Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4637151B2 - Ceiling slab construction method and equipment for medium and high-rise buildings - Google Patents
[go: Go Back, main page]

JP4637151B2 - Ceiling slab construction method and equipment for medium and high-rise buildings - Google Patents

Ceiling slab construction method and equipment for medium and high-rise buildings Download PDF

Info

Publication number
JP4637151B2
JP4637151B2 JP2007248562A JP2007248562A JP4637151B2 JP 4637151 B2 JP4637151 B2 JP 4637151B2 JP 2007248562 A JP2007248562 A JP 2007248562A JP 2007248562 A JP2007248562 A JP 2007248562A JP 4637151 B2 JP4637151 B2 JP 4637151B2
Authority
JP
Japan
Prior art keywords
block
ceiling
ceiling slab
joists
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007248562A
Other languages
Japanese (ja)
Other versions
JP2009079396A (en
Inventor
茂行 西島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Justwill
Original Assignee
Justwill
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Justwill filed Critical Justwill
Priority to JP2007248562A priority Critical patent/JP4637151B2/en
Priority to US12/668,746 priority patent/US20100207009A1/en
Priority to PCT/JP2008/060283 priority patent/WO2009041123A1/en
Priority to KR1020107006540A priority patent/KR20100081299A/en
Priority to CN2008801091301A priority patent/CN101809240B/en
Publication of JP2009079396A publication Critical patent/JP2009079396A/en
Application granted granted Critical
Publication of JP4637151B2 publication Critical patent/JP4637151B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

本発明は中高層鉄筋コンクリートの複数階の天井スラブの型枠(コンパネ)に略1度に生コンクリートを投入する天井スラブ施工法及びその装置に関するものである。   The present invention relates to a ceiling slab construction method and apparatus for putting ready-mixed concrete into a form of a ceiling slab on a plurality of floors of medium- and high-rise reinforced concrete approximately once.

従来、中高層鉄筋コンクリート建築物の施工に際し、天井スラブの施工は型枠(コンパネ)代わりになるプレキヤスコンクリート板材を予め架設したプレキヤスト桁行き梁にクレーンで吊って上方から躯体内に取り込み、支保工無しで天井スラブの施工を行うものであった(例えば特許文献1)。   Conventionally, when constructing medium- and high-rise reinforced concrete buildings, ceiling slabs are constructed by pre-casting girder beams pre-installed with pre-cast concrete plates that can be used as a substitute for the formwork (panel). The construction of the ceiling slab was performed (for example, Patent Document 1).

このような施工法による建築物は規格性に優れて良いが、桁行き梁及び天井スラブを量産する必要があり、坪量の減少、設計の単一性、設計の面積の減少及びそれに伴う耐震性に問題があった。   Buildings based on such construction methods may be excellent in standardity, but it is necessary to mass-produce girder beams and ceiling slabs, which reduces basis weight, unity in design, decreases in design area, and associated earthquake resistance. There was a problem with sex.

又、大形の中高層建築では比較的長い大引材及び根太により比較的広い天井スラブが多数の支保工により施工され天井スラブ施工にはコンクリートの硬化、凝固に時間を要した(例えば特許文献2)。   Further, in a large medium- and high-rise building, a relatively wide ceiling slab is constructed by a large number of support works due to a relatively long large drawing material and joists, and it takes time to harden and solidify the concrete (for example, Patent Document 2). ).

しかし、天井スラブの広さ、厚さを自由に設計できるが、各床の天井スラブのコンクリート硬化、凝固に時間を要した。   However, the width and thickness of the ceiling slab can be designed freely, but it took time to harden and solidify the concrete of the ceiling slab on each floor.

特開平9−217417JP-A-9-217417 特開平8−270069JP-A-8-270069

本発明は比較的広く厚い鉄筋コンクリートによる中高層建築物の生コンクリートによる天井スラブの硬化・凝固施工時間を略1/2に短縮することを目的とする。   An object of the present invention is to shorten the time required for hardening and solidifying a ceiling slab made of ready-mixed concrete of a medium and high-rise building made of relatively wide and thick reinforced concrete to about ½.

上記の目的を達成するため本発明は
第1に複数のサポートによって大引、根太を介して支持される天井型枠に上記大引、根太に囲まれる4角形部分に透孔を開口し、該透孔の内周に沿う上面に、それぞれ鉄筋コンクリートブロックの外周に沿う下面を載置し、上記ブロックの下面中央部に該ブロックのサポートを着脱自在に設け、上面中央部に上段階の天井型枠の大引、根太用のサポートを着脱自在に設け、上記ブロックの鉄筋を該ブロックの外周から4方に延長して天井型枠上の配筋と接続し、上記ブロックの高さと天井スラブの厚さとを同一に形成することを特徴とする中高層建築物の天井スラブ施工法、
第2に互に間隔を介して直交する根太と大引とによって囲まれる1つ置き4角部分に上記透孔を開口した上記第1発明記載の天井スラブ施工法、
第3に上記鉄筋コンクリートブロックが逆載頭錐形である上記第1又は第2発明記載の中高層建築物の天井スラブ施工法、
第4に複数のサポートによって大引、根太を介して支持される天井型枠に上記大引、根太に囲まれる4角形部分に透孔を開口し、該透孔の内周に沿う上面に、それぞれ鉄筋コンクリートブロックの外周に沿う下面を載置し、上記ブロックの下面中央部に該ブロックのサポートを着脱自在に設け、上面中央部に上段階の天井型枠の大引、根太用のサポートを着脱自在に設け、上記ブロックの鉄筋を該ブロックの外周から4方に延長して天井型枠上の配筋と接続し、上記ブロックの高さと天井スラブの厚さとを同一に形成してなる中高層建築物の天井スラブ施工装置、
によって構成される。
In order to achieve the above object, the present invention
First , a through hole is opened in the quadrilateral part surrounded by the above-mentioned large drawing and joists on the ceiling mold frame supported by the large supports and joists by a plurality of supports, and on the upper surface along the inner periphery of the through holes, The lower surface along the outer circumference of each reinforced concrete block is placed, and the support for the block is detachably provided at the center of the lower surface of the block. It is provided freely, the reinforcing bars of the block are extended in four directions from the outer periphery of the block and connected to the reinforcing bars on the ceiling formwork, and the height of the block and the thickness of the ceiling slab are formed to be the same. Ceiling slab construction method for middle- and high-rise buildings,
Secondly, the ceiling slab construction method according to the first aspect of the present invention, wherein the through holes are opened in every other four corners surrounded by the joists and the fork that are orthogonal to each other with a space therebetween,
Thirdly, the method for constructing a ceiling slab for a medium-to-high-rise building according to the first or second invention, wherein the reinforced concrete block is a reverse truncated cone shape,
Fourthly, a through hole is opened in the quadrilateral part surrounded by the above-mentioned large draw and joist on the ceiling formwork supported by the multiple supports and joists, on the upper surface along the inner periphery of the through hole, The lower surface along the outer circumference of each reinforced concrete block is placed, and the support for the block is detachably provided at the center of the lower surface of the block. A medium- and high-rise building that is freely provided, extends the reinforcing bars of the block in four directions from the outer periphery of the block, and connects with the reinforcing bars on the ceiling formwork so that the height of the block and the thickness of the ceiling slab are the same. Equipment ceiling slab construction equipment,
Consists of.

従って中高層建築物の躯体と複数段の梁との間に大引と根太を直交配置し、交差部の大引下面にサポート(支柱)の上端を接し、下端を下段のコンクリート床に支持し、上記根太の上面 に天井型枠(天井コンパネ)を載置する。   Therefore, the upper and lower joists are arranged orthogonally between the frame of the mid-to-high-rise building and the multi-stage beam, the upper end of the support (post) is in contact with the lower surface of the crossing, and the lower end is supported by the lower concrete floor. Place the ceiling formwork (ceiling panel) on the top of the joist.

そして上記天井コンパネの上部に該コンパネと平行な鉄筋を縦横に配筋する。   Then, reinforcing bars parallel to the panel are arranged vertically and horizontally on the top of the ceiling panel.

そして上記大引と根太とに囲まれる4角形部分に開口した透孔の内周に沿う上面に、それぞれ鉄筋コンクリートブロックの外周に沿う下面を重ねて該透孔を該ブロックで閉塞する。 And the lower surface along the outer periphery of a reinforced concrete block is piled up on the upper surface along the inner periphery of the through- hole opened in the quadrangular part surrounded by the said large drawing and joist, and this through-hole is obstruct | occluded with this block.

上記ブロックの下面中央部には下段のコンクリート床に至るサポートを着脱自在に設けることによって該ブロックを上記コンクリート床に支持し、それによって上記透孔は閉塞される。   A support reaching the lower concrete floor is detachably provided at the center of the lower surface of the block so that the block is supported by the concrete floor, thereby closing the through hole.

上記ブロックの上面中央部には上向サポートを着脱自在に設け、該サポートの上端で上段階のコンパネを支持する直交根太、大引の交差部を支持することができる。   An upward support can be detachably provided at the center of the upper surface of the block, and an orthogonal joist that supports the upper panel at the upper end of the support can be supported.

上記ブロックの鉄筋は該ブロックの中程外周から4方に延長露出され、上記天井型枠(天井コンパネ)上に配筋されている鉄筋を鉄線で巻付けて接続した後、
上記天井型枠及び上段階の天井型枠上に同時又は順次生コンクリートを投入することができる。
The reinforcing bars of the block are extended and exposed in four directions from the middle outer periphery of the block, and the reinforcing bars arranged on the ceiling formwork (ceiling panel) are wound and connected with a steel wire,
Ready-mixed concrete can be poured simultaneously or sequentially onto the ceiling formwork and the upper ceiling formwork.

上記天井型枠及びその上段階の天井型枠に略同時に投入した生コンクリートは略同時に硬化、凝固し、天井及びその上段の第2天井以上の天井スラブを略同時に施工し得る効果がある。   The ready-mixed concrete put into the ceiling mold and the upper ceiling mold almost simultaneously harden and solidify at the same time, and there is an effect that the ceiling and the ceiling slabs of the second and higher ceilings can be constructed almost simultaneously.

中高層建築物の柱及び壁10と複数段のコンクリート梁11,11との間に上下に水平方向に直交する複数の大引2,2及び根太3,3を配置し、交差部の大引2の下面に鋼製支柱(サポート)1の上端を接し、下端をコンクリート躯体床12に支持し、根太3,3の上面に天井型枠(コンパネ)4を載置する(図2)。又該コンパネ4上の大引2と根太3との交差部上に鉄筋コンクリートブロック6’を載置し、該ブロック6’上にサポート1を載置し、その上端で上段の根太3と大引2の交差部を支持することができる(図3)。   Between the pillars and walls 10 of the mid-to-high-rise building and the concrete beams 11, 11 of a plurality of stages, a plurality of large draws 2, 2 and joists 3, 3 perpendicular to the horizontal direction are arranged, and a large draw 2 at the intersection The upper end of the steel support (support) 1 is in contact with the lower surface of the steel frame, the lower end is supported on the concrete frame floor 12, and the ceiling formwork (compane) 4 is placed on the upper surfaces of the joists 3 and 3 (FIG. 2). In addition, a reinforced concrete block 6 'is placed on the intersection of the large drawing 2 and the joist 3 on the control panel 4, and the support 1 is placed on the block 6'. Two intersections can be supported (FIG. 3).

上記コンパネ4には図7に示すように大引2,2と根太3,3とに囲まれる4角形部分に透孔5を穿設し、該透孔5の内周に沿う上面に夫々鉄筋コンクリートブロック6の外周に沿う下面を載置支持する(図5(ロ)図)。
As shown in FIG. 7, the control panel 4 is formed with through holes 5 in the quadrangular portions surrounded by the large pulls 2 and 2 and the joists 3 and 3, and reinforced concrete is formed on the upper surface along the inner circumference of the through holes 5. The lower surface along the outer periphery of the block 6 is placed and supported (FIG. 5B).

上記透孔5は大引2,2と根太3,3とに囲まれる4角部分の夫々全部中央に穿設し、或は図6に示すように4角部分の1つ置きに穿設する。   The through-holes 5 are formed in the center of each of the four corners surrounded by the large pulls 2 and 2 and the joists 3 and 3, or are formed in every other square part as shown in FIG. .

上記ブロック6の上下面中央部には夫々支柱(サポート)1’,1”の上下端に設けたフランジ1a’,1a”を接し、ボルト13とボルト孔13’によって上記ブロック6と着脱自在に設け、下部サポート1’の下端をコンクリート躯体床12に支持し、上部サポート1”の上端を直上階に架設した根太3と大引2との交差部下面に接して支持し、根太3の上面に上段階のコンパネ4’を載置し、該コンパネ4’に上記透孔を穿設することはなく、縦横の鉄筋9,9’のみ配筋する。   Flange 1a 'and 1a "provided at the upper and lower ends of support columns (supports) 1' and 1" are in contact with the center of the upper and lower surfaces of the block 6 and are detachably attached to the block 6 by bolts 13 and bolt holes 13 '. The lower end of the lower support 1 'is supported on the concrete frame floor 12, and the upper end of the upper support 1 "is supported in contact with the lower surface of the intersection of the joist 3 and the draw 2 installed on the directly upper floor, and the upper surface of the joist 3 The upper panel 4 'is placed on the panel 4', and only the vertical and horizontal reinforcing bars 9, 9 'are arranged without drilling the through holes in the panel 4'.

上記鉄筋コンクリートブロック6の下面の径は上記透孔5の径より大であり、天井スラブsの高さtと同一の低円柱、低角柱又は逆載頭円錐形或は逆載頭角錐形(図3、図4(ロ)図)等であって、外側面を小凹凸粗面6’(図4)に形成し、生コンクリートによるスラブsとの結合を強化すると良い。   The diameter of the lower surface of the reinforced concrete block 6 is larger than the diameter of the through-hole 5 and is the same as a low cylinder, low prism, reverse head cone or reverse head cone with the same height t as the ceiling slab s (see FIG. 3, FIG. 4 (B)), etc., and the outer surface is preferably formed into a rough rough surface 6 ′ (FIG. 4) to strengthen the bond with the slab s by raw concrete.

縦横の鉄筋7,7’,8,8’は図3、図4(ロ)図、図5(ハ)(ニ)(ホ)図に示すように上下2重に4方に配筋され、かつ該ブロック6の外周から4方に延長し、コンパネ4上に縦横に配筋した上下2重の鉄筋9,9’に結束線14で巻き回して接続する。   The vertical and horizontal rebars 7, 7 ', 8, 8' are arranged in four directions in the top and bottom double as shown in FIGS. 3, 4 (b), 5 (c), (d), (e), In addition, the block 6 extends from the outer periphery to the four directions, and is connected to the upper and lower double reinforcing bars 9 and 9 ′ arranged vertically and horizontally on the control panel 4 by being wound around the binding wire 14.

上記上段階の天井型枠(上段階コンパネ)4’上にも縦横2重に鉄筋9,9’が配筋される。   Reinforcing bars 9, 9 'are also arranged vertically and horizontally on the upper ceiling formwork (upper panel) 4'.

その状態において天井型枠(コンパネ)4上に生コンクリートを上記ブロック6の上面水準まで打設し、その後直ちに上段階の天井型枠4’上に生コンクリートを規定水準まで打設する。   In this state, the ready-mixed concrete is placed on the ceiling formwork (compane) 4 to the upper surface level of the block 6, and immediately thereafter, ready-mixed concrete is placed on the upper ceiling formwork 4 '.

上記天井型枠4及び上段階の天井型枠4’に同時に生コンクリートを打設することも可能である。   It is also possible to place ready-mixed concrete on the ceiling mold 4 and the upper ceiling mold 4 'simultaneously.

本発明によると直上の天井型枠4の上面及びその上段階の天井型枠4’の上面に略同時に生コンクリートを打設することができるため、2階及び3階の天井コンパネ4,4’に生コンクリートを略同時に打設し得て約1ヶ月で硬化凝固させ得るから、1階毎に約2ヶ月掛っていた上下のコンクリート天井スラブs,sを約1ヶ月で施工することが可能となった。   According to the present invention, the ready-mixed concrete can be placed almost simultaneously on the upper surface of the ceiling formwork 4 immediately above and the upper surface of the upper ceiling formwork 4 ', so the ceiling panels 4, 4' on the second and third floors. Because it is possible to place ready-mixed concrete almost simultaneously and harden and solidify in about one month, it is possible to construct the upper and lower concrete ceiling slabs s, s, which took about two months per floor, in about one month. became.

本発明の中高層建築物の天井スラブ施工法の縦断面図である。It is a longitudinal cross-sectional view of the ceiling slab construction method of the middle-high-rise building of this invention. 天井スラブ及びその上段階天井スラブ施工法の縦断正面図である。It is a longitudinal front view of a ceiling slab and its upper stage ceiling slab construction method. 「図2」の他の実施例の天井スラブ及びその上段階天井スラブ施工法の縦断正面図である。It is the vertical front view of the ceiling slab of the other Example of "FIG. 2", and its upper stage ceiling slab construction method. 鉄筋コンクリートブロックの斜視図である。It is a perspective view of a reinforced concrete block. (イ)図は鉄筋コンクリートブロックの平面図、(ロ)図は(イ)図の実施状態正面図である。(A) is a plan view of a reinforced concrete block, and (B) is a front view of the implementation state of (A). (イ)図は天井型枠(コンパネ)の一部縦断面図、(ロ)(ハ)図は上記ブロックの実施状態正面図、(ニ)図は本発明による天井スラブの縦断面図である。(A) The figure is a partial longitudinal sectional view of the ceiling formwork (panel), (b) (c) is a front view of the implementation state of the block, and (d) is a longitudinal sectional view of the ceiling slab according to the present invention. . 天井型枠(コンパネ)の実施例の平面図である。It is a top view of the Example of a ceiling formwork (panel). 上記ブロックの配置状態の実施例を示す平面図である。It is a top view which shows the Example of the arrangement | positioning state of the said block.

符号の説明Explanation of symbols

1,1’,1” サポート
2 大引
3 根太
4,4’ 天井型枠(コンパネ)
5 透孔
6 鉄筋コンクリートブロック
7,7’,8,8’ 鉄筋
9,9’ 配筋
s 天井スラブ
t 高さ
1,1 ', 1 "support 2 large drawing 3 joist 4,4' ceiling formwork (panel)
5 Through-hole 6 Reinforced concrete block 7, 7 ', 8, 8' Reinforcing bar 9, 9 'Reinforcement s Ceiling slab t Height

Claims (4)

複数のサポートによって大引、根太を介して支持される天井型枠に上記大引、根太に囲まれる4角形部分に透孔を開口し、
該透孔の内周に沿う上面に、それぞれ鉄筋コンクリートブロックの外周に沿う下面を載置し、
上記ブロックの下面中央部に該ブロックのサポートを着脱自在に設け、上面中央部に上段階の天井型枠の大引、根太用のサポートを着脱自在に設け、
上記ブロックの鉄筋を該ブロックの外周から4方に延長して天井型枠上の配筋と接続し、上記ブロックの高さと天井スラブの厚さとを同一に形成することを特徴とする中高層建築物の天井スラブ施工法。
Opening a through-hole in the square part surrounded by the above-mentioned large drawing and joists on the ceiling formwork supported by the multiple supports and the joists
Place the lower surface along the outer periphery of the reinforced concrete block on the upper surface along the inner periphery of the through hole,
The support of the block is detachably provided at the center of the lower surface of the block, and the support for the joist and joist of the upper stage ceiling is detachably provided at the center of the upper surface.
A medium-to-high-rise building characterized in that the reinforcing bars of the block are extended in four directions from the outer periphery of the block and connected to the reinforcing bars on the ceiling formwork so that the height of the block is equal to the thickness of the ceiling slab. Ceiling slab construction method.
互に間隔を介して直交する根太と大引とによって囲まれる1つ置き4角部分に上記透孔を開口した請求項1記載の天井スラブ施工法。   The ceiling slab construction method according to claim 1, wherein the through-holes are opened at every other four corners surrounded by joists and large pulls that are orthogonal to each other with a space therebetween. 上記鉄筋コンクリートブロックが逆載頭錐形である請求項1又は2記載の中高層建築物の天井スラブ施工法。   The ceiling slab construction method for medium- and high-rise buildings according to claim 1 or 2, wherein the reinforced concrete block has a reverse headed cone shape. 複数のサポートによって大引、根太を介して支持される天井型枠に上記大引、根太に囲まれる4角形部分に透孔を開口し、
該透孔の内周に沿う上面に、それぞれ鉄筋コンクリートブロックの外周に沿う下面を載置し、
上記ブロックの下面中央部に該ブロックのサポートを着脱自在に設け、上面中央部に上段階の天井型枠の大引、根太用のサポートを着脱自在に設け、
上記ブロックの鉄筋を該ブロックの外周から4方に延長して天井型枠上の配筋と接続し、上記ブロックの高さと天井スラブの厚さとを同一に形成してなる中高層建築物の天井スラブ施工装置。
Opening a through-hole in the square part surrounded by the above-mentioned large drawing and joists on the ceiling formwork supported by the multiple supports and the joists
Place the lower surface along the outer periphery of the reinforced concrete block on the upper surface along the inner periphery of the through hole,
The support of the block is detachably provided at the center of the lower surface of the block, and the support for the joist and joist of the upper stage ceiling is detachably provided at the center of the upper surface.
A ceiling slab of a medium- and high-rise building in which the reinforcing bars of the block are extended from the outer periphery of the block in four directions and connected to the reinforcing bars on the ceiling formwork, and the height of the block and the thickness of the ceiling slab are formed to be the same. Construction equipment.
JP2007248562A 2007-09-26 2007-09-26 Ceiling slab construction method and equipment for medium and high-rise buildings Expired - Fee Related JP4637151B2 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2007248562A JP4637151B2 (en) 2007-09-26 2007-09-26 Ceiling slab construction method and equipment for medium and high-rise buildings
US12/668,746 US20100207009A1 (en) 2007-09-26 2008-06-04 Temporary post joint, temporary structure, and method for constructing slabs of floors
PCT/JP2008/060283 WO2009041123A1 (en) 2007-09-26 2008-06-04 Temporary post joint, temporary structure, and slab constructing method for multiple floors
KR1020107006540A KR20100081299A (en) 2007-09-26 2008-06-04 Temporary post joint, temporary structure, and slab constructing method for multiple floors
CN2008801091301A CN101809240B (en) 2007-09-26 2008-06-04 Temporary post joint, temporary structure, and slab constructing method for multiple floors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007248562A JP4637151B2 (en) 2007-09-26 2007-09-26 Ceiling slab construction method and equipment for medium and high-rise buildings

Publications (2)

Publication Number Publication Date
JP2009079396A JP2009079396A (en) 2009-04-16
JP4637151B2 true JP4637151B2 (en) 2011-02-23

Family

ID=40654354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007248562A Expired - Fee Related JP4637151B2 (en) 2007-09-26 2007-09-26 Ceiling slab construction method and equipment for medium and high-rise buildings

Country Status (1)

Country Link
JP (1) JP4637151B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4906881B2 (en) 2009-03-27 2012-03-28 富士電機機器制御株式会社 Thermal overload relay
KR20220043595A (en) 2020-09-29 2022-04-05 엘지전자 주식회사 Flow path switching apparatus

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60233269A (en) * 1984-05-01 1985-11-19 日本フエラス工業株式会社 Support apparatus of concrete floor mold frame
JPH0343569A (en) * 1990-05-11 1991-02-25 Gantan Biyuut Kogyo Kk Block for both leveling and flow stopping concrete
JPH06336838A (en) * 1993-05-26 1994-12-06 Shimizu Corp Standard type housing construction method

Also Published As

Publication number Publication date
JP2009079396A (en) 2009-04-16

Similar Documents

Publication Publication Date Title
CN103741792B (en) Overall assembling frame system and construction method
CN102449247B (en) Half precast floor plank, and slab construction method using same
CN118481286B (en) Beam-slab integrated prefabricated wafer slab structure and construction method thereof
JP6339923B2 (en) How to build a building frame
JP5532468B1 (en) Formwork support member in the slab
JP7572413B2 (en) How to build a structure
JP4637151B2 (en) Ceiling slab construction method and equipment for medium and high-rise buildings
JPH0657956A (en) Construction of concrete structure
KR20210079000A (en) π-TYPED HOLLOW PRECAST CONCRETE SLAB CONSTRUCTION METHOD USING SIDE CONNECTION MEMBER
CN110374228A (en) A kind of cast-in-place sleeper steel bar arrangement of shear wall and its construction technology
KR20190052638A (en) Beam-reinforced deck plate and construction method using the same
JP2023180858A (en) Reinforced concrete column switching structure
CN101024972A (en) Building with combined structure and its constructing method
JP2009197537A (en) Structure and method for supporting floor slab
JP6961408B2 (en) Precast concrete boards and concrete structural slabs
JP2852626B2 (en) Construction method of slab using arch slab plate
JP6700384B2 (en) Formwork panel assembly
KR20100033695A (en) Multi tee slab for structure construction
CN112942679B (en) A prefabricated concrete frame beam capable of realizing standardization and its construction method
JP2010138601A (en) Temporary structure and construction method of multistory slab
KR101387232B1 (en) Moment framework system
JPH06248700A (en) Building structure
JP7141096B2 (en) Building construction method
KR102109900B1 (en) Reinforced Concrete Method and Reinforced Concrete Structure
KR20250081648A (en) A method of structural construction using steel and deck plate at pit floor in apartment structural construction

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100608

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100701

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101026

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101122

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131203

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees