JP4734146B2 - Filled steel segment for shield tunnel - Google Patents
[go: Go Back, main page]

JP4734146B2 - Filled steel segment for shield tunnel - Google Patents

Filled steel segment for shield tunnel Download PDF

Info

Publication number
JP4734146B2
JP4734146B2 JP2006060919A JP2006060919A JP4734146B2 JP 4734146 B2 JP4734146 B2 JP 4734146B2 JP 2006060919 A JP2006060919 A JP 2006060919A JP 2006060919 A JP2006060919 A JP 2006060919A JP 4734146 B2 JP4734146 B2 JP 4734146B2
Authority
JP
Japan
Prior art keywords
concrete structure
steel
main girder
segment
cushioning material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2006060919A
Other languages
Japanese (ja)
Other versions
JP2006299792A (en
Inventor
義一 伊藤
毅 井上
節夫 高久
博英 橋本
一博 小林
洋一 守屋
義嗣 日野
淳一 早川
清 勝沼
満行 岩切
省吾 長岡
彰 佐野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Komatsu Ltd
Sekisui Chemical Co Ltd
Tokyo Metropolitan Government
JFE Metal Products and Engineering Inc
Sato Kogyo Co Ltd
Original Assignee
Obayashi Corp
Komatsu Ltd
Sekisui Chemical Co Ltd
Tokyo Metropolitan Government
JFE Metal Products and Engineering Inc
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Komatsu Ltd, Sekisui Chemical Co Ltd, Tokyo Metropolitan Government, JFE Metal Products and Engineering Inc, Sato Kogyo Co Ltd filed Critical Obayashi Corp
Priority to JP2006060919A priority Critical patent/JP4734146B2/en
Publication of JP2006299792A publication Critical patent/JP2006299792A/en
Application granted granted Critical
Publication of JP4734146B2 publication Critical patent/JP4734146B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

この発明は、地中に埋設される構造体の一部として、主に壁面を構成する中詰め鋼製セグメントに関し、他のセグメントと順次接合されてトンネル壁面等となる、曲線部にも適用可能な内面が平滑なシールドトンネル用中詰め鋼製セグメントに関するものである。   The present invention relates to a medium-filled steel segment that mainly constitutes a wall surface as part of a structure embedded in the ground, and can also be applied to curved sections that are sequentially joined to other segments to form a tunnel wall surface, etc. The present invention relates to an intermediate steel segment for a shield tunnel having a smooth inner surface.

水路トンネル等に適用され、セグメント組立完了と同時にトンネル内面が平滑になるセグメントを用いる例が増大している。これは、二次覆工の工程を省略するとともに、トンネル断面の縮小による経済的・工期的な効果を得ようとするものである。このような目的に適合するセグメントの代表例として、RCセグメントがある。   An example of using a segment which is applied to a waterway tunnel or the like and whose tunnel inner surface becomes smooth upon completion of segment assembly is increasing. This eliminates the secondary lining process and seeks to obtain economic and construction effects by reducing the tunnel cross section. As a typical example of a segment suitable for such a purpose, there is an RC segment.

一方、シールドトンネルの曲線部には、曲線に沿った形状の多種類のセグメントを用意する必要があることから、一般に寸法を調整することの容易な鋼製セグメントが用いられている。さらに、曲線部の施工に伴い、シールドジャッキ推力が複雑に作用するため、構造的に対応の取りやすい鋼製セグメントが用いられていた。   On the other hand, since it is necessary to prepare various types of segments having a shape along the curve, a steel segment whose dimensions can be easily adjusted is generally used for the curved portion of the shield tunnel. Further, since the shield jack thrust acts in a complicated manner with the construction of the curved portion, a steel segment that is structurally easy to handle has been used.

しかしながら、鋼製セグメントでは、トンネル内面が鋼板を組み合わせた構造であるため、平滑でなく、水路トンネル等では、流下機能を確保するため、コンクリートを打設(二次覆工)して内面の平滑性を確保していた。   However, in the steel segment, the inner surface of the tunnel is a combination of steel plates, so it is not smooth. In a waterway tunnel, etc., in order to ensure the flow-down function, concrete is placed (secondary lining) to smooth the inner surface. The sex was secured.

この方法によれば、セグメント組立(一次覆工)とコンクリート打設(二次覆工)の2工程を必要とし、工期短縮の支障となっていた。   According to this method, two steps of segment assembly (primary lining) and concrete placing (secondary lining) are required, which hinders the shortening of the construction period.

これを解決するため、鋼製セグメントにコンクリートをあらかじめ打設したセグメントを用いることが試みられている。   In order to solve this, an attempt has been made to use a segment in which concrete is previously placed on a steel segment.

具体的には、図17に示すような中詰め鋼製セグメントを用いたトンネル構造体構築方法が、知られている(例えば、特許文献1等参照)。   Specifically, a tunnel structure constructing method using an internally packed steel segment as shown in FIG. 17 is known (see, for example, Patent Document 1).

まず、構成から説明すると、この従来の中詰め鋼製セグメントでは、地中に埋設されるトンネル構造体や立坑が構築される際、掘削と同時に、複数の湾曲した中詰め鋼製セグメント1が隣接配置される他の中詰め鋼製セグメント1と順次接合されて、周方向に連設されることにより、トンネル構造体等の隔壁の一部が構成されるものである。   First, in terms of configuration, in this conventional medium-filled steel segment, when a tunnel structure or shaft buried in the ground is constructed, a plurality of curved medium-filled steel segments 1 are adjacent to each other at the same time as excavation. A part of a partition wall such as a tunnel structure is configured by sequentially joining the other intermediate-filled steel segments 1 to be arranged and continuously connecting in the circumferential direction.

この中詰め鋼製セグメント1は、水平断面略円弧状の鋼製の鋼殻部2の内面1a側に中詰めされたコンクリート構造部3を有している。   This center-filled steel segment 1 has a concrete structure portion 3 that is packed in the inner surface 1a side of a steel shell portion 2 made of steel having a substantially circular horizontal cross section.

前記鋼殻部2は、このコンクリート構造部3の外表面を覆う外板部2aと、この外板部2aの前記隔壁構築方向Yの端縁2b,2bに沿って設けられて、前記内面1aよりも一段高く盛り上がったこのコンクリート構造部3の内面3aに向けて延設される主桁部材4,4と、外周方向の各端縁2c,2cに設けられた端部連結板5,5とを有して、概略形成されている。   The steel shell portion 2 is provided along the outer plate portion 2a covering the outer surface of the concrete structure portion 3 and the edges 2b and 2b of the outer plate portion 2a in the partition wall construction direction Y, and the inner surface 1a. Main girder members 4, 4 extending toward the inner surface 3 a of the concrete structure 3 raised one step higher than the above, and end connection plates 5, 5 provided at the respective edges 2 c, 2 c in the outer circumferential direction, And is generally formed.

また、この鋼殻部2の内側には、前記主桁部材4,4と平行して中桁部材6,6が配置されると共に、前記端部連結板5,5と平行に配置される複数の連結板材7等によって連結されている。   Further, inside the steel shell portion 2, middle girder members 6 and 6 are arranged in parallel with the main girder members 4 and 4, and a plurality of members arranged in parallel with the end connecting plates 5 and 5. Are connected by the connecting plate member 7 and the like.

そして、この鋼殻部2の内側には、注入管8及び継手部9を除き、予めコンクリートが充填されて、前記コンクリート構造部3が構成されることにより、二次覆工が省略できるように構成されている。   And the inside of this steel shell part 2 is filled with concrete beforehand except for the injection pipe 8 and the joint part 9, so that the secondary lining can be omitted by configuring the concrete structure part 3. It is configured.

次に、この従来の中詰め鋼製セグメント1の作用について説明する。   Next, the operation of this conventional medium-filled steel segment 1 will be described.

このように構成された従来の中詰め鋼製セグメント1では、複数の中詰め鋼製セグメント1が、シールドマシン等によって掘削されたトンネル等の壁面に、周方向Xに環状となるように連結されると共に、トンネル等の長手方向である隔壁構築方向Yに複数隣接配置されて、円筒状の構造物が地中に構築される。
特開2005−42328号公報(段落0035乃至0036、図1乃至図9)
In the conventional medium-filled steel segment 1 configured as described above, a plurality of medium-filled steel segments 1 are connected to a wall surface of a tunnel or the like excavated by a shield machine or the like so as to form an annular shape in the circumferential direction X. At the same time, a cylindrical structure is constructed in the ground by being adjacently arranged in the partition construction direction Y that is the longitudinal direction of a tunnel or the like.
Japanese Patent Laying-Open No. 2005-42328 (paragraphs 0035 to 0036, FIGS. 1 to 9)

しかしながら、このような従来の中詰め鋼製セグメントでは、図示省略の推進ジャッキ等によって、前記主桁部材4に、隔壁構築方向Yへの荷重入力が与えられると、この鋼殻部2が撓み、前記コンクリート構造部3に、圧壊若しくは剥離による亀裂を生じさせるおそれがあった。   However, in such a conventional medium-filled steel segment, when a load input in the partition construction direction Y is given to the main girder member 4 by a propulsion jack (not shown), the steel shell portion 2 bends, There was a risk of causing cracks in the concrete structure 3 due to crushing or peeling.

特に、図10に示すような急曲線部10a(L1>L2)を有するトンネル構造体10を、シールド機Sを用いて構築する際、曲率半径Rが小さくなるほど、各中詰め鋼製セグメント1に不均等にジャッキ推力等による施工時荷重が作用しやすい。   In particular, when the tunnel structure 10 having the steeply curved portion 10a (L1> L2) as shown in FIG. 10 is constructed using the shield machine S, the smaller the radius of curvature R is, the smaller the each in-filled steel segment 1 is. Load during construction due to jack thrust etc. is easily applied.

このため、荷重集中により、鋼製の主桁部材4の歪み変位量が、前記コンクリート構造部3の許容歪み変位量以上となるコーナー部近傍等の箇所では、前記コンクリート構造部3に、圧壊若しくは剥離による亀裂を生じさせてしまい、シールド不良を発生させてしまうといった問題があった。   For this reason, due to the load concentration, in the vicinity of the corner portion where the strain displacement amount of the steel main girder member 4 is greater than or equal to the allowable strain displacement amount of the concrete structure portion 3, There was a problem that a crack was caused by peeling and a shield defect was generated.

つまり、このようにして製作されたセグメントでは、
・鋼製セグメントの製作時に溶接に伴う歪みが発生すること、
・歪んだ鋼製セグメント内にコンクリートを打設すると、コンクリートが歪んだままで硬化すること、
・このようにして歪みを持って製作されたセグメントにシールドジャッキ推力が作用した場合、歪みが戻されるように挙動すること、
・その際、鋼製部材とコンクリート部材の変形挙動が異なること、
・その結果としてコンクリートに亀裂を生じせしめることになること
等により、実用化が阻まれていた。
In other words, in the segment produced in this way,
・ Distortion caused by welding during the production of steel segments
・ If concrete is placed in a distorted steel segment, the concrete will harden while being distorted.
・ When shield jack thrust acts on a segment manufactured with distortion in this way, it behaves so that distortion is restored,
-At that time, the deformation behavior of steel and concrete members is different,
・ As a result, the concrete was cracked, and its practical use was hindered.

対応策として、鋼製セグメントの製作歪みを、熱処理等によって無くす方法により、コンクリートへのクラック防止を図る方法が採られている。しかしながら、歪み除去に熟練技術を要する上、コスト負担を強いられていた。   As a countermeasure, there has been adopted a method for preventing cracks in concrete by eliminating the production distortion of the steel segment by heat treatment or the like. However, skilled techniques are required for distortion removal, and a cost burden is imposed.

そこで、この発明は、所定の応力歪み以上の歪みを鋼殻部が生じても、中詰めされたコンクリート構造部の亀裂の発生を抑制できる中詰め鋼製セグメントを提供することを課題としている。   Therefore, an object of the present invention is to provide an internally packed steel segment that can suppress the occurrence of cracks in an internally packed concrete structure portion even when the steel shell portion has a strain greater than a predetermined stress strain.

上記目的を達成するために、請求項1に記載された発明は、地中に構築される隔壁の一部を構成して、内面が開放された鋼製の鋼殻部の内側に中詰めされたコンクリート構造部を有する中詰め鋼製セグメントであって、前記鋼殻部は、該コンクリート構造部の外面を覆う外板部と、該外板部の隔壁構築方向端縁に沿って設けられて、該コンクリート構造部の内面に向けて延設される主桁部材とを有し、前記主桁部材と、前記コンクリート構造部との間には、緩衝材が設けられていることを特徴としている。   In order to achieve the above object, the invention described in claim 1 constitutes a part of a partition wall constructed in the ground, and is packed inside a steel shell portion having an open inner surface. A steel-filled steel segment having a concrete structure part, wherein the steel shell part is provided along an outer plate part covering an outer surface of the concrete structure part, and an edge of the outer plate part in a partition construction direction. And a main girder member extending toward the inner surface of the concrete structure portion, and a buffer material is provided between the main girder member and the concrete structure portion. .

請求項2に記載された発明は、前記緩衝材は、平板状を呈して、前記主桁部材の裏面側と、前記コンクリート構造部の端面との間に介装されることを特徴としている。   The invention described in claim 2 is characterized in that the cushioning material has a flat plate shape and is interposed between a back surface side of the main girder member and an end surface of the concrete structure portion.

請求項に記載された発明は、前記緩衝材は、前記主桁部材と直交して設けられる連結板材を、該主桁部材と当接させるコーナー部近傍に設けられることを特徴としている。 The invention described in claim 3 is characterized in that the cushioning material is provided in the vicinity of a corner portion where a connecting plate material provided orthogonal to the main girder member is brought into contact with the main girder member.

請求項に記載された発明は、前記緩衝材は、短尺平板状を呈して、前記主桁部材の裏面側に設けられる水平緩衝材と、前記連結板材側に設けられる短尺平板状の縦緩衝材とを有して、略L字状を呈するように組み合わされたL字状コーナー部緩衝材からなることを特徴としている。 According to a fourth aspect of the present invention, the buffer material has a short flat plate shape, a horizontal buffer material provided on the back surface side of the main girder member, and a short flat plate type vertical buffer provided on the connecting plate material side. And is made of an L-shaped corner cushioning material combined so as to exhibit a substantially L-shape.

請求項に記載された発明は、前記緩衝材は、前記コーナー部に設けられて、直交する二辺を各々前記主桁部材及び連結板材に沿わせてなる三角コーナー部緩衝材であることを特徴としている。 The invention described in claim 5 is that the cushioning material is a triangular corner cushioning material provided at the corner portion and having two orthogonal sides along the main girder member and the connecting plate material, respectively. It is a feature.

請求項に記載された発明は、地中に構築される隔壁の一部を構成して、内面が開放された鋼製の鋼殻部の内側に中詰めされたコンクリート構造部を有する中詰め鋼製セグメントであって、前記鋼殻部は、該コンクリート構造部の外面を覆う外板部と、該外板部の隔壁構築方向端縁に沿って設けられた主桁部材と、外板部の隔壁外周方向の端縁に沿って設けられた端部連結板と、下端縁が外板部から離隔して端部連結板と平行に配置されて主桁部材間に連結された複数の連結板材とを有し、下端縁を外板部から離隔し、上端縁をコンクリート構造部の内面に達する高さの緩衝材が各連結板材に設けられていることを特徴としている。 The invention described in claim 6 has a concrete filling portion that constitutes a part of a partition wall built in the ground and has a concrete structure portion filled inside a steel shell portion whose inner surface is open. A steel segment, wherein the steel shell portion includes an outer plate portion covering an outer surface of the concrete structure portion, a main girder member provided along an edge of the outer plate portion in a partition construction direction, and an outer plate portion And a plurality of connections in which the lower end edge is spaced apart from the outer plate portion and arranged in parallel with the end connection plate and connected between the main girder members. Each of the connecting plate members is provided with a cushioning material having a height that reaches the inner surface of the concrete structure portion with the lower end edge spaced apart from the outer plate portion.

請求項に記載された発明は、前記緩衝材は、軟質の中心緩衝材と、該中心緩衝材を両側から挟み込む一対の硬質の支持緩衝材から形成されることを特徴としている。 The invention described in claim 7 is characterized in that the cushioning material is formed of a soft central cushioning material and a pair of hard supporting cushioning materials sandwiching the central cushioning material from both sides.

請求項に記載された発明は、前記硬質緩衝材の外面にアンカー部が突設されていることを特徴としている。 The invention described in claim 8 is characterized in that an anchor portion protrudes from the outer surface of the hard cushioning material.

請求項に記載された発明は、前記一対の硬質緩衝材の間に水膨張ゴムが配設されるとともに、水膨張ゴムが一対の硬質緩衝材の外周面にわたって貼着された止水テープによって密封されていることを特徴としている。 According to a ninth aspect of the present invention, there is provided a waterproof tape in which a water-expandable rubber is disposed between the pair of hard cushioning materials and the water-expandable rubber is adhered over the outer peripheral surfaces of the pair of hard cushioning materials. It is characterized by being sealed.

請求項10に記載された発明は、前記主桁部材の裏面側に板状緩衝材が設けられていることを特徴としている。 The invention described in claim 10 is characterized in that a plate-like cushioning material is provided on the back side of the main girder member.

このように構成された請求項1記載の発明は、前記主桁部材と、前記コンクリート構造部との間に設けられた緩衝材によって、隔壁構築方向に加わる荷重入力による前記主桁部材に生じた歪み変位が吸収されて、前記コンクリート構造部の許容歪み変位量内に収まるように、該コンクリート構造部へ伝えられる荷重が抑制される。   The invention according to claim 1 configured as described above is generated in the main girder member due to a load input applied in a partition construction direction by a cushioning material provided between the main girder member and the concrete structure portion. The load transmitted to the concrete structure portion is suppressed so that the strain displacement is absorbed and falls within the allowable strain displacement amount of the concrete structure portion.

このため、前記コンクリート構造部に、圧壊若しくは剥離による亀裂が生じるおそれを減少させて、良好なシールド性能を維持できる。   For this reason, it is possible to reduce the possibility of cracks due to crushing or peeling in the concrete structure part, and to maintain good shielding performance.

また、請求項2に記載された発明は、前記緩衝材が、平板状を呈して前記主桁部材の裏面側と、前記コンクリート構造部の端面との間に介装されているので、圧縮された該緩衝材が、平面内で、入力荷重を分散させて前記コンクリート構造部へ伝達する。   Moreover, the invention described in claim 2 is compressed because the cushioning material has a flat plate shape and is interposed between the back surface side of the main girder member and the end surface of the concrete structure portion. Further, the cushioning material disperses the input load in a plane and transmits it to the concrete structure portion.

このため、応力集中が発生しにくく、更に、前記コンクリート構造部に、圧壊若しくは剥離による亀裂が生じるおそれを減少させることができる。   For this reason, stress concentration is unlikely to occur, and furthermore, the risk of cracking due to crushing or peeling in the concrete structure portion can be reduced.

そして、請求項に記載された発明は、前記緩衝材が、前記主桁部材と直交して設けられる連結板材に沿って、該主桁部材と当接するコーナー部近傍に設けられている。 According to a third aspect of the present invention, the cushioning material is provided in the vicinity of a corner portion in contact with the main girder member along a connecting plate material provided orthogonal to the main girder member.

このため、コーナー部での荷重入力による前記主桁部材の変位が、該緩衝材によって吸収されて、前記コンクリート構造部に伝わりにくくなる。   For this reason, the displacement of the main girder member due to the load input at the corner portion is absorbed by the cushioning material and is not easily transmitted to the concrete structure portion.

従って、コンクリート構造部のコーナー部付近での圧壊若しくは剥離による亀裂を、有効に防止できる。   Therefore, it is possible to effectively prevent cracking due to crushing or peeling near the corner portion of the concrete structure portion.

また、請求項に記載された発明は、前記緩衝材が、短尺平板状を呈している水平緩衝材と、縦緩衝材とを略L字状を呈するように組み合わせて構成されるので、加工性が良好である。 In the invention described in claim 4 , since the cushioning material is configured by combining a horizontal cushioning material having a short flat plate shape and a vertical cushioning material so as to exhibit a substantially L shape. Good properties.

更に、請求項に記載された発明は、前記緩衝材としての三角コーナー部緩衝材が、前記コーナー部に設けられて、直交する二辺が、各々前記主桁部材及び連結板材に沿わせられている。 Further, in the invention described in claim 5 , a triangular corner portion cushioning material as the cushioning material is provided in the corner portion, and two orthogonal sides are set along the main girder member and the connecting plate material, respectively. ing.

このため、装着が容易で、有効にジャッキ推力によるコーナー部近傍でのコンクリート構造部の亀裂を防止できる。   For this reason, it is easy to mount, and cracks in the concrete structure near the corner due to jack thrust can be effectively prevented.

請求項に記載された発明は、連結板材に、上端縁をコンクリート構造部の内面に達する高さの緩衝材が設けられていることにより、隔壁構築方向に不均等な荷重が作用して鋼殻部の主桁部材に歪み変位が発生したとしても、コンクリート構造部の内面側は緩衝材によって周方向に複数個の分割されて切り離されていることにより、分割されたコンクリート構造部の変位量は、鋼殻部の変位量の数分の1となる。 In the invention described in claim 6 , the connecting plate member is provided with a cushioning material having a height that allows the upper end edge to reach the inner surface of the concrete structure portion. Even if strain displacement occurs in the main girder member of the shell, the inner surface side of the concrete structure part is divided into a plurality of parts in the circumferential direction by the cushioning material, so that the amount of displacement of the divided concrete structure part Is a fraction of the amount of displacement of the steel shell.

この結果、コンクリート構造部の内面側に、圧壊若しくは剥離による亀裂が生じるおそれを減少させて、良好なシールド性能を維持できる。   As a result, it is possible to reduce the possibility of cracking due to crushing or peeling on the inner surface side of the concrete structure portion, and maintain good shielding performance.

ここで、連結板材及び緩衝材は、外板部から離隔して設けられていることにより、コンクリート構造部を形成するためにコンクリートを鋼殻部に打設する際、コンクリートは鋼殻部全体に流動し、作業性が阻害されることがない。   Here, since the connecting plate material and the cushioning material are provided apart from the outer plate portion, when the concrete is placed on the steel shell portion to form the concrete structure portion, the concrete is applied to the entire steel shell portion. It will flow and workability will not be hindered.

請求項に記載された発明は、軟質の中心緩衝材と、硬質の支持緩衝材から形成されるため、コンクリート構造部を形成するためにコンクリートを鋼殻部に打設する際、緩衝材がへたることがない。また、不均等な荷重が主桁部材に作用したとしても、コンクリート構造部への荷重を緩和することができる。 Since the invention described in claim 7 is formed of a soft center cushioning material and a hard support cushioning material, when the concrete is placed on the steel shell portion to form the concrete structure portion, the cushioning material is There is no loss. Moreover, even if an uneven load acts on the main girder member, the load on the concrete structure portion can be reduced.

請求項に記載された発明は、支持緩衝材の外面にアンカー部が突設されていることにより、緩衝材はアンカー部を介してコンクリート構造部と一体化される。このため、中詰め鋼製セグメントに荷重が負荷された際に、緩衝材とコンクリート構造部との界面にずれによる微小な隙間が発生することを防止できる。 In the invention described in claim 8 , since the anchor portion protrudes from the outer surface of the support cushioning material, the cushioning material is integrated with the concrete structure portion via the anchor portion. For this reason, when a load is applied to the center-filled steel segment, it is possible to prevent a minute gap due to a shift from occurring at the interface between the cushioning material and the concrete structure portion.

請求項に記載された発明は、一対の支持緩衝材の間に水膨張ゴムが配設されることにより、中詰め鋼製セグメントに荷重が負荷された際に、緩衝材とコンクリート構造部との界面にずれによる微小な隙間が発生したとしても、微小な隙間を通して下水が水膨張ゴムに到達すれば、水膨張ゴムが膨張し、微小な隙間を密閉するように、支持緩衝材を押圧する。このため、下水が鋼殻に達することがなく、鋼殻部の劣化を確実に防止することができる。 According to the ninth aspect of the present invention, when the water expansion rubber is disposed between the pair of support cushioning materials, when the load is applied to the middle packed steel segment, the cushioning material, the concrete structure portion, Even if a minute gap due to deviation occurs at the interface, if the sewage reaches the water-expanded rubber through the minute gap, the water-expanded rubber expands and presses the support cushion so that the minute gap is sealed . For this reason, sewage does not reach the steel shell, and the deterioration of the steel shell portion can be reliably prevented.

この場合、水膨張ゴムの周囲は、止水テープによって包囲されており、コンクリート構造部を形成するためのコンクリート打設時に水膨張ゴムに水が接触することは確実に防止される。   In this case, the periphery of the water-expandable rubber is surrounded by the water-stopping tape, and it is reliably prevented that water contacts the water-expandable rubber when the concrete is placed for forming the concrete structure portion.

なお、止水テープは、中詰め鋼製セグメントが形成された際に除去すればよい。   In addition, what is necessary is just to remove a water stop tape, when an inside-packed steel segment is formed.

請求項10に記載された発明は、前記主桁部材の裏面側に板状緩衝材が設けられていることにより、隔壁構築方向に不均等な荷重が作用して鋼殻部の主桁部材に歪み変位が発生したとしても、主桁部材に生じた歪み変位が吸収され、コンクリート構造部へ伝えられる荷重は、その許容歪み変位量内に抑制される。 In the invention described in claim 10 , since a plate-like cushioning material is provided on the back side of the main girder member, an uneven load acts in the partition construction direction, and the main girder member of the steel shell portion is applied. Even if the strain displacement occurs, the strain displacement generated in the main girder member is absorbed, and the load transmitted to the concrete structure portion is suppressed within the allowable strain displacement amount.

次に、図面に基づいて、この発明を実施するための最良の実施の形態の中詰め鋼製セグメントを説明する。   Next, based on the drawings, description will be given of the best embodiment of the middle-filled steel segment for carrying out the present invention.

なお、前記従来例と同一乃至均等な部分については同一符号を付して説明する。   In addition, the same code | symbol is attached | subjected and demonstrated about the same or equivalent part as the said prior art example.

図1乃至図16は、この発明の実施の形態のセグメントとしての中詰め鋼製セグメント11等を説明するものである。   FIGS. 1 to 16 illustrate a middle-filled steel segment 11 as a segment according to an embodiment of the present invention.

まず、構成を説明すると、図1に示すようなこの発明の実施の形態の中詰め鋼製セグメント11等が、地中にトンネル若しくは立坑を構築する際、周方向に複数の円弧版状の中詰め鋼製セグメント11が、他の中詰め鋼製セグメント11と環状を呈するように複数隣接配置されたものを、順次、対向する端部連結板5,5同士を接合しながら、地中に構築されるトンネル構造体としての立坑若しくはトンネルの進行方向へ、図5に示すように、シールド機S等のジャッキJ,J等によってジャッキ推力が加えられつつ、連設されて、トンネル構造体等の壁面が構築されるものである。   First, the configuration will be described. When the middle-filled steel segment 11 or the like according to the embodiment of the present invention as shown in FIG. 1 constructs a tunnel or a shaft in the ground, The stuffed steel segments 11 are arranged adjacent to each other so as to form an annular shape with the other stuffed steel segments 11, and are constructed in the ground while sequentially joining the end connecting plates 5 and 5 facing each other. As shown in FIG. 5, a jack thrust is applied by jacks J, J, etc., such as a shield machine S, and the tunnel structure, etc. Wall surfaces are constructed.

図1乃至図6に示す実施例1の中詰め鋼製セグメント11では、内面1aが開放された水平断面略円弧状の鋼製の鋼殻部12の内側に、中詰めされたコンクリート構造部3を有している。   In the middle-filled steel segment 11 of Example 1 shown in FIGS. 1 to 6, the concrete structure portion 3 is filled in the inside of a steel shell portion 12 having a substantially circular arc section with an open inner surface 1 a. have.

なお、図1は、理解を容易にするため、コンクリート構造部3を取り除いた中詰め鋼製セグメント11の鋼殻部12を湾曲形状を平面状に展開して、内面側から、見た構成を示している。   In addition, FIG. 1 shows the structure seen from the inner surface side by expanding the curved shape of the steel shell portion 12 of the middle-filled steel segment 11 from which the concrete structure portion 3 is removed, in order to facilitate understanding. Show.

前記鋼殻部12は、図3に示すように、このコンクリート構造部3の外面を覆う外板部2aと、この外板部2aの前記隔壁構築方向Yの端縁2b,2bに沿って設けられて、前記内面1aよりも一段高く盛り上がったこのコンクリート構造部3の内面3a方向に向けて延設される主桁部材4,4と、周方向Xの各端縁2c,2cに設けられた端部連結板5,5とを有して、内面を開放する断面略コ字状を呈して形成されている。   As shown in FIG. 3, the steel shell portion 12 is provided along an outer plate portion 2a covering the outer surface of the concrete structure portion 3 and edges 2b and 2b of the outer plate portion 2a in the partition wall construction direction Y. The main girder members 4 and 4 extending toward the inner surface 3a of the concrete structure portion 3 raised one step higher than the inner surface 1a, and the end edges 2c and 2c in the circumferential direction X are provided. It has end connection plates 5 and 5 and is formed to have a substantially U-shaped cross section that opens the inner surface.

また、この鋼殻部12の内側には、前記主桁部材4,4と平行して補助桁部材13,13が左,右に配置されると共に、前記連結板5,5と平行に配置される複数の連結板材7等によって、これらの主桁部材4,4間が、連結されている。   Further, on the inner side of the steel shell portion 12, auxiliary girder members 13 and 13 are arranged on the left and right in parallel with the main girder members 4 and 4, and are arranged in parallel with the connecting plates 5 and 5. The main girder members 4 and 4 are connected by a plurality of connecting plate members 7 and the like.

そして、これらの各主桁部材4,4と、前記コンクリート構造部3との間には、緩衝材としての超高分子量ポリエチレンシート14が、設けられている。   And between these main girder members 4 and 4 and the concrete structure part 3, the ultra high molecular weight polyethylene sheet 14 as a buffering material is provided.

この実施例1では、この超高分子量ポリエチレンシート14は、厚さ約5〜20mmの平板状を呈して、前記主桁部材4の裏面側4aと、前記コンクリート構造部3の隔壁構築方向Yの端面3bとの間に介装されて、長,短片状に複数に切断されて設けられていて、図3及び図4に示すように、充填されたコンクリート構造部3によって覆われている。   In this Example 1, the ultra high molecular weight polyethylene sheet 14 has a flat plate shape with a thickness of about 5 to 20 mm, and the back side 4a of the main girder member 4 and the partition construction direction Y of the concrete structure portion 3 It is interposed between the end surface 3b and is provided by being cut into a plurality of long and short pieces, and is covered with a filled concrete structure portion 3 as shown in FIGS.

この超高分子量ポリエチレンシート14は、主に図7に示すような物性を有する超高分子量ポリエチレン材料によって構成されていて、図6に示すように、低荷重時(圧縮荷重:約0〜11.8MPa)には、硬度が小さく、圧縮変形によって、ジャッキ推力による前記主桁部材4の変位を吸収するように変形可能である。   The ultrahigh molecular weight polyethylene sheet 14 is mainly composed of an ultrahigh molecular weight polyethylene material having physical properties as shown in FIG. 7, and as shown in FIG. 6, at a low load (compressive load: about 0 to 11. 8 MPa) has a small hardness and can be deformed so as to absorb the displacement of the main girder member 4 due to the jack thrust by compressive deformation.

また、高荷重時(圧縮荷重:約11.8〜34.3MPa)には、硬度及び弾性率が増大して、板状となり、荷重を平面内に分散させて、前記コンクリート構造部3に荷重集中が発生しないように構成されている。   Further, when the load is high (compressive load: about 11.8 to 34.3 MPa), the hardness and elastic modulus are increased to form a plate shape, and the load is dispersed in a plane to load the concrete structure portion 3. It is configured so that concentration does not occur.

更に、この超高分子量ポリエチレンシート14は、耐薬品性を有して、例えば、下水表面に接触しても、腐食しない性質を有している。   Furthermore, the ultra high molecular weight polyethylene sheet 14 has chemical resistance, and has a property that it does not corrode even when it comes into contact with the sewage surface, for example.

そして、この鋼殻部12の内側には、注入管8及び継手部9を除き、予めコンクリートが充填されて、前記コンクリート構造部3が構成されることにより、二次覆工が省略できるように構成されている。   And the inside of this steel shell part 12 is filled with concrete beforehand except for the injection pipe 8 and the joint part 9, so that the secondary lining can be omitted by configuring the concrete structure part 3. It is configured.

次に、この実施例1の中詰め鋼製セグメント構造の作用について説明する。   Next, the operation of the mid-packed steel segment structure of the first embodiment will be described.

このように構成された実施例1の中詰め鋼製セグメント11では、図5に示すように、複数の中詰め鋼製セグメント11が、シールド機S等のジャッキJ,Jによって掘削されたトンネル等の壁面に、周方向Xに環状となるように連結されると共に、トンネル等の長手方向である隔壁構築方向Yに複数隣接配置されて、円筒状の構造物が地中に構築される。   In the intermediate steel segment 11 of Example 1 configured as described above, as shown in FIG. 5, a tunnel or the like in which a plurality of intermediate steel segments 11 are excavated by jacks J, J of the shield machine S or the like. A cylindrical structure is constructed in the ground by being connected to the wall surface of the wall so as to be annular in the circumferential direction X, and arranged adjacent to the partition construction direction Y that is the longitudinal direction of a tunnel or the like.

前記ジャッキJ,J等によって、前記主桁部材4に、隔壁構築方向Yへ不均等に荷重入力が作用すると、この鋼殻部12が撓み、前記主桁部材4に部分的な変位が生じる。   When a load input is applied to the main girder member 4 in the partition building construction direction Y by the jacks J, J, etc., the steel shell portion 12 is bent, and the main girder member 4 is partially displaced.

例えば、図10に示すように、前記トンネル構造体の進行方向へ向けて、シールド機S等によって、ジャッキ推力が加えられつつ、急曲線部10aが構築される。   For example, as shown in FIG. 10, the sharp curve portion 10a is constructed while the jack thrust is applied by the shield machine S or the like toward the traveling direction of the tunnel structure.

このような場合、前記主桁部材4の左,右両端部等は、部分的な変位量が大きくなる傾向があるが、前記主桁部材4と、前記コンクリート構造部3との間に設けられた前記超高分子量ポリエチレンシート14によって、この隔壁構築方向Yに加わる荷重入力で前記主桁部材4に生じた歪み変位が吸収されて、前記コンクリート構造部3の許容歪み変位が抑制される。   In such a case, the left and right end portions of the main girder member 4 tend to have a large amount of partial displacement, but are provided between the main girder member 4 and the concrete structure portion 3. Further, the ultrahigh molecular weight polyethylene sheet 14 absorbs the strain displacement generated in the main girder member 4 by the load input applied in the partition construction direction Y, and the allowable strain displacement of the concrete structure portion 3 is suppressed.

この実施例1の超高分子量ポリエチレンシート14は、図6に示すように、低荷重時(圧縮荷重:約0〜11.8MPa)には、硬度が小さく、圧縮変形によって、ジャッキ推力による前記主桁部材4の変位が吸収される。   As shown in FIG. 6, the ultra-high molecular weight polyethylene sheet 14 of Example 1 has a small hardness at a low load (compressive load: about 0 to 11.8 MPa), and the main thrust due to jacking thrust due to compressive deformation. The displacement of the girder member 4 is absorbed.

また、高荷重時(圧縮荷重:約11.8〜34.3MPa)には、硬度及び弾性率が増大して、板状となり、荷重を平面内に分散させて、前記コンクリート構造部3に荷重集中を発生させないように広い面積で、荷重が伝えられる。   Further, when the load is high (compressive load: about 11.8 to 34.3 MPa), the hardness and elastic modulus are increased to form a plate shape, and the load is dispersed in a plane to load the concrete structure portion 3. The load is transmitted over a wide area so as not to cause concentration.

そして、前記コンクリート構造部3は、一般的に、約29.4MPaの面圧力まで、圧壊しない。   And the said concrete structure part 3 is generally not crushed to the surface pressure of about 29.4 MPa.

このため、前記コンクリート構造部3の許容歪み変位量内に収まるように、前記超高分子量ポリエチレンシート14によって、コンクリート構造部3へ伝えられる荷重が抑制されていれば、前記コンクリート構造部3に、圧壊若しくは剥離による亀裂が生じるおそれを減少させて、良好なシールド性能を維持できる。   For this reason, if the load transmitted to the concrete structure part 3 is suppressed by the ultrahigh molecular weight polyethylene sheet 14 so as to be within the allowable strain displacement amount of the concrete structure part 3, the concrete structure part 3 It is possible to reduce the risk of cracking due to crushing or peeling and maintain good shielding performance.

しかも、この実施例1では、前記超高分子量ポリエチレンシート14が、弾性変形により、荷重入力を吸収するだけでなく、平板状を呈して前記主桁部材4の裏面側4aと、前記コンクリート構造部3の隔壁構築方向Y端面との間に介装されているので、一定の入力荷重以上では、厚み方向に圧縮されて、硬度及び弾性率が増大して、板状となった超高分子量ポリエチレンシート14が、平面内で、入力荷重を分散させて、前記コンクリート構造部3へ伝達する。   Moreover, in the first embodiment, the ultra high molecular weight polyethylene sheet 14 not only absorbs load input due to elastic deformation, but also has a flat plate shape, the back side 4a of the main girder member 4, and the concrete structure portion. 3 is interposed between the end face of the partition wall construction direction Y, so that at a certain input load or more, it is compressed in the thickness direction, the hardness and elastic modulus increase, and a plate-like ultra high molecular weight polyethylene The sheet 14 disperses the input load in a plane and transmits it to the concrete structure portion 3.

このため、更に、応力集中が発生しにくく、前記コンクリート構造部3に、圧壊若しくは剥離による亀裂が生じるおそれを減少させることができる。   For this reason, stress concentration is less likely to occur, and the risk of cracking due to crushing or peeling in the concrete structure 3 can be reduced.

図8は、この発明の実施の形態の実施例2の中詰め鋼製セグメント21を説明するものである。   FIG. 8 illustrates a middle-filled steel segment 21 of Example 2 of the embodiment of the present invention.

なお、前記実施例1と同一乃至均等な部分については同一符号を付して説明する。   The same or equivalent parts as those in the first embodiment will be described with the same reference numerals.

まず、この実施例2の中詰め鋼製セグメント21の構成を、実施例1の中詰め鋼製セグメント11との相違点を中心に説明すると、この実施例2の中詰め鋼製セグメント21では、緩衝材が、前記鋼製の主桁部材4の歪み変位量が、図示省略の前記コンクリート構造部3の許容歪み変位量以上となるところに設けられている。   First, the configuration of the middle-stuffed steel segment 21 of Example 2 will be described focusing on the differences from the middle-stuffed steel segment 11 of Example 1. In the middle-stuffed steel segment 21 of Example 2, The buffer material is provided where the strain displacement amount of the steel main girder member 4 is equal to or larger than the allowable strain displacement amount of the concrete structure portion 3 (not shown).

すなわち、この実施例2では、前記主桁部材4,4と直交して設けられる連結板材7,7が、この主桁部材4,4と当接するコーナー部22近傍に、緩衝材としてのL字状コーナー部緩衝材23が設けられている。   That is, in the second embodiment, the connecting plate members 7, 7 provided orthogonal to the main girder members 4, 4 are disposed in the vicinity of the corner portion 22 in contact with the main girder members 4, 4 so as to be L-shaped as a buffer material. A shaped corner cushioning material 23 is provided.

このL字状コーナー部緩衝材23は、SBR(スチレンブタジエンゴム)製で、図7に示すように所定の硬度(例えば、硬度約70等)を有し、短尺平板状を呈して、前記主桁部材4の裏面側4aに沿って設けられる水平緩衝材としての水平面材24と、前記連結板材7側に沿って設けられる短尺平板状の縦緩衝材としての縦面材25とを有して、略L字状を呈するように組み合わされて、主に構成されている。   The L-shaped corner cushioning material 23 is made of SBR (styrene butadiene rubber) and has a predetermined hardness (for example, hardness of about 70) as shown in FIG. It has a horizontal surface material 24 as a horizontal cushioning material provided along the back surface side 4a of the girder member 4, and a vertical surface material 25 as a short flat plate-like vertical cushioning material provided along the connecting plate material 7 side. It is mainly configured by being combined so as to exhibit a substantially L-shape.

次に、この実施例2の中詰め鋼製セグメント21の作用について説明する。   Next, the operation of the middle-filled steel segment 21 of Example 2 will be described.

この実施例2の中詰め鋼製セグメント21では、前記実施例1の中詰め鋼製セグメント11の作用効果に加えて、更に、前記L字状コーナー部緩衝材23,23が、前記鋼製の主桁部材4の歪み変位量が、前記コンクリート構造部3の許容歪み変位量以上となるコーナー部22,22に設けられている。   In the middle packed steel segment 21 of the second embodiment, in addition to the effect of the middle packed steel segment 11 of the first embodiment, the L-shaped corner cushioning materials 23 and 23 are made of the steel. The main girder member 4 is provided at the corner portions 22 and 22 where the strain displacement amount is equal to or larger than the allowable strain displacement amount of the concrete structure portion 3.

このため、効率的に荷重入力が緩衝されて、シールド性を良好に保持することができる。   For this reason, a load input is buffered efficiently and a shielding property can be kept favorable.

すなわち、この実施例2では、前記主桁部材4と直交して設けられる連結板材7に沿って、この主桁部材4と当接するコーナー部22,22近傍に、前記L字状コーナー部緩衝材23,23の縦面材25,25が設けられている。   That is, in the second embodiment, the L-shaped corner cushioning material is provided in the vicinity of the corner portions 22, 22 in contact with the main girder member 4 along the connecting plate material 7 provided orthogonal to the main girder member 4. 23, 23 vertical surface members 25, 25 are provided.

このため、コーナー部22,22での荷重入力による前記主桁部材4の変位が、大きくても、この縦面材25,25の面延設方向の長さ寸法によって吸収されて、前記コンクリート構造部3に伝わりにくくなる。   For this reason, even if the displacement of the main girder member 4 due to the load input at the corner portions 22 and 22 is large, it is absorbed by the length of the longitudinal members 25 and 25 in the surface extending direction, and the concrete structure It becomes difficult to be transmitted to part 3.

従って、コンクリート構造部3のコーナー部22,22付近での圧壊若しくは剥離による亀裂を、有効に防止できる。   Therefore, cracks due to crushing or peeling near the corner portions 22 and 22 of the concrete structure portion 3 can be effectively prevented.

また、この実施例2では、L字状コーナー部緩衝材23が、短尺平板状を呈して、前記主桁部材4の裏面側4aに沿って設けられる水平緩衝材としての水平面材24と、前記連結板材7側に沿って設けられる短尺平板状の縦緩衝材としての縦面材25とを有して、略L字状を呈するように組み合わされて構成されているので、板状の緩衝材を略矩形に切断するだけで、所望の大きさに加工でき、加工性が良好である。   Further, in this second embodiment, the L-shaped corner cushioning material 23 has a short flat plate shape, and is a horizontal cushioning material 24 as a horizontal cushioning material provided along the back surface side 4a of the main girder member 4; The plate-like cushioning material is configured to have a substantially flat L-shaped vertical cushioning material 25 that is provided along the connecting plate material 7 side so as to be substantially L-shaped. Can be processed into a desired size simply by cutting the substrate into a substantially rectangular shape, and the workability is good.

他の構成及び作用効果については、前記実施例1の中詰め鋼製セグメント11と略同様であるので説明を省略する。   About another structure and an effect, since it is substantially the same as that of the said inside-packed steel segment 11 of Example 1, description is abbreviate | omitted.

図9は、この発明の実施の形態の実施例3の中詰め鋼製セグメント31を説明するものである。   FIG. 9 illustrates the middle-filled steel segment 31 of Example 3 of the embodiment of the present invention.

なお、前記実施例1,2と同一乃至均等な部分については同一符号を付して説明する。   In addition, the same code | symbol is attached | subjected and demonstrated about the part thru | or equivalent to the said Examples 1,2.

まず、この実施例3の中詰め鋼製セグメント31の構成を、実施例2の中詰め鋼製セグメント21との相違点を中心に説明すると、この実施例3の中詰め鋼製セグメン31では、緩衝材として、上面視略直角二等辺三角形形状を呈する三角柱体の三角コーナー部緩衝材32が、SBR製で、図7に示すように所定の硬度(例えば、硬度約70等)を有して構成されている。   First, the configuration of the middle-stuffed steel segment 31 of the third embodiment will be described with a focus on the differences from the middle-stuffed steel segment 21 of the second embodiment. In the middle-stuffed steel segment 31 of the third embodiment, As the cushioning material, a triangular corner cushioning material 32 of a triangular prism body having a substantially right isosceles triangular shape in a top view is made of SBR and has a predetermined hardness (for example, a hardness of about 70 or the like) as shown in FIG. It is configured.

そして、前記鋼製の主桁部材4の歪み変位量が、前記コンクリート構造部3の許容歪み変位量以上となるコーナー部22近傍に、この三角コーナー部緩衝材32が、直交する二辺を各々前記主桁部材4及び連結板材7に沿わせて設けられている。   The triangular corner cushioning material 32 has two orthogonal sides in the vicinity of the corner portion 22 where the strain displacement amount of the steel main girder member 4 is equal to or greater than the allowable strain displacement amount of the concrete structure portion 3. It is provided along the main girder member 4 and the connecting plate member 7.

次に、この実施例3の中詰め鋼製セグメント31の作用について説明する。   Next, the operation of the middle-filled steel segment 31 of Example 3 will be described.

この実施例3の中詰め鋼製セグメント31では、前記実施例1,2の中詰め鋼製セグメント11,21の作用効果に加えて、更に、前記三角コーナー部緩衝材32が、直交する二辺を各々前記主桁部材4及び連結板材7に沿わせて設けられる。   In the middle packed steel segment 31 of the third embodiment, in addition to the effects of the middle packed steel segments 11 and 21 of the first and second embodiments, the triangular corner cushioning material 32 further includes two orthogonal sides. Are provided along the main girder member 4 and the connecting plate member 7, respectively.

この実施例3では、この三角コーナー部緩衝材32が、直交する二辺を、略同一長さとする上面視略直角二等辺三角形形状を呈する三角柱体によって構成されている。   In the third embodiment, the triangular corner cushioning material 32 is constituted by a triangular prism body having an isosceles right triangular shape in a top view in which two orthogonal sides have substantially the same length.

従って、左,右何れのコーナー部22,22でも、同一形状の三角コーナー部緩衝材32,32を使用でき、装着が容易で、しかも、部品の種類の増大を抑制でき、有効にジャッキ推力によるコーナー部22,22近傍でのコンクリート構造部3の亀裂を防止できる。他の構成及び作用効果については、前記実施例1,2と略同様であるので説明を省略する。   Accordingly, the triangular corner cushioning materials 32 and 32 having the same shape can be used in both the left and right corner portions 22 and 22, and can be easily mounted. Further, the increase in the types of components can be suppressed, and the jack thrust can be effectively used. The crack of the concrete structure part 3 in the corner parts 22 and 22 vicinity can be prevented. Other configurations and functions and effects are substantially the same as those of the first and second embodiments, and thus the description thereof is omitted.

図11及び図12は、この発明の実施の形態の実施例4の中詰め鋼製セグメント41の概略を説明するものである。   FIGS. 11 and 12 illustrate the outline of the middle-filled steel segment 41 of Example 4 of the embodiment of the present invention.

この実施例4の中詰め鋼製セグメント41も、内面1aが開放された水平断面略円弧状の鋼製の鋼殻部12と、鋼殻部12の内側に中詰めされてその内面1aよりも一段高く盛り上がったコンクリート構造部3とから構成されている。そして、鋼殻部12は、図11に示すように、コンクリート構造部3の外面を覆う外板部2aと、この外板部2aの前記隔壁構築方向Yの端縁2b,2bに沿って設けられた主桁部材4,4と、周方向Xの各端縁2c,2cに設けられた端部連結板5,5と、端部連結板5,5と平行に配置されて主桁部材4,4間に連結された複数の連結板材7によって主要部が構成されており、内面を開放する断面略コ字状に形成されている。   The fourth embodiment of the middle-filled steel segment 41 of the fourth embodiment also has a steel cross section 12 made of steel having a substantially arc-shaped horizontal cross section with the inner surface 1a open, and is packed inside the steel shell section 12 so as to be filled more than the inner surface 1a. It is comprised from the concrete structure part 3 which rose one step higher. And as shown in FIG. 11, the steel shell part 12 is provided along the outer plate part 2a covering the outer surface of the concrete structure part 3 and the edges 2b and 2b of the outer plate part 2a in the partition construction direction Y. The main girder members 4, 4, the end connecting plates 5, 5 provided at the respective edges 2 c, 2 c in the circumferential direction X, and the main girder member 4 arranged in parallel with the end connecting plates 5, 5. The main part is comprised by the some connection board | plate material 7 connected between 4 and formed in the cross-sectional substantially U-shape which open | releases an inner surface.

この実施例においては、コンクリート構造部3を形成するために図示しない型枠にコンクリートを打設する際、鋼殻部12全体へのコンクリートの流動性を確保することができるように、連結板材7は、その下端縁が外板部2aから離隔した状態で対向する主桁部材4,4間に連結されている。   In this embodiment, when the concrete is placed in a mold (not shown) in order to form the concrete structure portion 3, the connecting plate material 7 is provided so that the fluidity of the concrete to the entire steel shell portion 12 can be secured. Is connected between the main girder members 4 and 4 which face each other with the lower end edge thereof being separated from the outer plate portion 2a.

一方、各連結板材7には、下端縁が連結板材7の下端縁に沿わせるとともに、上端縁が連結板材7の上端縁を超えてコンクリート構造部3の内面3aに達する高さの緩衝材42がそれぞれ両面テープ43を介して貼着されている。この緩衝材42は、荷重負荷時の応力を緩和できるとともに、コンクリート打設時の倒れ防止性能を有する必要がある。例えば、前述した超高分子量ポリエチレンやSBR、さらには、HDPE(高密度ポリエチレン)は、圧縮降伏強度がコンクリートの破壊強度程度あり、下水用途として耐酸性、耐アルカリ性に優れ、鋼殻部12との接着性が良好であり、荷重時の歪応力を吸収し、かつ、ジャッキに反力を伝達できることから、好適に採用することができる。   On the other hand, each connecting plate member 7 has a lower end edge along the lower end edge of the connecting plate member 7, and the upper end edge exceeds the upper end edge of the connecting plate member 7 and reaches the inner surface 3 a of the concrete structure portion 3. Are attached via a double-sided tape 43. The cushioning material 42 needs to have the ability to prevent collapse when placing concrete, while being able to relieve stress when a load is applied. For example, the ultra-high molecular weight polyethylene and SBR described above, and HDPE (high density polyethylene) have compressive yield strength that is about the fracture strength of concrete, and have excellent acid resistance and alkali resistance for sewage applications. Since the adhesiveness is good, the strain stress at the time of loading is absorbed, and the reaction force can be transmitted to the jack, it can be suitably employed.

本実施例においては、緩衝材42は、図12に詳細に示すように、柔らかい性状を有する緩衝材、例えば、SBR50からなる中心緩衝材421と、該中心緩衝材421を両側から挟み込むように中心緩衝材421の外面にそれぞれ接着され、一定の硬さを有する緩衝材、例えば、SBR80からなる一対の支持緩衝材422と、から構成されている。   In the present embodiment, as shown in detail in FIG. 12, the cushioning material 42 has a soft cushioning material, for example, a central cushioning material 421 made of SBR50, and a center so as to sandwich the central cushioning material 421 from both sides. Each of the cushioning materials 421 is bonded to the outer surface of the cushioning material 421 and has a certain hardness, for example, a pair of support cushioning materials 422 made of SBR80.

ただし、荷重負荷時の応力を緩和できるとともに、コンクリート打設時の倒れ防止性能を有すれば、3層構造に限らず1層でも2層でもかまわない。   However, the structure is not limited to the three-layer structure, and may be one layer or two layers as long as it can relieve the stress at the time of loading and has a fall prevention performance when placing concrete.

次に、この実施例4の中詰め鋼製セグメント41の作用について説明する。   Next, the operation of the middle-filled steel segment 41 of the fourth embodiment will be described.

この実施例4の中詰め鋼製セグメント41では、複数の中詰め鋼製セグメント41が、シールド機S等のジャッキJ,Jによって掘削されたトンネル等の壁面に、周方向Xに環状となるように連結されると共に、トンネル等の長手方向である隔壁構築方向Yに複数隣接配置されて、円筒状の構造物が地中に構築される。   In the middle-filled steel segment 41 of the fourth embodiment, a plurality of middle-filled steel segments 41 are annular in the circumferential direction X on the wall surface of a tunnel or the like excavated by jacks J, J of the shield machine S or the like. A cylindrical structure is built in the ground by being adjacently arranged in the partition construction direction Y that is the longitudinal direction of a tunnel or the like.

ここで、例えば、図10に示したように、急曲線部10aが構築される場合には、シールド機SのジャッキJ,Jの推力が中詰め鋼製セグメント41の主桁部材4の左右各端部に不均等に作用する。このため、主桁部材4の左右各端部の変位量に差が発生し、中詰め鋼製セグメント41を変形させる。中詰め鋼製セグメント41の変形を考えるとき、図13に示すように、曲げを無視して主桁部材4の先端部に荷重が作用したと仮定して単純化すると、鋼殻部12の変形は、一端部に対して他端部がΔだけ微小変位するものとなる。一方、コンクリート構造部3は、その内面側が緩衝材42によって周方向Xに複数個に分割されて切り離されていることから、緩衝材42によって分割されたコンクリート構造部の変位量δは、鋼殻部12の変位量Δの数分の1となる。例えば、コンクリート構造部3が周方向に均等に分割されている場合には、分割されたコンクリート構造部の変位量δは、鋼殻部12の変位量Δに対して分割された個数分の1となる。つまり、分割されたコンクリート構造部の各変位量δの総和が鋼殻部12の変位量Δとなる。   Here, for example, as shown in FIG. 10, when the sharp curve portion 10 a is constructed, the thrusts of the jacks J, J of the shield machine S are changed to the left and right of the main girder member 4 of the center-filled steel segment 41. Acts unevenly on the edges. For this reason, a difference occurs in the amount of displacement of each of the left and right end portions of the main girder member 4 to deform the center-filled steel segment 41. When considering the deformation of the middle-filled steel segment 41, as shown in FIG. 13, if the load is applied to the tip of the main girder member 4 ignoring bending, the deformation of the steel shell 12 is simplified. Is that the other end is slightly displaced by Δ with respect to the one end. On the other hand, since the inner surface side of the concrete structure portion 3 is divided into a plurality of portions in the circumferential direction X by the cushioning material 42 and separated, the displacement δ of the concrete structure portion divided by the cushioning material 42 is a steel shell. This is a fraction of the amount of displacement Δ of the portion 12. For example, when the concrete structure portion 3 is evenly divided in the circumferential direction, the displacement amount δ of the divided concrete structure portion is 1 / the number divided into the displacement amount Δ of the steel shell portion 12. It becomes. That is, the sum total of the displacement amounts δ of the divided concrete structure portion becomes the displacement amount Δ of the steel shell portion 12.

この結果、分割されたコンクリート構造部の内面側の変形を抑制することができることから、コンクリート構造部3の内面側に圧壊若しくは剥離による亀裂が生じるおそれを減少させて、良好なシールド性能を維持できる。すなわち、下水と接触することになるコンクリート構造部3の内面側に亀裂がないことにより、亀裂を通して下水がコンクリートに浸透し、コンクリートを劣化させることを防止できる。   As a result, since the deformation on the inner surface side of the divided concrete structure portion can be suppressed, the possibility of cracking due to crushing or peeling on the inner surface side of the concrete structure portion 3 can be reduced, and good shielding performance can be maintained. . That is, since there is no crack on the inner surface side of the concrete structure portion 3 that comes into contact with the sewage, it is possible to prevent the sewage from penetrating into the concrete through the crack and deteriorating the concrete.

具体的には、縦500mm×外周円弧長2041mm×高さ147mm、曲率半径1147mm、中心角102度の中詰め鋼製セグメント41の主桁部材4に1000kNの荷重を負荷させた場合、鋼殻部12に最大1.49mmの変位が発生したが、コンクリート構造部3の内面側にクラックは発生しなかった。これに対し、緩衝材42を用いない同一の大きさの中詰め鋼製セグメントの主桁部材4に1000kNの荷重を負荷させた場合、鋼殻部12に最大1.86mmの変位が発生すると共に、コンクリート構造部3の内面側コーナー部にクラックが発生した。   Specifically, when a load of 1000 kN is applied to the main girder member 4 of the center-filled steel segment 41 of length 500 mm × peripheral arc length 2041 mm × height 147 mm, curvature radius 1147 mm, and central angle 102 degrees, the steel shell portion Although a displacement of 1.49 mm at the maximum occurred in No. 12, no crack occurred on the inner surface side of the concrete structure portion 3. On the other hand, when a load of 1000 kN is applied to the main girder member 4 of the same size middle-filled steel segment that does not use the cushioning material 42, a maximum displacement of 1.86 mm occurs in the steel shell portion 12. Cracks occurred at the corners on the inner surface side of the concrete structure 3.

ところで、前述した実施例4において、荷重が負荷されることにより、緩衝材42とコンクリート構造部3との界面にずれによる微小な隙間が発生することがある。このような微小な隙間が発生すると、隙間を通して下水が浸透し、鋼殻部12の劣化が懸念されるものとなる。   By the way, in Example 4 mentioned above, when a load is applied, the micro clearance gap by a shift | offset | difference may generate | occur | produce in the interface of the shock absorbing material 42 and the concrete structure part 3. When such a minute gap is generated, sewage permeates through the gap, and the steel shell 12 may be deteriorated.

このため、図14に示すように、緩衝材42を構成する支持緩衝材422の上端部近傍の外面にアンカー部422aを一体に形成することが好ましい。これにより、緩衝材42とコンクリート構造部3がアンカー部422aを介して一体化され、それらの界面に微小な隙間が発生することを防止できる。   For this reason, as shown in FIG. 14, it is preferable to integrally form the anchor portion 422a on the outer surface near the upper end portion of the support cushioning material 422 constituting the cushioning material. Thereby, the buffer material 42 and the concrete structure part 3 are integrated via the anchor part 422a, and it can prevent that a micro clearance gap generate | occur | produces in those interfaces.

また、仮に緩衝材42とコンクリート構造部3との界面に微小な隙間が発生したとしても、その微小な隙間を通して下水が鋼殻部12に到達しないように、微小な隙間を密封することがより好ましい。すなわち、図15に示すように、緩衝材42を構成する中心緩衝材421および一対の支持緩衝材422によって区画される空間に水膨張ゴム44を配設すれば、複数の中詰め鋼製セグメント41が、シールド機S等のジャッキJ,Jによって掘削されたトンネル等の壁面に、周方向Xに環状となるように連結されると共に、トンネル等の長手方向である隔壁構築方向Yに複数隣接配置されて、円筒状の構造物が地中に構築される際において、目に見えないような微小な隙間が緩衝材42とコンクリート構造部3との界面に発生したとしても、その微小な隙間を通して下水が浸透して水膨張ゴム44に到達すれば、水膨張ゴム44が水を受けて膨張することから、支持緩衝材422をコンクリート構造部3に向けて押圧し、支持緩衝材422とコンクリート構造部3との界面に発生した微小な隙間を支持緩衝材422を介して密閉することができる。   Further, even if a minute gap is generated at the interface between the buffer material 42 and the concrete structure portion 3, it is more preferable to seal the minute gap so that the sewage does not reach the steel shell portion 12 through the minute gap. preferable. That is, as shown in FIG. 15, if the water expansion rubber 44 is disposed in a space defined by the central cushioning material 421 and the pair of supporting cushioning materials 422 constituting the cushioning material 42, a plurality of middle-stuffed steel segments 41 are provided. Are connected to a wall surface of a tunnel or the like excavated by jacks J and J of the shield machine S or the like so as to form an annular shape in the circumferential direction X, and a plurality of adjacently arranged in the partition construction direction Y that is the longitudinal direction of the tunnel or the like When a cylindrical structure is constructed in the ground, even if a minute gap that cannot be seen is generated at the interface between the cushioning material 42 and the concrete structure portion 3, If the sewage penetrates and reaches the water expansion rubber 44, the water expansion rubber 44 receives water and expands. Therefore, the support cushioning material 422 is pressed toward the concrete structure portion 3 to support the support cushioning material 422. It is possible to seal the small gap that occurs at the interface between the concrete structure 3 via the supporting cushioning material 422.

この結果、下水が鋼殻部12に達することがなく、鋼殻部12の劣化を確実に防止することができる。   As a result, the sewage does not reach the steel shell 12 and the deterioration of the steel shell 12 can be reliably prevented.

なお、鋼殻部12にコンクリートを打設してコンクリート構造部3を形成する際、コンクリートの水分が水膨張ゴム44に接触することがないように、一対の支持緩衝材422の外周面にわたって止水テープ45が貼着される。すなわち、水膨張ゴム44の周囲は、止水テープ45によって包囲されており、コンクリート打設時に水膨張ゴム44に水が接触することを確実に防止することができる。この止水テープ45は、中詰め鋼製セグメント41が形成された際に除去すればよい。   In addition, when concrete is cast on the steel shell 12 to form the concrete structure portion 3, it is stopped over the outer peripheral surfaces of the pair of support cushioning materials 422 so that the moisture of the concrete does not contact the water expansion rubber 44. Water tape 45 is applied. That is, the periphery of the water expansion rubber 44 is surrounded by the water-stopping tape 45, so that it is possible to reliably prevent water from coming into contact with the water expansion rubber 44 when placing concrete. The water blocking tape 45 may be removed when the filling steel segment 41 is formed.

さらに、図16に示すように、連結板材7に緩衝材42を設けるとともに、主桁部材4の裏面側に板状緩衝材46を設けることもできる。   Further, as shown in FIG. 16, a buffer material 42 may be provided on the connecting plate material 7, and a plate-like buffer material 46 may be provided on the back side of the main girder member 4.

このように、主桁部材4の裏面側に板状緩衝材46を設けることにより、主桁部材4に作用する隔壁構築方向Yの荷重による主桁部材4の歪み変位が板状緩衝材46によって吸収されることから、コンクリート構造部3の歪み変位をさらに抑制することができる。   Thus, by providing the plate-like cushioning material 46 on the back surface side of the main girder member 4, the plate-like cushioning material 46 causes the strain displacement of the main girder member 4 due to the load in the partition construction direction Y acting on the main girder member 4. Since it is absorbed, the strain displacement of the concrete structure part 3 can be further suppressed.

以上、図面を参照して、本発明の実施の形態を詳述してきたが、具体的な構成は、この実施の形態に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   The embodiment of the present invention has been described in detail above with reference to the drawings. However, the specific configuration is not limited to this embodiment, and design changes that do not depart from the gist of the present invention are not limited to this embodiment. Included in the invention.

即ち、前記実施例1の中詰め鋼製セグメント11では、周方向に複数の円弧板状の中詰め鋼製セグメント11,11を、他のセグメント11と環状を呈するように連結したものを示して説明してきたが、特にこれに限らず、例えば、平板形状、矩形版状、多角形版状のセグメント等、側面の円弧が、一定角度で屈曲されるか或いは直線状のセグメントで、立坑若しくはトンネル等の地中に埋設される構造体の隔壁を構成するものであれば、断面形状は、断面矩形状等の多角形形状、楕円形形状若しくは長円形形状に構築されるもの等、どのような形状の中詰め鋼製セグメントであってもよい。   That is, in the middle-filled steel segment 11 of the first embodiment, a plurality of arc-plate shaped middle-filled steel segments 11, 11 in the circumferential direction are connected to other segments 11 so as to form an annular shape. Although described in particular, the present invention is not limited to this, and for example, a circular arc on a side surface such as a flat plate shape, a rectangular plate shape, a polygonal plate shape segment, etc. As long as it constitutes a partition wall of a structure embedded in the ground, the cross-sectional shape is any polygonal shape such as a rectangular cross-sectional shape, an oval shape or an oval shape, etc. It may be an intermediate steel segment in shape.

地中にトンネル構造体の隔壁を構築するものを示して説明してきたが、特にこれに限らず、立坑を、ジャッキ推力を用いて圧入工法によって構築するものに、前記中詰め鋼製セグメント11を用いても、トンネル進行方向に所定の荷重が加わるものであれば良い。   Although it has shown and demonstrated what constructs | assembles the partition wall of a tunnel structure in the ground, it is not restricted to this especially, In the thing which constructs a shaft by the press-fitting method using jack thrust, the said inside-packed steel segment 11 is used. Even if it uses, what is necessary is just to apply a predetermined load in the tunnel traveling direction.

また、前記実施例1では、緩衝材として超高分子量ポリエチレン材料によって構成される超高分子量ポリエチレンシート14が、設けられているが、特にこれに限らず、例えば、図7に示すように、6ナイロン、HDPE等の他の構成樹脂製材料を用いて構成してもよい。   Moreover, in the said Example 1, although the ultra high molecular weight polyethylene sheet 14 comprised by the ultra high molecular weight polyethylene material as a buffering material is provided, it is not restricted especially, For example, as shown in FIG. You may comprise using other structural resin materials, such as nylon and HDPE.

更に、この実施例1では、前記超高分子量ポリエチレンシート14が、図3に示すように、長,短片状に複数に切断されて、各連結板材7,7間に設けられているが、特にこれに限らず、例えば、各連結板材7の内端縁よりも内側位置で、長,短片状の超高分子量ポリエチレンシート14,14間を連続させて構成されていてもよく、前記主桁部材と、前記コンクリート構造部との間に設けられる緩衝材であるならば、特に、形状、数量及び材質が限定されるものではない。   Furthermore, in this Example 1, the ultra high molecular weight polyethylene sheet 14 is cut between a plurality of long and short pieces as shown in FIG. For example, the main girder member may be configured such that the long and short pieces of ultrahigh molecular weight polyethylene sheets 14 and 14 are continuously arranged at a position inside the inner end edge of each connecting plate member 7. And if it is a buffering material provided between the said concrete structure part, a shape, quantity, and a material will not be specifically limited.

この発明の最良の実施の形態の実施例1の中詰め鋼製セグメントで、コンクリート構造部を取り除いた中詰め鋼製セグメントの鋼殻部を湾曲形状を平面状に展開して、内側面側から、見た構成を示す模式的な平面図である。In the middle-filled steel segment of Example 1 of the best mode of the present invention, the curved shape of the steel shell portion of the middle-packed steel segment from which the concrete structure portion has been removed is developed in a planar shape from the inner side surface side. It is a typical top view which shows the structure which looked. 実施例1の中詰め鋼製セグメントで、図1中A−A線に沿った位置での断面図である。FIG. 2 is a cross-sectional view at a position along the line AA in FIG. 実施例1の中詰め鋼製セグメントで、内側面側から見た平面図である。FIG. 3 is a plan view seen from the inner surface side in the middle-stuffed steel segment of Example 1. 実施例1の中詰め鋼製セグメントで、図3中B−B線に沿った位置での断面図である。FIG. 4 is a cross-sectional view at a position along the line BB in FIG. 実施例1の中詰め鋼製セグメントの主桁部材を、推進ジャッキで、隔壁構築方向に押圧する様子を説明する一部省略斜視図である。It is a partially-omission perspective view explaining a mode that the main girder member of the middle steel-made segment of Example 1 is pressed in a partition construction direction with a propulsion jack. 実施例1の中詰め鋼製セグメントに用いられた緩衝材としての超高分子量ポリエチレンシートの圧縮荷重と、たわみ量との関係を説明するグラフ図である。It is a graph explaining the relationship between the compressive load of the ultrahigh molecular weight polyethylene sheet as a buffer material used for the medium-stuffed steel segment of Example 1, and the amount of deflection. 実施の形態で中詰め鋼製セグメントに用いられる緩衝材の物性を比較する表図である。It is a table | surface figure which compares the physical property of the shock absorbing material used for an inside-packed steel segment in embodiment. この発明の最良の実施の形態の実施例2の中詰め鋼製セグメントで、コンクリート構造部を取り除いた中詰め鋼製セグメントの鋼殻部を湾曲形状を平面状に展開して、内側面側から、見た構成を示す模式的な平面図である。In the middle-filled steel segment of Example 2 of the best mode of the present invention, the curved shape of the steel shell portion of the middle-filled steel segment from which the concrete structure portion has been removed is developed in a planar shape from the inner side surface side. It is a typical top view which shows the structure which looked. この発明の最良の実施の形態の実施例3の中詰め鋼製セグメントで、コンクリート構造部を取り除いた中詰め鋼製セグメントの鋼殻部を湾曲形状を平面状に展開して、内側面側から見た構成を示す模式的な平面図である。In the middle-filled steel segment of Example 3 of the best mode of the present invention, the curved shape of the steel shell portion of the middle-packed steel segment from which the concrete structure portion has been removed is developed in a planar shape from the inner side surface side. It is a typical top view which shows the structure which looked. 地中に構築されるトンネル構造体のうち、急曲線部を説明する模式的な平面図である。It is a typical top view explaining a sharp curve part among tunnel structures built in the ground. この発明の最良の実施の形態の実施例4の中詰め鋼製セグメントで、コンクリート構造部を取り除いた中詰め鋼製セグメントの鋼殻部を示す模式的な斜視図である。It is a typical perspective view which shows the steel shell part of the middle-stuffed steel segment which removed the concrete structure part in the middle-stuffed steel segment of Example 4 of this embodiment of this invention. 図11の中詰め鋼製セグメントの緩衝材を示す縦断面図である。It is a longitudinal cross-sectional view which shows the shock absorbing material of the middle packing steel segment of FIG. 図11の中詰め鋼製セグメントに剪断荷重が作用した場合の変位を説明する模式的な平面図である。FIG. 12 is a schematic plan view for explaining displacement when a shear load is applied to the middle-filled steel segment of FIG. 11. 図12の緩衝材の変形例を示す縦断面図である。It is a longitudinal cross-sectional view which shows the modification of the shock absorbing material of FIG. 図12の緩衝材の他の変形例を示す縦断面図である。It is a longitudinal cross-sectional view which shows the other modification of the shock absorbing material of FIG. 実施例4の中詰め鋼製セグメントの変形例で、コンクリート構造部を取り除いた中詰め鋼製セグメントの鋼殻部を示す模式的な斜視図である。FIG. 10 is a schematic perspective view showing a steel shell portion of a medium-filled steel segment from which a concrete structure portion is removed in a modification of the medium-filled steel segment of Example 4. 従来の中詰め鋼製セグメントの構成を説明し、中詰めされたコンクリート構造部の一部を除去したセグメントの斜視図である。It is a perspective view of a segment which explained the composition of the conventional middle-stuffed steel segment, and removed a part of the concrete structure part filled in the middle.

符号の説明Explanation of symbols

2a 外板部
3 コンクリート構造部
4 主桁部材
5 端部連結板
7 連結板材
11,21,31,41中詰め鋼製セグメント
12 鋼殻部
14 超高分子量ポリエチレンシート(緩衝材)
22 コーナー部
23 L字状コーナー部緩衝材
24 水平面材(水平緩衝材)
25 縦面材(縦緩衝材)
32 三角コーナー部緩衝材
42 緩衝材
421 中心緩衝材
422 支持緩衝材
422a アンカー部
44 水膨張ゴム
45 止水テープ
46 板状緩衝材
2a Outer plate portion 3 Concrete structure portion 4 Main girder member 5 End connection plate 7 Connection plate material 11, 21, 31, 41 Filled steel segment 12 Steel shell portion 14 Ultra high molecular weight polyethylene sheet (buffer material)
22 Corner portion 23 L-shaped corner cushioning material 24 Horizontal surface material (horizontal cushioning material)
25 Longitudinal material (vertical cushioning material)
32 Triangular corner cushioning material 42 Buffering material 421 Center cushioning material 422 Support cushioning material 422a Anchor portion 44 Water expansion rubber 45 Waterstop tape 46 Plate cushioning material

Claims (10)

地中に構築される隔壁の一部を構成して、内面が開放された鋼製の鋼殻部の内側に中詰めされたコンクリート構造部を有する中詰め鋼製セグメントであって、前記鋼殻部は、該コンクリート構造部の外面を覆う外板部と、該外板部の隔壁構築方向端縁に沿って設けられて、該コンクリート構造部の内面に向けて延設される主桁部材とを有し、前記主桁部材と、前記コンクリート構造部との間には、緩衝材が設けられていることを特徴とするシールドトンネル用中詰め鋼製セグメント。   A steel-filled steel segment comprising a part of a partition wall constructed in the ground and having a concrete structure part filled inside a steel steel shell part whose inner surface is open, The outer plate portion covering the outer surface of the concrete structure portion; and a main girder member provided along the partition wall construction direction edge of the outer plate portion and extending toward the inner surface of the concrete structure portion; An intermediate-packed steel segment for a shield tunnel, wherein a cushioning material is provided between the main girder member and the concrete structure portion. 前記緩衝材は、平板状を呈して、前記主桁部材の裏面側と、前記コンクリート構造部の端面との間に介装されることを特徴とする請求項1記載のシールドトンネル用中詰め鋼製セグメント。   The intermediate packing steel for shield tunnel according to claim 1, wherein the cushioning material has a flat plate shape and is interposed between a back surface side of the main girder member and an end surface of the concrete structure portion. Made segment. 前記緩衝材は、前記主桁部材と直交して設けられる連結板材を、該主桁部材と当接させるコーナー部近傍に設けられることを特徴とする請求項1または2記載のシールドトンネル用中詰め鋼製セグメント。 The intermediate packing for shield tunnel according to claim 1 or 2 , wherein the cushioning material is provided in the vicinity of a corner portion where a connecting plate material provided orthogonal to the main girder member is brought into contact with the main girder member. Steel segment. 前記緩衝材は、短尺平板状を呈して、前記主桁部材の裏面側に設けられる水平緩衝材と、前記連結板材側に設けられる短尺平板状の縦緩衝材とを有して、略L字状を呈するように組み合わされたL字状コーナー部緩衝材からなることを特徴とする請求項記載のシールドトンネル用中詰め鋼製セグメント。 The buffer material has a short flat plate shape, and has a horizontal buffer material provided on the back surface side of the main girder member and a short flat plate-shaped vertical buffer material provided on the connecting plate material side, and is substantially L-shaped. It consists of the L-shaped corner part cushioning material combined so that the shape may be exhibited, The inside steel segment for shield tunnels of Claim 3 characterized by the above-mentioned. 前記緩衝材は、前記コーナー部に設けられて、直交する二辺を各々前記主桁部材及び連結板材に沿わせてなる三角コーナー部緩衝材であることを特徴とする請求項記載のシールドトンネル用中詰め鋼製セグメント。 4. The shield tunnel according to claim 3 , wherein the cushioning material is a triangular corner cushioning material provided at the corner portion and having two orthogonal sides along the main girder member and the connecting plate material, respectively. Filled steel segment for use. 地中に構築される隔壁の一部を構成して、内面が開放された鋼製の鋼殻部の内側に中詰めされたコンクリート構造部を有する中詰め鋼製セグメントであって、前記鋼殻部は、該コンクリート構造部の外面を覆う外板部と、該外板部の隔壁構築方向端縁に沿って設けられた主桁部材と、外板部の隔壁外周方向の端縁に沿って設けられた端部連結板と、下端縁が外板部から離隔して端部連結板と平行に配置されて主桁部材間に連結された複数の連結板材とを有し、下端縁を外板部から離隔し、上端縁をコンクリート構造部の内面に達する高さの緩衝材が各連結板材に設けられていることを特徴とするシールドトンネル用中詰め鋼製セグメント。   A steel-filled steel segment comprising a part of a partition wall constructed in the ground and having a concrete structure part filled inside a steel steel shell part whose inner surface is open, The portion includes an outer plate portion covering the outer surface of the concrete structure portion, a main girder member provided along an edge of the outer plate portion in the partition construction direction, and an edge of the outer plate portion in the outer circumferential direction of the partition wall. An end connecting plate provided, and a plurality of connecting plate members that are arranged in parallel to the end connecting plate with the lower end edge spaced apart from the outer plate portion and connected between the main girder members, An intermediate-packed steel segment for shield tunnels, characterized in that each connecting plate is provided with a cushioning material that is spaced from the plate and has an upper edge that reaches the inner surface of the concrete structure. 前記緩衝材は、軟質の中心緩衝材と、該中心緩衝材を両側から挟み込む一対の硬質の支持緩衝材から形成されることを特徴とする請求項記載のシールドトンネル用中詰め鋼製セグメント。 The said shock absorbing material is formed from a soft center shock absorbing material and a pair of hard support shock absorbing material which pinches | interposes this center shock absorbing material from both sides, The segment made from the filling steel for shield tunnels of Claim 6 characterized by the above-mentioned. 前記各支持緩衝材の外面にアンカー部が突設されていることを特徴とする請求項記載のシールドトンネル用中詰め鋼製セグメント。 8. An intermediate-packed steel segment for a shield tunnel according to claim 7, wherein an anchor portion protrudes from the outer surface of each of the support cushioning materials. 前記一対の支持緩衝材の間に水膨張ゴムが配設されるとともに、水膨張ゴムが一対の支持緩衝材の外周面にわたって貼着された止水テープによって密封されていることを特徴とする請求項記載のシールドトンネル用中詰め鋼製セグメント。 A water expansion rubber is disposed between the pair of support cushioning materials, and the water expansion rubber is sealed with a water-stopping tape adhered across the outer peripheral surfaces of the pair of support cushioning materials. Item 8. A medium-filled steel segment for a shield tunnel according to Item 7 . 前記主桁部材の裏面側に板状緩衝材が設けられていることを特徴とする請求項6乃至9のいずれかに記載のシールドトンネル用中詰め鋼製セグメント。 10. The intermediate-packed steel segment for shield tunnel according to claim 6, wherein a plate-like cushioning material is provided on the back side of the main girder member.
JP2006060919A 2005-03-23 2006-03-07 Filled steel segment for shield tunnel Expired - Lifetime JP4734146B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006060919A JP4734146B2 (en) 2005-03-23 2006-03-07 Filled steel segment for shield tunnel

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2005085006 2005-03-23
JP2005085006 2005-03-23
JP2006060919A JP4734146B2 (en) 2005-03-23 2006-03-07 Filled steel segment for shield tunnel

Publications (2)

Publication Number Publication Date
JP2006299792A JP2006299792A (en) 2006-11-02
JP4734146B2 true JP4734146B2 (en) 2011-07-27

Family

ID=37468411

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006060919A Expired - Lifetime JP4734146B2 (en) 2005-03-23 2006-03-07 Filled steel segment for shield tunnel

Country Status (1)

Country Link
JP (1) JP4734146B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4956251B2 (en) * 2007-03-26 2012-06-20 東京都 Segment for shield method
JP4920623B2 (en) * 2008-04-02 2012-04-18 新日本製鐵株式会社 Concrete filled steel segment
CN104033161B (en) * 2014-07-03 2016-04-20 北京特泽热力工程设计有限责任公司 A thermal shield tunnel fixing bracket
KR101774713B1 (en) * 2016-12-02 2017-09-05 안석 excavation equipment for rock tunnel
CN111022080A (en) * 2019-12-31 2020-04-17 中铁第四勘察设计院集团有限公司 Connection structure of track beam and shield tunnel, construction method of connection structure and shield tunnel
CN116591728B (en) * 2023-07-03 2025-12-16 上海勘测设计研究院有限公司 In-situ welding construction device and construction technology for underground artificial tunnel steel lining

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2616144A1 (en) * 1976-04-13 1977-11-03 Metallgesellschaft Ag INHIBITOR TO Aqueous ACID SOLUTIONS
JP3050780B2 (en) * 1995-09-08 2000-06-12 太陽鉄工株式会社 Formwork for inner surface forming of lining segment consisting of steel shell filled with concrete
JP4724332B2 (en) * 2001-09-17 2011-07-13 新日本製鐵株式会社 Steel segment and segment ring structure with excellent earthquake resistance

Also Published As

Publication number Publication date
JP2006299792A (en) 2006-11-02

Similar Documents

Publication Publication Date Title
US8869468B2 (en) Buckling-restrained brace
JP3018291B2 (en) Sliding elastic bearing device for structures
JP4281010B2 (en) Tunnel structure
CN102770622B (en) Buffer material for pipe jacking and pipe jacking
JP2010512475A (en) Expansion joints
JP4734146B2 (en) Filled steel segment for shield tunnel
JP4709786B2 (en) Synthetic segment
KR101073610B1 (en) Reinforced Concrete Beam Strengthened with Slit Type Steel Plate
JP4956251B2 (en) Segment for shield method
JP3999192B2 (en) Strain absorption mechanism of lining of high pressure gas storage underground cavity
JP4920626B2 (en) Synthetic segment
CN213144485U (en) Tunnel anti-fault structure passing through active fracture zone area
JP3993878B2 (en) Water stoppage material
CN106437785A (en) Dislocation-resistant combined tunnel supporting structure for crossing active faults
JP6518377B1 (en) Rubber-made water-stopping material and water-stopping structure using the rubber-made water-stopping material
JP2003055938A (en) Fender
JP5014886B2 (en) Semi-rigid joint method and semi-rigid joint structure between pile head and foundation structure
JP7041577B2 (en) Formwork members and formwork structure
JP3121118U (en) Seismic isolation rubber bearing device for structures
JP2017002718A (en) Water cutoff structure of box body joint part
CN202689048U (en) Pipeline setting structure in deformation joint bottom plates
JPH05163894A (en) Synthetic segment
JP2024179056A (en) Brace Material
JP2025071734A (en) Composite Column
KR20220141625A (en) Insulation structure and method of manufacturing the insulation structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090302

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20090519

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20090519

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20091020

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101022

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101102

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110412

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110425

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140428

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4734146

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250