JP4710197B2 - Wiring structure of manhole pump control panel - Google Patents
[go: Go Back, main page]

JP4710197B2 - Wiring structure of manhole pump control panel - Google Patents

Wiring structure of manhole pump control panel Download PDF

Info

Publication number
JP4710197B2
JP4710197B2 JP2001249303A JP2001249303A JP4710197B2 JP 4710197 B2 JP4710197 B2 JP 4710197B2 JP 2001249303 A JP2001249303 A JP 2001249303A JP 2001249303 A JP2001249303 A JP 2001249303A JP 4710197 B2 JP4710197 B2 JP 4710197B2
Authority
JP
Japan
Prior art keywords
manhole
control panel
pump control
insulation resistance
manhole pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001249303A
Other languages
Japanese (ja)
Other versions
JP2003057277A (en
Inventor
光男 爪
孝緒 坪井
道隆 五味
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinfonia Technology Co Ltd
Original Assignee
Sinfonia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinfonia Technology Co Ltd filed Critical Sinfonia Technology Co Ltd
Priority to JP2001249303A priority Critical patent/JP4710197B2/en
Publication of JP2003057277A publication Critical patent/JP2003057277A/en
Application granted granted Critical
Publication of JP4710197B2 publication Critical patent/JP4710197B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
  • Measurement Of Resistance Or Impedance (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、マンホール内の水中に設置される2台のマンホールポンプを制御するために地下に埋設状態で設置される地下埋設設備であるマンホールポンプ制御盤の配線構造に関するものである。
【0002】
【従来の技術】
地下埋設設備の1つとして、マンホールポンプ制御盤Aが挙げられる。このマンホールポンプ制御盤Aは、図3に示されるように、下水道を流れる下水WをマンホールMH内においてポンプアップして、汚水処理場まで送り込むための2つの水中ポンプPa,Pb を制御するものである。当初、このマンホールポンプ制御盤Aは、地上に設置されたり、或いは地上に立てられたコンクリート製の支柱に取付けられていた。しかし、地上に設置した場合には、この制御盤A自体が大きい(幅×奥行き×高さが700mm×500mm×1600mm程度である)ので、歩行障害、交通障害を伴うと同時に、都市景観を損ない、しかも私有地に立てることが大部分であるために、その用地確保が困難な場合が多い等の問題があった。本出願人は、これらの問題を解決するために、このマンホールポンプ制御盤Aを地下に埋設することとした。
【0003】
マンホールポンプ制御盤Aの配線構造について説明する。マンホールポンプ制御盤Aの近傍の地表面には支柱1が立設されていて、該支柱1の所定高さの位置に地上引込盤2が取付けられている。外部電線3から分岐された引込線4は、前記地上引込盤2内に取付けられた漏電遮断器5を介して地下に埋設され、ハンドホールHに収容されたマンホールポンプ制御盤Aに接続されている。前記引込線4は、マンホールポンプ制御盤A内で2本の水中ポンプ接続線6a,6b に分岐され、それぞれ盤内スイッチ7a,7b を介して、マンホールMH内に設置された各水中ポンプPa,Pb に接続されている。作業者が、地上引込盤2に取付けられた漏電遮断器5を操作して「ON」の状態とすると、マンホールポンプ制御盤A内の各盤内スイッチ7a,7b が連動して入り、各水中ポンプPa,Pb を構成するそれぞれのモータMa,Mb が作動される。そして、前記漏電遮断器5を操作して「OFF」の状態とすると、マンホールポンプ制御盤A内の各盤内スイッチ7a,7b が連動して切断され、各水中ポンプPa,Pb に取付けられたモータMa,Mb が停止される。
【0004】
ここで、前記2つの水中ポンプPa,Pb は、常にマンホールMH内の下水Wに浸漬されている。そのため、これらの水中ポンプPa,Pb において、各モータMa,Mb と各水中ポンプ接続線6a,6b との接続部分には絶縁処理が施されている。しかし、長時間が経過すると絶縁処理された部分が劣化して下水Wが浸入し、各モータMa,Mb が損傷するおそれがある。
【0005】
このため、作業者は、絶縁抵抗計8を使用して、定期的に各モータMa,Mb に接続された各水中ポンプ接続線6a,6b と大地との間の絶縁抵抗を測定する必要がある。この作業を行うとき、漏電遮断器5が切断されるため、マンホールポンプ制御盤A内の各盤内スイッチ7a,7b も連動して切断される。この結果、作業者は、各水中ポンプ接続線6a,6b と大地との間に、絶縁抵抗計8を配置させなければならない。ところが、前記マンホールポンプ制御盤Aは地下に埋設されているため、この状態で各モータMa,Mb の絶縁抵抗を測定することは極めて困難である。そして、マンホールポンプ制御盤Aを地上に引き上げる作業は、面倒で大がかりなものである。上記した結果、マンホールポンプ制御盤Aが修理・点検のために地上に引き上げられたときに、各モータMa,Mb の絶縁抵抗を測定しているのが現状である。なお、図3において、9は、ハンドホール蓋である。
【0006】
【発明が解決しようとする課題】
本発明は、上記した不具合に鑑み、地下に埋設された地下埋設設備であるマンホールポンプ制御盤を地上に持ち上げることなく、マンホール内の水中に設置される2台のマンホールポンプの絶縁抵抗の測定を地上において、しかも個別に行えるようにすることを課題としている。
【0007】
【課題を解決するための手段】
上記課題を解決するための請求項1に記載の発明は、マンホール内の水中に設置される2台のマンホールポンプを制御するために地下に埋設状態で設置される地下埋設設備であるマンホールポンプ制御盤の配線構造であって、地上に設置される電源供給設備と前記マンホールポンプ制御盤とを接続する第1ケーブルと、前記マンホールポンプ制御盤に対して前記2台のマンホールポンプを並列に接続する2本の第2ケーブルと、前記マンホールポンプ制御盤に対して電源の供給と遮断を行うために、前記電源供給設備内に設けられた第1スイッチと、前記マンホールポンプ制御盤から各マンホールポンプに対して電源の供給及び遮断を行うために、前記2本の第2ケーブル上にそれぞれ設けられた2個の第2スイッチと、前記2本の第2ケーブルからそれぞれ分岐され、非分岐側の端部が端子となって前記電源供給設備内に配置されて、前記マンホールポンプの絶縁抵抗を測定するための絶縁抵抗計のリード線に接続可能に配線された2本の抵抗測定ケーブルとを備え、前記2個の第2スイッチは、いずれも前記第1スイッチの切断に連動して切断され、当該2個の第2スイッチが切断されることにより、前記マンホールポンプ制御盤と2台の前記マンホールポンプとを電気的に切り離した状態で、前記マンホールポンプ制御盤を地下に埋設したままで、前記2台のマンホールポンプのいずれかを選択して、その絶縁抵抗を個別に測定可能にしたことを特徴としている。
【0008】
マンホールポンプ制御盤に接続された2台のマンホールポンプの絶縁抵抗を測定するためには、次のようにして行う。地上に設置された電源供給設備とマンホールポンプ制御盤とを接続する第1スイッチを切断すると、それに連動して、マンホールポンプ制御盤に対して2台のマンホールポンプを並列に接続している2本の第2ケーブル上に設けられた2個の第2スイッチが切断される。2本の第2ケーブルには、前記2台のマンホールポンプの絶縁抵抗を測定するための抵抗測定ケーブルがそれぞれ分岐状態で取付けられている。作業者は、絶縁抵抗計により、前記抵抗測定ケーブルの測定端子と大地との間の絶縁抵抗を測定することにより、2台のマンホールポンプの絶縁状態を地上において個別に検知することができる。このように、請求項1の発明では、2台のマンホールポンプを制御するマンホールポンプ制御盤を地下に埋設したままで、当該2台のマンホールポンプのいずれかを選択して、その絶縁抵抗を地上において個別に測定することができる。
【0009】
請求項2に記載の発明は、請求項1において、前記第1スイッチと、前記2本の抵抗測定ケーブルの各測定端子のいずれかに接続して、前記2台のマンホールポンプのいずれか一方の絶縁抵抗を測定する絶縁抵抗計は、いずれも支柱に設けられた地上引込盤内にそれぞれ設けられていることを特徴としているため、マンホールポンプ制御盤に接続された2台のマンホールポンプの絶縁抵抗を測定するときに、作業者が絶縁抵抗計を持ち運ぶことが不要である。
【0010】
【0011】
【発明の実施の形態】
以下、実施形態を挙げて本発明を更に詳細に説明する。本実施例では、マンホールMH内に設置された2つの水中ポンプPa,Pb に取付けられた各モータMa,Mb の作動を制御するためのマンホールポンプ制御盤Aについて説明する。なお、従来の技術で説明したものと同一の部分には同一の符号を付し、重複説明を避けて、本発明の特徴部分についてのみ説明する。図1は本発明に係るマンホールポンプ制御盤Aの配線構造を示す概略図、図2は絶縁抵抗計8が組み込まれた地上引込盤2の正面図である。
【0012】
図1に示されるように、外部電線3から分岐され、地上引込盤2に取付けられた漏電遮断器5を介してマンホールポンプ制御盤Aに接続された引込線4は、該制御盤A内で2本に分岐され、各盤内スイッチ7a,7b を介して延設されている。そして、前記各盤内スイッチ7a,7b から延設された電線は、更に途中で2本に分岐され、そのうちの1本は、各水中ポンプ接続線6a,6b となって、それぞれ水中ポンプPa,Pb を構成するモータMa,Mb に接続されている。また、残りの1本は、絶縁抵抗測定線11a,11b となって、支柱1に取付けられた地上引込盤2内の各測定端子12a,12b に接続されている。前記地上引込盤2内には、大地に接続されたアース端子13が設けられている。
【0013】
作業者が、各モータMa,Mb の絶縁抵抗を測定する場合、次のようにして行う。最初に、漏電遮断器5を切断する。すると、該漏電遮断器5と連動して、マンホールポンプ制御盤A内の各盤内スイッチ7a,7b が切断されるため、各モータMa,Mb には電源が供給されなくなる。作業者は、地上引込盤2の近傍に絶縁抵抗計8を設置し、該絶縁抵抗計8から延設された一方側のリード線14をアース端子13に接続させると共に、他方側のリード線15を、絶縁抵抗の測定を行う側のモータ(図1の場合、モータMa)に接続された絶縁抵抗測定線11a側の測定端子12aに接続させる。こうすることによって、モータMaと絶縁抵抗計8とが、水中ポンプ接続線6aと絶縁抵抗測定線11aとによって接続される。このため、前記測定端子12aと大地との間の絶縁抵抗を測定することは、モータMaと大地との間の絶縁抵抗を測定することと同一となる。もう1つのモータMbの絶縁抵抗を測定する場合、絶縁抵抗計8から延設された一方側のリード線14をアース端子13に接続させたまま、他方側のリード線15を、モータMbに接続された絶縁抵抗測定線11b側の測定端子12bに接続させるだけで済む。
【0014】
このようにして、作業者は、各モータMa,Mb と大地との間の絶縁抵抗を測定することができる。そして、測定された抵抗値により、各モータMa,Mb の絶縁状態を検知することができる。上記した作業は、マンホールポンプ制御盤Aを地下に埋設したまま行うことができるため、従来のように、絶縁抵抗を測定するためにマンホールポンプ制御盤Aを引き上げる作業が不要である。
【0015】
上記した絶縁抵抗計8を、地上引込盤2内に組み込んでも構わない。次に、その実施例について説明する。図2に示されるように、地上引込盤2に絶縁抵抗計8が組み込まれていて、該絶縁抵抗計8から延設された一方側のリード線14は、予め、アース端子13に接続されている。そして、他方側のリード線15は、切換えスイッチ16に接続されている。また、各モータMa,Mb と接続される各絶縁抵抗測定線11a,11b は、地上引込盤2内に取付けられた各測定端子12a,12b に接続されている。通常の場合、前記切換えスイッチ16は、各測定端子12a,12b の間で、いずれの測定端子12a,12b とも非接続の状態で配置されている。そして、各モータMa,Mb の絶縁抵抗を測定する際に、作業者が、前記切換えスイッチ16といずれかの測定端子12a,12b とを接続させることができるようになっている。
【0016】
各モータMa,Mb の絶縁抵抗を測定するとき、作業者は、切換えスイッチ16を操作して、いずれかの測定端子12a,12b に接続させるだけで済む。この実施例の場合、絶縁抵抗計8が地上引込盤2に組み込まれているため、作業者が絶縁抵抗を測定する際に、絶縁抵抗計8を持ち運ぶことが不要である。
【0017】
上記したように、絶縁抵抗計8を地上引込盤2に組み込むことにより、該地上引込盤2が1つで済むという利点があるが、該絶縁抵抗計8を地上引込盤2とは別の場所に、単独で設置させても構わない。
【0018】
【発明の効果】
請求項1の発明は、マンホールポンプ制御盤に対して2台のマンホールポンプを並列に接続している2本の第2ケーブル上に設けられた2個の第2スイッチは、いずれも地上に設置された電源供給設備とマンホールポンプ制御盤とを接続する第1スイッチの切断に連動して切断されて、当該2個の第2スイッチの切断により、前記マンホールポンプ制御盤と2台の前記マンホールポンプとを電気的に切り離される。このため、2個の第2スイッチが切断されてマンホールポンプに給電されない状態で、2本の第2ケーブルにそれぞれ接続されている2本の抵抗測定ケーブルの端部の端子を絶縁抵抗計のリード線に接続させることにより、マンホール内に水中設置された2台のマンホールポンプを制御するマンホールポンプ制御盤を地下に埋設したままで、地上に持ち上げることなく、当該2台のマンホールポンプのいずれかを選択して、その絶縁抵抗を地上において個別に測定できる。
【0019】
請求項2に記載の発明は、前記第1スイッチと、前記2本の抵抗測定ケーブルの各測定端子のいずれかに接続して、前記2台のマンホールポンプのいずれか一方の絶縁抵抗を測定する絶縁抵抗計は、いずれも支柱に設けられた地上引込盤内にそれぞれ設けられていることを特徴としているため、作業者が絶縁抵抗計を持ち運ぶことが不要である。
【0020】
【図面の簡単な説明】
【図1】 本発明に係るマンホールポンプ制御盤Aの配線構造を示す概略図である。
【図2】 絶縁抵抗計8が組み込まれた地上引込盤2の正面図である。
【図3】 従来のマンホールポンプ制御盤Aの配線構造を示す概略図である。
【符号の説明】
A:マンホールポンプ制御盤
Pa,Pb :水中ポンプ(マンホールポンプ)
2:地上引込盤(電源供給設備)
3:外部電線(電源供給設備)
4:引込線(第1ケーブル)
5:漏電遮断器(第1スイッチ)
6a,6b :水中ポンプ接続線(第2ケーブル)
7a,7b :盤内スイッチ(第2スイッチ)
8:絶縁抵抗計
11a,11b :絶縁抵抗測定線(抵抗測定ケーブル)
12a,12b :測定端子
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a wiring structure for a manhole pump control panel , which is an underground installation facility installed underground in order to control two manhole pumps installed in water in a manhole .
[0002]
[Prior art]
One of the underground facilities is a manhole pump control panel A. As shown in FIG. 3, the manhole pump control panel A controls two submersible pumps Pa and Pb for pumping up the sewage W flowing through the sewer in the manhole MH and feeding it to the sewage treatment plant. is there. Initially, the manhole pump control panel A was installed on the ground or attached to a concrete support column standing on the ground. However, when installed on the ground, the control panel A itself is large (width × depth × height is about 700 mm × 500 mm × 1600 mm). Moreover, since most of them are standing on private land, there is a problem that it is often difficult to secure the land. In order to solve these problems, the present applicant decided to bury the manhole pump control panel A underground.
[0003]
The wiring structure of the manhole pump control panel A will be described. A support column 1 is erected on the ground surface in the vicinity of the manhole pump control panel A, and a ground pull-in panel 2 is attached at a predetermined height position of the support column 1. The lead-in wire 4 branched from the external electric wire 3 is buried underground through an earth leakage breaker 5 attached in the ground lead-in board 2 and connected to a manhole pump control panel A housed in the handhole H. . The lead-in wire 4 is branched into two submersible pump connection lines 6a and 6b in the manhole pump control panel A, and the submersible pumps Pa and Pb installed in the manhole MH via the panel switches 7a and 7b, respectively. It is connected to the. When the operator operates the earth leakage breaker 5 attached to the ground lead-in panel 2 to the “ON” state, the switches 7a and 7b in the panel in the manhole pump control panel A enter in conjunction with each other. The respective motors Ma and Mb constituting the pumps Pa and Pb are operated. Then, when the earth leakage breaker 5 is operated to be in the “OFF” state, the switches 7a and 7b in the manhole pump control panel A are cut off in conjunction with each other and attached to the submersible pumps Pa and Pb. The motors Ma and Mb are stopped.
[0004]
Here, the two submersible pumps Pa and Pb are always immersed in the sewage W in the manhole MH. For this reason, in these submersible pumps Pa and Pb, the insulating portions are applied to the connecting portions between the motors Ma and Mb and the submersible pump connecting wires 6a and 6b. However, when a long time elapses, the insulated portion deteriorates and the sewage W enters, and the motors Ma and Mb may be damaged.
[0005]
For this reason, the operator needs to periodically measure the insulation resistance between the submersible pump connection lines 6a and 6b connected to the motors Ma and Mb and the ground using the insulation resistance meter 8. . When this operation is performed, the earth leakage breaker 5 is disconnected, so that the switches 7a and 7b in the manhole pump control panel A are also disconnected in conjunction with each other. As a result, the operator must arrange the insulation resistance meter 8 between each submersible pump connection line 6a, 6b and the ground. However, since the manhole pump control panel A is buried underground, it is extremely difficult to measure the insulation resistance of the motors Ma and Mb in this state. And the operation | work which raises the manhole pump control panel A to the ground is troublesome and large-scale. As a result, when the manhole pump control panel A is lifted to the ground for repair and inspection, the insulation resistance of each of the motors Ma and Mb is currently measured. In FIG. 3, 9 is a handhole cover.
[0006]
[Problems to be solved by the invention]
In view of the above problems, the present invention measures the insulation resistance of two manhole pumps installed in the water in the manhole without lifting the manhole pump control panel, which is an underground burial facility buried underground. The challenge is to be able to do it individually on the ground .
[0007]
[Means for Solving the Problems]
The invention according to claim 1 for solving the above-described problem is a manhole pump control which is an underground burying facility installed in the underground in order to control two manhole pumps installed in the water in the manhole. A panel wiring structure, wherein a first cable connecting a power supply facility installed on the ground and the manhole pump control panel, and the two manhole pumps connected in parallel to the manhole pump control panel In order to supply and shut off the power to the two second cables and the manhole pump control panel, a first switch provided in the power supply facility, and the manhole pump control panel to each manhole pump for supplying and interrupting the power for, and two second switches respectively provided on the two second cables, said two second cable Are branched from the cable, and the end on the non-branch side becomes a terminal and is arranged in the power supply equipment, and is wired so as to be connectable to a lead wire of an insulation resistance meter for measuring the insulation resistance of the manhole pump. Two resistance measuring cables, and the two second switches are both disconnected in conjunction with the disconnection of the first switch, and the two second switches are disconnected, In a state where the manhole pump control panel and the two manhole pumps are electrically disconnected, the manhole pump control panel is buried in the basement, and one of the two manhole pumps is selected and insulated. The feature is that the resistance can be measured individually .
[0008]
In order to measure the insulation resistance of two manhole pumps connected to the manhole pump control panel , the following procedure is performed. When the first switch that connects the power supply equipment installed on the ground and the manhole pump control panel is cut off , two manhole pumps connected in parallel to the manhole pump control panel in conjunction with the switch The two second switches provided on the second cable are disconnected . A resistance measurement cable for measuring the insulation resistance of the two manhole pumps is attached to each of the two second cables in a branched state. The operator can individually detect the insulation state of the two manhole pumps on the ground by measuring the insulation resistance between the measurement terminal of the resistance measurement cable and the ground using an insulation resistance meter. As described above, in the invention of claim 1, the manhole pump control panel for controlling the two manhole pumps is buried in the basement, and either of the two manhole pumps is selected, and the insulation resistance is set on the ground. Can be measured individually .
[0009]
The invention according to claim 2 is the invention according to claim 1, wherein the first switch and one of the two resistance measurement cables are connected to any one of the two manhole pumps. The insulation resistance meters that measure the insulation resistance are each provided in the ground pull-in board provided on the support column, so that the insulation resistance of the two manhole pumps connected to the manhole pump control panel It is not necessary for the operator to carry the insulation resistance meter when measuring.
[0010]
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in more detail with reference to embodiments. In this embodiment, a manhole pump control panel A for controlling the operation of each motor Ma, Mb attached to two submersible pumps Pa, Pb installed in the manhole MH will be described. In addition, the same code | symbol is attached | subjected to the part same as what was demonstrated with the prior art, only the characteristic part of this invention is demonstrated, avoiding duplication description. FIG. 1 is a schematic view showing a wiring structure of a manhole pump control panel A according to the present invention, and FIG. 2 is a front view of the ground retracting board 2 in which an insulation resistance meter 8 is incorporated.
[0012]
As shown in FIG. 1, the lead-in wire 4 branched from the external electric wire 3 and connected to the manhole pump control panel A via the earth leakage circuit breaker 5 attached to the ground lead-in board 2 is 2 in the control panel A. It is branched into books and extended through the switches 7a and 7b in each panel. And the electric wires extended from the switches 7a and 7b in each panel are further branched into two on the way, one of which becomes the submersible pump connection lines 6a and 6b, respectively. It is connected to motors Ma and Mb constituting Pb. The remaining one is an insulation resistance measurement line 11a, 11b, which is connected to each measurement terminal 12a, 12b in the ground pull-in board 2 attached to the column 1. A ground terminal 13 connected to the ground is provided in the ground lead-in board 2.
[0013]
When an operator measures the insulation resistances of the motors Ma and Mb, the measurement is performed as follows. First, the earth leakage breaker 5 is disconnected. Then, in conjunction with the earth leakage circuit breaker 5, each switch 7a, 7b in the manhole pump control panel A is disconnected, so that no power is supplied to each motor Ma, Mb. The worker installs an insulation resistance meter 8 in the vicinity of the ground lead-in board 2 and connects one lead wire 14 extended from the insulation resistance meter 8 to the ground terminal 13 and the other lead wire 15. Are connected to the measurement terminal 12a on the insulation resistance measurement line 11a side connected to the motor on the measurement side of the insulation resistance (in the case of FIG. 1, the motor Ma). By doing so, the motor Ma and the insulation resistance meter 8 are connected by the submersible pump connection line 6a and the insulation resistance measurement line 11a. For this reason, measuring the insulation resistance between the measurement terminal 12a and the ground is the same as measuring the insulation resistance between the motor Ma and the ground. When measuring the insulation resistance of another motor Mb, the other lead wire 15 is connected to the motor Mb while the one lead wire 14 extending from the insulation resistance meter 8 is connected to the ground terminal 13. It is only necessary to connect to the measurement terminal 12b on the insulation resistance measurement line 11b side.
[0014]
In this way, the operator can measure the insulation resistance between each motor Ma, Mb and the ground. And the insulation state of each motor Ma and Mb can be detected from the measured resistance value. Since the above-described operation can be performed while the manhole pump control panel A is buried in the basement, it is not necessary to pull up the manhole pump control panel A in order to measure the insulation resistance as in the prior art.
[0015]
The above-described insulation resistance meter 8 may be incorporated in the ground pull-in board 2. Next, the embodiment will be described. As shown in FIG. 2, the insulation resistance meter 8 is incorporated in the ground lead-in board 2, and one lead wire 14 extending from the insulation resistance meter 8 is connected to the ground terminal 13 in advance. Yes. The other lead wire 15 is connected to the changeover switch 16. The insulation resistance measurement lines 11a and 11b connected to the motors Ma and Mb are connected to the measurement terminals 12a and 12b attached in the ground lead-in board 2. In the normal case, the change-over switch 16 is arranged between the measurement terminals 12a and 12b so as not to be connected to any of the measurement terminals 12a and 12b. When measuring the insulation resistances of the motors Ma and Mb, the operator can connect the changeover switch 16 and one of the measurement terminals 12a and 12b.
[0016]
When measuring the insulation resistances of the motors Ma and Mb, the operator only has to operate the changeover switch 16 and connect it to one of the measurement terminals 12a and 12b. In the case of this embodiment, since the insulation resistance meter 8 is incorporated in the ground lead-in board 2, it is not necessary for the operator to carry the insulation resistance meter 8 when measuring the insulation resistance.
[0017]
As described above, by incorporating the insulation resistance meter 8 into the ground pull-in board 2, there is an advantage that only one ground pull-in board 2 is required. In addition, it may be installed alone.
[0018]
【The invention's effect】
In the first aspect of the present invention, the two second switches provided on the two second cables connecting the two manhole pumps in parallel to the manhole pump control panel are both installed on the ground. When the two second switches are disconnected, the manhole pump control panel and the two manhole pumps are disconnected in conjunction with the disconnection of the first switch that connects the power supply facility and the manhole pump control panel. And are electrically disconnected. For this reason, the terminals of the two resistance measuring cables connected to the two second cables are connected to the leads of the insulation resistance meter in a state where the two second switches are disconnected and the manhole pump is not supplied with power. A manhole pump control panel that controls two manhole pumps installed underwater in the manhole is connected to the line, and either of the two manhole pumps can be operated without being lifted to the ground. Select and measure its insulation resistance individually on the ground.
[0019]
According to a second aspect of the present invention, the insulation resistance of one of the two manhole pumps is measured by connecting to the first switch and one of the measurement terminals of the two resistance measurement cables. Since each of the insulation resistance meters is provided in a ground pulling board provided on the support column, it is unnecessary for the operator to carry the insulation resistance meter.
[0020]
[Brief description of the drawings]
FIG. 1 is a schematic diagram showing a wiring structure of a manhole pump control panel A according to the present invention.
FIG. 2 is a front view of the ground pulling board 2 in which an insulation resistance meter 8 is incorporated.
FIG. 3 is a schematic diagram showing a wiring structure of a conventional manhole pump control panel A.
[Explanation of symbols]
A: Manhole pump control panel
Pa, Pb: Submersible pump (manhole pump)
2: Ground pull-in board (power supply equipment)
3: External wire (power supply equipment)
4: Lead-in wire (first cable)
5: Earth leakage breaker (first switch)
6a, 6b: Submersible pump connection line (second cable)
7a, 7b: In-panel switch (second switch)
8: Insulation resistance meter 11a, 11b: Insulation resistance measurement line (resistance measurement cable)
12a, 12b: Measurement terminals

Claims (2)

マンホール内の水中に設置される2台のマンホールポンプを制御するために地下に埋設状態で設置される地下埋設設備であるマンホールポンプ制御盤の配線構造であって、
地上に設置される電源供給設備と前記マンホールポンプ制御盤とを接続する第1ケーブルと、
前記マンホールポンプ制御盤に対して前記2台のマンホールポンプを並列に接続する2本の第2ケーブルと、
前記マンホールポンプ制御盤に対して電源の供給と遮断を行うために、前記電源供給設備内に設けられた第1スイッチと、
前記マンホールポンプ制御盤から各マンホールポンプに対して電源の供給及び遮断を行うために、前記2本の第2ケーブル上にそれぞれ設けられた2個の第2スイッチと、
前記2本の第2ケーブルからそれぞれ分岐され、非分岐側の端部が端子となって前記電源供給設備内に配置されて、前記マンホールポンプの絶縁抵抗を測定するための絶縁抵抗計のリード線に接続可能に配線された2本の抵抗測定ケーブルと、
を備え、
前記2個の第2スイッチは、いずれも前記第1スイッチの切断に連動して切断され、
当該2個の第2スイッチが切断されることにより、前記マンホールポンプ制御盤と2台の前記マンホールポンプとを電気的に切り離した状態で、前記マンホールポンプ制御盤を地下に埋設したままで、前記2台のマンホールポンプのいずれかを選択して、その絶縁抵抗を個別に測定可能にしたことを特徴とするマンホールポンプ制御盤の配線構造。
A wiring structure of a manhole pump control panel , which is an underground burial facility installed underground to control two manhole pumps installed in the water in the manhole ,
A first cable connecting a power supply facility installed on the ground and the manhole pump control panel ;
Two second cables connecting the two manhole pumps in parallel to the manhole pump control panel ;
A first switch provided in the power supply facility for supplying and shutting off power to the manhole pump control panel;
Two second switches respectively provided on the two second cables in order to supply power to and shut off each manhole pump from the manhole pump control panel ;
Lead wires of an insulation resistance meter for branching from the two second cables and arranged in the power supply facility with the non-branch end as a terminal and measuring the insulation resistance of the manhole pump Two resistance measurement cables wired to be connectable to,
With
The two second switches are both disconnected in conjunction with the disconnection of the first switch,
By disconnecting the two second switches, the manhole pump control panel and the two manhole pumps are electrically disconnected from each other, and the manhole pump control panel is buried underground, A wiring structure for a manhole pump control panel , wherein one of two manhole pumps is selected and its insulation resistance can be measured individually .
前記第1スイッチと、前記2本の抵抗測定ケーブルの各測定端子のいずれかに接続して、前記2台のマンホールポンプのいずれか一方の絶縁抵抗を測定する絶縁抵抗計は、いずれも支柱に設けられた地上引込盤内にそれぞれ設けられていることを特徴とする請求項1に記載のマンホールポンプ制御盤の配線構造。 An insulation resistance meter connected to one of the measurement terminals of the first switch and the two resistance measurement cables to measure the insulation resistance of one of the two manhole pumps is used as a support. The wiring structure of the manhole pump control panel according to claim 1, wherein the wiring structure is provided in a ground pull-in panel provided .
JP2001249303A 2001-08-20 2001-08-20 Wiring structure of manhole pump control panel Expired - Fee Related JP4710197B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001249303A JP4710197B2 (en) 2001-08-20 2001-08-20 Wiring structure of manhole pump control panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001249303A JP4710197B2 (en) 2001-08-20 2001-08-20 Wiring structure of manhole pump control panel

Publications (2)

Publication Number Publication Date
JP2003057277A JP2003057277A (en) 2003-02-26
JP4710197B2 true JP4710197B2 (en) 2011-06-29

Family

ID=19078328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001249303A Expired - Fee Related JP4710197B2 (en) 2001-08-20 2001-08-20 Wiring structure of manhole pump control panel

Country Status (1)

Country Link
JP (1) JP4710197B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112922894B (en) * 2021-03-31 2024-07-16 武汉联一合立技术有限公司 Fan fault detection circuit, device and control method
KR102807577B1 (en) * 2023-12-19 2025-05-19 한국전력공사 Power equipment diagnostic apparatus and installing method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5677774U (en) * 1979-11-20 1981-06-24
JPS57138064U (en) * 1981-02-23 1982-08-28
JPH0643195A (en) * 1992-07-25 1994-02-18 Mitsubishi Kasei Corp Automatic insulation resistance measuring apparatus
JP3894346B2 (en) * 1998-03-23 2007-03-22 財団法人東北電気保安協会 Protection relay control circuit test equipment
JP3287338B2 (en) * 1999-07-26 2002-06-04 神鋼電機株式会社 Underground burial equipment

Also Published As

Publication number Publication date
JP2003057277A (en) 2003-02-26

Similar Documents

Publication Publication Date Title
EP2645133A1 (en) Buried service detection
KR100968588B1 (en) Uninterruptible bypass device for repairing underground power distribution equipment and bypass method using the same
KR101041732B1 (en) Elbow Connector Separator
JP4710197B2 (en) Wiring structure of manhole pump control panel
US20120147511A1 (en) Smart ground bonding method for facilities
KR100837840B1 (en) Underground distribution box
CN108173186A (en) A kind of electric piping is registered one's residence with distribution box mounting process
RU2631859C1 (en) EARTHING DEVICE FOR ISOLATED AERIAL POWER LINES WITH VOLTAGE OF UP TO 3 kV
KR101806848B1 (en) Electric leakage protecting apparatus for submerged pump of Non-Grounded type
KR100837380B1 (en) Underground Cable Connection Rod
KR102433445B1 (en) Underground distribution line connection mechanism for connecting wires for underground distribution
KR101673170B1 (en) Insulation Structrue For Distribution Line
US6177630B1 (en) Equipment installation concrete pad having integrated equipotential grounding plane and method for installing equipment using same
KR100754488B1 (en) Grounding Unit and Grounding Method Using the Same
JP5258454B2 (en) Grounding system
KR20040003931A (en) A Cable Connect Box and Hindrance Detect Method of Electric Cable
KR100858344B1 (en) Underground cable fixing panel of apartment house
CN210350129U (en) A plant grounding system
KR100858116B1 (en) Underground switchboard box
KR101617385B1 (en) Apparatus for improving stability of electric power distribution line
JP2006302677A (en) Grounding device and construction method of grounding device
JPH0632747Y2 (en) Switch system for underground installation
JP2884034B2 (en) Control device for sewage equipment
CN113131352B (en) Power distribution cabinet and installation process thereof
JP7666153B2 (en) Electric powered machinery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080820

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101018

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101026

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101227

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110307

LAPS Cancellation because of no payment of annual fees