JP4657020B2 - Elevator renewal construction method and wiring path connecting elevator control panel and hoistway - Google Patents
[go: Go Back, main page]

JP4657020B2 - Elevator renewal construction method and wiring path connecting elevator control panel and hoistway - Google Patents

Elevator renewal construction method and wiring path connecting elevator control panel and hoistway Download PDF

Info

Publication number
JP4657020B2
JP4657020B2 JP2005175318A JP2005175318A JP4657020B2 JP 4657020 B2 JP4657020 B2 JP 4657020B2 JP 2005175318 A JP2005175318 A JP 2005175318A JP 2005175318 A JP2005175318 A JP 2005175318A JP 4657020 B2 JP4657020 B2 JP 4657020B2
Authority
JP
Japan
Prior art keywords
hoistway
control panel
guide sleeve
elevator
various
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005175318A
Other languages
Japanese (ja)
Other versions
JP2006347681A (en
Inventor
庸美 花田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2005175318A priority Critical patent/JP4657020B2/en
Publication of JP2006347681A publication Critical patent/JP2006347681A/en
Application granted granted Critical
Publication of JP4657020B2 publication Critical patent/JP4657020B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

本発明は、エレベータリニューアル工事方法及びエレベータの制御盤と昇降路とを接続する配線路に係り、特に、エレベータのリニューアルに伴い、機械室の制御盤を更新し、更新された制御盤から昇降路に新しく各種配線を敷設するときのエレベータリニューアル工事方法及びエレベータの制御盤と昇降路とを接続する配線路に関する。   The present invention relates to an elevator renewal construction method and a wiring path that connects an elevator control panel and a hoistway, and in particular, as the elevator is renewed, the control panel of a machine room is updated and the hoistway is updated from the updated control panel. The present invention relates to an elevator renewal construction method when newly laying various wirings and a wiring path for connecting an elevator control panel and a hoistway.

ビル等の建物の中に設置されているエレベータの機種等をリニューアル、すなわち更新する場合には、通常、エレベータのかごが昇降する昇降路をそのまま使用し、かごを含む昇降設備を更新する。これに伴い、制御盤も更新され、制御盤と、かご及び各階乗場の操作部とを接続する各種配線も更新される。例えば、10年、20年を経てエレベータ設備を更新するときは、各種配線の線材そのものが技術の進展に伴い大幅に異なっており、新しい性能の制御盤に使用される各種配線もそっくり入れ替えることが多い。例えば、以前は、バラバラ単線の集合であった各種配線を、今日では数10芯を1つのケーブルとしてまとめたものに入れ替えることが必要になる。   When renewing, that is, renewing, for example, an elevator model installed in a building such as a building, a hoistway in which the elevator car moves up and down is used as it is, and the lifting equipment including the car is updated. Along with this, the control panel is also updated, and various wirings connecting the control panel, the car, and the operation unit of each floor are also updated. For example, when an elevator installation is renewed after 10 or 20 years, the wiring material itself of the various wirings is significantly different with the progress of technology, and various wirings used in the control panel with new performance may be completely replaced. Many. For example, it is necessary to replace various wirings, which used to be a set of disjoint single wires, with a single cable that is composed of several tens of cores.

通常、エレベータの制御盤は、昇降路の最上部又は最下部に設けられる機械室に設置される。そして、制御盤からの各種配線を、かご及び各階乗場の操作部に接続するためには、建物内を上下に貫く空間である昇降路が用いられる。そして、制御盤から各種配線を昇降路内に通すために、機械室の床、又は天井、又は壁に通し口が設けられる。したがって、制御盤からの各種配線は、制御盤から機械室の床等に通し口に向かって敷設され通し口から昇降路内に入る。機械室の床等に敷設された各種配線は、保護のため、適当な埋設材を用いて床と一体となるように埋め込まれる。また、昇降路内の各種配線は、適当なダクト等を用いてその中に収納され、かごや各階操作部等に分岐配線される。   Usually, the control panel of an elevator is installed in the machine room provided in the uppermost part or the lowest part of a hoistway. And in order to connect the various wirings from the control panel to the car and the operation section of each floor landing, a hoistway that is a space penetrating the building up and down is used. And in order to let various wiring from a control panel pass in a hoistway, a through-hole is provided in the floor of a machine room, a ceiling, or a wall. Therefore, various wirings from the control panel are laid from the control panel to the floor of the machine room toward the opening and enter the hoistway from the opening. Various wirings laid on the floor or the like of the machine room are embedded so as to be integrated with the floor using an appropriate burying material for protection. Various wirings in the hoistway are housed in an appropriate duct or the like, and branched and wired to a car, each floor operation unit, or the like.

ここでエレベータ設備のリニューアルを行う場合には、上記のように制御盤も各種配線も更新されるので、これら新しい仕様の各種配線を改めて新しい制御盤から昇降路に通すことが必要になる。今までの各種配線は、上記のように機械室の床に埋設され、昇降路の中では今までの各種配線に合わせたダクト等の中を通るので、それらをそのまま転用することができない。したがって、改めて、新しい仕様の各種配線のために、機械室の床等に新たに通し穴を設ける工事等が行われる。   Here, when the elevator facility is renewed, the control panel and various wirings are updated as described above, and therefore, it is necessary to pass these various new wirings through the new control panel to the hoistway. Various wirings up to now are buried in the floor of the machine room as described above, and pass through ducts or the like that match the various wirings so far in the hoistway, so that they cannot be diverted as they are. Therefore, construction for newly providing a through hole on the floor of the machine room or the like is newly performed for various types of wiring with new specifications.

このように、従来のエレベータリニューアル工事は、新しい各種配線を敷設するために、機械室の床等に新たに昇降路に通じる通し穴を設けることが行われる。この場合、床等のハツリ作業や、穴開けのための振動ドリル等の装置を用いるので、すでに使用されている建物に振動や騒音等を与える。また、機械室の床等には、リニューアル工事に関係のないその他の電気配線や、場合によっては水道、ガス等の配管が埋設されていることもあるので、事前の検査は必要で、また工事にはそれらを損傷しないように注意が必要である。   As described above, in the conventional elevator renewal work, in order to lay various new wirings, a new through hole leading to the hoistway is provided in the floor of the machine room or the like. In this case, since a device such as a chipping work for a floor or a vibration drill for drilling is used, vibration or noise is given to an already used building. In addition, other electrical wiring not related to the renewal work, as well as pipes such as water and gas, may be embedded in the floor of the machine room, etc. Care must be taken not to damage them.

したがって、従来技術によるエレベータリニューアル工事は、各種配線の敷設のために、昇降路に通じる通し穴を開ける等のかなりの工事が必要である。   Therefore, the elevator renewal work according to the prior art requires considerable work such as opening a through hole leading to the hoistway for laying various wirings.

本発明の目的は、特別な穴開け工事を不要とするエレベータリニューアル工事方法及びエレベータの制御盤と昇降路とを接続する配線路を提供することである。   An object of the present invention is to provide an elevator renewal construction method that eliminates the need for special drilling work and a wiring path that connects an elevator control panel and a hoistway.

本発明に係るエレベータリニューアル工事方法は、エレベータのリニューアルに伴い、機械室の制御盤を更新し、更新された制御盤から昇降路に新しく各種配線を敷設する工事方法であって、既に設置されている制御盤から既設の各種配線を昇降路内に通すために機械室に設けられている通し口において、各種配線を通すために通し口から昇降路内に延びて設けられている案内スリーブと、案内スリーブの管部分の外形よりも大きい開口を有し昇降路に沿って設けられ、案内スリーブの管部分の下部が中に通される昇降路信号線ダクトとのうち、案内スリーブを昇降路側の導入部で切断する切断工程と、通し口に残っている案内スリーブの部分を除去する除去工程と、新しい各種配線を通す際の保護スリーブであって、昇降路信号線ダクトと干渉しない長さを有する保護スリーブを通し口に設置する設置工程と、更新された制御盤から通し口の保護スリーブを介して新しい各種配線を昇降路信号線ダクトに入らないように、かつ、その外側に垂れるようして昇降路内に敷設する敷設工程と、を含むことを特徴とする。 The elevator renewal construction method according to the present invention is a construction method in which the control panel of the machine room is updated in accordance with the renewal of the elevator, and various wirings are newly laid from the updated control panel to the hoistway. A guide sleeve provided in the machine room for passing various existing wires from the control panel to the inside of the hoistway, and extending from the through hole to the hoistway for passing various wires ; Of the hoistway signal line duct having an opening larger than the outer shape of the pipe portion of the guide sleeve and provided along the hoistway, and passing through the lower portion of the pipe portion of the guide sleeve, the guide sleeve is disposed on the hoistway side. a cutting step of cutting in the introduction, the removal step of removing a portion of the guide sleeve remaining in through opening, a protective sleeve when passing the new various wirings, and the hoistway signal line duct An installation step of installing a port through a protective sleeve having a length that does not negotiations, a new variety of wiring through the protection sleeve opening through the updated control panel that turning hoistway signal line duct, and that And a laying step of laying in the hoistway so as to hang outward .

また、敷設工程は、更新された制御盤から通し口の保護スリーブまで、保護ダクトを設け、その中に各種配線を敷設することが好ましい。   In the laying step, it is preferable that a protective duct is provided from the updated control panel to the protective sleeve of the through hole, and various wirings are laid therein.

また、本発明に係るエレベータの制御盤と昇降路とを接続する配線路は、エレベータのリニューアルに伴い、機械室の制御盤を更新し、更新された制御盤から昇降路に向けて敷設される新しい各種配線のための配線路であって、既に設置されている制御盤からの既設の各種配線を昇降路内に通すために機械室に設けられている通し口を用い、各種配線を通すために通し口から昇降路内に延びて設けられている案内スリーブと、案内スリーブの管部分の外形よりも大きい開口を有し昇降路に沿って設けられ、案内スリーブの管部分の下部が中に通される昇降路信号線ダクトとのうち、案内スリーブを昇降路側の導入部で切断し、通し口に残っている案内スリーブの部分を除去して、新しい各種配線を通す際の保護スリーブであって、昇降路信号線ダクトと干渉しない長さを有し、新しい各種配線を昇降路信号線ダクトに入らないように、かつ、その外側に垂れるようして昇降路内に敷設するための保護スリーブが設置された通し口と、更新された制御盤から通し口の保護スリーブまで、各種配線をその中に通す機械室の床の上に設けられた保護ダクトと、を備えることを特徴とする。
In addition, the wiring path that connects the elevator control panel and the hoistway according to the present invention is updated from the updated control panel toward the hoistway with the renewal of the elevator. This is a new wiring route for various wirings, and uses the through holes provided in the machine room to pass the various existing wirings from the already installed control panel through the hoistway and to pass various wirings. A guide sleeve that extends from the through hole into the hoistway, and an opening that is larger than the outer shape of the tube portion of the guide sleeve and that is provided along the hoistway. of the hoistway signal line duct is passed, the guide sleeve is cut in the introduction of the hoistway, by removing the portion of the guide sleeve remaining in through opening, encounters protective sleeve when passing the new various wires Hoistway signal Has a length that does not interfere with the duct, the new various wiring that turning hoistway signal line duct, and through opening the protective sleeve for installation in so hanging on the outside in the hoistway is installed And a protective duct provided on the floor of the machine room through which various wires pass from the updated control panel to the protective sleeve of the through hole.

上記構成により、従来からある通し口から昇降路内に延びて設けられている案内スリーブを昇降路側の導入部で切断し、そこで通し口に残っている案内スリーブの部分を除去し、代わって新しく保護スリーブを通し口に設置し、これを介して新しい各種配線を昇降路内に敷設する。このように従来からある通し口を利用するので、制御盤から昇降路に各種配線を通すのに、特別な穴開け工事が不要となる。   With the above configuration, the guide sleeve provided to extend into the hoistway from the conventional through hole is cut at the introduction part on the hoistway side, and the portion of the guide sleeve remaining in the through hole is removed there. A protective sleeve is installed in the through-hole, and various new wirings are laid in the hoistway through this. Thus, since a conventional through hole is used, no special drilling work is required to pass various wires from the control panel to the hoistway.

また、新しい制御盤から通し口の保護スリーブまでは、保護ダクトを設けて、その中に各種配線を敷設するので、従来の各種配線を掘り出したりせず、簡便に新しい各種配線を敷設することができる。   In addition, since a protective duct is provided from the new control panel to the protective sleeve of the through-hole, and various wirings are laid therein, it is possible to easily lay various new wirings without digging up the conventional various wirings. it can.

以下に図面を用いて本発明に係る実施の形態につき詳細に説明する。以下において、エレベータ設備の制御盤が配置される機械室は、昇降路の上、すなわち、エレベータが昇降する最上階のその天井の上にあるものとして説明するが、建物のこれ以外の場所に機械室が設けられていてもよい。例えば、昇降路の下、エレベータが昇降する最下階のその床の下にあるものとしてもよく、あるいは、昇降路の上下でない場所であってもよい。これらの場合、制御盤からの各種配線を昇降路に通す通し穴は、機械室の床でなく、その天井、あるいは壁に設けることができる。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following description, the machine room in which the control panel of the elevator equipment is arranged is described as being on the hoistway, that is, on the ceiling of the uppermost floor where the elevator moves up and down. A chamber may be provided. For example, it may be below the hoistway and below the floor of the lowest floor where the elevator goes up or down, or may be a place that is not above or below the hoistway. In these cases, the through holes through which various wires from the control panel pass through the hoistway can be provided not on the floor of the machine room but on the ceiling or wall.

図1は、エレベータリニューアル工事前後の各種配線の配線路の様子を示す図である。ここで、図1において、(a),(b)はエレベータリニューアル工事前の配線路30、(c),(d)はエレベータリニューアル工事後の配線路60をそれぞれ示す。また、これらの図のうち、(a),(c)は、それぞれの昇降路10に沿った縦方向の建物断面図で、(b),(d)は、それぞれの機械室12の平面図である。なお、図1(a)は、配線路30に関して、図1(b)に示すA−A線における断面図を示し、図1(c)は、配線路60に関して、図1(d)に示すC−C線における断面図を示している。   FIG. 1 is a diagram illustrating the state of various wiring paths before and after the elevator renewal work. Here, in FIG. 1, (a) and (b) show the wiring path 30 before the elevator renewal work, and (c) and (d) show the wiring path 60 after the elevator renewal work, respectively. Of these drawings, (a) and (c) are longitudinal sectional views of the building along the hoistway 10, and (b) and (d) are plan views of the respective machine rooms 12. It is. 1A shows a cross-sectional view taken along line AA shown in FIG. 1B with respect to the wiring path 30, and FIG. 1C shows the wiring path 60 shown in FIG. A sectional view taken along line CC is shown.

最初にエレベータリニューアル工事前の配線路30を説明し、次いでこれと比較しながらエレベータリニューアル工事後の配線路60を説明し、その後にエレベータリニューアル工事方法の詳細な手順とその内容を述べる。   First, the wiring path 30 before the elevator renewal work will be described, and then the wiring path 60 after the elevator renewal work will be described while comparing with this, and then the detailed procedure and contents of the elevator renewal work method will be described.

図1(a),(b)は、エレベータリニューアル工事前の配線路30、すなわち、今までに敷設されている配線路30の状態を示す図である。建物の中に上下に貫通して設けられるエレベータ用昇降路10の上部には、エレベータを運行するための設備が配置される機械室12が設けられる。したがって、機械室12の床14はまた昇降路10の天井でもある。昇降路10には、メインロープによって支持されるかご16が設置され、かご16は、メインロープの駆動に伴い、各階乗場18のところに停止しながら昇降する。各階乗場18には、かご16の停止を要求する操作盤20が設けられる。一方、機械室12にはメインロープを駆動する図示されていない駆動モータが設置され、また、エレベータ設備全体の運行を制御する制御盤32等が配置される。   FIGS. 1A and 1B are diagrams showing a state of the wiring path 30 before the elevator renewal work, that is, the wiring path 30 laid so far. A machine room 12 in which equipment for operating the elevator is arranged is provided at the upper part of the elevator hoistway 10 provided vertically through the building. Accordingly, the floor 14 of the machine room 12 is also the ceiling of the hoistway 10. A car 16 supported by a main rope is installed in the hoistway 10, and the car 16 ascends and descends while stopping at each floor landing 18 as the main rope is driven. Each floor hall 18 is provided with an operation panel 20 that requests the car 16 to stop. On the other hand, a drive motor (not shown) for driving the main rope is installed in the machine room 12, and a control panel 32 and the like for controlling the operation of the entire elevator facility are arranged.

配線路一般は、制御盤32から、駆動モータを含むエレベータ設備の各要素に電気信号等を伝達するための各種配線を敷設したものである。図1においては、制御盤32と接続される各種配線のうち、昇降路10を経由する各種配線34に関する配線路30のみが図示されている。この各種配線34は、制御盤32とかご16との間を接続するものと、制御盤32と各階乗場18の操作盤20との間を接続するものとを含む。各種配線34は、今までのエレベータの設置時期にもよるが、例えば1980年代以前の設置の場合、単芯の被覆導線の集合で、その芯線数は100本以上の場合がある。   In general, the wiring path is constructed by laying various wirings for transmitting an electrical signal or the like from the control panel 32 to each element of the elevator equipment including the drive motor. In FIG. 1, only the wiring path 30 related to the various wirings 34 passing through the hoistway 10 among the various wirings connected to the control panel 32 is illustrated. The various wirings 34 include a connection between the control panel 32 and the car 16 and a connection between the control panel 32 and the operation panel 20 of each floor hall 18. The various wirings 34 depend on the installation time of the elevator so far, but in the case of installation before the 1980s, for example, there are cases where the number of core wires is 100 or more in a set of single-core coated conductors.

配線路30は、各種配線34を機械室12の制御盤32から昇降路10のかご16、各階乗場18の操作盤20へ接続するために、(制御盤32)−埋設管48−通し口40−案内スリーブ44−昇降路信号線ダクト46−(かご16、操作盤20)の順に各要素が設けられる。   The wiring path 30 is connected to the control panel 32 of the machine room 12 from the control panel 32 of the machine room 12 to the car 16 of the hoistway 10 and the operation panel 20 of each floor landing 18 (control panel 32) -buried pipe 48-through port 40. Each element is provided in the order of the guide sleeve 44, the hoistway signal line duct 46 (the car 16, the operation panel 20).

埋設管48は、各種配線34を内部に収容する保護管である。埋設管48は、たとえば内径60mm、外径100mm程度の金属管あるいは剛性のあるプラスチック管を用いることができる。埋設管48の敷設は具体的には次のように行われる。すなわち、制御盤32からの各種配線34を埋設管48の内径に通して機械室12の床14に配置し、その上からモルタル等の適当な埋設材で覆い、機械室12の床を平らにする。埋設管48を覆う埋設材の厚みは、最も薄いところで例えば3mm程度でよい。   The buried pipe 48 is a protective pipe that accommodates various wirings 34 therein. As the buried pipe 48, for example, a metal pipe having an inner diameter of 60 mm and an outer diameter of about 100 mm or a rigid plastic pipe can be used. Specifically, the buried pipe 48 is laid out as follows. That is, various wirings 34 from the control panel 32 are placed on the floor 14 of the machine room 12 through the inner diameter of the buried pipe 48, covered with an appropriate buried material such as mortar from above, and the floor of the machine room 12 is flattened. To do. The thickness of the buried material covering the buried pipe 48 may be, for example, about 3 mm at the thinnest place.

通し口40は、機械室12の床14に昇降路10に向かって開けられた開口である。通し口40は、機械室12において埋設管48を通ってきた各種配線34を昇降路10に向かって通す機能を有する配線通路である。この通し口40は、建物にエレベータ設備を設置する際に開けられる。すなわち、通常は、建物が建てられるときに、そのように設計されて開口が設けられる。通し口40の大きさは、一例を挙げると100mm角程度である。   The through hole 40 is an opening that is opened in the floor 14 of the machine room 12 toward the hoistway 10. The through hole 40 is a wiring passage having a function of passing various wirings 34 that have passed through the buried pipe 48 in the machine room 12 toward the hoistway 10. The through hole 40 is opened when an elevator facility is installed in a building. That is, normally, when a building is built, it is designed and provided with an opening. For example, the size of the through hole 40 is about 100 mm square.

通し口40には、ケース42と蓋50が設けられる。ケース42は、蓋50で覆われる上部開口を有し、底部の中央にも上部開口より小さな開口を有する部材で、通し口40にはめ込まれる通し部材である。ケース42の側面には埋設管48を通ってくる各種配線34を導入する配線口が設けられる。蓋50は、ケース42の上部開口を覆う部材で、これを開けることで通し口40の中における各種配線34の様子を調べることができ、これを閉じることで通し口40をふさいで、不要のものが通し口40に混入することを防ぐ機能を有する。かかるケース42、蓋50は適当な金属板材を加工して得ることができ、あるいはまた、適当なプラスチック材料を成形したものを用いることができる。   The through hole 40 is provided with a case 42 and a lid 50. The case 42 is a member that has an upper opening that is covered with the lid 50, has an opening that is smaller than the upper opening at the center of the bottom, and is a through member that fits into the through hole 40. On the side surface of the case 42, a wiring port for introducing various wirings 34 passing through the buried pipe 48 is provided. The lid 50 is a member that covers the upper opening of the case 42. By opening the lid 50, the state of various wirings 34 in the through hole 40 can be examined. By closing this, the through hole 40 is blocked, which is unnecessary. It has a function to prevent things from being mixed into the through hole 40. The case 42 and the lid 50 can be obtained by processing an appropriate metal plate material, or can be obtained by molding an appropriate plastic material.

案内スリーブ44は、ケース42の底部にはめ込まれ、各種配線34を昇降路10側に通す案内を行う機能を有するフランジ付管部材である。ケース42の底部における開口の大きさに対し、案内スリーブ44の管部分の外形はそれより小さく、案内スリーブ44のフランジ部分の外形はそれより大きい。したがって、案内スリーブ44は、ケース42の底部にフランジ部分が支持され、管部分が昇降路10のほうに延びるように配置される。ケース42の側面から導入された各種配線34は、案内スリーブ44の内径を通って、案内スリーブ44に案内されて通し口40を昇降路10の方に導かれる。かかる案内スリーブ44は適当な金属板材を加工して得ることができ、あるいはまた、適当なプラスチック材料を成形したものを用いることができる。   The guide sleeve 44 is a flanged pipe member that is fitted into the bottom of the case 42 and has a function of guiding various wires 34 to the hoistway 10 side. The outer shape of the tube portion of the guide sleeve 44 is smaller than the size of the opening at the bottom of the case 42, and the outer shape of the flange portion of the guide sleeve 44 is larger. Therefore, the guide sleeve 44 is disposed so that the flange portion is supported on the bottom of the case 42 and the tube portion extends toward the hoistway 10. Various wires 34 introduced from the side surface of the case 42 pass through the inner diameter of the guide sleeve 44 and are guided by the guide sleeve 44 to guide the through hole 40 toward the hoistway 10. The guide sleeve 44 can be obtained by processing an appropriate metal plate, or can be formed by molding an appropriate plastic material.

昇降路信号線ダクト46は、昇降路10に沿って設けられ、その内部に各種配線34を通し、必要な位置で外部の方、すなわち昇降路10の方へ分岐して出す筒状部材である。昇降路信号線ダクト46の上部開口の大きさは案内スリーブ44の管部分の外形より大きく設定され、そこで案内スリーブ44の管部分の下部は、昇降路信号線ダクト46の中に通される。これにより、案内スリーブ44の内径を通って案内されてきた各種配線34は、昇降路信号線ダクト46の中に導かれ、適当な位置で分岐し、かご16、及び各階乗場18の操作盤20にそれぞれ接続される。かかる昇降路信号線ダクト46は、適当な金属板材を板金加工して得ることができ、あるいはまた、適当なプラスチック材料を成形したものを用いることができる。   The hoistway signal line duct 46 is a cylindrical member that is provided along the hoistway 10, passes various wirings 34 in the hoistway 10, and branches out toward the outside, that is, the hoistway 10 at a necessary position. . The size of the upper opening of the hoistway signal line duct 46 is set larger than the outer shape of the pipe portion of the guide sleeve 44, and the lower portion of the pipe portion of the guide sleeve 44 is passed through the hoistway signal line duct 46. As a result, the various wires 34 guided through the inner diameter of the guide sleeve 44 are guided into the hoistway signal line duct 46 and branched at an appropriate position, and the car 16 and the operation panel 20 of each floor landing 18. Connected to each. The hoistway signal line duct 46 can be obtained by sheet metal processing of an appropriate metal plate material, or can be obtained by molding an appropriate plastic material.

このようにして、エレベータリニューアル工事前の配線路30は、制御盤32から、機械室12の床14に埋設材で覆われて敷設された埋設管48の中を通り、通し口40のケース42の側面導入口からケース42と蓋50で区画される空間に入り、そこから案内スリーブ44の内径を通って昇降路10に配置される昇降路信号線ダクト46の中に導かれる。すなわち、各種配線34は、これらの配線保護部材に保護されて、制御盤32から昇降路10の方へ敷設されている。   In this way, the wiring path 30 before the elevator renewal work passes from the control panel 32 through the buried pipe 48 that is covered with the buried material on the floor 14 of the machine room 12 and passes through the case 42 of the through hole 40. Enters the space defined by the case 42 and the lid 50 from the side inlet, and is guided through the inner diameter of the guide sleeve 44 into the hoistway signal line duct 46 disposed in the hoistway 10. That is, the various wirings 34 are laid from the control panel 32 toward the hoistway 10 while being protected by these wiring protection members.

次に、エレベータリニューアル工事後の配線路60について説明する。ここで、エレベータリニューアル工事前の配線路30と同じ要素については同一の符号を付し、詳細な説明を省略する。エレベータリニューアルにおいて、ここでは新しく制御盤62が更新される。また、それに伴い、各種配線64も新しい構成で更新される。例えば、新しい各種配線64は、36芯の信号線を1本にまとめた36芯ケーブル、44芯の信号線を1本にまとめた44芯ケーブル、60芯の信号線を1本にまとめた60芯ケーブル等で構成される。光ファイバケーブルを含んでもよい。したがって、新しい配線路60は、基本的にはケーブルを敷設したものであり、従来の100本以上にも上る単芯線の集合である配線路30に比較して扱いやすくなっている。   Next, the wiring path 60 after the elevator renewal work will be described. Here, the same elements as those of the wiring path 30 before the elevator renewal work are denoted by the same reference numerals, and detailed description thereof is omitted. In the elevator renewal, the control panel 62 is newly updated here. Accordingly, various wirings 64 are also updated with a new configuration. For example, the new various wirings 64 are a 36-core cable that combines 36-core signal lines into one, a 44-core cable that combines 44-core signal lines into one, and a 60-core signal line that is combined into one 60 Consists of a core cable or the like. An optical fiber cable may be included. Therefore, the new wiring path 60 is basically a cable laid, and is easier to handle than the conventional wiring path 30 which is a set of more than 100 single core wires.

配線路60は、各種配線64を機械室12の制御盤62から昇降路10のかご16、各階乗場18の操作盤20へ接続するために、(制御盤62)−機械室ダクト68−通し口40−保護スリーブ66−(かご16、操作盤20)の順に各要素が設けられる。ここで、通し口40は、ケース42、蓋50は元のままであるが、案内スリーブ44の代わりに保護スリーブ66が用いられる。   The wiring path 60 is connected to the control panel 62 of the machine room 12 from the control panel 62 of the machine room 12 to the car 16 of the hoistway 10 and the operation panel 20 of each floor landing 18 (control panel 62) -machine room duct 68-through port. Each element is provided in the order of 40-protection sleeve 66- (car 16, operation panel 20). Here, the case 42 and the lid 50 remain unchanged, but the protective sleeve 66 is used instead of the guide sleeve 44.

機械室ダクト68は、各種配線64を内部に収容する保護ダクトである。機械室ダクト68は、従来からある埋設管48とは別に機械室12の床14の上に配置される。機械室ダクト68の敷設は具体的には次のように行われる。すなわち、制御盤62からの各種配線64を機械室12の床14に配置し、その上を覆うようにして機械室ダクト68をかぶせる。これにより、制御盤62からの各種配線64は、機械室ダクト68に保護され、その中を通って、ケース42の側面の導入口からケース42と蓋50によって区画される空間に導かれる。かかる機械室ダクト68は適当な金属板材を板金加工して得ることができ、あるいはまた、適当なプラスチック材料を成形したものを用いることができる。   The machine room duct 68 is a protective duct that houses various wirings 64 therein. The machine room duct 68 is disposed on the floor 14 of the machine room 12 separately from the conventional buried pipe 48. Specifically, the machine room duct 68 is laid out as follows. That is, various wirings 64 from the control panel 62 are arranged on the floor 14 of the machine room 12 and covered with the machine room duct 68 so as to cover it. As a result, the various wirings 64 from the control panel 62 are protected by the machine room duct 68, passed through the duct 64, and led from the introduction port on the side surface of the case 42 to the space defined by the case 42 and the lid 50. The machine room duct 68 can be obtained by sheet metal processing of an appropriate metal plate material, or can be obtained by molding an appropriate plastic material.

保護スリーブ66は、ケース42の底部にはめ込まれ、各種配線34を保護して昇降路10側に通す機能を有するフランジ付すそ広がり管部材である。すなわち、管部分の一方側は、ケース42の底部開口より大きな外形を有するフランジ部分で、他方側は、すそ広がりとなる外形を有する。保護スリーブ66は、従来からある昇降路信号線ダクト46と干渉しない長さを有する。したがって、保護スリーブ66は昇降路信号線ダクト46の中に入り込まないように配置される。かかる保護スリーブ66は適当なプラスチック材料を成形して得ることができ、あるいは、金属材料を成形したものを用いてもよい。   The protective sleeve 66 is a flanged tube member fitted to the bottom of the case 42 and having a function of protecting the various wires 34 and passing them through the hoistway 10 side. That is, one side of the tube portion is a flange portion having an outer shape larger than the bottom opening of the case 42, and the other side has an outer shape that spreads out. The protective sleeve 66 has a length that does not interfere with the conventional hoistway signal line duct 46. Therefore, the protective sleeve 66 is arranged so as not to enter the hoistway signal line duct 46. The protective sleeve 66 can be obtained by molding a suitable plastic material, or a molded metal material may be used.

このようにして、エレベータリニューアル工事後の配線路60は、制御盤62から、機械室12の床14に設けられる機械室ダクト68の中を通り、通し口40のケース42の側面導入口からケース42と蓋50で区画される空間に入り、そこから保護スリーブ66の内径を通って昇降路10に導かれる。保護スリーブ66のすそ広がり部分から出た各種配線64は、実際には数本のケーブルであるので、特にダクト等の保護も要せず、適当な位置で分岐し、かご16、及び各階乗場18の操作盤20にそれぞれ接続される。   Thus, the wiring path 60 after the elevator renewal work passes from the control panel 62 through the machine room duct 68 provided on the floor 14 of the machine room 12, and from the side inlet of the case 42 of the through hole 40 to the case. 42 enters the space defined by 42 and the lid 50, and is led to the hoistway 10 from there through the inner diameter of the protective sleeve 66. Since the various wires 64 coming out from the flared portion of the protective sleeve 66 are actually several cables, they do not particularly require protection of ducts and the like, branch off at an appropriate position, and the car 16 and each floor landing 18. Are connected to the operation panel 20, respectively.

上記構成の構造におけるエレベータ設備において、エレベータリニューアルのために新しく配線路60を敷設するエレベータリニューアル工事の手順につき、以下に詳細に説明する。図2はエレベータリニューアル工事の手順を示すフローチャートであり、図3から図7は、各手順における通し口40付近の構造の様子を示す図である。エレベータリニューアル工事には、かごを含む昇降設備の更新と、制御盤の更新と、これに伴う各種配線の更新が含まれるが、ここでは主に各種配線の更新敷設工事について説明する。制御盤の更新設置は、各種配線の敷設の前、あるいは後に行ってもよく、また、かごを含む昇降設備の更新を最初に行ってもよく、最後に行ってもよい。これらの更新工事の順序は、建物の状況、更新される内容に応じて適宜変更してもよい。   In the elevator facility having the above-described structure, the procedure of the elevator renewal work for newly laying the wiring path 60 for the elevator renewal will be described in detail below. FIG. 2 is a flowchart showing the procedure of the elevator renewal work, and FIGS. 3 to 7 are views showing the structure in the vicinity of the through hole 40 in each procedure. Elevator renewal work includes upgrade of elevator equipment including a car, update of control panel, and update of various wiring associated therewith. Here, update wiring construction of various wiring will be mainly described. The update installation of the control panel may be performed before or after the laying of various wirings, or the lifting equipment including the car may be updated first or last. The order of these renewal works may be changed as appropriate according to the building situation and the content to be updated.

エレベータリニューアルに伴う各種配線の更新敷設は、従来からあるエレベータ設備の運転を全部停止し、電源等の供給を全部切断して行われる。そして、まず案内スリーブ44を切断する(S10)。具体的には、昇降路10の天井部、すなわち機械室12の床14の裏側である昇降路10側のところで、案内スリーブ44を切断する。切断個所は、案内スリーブ44が昇降路信号線ダクト46に差し込まれる手前で、できるだけ昇降路10の天井部に近いところが望ましい。   The renewal laying of various wirings associated with the renewal of the elevator is performed by stopping the operation of the conventional elevator equipment and disconnecting all the supplies of power and the like. First, the guide sleeve 44 is cut (S10). Specifically, the guide sleeve 44 is cut at a ceiling portion of the hoistway 10, that is, at the hoistway 10 side that is the back side of the floor 14 of the machine room 12. It is desirable that the cut portion be as close to the ceiling portion of the hoistway 10 as possible before the guide sleeve 44 is inserted into the hoistway signal line duct 46.

その様子を図3に示す。ここでは、回転丸のこぎり装置70で、案内スリーブ44を側面から切断する様子が示される。回転丸のこぎり装置70は、円盤の外周にダイヤモンド刃が設けられるカッタを高速回転させるものを用いることができる。上記の寸法例の場合は、直径が例えば180mm程度のカッタを有する回転丸のこぎり装置70を用いることができる。好ましくは吸塵機能を有するものがよい。上記の寸法、材質の案内スリーブ44の場合、数10秒で、切断作業を終了させることができる。   This is shown in FIG. Here, a state in which the guide sleeve 44 is cut from the side surface by the rotary circular saw device 70 is shown. As the rotary circular saw device 70, a device that rotates a cutter provided with a diamond blade on the outer periphery of a disk at high speed can be used. In the case of the above dimension example, the rotating circular saw device 70 having a cutter with a diameter of, for example, about 180 mm can be used. Those having a dust absorbing function are preferable. In the case of the guide sleeve 44 having the above dimensions and materials, the cutting operation can be completed in several tens of seconds.

図3においては、従来の各種配線34が敷設されたまま、切断を行うものとしてある。切断後に昇降路信号線ダクト46内及び埋設管48内に残される各種配線34をそのままにしておくことができる場合は、このようにすることで作業効率が向上する。一方、昇降路信号線ダクト46内及び埋設管48内の各種配線34をきれいに除去する必要がある場合には、除去の手順等を考慮し、S10工程の前に、従来の各種配線34を別途切断等により除去しておいてもよい。   In FIG. 3, the cutting is performed while the conventional various wirings 34 are laid. When various wirings 34 left in the hoistway signal line duct 46 and the buried pipe 48 can be left as they are after cutting, the work efficiency is improved by doing so. On the other hand, when it is necessary to cleanly remove the various wirings 34 in the hoistway signal line duct 46 and the buried pipe 48, the conventional various wirings 34 are separately provided before the step S10 in consideration of the removal procedure. It may be removed by cutting or the like.

次に、案内スリーブ44を除去する(S12)。前の工程で、案内スリーブ44は2体に分離し、切断された下側の部分は、昇降路信号線ダクト46に予め固定されていない限り、自由落下する。したがって、ケース42の中に残っている部分の案内スリーブを除去する。   Next, the guide sleeve 44 is removed (S12). In the previous step, the guide sleeve 44 is separated into two bodies, and the cut lower portion is free-falling unless it is previously fixed to the hoistway signal line duct 46. Therefore, the guide sleeve remaining in the case 42 is removed.

図4は、切断によってケース42の中に残された案内スリーブ45の様子を示す。案内スリーブ45の除去は、蓋50を開けて、機械室12側から行う。この前に、少なくともケース42及び案内スリーブ45の中に残されている各種配線34も取り除かれる。各種配線34の取り除きは、元々ある制御盤32から各種配線34を取り外して自由端とし、ケース42側から引き抜いてもよい。これが面倒なときは、ケース42の側面導入口のところで適当な切断具によって各種配線を切断してもよい。各種配線34が取り除かれた後、案内スリーブ45のフランジ部分を上方に引き上げて、ケース42の底部開口から案内スリーブ45を引き抜いて除去する。図5は、残されていた案内スリーブ45と各種配線34とが取り除かれた様子を示す図である。   FIG. 4 shows the state of the guide sleeve 45 left in the case 42 by cutting. The guide sleeve 45 is removed from the machine room 12 side with the lid 50 opened. Prior to this, at least the various wires 34 remaining in the case 42 and the guide sleeve 45 are also removed. The various wirings 34 may be removed by removing the various wirings 34 from the original control panel 32 so as to be free ends and pulling them out from the case 42 side. When this is troublesome, various wirings may be cut with an appropriate cutting tool at the side surface inlet of the case 42. After the various wires 34 are removed, the flange portion of the guide sleeve 45 is pulled upward, and the guide sleeve 45 is pulled out from the bottom opening of the case 42 and removed. FIG. 5 is a diagram illustrating a state where the remaining guide sleeve 45 and various wirings 34 are removed.

次に保護スリーブ66を設置する(S14)。保護スリーブ66は、末広がり形状を有しているが、その曲率は、新しく敷設される各種配線64を構成するケーブルを傷つけずに案内するように滑らかな形状であるとともに、ケース42の底部開口に挿入できる形状に形作られる。挿入は、ケース42の上方、つまり機械室12側から、保護スリーブ66をやや傾けて末広がり形状の一部側からケース42の底部開口に差し込むようにしてもよい。図6はケース42の底部開口に保護スリーブ66が挿入されて設置された様子を示す図である。   Next, the protective sleeve 66 is installed (S14). The protective sleeve 66 has a divergent shape, and its curvature is smooth so as to guide the cables constituting the newly laid various wires 64 without damaging them, and at the bottom opening of the case 42. Shaped into a shape that can be inserted. For the insertion, the protective sleeve 66 may be slightly inclined from the upper side of the case 42, that is, from the machine chamber 12 side, and may be inserted into the bottom opening of the case 42 from a part of the divergent shape. FIG. 6 is a view showing a state where the protective sleeve 66 is inserted and installed in the bottom opening of the case 42.

そして、新しい各種配線64を敷設する(S16)。具体的には、各種配線64の一方端側を新しい制御盤62の接続部側に置き、機械室12の床14の上に配置する。そして、各種配線64の他方端側を保護スリーブ66の内径に挿入し、昇降路10側に垂らす。ここで、垂らした各種配線64は、元々ある昇降路信号線ダクト46の中に入らないように、その外側に垂れるようにする。その後、機械室ダクト68で、機械室12の床14の上に配置された各種配線64を覆う(S18)。その前後に、各種配線64の一方側端を新しい制御盤62に接続し、他方端をかご16及び各階乗場18の操作盤20にそれぞれ接続する。   Then, various new wirings 64 are laid (S16). Specifically, one end side of each wiring 64 is placed on the connection part side of the new control panel 62 and arranged on the floor 14 of the machine room 12. And the other end side of various wiring 64 is inserted in the internal diameter of the protection sleeve 66, and hangs down to the hoistway 10 side. Here, the various wirings 64 that are hung are hung outside the original hoistway signal line duct 46 so as not to enter the hoistway signal line duct 46. Thereafter, the machine room duct 68 covers the various wires 64 arranged on the floor 14 of the machine room 12 (S18). Before and after that, one end of each wiring 64 is connected to a new control panel 62, and the other end is connected to the car 16 and the operation panel 20 of each floor hall 18.

このようにして、エレベータリニューアルにおける新しい各種配線64の配線路60の敷設が行われ、制御盤62の更新、昇降設備の更新とともに、エレベータリニューアル工事が行われる。上記のように、このエレベータリニューアル工事において、現場加工工事は、簡単な切断装置を用いて案内スリーブ44を切断するだけの数十秒ですませることが可能である。したがって、機械室に改めて通し口を開ける特別な穴開け工事が不要となり、大掛かりな工事設備を要しない。また、工事期間も短縮でき、建物の使用上に与える影響も少なくすることができる。また、不要となる埋設管48、昇降路信号線ダクト46、あるいは残された従来の各種配線34等をそのままの状態にしておくことができ、余分の撤去工事を要せず、また外観を損なうことも少ない。   In this way, the wiring paths 60 of various new wirings 64 are laid in the elevator renewal, and the elevator renewal work is performed along with the update of the control panel 62 and the lifting equipment. As described above, in this elevator renewal work, the on-site working work can be completed in several tens of seconds just by cutting the guide sleeve 44 using a simple cutting device. This eliminates the need for special drilling work to open the opening to the machine room, and does not require large-scale construction facilities. In addition, the construction period can be shortened and the influence on the use of the building can be reduced. Further, unnecessary buried pipe 48, hoistway signal line duct 46, or remaining conventional wiring 34 can be left as they are, so that no extra removal work is required and the appearance is impaired. There are few things.

本発明に係る実施の形態において、エレベータリニューアル工事前後の各種配線の配線路の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the wiring path of various wiring before and after an elevator renewal construction. 本発明に係る実施の形態において、エレベータリニューアル工事の手順を示すフローチャートである。In embodiment which concerns on this invention, it is a flowchart which shows the procedure of the elevator renewal construction. 本発明に係る実施の形態において、案内スリーブ切断手順における通し口付近の構造の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the structure of the through-hole vicinity in the guide sleeve cutting | disconnection procedure. 本発明に係る実施の形態において、案内スリーブ切断後における通し口付近の構造の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the structure of the through-hole vicinity after a guide sleeve cutting | disconnection. 本発明に係る実施の形態において、案内スリーブ除去後における通し口付近の構造の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the structure of the through-hole vicinity after guide sleeve removal. 本発明に係る実施の形態において、保護スリーブ設置手順における通し口付近の構造の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the structure of the through-hole vicinity in the protection sleeve installation procedure. 本発明に係る実施の形態において、新しい各種配線敷設手順における通し口付近の構造の様子を示す図である。In embodiment which concerns on this invention, it is a figure which shows the mode of the structure of the through-hole vicinity in the new various wiring-laying procedure.

符号の説明Explanation of symbols

10 昇降路、12 機械室、14 床、18 各階乗場、20 操作盤、30 (従来の)配線路、32 (従来の)制御盤、34 (従来の)各種配線、40 通し口、42 ケース、44,45 案内スリーブ、46 昇降路信号線ダクト、48 埋設管、50 蓋、60 (新しい)配線路、62 (新しい)制御盤、64 (新しい)各種配線、66 保護スリーブ、68 機械室ダクト、70 回転丸のこぎり装置。   10 hoistway, 12 machine room, 14 floors, 18 floors, 20 operation panel, 30 (conventional) wiring path, 32 (conventional) control panel, 34 (conventional) various wiring, 40 through holes, 42 cases, 44, 45 Guide sleeve, 46 hoistway signal line duct, 48 buried pipe, 50 lid, 60 (new) wiring path, 62 (new) control panel, 64 (new) various wiring, 66 protective sleeve, 68 machine room duct, 70 Rotary round saw device.

Claims (3)

エレベータのリニューアルに伴い、機械室の制御盤を更新し、更新された制御盤から昇降路に新しく各種配線を敷設する工事方法であって、
既に設置されている制御盤から既設の各種配線を昇降路内に通すために機械室に設けられている通し口において、各種配線を通すために通し口から昇降路内に延びて設けられている案内スリーブと、案内スリーブの管部分の外形よりも大きい開口を有し昇降路に沿って設けられ、案内スリーブの管部分の下部が中に通される昇降路信号線ダクトとのうち、案内スリーブを昇降路側の導入部で切断する切断工程と、
通し口に残っている案内スリーブの部分を除去する除去工程と、
新しい各種配線を通す際の保護スリーブであって、昇降路信号線ダクトと干渉しない長さを有する保護スリーブを通し口に設置する設置工程と、
更新された制御盤から通し口の保護スリーブを介して新しい各種配線を昇降路信号線ダクトに入らないように、かつ、その外側に垂れるようして昇降路内に敷設する敷設工程と、
を含むことを特徴とするエレベータリニューアル工事方法。
With the renewal of the elevator, the machine room control panel is renewed, and various wirings are newly laid from the updated control panel to the hoistway.
In the through-hole provided in the machine room for passing various existing wiring from the control panel already installed in the hoistway, it is provided to extend from the through-hole to the hoistway for passing various wiring. A guide sleeve among a guide sleeve and a hoistway signal line duct having an opening larger than the outer shape of the pipe portion of the guide sleeve and provided along the hoistway and through which a lower portion of the pipe portion of the guide sleeve is passed. A cutting step of cutting at the introduction part on the hoistway side,
A removal step of removing a portion of the guide sleeve remaining in the through hole;
An installation process for installing a protective sleeve having a length that does not interfere with the hoistway signal line duct, which is a protective sleeve for passing various new wirings,
A laying step of laying in the hoistway so that various new wirings do not enter the hoistway signal line duct from the updated control panel via the protective sleeve of the through hole,
The elevator renewal construction method characterized by including.
請求項1に記載のエレベータリニューアル工事方法において、
敷設工程は、更新された制御盤から通し口の保護スリーブまで、保護ダクトを設け、その中に各種配線を敷設することを特徴とするエレベータリニューアル工事方法。
In the elevator renewal construction method according to claim 1,
The laying process is an elevator renewal construction method characterized in that a protective duct is provided from the updated control panel to the protective sleeve of the through hole, and various wirings are laid therein.
エレベータのリニューアルに伴い、機械室の制御盤を更新し、更新された制御盤から昇降路に向けて敷設される新しい各種配線のための配線路であって、
既に設置されている制御盤からの既設の各種配線を昇降路内に通すために機械室に設けられている通し口を用い、各種配線を通すために通し口から昇降路内に延びて設けられている案内スリーブと、案内スリーブの管部分の外形よりも大きい開口を有し昇降路に沿って設けられ、案内スリーブの管部分の下部が中に通される昇降路信号線ダクトとのうち、案内スリーブを昇降路側の導入部で切断し、通し口に残っている案内スリーブの部分を除去して、新しい各種配線を通す際の保護スリーブであって、昇降路信号線ダクトと干渉しない長さを有し、新しい各種配線を昇降路信号線ダクトに入らないように、かつ、その外側に垂れるようして昇降路内に敷設するための保護スリーブが設置された通し口と、
更新された制御盤から通し口の保護スリーブまで、各種配線をその中に通す機械室の床の上に設けられた保護ダクトと、
を備えることを特徴とするエレベータの制御盤と昇降路とを接続する配線路。
Along with the renewal of the elevator, the control panel of the machine room is updated, and a wiring path for various new wirings laid from the updated control panel toward the hoistway,
Use the through holes provided in the machine room to pass existing wiring from the control panel already installed in the hoistway, and extend from the through holes to the hoistway to pass various wires. A guide sleeve, and a hoistway signal line duct provided along the hoistway having an opening larger than the outer shape of the pipe portion of the guide sleeve, and passing through a lower portion of the pipe portion of the guide sleeve, Cut the guide sleeve at the introduction part on the hoistway side, remove the part of the guide sleeve remaining in the through hole, and pass the new wiring, and it is a protective sleeve that does not interfere with the hoistway signal line duct A through hole provided with a protective sleeve for laying in the hoistway so as not to enter the hoistway signal line duct and to hang outside the hoistway signal line duct ,
From the updated control panel to the protective sleeve of the through-hole, a protective duct provided on the floor of the machine room that passes various wires through it,
A wiring path for connecting an elevator control panel and a hoistway.
JP2005175318A 2005-06-15 2005-06-15 Elevator renewal construction method and wiring path connecting elevator control panel and hoistway Expired - Fee Related JP4657020B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005175318A JP4657020B2 (en) 2005-06-15 2005-06-15 Elevator renewal construction method and wiring path connecting elevator control panel and hoistway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005175318A JP4657020B2 (en) 2005-06-15 2005-06-15 Elevator renewal construction method and wiring path connecting elevator control panel and hoistway

Publications (2)

Publication Number Publication Date
JP2006347681A JP2006347681A (en) 2006-12-28
JP4657020B2 true JP4657020B2 (en) 2011-03-23

Family

ID=37643927

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005175318A Expired - Fee Related JP4657020B2 (en) 2005-06-15 2005-06-15 Elevator renewal construction method and wiring path connecting elevator control panel and hoistway

Country Status (1)

Country Link
JP (1) JP4657020B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016006033A1 (en) * 2014-07-08 2016-01-14 三菱電機株式会社 Wiring retainer and elevator control device using wiring retainer

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55113368U (en) * 1979-01-31 1980-08-09
JPH08245115A (en) * 1995-03-13 1996-09-24 Hitachi Building Syst Eng & Service Co Ltd Elevator cable laying method
JPH101273A (en) * 1996-06-14 1998-01-06 Hitachi Building Syst Co Ltd Elevator main rope duct
JP3179713B2 (en) * 1996-09-20 2001-06-25 株式会社日立ビルシステム Elevator renewal method
JPH10279234A (en) * 1997-04-07 1998-10-20 Mitsubishi Electric Corp Elevator machine cabling equipment
JP2000115950A (en) * 1998-10-08 2000-04-21 Hitachi Building Systems Co Ltd Duct for wiring in elevator tower

Also Published As

Publication number Publication date
JP2006347681A (en) 2006-12-28

Similar Documents

Publication Publication Date Title
JP5938250B2 (en) In-wall wiring method and jig
US6257808B1 (en) Wall fishing apparatus
JP4657020B2 (en) Elevator renewal construction method and wiring path connecting elevator control panel and hoistway
KR101520287B1 (en) Plumbing box for wires wiring
JPH0318569A (en) Control panel for elevator
KR101072185B1 (en) Light Weight Concrete Panel having Imbedded Electric Boxes, Runner Member for Installing Such Panel and Install Structure of such Panel
JP2003032836A (en) Wiring box installation method, wiring box and conduit, and wiring device
JP4682016B2 (en) Indoor external communication transmission line and integrated signal transmission system
JP3179713B2 (en) Elevator renewal method
JP4121526B2 (en) Optical cable with branch
JP3828919B2 (en) Laying optical transmission lines in buildings
JP5596529B2 (en) Reinforcing bar mounting structure
JP2008058766A (en) Laying method of in-building optical transmission line
US6781054B1 (en) Conduit and junction box guide
CN213185401U (en) Wire through-wall stay wire protection device
JP4289497B2 (en) Pull-up pipe end treatment article and cable laying method
JP2009061226A (en) Fire door
KR100449643B1 (en) Manhole
JP2884221B2 (en) A wall with an access door
JP3085930B2 (en) Building and building renovation methods
JPH0711757A (en) Building and building renovation method
JPH08245115A (en) Elevator cable laying method
JP2009134059A (en) Pipe member for laying optical fiber and optical fiber laying method
JP3967945B2 (en) Connection method and connection factory between optical submarine cable and submarine repeater
JP2019189364A (en) Renovating method of hydraulic elevator to non-hydraulic elevator and non-hydraulic elevator

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071101

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100825

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100831

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101001

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101214

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101221

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140107

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4657020

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees