Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4625752B2 - Form for tunnel gate and method of constructing tunnel gate using this form - Google Patents
[go: Go Back, main page]

JP4625752B2 - Form for tunnel gate and method of constructing tunnel gate using this form - Google Patents

Form for tunnel gate and method of constructing tunnel gate using this form Download PDF

Info

Publication number
JP4625752B2
JP4625752B2 JP2005309829A JP2005309829A JP4625752B2 JP 4625752 B2 JP4625752 B2 JP 4625752B2 JP 2005309829 A JP2005309829 A JP 2005309829A JP 2005309829 A JP2005309829 A JP 2005309829A JP 4625752 B2 JP4625752 B2 JP 4625752B2
Authority
JP
Japan
Prior art keywords
tunnel
mold frame
formwork
outer mold
peripheral surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2005309829A
Other languages
Japanese (ja)
Other versions
JP2007120025A (en
Inventor
俊樹 柴田
Original Assignee
テクノプロ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by テクノプロ株式会社 filed Critical テクノプロ株式会社
Priority to JP2005309829A priority Critical patent/JP4625752B2/en
Publication of JP2007120025A publication Critical patent/JP2007120025A/en
Application granted granted Critical
Publication of JP4625752B2 publication Critical patent/JP4625752B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明はトンネル坑門用型枠及びこの型枠を用いたトンネル坑門の施工方法に関する。   The present invention relates to a tunnel gate form and a tunnel gate construction method using the form.

近年、景観をよくしたり、地山からの落石を防止したりするために、面壁スタイル(方式)に代えて、坑門が地山から突出し出口側端面が略垂直になっている突出型坑門、出口側端面がトンネル側に傾斜している竹割り式坑門、出口側端面が竹割り式坑門と逆方向に傾斜している逆竹割り式坑門等が多用されている。   In recent years, in order to improve the landscape and prevent rock fall from the natural ground, instead of the face wall style (method), the projecting type mine where the pit protrudes from the natural ground and the exit side end surface is almost vertical The gate, the bamboo split type mine whose exit side end face is inclined toward the tunnel side, and the reverse bamboo split type mine whose exit side end face is inclined in the opposite direction to the bamboo split type pit are widely used.

このような地山から突出するタイプのトンネル坑門は、トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠と、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠と、前記内型枠と外型枠のトンネル出入口側開放部分を閉塞する妻型枠とを備えたトンネル坑門用型枠内に生コンクリートを打設して、所定期間養生した後に前記型枠を脱型することで形成される(例えば、特許文献1参照)が、コンクリート打設時の、まだ固まらないコンクリートの側面応力に対して型枠を補強する必要がある。   The type of tunnel tunnel that protrudes from such a natural ground is formed into an inner mold frame having a curved surface along the inner peripheral surface of the tunnel gate and a curved shape along the outer peripheral surface of the tunnel gate. Placing the ready-mixed concrete in the tunnel mine formwork comprising the outer formwork having the formed surface, and the inner formwork and the wife formwork that closes the tunnel entrance side opening portion of the outer formwork, It is formed by demolding the mold after curing for a predetermined period (see, for example, Patent Document 1), but it is necessary to reinforce the mold against the side stress of the concrete that has not yet hardened during concrete placement. is there.

この補強方法として、従来より、パイプサポートを用いる方法と、セパレータを用いる方法が知られている。このうちパイプサポートを用いる方法は、図12に示されるように、外型枠51の下部ないしは側部と切土52との間にパイプサポート53を配設し、前記切土52の反力を利用して外型枠51の変形を抑制している。一方、セパレータを用いる方法は、図13に示されるように、外型枠51と内型枠54とを貫通するセパレータ55により両型枠51、54間の間隔を一定に保持することで、外型枠51の変形を抑制している。   As a reinforcing method, a method using a pipe support and a method using a separator are conventionally known. Among these, the method using the pipe support is such that a pipe support 53 is disposed between the lower part or side part of the outer mold 51 and the cut 52 as shown in FIG. By utilizing this, deformation of the outer mold 51 is suppressed. On the other hand, as shown in FIG. 13, a method using a separator is performed by keeping the distance between both mold frames 51 and 54 constant by a separator 55 penetrating the outer mold frame 51 and the inner mold frame 54. Deformation of the mold 51 is suppressed.

特開2003−82993号公報JP 2003-82993 A

パイプサポートを用いる方法は、作業が容易であり、コンクリートの打設作業中に外型枠の変形を目視にて確認することができ、追加のパイプサポートを設置する等の対応が容易であるという利点を有するものの、パイプサポートを安定して支持するためには、背面地山は安定した切土である必要があり、盛土部ではパイプサポートを安定して支持することができないことから、地形によっては当該方法を採用できないケースがある。突出タイプのトンネル坑門は、従来、切土部に構築されることが多かったが、景観対策上、様々な地形(切土、盛土)において突出タイプのトンネル坑門が計画されるようになり、パイプサポートを用いる方法では対応に限界がある。   The method using the pipe support is easy to work, the deformation of the outer mold can be visually confirmed during the concrete placing work, and it is easy to handle such as installing an additional pipe support. Although it has an advantage, in order to support the pipe support stably, the back ground must be a stable cut, and the embankment cannot stably support the pipe support. May not be able to adopt this method. Protruding type tunnel gates were often constructed in cuts, but for the purpose of landscape countermeasures, protruding type tunnels have been planned for various terrain (cutting and embankment). However, the method using the pipe support has a limit to the response.

一方、セパレータを用いる方法は、型枠に反力を与える部分を要しないので、切土及び盛土のいずれの場合でも採用可能であるが、この方法は、内型枠と外型枠とを直接セパレータで固定することから、内型枠と外型枠との設置誤差を小さくしないと、セパレータを嵌めこむのに時間を要したり、ピーコンの調整に手間取る等作業が煩雑であるという問題がある。   On the other hand, since the method using a separator does not require a part that gives a reaction force to the formwork, it can be used for both cutting and embankment, but this method directly connects the inner formwork and the outer formwork. Since it is fixed with the separator, unless the installation error between the inner mold and the outer mold is reduced, it takes time to fit the separator, and it takes time to adjust the peaker. .

本発明は、このような事情に鑑みてなされたものであり、様々な地形において採用可能であり、しかも設置作業が簡単であり、工期短縮及び工費削減を実現することができるトンネル坑門用型枠及びこの型枠を用いたトンネル坑門の施工方法を提供することを目的としている。   The present invention has been made in view of such circumstances, and can be employed in various terrain, yet has a simple installation work, and can realize a shortened construction period and a reduced construction cost. It aims at providing the construction method of a frame and a tunnel mine using this formwork.

本発明のトンネル坑門用型枠は、トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠と、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠と、前記内型枠と外型枠のトンネル出入口側開放部分を閉塞する妻型枠とを備えたトンネル坑門用型枠であって、
前記内型枠と外型枠との間に当該外型枠を支持するための巻厚保持材が配設されており、
この巻厚保持材は、前記内型枠と外型枠との間に設置し、前記型枠内にコンクリートを打設する場合に当該外型枠の変形を抑え、所定の巻厚を確保するように配置されており、且つ
前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されていることを特徴としている。
The tunnel gate form of the present invention comprises an inner mold having a surface formed in a curved shape along the inner peripheral surface of the tunnel gate, and a surface formed in a curved shape along the outer peripheral surface of the tunnel gate. A tunnel mine formwork comprising an outer formwork and a wife formwork that closes the inner formwork and the opening part on the tunnel entrance side of the outer formwork,
A thickness holding material for supporting the outer mold frame is disposed between the inner mold frame and the outer mold frame,
This winding thickness holding material is installed between the inner mold frame and the outer mold frame, and when concrete is placed in the mold frame, the deformation of the outer mold frame is suppressed and a predetermined winding thickness is secured. Arranged , and
The winding thickness holding member includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel gate of both spacer blocks. The spacer block is characterized in that a taper surface for retaining is formed .

本発明のトンネル坑門用型枠では、巻厚保持材が、内型枠と外型枠との間に設置され、前記型枠内にコンクリートを打設する場合に当該外型枠の変形を抑える箇所に配置されており、この巻厚保持材は、突っ張り棒として機能し前記外型枠の頂部又はクラウン部の下方(内方)への変形(変位)を防止する。巻厚保持材は、内型枠と外型枠との間に配設されるので、トンネル坑門周辺の地山の種類に影響されることなく採用することができ、また両型枠間に設置するだけであるので、作業が容易であり、短時間で作業を終えることができる。また、巻厚保持材は打設したコンクリート中に埋設することも可能なので、この場合は除去作業が不要となる。したがって、工期短縮及び工費削減を実現することができる。   In the tunnel gate mold according to the present invention, the thickness holding material is installed between the inner mold and the outer mold, and when the concrete is placed in the mold, the outer mold is deformed. It is arranged at a place to be restrained, and this thickness holding material functions as a tension rod and prevents deformation (displacement) of the top part or the crown part of the outer mold frame downward (inward). Since the roll thickness holding material is disposed between the inner mold frame and the outer mold frame, it can be used without being affected by the type of ground around the tunnel gate, and between the two mold frames. Since it is only installed, the work is easy and the work can be completed in a short time. Further, since the roll thickness holding material can be embedded in the cast concrete, the removal work is not necessary in this case. Therefore, the construction period can be shortened and the construction cost can be reduced.

また、前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されている。この場合、軸部の長さを調節するだけで、簡単に巻厚保持材の全長を調節することができ、外型枠の内周面と内型枠の外周面との間に当該巻厚保持材を確実に突っ張った状態で配置することができる。また、本発明における巻厚保持材は、トンネル坑門を構成するコンクリート中に埋設することも可能であるが、トンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されているので、当該スペーサブロックがトンネル内に落下するのを確実に防止することができる。 Further, the winding thickness holding material includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel tunnel among the both spacer blocks. the spacer blocks, that have been tapered surface for retaining formation. In this case, it is possible to easily adjust the total length of the thickness holding material simply by adjusting the length of the shaft portion, and the winding thickness between the inner peripheral surface of the outer mold frame and the outer peripheral surface of the inner mold frame. It can arrange | position in the state which held the holding | maintenance material reliably. Further, the winding thickness retaining material in the present invention can be embedded in the concrete constituting the tunnel gate, but the spacer block arranged on the inner peripheral surface side of the tunnel gate is provided with a taper for retaining. Since the surface is formed, it is possible to reliably prevent the spacer block from falling into the tunnel.

前記内型枠がトンネル覆工に用いられるセントルであり、このセントルが、トンネル坑門内周面のうち頂面に対応する頂部と、前記頂面のトンネル周方向両側の側面に対応する側部とからなるとともに前記頂部と側部とがヒンジにて結合されており、前記巻厚保持材が、当該セントルの頂部に配置されているのが好ましい。トンネル覆工に用いられるセントルをトンネル坑門施工用の内型枠として用いると、内型枠の組立に要する時間を短縮するとともに、型枠用のコストを削減することができる。また、セントルの頂部に対応する外型枠の部分にトンネル内方に向かう曲げ応力等の多くが生じることから、当該セントルの頂部に巻厚保持材を配置することで、前記外型枠部分の下方(内方)への変形(変位)を防止することができる。   The inner mold is a centle used for tunnel lining, and the centle has a top corresponding to the top surface of the inner peripheral surface of the tunnel pit, and side portions corresponding to side surfaces on both sides in the tunnel circumferential direction of the top surface. Preferably, the top part and the side part are connected by a hinge, and the thickness holding member is preferably arranged at the top part of the centle. When the centle used for tunnel lining is used as the inner formwork for tunnel tunnel construction, the time required for assembling the inner formwork can be reduced and the cost for the formwork can be reduced. In addition, since a lot of bending stress or the like toward the inside of the tunnel occurs in the part of the outer mold corresponding to the top of the centle, by disposing a winding thickness holding material on the top of the centle, Deformation (displacement) in the downward (inward) direction can be prevented.

また、本発明のトンネル坑門の施工方法は、トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠を、トンネルの坑口に配置する工程、
前記内型枠の外周側を、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠で覆うようにして当該外型枠を前記トンネルの坑口に配置する工程、
前記内型枠と外型枠のトンネル出入口側開放部分を妻型枠で閉塞する工程、及び
前記内型枠と外型枠との間に当該外型枠を支持するための巻厚保持材を配設する工程
を含んでおり、
前記巻厚保持材を、前記内型枠と外型枠との間に設置し、前記型枠内にコンクリートを打設する場合に当該外型枠の変形を抑え、所定の巻厚を確保するように配置し、且つ
前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されていることを特徴としている。
In addition, the tunnel gate construction method of the present invention includes a step of placing an inner mold having a curved surface along the inner peripheral surface of the tunnel gate at the tunnel entrance,
A step of disposing the outer formwork at the tunnel well opening so as to cover the outer form side of the inner formwork with an outer formwork having a curved surface formed along the outer peripheral surface of the tunnel gate;
A step of closing a tunnel entrance / exit side opening portion of the inner mold frame and the outer mold frame with a wife mold frame, and a winding thickness holding material for supporting the outer mold frame between the inner mold frame and the outer mold frame Including a step of arranging,
The winding thickness holding material is installed between the inner mold frame and the outer mold frame, and when concrete is placed in the mold frame, the deformation of the outer mold frame is suppressed and a predetermined winding thickness is secured. and arranged to, and
The winding thickness holding member includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel gate of both spacer blocks. a spacer block, has been tapered surface for retaining formation is characterized in Rukoto.

本発明の施工方法では、巻厚保持材を、前記型枠内にコンクリートを打設する場合に外型枠の変形を抑え、所定の巻厚を確保するように配置しており、この巻厚保持材は、突っ張り棒として機能し前記外型枠の頂部又はクラウン部の下方(内方)への変形(変位)を防止する。巻厚保持材は、内型枠と外型枠との間に配設されるので、トンネル坑門周辺の地山の種類に影響されることなく採用することができ、また両型枠間に設置するだけであるので、作業が容易であり、短時間で作業を終えることができる。また、巻厚保持材は打設したコンクリート中に埋設することも可能なので、この場合は除去作業が不要となる。したがって、工期短縮及び工費削減を実現することができる。
また、前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されている。この場合、軸部の長さを調節するだけで、簡単に巻厚保持材の全長を調節することができ、外型枠の内周面と内型枠の外周面との間に当該巻厚保持材を確実に突っ張った状態で配置することができる。
In the construction method of the present invention, the winding thickness holding material is arranged so as to suppress deformation of the outer mold and secure a predetermined winding thickness when placing concrete in the mold. The holding material functions as a tension bar and prevents deformation (displacement) of the top part or the crown part of the outer mold frame downward (inward). Since the roll thickness holding material is disposed between the inner mold frame and the outer mold frame, it can be used without being affected by the type of ground around the tunnel gate, and between the two mold frames. Since it is only installed, the work is easy and the work can be completed in a short time. Further, since the roll thickness holding material can be embedded in the cast concrete, the removal work is not necessary in this case. Therefore, the construction period can be shortened and the construction cost can be reduced.
Further, the winding thickness holding material includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel tunnel among the both spacer blocks. The spacer block is formed with a taper surface for retaining. In this case, it is possible to easily adjust the total length of the thickness holding material simply by adjusting the length of the shaft portion, and the winding thickness between the inner peripheral surface of the outer mold frame and the outer peripheral surface of the inner mold frame. It can arrange | position in the state which held the holding | maintenance material reliably.

本発明のトンネル坑門用型枠及びこの型枠を用いたトンネル坑門の施工方法は、様々な地形において採用可能であり、しかも設置作業が簡単であり、工期短縮及び工費削減を実現することができる。   The tunnel gate form of the present invention and the tunnel gate construction method using this form can be used in various terrain, and the installation work is simple, and the construction period and construction cost can be reduced. Can do.

以下、添付図面を参照しつつ、本発明のトンネル坑門用型枠及びこの型枠を用いたトンネル坑門の施工方法の実施の形態を詳細に説明する。
図1は、本発明の一実施の形態に係る竹割型トンネル坑門用型枠(以下、単に坑門用型枠ともいう)の正面説明図である。この坑門用型枠Fは、トンネル坑門1の内周面に沿う湾曲形状に形成された面を有する内型枠2と、トンネル坑門1の外周面に沿う湾曲形状に形成された面を有する外型枠3と、前記内型枠2と外型枠3のトンネル出入口側開放部分を閉塞する妻型枠(図示せず)とを備えており、前記内型枠2と外型枠3との間に当該外型枠3を支持するための複数の巻厚保持材20が配設されている。
Hereinafter, embodiments of a tunnel gate form of the present invention and a tunnel gate construction method using the form will be described in detail with reference to the accompanying drawings.
FIG. 1 is an explanatory front view of a bamboo split type tunnel tunnel form (hereinafter also simply referred to as a tunnel form) according to an embodiment of the present invention. This formwork F for the gate is an inner mold 2 having a surface formed in a curved shape along the inner peripheral surface of the tunnel gate 1 and a surface formed in a curved shape along the outer peripheral surface of the tunnel gate 1. And an inner mold 2 and a wife mold (not shown) that closes the tunnel entrance opening portion of the outer mold 3 and the inner mold 2 and the outer mold A plurality of thickness holding members 20 for supporting the outer mold 3 are disposed between the outer frame 3 and the outer frame 3.

図1において、外型枠3は、トンネル坑門1の左右(図1において左右)の側面に対応する側部3sと、同じくトンネル坑門1の頂面(天井面)に対応する頂部(クラウン部)3tとをアーチ状に連結して構成されている。トンネル坑門1を成すコンクリートは、路面R下部に埋設されるインバート4と接合され、ほぼ馬蹄形の構造体を形成する。一方、内型枠2は、トンネル内部において覆工コンクリートを打設する際に用いられる、セントルと呼ばれるものであり、この内型枠2は、専用の台車(移動足場)によりトンネルの長手方向に移動自在である。内型枠(セントル)2は、トンネル坑門内周面のうち頂面に対応する頂部2tと、前記頂面のトンネル周方向両側の側面に対応する側部2sとからなるとともに前記頂部2tと側部2sとがヒンジ10にて結合されている。トンネル覆工に用いられるセントルをトンネル坑門施工用の内型枠2として用いると、内型枠2の組立に要する時間を短縮するとともに、型枠用のコストを削減することができる。   In FIG. 1, the outer mold frame 3 includes side portions 3 s corresponding to the left and right (left and right in FIG. 1) side surfaces of the tunnel gate 1 and a top portion (crown) corresponding to the top surface (ceiling surface) of the tunnel gate 1. Part) 3t and connected in an arch shape. The concrete forming the tunnel pit 1 is joined to the invert 4 embedded in the lower portion of the road surface R to form a substantially horseshoe-shaped structure. On the other hand, the inner formwork 2 is called a centle used when placing lining concrete inside the tunnel. This inner formwork 2 is arranged in the longitudinal direction of the tunnel by a dedicated carriage (moving scaffold). It is movable. The inner formwork (centre) 2 includes a top portion 2t corresponding to the top surface of the inner peripheral surface of the tunnel gate, and side portions 2s corresponding to side surfaces on both sides in the tunnel circumferential direction of the top surface, and the side of the top portion 2t. The portion 2 s is coupled with the hinge 10. When the centle used for tunnel lining is used as the inner mold 2 for tunnel tunnel construction, the time required for assembling the inner mold 2 can be shortened and the cost for the mold can be reduced.

図2及び図3は、それぞれ前記外型枠3の側面説明図及び平面説明図である。外型枠3は、竹割型坑門の坑道方向(図2の左右方向、図3の上下方向)に分割構成された複数(本例では7つ)の外型枠小ユニット3A、3B、3C、3D、3E、3F、3Gを当該坑道方向に連結して成るものである。外型枠小ユニット3A〜3Gのうち、トンネル側に配設される外型枠小ユニット3A〜3Eは、それぞれ側部3sと頂部3tを有しており、これらが連結されてアーチ形状を呈している。残りの外型枠小ユニット3F及び3Gは、いずれも側部3sのみからなっている。外型枠小ユニット3A〜3Eの各々は、全体としてアーチ状になる支保工5と、水平に配置される直線状の通しビーム6とを縦横に組み立てたものであり、また外型枠小ユニット3F及び3Gは、アーチ形状の一部(根元部分)を呈する支保工5と、水平に配置される直線状の通しビーム6とを縦横に組み立てたものであり、前記支保工5及び通しビーム6は、H形鋼からなっている。支保工5の下端部は、アンカーボルト(図示せず)により、インバート4(図1参照)に固定することができるようになっている。また、最下段の通しビーム6には止め金具7が取り付けられており、これとインバート4とを、いわゆるセパレータ(図示せず)を介して相互に固定することができるようになっている。外型枠小ユニット3A〜3Gの内面側には、竹割型坑門の形態に対応した形状の鋼板8が取り付けられている。   2 and 3 are an explanatory side view and an explanatory plan view of the outer mold 3, respectively. The outer mold 3 is divided into a plurality of (seven in this example) outer mold sub-units 3A, 3B divided in the direction of the tunnel (the left-right direction in FIG. 2, the up-down direction in FIG. 3) 3C, 3D, 3E, 3F, and 3G are connected in the direction of the tunnel. Outer formwork small units 3A to 3G, outer formwork small units 3A to 3E arranged on the tunnel side have side portions 3s and top portions 3t, respectively, which are connected to form an arch shape. ing. The remaining outer formwork small units 3F and 3G each consist only of side portions 3s. Each of the outer mold small units 3A to 3E is an assembly in which a support 5 having an arch shape as a whole and a linear through beam 6 arranged horizontally are vertically and horizontally assembled. 3F and 3G are assemblies in which a support 5 having a part of the arch shape (base portion) and a straight through beam 6 arranged horizontally are vertically and horizontally assembled. Is made of H-section steel. The lower end portion of the support 5 can be fixed to the invert 4 (see FIG. 1) by an anchor bolt (not shown). Further, a stopper 7 is attached to the lowermost through beam 6, and this and the invert 4 can be fixed to each other via a so-called separator (not shown). A steel plate 8 having a shape corresponding to the shape of the bamboo split type pit is attached to the inner surface side of the outer mold small units 3A to 3G.

図4の(a)は前記外型枠小ユニット3A〜3Eの側部3sにおける、支保工5と通しビーム6とを組み立てた状態を示す側面図であり、(b)はその正面図である。この側部3sは、左右一対存在する。一方、図5の(a)は、前記外型枠小ユニット3A〜3Eの頂部3tにおける、支保工5と通しビーム6とを組み立てた状態を示す正面図であり、(b)はその平面図である。外型枠小ユニット3A〜3Eの各々は、側部3sと頂部3tとに分割された支保工5をアーチ状に連結したものである。   4A is a side view showing a state in which the supporting work 5 and the through beam 6 are assembled in the side portion 3s of the outer formwork small units 3A to 3E, and FIG. 4B is a front view thereof. . There are a pair of left and right side portions 3s. On the other hand, (a) of FIG. 5 is a front view showing a state in which the supporting work 5 and the through beam 6 are assembled at the top 3t of the outer formwork small units 3A to 3E, and (b) is a plan view thereof. It is. Each of the outer formwork small units 3A to 3E is obtained by connecting the supporting work 5 divided into the side portion 3s and the top portion 3t in an arch shape.

本発明の特徴は、図1に示されるように、前記巻厚保持材20を、内型枠2と外型枠3の間に配置し、前記型枠内にコンクリートを打設する場合に当該外型枠3の変形を抑え所定の巻厚を確保するように配置したことである。以下、この点について詳細に説明する。
図6の(a)は坑門型枠内に打設したコンクリートの側圧に起因する外型枠の曲げモーメントの大きさ(巻厚保持材無し)を示す、当該坑門型枠の正面説明図であり、(b)は同じく変位の大きさを示す、坑門型枠の正面説明図である。この図6より明らかなように、概ね外型枠3の頂部3tないしはクラウン部にトンネル内方に向かう曲げ応力が生じ、その値はトンネル中央において最大となっている。また、概ね外型枠3の側部3sにトンネル外方に向かう曲げ応力が生じている。外型枠3には、曲げ応力以外に、圧縮応力や引張応力が作用するが、主としてこの曲げ応力に対応して、概ね外型枠3の頂部3tないしはクラウン部は、トンネル内方側に変位し、また概ね外型枠3の側部3sは、トンネル外方側に変位している。なお、本明細書において、「トンネル内方に向かう曲げ応力」とは、該当する部材(本発明では外型枠)をトンネル内方側に突出させる曲げ応力のことであり、一方、「トンネル外方に向かう曲げ応力」とは、この逆に該当する部材(本発明では外型枠)をトンネル外方側に突出させる曲げ応力のことである。
As shown in FIG. 1, the feature of the present invention is that the winding thickness holding member 20 is disposed between the inner mold frame 2 and the outer mold frame 3 and concrete is placed in the mold frame. That is, the outer mold 3 is arranged so as to suppress deformation and to secure a predetermined winding thickness. Hereinafter, this point will be described in detail.
FIG. 6 (a) is a front explanatory view of the portal formwork showing the magnitude of the bending moment of the outer formwork (without the roll thickness retaining material) due to the lateral pressure of the concrete placed in the wellwork formwork. (B) is the front explanatory drawing of a mine formwork which shows the magnitude of displacement similarly. As apparent from FIG. 6, bending stress inward toward the tunnel inward is generally generated at the top 3t or the crown of the outer mold 3 and the value is maximum at the center of the tunnel. Further, a bending stress is generated on the side 3 s of the outer mold 3 substantially toward the outside of the tunnel. In addition to bending stress, compressive stress and tensile stress act on the outer mold 3, and the top 3 t or the crown of the outer mold 3 is generally displaced inward of the tunnel mainly corresponding to the bending stress. In addition, generally, the side 3s of the outer mold 3 is displaced outwardly of the tunnel. In the present specification, the “bending stress toward the inside of the tunnel” is a bending stress that causes the corresponding member (in the present invention, the outer mold frame) to protrude toward the inside of the tunnel. The “bending stress toward the direction” refers to a bending stress that causes a member corresponding to the opposite (in the present invention, the outer mold frame) to protrude outward from the tunnel.

図7は、図6においてトンネル内方に向かう曲げ応力が生じる外型枠部分の中央及び両端付近の合計3箇所を巻厚保持材20で補強した場合の外型枠の曲げモーメントの大きさを示す、坑門型枠の正面説明図であり、(b)は同じく変位の大きさを示す、坑門型枠の正面説明図である。図7より分かるように、トンネル内方に向かう曲げ応力が生じる外型枠部分を支持するべく、内型枠2と外型枠3との間に巻厚保持材20を配置することで、コンクリートの側圧を内型枠2とインバート4に分散させて、すなわちコンクリートの側圧を内型枠2とインバート4とで支持して、当該外型枠3の変位を大幅に小さくすることができる。なお、内型枠として、本実施の形態のようにトンネル覆工に用いられるセントルを用いた場合、トンネル内方に向かう曲げ応力が生じる外型枠部分は、ヒンジ10を介して両端に側部2sが連結されたセントルの頂部2tにほぼ対応することから、このセントルの頂部2tに巻厚保持材20を配置してもよい。   FIG. 7 shows the magnitude of the bending moment of the outer mold frame when the thickness holding member 20 reinforces a total of three locations near the center and both ends of the outer mold frame portion where bending stress inward toward the tunnel in FIG. 6 occurs. It is a front explanatory drawing of a mine formwork, and (b) is a front explanatory view of a mine formwork showing the magnitude of displacement similarly. As can be seen from FIG. 7, in order to support the outer mold part that generates bending stress toward the inside of the tunnel, the roll thickness holding member 20 is disposed between the inner mold 2 and the outer mold 3 to thereby provide concrete. Is distributed to the inner mold 2 and the invert 4, that is, the concrete side pressure is supported by the inner mold 2 and the invert 4, so that the displacement of the outer mold 3 can be greatly reduced. When a centle used for tunnel lining as in this embodiment is used as the inner mold, the outer mold part that generates bending stress toward the inside of the tunnel has side portions at both ends via hinges 10. Since it substantially corresponds to the top 2t of the centle to which 2s is connected, the winding thickness holding member 20 may be disposed on the top 2t of the centle.

前記巻厚保持材20は、例えば図3に示されるように、支保工5又は通しビーム6に沿って配設することができ、またトンネル中央部分ではトンネル方向に沿って当該トンネル中心線の左右に千鳥状に配設することができる。なお、図3において、30はコンクリートが打設される領域外において内型枠2と外型枠3との間に配設され、当該外型枠3の変形を抑制するための補助サポートである。   For example, as shown in FIG. 3, the winding thickness holding member 20 can be disposed along the support 5 or the through beam 6, and at the center portion of the tunnel, the right and left of the tunnel center line along the tunnel direction. It can be arranged in a staggered pattern. In FIG. 3, reference numeral 30 denotes an auxiliary support that is disposed between the inner mold frame 2 and the outer mold frame 3 outside the region where the concrete is placed, and suppresses deformation of the outer mold frame 3. .

図8は本発明における巻厚保持材20の一例の正面説明図である。図9は図8に示される巻厚保持材20の外型枠側ピースの正面説明図であり、図10は同じく内型枠側ピースの正面説明図である。巻厚保持材20は、長さ調節可能な軸部21と、この軸部の両端に固定されるスペーサブロック22、23とを備えており、スペーサブロック22が外型枠3側に位置するように、内型枠2と外型枠3との間に配設される。前記軸部21は、異形鉄筋からなる下軸部21aと、ハイテンションボルトからなる上軸部21bとで構成されており、前記下軸部21aの一端(図8において上端)にはメネジ部21cが形成されており、このメネジ部21cに前記上軸部21bを構成するハイテンションボルトがねじ込まれる。このねじ込み量を調整することで、軸部21、すなわち巻厚保持材20の軸方向の長さを簡単に調節することができる。そして、外型枠3の内周面と内型枠2の外周面との間に当該巻厚保持材20を確実に突っ張った状態で配置することができる。なお、図8において、25は、長さ調節後に前記下軸部21aと上軸部21bとが相対回転するのを防止する、固定用のハイテンションナットである。   FIG. 8 is an explanatory front view of an example of the thickness holding member 20 in the present invention. FIG. 9 is an explanatory front view of the outer frame side piece of the thickness holding member 20 shown in FIG. 8, and FIG. 10 is an explanatory front view of the inner frame side piece. The winding thickness holding member 20 includes a shaft portion 21 whose length can be adjusted, and spacer blocks 22 and 23 fixed to both ends of the shaft portion, so that the spacer block 22 is positioned on the outer mold frame 3 side. In addition, it is disposed between the inner mold 2 and the outer mold 3. The shaft portion 21 is composed of a lower shaft portion 21a made of a deformed reinforcing bar and an upper shaft portion 21b made of a high tension bolt, and a female screw portion 21c is provided at one end (upper end in FIG. 8) of the lower shaft portion 21a. A high tension bolt constituting the upper shaft portion 21b is screwed into the female screw portion 21c. By adjusting the screwing amount, the axial length of the shaft portion 21, that is, the winding thickness holding member 20, can be easily adjusted. And the winding thickness holding | maintenance material 20 can be arrange | positioned in the state stretched reliably between the inner peripheral surface of the outer mold frame 3, and the outer peripheral surface of the inner mold frame 2. In FIG. 8, reference numeral 25 denotes a fixing high tension nut that prevents the lower shaft portion 21a and the upper shaft portion 21b from rotating relative to each other after the length adjustment.

本例の巻厚保持材20は、前記軸部21両端と各スペーサブロック22、23との間に鋼板からなる矩形状の支持プレート24が配設されている。そして、軸部21の端面と支持プレート24、及び支持プレート24とスペーサブロック22、23は接着剤により互いに固着されている。なお、接着剤による固着に代えて、例えば軸部21の端面と支持プレート24とは溶接により固着してもよいし、また支持プレート24とスペーサブロック22、23とは、スペーサブロック22、23中にメネジ部を有するブロック体を埋設するとともに支持プレート24に丸孔を開けておき、ボルトを用いて当該支持プレート24をスペーサブロック22、23に固着してもよい。   In the thickness holding member 20 of this example, a rectangular support plate 24 made of a steel plate is disposed between both ends of the shaft portion 21 and the spacer blocks 22 and 23. The end face of the shaft portion 21 and the support plate 24, and the support plate 24 and the spacer blocks 22 and 23 are fixed to each other with an adhesive. Instead of fixing with an adhesive, for example, the end surface of the shaft portion 21 and the support plate 24 may be fixed by welding, and the support plate 24 and the spacer blocks 22 and 23 are included in the spacer blocks 22 and 23. Alternatively, a block body having a female thread portion may be embedded, and a round hole may be formed in the support plate 24, and the support plate 24 may be fixed to the spacer blocks 22 and 23 using bolts.

スペーサブロック22の外周及び下軸部21aの外周には、止水用のシール部26が設けられており、このシール部26は水分を吸収して膨張し得る材料で作製されている。かかるシール部26を設けることにより、トンネル坑門1とスペーサブロック22との境目から雨水等が浸入しても、この雨水等がトンネル内部に漏れるのを効果的に防ぐことができる。   The outer periphery of the spacer block 22 and the outer periphery of the lower shaft portion 21a are provided with a seal portion 26 for water stop, and the seal portion 26 is made of a material that can absorb moisture and expand. By providing such a seal portion 26, even if rainwater or the like enters from the boundary between the tunnel pit 1 and the spacer block 22, it is possible to effectively prevent the rainwater or the like from leaking into the tunnel.

スペーサブロック22、23は高強度に作製されており、内型枠2側に配置されるスペーサブロック23の端部には、抜け止め用のテーパ面27が形成されている。このテーパ面27は、断面矩形のスペーサブロック23の4つの角部を面取りすることで形成することができる。そして、かかるテーパ面27により、スペーサブロック23は先端(図8において下端側)が先細になっている。換言すれば、先端部の断面積が根元部の断面積よりも小さくなっている(図11参照)。巻厚保持材20は、トンネル坑門1を構成するコンクリート中に埋設されたままとなるが、トンネル坑門1の内周面側に配置されるスペーサブロック23に、このようなテーパ面27を形成することで、当該スペーサブロック23がトンネル内に落下するのを確実に防止することができる。なお、スペーサブロック23の抜け止めは、当該スペーサブロック23の側面に突起を形成することで行うこともできる。また、例えば円すい台のように、スペーサブロック23の形態自体を先細状のものとすることで、抜け止めを行うこともできる。   The spacer blocks 22 and 23 are made with high strength, and a taper surface 27 for preventing the spacer block 27 is formed at the end of the spacer block 23 arranged on the inner mold frame 2 side. The tapered surface 27 can be formed by chamfering four corners of the spacer block 23 having a rectangular cross section. With the tapered surface 27, the spacer block 23 has a tapered tip (lower end side in FIG. 8). In other words, the cross-sectional area of the tip portion is smaller than the cross-sectional area of the root portion (see FIG. 11). The winding thickness retaining material 20 remains embedded in the concrete constituting the tunnel gate 1, but such a tapered surface 27 is provided on the spacer block 23 disposed on the inner peripheral surface side of the tunnel gate 1. By forming, it can prevent reliably that the said spacer block 23 falls in a tunnel. The spacer block 23 can be prevented from coming off by forming a protrusion on the side surface of the spacer block 23. In addition, the spacer block 23 itself can be tapered, for example, like a truncated cone, so that it can be prevented from coming off.

前記坑門型枠を用いたトンネル坑門の施工は、例えば以下のようにして行うことができる。まず、トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠を、トンネルの坑口に配置する。その際、内型枠としてトンネル覆工に用いられるセントルを用いると、内型枠の組立に要する時間を短縮するとともに、型枠用のコストを削減することができる。つぎに、前記内型枠の外周側を、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠で覆うようにして当該外型枠を前記トンネルの坑口に配置する。
ついで、前記内型枠と外型枠のトンネル出入口側開放部分を妻型枠で閉塞するとともに、前記内型枠と外型枠との間に当該外型枠を支持するための巻厚保持材を前述した所定の位置(外型枠の変形を抑え、所定の巻厚を確保できる位置)に配設する。これにより、型枠内にコンクリートを打設した場合に、この巻厚保持材が突っ張り棒として機能し前記外型枠部分の下方への変形(変位)を防止する。
Construction of the tunnel mine using the mine formwork can be performed as follows, for example. First, an inner mold having a curved surface formed along the inner peripheral surface of the tunnel mine is placed at the tunnel entrance. At that time, when a centle used for tunnel lining is used as the inner mold, the time required for assembling the inner mold can be shortened and the cost for the mold can be reduced. Next, the outer mold is disposed at the tunnel entrance so as to cover the outer circumference of the inner mold with an outer mold having a curved surface along the outer circumference of the tunnel gate.
Next, a tunnel thickness holding material for supporting the outer mold frame between the inner mold frame and the outer mold frame while closing a tunnel entrance / exit side opening portion of the inner mold frame and the outer mold frame with a wife mold frame. Is disposed at the above-described predetermined position (a position where deformation of the outer mold can be suppressed and a predetermined winding thickness can be secured). As a result, when concrete is placed in the mold, the thickness holding material functions as a tension bar to prevent the outer mold part from being deformed (displaced) downward.

本発明のトンネル坑門用型枠の一実施の形態の正面説明図である。It is front explanatory drawing of one embodiment of the form for tunnel tunnels of this invention. 図1に示されるトンネル坑門用型枠における外型枠の側面説明図である。It is side surface explanatory drawing of the outer formwork in the tunnel mine formwork shown by FIG. 図1に示されるトンネル坑門用型枠における外型枠の平面説明図である。It is a plane explanatory view of the outer formwork in the tunnel gate formwork shown in FIG. (a)は図2〜3に示される外型枠の外型枠小ユニットの側部における、支保工と通しビームとを組み立てた状態を示す側面図であり、(b)はその正面図である。(A) is the side view which shows the state which assembled the support and the through beam in the side part of the outer-form-frame small unit of the outer-form form shown by FIGS. 2-3, (b) is the front view. is there. (a)は図2〜3に示される外型枠の外型枠小ユニットの頂部における、支保工と通しビームとを組み立てた状態を示す正面図であり、(b)はその平面図である。(A) is a front view which shows the state which assembled the support and the through beam in the top part of the outer-form-frame small unit of the outer-form frame shown by FIGS. 2-3, (b) is the top view. . (a)は型枠内に打設したコンクリートの側圧に起因する外型枠の曲げモーメントの大きさ(巻厚保持材無し)を示す、型枠の正面説明図であり、(b)は同じく変位の大きさを示す、型枠の正面説明図である。(A) is front explanatory drawing of a formwork which shows the magnitude | size of the bending moment (without a thickness holding material) of an outer formwork resulting from the side pressure of the concrete cast in the formwork, (b) is the same. It is front explanatory drawing of a formwork which shows the magnitude | size of a displacement. (a)は型枠内に打設したコンクリートの側圧に起因する外型枠の曲げモーメントの大きさ(巻厚保持材有り)を示す、型枠の正面説明図であり、(b)は同じく変位の大きさを示す、型枠の正面説明図である。(A) is front explanatory drawing of a formwork which shows the magnitude | size (with a thickness holding material) of the bending moment of an outer formwork resulting from the side pressure of the concrete cast in the formwork, (b) It is front explanatory drawing of a formwork which shows the magnitude | size of a displacement. 本発明における巻厚保持材の一例の正面説明図である。It is front explanatory drawing of an example of the winding thickness holding | maintenance material in this invention. 図8に示される巻厚保持材の外型枠側ピースの正面説明図である。It is front explanatory drawing of the outer-form-frame side piece of the thickness holding | maintenance material shown by FIG. 図8に示される巻厚保持材の内型枠側ピースの正面説明図である。It is front explanatory drawing of the inner mold side piece of the winding thickness holding | maintenance material shown by FIG. (a)は図10のA−A線断面図であり、(b)は同じくB−B線断面図である。(A) is the sectional view on the AA line of FIG. 10, (b) is the sectional view on the BB line similarly. パイプサポートを用いた従来の外型枠の補強方法の説明図である。It is explanatory drawing of the reinforcement method of the conventional outer formwork using a pipe support. セパレータを用いた従来の外型枠の補強方法の説明図である。It is explanatory drawing of the reinforcement method of the conventional outer formwork using a separator.

符号の説明Explanation of symbols

1 トンネル坑門
2 内型枠
3 外型枠
4 インバート
5 支保工
6 通しビーム
10 ヒンジ
20 巻厚保持材
21 軸部
22、23 スペーサブロック
27 テーパ面
DESCRIPTION OF SYMBOLS 1 Tunnel mine 2 Inner formwork 3 Outer formwork 4 Invert 5 Support work 6 Through beam 10 Hinge 20 Winding thickness holding material 21 Shaft part 22, 23 Spacer block 27 Tapered surface

Claims (3)

トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠と、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠と、前記内型枠と外型枠のトンネル出入口側開放部分を閉塞する妻型枠とを備えたトンネル坑門用型枠であって、
前記内型枠と外型枠との間に当該外型枠を支持するための巻厚保持材が配設されており、
この巻厚保持材は、前記内型枠と外型枠との間に設置し、前記型枠内にコンクリートを打設する場合に当該外型枠の変形を抑え、所定の巻厚を確保するように配置されており、且つ
前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されていることを特徴とするトンネル坑門用型枠。
An inner mold frame having a surface formed in a curved shape along the inner peripheral surface of the tunnel gate, an outer mold frame having a surface formed in a curved shape along the outer peripheral surface of the tunnel tunnel, and the inner mold frame, A tunnel tunnel formwork comprising a wife formwork that closes a tunnel entrance side open part of the outer formwork,
A thickness holding material for supporting the outer mold frame is disposed between the inner mold frame and the outer mold frame,
This winding thickness holding material is installed between the inner mold frame and the outer mold frame, and when concrete is placed in the mold frame, the deformation of the outer mold frame is suppressed and a predetermined winding thickness is secured. Arranged , and
The winding thickness holding member includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel gate of both spacer blocks. A tunnel gate form, wherein the spacer block is formed with a taper surface for retaining .
前記内型枠がトンネル覆工に用いられるセントルであり、このセントルが、トンネル坑門内周面のうち頂面に対応する頂部と、前記頂面のトンネル周方向両側の側面に対応する側部とからなるとともに前記頂部と側部とがヒンジにて結合されており、前記巻厚保持材が、当該セントルの頂部に配置されている請求項1に記載のトンネル坑門用型枠。 The inner mold is a centle used for tunnel lining, and the centle has a top corresponding to the top surface of the inner peripheral surface of the tunnel pit, and side portions corresponding to side surfaces on both sides in the tunnel circumferential direction of the top surface. 2. The tunnel tunnel form according to claim 1, wherein the top part and the side part are coupled by a hinge, and the thickness holding member is disposed on the top part of the centle. トンネル坑門の内周面に沿う湾曲形状に形成された面を有する内型枠を、トンネルの坑口に配置する工程、
前記内型枠の外周側を、トンネル坑門の外周面に沿う湾曲形状に形成された面を有する外型枠で覆うようにして当該外型枠を前記トンネルの坑口に配置する工程、
前記内型枠と外型枠のトンネル出入口側開放部分を妻型枠で閉塞する工程、及び
前記内型枠と外型枠との間に当該外型枠を支持するための巻厚保持材を配設する工程
を含んでおり、
前記巻厚保持材を、前記内型枠と外型枠との間に設置し、前記型枠内にコンクリートを打設する場合に当該外型枠の変形を抑え、所定の巻厚を確保するように配置し、且つ
前記巻厚保持材が、長さ調節可能な軸部と、この軸部の両端に固定されるスペーサブロックとを備えており、両スペーサブロックのうちトンネル坑門の内周面側に配置されるスペーサブロックに、抜け止め用のテーパ面が形成されていることを特徴とするトンネル坑門の施工方法。
A step of disposing an inner formwork having a curved surface along the inner peripheral surface of the tunnel gate at the tunnel wellhead;
A step of disposing the outer formwork at the tunnel well opening so as to cover the outer form side of the inner formwork with an outer formwork having a curved surface formed along the outer peripheral surface of the tunnel gate;
A step of closing a tunnel entrance / exit side opening portion of the inner mold frame and the outer mold frame with a wife mold frame, and a winding thickness holding material for supporting the outer mold frame between the inner mold frame and the outer mold frame Including a step of arranging,
The winding thickness holding material is installed between the inner mold frame and the outer mold frame, and when concrete is placed in the mold frame, the deformation of the outer mold frame is suppressed and a predetermined winding thickness is secured. and arranged to, and
The winding thickness holding member includes a shaft portion whose length can be adjusted, and a spacer block fixed to both ends of the shaft portion, and is disposed on the inner peripheral surface side of the tunnel gate of both spacer blocks. the spacer blocks, have been tapered surface for retaining formation method of constructing of tunnel gate, wherein Rukoto.
JP2005309829A 2005-10-25 2005-10-25 Form for tunnel gate and method of constructing tunnel gate using this form Expired - Lifetime JP4625752B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005309829A JP4625752B2 (en) 2005-10-25 2005-10-25 Form for tunnel gate and method of constructing tunnel gate using this form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005309829A JP4625752B2 (en) 2005-10-25 2005-10-25 Form for tunnel gate and method of constructing tunnel gate using this form

Publications (2)

Publication Number Publication Date
JP2007120025A JP2007120025A (en) 2007-05-17
JP4625752B2 true JP4625752B2 (en) 2011-02-02

Family

ID=38144144

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005309829A Expired - Lifetime JP4625752B2 (en) 2005-10-25 2005-10-25 Form for tunnel gate and method of constructing tunnel gate using this form

Country Status (1)

Country Link
JP (1) JP4625752B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101256589B1 (en) * 2011-04-12 2013-04-19 (주)한국투아치 Lining Form Structure Having Separable Plural Partial Lining Form and Tunnel Lining Construction Method Using the Same
KR101152419B1 (en) 2011-12-19 2012-06-07 최준열 Ventilation of road construction include tunnel and underground way, and method for constructing thereof
JP2021092049A (en) * 2019-12-09 2021-06-17 テクノプロ株式会社 Form for arch structures and construction methods for arch structures
CN115821981A (en) * 2022-11-23 2023-03-21 中铁二十一局集团第三工程有限公司 Concrete pouring formwork device for tunnel open hole

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH036718Y2 (en) * 1988-03-14 1991-02-20
JPH0674715B2 (en) * 1989-09-07 1994-09-21 飛島建設株式会社 Mobile formwork for tunnels
JP3079309B2 (en) * 1997-05-09 2000-08-21 岩波コンサルティング株式会社 How to install inserts
JP3590786B2 (en) * 2001-09-12 2004-11-17 テクノプロ株式会社 Outer formwork for bamboo split type gate and its construction method
JP3798296B2 (en) * 2001-11-01 2006-07-19 新日本製鐵株式会社 Fireproof coating structure in tunnel
JP4052918B2 (en) * 2002-10-07 2008-02-27 テクノプロ株式会社 Outer formwork for tunnel gate and tunnel tunnel construction method using this

Also Published As

Publication number Publication date
JP2007120025A (en) 2007-05-17

Similar Documents

Publication Publication Date Title
JP4522941B2 (en) How to dismantle and remove the arch bridge
JP2008303702A (en) Bidirectional press stressing system and bent portion forming apparatus
JP4625752B2 (en) Form for tunnel gate and method of constructing tunnel gate using this form
KR200484408Y1 (en) seismic retrofit of RC column using hat-shape steel section and channel with high tension bolt connection and seismic retrofit method using the RC column
JP6851686B2 (en) How to build a beam
JP2008163630A (en) Joint structure of reinforced concrete column and steel beam
JP6368584B2 (en) Foundation construction method
KR200313103Y1 (en) The supporting structure for fixing a walling panels
JP4451699B2 (en) Pile head joint structure
JP5809487B2 (en) Column structure and column reinforcement method
KR20160122393A (en) seismic retrofit of RC column using hat-shape steel section and channel with high tension bolt connection and seismic retrofit method using the RC column
JP4960986B2 (en) Tunnel lining structure
JP4332074B2 (en) Tunnel structure using synthetic segment and its design method
JP5001679B2 (en) Supporting device for column, its mounting structure and mounting method
CN112458908A (en) Construction method for steel hoops of pier anti-seismic facility in two-step accurate-in-place mode
JP6999282B2 (en) Pile foundation structure and its construction method
JP2017172278A (en) Earthquake-proof reinforcement structure
CN105113510B (en) The inner support beam structure at the unearthed hole of foundation ditch and construction method in contrary sequence method
JP6579902B2 (en) Tunnel reinforcement structure
JP5134305B2 (en) Supporting device for column, its mounting structure and mounting method
JP5280711B2 (en) Seismic control frame structure
JP2005126917A (en) Bamboo split type entrance of steel construction
KR100484788B1 (en) Device for reinforcing the head section of steel pile
JP7178162B2 (en) Reinforcing mechanism in RC/SRC construction
JP4215659B2 (en) Reinforcing method for reinforced concrete members

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071102

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090904

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100907

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101026

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101108

R150 Certificate of patent or registration of utility model

Ref document number: 4625752

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131112

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term