JP4675449B2 - Structure of exposed column base - Google Patents
Structure of exposed column base Download PDFInfo
- Publication number
- JP4675449B2 JP4675449B2 JP2000093967A JP2000093967A JP4675449B2 JP 4675449 B2 JP4675449 B2 JP 4675449B2 JP 2000093967 A JP2000093967 A JP 2000093967A JP 2000093967 A JP2000093967 A JP 2000093967A JP 4675449 B2 JP4675449 B2 JP 4675449B2
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- foundation beam
- bar
- extra length
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Foundations (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、露出型柱脚の基礎部の構造に関する。
【0002】
【従来の技術】
図13は従来の露出型柱脚の基礎部の断面図である。従来の露出型柱脚における基礎部は、図13に示すように、柱型部5a、基礎梁部5b及び基礎部5に埋設されたアンカーボルト7とを有している。そして、鉄骨柱1の下端部に溶接されたベ−スプレート3をアンカーボルト7にナット締めすることにより、鉄骨柱1を柱型部5a上に固定している。
【0003】
鉄骨柱1に作用する力は、ベ−スプレート3を介してアンカーボルト7に引張力として伝達される。この引張力は基礎コンクリート5に定着されたアンカーボルト7を介して基礎部5に伝達される。そして、この伝達は、アンカーボルト7がアンボンドタイプの場合にはアンカーボルト7の下端部に取り付けられた定着板9を介して行われる。
【0004】
アンカーボルト7に引張力が作用した場合に、基礎部を構成するコンクリートの耐力が不十分な場合には、図13に破線で示すように、定着板9を起点として基礎コンクリート5が円錐状に割れる(これをコーン状破壊という)ことが知られている。
このコーン状破壊を防止して、アンカーボルト引張力を基礎部5で保持させる方法としては、現在、以下の2つの方法が知られている。
第1の方法は基礎部5を構成するコンクリート自体にコーン破壊耐力Taを確保する方法であり、基礎部5の面積を大きくとることで、コーン状破壊が起こらないようにするというものであり、具体的には以下のようにする。
【0005】
コーン破壊耐力Taは次式で求められる。
Ta = 0.6√Fc・Ac(短期設計時)
Ta = 0.8√Fc・Ac(終局設計時)
ここで、Fc:コンクリートの設計基準強度
Ac:コンクリートのコーン状破壊面の有効水平投影面積
【0006】
ここで、コーン状破壊面の有効水平投影面積とは、定着板9を頂点とする円錐の母線が基礎コンクリート部5の表面と交ってできる線で囲まれた部分の面積をいう。
この有効水平投影面積Acを模式的に示すと、隅柱では図14、側柱では図15、中柱では図16の斜線で示す部分になる。
【0007】
コーン状破壊を防止するには、アンカーボルトの引張力をTとすれば、Ta>Tを満たすように上式のAcを定める。
【0008】
コーン状破壊を防止する第2の方法は、基礎コンクリート部内に立上筋を必要量設置するというものである。
図17、図18は第2の方法の説明図であり、図17は隅柱の側面断面を、図18は平面断面をそれぞれ示している。
【0009】
この方法においては、アンカーボルト7の引張力を負担できる本数の立上筋11を定着板9の近傍に配置すると共に定着板9の上下に、それぞれ必要定着長さをとるようにしている。これによって、アンカーボルト7の引張力を立上筋11に伝達し、立上筋11に引張力を負担させるとともに立上筋11が引き抜かれないようにしている。
なお、立上筋11を囲むようにフープ筋15が設置されている。
【0010】
立上筋の引張耐力Ta’は次式で求められる。
Ta’= nF・A1(短期設計時)
Ta’= nF1.1A1(終局設計時)
ここで、n :定着板の近傍の立上筋の本数
F :立上筋の強度
A1:立上筋の断面積
【0011】
アンカーボルト7の引張力を負担できるようにするには、アンカーボルト7の引張力をTとすれば、Ta’>Tを満たすように上式のn(定着板の近傍の立上筋の本数)を決定すればよい。この例では、n=6に設定している。以下、n=6に設定することで、Ta’>Tを満たすことを確認する。
【0012】
なお、上記の例ではM27のアンカーボルトを4本用いたものであり、引張耐力は、
Ty=225.06kN(短期設計時)
Tu=280.76kN(終局設計時)
である。
また、立上筋としては、D19(SD345)を用いている。
【0013】
右曲げの場合には、図18に黒塗りで示した6本の立上筋が引張力に抵抗することになる。この6本の引張耐力をTa’とすれば、
Ta’=(6本)×(降伏耐力)×1.1×(立上筋の断面積)で求まり、具体的な数値を代入すると、
Ta’= 6×34.32×1.1×2.87=650.1kN
となる。
この値は、アンカーボルト7の引張耐力:2×280.76=561.52kNを上回っており、Ta’>Tを満たすことが確認された。
なお、逆に言えば、上記の従来例においては、アンカーボルトの引張耐力561.52kNを上回るにはアンカーボルトが片側に6本(合計で12本)必要な構造である。
【0014】
【発明が解決しようとする課題】
第1の方法ではコーン状破壊を起こさないように有効水平投影面積を確保しなければならず、基礎部が大きく、重くなるという問題がある。
また、第2の方法では立上筋の本数が多くなり(上記の例では12本)、配筋が煩雑になり配筋作業効率が悪くなるという問題がある。
本発明はかかる課題を解決するためになされたものであり、立上筋の本数を減らして配筋が容易な露出型柱脚の基礎部の構造を得ることを目的としている。
【0015】
【課題を解決するための手段】
本発明に係る隅柱又は側柱における露出型柱脚の基礎部の構造は、柱型部にアンカーボルト、アンカーボルトの下端部に設けられた定着板、及び立上筋を備え、基礎梁部に基礎梁上端筋、基礎梁下端筋及びスタラップ筋を備え、基礎梁上端筋及び基礎梁下端筋を柱型部まで延設した隅柱又は側柱における露出型柱脚の基礎部の構造において、露出型柱脚の基礎部における仮想的なコーン破壊面内に、立上筋、基礎梁上端筋の折曲後の余長部、基礎梁下端筋の折曲後の余長部、スタラップ筋をそれぞれ配置し、基礎梁上端筋の余長部を定着板よりも下部まで延出して配置し、基礎梁下端筋の余長部を定着板よりも上部まで延出して配置し、立上筋の断面積に基づいて求められる立上筋の引張耐力、定着板よりも下部に配置した基礎梁上端筋の余長部の付着力、定着板よりも上部に配置した基礎梁下端筋の余長部の付着力、及びスタラップ筋の断面積に基づいて求められるスタラップの引張耐力を算出し、立上筋の引張耐力、基礎梁上端筋の余長部の付着力、基礎梁下端筋の余長部の付着力、及びスタラップ筋の引張耐力の和がアンカーボルトの引張力よりも大きくなるように、コーン破壊面内に配置される立上筋の本数を決定したものである。
【0017】
【発明の実施の形態】
実施の形態1.
図1は本発明の一実施の形態の側面断面図、図2は平面断面図である。この例は、隅柱の基礎部の構造に関するものである。なお、図において、従来例を示した図17、図18と同一部分には同一の符号を付している。
この例は、250mm角の角形鋼管柱を、アンカーボルト4本で基礎部5に定着させるものである。
【0018】
具体的には、各定着板9の近傍に立上筋11を各1本ずつ合計4本配置すると共に、基礎梁部5bの上端筋17及び下端筋19の折曲後の余長部を定着板9のそれぞれ下側上側まで200mm延出させて配置している。さらに、基礎梁部5bのスタラップ筋21が露出型柱脚の基礎部における仮想的なコーン破壊面内に配置されている。ここに言う仮想的なコーン破壊面とは、図1で破線で示す部分であり、定着板9を頂点とする円錐形の側面のことをいう。
なお、立上筋11の下端部については、図面上記載を省略しているが、基礎梁部5b側に折曲して定着されている。そして、この点は以下の図3、図5、図7、図9、図11においても同様である。
【0019】
図3〜図6は本実施の形態の作用の説明図であり、図3、図4は右曲げの場合を、図5、図6は左曲げの場合をそれぞれ示している。
右曲げの場合には、図3、図4において黒く塗りつぶした立上筋11(2本)、基礎梁主筋17,19の折曲後の余長部17a,19a、スタラップ筋21(2本)が協同してアンカーボルト7の引張力:Tに抵抗する。
また、左曲げの場合は、図5、図6において黒く塗りつぶした立上筋11(2本)、スタラップ筋21(5本)が協同して、アンカーボルト7の引張力Tに抵抗する。
【0020】
次に、上記の構造において、実際に、立上筋11、基礎梁主筋17,19の折曲後の余長部17a,19a、スタラップ筋21によってアンカーボルト7の引張力に抵抗できるかどうかについて考察する。
【0021】
上記の例における具体的な仕様を次に示す。なお、従来例との比較を明確にするために、アンカーボルト7、立上筋11は従来例と同様のものを使用している。)
アンカーボルト7はネジ部がM27であり、その引張耐力は、
Ty=225.06kN(短期設計時)
Tu=280.76kN(終局設計時)
【0022】
立上筋11、スタラップ筋21、基礎梁主筋17,19、フープ筋15の各仕様は以下の通りである。
立上筋 :D19(SD345)
スタラップ筋:D13(SD295)
基礎梁主筋 :D25(SD345)
フープ筋 :D13(SD295)
フープ筋の間隔(図1のX):100mm
基礎梁主筋の間隔(図2のY):62mm
基礎梁主筋の最小かぶり厚さ(図2のZ):66.9mm
【0023】
上記の仕様を前提として、以下検討する。まず、右曲げについて検討する。
終局設計時のアンカーボルト7の耐力は、アンカーボルト7が片側に2本配置されているので、280.76×2=561.52kNとなる。
一方、右曲げの場合にアンカーボルト7の引張力に抵抗するのは、立上筋11(2本)、スタラップ筋21(2本)と、基礎梁主筋17,19の余長部17a,19a(3本)である。なお、基礎梁上端筋17及び基礎梁下端筋19の余長部17a,19a(図4において黒塗りしていない部分)についてもアンカーボルト7の引張力に抵抗することが考えられるが、この実施の形態においては安全側に考慮して、これらの余長部17a,19aの抵抗力については無視している。
そして、立上筋11は一般に全断面の引張力をカバ一できるだけの定着長さが確保されているので全断面の引張力を、基礎梁下端筋19は定着板9より上部の余長部19aにおける付着力分を、基礎梁上端筋17は定着板9より下部の余長部17aの付着力分を、スタラップ筋21は全断面の引張力を考える。
なお、上記の基礎梁上端筋17及び基礎梁下端筋19に直交する側の基礎梁上端筋17及び基礎梁下端筋19の余長部17a,19a(図4において黒塗りしていない部分)についてもアンカーボルト7の引張力に抵抗することが考えられるが、この実施の形態においては安全側に考慮して、これらの余長部17a,19aについては無視している。
【0024】
立上筋11とスタラップ筋21の引張耐力はそれぞれ以下の通りである。
立上筋: 2×34.32×1.1×2.87=216.7kN
スタラップ筋: 2×29.42×1.1×1.27×2=164.4kN
【0025】
基礎梁主筋17,19の余長部17a,19aについては、付着力を求める必要がある。
ところで、日本建築学会の鉄筋コンクリート構造計算基準によると、必要付着長さはlabは次式で与えられる。
lab=σtAs/Kfbψ (1)
σt:付着検定断面位置における短期、長期荷重時の鉄筋存在応力度とし、
鉄筋端に標準フックを設ける場合にはその値の2/3倍とする。
As:当該鉄筋の断面積
ψ:当該鉄筋の周長
fb:許容付着応力度
K:鉄筋配置と横補強筋による以下の修正係数であり、2.5以下とする。
長期荷重時 K=0.3C/db+0.4 (2)
短期荷重時 K=0.3(C+W)/db+0.4 (3)
ここで、C:鉄筋間のあき、もしくは最小かぶり厚さの3倍のうち小さいほうで、鉄筋径の5倍を超える値としてはならない。
W:付着割裂面を横切る横補強筋効果を表す換算長さで、次式により与えられる。鉄筋径の2.5倍を超える値としてはならない。
W=80Ast/sN (4)
ここで、Ast:当該鉄筋列の想定される付着割裂面を横切る1組の横補強筋全断面積
s: 1組の横補強筋(断面積Ast)の間隔
N:当該鉄筋列の想定される付着割裂面における鉄筋本数
db:曲げ補強筋径
【0026】
(1)式を変形して、
σtAs=labKfbψ (5)
とすると、この式によって求まるσtAsが基礎梁主筋17,19の付着力に相当する。そこで、(5)式に各値を代入してσtAsを求める。
まず、付着長さ:labは設定値であり、この例では200mmである。
【0027】
Kを(3)式に基づいて求める。
まず、(3)式における、Cの値を求める。Cの値は前述のように、鉄筋間のあき、もしくは最小かぶり厚さの3倍のうち小さいほうで、鉄筋径の5倍を超える値としてはならない、と規定される。本実施の形態において、鉄筋間のあき寸法は62mmに設定している。また、最小かぶり厚さは66.9mmに設定しており、この3倍は66.9×3=200.7mmである。鉄筋径は25mmであり、これの5倍は25×5=125mmである。したがって、Cの値としては、これらの値中の最小値である62mmを採用する。
【0028】
次に、Wの値を求める。W=80Ast/sN(上記(4)式)である。Astは、前述のように、当該鉄筋列の想定される付着割裂面を横切る1組の横補強筋全断面積である。
ここで、当該鉄筋列とは、立上筋11と上端筋17の余長部17a、下端筋19の余長部19aが相当する。横補強筋にはフープ筋15が相当する。フープ筋15は輪になっているので割裂面に対して2断面が交わる。したがって、Ast=2×127となる。
sは1組の横補強筋(フープ筋)(断面積Ast)の間隔であり、この例では100mmである。
また、Nは当該鉄筋列の想定される付着割裂面における鉄筋本数であり、2本の立上筋11と3本の上端筋17の余長部17a、下端筋19の余長部19a(各1本の組を1本としてカウントする)であり、本数としては5本になる。
よって、W=80×2×127/(5×100)=40.64
この値は、鉄筋径の2.5倍である25×2.5=62.5を超えていない。よって、W=40.64となる。
【0029】
dbを求める。dbは曲げ補強筋径であり、曲げ補強筋としては基礎梁主筋が相当し、この例では、db=25mmである。
【0030】
鉄筋コンクリート構造計算基準においては、付着力に関して終局時設計という概念が示されていないので、上記の短期荷重時を示した(3)式を用いる。(3)式を用いたとしても、設計上は安全側に作用するので問題はない。
(3)式に上記で求めた各値を代入することによって、K=1.632となる。
【0031】
許容付着応力度fbは、Fc=20.6N/mm2のコンクリートの場合には鉄筋コンクリート構造計算基準によると、fb=1.415N/mm2となる。
また、基礎梁主筋の周長はψは80mmである。
【0032】
以上のようにして求まった各値を(5)式に代入してσtAsを求める。
σtAs=200×2×3×1.632×1.415×80=221690.88Nとなる。単位をkNに統一して、小数点第3位以下を四捨五入すると、221.69kNになる。
したがって、立上筋11、スタラップ筋21、基礎梁主筋の余長部17a,19aの合計の耐力は、=216.7kN+164.4kN+221.69kN=602.79kNとなる。そして、この値はアンカーボルトの引張耐力である561.52kNを上回っており、要件を満たす。
【0033】
次に、左曲げの場合について検討する。
左曲げの場合には、図5、図6に示すように、立上筋2本とスタラップ筋5本が引張力に抵抗する。なお、右曲げの場合と同様に、基礎梁上端筋17及び基礎梁下端筋19の余長部17a,19a(図4において黒塗りしていない部分)についてもアンカーボルト7の引張力に抵抗することが考えられるが、この実施の形態においては安全側に考慮して、これらの余長部17a,19aの抵抗力については無視している。
立上筋2本の引張耐力は 2×34.32×1.1×2.87=216.7kN
スタラップ筋5本の引張耐力は 5×29.42×1.1×1.27×2=411kN
これらの合計は216.7kN+411kN=627.7kNとなり、アンカーボルトの引張耐力である561.52kNを上回っており、この場合にも要件を満たしている。
以上のように、右曲げ、左曲げのいずれの場合であっても、要件を満たすことが確認できた。
【0034】
本実施の形態によれば、従来であれば12本必要であった立上筋を4本に減らすことができ、露出型柱脚の基礎部の構造を単純化でき、配筋効率を大きく高めることができる。
【0035】
実施の形態2.
図7〜図10は本発明の他の実施の形態の説明図であり、側柱の構造に関するものである。なお、図7、図8が右曲げの場合の説明図であり、図9、図10が左曲げの場合の説明図である。
右曲げの場合には、図7、図8において黒く塗りつぶした立上筋11、基礎梁主筋17,19の余長部17a,19a、スタラップ筋21が協同してアンカーボルトの引張力Tに抵抗する。
また、左曲げの場合は、図9、図10において黒く塗りつぶした立上筋11、スタラップ筋21が協同して、アンカーボルトの引張力Tに抵抗する。
【0036】
実施の形態3.
図11、図12は本発明の他の実施の形態の説明図であり、中柱の構造に関するものである。
右曲げの場合には、図11、図12において黒く塗りつぶした立上筋11、スタラップ筋21が協同して、アンカーボルトの引張力Tに抵抗する。
また、左曲げの場合も同様に、立上筋11、スタラップ筋21が協同して、アンカーボルトの引張力Tに抵抗する。
【0037】
【発明の効果】
本発明においては、露出型柱脚の基礎部における仮想的なコーン破壊面内に、立上筋、スタラップ筋、基礎梁主筋の余長部を配置し、これらによってアンカーボルトの引張力に抵抗するようにしたので、立上筋の本数を減らすことが可能となり、露出型柱脚の基礎部の構造を単純化でき、配筋効率を大きく高めることができる。
【図面の簡単な説明】
【図1】 本発明の実施の形態1の側面断面図である。
【図2】 本発明の実施の形態1の平面断面図である。
【図3】 本発明の実施の形態1の作用の説明図である(右曲げ)。
【図4】 本発明の実施の形態1の作用の説明図である(右曲げ)。
【図5】 本発明の実施の形態1の作用の説明図である(左曲げ)。
【図6】 本発明の実施の形態1の作用の説明図である(左曲げ)。
【図7】 本発明の実施の形態2の作用の説明図である(右曲げ)。
【図8】 本発明の実施の形態2の作用の説明図である(右曲げ)。
【図9】 本発明の実施の形態2の作用の説明図である(左曲げ)。
【図10】 本発明の実施の形態2の作用の説明図である(左曲げ)。
【図11】 本発明の実施の形態3の作用の説明図である(右曲げ)。
【図12】 本発明の実施の形態3の作用の説明図である(右曲げ)。
【図13】 露出型柱脚の基礎部の構造の説明図である。
【図14】 コーン状破壊面の有効水平投影面積の説明図である(隅柱)。
【図15】 コーン状破壊面の有効水平投影面積の説明図である(側柱)。
【図16】 コーン状破壊面の有効水平投影面積の説明図である(中柱)。
【図17】 従来の露出型柱脚の基礎部の側面断面図である。
【図18】 従来の露出型柱脚の基礎部の平面断面図である。
【符号の説明】
5 基礎コンクリート部
7 アンカーボルト
9 定着板
11 立上筋
15 フープ筋
17 上端筋
17a 上端筋の余長部
19 下端筋
19a 下端筋の余長部
21 スタラップ筋[0001]
BACKGROUND OF THE INVENTION
The present invention relates to the structure of the foundation of an exposed column base.
[0002]
[Prior art]
FIG. 13 is a cross-sectional view of a base portion of a conventional exposed column base. As shown in FIG. 13, the foundation portion of the conventional exposed column base includes a
[0003]
The force acting on the steel column 1 is transmitted as a tensile force to the
[0004]
When the tensile force is applied to the
Currently, the following two methods are known as methods for preventing the cone-like fracture and maintaining the anchor bolt tension force at the
The first method is a method of securing the cone fracture resistance Ta to the concrete itself constituting the
[0005]
The cone fracture resistance Ta is obtained by the following equation.
Ta = 0.6√Fc · Ac (for short-term design)
Ta = 0.8√Fc · Ac (at the time of final design)
Here, Fc: Design standard strength of concrete Ac: Effective horizontal projected area of concrete cone-shaped fracture surface
Here, the effective horizontal projected area of the cone-shaped fracture surface means an area of a portion surrounded by a line formed by a conical bus line intersecting the surface of the
The effective horizontal projection area Ac is schematically shown in FIG. 14 for the corner pillar, FIG. 15 for the side pillar, and the hatched part in FIG. 16 for the middle pillar.
[0007]
In order to prevent cone-like fracture, if the tensile force of the anchor bolt is T, Ac in the above equation is determined so that Ta> T is satisfied.
[0008]
A second method for preventing cone-like fracture is to install a required amount of rising bars in the foundation concrete part.
17 and 18 are explanatory views of the second method. FIG. 17 shows a side cross section of a corner post, and FIG. 18 shows a plan cross section.
[0009]
In this method, a number of rising
A
[0010]
The tensile strength Ta ′ of the standing muscle is obtained by the following equation.
Ta '= nF · A 1 (for short-term design)
Ta '= nF1.1A 1 (at the time of final design)
Here, n: number of rising muscles in the vicinity of the fixing plate F: strength of the rising muscle A 1 : sectional area of the rising muscle
In order to be able to bear the tensile force of the
[0012]
In the above example, four M27 anchor bolts were used, and the tensile strength was
Ty = 225.06kN (short-term design)
Tu = 280.76kN (at the time of final design)
It is.
Further, D19 (SD345) is used as the standing muscle.
[0013]
In the case of right bending, the six upright bars shown in black in FIG. 18 resist the tensile force. If these six tensile strengths are Ta ′,
Ta ′ = (6 pieces) × (yield strength) × 1.1 × (cross-sectional area of the rising muscle) and substituting specific numerical values,
Ta '= 6 × 34.32 × 1.1 × 2.87 = 650.1kN
It becomes.
This value exceeded the tensile strength of the anchor bolt 7: 2 × 280.76 = 561.52 kN, and it was confirmed that Ta ′> T was satisfied.
In other words, in the above conventional example, in order to exceed the anchor bolt's tensile strength of 561.52 kN, six anchor bolts (12 in total) are required on one side.
[0014]
[Problems to be solved by the invention]
In the first method, an effective horizontal projection area must be ensured so as not to cause cone-like destruction, and there is a problem that the base portion is large and heavy.
Further, in the second method, there are problems that the number of upright bars increases (12 in the above example), the bar arrangement becomes complicated, and the bar arrangement work efficiency is deteriorated.
The present invention has been made to solve such a problem, and an object of the present invention is to obtain a structure of a foundation portion of an exposed-type column base in which the number of upright bars is reduced to facilitate the arrangement of bars.
[0015]
[Means for Solving the Problems]
The structure of the foundation portion of the exposed column base in the corner column or the side column according to the present invention includes an anchor bolt in the column mold portion, a fixing plate provided at a lower end portion of the anchor bolt, and a rising bar, and a foundation beam portion In the structure of the foundation part of the exposed column base in the corner column or side column, which has the top beam top bar, the bottom beam bottom bar, and the stirrup bar in the base column, In the hypothetical cone fracture plane at the foundation part of the exposed column base, the surplus bar, the extra length after bending of the upper end of the foundation beam, the extra length after bending of the lower end of the foundation beam, and the stirrup bar Place the extra length of the top beam of the foundation beam extending below the anchor plate, arrange the extra length of the bottom beam of the foundation beam above the anchor plate, and Tensile strength of the upright bar calculated based on the cross-sectional area, the surplus of the upper end bar of the foundation beam placed below the anchor plate The tensile strength of the stirrup is calculated by calculating the tensile strength of the stirrup calculated based on the adhesive strength of the joint, the adhesive strength of the extra length of the bottom beam of the foundation beam placed above the fixing plate, and the cross-sectional area of the stapling In the cone fracture plane, the sum of the adhesive strength of the extra length of the foundation beam upper bar, the extra length of the lower beam of the foundation beam, and the tensile strength of the stirrup bar is greater than the tensile strength of the anchor bolt. The number of the standing muscles to be arranged in is determined.
[0017]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
FIG. 1 is a side sectional view of an embodiment of the present invention, and FIG. 2 is a plan sectional view. This example relates to the structure of the corner pillar foundation. In the figure, the same parts as those in FIGS. 17 and 18 showing the conventional example are denoted by the same reference numerals.
In this example, a square steel pipe column of 250 mm square is fixed to the
[0018]
Specifically, a total of four rising
In addition, about the lower end part of the standing-up
[0019]
3 to 6 are explanatory views of the operation of the present embodiment. FIGS. 3 and 4 show the case of right bending, and FIGS. 5 and 6 show the case of left bending, respectively.
In the case of right bending, the upright bars 11 (two) painted black in FIGS. 3 and 4, the
Further, in the case of left bending, the standing muscles 11 (two) and the stirrup muscles 21 (five) painted black in FIGS. 5 and 6 cooperate to resist the tensile force T of the
[0020]
Next, in the above-described structure, whether or not the rising
[0021]
Specific specifications in the above example are as follows. In addition, in order to clarify the comparison with the conventional example, the
The
Ty = 225.06kN (short-term design)
Tu = 280.76kN (at the time of final design)
[0022]
The specifications of the standing
Standing muscle: D19 (SD345)
Stalrup muscle: D13 (SD295)
Foundation beam main bar: D25 (SD345)
Hoop muscle: D13 (SD295)
Hoop muscle spacing (X in Fig. 1): 100mm
Spacing of foundation beam main bars (Y in Fig. 2): 62mm
Minimum cover thickness of the foundation beam main bar (Z in Fig. 2): 66.9mm
[0023]
Considering the above specifications, the following is considered. First, consider right bending.
The strength of the
On the other hand, the resistance to the tensile force of the
In general, the standing
In addition,
[0024]
The tensile strengths of the standing
Standing muscle: 2 × 34.32 × 1.1 × 2.87 = 216.7kN
Stalrup muscle: 2 × 29.42 × 1.1 × 1.27 × 2 = 164.4kN
[0025]
For the
By the way, according to the reinforced concrete structure calculation basis of the Architectural Institute of Japan, necessary adhesion length l ab is given by the following equation.
l ab = σ t A s / Kf b ψ (1)
σ t : Reinforcing bar existence stress level at the time of short-term and long-term loading at the cross-section position of adhesion test,
If a standard hook is provided at the end of the rebar, it should be 2/3 times that value.
A s : Cross section area of the reinforcing bar ψ: Perimeter length of the reinforcing bar f b : Permissible adhesion stress K: The following correction coefficient based on the reinforcing bar arrangement and the lateral reinforcing bar, which is 2.5 or less.
Long-term load K = 0.3C / d b +0.4 (2)
Short-term load when K = 0.3 (C + W) / d b +0.4 (3)
Here, C: the space between the reinforcing bars or 3 times the minimum cover thickness, which should be smaller than 5 times the diameter of the reinforcing bar.
W: A conversion length representing the transverse reinforcement effect across the adhesion splitting surface, and is given by the following equation. The value should not exceed 2.5 times the diameter of the reinforcing bar.
W = 80A st / sN (4)
Here, A st : one set of cross-sectional area of a set of transverse reinforcing bars crossing the assumed bond splitting surface of the reinforcing bar row
s: distance a pair of lateral reinforcement (cross-sectional area A st) N: rebar number in Bond crack surfaces envisaged in the rebar column d b: Bending reinforcement diameter [0026]
(1)
σ t A s = l ab Kf b ψ (5)
Then, σ t A s obtained by this equation corresponds to the adhesive force of the foundation beam
First, the adhesion length: l ab is a set value, which is 200 mm in this example.
[0027]
K is obtained based on equation (3).
First, the value of C in equation (3) is obtained. As described above, the value of C is defined to be a value smaller than three times the space between the reinforcing bars or the minimum cover thickness and not to exceed 5 times the diameter of the reinforcing bars. In the present embodiment, the space between the reinforcing bars is set to 62 mm. Further, the minimum cover thickness is set to 66.9 mm, and this triple is 66.9 × 3 = 200.7 mm. The diameter of the reinforcing bar is 25 mm, and 5 times this is 25 × 5 = 125 mm. Therefore, the value C is 62 mm, which is the minimum value among these values.
[0028]
Next, the value of W is obtained. W = 80 A st / sN (the above equation (4)). As described above, A st is the total cross-sectional area of a set of transverse reinforcing bars that crosses the assumed bond splitting surface of the reinforcing bar row.
Here, the said reinforcing bar row | line | column corresponds to the
s is a distance between a pair of lateral reinforcing bars (hoop bars) (cross-sectional area A st ), and is 100 mm in this example.
N is the number of reinforcing bars on the assumed split surface of the reinforcing bar row, and the
Therefore, W = 80 × 2 × 127 / (5 × 100) = 40.64
This value does not exceed 25 × 2.5 = 62.5, which is 2.5 times the diameter of the reinforcing bar. Therefore, W = 40.64.
[0029]
Find d b . d b is the diameter of the bending reinforcement, and the bending reinforcement is equivalent to the foundation beam main reinforcement, and in this example, d b = 25 mm.
[0030]
In the reinforced concrete structure calculation standard, the concept of ultimate design with respect to adhesive force is not shown, so the above equation (3) showing the short-term load is used. Even if equation (3) is used, there is no problem because it acts on the safe side in design.
By substituting each value obtained above into equation (3), K = 1.632.
[0031]
Acceptable adhesion stresses f b, in the case of concrete Fc = 20.6N / mm 2 is said to reinforced concrete structures calculation basis, and f b = 1.415N / mm 2.
The circumference of the foundation beam main reinforcement is 80 mm.
[0032]
Each value obtained as described above is substituted into the equation (5) to obtain σ t A s .
σ t A s = 200 × 2 × 3 × 1.632 × 1.415 × 80 = 221690.88N. If the unit is kN and rounded off to the second decimal place, the result is 221.69 kN.
Therefore, the total proof stress of the upright bars 11, the stirrup bars 21, and the
[0033]
Next, consider the case of left bending.
In the case of left bending, as shown in FIGS. 5 and 6, the two rising muscles and the five stirrup muscles resist the tensile force. As in the case of right bending, the
Tensile strength of 2 standing muscles is 2 × 34.32 × 1.1 × 2.87 = 216.7kN
Tensile strength of 5 stirrup muscles is 5 × 29.42 × 1.1 × 1.27 × 2 = 411kN
These totals are 216.7kN + 411kN = 627.7kN, exceeding the anchor bolt's tensile strength of 561.52kN, which also meets the requirements.
As described above, it was confirmed that the requirements were satisfied in both cases of right bending and left bending.
[0034]
According to the present embodiment, it is possible to reduce the number of upright muscles, which conventionally required twelve, to four, simplify the structure of the foundation of the exposed column base, and greatly increase the efficiency of the bar arrangement. be able to.
[0035]
Embodiment 2. FIG.
7-10 is explanatory drawing of other embodiment of this invention, and is related with the structure of a side pillar. 7 and 8 are explanatory diagrams when the right bending is performed, and FIGS. 9 and 10 are explanatory diagrams when the left bending is performed.
In the case of right bending, the upright bars 11, the
Further, in the case of left bending, the standing
[0036]
11 and 12 are explanatory views of another embodiment of the present invention, and relate to the structure of the middle pillar.
In the case of a right bend, the standing
Similarly, in the case of left bending, the standing
[0037]
【The invention's effect】
In the present invention, the surplus lengths of the standing muscle, the stirrup muscle, and the foundation beam main reinforcement are arranged in the virtual cone fracture surface in the foundation portion of the exposed type column base, thereby resisting the tensile force of the anchor bolt. Since it did in this way, it becomes possible to reduce the number of standing-up bars, the structure of the foundation part of an exposed type column base can be simplified, and bar arrangement efficiency can be improved greatly.
[Brief description of the drawings]
FIG. 1 is a side cross-sectional view of a first embodiment of the present invention.
FIG. 2 is a plan sectional view of the first embodiment of the present invention.
FIG. 3 is an explanatory diagram of the operation of the first embodiment of the present invention (right bend).
FIG. 4 is an explanatory diagram of the operation of the first embodiment of the present invention (right bend).
FIG. 5 is an explanatory view of the operation of Embodiment 1 of the present invention (left bending).
FIG. 6 is an explanatory diagram of the operation of the first embodiment of the present invention (left bending).
FIG. 7 is an explanatory view of the operation of the second embodiment of the present invention (right bend).
FIG. 8 is an explanatory diagram of the operation of the second embodiment of the present invention (right bend).
FIG. 9 is an explanatory view of the operation of Embodiment 2 of the present invention (left bending).
FIG. 10 is an explanatory diagram of the operation of the second embodiment of the present invention (left bending).
FIG. 11 is an explanatory diagram of the operation of the third embodiment of the present invention (right bend).
FIG. 12 is an explanatory diagram of the operation of the third embodiment of the present invention (right bend).
FIG. 13 is an explanatory diagram of the structure of the foundation portion of the exposed column base.
FIG. 14 is an explanatory diagram of an effective horizontal projected area of a cone-shaped fracture surface (corner column).
FIG. 15 is an explanatory diagram of an effective horizontal projected area of a cone-shaped fracture surface (side pillar).
FIG. 16 is an explanatory diagram of an effective horizontal projected area of a cone-shaped fracture surface (middle column).
FIG. 17 is a side sectional view of a base portion of a conventional exposed column base.
FIG. 18 is a cross-sectional plan view of a base portion of a conventional exposed column base.
[Explanation of symbols]
5
Claims (1)
基礎梁部に基礎梁上端筋、基礎梁下端筋及びスタラップ筋を備え、
前記基礎梁上端筋及び前記基礎梁下端筋を前記柱型部まで延設した隅柱又は側柱における露出型柱脚の基礎部の構造において、
露出型柱脚の基礎部における仮想的なコーン破壊面内に、前記立上筋、前記基礎梁上端筋の折曲後の余長部、前記基礎梁下端筋の折曲後の余長部、前記スタラップ筋をそれぞれ配置し、
前記基礎梁上端筋の余長部を、前記定着板よりも下部まで延出して配置し、
前記基礎梁下端筋の余長部を、前記定着板よりも上部まで延出して配置し、
当該立上筋の断面積に基づいて求められる当該立上筋の引張耐力、前記定着板よりも下部に配置した前記基礎梁上端筋の余長部の付着力、前記定着板よりも上部に配置した前記基礎梁下端筋の余長部の付着力、及び当該スタラップ筋の断面積に基づいて求められる当該スタラップの引張耐力を算出し、
当該立上筋の引張耐力、当該基礎梁上端筋の余長部の付着力、当該基礎梁下端筋の余長部の付着力、及び当該スタラップ筋の引張耐力の和が前記アンカーボルトの引張力よりも大きくなるように、前記コーン破壊面内に配置される当該立上筋の本数を決定したことを特徴とする隅柱又は側柱における露出型柱脚の基礎部の構造。 The column mold portion includes an anchor bolt, a fixing plate provided at a lower end portion of the anchor bolt, and a rising line,
The foundation beam section has a foundation beam top bar, a foundation beam bottom bar and a stirrup bar,
In the structure of the foundation part of the exposed column base in the corner column or the side column in which the foundation beam upper bar and the foundation beam lower bar are extended to the column type part,
In the hypothetical cone fracture plane at the foundation of the exposed column base, the riser, the extra length after bending of the upper end of the foundation beam, the extra length after bending of the lower end of the foundation beam, Placing each of the stirrup muscles,
The extra length of the upper end of the foundation beam is arranged extending to the lower part than the fixing plate,
Arrange the extra length part of the bottom beam of the foundation beam to extend above the fixing plate,
Tensile strength of the upright bar determined based on the cross-sectional area of the upright bar, adhesive strength of the extra length of the upper end bar of the foundation beam arranged below the fixing plate, arranged above the fixing plate Calculating the adhesive strength of the extra length portion of the bottom beam of the foundation beam, and the tensile strength of the scallop obtained based on the cross-sectional area of the scallop muscle,
The tensile strength of the anchor bolt is the sum of the tensile strength of the upright bar, the adhesive strength of the extra length of the upper end of the foundation beam, the adhesive strength of the extra length of the lower end of the base beam, and the tensile strength of the stirrup. The structure of the foundation part of the exposed column base in the corner column or the side column , wherein the number of the upright bars arranged in the cone fracture plane is determined so as to be larger than
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000093967A JP4675449B2 (en) | 2000-03-30 | 2000-03-30 | Structure of exposed column base |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000093967A JP4675449B2 (en) | 2000-03-30 | 2000-03-30 | Structure of exposed column base |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001279684A JP2001279684A (en) | 2001-10-10 |
| JP4675449B2 true JP4675449B2 (en) | 2011-04-20 |
Family
ID=18609079
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000093967A Expired - Lifetime JP4675449B2 (en) | 2000-03-30 | 2000-03-30 | Structure of exposed column base |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4675449B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4519419B2 (en) * | 2003-04-30 | 2010-08-04 | 日本鋳造株式会社 | Columnar part design support device and columnar part design support program |
| JP4711463B2 (en) * | 2006-08-28 | 2011-06-29 | 岡部株式会社 | Pile head joint structure |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0476118A (en) * | 1990-07-17 | 1992-03-10 | Misawa Homes Co Ltd | Frame of foundation for steel structure building |
| JPH0814110B2 (en) * | 1991-07-22 | 1996-02-14 | 日立金属株式会社 | Steel column base |
| JPH05112952A (en) * | 1991-10-23 | 1993-05-07 | Asahi Chem Ind Co Ltd | Reinforcing method of foundation |
| JP3161220B2 (en) * | 1993-05-17 | 2001-04-25 | 日本鋼管株式会社 | Exposed column base |
| JP3990504B2 (en) * | 1998-11-19 | 2007-10-17 | 日立機材株式会社 | Exposed type column base structure |
-
2000
- 2000-03-30 JP JP2000093967A patent/JP4675449B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001279684A (en) | 2001-10-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20110192108A1 (en) | Grid-type drop-panel structure, and a construction method therefor | |
| JP3728391B2 (en) | Continuous girder bridge structure | |
| CN101245610B (en) | Reinforced Concrete Structure with Steel Plate Reinforcement on Partial Surface | |
| JP3999114B2 (en) | Reinforcing method and structure of notched corner of bridge main girder | |
| CN109440962A (en) | The horizontal joint connecting node and its height calculation method of precast shear wall edge member | |
| JP4675449B2 (en) | Structure of exposed column base | |
| KR101358878B1 (en) | Reinforcement member and girder using the same | |
| CN102418402B (en) | Pre-tensioned prestressed reinforced concrete precast beam | |
| JP6513754B2 (en) | Reinforcement structure of reinforced concrete wall column | |
| KR200233599Y1 (en) | Installation structure for reinforcing rod of bent | |
| CN116677137A (en) | Large-span prestressed concrete beam slab small-scale frame structure and construction method | |
| CN115075120A (en) | Continuous beam No. 0 block oblique crossing orthogonal system and construction method thereof | |
| JP3608131B2 (en) | Building reinforcement structure | |
| JPH04222742A (en) | Composite beam | |
| JP2014173223A (en) | Reinforcement structure | |
| CN209145068U (en) | A kind of horizontal joint connecting node of precast shear wall edge member | |
| JP4003911B2 (en) | Reinforced reinforced concrete reinforced wall and method for forming reinforced wall | |
| CN221461471U (en) | A high-strength and high-ductility plate-column joint | |
| CN216428794U (en) | Assembled multi-cavity composite concrete frame column | |
| TWI871244B (en) | Concrete seismic energy dissipation element and construction method thereof and seismic energy dissipation system having the same | |
| JPS5817052Y2 (en) | reinforced concrete column | |
| JPH078673Y2 (en) | Composite beam structure | |
| CN223509546U (en) | A reinforcement structure for the main body of a tower crane attachment point | |
| KR102869566B1 (en) | Shear reinforcement | |
| CN221877763U (en) | Support bracket structure for heavy load of cable tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070214 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090406 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100126 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100318 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100817 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100930 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110118 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110126 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140204 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4675449 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |