JP4618938B2 JP2001183275A JP2001183275A JP4618938B2 JP 4618938 B2 JP4618938 B2 JP 4618938B2 JP 2001183275 A JP2001183275 A JP 2001183275A JP 2001183275 A JP2001183275 A JP 2001183275A JP 4618938 B2 JP4618938 B2 JP 4618938B2
Authority
JP
Japan
Prior art keywords
air conditioner
indoor unit
accumulation
cumulative
communication adapter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001183275A
Other languages
Japanese (ja)
Other versions
JP2002372281A (en
Inventor
裕 鈴木
秀憲 武居
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP2001183275A priority Critical patent/JP4618938B2/en
Publication of JP2002372281A publication Critical patent/JP2002372281A/en
Application granted granted Critical
Publication of JP4618938B2 publication Critical patent/JP4618938B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、室外機及び複数の室内機を備えた空気調和装置を集中管理装置が集中管理するとともに、この集中管理装置が各室内機毎のエネルギー按分率を算出する空気調和システムに関する。
【0002】
【従来の技術】
例えば、ビル等に装備される空気調和システムにおいては、一または複数の室外機と複数の室内機とを有する一または複数の空気調和装置が、一台の集中管理装置により集中管理されるよう構成されたものがある。
【0003】
上述のような空気調和システムは、テナントビル等のように、複数の使用者が混在する環境に設置されることがある。このため、集中管理装置は、各室内機の累積運転時間に基づき、室内機毎に使用電力の按分率を算出し、空気調和装置の電力使用量に上記電力按分率を乗じて、室内機毎に電力使用量及び電力使用料金を算出できるようにしたものがある。このとき、各室内機の使用者には、各室内機を使用した分の電力使用料金が過不足なく計算されて表示される必要がある。
【0004】
【発明が解決しようとする課題】
ところが、上述のテナントビル等において、空気調和装置が運転されるのは、テナントの使用者が使用する場合のみならず、例えば空気調和システムの設置当初の初期試運転、または定期点検や故障修理等のメンテナンスの際の試運転等のように、テナントの使用者の使用とは無関係な場合がある。
【0005】
このような、試運転時における室内機の運転時間のデータを室内機毎の使用電力の按分率に算入してしまうと、上述の試運転に要した使用電力をもテナントの使用者が負担しなければならず、適切でない。
【0006】
本発明の目的は、上述の事情を考慮してなされたものであり、空気調和装置の使用者に、初期試運転時またはメンテナンス試運転時における空気調和装置のエネルギー使用料金が課されることを回避できる空気調和システムを提供することにある。
【0007】
【課題を解決するための手段】
請求項1に記載の発明は、室外機及び複数の室内機を備えた空気調和装置を、集中管理装置が集中管理する空気調和システムにおいて、上記室内機の使用エネルギーの按分率を算出するために上記各室内機の運転時間の累積が個別にカウントされ、上記空気調和装置のエネルギー使用量を計量するエネルギー計量計の計量値が、集中管理装置と一若しくは複数の空気調和装置とを接続する通信線に配設された各通信アダプタにより累積され、初期試運転時またはメンテナンス試運転時に前記集中管理装置に設けられた累積中断スイッチ操作されることにより、上記各室内機の運転時間の累積、及び、上記空気調和装置のエネルギー使用量の累積が中断されることを特徴とするものである。
【0008】
請求項2に記載の発明は、請求項1に記載の発明において、上記室内機の運転時間の累積の中断は、集中管理装置と一または複数の空気調和装置とを接続する通信線に配設された各通信アダプタの系統毎に、または全ての空気調和装置に対して一括して実施されることを特徴とするものである。
【0010】
請求項に記載の発明は、請求項1または2記載の発明において、上記室内機の運転時間の累積の再開、及び、上記空気調和装置のエネルギー使用量の累積の再開は、集中管理装置に設けられた累積再開スイッチの操作により実施されることを特徴とするものである。
【0011】
請求項に記載の発明は、請求項1または2のいずれかに記載の発明において、上記室内機の運転時間の累積の再開、及び、上記空気調和装置のエネルギー使用量の累積の再開は、集中管理装置に設けられた、室内機の運転時間の累積中断の時限式解除機能により実施されることを特徴とするものである。
【0012】
請求項に記載の発明は、請求項1乃至のいずれかに記載の発明において、上記室内機の運転時間の累積は、集中管理装置が全ての室内機の運転時間をカウントすることにより、または、集中管理装置と一若しくは複数の空気調和装置とを接続する通信線に配設された各通信アダプタが、自己の通信アダプタに属する系統の室内機の運転時間をカウントすることにより、または、個々の室内機が、自らの運転時間を個別にカウントすることにより実施されることを特徴とするものである。
【0014】
請求項に記載の発明は、請求項1乃至5に記載の発明において、上記エネルギー計量計からの計量値の累積の中断は、集中管理装置と一または複数の空気調和装置とを接続する通信線に配設された各通信アダプタの系統毎に、または全ての上記エネルギー計量計に対して一括して実施されることを特徴とするものである。
【0018】
請求項に記載の発明は、請求項1乃至のいずれかに記載の発明において、上記エネルギーは電力であり、上記エネルギー計量計は、空気調和装置にて使用した電力を計量する電力量計であり、上記集中管理装置は、室内機毎に電力按分率を算出することを特徴とするものである。
【0019】
請求項1、3または乃至のいずれかに記載の発明には、次の作用がある。
【0020】
室内機の運転時間の累積が中断可能に構成されたことから、空気調和システムの設置当初の初期試運転時、または定期点検や故障修理の際のメンテナンス試運転時に、室内機の運転時間の累積を中断できる。これにより、上記試運転時における室内機の運転時間が、室内機の使用エネルギーの按分率に算入されなくなるので、上記試運転に要したエネルギーの料金を、空気調和装置の使用者に課すことを回避できる。
【0021】
請求項2に記載の発明には、次の作用がある。
【0022】
室内機の運転時間の累積の中断が、集中管理装置と一または複数の空気調和装置とを接続する通信線に配設された各通信アダプタの通信系統毎に実施可能に構成されることから、例えば、メンテナンスが実施されていない空気調和装置の室内機の運転時間を累積して、この室内機の使用エネルギーの按分率を算出できるので、空気調和装置の使用者が使用した分のエネルギーの料金を、過不足なく算出することができる。
【0023】
請求項に記載の発明には、次の作用がある。
【0024】
室内機の運転時間の累積の再開が、集中管理装置に設けられた、室内機の運転時間の累積中断の時限式解除機能により実施されることから、集中管理装置に設けられた累積再開スイッチを操作し忘れた場合にも、室内機の運転時間の累積を中断してから一定時間経過後には、室内機の運転時間の累積を再開できる。このため、空気調和装置の使用者が使用した室内機の使用エネルギーの料金を、可能な限り正確に算出できる。
【0025】
【発明の実施の形態】
以下、本発明の実施の形態を、図面に基づき説明する。
【0026】
図1は、本発明に係る空気調和システムの一実施の形態を示す系統図である。
【0027】
この図1に示す空気調和システム10は、第1空気調和装置11及び第2空気調和装置12を第1通信アダプタ21を介して、第3空気調和装置13等を第2通信アダプタ22を介して、それぞれ集中管理装置15により集中的に管理するよう構成されたものである。
【0028】
第1空気調和装置11及び第2空気調和装置12は、1台の室外機16に例えば2台の室内機17及び18が冷媒配管(不図示)によって連結されて構成される、それぞれマルチタイプの空気調和装置である。第3空気調和装置13は、1台の室外機16に例えば3台の室内機17、18及び19が冷媒配管(不図示)によって接続される、マルチタイプの空気調和装置である
上記集中管理装置15は集中管理通信線20を介して、第1通信アダプタ21及び第2通信アダプタ22に接続される。この第1通信アダプタ21は、室内外通信線23を介して、第1空気調和装置11の室外機16、室内機17及び18、並びに第2空気調和装置12の室外機16、室内機17及び18に接続される。また、第2通信アダプタ22は、室内外通信線24を介して、第3空気調和装置13の室外機16、室内機17、18及び19等に接続される。
【0029】
室内外通信線23は、第1空気調和装置11及び第2空気調和装置12の室外機16、室内機17、18間で空調制御用信号を送受信させて、これらの室外機16、室内機17、18に空調機能を発揮させるものである。また、室内外通信線24も同様に、第3空気調和装置13の室外機16、室内機17、18及び19等間で空調制御用信号を送受信させて、これらの室外機16、室内機17、18及び19に空調機能を発揮させる。
【0030】
上記集中管理通信線20は集中管理信号を、集中管理装置15から第1通信アダプタ21を介して第1空気調和装置11及び第2空気調和装置12へ、また、第2通信アダプタ22を介して第3空気調和装置13へそれぞれ送受信するものである。更に、この集中管理通信線20は、第1空気調和装置11及び第2空気調和装置12から第1通信アダプタ21を介して、また、第3空気調和装置13から第2通信アダプタ22を介して運転状態データ等を集中管理装置15へ送信する。
【0031】
ここで、第1通信アダプタ21、第2通信アダプタ22は、集中管理装置15との間で集中管理通信線20を用いて送受信される信号と、第1空気調和装置11及び第2空気調和装置12との間で室内外通信線23を用いて、第3空気調和装置13との間で室内外通信線24を用いてそれぞれ送受信される信号との通信形態を変換する機器である。
【0032】
上記集中管理装置15は、操作表示盤25を用いて、第1通信アダプタ21を介し第1空気調和装置11及び第2空気調和装置12を集中管理するとともに、この第1空気調和装置11及び第2空気調和装置12の状態を監視し、また、第2通信アダプタ22を介し第3空気調和装置13を集中管理するとともに、この第3空気調和装置13の状態を監視する。
【0033】
また、第1空気調和装置11、第2空気調和装置12及び第3空気調和装置13の室内機17、18、19のそれぞれには、リモートコントローラ26が接続されている。室内機17、18、19は、このリモートコントローラ26の手動操作によって、運転や停止、設定温度の変更、冷房や暖房などの運転モードが切り換えられる。
【0034】
ところで、集中管理装置15は、前述の第1空気調和装置11、第2空気調和装置12及び第3空気調和装置13の集中制御機能及び状態監視機能の他、第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の各室内機17、18、19毎のエネルギー按分率としての電力按分率、及びこの電力按分率に基づく各室内機17、18、19のエネルギー使用料金としての電力使用料金を算出する機能をする。
【0035】
以下、集中管理装置15による上記電力按分率及び電力使用料金の算出機能について説明する。
【0036】
各室内機17、18、19の電力按分率は、各室内機17、18、19の運転時間の累積値に基づいて算出され、この運転時間の累積の方式に集中管理装置カウント方式、通信アダプタカウント方式、室内機カウント方式がある。
【0037】
上記集中管理装置カウント方式は、集中管理装置15が全ての室内機17、18、19の運転時間を個別にカウントすることにより、各室内機17、18、19の運転時間の累積値を算出するものである。
【0038】
上記通信アダプタカウント方式は、第1通信アダプタ21、第2通信アダプタ22のそれぞれが、自己の第1通信アダプタ21、第2通信アダプタ22に属する通信系統の室内機、例えば、第1通信アダプタ21の場合には第1空気調和装置11の室内機17及び18並びに第2空気調和装置12の室内機17及び18、また、第1通信アダプタ21の場合には第3空気調和装置13の室内機17、18及び19の運転時間を個別にカウントすることにより、各室内機17、18、19の運転時間の累積値を算出する。
【0039】
上記室内機カウント方式は、個々の室内機17、18、19が、自らの運転時間を個別にカウントすることにより、各室内機17、18、19の運転時間が累積される。
【0040】
これらの各カウント方式のうち、万一の故障時の危険分散のためには、全ての室内機17、18、19の運転時間の累積を、集中管理装置カウント方式のように集中管理装置15の一カ所で算出するのではなく、通信アダプタカウント方式のように幾つかのセクション毎に算出し、または、室内機カウント方式のように個々の室内機毎に算出するものが安全である。
【0041】
集中管理装置15は、上述の各カウント方式のいずれかによりカウントされた各室内機17、18、19の運転時間の累積値により、各室内機17、18、19の電力按分率を算出する。このとき、集中管理装置15は、空気調和システム10の設置当初の初期試運転時、または定期点検や故障修理の際のメンテナンス試運転時には、これらの試運転時における室内機17、18、19の運転時間の累積を中断するよう構成される。
【0042】
この室内機17、18、19の運転時間の累積の中断は、集中管理装置15の操作表示盤25に設置された累積中断スイッチ27A、27Bの操作により実施される。また、室内機17、18、19の運転時間の累積の再開は、同じく、集中管理装置15の操作表示盤25に設置された累積再開スイッチ28A、28Bの操作により実施される。更に、この運転時間の累積の再開は、当該運転時間の累積が中断されてから所定時間経過後にこの中断を解除する、集中管理装置15が有する累積中断の時限式解除機能により実施される。
【0043】
これら室内機17、18、19の運転時間の累積の中断及び累積の再開は、第1通信アダプタ21、第2通信アダプタ22毎に、つまり、各第1通信アダプタ21、第2通信アダプタ22に属する通信系統毎に実施される。上記累積中断スイッチ27A、累積再開スイッチ28Aは、第1通信アダプタ21に属する通信系統の室内機17、18について運転時間の累積を、それぞれ中断、再開するものであり、また、上記累積中断スイッチ27B、累積再開スイッチ28Bは、第2通信アダプタ22に属する通信系統の室内機17、18、19について運転時間の累積を、それぞれ中断、再開するものである。
【0044】
一方、各室内機17、18、19の電力使用料金を算出するために、エネルギー計量計としての電力量計29、30が、第1空気調和装置11、第2空気調和装置12、第3空気調和装置13のエネルギー使用量としての電力使用量を計量する。つまり、電力量計29は第1通信アダプタ21に接続されて、第1空気調和装置11及び第2空気調和装置12にて使用された電力使用量を計量する。また、電力量計30は第2通信アダプタ22に接続されて、第3空気調和装置13にて使用された電力使用量を計量する。
【0045】
この第1通信アダプタ21は、電力量計29が計量した電力使用量を集中管理装置15へ送信し、また、第2通信アダプタ22は、電力量計30が計量した電力使用量を集中管理装置15へ送信する。集中管理装置15は、これらの電力使用量と、上述のようにして算出した電力按分率と、電力使用量の単位当たりの料金とから、各室内機17、18、19の電力使用料金を算出する。
【0046】
そして、第1通信アダプタ21は電力量計29が、第2通信アダプタ22は電力量計30が、それぞれ計量した電力使用量の累積を、上記初期試運転またはメンテナンス試運転時には中断するよう構成される。この第1通信アダプタ21による第1空気調和装置11及び第2空気調和装置12の電力使用量の累積の中断、また、第2通信アダプタ22による第3空気調和装置13の電力使用量の累積の中断は、室内機17、18、19の運転時間の累積の中断と同様に、集中管理装置15に設置された前記累積中断スイッチ27A、27Bのそれぞれの操作により実施される。
【0047】
第1通信アダプタ21による第1空気調和装置11及び第2空気調和装置12の電力使用量の累積の再開、また、第2通信アダプタ22による第3空気調和装置13の電力使用量の累積の再開も、室内機17、18、19の運転時間の累積再開と同様に、集中管理装置15に設置された前記累積再開スイッチ28A、28Bのそれぞれの操作により実施される。更に、この第1通信アダプタ21、第2通信アダプタ22による第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の電力使用量の累積の再開は、室内機17、18、19の運転時間の場合と同様に、当該電力使用量の累積の中断から一定時間経過後に、集中管理装置15が有する累積中断の時限式解除機能により実施される。
【0048】
上述のように、累積中断スイッチ27A、累積再開スイッチ28Aは、電力量計29によって計量された、第1通信アダプタ21に属する第1空気調和装置11及び第2空気調和装置12の電力使用量の累積をそれぞれ中断、再開する。また、累積中断スイッチ27B、累積再開スイッチ28Bは、電力量計30によって計量された、第2通信アダプタ22に属する第3空気調和装置13の電力使用量の累積をそれぞれ中断、再開する。このように、第1通信アダプタ21、第2通信アダプタ22による第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の電力使用量の累積の中断及び再開も、室内機17、18、19の運転時間の場合と同様に、各第1通信アダプタ21、第2通信アダプタ22に属する通信系統毎に実施される。
【0049】
次に、前記室内機17、18、19の運転時間の各累積方式について、この運転時間の累積の中断及び再開と、電力使用量の累積の中断及び再開等を説明する。
【0050】
集中管理装置カウント方式の場合、
例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Aが操作されると、集中管理装置15は、この操作された累積中断スイッチ27Aに対応する第1通信アダプタ21に属する通信系統の第1空気調和装置11及び第2空気調和装置12における室内機17及び18の運転時間の累積を中断し、更に、累積中断スイッチ27Aに対応する第1通信アダプタ21は、自己に属する通信系統の、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を中断する。
【0051】
上述の試運転終了後に、集中管理装置15の累積再開スイッチ28Aが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Aに対応する第1通信アダプタ21に属する通信系統の室内機17及び18の運転時間の累積を再開し、更に、累積再開スイッチ28Aに対応する第1通信アダプタ21は、自己に属する通信系統の、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を再開する。
【0052】
また、例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Bが操作された時には、集中管理装置15は、この累積中断スイッチ27Bに対応する第2通信アダプタ22に属する通信系統の第3空気調和装置13の室内機19における運転時間の累積を中断し、更に、累積中断スイッチ27Bに対応する第2通信アダプタ22は、自己に属する通信系統の、電力量計30により計量される第3空気調和装置13の電力使用量の累積を中断する。
【0053】
また、上述の試運転終了後に、集中管理装置15の累積再開スイッチ28Bが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Bに対応する第2通信アダプタ22に属する通信系統の室内機19における運転時間の累積を再開し、更に、累積再開スイッチ28Bに対応する第2通信アダプタ22は、自己に属する通信系統の、電力量計30により計量される第3空気調和装置13の電力使用量の累積を再開する。
【0054】
通信アダプタカウンタ方式の場合
例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Aが操作されると、集中管理装置15は、この操作された累積中断スイッチ27Aに対応する第1通信アダプタ21へ、室内機17及び18の運転時間の累積を中断するよう指示するコマンドを送信し、この累積の再開を指示するコマンドを送信するまで、この第1通信アダプタ21に室内機17及び18の運転時間の累積を中断させる。と同時に、累積中断スイッチ27Aに対応する第1通信アダプタ21は、自己に属する通信系統の、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を中断する。
【0055】
上述の試運転終了後に累積再開スイッチ28Aが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Aに対応する第1通信アダプタ21へ、室内機17及び18の運転時間の累積を再開するよう指示するコマンドを送信し、この第1通信アダプタ21に、室内機17及び18の運転時間の累積を再開させる。と同時に、累積再開スイッチ28Aに対応する第1通信アダプタ21は、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を再開する。
【0056】
例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Bが操作されると、集中管理装置15は、この操作された累積中断スイッチ27Bに対応する第2通信アダプタ22へ、室内機19の運転時間の累積を中断するよう指示するコマンドを送信し、この累積の再開を指示するコマンドを送信するまで、この第2通信アダプタ22に室内機19の運転時間の累積を中断させる。と同時に、累積中断スイッチ27Bに対応する第2通信アダプタ22は、自己に属する通信系統の、電力量計30により計量される第3空気調和装置13の電力使用量の累積を中断する。
【0057】
上述の試運転終了後に累積再開スイッチ28Bが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Bに対応する第1通信アダプタ21へ、室内機19の運転時間の累積を再開するよう指示するコマンドを送信し、この第2通信アダプタ22に、室内機19の運転時間の累積を再開させる。と同時に、累積再開スイッチ28Bに対応する第2通信アダプタ22は、電力量計30により計量される第3空気調和装置13の電力使用量の累積を再開する。
【0058】
室内機カウント方式の場合
例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Aが操作されると、集中管理装置15は、この操作された累積中断スイッチ27Aに対応する第1通信アダプタ21に属する通信系統の第1空気調和装置11及び第2空気調和装置12における室内機17及び18へ、第1通信アダプタ21を経て、運転時間の累積を中断するよう指示するコマンドを送信し、この累積の再開を指示するコマンドを送信するまで、この室内機17及び18に運転時間の累積を中断させる。と同時に、累積中断スイッチ27Aに対応する第1通信アダプタ21は、自己に属する通信系統の、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を中断する。
【0059】
上述の試運転終了後に累積再開スイッチ28Aが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Aに対応する第1通信アダプタ21に属する通信系統の室内機17及び18へ、第1通信アダプタ21を経て、運転時間の累積を再開するよう指示するコマンドを送信し、この室内機17及び18に運転時間の累積を再開させる。と同時に、累積再開スイッチ28Aに対応する第1通信アダプタ21は、電力量計29により計量される第1空気調和装置11及び第2空気調和装置12の電力使用量の累積を再開する。
【0060】
例えば、初期試運転時またはメンテナンス試運転時に、集中管理装置15の累積中断スイッチ27Bが操作されると、集中管理装置15は、この操作された累積中断スイッチ27Bに対応する第2通信アダプタ22に属する通信系統の第3空気調和装置13における室内機19へ、第2通信アダプタ22を経て、運転時間の累積を中断するよう指示するコマンドを送信し、この累積の再開を指示するコマンドを送信するまで、室内機19に運転時間の累積を中断させる。と同時に、累積中断スイッチ27Bに対応する第2通信アダプタ22は、自己の属する通信系統の、電力量計30により計量される第3空気調和装置13の電力使用量の累積を中断する。
【0061】
上述の試運転終了後に、累積再開スイッチ28Bが操作されると、集中管理装置15は、この操作された累積再開スイッチ28Bに対応する第2通信アダプタ22に属する通信系統の室内機19へ、第2通信アダプタ22を経て、運転時間の累積を再開するよう指示するコマンドを送信し、この室内機19に運転時間の累積を再開させる。と同時に、累積再開スイッチ28Bに対応する第2通信アダプタ22は、電力量計30により計量される第3空気調和装置13の電力使用量の累積を再開する。
【0062】
空気調和システム10が上述のように構成されたことから、上記実施の形態によれば、次の効果▲1▼〜▲3▼を奏する。
【0063】
▲1▼室内機17、18、19の運転時間の累積が中断可能に構成されたことから、空気調和システム10の設置当初の初期試運転時、または定期点検や故障修理の際のメンテナンス試運転時に、室内機17、18、19の運転時間の累積と、電力量計29、30により計量される電力使用量の累積等を中断できる。これにより、上記試運転時における室内機17、18、19の運転時間が、室内機17、18、19の使用電力の按分率に算入されなくなり、且つ、上記試運転時における電力使用量がカウントされなくなるので、上記試運転に要した電力使用料金を、第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の各室内機17、18、19の使用者に課すことを回避できる。
【0064】
▲2▼室内機17、18、19の運転時間の累積の中断が、集中管理装置15と第1空気調和装置11、第2空気調和装置12、第3空気調和装置13とを接続する通信線(集中管理通信線20、室内外通信線23、24)に配設された第1通信アダプタ21、第2通信アダプタ22の通信系統毎に実施されることから、例えばメンテナンスが実施されていない第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の室内機17、18、19の運転時間を累積して、この室内機17、18、19の使用電力の按分率を算出できる。このため、第1空気調和装置11、第2空気調和装置12,第3空気調和装置13の各室内機17、18、19の使用者が使用した分の電力使用料金を、過不足なく算出することができる。
【0065】
▲3▼室内機17、18、19の運転時間の累積の再開が、集中管理装置15に設けられた、室内機17、18、19の運転時間の累積中断の時限式解除機能により実施されることから、集中管理装置15に設けられた累積再開スイッチ28A、累積再開スイッチ28Bを作業者が操作し忘れた場合にも、室内機17、18、19の運転時間の累積を中断してから一定時間経過後には、第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の室内機17、18、19の運転時間の累積を再開できる。このため、第1空気調和装置11、第2空気調和装置12,第3空気調和装置13の各室内機17、18、19の使用者が使用した電力使用料金を、可能な限り正確に算出できる。
【0066】
以上、本発明を上記実施の形態に基づいて説明したが、本発明はこれに限定されるものではない。
【0067】
例えば、上記実施の形態では、累積中断スイッチ27A、27Bまたは累積再開スイッチ28A、28Bの操作により室内機17、18、19の運転時間の累積や、電力量計29、30により計量される電力使用量の累積が、第1通信アダプタ21、第2通信アダプタ22の通信系統毎に中断または再開されるものを述べたが、累積中断スイッチ27A、27Bまたは累積再開スイッチ28A、28Bの操作により、上記運転時間の累積が全ての室内機17、18及び19について一括して中断または再開され、上記電力使用量の累積が全ての電力量計29及び30について一括して中断または再開されるよう構成されてもよい。
【0068】
また、集中管理装置15の操作表示盤25がタッチパネル付き表示器を備えたものである場合には、累積中断スイッチ27A、27B、累積再開スイッチ28A、28Bは、この表示器に表示されたスイッチであってもよい。
【0069】
更に、上記実施の形態では、集中管理装置15は、第1空気調和装置11、第2空気調和装置12、第3空気調和装置13の各室内機17、18、19についての電力按分率と電力使用料金とを算出するものを述べたが、上記電力按分率のみを求めてもよい。
【0070】
また、上記実施の形態では、第1空気調和装置11、第2空気調和装置12及び第3空気調和装置13に使用されるエネルギーが電力の場合を述べたが、ガスの場合で、ガス按分率を算出し、ガス計量計にて計量されたガス使用量から室内機17、18、19毎にガス使用量及びガス使用料金を算出するものでもよい。
【0071】
【発明の効果】
以上のように、本発明に係る空気調和システムによれば、空気調和装置の使用者に、初期試運転時またはメンテナンス試運転時における空気調和装置のエネルギー使用料金が課されることを回避できる。
【図面の簡単な説明】
【図1】本発明に係る空気調和システムの一実施の形態を示す系統図である。
【符号の説明】
10 空気調和システム
11 第1空気調和装置
12 第2空気調和装置
13 第3空気調和装置
15 集中管理装置
17、18、19 室内機
20 集中管理通信線
21 第1通信アダプタ
22 第2通信アダプタ
23、24 室内外通信線
27A、27B 累積中断スイッチ
28A、28B 累積再開スイッチ
29、30 電力量計
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an air conditioning system in which a central management device centrally manages an air conditioner including an outdoor unit and a plurality of indoor units, and the central management device calculates an energy apportioning rate for each indoor unit.
[0002]
[Prior art]
For example, in an air conditioning system installed in a building or the like, one or a plurality of air conditioners having one or a plurality of outdoor units and a plurality of indoor units are configured to be centrally managed by a single central management device. There is something that was done.
[0003]
The air conditioning system as described above may be installed in an environment where a plurality of users are mixed, such as a tenant building. For this reason, the centralized management device calculates an apportioning rate of electric power used for each indoor unit based on the accumulated operation time of each indoor unit, and multiplies the electric power usage amount of the air conditioner by the electric power apportioning rate for each indoor unit. In some cases, it is possible to calculate the power consumption and the power usage fee. At this time, it is necessary for the user of each indoor unit to calculate and display the power usage fee for using each indoor unit without excess or deficiency.
[0004]
[Problems to be solved by the invention]
However, in the above tenant building, etc., the air conditioner is operated not only when it is used by a tenant user, but for example, an initial test run at the beginning of installation of the air conditioner system, periodic inspection, failure repair, etc. There are cases where it is irrelevant to the use of tenant users, such as a test run during maintenance.
[0005]
If the data on the operation time of the indoor unit at the time of the trial operation is included in the apportioning rate of the electric power used for each indoor unit, the tenant's user must bear the electric power required for the trial operation. It is not appropriate.
[0006]
The object of the present invention has been made in consideration of the above-described circumstances, and can prevent the user of the air conditioner from being charged with the energy use fee of the air conditioner during the initial test run or the maintenance test run. It is to provide an air conditioning system.
[0007]
[Means for Solving the Problems]
In the air conditioning system in which the central management device centrally manages the air conditioner including the outdoor unit and the plurality of indoor units, the invention described in claim 1 is for calculating a proportion of the energy used by the indoor unit. A communication in which the accumulated operating time of each indoor unit is individually counted, and the measured value of an energy meter that measures the amount of energy used by the air conditioner connects the central control device and one or more air conditioners. Accumulated by each communication adapter arranged on the line, During initial test run or maintenance test run Cumulative interruption switch provided in the centralized management device But operation To be done Thus, the accumulation of the operation time of each indoor unit and the accumulation of the energy usage amount of the air conditioner are interrupted.
[0008]
According to a second aspect of the present invention, in the first aspect of the present invention, the interruption of the accumulated operation time of the indoor unit is provided on a communication line that connects the central control device and one or more air conditioners. The present invention is characterized in that it is implemented for each communication adapter system or for all the air conditioners.
[0010]
Claim 3 The invention described in claim 1 Or 2 In the described invention, resumption of accumulation of operation time of the indoor unit And restart of accumulation of energy consumption of the air conditioner Is implemented by operating a cumulative restart switch provided in the centralized management apparatus.
[0011]
Claim 4 The invention described in claim 1 Or 2 In the invention according to any one of the above, restart of cumulative operation time of the indoor unit And restart of accumulation of energy consumption of the air conditioner Is implemented by a timed release function for cumulative interruption of the operation time of the indoor unit provided in the centralized management device.
[0012]
Claim 5 The invention described in claim 1 to claim 1 4 In the invention described in any one of the above, the cumulative operation time of the indoor unit is calculated by the central control device counting the operation time of all indoor units, or the central control device and one or more air conditioners. Each communication adapter installed on the communication line that connects to each other counts the operating time of the indoor unit of the system belonging to its own communication adapter, or each indoor unit counts its own operating time individually It is implemented by doing.
[0014]
Claim 6 The invention described in claim 1 to 5 In the invention described in the above, the interruption of the accumulation of the measurement value from the energy meter is performed for each communication adapter system provided in the communication line connecting the central control device and the one or more air conditioners. Or it is implemented collectively with respect to all the said energy meter.
[0018]
Claim 7 The invention described in claim 1 to claim 1 6 In the invention described in any one of the above, the energy is electric power, the energy meter is a watt-hour meter that measures electric power used in the air conditioner, and the central control device is configured to supply electric power for each indoor unit. The apportion rate is calculated.
[0019]
Claim 1, 3 Or 5 Thru 7 The invention described in any of the above has the following effects.
[0020]
Since the accumulation of indoor unit operation time is configured to be interruptable, the accumulation of indoor unit operation time is interrupted during the initial trial operation at the beginning of the installation of the air conditioning system, or during the maintenance test operation during periodic inspections and repairs. it can. Thereby, since the operation time of the indoor unit at the time of the test operation is not included in the apportioning rate of the energy used by the indoor unit, it is possible to avoid imposing the energy charge required for the test operation on the user of the air conditioner. .
[0021]
The invention according to claim 2 has the following effects.
[0022]
Because the interruption of the accumulation of the operation time of the indoor unit is configured to be executable for each communication system of each communication adapter disposed in the communication line connecting the centralized management device and one or more air conditioners, For example, it is possible to calculate the apportioning rate of energy used by the indoor unit of an air conditioner that has not been maintained and calculate the proportion of energy used by the indoor unit. Can be calculated without excess or deficiency.
[0023]
Claim 4 The invention described in (1) has the following effects.
[0024]
Since the restart of the accumulation of the indoor unit operation time is performed by the timed release function for the cumulative interruption of the operation time of the indoor unit provided in the central control unit, the cumulative restart switch provided in the central control unit is Even when the operation is forgotten, the accumulation of the operation time of the indoor unit can be resumed after a certain time has elapsed since the accumulation of the operation time of the indoor unit was interrupted. For this reason, the charge of the energy used of the indoor unit used by the user of the air conditioner can be calculated as accurately as possible.
[0025]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0026]
FIG. 1 is a system diagram showing an embodiment of an air conditioning system according to the present invention.
[0027]
The air conditioning system 10 shown in FIG. 1 includes a first air conditioner 11 and a second air conditioner 12 via a first communication adapter 21, and a third air conditioner 13 and the like via a second communication adapter 22. These are configured to be centrally managed by the centralized management device 15.
[0028]
Each of the first air conditioner 11 and the second air conditioner 12 is a multi-type, which is configured by connecting, for example, two indoor units 17 and 18 to one outdoor unit 16 through refrigerant pipes (not shown). It is an air conditioner. The third air conditioner 13 is a multi-type air conditioner in which, for example, three indoor units 17, 18 and 19 are connected to one outdoor unit 16 by refrigerant piping (not shown).
The central management device 15 is connected to the first communication adapter 21 and the second communication adapter 22 via the central management communication line 20. The first communication adapter 21 is connected to the outdoor unit 16, the indoor units 17 and 18 of the first air conditioner 11, and the outdoor unit 16, the indoor unit 17 and the second air conditioner 12 via the indoor / outdoor communication line 23. 18 is connected. The second communication adapter 22 is connected to the outdoor unit 16, the indoor units 17, 18, and 19 of the third air conditioner 13 through the indoor / outdoor communication line 24.
[0029]
The indoor / outdoor communication line 23 transmits and receives an air conditioning control signal between the outdoor unit 16 and the indoor units 17 and 18 of the first air conditioner 11 and the second air conditioner 12, and the outdoor unit 16 and the indoor unit 17. , 18 allows the air conditioning function to be demonstrated. Similarly, the indoor / outdoor communication line 24 transmits / receives an air conditioning control signal between the outdoor unit 16 and the indoor units 17, 18 and 19 of the third air conditioner 13, and the outdoor unit 16 and the indoor unit 17. , 18 and 19 have air conditioning functions.
[0030]
The centralized management communication line 20 sends a centralized management signal from the centralized management device 15 to the first air conditioner 11 and the second air conditioner 12 via the first communication adapter 21 and via the second communication adapter 22. The data is transmitted to and received from the third air conditioner 13. Furthermore, this centralized management communication line 20 is routed from the first air conditioner 11 and the second air conditioner 12 via the first communication adapter 21, and from the third air conditioner 13 via the second communication adapter 22. The operating state data and the like are transmitted to the central management device 15.
[0031]
Here, the 1st communication adapter 21 and the 2nd communication adapter 22 are the signal transmitted / received using the centralized management communication line 20 between the centralized management apparatuses 15, and the 1st air conditioning apparatus 11 and the 2nd air conditioning apparatus. 12 is a device that converts a communication form with a signal that is transmitted to and received from the third air conditioner 13 using an indoor / outdoor communication line 23.
[0032]
The central management device 15 uses the operation display panel 25 to centrally manage the first air conditioner 11 and the second air conditioner 12 via the first communication adapter 21, and the first air conditioner 11 and the first air conditioner 11. The state of the second air conditioner 12 is monitored, the third air conditioner 13 is centrally managed via the second communication adapter 22, and the state of the third air conditioner 13 is monitored.
[0033]
A remote controller 26 is connected to each of the indoor units 17, 18, 19 of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13. The indoor units 17, 18, and 19 can be switched between operation modes such as operation and stop, change of set temperature, cooling and heating by manual operation of the remote controller 26.
[0034]
By the way, the central management device 15 includes the first air conditioning device 11, the second air conditioning device 11, the second air conditioning device 12, the third air conditioning device 13, the central control function and the state monitoring function. The power apportioning rate as the energy apportioning rate for each of the indoor units 17, 18, and 19 of the air conditioning device 12 and the third air conditioning device 13, and the energy usage charges for the indoor units 17, 18, and 19 based on the electric apportioning rate Function to calculate the electricity usage fee.
[0035]
Hereinafter, the calculation function of the power apportionment ratio and the power usage fee by the centralized management device 15 will be described.
[0036]
The power apportioning ratio of each indoor unit 17, 18, 19 is calculated based on the cumulative value of the operation time of each indoor unit 17, 18, 19, and the central control device count method, communication adapter is used as the cumulative operation time method. There are a counting method and an indoor unit counting method.
[0037]
In the centralized management device counting method, the centralized management device 15 individually counts the operation time of all the indoor units 17, 18, 19, thereby calculating the cumulative value of the operation time of each indoor unit 17, 18, 19. Is.
[0038]
In the communication adapter counting method, each of the first communication adapter 21 and the second communication adapter 22 is an indoor unit of a communication system belonging to the first communication adapter 21 and the second communication adapter 22, for example, the first communication adapter 21. In the case of the first air conditioner 11, the indoor units 17 and 18 of the second air conditioner 12, and in the case of the first communication adapter 21, the indoor unit of the third air conditioner 13. The cumulative value of the operation time of each indoor unit 17, 18, and 19 is calculated by counting the operation time of 17, 18, and 19 separately.
[0039]
In the indoor unit counting method, the operation times of the indoor units 17, 18, and 19 are accumulated by the individual indoor units 17, 18, and 19 individually counting their own operation times.
[0040]
Of these counting methods, in order to distribute the danger in the event of a failure, the accumulated operation time of all the indoor units 17, 18, 19 is stored in the centralized management device 15 as in the centralized management device counting method. It is safe to calculate for each section like the communication adapter count method, or to calculate for each individual indoor unit like the indoor unit count method, instead of calculating at one place.
[0041]
The centralized management device 15 calculates the power distribution ratio of each indoor unit 17, 18, 19 based on the cumulative value of the operation time of each indoor unit 17, 18, 19 counted by any of the above-described counting methods. At this time, the central control device 15 determines the operating time of the indoor units 17, 18, 19 at the time of initial test operation at the beginning of installation of the air conditioning system 10 or at the time of maintenance test operation at the time of periodic inspection or repair of failure. Configured to suspend accumulation.
[0042]
The interruption of the accumulated operation time of the indoor units 17, 18, 19 is performed by operating the accumulation interruption switches 27 </ b> A, 27 </ b> B installed on the operation display panel 25 of the central management device 15. Similarly, the restart of the accumulated operation time of the indoor units 17, 18, 19 is performed by operating the cumulative restart switches 28 </ b> A, 28 </ b> B installed on the operation display panel 25 of the central management device 15. Further, the resumption of the accumulation of the operation time is performed by a timed cancellation function of the accumulation interruption that the centralized management device 15 has, which cancels the interruption after a predetermined time has elapsed since the accumulation of the operation time was interrupted.
[0043]
The accumulation of the operation time of the indoor units 17, 18, 19 is stopped and the accumulation is restarted for each of the first communication adapter 21 and the second communication adapter 22, that is, for each of the first communication adapter 21 and the second communication adapter 22. It is implemented for each communication system to which it belongs. The cumulative interruption switch 27A and the cumulative resumption switch 28A are for interrupting and resuming the accumulation of operation time for the indoor units 17 and 18 of the communication system belonging to the first communication adapter 21, respectively, and the cumulative interruption switch 27B. The cumulative resumption switch 28B is for suspending and resuming the accumulation of operation time for the indoor units 17, 18, and 19 of the communication system belonging to the second communication adapter 22, respectively.
[0044]
On the other hand, in order to calculate the electricity usage charges of the indoor units 17, 18, and 19, the watt-hour meters 29 and 30 as energy meters measure the first air conditioner 11, the second air conditioner 12, and the third air. The power usage amount as the energy usage amount of the harmony device 13 is measured. That is, the watt-hour meter 29 is connected to the first communication adapter 21 and measures the amount of power used in the first air conditioner 11 and the second air conditioner 12. The watt hour meter 30 is connected to the second communication adapter 22 and measures the amount of power used in the third air conditioner 13.
[0045]
The first communication adapter 21 transmits the power usage measured by the watt hour meter 29 to the central management device 15, and the second communication adapter 22 transmits the power usage measured by the watt hour meter 30 to the central management device. 15 to send. The central management device 15 calculates the power usage fee of each indoor unit 17, 18, 19 from these power usage amounts, the power apportioning rate calculated as described above, and the charge per unit of power usage amount. To do.
[0046]
The first communication adapter 21 and the second communication adapter 22 are configured such that the watt hour meter 29 and the watt hour meter 30 interrupt the accumulation of the measured power consumption during the initial test operation or the maintenance test operation, respectively. Discontinuation of the accumulation of the power consumption of the first air conditioner 11 and the second air conditioner 12 by the first communication adapter 21 and the accumulation of the power consumption of the third air conditioner 13 by the second communication adapter 22 The interruption is performed by the operation of each of the accumulation interruption switches 27A and 27B installed in the centralized management device 15, similarly to the interruption of the accumulation of the operation time of the indoor units 17, 18, and 19.
[0047]
The first communication adapter 21 resumes accumulating the power usage of the first air conditioner 11 and the second air conditioner 12, and the second communication adapter 22 resumes accumulating the power usage of the third air conditioner 13. In the same way as the cumulative restart of the operation time of the indoor units 17, 18, 19 is performed by the operation of each of the cumulative restart switches 28A, 28B installed in the central control device 15. Further, the restart of the accumulation of the power consumption of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13 by the first communication adapter 21 and the second communication adapter 22 is performed by the indoor units 17 and 18. In the same manner as in the case of the operation time of 19, after a predetermined time has elapsed from the interruption of the accumulation of the electric power consumption, the centralized management device 15 has a timed cancellation function for the accumulation interruption.
[0048]
As described above, the cumulative interruption switch 27 </ b> A and the cumulative restart switch 28 </ b> A are used for measuring the power usage of the first air conditioner 11 and the second air conditioner 12 belonging to the first communication adapter 21 measured by the watt-hour meter 29. Suspend and resume each accumulation. In addition, the cumulative interruption switch 27B and the cumulative restart switch 28B interrupt and restart the accumulation of the power consumption of the third air conditioner 13 belonging to the second communication adapter 22 measured by the watt-hour meter 30, respectively. As described above, the interruption and resumption of the accumulation of the power consumption of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13 by the first communication adapter 21 and the second communication adapter 22 are also performed in the indoor unit. As in the case of the operating hours of 17, 18, and 19, this is performed for each communication system belonging to each of the first communication adapter 21 and the second communication adapter 22.
[0049]
Next, with respect to each accumulation method of the operation time of the indoor units 17, 18, and 19, the interruption and resumption of the accumulation of the operation time, the interruption and resumption of the accumulation of the electric power consumption will be described.
[0050]
In the case of the central control device count method,
For example, when the cumulative interruption switch 27A of the centralized management device 15 is operated during the initial test operation or the maintenance trial operation, the centralized management device 15 performs communication belonging to the first communication adapter 21 corresponding to the operated cumulative interruption switch 27A. The accumulation of the operation time of the indoor units 17 and 18 in the first air conditioner 11 and the second air conditioner 12 of the system is interrupted, and further, the first communication adapter 21 corresponding to the accumulation interrupt switch 27A communicates with itself. The accumulation of the power consumption of the first air conditioner 11 and the second air conditioner 12 measured by the watt hour meter 29 of the system is interrupted.
[0051]
When the cumulative restart switch 28A of the centralized management device 15 is operated after the end of the above test run, the centralized management device 15 causes the indoor unit of the communication system belonging to the first communication adapter 21 corresponding to the operated cumulative restart switch 28A. The first communication adapter 21 corresponding to the cumulative restart switch 28A restarts the accumulation of the operation times 17 and 18, and the first air conditioner 11 measured by the watt-hour meter 29 of the communication system belonging to itself and The accumulation of the power usage amount of the second air conditioner 12 is restarted.
[0052]
Further, for example, when the cumulative interruption switch 27B of the centralized management device 15 is operated during the initial trial operation or the maintenance trial operation, the centralized management device 15 communicates with the communication system belonging to the second communication adapter 22 corresponding to the cumulative interruption switch 27B. The accumulation of operation time in the indoor unit 19 of the third air conditioner 13 is interrupted, and the second communication adapter 22 corresponding to the accumulation interruption switch 27B is measured by the watt-hour meter 30 of the communication system belonging to itself. The accumulation of the power consumption of the third air conditioner 13 is interrupted.
[0053]
In addition, when the cumulative restart switch 28B of the centralized management device 15 is operated after the above-described trial operation is completed, the centralized management device 15 causes the communication system belonging to the second communication adapter 22 corresponding to the operated cumulative restart switch 28B. The accumulation of the operation time in the indoor unit 19 is resumed, and the second communication adapter 22 corresponding to the accumulation resume switch 28B of the third air conditioner 13 that is metered by the watt hour meter 30 of the communication system belonging to itself. Restart accumulating power usage.
[0054]
For communication adapter counter method
For example, when the cumulative interruption switch 27A of the centralized management device 15 is operated during the initial trial operation or the maintenance trial operation, the centralized management device 15 transfers the indoor space to the first communication adapter 21 corresponding to the operated cumulative interruption switch 27A. The command for instructing to interrupt the accumulation of the operation time of the units 17 and 18 is transmitted, and the operation time of the indoor units 17 and 18 is accumulated in the first communication adapter 21 until the command for instructing the restart of the accumulation is transmitted. Interrupt. At the same time, the first communication adapter 21 corresponding to the cumulative interruption switch 27A determines the power usage of the first air conditioner 11 and the second air conditioner 12 measured by the watt hour meter 29 of the communication system belonging to itself. Suspend accumulation.
[0055]
When the cumulative resumption switch 28A is operated after the end of the trial operation described above, the central control device 15 accumulates the operation time of the indoor units 17 and 18 to the first communication adapter 21 corresponding to the operated cumulative resumption switch 28A. A command instructing to resume is transmitted, and the first communication adapter 21 is made to resume accumulation of the operation time of the indoor units 17 and 18. At the same time, the first communication adapter 21 corresponding to the cumulative restart switch 28 </ b> A restarts the accumulation of the power usage of the first air conditioner 11 and the second air conditioner 12 measured by the watt hour meter 29.
[0056]
For example, when the cumulative interruption switch 27B of the centralized management device 15 is operated during the initial trial operation or the maintenance trial operation, the centralized management device 15 transfers the indoors to the second communication adapter 22 corresponding to the operated cumulative interruption switch 27B. A command instructing to interrupt the accumulation of the operation time of the machine 19 is transmitted, and the second communication adapter 22 is caused to interrupt the accumulation of the operation time of the indoor unit 19 until a command to instruct the restart of the accumulation is transmitted. At the same time, the second communication adapter 22 corresponding to the cumulative interruption switch 27B interrupts the accumulation of the power consumption of the third air conditioner 13 measured by the watt hour meter 30 of the communication system belonging to itself.
[0057]
When the cumulative resumption switch 28B is operated after the end of the trial operation, the centralized management device 15 resumes accumulating the operation time of the indoor unit 19 to the first communication adapter 21 corresponding to the operated cumulative resumption switch 28B. The command which instruct | indicates is transmitted, This 2nd communication adapter 22 is made to restart accumulation | storage of the operating time of the indoor unit 19. At the same time, the second communication adapter 22 corresponding to the accumulation restart switch 28 </ b> B resumes accumulating the power usage amount of the third air conditioner 13 measured by the watt hour meter 30.
[0058]
For indoor unit counting method
For example, when the cumulative interruption switch 27A of the centralized management device 15 is operated during the initial test operation or the maintenance trial operation, the centralized management device 15 performs communication belonging to the first communication adapter 21 corresponding to the operated cumulative interruption switch 27A. A command instructing to interrupt the accumulation of the operation time is transmitted to the indoor units 17 and 18 in the first air conditioner 11 and the second air conditioner 12 of the system via the first communication adapter 21, and the accumulation is resumed. Until the command instructing is transmitted, the indoor units 17 and 18 are caused to interrupt the accumulation of the operation time. At the same time, the first communication adapter 21 corresponding to the cumulative interruption switch 27A determines the power usage of the first air conditioner 11 and the second air conditioner 12 measured by the watt hour meter 29 of the communication system belonging to itself. Suspend accumulation.
[0059]
When the cumulative restart switch 28A is operated after the end of the above-described trial operation, the centralized management device 15 sends the communication system indoor units 17 and 18 belonging to the first communication adapter 21 corresponding to the operated cumulative restart switch 28A to the first The command which instruct | indicates to restart accumulation | storage of operation time is transmitted through the 1 communication adapter 21, and accumulation of operation time is restarted by this indoor unit 17 and 18. FIG. At the same time, the first communication adapter 21 corresponding to the cumulative restart switch 28 </ b> A restarts the accumulation of the power usage of the first air conditioner 11 and the second air conditioner 12 measured by the watt hour meter 29.
[0060]
For example, when the cumulative interruption switch 27B of the centralized management device 15 is operated during the initial trial operation or the maintenance trial operation, the centralized management device 15 communicates with the communication belonging to the second communication adapter 22 corresponding to the operated cumulative interruption switch 27B. Until the indoor unit 19 in the third air conditioner 13 of the system transmits a command instructing to interrupt the accumulation of the operation time via the second communication adapter 22, until a command instructing the restart of the accumulation is transmitted. The indoor unit 19 is made to interrupt the accumulation of operation time. At the same time, the second communication adapter 22 corresponding to the cumulative interruption switch 27B interrupts the accumulation of the power consumption of the third air conditioner 13 measured by the watt hour meter 30 of the communication system to which the second communication adapter 22 belongs.
[0061]
When the cumulative resumption switch 28B is operated after the end of the above-described trial operation, the centralized management device 15 sends the second communication system indoor unit 19 belonging to the second communication adapter 22 corresponding to the operated cumulative resumption switch 28B to the second A command for instructing to resume the accumulation of the operation time is transmitted via the communication adapter 22, and the indoor unit 19 is caused to resume the accumulation of the operation time. At the same time, the second communication adapter 22 corresponding to the accumulation restart switch 28 </ b> B resumes accumulating the power usage amount of the third air conditioner 13 measured by the watt hour meter 30.
[0062]
Since the air conditioning system 10 is configured as described above, the following effects (1) to (3) are achieved according to the above embodiment.
[0063]
(1) Since the accumulation of the operation time of the indoor units 17, 18, and 19 can be interrupted, during the initial test operation at the beginning of the installation of the air conditioning system 10, or during the maintenance test operation at the time of periodic inspection or failure repair, Accumulation of the operation time of the indoor units 17, 18, 19, accumulation of the amount of power used measured by the watt hour meters 29, 30 can be interrupted. As a result, the operation time of the indoor units 17, 18, and 19 during the trial operation is not counted in the apportioning rate of the power used by the indoor units 17, 18, and 19, and the power consumption during the trial operation is not counted. Therefore, it is possible to avoid imposing the power usage fee required for the trial operation on the users of the indoor units 17, 18, and 19 of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13. .
[0064]
(2) A communication line that connects the central control device 15 to the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13 when the interruption of the accumulated operation time of the indoor units 17, 18, 19 occurs. Since it is implemented for each communication system of the first communication adapter 21 and the second communication adapter 22 arranged in the (centralized management communication line 20, indoor / outdoor communication lines 23, 24), for example, maintenance is not performed. The operating hours of the indoor units 17, 18, and 19 of the 1 air conditioner 11, the second air conditioner 12, and the third air conditioner 13 are accumulated, and the proportion of power used by the indoor units 17, 18, and 19 is calculated. It can be calculated. For this reason, the electric power usage charges for the users of the indoor units 17, 18, 19 of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13 are calculated without excess or deficiency. be able to.
[0065]
(3) The restart of the accumulation of the operation time of the indoor units 17, 18, and 19 is carried out by the timed release function of the accumulated interruption of the operation time of the indoor units 17, 18, and 19 provided in the central control device 15. Therefore, even when the operator forgets to operate the cumulative restart switch 28A and the cumulative restart switch 28B provided in the centralized management device 15, the accumulation of the operation time of the indoor units 17, 18, and 19 is interrupted and fixed. After the elapse of time, the accumulation of the operation time of the indoor units 17, 18, 19 of the first air conditioner 11, the second air conditioner 12, and the third air conditioner 13 can be resumed. For this reason, the electric power usage fee which the user of each indoor unit 17, 18, 19 of the 1st air conditioning apparatus 11, the 2nd air conditioning apparatus 12, and the 3rd air conditioning apparatus 13 used can be calculated as accurately as possible. .
[0066]
As mentioned above, although this invention was demonstrated based on the said embodiment, this invention is not limited to this.
[0067]
For example, in the above embodiment, the accumulated operation time of the indoor units 17, 18, and 19 by the operation of the cumulative interruption switches 27A and 27B or the cumulative resumption switches 28A and 28B, The accumulation of the amount is described as being suspended or resumed for each communication system of the first communication adapter 21 and the second communication adapter 22, but the above operation is performed by operating the accumulation suspension switches 27A and 27B or the accumulation restart switches 28A and 28B. The accumulation of operation time is suspended or resumed for all indoor units 17, 18 and 19 at once, and the accumulation of power consumption is suspended or resumed for all electricity meters 29 and 30 at once. May be.
[0068]
Further, when the operation display panel 25 of the centralized management device 15 includes a display with a touch panel, the cumulative suspension switches 27A and 27B and the cumulative restart switches 28A and 28B are switches displayed on the display. There may be.
[0069]
Furthermore, in the said embodiment, the centralized management apparatus 15 is the power distribution ratio and electric power about each indoor unit 17,18,19 of the 1st air conditioning apparatus 11, the 2nd air conditioning apparatus 12, and the 3rd air conditioning apparatus 13. Although the calculation of the usage fee has been described, only the power apportionment rate may be obtained.
[0070]
Moreover, in the said embodiment, although the case where the energy used for the 1st air conditioning apparatus 11, the 2nd air conditioning apparatus 12, and the 3rd air conditioning apparatus 13 was electric power was described, in the case of gas, a gas distribution ratio The gas usage amount and the gas usage fee may be calculated for each of the indoor units 17, 18, and 19 from the gas usage amount measured by the gas meter.
[0071]
【The invention's effect】
As described above, according to the air conditioning system of the present invention, it is possible to avoid the user of the air conditioning apparatus from being charged with the energy usage fee of the air conditioning apparatus during the initial test operation or the maintenance test operation.
[Brief description of the drawings]
FIG. 1 is a system diagram showing an embodiment of an air conditioning system according to the present invention.
[Explanation of symbols]
10 Air conditioning system
11 First air conditioner
12 Second air conditioner
13 Third air conditioner
15 Centralized management device
17, 18, 19 Indoor unit
20 Centralized management communication line
21 First communication adapter
22 Second communication adapter
23, 24 Indoor / outdoor communication lines
27A, 27B Cumulative interruption switch
28A, 28B Cumulative restart switch
29, 30 electricity meter

Claims (7)

室外機及び複数の室内機を備えた空気調和装置を、集中管理装置が集中管理する空気調和システムにおいて、
上記室内機の使用エネルギーの按分率を算出するために上記各室内機の運転時間の累積が個別にカウントされ、上記空気調和装置のエネルギー使用量を計量するエネルギー計量計の計量値が、集中管理装置と一若しくは複数の空気調和装置とを接続する通信線に配設された各通信アダプタにより累積され、
初期試運転時またはメンテナンス試運転時に、前記集中管理装置に設けられた累積中断スイッチが操作されることにより、上記各室内機の運転時間の累積、及び、上記空気調和装置のエネルギー使用量の累積が中断されることを特徴とする空気調和システム。
In an air conditioning system in which an air conditioner having an outdoor unit and a plurality of indoor units is centrally managed by a central control device,
In order to calculate the proportion of energy used by the indoor unit, the cumulative operating time of each indoor unit is counted individually, and the measured value of the energy meter that measures the energy usage of the air conditioner is centrally managed. Accumulated by each communication adapter disposed on a communication line connecting the apparatus and one or more air conditioners,
During the initial test run or the maintenance test run, the cumulative interruption switch provided in the central control device is operated to interrupt the cumulative operation time of each indoor unit and the cumulative energy usage of the air conditioner. Air conditioning system characterized by being made.
上記室内機の運転時間の累積の中断は、集中管理装置と一または複数の空気調和装置とを接続する通信線に配設された各通信アダプタの系統毎に、または全ての空気調和装置に対して一括して実施されることを特徴とする請求項1に記載の空気調和システム。  The cumulative interruption of the operation time of the indoor unit described above is performed for each communication adapter system arranged on the communication line connecting the central control device and one or a plurality of air conditioners, or for all air conditioners. The air conditioning system according to claim 1, wherein the air conditioning system is implemented collectively. 上記室内機の運転時間の累積の再開、及び、上記空気調和装置のエネルギー使用量の累積の再開は、集中管理装置に設けられた累積再開スイッチの操作により実施されることを特徴とする請求項1または2記載の空気調和システム。  The restart of the accumulation of the operation time of the indoor unit and the restart of the accumulation of the energy usage amount of the air conditioner are performed by operating a cumulative restart switch provided in a centralized management device. The air conditioning system according to 1 or 2. 上記室内機の運転時間の累積の再開、及び、上記空気調和装置のエネルギー使用量の累積の再開は、集中管理装置に設けられた、室内機の運転時間の累積中断の時限式解除機能により実施されることを特徴とする請求項1または2記載の空気調和システム。  Resuming the accumulation of the operating time of the indoor unit and resuming the accumulation of the energy consumption amount of the air conditioner are performed by the timed cancellation function for the cumulative interruption of the operating time of the indoor unit provided in the central control device. The air conditioning system according to claim 1 or 2, wherein 上記室内機の運転時間の累積は、集中管理装置が全ての室内機の運転時間をカウントすることにより、または、集中管理装置と一若しくは複数の空気調和装置とを接続する通信線に配設された各通信アダプタが、自己の通信アダプタに属する系統の室内機の運転時間をカウントすることにより、または、個々の室内機が、自らの運転時間を個別にカウントすることにより実施されることを特徴とする請求項1乃至4のいずれかに記載の空気調和システム。  The accumulation of the operation time of the indoor unit is arranged by the central control device counting the operation time of all the indoor units or arranged on a communication line connecting the central control device and one or a plurality of air conditioners. Each communication adapter is implemented by counting the operation time of the indoor unit of the system belonging to its own communication adapter, or by each individual indoor unit counting its own operation time individually. The air conditioning system according to any one of claims 1 to 4. 上記エネルギー計量計からの計量値の累積の中断は、集中管理装置と一または複数の空気調和装置とを接続する通信線に配設された各通信アダプタの系統毎に、または全ての上記エネルギー計量計に対して一括して実施されることを特徴とする請求項1乃至5のいずれかに記載の空気調和システム。The interruption of the accumulation of the measurement value from the energy meter is performed for each system of each communication adapter arranged in the communication line connecting the central control device and one or a plurality of air conditioners, or for all the energy metering. The air conditioning system according to any one of claims 1 to 5 , wherein the air conditioning system is collectively implemented with respect to the meter. 上記エネルギーは電力であり、上記エネルギー計量計は、空気調和装置にて使用した電力を計量する電力量計であり、上記集中管理装置は、室内機毎に電力按分率を算出することを特徴とする請求項1乃至6のいずれかに記載の空気調和システム。  The energy is electric power, the energy meter is a watt-hour meter for measuring electric power used in an air conditioner, and the centralized management device calculates a power distribution ratio for each indoor unit. The air conditioning system according to any one of claims 1 to 6.
JP2001183275A 2001-06-18 2001-06-18 Air conditioning system Expired - Fee Related JP4618938B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001183275A JP4618938B2 (en) 2001-06-18 2001-06-18 Air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001183275A JP4618938B2 (en) 2001-06-18 2001-06-18 Air conditioning system

Publications (2)

Publication Number Publication Date
JP2002372281A JP2002372281A (en) 2002-12-26
JP4618938B2 true JP4618938B2 (en) 2011-01-26

Family

ID=19023250

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001183275A Expired - Fee Related JP4618938B2 (en) 2001-06-18 2001-06-18 Air conditioning system

Country Status (1)

Country Link
JP (1) JP4618938B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100550556B1 (en) * 2003-11-11 2006-02-10 엘지전자 주식회사 Central control system of air conditioner and its operation method
KR100688203B1 (en) * 2005-02-25 2007-03-02 엘지전자 주식회사 Central control system of multi air conditioner and its power control method
CN101025370B (en) * 2006-02-23 2010-10-13 珠海格力电器股份有限公司 Household metering method and system for central air conditioner

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH085470B2 (en) * 1991-07-06 1996-01-24 株式会社フジキカイ Method and device for measuring the time of maintenance and management of packaging machine
JP3813272B2 (en) * 1996-11-21 2006-08-23 三洋電機株式会社 Centralized control type air conditioning system and centralized control method for air conditioning system
JPH11296582A (en) * 1998-04-08 1999-10-29 Computer Technica:Kk Man-hour cost totalizing device
JP4134379B2 (en) * 1998-05-28 2008-08-20 松下電器産業株式会社 Air conditioning equipment usage comparison system
JP2000234792A (en) * 1999-02-17 2000-08-29 Mitsubishi Electric Corp Air conditioner charge management device
JP4390929B2 (en) * 1999-10-06 2009-12-24 三菱電機株式会社 Air conditioning control system and air conditioning control method

Also Published As

Publication number Publication date
JP2002372281A (en) 2002-12-26

Similar Documents

Publication Publication Date Title
CN104364585B (en) Refrigerating plant management system
KR100844325B1 (en) Multi-Air Conditioning Demand Control System
KR100688203B1 (en) Central control system of multi air conditioner and its power control method
JP5749092B2 (en) Power distribution system and power distribution method
RU2007127927A (en) PIPELINE NETWORK FOR WATER- OR GAS SUPPLY AND / OR FOR DISPOSAL OF TECHNICAL WATER, METHOD FOR DETECTING LEAKAGE IN THE PIPELINE NETWORK AND METHOD FOR AUTOMATED SUSPENSIBLE SALES
KR100751834B1 (en) Integrated control system of heat pump type air conditioner
IT202000015196A1 (en) REMOTE CONTROLLABLE WATER METER AND RELATED MONITORING SYSTEM AND CONTROL METHOD
WO2017004963A1 (en) Remote transmission communication system for temperature control and heat metering and method therefor
JP4618938B2 (en) Air conditioning system
KR102399915B1 (en) Air conditioner
JP2002156142A (en) Air conditioning system
CN103104949A (en) Heat metering method, system and heat metering device
KR20130038559A (en) Air conditioner and method
KR20080040454A (en) Power management device for system air conditioner and method
JP5964136B2 (en) Wireless demand control system
JPWO2007032065A1 (en) Air conditioner
JP2001197662A (en) Power amount calculation device, power amount calculation method, and power amount information processing system
CN1959263B (en) Air conditioning system and operation method
JP2000310438A (en) Air conditioning system
CN1719129B (en) Central control system of air conditioner
KR20090085923A (en) Leak Monitoring System and Method Using Remote Meter Data
KR101909755B1 (en) A system and a method for remote control of electricity
CN205174702U (en) Central air conditioning charging monitoring device and system
JP2014129935A (en) Electric energy information providing system and proportional division electric energy calculation method
JP2008145054A (en) Centralized control device for air conditioner and air conditioning system provided with this centralized control device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080522

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100208

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100216

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100416

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100416

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100601

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100716

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100817

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100903

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100928

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101026

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131105

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131105

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees