Connection structure for easy repair of uneven settlement between foundation and foundation structure Download PDFInfo
- Publication number
- JP4615792B2 JP4615792B2 JP2001295160A JP2001295160A JP4615792B2 JP 4615792 B2 JP4615792 B2 JP 4615792B2 JP 2001295160 A JP2001295160 A JP 2001295160A JP 2001295160 A JP2001295160 A JP 2001295160A JP 4615792 B2 JP4615792 B2 JP 4615792B2
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- opening
- nut
- screw rod
- male
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、基礎と基礎上構造物との不同沈下修復容易な連結構造に関する。
【0002】
【従来の技術】
軟弱地盤地域に建てられた建物では、地盤の圧密沈下などによって建物が不同沈下を起こすことがある。このような不同沈下に対する建物の修復方法として、コンクリート基礎と、基礎上構造物としての例えば土台とのアンカーボルトによる連結を一旦解除し、土台をジャッキアップでコンクリート基礎の天面から上昇させ、土台と基礎天面との間にプレートなどの詰め物をし、再度、アンカーボルトで土台をコンクリート基礎に連結するという方法がある。
【0003】
【発明が解決しようとする課題】
しかしながら、この土台上昇による不同沈下修復方法において、不同沈下の不同の程度が大きいために土台をコンクリート基礎の天面から大きく上昇させなければ修復ができないような場合があり、そのような場合に、コンクリート基礎の天面から上方に突出するアンカーボルトの雄ネジ棒部の高さ寸法が不足してしまい、土台を再度このアンカーボルトでコンクリート基礎に連結するのが困難ないしは不可能となることがある。
【0004】
そこで、コンクリート基礎の天面から上方に突出するアンカーボルトの雄ネジ棒部の高さ寸法を予め大きくしておくことも考えられるが、他との取り合い関係からできないことが多い。
【0005】
また、不同沈下修復時において、他との取り合い関係で、アンカーボルトに螺合され土台をコンクリート基礎に連結しているナットを緩めることや、土台の設置されているコンクリート基礎の天面部にアクセスすることさえも困難ないし不可能なことがあり、不同沈下の修復が困難ないし不可能となる場合がある。
【0006】
本発明は、上記のような従来の問題点に鑑み、不同沈下の修復において、土台などの基礎上構造物をコンクリート基礎の天面から大きく上昇させた場合でも、基礎上構造物とコンクリート基礎とを再度容易に連結することができ、また、他との取り合い関係で、基礎上構造物をコンクリート基礎に連結しているナットを緩めることや、基礎上構造物の設置されているコンクリート基礎の天面部にアクセスすることさえも困難ないし不可能な場合であっても不同沈下を容易に修復することができる、基礎と基礎上構造物との不同沈下修復容易な連結構造及び連結方法を提供することを課題とする。
【0007】
【発明が解決しようとする課題】
上記の課題は、コンクリート基礎の立ち上がり部の側面に開口部が設けられ、この開口部を挟む上側の基礎コンクリート部分に、基礎天面と開口部内とに開口する上下方向に貫通した上側ネジ通孔が設けられ、
この上側ネジ通孔に雄ネジ棒が挿通され、
開口部内に突出する雄ネジ棒部分に、開口部内の上面に当接し、上方への雄ネジ棒の抜けを規制する第1ナットが螺合されると共に、
基礎天面から上方に突出する雄ネジ棒部分に、上方への基礎上構造物の外れを規制する第2ナットが螺合され、
これら第1,第2ナットで、基礎上構造物がコンクリート基礎に連結されており、
開口部を通じて第1ナットを緩め、開口部内に突出する雄ネジ棒を上昇させることにより、基礎天面からの雄ネジ棒の突出長さ寸法を大きくすることができるようになされていることを特徴とする基礎と基礎上構造物との不同沈下修復容易な連結構造によって解決される。
【0008】
この構造では、開口部を通じて第1ナットを緩め、開口部内に突出する雄ネジ棒を上昇させることにより、基礎天面からの雄ネジ棒の突出長さ寸法を大きくすることができるようになされているので、不同沈下の修復において、基礎上構造物をコンクリート基礎の天面から大きく上昇させなければならないような場合であっても、基礎天面からの雄ネジ棒の突出長さ寸法を大きくし、上昇させた基礎上構造物とコンクリート基礎とを同じ雄ネジ棒を用いて再度容易に連結することができる。
【0009】
しかも、修復前の基礎天面から突出する雄ネジ棒の高さ寸法を修復に際して大きくすることができるようになされているものであるから、修復前の当初の雄ネジ棒の基礎天面突出高さ寸法はこれを小さくすることができ、そのため、他との取り合い関係に不都合を生じさせることもない。
【0010】
更に、コンクリート基礎の立ち上がり部の高さ方向中間部の側面に設けられている開口部を通じて雄ネジ棒を上昇させることができるようになされているので、取り合い関係の込み入りやすい基礎天面部にアクセスして雄ネジ棒を上昇させる必要がなく、雄ネジ棒を開口部を通じて容易に上昇させることができる。
【0011】
上記の構造において、第2ナットよりも下位に位置して雄ネジ棒に受けが備えられ、開口部を通じて雄ネジ棒を上昇させることにより基礎上構造物が受けに支えられて雄ネジ棒とともに上昇するようになされているとよい。
【0012】
この場合は、不同沈下の修復において開口部を通じて雄ネジ棒を上昇させれば、基礎上構造物も受けによって同時に上昇するようになされているので、基礎上構造物を上昇させる際に基礎天面側の第2ナットを操作する必要がなく、そのため、不同沈下の修復を施工容易に行っていくことができる。
【0013】
しかも、このように、開口部を通じて雄ネジ棒を上昇させることで基礎上構造物も上昇するようになされているから、取り合い関係の込み入りやすい基礎天面部にアクセスせずに基礎上構造物を上昇させることができる。
【0014】
また、上記の構造において、開口部を挟む下側の基礎コンクリート部分に、上側ネジ通孔と同じ軸線上を延びて開口部内に開口する下側のネジ通孔が設けられ、前記雄ネジ棒が下側のネジ通孔内にも挿入されており、
開口部内において雄ネジ棒には第1ナットより下に、開口部内の下面に当接して雄ネジ棒の下降を規制する第3ナットが螺合されているのもよい。
【0015】
この構造では、この第3ナットと第1ナットとで、雄ネジ棒それ自体を必要な高さ位置でコンクリート基礎と連結一体化することができる。また、雄ネジ棒を上昇させた際に、この第3ナットが雄ネジ棒を支え、この雄ネジ棒を不本意に下降してしまわないようにその高さ位置に保持することができる。
【0016】
【発明の実施の形態】
次に、本発明の実施形態を図面に基づいて説明する。
【0017】
図1及び図2に示す実施形態の連結構造は、建物の屋外に面しない内部の基礎と基礎上構造物との連結に用いた場合のものである。1はコンクリート基礎で、布基礎からなり、2は基礎上構造物としてのベースプレートである。
【0018】
コンクリート基礎1の立ち上がり部1aの側面には、貫通した開口部3が設けられ、この開口部3を挟む上側のコンクリート部分に、基礎1の天面と開口部3内とに開口する上下方向に貫通した上側ネジ通孔4が設けられている。また、開口部3を挟む下側の基礎コンクリート部分には、上側ネジ通孔4と同じ軸線上を延びて開口部3内に開口する下側ネジ通孔5が設けられている。これら上下のネジ通孔4,5は、例えば、鋼管6,6を基礎コンクリート中に埋込み状態に入れることで形成することができる。
【0019】
これら上下のネジ通孔4,5に渡すように雄ネジ棒7が挿通されている。この雄ネジ棒7には、開口部3内において、開口部3内の上面に当接して上方への雄ネジ棒7の抜けを規制する第1ナット8と、開口部3内の下面に当接して雄ネジ棒7が下降するのを規制する第3ナット10とが螺合されている。
【0020】
また、基礎1の天面から上方に突出する雄ネジ棒部分7aには、ベースプレート2の上面に当接して、上方へのベースプレート2の外れを規制する第2ナット9が螺合され、更に、この雄ネジ棒7には、この第2ナット9よりも下位に位置してベースプレート2を下から受ける受け13が備えられている。
【0021】
また、雄ネジ棒7には、開口部3内において、第1ナット8と第3ナット10との間に位置して、雄ネジ棒7を上昇させるための上下の第4、第5ナット11,12が螺合されている。
【0022】
そして、第1ナット8が開口部3内の上面に締め付けられると共に、第3ナット10が開口部3内の下面に締め付けられ、かつ、第3ナット10がベースプレート2の上面に締め付けられて、ベースプレート2は、第3ナット10と基礎1の天面との間に挟み込まれて、コンクリート基礎1に連結されている。なお、受け13は、コンクリート基礎1の天面部に設けた凹所14内に存置されている。
【0023】
上記のような連結構造において、建物に不同沈下を生じた場合、その修復は次のようにして行うことができる。即ち、まず、図3(イ)に示すように、開口部3を通じて、第1ナット8を緩めて下降させる。そして、図3(ロ)に示すように、開口部3内の第4、第5ナット11,12を適当な高さ位置に位置させ、これら第4、第5ナット11,12間にジャッキアップ用の補助鉄板15を挟み込み、図3(ハ)に示すように、油圧ジャッキ16等でこの補助鉄板15を持ち上げる。これにより、ベースプレート2は、雄ネジ棒7の受け13に支えられて、雄ネジ棒7とともに基礎1の天面から上昇していく。
【0024】
こうして雄ネジ棒7を修復高さ位置まで上昇させた後、図4(ニ)に示すように、第3ナット10を開口部3内の下面位置まで降ろして雄ネジ棒7が下降してしまわないように保持し、図4(ホ)に示すように、ベースプレート2と基礎1の天面との間に、プレート17…などによる詰め物をする。そして最後に、図4(へ)に示すように、第1ナット8を開口部3内の上面に締め付ける。第1ナット8の締付けにより、ベースプレート2と詰め物17とが第1ナット8と第2ナット9とに挟み込まれ、ベースプレート2は修復高さ位置においてコンクリート基礎1としっかり連結され、建物の不同沈下が修復される。
【0025】
このように、上記の連結構造によれば、不同沈下の修復において、ベースプレート2をコンクリート基礎1の天面から大きく上昇させなければならないような場合であっても、基礎1の天面からの雄ネジ棒7の突出部分7aの高さ寸法を雄ネジ棒7を上昇させることで大きくすることができ、上昇させたベースプレート2とコンクリート基礎1とを同じこの雄ネジ棒7を用いて再度容易に連結することができる。しかも、修復前の当初の雄ネジ棒7の基礎天面突出高さ寸法はこれを小さくさせておくことができ、そのため、他との取り合い関係に不都合を生じさせることもない。
【0026】
また、雄ネジ棒7の上昇操作は、開口部3を通じて行うことができるので、取り合い関係の込み入りやすい基礎1の天面部にアクセスしなくともよい。また、ベースプレート2の上昇操作に際しても、第2ナット9を操作する必要はなく、開口部3を通じて雄ネジ棒7を上昇させることでベースプレート2を上昇させることができ、ベースプレート2を上昇させるのに、コンクリート基礎1の天面部にアクセスする必要もない。更に、ベースプレート2を上昇させた後のベースプレート2とコンクリート基礎1との連結においても、開口部3を通じて第1ナット8を締めるだけでよく、第2ナット9を操作する必要はなく、コンクリート基礎1の天面部にアクセスする必要がない。従って、基礎1が屋外に面しない内部基礎であるような場合であっても、床下空間部を利用して、コンクリート基礎1の天面部にアクセスせずに、不同沈下の修復を容易に行っていくことができる。
【0027】
以上に、本発明の実施形態を示したが、本発明はこれに限られるものではなく、発明思想を逸脱しない範囲で、各種の変更が可能である。例えば、上記の実施形態では、受け13が備えられ、雄ネジ棒7を上昇させることで、基礎上構造物であるベースプレート2も上昇するように構成して、雄ネジ棒7とベースプレート2の上昇をスムーズに行えるように構成しているが、受け13を省略し、雄ネジ棒7を上昇させてもベースプレート2は上昇しないようにし、ベースプレート2の上昇は別途にジャッキアップなどで行うようにする連結構造としてもよい。
また、上記の実施形態では、コンクリート基礎1の立ち上がり部1aの側面に設けられている開口部3は、立ち上がり部1aの両側面に開口した孔で構成されているが、この立ち上がり部1aの一方の側面にのみ開口する凹所からなるものであってもよい。また、コンクリート基礎1の開口部3を挟む下側のネジ通孔5と第3ナット10は省略されてもよいし、雄ネジ棒7を上昇させるための操作部は、第4,第5ナット11,12によるものに替えて他のものが採用されてもよい。また、本発明は、屋外に面する外部基礎に用いられてもよい。基礎上構造物についても、上記のようなベースプレート2に限らず、土台であってもよいし、他のものであってもよく、要は、コンクリート基礎1の天面から上方に突出される雄ネジ棒部分によって連結される構造物であればよい。
【0028】
【発明の効果】
本発明は、以上のとおりのものであるから、不同沈下の修復において、土台などの基礎上構造物をコンクリート基礎の天面から大きく上昇させた場合でも、基礎上構造物とコンクリート基礎とを再度容易に連結することができる。また、他との取り合い関係で、基礎上構造物をコンクリート基礎に連結しているナットを緩めることや、基礎上構造物の設置されているコンクリート基礎の天面部にアクセスすることさえも困難ないし不可能な場合であっても不同沈下を容易に修復することができる。
【図面の簡単な説明】
【図1】実施形態の基礎と基礎上構造物との連結構造を示す断面側面図である。
【図2】同正面図である。
【図3】図(イ)〜図(ハ)は、図4(ニ)〜(へ)とともに、不同沈下修復の方法を順次に示す断面側面図である。
【図4】図(ニ)〜図(へ)は、図3(イ)〜(ハ)とともに、不同沈下修復の方法を順次に示す断面側面図である。
【符号の説明】
1…コンクリート基礎
1a…立ち上がり部
2…ベースプレート(基礎上構造物)
3…開口部
4…上側ネジ通孔
5…下側ネジ通孔
7…雄ネジ棒
8…第1ナット
9…第2ナット
10…第3ナット
13…受け[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a connection structure in which a foundation and a structure on a foundation can be easily repaired by different settlement.
[0002]
[Prior art]
In buildings built in soft ground areas, the buildings may cause uneven settlement due to the consolidation settlement of the ground. As a method of repairing a building against such subsidence, the anchor foundation bolts are temporarily disconnected from the concrete foundation and the foundation structure such as the foundation, and the foundation is raised from the top surface of the concrete foundation by jacking up. There is a method in which a pad or the like is filled between the base and the top of the foundation, and the foundation is connected to the concrete foundation again with anchor bolts.
[0003]
[Problems to be solved by the invention]
However, in this method of repairing dissimilar settlement due to the rise of the foundation, there is a case where the restoration cannot be performed unless the foundation is greatly raised from the top surface of the concrete foundation because the degree of disparity of the irregular settlement is large. The height of the male screw rod part of the anchor bolt protruding upward from the top surface of the concrete foundation may be insufficient, and it may be difficult or impossible to connect the foundation to the concrete foundation again with this anchor bolt. .
[0004]
Therefore, it is conceivable to increase the height dimension of the male threaded rod portion of the anchor bolt protruding upward from the top surface of the concrete foundation in advance, but this is often not possible due to the relationship with others.
[0005]
Also, when repairing uneven settlement, loosen the nut that is screwed to the anchor bolt and connects the foundation to the concrete foundation, and accesses the top surface of the concrete foundation where the foundation is installed. Even this may be difficult or impossible, and repair of uneven settlement may be difficult or impossible.
[0006]
In view of the conventional problems as described above, the present invention provides a foundation structure and a concrete foundation even when the foundation structure such as the foundation is greatly raised from the top surface of the concrete foundation in the restoration of the uneven settlement. Can be easily connected again, and in connection with others, the nut connecting the foundation structure to the concrete foundation can be loosened, or the top of the concrete foundation where the foundation structure is installed To provide a connecting structure and a connecting method capable of easily repairing uneven settlement of a foundation and a structure on the foundation, which can easily repair uneven settlement even when it is difficult or impossible to access the surface portion. Is an issue.
[0007]
[Problems to be solved by the invention]
The above problem is that an opening is provided on the side surface of the rising portion of the concrete foundation, and the upper screw through-hole penetrating in the vertical direction that opens to the top of the foundation and the inside of the opening in the upper foundation concrete portion sandwiching the opening. Is provided,
A male threaded rod is inserted through this upper threaded hole,
A first nut that abuts the upper surface of the opening and restricts the male screw rod from being pulled upward is screwed onto the male screw rod portion protruding into the opening.
A second nut that regulates the upward disengagement of the structure on the base is screwed onto the male threaded rod portion protruding upward from the base top surface.
With these first and second nuts, the structure on the foundation is connected to the concrete foundation,
By loosening the first nut through the opening and raising the male screw rod protruding into the opening, the protruding length of the male screw rod from the base top surface can be increased. It is solved by a joint structure that facilitates repair of uneven settlement between foundation and foundation structure.
[0008]
In this structure, by loosening the first nut through the opening and raising the male screw rod protruding into the opening, the protruding length of the male screw rod from the base top surface can be increased. Therefore, even when the structure on the foundation has to be lifted greatly from the top surface of the concrete foundation in the repair of uneven settlement, the protruding length dimension of the male screw rod from the top surface of the foundation is increased. The structure on the raised foundation and the concrete foundation can be easily connected again using the same male threaded rod.
[0009]
In addition, the height of the male threaded rod protruding from the basic top surface before repair can be increased during the repair, so that the height of the basic top surface of the original male threaded rod before repairing can be increased. The height dimension can make this smaller, so that it does not cause any inconvenience in the relationship with others.
[0010]
Furthermore, the male threaded rod can be lifted through the opening provided in the side of the intermediate part in the height direction of the rising part of the concrete foundation. Thus, there is no need to raise the male screw rod, and the male screw rod can be easily raised through the opening.
[0011]
In the above structure, the male screw rod is provided below the second nut, and the male screw rod is raised through the opening so that the structure on the foundation is supported by the receiver and rises together with the male screw rod. It should be made to do.
[0012]
In this case, if the male screw rod is raised through the opening in the repair of the uneven settlement, the foundation structure is also raised simultaneously by the receiver, so when raising the foundation structure, the top surface of the foundation It is not necessary to operate the second nut on the side, and therefore, repair of uneven settlement can be easily performed.
[0013]
In addition, as the male threaded rod is lifted through the opening as described above, the structure on the foundation is also raised, so that the structure on the foundation can be moved without accessing the top surface of the foundation that is easily involved. Can be raised.
[0014]
Further, in the above structure, the lower basic concrete portion sandwiching the opening is provided with a lower screw hole extending on the same axis as the upper screw hole and opening into the opening, and the male screw rod is It is also inserted into the lower screw hole,
A third nut that contacts the lower surface in the opening and restricts the lowering of the male screw rod may be screwed onto the male screw rod below the first nut in the opening.
[0015]
In this structure, the male screw rod itself can be connected and integrated with the concrete foundation at a required height position by the third nut and the first nut. Further, when the male threaded rod is raised, the third nut supports the male threaded rod and can be held at the height position so that the male threaded rod is not lowered unintentionally.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings.
[0017]
The connection structure of the embodiment shown in FIGS. 1 and 2 is a case where the connection structure is used for connection between an internal foundation that does not face the outside of a building and a structure on the foundation.
[0018]
A side surface of the rising
[0019]
A
[0020]
The male
[0021]
In addition, the
[0022]
The
[0023]
In the connection structure as described above, in the case where uneven settlement occurs in the building, the repair can be performed as follows. That is, first, as shown in FIG. 3A, the
[0024]
After raising the male threaded
[0025]
As described above, according to the above-described connection structure, even when the
[0026]
Moreover, since the raising operation of the male threaded
[0027]
Although the embodiment of the present invention has been described above, the present invention is not limited to this, and various modifications can be made without departing from the spirit of the invention. For example, in the above-described embodiment, the
Moreover, in said embodiment, although the
[0028]
【The invention's effect】
Since the present invention is as described above, even when the foundation structure such as the foundation is greatly raised from the top surface of the concrete foundation in the restoration of the uneven settlement, the foundation structure and the concrete foundation are again connected. Can be easily connected. In addition, it is difficult or even impossible to loosen the nuts that connect the foundation structure to the concrete foundation or to access the top surface of the concrete foundation where the foundation structure is installed. Even if possible, the uneven settlement can be easily repaired.
[Brief description of the drawings]
FIG. 1 is a cross-sectional side view showing a connection structure between a foundation and a structure on a foundation according to an embodiment.
FIG. 2 is a front view of the same.
FIGS. 3A to 3C are cross-sectional side views sequentially showing a method for repairing dissimilar subsidence together with FIGS.
FIGS. 4 (a) to 4 (f) are cross-sectional side views sequentially showing a method for repairing dissimilar settlement along with FIGS. 3 (a) to 3 (c).
[Explanation of symbols]
DESCRIPTION OF
DESCRIPTION OF
Claims (3)
この開口部を挟む上側の基礎コンクリート部分に、基礎天面と開口部内とに開口する上下方向に貫通した上側ネジ通孔が設けられ、
この上側ネジ通孔に雄ネジ棒が挿通され、
開口部内に突出する雄ネジ棒部分に、開口部内の上面に当接し、上方への雄ネジ棒の抜けを規制する第1ナットが螺合されると共に、
基礎天面から上方に突出する雄ネジ棒部分に、上方への基礎上構造物の外れを規制する第2ナットが螺合され、
これら第1,第2ナットで、基礎上構造物がコンクリート基礎に連結されており、
開口部を通じて第1ナットを緩め、開口部内に突出する雄ネジ棒を上昇させることにより、基礎天面からの雄ネジ棒の突出長さ寸法を大きくすることができるようになされていることを特徴とする基礎と基礎上構造物との不同沈下修復容易な連結構造。An opening is provided on the side of the rising part of the concrete foundation,
An upper screw through-hole penetrating in the vertical direction that opens to the top of the foundation and the opening is provided in the upper foundation concrete portion sandwiching the opening,
A male threaded rod is inserted through this upper threaded hole,
A first nut that abuts the upper surface of the opening and restricts the male screw rod from being pulled upward is screwed onto the male screw rod portion protruding into the opening.
A second nut that regulates the upward disengagement of the structure on the base is screwed onto the male threaded rod portion protruding upward from the base top surface.
With these first and second nuts, the structure on the foundation is connected to the concrete foundation,
By loosening the first nut through the opening and raising the male screw rod protruding into the opening, the protruding length of the male screw rod from the base top surface can be increased. Connecting structure that facilitates repair of uneven settlement between foundation and foundation structure.
開口部内において雄ネジ棒には第1ナットより下に、開口部内の下面に当接して雄ネジ棒の下降を規制する第3ナットが螺合されている請求項1又は2に記載の基礎と基礎上構造物との不同沈下修復容易な連結構造。The lower basic concrete portion sandwiching the opening is provided with a lower screw through hole that extends on the same axis as the upper screw through hole and opens into the opening, and the male screw rod is the lower screw through hole. Is also inserted inside,
The base according to claim 1 or 2, wherein a third nut that abuts the lower surface of the opening and regulates the descending of the male screw rod is screwed onto the male screw rod below the first nut in the opening. Connecting structure that allows easy repair of uneven settlement with the structure on the foundation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001295160A JP4615792B2 (en) | 2001-09-26 | 2001-09-26 | Connection structure for easy repair of uneven settlement between foundation and foundation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001295160A JP4615792B2 (en) | 2001-09-26 | 2001-09-26 | Connection structure for easy repair of uneven settlement between foundation and foundation structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003096787A JP2003096787A (en) | 2003-04-03 |
| JP4615792B2 true JP4615792B2 (en) | 2011-01-19 |
Family
ID=19116641
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001295160A Expired - Fee Related JP4615792B2 (en) | 2001-09-26 | 2001-09-26 | Connection structure for easy repair of uneven settlement between foundation and foundation structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4615792B2 (en) |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5375903U (en) * | 1977-10-21 | 1978-06-24 | ||
| JPS58135230A (en) * | 1982-02-06 | 1983-08-11 | Shozo Nakabayashi | Repairing device for settling building |
| JP4312907B2 (en) * | 1999-11-19 | 2009-08-12 | 大和ハウス工業株式会社 | Direct foundation structure with non-settlement correction function |
-
2001
- 2001-09-26 JP JP2001295160A patent/JP4615792B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003096787A (en) | 2003-04-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2628422C (en) | Height-adjustable, structurally suspended slabs for a structural foundation | |
| US6193442B1 (en) | Method and device for raising and supporting a building foundation | |
| US8851800B2 (en) | Concentrically loaded, adjustable piering system | |
| CN215484676U (en) | Aluminum alloy template wall column base leak protection thick liquid block structure | |
| JP4615792B2 (en) | Connection structure for easy repair of uneven settlement between foundation and foundation structure | |
| JP4553978B1 (en) | Support device for height adjustment | |
| KR100965939B1 (en) | Manhole height adjusting implement and height adjusting mehthod thereby | |
| US7454871B2 (en) | Adjustable pier | |
| JP3855196B2 (en) | Basic structure of the structure | |
| JP3023869B2 (en) | Reinforcement structure of base frame when moving building | |
| CN207974142U (en) | A kind of building hoist basis | |
| JP3141189B2 (en) | Differential settlement settlement method and differential settlement modification floor structure | |
| JP3061593B2 (en) | Concrete block connection method and connection metal fittings | |
| JP3260096B2 (en) | Anchor bolt device for correcting settlement of buildings | |
| CN224149268U (en) | Iron tower embedded part with adjusting function | |
| JP2003096789A (en) | Coupling construction and method capable of easily repairing differential settlement for foundation and structure thereupon | |
| JP4312907B2 (en) | Direct foundation structure with non-settlement correction function | |
| CN223707215U (en) | An auxiliary device for correcting the deviation of an angle tower | |
| JP6730554B2 (en) | Inclined house jack up auxiliary metal fittings and jack up construction method using the same. | |
| CN223593404U (en) | Movable concrete support foundation | |
| KR102868122B1 (en) | Steel pipe connector for jack support | |
| JP3270417B2 (en) | Concrete block and concrete block installation method | |
| CN221856167U (en) | A bracket connection structure convenient for docking | |
| JP2003253856A (en) | Floor structure for entrance earth floor | |
| JP3189210U (en) | Equipment for correcting settlement of existing pillars |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080825 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20101006 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20101019 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101021 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4615792 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131029 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |