shaft 110 on the starting position side, the excavator 1 is reassembled on the plate 112, and the next tunnel 101 Start drilling. Thereafter, the above operation is repeated until the construction of the tunnels 102 to 105 is completed.

ここに、レール140、140はトンネル100の一箇所にのみ敷設されており、上部10b、上部30b、上部42b、スクリューコンベアユニット6、カッタユニット本体2a及びテールユニット本体4aの引き戻しについてはレール140、140を繰り返し使用して全てトンネル100を利用して行うようにする。なお、レール140、140については使用後に回収してもよいし、そのまま残してコンクリートで埋設してもよい。   Here, the rails 140 and 140 are laid only in one place of the tunnel 100, and the upper part 10b, the upper part 30b, the upper part 42b, the screw conveyor unit 6, the cutter unit main body 2a and the tail unit main body 4a are pulled back. 140 is repeatedly used to perform all using the tunnel 100. The rails 140 and 140 may be collected after use, or may be left as they are and embedded in concrete.

このように、本発明に係る掘進機の分割構造及び掘進機の引戻し方法によれば、揺動カッタ10の上部10bを本体10aから着脱自在に分割し、サブカッタ30の上側の一部と前部テール40の上部とを含む上部30bを揺動カッタ駆動部20及び本体30a並びに本体40aから着脱自在に分割し、後部テール42の上部42bを本体42aから着脱自在に分割し、さらに、揺動カッタ10の本体10a、揺動カッタ駆動部20及びサブカッタ30の本体30aからなるカッタユニット本体2aと前部テール40の本体40a及び後部テール42の本体42aからなるテールユニット本体4aとを前後方向で着脱自在に分割し、これにより掘進機1を構築したトンネル100を通り得る大きさにまで分割解体可能にしているので、分割数を最小限に抑えつつ掘進機1を掘削後において簡単に解体できるとともに、これら解体した掘進機1の上記各部分をセグメント60との干渉もなくトンネル100を通って発進位置側の立坑110まで引き戻すことができる。   Thus, according to the division structure of the excavator and the retracting method of the excavator according to the present invention, the upper part 10b of the swinging cutter 10 is detachably divided from the main body 10a, and the upper part and the front part of the sub cutter 30 are separated. The upper part 30b including the upper part of the tail 40 is detachably divided from the swinging cutter drive unit 20, the main body 30a, and the main body 40a, and the upper part 42b of the rear tail 42 is detachably split from the main body 42a. 10 a main body 10a, a swinging cutter drive unit 20 and a main body 30a of the sub-cutter 30 and a tail unit main body 4a including a main body 40a of the front tail 40 and a main body 42a of the rear tail 42 in the front-rear direction. Since it is possible to divide freely, and this allows division dismantling to a size that can pass through the tunnel 100 in which the excavator 1 is constructed, the number of divisions The excavator 1 can be easily disassembled after excavation while minimizing it, and the parts of the disassembled excavator 1 can be pulled back to the shaft 110 on the start position through the tunnel 100 without interference with the segment 60. Can do.

これにより、工事が完了するまで掘進機1を一切地上に搬出する必要がなくなり、地上スペースを必要とせず、構築したトンネル100を有効に利用して掘進機1の全部を発進位置側の立坑110まで引き戻すことができ、掘進機1を容易に再利用でき、工事費用の大幅な削減を図ることができる。
この際、カッタユニット2については、サブカッタ30の上側の一部と揺動カッタ駆動部20とを上下方向で分割するようにしているので、揺動カッタ駆動部20については細分化することなく一体回収でき、掘進機1を容易に再組立可能である。
Thereby, it is not necessary to carry out the excavator 1 to the ground until construction is completed, and no ground space is required, and the tunnel 100 that is constructed is effectively used to make the entire excavator 1 the vertical shaft 110 on the start position side. The excavator 1 can be easily reused, and the construction cost can be greatly reduced.
At this time, with respect to the cutter unit 2, the upper part of the sub-cutter 30 and the swinging cutter driving unit 20 are divided in the vertical direction, so that the swinging cutter driving unit 20 is integrated without being subdivided. The excavator 1 can be easily reassembled.

また、テールユニット4については、複数の方向制御ジャッキ44の全てが前部テール40の本体40a及び後部テール42の本体42a側、即ちテールユニット本体4a側に位置するように分割し、シール部材46を本体40aと本体42aとの間に介装するようにしているので、複数の方向制御ジャッキ44を細分化することなく一体回収でき、やはり掘進機1を容易に再組立可能である。また、複数の方向制御ジャッキ44を分離しないことで、方向制御の精度を常に一定に維持可能である。   The tail unit 4 is divided so that all of the plurality of directional control jacks 44 are located on the main body 40a side of the front tail 40 and the main body 42a side of the rear tail 42, that is, on the tail unit main body 4a side. Is interposed between the main body 40a and the main body 42a, the plurality of direction control jacks 44 can be integrally recovered without being subdivided, and the excavator 1 can be easily reassembled. Further, by not separating the plurality of direction control jacks 44, the accuracy of the direction control can always be maintained constant.

また、構築したトンネル100に引戻し用のレール140、140を敷設するとともに、少なくとも分割解体したカッタユニット本体2a及びテールユニット本体4aにそれぞれ上記レール140用のローラ142を複数仮付けし、当該ローラ142をレール140、140上で転動させてこれらカッタユニット本体2a及びテールユニット本体4a等を引き戻すようにしているので、分割解体した掘進機1の各部分を極めて容易に発進位置側の立坑110まで引き戻すことができる。   Further, the pull-back rails 140 and 140 are laid in the constructed tunnel 100, and a plurality of rollers 142 for the rail 140 are temporarily attached to at least the cutter unit main body 2a and the tail unit main body 4a, respectively. Since the cutter unit main body 2a, the tail unit main body 4a and the like are pulled back on the rails 140, 140, the parts of the divided excavator 1 can be very easily reached to the vertical shaft 110 on the start position side. Can be pulled back.

この際、トンネル100にのみレール140、140を敷設して当該レール140、140を繰り返し利用することにより、分割解体した掘進機1の各部分を効率よく発進位置側の立坑110まで引き戻すことができる。
以上で本発明に係る実施形態の説明を終えるが、実施形態は上記に限られるものではなく、発明の趣旨を逸脱しない範囲で種々変形可能である。
At this time, by laying the rails 140 and 140 only in the tunnel 100 and repeatedly using the rails 140 and 140, each part of the divided excavator 1 can be efficiently pulled back to the shaft 110 on the start position side. .
Although the description of the embodiment according to the present invention is finished above, the embodiment is not limited to the above, and various modifications can be made without departing from the spirit of the invention.

例えば、上記実施形態では、矩形断面のトンネルを掘削可能な掘進機1を例に説明したが、本発明は如何なる断面のトンネルを掘削可能な掘進機に対しても適用可能である。但し、特殊断面(矩形、楕円形、馬蹄形等)のトンネルを掘削可能な掘進機においては、その形状特性から通常の円形断面の掘進機に比べて分割単位を比較的適切に設定し易いという利点があり、本発明は当該特殊断面のトンネルを掘削可能な掘進機において特に高い効果を発揮可能である。   For example, in the above embodiment, the excavator 1 capable of excavating a tunnel having a rectangular cross section has been described as an example. However, the present invention can be applied to an excavator capable of excavating a tunnel having any cross section. However, in an excavator capable of excavating a tunnel with a special cross section (rectangular, elliptical, horseshoe-shaped, etc.), the advantage is that it is easier to set the division unit relatively appropriately than an excavator with a normal circular cross section due to its shape characteristics. Therefore, the present invention can exhibit particularly high effects in an excavator capable of excavating the tunnel having the special cross section.

また、上記実施形態では、推進式の掘進機1を例に説明したが、これに限られず、本発明はシールド掘進機に対しても同様に適用可能である。   Moreover, although the propulsion-type excavator 1 has been described as an example in the above embodiment, the present invention is not limited to this, and the present invention can be similarly applied to a shield excavator.

本発明に係る掘進機の分割構造及び掘進機の引戻し方法に適用される掘進機の縦断面図である。It is a longitudinal cross-sectional view of the excavator applied to the division structure of the excavator and the retracting method of the excavator according to the present invention. 図1の矢視A方向から視た掘進機の正面図である。It is a front view of the excavator seen from the arrow A direction of FIG. 図1に対応した掘進機の分解図である。It is an exploded view of the excavator corresponding to FIG. 図2に対応した掘進機の分解図である。FIG. 3 is an exploded view of the excavator corresponding to FIG. 2. 掘進機を解体し、当該解体した掘進機の部分を発進位置まで戻す様子を示したトンネルの縦断面図である。It is the longitudinal cross-sectional view of the tunnel which showed a mode that the excavation machine was dismantled and the part of the excavation machine disassembled was returned to the start position. 図5の矢視B方向から視たトンネルの正面図である。It is the front view of the tunnel seen from the arrow B direction of FIG. 図6のC部を拡大して示す図である。It is a figure which expands and shows the C section of FIG.

符号の説明Explanation of symbols

1 掘進機
2 カッタユニット
2a カッタユニット本体
4 テールユニット
4a テールユニット本体
6 スクリューコンベアユニット
10 揺動カッタ(メインカッタ)
10a 本体
10b 上部
20 揺動カッタ駆動部(メインカッタ駆動部)
30 サブカッタ
30a 本体
30b 上部
32 コーナカッタ
38 固定カッタ
40 前部テール
40a 本体
42 後部テール
42a 本体
42b 上部
44 方向制御ジャッキ
46 シール部材
60 セグメント
100 トンネル
110、120 立坑
130 推進装置
140 レール
142 ローラ(車輪)
DESCRIPTION OF SYMBOLS 1 Excavator 2 Cutter unit 2a Cutter unit main body 4 Tail unit 4a Tail unit main body 6 Screw conveyor unit 10 Oscillation cutter (main cutter)
10a body 10b upper part 20 swing cutter drive unit (main cutter drive unit)
30 Sub cutter 30a Main body 30b Upper part 32 Corner cutter 38 Fixed cutter 40 Front tail 40a Main body 42 Rear tail 42a Main body 42b Upper part 44 Direction control jack 46 Seal member 60 Segment 100 Tunnel 110, 120 Shaft 130 Propulsion device 140 Rail 142 Roller (wheel)

Claims (7)

掘進機を、前後寸法が構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと掘進機の掘進方向を制御する後部のテールユニットとを前後方向で着脱自在に分割するとともに、上下寸法が構築した坑の坑内上下寸法より小さくなるよう、前記カッタユニット及び前記テールユニットをそれぞれ上下方向で着脱自在に分割したことを特徴とする掘進機の分割構造。 A front cutter unit including a main cutter, a main cutter drive unit, and a sub cutter, and a rear tail unit that controls the excavation direction of the excavator so that the front and rear dimensions of the excavator are smaller than the inner pit width dimension of the constructed mine. An excavator characterized in that the cutter unit and the tail unit are detachably divided in the vertical direction so that the vertical dimension is smaller than the vertical dimension of the constructed pit in the vertical direction while being detachable in the longitudinal direction. Split structure. 前記サブカッタは前記メインカッタ駆動部の周囲に配設されており、
前記カッタユニットについては、前記メインカッタを上下方向で着脱自在に分割するとともに、前記メインカッタ駆動部と前記サブカッタの一部とを上下方向で着脱自在に分割したことを特徴とする、請求項記載の掘進機の分割構造。
The sub cutter is disposed around the main cutter driving unit,
For said cutter unit, characterized in that the addition to detachably split the main cutter vertically and detachably split a part of the said main cutter drive portion Sabukatta in the vertical direction, according to claim 1 Divided structure of the described excavator.
前記テールユニットは方向制御ジャッキを複数備え、
前記テールユニットについては、前記複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で着脱自在に分割したことを特徴とする、請求項または記載の掘進機の分割構造。
The tail unit includes a plurality of directional control jacks,
The division structure of the excavator according to claim 1 or 2 , wherein the tail unit is detachable in the vertical direction so that all of the plurality of directional control jacks are located on one side.
掘進機によって坑を構築した後、該掘進機を前後寸法が前記構築した坑の坑内幅寸法より小さくなるよう、メインカッタ、メインカッタ駆動部及びサブカッタからなる前部のカッタユニットと掘進機の掘進方向を制御する後部のテールユニットとを前後方向で分割解体するとともに上下寸法が前記構築した坑の坑内上下寸法より小さくなるよう、前記カッタユニット及び前記テールユニットを上下方向で分割解体し、該分割解体した掘進機の各部分をそれぞれ前記構築した坑内を通り得る向きに変えて該坑内を発進位置まで引き戻すことを特徴とする掘進機の引戻し方法。 After constructing the pit with the excavator, the excavator is connected to the front cutter unit including the main cutter, the main cutter drive unit, and the sub cutter, and the excavator so that the longitudinal dimension is smaller than the in-hole width dimension of the constructed mine . a rear tail unit for controlling the excavation direction with dividing dismantled in the longitudinal direction, so that the vertical dimension is less than the downhole vertical dimension of pit described above constructs, split dismantling the cutter unit and the tail unit in the vertical direction, A retracting method for an excavating machine, wherein each part of the divided excavating machine is changed to a direction in which it can pass through the constructed underground tunnel, and the interior of the tunnel is pulled back to a starting position. 前記サブカッタは前記メインカッタ駆動部の周囲に配設されており、
前記カッタユニットについては、前記メインカッタを上下方向で着脱自在に分割するとともに、前記メインカッタ駆動部と前記サブカッタの一部とを上下方向で分割解体することを特徴とする、請求項記載の掘進機の引戻し方法。
The sub cutter is disposed around the main cutter driving unit,
For said cutter unit is configured to divide detachably said main cutter in the vertical direction, and wherein the dividing dismantling a portion of the said main cutter drive portion Sabukatta in the vertical direction, according to claim 4, wherein How to retract the machine.
前記テールユニットは前記方向制御ジャッキを複数備え、
前記テールユニットについては、前記複数の方向制御ジャッキの全てが一方の側に位置するように上下方向で分割解体することを特徴とする、請求項または記載の掘進機の引戻し方法。
The tail unit includes a plurality of the direction control jacks,
The retracting method for an excavator according to claim 4 or 5 , wherein the tail unit is divided and disassembled in the vertical direction so that all of the plurality of directional control jacks are located on one side.
前記構築した坑に引戻し用のレールを敷設するとともに、少なくとも前記分割解体したカッタユニット及びテールユニットの一の部分に前記レール用の車輪を仮付けし、
該車輪を該レール上で転動させて少なくとも前記分割解体したカッタユニット及びテールユニットの一の部分を発進位置まで引き戻すことを特徴とする、請求項乃至のいずれか記載の掘進機の引戻し方法。
While laying a rail for pulling back in the constructed mine, and temporarily attaching the rail wheel to at least one part of the divided and disassembled cutter unit and tail unit,
7. The retractor of the excavator according to any one of claims 4 to 6 , characterized in that the wheel is rolled on the rail to pull back at least one part of the divided and disassembled cutter unit and tail unit to a start position. Method.
JP2005292410A 2005-10-05 2005-10-05 Dividing structure of excavator and method for retracting excavator Expired - Lifetime JP4599530B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005292410A JP4599530B2 (en) 2005-10-05 2005-10-05 Dividing structure of excavator and method for retracting excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005292410A JP4599530B2 (en) 2005-10-05 2005-10-05 Dividing structure of excavator and method for retracting excavator

Publications (2)

Publication Number Publication Date
JP2007100408A JP2007100408A (en) 2007-04-19
JP4599530B2 true JP4599530B2 (en) 2010-12-15

Family

ID=38027613

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005292410A Expired - Lifetime JP4599530B2 (en) 2005-10-05 2005-10-05 Dividing structure of excavator and method for retracting excavator

Country Status (1)

Country Link
JP (1) JP4599530B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010084396A (en) * 2008-09-30 2010-04-15 Ihi Corp Shield machine
JP5475521B2 (en) * 2010-03-30 2014-04-16 三菱重工メカトロシステムズ株式会社 Tunnel excavator
JP5705662B2 (en) * 2011-06-15 2015-04-22 株式会社奥村組 Shield excavator

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4152541B2 (en) * 1999-10-01 2008-09-17 株式会社熊谷組 Shield machine and shield method using the same
JP2003269079A (en) * 2002-03-15 2003-09-25 Daiho Constr Co Ltd How to build a tunnel
JP3840219B2 (en) * 2003-10-31 2006-11-01 株式会社奥村組 Shield excavator
JP3836467B2 (en) * 2004-03-02 2006-10-25 株式会社奥村組 Tunnel excavator

Also Published As

Publication number Publication date
JP2007100408A (en) 2007-04-19

Similar Documents

Publication Publication Date Title
JP4181980B2 (en) Tunnel construction method
JP5162316B2 (en) Tunnel excavation method
JP4599530B2 (en) Dividing structure of excavator and method for retracting excavator
KR101018889B1 (en) Horizontal drilling device and construction method of non-adhesive underpastel using the same
JP3439745B2 (en) Shield excavator and method of excavating pit with shield excavator
JP5528049B2 (en) Tunnel drilling equipment
JP2004060266A (en) Non-open-cut construction method for underground structure
JPH03176591A (en) Shield machine
JP4334954B2 (en) Method and apparatus for widening underground space
JP5066281B2 (en) Excavation method
JP3830917B2 (en) Tunnel excavator for pipe formation
JP4205123B2 (en) Open shield machine
JP2648051B2 (en) Construction method of arch shell in tunnel precedent
JP4343748B2 (en) Tunnel excavation method
JP2006037595A (en) Excavator for jacking method and jacking method
JP6746483B2 (en) Tunnel machine
JP2001280078A (en) How to excavate
JP4680678B2 (en) Tunnel widening method and widening segment used in the method
JP7465832B2 (en) Excavator
JP7465831B2 (en) Excavator
JP4629598B2 (en) Underground space widening device and underground space widening method
JP4172330B2 (en) Widening equipment and widening method for existing tunnels
JP6249620B2 (en) Widening tunnel construction method and widening shield machine
JP2024143676A (en) Box-shaped roof pipe for underpass construction
JP5066280B2 (en) Excavation mechanism

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080423

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100303

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100310

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100510

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100804

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20100831

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100831

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20100831

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131008

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4599530

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term