Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4615681B2 - Hook block suspension mechanism for vehicle-mounted crane - Google Patents
[go: Go Back, main page]

JP4615681B2 - Hook block suspension mechanism for vehicle-mounted crane - Google Patents

Hook block suspension mechanism for vehicle-mounted crane Download PDF

Info

Publication number
JP4615681B2
JP4615681B2 JP2000238220A JP2000238220A JP4615681B2 JP 4615681 B2 JP4615681 B2 JP 4615681B2 JP 2000238220 A JP2000238220 A JP 2000238220A JP 2000238220 A JP2000238220 A JP 2000238220A JP 4615681 B2 JP4615681 B2 JP 4615681B2
Authority
JP
Japan
Prior art keywords
pulley
hook block
hook
wire rope
boom tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000238220A
Other languages
Japanese (ja)
Other versions
JP2002053288A5 (en
JP2002053288A (en
Inventor
正裕 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tadano Ltd
Original Assignee
Tadano Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tadano Ltd filed Critical Tadano Ltd
Priority to JP2000238220A priority Critical patent/JP4615681B2/en
Publication of JP2002053288A publication Critical patent/JP2002053288A/en
Publication of JP2002053288A5 publication Critical patent/JP2002053288A5/ja
Application granted granted Critical
Publication of JP4615681B2 publication Critical patent/JP4615681B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

【0001】
【発明が属する技術分野】
本願発明は、車両搭載型クレーンの起伏自在な伸縮ブームの先端部に、フックブロックを巻き上げ巻き下げ自在に吊り下げるためのフックブロック吊下げ機構に関するものである。
【0002】
【従来の技術】
本願発明が対象とするワイヤーロープ5本掛け式車両搭載型クレーンのフックブロック吊下げ機構の従来例について図9,10により説明する。
【0003】
1は車両搭載型クレーンの伸縮ブームであり、そのブーム先端部2には、両側板3,4間に橋架される支軸6に、回転自在に軸支される3個の略同径の第1ないし第3ブーム先端滑車7,8,9が配置されている。
【0004】
前記支軸6は、伸縮ブーム1の伸縮方向に水平方向で直交するように設けられ、該支軸6には、前記ブーム先端滑車7,8,9が図10の正面図でみて左から第3ブーム先端滑車9,第1ブーム先端滑車7、第2ブーム先端滑車8の順に配置されている。
【0005】
そして、第3ブーム先端滑車9と第1ブーム先端滑車7とは側板4を挟んで近接配置されるとともに、第1ブーム先端滑車7と第2ブーム先端滑車8とは所定の間隔を隔てて配置されており、第3ブーム先端滑車9の外周は、カバー部材5でカバーされている。
【0006】
なお、3個の滑車の配置は、前記した配置のものだけではなく、例えば、図10の正面図でみて側板3,4間に左から第1ブーム先端滑車7,第3ブーム先端滑車9、第2ブーム先端滑車8の順で、且つ、第1ブーム先端滑車7と第3ブーム先端滑車9とは近接配置されるとともに、第3ブーム先端滑車9と第2ブーム先端滑車8とは所定の間隔を隔てて配置されるものもあり、このようなものにおいても後述する課題を有している。
【0007】
20は前記ブーム先端滑車7,8,9により吊り下げられるフックブロックであり、滑車支持体21,第1及び第2フックブロック滑車25,26,及びフック30からなる。
【0008】
滑車支持体21は、左右一対の側端板22,23、該両側端板22,23間に橋架され第1及び第2フックブロック滑車25,26を回転自在に軸支する滑車支軸24、前記第1及び第2フックブロック滑車25,26の下側で、且つ、前記滑車支軸24に平行で前記両側端板22,23間に回転自在に橋架されたフック取付部材31、及び両側端板22,23間を連結する連結部材27からなる。
【0009】
そして、前記滑車支軸24は、前記ブーム先端部2の支軸6に水平方向で直交し、該滑車支軸24上には、回転自在で略同径の第1フックブロック滑車25及び第2フックブロック滑車26が互いに所定の間隔を隔て、第1フックブロック滑車25は図9の側面図でみて右側の側端板22側に、第2フックブロック滑車26は同じく図9でみて左側の側端板23側になるように配置される。
【0010】
また、前記フック取付部材31には、前記滑車支軸24に垂直方向で直交し、且つ、該滑車支軸24のほぼ軸心を通る面にフック軸心Yを持ち、該フック軸心Yの回りに捻転自在なようにフック30が取付けられている。
【0011】
更に両側端板22,23間には、連結部材27が介在され、該連結部材27は、前記第1及び第2フックブロック滑車25,26を下から包むように湾曲された平板からなり、その両端部を前記両側端板22,23に溶着している。
【0012】
一方前記側端板22のほぼ直上部には、突起部28が設けられ、この突起部28には、ワイヤーロープ索端止め具29が止着している。
【0013】
そしてワイヤーロープ10は、伸縮ブーム1の基端側に配置した図示しないウインチから引き出され、前記第1ブーム先端滑車7、第1フックブロック滑車25、第2ブーム先端滑車8、第2フックブロック滑車26、第3ブーム先端滑車9の順に懸け回され、その索端をフックブロック20の前記ワイヤーロープ索端止め具29に止着している。
【0014】
従来のフックブロック吊下げ機構はこのように構成され、特に、フックブロック20に配置したワイヤーロープ索端止め具29は、フックブロック滑車25,26の回転軸心を通る鉛直面近傍、即ち図10の正面図でみて滑車支軸24の軸心のほぼ直上部に位置するように滑車支持体21に配置されている。
【0015】
そのため、当該ワイヤーロープ索端止め具29に作用するワイヤーロープ張力に起因するフックブロック滑車の回転軸心回りの揺動力、即ち図10でみて滑車支軸24の回転軸心を中心にしてフック30が左右に揺れる動きを小さくすることができ、滑車支持体21のこの方向への揺動を防止するようにしている。
【0016】
【発明が解決しようとする課題】
しかしながら、ワイヤーロープ索端止め具29のこのような配置は、第3ブーム先端滑車9からワイヤーロープ索端止め具29に至るワイヤーロープ10が図10に図示するように傾斜状態にあるため、当該ワイヤーロープ索端止め具29に作用するワイヤーロープ10からの力が滑車支持体21に該滑車支持体21を前記フック軸心Yを中心にして水平面内で回転させる捻転力を生じさせ、しかもこの捻転力は、フック30に懸けられた荷重の大小に応じて変動するため、フックブロック20全体が捻転方向に安定しないという問題があった。また、従来例のものは、図9に示すようにフックブロック20は右側が3本のロープで左側が2本のロープで支持された状態にあり、且つ、フック30の回転中心が2枚のフックブロック滑車25,26の中間に位置しているため、フックブロック20は、フック30に懸けられた荷重の大小に応じてフックブロック滑車25,26の回転軸心に平行な鉛直面方向、即ち、図9でみて左右方向に揺動するという問題もあった。
【0017】
本願発明は、このように従来のフックブロック吊下げ機構が有していた捻転と揺動という2つの問題を同時に解決するものである。
【0018】
【課題を解決するための手段】
本願発明の目的を達成するための手段は、以下のとおりである。
【0019】
車両搭載型クレーンの起伏自在な伸縮ブームの先端部に、フックブロックを巻上げ巻下げ自在に吊下げるためのフックブロック吊下げ機構であって、前記伸縮ブームの先端部には、軸支された3個のブーム先端滑車を有し、前記フックブロックには、滑車支持体と、該滑車支持体に軸支された2個のフックブロック滑車と、軸心回りで回転自在に前記滑車支持体に取付けられたフックと、前記滑車支持体に取付けられたワイヤーロープ索端止め具とを有し、ワイヤーロープを第1ブーム先端滑車、第1フックブロック滑車、第2ブーム先端滑車、第2フックブロック滑車、第3ブーム先端滑車の順に懸け回した後、その索端を前記ワイヤーロープ索端止め具に止着してなる車両搭載型クレーンにおけるフックブロック吊下げ機構において、前記ワイヤーロープ索端止め具は、前記第3ブーム先端滑車のワイヤーロープ導出部の下方に位置するように前記滑車支持体に配置し、且つ前記フック軸心は、無負荷状態にあるフックブロックの平面視にてブーム先端部とフックブロック間に掛け渡された5本のワイヤーロープ部分の各フックブロック側係合点に作用する均等な作用力の合力着力点近傍に位置するように前記滑車支持体に配置した構成。
【0021】
また前記ワイヤーロープ索端止め具は、前記第3ブーム先端滑車のワイヤーロープ導出部の下方に位置するように前記滑車支持体に配置し、且つ前記フック軸心は、無負荷状態にあるフックブロックの平面視にて滑車支軸上の第1フックブロック滑車と第2フックブロック滑車中間点と、前記ワイヤーロープ索端止め具の取付位置を結ぶ線分上であって、前記中間点から前記線分長さの略1/5だけ前記ワイヤーロープ索端止め具側に偏った位置に配置した構成。
【0023】
更に前記滑車支持体を一体のブロック材とした構成。そしてこの構成により、フックブロックの製造を簡素化する。
【0024】
【発明の実施の形態】
図1ないし図5は、一実施例を示し、図9,10で説明した従来例と同じものは同じ番号を付している。
【0025】
従来例と同様に伸縮ブーム1のブーム先端部2には、両側板3,4間に橋架される支軸6に回転自在に3個の略同径の第1ないし第3ブーム先端滑車7,8,9が配置されている。
【0026】
前記支軸6は、伸縮ブーム1の伸縮方向に水平方向で直交するように配設され、前記ブーム先端滑車7,8,9は、図2の正面図でみて左から第3ブーム先端滑車9,第1ブーム先端滑車7、第2ブーム先端滑車8の順に配置される。
【0027】
そして、第3ブーム先端滑車9と第1ブーム先端滑車7とは側板4を挟んで近接配置されるとともに、第1ブーム先端滑車7と第2ブーム先端滑車8とは所定の間隔を隔てて配置されており、第3ブーム先端滑車9の外周は、カバー部材5でカバーされている。
【0028】
なお、3個の滑車の配置は、前記した配置のものだけではなく、例えば、図2の正面図でみて両側板3,4間に左から第1ブーム先端滑車7,第3ブーム先端滑車9、第2ブーム先端滑車8の順で、且つ、第1ブーム先端滑車7と第3ブーム先端滑車9とは近接配置されるとともに、第3ブーム先端滑車9と第2ブーム先端滑車8とは所定の間隔を隔てて配置されるものでもよい。
【0029】
20は前記ブーム先端滑車7,8,9により吊り下げられる本願発明のフックブロックであり、滑車支持体21,第1及び第2フックブロック滑車25,26,及びフック30からなり、その詳細を図3ないし図5に示す。
【0030】
滑車支持体21は、左右一対の側端板22,23、該両側端板22,23間に橋架され第1及び第2フックブロック滑車25,26を回転自在に軸支する滑車支軸24、第1及び第2フックブロック滑車25,26の下側で、且つ、前記滑車支軸24に平行で前記両側端板22,23間に回転自在に橋架されたフック取付部材31、及び両側端板22,23間を連結する連結部材27からなる。
【0031】
そして、前記滑車支軸24は、前記ブーム先端部2の支軸6に水平方向で直交し、ワイヤーロープ10によって吊り下げられたフックブロック20は、そのフックブロック滑車25,26がブーム先端滑車7,8,9に対して、平面視で直交するようになっているとともに、該滑車支軸24上には、回転自在で略同径の第1フックブロック滑車25及び第2フックブロック滑車26が互いに所定の間隔を隔て、第1フックブロック滑車25は図1の側面図でみて右側の側端板22側に、第2フックブロック滑車26は同じく図1でみて左側の側端板23側になるように配置される。
【0032】
また、前記フック取付部材31には、垂直方向のフック軸心Yを持ち、該フック軸心Yの回りに捻転自在なようにフック30が取付けられている。
【0033】
更に両側端板22,23間には、連結部材27が介在され、該連結部材27は、前記第1及び第2フックブロック滑車25,26を下から包むように湾曲された平板からなり、その両端部を前記両側端板22,23に溶着している。
【0034】
一方前記両側端板22、23の片側、即ち、フックブロック20がワイヤーロープ10により吊り下げられた時、図2に示すように第3ブーム先端滑車9の下方になる側には、コ字状部材32が両側端板22、23を挟むように溶着され、且つ、該コ字状部材32の第1フックブロック滑車25の近傍には、図4に示すようにワイヤーロープ索端止め具29を止着するための開口33が設けられている。
【0035】
そして、ワイヤーロープ10は、伸縮ブーム1の基端側に配置した図示しないウインチから引き出され、前記第1ブーム先端滑車7、第1フックブロック滑車25、第2ブーム先端滑車8、第2フックブロック滑車26、第3ブーム先端滑車9の順に懸け回され、その索端をフックブロック20に溶着してなる前記コ字状部材32の開口33に固着される前記ワイヤーロープ索端止め具29に止着する。
【0036】
なお、ワイヤーロープをこのように懸け回すことにより、前記第1ブーム先端滑車7から第1フックブロック滑車25に懸け回されるワイヤーロープは、図5の平面図でみて左側、即ち前記コ字状部材32の開口33側から入り、第1フックブロック滑車25の下側を回り同図の右側から上方に出ることになるので、前記コ字状部材32の開口33側は、前記第1フックブロック滑車25へのワイヤーロープ導入部側に設けられることになる。
【0037】
更にこの実施例においては、前記ワイヤーロープ索端止め具29の取付位置である第1フックブロック滑車25へのワイヤーロープ導入部近傍の位置を、コ字状部材32を設けその開口33の位置として特定したが、前記コ字状部材32は必須ではなく、例えば、図3でみて側端板22の上端部の最も左寄りに図10で説明した突起部28に相当するようなものを設けその部材を前記コ字状部材32の開口33に代わるものとして用いてもよい。
【0038】
このように前記ワイヤーロープ索端止め具29を、図2の正面図でみて前記第3ブーム先端滑車9の下方側で、且つ、図1の側面図でみて前記第1フックブロック滑車25側になる位置に設けることにより、ワイヤーロープ索端止め具29に連結されるワイヤーロープ10が従来例のように傾斜することがないのでフックブロック20が捻転することがなくなる。
【0039】
次に前記フック取付部材31に垂直に取り付けられるフック30のフック軸心Yの取付位置について図5により説明する。
【0040】
第1フックブロック滑車25と第2フックブロック滑車26とを軸支する滑車支軸24の軸心上で、且つ、前記両滑車25,26間の中間点Pと、前記コ字状部材32の開口33の中心点を線Rで結ぶ。
【0041】
そしてその線R上の前記中間点Pと前記コ字状部材32の開口33の中心点とからなる線分長さの略1/5だけ前記中間点Pより前記開口33の中心点側に偏った位置にフック軸心Yを設けている。
【0042】
このような位置にフック軸心Yを設ける理由は、この位置がブーム先端部とフックブロック間に掛け渡された5本のワイヤーロープ部分の各フックブロック側係合点に作用する均等な作用力の合力着力点になるためである。
【0043】
即ち、まずこの両滑車25及び26での前記合力着力点についてみると、その合力着力点は、滑車支軸24の軸心上で、且つ、前記両滑車25,26間の中央である中間点Pになる。
【0044】
ところが実際には5本目のワイヤーロープが前記コ字状部材32の開口33の中心点に作用しているため、全体の合力着力点は、前記中間点Pと前記開口33の中心点を結んだ線R上のいずれかに移動することになる。
【0045】
その移動量は、前記中間点Pに作用する力と前記開口33の中心点に作用する力の割合に応じて決まるところ、前記中間点Pに作用する力と前記開口33の中心点に作用する力の割合は4対1の関係にあるため、前記移動量は、前記中間点Pから該中間点Pと前記コ字状部材32の開口33の中心点とを結んだ線分長さの略1/5ということになり、本願発明は、この位置に前記フック30のフック軸心Yを設けたものである。
【0046】
そして、このような構成を採用することにより、図1及び図4からも明らかなように、フックの回転中心が3本のロープで支持される右側(図1での右側)のフックブロック滑車側に偏心して配置されるため、図1でみてのフックブロックの左右の揺動をも防止できる。
なお、第1フックブロック滑車25及び第2フックブロック滑車26、ないしは前記ブーム先端滑車7,8,9の大きさが変れば、その位置は5本のワイヤーロープによって決まる合力着力点になる。
【0047】
図6ないし図8は、フックブロックが異なる他の実施例である。フックブロックは一体のブロック材35から構成されている。該ブロック材35は、幅に比べ高さが低いほぼ直方形状をなし、その一端部には、ワイヤーロープ索端止め具29を止着するための開口37を有する突出部36が形成されている。
【0048】
また、このブロック材35には、第1フックブロック滑車25及び第2フックブロック滑車26が軸支される滑車支軸24が水平に取り付けられるとともに、フック30の軸が前記滑車支軸24と重ならないよう垂直に取り付けられている。
【0049】
そして前記突出部36の開口37は、第1フックブロック滑車25のワイヤーロープ導入部、即ち図8の平面図でみて第1フックブロック滑車25の左側部分近傍に設けられる。
【0050】
更に前記フック30のフック軸心Yは、図8で図示するように第1フックブロック滑車25と第2フックブロック滑車26とを軸支する滑車支軸24の軸心上で、且つ、前記両滑車25,26間の中間点Pと、前記突出部36の開口37の中心点を結んだ線R上で、前記中間点Pと前記コ字状部材32の開口33の中心点とからなる線分長さの略1/5だけ前記中間点Pから前記開口33の中心点側に偏った位置にフック軸心Yを設けている。
【0051】
なお、該実施例のブロック材35は、図6ないし図8のものとして説明したが、その形状は、前記滑車支軸24及びフック30を軸支でき、且つ、前記ワイヤーロープ索端止め具29を止着できる部分を有すればどのような形状であっても構わない。また、実施例では、フック滑車を同一軸線上に配置したものについて説明したが、同一軸線上に配置されていないものにも適用可能である。
【0052】
【発明の効果】
本願発明は、ワイヤーロープ索端止め具を第1フックブロック滑車へのワイヤーロープ導入部近傍に位置するように滑車支持体に配置するとともに、フックの捻転軸心を、無負荷状態にあるフックブロックの平面視にてブーム先端部とフックブロック間に掛け渡された5本のワイヤーロープ部分の各フックブロック側係合点に作用する均等な作用力の合力着力点近傍に位置するように前記滑車支持体に配置することにより、フックブロック滑車の回転軸心に平行な鉛直面方向、即ち、図でみての左右方向の揺動も含め、フックブロック全体の捻転及び揺動を同時に無くすることができ、フックブロック全体の上下動を安定化することができる。
【0053】
また、滑車支持体を一体のブロック材として構成することにより、フックブロックの製造を簡素化することができ、そのコストを低減することができる。
【図面の簡単な説明】
【図1】本願発明の車両搭載型クレーンにおけるフックブロック吊下げ機構の側面図。
【図2】本願発明の車両搭載型クレーンにおけるフックブロック吊下げ機構の正面図。
【図3】本願発明のフックブロックの正面図。
【図4】本願発明のフックブロックの側面図。
【図5】本願発明のフックブロックの平面図。
【図6】本願発明のフックブロックの他の実施例の正面図。
【図7】本願発明のフックブロックの他の実施例の側面図。
【図8】本願発明のフックブロックの他の実施例の平面図。
【図9】従来の車両搭載型クレーンにおけるフックブロック吊下げ機構の側面図。
【図10】従来の車両搭載型クレーンにおけるフックブロック吊下げ機構の正面図。
【符号の説明】
1 伸縮ブーム
2 ブーム先端部
3、4 側板
5 カバー部材
6 支軸
7 第1ブーム先端滑車
8 第2ブーム先端滑車
9 第3ブーム先端滑車
10 ワイヤーロープ
20 フックブロック
21 滑車支持体
22、23 側端板
24 滑車支軸
25 第1フックブロック滑車
26 第2フックブロック滑車
27 連結部材
28 突起部
29 ワイヤーロープ索端止め具
30 フック
31 フック取付部材
32 コ字状部材
33 開口
35 ブロック材
36 突出部
37 開口
[0001]
[Technical field to which the invention belongs]
The present invention relates to a hook block suspending mechanism for hoisting and suspending a hook block at a tip end portion of a telescopic boom that can be raised and lowered in a vehicle-mounted crane.
[0002]
[Prior art]
A conventional example of a hook block hanging mechanism of a five-wire rope hanging type vehicle-mounted crane targeted by the present invention will be described with reference to FIGS.
[0003]
Reference numeral 1 denotes a telescopic boom of a vehicle-mounted crane, and three booms of substantially the same diameter that are rotatably supported on a support shaft 6 that is bridged between both side plates 3 and 4 are provided at the boom tip 2. First to third boom tip pulleys 7, 8, 9 are arranged.
[0004]
The support shaft 6 is provided so as to be orthogonal to the expansion / contraction direction of the telescopic boom 1 in the horizontal direction. The boom tip pulleys 7, 8, and 9 are arranged on the support shaft 6 from the left in the front view of FIG. A three-boom tip pulley 9, a first boom tip pulley 7, and a second boom tip pulley 8 are arranged in this order.
[0005]
The third boom tip pulley 9 and the first boom tip pulley 7 are arranged close to each other with the side plate 4 interposed therebetween, and the first boom tip pulley 7 and the second boom tip pulley 8 are arranged at a predetermined interval. The outer periphery of the third boom tip pulley 9 is covered with a cover member 5.
[0006]
The arrangement of the three pulleys is not limited to the arrangement described above. For example, the first boom tip pulley 7, the third boom tip pulley 9 from the left between the side plates 3 and 4 in the front view of FIG. The first boom tip pulley 7 and the third boom tip pulley 9 are arranged in the order of the second boom tip pulley 8 and the third boom tip pulley 9 and the second boom tip pulley 8 are predetermined. Some of them are arranged at intervals, and such a thing also has the problem described later.
[0007]
A hook block 20 is suspended by the boom tip pulleys 7, 8, and 9, and includes a pulley support 21, first and second hook block pulleys 25 and 26, and a hook 30.
[0008]
The pulley support body 21 includes a pair of left and right side end plates 22 and 23, a pulley support shaft 24 that is bridged between the side end plates 22 and 23 and rotatably supports the first and second hook block pulleys 25 and 26. A hook mounting member 31 below the first and second hook block pulleys 25 and 26 and parallel to the pulley support shaft 24 and rotatably bridged between the side end plates 22 and 23, and both side ends. It consists of a connecting member 27 that connects between the plates 22 and 23.
[0009]
The pulley support shaft 24 is orthogonal to the support shaft 6 of the boom tip 2 in the horizontal direction. On the pulley support shaft 24, a first hook block pulley 25 and a second hook block pulley 25 that are rotatable and have substantially the same diameter. The hook block pulleys 26 are spaced apart from each other by a predetermined distance, the first hook block pulley 25 is on the side plate 22 on the right side in the side view of FIG. 9, and the second hook block pulley 26 is on the left side in FIG. It arrange | positions so that it may become the end plate 23 side.
[0010]
The hook mounting member 31 has a hook axis Y on a surface perpendicular to the pulley support shaft 24 in the vertical direction and passing through the axis of the pulley support shaft 24. A hook 30 is attached so that it can be twisted around.
[0011]
Further, a connecting member 27 is interposed between the side end plates 22 and 23, and the connecting member 27 is formed of a flat plate curved so as to wrap the first and second hook block pulleys 25 and 26 from below. The part is welded to the both side end plates 22 and 23.
[0012]
On the other hand, a projection 28 is provided almost directly above the side end plate 22, and a wire rope rope end stopper 29 is fixed to the projection 28.
[0013]
The wire rope 10 is pulled out from a winch (not shown) disposed on the base end side of the telescopic boom 1, and the first boom tip pulley 7, the first hook block pulley 25, the second boom tip pulley 8, and the second hook block pulley. 26, the third boom tip pulley 9 is hung around in this order, and the end of the rope is fixed to the wire rope end stop 29 of the hook block 20.
[0014]
The conventional hook block suspending mechanism is configured in this manner. In particular, the wire rope rope end stop 29 disposed on the hook block 20 is in the vicinity of the vertical plane passing through the rotation axis of the hook block pulleys 25 and 26, that is, FIG. As shown in the front view, the pulley support 21 is disposed so as to be located almost directly above the axis of the pulley support shaft 24.
[0015]
Therefore, the hook 30 around the rotation axis of the pulley support shaft 24 as viewed in FIG. 10, that is, the swinging force around the rotation axis of the hook block pulley caused by the wire rope tension acting on the wire rope rope end stop 29. The swinging motion of the pulley supporter 21 can be reduced, and the swinging of the pulley support 21 in this direction is prevented.
[0016]
[Problems to be solved by the invention]
However, such an arrangement of the wire rope rope end stopper 29 is such that the wire rope 10 from the third boom tip pulley 9 to the wire rope rope end stopper 29 is in an inclined state as shown in FIG. The force from the wire rope 10 acting on the wire rope end stop 29 causes the pulley support 21 to generate a torsional force that rotates the pulley support 21 around the hook axis Y in the horizontal plane. Since the torsional force fluctuates according to the magnitude of the load hung on the hook 30, there is a problem that the entire hook block 20 is not stable in the torsional direction. In the conventional example, as shown in FIG. 9, the hook block 20 is supported by three ropes on the right side and two ropes on the left side, and the center of rotation of the hook 30 is two. Since the hook block 20 is located between the hook block pulleys 25 and 26, the hook block 20 corresponds to the vertical plane direction parallel to the rotation axis of the hook block pulleys 25 and 26 according to the magnitude of the load applied to the hook 30. 9 has a problem of swinging in the left-right direction .
[0017]
The present invention thus solves the two problems of twisting and swinging that the conventional hook block suspension mechanism has in this way.
[0018]
[Means for Solving the Problems]
Means for achieving the object of the present invention are as follows.
[0019]
A hook block suspending mechanism for hoisting and hanging a hook block at a distal end portion of a telescopic boom that can be raised and lowered of a vehicle-mounted crane, and is pivotally supported by the distal end portion of the telescopic boom. A plurality of boom tip pulleys, and the hook block has a pulley support, two hook block pulleys pivotally supported by the pulley support, and is rotatably attached to the pulley support about an axis. And a wire rope rope end stopper attached to the pulley support, the wire rope being a first boom tip pulley, a first hook block pulley, a second boom tip pulley, and a second hook block pulley. In the hook block suspension mechanism in the vehicle-mounted crane, the rope end is fastened to the wire rope rope end stopper after hanging around in order of the third boom tip pulley. Wire rope rope end stop, the third place in the pulley support so as to be positioned below the wire rope outlet end of the boom tip sheave, and the hook axis, the plane of the hook block in the unloaded condition The pulley support is positioned so that it is located in the vicinity of the resultant force application point of the equal acting force acting on each hook block side engagement point of the five wire rope portions spanned between the boom tip portion and the hook block. Arranged configuration.
[0021]
The wire rope rope end stopper is disposed on the pulley support so as to be positioned below the wire rope leading portion of the third boom tip pulley , and the hook axis is a hook block in an unloaded state. On the line connecting the first hook block pulley and the second hook block pulley intermediate point on the pulley support shaft and the mounting position of the wire rope end stop on the pulley spindle in plan view of the line, from the intermediate point to the line The structure which has arrange | positioned in the position biased to the said wire rope rope end stopper side only about 1/5 of length.
[0023]
Further, the pulley support is formed as an integral block member. And this structure simplifies the manufacture of the hook block.
[0024]
DETAILED DESCRIPTION OF THE INVENTION
1 to 5 show an embodiment, and the same reference numerals are assigned to the same components as those of the conventional example described with reference to FIGS.
[0025]
As in the conventional example, the boom tip 2 of the telescopic boom 1 is provided with three first to third boom tip pulleys 7 having substantially the same diameter so as to be rotatable around a support shaft 6 bridged between the side plates 3 and 4. 8, 9 are arranged.
[0026]
The support shaft 6 is disposed so as to be orthogonal to the telescopic direction of the telescopic boom 1 in the horizontal direction, and the boom tip pulleys 7, 8, and 9 are viewed from the left in the front view of FIG. , The first boom tip pulley 7 and the second boom tip pulley 8 are arranged in this order.
[0027]
The third boom tip pulley 9 and the first boom tip pulley 7 are arranged close to each other with the side plate 4 interposed therebetween, and the first boom tip pulley 7 and the second boom tip pulley 8 are arranged at a predetermined interval. The outer periphery of the third boom tip pulley 9 is covered with a cover member 5.
[0028]
The arrangement of the three pulleys is not limited to the arrangement described above. For example, as seen from the front view of FIG. 2, the first boom tip pulley 7 and the third boom tip pulley 9 are arranged between the side plates 3 and 4 from the left. The first boom tip pulley 7 and the third boom tip pulley 9 are arranged close to each other in the order of the second boom tip pulley 8, and the third boom tip pulley 9 and the second boom tip pulley 8 are predetermined. It may be arranged with an interval of.
[0029]
Reference numeral 20 denotes a hook block according to the present invention which is suspended by the boom tip pulleys 7, 8, and 9. The hook block includes a pulley support 21, first and second hook block pulleys 25 and 26, and a hook 30. Shown in FIGS.
[0030]
The pulley support body 21 includes a pair of left and right side end plates 22 and 23, a pulley support shaft 24 that is bridged between the side end plates 22 and 23 and rotatably supports the first and second hook block pulleys 25 and 26. A hook attachment member 31 below the first and second hook block pulleys 25 and 26 and parallel to the pulley support shaft 24 and rotatably bridged between the side end plates 22 and 23, and both side end plates It consists of a connecting member 27 that connects between 22 and 23.
[0031]
The pulley support shaft 24 is orthogonal to the support shaft 6 of the boom tip 2 in the horizontal direction, and the hook block pulleys 25 and 26 of the hook block 20 suspended by the wire rope 10 are connected to the boom tip pulley 7. , 8 and 9 are orthogonal to each other in plan view, and a first hook block pulley 25 and a second hook block pulley 26 which are rotatable and have substantially the same diameter are provided on the pulley support shaft 24. The first hook block pulley 25 is on the right side end plate 22 side in the side view of FIG. 1, and the second hook block pulley 26 is on the left side end plate 23 side in the same manner as shown in FIG. It is arranged to become.
[0032]
The hook attachment member 31 has a hook axis Y in the vertical direction, and a hook 30 is attached so that it can be twisted around the hook axis Y.
[0033]
Further, a connecting member 27 is interposed between the side end plates 22 and 23, and the connecting member 27 is formed of a flat plate curved so as to wrap the first and second hook block pulleys 25 and 26 from below. The part is welded to the both side end plates 22 and 23.
[0034]
On the other hand, on one side of the side end plates 22, 23, that is, on the side below the third boom tip pulley 9 as shown in FIG. A member 32 is welded so as to sandwich the both end plates 22 and 23, and a wire rope rope end stop 29 is provided in the vicinity of the first hook block pulley 25 of the U-shaped member 32 as shown in FIG. An opening 33 for fastening is provided.
[0035]
The wire rope 10 is pulled out from a winch (not shown) disposed on the base end side of the telescopic boom 1 and is connected to the first boom tip pulley 7, the first hook block pulley 25, the second boom tip pulley 8, and the second hook block. A pulley 26 and a third boom tip pulley 9 are hung around in this order, and the rope end is fixed to the wire rope rope end stop 29 fixed to the opening 33 of the U-shaped member 32 formed by welding the rope end to the hook block 20. To wear.
[0036]
Note that the wire rope suspended from the first boom tip pulley 7 to the first hook block pulley 25 by hanging the wire rope in this way is the left side in the plan view of FIG. Since it enters from the opening 33 side of the member 32 and goes around the lower side of the first hook block pulley 25 and exits from the right side of the figure, the opening 33 side of the U-shaped member 32 is connected to the first hook block. It is provided on the wire rope introduction part side to the pulley 25.
[0037]
Furthermore, in this embodiment, the position near the wire rope introduction portion to the first hook block pulley 25, which is the attachment position of the wire rope rope end stopper 29, is set as the position of the opening 33 provided with the U-shaped member 32. However, the U-shaped member 32 is not essential. For example, a member corresponding to the protruding portion 28 described in FIG. 10 is provided at the leftmost end of the upper end portion of the side end plate 22 in FIG. May be used as an alternative to the opening 33 of the U-shaped member 32.
[0038]
Thus, the wire rope rope end stopper 29 is located on the lower side of the third boom tip pulley 9 as seen in the front view of FIG. 2, and on the first hook block pulley 25 side as seen in the side view of FIG. Since the wire rope 10 connected to the wire rope rope end stop 29 is not inclined as in the conventional example, the hook block 20 is not twisted.
[0039]
Next, the attachment position of the hook axis Y of the hook 30 attached perpendicularly to the hook attachment member 31 will be described with reference to FIG.
[0040]
On the axial center of the pulley support shaft 24 that supports the first hook block pulley 25 and the second hook block pulley 26, and between the intermediate point P between the pulleys 25 and 26, the U-shaped member 32 The center point of the opening 33 is connected by a line R.
[0041]
Then, the center point of the opening 33 is biased from the intermediate point P by about 1/5 of the length of the line segment formed by the intermediate point P on the line R and the center point of the opening 33 of the U-shaped member 32. A hook axis Y is provided at the position.
[0042]
The reason for providing the hook axis Y at such a position is that this position has an equal acting force that acts on each hook block side engaging point of the five wire rope portions spanned between the boom tip and the hook block. This is because it becomes a resultant force point.
[0043]
That is, first, regarding the resultant force applied point at the pulleys 25 and 26, the resultant applied force point is an intermediate point on the axis of the pulley support shaft 24 and at the center between the pulleys 25 and 26. Become P.
[0044]
However, since the fifth wire rope actually acts on the center point of the opening 33 of the U-shaped member 32, the total resultant force application point connects the intermediate point P and the center point of the opening 33. It will move to somewhere on the line R.
[0045]
The amount of movement is determined according to the ratio of the force acting on the intermediate point P and the force acting on the center point of the opening 33, and acts on the force acting on the intermediate point P and the center point of the opening 33. Since the force ratio is in a 4-to-1 relationship, the amount of movement is approximately the length of the line segment connecting the intermediate point P and the intermediate point P to the center point of the opening 33 of the U-shaped member 32. Therefore, the present invention is such that the hook axis Y of the hook 30 is provided at this position.
[0046]
By adopting such a configuration, the hook block pulley side on the right side (right side in FIG. 1) where the center of rotation of the hook is supported by three ropes, as is apparent from FIGS. Therefore, the hook block can be prevented from swinging left and right as viewed in FIG.
If the size of the first hook block pulley 25 and the second hook block pulley 26 or the boom tip pulleys 7, 8, and 9 is changed, the position becomes a resultant force application point determined by five wire ropes.
[0047]
6 to 8 show other embodiments having different hook blocks. The hook block is composed of an integral block member 35. The block member 35 has a substantially rectangular shape whose height is lower than the width, and a protruding portion 36 having an opening 37 for fixing the wire rope end stop 29 is formed at one end thereof. .
[0048]
Further, a pulley support shaft 24 on which the first hook block pulley 25 and the second hook block pulley 26 are pivotally attached is horizontally attached to the block member 35, and the shaft of the hook 30 is overlapped with the pulley support shaft 24. It is mounted vertically so that it does not become.
[0049]
The opening 37 of the protruding portion 36 is provided in the vicinity of the left side portion of the first hook block pulley 25 when viewed from the wire rope introduction portion of the first hook block pulley 25, that is, in the plan view of FIG.
[0050]
Further, the hook axis Y of the hook 30 is on the axis of the pulley support shaft 24 that supports the first hook block pulley 25 and the second hook block pulley 26 as shown in FIG. A line composed of the intermediate point P and the central point of the opening 33 of the U-shaped member 32 on the line R connecting the intermediate point P between the pulleys 25 and 26 and the central point of the opening 37 of the protruding portion 36. A hook axis Y is provided at a position deviated from the intermediate point P toward the center point side of the opening 33 by approximately 1/5 of the length.
[0051]
Although the block member 35 of the embodiment has been described as that of FIGS. 6 to 8, the shape thereof can support the pulley support shaft 24 and the hook 30, and the wire rope end stop 29. Any shape can be used as long as it has a portion that can be fixed. Moreover, although the Example demonstrated what arrange | positioned the hook pulley on the same axis line, it is applicable also to what is not arrange | positioned on the same axis line.
[0052]
【The invention's effect】
In the present invention, the wire rope rope end stopper is arranged on the pulley support so as to be positioned in the vicinity of the wire rope introduction portion to the first hook block pulley, and the torsion axis of the hook is a hook block in an unloaded state. The pulley support is positioned so as to be located in the vicinity of the resultant force application point of the equal acting force acting on each hook block side engagement point of the five wire rope portions spanned between the boom tip portion and the hook block in a plan view of by arranging the body, the hook block vertical plane parallel direction to the rotation axis of the pulley, i.e., including the swing in the lateral direction of the viewed in FIG. 1, be without kinking and swinging of the entire hook block simultaneously The vertical movement of the entire hook block can be stabilized.
[0053]
Further, by configuring the pulley support body as an integral block member, the manufacture of the hook block can be simplified and the cost can be reduced.
[Brief description of the drawings]
FIG. 1 is a side view of a hook block suspension mechanism in a vehicle-mounted crane according to the present invention.
FIG. 2 is a front view of a hook block suspension mechanism in a vehicle-mounted crane according to the present invention.
FIG. 3 is a front view of a hook block according to the present invention.
FIG. 4 is a side view of the hook block of the present invention.
FIG. 5 is a plan view of a hook block according to the present invention.
FIG. 6 is a front view of another embodiment of the hook block of the present invention.
FIG. 7 is a side view of another embodiment of the hook block of the present invention.
FIG. 8 is a plan view of another embodiment of the hook block of the present invention.
FIG. 9 is a side view of a hook block suspension mechanism in a conventional vehicle-mounted crane.
FIG. 10 is a front view of a hook block suspension mechanism in a conventional vehicle-mounted crane.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Telescopic boom 2 Boom front-end | tip part 3, 4 Side board 5 Cover member 6 Spindle 7 1st boom front end pulley 8 2nd boom front end pulley 9 3rd boom front end pulley 10 Wire rope 20 Hook block 21 Pulley support body 22,23 Side end Plate 24 Pulley spindle 25 First hook block pulley 26 Second hook block pulley 27 Connecting member 28 Protrusion 29 Wire rope rope end stop 30 Hook 31 Hook attachment member 32 U-shaped member 33 Opening 35 Block member 36 Protrusion 37 Opening

Claims (3)

車両搭載型クレーンの起伏自在な伸縮ブームの先端部に、フックブロックを巻上げ巻下げ自在に吊下げるためのフックブロック吊下げ機構であって、
前記伸縮ブームの先端部には、軸支された3個のブーム先端滑車を有し、前記フックブロックには、滑車支持体と、該滑車支持体に軸支された2個のフックブロック滑車と、軸心回りで回転自在に前記滑車支持体に取付けられたフックと、前記滑車支持体に取付けられたワイヤーロープ索端止め具とを有し、ワイヤーロープを第1ブーム先端滑車、第1フックブロック滑車、第2ブーム先端滑車、第2フックブロック滑車、第3ブーム先端滑車の順に懸け回した後、その索端を前記ワイヤーロープ索端止め具に止着してなる車両搭載型クレーンにおけるフックブロック吊下げ機構において、
前記ワイヤーロープ索端止め具は、前記第3ブーム先端滑車のワイヤーロープ導出部の下方に位置するように前記滑車支持体に配置され、且つ前記フック軸心は、無負荷状態にあるフックブロックの平面視にてブーム先端部とフックブロック間に掛け渡された5本のワイヤーロープ部分の各フックブロック側係合点に作用する均等な作用力の合力着力点近傍に位置するように前記滑車支持体に配置されていることを特徴とする車両搭載型クレーンにおけるフックブロック吊下げ機構。
A hook block suspending mechanism for hoisting and hanging the hook block freely at the tip of a telescopic boom that can be raised and lowered in a vehicle-mounted crane,
There are three boom tip pulleys pivotally supported at the tip of the telescopic boom, the hook block includes a pulley support, and two hook block pulleys pivotally supported by the pulley support. , A hook attached to the pulley support so as to be rotatable about an axis, and a wire rope rope end stopper attached to the pulley support, wherein the wire rope is a first boom tip pulley, a first hook. A hook in a vehicle-mounted crane formed by hanging a block pulley, a second boom tip pulley, a second hook block pulley, and a third boom tip pulley in that order, and then fixing the rope end to the wire rope rope end stopper. In the block suspension mechanism,
The wire rope rope end stopper is disposed on the pulley support so as to be positioned below the wire rope lead-out portion of the third boom tip pulley , and the hook axis is a hook block in an unloaded state. The pulley support body is positioned so as to be located in the vicinity of a resultant force application point of equal acting force acting on each hook block side engagement point of the five wire rope portions spanned between the boom tip portion and the hook block in a plan view. A hook block suspension mechanism in a vehicle-mounted crane, characterized in that
車両搭載型クレーンの起伏自在な伸縮ブームの先端部に、フックブロックを巻上げ巻下げ自在に吊下げるためのフックブロック吊下げ機構であって、
前記伸縮ブームの先端部には、軸支された略同径の3個のブーム先端滑車を有し、前記フックブロックには、滑車支持体と、該滑車支持体に軸支された略同径の2個のフックブロック滑車と、軸心回りで回転自在に前記滑車支持体に取付けられたフックと、前記滑車支持体に取付けられたワイヤーロープ索端止め具とを有し、ワイヤーロープを第1ブーム先端滑車、第1フックブロック滑車、第2ブーム先端滑車、第2フックブロック滑車、第3ブーム先端滑車の順に懸け回した後、その索端を前記ワイヤーロープ索端止め具に止着してなる車両搭載型クレーンにおけるフックブロック吊下げ機構において、
前記ワイヤーロープ索端止め具は、前記第3ブーム先端滑車のワイヤーロープ導出部の下方に位置するように前記滑車支持体に配置され、且つ前記フック軸心は、無負荷状態にあるフックブロックの平面視にて滑車支軸上の第1フックブロック滑車と第2フックブロック滑車中間点と、前記ワイヤーロープ索端止め具の取付位置を結ぶ線分上であって、前記中間点から前記線分長さの略1/5だけ前記ワイヤーロープ索端止め具側に偏った位置に配置されていることを特徴とする車両搭載型クレーンにおけるフックブロック吊下げ機構。
A hook block suspending mechanism for hoisting and hanging the hook block freely at the tip of a telescopic boom that can be raised and lowered in a vehicle-mounted crane,
The telescopic boom has three boom tip pulleys with substantially the same diameter that are pivotally supported at the distal end of the boom, and the hook block has a pulley support and substantially the same diameter that is pivotally supported by the pulley support. Two hook block pulleys, a hook attached to the pulley support so as to be rotatable about an axis, and a wire rope end stop attached to the pulley support. After hanging around the boom tip pulley, the first hook block pulley, the second boom tip pulley, the second hook block pulley, and the third boom tip pulley in this order, the end of the rope is fastened to the wire rope end stop. In the hook block suspension mechanism in the vehicle-mounted crane,
The wire rope rope end stopper is disposed on the pulley support so as to be positioned below the wire rope lead-out portion of the third boom tip pulley , and the hook axis is a hook block in an unloaded state. It is on a line segment connecting the first hook block pulley and second hook block pulley intermediate point on the pulley spindle in plan view and the attachment position of the wire rope rope end stopper, and from the intermediate point to the line segment A hook block suspension mechanism in a vehicle-mounted crane, wherein the hook block suspension mechanism is disposed at a position deviated toward the wire rope end stop side by approximately 1/5 of the length.
前記滑車支持体は、一体のブロック材で構成されていることを特徴とする請求項1または2に記載の車両搭載型クレーンにおけるフックブロック吊下げ機構。  The hook block suspension mechanism in a vehicle-mounted crane according to claim 1 or 2, wherein the pulley support is made of an integral block member.
JP2000238220A 2000-08-07 2000-08-07 Hook block suspension mechanism for vehicle-mounted crane Expired - Fee Related JP4615681B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000238220A JP4615681B2 (en) 2000-08-07 2000-08-07 Hook block suspension mechanism for vehicle-mounted crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000238220A JP4615681B2 (en) 2000-08-07 2000-08-07 Hook block suspension mechanism for vehicle-mounted crane

Publications (3)

Publication Number Publication Date
JP2002053288A JP2002053288A (en) 2002-02-19
JP2002053288A5 JP2002053288A5 (en) 2007-10-04
JP4615681B2 true JP4615681B2 (en) 2011-01-19

Family

ID=18729956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000238220A Expired - Fee Related JP4615681B2 (en) 2000-08-07 2000-08-07 Hook block suspension mechanism for vehicle-mounted crane

Country Status (1)

Country Link
JP (1) JP4615681B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5844566B2 (en) * 2011-07-20 2016-01-20 古河ユニック株式会社 Crane hook device
CN108726406B (en) * 2018-07-13 2023-08-08 芜湖天风新能源科技有限公司 Gravity tensioning device
CN109812543B (en) * 2019-02-15 2024-03-15 中建八局装饰工程有限公司 Suspension rope fixing structure for aerial work equipment and its installation method
JP7254338B2 (en) * 2019-02-28 2023-04-10 株式会社トップラン orthotics
CN110282549A (en) * 2019-06-28 2019-09-27 三一海洋重工有限公司 A kind of anti-roll device and crane
CN119100267B (en) * 2024-09-03 2025-07-08 中国港湾工程有限责任公司 Lifting device of bridge girder erection machine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4631464Y1 (en) * 1968-05-28 1971-10-30
JPS5860675U (en) * 1981-10-21 1983-04-23 古河鉱業株式会社 hook device
JPS58131277U (en) * 1982-02-26 1983-09-05 住友重機械工業株式会社 Futsk block
JPS6064993U (en) * 1983-10-11 1985-05-08 株式会社 多田野鉄工所 hook device
JPH0617831Y2 (en) * 1988-08-05 1994-05-11 株式会社タダノ Hook device

Also Published As

Publication number Publication date
JP2002053288A (en) 2002-02-19

Similar Documents

Publication Publication Date Title
JP4615681B2 (en) Hook block suspension mechanism for vehicle-mounted crane
CN202542753U (en) Luffing fixed pulley block of luffing jib tower crane and luffing jib tower crane with same
JP7521242B2 (en) Wire rope anti-sway structure
JP6638434B2 (en) Crane boom mounting method
JP3523191B2 (en) Crane attachment support device
JP7379908B2 (en) Overwinding detection device and construction machinery
JP5529444B2 (en) Container crane rope hanging structure
JP4190854B2 (en) Trolley crane
JP2001039678A (en) Crane guide sheave device
JP2004155580A (en) Trolley crane
JP6642112B2 (en) crane
JPH05328553A (en) Cable pulley unit equipped with cable braking mechanism
JP4274336B2 (en) Hook device
CN223072321U (en) A simple suspension cable device for mobile contact network
CN220033718U (en) Swing-preventing device for travelling cable and elevator
JP4286368B2 (en) Mobile crane with luffing jib
JP5306520B1 (en) Crane attachment
JPH09132381A (en) Crane rope disengagement prevention device
JP2020055692A (en) Handrail device
JP7597082B2 (en) Guide members and construction machinery
JP2020152501A (en) Front strut backstop
JPH1111874A (en) Tower crane
JP3652857B2 (en) Hanging bracket
JP7638131B2 (en) Wire rope, connecting member, and method for attaching wire rope
JPH0547781Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070730

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070822

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100707

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100713

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100820

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101005

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101021

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4615681

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131029

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees