JP4649201B2 - Non-land adjustment mat and construction method of non-land adjustment mat - Google Patents
[go: Go Back, main page]

JP4649201B2 - Non-land adjustment mat and construction method of non-land adjustment mat - Google Patents

Non-land adjustment mat and construction method of non-land adjustment mat Download PDF

Info

Publication number
JP4649201B2
JP4649201B2 JP2004373374A JP2004373374A JP4649201B2 JP 4649201 B2 JP4649201 B2 JP 4649201B2 JP 2004373374 A JP2004373374 A JP 2004373374A JP 2004373374 A JP2004373374 A JP 2004373374A JP 4649201 B2 JP4649201 B2 JP 4649201B2
Authority
JP
Japan
Prior art keywords
mat
grout
mat portion
ground
pressure receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004373374A
Other languages
Japanese (ja)
Other versions
JP2006177095A (en
Inventor
彰 山本
誠 鳥井原
賢治 岡崎
泰治 三上
大伍 佐藤
正良 深井
信一 薄葉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Nippon Concrete Industries Co Ltd
Sumitomo SEI Steel Wire Corp
Nittoc Constructions Co Ltd
Original Assignee
Obayashi Corp
Nippon Concrete Industries Co Ltd
Sumitomo SEI Steel Wire Corp
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Nippon Concrete Industries Co Ltd, Sumitomo SEI Steel Wire Corp, Nittoc Constructions Co Ltd filed Critical Obayashi Corp
Priority to JP2004373374A priority Critical patent/JP4649201B2/en
Publication of JP2006177095A publication Critical patent/JP2006177095A/en
Application granted granted Critical
Publication of JP4649201B2 publication Critical patent/JP4649201B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、受圧板と地表面との間に介装されて、地表面の不陸調整を行うための不陸調整マット及び不陸調整マットの施工方法に関する。   The present invention relates to a non-land adjustment mat that is interposed between a pressure receiving plate and a ground surface, and performs a non-land adjustment of the ground surface, and a construction method of the non-land adjustment mat.

斜面の安定化等を図る工法の一例として、グラウンドアンカー工法が知られている。グラウンドアンカー工法は、安定地盤に定着させたグラウンドアンカーに緊張力を与え、この緊張力を法面上に設置した受圧板を介して地盤側に伝達させることにより、斜面の安定化を図るように構成したものである。   A ground anchor method is known as an example of a method for stabilizing a slope or the like. The ground anchor method is designed to stabilize the slope by applying tension to the ground anchor fixed on the stable ground and transmitting this tension to the ground side via the pressure plate installed on the slope. It is composed.

このような構成のグラウンドアンカー工法においては、地表面の凹凸が著しい切土法面に受圧板を設置し、グラウンドアンカーに緊張力を付与した場合に、受圧板の一部に応力集中が生じるため、受圧板にクラックが生じることがある。   In the ground anchor method with such a configuration, when a pressure receiving plate is installed on the cut slope where the unevenness of the ground surface is remarkable and tension is applied to the ground anchor, stress concentration occurs in a part of the pressure receiving plate. Cracks may occur in the pressure receiving plate.

このため、地表面の凹凸が激しい切土法面に受圧板を設置する場合には、受圧板と地表面との間に袋状の不陸調整マットを介装させ、グラウンドアンカーを仮緊張させた後に、不陸調整マット内にグラウトを注入して地表面の凹凸を吸収し、受圧板と地表面との密着性を高めている。   For this reason, when installing a pressure receiving plate on a cut slope with severe irregularities on the ground surface, a bag-like uneven adjustment mat is interposed between the pressure receiving plate and the ground surface to temporarily tension the ground anchor. After that, grout is injected into the unevenness adjustment mat to absorb the unevenness of the ground surface, and the adhesion between the pressure receiving plate and the ground surface is enhanced.

このような構成の不陸調整マットの一例として、外形を受圧板とほぼ同一形状、大きさに形成し、内部にグラウトを充填可能な1つの室を設けた不陸調整マットが提案されている(例えば、特許文献1参照。)。   As an example of the unevenness adjustment mat having such a configuration, an unevenness adjustment mat has been proposed in which the outer shape is formed in substantially the same shape and size as the pressure receiving plate, and one chamber that can be filled with grout is provided. (For example, refer to Patent Document 1).

また、不陸調整マットの他の例として、複数の分割体を組み合わせることによって不陸調整マットを構成し、受圧板の形状、大きさに合わせて、受圧板と地表面との間に適宜の数の分割体を介装させるように構成したものが提案されている。   Further, as another example of the non-land adjustment mat, a non-land adjustment mat is configured by combining a plurality of divided bodies, and according to the shape and size of the pressure receiving plate, an appropriate amount is provided between the pressure receiving plate and the ground surface. A configuration in which a number of divided bodies are interposed has been proposed.

さらに、不陸調整マットの他の例として、内部を中央部に位置する第1室と、その外側に位置する第2室の2室に区画し、第1室及び第2室内のそれぞれにグラウトを充填可能に構成したものが提案されている(例えば、特許文献2参照。)。
実用新案登録第2530211号公報 特開2001−295271号公報
Further, as another example of the unevenness adjustment mat, the interior is divided into two chambers, a first chamber located in the center and a second chamber located outside thereof, and grouts are provided in each of the first chamber and the second chamber. Has been proposed (see, for example, Patent Document 2).
Utility Model Registration No. 2530211 JP 2001-295271 A

ところで、上記のような構成の各種の不陸調整マットのうち、特許文献1に記載されている不陸調整マットは、グラウンドアンカーを仮緊張させて内部にグラウトを注入した場合に、地表面の傾斜によって不陸調整マットの下端部に行くほどグラウトの圧力が大きくなり、不陸調整マットの下端部が大きく膨らんでしまい、受圧板の設置角度が変化してしまう。このため、グラウンドアンカーに本緊張力を与えた場合に、受圧板にクラックが生じてしまうことがある。また、グラウンドアンカー用の受圧板は、中心部分に大きな荷重が作用するため、中心に近いほど剛性が高くなるように設計されているが、特許文献1に記載されているものは、構造的にそのような大きな荷重を支持するのに十分ではなく、受圧板が傾く等の問題が生じ、長期的に受圧板を安定して支持することが困難になる。   By the way, among the various unevenness adjustment mats having the above-described configuration, the unevenness adjustment mat described in Patent Document 1 is a surface of the ground surface when a ground anchor is temporarily tensioned and grout is injected therein. Due to the inclination, the pressure of the grout increases as it goes to the lower end portion of the unevenness adjustment mat, the lower end portion of the unevenness adjustment mat expands greatly, and the installation angle of the pressure receiving plate changes. For this reason, when this tension force is given to the ground anchor, a crack may occur in the pressure receiving plate. In addition, the pressure receiving plate for the ground anchor is designed so that the rigidity is higher as it is closer to the center because a large load acts on the center portion. However, the structure described in Patent Document 1 is structurally It is not sufficient to support such a large load, and problems such as tilting of the pressure receiving plate occur, making it difficult to stably support the pressure receiving plate in the long term.

また、複数の分割体を組み合わせることによって構成した不陸調整マットの場合には、受圧板の形状、大きさに合わせて、複数の分割体を組み合わせて設置しなければならないとともに、分割体ごとにグラウトを注入しなければならないため、設置及びグラウトの注入に時間と手間がかかる。さらに、このタイプの不陸調整マットも、特許文献1に記載されているものと同様に、構造的に受圧板の中心部分に作用する大きな荷重を支持するのに十分ではなく、長期的に受圧板を安定して支持することが困難になる。   In addition, in the case of the unevenness adjustment mat configured by combining a plurality of divided bodies, it is necessary to install a plurality of divided bodies according to the shape and size of the pressure receiving plate, and for each divided body Because the grout must be injected, it takes time and effort to install and inject the grout. Further, this type of uneven adjustment mat is also not sufficient to support a large load acting on the central portion of the pressure receiving plate structurally, similar to the one described in Patent Document 1, and the pressure receiving in the long term. It becomes difficult to support the plate stably.

さらに、特許文献2に記載されている不陸調整マットは、中央部分とその外側部分の2つの室内にそれぞれグラウトを注入することにより、グラウンドアンカー用の孔の開口部の凹状の部分を吸収しているが、この不陸調整マットにおいても、受圧板の中心部分に作用する大きな荷重を支持するのに十分ではなく、長期的に受圧板を安定して支持することが困難になる。   Furthermore, the unevenness adjustment mat described in Patent Document 2 absorbs the concave portion of the opening of the hole for the ground anchor by injecting grout into the two chambers of the central portion and the outer portion thereof, respectively. However, this unevenness adjustment mat is not sufficient to support a large load acting on the central portion of the pressure receiving plate, and it becomes difficult to stably support the pressure receiving plate in the long term.

本発明は、上記のような従来の問題に鑑みなされたものであって、設置及びグラウトの注入が容易であるとともに、長期的に受圧板を安定して支持することができ、さらに、グラウンドアンカーの軸線と受圧板の底面との角度を予め計画した角度に保つことができる不陸調整マットを提供することを目的とする。   The present invention has been made in view of the conventional problems as described above, and is easy to install and inject grout, and can stably support the pressure receiving plate for a long period of time. It is an object of the present invention to provide a non-land adjustment mat that can keep the angle between the axis of the pressure plate and the bottom surface of the pressure receiving plate at a predetermined angle.

上記のような課題を解決するために、本発明は、以下のような手段を採用している。
すなわち、請求項1に係る発明は、受圧板と地盤の地表面との間に介装される不陸調整マットであって、内部にグラウトを充填可能な第1室を有する第1マット部と、該第1マット部の外側に設けられるとともに、内部にグラウトを充填可能な第2室を有する第2マット部とを備え、前記第1マット部と全マット部との面積比が、前記地盤の短期的な地耐力に対する安全率と長期的な地耐力に対する安全率との比に相当するように、前記第1マット部及び前記第2マット部の面積を設定したことを特徴とする。
本発明による不陸調整マットによれば、第1マット部により短期的な荷重を支持し、第1マット部と第2マット部との協働により、長期的な荷重を支持することができ、長期に亘って受圧板を安定して支持することができる。
In order to solve the above problems, the present invention employs the following means.
That is, the invention according to claim 1 is a non-landing adjustment mat interposed between the pressure receiving plate and the ground surface of the ground, and includes a first mat portion having a first chamber in which grout can be filled. And a second mat portion having a second chamber capable of being filled with grout, and having an area ratio between the first mat portion and the entire mat portion. The area of the first mat portion and the second mat portion is set so as to correspond to the ratio of the safety factor for short-term ground strength and the safety factor for long-term ground strength.
According to the unevenness adjustment mat according to the present invention, a short-term load can be supported by the first mat portion, and a long-term load can be supported by the cooperation of the first mat portion and the second mat portion, The pressure receiving plate can be stably supported over a long period of time.

請求項2に係る発明は、請求項1に記載の不陸調整マットであって、前記第1マット部は円形に形成され、前記第2マット部は環状に形成されていることを特徴とする。
本発明による不陸調整マットによれば、全体の外形を円形状に形成することができるので、荷重に対する剛性を中央部を中心として全体に亘って均等にすることができる。
The invention according to claim 2 is the unevenness adjustment mat according to claim 1, wherein the first mat portion is formed in a circular shape and the second mat portion is formed in an annular shape. .
According to the unevenness adjustment mat according to the present invention, the entire outer shape can be formed in a circular shape, so that the rigidity with respect to the load can be made uniform over the entire center portion.

請求項3に係る発明は、請求項1又は2に記載の不陸調整マットであって、前記第1マット部と前記第2マット部とは、一体に形成されていることを特徴とする。
本発明による不陸調整マットによれば、第1マット部と第2マット部とは一体に形成されているので、施工が容易となる。
The invention according to claim 3 is the unevenness adjustment mat according to claim 1 or 2, wherein the first mat portion and the second mat portion are integrally formed.
According to the unevenness adjustment mat according to the present invention, the first mat portion and the second mat portion are integrally formed, so that the construction is facilitated.

請求項4に係る発明は、請求項1又は2に記載の不陸調整マットであって、前記第1マット部と前記第2マット部とは、別体に形成されていることを特徴とする。
本発明による不陸調整用マットによれば、第1マット部と第2マット部とは別体に形成されているので、施工箇所の状態に応じて、第1マット部と第2マット部とを一緒に設置したり、別々に設置したりするような使い方ができることになる。
The invention according to claim 4 is the unevenness adjustment mat according to claim 1 or 2, wherein the first mat portion and the second mat portion are formed separately. .
According to the unevenness adjusting mat according to the present invention, the first mat portion and the second mat portion are formed separately from each other. Can be used together or installed separately.

請求項5に係る発明は、内部にグラウトを充填可能な第1室を有する第1マット部と、該第1マット部の外側に設けられるとともに、内部にグラウトを充填可能な第2室を有する第2マット部とを備え、前記第1マット部と全マット部との面積比が、前記地盤の短期的な地耐力に対する安全率と長期的な地耐力に対する安全率との比に相当するように、前記第1マット部及び前記第2マット部の面積を設定した不陸調整マットの施工方法であって、前記不陸調整マットを地盤の地表面上に設置するとともに、該不陸調整マットの上部に受圧板を設置し、それらの中心部にグラウンドアンカーを挿通させて、グラウンドアンカーに仮緊張力を与えることにより、受圧板及び不陸調整マットを地盤に仮支持する仮緊張力付与工程と、不陸調整マットの第1マット部の第1室内にグラウトを充填して地表面の不陸調整を行う第1グラウト注入工程と、グラウンドアンカーに本緊張力を与えて、受圧板及び不陸調整マットを地盤上に本支持する本緊張力付与工程と、不陸調整マットの第2マット部の第2室内にグラウトを充填する第2グラウト注入工程とからなることを特徴とする。
本発明による不陸調整マットの施工方法によれば、仮緊張力付与工程において、地盤の地表面上に不陸調整マットを介して受圧板を設置し、グラウンドアンカーに仮緊張力を与えることにより、不陸調整マット及び受圧板が地表面上に仮支持される。そして、第1グラウト注入工程において、第1マット部の第1室内にグラウトを充填することにより、受圧板が地表面に対して平行に支持される。そして、グラウトが硬化した後に、本緊張力付与工程において、グラウンドアンカーに本緊張力を与えることにより、受圧板が不陸調整マットを介して地表面上に本支持される。そして、第2グラウト注入工程において、第2マット部の第2室内にグラウトを注入することにより、第1マット部と第2マット部とによって受圧板が支持されることになる。
The invention according to claim 5 includes a first mat portion having a first chamber in which grout can be filled, and a second chamber which is provided outside the first mat portion and can be filled with grout. A second mat portion, and an area ratio between the first mat portion and all the mat portions corresponds to a ratio of a safety factor with respect to a short-term ground strength and a safety factor with respect to a long-term ground strength of the ground. And a non-land adjustment mat construction method in which the areas of the first mat portion and the second mat portion are set, wherein the non-land adjustment mat is installed on the ground surface of the ground, Temporary tension applying process for temporarily supporting the pressure-receiving plate and the unevenness adjustment mat on the ground by installing a pressure-receiving plate at the top of the ground, inserting a ground anchor through the center of the plate, and applying a temporary tension to the ground anchor And the unevenness adjustment map A first grout injection process for adjusting the ground surface by filling the first chamber of the first mat portion with ground, and applying a main tension to the ground anchor so that the pressure receiving plate and the uneven land adjustment mat are placed on the ground. And a second tension injection step of filling the second chamber of the second mat portion of the unevenness adjustment mat with a second grout filling step.
According to the construction method of the non-land adjustment mat according to the present invention, in the provisional tension applying step, the pressure receiving plate is installed on the ground surface via the non-land adjustment mat, and temporary tension is applied to the ground anchor. The unevenness adjustment mat and the pressure receiving plate are temporarily supported on the ground surface. In the first grout injection step, the pressure receiving plate is supported in parallel to the ground surface by filling the first chamber of the first mat portion with grout. Then, after the grout is hardened, in the main tension applying step, the main pressure is applied to the ground anchor, whereby the pressure receiving plate is finally supported on the ground surface via the unevenness adjustment mat. In the second grout injection step, the pressure receiving plate is supported by the first mat portion and the second mat portion by injecting grout into the second chamber of the second mat portion.

請求項6に係る発明は、請求項5に記載の不陸調整マットの施工方法であって、仮緊張力付与工程においてグラウンドアンカーに仮緊張力を与えた後に、第1グラウト注入工程において第1マット部の第1室内にグラウトを充填し、グラウトが硬化する前に受圧板の底面とグラウンドアンカーの長軸が直角なるように受圧板の角度を調整し、第1マット部の第1室内のグラウトが硬化した後に、本緊張力付与工程においてグラウンドアンカーに本緊張力を与え、第2グラウト注入工程において第2マット部の第2室内にグラウトを充填することにより、受圧板を斜面に予め計画した角度で設置するように構成したことを特徴とする。
本発明による不陸調整マットの施工方法によれば、グラウンドアンカーに仮緊張力を与えた後に、第1マット部の第1室内にグラウトを充填し、グラウトが硬化する前に不陸調整マット上の受圧板の角度補正を行う。そして、補正した角度を保持した状態で、第1マット部の第1室内のグラウトを硬化させた後に、グラウンドアンカーに本緊張力を与え、第2マット部の第2室内にグラウトを充填することにより、受圧板の角度を保持したままの状態で、不陸調整と必要な受圧面積が確保できる。
The invention according to claim 6 is the construction method of the unevenness adjustment mat according to claim 5, wherein after the provisional tension force is applied to the ground anchor in the provisional tension application step, the first in the first grout injection step. The grout is filled in the first chamber of the mat portion, and the angle of the pressure receiving plate is adjusted so that the bottom surface of the pressure receiving plate and the long axis of the ground anchor are perpendicular to each other before the grout is cured. After the grout has hardened, the pressure receiving plate is preliminarily planned on the slope by applying the main tension to the ground anchor in the main tension applying step and filling the second chamber of the second mat portion with the main grout in the second grout injection step. It is configured to be installed at an angle.
According to the construction method of the non-land adjustment mat according to the present invention, after provisional tension is applied to the ground anchor, the grout is filled in the first chamber of the first mat portion, and before the grout is hardened, The angle of the pressure receiving plate is corrected. And after hardening the grout in the 1st room of the 1st mat part in the state where the amended angle was maintained, this tension is given to the ground anchor and the grout is filled into the 2nd room of the 2nd mat part. Thus, it is possible to ensure unevenness adjustment and a necessary pressure receiving area while maintaining the angle of the pressure receiving plate.

以上、説明したように、本発明の不陸調整マット及び不陸調整マットの施工方法によれば、第1マット部の第1室内、及び第2マット部の第2室内に、それぞれグラウトを充填可能に構成し、第1マット部と全マット部(第1マット部と第2マット部との和)との面積比が、短期的な地耐力に対する安全率と長期的な地耐力に対する安全率の比に相当するように、第1マット部及び第2マット部の面積を設定するように構成したので、短期的な荷重を第1マット部によって確実に支持することができるとともに、長期的な荷重を第1マット部と第2マット部との協働によって確実に支持することができることになる。従って、長期に渡って受圧板が傾くようなことはなく、安定して支持することができる。また、全体の外形を円形状に形成しているので、荷重に対する剛性を中央部を中心として、全体に亘って均等にすることができ、これによっても、受圧板を安定して支持することができる。さらに、第1マット部及び第2マット部を一体、又は別体に形成しているので、地表面の状態に応じて、第1マット部と第2マット部を一緒に設置したり、別々に設置して両者を組み合わせるような使い方ができ、汎用性を高めることができる。
さらに、グラウンドアンカーに仮緊張力を与えた後に、第1マット部の第1室内にグラウトを充填し、グラウトが硬化する前に不陸調整マット上の受圧板の角度補正を行い、補正した角度を保持した状態で、第1マット部の第1室内のグラウトを硬化させた後に、グラウンドアンカーに本緊張力を与え、第2マット部の第2室内にグラウトを充填しているので、受圧板の角度を保持したままの状態で、不陸調整と必要な受圧面積を確保することができる。
As described above, according to the non-land adjustment mat and the non-land adjustment mat construction method of the present invention, the grout is filled in the first chamber of the first mat portion and the second chamber of the second mat portion, respectively. The area ratio between the first mat portion and all mat portions (the sum of the first mat portion and the second mat portion) is configured so that the safety factor against short-term ground strength and the safety factor against long-term ground strength. Since the areas of the first mat portion and the second mat portion are set so as to correspond to the ratio, the short-term load can be reliably supported by the first mat portion, and the long-term The load can be reliably supported by the cooperation of the first mat portion and the second mat portion. Therefore, the pressure receiving plate does not tilt for a long time and can be supported stably. In addition, since the entire outer shape is formed in a circular shape, the rigidity with respect to the load can be made uniform over the entire center and the pressure receiving plate can be stably supported. it can. Furthermore, since the first mat portion and the second mat portion are formed integrally or separately, the first mat portion and the second mat portion can be installed together or separately according to the state of the ground surface. It can be installed and used in combination with both, increasing versatility.
Furthermore, after applying a temporary tension force to the ground anchor, the grout is filled in the first chamber of the first mat portion, and the angle of the pressure receiving plate on the non-land adjustment mat is corrected before the grout is hardened. Since the grout in the first chamber of the first mat portion is cured in a state where the first mat portion is held, the tension is applied to the ground anchor, and the grout is filled in the second chamber of the second mat portion. With the angle maintained, the unevenness adjustment and the necessary pressure receiving area can be secured.

以下、図面を参照しつつ本発明の実施の形態について説明する。
図1及び図2には、本発明による不陸調整マットの一実施の形態が示されていて、図1は不陸調整マットの全体を示す概略平面図、図2は図1のA−A線断面図である。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
1 and 2 show an embodiment of the unevenness adjustment mat according to the present invention. FIG. 1 is a schematic plan view showing the entire unevenness adjustment mat, and FIG. 2 is an AA view of FIG. It is line sectional drawing.

すなわち、この不陸調整マット1は、ポリエステル等の合成繊維からなる不織布、織布を基材として形成される円形袋状をなすものであって、内部が第1室3と第2室11の2室に区画され、第1室3及び第2室11のそれぞれにグラウト20が充填可能に構成されている。   That is, the unevenness adjusting mat 1 is formed in a circular bag shape using a nonwoven fabric or a woven fabric made of synthetic fibers such as polyester as a base material, and the inside is composed of the first chamber 3 and the second chamber 11. It is divided into two chambers, and each of the first chamber 3 and the second chamber 11 can be filled with a grout 20.

第1室3は、不陸調整マット1の中央部に位置する円形状をなすものであって、この第1室3に相当する不陸調整マット1の部分が第1マット部2として機能するように構成されている。第2室11は、不陸調整マット1の第1室3の外側に部分に第1室3を囲むように位置する円環状をなすものであって、この第2室11に相当する不陸調整マット1の部分が第2マット部10として機能するように構成されている。   The first chamber 3 has a circular shape located at the center of the unevenness adjustment mat 1, and the portion of the unevenness adjustment mat 1 corresponding to the first chamber 3 functions as the first mat portion 2. It is configured as follows. The second chamber 11 has an annular shape positioned so as to surround the first chamber 3 on the outside of the first chamber 3 of the non-land adjustment mat 1, and the non-land corresponding to the second chamber 11. The portion of the adjustment mat 1 is configured to function as the second mat portion 10.

第1マット部2は、円形状の上壁4と、上壁4の下方に所定の間隔をおいて平行に位置する円形状の下壁5と、上壁4と下壁5の外周端部間を全周に渡って一体に連結する環状の周壁6とから構成され、これらの上壁4と下壁5と周壁6とによって囲まれる部分に、円形状の空間である第1室3が形成されている。   The first mat portion 2 includes a circular upper wall 4, a circular lower wall 5 positioned in parallel below the upper wall 4 at a predetermined interval, and outer peripheral ends of the upper wall 4 and the lower wall 5. The first chamber 3 that is a circular space is formed in a portion surrounded by the upper wall 4, the lower wall 5, and the peripheral wall 6. Is formed.

第1マット部2の上壁4と下壁5との間には、それらの中心部間を貫通する挿通孔7が第1室3から隔離された状態で設けられ、この挿通孔7内をグラウンドアンカー25が挿通するように構成されている。   Between the upper wall 4 and the lower wall 5 of the first mat portion 2, an insertion hole 7 penetrating between the central portions is provided in a state of being isolated from the first chamber 3. The ground anchor 25 is configured to be inserted.

第1マット部2の周壁6の一部には、第1室3内外を貫通する貫通孔8が設けられ、この貫通孔8の周縁部にパイプ状の第1注入口9が一体に連結され、この第1注入口9を介して第1室3内にグラウト20が充填されるように構成されている。   A part of the peripheral wall 6 of the first mat portion 2 is provided with a through hole 8 that penetrates the inside and outside of the first chamber 3, and a pipe-shaped first inlet 9 is integrally connected to the peripheral portion of the through hole 8. The grout 20 is filled into the first chamber 3 through the first inlet 9.

第2マット部10は、内周端部が第1マット部2の上壁4の外周端部に一体に連結される環状の上壁12と、上壁12の下方に所定の間隔をおいて位置するとともに、内周端部が第1マット部2の下壁5の外周端部に一体に連結され、かつ、外周端部が上壁12の外周端部に一体に連結される環状の下壁13とからなり、上壁12と下壁13と第1マット部2の周壁6とによって囲まれる部分に、環状の空間である第2室11が形成されている。   The second mat portion 10 has an annular upper wall 12 whose inner peripheral end is integrally connected to the outer peripheral end of the upper wall 4 of the first mat portion 2, and a predetermined interval below the upper wall 12. The lower end of the first mat portion 2 is integrally connected to the outer peripheral end portion of the lower wall 5 and the outer peripheral end portion is integrally connected to the outer peripheral end portion of the upper wall 12. A second chamber 11, which is an annular space, is formed in a portion that includes the wall 13 and is surrounded by the upper wall 12, the lower wall 13, and the peripheral wall 6 of the first mat portion 2.

第2マット部10の上壁12の一部には、第2室11内外を貫通する貫通孔14が設けられ、この貫通孔14の周縁部にパイプ状の第2注入口15が一体に連結され、この第2注入口15を介して第2室11内にグラウト20が充填されるように構成されている。   A part of the upper wall 12 of the second mat portion 10 is provided with a through hole 14 penetrating the inside and outside of the second chamber 11, and a pipe-like second inlet 15 is integrally connected to the peripheral portion of the through hole 14. The grout 20 is filled into the second chamber 11 through the second inlet 15.

第2マット部10の上壁12の第2注入口15に隣接する部分には、第2室11内外を貫通する貫通孔16が設けられ、この貫通孔16内を第1マット部2の第1注入口9が挿通し、第2マット部10の外側の部分に引き出されている。なお、第1注入口9を、第2注入口15の内側の部分を挿通させて、第2マット部10の外側の部分に引き出してもよい。   A portion of the upper wall 12 of the second mat portion 10 adjacent to the second inlet 15 is provided with a through hole 16 that penetrates the inside and outside of the second chamber 11, and the inside of the through hole 16 is the second of the first mat portion 2. One injection port 9 is inserted and drawn out to the outer portion of the second mat portion 10. Note that the first injection port 9 may be drawn out to the outer portion of the second mat portion 10 through the inner portion of the second injection port 15.

第1マット部2の上壁4、下壁5、周壁6、及び第2マット部10の上壁12、下壁13は、一体に形成してもよいし、それらを別体に形成して、適宜の手段により一体に連結してもよい。   The upper wall 4, the lower wall 5, the peripheral wall 6, and the upper wall 12, the lower wall 13 of the second mat portion 10 may be formed integrally, or they may be formed separately. Alternatively, they may be integrally connected by an appropriate means.

第1マット部2の面積は、不陸調整マット1の全体の面積の50〜70%に設定されている。
すなわち、不陸調整マット1の第1マット部2及び全マット部(第1マット部2と第2マット部10との和)は、施工対象箇所の地盤の短期的な地耐力に対する安全率と長期的な地耐力に対する安全率の比に相当するように、面積比が設定される。
The area of the first mat portion 2 is set to 50 to 70% of the entire area of the unevenness adjustment mat 1.
That is, the first mat portion 2 and the entire mat portion (the sum of the first mat portion 2 and the second mat portion 10) of the unevenness adjustment mat 1 have a safety factor against the short-term ground strength of the ground at the construction target location. The area ratio is set so as to correspond to the ratio of the safety factor to the long-term ground strength.

例えば、施工対象箇所の地盤の地耐力を300kN/mとし、短期的な地耐力に対する安全率s1=2、長期的な地耐力に対する安全率s2=3とすると、短期的な荷重は150kN/m、長期的な荷重は100kN/mとなる。
従って、第1マット部2の面積をa1、第2マット部10の面積をa2とすると、
(a1+a2):a1=150:100=3:2
a1:a2=100:50=2:1……(1)
となり、この比率で第1マット部2と第2マット部10との面積比を設定すればよいことになる。
For example, if the ground strength of the construction site is 300 kN / m 2 , the safety factor s1 = 2 for short-term ground strength, and the safety factor s2 = 3 for long-term ground strength, the short-term load is 150 kN / m 2 , the long-term load is 100 kN / m 2 .
Therefore, if the area of the first mat portion 2 is a1, and the area of the second mat portion 10 is a2,
(A1 + a2): a1 = 150: 100 = 3: 2
a1: a2 = 100: 50 = 2: 1 (1)
Thus, the area ratio between the first mat portion 2 and the second mat portion 10 may be set with this ratio.

次に、上記のように構成した不陸調整マット1の施工方法について、図3〜図5を参照して説明する。
(1)仮緊張力付与工程
図3に示すように、不陸調整マット1を地盤26の地表面27上に設置し、不陸調整マット1の上部に受圧板30を設置し、地盤26に予め定着されているグラウンドアンカー25を不陸調整マット1の中心部の挿通孔7、及び受圧板30の中心部の挿通孔31内を挿通させ、受圧板30の上面から突出させたグラウンドアンカー25の頭部に定着具35を固定し、ジャッキを用いてグラウンドアンカー25に仮緊張力を与え、受圧板30及び不陸調整マット1を地盤26の地表面27上に仮支持する。
Next, the construction method of the unevenness adjustment mat 1 configured as described above will be described with reference to FIGS.
(1) Temporary tension applying step As shown in FIG. 3, the non-land adjustment mat 1 is installed on the ground surface 27 of the ground 26, and the pressure receiving plate 30 is installed on the top of the non-land adjustment mat 1. The ground anchor 25 that has been fixed in advance is inserted through the insertion hole 7 at the center of the unevenness adjustment mat 1 and the insertion hole 31 at the center of the pressure receiving plate 30, and protrudes from the upper surface of the pressure receiving plate 30. The fixing tool 35 is fixed to the head of the head, a temporary tension is applied to the ground anchor 25 using a jack, and the pressure receiving plate 30 and the unevenness adjustment mat 1 are temporarily supported on the ground surface 27 of the ground 26.

(2)第1グラウト注入工程
図4に示すように、不陸調整マット1の第1マット部2の第1室内3に、第1注入口9を介してグラウト20を注入し、第1室3内に所定量のグラウト20を充填し、地表面27の不陸調整を行い、地表面27の凹凸を吸収して、受圧板30を地表面27に対して平行に支持する。
(2) First Grout Injection Step As shown in FIG. 4, the grout 20 is injected into the first chamber 3 of the first mat portion 2 of the unevenness adjustment mat 1 through the first injection port 9. 3 is filled with a predetermined amount of grout 20 to adjust the unevenness of the ground surface 27, absorb the unevenness of the ground surface 27, and support the pressure receiving plate 30 parallel to the ground surface 27.

この場合、第1マット部2の面積は不陸調整マット1全体の面積の50〜70%に設定されているので、地表面27の短期的な地耐力に対する安全率を確保するのに十分な支持力が得られ、次の本緊張力工程において、グラウンドアンカー25に与える本緊張力を十分に支持することができる。   In this case, since the area of the first mat portion 2 is set to 50 to 70% of the entire area of the unevenness adjustment mat 1, it is sufficient to ensure a safety factor against the short-term ground strength of the ground surface 27. A support force is obtained, and the main tension force applied to the ground anchor 25 can be sufficiently supported in the next main tension step.

(3)本緊張力付与工程
図4に示すように、第1室3内に充填したグラウト20が硬化した後、ジャッキを用いてグラウンドアンカー25に本緊張力を与え、受圧板30及び不陸調整マット1を地盤26の地表面27上に本支持する。この場合、前述したように、グラウンドアンカー25に与えた本緊張力が受圧板30を介して不陸調整マット1に作用しても、不陸調整マット1の第1マット部2の面積を短期的な地耐力に対する安全率を確保できるのに十分な値に設定しているので、グラウンドアンカー25からの本緊張力を十分に支持することができる。従って、受圧板30が地表面27に対して傾くようなことはなく、受圧板30を地表面27に対して平行な状態に保つことができる。
(3) Main tension applying step As shown in FIG. 4, after the grout 20 filled in the first chamber 3 is cured, the main anchor is applied to the ground anchor 25 using a jack, and the pressure receiving plate 30 and the non-landing The adjustment mat 1 is fully supported on the ground surface 27 of the ground 26. In this case, as described above, even if the main tension applied to the ground anchor 25 acts on the unevenness adjustment mat 1 via the pressure receiving plate 30, the area of the first mat portion 2 of the unevenness adjustment mat 1 is reduced for a short time. Since it is set to a value sufficient to ensure a safety factor against the ground strength, the tension force from the ground anchor 25 can be sufficiently supported. Therefore, the pressure receiving plate 30 is not inclined with respect to the ground surface 27, and the pressure receiving plate 30 can be kept parallel to the ground surface 27.

(4)第2グラウト注入工程
図5に示すように、不陸調整マット1の第2マット部10の第2室11内に、第2注入口15を介してグラウト20を注入し、第2室11内に所定量のグラウト20を充填する。この工程においては、全マット部(第1マット部2と第2マット部10との和)の面積が長期的な地耐力に対する安全率を確保できるのに十分な値に設定されているので、グラウンドアンカー25からの緊張力を不陸調整マット1の全体に分散することができ、受圧板30を長期的に安定して支持することができる。
(4) Second Grout Injection Step As shown in FIG. 5, the grout 20 is injected into the second chamber 11 of the second mat portion 10 of the uneven adjustment mat 1 through the second injection port 15, A predetermined amount of grout 20 is filled in the chamber 11. In this process, since the area of all mat parts (the sum of the first mat part 2 and the second mat part 10) is set to a value sufficient to ensure a long-term safety factor against earth resistance, The tension from the ground anchor 25 can be dispersed throughout the unevenness adjustment mat 1, and the pressure receiving plate 30 can be stably supported over a long period of time.

なお、前記の説明においては、不陸調整マット1及び受圧板30を設置した後に、仮緊張によって両者を地表面27上に仮支持し、その後に、第1マット部2の第1室3内にグラウト20を充填して本緊張を行い、その後に第2マット部10の第2室11内にグラウト20を充填したが、仮緊張の後に、第1マット2の第1室3内、及び第2マット部10の第2室11内の両方にグラウト20を充填し、その後に本緊張を行うように構成してもよい。また、不陸調整マット1及び受圧板30を設置した後に、本緊張を行って第1マット部2の第1室3内にグラウト20を充填し、その後に第2マット部10の第2室11内にグラウトを充填するように構成してもよい。   In the above description, after the non-land adjustment mat 1 and the pressure receiving plate 30 are installed, both are temporarily supported on the ground surface 27 by temporary tension, and thereafter, in the first chamber 3 of the first mat portion 2. The grout 20 is filled into the second chamber 11 of the second mat portion 10 and then the grout 20 is filled. After the temporary tension, the first chamber 3 of the first mat 2 and You may comprise so that the grout 20 may be filled into both the 2nd chambers 11 of the 2nd mat | matte part 10, and this tension may be performed after that. Further, after installing the unevenness adjusting mat 1 and the pressure receiving plate 30, the tension is applied to fill the first chamber 3 of the first mat portion 2 with the grout 20, and then the second chamber of the second mat portion 10. 11 may be filled with grout.

上記のように構成した本実施の形態による不陸調整マット1及び不陸調整マット1の施工方法にあっては、不陸調整マット1を、第1マット部2と第2マット部10とによって構成するとともに、第1マット部2と全マット部(第1マット部2と第2マット部10との和)の面積比を、短期的な地耐力に対する安全率と長期的な地耐力に対する安全率との比に相当する値に設定し、第1マット部2に最初にグラウト20を充填して本緊張した後に、第2マット部10にグラウト20を充填するように構成したので、本緊張によってグラウンドアンカー25からの本緊張力が受圧板30に作用しても、その緊張力を第1マット部2で十分に支持することができる。従って、短期的に受圧板30が傾くようなことはなく、受圧板30を安定して支持することができる。   In the construction method of the unevenness adjustment mat 1 and the unevenness adjustment mat 1 according to the present embodiment configured as described above, the unevenness adjustment mat 1 is composed of the first mat portion 2 and the second mat portion 10. In addition, the area ratio of the first mat portion 2 and all mat portions (the sum of the first mat portion 2 and the second mat portion 10) is set to a safety factor for short-term ground strength and safety for long-term ground strength. Since the first mat portion 2 is initially filled with the grout 20 and fully tensioned and then the second mat portion 10 is filled with the grout 20, the tension is set to a value corresponding to the ratio with the rate. Thus, even if the main tension force from the ground anchor 25 acts on the pressure receiving plate 30, the tension force can be sufficiently supported by the first mat portion 2. Therefore, the pressure receiving plate 30 does not tilt in the short term, and the pressure receiving plate 30 can be stably supported.

また、第1マット部2内にグラウト20を充填した後に、第2マット部10内にグラウト20を充填することにより、グラウンドアンカー25からの緊張力を不陸調整マット1の全体に分散させることができるので、長期的に受圧板30が傾くようなことはなく、受圧板30を安定して支持することができる。   Moreover, after filling the grout 20 in the 1st mat part 2, the tension force from the ground anchor 25 is disperse | distributed to the whole unevenness adjustment mat 1 by filling the grout 20 in the 2nd mat part 10. Therefore, the pressure receiving plate 30 does not tilt for a long time, and the pressure receiving plate 30 can be stably supported.

さらに、全体の外形を円形状に形成しているので、グラウンドアンカー25からの緊張力を受けた場合に、荷重が集中する中央部を中心として、曲げに対する剛性を均一にすることができ、これによっても、受圧板30を安定して支持することができる。   Furthermore, since the entire outer shape is formed in a circular shape, when subjected to a tension force from the ground anchor 25, the rigidity against bending can be made uniform around the central portion where the load is concentrated. Therefore, the pressure receiving plate 30 can be stably supported.

なお、前記の説明においては、不陸調整マット1の第1マット部2と第2マット部10とを一体に形成したが、第1マット部2及び第2マット部10を別体に形成して、両者を組み合わせて受圧板30と地表面27との間に設置するように構成してもよいものであり、その場合にも、同様の作用、効果を奏するのは勿論のことである。   In the above description, the first mat portion 2 and the second mat portion 10 of the unevenness adjustment mat 1 are integrally formed. However, the first mat portion 2 and the second mat portion 10 are formed separately. The two may be combined and installed between the pressure receiving plate 30 and the ground surface 27. In this case, the same operation and effect are naturally obtained.

本発明による不陸調整マットの一実施の形態を示した概略平面図である。It is the schematic plan view which showed one Embodiment of the unevenness adjustment mat by this invention. 図1のA−A線断面図である。It is the sectional view on the AA line of FIG. 本発明による不陸調整マットの施工方法を示した説明図であって、仮緊張力付与工程を示した説明図である。It is explanatory drawing which showed the construction method of the unevenness adjustment mat by this invention, Comprising: It is explanatory drawing which showed the temporary tension | tensile_strength provision process. 第1グラウト注入工程、及び本緊張力付与工程を示した説明図である。It is explanatory drawing which showed the 1st grout injection | pouring process and this tension | tensile_strength provision process. 第2グラウト注入工程を示した説明図である。It is explanatory drawing which showed the 2nd grout injection | pouring process.

符号の説明Explanation of symbols

1 不陸調整マット 2 第1マット部 3 第1室
4、12 上壁 5、13 下壁 6 周壁
7 挿入孔 8、14、16 貫通孔 9 第1注入口
10 第2マット部 11 第2室 15 第2注入口
20 グラウト 25 グラウンドアンカー 26 地盤
27 地表面 30 受圧板 31 挿通孔
35 定着具
DESCRIPTION OF SYMBOLS 1 Non-land adjustment mat 2 1st mat part 3 1st chamber 4, 12 Upper wall 5, 13 Lower wall 6 Perimeter wall 7 Insertion hole 8, 14, 16 Through-hole 9 1st inlet 10 2nd mat part 11 2nd chamber 15 Second inlet 20 Grout 25 Ground anchor 26 Ground 27 Ground surface 30 Pressure receiving plate 31 Insertion hole 35 Fixing tool

Claims (6)

受圧板と地盤の地表面との間に介装される不陸調整マットであって、
内部にグラウトを充填可能な第1室を有する第1マット部と、該第1マット部の外側に設けられるとともに、内部にグラウトを充填可能な第2室を有する第2マット部とを備え、
前記第1マット部と全マット部との面積比が、前記地盤の短期的な地耐力に対する安全率と長期的な地耐力に対する安全率との比に相当するように、前記第1マット部及び前記第2マット部の面積を設定したことを特徴とする不陸調整マット。
A non-land adjustment mat interposed between the pressure plate and the ground surface,
A first mat portion having a first chamber capable of filling grout therein, and a second mat portion provided outside the first mat portion and having a second chamber capable of filling grout therein,
The first mat portion and the mat portion so that the area ratio of the first mat portion and all the mat portions corresponds to the ratio of the safety factor for the short-term ground strength and the safety factor for the long-term ground strength of the ground. An unevenness adjustment mat, wherein an area of the second mat portion is set.
前記第1マット部は円形に形成され、前記第2マット部は環状に形成されていることを特徴とする請求項1に記載の不陸調整マット。   The unevenness adjusting mat according to claim 1, wherein the first mat portion is formed in a circular shape, and the second mat portion is formed in an annular shape. 前記第1マット部と前記第2マット部とは、一体に形成されていることを特徴とする請求項1又は2に記載の不陸調整マット。   The unevenness adjustment mat according to claim 1 or 2, wherein the first mat portion and the second mat portion are formed integrally. 前記第1マット部と前記第2マット部とは、別体に形成されていることを特徴とする請求項1又は2に記載の不陸調整マット。   The unevenness adjustment mat according to claim 1 or 2, wherein the first mat portion and the second mat portion are formed separately. 内部にグラウトを充填可能な第1室を有する第1マット部と、該第1マット部の外側に設けられるとともに、内部にグラウトを充填可能な第2室を有する第2マット部とを備え、前記第1マット部と全マット部との面積比が、前記地盤の短期的な地耐力に対する安全率と長期的な地耐力に対する安全率との比に相当するように、前記第1マット部及び前記第2マット部の面積を設定した不陸調整マットの施工方法であって、
前記不陸調整マットを地盤の地表面上に設置するとともに、該不陸調整マットの上部に受圧板を設置し、それらの中心部にグラウンドアンカーを挿通させて、グラウンドアンカーに仮緊張力を与えることにより、受圧板及び不陸調整マットを地盤に仮支持する仮緊張力付与工程と、不陸調整マットの第1マット部の第1室内にグラウトを充填して地表面の不陸調整を行う第1グラウト注入工程と、グラウンドアンカーに本緊張力を与えて、受圧板及び不陸調整マットを地盤上に本支持する本緊張力付与工程と、不陸調整マットの第2マット部の第2室内にグラウトを充填する第2グラウト注入工程とからなることを特徴とする不陸調整マットの施工方法。
A first mat portion having a first chamber capable of filling grout therein, and a second mat portion provided outside the first mat portion and having a second chamber capable of filling grout therein, The first mat portion and the mat portion so that the area ratio of the first mat portion and all the mat portions corresponds to the ratio of the safety factor for the short-term ground strength and the safety factor for the long-term ground strength of the ground. It is a construction method of the unevenness adjustment mat which set the area of the 2nd mat part,
The non-land adjustment mat is installed on the ground surface, and a pressure receiving plate is installed on the top of the non-land adjustment mat, and a ground anchor is inserted through the center of the mat to provide temporary tension to the ground anchor. Thus, a provisional tension applying step for temporarily supporting the pressure receiving plate and the non-land adjustment mat on the ground, and a non-land adjustment of the ground surface by filling the first chamber of the first mat portion of the non-land adjustment mat with the grout. A first grout injecting step, a main tension applying step of applying a main tension to the ground anchor to fully support the pressure receiving plate and the non-landing adjustment mat on the ground, and a second of the second mat portion of the non-landing adjusting mat. The construction method of the non-land adjustment mat | matte characterized by including the 2nd grout injection | pouring process filled with grout indoors.
仮緊張力付与工程においてグラウンドアンカーに仮緊張力を与えた後に、第1グラウト注入工程において第1マット部の第1室内にグラウトを充填し、グラウトが硬化する前に受圧板の底面とグラウンドアンカーの長軸が直角なるように受圧板の角度を調整し、第1マット部の第1室内のグラウトが硬化した後に、本緊張力付与工程においてグラウンドアンカーに本緊張力を与え、第2グラウト注入工程において第2マット部の第2室内にグラウトを充填することにより、受圧板を斜面に予め計画した角度で設置するように構成したことを特徴とする請求項5に記載の不陸調整マットの施工方法。

After provisional tension is applied to the ground anchor in the provisional tension applying step, the first chamber of the first mat portion is filled with grout in the first grout injection step, and the bottom surface of the pressure receiving plate and the ground anchor are set before the grout is cured. After adjusting the angle of the pressure receiving plate so that the major axis of the first plate is at right angles and the grout in the first chamber of the first mat portion is hardened, the main tension is applied to the ground anchor in the main tension applying step, and the second grout is injected. 6. The unevenness adjustment mat according to claim 5, wherein the pressure receiving plate is installed on the slope at a predetermined angle by filling grout in the second chamber of the second mat portion in the process. Construction method.

JP2004373374A 2004-12-24 2004-12-24 Non-land adjustment mat and construction method of non-land adjustment mat Expired - Fee Related JP4649201B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004373374A JP4649201B2 (en) 2004-12-24 2004-12-24 Non-land adjustment mat and construction method of non-land adjustment mat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004373374A JP4649201B2 (en) 2004-12-24 2004-12-24 Non-land adjustment mat and construction method of non-land adjustment mat

Publications (2)

Publication Number Publication Date
JP2006177095A JP2006177095A (en) 2006-07-06
JP4649201B2 true JP4649201B2 (en) 2011-03-09

Family

ID=36731450

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004373374A Expired - Fee Related JP4649201B2 (en) 2004-12-24 2004-12-24 Non-land adjustment mat and construction method of non-land adjustment mat

Country Status (1)

Country Link
JP (1) JP4649201B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7197098B1 (en) 2022-08-23 2022-12-27 長寿補強土株式会社 Ground anchor construction method with uniform adhesion stress

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2713497B2 (en) * 1990-07-26 1998-02-16 日本基礎技術株式会社 Frame body, installation method thereof, and method of manufacturing frame body
JP3214809B2 (en) * 1995-11-01 2001-10-02 東興建設株式会社 Ground treatment method in slope construction
JP3893551B2 (en) * 1997-08-08 2007-03-14 富久 吉川 Rock bolt bearing plate device
JPH11280079A (en) * 1998-03-30 1999-10-12 Raito Kogyo Co Ltd Slope stabilization method and slope stabilization structure
JP2000240065A (en) * 1999-02-23 2000-09-05 Sekisui Chem Co Ltd Pressure plate
JP3913936B2 (en) * 1999-07-27 2007-05-09 新技術工営株式会社 Foundation method of ground structure
JP4666711B2 (en) * 2000-02-01 2011-04-06 伸吉 大岡 Backfilling member installed under pressure receiving plate for stabilizing slope and backfilling method using this backfilling member

Also Published As

Publication number Publication date
JP2006177095A (en) 2006-07-06

Similar Documents

Publication Publication Date Title
US4592678A (en) Modular block retaining wall
US6503024B2 (en) Concrete foundation pierhead and method of lifting a foundation using a jack assembly
JPH08170340A (en) Pedestal structure and method of pedestal construction
US20220380996A1 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
US3946570A (en) Support and foundation composite pile for various works and method for manufacturing the same
JP2016515173A (en) Precast concrete retaining wall
JP4599423B2 (en) Embankment structure and construction method thereof
CN209144855U (en) Adjustable positioning bracket profile steel concrete column embedded column base structure
CN106133245A (en) Earth anchor and the construction method of earth anchor
JP2003055984A (en) Column base connection structure
KR20040076713A (en) Retaining Wall using Permanent Anchor and Pre-Cast Concrete Panel and its Construction Method
JP2015121061A (en) Infilling member and installation method of pressure plate for slope stabilization using infilling member
JP4649201B2 (en) Non-land adjustment mat and construction method of non-land adjustment mat
JP6515279B2 (en) Anchor frame, foundation structure and construction method thereof
JP2006070513A (en) How to adjust the height of the structure
EP3124705A1 (en) Formers
JP7285386B1 (en) Support device for retaining wall panel in slope-stabilized retaining wall
JP3690485B2 (en) Support structure of structure
JP7475630B2 (en) Filling material for installation on slopes, slope stabilization method and slope stabilization structure using said filling material
JP3048535B2 (en) Legal block
KR102335023B1 (en) pulling up device for restoration structure
KR102209904B1 (en) Anchorsocket height controlable support device and construction method thereof
JP2024121168A (en) Support device for retaining wall panels in slope stabilization retaining walls
JP2767372B2 (en) Slope stabilization method and concrete block used for it
KR102657300B1 (en) Panel type retaining wall construction method using color panel and retaining wall

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071120

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090929

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101116

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101213

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131217

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4649201

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees