JP4739592B2 - Rotating multi-layer hanging jig - Google Patents
[go: Go Back, main page]

JP4739592B2 - Rotating multi-layer hanging jig - Google Patents

Rotating multi-layer hanging jig Download PDF

Info

Publication number
JP4739592B2
JP4739592B2 JP2001229584A JP2001229584A JP4739592B2 JP 4739592 B2 JP4739592 B2 JP 4739592B2 JP 2001229584 A JP2001229584 A JP 2001229584A JP 2001229584 A JP2001229584 A JP 2001229584A JP 4739592 B2 JP4739592 B2 JP 4739592B2
Authority
JP
Japan
Prior art keywords
main body
hanging jig
layer hanging
pair
rotary multi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001229584A
Other languages
Japanese (ja)
Other versions
JP2003041778A (en
Inventor
功一 斎藤
洋和 金田
初雄 津山
太一 中山
Original Assignee
東京アール・アイ株式会社
向井建設株式会社
イーグルクランプ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京アール・アイ株式会社, 向井建設株式会社, イーグルクランプ株式会社 filed Critical 東京アール・アイ株式会社
Priority to JP2001229584A priority Critical patent/JP4739592B2/en
Publication of JP2003041778A publication Critical patent/JP2003041778A/en
Application granted granted Critical
Publication of JP4739592B2 publication Critical patent/JP4739592B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は鉄骨梁等を吊り上げるための吊治具に関し、特に、一回のクレーン操作で複数の鉄骨梁を連層状態で吊り上げるに適した回転式連層吊治具に関する。
【0002】
【従来の技術】
建築現場における鉄骨梁等の吊り作業は、鉄骨梁等を1ピース単位で吊り上げて現場に搬送し、取付作業を行う工法が一般的である。すなわち、一回のクレーン操作で1ピースの鉄骨梁を吊り上げる。
【0003】
【発明が解決しようとする課題】
しかしながら、高層ビル等の建築現場でこのような工法を採用すると、作業効率が悪く、工期が長くなり、工費も高騰する。一回のクレーン操作で複数の鉄骨梁を連層状態で吊り上げることも可能であるが、従来の吊治具では複数の鉄骨梁が上下に並んだ状態で吊り上げられることになるため、下段の鉄骨梁を外す作業をしているときに、作業者の頭上に上段の鉄骨梁が存在しており、非常に危険である。また、このような従来技術によると、玉掛けワイヤロープと鉄骨梁とが干渉することがあり、この意味からも作業の安全性を確保することができない。
【0004】
【課題を解決するための手段】
そこで本発明は、上記問題を解決し、一回のクレーン操作で複数の鉄骨梁を連層状態で吊り上げるに際して該複数の鉄骨梁が上下に並ばずにずれた位置で吊り上げられ、したがって下段の鉄骨梁の取り外し作業時に作業者の真上に上段の鉄骨梁が存在する危険な状態をなくし、しかも、玉掛けワイヤロープと鉄骨梁との干渉をなくして作業の安全性を確保することのできる新規な構成の回転式連層吊治具を提供することを目的とする。
【0005】
この目的を達成するため、請求項1にかかる本発明は、クレーンフックと係合連結される吊環が正面視略菱形の本体の上部頂点に回動自在に連結されるとともに、本体の他の3頂点には各々シャックルが回転自在に連結され、各シャックルには本体の幅方向の一方から他方に順次に長さが長くなる玉掛けワイヤロープが架け渡され、各シャックルに玉掛けワイヤロープを介して等質量の被吊上物を吊したときには本体のバランスが維持され、最長の玉掛けワイヤロープを介して吊られた被吊上物から順次取り外したときには残りの被吊上物の重心に向けて本体が吊環連結地点を中心として回転するように構成されてなることを特徴とする回転式連層吊治具である。
【0006】
請求項にかかる本発明は、請求項1記載の回転式連層吊治具において、シャックルに代えて、上記複数地点の各々において本体を貫通するボルトの両端に一対の全方向リングを連結し、該全方向リングはボルト軸を中心にして回動自在であるとともにボルト軸と直交する軸を中心にして揺動自在であることを特徴としている。
【0007】
請求項にかかる本発明は、請求項1または2記載の回転式連層吊治具において、本体に空間部が設けられ、この空間部の補強および運搬用の取手として本体両側に少なくとも各一対のパイプリブが設けられ、これら一対のパイプリブは少なくとも一の水平パイプで連結されていることを特徴としている。
【0008】
請求項にかかる本発明は、請求項1ないしのいずれか記載の回転式連層吊治具を一対用いてこれらを任意長さの構造物で連結したことを特徴としている。
【0009】
【発明の実施の形態】
図1および図2は本発明の一実施形態による回転式連層吊治具10を示し、略菱形に成形された本体11の上部頂点に吊環12が回転自在に連結されるとともに、他の3頂点にはシャックル13a〜13cが回転自在に連結されている。
【0010】
吊環12はクレーンフックと係合連結される。各シャックル13a〜13cには玉掛けワイヤロープ14a〜14c(図8)が架け渡されて鉄骨梁等の被吊上物(以下「鉄骨梁」と言う)の吊り上げを可能にしている。
【0011】
本体11の中央部には軽量化のために左右一対の空間部15,15が形成されており、これら空間部形成による強度低下を補うため、本体11の両側に各々左右一対のパイプリブ16,16が設けられている。
【0012】
この実施形態では本体11の両側のパイプリブ16,16が各々半円弧形状を有しており、これらが一体となって輪状のパイプリブを形成している(図2)。左右一対のパイプリブ16,16は水平パイプ17,17によって連結され、さらに補強されている。また、パイプリブ16,16はこの回転式連層吊治具10の運搬時に使用される取手としての機能を兼用している。
【0013】
各シャックル13a〜13cは、図1において代表的にシャックル13bについて示されているように、矢印両方向に回転自在である。
【0014】
図3および図4は本発明の他の実施形態による回転式連層吊治具10’を示し、図1および図2に示す実施形態と相違する点は、シャックル13a〜13cに代えて全方向リング18(18a,18a〜18c,18c)を用いた点にある。すなわち、菱形本体10の上部頂点以外の3頂点にボルト19(19a〜19c)を貫通し、各ボルトの両端(本体10の両側)に各々全方向リング18a,18a〜18c,18cを止着している。
【0015】
図5には全方向リング18が拡大して示されており、図3において代表的に全方向リング18cについて、また図5(b)においてそれぞれ矢印で示されているように、ボルト19の軸を中心として両方向に回転自在であるとともに、図4において代表的に全方向リング18a(18c)について、また図5(a)においてそれぞれ矢印で示されているように、ボルト軸と直交する軸21を中心として両方向に揺動自在である。
【0016】
この実施形態によると、シャックルに代えて採用した全方向リング18が全方向にスムーズに回転可能であり、また、特に図4および図5(a)に示すような方向に揺動自在である全方向リング18が本体11の両面側に取り付けられているため玉掛けワイヤロープ14a〜14c(図8)を本体11の両面側で異なる方向に取り付けることができることから、多様な吊り上げ状態に適応することができる利点を有する。
【0017】
図6および図7は本発明のさらに別の実施形態による回転式連層吊治具20を示し、一対の回転式連層吊治具を任意長さの構造物で連結したものである。この実施形態では構造物として断面方形状の長尺パイプ22を用い、その両端に各々略菱形の本体23,23を固着し、各本体23の上部頂点に吊環24を回転自在に連結するとともに、他の3頂点にはシャックル25a〜25cを回転自在に連結している。図3および図4の実施形態で説明したように、シャックルに代えて全方向リングを用いてもよい。符号26および27は長尺パイプ22と本体23,23との固着強度を高めるための水平補強リブおよび垂直補強リブである。
【0018】
図6および図7に示す実施形態では、一対の回転式連層吊治具が長尺パイプ22によって所定の間隔をあけて配置されることになるため、大型の鉄骨梁を複数同時に連層状態で吊り上げるのに適している。
【0019】
図8は本発明の回転式連層吊治具の作用を示すものであり、この図では図1および図2に示す回転式連層吊治具10が示されているが、他の実施形態の回転式連層吊治具を用いた場合の作用も略同様である。
【0020】
図8(a)は各シャックル13a〜13cに玉掛けワイヤロープ14a〜14cを介して等質量の鉄骨梁28a〜28cを吊り下げた状態を示している。シャックル13a,13cは中央のシャックル13bを中心として対称位置にあり、且つ、鉄骨梁28a〜28cは等質量であるから、この状態では回転式連層吊治具10のバランスが維持されている。図より明らかなように、玉掛けワイヤロープ14a〜14cは順次長さが長くなっている。
【0021】
この状態で建築現場に運搬し、最長の玉掛けワイヤロープ14cに吊り下げられている鉄骨梁28cを取り外すと、本体11は吊環12との連結地点を中心として、残り2つの鉄骨梁28a,28bの重心に向けて、図において反時計方向に回転して、図8(b)に示す状態となる。吊環12および各シャックル13a〜13cがいずれも回転自在に本体11に連結されていることから、図8(a)〜図8(b)への状態移動はスムーズに行われる。
【0022】
次いで、中央の玉掛けワイヤロープ14bに吊り下げられている鉄骨梁28bを取り外すと、本体11は吊環12との連結地点を中心として、残る鉄骨梁28aの重心に向けて、図において反時計方向にさらに回転して、図8(c)に示す状態となる。この状態から、玉掛けワイヤロープ14aに吊り下げられている鉄骨梁28aを取り外すと、すべての吊り下げ荷重から開放されるので、本体11は吊環12との連結地点を中心として図において時計方向に回転して、図1に示す状態に復帰する。
【0023】
図8では各シャックル13a〜13cに玉掛けワイヤロープ14a〜14cを介して等質量の鉄骨梁28a〜28cを吊り下げた三段吊りの場合を示しているが、この実施形態を二段吊りに適用する場合は、中央のシャックルを使用せず、両端のシャックル13a,13cに玉掛けワイヤロープ14a,14cを介して等質量の鉄骨梁28a,28cを吊り下げればよい。この場合には、長い方の玉掛けワイヤロープ14cに吊り下げられている鉄骨梁28cを取り外すと、本体11は吊環12との連結地点を中心として、残る鉄骨梁28aの重心に向けて、図において反時計方向に回転して、図8(c)に示す状態となる。
【0024】
なお、二段吊りで使用する場合は、鉄骨梁28cを取り外したときに、残る鉄骨梁28aが一挙に鉄骨梁28cの取り外し位置に近づくので、玉掛けワイヤロープ14a,14cの長さの差を大きく取ることが好ましい。
【0025】
【発明の効果】
本発明の回転式連層吊治具によれば、一回のクレーン操作で複数の鉄骨梁を連層状態で吊り上げるに際して該複数の鉄骨梁が上下に並ばずにずれた位置で吊り上げられるため、下段の鉄骨梁の取り外し作業時に作業者の真上に上段の鉄骨梁が存在する危険な状態が回避される。また、玉掛けワイヤロープと鉄骨梁との干渉をなくして作業の安全性を確保することができる。
【0026】
【図面の簡単な説明】
【図1】本発明の一実施形態による回転式連層吊治具の正面図である。
【図2】図1の回転式連層吊治具の側面図である。
【図3】本発明の他の実施形態による回転式連層吊治具の正面図である。
【図4】図3の回転式連層吊治具の側面図である。
【図5】図3および図4に示す回転式連層吊治具に用いられる全方向リングを示す拡大図である。
【図6】一対の回転式連層吊治具を任意長さの構造物で連結した本発明の他の実施形態を示す正面図である。
【図7】図6の回転式連層吊治具の側面図である。
【図8】図1および図2に示す回転式連層吊治具を用いて3つの鉄骨梁を連層状態で吊り上げた状態図(a)、(a)の状態から最長の玉掛けワイヤロープで吊られた鉄骨梁を取り外した状態図(b)、および(b)の状態から中央の玉掛けワイヤロープで吊られた鉄骨梁を取り外した状態図(c)である。
【0027】
【符号の説明】
10,10’,20 回転式連層吊治具
11 本体
12 吊環
13a〜13c シャックル
14a〜14c 玉掛けワイヤロープ
15 空間部
16 パイプリブ
17 水平パイプ
18(18a〜18c) 全方向リング
19 ボルト
21 ボルト軸と直交する軸
22 長尺パイプ
23 本体
24 吊環
25a〜25c シャックル
26 水平補強リブ
27 垂直補強リブ
28a〜28c 鉄骨梁
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a lifting jig for lifting a steel beam or the like, and more particularly to a rotary multi-layer hanging jig suitable for lifting a plurality of steel beams in a multi-layer state by a single crane operation.
[0002]
[Prior art]
As for the suspension work of a steel beam or the like at a construction site, a construction method is generally employed in which the steel beam or the like is lifted in units of one piece, conveyed to the site, and attached. That is, one piece of steel beam is lifted by one crane operation.
[0003]
[Problems to be solved by the invention]
However, when such a construction method is adopted at a construction site such as a high-rise building, the work efficiency is poor, the construction period becomes long, and the construction cost increases. It is possible to lift multiple steel beams in a multi-layered state with a single crane operation. However, with conventional lifting jigs, multiple steel beams are lifted up and down. When removing the beam, there is an upper steel beam above the operator's head, which is very dangerous. Moreover, according to such a prior art, a sling wire rope and a steel beam may interfere, and the safety of work cannot be ensured also from this meaning.
[0004]
[Means for Solving the Problems]
Therefore, the present invention solves the above-described problem, and when lifting a plurality of steel beams in a multi-layered state by a single crane operation, the plurality of steel beams are lifted at positions shifted without being lined up and down. A new state that eliminates the danger of having the upper steel beam directly above the operator during beam removal work, and also eliminates the interference between the sling wire rope and the steel beam, thus ensuring work safety. An object of the present invention is to provide a rotary multi-layer hanging jig having a configuration.
[0005]
To this end, according the present invention in claim 1, together with Tsuwa coupled engagement with crane hook is rotatably connected to the upper apex of the body in front view substantially rhombic, other 3 of the body Shackles are rotatably connected to the vertices, and slack wire ropes that become longer in length from one side to the other in the width direction of the main body are spanned on each shackle, and each shackle is connected via a sling wire rope. The balance of the main body is maintained when a suspended object with a mass is suspended, and the main body moves toward the center of gravity of the remaining suspended objects when it is sequentially removed from the suspended object suspended through the longest sling wire rope. A rotary multi-layer hanging jig configured to rotate around a hanging ring connecting point.
[0006]
The present invention according to claim 2, in rotary communication layer Tutsi device according to claim 1, in place of the shackle, and connecting the pair of omnidirectional rings at both ends of the bolts passing through the body in each of the plurality of points The omnidirectional ring is rotatable about a bolt axis and swingable about an axis orthogonal to the bolt axis.
[0007]
According to a third aspect of the present invention, in the rotary multi-layered hanging jig according to the first or second aspect, a space is provided in the main body, and at least a pair of both sides of the main body are provided as handles for reinforcing and transporting the space. These pipe ribs are provided, and the pair of pipe ribs are connected by at least one horizontal pipe.
[0008]
The present invention according to claim 4 is characterized in that a pair of rotary multi-layer suspension jigs according to any one of claims 1 to 3 is used and these are connected by a structure having an arbitrary length.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
1 and 2 show a rotary multi-layer hanging jig 10 according to an embodiment of the present invention. A hanging ring 12 is rotatably connected to an upper apex of a main body 11 formed in a substantially rhombus shape. Shackles 13a to 13c are rotatably connected to the apex.
[0010]
The suspension ring 12 is engaged and connected to the crane hook. Hanging shackle wire ropes 14a to 14c (FIG. 8) are spanned on the shackles 13a to 13c to enable lifting of objects to be suspended (hereinafter referred to as “steel beams”) such as steel beams.
[0011]
A pair of left and right space portions 15 and 15 are formed in the central portion of the main body 11 for weight reduction, and a pair of left and right pipe ribs 16 and 16 are provided on both sides of the main body 11 in order to compensate for strength reduction due to the formation of these space portions. Is provided.
[0012]
In this embodiment, the pipe ribs 16 and 16 on both sides of the main body 11 each have a semicircular arc shape, and these are integrated to form a ring-shaped pipe rib (FIG. 2). The pair of left and right pipe ribs 16 and 16 are connected by horizontal pipes 17 and 17 and further reinforced. Further, the pipe ribs 16 and 16 also serve as a handle used when the rotary multi-layer hanging jig 10 is transported.
[0013]
Each of the shackles 13a to 13c is rotatable in both directions of an arrow, as typically shown for the shackle 13b in FIG.
[0014]
3 and 4 show a rotary multi-layer hanging jig 10 'according to another embodiment of the present invention. The difference from the embodiment shown in FIGS. 1 and 2 is that the omni-direction is replaced with the shackles 13a to 13c. The ring 18 (18a, 18a to 18c, 18c) is used. That is, the bolts 19 (19a to 19c) are passed through three vertices other than the upper vertex of the rhombus body 10, and the omnidirectional rings 18a, 18a to 18c and 18c are fixed to both ends of the bolts (both sides of the main body 10). ing.
[0015]
5 shows the omnidirectional ring 18 on an enlarged scale, and the axis of the bolt 19 is typically shown for the omnidirectional ring 18c in FIG. 3 and as indicated by arrows in FIG. 5 (b). 4 is representative of the omnidirectional ring 18a (18c) in FIG. 4, and as shown by the arrows in FIG. 5 (a), the axis 21 orthogonal to the bolt axis. Is swingable in both directions around the center.
[0016]
According to this embodiment, the omnidirectional ring 18 employed in place of the shackle can rotate smoothly in all directions, and in particular can be swung in the directions as shown in FIGS. 4 and 5 (a). Since the direction ring 18 is attached to both sides of the main body 11, the sling wire ropes 14 a to 14 c (FIG. 8) can be attached to different directions on both sides of the main body 11, so that it can be adapted to various lifting states. Has the advantage of being able to.
[0017]
6 and 7 show a rotary multi-layer hanging jig 20 according to still another embodiment of the present invention, in which a pair of rotary multi-layer hanging jigs are connected by a structure having an arbitrary length. In this embodiment, a long pipe 22 having a rectangular cross section is used as a structure, substantially rhombus-shaped main bodies 23 and 23 are fixed to both ends thereof, and a hanging ring 24 is rotatably connected to an upper apex of each main body 23. Shackles 25a to 25c are rotatably connected to the other three vertices. As described in the embodiment of FIGS. 3 and 4, an omnidirectional ring may be used instead of the shackle. Reference numerals 26 and 27 denote horizontal reinforcing ribs and vertical reinforcing ribs for increasing the fixing strength between the long pipe 22 and the main bodies 23 and 23.
[0018]
In the embodiment shown in FIG. 6 and FIG. 7, a pair of rotary multi-layer suspension jigs are arranged at predetermined intervals by the long pipe 22, so that a plurality of large steel beams are in a multi-layer state simultaneously. Suitable for lifting with.
[0019]
FIG. 8 shows the operation of the rotary multi-layer hanging jig of the present invention. In this figure, the rotary multi-layer hanging jig 10 shown in FIGS. 1 and 2 is shown, but another embodiment is shown. The operation when using the above-described rotary multi-layer hanging jig is substantially the same.
[0020]
FIG. 8A shows a state in which steel beams 28a to 28c having the same mass are suspended from the shackles 13a to 13c via sling wire ropes 14a to 14c. Since the shackles 13a and 13c are in a symmetrical position around the central shackle 13b, and the steel beams 28a to 28c have the same mass, in this state, the balance of the rotary multi-layer hanging jig 10 is maintained. As is clear from the figure, the lengths of the sling wire ropes 14a to 14c are sequentially increased.
[0021]
When the steel beam 28c suspended from the longest sling wire rope 14c is removed and transported to the construction site in this state, the main body 11 has the remaining two steel beams 28a and 28b centered on the connection point with the suspension ring 12. It rotates counterclockwise in the figure toward the center of gravity, and the state shown in FIG. 8B is obtained. Since the suspension ring 12 and the shackles 13a to 13c are both rotatably connected to the main body 11, the state movement from FIG. 8 (a) to FIG. 8 (b) is performed smoothly.
[0022]
Next, when the steel beam 28b suspended from the central sling wire rope 14b is removed, the main body 11 is directed counterclockwise in the figure toward the center of gravity of the remaining steel beam 28a with the connection point with the suspension ring 12 as the center. It further rotates and it will be in the state shown in FIG.8 (c). In this state, when the steel beam 28a suspended from the sling wire rope 14a is removed, all the suspended loads are released, so that the main body 11 rotates in the clockwise direction around the connection point with the suspension ring 12. Then, it returns to the state shown in FIG.
[0023]
Although FIG. 8 shows a case of three-stage suspension in which steel beams 28a to 28c of equal mass are suspended on the shackles 13a to 13c via sling wire ropes 14a to 14c, this embodiment is applied to two-stage suspension. In order to do so, it is only necessary to suspend the steel beams 28a and 28c of equal mass from the shackles 13a and 13c at both ends via the sling wire ropes 14a and 14c without using the central shackle. In this case, when the steel beam 28c suspended from the longer sling wire rope 14c is removed, the main body 11 is centered on the connection point with the suspension ring 12 toward the center of gravity of the remaining steel beam 28a. It will rotate counterclockwise and it will be in the state shown in FIG.8 (c).
[0024]
When used in two-stage suspension, when the steel beam 28c is removed, the remaining steel beam 28a approaches the removal position of the steel beam 28c all at once, so that the difference in the length of the sling wire ropes 14a, 14c is increased. It is preferable to take.
[0025]
【The invention's effect】
According to the rotary multi-layer suspension jig of the present invention, when lifting a plurality of steel beams in a multi-layer state by a single crane operation, the plurality of steel beams are lifted at positions shifted without being lined up and down, When the lower steel beam is removed, a dangerous situation in which the upper steel beam is present right above the operator is avoided. In addition, the work safety can be ensured by eliminating the interference between the sling wire rope and the steel beam.
[0026]
[Brief description of the drawings]
FIG. 1 is a front view of a rotary multi-layer hanging jig according to an embodiment of the present invention.
2 is a side view of the rotary multi-layer hanging jig of FIG. 1. FIG.
FIG. 3 is a front view of a rotary multi-layer hanging jig according to another embodiment of the present invention.
4 is a side view of the rotary multi-layer hanging jig in FIG. 3. FIG.
5 is an enlarged view showing an omnidirectional ring used in the rotary multi-layer hanging jig shown in FIGS. 3 and 4. FIG.
FIG. 6 is a front view showing another embodiment of the present invention in which a pair of rotary multi-layer hanging jigs are connected by a structure having an arbitrary length.
7 is a side view of the rotary multi-layer hanging jig in FIG. 6. FIG.
FIG. 8 is a state diagram in which three steel beams are lifted in a multi-layered state using the rotary multi-layer hanging jig shown in FIGS. 1 and 2, and the longest sling wire rope from the state of (a). It is the state figure (b) which removed the suspended steel beam, and the state figure (c) which removed the steel beam suspended with the center sling wire rope from the state of (b).
[0027]
[Explanation of symbols]
10, 10 ', 20 Rotating multi-layer hanging jig 11 Main body 12 Suspension rings 13a to 13c Shackles 14a to 14c Sling wire rope 15 Space portion 16 Pipe rib 17 Horizontal pipe 18 (18a to 18c) Omnidirectional ring 19 Bolt 21 Bolt shaft and Orthogonal shaft 22 Long pipe 23 Main body 24 Suspension ring 25a-25c Shackle 26 Horizontal reinforcing rib 27 Vertical reinforcing rib 28a-28c Steel beam

Claims (4)

クレーンフックと係合連結される吊環が正面視略菱形の本体の上部頂点に回動自在に連結されるとともに、本体の他の3頂点には各々シャックルが回転自在に連結され、各シャックルには本体の幅方向の一方から他方に順次に長さが長くなる玉掛けワイヤロープが架け渡され、各シャックルに玉掛けワイヤロープを介して等質量の被吊上物を吊したときには本体のバランスが維持され、最長の玉掛けワイヤロープを介して吊られた被吊上物から順次取り外したときには残りの被吊上物の重心に向けて本体が吊環連結地点を中心として回転するように構成されてなることを特徴とする回転式連層吊治具。A suspension ring engaged with and connected to the crane hook is rotatably connected to the upper apex of the main body having a generally rhombic shape when viewed from the front, and shackles are rotatably connected to the other three apexes of the main body. A slinging wire rope that increases in length sequentially from one to the other in the width direction of the main body is spanned, and the balance of the main body is maintained when an equal mass suspended object is hung on each shackle via the slinging wire rope. The main body is configured to rotate about the suspension ring connection point toward the center of gravity of the remaining suspended object when sequentially removed from the suspended object suspended through the longest sling wire rope. A rotating multi-layer hanging jig. シャックルに代えて、上記複数地点の各々において本体を貫通するボルトの両端に一対の全方向リングを連結し、該全方向リングはボルト軸を中心にして回動自在であるとともにボルト軸と直交する軸を中心にして揺動自在であることを特徴とする請求項1記載の回転式連層吊治具。Instead of the shackle, a pair of omnidirectional rings are connected to both ends of the bolt that penetrates the main body at each of the plurality of points, and the omnidirectional ring is rotatable about the bolt axis and orthogonal to the bolt axis. The rotary multi-layer hanging jig according to claim 1, wherein the jig is swingable about an axis. 本体に空間部が設けられ、この空間部の補強および運搬用の取手として本体両側に少なくとも各一対のパイプリブが設けられ、これら一対のパイプリブは少なくとも一の水平パイプで連結されていることを特徴とする請求項1または2記載の回転式連層吊治具。A space portion is provided in the main body, and at least a pair of pipe ribs are provided on both sides of the main body as handles for reinforcing and transporting the space portion, and the pair of pipe ribs are connected by at least one horizontal pipe. The rotary multi-layer hanging jig according to claim 1 or 2 . 請求項1ないし3のいずれか記載の回転式連層吊治具を一対用いてこれらを任意長さの構造物で連結したことを特徴とする吊冶具。A hanging jig characterized by using a pair of rotary multi-layer hanging jigs according to any one of claims 1 to 3 and connecting them with a structure having an arbitrary length.
JP2001229584A 2001-07-30 2001-07-30 Rotating multi-layer hanging jig Expired - Fee Related JP4739592B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001229584A JP4739592B2 (en) 2001-07-30 2001-07-30 Rotating multi-layer hanging jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001229584A JP4739592B2 (en) 2001-07-30 2001-07-30 Rotating multi-layer hanging jig

Publications (2)

Publication Number Publication Date
JP2003041778A JP2003041778A (en) 2003-02-13
JP4739592B2 true JP4739592B2 (en) 2011-08-03

Family

ID=19061916

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001229584A Expired - Fee Related JP4739592B2 (en) 2001-07-30 2001-07-30 Rotating multi-layer hanging jig

Country Status (1)

Country Link
JP (1) JP4739592B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5292035B2 (en) * 2008-09-22 2013-09-18 日本建設工業株式会社 Lifting lifting scale
CN109322401B (en) * 2018-12-11 2024-03-19 辰信重工(江苏)有限公司 Component rotating device of large artistic steel structure building

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62285895A (en) * 1986-06-02 1987-12-11 小林 正剛 Clearance-sensing block hanger
JPH0326010U (en) * 1989-07-25 1991-03-18
JPH06345378A (en) * 1993-06-10 1994-12-20 Ohbayashi Corp Cargo hoist device for crane
JP2842286B2 (en) * 1995-03-17 1998-12-24 株式会社大林組 Crane lifting equipment
JPH10338460A (en) * 1997-04-08 1998-12-22 Kawasaki Steel Corp Hoisting and holding device of shape steel and method therefor

Also Published As

Publication number Publication date
JP2003041778A (en) 2003-02-13

Similar Documents

Publication Publication Date Title
JP6098453B2 (en) Jib hanger
JP6587964B2 (en) Car body of work machine
JP4739592B2 (en) Rotating multi-layer hanging jig
CN111017695A (en) Process for hoisting large ship block by matching crawler crane with hoisting system
CN201046884Y (en) Sling
JP7415727B2 (en) Width change link member
JP2756466B2 (en) Method for controlling lifting posture of curved plate and hanging tool for curved plate
JP4221341B2 (en) Lifting magnet type lifting device and transport crane
CN106049848B (en) A kind of adjustable anti-shake mobile platform and its installation method
JP2022144148A (en) lifting jig
JPH1111857A (en) Overhead traveling crane
CN101012042A (en) Slings for lifting loads
JP6454746B2 (en) Swivel frame of work machine
JP2008240286A (en) Hydraulic shovel
CN210767201U (en) Connecting structure for cable-pole cooperated hanging heavy object
CN205634613U (en) A balanced hanging beam for hoisting steel bridge box girder
CN110550538B (en) a spreader
JP3457168B2 (en) Construction method of long structure and lifting beam used in this method
CN105384054B (en) A kind of steel-reinforcement cage hanger
JP2514314Y2 (en) Suspension equipment for mountain retaining materials
CN208103767U (en) Tackling system
CN209143485U (en) A kind of lifting device
JP2003276978A (en) Method for transporting suspended load, rigging rope and truss truss
KR200407842Y1 (en) Auxiliary hanger for crane
CN108238552B (en) A kind of multi-functional bar of lying prone of the assembled being connect with structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101130

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110405

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110428

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4739592

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140513

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees