JP4606980B2 - Greening retaining wall block - Google Patents
[go: Go Back, main page]

JP4606980B2 - Greening retaining wall block - Google Patents

Greening retaining wall block Download PDF

Info

Publication number
JP4606980B2
JP4606980B2 JP2005270981A JP2005270981A JP4606980B2 JP 4606980 B2 JP4606980 B2 JP 4606980B2 JP 2005270981 A JP2005270981 A JP 2005270981A JP 2005270981 A JP2005270981 A JP 2005270981A JP 4606980 B2 JP4606980 B2 JP 4606980B2
Authority
JP
Japan
Prior art keywords
block
bypass
retaining wall
view
planting pot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005270981A
Other languages
Japanese (ja)
Other versions
JP2007077771A (en
Inventor
隆行 大月
修司 小野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Landes Co Ltd
Original Assignee
Landes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landes Co Ltd filed Critical Landes Co Ltd
Priority to JP2005270981A priority Critical patent/JP4606980B2/en
Publication of JP2007077771A publication Critical patent/JP2007077771A/en
Application granted granted Critical
Publication of JP4606980B2 publication Critical patent/JP4606980B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Description

本発明は、地山を切除した法面や切り通し面、河川岸壁面等に設置され、これら壁面を保護しながら緑化する擁壁ブロックの改良に関するものである。   The present invention relates to an improvement of a retaining wall block that is installed on a slope, a cut-through surface, a riverbank wall surface, or the like obtained by cutting a natural mountain and that greens while protecting these wall surfaces.

ブロック前面に棚状の植栽スペースを設けた擁壁ブロックや護岸ブロックは、従来から多種多様なものが提案されている。例えば、特許文献1に係る植栽用擁壁ブロックは、ブロック前面に段部を階段状に複数段形成したもので、現場打ちにより形成した基礎コンクリート上にブロックを据え付けた後、ブロックの背面側を土で埋め戻して地山との一体化を図ることとしている。土が充填された階段状の段部内が植栽ポットとして機能し、植物の根の張りが良好な植栽用擁壁ブロックとすることができる旨が開示されている。   Various types of retaining wall blocks and revetment blocks with shelf-like planting spaces in front of the blocks have been proposed. For example, the retaining wall block for planting according to Patent Document 1 is a step in which a plurality of steps are formed stepwise on the front surface of the block. The soil is backfilled with soil and integrated with the natural ground. It is disclosed that the inside of a stepped step portion filled with soil functions as a planting pot and can be used as a retaining wall block for planting with a good plant root tension.

確かに、こうした擁壁背面側が地山と連続するように設置した擁壁ブロックでは、植栽ポットに植えられた樹木や植物の根が直接地山に活着するから良好な植生が期待できるのであるが、反面、地山の地質によっては十分な排水が行えず、水圧が作用して擁壁・護岸面が崩壊してしまう危険性もあった。   Certainly, in the retaining wall block installed so that the back side of the retaining wall is continuous with the natural ground, good vegetation can be expected because the trees and plant roots planted in the planting pot directly settle on the natural ground. On the other hand, depending on the geology of the natural ground, sufficient drainage could not be performed, and there was a risk that the retaining wall and revetment surface would collapse due to water pressure.

すなわち、従来の一般的な緑化擁壁ブロックでは、ブロック後壁面に開口部を設けつつも、ブロック背面に砕石などの透水性の高い材料を裏込め材として層状に投入し、かつ、これら裏込め材と擁壁ブロック背面との間に吸い出し防止材を介在させるよう設置するのが通例となっている(特許文献2)。ところが、こうした施工方法においては、とくに擁壁ブロックが高温となる夏季には植栽ポット内の水分が蒸発してしまい、植物の生育が妨げられ、場合によっては枯死してしまう欠点があった。   That is, in the conventional general greening retaining wall block, an opening is provided on the rear wall surface of the block, but a highly water-permeable material such as crushed stone is introduced into the back of the block as a back-filling material, and these back-filling It is customary to install a sucking prevention material between the material and the back of the retaining wall block (Patent Document 2). However, such a construction method has a drawback that the water in the planting pot evaporates, especially during the summer when the retaining wall block is hot, and the growth of the plant is hindered, and in some cases, the plant is dead.

そこで、植栽ポット内への給水を図るべく、ブロック内背面側に雨水の集水・給水室を別途に設けておき、当該集水・給水室と客土を充填した植栽ポット内とをロープで連結することにより、ロープの毛細管現象を利用して植栽ポット内に対して雨水の供給を図る植生用ブロックが提案されている(特許文献3)。この植生用ブロックでは、ブロック背面側に砕石等の裏込め材を用いて透水性を確保しつつも、普段からブロック内の集水・給水室内に溜め置きしておいた雨水を植栽ポットへ供給しながら植物の良好な成育による緑化を図ることができることになる。   Therefore, in order to supply water to the planting pot, a rainwater collection / water supply room is separately provided on the back side of the block, and the water collection / water supply room and the planting pot filled with the customer's soil are provided. A vegetation block has been proposed in which rainwater is supplied to the inside of a planting pot by connecting with a rope using the capillary phenomenon of the rope (Patent Document 3). In this vegetation block, rainwater stored in the water collection / water supply room in the block is regularly transferred to the planting pot while using a backfill material such as crushed stone on the back side of the block to ensure water permeability. It will be possible to plan planting with good growth of plants while supplying.

特開平10−8480号公報(請求項1、図5)Japanese Patent Laid-Open No. 10-8480 (Claim 1, FIG. 5) 特開2003−313889号公報([0003]、図6)JP 2003-313889 A ([0003], FIG. 6) 特開2000−104268号公報(特許請求の範囲)JP 2000-104268 A (Claims)

前記特許文献3に係る植生用ブロック等によって、緑化擁壁ブロックにおける緑化不足の原因の一つである水分不足についてはある程度改善されてきたものの、植物の十分な成育を図るためにはそもそも植栽ポット内に充填される土量が不足しているとの指摘がある。しかるに、緑化擁壁ブロック自体の大きさに制約されて植栽ポットの容積を拡大するには限界があるし、前記特許文献1のように擁壁ブロック背面側を地山と連続させてしまうと、前述のように地山の透水性を損なって擁壁自体が崩落する危険性を生じてしまう欠点があった。   Although the lack of water, which is one of the causes of lack of greening in the greening retaining wall block, has been improved to some extent by the vegetation block and the like according to Patent Document 3, planting in the first place in order to achieve sufficient growth of the plant There are indications that there is not enough soil to fill the pot. However, there is a limit to expand the volume of the planting pot constrained by the size of the greening retaining wall block itself, and when the rear surface of the retaining wall block is made continuous with the natural ground as in Patent Document 1 above. As mentioned above, there is a drawback that the permeability of the natural ground is impaired and the retaining wall itself is liable to collapse.

本発明はこうした事情に鑑みてなされたものであり、その課題とするところは、従来工法どおりに裏込め材を用いて擁壁部分の透水性を確保しつつも、植栽ポット内に植生した植物成育に十分な土量確保と水分補給を可能とする緑化擁壁ブロックを提供することにある。   This invention is made | formed in view of such a situation, The place made into the subject was vegetated in the planting pot, ensuring the water permeability of a retaining wall part using a backfill material like a conventional construction method. The purpose of the present invention is to provide a greening retaining wall block capable of securing sufficient soil volume and hydration for plant growth.

前記所期の課題解決を図るため、本発明に係る緑化擁壁ブロックでは、ブロック本体の前壁面寄りに配設された植栽ポットから連続するバイパス部を、その後端開口部がブロック本体後壁面側に位置するよう延設した。擁壁ブロックの背面側に層状に投入される裏込め材を横断し、ブロック内の植栽ポットから地山までを直接に連結するバイパス部に後述する貯水ポットや延長バイパス部を設けることで、植栽ポットに植えられた樹木等の根を地山まで十分に導くことができるようにしたのである。 In order to solve the expected problem, in the greening retaining wall block according to the present invention, the bypass portion continuous from the planting pot disposed near the front wall surface of the block body is provided, and the rear end opening portion is the rear wall surface of the block body. It extended so that it might be located in the side. By crossing the backfilling material thrown in layers on the back side of the retaining wall block, by providing a water storage pot and an extension bypass part described later in the bypass part that directly connects the planting pot in the block to the natural ground, The roots of trees and the like planted in the planting pot can be sufficiently guided to the natural ground.

本発明における擁壁ブロック本体は、上面が開放したボックス状のブロックなど、従来から提供されている緑化用ブロックであれば様々な形状のものを採用しうる。こうした緑化用ブロックにおける植栽ポットはできるだけその前壁面寄りに配設されるのが通例であるところ、本発明におけるバイパス部は背面地山と植栽ポットがつながるようにブロック本体の後壁面側に後端開口部が位置していればよいので、必ずしも植栽ポットの最後端からバイパス部を連続させなくてもよく、植栽ポットの左右側壁面寄りの位置や底面からバイパス部を延設することにしてもよい。また、バイパス部を2本以上に分割して横方向に並設することにしてもよい。   The retaining wall block main body in the present invention can adopt a variety of shapes as long as it is a conventional greening block such as a box-shaped block having an open upper surface. The planting pot in such a greening block is usually arranged as close to the front wall as possible, but the bypass portion in the present invention is on the rear wall side of the block body so that the back ground mountain and the planting pot are connected. Since the rear end opening only needs to be positioned, the bypass portion does not necessarily have to be continuous from the rearmost end of the planting pot, and the bypass portion is extended from the position near the left and right side walls or the bottom surface of the planting pot. You may decide. Moreover, you may decide to divide a bypass part into 2 or more, and to arrange in parallel in the horizontal direction.

前記バイパス部は、擁壁ブロックの背面に層状に形成される裏込め材を横断して背面地山まで到達する必要上、ブロック本体後壁面側より背面地山方向に突出するように形成されるのが一般的ではあるが、バイパス部の後端開口部と同一面をなす最後壁を設けることによりバイパス部を擁壁ブロックの本体内に収めてしまい、前記後壁と植栽ポット背面の後壁面との間に裏込め材を投入保持させるよう形成してもよい。   The bypass part is formed so as to protrude from the rear wall surface side of the block main body toward the back ground in order to cross the backfill material formed in layers on the back of the retaining wall block and reach the back ground. Although it is general, the rear wall is placed in the main body of the retaining wall block by providing the last wall that is flush with the rear end opening of the bypass portion, and the rear wall and the back of the planting pot You may form so that a backfilling material may be thrown in between and a wall surface.

また、前記バイパス部は、胴部が完全に閉塞された筒状のもののほか、擁壁内を透過する雨水を受けるように一部又は全部をポーラスコンクリートにより形成したものや、少なくとも上面にスリット長孔又は複数個の透孔等を備えた筒状のものなども採用しうるが、上面が開放した受け溝状に形成することで、施工時の土の投入が容易になるし、より一層雨水を受けやすくなる。また、ブロックを上下方向に多段に積み重ね設置することにより形成された緑化擁壁より内側に位置する裏込め材内を雨水排水が縦横無尽に流れやすくするため、バイパス部は、上面の少なくとも一部分がブロック本体上面より低い位置にあるように形成したり、底面の少なくとも一部分がブロック本体底面より高い位置にあるように形成したり、あるいは横方向に抜ける切り欠きを設けるように形成できる。   The bypass part may be a cylindrical part whose body part is completely closed, a part or all of which is made of porous concrete so as to receive rainwater that passes through the retaining wall, and at least a slit length on the upper surface. Cylindrical ones with holes or a plurality of through-holes can also be adopted, but by forming a receiving groove shape with an open upper surface, it becomes easier to throw in soil at the time of construction, and rainwater further It becomes easy to receive. In addition, in order to make it easy for rainwater drainage to flow in the backfilling material located inside the greening retaining wall formed by stacking the blocks in multiple stages in the vertical direction, at least a part of the upper surface of the bypass section It can be formed so as to be at a position lower than the top surface of the block body, formed so that at least a part of the bottom surface is located at a position higher than the bottom surface of the block body, or provided with a notch that extends laterally.

そして、バイパス部には、植栽ポットとの境界から後端開口部までの間、とくにその後端部分、すなわち擁壁ブロック外部の温度変化を受けにくく乾燥しにくい場所である最も背面地山に近い部分において、余剰水を蓄えるための貯水ポットを設けるのであるAnd in the bypass part, it is close to the back ground, which is the place between the boundary with the planting pot and the rear end opening, especially the rear end part, that is, the place where it is difficult to be subject to temperature change outside the retaining wall block and is difficult to dry. in part, it is to provide a water pot for storing excess water.

さらに、ブロック背面に投入される裏込め材の層厚にかかわらずバイパス部の後端開口部を背面地山に到達させるべく、バイパス部の長さを適宜選択しうるように、前記バイパス部をブロック本体とは別体としつつ、ブロック本体後壁面に穿設された開口に接続されるよう構成することができる。あるいは、前述のように、バイパス部の後端開口部がブロック本体後壁面に位置するように形成しておきながら、さらにその後端開口部に接続される延長バイパスを設けるのであるFurther, the bypass portion is arranged so that the length of the bypass portion can be appropriately selected so that the rear end opening of the bypass portion reaches the back ground regardless of the layer thickness of the backfilling material put on the back of the block. While being separate from the block body, it can be configured to be connected to an opening formed in the rear wall surface of the block body. Alternatively, as described above, while the rear end opening of the bypass portion is previously formed so as to be located in the block body after the wall is of providing an extension bypass which is further connected to the rear end opening.

また、前記バイパス部は、その断面形状が底面方向に先細りとなるよう、側壁面を傾斜形成することができる。例えば、断面V字形、断面U字型などに形成しておけば、本発明に係る緑化擁壁ブロックを多段に積み重ね設置した際には、上段に位置するブロックのバイパス部の最底面と、下段に位置するブロックのバイパス部の最上面との間には、下段側に投入された土が露出するような隙間を確保することができるし、裏込め材として用いられる砕石等を上方から投入してもバイパス部の底面側にまで砕石等が回り込みやすくなるのである。   Further, the bypass portion can be formed with an inclined side wall surface so that the cross-sectional shape thereof is tapered in the bottom surface direction. For example, if the greening retaining wall block according to the present invention is stacked and installed in multiple stages if it is formed in a V-shaped section, a U-shaped section, etc., the bottom surface of the bypass portion of the block located in the upper stage, and the lower stage Between the uppermost surface of the bypass part of the block located at the bottom, a gap can be secured so that the soil thrown into the lower stage is exposed, and crushed stone used as a backfill material is thrown in from above. Even so, crushed stones and the like can easily reach the bottom surface of the bypass portion.

本発明に係る緑化擁壁ブロックでは、バイパス部を設けることによって砕石等の裏込め材層を貫通するように、ブロック前面寄りの植栽ポットから背面地山に至るまで連続した植生土を配することができるので、植物の生育に十分な土量を確保することができるし、根の成長を妨げることなく背面地山まで導いて十分に活着させることも期待できる。また、背面地山まで連続した植生土の存在は、植栽ポットを孤立させないので、背面地山からの水分供給が図られるし、バイパス部上に位置する裏込め材としての砕石等が緑化擁壁ブロックのカウンターとして作用するので、擁壁の安定性をより向上させることができる。   In the greening retaining wall block according to the present invention, continuous vegetation soil is arranged from the planting pot near the front of the block to the back ground so as to penetrate the backfilling material layer such as crushed stone by providing a bypass part. Therefore, it is possible to secure a sufficient amount of soil for the growth of the plant, and it can be expected to lead to the back ground without damaging the growth of the roots and to be fully alive. In addition, the presence of vegetation soil that continues to the back ground does not isolate the planting pot, so water can be supplied from the back ground, and crushed stones as backfill materials located on the bypass section can be greened. Since it acts as a counter for the wall block, the stability of the retaining wall can be further improved.

とくにバイパス部を受け溝状に形成し、その上面の少なくとも一部分をブロック本体上面より低い位置にあるようにしたり、その底面の少なくとも一部分をブロック本体底面より高い位置にあるようにしたり、あるいは横方向の切り欠きを設けることで、擁壁内側の裏込め材層内における横方向の連続した排水を確保しつつ、各バイパス部への雨水供給を可能とすることができる。ここで、バイパス部の植栽ポットとの境界から後端開口部までの間に貯水ポットを設けたので、雨水の余剰水を蓄えることができて乾燥時における植栽の立ち枯れを防ぐことができる。 In particular, the bypass portion is formed in a receiving groove shape, and at least a part of the upper surface thereof is located at a position lower than the upper surface of the block body, or at least a part of the bottom surface thereof is located at a position higher than the bottom surface of the block body. By providing the notch, it is possible to supply rainwater to each bypass portion while securing continuous drainage in the lateral direction in the backfilling material layer inside the retaining wall. Here, since the water storage pot is provided between the boundary with the planting pot of the bypass part and the rear end opening, it is possible to store excess water of rainwater and prevent planting from withering during drying. .

また、バイパス部自体の長さを適宜選択したり、バイパス部の後端開口部にさらに延長バイパス部を設けた場合には、裏込め材の層厚にかかわらず、緑化擁壁ブロックの設置現場条件に応じて植栽ポットと背面地山間を確実に連続させることができる。   In addition, when the length of the bypass section itself is appropriately selected or an extended bypass section is provided at the rear end opening of the bypass section, the installation site of the greening retaining wall block is used regardless of the layer thickness of the backfill material. Depending on the conditions, the planting pot and the back ground mountain can be reliably continued.

さらにまた、バイパス部の断面形状を底面方向に先細りとなるように形成すれば、ブロックを多段に積み上げ設置する際に上方から投入した砕石等がバイパス部底面側にまで回り込み易くなるので、各段毎の転圧・均しが不要となり、裏込め材設置作業の効率化を図ることができる。   Furthermore, if the cross-sectional shape of the bypass part is tapered in the bottom direction, the crushed stones, etc. thrown from the top when the blocks are stacked and installed in multiple stages can easily reach the bottom of the bypass part. There is no need for rolling and leveling every time, and the efficiency of the backfill material installation work can be improved.

以下、図面にしたがって本発明を詳細に説明する。図1及び図2は本発明に係る緑化擁壁ブロックの基礎となる参考例を示すもので、図1は斜視図、図2(a)は同ブロックの平面図、図2(b)は同ブロックの背面図、図2(c)は同ブロックの右側面図である。図示された例のブロックでは、ブロック本体Bの前壁1寄りに配設された植栽ポット2から連続する2本のバイパス部3,3を、その後端開口部31,31がブロック本体Bから突出するように、後壁面4側から背面方向に延設している。各図に示されるように、バイパス部3は上面が開放した凹字形の受け溝状に形成されており、その突出長さは背面側の裏込め材の層厚に応じて設定される。 Hereinafter, the present invention will be described in detail with reference to the drawings. 1 and 2 intended to indicate a reference example underlying the greening retaining wall block according to the present invention, FIG. 1 is a perspective view, FIG. 2 (a) is a plan view of the block, FIG. 2 (b) FIG. 2C is a rear view of the block, and FIG. 2C is a right side view of the block. In the block of the example shown in the figure, the two bypass parts 3 and 3 that are continuous from the planting pot 2 disposed near the front wall 1 of the block body B are connected to the block body B, and the rear end openings 31 and 31 are connected to the block body B. It extends in the back direction from the rear wall surface 4 side so as to protrude. As shown in each drawing, the bypass portion 3 is formed in a concave-shaped receiving groove shape with an open upper surface, and the protruding length is set according to the layer thickness of the backside backing material.

図3は、図1の例の緑化擁壁ブロックの施工状態を示す側面図である。地山Gを斜めに切除した法面に対して施工される緑化擁壁ブロック本体Bは、基礎コンクリートK上において多段に積み上げ設置されることになるが、従来工法どおりに、地山Gとブロック本体Bとの間には砕石等の裏込め材Sが層状に配設され、植栽ポット2に緑化用植物Pが植栽されることになる。   FIG. 3 is a side view showing a construction state of the green retaining wall block of the example of FIG. The greening retaining wall block body B, which is constructed on the slope where the natural ground G is cut diagonally, is piled up and installed on the foundation concrete K in multiple stages. Between the main body B, the backfilling material S such as crushed stone is arranged in a layered manner, and the planting plant P is planted in the planting pot 2.

図4は、図3の施工状態にあるブロックを背面(地山側)からみた図である。ブロック本体Bから突出したバイパス部3には植栽ポット2内と同じように植生土Tが充填され背面の地山Gまで到達しているので、左右(水平)方向に離隔して存在するバイパス部3,3の間において各々角柱状に裏込め材Sが充填されることになる。   FIG. 4 is a view of the block in the construction state of FIG. 3 as seen from the back (natural ground side). The bypass part 3 protruding from the block body B is filled with the vegetation soil T in the same manner as in the planting pot 2 and reaches the ground ground G on the back side, so that the bypass exists in the left and right (horizontal) direction. The backfilling material S is filled in a prismatic shape between the portions 3 and 3.

図5は、図4におけるX−X線断面図である。各ブロック本体B内に充填された植生土Tが植栽ポット2からバイパス部3を経て地山Gまで連続しているために、植栽ポット2に植えられた緑化用植物P等の植物の根P1が地山Gに至るまで成長している様子が示されている。   5 is a cross-sectional view taken along line XX in FIG. Since the vegetation soil T filled in each block body B is continuous from the planting pot 2 to the natural ground G via the bypass part 3, the plant such as the planting plant P planted in the planting pot 2. The state where the root P1 has grown up to the natural mountain G is shown.

図6(a)ないし(d)は、先の図1に示したブロックにおけるバイパス部を背面中間位置に一つだけ設けた例を示した図である。本例のブロックは、多段に千鳥積みにすると、図7に示されるように各バイパス部3と裏込め材Sが上下方向に交互に位置し、バイパス部3の開放した上面にある植生土Tが裏込め材Sと接するようになるため、裏込め材S内を流下していく雨水排水が容易にバイパス部3によって受け溜められる利点がある。   FIGS. 6A to 6D are views showing an example in which only one bypass portion in the block shown in FIG. If the block of this example is staggered in multiple stages, as shown in FIG. 7, the bypass portions 3 and the backfill material S are alternately positioned in the vertical direction, and the vegetation soil T on the open upper surface of the bypass portion 3 Since it comes into contact with the backfill material S, there is an advantage that rainwater drainage flowing down through the backfill material S can be easily received by the bypass portion 3.

図8(a)ないし(d)は、先の図1に示したブロックにおけるバイパス部の後端開口部と同一面をなす最後壁を設けた例を示した図である。すなわち、ブロック本体Bの後壁面4から延設した2本のバイパス部3,3における後端開口部31,31と同一平面をなすように最後壁51,52,53が設けられたブロックである。植栽ポット2から連続する2本のバイパス部3,3の後端開口部31,31が地山Gに接続される点は先の図1の例の緑化擁壁ブロックと同じであるが、前記最後壁51,52,53の存在によって、実質的にバイパス部3,3は緑化擁壁ブロック本体B内に収まってしまったような態様となり、後壁面4とバイパス部3,3そして最後壁51,52,53によって囲繞された充填用空間61,62,63内に裏込め材S
が投入保持されることになるわけである。
FIGS. 8A to 8D are views showing an example in which a rearmost wall that is flush with the rear end opening of the bypass portion in the block shown in FIG. 1 is provided. That is, the block is provided with the rearmost walls 51, 52, 53 so as to be flush with the rear end openings 31, 31 in the two bypass parts 3, 3 extending from the rear wall 4 of the block body B. . The point that two rear end openings 31, 31 continuous from the planting pot 2 are connected to the natural ground G is the same as the green retaining wall block in the example of FIG. Due to the presence of the rear walls 51, 52, 53, the bypass parts 3, 3 are substantially confined in the green retaining wall block main body B. The rear wall surface 4, the bypass parts 3, 3 and the rear wall Backfilling material S is filled in the filling spaces 61, 62, 63 surrounded by 51, 52, 53.
Is input and held.

図9ないし図10は、それぞれバイパス部上面の少なくとも一部分をブロック本体上面より低い位置にあるように形成した例を示した図である。先ず、図9(a)ないし(d)に示される緑化擁壁ブロックは、ブロック本体Bの前壁1寄りに配設された植栽ポット2を横長直方体状とし、当該植栽ポット2の後壁面4の下寄り2か所に設けられた開口38,38より2本に分離されたバイパス部3,3を延設している。各バイパス部3,3は、先の例と同様に上面が開放した凹字形の受け溝状に形成されているが、その側壁32の高さは植栽ポット2の高さのおよそ半分程度である。   9 to 10 are views showing examples in which at least a part of the upper surface of the bypass portion is formed at a position lower than the upper surface of the block main body. First, the greening retaining wall block shown in FIGS. 9 (a) to 9 (d) has a planting pot 2 disposed near the front wall 1 of the block body B as a horizontally long rectangular parallelepiped, Bypass portions 3 and 3 separated into two from openings 38 and 38 provided at two positions below the wall surface 4 are extended. Each of the bypass portions 3 and 3 is formed in a concave receiving groove shape having an open upper surface as in the previous example, but the height of the side wall 32 is about half of the height of the planting pot 2. is there.

次に、図10(a)ないし(d)に示される緑化擁壁ブロックでは、こうした2本のバイパス部を1本に統合し、中央に補強壁41を立設して左右2つに区画しながらも、ブロック本体後壁面4の全幅に亘る広幅で薄いバイパス部3としている。バイパス部3における両側壁32,32や補強壁41の高さが植栽ポット2の高さの約半分程度にとどまっているため、設置時においてはバイパス部3内に充填された植生土の上に裏込め材Sが層状に充填されることになるので、隣接設置された緑化擁壁ブロックの裏込め材S同士が左右(水平)方向に連続することとなり、擁壁背面の雨水は横流し的に排水されながらバイパス部3内の植生土に吸収されていくことになる。したがって、本例の緑化擁壁ブロックでは、先の図10に示された緑化擁壁ブロックに比べてバイパス部3が広い面積で雨水排水を受けられるほか、バイパス部3が植栽ポット2と接続している開口部38も広いので緑化用植物の根を地山へと導きやすいという利点がある。   Next, in the greening retaining wall block shown in FIGS. 10 (a) to 10 (d), these two bypass portions are integrated into one, and a reinforcing wall 41 is erected at the center and divided into two on the left and right. However, the wide and thin bypass portion 3 is formed over the entire width of the rear wall surface 4 of the block body. Since the height of the side walls 32, 32 and the reinforcing wall 41 in the bypass section 3 is only about half of the height of the planting pot 2, the top of the vegetation soil filled in the bypass section 3 is installed. Since the backfill material S is filled in layers, the backfill materials S of the greening retaining wall blocks installed adjacent to each other are continuous in the left-right (horizontal) direction, and the rain water on the back of the retaining wall is laterally flowing. It is absorbed by the vegetation soil in the bypass part 3 while being drained by the water. Therefore, in the greening retaining wall block of this example, the bypass part 3 can receive rainwater drainage in a larger area than the greening retaining wall block shown in FIG. 10 and the bypass part 3 is connected to the planting pot 2. Since the opening 38 is wide, there is an advantage that the root of the planting plant can be easily guided to the natural ground.

一方、図11(a)ないし(d)に示される緑化擁壁ブロックは、基本形状は先の図1に示した例のブロックと同じであるが、2本のバイパス部3,3の側壁32,32を下降傾斜するようにカットしている点が相違している。したがって、これらのブロックを法面等に多段に積み重ねて設置すると、必ず上下段のバイパス部3間に隙間ができるので、裏込め材S内を流下する雨水排水がバイパス部3の存在に妨げられることなく、左右方向にも流れやすくなるのである。   On the other hand, the greening retaining wall block shown in FIGS. 11 (a) to 11 (d) has the same basic shape as the block of the example shown in FIG. 1, but the side walls 32 of the two bypass parts 3 and 3 are the same. , 32 is cut in a downward slope. Accordingly, when these blocks are stacked in a multi-stage on a slope or the like, a gap is always formed between the upper and lower bypass sections 3, so that rainwater drainage flowing down the backfill material S is hindered by the presence of the bypass section 3. It will be easier to flow in the left and right direction.

図12および図13は、それぞれバイパス部底面の少なくとも一部をブロック本体底面より高い位置にあるように形成した例を示した図である。先の図9ないし図11の例と同様に、多段設置した上下ブロックの各バイパス部3,3間に隙間を確保し、裏込め材S内を流下する雨水が左右方向にも流れやすくなるよう配慮したものである。具体的には、図12(a)ないし(d)に示される緑化擁壁ブロックは、植栽ポット2の後壁面4の上辺2か所に設けられた切り欠きよりバイパス部3,3を延設している。各バイパス部3,3は、先の例と同様に上面が開放した凹字形の受け溝状に形成されているが、その側壁32の高さを植栽ポット2の高さのおよそ半分程度としつつ、植栽ポット2の後壁面4の上寄りに偏った位置から延設することで、バイパス部3,3の下方に空間を確保しているのである。一方、図13(a)ないし(d)に示される緑化擁壁ブロックは、基本形状は先の図1に示した例のブロックと同じであるが、2本のバイパス部3,3の側壁32,32を上昇傾斜するようにカットしている点が相違している。   12 and 13 are diagrams showing examples in which at least a part of the bottom surface of the bypass portion is formed to be higher than the bottom surface of the block main body. As in the example of FIGS. 9 to 11 above, a gap is secured between the bypass sections 3 and 3 of the upper and lower blocks installed in multiple stages so that rainwater flowing down the backfill material S can easily flow in the left-right direction. It is a consideration. Specifically, the greening retaining wall block shown in FIGS. 12 (a) to 12 (d) extends the bypass parts 3 and 3 from the notches provided at the two upper sides of the rear wall 4 of the planting pot 2. Has been established. Each of the bypass portions 3 and 3 is formed in a concave receiving groove shape having an open top surface as in the previous example, but the height of the side wall 32 is about half of the height of the planting pot 2. On the other hand, the space is secured below the bypass parts 3 and 3 by extending from a position biased to the upper side of the rear wall surface 4 of the planting pot 2. On the other hand, the greening retaining wall block shown in FIGS. 13 (a) to 13 (d) has the same basic shape as the block of the example shown in FIG. 1, but the side walls 32 of the two bypass parts 3 and 3 are the same. , 32 is different in that it is cut so as to incline upward.

図14は、バイパス部の下側において横方向に抜ける切り欠きを設けた例を示した図である。本例のブロックにあっても、上下方向に多段に積み重ねて設置した際には、千鳥積みによらなくても上下ブロックの各バイパス部3,3間において切り欠き部33に相当する隙間が確保されることになるので、裏込め材S内を流下する雨水が左右方向にも流れやすくなるわけである。具体的には、図14(a)ないし(d)に示されるように、先の図12に示された例の緑化擁壁ブロックにおけるバイパス部3の後端を下方に屈曲させた形状とすることで、結果的に当該バイパス部3後端屈曲部分と植栽ポット2の後壁面4との間に切り欠き部33を確保している。なお、ブロック設置時にあっては、前記切り欠き部33内に対しても裏込め材Sが充填されることになる。   FIG. 14 is a view showing an example in which a notch that extends in the lateral direction is provided on the lower side of the bypass portion. Even in the case of the block of this example, when it is stacked and installed in multiple stages in the vertical direction, a gap corresponding to the notch 33 is secured between the bypass parts 3 and 3 of the upper and lower blocks without using staggered stacking. Therefore, the rain water flowing down in the backfill material S can easily flow in the left-right direction. Specifically, as shown in FIGS. 14A to 14D, the rear end of the bypass portion 3 in the greening retaining wall block of the example shown in FIG. 12 is bent downward. As a result, a notch 33 is secured between the bent portion of the rear end of the bypass portion 3 and the rear wall surface 4 of the planting pot 2. When the block is installed, the backfill material S is also filled into the notch 33.

図15および図16は、バイパス部の後端に貯水ポットを設けた本発明の実施例を示した図である。直射日光や外気の温度変化による影響を最も受けにくいバイパス部3,3の後端に、裏込め材S内を流下する雨水排水を貯留しておくための貯水ポット36を設けて、植栽植物の根への水分供給の一助としている。具体的には、図15(a)ないし(e)に示される実施例では、バイパス部3の後端部分に前仕切り壁34と後仕切り壁35を離隔して立設し、両仕切り壁間を貯水ポット36としている。そのため、貯水ポット36の容積は、前記各仕切り壁34,35の高さと離隔距離を調節することによって適宜設定することができる。また、図16(a)ないし(e)に示される実施例では、先の図14に示された緑化擁壁ブロックにおけるバイパス部3後端に仕切り壁37を立設することにより、当該仕切り壁37の内側を貯水ポット36としている。したがって、本例の緑化擁壁ブロックを多段に設置した場合には、雨水排水は、切り欠き部33を通過しながら裏込め材層内を縦横無尽に流下しつつ、貯水ポット36内にも貯留することになる。 15 and 16 are views showing an embodiment of the present invention in which a water storage pot is provided at the rear end of the bypass portion. A water storage pot 36 for storing rainwater drainage flowing down the backfill material S is provided at the rear ends of the bypass parts 3 and 3 that are least affected by direct sunlight and temperature changes of the outside air. It helps to supply moisture to the roots. Specifically, in the embodiment shown in to FIG. 15 (a) no (e), to stand by separating the rear partition wall 35 and the front partition wall 34 to the rear end portion of the bypass section 3, both the partition walls Is a water storage pot 36. Therefore, the volume of the water storage pot 36 can be appropriately set by adjusting the height and the separation distance of the partition walls 34 and 35. Further, in the embodiment shown in Figures 16 (a) (e), by upright partition wall 37 in the bypass section 3 rear of greening retaining wall blocks shown in the previous figures 14, the partition wall The inside of 37 is a water storage pot 36. Therefore, when the greening retaining wall block of this example is installed in multiple stages, rainwater drainage flows through the notch 33 and flows down the backfilling material layer in a vertical and horizontal manner, and is also stored in the water storage pot 36. Will do.

図17ないし図19は、いずれもバイパス部の長さ調節を可能とした本発明に係る緑化擁壁ブロックを示した斜視図である。バイパス部の長さをブロック設置現場の状況に応じて伸縮させることで、植栽ポットと背面地山間を確実に連結できるようにした。具体的には、図17に示される実施例では、植栽ポット2における後壁面4に対して2か所に切り欠き43,43を設け、これら切り欠き43,43に対して、概略U字溝状をしたバイパス部3,3を挿脱自在に嵌合している。また、図18に示される実施例では、前記切り欠き43,43に代えて植栽ポット2の後壁面4に2か所の透孔42,42を穿設し、該透孔42,42内に概略U字溝状をしたバイパス部3,3を挿脱自在に嵌挿している。これらのバイパス部3,3は、いずれも植栽ポット2とは完全に別体となったものであるが、図19に示される実施例のように、植栽ポット2からバイパス部3,3を延設するとともに、該バイパス部3,3に内挿した延長バイパス7,7を進退させることによって、植栽ポット2と背面地山との連結調節を可能としているFIGS. 17 to 19 are perspective views showing a greening retaining wall block according to the present invention in which the length of the bypass portion can be adjusted. By expanding and contracting the length of the bypass portion according to the situation of the block installation site, the planting pot and the back ground were able to be reliably connected. Specifically, in the embodiment shown in FIG. 17, cutouts 43 and 43 are provided at two places on the rear wall surface 4 in the planting pot 2, and the cutouts 43 and 43 are roughly U-shaped. The groove-like bypass portions 3, 3 are detachably fitted. Further, in the embodiment shown in FIG. 18, two through holes 42, 42 are formed in the rear wall surface 4 of the planting pot 2 instead of the notches 43, 43, and the inside of the through holes 42, 42 is formed. The bypass portions 3 and 3 each having a substantially U-shaped groove are inserted in a freely detachable manner. Although these bypass parts 3 and 3 are all separated from the planting pot 2, the bypass parts 3 and 3 are separated from the planting pot 2 as in the embodiment shown in FIG. 19. as well as extending the, by advancing and retracting the extension bypass 7,7 with interpolation of the said bypass section 3,3, are as enabling ligation adjustment of the planting pot 2 and the back ground mountain.

図20は、バイパス部の断面形状を底面方向に先細りとなるように形成した緑化擁壁ブロックを示した図である。図示されるように、植栽ポット2の後壁面4から延設されるバイパス部3,3を背面視略V字形に形成することで、ブロックを多段に積み上げ設置する際、上方から落下投入した裏込め材Sとしての砕石等がバイパス部3底面側にまで自然に回り込み易くなるので、各段毎の転圧・均し作業が不要となり、裏込め材S設置作業の効率化を図ることができるわけである。したがって、背面視略V字形とする具体的な角度については裏込め材として用いる砕石等の安息角以上の勾配に設定するのが最も望ましいことになるが、例えば側壁面を湾曲させたり多段に角度を変えて傾斜させたりなど、少なくとも砕石等がバイパス部3底面側に回り込み易い先細り形状を採用するだけでも各段毎の転圧・均し作業を軽減できることになる。 Figure 20 is a diagram showing the greening retaining wall blocks formed to have a tapered cross-sectional shape of the bypass portion toward the bottom. As shown in the figure, when the bypass parts 3 and 3 extending from the rear wall surface 4 of the planting pot 2 are formed in a substantially V shape when viewed from the back, when the blocks are stacked and installed in multiple stages, they are dropped from above. Since crushed stone or the like as the backfilling material S easily goes naturally to the bottom surface side of the bypass portion 3, the rolling and leveling work for each stage is unnecessary, and the efficiency of the backfilling material S installation work can be improved. It can be done. Therefore, it is most desirable to set the specific angle of the substantially V shape in the rear view to a gradient equal to or greater than the repose angle of crushed stone used as a backfill material. It is possible to reduce the rolling and leveling work for each stage simply by adopting a tapering shape in which at least crushed stones or the like are easy to go around to the bottom surface side of the bypass part 3 such as changing the slope.

本発明に係る緑化擁壁ブロックの基礎となる参考例を示した斜視図である。It is the perspective view which showed the reference example used as the foundation of the greening retaining wall block which concerns on this invention. 図1のブロックの平面図(a)、背面図(b)および右側面図(c)である。It is the top view (a), back view (b), and right view (c) of the block of FIG. 図1の参考例の緑化擁壁ブロックの施工状態を示す側面図である。It is a side view which shows the construction state of the greening retaining wall block of the reference example of FIG. 図3の施工状態にあるブロックを背面(地山側)からみた図である。It is the figure which looked at the block in the construction state of FIG. 3 from the back surface (natural ground side). 図4におけるX−X線断面図である。It is XX sectional drawing in FIG. 先の図1に示したブロックにおけるバイパス部を背面中間位置に一つだけ設けた本発明に係る緑化擁壁ブロックの基礎となる他の参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。The perspective view (a) which showed the other reference example used as the foundation of the greening retaining wall block based on this invention which provided only one bypass part in the back intermediate position in the block shown in previous FIG. 1, the top view (b ), Rear view (c) and right side view (d). 図6の参考例の緑化擁壁ブロックの施工状態をブロック背面(地山側)からみた図である。It is the figure which looked at the construction state of the greening retaining wall block of the reference example of FIG. 6 from the back surface (natural ground side) of the block. 先の図1に示したブロックにおけるバイパス部の後端開口部と同一面をなす最後壁を設けた緑化擁壁ブロックの参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Previous perspective view showing a reference example of greening retaining wall block having a final wall forming the rear end opening portion of the same surface of the bypass section in the block shown in FIG. 1 (a), a plan view (b), rear It is a figure (c) and a right side view (d). バイパス部上面の少なくとも一部分をブロック本体上面より低い位置にあるように形成した緑化擁壁ブロックの参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Perspective view at least a portion showing a reference example of the formed green of retaining wall blocks to be lower than the block body upper surface position of the bypass portion upper surface (a), a plan view (b), rear view (c) and right It is a surface view (d). バイパス部上面の少なくとも一部分をブロック本体上面より低い位置にあるように形成した緑化擁壁ブロックのさらに他の参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Further perspective view showing another reference example of greening retaining wall blocks formed of at least a portion to be lower than the block body upper surface position of the bypass portion upper surface (a), a plan view (b), rear view (c ) And right side view (d). バイパス部上面の少なくとも一部分をブロック本体上面より低い位置にあるように形成した緑化擁壁ブロックのさらに他の参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Further perspective view showing another reference example of greening retaining wall blocks formed of at least a portion to be lower than the block body upper surface position of the bypass portion upper surface (a), a plan view (b), rear view (c ) And right side view (d). バイパス部底面の少なくとも一部分をブロック本体底面より高い位置にあるように形成した緑緑化擁壁ブロックの参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Perspective view at least a portion showing a reference example of the formed green greening retaining wall blocks to be higher than the block body bottom position of the bypass portion bottom (a), a plan view (b), rear view (c) and right It is a surface view (d). バイパス部底面の少なくとも一部分をブロック本体底面より高い位置にあるように形成した緑緑化擁壁ブロックの他の参考例を示した斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。 Green greening retaining walls another perspective view showing a reference example of blocks forming at least a portion to be higher than the block body bottom position of the bypass portion bottom (a), a plan view (b), rear view (c) It is a right side view (d). バイパス部の下側において横方向に抜ける切り欠きを設けた緑化擁壁ブロックの参考例を示す斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。It is a perspective view (a), a plan view (b), a rear view (c), and a right side view (d) showing a reference example of a greening retaining wall block provided with a cutout extending laterally on the lower side of the bypass part. . バイパス部の後端に貯水ポットを設けた本発明に係る緑化擁壁ブロックの実施例を示す斜視図(a)、平面図(b)、背面図(c)、右側面図(d)およびY−Y線破断斜視図(e)である。A perspective view (a), a plan view (b), a rear view (c), a right side view (d) and Y showing an embodiment of a greening retaining wall block according to the present invention in which a water storage pot is provided at the rear end of the bypass portion -Y line fracture perspective view (e). バイパス部の後端に貯水ポットを設けた本発明に係る緑化擁壁ブロックの他の実施例を示す斜視図(a)、平面図(b)、背面図(c)、右側面図(d)およびZ−Z線破断斜視図(e)である。Perspective view (a), plan view (b), rear view (c), right side view (d) showing another embodiment of the greening retaining wall block according to the present invention provided with a water storage pot at the rear end of the bypass part FIG. 5 is a perspective view (e) taken along the line Z-Z. バイパス部の長さ調節を可能とした本発明に係る緑化擁壁ブロックの実施例を示した斜視図である。 Example greening retaining wall block according to the present invention which enables length adjustment of the bypass section is a perspective view of the. バイパス部の長さ調節を可能とした本発明に係る緑化擁壁ブロックの他の実施例を示した斜視図である。Another embodiment of the greening retaining wall block according to enable the the present invention the length adjustment of the bypass section is a perspective view of the. バイパス部の長さ調節を可能とした本発明に係る緑化擁壁ブロックのさらに他の実施例を示した斜視図である。Yet another embodiment of the greening retaining wall block according to the present invention which enables length adjustment of the bypass section is a perspective view of the. バイパス部の断面形状を底面方向に先細りとなるように形成した緑化擁壁ブロックの斜視図(a)、平面図(b)、背面図(c)および右側面図(d)である。Perspective view of the greening retaining wall blocks formed to have a tapered cross-sectional shape of the bypass portion toward the bottom (a), a plan view (b), rear view (c) and right side view (d).

1 前壁
2 植栽ポット
3 バイパス部
4 後壁面
31 後端開口部
32 バイパス部側壁
33 切り欠き部
34 前仕切り壁
35 後仕切り壁
36 貯水ポット
37 仕切り壁
38 開口
41 補強壁
42 透孔
43 切り欠き
51,52,53 最後壁
61,62,63 充填用空間
7 延長バイパス
B ブロック本体
K 基礎コンクリート
P 緑化用植物
S 裏込め材(砕石)
T 植生土
G 地山
P1 植物の根
1 Front wall 2 Planting pot 3 Bypass section 4 Rear wall
31 Rear end opening
32 Bypass side wall
33 Notch
34 Front partition wall
35 Rear partition wall
36 water pot
37 partition wall
38 opening
41 Reinforcement wall
42 Through-hole
43 Notch
51,52,53 Last wall
61,62,63 Filling space 7 Extended bypass B Block body K Foundation concrete P Planting plant S Backfill material (crushed stone)
T Vegetation soil G Ground mountain P1 Plant root

Claims (2)

ブロック本体の前壁面寄りに配設された植栽ポットから連続して上面が開放した受け溝状に形成されたバイパス部を、その後端開口部がブロック本体後壁面側に位置するよう延設されてなる擁壁ブロックにおいて、
該バイパス部の植栽ポットとの境界から後端開口部までの間に貯水ポットを備えてなることを特徴とする緑化擁壁ブロック。
A bypass portion front wall surface closer continuously from disposed a planting pot on the upper surface is formed on the receiving groove which is open in the block body, the rear end opening is extended to be located after the block body wall surface in ing Te retaining wall block,
A greening retaining wall block comprising a water storage pot between a boundary between the bypass pot and a planting pot and a rear end opening .
バイパス部は、その後端開口部に連続して接続される上面が開放した受け溝状に形成された延長バイパス部を備えてなる請求項1記載の緑化擁壁ブロック。 The greening retaining wall block according to claim 1, wherein the bypass portion includes an extended bypass portion formed in a receiving groove shape having an open upper surface continuously connected to the rear end opening.
JP2005270981A 2005-09-16 2005-09-16 Greening retaining wall block Expired - Fee Related JP4606980B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005270981A JP4606980B2 (en) 2005-09-16 2005-09-16 Greening retaining wall block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005270981A JP4606980B2 (en) 2005-09-16 2005-09-16 Greening retaining wall block

Publications (2)

Publication Number Publication Date
JP2007077771A JP2007077771A (en) 2007-03-29
JP4606980B2 true JP4606980B2 (en) 2011-01-05

Family

ID=37938364

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005270981A Expired - Fee Related JP4606980B2 (en) 2005-09-16 2005-09-16 Greening retaining wall block

Country Status (1)

Country Link
JP (1) JP4606980B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071094A (en) * 2017-11-15 2018-05-25 深圳市华茂建设工程有限公司 A kind of construction method of protective slope structure

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5097249B2 (en) * 2010-07-30 2012-12-12 共和ハーモテック株式会社 Drain structure and construction method of drain structure
CN102561370B (en) * 2012-03-29 2014-12-10 中铁第四勘察设计院集团有限公司 Protective structure for reinforcing high-liquid-limit soil slope

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55148828A (en) * 1980-02-28 1980-11-19 Takeshige Shimonohara Hollow concrete block
JPS5719425A (en) * 1980-07-10 1982-02-01 Takeshige Shimonohara Hollow concrete block
JPH0395273U (en) * 1990-01-16 1991-09-27
JPH11117313A (en) * 1997-10-16 1999-04-27 Toei Shoko Kk Protection block for surface of slope
JP2003003498A (en) * 2001-06-21 2003-01-08 Fuji Koatsu Concrete Kk Block for greening wall, and structure of retaining wall and the like, using the block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071094A (en) * 2017-11-15 2018-05-25 深圳市华茂建设工程有限公司 A kind of construction method of protective slope structure

Also Published As

Publication number Publication date
JP2007077771A (en) 2007-03-29

Similar Documents

Publication Publication Date Title
US6715965B2 (en) Retaining wall blocks and retaining walls constructed from such blocks
KR102311276B1 (en) Tonal binding plate with improved drainage function
JP4606980B2 (en) Greening retaining wall block
JP3565222B2 (en) Green block and green block wall
KR20100092837A (en) Plantable block and a plantable retaining wall construction method which uses the plantable block
KR100886746B1 (en) Eco-friendly vegetation wire mesh basket revetment method
KR20160043305A (en) Block for engineering works
KR101124639B1 (en) Vegetation Block
KR20110012788A (en) Greening Gebion and its construction method
KR101046650B1 (en) Planting structure, Revetment having the Planting structure and building method of the Revetment
JPH08120693A (en) Retaining wall
KR200442424Y1 (en) Retaining Wall Block for Vegetation
KR101055295B1 (en) Rural block construction method using grid integrated vegetation wire basket and grid integrated vegetation wire basket
JP2000170184A (en) Concrete block for retaining wall, and retaining wall
KR200486017Y1 (en) Eco vegetation block
JP2007002427A (en) Slope greening structure and method of constructing the same
JP2007303251A (en) Construction method for greening accelerating retaining wall and bypass member used in the method
JPH09285229A (en) Method of supplying liquid to plant growing on slope, gabion for growing plant used on slope, slope structure using the same, sheet member for growing plant used on slope and use thereof Slope structure
JPWO2006021987A1 (en) Vegetation retaining wall
JP2000038733A (en) Vegetating concrete block
JP3406304B2 (en) Rooftop greening equipment
KR200352991Y1 (en) A structure of block for inclination face
KR100777386B1 (en) Exterior wall greening structure of building
JP2005200953A (en) Slope face seeding and planting retaining wall structure
JPH11315541A (en) Vegetation block and slope face protection using the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080828

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100618

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100629

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100728

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100907

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101006

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131015

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees