Energy supply system Download PDF

Info

Publication number
JP4614809B2
JP4614809B2 JP2005103153A JP2005103153A JP4614809B2 JP 4614809 B2 JP4614809 B2 JP 4614809B2 JP 2005103153 A JP2005103153 A JP 2005103153A JP 2005103153 A JP2005103153 A JP 2005103153A JP 4614809 B2 JP4614809 B2 JP 4614809B2
Authority
JP
Japan
Prior art keywords
past
usage status
load
hot water
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005103153A
Other languages
Japanese (ja)
Other versions
JP2006288037A (en
Inventor
桂嗣 滝本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2005103153A priority Critical patent/JP4614809B2/en
Publication of JP2006288037A publication Critical patent/JP2006288037A/en
Application granted granted Critical
Publication of JP4614809B2 publication Critical patent/JP4614809B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、前記運転制御手段が、熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムに関する。   The present invention is provided with a combined heat and power device for generating heat and electric power, and an operation control means for controlling the operation of the combined heat and power device, the operation control means being a past load for a heat load and a power load. Data management process for managing data for a plurality of past unit periods in a state where the data is divided into unit periods in the order of passage of time, and based on past load data managed in the data management process, A predicted load calculation process for obtaining predicted load data for a thermal load and a power load within the target unit period, and an operation process for performing a planned operation of the combined heat and power unit based on the predicted load data. Energy supply system.

上記したような構成のエネルギ供給システムは、需要家に対して熱及び電力のエネルギを供給するためのものであるが、このようなエネルギ供給システムにおいて、従来では、次のように構成したものがあった。   The energy supply system having the above-described configuration is for supplying heat and electric energy to consumers. Conventionally, in such an energy supply system, the following configuration is conventionally used. there were.

すなわち、前記運転制御手段が、前記データ管理処理において、1日を前記単位期間として設定して、過去の複数の日についての全ての過去負荷データを対象としてデータ管理しながら、発生する順に1週間の各曜日に対応する7つのグループに分類する状態で記憶するように構成され、前記予測負荷演算処理においては、計画運転の対象となる対象単位期間としての予測日と同じ曜日に対応するグループ別に分類されて管理される過去負荷データと予測日の前日の過去負荷データとを用いて、予測日における熱負荷及び電力負荷についての予測負荷データを求めるように構成したものがあった(例えば、特許文献1参照。)。   That is, in the data management process, the operation control unit sets one day as the unit period, and manages data for all past load data for a plurality of past days. Are stored in a state of being classified into seven groups corresponding to each day of the week, and in the predicted load calculation process, for each group corresponding to the same day of the week as the predicted date as the target unit period to be the target of planned operation There is a configuration in which the predicted load data for the thermal load and the power load on the prediction date is obtained using the past load data classified and managed and the previous load data on the day before the prediction date (for example, patents) Reference 1).

特開2004−48838号公報JP 2004-48838 A

上記従来構成においては、過去の複数の日における全ての過去負荷データを対象としてデータ管理しながら、予測日における熱負荷及び電力負荷についての予測負荷データを求める構成となっていることから、次のような不利があった。   In the above-described conventional configuration, while the data management is performed for all past load data in a plurality of past days, the predicted load data for the thermal load and the power load on the predicted date is obtained. There was such a disadvantage.

すなわち、この種のエネルギ供給システムでは、需要家が毎日規則正しい生活パターンで生活するとは限らないものであるが、予測負荷データを求めるのに用いられる過去負荷データが計測された過去の日において、需要家が普段の生活パターンとは異なる生活をしていることがある。
例えば、来客があるために本来は4人家族であるにも拘わらず当日は7人の在宅者がいるという場合や、月曜日が祝日であるために通常の休日と同様の生活パターンで月曜日を過ごすという場合や、出かけていて不在である場合など、需要家の生活パターンが通常とは異なる特異な日になっていることがある。
In other words, in this type of energy supply system, consumers do not always live in a regular lifestyle pattern every day, but in the past days when past load data used to calculate predicted load data is measured, The house may have a different lifestyle than normal.
For example, if there are 7 guests who are originally a family of 4 because there are visitors, or if Monday is a holiday, spend the Monday in the same lifestyle pattern as a normal holiday In some cases, such as when you are out and you are away, the lifestyle pattern of the customer may be unusual and unusual.

しかし、上記従来構成においては、過去の複数の日における全ての過去負荷データを対象としてデータ管理するようになっているので、上述したような特異な日における過去負荷データであってもそのまま用いることになるから、前記予測負荷演算処理において熱負荷及び電力負荷についての予測負荷データを求めるのに適切ではない過去負荷データが含まれることになり、求められた予測負荷データが需要家における実際のエネルギ消費状況とは大きく異なる不適切なものになるおそれがある。   However, in the above conventional configuration, data management is performed for all past load data on a plurality of past days, so even the past load data on a specific day as described above can be used as it is. Therefore, in the predicted load calculation process, past load data that is not appropriate for obtaining predicted load data for the thermal load and the power load is included, and the obtained predicted load data is the actual energy in the consumer. There is a risk that it may become inappropriate, significantly different from the consumption situation.

本発明の目的は、実際のエネルギ消費状況に極力対応する状態で、熱負荷及び電力負荷についての予測負荷データを求めることが可能となるエネルギ供給システムを提供する点にある。   An object of the present invention is to provide an energy supply system capable of obtaining predicted load data for a thermal load and a power load in a state corresponding as much as possible to an actual energy consumption state.

本発明に係るエネルギ供給システムは、熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、前記運転制御手段が、熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているものであって、
その第1特徴構成は、前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて浴槽に風呂湯張りを行う風呂湯張り手段を備え、
前記使用状況関連データ収集手段が、風呂湯張り時刻を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の風呂湯張り時刻について、その風呂湯張り時刻が他の過去の複数の単位期間の風呂湯張り時刻の平均値と比較して特異であるか否かを判定するように構成されている点にある。
An energy supply system according to the present invention is provided with a cogeneration device that generates heat and electric power together, and an operation control unit that controls the operation of the cogeneration device, and the operation control unit includes a heat load and electric power. Based on the past load data managed in the data management process, the data management process for managing the past load data for the load for a plurality of past unit periods in a state in which the unit periods are sorted in the order of time passage, Predictive load calculation processing for obtaining predicted load data for a thermal load and an electric power load within a target unit period that is a target of planned operation, and an operation processing for planned operation of the combined heat and power supply apparatus based on the predicted load data are executed. Which is configured as follows:
The first characteristic configuration is that the usage status related data for collecting the actual usage status related data directly or indirectly related to at least one of the heat usage status and the power usage status by the customer for each of the plurality of past unit periods. Data collection means are provided,
For the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is actually used for a plurality of other past unit periods. It is configured to execute a usage status related data determination process that determines whether or not it is unique compared to the status related data,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data ;
A bath hot water filling means for bathing the bathtub with hot water stored in a hot water storage device for storing hot water with heat generated by the combined heat and power supply device;
The usage status related data collecting means is configured to collect bath hot water filling time as the actual usage status related data,
In the usage status related data determination process, the operation control unit is configured to set the bath hot water time of each of the past plurality of unit periods to the bath hot water time of other past unit periods. It is in the point which is comprised so that it may determine whether it is peculiar compared with an average value .

第1特徴構成によれば、運転制御手段は、使用状況関連データ判定処理を実行することによって、使用状況関連データ収集手段によって収集される過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する。すなわち、需要家の生活パターンが通常とは異なる特異な生活パターンである単位期間であるか否かを判定するのである。   According to the first characteristic configuration, the operation control means executes the usage status related data determination process, and the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection means. It is determined whether or not the actual usage status related data is unique as compared with the actual usage status related data of a plurality of other past unit periods. That is, it is determined whether or not the consumer life pattern is a unit period that is a peculiar life pattern different from the normal one.

そして、運転制御手段は、予測負荷演算処理において、過去の複数の単位期間のうちで特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、予測電力負荷及び予測熱負荷を求めるようにしたので、上述したような需要家の生活パターンが通常とは異なる特異な生活パターンであった単位期間における過去負荷データは、予測負荷データを求めるための対象から除外されることになり、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。   Then, the operation control means, in the predicted load calculation process, based on the past load data in the plurality of unit periods excluding the unit period determined to be unique among the plurality of past unit periods, Since the predicted heat load is obtained, the past load data in the unit period in which the life pattern of the consumer as described above is a peculiar life pattern different from normal is excluded from the target for obtaining the predicted load data. Thus, the predicted load data can be appropriately obtained in a state that does not greatly differ from the actual energy consumption situation in the consumer.

従って、実際のエネルギ消費状況に極力対応する状態で、熱負荷及び電力負荷についての予測負荷データを求めることが可能となるエネルギ供給システムを提供できるに至った。
又、第1特徴構成によれば、運転制御手段は、過去の複数の単位期間夫々の風呂湯張り時刻について、その風呂湯張り時刻が他の過去の複数の単位期間の風呂湯張り時刻の平均値と比較して特異であるか否かを判定するのである。
前記風呂湯張り時刻が前記平均値から大きく離れている場合、例えば、普段の生活パターンであれば湯張り時刻が午後6時頃であるのに対して午後12時頃になる等、大きく離れている場合には、普段の生活パターンとは異なる特異な生活パターンであるから、このような単位期間における過去負荷データを除外することで、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。
Accordingly, it has become possible to provide an energy supply system capable of obtaining predicted load data for the thermal load and the power load in a state corresponding as much as possible to the actual energy consumption state.
Further, according to the first characteristic configuration, the operation control means, for each of the plurality of unit bath periods in the past, has an average of the bath bathing times of the other plurality of unit periods in the past. It is determined whether or not it is unique by comparing with the value.
If the hot water bathing time is far from the average value, for example, in the case of a normal life pattern, the hot water bathing time is around 6:00 pm compared to around 12:00 pm If it is, it is a unique life pattern that is different from the normal life pattern. By excluding the past load data in such a unit period, the predicted load data is significantly different from the actual energy consumption situation in the consumer. It can be obtained appropriately without any problems.

本発明の第2特徴構成は、熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、前記運転制御手段が、計測された熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムであって、
前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて浴槽に風呂湯張りを行う風呂湯張り手段を備え、
前記使用状況関連データ収集手段が、風呂湯張り回数を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の風呂湯張り回数について、その風呂湯張り回数が他の過去の複数の単位期間の風呂湯張り回数の平均値と比較して特異であるか否かを判定するように構成されている点にある。
A second characteristic configuration of the present invention is provided with a combined heat and power device that generates heat and electric power, and an operation control unit that controls the operation of the combined heat and power device. The past load data for the load and the power load is managed for a plurality of past unit periods in a state where the past load data is divided into unit periods in the order of passage of time, and the past load data managed by the data management process Based on a predicted load calculation process for obtaining predicted load data for a thermal load and a power load within a target unit period that is a target of the planned operation, and an operation process for performing a planned operation of the combined heat and power unit based on the predicted load data An energy supply system configured to perform
For each of the past plurality of unit periods, usage status related data collecting means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by a consumer is provided,
For the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is actually used for a plurality of other past unit periods. It is configured to execute a usage status related data determination process that determines whether or not it is unique compared to the status related data,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data;
A bath hot water filling means for bathing the bathtub with hot water stored in a hot water storage device for storing hot water with heat generated by the combined heat and power supply device;
The usage status related data collection means is configured to collect the number of hot water bathing as the actual usage status related data,
In the usage status related data determination process, the operation control means is configured such that the number of times of bath hot water for each of the plurality of past unit periods is the number of times of bath hot water for the other past unit periods. It is in the point which is comprised so that it may determine whether it is peculiar compared with an average value .

第2特徴構成によれば、運転制御手段は、使用状況関連データ判定処理を実行することによって、使用状況関連データ収集手段によって収集される過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する。すなわち、需要家の生活パターンが通常とは異なる特異な生活パターンである単位期間であるか否かを判定するのである。
そして、運転制御手段は、予測負荷演算処理において、過去の複数の単位期間のうちで特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、予測電力負荷及び予測熱負荷を求めるようにしたので、上述したような需要家の生活パターンが通常とは異なる特異な生活パターンであった単位期間における過去負荷データは、予測負荷データを求めるための対象から除外されることになり、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。
従って、実際のエネルギ消費状況に極力対応する状態で、熱負荷及び電力負荷についての予測負荷データを求めることが可能となるエネルギ供給システムを提供できるに至った。
又、第2特徴構成によれば、運転制御手段は、過去の複数の単位期間夫々の風呂湯張り回数について、その風呂湯張り回数が他の過去の複数の単位期間の風呂湯張り回数の平均値と比較して特異であるか否かを判定するのである。
単位期間の風呂湯張り回数が前記平均値から大きく離れている場合、例えば、平均値が複数の単位期間の風呂湯張り回数の平均値が、単位期間(1日)内で1回の湯張り回数であるのに対して、単位期間内に2〜3回の湯張り回数になっている場合であれば、普段の生活パターンとは異なる特異な生活パターンであるから、このような単位期間における過去負荷データを除外することで、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。
According to the second feature configuration, the operation control means executes the usage status related data determination process, and the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection means. It is determined whether or not the actual usage status related data is unique as compared with the actual usage status related data of a plurality of other past unit periods. That is, it is determined whether or not the consumer life pattern is a unit period that is a peculiar life pattern different from the normal one.
Then, the operation control means, in the predicted load calculation process, based on the past load data in the plurality of unit periods excluding the unit period determined to be unique among the plurality of past unit periods, Since the predicted heat load is obtained, the past load data in the unit period in which the life pattern of the consumer as described above is a peculiar life pattern different from normal is excluded from the target for obtaining the predicted load data. Thus, the predicted load data can be appropriately obtained in a state that does not greatly differ from the actual energy consumption situation in the consumer.
Accordingly, it has become possible to provide an energy supply system capable of obtaining predicted load data for the thermal load and the power load in a state corresponding as much as possible to the actual energy consumption state.
Further, according to the second feature configuration, the operation control means is configured such that the number of bath hot water fillings for each of a plurality of past unit periods is an average of the number of bath hot water fillings for a plurality of other past unit periods. It is determined whether or not it is unique by comparing with the value.
In the case where the number of bath hot water bathing per unit period is far from the average value, for example, the average value of the bath hot water bathing times for a plurality of unit periods is one hot water bathing within the unit period (1 day). This is a unique life pattern that is different from the normal life pattern if the number of times of hot water filling is 2 to 3 times within the unit period. By excluding the past load data, it is possible to appropriately obtain the predicted load data in a state that does not greatly differ from the actual energy consumption situation in the consumer.

本発明の第3特徴構成は、熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、
前記運転制御手段が、計測された熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムであって、
前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、
前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記使用状況関連データ収集手段が、前記過去負荷データのうちの電力負荷を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々について、設定時間毎の電力負荷を時系列的に前後で比較してその差の絶対値を演算し、演算した絶対値の実積算値を求めるように構成され、且つ、その求めた実積算値と他の過去の複数の単位期間についての実積算値の平均値と比較して特異であるか否かを判定するように構成されている点にある。
The third characteristic configuration of the present invention is provided with a cogeneration device that generates heat and electric power together, and an operation control means for controlling the operation of the cogeneration device,
A data management process in which the operation control means manages past load data for the measured thermal load and electric power load for a plurality of unit periods in the past in a state in which each unit period is sorted in the order of passage of time, and the data management Based on the past load data managed in the process, based on the predicted load calculation process for obtaining the predicted load data for the thermal load and the power load in the target unit period that is the target of the planned operation, and the predicted load data An energy supply system configured to execute an operation process for planned operation of the cogeneration device,
For each of the past plurality of unit periods, usage status related data collecting means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by a consumer is provided,
The operation control means is
For the actual usage status related data of each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is compared with the actual usage status related data of the other past plurality of unit periods. Is configured to execute usage-related data determination processing for determining whether or not it is unique,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data;
The usage status related data collecting means is configured to collect a power load of the past load data as the actual usage status related data,
The operation control means, in the usage status related data determination process, for each of the plurality of past unit periods, to calculate the absolute value of the difference by comparing the power load for each set time in chronological order, It is configured to calculate the actual integrated value of the calculated absolute value, and whether the calculated actual integrated value is unique compared to the average value of the actual integrated values for other past unit periods It is in the point comprised so that it may determine .

第3特徴構成によれば、運転制御手段は、使用状況関連データ判定処理を実行することによって、使用状況関連データ収集手段によって収集される過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する。すなわち、需要家の生活パターンが通常とは異なる特異な生活パターンである単位期間であるか否かを判定するのである。
そして、運転制御手段は、予測負荷演算処理において、過去の複数の単位期間のうちで特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、予測電力負荷及び予測熱負荷を求めるようにしたので、上述したような需要家の生活パターンが通常とは異なる特異な生活パターンであった単位期間における過去負荷データは、予測負荷データを求めるための対象から除外されることになり、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。
従って、実際のエネルギ消費状況に極力対応する状態で、熱負荷及び電力負荷についての予測負荷データを求めることが可能となるエネルギ供給システムを提供できるに至った。
又、第3特徴構成によれば、運転制御手段は、過去の複数の単位期間夫々について、設定時間毎の電力負荷を時系列的に前後で比較してその差の絶対値を演算し、演算した絶対値の実積算値を求め、且つ、その求めた実積算値と他の過去の複数の単位期間についての実積算値の平均値と比較して特異であるか否かを判定するのである。
前記電力負荷の設定時間毎の時系列的な変化の状態が平均値と比べて異なっていると、普段の生活パターンとは異なる特異な生活パターンであるから、このような単位期間における過去負荷データを除外することで、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。
According to the third feature configuration, the operation control means executes the usage status related data determination process, and the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection means. It is determined whether or not the actual usage status related data is unique as compared with the actual usage status related data of a plurality of other past unit periods. That is, it is determined whether or not the consumer life pattern is a unit period that is a peculiar life pattern different from the normal one.
Then, the operation control means, in the predicted load calculation process, based on the past load data in the plurality of unit periods excluding the unit period determined to be unique among the plurality of past unit periods, Since the predicted heat load is obtained, the past load data in the unit period in which the life pattern of the consumer as described above is a peculiar life pattern different from normal is excluded from the target for obtaining the predicted load data. Thus, the predicted load data can be appropriately obtained in a state that does not greatly differ from the actual energy consumption situation in the consumer.
Accordingly, it has become possible to provide an energy supply system capable of obtaining predicted load data for the thermal load and the power load in a state corresponding as much as possible to the actual energy consumption state.
Further, according to the third feature configuration, the operation control means calculates the absolute value of the difference by comparing the power load for each set time in a time series before and after each of a plurality of past unit periods. The actual integrated value of the absolute value obtained is obtained, and the obtained actual integrated value is compared with the average value of the actual integrated values for a plurality of other past unit periods to determine whether or not it is unique. .
If the state of the time-series change for each set time of the power load is different from the average value, it is a unique life pattern different from the normal life pattern, so the past load data in such a unit period By excluding “”, it is possible to appropriately obtain the predicted load data in a state that does not greatly differ from the actual energy consumption situation in the consumer.

本発明の第4特徴構成は、第1特徴構成〜第3特徴構成のいずれかに加えて、
前記使用状況関連データ収集手段が、前記過去負荷データのうちの電力負荷を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の電力負荷について、その電力負荷が他の過去の複数の単位期間の電力負荷の平均値と比較して特異であるか否かを判定するように構成されている点にある。
In addition to any of the first feature configuration to the third feature configuration, the fourth feature configuration of the present invention,
The usage status related data collecting means is configured to collect a power load of the past load data as the actual usage status related data,
In the usage status related data determination process, the operation control unit compares the power load of each of the past plurality of unit periods with an average value of the power loads of other past unit periods. It is in the point comprised so that it may determine whether it is peculiar.

第4特徴構成によれば、運転制御手段は、過去の複数の単位期間夫々の電力負荷について、その電力負荷が他の過去の複数の単位期間の電力負荷の平均値と比較して特異であるか否かを判定するのである。   According to the fourth characteristic configuration, the operation control means is unique for the power load of each of the past plurality of unit periods as compared with the average value of the power loads of the other past unit periods. It is determined whether or not.

前記電力負荷が前記平均値から大きく離れている場合、例えば、前記電力負荷が前記平均値に対して約半分になったり、あるいは、2倍以上になる等、電力負荷が大きく異なるときは、普段の生活パターンとは異なる特異な生活パターンであるから、このような単位期間における過去負荷データを除外することで、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。   When the power load is greatly different from the average value, for example, when the power load is greatly different, such as when the power load is about half of the average value or more than twice, Because it is a peculiar life pattern that is different from the daily life pattern, by excluding the past load data in such a unit period, the predicted load data is appropriate in a state that does not greatly differ from the actual energy consumption situation in the consumer. Can be requested.

本発明の第特徴構成は、第1特徴構成〜第特徴構成のいずれかに加えて、
水又は前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて得られる温水を供給する給水及び給湯装置を備え、
前記使用状況関連データ収集手段が、前記過去の複数の単位期間夫々の前記水及び前記温水の少なくとも一方の実供給量について、その実供給量が他の過去の複数の単位期間の実供給量の平均値と比較して特異であるか否かを判定するように構成されている点にある。
In addition to any of the first feature configuration to the fourth feature configuration, the fifth feature configuration of the present invention includes:
Water supply or hot water supply device for supplying hot water obtained using hot water stored in water or hot water storage device that stores hot water by heat generated in the combined heat and power supply device,
For the actual supply amount of at least one of the water and the hot water in each of the plurality of past unit periods, the usage status related data collection means is an average of the actual supply amounts of other past unit periods. The point is that it is configured to determine whether or not it is singular compared to the value.

特徴構成によれば、運転制御手段は、過去の複数の単位期間夫々の前記水及び前記温水の少なくとも一方の実供給量について、その実供給量が他の過去の複数の単位期間の実供給量の平均値と比較して特異であるか否かを判定するのである。 According to the fifth characteristic configuration, the operation control means has the actual supply amount of at least one actual supply amount of each of the past plurality of unit periods and the actual supply amount of the other plurality of past unit periods. It is judged whether it is peculiar compared with the average value of quantity.

すなわち、単位期間内の水及び温水の少なくとも一方の実供給量が前記平均値から大きく離れている場合、例えば、普段の生活パターンにおける実供給量に対して、約半分になったり、あるいは、2倍以上になる等大きく異なるときは、普段の生活パターンとは異なる特異な生活パターンであるから、このような単位期間における過去負荷データを除外することで、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。   That is, when the actual supply amount of at least one of water and warm water within the unit period is far from the average value, for example, the actual supply amount is about half of the actual supply amount in a normal life pattern, or 2 When it is significantly different, such as more than twice, it is a unique life pattern that is different from the normal life pattern, so by excluding the past load data in such a unit period, the predicted load data is the actual energy in the consumer. It can be obtained appropriately in a state that does not greatly differ from the consumption situation.

本発明の第特徴構成は、第1特徴構成〜第特徴構成のいずれかに加えて、
前記運転制御手段が、
前記使用状況関連データ判定処理において、前記過去の複数の単位期間のうち、前記実使用状況データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、前記実使用状況データが特異であると判定された単位期間における過去負荷データの代用とする過去負荷データを求めるように構成されている点にある。
In addition to any of the first to fifth feature configurations, the sixth feature configuration of the present invention includes:
The operation control means is
In the usage status related data determination process, based on past load data in a plurality of unit periods excluding a unit period in which the actual usage status data is determined to be unique among the plurality of past unit periods, The configuration is such that the past load data is obtained as a substitute for the past load data in the unit period in which the actual usage status data is determined to be unique.

特徴構成によれば、運転制御手段は、過去の複数の単位期間のうち、特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、特異であると判定された単位期間における過去負荷データの代用とする過去負荷データを求めるようにしたので、過去の実際のエネルギ消費状況をできるだけ反映した状態で予測負荷データを求めることができ、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。 According to the sixth feature configuration, the operation control means is peculiar based on past load data in a plurality of unit periods excluding a unit period determined to be peculiar among a plurality of past unit periods. Since the past load data is obtained as a substitute for the past load data in the determined unit period, the predicted load data can be obtained in a state reflecting the past actual energy consumption as much as possible. It can be obtained appropriately in a state that does not differ greatly from the actual energy consumption situation at home.

本発明の第特徴構成は、第特徴構成に加えて、前記運転制御手段が、前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間よりも前の7日間の過去負荷データの平均値にて代用するように構成されている点にある。 According to a seventh feature configuration of the present invention, in addition to the sixth feature configuration, the operation control means in the unit period determined to be unique with the unit period as one day in the use state-related data determination process. Instead of the past load data, the average value of the past load data for seven days before the unit period determined to be unique among the plurality of past unit periods is substituted. It is in.

特徴構成によれば、特異であると判定された日(単位期間)の過去負荷データの代用として、特異であると判定された単位期間よりも前の7日間の単位期間の過去負荷データの平均値を用いるようにしている。つまり、一般家庭においては、毎日の生活パターンは、1週間を単位として周期的に変化している場合が多く、しかも、熱や電力の消費状況は季節の変化等の時間の経過に伴って徐々に変化するものであるから、前の7日間の単位期間の過去負荷データの平均値を用いることで、実際のエネルギ消費状況に極力近い状態で予測負荷データを求めることができ、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。 According to the seventh feature configuration, the past load data of the unit period of 7 days before the unit period determined to be unique as a substitute for the past load data of the day (unit period) determined to be specific The average value is used. In other words, in ordinary households, the daily life pattern often changes periodically in units of one week, and the consumption of heat and power gradually increases with the passage of time such as seasonal changes. Therefore, by using the average value of the past load data of the unit period of the previous seven days , the predicted load data can be obtained in a state as close as possible to the actual energy consumption state. It can be obtained appropriately in a state that does not greatly differ from the actual energy consumption situation in the consumer.

本発明の第特徴構成は、第特徴構成〜第5特徴構成のいずれかに加えて、前記運転制御手段が、前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間の前日における過去負荷データにて代用するように構成されている点にある。 According to an eighth feature configuration of the present invention, in addition to any one of the first feature configuration to the fifth feature configuration , the operation control unit is unique with the unit period as one day in the use state related data determination process. Instead of the past load data in the unit period determined to be present, the past load data on the day before the unit period determined to be unique among the plurality of past unit periods is substituted. In the point.

特徴構成によれば、特異であると判定された日(単位期間)の過去負荷データの代用として、その特異であると判定された日の前日の過去負荷データを用いるようにしている。つまり、一般家庭においては、毎日の生活パターンはそれほど大きく変化することは少ないが、熱や電力の消費状況は季節の変化等の時間の経過に伴って徐々に変化するものであり、前日の過去負荷データは予測負荷データの対象となる対象単位期間のエネルギ消費状況に近いと考えられる。そこで、前日の過去負荷データを代用することで、実際のエネルギ消費状況に極力近い状態で予測負荷データを求めることができ、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。 According to the eighth characteristic configuration, the past load data of the day before the date determined to be peculiar is used as a substitute for the past load data of the day (unit period) determined to be peculiar. In other words, in daily life, daily life patterns rarely change so much, but the consumption of heat and electricity changes gradually over time, such as seasonal changes, and the past day's past The load data is considered to be close to the energy consumption status of the target unit period that is the target of the predicted load data. Therefore, by substituting the previous load data of the previous day, the predicted load data can be obtained in a state as close as possible to the actual energy consumption status, and the predicted load data is not significantly different from the actual energy consumption status at the consumer. It can be determined appropriately according to the condition.

本発明の第特徴構成は、第特徴構成〜第5特徴構成のいずれかに加えて、前記運転制御手段が、前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間の7日前における過去負荷データにて代用するように構成されている点にある。 According to a ninth feature configuration of the present invention, in addition to any one of the first feature configuration to the fifth feature configuration , the operation control unit is unique with the unit period as one day in the use state related data determination process. Instead of the past load data in the unit period determined to be, the past load data in the past 7 days before the unit period determined to be unique among the plurality of unit periods is substituted. There is in point.

特徴構成によれば、特異であると判定された日(単位期間)の過去負荷データの代用として、その特異であると判定された日の7日前の過去負荷データを用いるようにしている。つまり、一般家庭においては、毎日の生活パターンは、1週間を単位として周期的に変化している場合が多いので、7日前の過去負荷データは予測負荷データの対象となる対象単位期間のエネルギ消費状況に近いと考えられる。そこで、7日前の過去負荷データを代用することで、実際のエネルギ消費状況に極力近い状態で予測負荷データを求めることができ、予測負荷データを需要家における実際のエネルギ消費状況と大きく異なることのない状態で適切に求めることができる。 According to the ninth feature configuration, the past load data of 7 days before the date determined to be peculiar is used as a substitute for the past load data of the day (unit period) determined to be peculiar. . That is, in ordinary households, the daily life pattern often changes periodically in units of one week, so the past load data seven days ago is the energy consumption of the target unit period that is the target of the predicted load data. It is considered close to the situation. Therefore, by substituting the past load data of 7 days ago , the predicted load data can be obtained in a state as close as possible to the actual energy consumption status, and the predicted load data is greatly different from the actual energy consumption status in the consumer. It can be obtained appropriately in the absence.

以下、本発明に係るエネルギ供給システムの一例としてのコージェネレーションシステムの実施形態について図面に基づいて説明する。
このコージェネレーションシステムは、図1及び図2に示すように、電力と熱を発生する熱電併給装置1と、その熱電併給装置1にて出力される熱を冷却水にて回収し、その冷却水を利用して、貯湯タンク2への貯湯及び暖房端末3への熱媒供給を行う貯湯ユニット4と、熱電併給装置1及び貯湯ユニット4の運転を制御する運転制御手段としての運転制御部5などから構成されている。本実施形態においては、前記熱電併給装置1は、発電機1gとその発電機1gを駆動するガスエンジン1eとを備えて構成されている。
Hereinafter, an embodiment of a cogeneration system as an example of an energy supply system according to the present invention will be described with reference to the drawings.
As shown in FIGS. 1 and 2, this cogeneration system recovers heat output from the combined heat and power supply device 1 that generates electric power and heat, and the combined heat and power supply device 1 with cooling water. Is used to store hot water in the hot water storage tank 2 and supply a heating medium to the heating terminal 3, and an operation control unit 5 as operation control means for controlling the operation of the combined heat and power supply device 1 and hot water storage unit 4. It is composed of In the present embodiment, the cogeneration apparatus 1 includes a generator 1g and a gas engine 1e that drives the generator 1g.

前記ガスエンジン1eには、設定流量でガス燃料が供給されて、前記熱電併給装置1が定格運転されるようになっており、その定格運転では、前記熱電併給装置1の発電電力は定格発電電力(例えば1kW)で略一定になるようになっている。
前記発電機1gの出力側には、系統連系用のインバータ6が設けられ、そのインバータ6は、発電機1gの出力電力を商用系統7から供給される電力と同じ電圧及び同じ周波数にするように構成されている。
前記商用系統7は、例えば、単相3線式100/200Vであり、商業用電力供給ライン8を介して、テレビ、冷蔵庫、洗濯機などの電力負荷9に電気的に接続されている。
また、インバータ6は、コージェネ用供給ライン10を介して商業用電力供給ライン8に電気的に接続され、熱電併給装置1からの発電電力がインバータ6及びコージェネ用供給ライン10を介して電力負荷9に供給されるように構成されている。
Gas fuel is supplied to the gas engine 1e at a set flow rate so that the combined heat and power supply device 1 is rated. In the rated operation, the generated power of the combined heat and power supply device 1 is rated generated power. (For example, 1 kW) is substantially constant.
A grid interconnection inverter 6 is provided on the output side of the generator 1g, and the inverter 6 sets the output power of the generator 1g to the same voltage and the same frequency as the power supplied from the commercial system 7. It is configured.
The commercial system 7 is, for example, a single-phase three-wire system 100/200 V, and is electrically connected to a power load 9 such as a television, a refrigerator, or a washing machine via a commercial power supply line 8.
Further, the inverter 6 is electrically connected to the commercial power supply line 8 via the cogeneration supply line 10, and the generated power from the combined heat and power supply device 1 is supplied to the power load 9 via the inverter 6 and the cogeneration supply line 10. It is comprised so that it may be supplied to.

前記商業用電力供給ライン8には、この商業用電力供給ライン8にて供給される商業用電力を計測する商用電力計測部P1が設けられ、コージェネ用供給ライン10には、熱電併給装置1の発電電力を計測する発電電力計測部P2が設けられ、前記商用電力計測部P1は、商業用電力供給ライン8を通して流れる電流に逆潮流が発生するか否かをも検出するように構成されている。
そして、逆潮流が生じないように、インバータ6により熱電併給装置1から商業用電力供給ライン8に供給される電力が制御され、発電電力の余剰電力は、その余剰電力を熱に代えて回収する電気ヒータ12に供給されるように構成されている。
The commercial power supply line 8 is provided with a commercial power measuring unit P1 that measures the commercial power supplied through the commercial power supply line 8, and the cogeneration supply line 10 includes A generated power measuring unit P2 for measuring generated power is provided, and the commercial power measuring unit P1 is configured to detect whether or not a reverse power flow occurs in the current flowing through the commercial power supply line 8. .
And the electric power supplied from the cogeneration apparatus 1 to the commercial power supply line 8 is controlled by the inverter 6 so that the reverse power flow does not occur, and the surplus power of the generated power is recovered by replacing the surplus power with heat. It is configured to be supplied to the electric heater 12.

前記電気ヒータ12は、複数の電気ヒータから構成され、冷却水循環ポンプ15の作動により冷却水循環路13を通流する熱電併給装置1の冷却水を加熱するように設けられ、インバータ6の出力側に接続された作動スイッチ14によりON/OFFが切り換えられている。また、作動スイッチ14は、余剰電力の大きさが大きくなるほど、電気ヒータ12の消費電力が大きくなるように、余剰電力の大きさに応じて電気ヒータ12の消費電力を調整するように構成されている。   The electric heater 12 is composed of a plurality of electric heaters, and is provided so as to heat the cooling water of the cogeneration device 1 that flows through the cooling water circulation path 13 by the operation of the cooling water circulation pump 15. ON / OFF is switched by the connected operation switch 14. The operation switch 14 is configured to adjust the power consumption of the electric heater 12 according to the amount of surplus power so that the power consumption of the electric heater 12 increases as the amount of surplus power increases. Yes.

前記貯湯ユニット4は、温度成層を形成する状態で湯水を貯湯する貯湯装置としての貯湯タンク2、湯水循環路16を通して貯湯タンク2内の湯水を循環させる湯水循環ポンプ17、熱源用循環路20を通して熱源用湯水を循環させる熱源用循環ポンプ21、熱媒循環路22を通して熱媒を暖房端末3に循環供給する熱媒循環ポンプ23、湯水循環路16を通流する湯水を加熱させる貯湯用熱交換器24、熱源用循環路20を通流する熱源用湯水を加熱させる熱源用熱交換器25、熱媒循環路22を通流する熱媒を加熱させる熱媒加熱用熱交換器26、貯湯タンク2内から取り出されて給湯路33を通流する湯水及び熱源用循環路20を通流する熱源用湯水を加熱させる補助加熱器Mなどを備えて構成されている。   The hot water storage unit 4 passes through a hot water storage tank 2 as a hot water storage device for storing hot water in a state where temperature stratification is formed, a hot water circulation pump 17 for circulating hot water in the hot water storage tank 2 through the hot water circulation path 16, and a heat source circulation path 20. Heat source circulation pump 21 that circulates hot water for heat source, heat medium circulation pump 23 that circulates the heat medium to the heating terminal 3 through the heat medium circulation path 22, and heat exchange for hot water storage that heats the hot water flowing through the hot water circulation path 16. 24, heat source heat exchanger 25 for heating hot water for heat source flowing through heat source circulation path 20, heat exchanger for heat medium heating for heating heat medium flowing through heat medium circulation path 22, and hot water storage tank 2 is provided with an auxiliary heater M that heats hot water that is taken out from the inside 2 and flows through the hot water supply passage 33 and hot water for the heat source that flows through the heat source circulation passage 20.

前記湯水循環路16は、その一部が並列になるように分岐接続され、その接続箇所に三方弁18が設けられており、分岐された一方側の流路には、ラジエータ19が設けられている。前記三方弁18を切り換えることにより、貯湯タンク2の下部から取り出した湯水がラジエータ19を通過するように循環させる状態と、貯湯タンク2の下部から取り出した湯水がラジエータ19をバイパスするように循環させる状態とに切り換えるように構成されている。   The hot water circulation path 16 is branched and connected so that a part thereof is in parallel, a three-way valve 18 is provided at the connection location, and a radiator 19 is provided in the branched flow path. Yes. By switching the three-way valve 18, the hot water taken out from the lower part of the hot water storage tank 2 is circulated so as to pass through the radiator 19, and the hot water taken out from the lower part of the hot water storage tank 2 is circulated so as to bypass the radiator 19. It is comprised so that it may switch to a state.

前記給湯路33は、前記湯水循環路16を介して前記貯湯タンク2に接続され、その給湯路33を通して前記貯湯タンク2内の湯水が浴槽、給湯栓、シャワー等の給湯装置34に給湯されるようになっている。従って、この実施形態では、貯湯ユニット4に貯湯された湯水を用いて浴槽に湯張りする風呂湯張り手段は給湯装置34に含まれる。   The hot water supply path 33 is connected to the hot water storage tank 2 via the hot water circulation path 16, and hot water in the hot water storage tank 2 is supplied to a hot water supply apparatus 34 such as a bathtub, a hot water tap, and a shower through the hot water supply path 33. It is like that. Therefore, in this embodiment, the hot water supply device 34 includes bath hot water filling means for hot water filling the bathtub using hot water stored in the hot water storage unit 4.

前記熱源用循環路20は、給湯路33の一部分を共用する状態で循環経路を形成するように設けられ、前記補助加熱器Mは熱源用循環路20との共用部分に設けられた補助加熱用熱交換器29、その補助加熱用熱交換器29を加熱するバーナ28及びそのバーナ28に燃焼用空気を供給するファン27等を備えて構成されている。   The heat source circulation path 20 is provided so as to form a circulation path in a state where a part of the hot water supply path 33 is shared, and the auxiliary heater M is for auxiliary heating provided in a shared portion with the heat source circulation path 20. The heat exchanger 29 includes a burner 28 that heats the auxiliary heating heat exchanger 29, a fan 27 that supplies combustion air to the burner 28, and the like.

前記貯湯用熱交換器24においては、熱電併給装置1から出力される熱を回収した冷却水循環路13の冷却水を通流させることにより、湯水循環路16を通流する湯水を加熱させるように構成されている。前記熱源用熱交換器25においては、熱電併給装置1にて出力される熱を回収した冷却水循環路13の冷却水を通流させることにより、熱源用循環路20を通流する熱源用湯水を加熱させるように構成されている。また、熱源用循環路20には、熱源用湯水の通流を断続させる熱源用断続弁40が設けられている。前記熱媒加熱用熱交換器26においては、熱源用熱交換器25や補助加熱器Mにて加熱された熱源用湯水を通流させることにより、熱媒循環路22を通流する熱媒を加熱させるように構成されている。前記暖房端末3は、床暖房装置や浴室暖房装置などにて構成されている。   In the hot water storage heat exchanger 24, hot water flowing through the hot water circulation path 16 is heated by passing the cooling water of the cooling water circulation path 13 that has recovered the heat output from the cogeneration apparatus 1. It is configured. In the heat source heat exchanger 25, the heat source hot water flowing through the heat source circulation path 20 is made to flow through the cooling water of the cooling water circulation path 13 that has recovered the heat output from the cogeneration apparatus 1. It is configured to be heated. Further, the heat source circulation path 20 is provided with a heat source intermittent valve 40 for intermittently flowing the heat source hot water. In the heat exchanger for heat medium heating 26, the heat medium flowing through the heat medium circulation path 22 is passed by flowing hot water for the heat source heated by the heat exchanger for heat source 25 or the auxiliary heater M. It is configured to be heated. The heating terminal 3 includes a floor heating device, a bathroom heating device, and the like.

前記冷却水循環路13は、貯湯用熱交換器24側と熱源用熱交換器25側とに分岐され、その分岐箇所に、貯湯用熱交換器24側に通流させる冷却水の流量と熱源用熱交換器25側に通流させる冷却水の流量との割合を調整する分流弁30が設けられている。
そして、分流弁30は、冷却水循環路13の冷却水の全量を貯湯用熱交換器24側に通流させたり、冷却水循環路13の冷却水の全量を熱源用熱交換器25側に通流させることもできるように構成されている。
The cooling water circulation path 13 is branched into a hot water storage heat exchanger 24 side and a heat source heat exchanger 25 side, and the flow rate of the cooling water to be passed to the hot water storage heat exchanger 24 side and the heat source use are branched at the branch points. A diversion valve 30 is provided that adjusts the ratio of the flow rate of the cooling water that flows to the heat exchanger 25 side.
The diverter valve 30 allows the entire amount of cooling water in the cooling water circulation path 13 to flow to the hot water storage heat exchanger 24 side, or allows the entire amount of cooling water in the cooling water circulation path 13 to flow to the heat source heat exchanger 25 side. It is comprised so that it can also be made.

また、貯湯タンク2から取り出した湯水を給湯するときの給湯熱負荷を計測する給湯熱負荷計測手段31が設けられ、暖房端末3での暖房熱負荷を計測する暖房熱負荷計測手段32も設けられている。上述したように、給湯熱負荷計測手段31は、給湯装置33を構成するカランなどでの給湯熱負荷や、同じく給湯装置33を構成する風呂湯張り手段での給湯熱負荷を計測する。つまり、この実施形態では、熱負荷として暖房熱負荷と給湯熱負荷とがある。   Further, a hot water supply heat load measuring means 31 for measuring the hot water supply heat load when supplying hot water taken out from the hot water storage tank 2 is provided, and a heating heat load measuring means 32 for measuring the heating heat load at the heating terminal 3 is also provided. ing. As described above, the hot water supply heat load measuring means 31 measures the hot water supply heat load in the currant or the like constituting the hot water supply apparatus 33 or the hot water supply heat load in the bath hot water filling means constituting the hot water supply apparatus 33. That is, in this embodiment, there are a heating heat load and a hot water supply heat load as heat loads.

前記運転制御部5は、マイクロコンピュータを備えて構成され、後述するような各種の運転制御を実行するように構成されている。すなわち、運転制御部5は、熱電併給装置1の運転中には冷却水循環ポンプ15を作動させる状態で、熱電併給装置1の運転及び冷却水循環ポンプ15の作動状態を制御するとともに、湯水循環ポンプ17、熱源用循環ポンプ21、熱媒循環ポンプ23の作動状態を制御することによって、貯湯タンク2内に湯水を貯湯する貯湯運転や、暖房端末3に熱媒を供給して暖房対象域を暖房する暖房運転を行うように構成されている。又、図2に示すように、運転制御部5に操作を指令するリモコン操作部35が備えられ、このリモコン操作部35には、浴槽への湯張りを指令する風呂湯張りスイッチ36や風呂の予約運転を指令する風呂予約スイッチ37等が設けられている。   The operation control unit 5 includes a microcomputer, and is configured to execute various operation controls as will be described later. That is, the operation control unit 5 controls the operation of the combined heat and power supply device 1 and the operating state of the cooling water circulation pump 15 in a state where the cooling water circulation pump 15 is operated during the operation of the combined heat and power supply device 1. By controlling the operating states of the heat source circulation pump 21 and the heat medium circulation pump 23, the hot water storage operation for storing hot water in the hot water storage tank 2 or the heating terminal 3 is supplied with the heat medium to heat the heating target area. It is comprised so that heating operation may be performed. Further, as shown in FIG. 2, a remote control operation unit 35 for instructing operation to the operation control unit 5 is provided. The remote control operation unit 35 includes a bath hot water switch 36 for instructing hot water filling to the bathtub and a bath hot water switch 36. A bath reservation switch 37 and the like for instructing reservation operation are provided.

次に、前記運転制御部5による貯湯運転及び熱媒供給運転の動作について説明を加える。
前記貯湯運転は、熱電併給装置1の運転中で冷却水循環ポンプ15の作動により、貯湯用熱交換器24において、冷却水循環路13を通流する冷却水にて湯水循環路16を通流する湯水を加熱させることができる状態で行われる。
そして、貯湯タンク2の下部から取り出した湯水がラジエータ19をバイパスするように循環させる状態に三方弁18を切り換えて、湯水循環ポンプ17を作動させて、貯湯タンク2の下部から湯水を湯水循環路16に取り出し、その湯水を貯湯用熱交換器24を通過させて加熱したのち、貯湯タンク2の上部に戻して、貯湯タンク2内に貯湯するようにしている。
Next, description will be made on operations of the hot water storage operation and the heat medium supply operation by the operation control unit 5.
The hot water storage operation is performed by operating the cooling water circulation pump 15 during operation of the combined heat and power supply device 1, and hot water flowing through the hot water circulation path 16 using the cooling water flowing through the cooling water circulation path 13 in the hot water storage heat exchanger 24. Is carried out in a state where it can be heated.
Then, the three-way valve 18 is switched to a state in which hot water taken out from the lower part of the hot water storage tank 2 is circulated so as to bypass the radiator 19, and the hot water circulation pump 17 is operated to supply hot water from the lower part of the hot water storage tank 2. 16, the hot water is heated by passing through a hot water storage heat exchanger 24, and then returned to the upper part of the hot water storage tank 2 so as to be stored in the hot water storage tank 2.

図示を省略するが、前記貯湯タンク2の貯湯量を検出する貯湯量検出手段が設けられており、その貯湯量検出手段にて貯湯タンク2内の貯湯量が満杯である状態が検出されると、貯湯タンク2の下部から取り出した湯水がラジエータ19を通過するように循環させる状態に三方弁18を切り換えると共に、ラジエータ19を作動させて、貯湯タンク2の下部から取り出した湯水をラジエータ19にて放熱させたのち、貯湯用熱交換器24を通過させて加熱するように構成されている。   Although not shown in the drawings, a hot water storage amount detecting means for detecting the hot water storage amount of the hot water storage tank 2 is provided, and when the hot water storage amount detecting means detects that the hot water storage amount in the hot water storage tank 2 is full. The three-way valve 18 is switched to a state in which hot water taken out from the lower part of the hot water storage tank 2 is circulated so as to pass through the radiator 19, and the radiator 19 is operated so that the hot water taken out from the lower part of the hot water storage tank 2 is After the heat radiation, the hot water storage heat exchanger 24 is passed through and heated.

前記暖房運転は、図示しない暖房端末3側のリモコン操作部等から暖房運転の開始が指令されると、熱源用断続弁40を開弁させる状態で熱源用循環ポンプ21と熱媒循環ポンプ23とを作動させて、熱源用熱交換器25と補助加熱用熱交換器29との少なくとも一方にて熱源用湯水を加熱させて、その加熱された熱源用湯水を熱媒加熱用熱交換器26を通過する状態で循環させ、熱媒加熱用熱交換器26において熱源用湯水により加熱される熱媒を暖房端末3に循環供給するようにしている。   In the heating operation, when the start of the heating operation is instructed from a remote control operation unit or the like on the heating terminal 3 side (not shown), the heat source circulation pump 21 and the heat medium circulation pump 23 are in a state where the heat source intermittent valve 40 is opened. To heat the hot water for the heat source in at least one of the heat exchanger 25 for the heat source and the heat exchanger 29 for the auxiliary heating, and the heated hot water for the heat source is converted into the heat exchanger 26 for the heat medium. The heating medium is circulated and supplied to the heating terminal 3 by being circulated in a passing state and heated by the hot water for the heat source in the heat exchanger for heat medium heating 26.

熱源用湯水の加熱について説明を加えると、熱電併給装置1の運転中である場合には、分流弁30にて熱源用熱交換器25側に冷却水が通流するように調整した状態での冷却水循環ポンプ15の作動により、熱源用熱交換器25において熱源用湯水を加熱させるように構成されている。また、熱電併給装置1からの冷却水だけでは暖房端末3で要求されている現暖房熱負荷を賄えない場合や、熱電併給装置1の非運転中の場合には、補助加熱器Mを加熱作動させることにより、補助加熱用熱交換器29において熱源用湯水を加熱させるように構成されている。   When the explanation of heating of the hot water for the heat source is added, when the combined heat and power supply device 1 is in operation, the diverter valve 30 is adjusted so that the cooling water flows to the heat source heat exchanger 25 side. By operating the cooling water circulation pump 15, the heat source heat exchanger 25 is configured to heat the hot water for the heat source. In addition, when the current heating heat load required by the heating terminal 3 cannot be covered only with the cooling water from the combined heat and power supply device 1 or when the combined heat and power supply device 1 is not in operation, the auxiliary heater M is heated. By operating, the auxiliary heating heat exchanger 29 is configured to heat the hot water for the heat source.

前記運転制御部5は、熱電併給装置1の運転中に、貯湯運転と暖房運転とを同時に行う場合には、暖房端末3で要求されている現暖房熱負荷に基づいて、分流弁30にて貯湯用熱交換器24側に通流させる冷却水の流量と熱源用熱交換器25側に通流させる冷却水の流量との割合を調整するように構成されている。   When the hot water storage operation and the heating operation are performed simultaneously during the operation of the combined heat and power supply device 1, the operation control unit 5 uses the current dividing heat valve 30 based on the current heating heat load requested by the heating terminal 3. It is configured to adjust the ratio between the flow rate of the cooling water to be passed to the hot water storage heat exchanger 24 side and the flow rate of the cooling water to be passed to the heat source heat exchanger 25 side.

次に、運転制御部5による熱電併給装置1の運転の制御について説明を加える。
前記運転制御部5は、熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて熱電併給装置1を計画運転する運転処理を実行するように構成されている。又、前記運転処理は、具体的には、前記予測負荷データから熱電併給装置1を運転させるか否かの基準となる省エネ度基準値を求める省エネ度基準値演算処理と、その省エネ度基準値演算処理にて求められた省エネ度基準値よりも現時点での実省エネ度が上回っているか否かによって、熱電併給装置1の運転の可否を判別する運転可否判別処理とを行う構成となっている。
Next, description is added about control of the driving | operation of the cogeneration apparatus 1 by the operation control part 5. FIG.
The operation control unit 5 is a data management process for managing past load data for a thermal load and an electric load for a plurality of unit periods in the past in a state in which the unit periods are divided in order of passage of time. Predictive load calculation processing for obtaining predicted load data for a thermal load and an electric power load within a target unit period that is a target of planned operation based on past load data managed by the system, and combined heat and power based on the predicted load data It is comprised so that the driving | operation process which carries out the planned driving | operation of the apparatus 1 may be performed. Further, the operation process specifically includes an energy-saving degree reference value calculation process for obtaining an energy-saving degree reference value as a reference for determining whether or not to operate the cogeneration apparatus 1 from the predicted load data, and its energy-saving degree reference value. It is configured to perform an operation availability determination process for determining whether or not the cogeneration apparatus 1 can be operated depending on whether or not the actual energy saving level at the present time is higher than the energy saving level reference value obtained by the calculation process. .

そして、このコージェネレーションシステムにおいては、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、運転制御部5は、この使用状況関連データ収集手段によって収集される過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成されている。   In this cogeneration system, usage status related data collection means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by the customer is provided, and operation control is provided. For the actual usage status related data for each of the past plurality of unit periods collected by the usage status related data collection unit, the unit 5 uses the actual usage status related data for other past unit periods. It is comprised so that the use condition related data determination process which determines whether it is peculiar compared with may be performed.

又、使用状況関連データ判定処理において、前記過去の複数の単位期間のうち実使用状況データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、実使用状況データが特異であると判定された単位期間における過去負荷データの代用とする過去負荷データを求めるように構成されている。   Further, in the usage status-related data determination process, actual usage is based on past load data in a plurality of unit periods excluding the unit period in which the actual usage status data is determined to be unique among the plurality of past unit periods. It is configured to obtain past load data as a substitute for past load data in a unit period in which the situation data is determined to be unique.

前記使用状況関連データ収集手段は、商用電力計測部P1、発電電力計測部P2、給湯熱負荷計測手段31、暖房熱負荷計測手段32、リモコン操作部35の風呂湯張りスイッチ36、風呂予約スイッチ37にて構成される。   The usage status related data collection means includes a commercial power measurement unit P1, a generated power measurement unit P2, a hot water supply thermal load measurement unit 31, a heating thermal load measurement unit 32, a bath hot water switch 36 of the remote control operation unit 35, and a bath reservation switch 37. Consists of.

以下、前記運転制御部5の具体的な制御処理の構成について説明を加える。
運転制御部5は、1日を前記単位期間として管理するように構成され、図6に示すように、計画運転の対象となる対象単位期間である負荷予測の対象となる予測日の前日が終了した時点、例えば午前零時になると、前記使用状況関連データ判定処理、前記データ管理処理、及び、前記予測負荷演算処理を夫々実行するように構成されている(ステップ1〜4)。
Hereinafter, a specific control processing configuration of the operation control unit 5 will be described.
The operation control unit 5 is configured to manage one day as the unit period, and as shown in FIG. 6, the day before the prediction date that is the target of the load prediction that is the target unit period that is the target of the planned operation ends. For example, at midnight, for example, the usage state related data determination process, the data management process, and the predicted load calculation process are executed (steps 1 to 4).

前記使用状況関連データ判定処理においては、図7に示すように、前日における使用状況関連データについて特異であるか否かの判定処理を実行する(ステップ21)。
説明を加えると、上述した使用状況関連データ収集手段として、需要家による電力使用状況と直接関連する使用状況関連データを計測する電力負荷計測手段11を用いた場合、前日の時系列的な電力負荷に関する情報を収集でき、また、後述するような電力負荷の時間変動量、つまり、電力負荷装置9における設定時間毎の実電力負荷データを時系列的に前後で比較してその差の絶対値を演算し、演算した絶対値の現時点までの実積算値に関する情報を収集できる。
In the usage status related data determination process, as shown in FIG. 7, a determination process is performed to determine whether or not the usage status related data on the previous day is unique (step 21).
In other words, when the power load measuring unit 11 that measures the usage state related data directly related to the power usage state by the consumer is used as the above-described usage state related data collecting unit, the time series power load of the previous day is used. In addition, it is possible to collect information on the time variation of the power load as described later, that is, the actual power load data for each set time in the power load device 9 is compared before and after in time series, and the absolute value of the difference is obtained. It is possible to collect information on the actual integrated value of the calculated absolute value up to the present time.

また、使用状況関連データ収集手段として、需要家による熱使用状況と直接関連する使用状況関連データを計測する給湯熱負荷計測手段31を用いた場合、需要家が浴槽へ風呂湯張りを行うときに要した給湯熱負荷量の情報を収集することができる。同様に、使用状況関連データ収集手段として、需要家による熱使用状況と直接関連する使用状況関連データを計測する暖房熱負荷計測手段32を用いた場合、需要家が暖房端末3で消費した暖房熱負荷量の情報を収集することができる。   Moreover, when the hot water supply thermal load measuring means 31 that measures the usage status related data directly related to the heat usage status by the consumer is used as the usage status related data collecting means, when the customer performs bathing in the bathtub, It is possible to collect information on the required hot water supply heat load. Similarly, when the heating heat load measuring means 32 for measuring the use state related data directly related to the heat use state by the consumer is used as the use state related data collecting means, the heating heat consumed by the consumer at the heating terminal 3 is used. Information on load amount can be collected.

また更に、使用状況関連データ収集手段として上記給湯熱負荷量計測手段31を用いた場合、需要家による熱使用状況と間接的に関連する使用状況関連データとして、需要家が給湯装置33を用いて消費した水量の情報を収集することができる。例えば、夏場などは給湯装置33において温水を使用せず(つまり、熱を消費せず)に水を使用することもあるため、本実施形態では、給湯熱負荷計測手段31において計測される水及び温水の実供給量を、需要家による熱使用状況と間接的に関連する使用状況関連データと見なしている。つまり、この給湯装置33は、本発明の「給水及び給湯装置」に相当する。   Still further, when the hot water supply heat load measuring means 31 is used as the usage status related data collection means, the customer uses the hot water supply device 33 as usage status related data indirectly related to the heat usage status by the consumer. Information on the amount of water consumed can be collected. For example, since water may be used without using hot water (that is, without consuming heat) in the hot water supply device 33 in summer, the water measured by the hot water supply thermal load measuring means 31 and The actual supply of hot water is regarded as usage-related data indirectly related to heat usage by consumers. That is, the hot water supply device 33 corresponds to the “water supply and hot water supply device” of the present invention.

また更に、使用状況関連データ収集手段として、需要家が操作するリモコン操作部34の風呂湯張りスイッチ35や風呂湯張り時刻を予約するための予約スイッチ36を用いた場合、風呂湯張りスイッチ35がオン操作された時刻を風呂湯張り時刻の情報として収集することや、予約スイッチ36によって予約された風呂湯張り予約時刻を風呂湯張り時刻の情報として収集することができる。加えて、風呂湯張りスイッチ35のオン操作、及び、予約スイッチ36による予約操作に基づいて行われた風呂湯張り回数の情報を収集することができる。   Furthermore, when using the bath hot water switch 35 of the remote control operation unit 34 operated by the consumer or the reservation switch 36 for reserving the bath hot water time as the usage status related data collecting means, the bath hot water switch 35 is used. The on-operation time can be collected as bath hot water time information, and the bath hot water reserved time reserved by the reservation switch 36 can be collected as bath hot water time information. In addition, it is possible to collect information on the number of times of bath hot water performed based on the ON operation of the bath hot water switch 35 and the reservation operation performed by the reservation switch 36.

以上のように、使用状況関連データ収集手段が収集可能な実使用状況関連データには、電力負荷、電力負荷の時間変動量、風呂湯張り時刻、風呂湯張り回数、水及び温水の実供給量などがある。   As described above, the actual usage status-related data that can be collected by the usage status-related data collection means includes the power load, the amount of time fluctuation of the power load, the bath hot water filling time, the number of hot water bath fillings, the actual supply amount of water and hot water. and so on.

そこで、運転制御部5は、前記判定処理として、使用状況関連データ収集手段によって収集される前日の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の日の実使用状況関連データと比較して特異であるか否かを判定するのである。   Therefore, the operation control unit 5 determines, as the determination process, the actual usage status related data collected by the usage status related data collecting means on the previous day, that the actual usage status related data is related to the actual usage status of a plurality of other past days. It is determined whether or not it is unique compared to the data.

ここで、他の過去の複数の日の実使用状況関連データについて説明を加えると、単位期間としての1日が終了する毎に、この使用状況関連データ判定処理を繰り返し実行するものであるから、過去の複数の日の夫々の実使用状況関連データも収集されて記憶される。後述するように、データ管理処理では、過去の電力負荷や熱負荷の過去負荷データを管理して記憶することになるが、運転制御部5は、この過去負荷データは予測日よりも前の過去3週間(21日)分を記憶するようになっており、実使用状況関連データについても同様に予測日よりも前の過去3週間分を記憶するようになっている。   Here, when the description is added to the actual usage status related data of a plurality of other past days, the usage status related data determination process is repeatedly executed every time one day as a unit period ends. Data related to actual use status of each of a plurality of past days is also collected and stored. As will be described later, in the data management process, the past load data of the past power load and heat load is managed and stored. However, the operation control unit 5 determines that the past load data is the past before the predicted date. Three weeks (21 days) are stored, and the actual usage-related data is also stored for the past three weeks before the predicted date.

次に、前記判定処理について説明する。
先ず、実使用状況関連データとしての前日の電力負荷について、その1日分の総量が他の過去の複数の日の電力負荷の1日分の総量の平均値と比較して特異であるか否かを判定するように構成されている。例えば、前日の電力負荷の1日分の総量が複数の日の総量の平均値の50%以下、又は、150%以上であるときは、特異なデータであると判定する。
Next, the determination process will be described.
First, regarding the power load of the previous day as the actual usage status related data, whether or not the total amount for one day is unique compared with the average value of the total amount for one day of the power loads for other past days It is comprised so that it may determine. For example, when the total amount of the power load for the previous day is 50% or less or 150% or more of the average value of the total amount of a plurality of days, it is determined that the data is unique.

又、実使用状況関連データとしての前日の電力負荷について、設定時間毎の電力負荷を時系列的に前後で比較してその差の絶対値を演算し、演算した絶対値の実積算値を求めるように構成され、且つ、その求めた実積算値と他の過去の複数の日についての実積算値の平均値と比較して特異であるか否かを判定するように構成されている。例えば、需要家の過去の1時間毎の電力負荷の平均値、その1時間毎の電力負荷に関して時系列的に前後の差の絶対値、及び、その時刻までの絶対値の積算値は下記の表1のようになる。   In addition, regarding the power load of the previous day as the actual usage status related data, the power load for each set time is compared before and after in time series, the absolute value of the difference is calculated, and the actual integrated value of the calculated absolute value is obtained. It is comprised so that it may be determined whether it is peculiar by comparing the calculated | required actual integrated value with the average value of the actual integrated value about the other several past days. For example, the average value of the past hourly power load of the consumer, the absolute value of the difference before and after the hourly power load, and the integrated value of the absolute value up to that time are as follows: It becomes like Table 1.

Figure 0004614809
Figure 0004614809

表1に示すように、需要家が通常の生活パターンで電力を使用していれば1時間毎の電力負荷は変動を繰り返すため、差の絶対値の積算値は一様に増大する。しかし、需要家が不在である場合には1時間毎の電力負荷は変動しないため、上記表1中の11時から17時までと同様に、差の絶対値は零になる。そして、差の絶対値の積算値も零である。従って、前日における前記差の絶対値の積算値について、その積算値が複数の日の積算値の平均値の50%以下、又は、150%以上であるときは、特異なデータであると判定する。   As shown in Table 1, if the consumer uses power in a normal life pattern, the hourly power load repeatedly fluctuates, so the integrated value of the absolute value of the difference increases uniformly. However, when the customer is absent, the hourly power load does not fluctuate, so that the absolute value of the difference is zero as in the case of 11:00 to 17:00 in Table 1 above. The integrated value of the absolute value of the difference is also zero. Therefore, regarding the integrated value of the absolute value of the difference on the previous day, when the integrated value is 50% or less or 150% or more of the average value of the integrated values of a plurality of days, it is determined that the data is unique. .

また更に、実使用状況関連データとしての前日の風呂湯張り時刻について、その風呂湯張り時刻が他の過去の複数の日の風呂湯張り時刻の平均値と比較して特異であるか否かを判定するように構成されている。例えば、前日の風呂湯張り時刻(風呂湯張りスイッチ35がオン操作された時刻又は予約スイッチ36による風呂湯張り予約時刻)が、過去の複数の日の風呂湯張り時刻の平均値から例えば4時間以上離れると、特異なデータであると判定する。   Furthermore, regarding the bath filling time of the previous day as the actual usage-related data, whether or not the bath filling time is peculiar compared with the average value of the bath filling times of other past days. It is configured to determine. For example, the bath bathing time of the previous day (the time when the bath bathing switch 35 is turned on or the bath bathing reservation time by the reservation switch 36) is, for example, four hours from the average value of the bath bathing times of a plurality of past days. If it is more than the above, it is determined that the data is unique.

また更に、実使用状況関連データとしての前日の風呂湯張り回数について、その風呂湯張り回数が他の過去の複数の日の風呂湯張り回数の平均値と比較して特異であるか否かを判定するように構成されている。例えば、前日の風呂湯張り回数が過去の複数の日の風呂湯張り回数の平均値よりも0.5回以上多い上側閾値よりも多い場合、又は、平均値よりも0.5回以上少ない下側閾値よりも少ない場合、特異なデータであると判定する。   Furthermore, regarding the number of hot water bathing on the previous day as actual usage-related data, whether the hot water bathing frequency of the previous day is peculiar or not compared with the average value of the hot water bathing times of other past days. It is configured to determine. For example, if the number of hot water bathing on the previous day is more than the upper threshold value that is 0.5 times or more higher than the average value of the hot water bathing times for a plurality of days in the past, or less than 0.5 times lower than the average value If it is less than the side threshold, it is determined that the data is unique.

また更に、実使用状況関連データとしての前日の給湯装置33からの水及び温水の少なくとも一方の実供給量について、その実供給量が他の過去の複数の日の実供給量の平均値と比較して特異であるか否かを判定するように構成されている。例えば、前日の前記実供給量が複数の日の前記実供給量の平均値の50%以下、又は、150%以上であるときは、特異なデータであると判定する。   Furthermore, the actual supply amount of at least one of water and hot water from the hot water supply device 33 on the previous day as the actual use status related data is compared with the average value of the actual supply amounts of other past days. It is configured to determine whether or not it is unique. For example, when the actual supply amount on the previous day is 50% or less or 150% or more of the average value of the actual supply amounts on a plurality of days, it is determined that the data is unique.

以上のような判定処理により、予測日の前日における実使用状況関連データが特異であると判定した場合には、その日の負荷データを、予測日における予測負荷データを算出するための過去負荷データから削除して、その日以外の過去の日のうちで、その日の前の日(予測日の前々日)における過去負荷データを、前日における過去負荷データの代用として置き換えるデータ代用処理を実行する(ステップ22、23、24)。   When it is determined that the actual usage status related data on the day before the prediction date is unique by the determination process as described above, the load data for the day is calculated from the past load data for calculating the predicted load data on the prediction date. Delete and execute a data substitution process that replaces the past load data on the day before that day (the day before the forecast date) as a substitute of the past load data on the previous day among the past days other than that day (step) 22, 23, 24).

次に、前記データ管理処理について説明を加える。
運転制御部5は、電力負荷、給湯熱負荷、及び、暖房熱負荷について、単位時間毎の過去負荷データを時間経過の並び順に単位期間毎に区分けした状態で過去の複数の日、つまり、過去の3週間分について逐次計測して図示しないメモリに記憶するように構成されており、データ管理処理においては、このような過去負荷データを複数の日について曜日と対応付ける状態で管理するようになっている。
Next, the data management process will be described.
The operation control unit 5 includes a plurality of past days in a state in which past load data for each unit time is divided into unit periods in the order of passage of time with respect to the electric power load, the hot water supply heat load, and the heating heat load. The three weeks are sequentially measured and stored in a memory (not shown). In the data management process, such past load data is managed in a state in which a plurality of days are associated with the day of the week. Yes.

前記過去負荷データは、上述したように電力負荷データ、給湯熱負荷データ、暖房熱負荷データの3種類の負荷データからなり、商用電力計測部P1、発電電力計測部P2、給湯熱負荷計測手段31、及び、暖房熱負荷計測手段32にて夫々計測される。   As described above, the past load data is composed of three types of load data, that is, power load data, hot water supply heat load data, and heating heat load data, and includes a commercial power measurement unit P1, a generated power measurement unit P2, and a hot water supply heat load measurement unit 31. , And the heating heat load measuring means 32 respectively.

ちなみに、電力負荷データは、商用電力計測部P1で計測した電力と、発電電力計測部P2で計測した熱電併給装置1の発電出力との和から、電気ヒータ14の電力負荷とコージェネレーションシステム固有の補機の電力負荷とを差し引いたものとなる。固有の補機とは、このコージェネレーションシステムで固有に補助的に設けられる装置や機械であり、冷却水循環ポンプ15や湯水循環ポンプ17がこれに該当する。又、前記給湯熱負荷データは、給湯栓に供給される一般給湯並びに浴槽に給湯される風呂給湯の両方を含む負荷データである。   Incidentally, the power load data is obtained from the sum of the power measured by the commercial power measuring unit P1 and the power generation output of the cogeneration device 1 measured by the generated power measuring unit P2, and is specific to the power load of the electric heater 14 and the cogeneration system. Subtracting the power load of the auxiliary equipment. The unique auxiliary machine is a device or machine that is uniquely and supplementarily provided in the cogeneration system, and corresponds to the cooling water circulation pump 15 and the hot water circulation pump 17. The hot water supply heat load data is load data including both general hot water supplied to the hot water tap and bath hot water supplied to the bathtub.

実際の使用状況に基づいて、商用電力計測部P1、発電電力計測部P2、給湯熱負荷計測手段31及び暖房熱負荷計測手段32により、電力負荷データ、給湯熱負荷データ、暖房熱負荷データが各別に計測されて記憶される。1日分の時系列的な過去負荷データは、24時間のうち1時間を単位時間として、単位時間当たりの電力負荷データの24個、単位時間当たりの給湯熱負荷データの24個、および、単位時間当たりの暖房熱負荷データの24個から構成されている。   Based on the actual usage situation, the electric power load data, the hot water supply heat load data, and the heating heat load data are respectively obtained by the commercial power measurement unit P1, the generated power measurement unit P2, the hot water supply thermal load measurement unit 31, and the heating heat load measurement unit 32. Separately measured and stored. The time-series past load data for one day includes 24 pieces of power load data per unit time, 24 pieces of hot water supply heat load data per unit time, and one unit of 24 hours. It consists of 24 pieces of heating heat load data per hour.

そして、1日分の時系列的な実負荷データが1週間分記憶されると、曜日ごとに、グループ分けして管理している時系列的な過去負荷データと時系列的な実負荷データとを所定の割合で足し合わせることにより、新しい時系列的なグループ別の過去負荷データを求めて記憶内容を更新するように構成されている。   When one day of time-series actual load data is stored for one week, the time-series past load data and time-series actual load data managed in groups are grouped for each day of the week. Are added at a predetermined ratio to obtain past load data for each new time-series group and update the stored contents.

日曜日を例に挙げて具体的に説明すると、図3に示すように、時系列的な過去負荷データのうち日曜日に対応する時系列的な過去負荷データD1mと、時系列的な実負荷データのうち日曜日に対応する時系列的な実負荷データA1とから、下記の〔数1〕により、日曜日に対応する新しい時系列的な過去負荷データD1(m+1)が求められ、その求められた時系列的な過去負荷データD1(m+1)を記憶する。
なお、下記の〔数1〕において、D1mを、日曜日に対応する時系列的な過去負荷データとし、A1を、日曜日に対応する時系列的な実負荷データとし、Kは、0.75の定数であり、D1(m+1)を、新しい時系列的な過去負荷データとする。
但し、上述したように、前記使用状況関連データ判定処理において、特異であると判定された場合には、過去負荷データから削除されることになるので、その日のデータは予測負荷の算出には使用されない。
Specifically, taking Sunday as an example, as shown in FIG. 3, time-series past load data D1m corresponding to Sunday among time-series past load data and time-series actual load data Among them, new time-series past load data D1 (m + 1) corresponding to Sunday is obtained from the time-series actual load data A1 corresponding to Sunday by the following [Equation 1], and the obtained time-series Historical past load data D1 (m + 1) is stored.
In the following [Equation 1], D1m is time-series past load data corresponding to Sunday, A1 is time-series actual load data corresponding to Sunday, and K is a constant of 0.75. D1 (m + 1) is new time-series past load data.
However, as described above, when it is determined that the usage status related data determination process is unique, it is deleted from the past load data, so that day's data is used for calculating the predicted load. Not.

〔数1〕
D1(m+1)=(D1m×K)+{A1×(1−K)}
[Equation 1]
D1 (m + 1) = (D1m × K) + {A1 × (1-K)}

前記予測負荷演算処理について説明を加えると、この予測負荷演算処理においては、予測日のどの時間帯にどれだけの電力負荷、給湯熱負荷、暖房熱負荷が予測されているかの1日分の時系列的な予測負荷データを求めるように構成されている。
すなわち、曜日ごとの7つのグループ別の過去負荷データのうちの予測日の曜日に対応する過去負荷データと前日の実負荷データとを所定の割合で足し合わせることにより、どの時間帯にどれだけの電力負荷、給湯熱負荷、暖房熱負荷が予測されているかのその日1日分の時系列的な予測負荷データを求めるように構成されている。
The predicted load calculation process will be further described. In the predicted load calculation process, how much power load, hot water supply heat load, and heating heat load is predicted for one day in which time zone of the predicted date. The system is configured to obtain sequential predicted load data.
That is, by adding the past load data corresponding to the forecast day of the seven groups of past load data for each day of the week and the actual load data of the previous day in a predetermined ratio, how much in what time zone It is configured to obtain time-series predicted load data for one day on the day as to whether an electric power load, a hot water supply heat load, and a heating heat load are predicted.

但し、前日の実使用状況関連データが使用状況関連データ判定処理において特異であると判定された場合には、前日の過去負荷データは削除されることになるので、前日の実負荷データに代えて前々日の過去負荷データが代用して用いられることになる。   However, if it is determined that the actual usage status related data of the previous day is peculiar in the usage status related data determination process, the previous load data of the previous day will be deleted. The past load data of two days before will be used instead.

月曜日1日分の予測負荷データを求める場合を例に挙げて具体的に説明すると、図3に示すように、曜日ごとの7つの過去負荷データD1m〜D7mと曜日ごとの7つの実負荷データA1〜A7とが記憶されているので、月曜日に対応する過去負荷データD2mと、前日の日曜日に対応する実負荷データA1とから、下記の〔数2〕により、月曜日の1日分の時系列的な予測負荷データBを求める。   Specifically, the case of obtaining the predicted load data for one day on Monday will be described as an example. As shown in FIG. 3, seven past load data D1m to D7m for each day of the week and seven actual load data A1 for each day of the week are shown. ~ A7 are stored, so the past load data D2m corresponding to Monday and the actual load data A1 corresponding to Sunday of the previous day are used to calculate the time series for one day on Monday by the following [Equation 2]. Predictive load data B is obtained.

そして、1日分の予測負荷データBは、図4に示すように、1日分の時系列的な予測電力負荷データ、1日分の時系列的な予測給湯熱負荷データ、1日分の時系列的な予測暖房熱負荷データからなり、図4の(イ)は、1日分の時系列的な予測電力負荷を示しており、図4の(ロ)は、1日分の時系列的な予測給湯熱負荷を示しており、図4の(ハ)は、1日分の時系列的な予測暖房熱負荷を示している。
なお、下記の〔数2〕において、D2mを、月曜日に対応する過去負荷データとし、A1を、日曜日に対応する実負荷データとし、Qは、0.25の定数であり、Bは、予測負荷データとする。
As shown in FIG. 4, the predicted load data B for one day includes time-series predicted power load data for one day, time-series predicted hot water supply heat load data for one day, and data for one day. It consists of time-series predicted heating heat load data, (a) in FIG. 4 shows the time-series predicted power load for one day, and (b) in FIG. 4 is the time series for one day. 4 shows a typical predicted hot water supply heat load, and (c) in FIG. 4 shows a time-series predicted heating heat load for one day.
In the following [Equation 2], D2m is past load data corresponding to Monday, A1 is actual load data corresponding to Sunday, Q is a constant of 0.25, and B is a predicted load. Data.

〔数2〕
B=(D2m×Q)+{A1×(1−Q)}
[Equation 2]
B = (D2m × Q) + {A1 × (1-Q)}

従って、上記予測負荷演算処理においては、過去の複数の日のうち、使用状況関連データ判定処理において実使用状況関連データが特異であると判定された日を除いた複数の日における過去負荷データに基づいて予測負荷データを求めることになる。   Therefore, in the predicted load calculation process, the past load data on a plurality of days excluding the day on which the actual use situation related data is determined to be unique in the use situation related data determination process among the plurality of past days. Based on this, the predicted load data is obtained.

前記運転制御部5は、上述のように予測日の予測負荷データを求めた状態で、単位時間である1時間が経過する毎に、予測負荷データから、熱電併給装置1を運転させるか否かの基準となる省エネ度基準値を求める省エネ度基準値演算処理を行うと共に、その省エネ度基準値演算処理にて求められた省エネ度基準値よりも現時点での実省エネ度が上回っているか否かによって、熱電併給装置1の運転の可否を判別する運転可否判別処理を行うように構成されている(ステップ5〜9)。   Whether the operation control unit 5 operates the combined heat and power supply device 1 from the predicted load data every time one hour as a unit time elapses in a state where the predicted load data of the predicted date is obtained as described above. Whether or not the actual energy saving level is higher than the energy saving level reference value obtained in the energy saving level reference value calculation process. Thus, an operation availability determination process is performed to determine whether the operation of the combined heat and power supply device 1 is possible (steps 5 to 9).

前記省エネ度基準値演算処理においては、予測給湯熱負荷データを用いて、現時点から基準値用時間先までの間に必要となる貯湯必要量を賄えるように熱電併給装置1を運転させた場合に、熱電併給装置1を運転させることによって省エネルギ化を実現できる省エネ度基準値を求めるように構成されている。   In the energy saving standard value calculation process, when the combined heat and power supply device 1 is operated so as to cover the required hot water storage amount from the present time to the reference value time ahead using the predicted hot water supply thermal load data The energy-saving standard value that can realize energy saving by operating the combined heat and power supply apparatus 1 is obtained.

例えば、単位時間を1時間とし、基準値用時間を12時間として説明を加えると、まず、予測負荷データによる予測電力負荷、予測給湯熱負荷、及び、予測暖房熱負荷から、下記の式5により、熱電併給装置1を運転させた場合の予測省エネ度を1時間毎に12時間先までの12個分を求めると共に、熱電併給装置1を運転させた場合に貯湯タンク2に貯湯することができる予測貯湯量を1時間毎に12時間先までの12個分を求める。   For example, when the unit time is set to 1 hour and the reference value time is set to 12 hours, first, from the predicted power load, predicted hot water supply heat load, and predicted heating heat load based on the predicted load data, In addition, the predicted energy saving degree when the combined heat and power supply apparatus 1 is operated is obtained for 12 hours up to 12 hours ahead every hour, and hot water can be stored in the hot water storage tank 2 when the combined heat and power supply apparatus 1 is operated. The predicted amount of stored hot water is determined for 12 pieces every hour up to 12 hours ahead.

省エネ度P={(EK1+EK2+EK3)/熱電併給装置1の必要エネルギ}×100……………(式5)   Energy saving level P = {(EK1 + EK2 + EK3) / necessary energy of cogeneration apparatus 1} × 100 (Equation 5)

但し、EK1は、有効発電出力E1を変数とする関数であり、EK2は、E2を変数とする関数であり、EK3は、E3を変数とする関数であり、
EK1=有効発電出力E1の発電所一次エネルギ換算値
=f1(有効発電出力E1,発電所での必要エネルギ)
EK2=有効暖房熱出力E2の従来給湯器でのエネルギ換算値
=f2(有効暖房熱出力E2,バーナ効率(暖房時))
EK3=有効貯湯熱出力E3の従来給湯器でのエネルギ換算値
=f3(有効貯湯熱出力E3,バーナ効率(給湯時))
熱電併給装置1の必要エネルギ:5.5kW(熱電併給装置1を1時間稼動させたときの都市ガス消費量を0.433m3とする)
単位電力発電必要エネルギ:2.8kW
バーナ効率(暖房時):0.8
バーナ効率(給湯時):0.9
However, EK1 is a function with the effective power generation output E1 as a variable, EK2 is a function with E2 as a variable, EK3 is a function with E3 as a variable,
EK1 = Equivalent power generation output E1 power plant primary energy equivalent value = f1 (Effective power generation output E1, required energy at the power plant)
EK2 = energy conversion value in conventional water heater of effective heating heat output E2 = f2 (effective heating heat output E2, burner efficiency (during heating))
EK3 = Equivalent hot water heat output E3 energy conversion value in conventional water heater = f3 (effective hot water heat output E3, burner efficiency (during hot water supply))
Necessary energy of the combined heat and power unit 1: 5.5 kW (the city gas consumption when the combined heat and power unit 1 is operated for 1 hour is 0.433 m 3 )
Unit power generation required energy: 2.8kW
Burner efficiency (heating): 0.8
Burner efficiency (with hot water supply): 0.9

また、有効発電出力E1、有効暖房熱出力E2、有効貯湯熱出力E3の夫々は、下記の式6〜式8により求められる。   Moreover, each of the effective power generation output E1, the effective heating heat output E2, and the effective hot water storage heat output E3 is obtained by the following formulas 6 to 8.

E1=熱電併給装置1の発電電力−(余剰電力+固有の補機の電力負荷)……………(式6)   E1 = Power generated by the combined heat and power supply apparatus 1− (surplus power + specific auxiliary power load) ………… (Formula 6)

E2=暖房端末3での熱負荷……………(式7)   E2 = Heat load at the heating terminal 3 ............ (Expression 7)

E3=(熱電併給装置1の熱出力+電気ヒータ12の回収熱量−有効暖房熱出力E2)−放熱ロス……………(式8)
但し、電気ヒータ12の回収熱量=電気ヒータ12の消費電力×ヒータの熱効率とする。
E3 = (heat output of the combined heat and power supply device 1 + recovered heat amount of the electric heater 12−effective heating heat output E2) −heat dissipation loss (Equation 8)
However, the amount of heat recovered by the electric heater 12 = power consumption of the electric heater 12 × heat efficiency of the heater.

続いて、図5に示すように、1時間毎の予測省エネ度及び予測貯湯量を12個分求めた状態において、まず、予測給湯熱負荷データから12時間先までに必要とされている予測必要貯湯量を求め、その予測必要貯湯量から現時点での貯湯タンク2内の貯湯量を引いて、12時間先までの間に必要となる必要貯湯量を求める。例えば、予測給湯熱負荷データから12時間後に9.8kWの給湯熱負荷が予測されていて、現時点での貯湯タンク2内の貯湯量が2.5kWである場合には、12時間先までの間に必要となる必要貯湯量は7.3kWとなる。   Next, as shown in FIG. 5, in the state where the predicted energy saving degree and predicted hot water storage amount for every 12 hours are obtained, first, the prediction required for 12 hours ahead from the predicted hot water supply thermal load data is necessary. The hot water storage amount is obtained, and the hot water storage amount in the hot water storage tank 2 at the present time is subtracted from the predicted required hot water storage amount to obtain the necessary hot water storage amount required for 12 hours ahead. For example, if a hot water supply heat load of 9.8 kW is predicted 12 hours later from the predicted hot water supply heat load data, and the hot water storage amount in the hot water storage tank 2 is 2.5 kW at the present time, the time until 12 hours ahead The necessary hot water storage required for 7.3 kW is 7.3 kW.

そして、単位時間の予測貯湯量を足し合わせる状態で、その足し合わせた予測貯湯量が必要貯湯量に達するまで、12個分の単位時間のうち、予測省エネ度の数値が高いものから選択していくようにしている。   And in the state where the predicted hot water storage amount of the unit time is added, until the total predicted hot water storage amount reaches the required hot water storage amount, select from among the unit time for 12 units that has the highest predicted energy saving level I am going to go.

以下、具体的な数値を例示した図5を参照しながら説明を加える。
例えば、上述の如く、必要貯湯量が7.3kWである場合には、まず、予測省エネ度の一番高い7時間先から8時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせる。次に予測省エネ度の高い6時間先から7時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせて、そのときの足し合わせた予測貯湯量が1.1kWとなる。
また次に予測省エネ度の高い5時間先から6時間先までの単位時間を選択し、その単位時間における予測貯湯量を足し合わせて、そのときの足し合わせた予測貯湯量が4.0kWとなる。
Hereinafter, description will be added with reference to FIG. 5 illustrating specific numerical values.
For example, as described above, when the required hot water storage amount is 7.3 kW, first, a unit time from 7 hours ahead to 8 hours ahead with the highest predicted energy saving degree is selected, and the predicted hot water storage amount in that unit time. Add together. Next, a unit time from 6 hours ahead to 7 hours ahead with a high predicted energy saving degree is selected, and the predicted hot water storage amount in the unit time is added, and the predicted hot water storage amount at that time is 1.1 kW.
Moreover, the unit time from 5 hours ahead to 6 hours ahead with the highest predicted energy saving degree is selected, and the predicted hot water storage amount in the unit time is added, and the predicted hot water storage amount at that time is 4.0 kW. .

このようにして、予測省エネ度の数値が高いものからの単位時間の選択と予測貯湯量の足し合わせを繰り返していくと、図5に示すように、8時間先から9時間先までの単位時間を選択したときに、足し合わせた予測貯湯量が7.3kWに達する。
そうすると、8時間先から9時間先までの単位時間の省エネ度を省エネ度基準値として設定し、図5に示すものでは、省エネ度基準値が106となる。
In this way, when the selection of the unit time from the one with the high predicted energy saving value and the addition of the predicted hot water storage amount are repeated, the unit time from 8 hours to 9 hours ahead as shown in FIG. When is selected, the combined predicted hot water storage amount reaches 7.3 kW.
If it does so, the energy-saving degree of the unit time from 8 hours ahead to 9 hours ahead will be set as an energy-saving degree reference value, and in the thing shown in FIG.

前記運転可否判別処理について説明を加えると、現時点での電力負荷、現時点での給湯熱負荷、及び、現時点での暖房熱負荷から、上記の式5により求められる実省エネ度が省エネ度基準値よりも上回ると、熱電併給装置1の運転が可と判別し、実省エネ度が省エネ度基準値以下であると、熱電併給装置1の運転が不可と判別するようにしている。熱電併給装置1の運転が可と判別すると熱電併給装置1を運転させ、熱電併給装置1の運転が不可と判別すると熱電併給装置1の運転を停止させる(ステップ7、8、9)。   When the operation determination process is further described, the actual energy saving degree obtained by the above equation 5 from the current electric power load, the hot water supply heat load, and the current heating heat load is calculated based on the energy saving degree reference value. Is exceeded, it is determined that the operation of the cogeneration apparatus 1 is possible, and if the actual energy saving level is less than or equal to the energy saving standard value, it is determined that the operation of the cogeneration apparatus 1 is not possible. When it is determined that the operation of the cogeneration apparatus 1 is possible, the cogeneration apparatus 1 is operated. When it is determined that the operation of the cogeneration apparatus 1 is impossible, the operation of the cogeneration apparatus 1 is stopped (steps 7, 8, 9).

つまり、実際の電力負荷、給湯熱負荷及び暖房熱負荷が、予測電力負荷データ、予測給湯熱負荷データ及び予測暖房熱負荷データと略等しければ、実省エネ度は、省エネ基準値演算処理において求めた予測省エネ度と略等しくなるので、必要貯湯量を貯湯できるように予測省エネ度の高い時間帯の順に選択した複数の単位時間において、熱電併給装置1が運転されることになる。   That is, if the actual power load, hot water supply heat load, and heating heat load are substantially equal to the predicted power load data, predicted hot water supply heat load data, and predicted heating heat load data, the actual energy saving degree is obtained in the energy saving reference value calculation process. Since it becomes substantially equal to the predicted energy saving level, the combined heat and power supply apparatus 1 is operated in a plurality of unit times selected in order of the time zone with the highest predicted energy saving level so that the required hot water storage amount can be stored.

〔別実施形態〕
以下、別実施形態を列記する。
[Another embodiment]
Hereinafter, other embodiments are listed.

(1)上記実施形態では、前記使用状況関連データ判定処理において、特異であると判定された日を除いた複数の日における過去負荷データに基づいて、特異であると判定された日における過去負荷データの代用とする過去負荷データを求めるにあたって、特異であると判定された日の前の日の過去負荷データを代用するように構成したが、このような構成に代えて、次の[イ]、[ロ]に示すような構成としてもよい。 (1) In the above embodiment, the past load on the day determined to be unique based on the past load data on a plurality of days excluding the date determined to be unique in the usage status related data determination process. In determining the past load data to be used as a substitute for the data, the past load data on the day before the date determined to be peculiar was substituted. However, instead of such a configuration, the following [A] The configuration as shown in [b] may be adopted.

[イ] 上記実施形態における図7の制御フローチャートのうちのステップ24の処理として、特異であると判定された日よりも7日前の過去負荷データを、特異であると判定された日の過去負荷データに代用する過去負荷データとして求めて、そのデータにて代用する構成としてもよい。
[ロ] 上記実施形態における図7の制御フローチャートのうちのステップ24の処理として、特異であると判定された日よりも前の7日間(1週間)の過去負荷データの平均値を、特異であると判定された日の過去負荷データに代用する過去負荷データとして求めて、そのデータにて代用する構成としてもよい。
[A] As the processing of step 24 in the control flowchart of FIG. 7 in the above embodiment, the past load data seven days before the day determined to be peculiar is used as the past load of the day determined to be peculiar. It is also possible to obtain the past load data to be substituted for the data and substitute the data for the past load data.
[B] As the process of step 24 in the control flowchart of FIG. 7 in the above embodiment, the average value of past load data for 7 days (one week) before the day determined to be unique is determined to be specific. It is also possible to obtain past load data that substitutes for past load data for a day determined to be present, and substitute that data.

(2)上記実施形態では、前記使用状況関連データ判定処理において、特異であると判定された日を除いた複数の日における過去負荷データに基づいて、特異であると判定された日における過去負荷データの代用とする過去負荷データを求める構成としたが、このような構成に限らず、特異であると判定された日における過去負荷データを空白のままにしておく構成であってもよい。このように構成した場合には、上記実施形態において説明したような各曜日に対応する時系列的な過去負荷データとしてグル−プ分けして管理しながら記憶内容を更新する処理を実行する際には、上記した〔数1〕における係数「K」をK=1として設定する。その結果、曜日毎にグループ分けして管理される過去負荷データは、D1(m+1)=D1(m)となってそのままのデータが維持されることになる。 (2) In the above-described embodiment, the past load on the date determined to be unique based on the past load data on a plurality of days excluding the date determined to be unique in the usage status related data determination process. Although the configuration is such that the past load data is obtained as a substitute for the data, the configuration is not limited to such a configuration, and the past load data on the day determined to be unique may be left blank. In the case of such a configuration, when executing the process of updating the stored content while grouping and managing as time-series past load data corresponding to each day of the week as described in the above embodiment, Sets the coefficient “K” in the above [Equation 1] as K = 1. As a result, the past load data managed by grouping for each day of the week is maintained as D1 (m + 1) = D1 (m).

(3)上記実施形態では、前記使用状況関連データ収集手段が収集可能な実使用状況関連データとして、電力負荷、電力負荷の時間変動量、風呂湯張り時刻、風呂湯張り回数、水及び温水の実供給量を記載したが、これらのうちのいずれか1つの種類の実使用状況関連データを用いて特異か否かを判定してもよく、又、それらのうちのいずれか2種類以上の実使用状況関連データの組み合わせにより特異か否かを判定してもよい。 (3) In the above embodiment, as the actual usage status related data that can be collected by the usage status related data collection means, the power load, the time fluctuation amount of the power load, the bath hot water time, the number of hot water baths, water and hot water Although the actual supply amount has been described, it may be determined whether or not it is peculiar by using any one of these types of actual usage status-related data, and any two or more types of these may be determined. You may determine whether it is peculiar by the combination of usage condition related data.

(4)上記実施形態では、前記熱電併給装置として、発電機とその発電機を駆動するガスエンジンとを備えて構成したが、この構成に代えて、燃料電池にて構成してもよい。 (4) In the above-described embodiment, the thermoelectric generator is provided with a generator and a gas engine that drives the generator. However, instead of this configuration, a fuel cell may be used.

コージェネレーションシステムの全体構成を示すブロック図Block diagram showing the overall configuration of the cogeneration system コージェネレーションシステムの制御構成を示すブロック図Block diagram showing control configuration of cogeneration system グループ別に管理される過去負荷データを示す図Figure showing past load data managed by group 予測負荷データを示す図Diagram showing predicted load data 省エネ度基準値演算処理を説明する図The figure explaining energy-saving standard value calculation processing 制御動作のフローチャートFlow chart of control operation 制御動作のフローチャートFlow chart of control operation

符号の説明Explanation of symbols

1 熱電併給装置
2 貯湯装置
5 運転制御手段
31 給湯熱負荷計測手段(使用状況関連データ収集手段)
32 暖房熱負荷計測手段(使用状況関連データ収集手段)
33 給湯装置(風呂湯張り手段)
36 風呂湯張りスイッチ(使用状況関連データ収集手段)
37 風呂予約スイッチ(使用状況関連データ収集手段)
P1 商用電力計測部(使用状況関連データ収集手段)
P2 発電電力計測部(使用状況関連データ収集手段)
DESCRIPTION OF SYMBOLS 1 Combined heat and power supply device 2 Hot water storage device 5 Operation control means 31 Hot water supply heat load measurement means (usage condition related data collection means)
32 Heating heat load measuring means (use status related data collecting means)
33 Hot water supply system (bath bathing means)
36 Bath hot water switch (use status related data collection means)
37 Bath reservation switch (usage-related data collection means)
P1 Commercial power measurement unit (usage-related data collection means)
P2 Power generation measurement unit (usage-related data collection means)

Claims (9)

熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、
前記運転制御手段が、計測された熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムであって、
前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、
前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて浴槽に風呂湯張りを行う風呂湯張り手段を備え、
前記使用状況関連データ収集手段が、風呂湯張り時刻を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、
前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の風呂湯張り時刻について、その風呂湯張り時刻が他の過去の複数の単位期間の風呂湯張り時刻の平均値と比較して特異であるか否かを判定するように構成されているエネルギ供給システム。
A cogeneration device that generates heat and electric power together, and an operation control means for controlling the operation of the cogeneration device are provided,
A data management process in which the operation control means manages past load data for the measured thermal load and electric power load for a plurality of unit periods in the past in a state in which each unit period is sorted in the order of passage of time, and the data management Based on the past load data managed in the process, based on the predicted load calculation process for obtaining the predicted load data for the thermal load and the power load in the target unit period that is the target of the planned operation, and the predicted load data An energy supply system configured to execute an operation process for planned operation of the cogeneration device,
For each of the past plurality of unit periods, usage status related data collecting means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by a consumer is provided,
The operation control means is
For the actual usage status related data of each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is compared with the actual usage status related data of the other past plurality of unit periods. Is configured to execute usage-related data determination processing for determining whether or not it is unique,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data ;
A bath hot water filling means for bathing the bathtub with hot water stored in a hot water storage device for storing hot water with heat generated by the combined heat and power supply device;
The usage status related data collecting means is configured to collect bath hot water filling time as the actual usage status related data,
The operation control means includes
In the usage status related data determination process, the bath hot water time for each of the past plurality of unit periods is compared with the average value of the bath hot water times of other past unit periods. An energy supply system configured to determine whether it is unique .
熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、
前記運転制御手段が、計測された熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムであって、
前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、
前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて浴槽に風呂湯張りを行う風呂湯張り手段を備え、
前記使用状況関連データ収集手段が、風呂湯張り回数を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の風呂湯張り回数について、その風呂湯張り回数が他の過去の複数の単位期間の風呂湯張り回数の平均値と比較して特異であるか否かを判定するように構成されているエネルギ供給システム。
A cogeneration device that generates heat and electric power together, and an operation control means for controlling the operation of the cogeneration device are provided,
A data management process in which the operation control means manages past load data for the measured thermal load and electric power load for a plurality of unit periods in the past in a state in which each unit period is sorted in the order of passage of time, and the data management Based on the past load data managed in the process, based on the predicted load calculation process for obtaining the predicted load data for the thermal load and the power load in the target unit period that is the target of the planned operation, and the predicted load data An energy supply system configured to execute an operation process for planned operation of the cogeneration device,
For each of the past plurality of unit periods, usage status related data collecting means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by a consumer is provided,
The operation control means is
For the actual usage status related data of each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is compared with the actual usage status related data of the other past plurality of unit periods. Is configured to execute usage-related data determination processing for determining whether or not it is unique,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data;
A bath hot water filling means for bathing the bathtub with hot water stored in a hot water storage device for storing hot water with heat generated by the combined heat and power supply device;
The usage status related data collection means is configured to collect the number of hot water bathing as the actual usage status related data,
In the usage status related data determination process, the operation control means is configured such that the number of times of bath hot water for each of the plurality of past unit periods is the number of times of bath hot water for the other past unit periods. An energy supply system configured to determine whether it is singular compared to an average value .
熱と電力とを併せて発生する熱電併給装置と、その熱電併給装置の運転を制御する運転制御手段とが設けられ、
前記運転制御手段が、計測された熱負荷及び電力負荷についての過去負荷データを、時間経過の並び順に単位期間毎に区分けした状態で過去の複数の単位期間について管理するデータ管理処理、そのデータ管理処理にて管理される過去負荷データに基づいて、計画運転の対象となる対象単位期間内における熱負荷及び電力負荷についての予測負荷データを求める予測負荷演算処理、及び、前記予測負荷データに基づいて前記熱電併給装置を計画運転する運転処理を実行するように構成されているエネルギ供給システムであって、
前記過去の複数の単位期間の夫々について、需要家による熱使用状況及び電力使用状況の少なくとも一方と直接又は間接的に関連する実使用状況関連データを収集する使用状況関連データ収集手段が設けられ、
前記運転制御手段が、
前記使用状況関連データ収集手段によって収集される前記過去の複数の単位期間夫々の実使用状況関連データについて、その実使用状況関連データが他の過去の複数の単位期間の実使用状況関連データと比較して特異であるか否かを判定する使用状況関連データ判定処理を実行するように構成され、
前記予測負荷演算処理において、前記過去の複数の単位期間のうち、前記使用状況関連データ判定処理において実使用状況関連データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて前記予測負荷データを求めるように構成され、
前記使用状況関連データ収集手段が、前記過去負荷データのうちの電力負荷を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々について、設定時間毎の電力負荷を時系列的に前後で比較してその差の絶対値を演算し、演算した絶対値の実積算値を求めるように構成され、且つ、その求めた実積算値と他の過去の複数の単位期間についての実積算値の平均値と比較して特異であるか否かを判定するように構成されているエネルギ供給システム。
A cogeneration device that generates heat and electric power together, and an operation control means for controlling the operation of the cogeneration device are provided,
A data management process in which the operation control means manages past load data for the measured thermal load and electric power load for a plurality of unit periods in the past in a state in which each unit period is sorted in the order of passage of time, and the data management Based on the past load data managed in the process, based on the predicted load calculation process for obtaining the predicted load data for the thermal load and the power load in the target unit period that is the target of the planned operation, and the predicted load data An energy supply system configured to execute an operation process for planned operation of the cogeneration device,
For each of the past plurality of unit periods, usage status related data collecting means for collecting actual usage status related data directly or indirectly related to at least one of heat usage status and power usage status by a consumer is provided,
The operation control means is
For the actual usage status related data of each of the past plurality of unit periods collected by the usage status related data collection means, the actual usage status related data is compared with the actual usage status related data of the other past plurality of unit periods. Is configured to execute usage-related data determination processing for determining whether or not it is unique,
In the predicted load calculation process, among the plurality of past unit periods, past loads in a plurality of unit periods excluding a unit period in which the actual use state related data is determined to be unique in the use state related data determination process Configured to determine the predicted load data based on the data;
The usage status related data collecting means is configured to collect a power load of the past load data as the actual usage status related data,
The operation control means, in the usage status related data determination process, for each of the plurality of past unit periods, to calculate the absolute value of the difference by comparing the power load for each set time in chronological order, It is configured to calculate the actual integrated value of the calculated absolute value, and whether the calculated actual integrated value is unique compared to the average value of the actual integrated values for other past unit periods An energy supply system configured to determine .
前記使用状況関連データ収集手段が、前記過去負荷データのうちの電力負荷を前記実使用状況関連データとして収集するように構成され、
前記運転制御手段は、前記使用状況関連データ判定処理において、前記過去の複数の単位期間夫々の電力負荷について、その電力負荷が他の過去の複数の単位期間の電力負荷の平均値と比較して特異であるか否かを判定するように構成されている請求項1〜3のいずれか1項に記載のエネルギ供給システム。
The usage status related data collecting means is configured to collect a power load of the past load data as the actual usage status related data,
In the usage status related data determination process, the operation control unit compares the power load of each of the past plurality of unit periods with an average value of the power loads of other past unit periods. The energy supply system according to claim 1, wherein the energy supply system is configured to determine whether or not it is peculiar.
水又は前記熱電併給装置で発生した熱にて貯湯する貯湯装置に貯湯された湯水を用いて得られる温水を供給する給水及び給湯装置を備え、
前記使用状況関連データ収集手段が、前記過去の複数の単位期間夫々の前記水及び前記温水の少なくとも一方の実供給量について、その実供給量が他の過去の複数の単位期間の実供給量の平均値と比較して特異であるか否かを判定するように構成されている請求項1〜4のいずれか1項に記載のエネルギ供給システム。
Water supply or hot water supply device for supplying hot water obtained using hot water stored in water or hot water storage device that stores hot water by heat generated in the combined heat and power supply device,
For the actual supply amount of at least one of the water and the hot water in each of the plurality of past unit periods, the usage status related data collection means is an average of the actual supply amounts of other past unit periods. The energy supply system according to any one of claims 1 to 4, wherein the energy supply system is configured to determine whether or not it is singular compared to a value.
前記運転制御手段が、
前記使用状況関連データ判定処理において、前記過去の複数の単位期間のうち、前記実使用状況データが特異であると判定された単位期間を除いた複数の単位期間における過去負荷データに基づいて、前記実使用状況データが特異であると判定された単位期間における過去負荷データの代用とする過去負荷データを求めるように構成されている請求項1〜5のいずれか1項に記載のエネルギ供給システム。
The operation control means is
In the usage status related data determination process, based on past load data in a plurality of unit periods excluding a unit period in which the actual usage status data is determined to be unique among the plurality of past unit periods, The energy supply system according to any one of claims 1 to 5, wherein the energy supply system is configured to obtain past load data as a substitute for past load data in a unit period in which the actual usage status data is determined to be unique .
前記運転制御手段が、
前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間よりも前の7日間の過去負荷データの平均値にて代用するように構成されている請求項6記載のエネルギ供給システム。
The operation control means is
In the usage status related data determination process, the unit period is determined to be unique among the plurality of past unit periods instead of the past load data in the unit period determined to be unique, with the unit period as one day. 7. The energy supply system according to claim 6 , wherein the energy supply system is configured to substitute an average value of past load data for seven days before the unit period .
前記運転制御手段が、
前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間の前日における過去負荷データにて代用するように構成されている請求項1〜5のいずれか1項に記載のエネルギ供給システム。
The operation control means is
In the usage status related data determination process, the unit period is determined to be unique among the plurality of past unit periods instead of the past load data in the unit period determined to be unique, with the unit period as one day. The energy supply system of any one of Claims 1-5 comprised so that the past load data in the day before the unit period may be substituted .
前記運転制御手段が、
前記使用状況関連データ判定処理において、前記単位期間を1日として、特異であると判定された単位期間における前記過去負荷データに代えて、前記過去の複数の単位期間のうち特異であると判定された単位期間の7日前における過去負荷データにて代用するように構成されている請求項1〜5のいずれか1項に記載のエネルギ供給システム。
The operation control means is
In the usage status related data determination process, the unit period is determined to be unique among the plurality of past unit periods instead of the past load data in the unit period determined to be unique, with the unit period as one day. The energy supply system of any one of Claims 1-5 comprised so that it may substitute for the past load data in 7 days before the unit period .
JP2005103153A 2005-03-31 2005-03-31 Energy supply system Expired - Fee Related JP4614809B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005103153A JP4614809B2 (en) 2005-03-31 2005-03-31 Energy supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005103153A JP4614809B2 (en) 2005-03-31 2005-03-31 Energy supply system

Publications (2)

Publication Number Publication Date
JP2006288037A JP2006288037A (en) 2006-10-19
JP4614809B2 true JP4614809B2 (en) 2011-01-19

Family

ID=37409367

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005103153A Expired - Fee Related JP4614809B2 (en) 2005-03-31 2005-03-31 Energy supply system

Country Status (1)

Country Link
JP (1) JP4614809B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5282060B2 (en) * 2010-03-23 2013-09-04 リンナイ株式会社 Energy usage indicator
JP6029901B2 (en) * 2012-09-13 2016-11-24 アズビル株式会社 Load amount prediction apparatus and load amount prediction method
JP7787022B2 (en) * 2022-06-06 2025-12-16 東京瓦斯株式会社 Energy consumption prediction method, energy consumption prediction system and program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11125448A (en) * 1997-10-22 1999-05-11 Ntt Power And Building Facilities Inc Thermal load-predicting device
JP2002364927A (en) * 2001-06-07 2002-12-18 Chofu Seisakusho Co Ltd Cogeneration system and hot water storage operation control method
JP3985896B2 (en) * 2002-07-09 2007-10-03 大阪瓦斯株式会社 Cogeneration system operation control device
JP2006090240A (en) * 2004-09-24 2006-04-06 Toho Gas Co Ltd Operation control device for household cogeneration system

Also Published As

Publication number Publication date
JP2006288037A (en) 2006-10-19

Similar Documents

Publication Publication Date Title
JP7108220B2 (en) Storage hot water heater
JP5048820B2 (en) Cogeneration system
JP4614793B2 (en) Energy load data creation device and cogeneration system
JP4614809B2 (en) Energy supply system
JP4605942B2 (en) Cogeneration system operation method
JP4056428B2 (en) Cogeneration system
JP4163977B2 (en) Heat source system
JP4176028B2 (en) Energy system
JP4208802B2 (en) Heat source system
JP4516862B2 (en) Energy supply system
JP2004264010A (en) Cogeneration system
JP3970239B2 (en) Cogeneration system energy saving degree calculation method
JP4659525B2 (en) Cogeneration system
JP2004260946A (en) Operation control system
JP2004257590A (en) Heat source system
JP4516875B2 (en) Energy supply system
JP4101082B2 (en) Cogeneration system
JP4649182B2 (en) Energy load data creation device and cogeneration system for energy generator
JP2004048838A (en) Method for storing data of energy load, and operation control device of cogeneration system using the same
JP2004263622A (en) Cogeneration system
JP4916197B2 (en) Cogeneration system
JP4861059B2 (en) Cogeneration system
JP2005226969A (en) Energy system
JP2006118748A (en) Cogeneration system
JP2004263943A (en) Cogeneration system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080226

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091029

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101007

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101019

R150 Certificate of patent or registration of utility model

Ref document number: 4614809

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131029

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees