JP4702933B2 - Ground improvement construction support system and its support method - Google Patents
Ground improvement construction support system and its support method Download PDFInfo
- Publication number
- JP4702933B2 JP4702933B2 JP2005162241A JP2005162241A JP4702933B2 JP 4702933 B2 JP4702933 B2 JP 4702933B2 JP 2005162241 A JP2005162241 A JP 2005162241A JP 2005162241 A JP2005162241 A JP 2005162241A JP 4702933 B2 JP4702933 B2 JP 4702933B2
- Authority
- JP
- Japan
- Prior art keywords
- ground improvement
- flow rate
- data
- ground
- integrated flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/00474—Uses not provided for elsewhere in C04B2111/00
- C04B2111/00732—Uses not provided for elsewhere in C04B2111/00 for soil stabilisation
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Structural Engineering (AREA)
- Organic Chemistry (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Description
本発明は、地盤改良機により地盤改良を行うための施工データを作成して地盤改良の施工支援を行う地盤改良施工支援システムとその支援方法に関する。更に詳しくは、地盤の掘削、セメントと水とからなるセメントミルクの注入、攪拌混合等の施工を地盤改良機で行う前に、適切な施工データの作成が容易に行える地盤改良支援システムとその支援方法に関する。 The present invention relates to a ground improvement construction support system that creates construction data for ground improvement by a ground improvement machine and supports the construction of the ground improvement and a support method thereof. More specifically, the ground improvement support system and its support can easily create appropriate construction data before performing ground excavation, cement milk injection with cement and water, and mixing with a ground improvement machine. Regarding the method.
地盤改良は、地盤改良機により地盤を掘削し、その掘削孔にセメント等の地盤改良材(地盤硬化材、地盤固化材などともいう)を注入して地盤を強化するために行われる。基本的な地盤改良の工法は種々あって公知である。その工法の一例を説明すると、地盤改良機において、先ず回転する回転チューブ体の下端部の掘削ビットで地盤深層まで掘削する。掘削しながら回転チューブ体の下方部分に取り付けられる攪拌翼で掘削孔中の地盤構成物体を攪拌し、攪拌翼から地盤改良材を噴出させ注入し地盤改良する形で行なわれている。 The ground improvement is performed to excavate the ground with a ground improvement machine and inject a ground improvement material such as cement (also referred to as ground hardening material or ground solidification material) into the excavation hole to strengthen the ground. There are various basic ground improvement methods known in the art. An example of the construction method will be described. In the ground improvement machine, first, the excavation bit at the lower end portion of the rotating rotating tube body is excavated to the deep ground. While excavating, the ground constituent object in the excavation hole is stirred with the stirring blade attached to the lower part of the rotating tube body, and the ground improvement material is ejected from the stirring blade and injected to improve the ground.
回転チューブ体は中空体であるので、地盤改良材は上方からこの回転チューブ体の内部を通って供給される。地盤改良材は、水とセメントとからなるセメントミルクとして、地盤改良機の上部側からホース等を介して供給される。住宅等構造物の地盤改良では、軟弱地盤に対して柱状改良を行うことが多く行われる。この柱状になるものは地盤をセメントミルクとともに攪拌混合し固化させたものである。この柱状体は上部に設置される建造物等の基礎になるので、品質が高く強固で安定したものが要求される。この地盤改良は前述のように通常は地盤改良機で行われる。 Since the rotating tube body is a hollow body, the ground improvement material is supplied from above through the inside of the rotating tube body. The ground improvement material is supplied as cement milk made of water and cement from the upper side of the ground improvement machine via a hose or the like. In the ground improvement of a structure such as a house, columnar improvement is often performed on soft ground. This columnar shape is obtained by mixing and solidifying the ground with cement milk. Since this columnar body is the basis of a building or the like installed on the upper part, a high quality, strong and stable one is required. This ground improvement is usually performed by a ground improvement machine as described above.
この地盤改良機による柱状改良工法の工程は、一般的に図2に示すようになっていることが多い。この地盤改良は、地盤を掘削するとともに、地盤改良材等であるセメントと水とを混合したセメントミルクの注入し土砂と攪拌混合して地盤を改良する工法である。この地盤改良機の管理装置としていろいろな提案がなされている。例えば、従来の地盤改良機の管理装置では、施工時に多くの管理項目を管理しなければならないが、管理すべき項目が多いとかえって煩わしくなり、能率が低下してしまうという問題点があった。
そこで、管理項目を減らすことで管理が容易になり、また良好な管理がおこなわれているかの判断を瞬時に正確に行うことができ、さらに当初予想していなかった地層の変化に対しても対応することができる地盤改良機の管理方法及び管理装置がよく知られている(例えば、特許文献1、2参照)。一方、土木基礎工事における土質安定剤であるグラウトを注入する場合において、掘削刃の進入速度に応じてグラウトの注入量を刻々と正確に制御するグラウト注入制御装置も知られている(例えば、特許文献3参照)。
The process of the columnar improvement method by this ground improvement machine is generally as shown in FIG. This ground improvement is a method of excavating the ground and injecting cement milk in which cement and water as a ground improvement material or the like are mixed and stirring and mixing with the earth and sand to improve the ground. Various proposals have been made as management devices for this ground improvement machine. For example, in a conventional ground improvement machine management device, many management items must be managed at the time of construction. However, if there are many items to be managed, there is a problem that the efficiency becomes low.
Therefore, management can be facilitated by reducing the number of management items, and it is possible to quickly and accurately determine whether good management is being performed, and also respond to changes in the strata that were not initially anticipated. A management method and a management apparatus for a ground improvement machine that can be used are well known (see, for example,
地盤改良を行って杭の品質を保持するためには、設計通りの施工管理を行うことが必要であり、地盤改良機を操作する作業者の知識、経験、技量の差により杭の品質に良否が生じてしまうおそれがあるという問題点があった。すなわち、地盤改良のための施工条件のデータから、地盤改良施工のための施工データを求め、実際に地盤改良機を操作することは、知識、経験が浅く技量が少し未熟な作業者にとってはたいへん難しい作業の一つである。例えば、地盤改良を行うためのセメントミルクの流量計算、どのような流量・速度で施工するのがよいのか等の検討は作業者に委ねられており、経験、技量に関係なく作業者が即座に検討を行えるものではない。また、施工データの作成に時間がかかり地盤改良作業の作業能率を低下させたり、計算ミス等人為的ミスを発生させるおそれもあるという問題点もあった。
しかしながら、特許文献1,2の地盤改良機の技術は、施工している時の状態の管理について提案されたものであり、特許文献3の技術も施工時のグラウトの注入量の制御を行うものであった。すなわち、施工前に行われる施工データ作成の支援を行うものではなかった。
However, the technology of the ground improvement machine of
そこで、地盤改良の施工に入る前に、作業者が地盤改良のための施工条件のデータを、簡単な操作例えば表示画面の誘導に従って入力操作するのみで、施工データが求められ、かつ、その施工データを確認することで地盤改良のイメージをつかむことができるような施工支援方法の開発が要望されていた。例えば、現場において、表示画面の表示による誘導に従って入力操作するのみで、セメントミルクの必要積算流量値等施工データの自動計算等を行えるようなものの開発が要望されていた。すなわち、施工前に、セメントミルクの必要積算流量値等を作業者が計算することなく、施工条件のデータを入力するのみで施工データを求めることができれば、施工支援としてたいへん心強いものとなる。また、施工前に施工データを求め、出力しておけば、その施工データに沿って、微調整や補正を行うことも容易であり、知識や技量の少し劣る作業者、経験が少し足りない作業者であっても品質の高い地盤改良を行うことができる。 Therefore, before entering the ground improvement work, the operator can simply input the construction condition data for ground improvement according to simple operations such as guidance on the display screen, and the construction data is obtained. There has been a demand for the development of construction support methods that can grasp the image of ground improvement by checking the data. For example, there has been a demand for the development of an apparatus that can automatically calculate construction data such as a required integrated flow rate value of cement milk by simply performing an input operation in accordance with guidance on the display screen. That is, if construction data can be obtained only by inputting construction condition data without requiring the operator to calculate the necessary integrated flow rate value of cement milk or the like before construction, it will be very encouraging as construction support. In addition, if construction data is obtained and output before construction, it is easy to make fine adjustments and corrections according to the construction data, and workers with slightly inferior knowledge and skills and work with little experience. Even a skilled person can make high-quality ground improvement.
本発明は、以上の技術背景に基づき、従来の問題点を解決するためになされたもので、次の目的を達成した。 The present invention has been made to solve the conventional problems based on the above technical background, and has achieved the following object.
本発明の目的は、作業者の技量に関係なく、表示画面の表示による誘導に従って、所定の施工条件のデータを入力するのみで、施工前に地盤改良のための施工データが容易に求められ、施工支援することができる地盤改良の施工支援システムとその支援方法を提供することにある。 The purpose of the present invention, regardless of the skill of the operator, is simply to enter the data of the predetermined construction conditions according to the guidance by display on the display screen, construction data for ground improvement is easily obtained before construction, The object is to provide a construction support system and a support method for ground improvement that can support the construction.
本発明は、前記目的を達成するために次の手段をとる。
本発明1の地盤改良施工支援システムは、地盤を掘削するとともにセメントミルクを注入し、攪拌混合して地盤を改良する地盤改良機の制御装置において、前記制御装置に設けられ、地盤改良のための所定の施工条件のデータを入力する入力手段と、前記制御装置に設けられ、前記データをもとに、前記セメントミルクの積算流量値を演算する第1の演算手段と、前記制御装置に設けられ、前記第1の演算手段で演算された前記セメントミルクの演算積算流量値を表示する演算積算流量表示手段とからなり、前記地盤改良機による地盤改良の施工前に、前記セメントミルクの積算流量値が求められるようにしたことを特徴とする。
The present invention takes the following means in order to achieve the object.
The ground improvement construction support system according to the first aspect of the present invention is a control device for a ground improvement machine that excavates the ground, injects cement milk, and agitates and mixes to improve the ground. Input means for inputting data of a predetermined construction condition, provided in the control device, provided on the control device, first calculation means for calculating an integrated flow rate value of the cement milk based on the data. An integrated flow rate display means for displaying the calculated integrated flow rate value of the cement milk calculated by the first calculating means, and before the construction of the ground improvement by the ground improvement machine, the integrated flow rate value of the cement milk It is characterized in that is required.
本発明2の地盤改良施工支援システムは、本発明1において、
前記データは、地盤に注入するセメント添加量データ、地盤に掘削する杭の杭径データ、地盤改良の深度データ、及び、セメントと水の配合比データが含まれているものであることを特徴とする。
The ground improvement construction support system of the
The data includes cement addition amount data to be injected into the ground, pile diameter data of piles excavated in the ground, depth improvement depth data, and blending ratio data of cement and water. To do.
本発明3の地盤改良施工支援システムは、本発明1又は2において、
前記演算積算流量値を、所定の経過深度区間ごとに分割し、前記区間ごとに分割した積算流量値及び/又は昇降動作のパターンを出力するための出力手段を前記制御装置に設けたことを特徴とする。
The ground improvement construction support system of the
The control device is provided with output means for dividing the calculated integrated flow rate value for each predetermined elapsed depth section and outputting the integrated flow value and / or lifting / lowering pattern divided for each section. And
本発明4の地盤改良施工支援システムは、本発明1又は2において、
前記演算積算流量値を満足させるために必要な前記地盤改良機の昇降速度及び前記セメントミルクの瞬時流量を、所定の経過深度区間ごとに演算する第2の演算手段と、前記演算された前記昇降速度及び/又は前記瞬時流量とを表示する速度・流量表示手段を前記制御装置に設けたことを特徴とする。
The ground improvement construction support system of the
Second computing means for computing the elevation speed of the ground improvement machine and the instantaneous flow rate of the cement milk necessary for satisfying the calculated integrated flow rate value for each predetermined elapsed depth section; and the computed elevation A speed / flow rate display means for displaying the speed and / or the instantaneous flow rate is provided in the control device.
本発明5の地盤改良施工支援システムは、本発明1から4において、
前記入力手段からのデータ入力は、前記表示手段に表示された表示画面の表示内容に基づいて行えるようにしたことを特徴とする。
The ground improvement construction support system of the
The data input from the input means can be performed based on the display content of the display screen displayed on the display means.
本発明6の地盤改良施工支援方法は、
地盤を掘削するとともにセメントミルクを注入し、攪拌混合して地盤を改良する地盤改良機の制御装置における制御方法において、前記制御装置に、地盤改良のための所定の施工条件のデータを入力する工程と、入力した前記データをもとに前記セメントミルクの演算積算流量値を求めるための演算を行う工程と、演算された前記セメントミルクの演算積算流量値を演算積算流量表示手段に表示する工程とからなり、前記地盤改良機による地盤改良の施工前に、前記セメントミルクの積算流量値が求められるようにしたことを特徴とする。
The ground improvement construction support method of the
In the control method in the control device of the ground improvement machine that excavates the ground and injects cement milk and mixes and improves the ground, the step of inputting data of predetermined construction conditions for ground improvement to the control device And calculating the calculated integrated milk flow rate value of the cement milk based on the input data; and displaying the calculated calculated integrated milk flow rate value of the cement milk on the calculated integrated flow rate display means; The integrated flow rate value of the cement milk is obtained before construction for ground improvement by the ground improvement machine.
本発明7の地盤改良施工支援方法は、本発明6において、
前記データは、地盤に注入するセメント添加量データ、地盤に掘削する杭の杭径データ、掘削の深度データ、及び、セメントと水の配合比データが含まれているものであることを特徴とする。
The ground improvement construction support method of the
The data includes cement addition amount data to be injected into the ground, pile diameter data of a pile to be excavated into the ground, excavation depth data, and cement / water mixing ratio data. .
本発明8の地盤改良施工支援方法は、本発明6又は7において、
演算された前記セメントミルクの演算積算流量値を所定の経過深度区間ごとに分割し、前記分割された区間ごとの積算流量値を出力するための工程が設けられていることを特徴とする。
The ground improvement construction support method of the
A step for dividing the calculated integrated flow rate value of the cement milk for each predetermined elapsed depth section and outputting the integrated flow rate value for each of the divided sections is provided.
本発明9の地盤改良施工支援方法は、本発明6から8において、
前記演算積算流量値を満足させるために必要な前記地盤改良機の昇降速度及び前記セメントミルクの瞬時流量を、所定の経過深度区間ごとに演算するための工程と、前記演算された前記昇降速度及び/又は前記瞬時流量を表示するための工程を設けたことを特徴とする。
The ground improvement construction support method of the
A step for calculating the elevation speed of the ground improvement machine and the instantaneous flow rate of the cement milk necessary for satisfying the calculated integrated flow rate value for each predetermined elapsed depth section, the calculated elevation speed and In addition, a process for displaying the instantaneous flow rate is provided.
本発明10の地盤改良施工支援方法は、本発明6から9において、
前記データを入力する工程は、前記表示手段に表示された表示画面の表示内容に基づいて行えるようにしたものであることを特徴とする。
The ground improvement construction support method of the present invention 10 in the
The step of inputting the data is characterized in that it can be performed based on the display content of the display screen displayed on the display means.
以上説明したように、本発明は、地盤改良の施工前にセメント添加量、杭径、改良深度及び配合比の4つの施工条件のデータを、表示画面の表示による誘導に従って入力することで杭1本当たりのセメントミルクの積算流量、各改良深度ごとの昇降速度、瞬時流量等地盤改良の施工工事に必要な施工データを自動的に得ることができ表示画面上に表示できる。また、自動計算され求められた施工データをプリンタ等出力手段に出力することができ、作業者が出力結果を確認することもできる。さらに、表示手段の表示画面の内容に基づき、表示画面の表示内容に誘導されて施工条件のデータを入力しているので、入力ミス等人為的ミスの減少が図れる。 As explained above, the present invention can input the data of the four construction conditions of the cement addition amount, the pile diameter, the improvement depth, and the blending ratio according to the guidance by the display on the display screen before the ground improvement work. Construction data necessary for ground improvement work such as the cumulative flow rate of cement milk per book, the lifting speed at each improvement depth, and the instantaneous flow rate can be automatically obtained and displayed on the display screen. In addition, construction data that is automatically calculated and obtained can be output to output means such as a printer, and the operator can also check the output result. Furthermore, since the construction condition data is input by being guided by the display content of the display screen based on the content of the display screen of the display means, it is possible to reduce human errors such as input mistakes.
作業者の技量、経験等に関係なく施工条件データの入力操作で、地盤改良のための施工データを容易に作成できるようになった。この結果、どんな作業者であっても、施工前に地盤改良の施工の状態を把握してイメージすることができるようになった。また、施工前に施工データを求め、出力しておけば、施工時にその施工データに沿って、微調整や補正を行うことも容易であり、知識や技量の少し劣る作業者、経験が少し足りない作業者であっても品質の高い地盤改良を行うことができる。
さらに、施工データ作成時間の短縮が図れ、地盤改良の作業能率向上が図れる。
Construction data for ground improvement can be created easily by inputting construction condition data regardless of the skill and experience of the operator. As a result, any worker can grasp and image the state of ground improvement before construction. In addition, if construction data is obtained and output before construction, it is easy to make fine adjustments and corrections according to the construction data at the time of construction. Even an unsatisfactory worker can improve the quality of the ground.
Furthermore, the construction data creation time can be shortened, and the work efficiency of ground improvement can be improved.
以下、本発明の地盤改良支援システムとその支援方法について、図面をもとに詳細にその実施の形態を説明する。 DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of a ground improvement support system and a support method thereof according to the present invention will be described in detail with reference to the drawings.
図1は、本発明の施工支援システムを適用した地盤改良機の全体構成図、図2は、攪拌ヘッドによる掘削、攪拌混合の状態を示す説明図、図3は、施工支援システムのフロー図、図11は、制御装置の構成を示すブロック図である。
図4は、柱状改良施工支援の表示画面図、図5は、杭一本当たりの積算流量計算式を示す表示画面図、図6は、セメントと水の配合比(配合量)を示す表示画面図、図7は、経過流量プリント機能における条件設定を行うための表示画面図、図8は、流量の経過を数値で示す印字例図、図9は、1ストロークの場合における深度、積算流量対応印字パターン例図、図10は、施工流量・フィード速度計算機能を示す表示画面図である。
1 is an overall configuration diagram of a ground improvement machine to which the construction support system of the present invention is applied, FIG. 2 is an explanatory diagram showing a state of excavation and stirring mixing by a stirring head, and FIG. 3 is a flowchart of the construction support system, FIG. 11 is a block diagram illustrating a configuration of the control device.
4 is a display screen diagram for columnar improvement construction support, FIG. 5 is a display screen diagram showing an integrated flow rate calculation formula per pile, and FIG. 6 is a display screen showing a mixing ratio (mixing amount) of cement and water. FIGS. 7 and 7 are display screen diagrams for setting the conditions in the elapsed flow rate print function, FIG. 8 is a print example diagram showing the flow rate numerically, and FIG. 9 corresponds to the depth and integrated flow rate in the case of one stroke. FIG. 10 is a display screen diagram showing a construction flow rate / feed speed calculation function.
図1は、本実施の形態の地盤改良機1の全体構成を示す。図1において、地盤改良機1の前面にはリーダ2が設けられ、このリーダ2には攪拌軸3の駆動装置4が上下方向に移動可能に設けられている。この駆動装置4はワイヤ(図示せず)によってリーダ側壁に設けられたシリンダにより上下動する。
FIG. 1 shows an overall configuration of a
この駆動装置4は、攪拌のための回転駆動機能を有していて攪拌軸3を回転駆動する。又攪拌軸3の端部には、先端側から掘削翼と、共回り防止装置と、複数の攪拌翼により構成される攪拌ヘッド5が設けられていて、地盤を掘削しながら攪拌する。一方攪拌に際しては、掘削の際攪拌軸3の上方からセメントと水の混練したセメントミルクを注入するようになっている。このセメントミルクは攪拌軸3の内部を通り、攪拌ヘッド5の先端部から吐出される。吐出されたセメントミルクは地盤とともに攪拌混合され、最終的には固化し地盤改良柱状体となる。
This
この地盤の柱状改良工法の工程は、一般的に図2に示すようになっていることが多い。すなわち、攪拌ヘッド5の抗芯セットを行う工程S1に始まり、地盤の掘削、セメントミルクの注入、混合、攪拌を行う工程S2、攪拌ヘッド5を上下に移動させて攪拌を行う工程S3、S4、攪拌混合が完了する工程S5、このとき攪拌ヘッド5は上方に引き上げられている。最終的に基礎打設により固化し地盤改良柱状体が完成する(S6)。これに関連して、地盤改良の施工工事を支援するための地盤改良支援プログラムを内蔵する制御装置6が地盤改良機1の操作室8の内部又は操作室8の近傍に設けられ、作業者が操作できるようになっている。
The process of this columnar improvement method for the ground is generally as shown in FIG. That is, starting with step S1 for performing anti-core setting of the
図11は、地盤改良支援プログラムを内蔵した制御装置6を示すブロック図である。制御装置6には、種々のデータ処理を行う情報処理手段としてのCPU30が設けられており、CPU30には、バス31を介して主記憶装置としてROM32、RAM33が接続されている。
CPU30は、ROM32に記憶されているシステムプログラム及びデータと、RAM32にロード(メモリ中に読み込むこと)されたプログラム及びデータに従って動作する。このようにRAM33にロードされるプログラムとしては、施工支援プログラム331、第1演算プログラム332、第2演算プログラム333、施工支援モニタープログラム338、表示手段41に対して文字や図形の表示を行う表示制御プログラム等がある。
FIG. 11 is a block diagram showing the
The
また、バス31には、インタフェースを介して、表示手段41、入力手段42、出力手段(プリンタ)43、検出手段(検出センサ)44、メモリーカード読取書込手段45等が接続されている。さらに、バス31には、施工データファイルメモリ34、配合量データファイルメモリ35等も接続されている。
The
以上のように構成されている地盤改良機1において、必要なセメントミルクを注入し地盤改良を施工しているときの施工状態を確認するためのデータが必要であるが、そのデータを得るための検出手段(検出センサ)44が地盤改良機1の本体に設けられている。これらのデータの検出のための手段は、よく使用されている周知なものであるので詳細な説明を省略するが、対象となるものは次のようなものである。攪拌軸の回転数を検出するための回転数検出手段、攪拌軸の駆動電流を検出するための電流検出手段及びトルクを検出するためのトルク検出手段、セメントミルクの吐出量を検出するためのセメントミルク流量検出手段、攪拌ヘッドの深度を検出するための深度検出手段、給圧検出手段、フィード速度(昇降速度)検出手段等である。
In the
本実施の形態の制御装置6は、現場で作業者が施工支援システムの表示画面の表示を見ながら入力データ(施工条件のデータ)を入力することで適切な施工データの作成等ができる施工支援システムとし、そのためのプログラムを有したものとなっている。
The
次にその施工支援システムについて説明する。この施工支援システムは現場で地盤改良機1の表示手段(ディスプレイ)41に表示された表示内容への応答によりキー入力操作が容易にできるようになっているものである。すなわち、表示画面の表示内容に誘導されて施工条件のデータ等の入力をすることができる。この施工支援システムの施工支援プログラムは、図3に示すフロー図に沿っている。次にこのフロー図の流れに沿ってその内容を説明する。地盤改良の施工工事の前に、本実施の形態の地盤改良の施工支援システムを起動させ(S101)、表示装置41に「施工支援システムのメニュー」を表示させる(S102)。本形態の施工支援システムのメニュー項目は、「柱状改良支援」、「プリント(深度・積算流量印字機能)」等となっている。
Next, the construction support system will be described. In this construction support system, key input operation can be easily performed by a response to the display contents displayed on the display means (display) 41 of the
先ず「柱状改良支援」を選択するための入力手段であるボタンキーを押す(S103)と、柱状改良支援メニューが表示される(S104)。本発明のメインをなすのは、この柱状改良支援メニューで選択される内容である。その内容項目は、「セメントミルク流量計算機能」「深度・経過流量設定」、「フィード速度・瞬時流量設定」等となっている。次に「セメントミルク流量計算機能」のボタンキーを選択し押す(S105)と、図4に示した表示画面になる。この画面により、杭一本当たりの積算流量値算出のための入力をする。 First, when a button key which is an input means for selecting “columnar improvement support” is pressed (S103), a columnar improvement support menu is displayed (S104). The main contents of the present invention are the contents selected in this columnar improvement support menu. The content items are “cement milk flow rate calculation function”, “depth / elapsed flow rate setting”, “feed speed / instantaneous flow rate setting”, and the like. Next, when the button key of the “cement milk flow rate calculation function” is selected and pressed (S105), the display screen shown in FIG. 4 is displayed. On this screen, input for calculating the integrated flow rate value per pile.
この算出のためには、施工条件のデータである地盤に注入する「セメント添加量」、地盤に掘削する杭の「杭径」、地盤改良の「改良深度」及びセメントと水の「配合比(配合量)」の4項目の数値を入力手段であるキー(入力手段)42により入力する(S106)。施工条件のデータは、柱状改良工事の現場で与えられることが多い「セメント添加量」、「杭径」、「改良深度」及び「配合比(配合量)」であることが好ましい。このキー42は、画面上に表示されたキー部分にタッチすることでキー入力が可能なタッチキー方式のものであるが、表示手段41の表示画面の近傍に操作キーを設けたものであってもよい。カーソルキー42bの操作により画面の入力項目を選択する。例えば、第1から第4の入力表示部41a〜41dにカーソルを移動させることで選択する。選択後、数値キー42a、ENTキー等で数値を入力していく。この入力をすると、数値キー42aに隣接する第1の入力表示部(セメント添加量表示部)41a、第2の入力表示部(杭径表示部)41b、第3の入力表示部(深度表示部)41c、第4の入力表示部(配合比表示部)41dに入力した数値が表示される。全項目の数値が入力されると、制御装置6の第1の演算手段(第1演算プログラム)332により杭一本当たりの積算流量値が自動的に計算され、結果は表示手段41の第5の入力表示部(杭1本当たりの積算流量値表示部)41eに、積算流量値として表示される(S107)。
For this calculation, the data of construction conditions are “cement addition amount” injected into the ground, “pile diameter” of piles excavated into the ground, “improvement depth” of ground improvement and “combination ratio of cement and water ( The numerical values of the four items of “mixing amount” ”are input by the key (input means) 42 as input means (S106). The construction condition data is preferably “cement addition amount”, “pile diameter”, “improvement depth”, and “combination ratio (mixing amount)” that are often given at the site of columnar improvement work. This key 42 is of a touch key type that allows key input by touching a key portion displayed on the screen, but an operation key is provided in the vicinity of the display screen of the display means 41. Also good. An input item on the screen is selected by operating the cursor key 42b. For example, the selection is made by moving the cursor to the first to fourth
また、この杭1本当たりの積算流量値の計算は、次に示す式1、式2に従って行われる(図5参照)。
The calculation of the integrated flow rate value per pile is performed according to the following
1m3 当たりのセメントミルク
=(セメント添加量/セメント比重)*(1+3.15*配合比) (式1)
杭一本当たりの積算流量値
=(杭径/2)2 *π*改良深度*1m3 当たりのセメントミルク (式2)
Cement milk per 1 m 3 = (addition amount of cement / cement specific gravity) * (1 + 3.15 * composition ratio) (Formula 1)
Integrated flow rate per pile = (Pile diameter / 2) 2 * π * Depth of improvement * Cement milk per 1 m 3 (Formula 2)
例えば、第1の入力表示部(セメント添加量表示部)41aに「300」の数値を、第2の入力表示部(杭径表示部)41bに「600」の数値を、第3の入力表示部(深度表示部)41cに「3.5」の数値を、第4の入力表示部(配合比表示部)41dに「0.7」の数値を入力すると、式1、2に基づいて自動計算され、第5の入力表示部(杭1本当たりの積算流量値表示部)41eに「302」の数値が表示される(図4参照)。
For example, a numerical value “300” is displayed on the first input display unit (cement addition amount display unit) 41a, and a numerical value “600” is displayed on the second input display unit (pile diameter display unit) 41b. When a numerical value of “3.5” is input to the part (depth display part) 41c and a numerical value of “0.7” is input to the fourth input display part (composition ratio display part) 41d, it is automatically based on the
また、図4の表示画面で「詳細」ボタンキー42dを押すと、図5にその例を示すが、杭一本当たりの積算流量の計算式が表示される。さらに、図5の表示画面で「配合量」ボタンキー42eを押すと、図6にその一例を示すが、配合量データファイル35に記憶されたセメントと水の配合比(配合量の割合)の詳細データが表示されるようになっている。この図6の表示は、作業者が、地盤の状況を考慮した適切な配合比(配合量)を決める際の参考とすることができる。 Further, when the “detail” button key 42d is pressed on the display screen of FIG. 4, an example is shown in FIG. 5, and a formula for calculating the integrated flow rate per pile is displayed. Further, when the “mixing amount” button key 42e is pressed on the display screen of FIG. 5, an example is shown in FIG. 6, but the mixing ratio of the cement and water (ratio of the mixing amount) stored in the mixing amount data file 35 is shown. Detailed data is displayed. The display in FIG. 6 can be used as a reference when the operator determines an appropriate blending ratio (blending amount) in consideration of the ground conditions.
次に、経過流量を印字(プリント)する機能について説明する。所望のデータを入力し設定後、施工支援システムメニューから「プリント」を選択する(S140)。印刷開始方向の選択を行う(S141)。 Next, a function for printing (printing) the elapsed flow rate will be described. After inputting and setting desired data, “print” is selected from the construction support system menu (S140). A print start direction is selected (S141).
例えば、印刷開始方向の選択で「下降側」を選択すると図7に示すような画面が表示される。図7は、経過流量プリント機能における条件設定を行うための表示画面図である。この表示画面から、第6の入力表示部41fに深度のデータを、第7の入力表示部41gに積算流量のデータを入力する。なお、下降側を選択した場合、改良深度の数値データは、深度1<深度2、深度2>深度3、深度3<深度4、深度4>深度5、深度5<深度6のような関係になるように入力する。また、積算流量の数値データは、積算流量1<積算流量2、積算流量2<積算流量3、積算流量3<積算流量4、積算流量4<積算流量5、積算流量5<積算流量6のような関係になるように入力する。そして、この表示画面からは、最大2ストローク分の入力が可能になっている。
For example, when “down” is selected in the print start direction, a screen as shown in FIG. 7 is displayed. FIG. 7 is a display screen diagram for setting conditions in the elapsed flow rate print function. From this display screen, depth data is input to the sixth
前述したデータを入力した例で説明を行うと、例えば、深度1=0、積算流量1=0、深度2=3.5、積算流量2=151、深度3=0、積算流量3=302のように、第6の入力表示部41fの各入力表示部、第7の入力表示部41gの各入力表示部にデータを入力する。このデータの入力は、カーソルキー42b、数値キー42a、ENTキー等で行う。入力データが正確に入力された場合には、設定キーを押圧操作するとよい。なお、この例では、下降側と上昇側で、同一の積算流量の数値を入力しているが、異なる数値を入力してもよい。
For example, when the above-described data is input, for example,
戻りキーで所定の画面(図示せず)に戻り、この画面から「経過流量プリント機能」を選択する(S142)。次のような印字をすることができる。すなわち、前述した第1の演算手段(第1演算プログラム)332により計算された「杭一本当たりの積算流量」を所定の経過深度区間(例えば、本実施の形態においては0.5m間隔としている)で分割し、区間ごとの積算流量値を出力手段(プリンタ)43で印字又は印刷することができる。このような区間ごとの積算流量値を予め出力しておくと、実際に地盤改良を施工したときの検出データとの比較が容易である。 The return key is used to return to a predetermined screen (not shown), and the “elapsed flow rate print function” is selected from this screen (S142). The following prints can be made. That is, the “cumulative flow rate per pile” calculated by the above-described first calculation means (first calculation program) 332 is set to a predetermined elapsed depth section (for example, 0.5 m in this embodiment). ) And the integrated flow rate value for each section can be printed or printed by the output means (printer) 43. If the integrated flow rate value for each section is output in advance, it is easy to compare with the detection data when the ground improvement is actually performed.
その印字例を図8に示す。図8は、セメント添加量300kg/m3、杭径φ600mm、改良長(改良深度)L3.5m、配合比W/C0.7の数値を入力し杭一本当たり積算流量を分割した場合の印字例を示す。そして、地盤改良の施工を行う際、掘削時・引き上げ時に、施工前に求めたその深度における通過時の積算流量値が印字された数値を見ながら施工を行うとたいへん便利である。 An example of the printing is shown in FIG. Fig. 8 shows the print when the cumulative flow rate per pile is divided by inputting the values of cement addition amount 300kg / m 3 , pile diameter φ600mm, improved length (improved depth) L3.5m, compounding ratio W / C0.7. An example is shown. When performing ground improvement work, it is very convenient to perform the work while looking at the numerical value on which the accumulated flow rate value at the time of passage at the depth obtained before construction is printed during excavation and lifting.
又、図示していない画面から「深度・積算流量対応印字パターン」を選択すると、図9に一例を示すような地盤改良のための昇降動作パターンから選択された動作パターンが、表示手段41に表示されるとともに、出力手段(プリンタ)43で印刷することができる。この動作パターンは1ストロークの動作確認パターンを示すものであり、図示していないが1.5ストローク、2ストローク等の昇降動作パターンも用意されている。入力されたデータが正確であれば、そのデータに従って昇降動作パターンが選択され、表示又は出力(印刷)することができる。このようにすることで、昇降動作をパターンとして容易に確認することができる。図8のような印字例と組み合わせると、施工の状態のイメージを把握するのが容易となる。 Further, when “print pattern corresponding to depth / integrated flow rate” is selected from a screen (not shown), an operation pattern selected from the lifting / lowering operation pattern for ground improvement as shown in FIG. In addition, printing can be performed by the output means (printer) 43. This operation pattern shows a one-stroke operation confirmation pattern, and although not shown, a lifting / lowering operation pattern of 1.5 stroke, 2 stroke, etc. is also prepared. If the input data is accurate, the lifting / lowering operation pattern is selected according to the data and can be displayed or output (printed). By doing in this way, raising / lowering operation | movement can be confirmed easily as a pattern. When combined with the printing example as shown in FIG. 8, it becomes easy to grasp the image of the construction state.
続いて、フィード速度、瞬時流量計算機能について説明する。なお、フィード速度、瞬時流量計算機能は、経過流量印字(プリント)機能の後に行うことが好ましい。この加工支援システムメニューから「フィード速度、瞬時流量設定選択機能」を選択する(S120)。図10は、その表示画面であり、下降開始時の設定による表示画面を示している。画面の右側に示す「改良深度」入力表示部41hと「積算流量」入力表示部41iに、カーソルキー42b、数値キー42a、ENTキー等で数値を入力する(S121)。入力後、その下部に示される「速度」入力表示部41j又は「瞬時流量」入力表示部41kのいずれか一方に数値を数字キー42a、ENTキー等によって入力すると(S122)、設定した改良深度と設定した積算流量を満たすために必要な理想的速度又は瞬時流量が第2の演算手段(第2演算プログラム)333で自動計算され、表示部41mの1〜2、2〜3、3〜4、・・に表示される。(S123)。なお、杭1本当たりの積算流量値の表示部には、経過流量印字機能で入力された値を表示することが好ましいが、同様な方法で入力してもよい。
Next, the feed speed and instantaneous flow rate calculation function will be described. The feed speed and instantaneous flow rate calculation function is preferably performed after the elapsed flow rate print (print) function. “Feed speed / instantaneous flow rate setting selection function” is selected from the processing support system menu (S120). FIG. 10 shows the display screen, which is a display screen set according to the start of descent. A numerical value is input to the “improved depth”
また、第2の演算手段(第2演算プログラム)では、式3、式4に基づいて自動計算される。
瞬時流量 = 速度*積算流量/改良深度 (式3)
速 度 = 瞬時流量*改良深度/積算流量 (式4)
In the second calculation means (second calculation program), the calculation is automatically performed based on
Instantaneous flow rate = Speed * Integrated flow rate / Improved depth (Equation 3)
Speed = Instantaneous flow * Improved depth / Integrated flow (Formula 4)
例えば、改良深度「3.5」m、積算流量「151」Lであるとき、「速度」入力表示部41jに「1.0」を入力すると、式3、式4で自動計算がなされ、「速度」入力表示部41jの隣に、瞬時流量「43」が表示される。逆に、改良深度「3.5」m、積算流量「151」Lであるとき、「瞬時流量」入力表示部41kに「43」を入力すると、式3、式4で自動計算がなされ、「瞬時流量」入力表示部41kの隣に速度「1.0」が表示される(図10参照)。
For example, when the improved depth is “3.5” m and the integrated flow rate is “151” L, when “1.0” is input to the “speed”
この実施の形態では、セメントミルク流量計算機能、プリント機能(深度積算流量印字機能)、フィード速度・瞬時流量計算機能の順に選択していくと、施工条件のデータから施工データが容易に求められ、表示、出力することができる。すなわち、この形態の施工支援システム及び施工支援方法を利用して施工前に、施工データを作成して表示又は出力(印字、印刷)することができるので、地盤改良工事の概要のイメージが施工前につかめる。例えば、深度と積算流量の関係を示す区間ごとの積算流量値、昇降動作パターンなどの表示又は出力(印字、印刷)されたデータを見ることでイメージをつかむことができる。さらに、図7、図10のような表示画面を出力(印刷)しておくとさらによい。
また、この施工支援システム及び施工支援方法を利用して作成された施工データ等は、施工データメモリ34に記憶させることができる。
In this embodiment, when the cement milk flow rate calculation function, the print function (depth integrated flow rate print function), and the feed speed / instantaneous flow rate calculation function are selected in this order, the construction data is easily obtained from the construction condition data, Can be displayed and output. In other words, since construction data can be created and displayed or printed (printed or printed) before construction using the construction support system and construction support method of this form, an image of the outline of ground improvement work is shown before construction. To catch. For example, an image can be grasped by looking at data that is displayed or output (printed or printed) such as an integrated flow rate value for each section indicating the relationship between depth and integrated flow rate, an ascending / descending operation pattern, or the like. Furthermore, it is better to output (print) the display screens as shown in FIGS.
In addition, construction data and the like created using this construction support system and construction support method can be stored in the
施工データを表示、出力(印字、印刷)等し、施工データを確認した後、施工支援モニター機能を起動させ、地盤改良の施工を行う(S151,S152)。施工支援モニター機能を起動させることで、検出手段(検出センサ)44のデータをモニター(確認)しながら地盤改良を行うことができる。また、施工前に作成された施工データに沿って、施工時に微調整や補正を行うことも容易であり、知識や技量の少し劣る作業者、経験が少し足りない作業者であっても品質の高い地盤改良を容易に行うことができる。 After displaying the construction data, outputting (printing, printing), etc. and confirming the construction data, the construction support monitor function is activated to perform ground improvement construction (S151, S152). By starting the construction support monitor function, the ground can be improved while monitoring (confirming) the data of the detection means (detection sensor) 44. In addition, it is easy to make fine adjustments and corrections during construction according to the construction data created before construction. High ground improvement can be easily performed.
以上、本発明の実施の形態について説明したが、本発明はこの実施の形態に限定されることはない。本発明の目的、趣旨を逸脱しない範囲内での変更が可能であることはいうまでもない。 As mentioned above, although embodiment of this invention was described, this invention is not limited to this embodiment. Needless to say, modifications can be made without departing from the scope and spirit of the present invention.
1…地盤改良機
2…リーダ
3…攪拌軸
4…駆動装置
5…攪拌ヘッド
6…制御装置
30…CPU
32…ROM
33…RAM
41…表示手段
42…入力手段
43…出力手段(プリンタ)
44…検出手段(検出センサ)
DESCRIPTION OF
32 ... ROM
33 ... RAM
41 ... Display means 42 ... Input means 43 ... Output means (printer)
44. Detection means (detection sensor)
Claims (10)
前記制御装置に設けられ、地盤改良のための所定の施工条件のデータを入力する入力手段(42)と、
前記制御装置に設けられ、前記データをもとに、前記セメントミルクの積算流量値を演算する第1の演算手段(30,332)と、
前記制御装置に設けられ、前記第1の演算手段で演算された前記セメントミルクの演算積算流量値を表示する演算積算流量表示手段(41)とからなり、
前記地盤改良機による地盤改良の施工前に、前記セメントミルクの積算流量値が求められるようにした
ことを特徴とする地盤改良施工支援システム。 In the control device (6) of the ground improvement machine that excavates the ground and injects cement milk and mixes it with stirring to improve the ground,
Input means (42) provided in the control device for inputting data of predetermined construction conditions for ground improvement;
First calculating means (30, 332) that is provided in the control device and calculates an integrated flow rate value of the cement milk based on the data;
Computation integrated flow rate display means (41) for displaying the calculated integrated flow rate value of the cement milk calculated by the first calculation means provided in the control device,
The ground improvement construction support system characterized in that the integrated flow rate value of the cement milk is obtained before construction of ground improvement by the ground improvement machine.
前記データは、地盤に注入するセメント添加量データ、地盤に掘削する杭の杭径データ、地盤改良の深度データ、及び、セメントと水の配合比データが含まれているものである
ことを特徴とする地盤改良施工支援システム。 In the ground improvement construction support system according to claim 1,
The data includes cement addition amount data to be injected into the ground, pile diameter data of piles to be excavated into the ground, depth improvement depth data, and blending ratio data of cement and water. Ground improvement construction support system to do.
前記演算積算流量値を、所定の経過深度区間ごとに分割し、前記区間ごとに分割した積算流量値及び/又は昇降動作のパターンを出力するための出力手段(43)を前記制御装置(6)に設けた
ことを特徴とする地盤改良施工支援システム。 In the ground improvement construction support system according to claim 1 or 2,
The control device (6) includes an output means (43) for dividing the calculated integrated flow rate value for each predetermined elapsed depth section and outputting the integrated flow rate value and / or the lifting / lowering pattern divided for each section. The ground improvement construction support system characterized by
前記演算積算流量値を満足させるために必要な前記地盤改良機の昇降速度及び前記セメントミルクの瞬時流量を、所定の経過深度区間ごとに演算する第2の演算手段と、
前記演算された前記昇降速度及び/又は前記瞬時流量を表示する速度・流量表示手段とを前記制御装置に設けた
ことを特徴とする地盤改良施工支援システム。 In the ground improvement construction support system according to claim 1 or 2,
A second calculating means for calculating a lifting speed of the ground improvement machine and an instantaneous flow rate of the cement milk necessary for satisfying the calculated integrated flow value for each predetermined elapsed depth section;
A ground improvement construction support system, wherein the controller is provided with speed / flow rate display means for displaying the calculated ascending / descending speed and / or the instantaneous flow rate.
前記入力手段からのデータ入力は、前記表示手段に表示された表示画面の表示内容に基づいて行えるようにした
ことを特徴とする地盤改良施工支援システム。 In the ground improvement construction support system according to any one of claims 1 to 4,
The ground improvement construction support system characterized in that data input from the input means can be performed based on the display content of the display screen displayed on the display means.
前記制御装置に、地盤改良のための所定の施工条件のデータを入力する工程と、
入力した前記データをもとに前記セメントミルクの積算流量値を求めるための演算を行う工程と、
演算された前記セメントミルクの演算積算流量値を演算積算流量表示手段に表示する工程とからなり、
前記地盤改良機による地盤改良の施工前に、前記セメントミルクの積算流量値が求められるようにした
ことを特徴とする地盤改良施工支援方法。 In the control method in the control device of the ground improvement machine that excavates the ground and injects cement milk, improves the ground by stirring and mixing,
A step of inputting predetermined construction condition data for ground improvement to the control device;
Performing a calculation for obtaining an integrated flow rate value of the cement milk based on the input data;
It comprises the step of displaying the calculated integrated flow rate value of the calculated cement milk on the calculated integrated flow rate display means,
The ground improvement construction support method characterized in that an integrated flow rate value of the cement milk is obtained before construction of ground improvement by the ground improvement machine.
前記データは、地盤に注入するセメント添加量データ、地盤に掘削する杭の杭径データ、掘削の深度データ、及び、セメントと水の配合比データが含まれているものである
ことを特徴とする地盤改良機の施工支援方法。 In the ground improvement construction support method according to claim 6,
The data includes cement addition amount data to be injected into the ground, pile diameter data of piles to be excavated in the ground, depth data of excavation, and blending ratio data of cement and water. Construction support method for ground improvement machines.
演算された前記セメントミルクの演算積算流量値を所定の経過深度区間ごとに分割し、前記分割された区間ごとの積算流量値を出力するための工程が設けられている
ことを特徴とする地盤改良施工支援方法。 In the ground improvement construction support method according to claim 6 or 7,
A ground improvement is provided, wherein the calculated integrated flow value of the cement milk is divided for each predetermined elapsed depth section, and a step for outputting the integrated flow value for each of the divided sections is provided. Construction support method.
前記演算積算流量値を満足させるために必要な前記地盤改良機の昇降速度及び前記セメントミルクの瞬時流量を、所定の経過深度区間ごとに演算するための工程と、
前記演算された前記昇降速度及び/又は前記瞬時流量を表示するための工程を設けた
ことを特徴とする地盤改良施工支援方法。 In the ground improvement construction support method according to any one of claims 6 to 8,
A step for calculating a lifting speed of the ground improvement machine and an instantaneous flow rate of the cement milk necessary for satisfying the calculated integrated flow rate value for each predetermined elapsed depth section;
A ground improvement construction support method, comprising a step for displaying the calculated ascending / descending speed and / or the instantaneous flow rate.
前記データを入力する工程は、前記表示手段に表示された表示画面の表示内容に基づいて行えるようにしたものである
ことを特徴とする地盤改良施工支援方法。
In the ground improvement construction support method according to any one of claims 6 to 9,
The step of inputting the data can be performed based on the display content of the display screen displayed on the display means.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2005162241A JP4702933B2 (en) | 2005-06-02 | 2005-06-02 | Ground improvement construction support system and its support method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2005162241A JP4702933B2 (en) | 2005-06-02 | 2005-06-02 | Ground improvement construction support system and its support method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2006336300A JP2006336300A (en) | 2006-12-14 |
| JP4702933B2 true JP4702933B2 (en) | 2011-06-15 |
Family
ID=37557091
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2005162241A Expired - Fee Related JP4702933B2 (en) | 2005-06-02 | 2005-06-02 | Ground improvement construction support system and its support method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4702933B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6329794B2 (en) * | 2014-03-26 | 2018-05-23 | 大和ハウス工業株式会社 | Pile extraction method |
| JP7572586B1 (en) | 2024-07-10 | 2024-10-23 | 小野田ケミコ株式会社 | Ground improvement mixing equipment |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0586613A (en) * | 1991-03-19 | 1993-04-06 | Yamato Boring Kk | Injection work of ground-improving material |
| JP3126909B2 (en) * | 1995-11-15 | 2001-01-22 | 株式会社鴻池組 | Automatic soil augmentation control method of soil cement column in foundation ground |
| JP2002256555A (en) * | 2001-02-28 | 2002-09-11 | Nippon Sharyo Seizo Kaisha Ltd | Execution control device |
-
2005
- 2005-06-02 JP JP2005162241A patent/JP4702933B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2006336300A (en) | 2006-12-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5071858B2 (en) | Ready-made pile construction management equipment | |
| JP2002348868A (en) | Construction method of pile hole consolidation layer, construction management device of foundation pile, construction management method of foundation pile | |
| EP2468960B1 (en) | Ground drilling method and apparatus. | |
| JP3437108B2 (en) | Management method of ground improvement method and management device of ground improvement machine | |
| JP6166833B1 (en) | Management equipment for deep mixing equipment | |
| JP4702933B2 (en) | Ground improvement construction support system and its support method | |
| JP7526078B2 (en) | Pile driver display system | |
| JP4954166B2 (en) | Control system for stirring and mixing equipment | |
| JP6763655B2 (en) | Ground improvement system and ground improvement method | |
| JP5698512B2 (en) | Foundation pile construction method, compressive strength estimation method | |
| JP6409146B1 (en) | Ground agitator management system | |
| JP4753132B2 (en) | Pile hole drilling method | |
| JP5812450B2 (en) | Control system for stirring and mixing equipment | |
| JP3753240B2 (en) | Management method for ground improvement method and management device for ground improvement machine | |
| JP4157152B1 (en) | Ground agitator management system | |
| JP2014145192A (en) | Improvement body construction system | |
| JP6035649B2 (en) | Ground investigation device, continuous wall construction device and continuous wall construction method | |
| JP4459272B2 (en) | Ground agitator management system | |
| JPH09137449A (en) | Control method for automatic formation of soil cement columns in foundation ground | |
| JP3430148B2 (en) | Ground improvement construction method and construction management device | |
| JP2008095388A (en) | Construction management method and apparatus in mixed processing method | |
| JP2020183677A (en) | Ground improvement method and ground improvement device using hydraulic measurement | |
| JP4993719B2 (en) | Soil columnar improvement equipment and its control program. | |
| JP3788728B2 (en) | Device that displays the construction status of the ground improvement method | |
| JP2005213937A (en) | Construction machine construction management device and foundation construction machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080414 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100405 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110302 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110307 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4702933 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |