JP4750972B2 - Balcony drainage structure - Google Patents
Balcony drainage structure Download PDFInfo
- Publication number
- JP4750972B2 JP4750972B2 JP2001207333A JP2001207333A JP4750972B2 JP 4750972 B2 JP4750972 B2 JP 4750972B2 JP 2001207333 A JP2001207333 A JP 2001207333A JP 2001207333 A JP2001207333 A JP 2001207333A JP 4750972 B2 JP4750972 B2 JP 4750972B2
- Authority
- JP
- Japan
- Prior art keywords
- balcony
- drainage
- floor
- overflow pipe
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Floor Finish (AREA)
- Building Environments (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、バルコニーの排水構造に関し、より詳細には、バルコニー内の水位が所定水位に達したときに排水されるオーバフロー管を備えたバルコニーの排水構造に関する。
【0002】
【背景技術】
近年では、高齢者や車椅子使用者等に配慮したバリアフリー型住宅の建築が主流になりつつある。このバリアフリー型住宅は、床の段差や傾斜を可能な限り小さくするように設計されており、例えば、引き戸の敷居を床面と同一レベルに設計したり、洋室と和室の段差をなくしたりすることで実現される。また、バリアフリー化の流れは、室内空間のみならず、例えば、バルコニーといった室外においても適用されつつある。
【0003】
ところで、従来のバルコニーでは、バルコニーの縁に沿って設けられた手摺り沿いに排水溝が形成されていた。また、排水の処理が間に合わずバルコニー内の水位が所定水位に達したときに排水を補助するオーバフロー管は、手摺りの下端に設けられた笠木を貫通してバルコニー外に配管されていた。
【0004】
【発明が解決しようとする課題】
このためバルコニーのバリアフリー化において、以下の点で不都合が生じた。
まず、従来の排水構造では、バルコニーの縁に沿って排水溝が設けられるため、室内空間内からバルコニーの外方(張出方向)にかけて高低差の大きな水勾配をつける必要があった。また、手摺り下方にオーバフロー管を備えるため、手摺りの取付位置はバルコニー床面に対して高くなり、見た目において圧迫感を与えていた。すなわち、バリアフリー化に伴い要求される室内空間とバルコニーとの一体感が得られにくい構造であった。
【0005】
よって本発明は、バルコニーと室内空間との一体感が得られ易いバルコニーの排水構造を提供することを課題とする。
【0006】
【課題を解決するための手段】
上記した技術的課題を解決するため、本発明では以下の構成とした。すなわち、本発明のバルコニーの排水構造は、建物のバルコニーと、このバルコニー内およびバルコニーの下方に立設された柱の周囲を覆う柱カバーと、上端が前記バルコニーの床面より高い位置にて開口したオーバフロー管と、を備え、前記バルコニー内の水位が所定水位に達したとき、前記オーバフロー管を介して排水が行われるバルコニーの排水構造であって、
前記オーバフロー管は、建物下方に向かって延出されており、
前記バルコニーには、その一側から他側に向かって排水溝が形成されており、
前記排水溝に集水された排水は、前記オーバフロー管とは別体として構成された樋を通じて建物下方に排出されており、
前記樋は、前記バルコニーの下方に立設された柱に沿って設けられる竪樋と、この竪樋と前記排水溝とを連結する部分とを備えており、
前記オーバフロー管および竪樋は、前記柱カバーの内方に設けられていることを特徴とする。
【0007】
このように構成された本発明の排水構造によれば、オーバフロー管が、柱カバーの内方に配置され、バルコニー内の水位が所定水位に達したときには、該バルコニー内の排水が、柱カバー内に流れ込み、この柱カバー内に隠されたオーバフロー管を介してバルコニー外に排水される。
【0008】
このように本発明の排水構造では、オーバフロー管が柱カバーによって隠されるため、バルコニー内にてオーバフロー管を露出させることなく配管できる。また、オーバフロー管が柱カバー内に移設されるため、バルコニーの縁に沿って設けられる手摺りの高さを十分に低く抑えることができる。
よって、バリアフリー化に伴い要求されるバルコニーと室内空間との一体感が得られ易くなる。
【0009】
また、バルコニーの正面側及びバルコニーの奥側からは、それぞれ前記排水溝に向かって下る水勾配が形成された構成としてもよい。
【0010】
この構成では、バルコニーの正面側及びバルコニーの奥側から、それぞれ排水溝に向かって水勾配が付けられている。従って、バルコニーの奥側からバルコニーの正面側に向かって大きな水勾配を付けることなくバルコニー内の排水を効率良く行える。また、手摺りが設けられるバルコニーの正面側において高低差が最も少なくなるため、バルコニー床面から手摺り下端にかけての距離が短縮される。このため、手摺りとバルコニーとの一体感が生まれ、開放的な印象を与えることが可能となる。
【0011】
また、バルコニーの一側から他側に向かって形成された排水溝は、前記バルコニーの幅方向中央寄りに配設するのが望ましい。
なお、ここで幅方向とは、バルコニーの張り出し方向に対応する方向であり、バルコニーの幅方向中央寄りに排水溝を設けた場合には、バルコニーの正面側及びバルコニーの奥側から形成される水勾配の高低差を必要最小限の高低差に抑えることが可能となる。
【0012】
また、バルコニーは、長手方向に複数の区画に形成されるとともに、その区画と区画との間には、前記建物の柱が設けられ、排水溝は、最寄りの柱に向かって下る水勾配を有する構成としてもよい。
【0013】
この構成では、区画と区画との間に設けられた柱に向かって水勾配を付けることにより、本来、バルコニーの一側から他側に向かって連続的に傾斜させるべき水勾配を、区画の一つ一つにおいて対応できる。
よってバルコニーの床面の傾きを必要最小限とすることができる。
また、区画と区画との間に防水処理を施さずとも、各区画の排水を行えるため排水溝の施工に係る労力を大幅に軽減できる。
【0014】
また、建物下方に向かって延出されたオーバフロー管は、区画と区画との間を通る構成としてもよい。すなわち、この構成では、区画と区画との間にオーバフロー管が配管されるため、バルコニーの床面に加工を施すことなくオーバフロー管の設置が行える。また、オーバフロー管から排水されたバルコニー内の排水は、即座に建物下方に流下するため、スムースに排水が行われることとなる。
【0015】
また、バルコニーの縁部には、手摺りが設けられるとともに、その手摺りの下方に手摺りの基台を兼ねる笠木が設けられ、オーバフロー管の上端は、前記笠木の上端面より低い位置にて開口する構成としてもよい。
この構成では、オーバフロー管が笠木の上端面より低い位置にて開口しているため、排水が笠木を越えてバルコニー外に溢れ出ることを抑制できる。
【0016】
【発明の実施の形態】
以下、本発明をユニット式建物のバルコニーに適用した一実施形態について図面を参照して説明する。なお、本発明の適用範囲は、勿論、ユニット式建物に限られることはない。
【0017】
図1に示すように、ユニット式建物10は、基礎11上に載置された複数個の1階建物ユニット12、これらの一階建物ユニット12の上に載置された複数個の2階建物ユニット13、およびこれらの2階建物ユニット13の上に載置された屋根14とを備えて構成されている。
そして、このユニット式建物10では、長辺方向に3個、短辺方向に4個ずつ合計12個の1階及び2階建物ユニット12,13が配置されている。
【0018】
1階建物ユニット12および2階建物ユニット13は、前記建物ユニット1と同様の構造となっており、予め工場で生産されるものである。
屋根14も予め工場で生産され、屋根パネルを屋根束等で支持する形式、あるいは骨組みに屋根パネルを取り付けた形式等により構成されている。
【0019】
このようなユニット式建物10において、1階には庭に通じるテラス15が、2階にはインナーバルコニー16(バルコニー)が、屋上には屋上テラス17がそれぞれ設けられている。またテラス15の反対側に玄関ポーチ18が設けられている、そして、テラス15及びインナーバルコニー16の一部は、建物の外壁26の表面から居室K(図3参照)側に入り込んでいる。
そのため、12個の1階建物ユニット12、および2階建物ユニット13のうち、テラス15等に臨んだ一方の外側の1階建物ユニット12Aおよび2階建物ユニット13A、中央の1階建物ユニット12Bおよび2階建物ユニット13B、他方の外側の1階建物ユニット12Cおよび2階建物ユニット13Cは、他の1階建物ユニット12および2階建物ユニット13とわずかに構造が異なっている。
【0020】
すなわち、一方の外側の1階建物ユニット12Aおよび2階建物ユニット13Aは、図3に一部を示すように、外側の2本の柱22,22間に中間柱23を立設し、この中間柱23と外側の1本の柱22との外側に突出部Tを有する平面L形ユニットとされている。そして、この突出部Tは、補強梁24、天井梁、床梁25や外壁26を備え、内部が例えば収容室となっている。
なお、他方の外側の一階建物ユニット12Cおよび2階建物ユニット13Cは、上記1階建物ユニット12Aおよび2階建物ユニット12Aと同じ構造であるが、勝手違いに形成されている。
【0021】
また、これらの1階建物ユニット12Aおよび2階建物ユニット13Aにおいて、内側の柱22からテラス15側に所定寸法離れた位置には、バルコニー部柱27が長辺天井梁、短辺天井梁、および長辺床梁28、短辺床梁29に連結されて設けられている。
なお、他方の外側の1階建物ユニット12Cおよび2階建物ユニット13Cは、上記1階建物ユニット12Aおよび2階建物ユニット12Aと同じ構造であるが勝手違いに形成されている。
【0022】
また、前記中央の1階建物ユニット12Bおよび2階建物ユニット13Bには、前記1階建物ユニット12Aおよび2階建物ユニット13Aの突出部Tがなく、前記バルコニー部柱27と対向して、且つ、長辺天井梁、短辺天井梁、および長辺天井梁30、短辺床梁31と連結したバルコニー部柱37を備えた形状となっている。
【0023】
これらの柱27,37は、柱カバー35で囲われている。この柱カバー35は、断面コ字状のカバー部材を断面正四角枠状になるように組み込んで形成されている。また、柱27、37自体は、高い被覆材としての珪酸カルシウム板(ケイカル板)36により囲まれており、柱27,37は耐火構造になっている。
そして、これら柱27,37、ケイカル板36を含み建物の柱部が構成され、外側の1階建物ユニット12Aと、中央の一階建物ユニット12Bとの境界の柱部が1階の第1柱部41とされ、中央の1階建物ユニット12Bと外側の1階建物ユニット12Cとの境界の柱部が1階の第2柱部42とされている。
【0024】
また、外側の2階建物ユニット13Aと、中央の2階建物ユニット13Bとの境界の柱部が2階の第1柱部51とされ、中央の2階建物ユニット13Bと外側の2階建物ユニット13Cとの境界の柱部が2階の第2柱部52とされている。これらの第1柱部41、第2柱部42と、2階の第1柱部51、2階の第2柱部52とは上下方向に同一位置に配置され、かつ、インナーバルコニー16の幅方向(居室Kからの張り出し方向)の略中央に配置されている。
【0025】
前記インナーバルコニー16は、このような一方の外側の1階建物ユニット12Aおよび2階建物ユニット13Aと、他方の外側の1階建物ユニット12Cおよび2階建物ユニット13Cとの互いの突出部T間に、一部が入り込んで設けられている。
【0026】
そして、インナーバルコニー16は、図2に示されるように3つの区間、つまり第1バルコニー16A、第2バルコニー16B、第3バルコニー16Cに分割され、各バルコニー16A〜16Cは、それぞれ、2階建物ユニット12A、2階建物ユニット12B、2階建物ユニット12Cに対応して取り付けられている。
また、インナーバルコニー16の正面側(張り出し方向)には、図1及び図4に示されるように、その長手方向に手摺り20が設けられ、手摺り20の下端には、手摺り20の基台を兼ねる笠木21が、各2階建物ユニット12A,12B,12Cに対応して設けられている。
【0027】
なお、前記屋上テラス17も3つの区画、つまり第1テラス17A、第2テラス17B、第3テラス17Cに分かれており、各テラス17A〜17Cは、それぞれ、2階建物ユニット12A、2階建物ユニット12B、2階建物ユニット12Cに対応し、かつそれぞれの屋上に形成されている。
【0028】
このようなユニット式建物10において、インナーバルコニー16の排水用の樋構造は、図2に示すように設けられている。
すなわち、インナーバルコニー16には、長手方向に3箇所の排水溝、つまり第1バルコニー16Aに設けられた第1排水溝45、第2バルコニー16Bに設けられた第2排水溝46、第3バルコニー16Cに設けられた第3排水溝47が形成されている。
【0029】
これらの第1排水溝45および第2排水溝46は、図3及び図4に示されるように、各バルコニー16A〜16Cの床面60に、幅寸法W、深さ寸法Dの角溝状に形成され、それぞれ2階の第1柱部51に向かってその近傍まで延びている。
そして、溝の底部には、矢印Aで示すように、2階の第1柱部51に向かって低くなる水勾配が形成されている。第2排水溝46は、中央の2階建物ユニット13B、言い換えれば第2バルコニー16Bとほぼ同じ長さ寸法に形成されているため、第1排水溝45より長くなっている。
【0030】
なお、インナーバルコニー16の幅方向において、床面60には、インナーバルコニー16の正面側及びインナーバルコニー16の奥側から、それぞれ矢印Cのように、第1排水溝45、第2排水溝46に向かって傾斜が低くなる水勾配が付けられている。なお、図3のインナーバルコニー16は、各バルコニー16A〜16Cを接続した後の状態を示している。
また、図4には、インナーバルコニー16をその幅方向に切断した断面を示している。
【0031】
また、インナーバルコニー16の周囲には、図3及び図5に示されるように床面60に対して所定寸法高くなった防水立上がり壁61が設けられ、2階の第1柱部51の周囲には、その防止立上がり壁61と同じ高さ寸法の防水立上がり壁62が設けられている。また、第1柱部41の周囲の防水立上がり壁62は、その内側に設けられた四角升状の受部材63と一体に固着されている。
この受部材63と防水立上がり壁62との上端面および外周には塩ビ鋼板64が設けられ、塩ビ鋼板64の端部は前記床面60の一部に張られている。
【0032】
前記第3排水溝47の詳細な構造は図示しないが、第3バルコニー16Cに設けられ、この第3バルコニー16Cの外側から2階の第2柱部52に向かって延びて形成されている。
この第3排水溝47の構造は、第1排水溝45等と同じである。
【0033】
このような第1排水溝45および第2排水溝46には、前記塩ビ鋼板64の表面から床面60を覆った防水シート65が張り巡らされている。
この防水シート65は、塩ビ鋼板64の表面を覆い、防水立上がり壁62および受部材63の上端面まで設けられている。
防水シート65、塩ビ鋼板64および柱カバー35の下端部は、バルコニーの簀の子部材67で隠されており、通常時には見えない。
また、各排水溝45、46の第1柱部41側端部には、ドレン管66が取り付けられている。図示はしないが、第3排水溝47の第2柱部42の側端部にも、同様のドレン管が取り付けられている。
【0034】
前記第1柱部41の柱カバー35内には、図示しない配管サポートにより支持されて、バルコニー用の第1竪樋70が設けられている、この第1竪樋70は、第1排水溝45からの排水を排出するもので、エルボ71,71および連結ドレン管73を介して前記第1排水溝45のドレン管66と接続されている。
なお、連結ドレン管73は、第1竪樋70側が低くなる傾斜状に配置されている。
【0035】
第2排水溝46からの排水は、第1柱部41の柱カバー35内において、第1竪樋70の反対側に設けられた第2竪樋75により行われ、第3排水溝47からの排水は、第2柱部42の柱カバー内において、他方の外側建物ユニット12C側に設けられた第3竪樋76(図2参照)により行われるようになっている。
これらの第1竪樋70、第2竪樋75および第3竪樋76の下端は、基礎11に沿って延び、図示しない採集升に接続されている。
【0036】
2階の第1柱部51において、その柱27,37の間には、防止シート81を介してオーバフロー管80が延びている。このオーバフロー管80の上端面は、笠木21の上端面に対して十分に低い位置にて開口し、本実施の形態では、受部材63の底面とほぼ同じ高さで開口していてる。
また、下端は1階の第1柱部41に沿って図示しない浸透升に接続されている。
すなわち、オーバフロー管80は、区画化されたインナーバルコニー16A〜16Cの間を貫通して、建物下方に延びている。
【0037】
そして、第1排水溝45、第2排水溝46、第3排水溝47で処理しきれず簀の子部材67上面から溢出た排水は、柱カバー35と受部材63との間に形成される隙間から柱カバー35内に侵入し、オーバフロー管80から排出される。従って、インナーバルコニー16内の排水が、インナーバルコニー16の周囲に設けられた防水立上がり壁61を越えて溢れ出ることが回避される。
なお、2階の第2柱部52においても同じようにオーバフロー管80が設けられている。
【0038】
また、前記屋上テラス17の第1テラス17A、第2テラス17B、第3テラス17Cにも、それぞれ第1屋上排水溝55、第2屋上排水溝56、第3屋上排水溝57が形成されている。
【0039】
屋上テラス17の第1屋上排水溝55からの排水は、2階建物ユニット13Aおよび1階建物ユニット12Aの外壁の沿って設けられた第1屋上排水用竪樋90に流れ込むようになっており、第3屋上排水溝57からの排水は、2階建物ユニット13Cおよび1階建物ユニット12Cの外壁に沿って設けられた第3屋上排水用竪樋96に流れ込むようになっている。そして、第2屋上排水溝56からの排水は、2階建物ユニット13Bおよび1階建物ユニット12Bに連続する前記2階の第2柱部52と1階の第2柱部42の内部に設けられた第2屋上排水用竪樋95に流れ込むようになっている。
【0040】
これらの屋上テラス17の第1屋上排水溝55、第2屋上排水溝56、および第3屋上排水溝57の構造は、図示しないが、第1排水溝45、第2排水溝46、第3排水溝47と同じような構造となっている。
【0041】
以上のような建物の樋構造では、建物の2階のインナーバルコニー16に溜まった雨水等の水は、外側2階建物ユニット13A側の第1バルコニー16Aでは、第1排水溝45から、ドレン管66、連結ドレン管73を通じて第1柱部41内の第1竪樋70に流れ込み、中央2階建物ユニット13Bの第2バルコニー16Bにおいては、第2排水溝46からドレン管66、連結ドレン管73を通じて第1柱部41内の第2竪樋75に流れ込む。
また、他方の外側2階建物ユニット13C側の第3バルコニー16Cでは、第3排水溝47からドレン管、連結ドレン管を通じて第2柱部42内の第3竪樋76に流れ込む。
さらに、第1排水溝45、第2排水溝46、第3排水溝47で処理しきれず、簀の子部材67上面から 溢れ出た排水は柱カバー35内に侵入し、受部材63内に溜まった水は、オーバフロー管80を介してインナーバルコニー16外に排水される。
【0042】
屋上テラス17においては、中央2階建物ユニット13Bの第2テラスでは、第2屋上排水溝56から、2階建物ユニット13Bおよび1階建物ユニット12Bの第2柱部52,42内の第2屋上竪樋95に流れ込む。
外側屋上テラス17の第1屋上排水溝55からの排水は、屋上第1竪樋90に流れ込み、第3屋上排水溝57からの排水は、屋上第3竪樋96に流れ込む。
【0043】
このように本実施の形態によれば、インナーバルコニー16が第1バルコニー16A、第2バルコニー16B、第3バルコニー16Cの3つからなり、それぞれのバルコニー16A,16B,16Cに排水溝45,46,47が形成されているので、インナーバルコニー16が3つの建物ユニット13A〜13Cに跨る長いものであっても、排水は、1本の柱部51に向かって、2つのインナーバルコニー16A,16Bから流入するので、効率よく排水が行われる。
【0044】
また、区画化されたインナーバルコニー16A〜16Cは、それぞれ別個の外側建物ユニット13A、中央建物ユニット13B、外側建物ユニット13Cに設けられているので、現場では、建物ユニット13A等同士を組み合わせた後、隣り合うインナーバルコニー16A等同士の接続部の施工を行えばよいので、現場作業が少なくて済む。
【0045】
また、2階の第1柱部および第2柱部52内には、オーバフロー管80が設けられ、その上端面は、笠木21より低い位置にて開口するため、第1排水溝45、第2排水溝46、第3排水溝47内で処理しきれず、簀の子部材67の上面から溢れ出た排水は柱カバー35と受部材63との間に形成された隙間を通じてオーバフロー管80から排出される。
従って、インナーバルコニー 16の排水を効率よく行うことができ、いつまでも床面60に溢れ出るおそれは少ない。
【0046】
また、オーバフロー管80は、柱カバー35内に配置されており、外部から見えないように隠されているので、オーバフロー80管を目立たせることなく配置できる。
また、オーバフロー管80が柱カバー35内に移設されるため、笠木21を低く形成でき、手摺り20の高さも低く抑えることが可能となる。従って、手摺り20が与える見た目の圧迫感を緩和できる。
【0047】
また、インナーバルコニー16の幅方向中央に排水溝45、46、47が設けられると共に、インナーバルコニー16の正面側及びインナーバルコニー16の奥側から、それぞれ排水溝45、46、47に向かって水勾配が付けられているため、インナーバルコニー16の奥側からインナーバルコニー16の正面側に向かって大きな水勾配を付けることなくインナーバルコニー16内の排水を集水できる。
従って、インナーバルコニー16の床面60と居室Kとの高低差を十分小さくできる。
また、手摺り20が設けられるインナーバルコニー16の正面側において高低差が最も少なくなるため、床面60から手摺り20の下端にかけての距離が短縮される。
このため、手摺り20とインナーバルコニー16との一体感が生まれ、開放的な印象を与えることとなる。
このようにバリアフリー化に伴い要求されるインナーバルコニー16と居室K(室内空間)との一体感が得られ易くなる。
【0048】
また、オーバフロー管80は、区画化されたインナーバルコニー16A〜16Cの間を貫通して、建物下方に延びるため、オーバフロー管80の設置が容易となる。また、オーバフロー管80から排水された排水は、建物下方に即座に流下するため、スムースに排水が行われることとなる。
【0049】
なお、上記した実施形態は、あくまでも本発明の一実施形態にすぎず、その詳細は、所望に応じて適時変更可能である。
例えば、前記実施形態では、インナーバルコニー16の排水は、第1バルコニー16Aの第1排水溝45と、第2バルコニー16Bの第2排水溝46とから2階の第1柱部51に向かって流入し、第1柱部41内のバルコニー用第1竪樋70に流れ込み、第3バルコニー16Cの第3排水溝47と、第2テラス17Bの第2屋上排水溝56とは、2階の第2柱部52および1階の第2柱部42を用いているが、これに限られず、両者を逆としてもよい。つまり、第1バルコニー16Aの第1排水溝45と第2テラス17Bの第2屋上排水溝56とを、2階の第1柱部51および1階の第1柱部41に接続し、第2バルコニー16Bの第2排水溝46と第3バルコニー16Cの第3排水溝47とを第1柱部41に接続してもよい。
【0050】
また、前記実施形態では、第1テラス17A、第3テラス17Cの排水は、それぞれ建物の外壁に沿って配置された第1屋上用排水竪樋90、第3屋上用排水竪樋96により行っていたが、この構成に限られることはない。前記第2屋上用排水竪樋95と同様に、それぞれの竪樋90,96を、2階の第1柱部51と1階の第1柱部41とに連続する第1屋上用排水竪樋、2階の第2柱部52と1階の第2柱部42とに連続する第3屋上用排水竪樋としてもよい。この場合、各バルコニー16A等からの連結ドレン管は、これら屋上用排水竪樋にティ等を利用して接続するようにしてもよい。
このようにすれば、建物の外側に現れる排水用樋がないので、外観がすっきりし、デザイン的に優れたものとなる。
【0051】
【発明の効果】
以上のように本発明によれば、手摺りの下方に配置されていたオーバフロー管を柱カバー内に移設するため、手摺りの高さを十分に低く抑えることができる。
また、バルコニーの幅方向中央に排水溝を形成すると共に、バルコニーの正面側及び奥側から排水溝に向かう水勾配を付けるため、バルコニー内における高低差を必要最小限に抑えることができる。
よって、バリアフリー化に伴い要求されるバルコニーと室内空間との一体感が得られ易くなる。
【図面の簡単な説明】
【図1】 本発明に係る一実施形態のユニット式建物を示す全体斜視図。
【図2】 本実施形態に係る建物の樋構造を示す概略図。
【図3】 本実施形態に係るバルコニーをその上方から見た図。
【図4】 本実施形態に係る排水溝の断面を示した断面図。
【図5】 本実施形態に係るオーバフロー管と柱部との位置関係を柱部正面側から見た図。
【図6】 本実施形態に係るオーバフロー管と柱部との位置関係を柱部上方から見た図。
【図7】 本実施形態に係るオーバフロー管と柱部との位置関係を柱部斜め上方から見た図。
【符号の説明】
10 ユニット式建物
11 基礎
12 1階建物ユニット
13 2階建物ユニット
14 屋根
15 テラス
16 インナーバルコニー
17 屋上テラス
18 玄関ポーチ
16A 第1バルコニー
16B 第2バルコニー
16C 第3バルコニー
17A 第1テラス
17B 第2テラス
17C 第3テラス
20 手摺り
21 笠木
22 柱
23 中間柱
26 建物の外壁
27 バルコニー部柱
35 柱カバー
37 バルコニー部柱
41 1階の第1柱部
42 1階の第2柱部
45 第1排水溝
46 第2排水溝
47 第3排水溝
51 2階の第1柱部
52 2階の第2柱部
55 第1屋上排水溝
56 第2屋上排水溝
57 第3屋上排水溝
60 床面
61 防水立上がり壁
62 防水立上がり壁
63 受部材
64 塩ビ鋼板
66 ドレン管
67 簀の子部材
70 第1竪樋
71 エルボ
73 連結ドレン管
75 第2竪樋
76 第3竪樋
80 オーバフロー管
81 防水シート
90 第1屋上排水用竪樋
95 第2屋上排水用竪樋
96 第3屋上排水用竪樋
C 水勾配
K 居室
T 突出部(収容部)[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a drainage structure for a balcony, and more particularly, to a drainage structure for a balcony having an overflow pipe that drains when the water level in the balcony reaches a predetermined water level.
[0002]
[Background]
In recent years, the construction of barrier-free houses taking into account the elderly and wheelchair users is becoming mainstream. This barrier-free house is designed to make the level difference and inclination of the floor as small as possible. For example, the sliding door sill is designed to be the same level as the floor, or the level difference between the Western-style room and the Japanese-style room is eliminated. This is realized. Moreover, the flow of barrier-free is being applied not only in indoor spaces but also outdoors such as balconies.
[0003]
By the way, in the conventional balcony, the drainage groove was formed along the handrail provided along the edge of the balcony. In addition, the overflow pipe that assists drainage when the drainage process is not in time and the water level in the balcony reaches a predetermined level has been piped outside the balcony through the headboard provided at the lower end of the handrail.
[0004]
[Problems to be solved by the invention]
For this reason, inconvenience occurred in the following points in making the balcony barrier-free.
First, in the conventional drainage structure, since the drainage groove is provided along the edge of the balcony, it is necessary to provide a large water gradient with a height difference from the interior space to the outside of the balcony (the projecting direction). In addition, since the overflow pipe is provided below the handrail, the handrail mounting position is higher than the balcony floor surface, giving a feeling of pressure in appearance. That is, it is a structure in which it is difficult to obtain a sense of unity between the indoor space and the balcony that are required with the barrier-free operation.
[0005]
Therefore, an object of the present invention is to provide a drainage structure for a balcony where a sense of unity between the balcony and the indoor space can be easily obtained.
[0006]
[Means for Solving the Problems]
In order to solve the above technical problem, the present invention has the following configuration. In other words, the balcony drainage structure of the present invention has a balcony in the building, a column cover that covers the periphery of the column standing in and below the balcony, and an upper end that is open at a position higher than the floor of the balcony. An overflow pipe, and when the water level in the balcony reaches a predetermined water level, a drainage structure for the balcony that drains through the overflow pipe,
The overflow pipe extends downward from the building,
In the balcony, a drainage groove is formed from one side to the other side,
Drainage collected in the drain is,in frontIt is discharged to the bottom of the building through a gutter constructed as a separate body from the overflow pipe.
The scissors are provided with scissors provided along pillars erected below the balcony, and a portion connecting the scissors and the drainage grooves,
Said overflow pipe and竪 樋Is provided inside the pillar cover.
[0007]
According to the drainage structure of the present invention configured as described above, the overflow pipe is disposed inside the column cover, and when the water level in the balcony reaches a predetermined water level, the drainage in the balcony is It is drained outside the balcony through an overflow pipe hidden in the pillar cover.
[0008]
Thus, in the drainage structure of the present invention, since the overflow pipe is hidden by the column cover, it is possible to perform piping without exposing the overflow pipe in the balcony. Moreover, since the overflow pipe is moved into the column cover, the height of the handrail provided along the edge of the balcony can be sufficiently reduced.
Therefore, it becomes easy to obtain a sense of unity between the balcony and the indoor space required with the barrier-free operation.
[0009]
Also, BaIt is good also as a structure in which the water gradient which goes down to the said drain groove is formed from the front side of Luccony and the back side of a balcony, respectively.
[0010]
In this configuration, BaWater gradients are attached from the front side of Luccony and the back side of the balcony toward the drain. Therefore, drainage in the balcony can be efficiently performed without providing a large water gradient from the back side of the balcony toward the front side of the balcony. Moreover, since the height difference is minimized on the front side of the balcony where the handrail is provided, the distance from the balcony floor surface to the lower end of the handrail is shortened. For this reason, a sense of unity between the handrail and the balcony is born, and an open impression can be given.
[0011]
Further, it is desirable that the drainage groove formed from one side of the balcony toward the other side is disposed near the center in the width direction of the balcony.
Here, the width direction is a direction corresponding to the protruding direction of the balcony. When a drainage groove is provided near the center of the balcony in the width direction, water formed from the front side of the balcony and the back side of the balcony. It becomes possible to suppress the height difference of the gradient to the minimum necessary height difference.
[0012]
In addition, the balcony is formed in a plurality of sections in the longitudinal direction, and the pillars of the building are provided between the sections, and the drainage groove has a water gradient descending toward the nearest pillar.DoIt is good also as a structure.
[0013]
In this configuration, by providing a water gradient toward the pillar provided between the compartments, the water gradient that should be continuously inclined from one side of the balcony to the other side is inherently one of the compartments. One can cope with each.
Therefore, the inclination of the floor surface of the balcony can be minimized.
Moreover, since the drainage of each section can be performed without performing a waterproof treatment between the sections, the labor related to the construction of the drainage grooves can be greatly reduced.
[0014]
Also,Extended down the buildingThe overflow pipe passes between compartments.RuIt is good also as a structure. That is, in this configuration, since the overflow pipe is provided between the sections, the overflow pipe can be installed without processing the floor surface of the balcony. Moreover, since the drainage in the balcony drained from the overflow pipe immediately flows down to the building, the drainage is smoothly performed.
[0015]
In addition, a handrail is provided at the edge of the balcony, and a headboard that also serves as a handrail base is provided below the handrail, and the upper end of the overflow pipe is at a position lower than the upper end surface of the headboard. It is good also as a structure which opens.
In this configuration, since the overflow pipe is opened at a position lower than the upper end surface of the headboard, it is possible to suppress drainage from overflowing outside the balcony beyond the headboard.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment in which the present invention is applied to a balcony of a unit type building will be described with reference to the drawings. Of course, the scope of application of the present invention is not limited to unit buildings.
[0017]
As shown in FIG. 1, a
In this unit type building 10, a total of twelve first-floor and second-
[0018]
The first-
The
[0019]
In such a
Therefore, of the twelve first-
[0020]
That is, as shown in a part of FIG. 3, the outer first
The other outer first-
[0021]
Further, in these first-
The other outer first-
[0022]
The central first-
[0023]
These
And the pillar part of a building is comprised including these
[0024]
In addition, the pillar portion at the boundary between the outer second-
[0025]
The
[0026]
The
Further, as shown in FIG. 1 and FIG. 4, a
[0027]
The
[0028]
In such a unit type building 10, the drainage ridge structure of the
That is, the
[0029]
As shown in FIGS. 3 and 4, the
And as shown by the arrow A, the water gradient which becomes low toward the
[0030]
In addition, in the width direction of the
FIG. 4 shows a cross section of the
[0031]
Further, as shown in FIGS. 3 and 5, a waterproof rising
A
[0032]
Although the detailed structure of the
The structure of the
[0033]
A
The
The lower end portions of the
A
[0034]
In the
Note that the
[0035]
The drainage from the
The lower ends of the
[0036]
In the
Moreover, the lower end is connected to the permeation not shown along the
That is, the
[0037]
The drainage that cannot be treated by the
Similarly, an
[0038]
Further, the first
[0039]
The drainage from the first
[0040]
Although the structures of the
[0041]
In the structure of the building as described above, water such as rainwater collected on the
Moreover, in the
Furthermore, the wastewater that cannot be treated by the
[0042]
In the
Drainage from the first
[0043]
As described above, according to the present embodiment, the
[0044]
Moreover, since the partitioned
[0045]
In addition, an
Therefore, the
[0046]
Moreover, since the
Further, since the
[0047]
In addition,
Therefore, the height difference between the
Further, since the height difference is minimized on the front side of the
For this reason, a sense of unity between the
Thus, it becomes easy to obtain a sense of unity between the
[0048]
Moreover, since the
[0049]
The above-described embodiment is merely an embodiment of the present invention, and details thereof can be changed as needed.
For example, in the said embodiment, the waste_water | drain of the
[0050]
In the embodiment, the drainage of the
In this way, since there is no drainage dredge that appears outside the building, the appearance is clean and the design is excellent.
[0051]
【The invention's effect】
As described above, according to the present invention, since the overflow pipe disposed below the handrail is moved into the column cover, the height of the handrail can be sufficiently reduced.
Moreover, since the drainage groove is formed in the center of the balcony in the width direction and the water gradient from the front side and the back side of the balcony toward the drainage groove is provided, the height difference in the balcony can be minimized.
Therefore, it becomes easy to obtain a sense of unity between the balcony and the indoor space required with the barrier-free operation.
[Brief description of the drawings]
FIG. 1 is an overall perspective view showing a unit building according to an embodiment of the present invention.
FIG. 2 is a schematic view showing a building structure of a building according to the present embodiment.
FIG. 3 is a view of a balcony according to the present embodiment as viewed from above.
FIG. 4 is a cross-sectional view showing a cross section of a drain groove according to the present embodiment.
FIG. 5 is a diagram of the positional relationship between the overflow pipe and the column part according to the present embodiment as viewed from the front side of the column part.
FIG. 6 is a diagram of the positional relationship between the overflow pipe and the column part according to the present embodiment as viewed from above the column part.
FIG. 7 is a diagram of the positional relationship between the overflow pipe and the column part according to the present embodiment as viewed obliquely from above the column part.
[Explanation of symbols]
10 Unit type building
11 Basics
12 1st floor building unit
13 2nd floor building unit
14 Roof
15 Terrace
16 Inner balcony
17 Roof terrace
18 Entrance porch
16A 1st balcony
16B 2nd balcony
16C 3rd balcony
17A 1st terrace
17B 2nd terrace
17C 3rd terrace
20 Handrail
21 Kasagi
22 pillars
23 Middle pillar
26 Building exterior
27 Balcony pillar
35 Pillar cover
37 Balcony pillar
41 First pillar on the 1st floor
42 Second pillar on the 1st floor
45 First drain
46 Second drainage ditch
47 Third drain
51 First pillar on the 2nd floor
52 Second pillar on the 2nd floor
55 First roof drain
56 Second roof drain
57 Third roof drain
60 Floor
61 Waterproof rising wall
62 Waterproof rising wall
63 Receiving member
64 PVC steel sheet
66 Drain pipe
67 Samurai
70 No. 1
71 Elbow
73 Connecting drain pipe
75 Second
76 3rd
80 overflow pipe
81 tarpaulin
90 First roof drain
95 Second roof drain
96 Third roof drain
C water gradient
K living room
T Protruding part (housing part)
Claims (6)
前記オーバフロー管は、建物下方に向かって延出されており、
前記バルコニーには、その一側から他側に向かって排水溝が形成されており、
前記排水溝に集水された排水は、前記オーバフロー管とは別体として構成された樋を通じて建物下方に排出されており、
前記樋は、前記バルコニーの下方に立設された柱に沿って設けられる竪樋と、この竪樋と前記排水溝とを連結する部分とを備えており、
前記オーバフロー管および竪樋は、前記柱カバーの内方に設けられていることを特徴とするバルコニーの排水構造。A balcony of the building, a pillar cover covering the periphery of the pillars standing in and below the balcony, and an overflow pipe having an upper end opened at a position higher than the floor surface of the balcony. When the water level reaches a predetermined water level, the drainage structure of the balcony is drained through the overflow pipe,
The overflow pipe extends downward from the building,
In the balcony, a drainage groove is formed from one side to the other side,
Wastewater that is collecting in the drainage groove is discharged to the building downward through constructed trough separately from the previous SL overflow tube,
The scissors are provided with scissors provided along pillars erected below the balcony, and a portion connecting the scissors and the drainage grooves,
The drainage structure for a balcony, wherein the overflow pipe and the trough are provided inside the pillar cover.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001207333A JP4750972B2 (en) | 2001-07-09 | 2001-07-09 | Balcony drainage structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001207333A JP4750972B2 (en) | 2001-07-09 | 2001-07-09 | Balcony drainage structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003020761A JP2003020761A (en) | 2003-01-24 |
| JP4750972B2 true JP4750972B2 (en) | 2011-08-17 |
Family
ID=19043333
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001207333A Expired - Fee Related JP4750972B2 (en) | 2001-07-09 | 2001-07-09 | Balcony drainage structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4750972B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6462427B2 (en) * | 2015-03-10 | 2019-01-30 | ミサワホーム株式会社 | Fireproof structure of balcony pillar in unit type building |
| JP6526881B2 (en) * | 2018-07-02 | 2019-06-05 | ミサワホーム株式会社 | Fireproof structure of a building |
| JP7612409B2 (en) | 2020-12-22 | 2025-01-14 | 株式会社竹中工務店 | building |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0281829U (en) * | 1988-12-12 | 1990-06-25 | ||
| JPH0728241Y2 (en) * | 1989-12-25 | 1995-06-28 | 新日軽株式会社 | balcony |
| JPH0725369Y2 (en) * | 1989-12-25 | 1995-06-07 | 新日軽株式会社 | Rain gutter device on the roof of the terrace on top of the balcony |
| JPH0437722U (en) * | 1990-07-25 | 1992-03-30 | ||
| JPH05148965A (en) * | 1991-11-29 | 1993-06-15 | Sekisui Chem Co Ltd | Column with built-in vertical gutter |
| JP2557168B2 (en) * | 1992-09-29 | 1996-11-27 | ミサワホーム株式会社 | Unit building with balcony |
| JPH08193393A (en) * | 1995-01-13 | 1996-07-30 | Mitsui Constr Co Ltd | Drainage equipment structure in balcony |
| JP2852198B2 (en) * | 1995-02-28 | 1999-01-27 | ナショナル住宅産業株式会社 | Gutter drainage structure of attached structure |
| JPH08260635A (en) * | 1995-03-24 | 1996-10-08 | Misawa Homes Co Ltd | Drainage structure of building |
| JPH09296506A (en) * | 1996-05-02 | 1997-11-18 | Misawa Homes Co Ltd | Outdoor exposed support for protrusion |
| JPH11148205A (en) * | 1997-11-17 | 1999-06-02 | Asahi Chem Ind Co Ltd | Drainage structure of outdoor floor part of building |
| JPH11159046A (en) * | 1997-11-26 | 1999-06-15 | Sekisui Chem Co Ltd | Roof panel for unit building |
| JPH11287023A (en) * | 1998-04-03 | 1999-10-19 | Tsuzuki Co Ltd | Mounting structure of balustrade for balcony |
| JP2002088988A (en) * | 2000-09-12 | 2002-03-27 | Misawa Homes Co Ltd | Gutter structure of building |
-
2001
- 2001-07-09 JP JP2001207333A patent/JP4750972B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003020761A (en) | 2003-01-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| PL198482B1 (en) | A drain and a building structure having a drain | |
| JP4750972B2 (en) | Balcony drainage structure | |
| JP2019027038A (en) | Roof structure and method for draining dew condensation water of roof structure | |
| JP3640062B2 (en) | Arrangement structure of sash lower frame, gutter and frame beam | |
| JPS6235719Y2 (en) | ||
| JPH0453930U (en) | ||
| JP3802323B2 (en) | Balcony structure | |
| JPH11324131A (en) | Unit building | |
| JP2002088988A (en) | Gutter structure of building | |
| JPH043083Y2 (en) | ||
| JP2990228B2 (en) | Flat sash with built-in drain | |
| JP2024048889A (en) | Exterior wall gutter structure | |
| JPH0357263B2 (en) | ||
| JP2863496B2 (en) | Unit room drainage structure | |
| JP3517397B2 (en) | Drainage structure of dwelling unit | |
| JP3566537B2 (en) | Building with inner balcony | |
| JP3340033B2 (en) | Bathroom waterproof pan | |
| JP5604260B2 (en) | Drainage structure of balcony and drainage unit used for it | |
| JP3320935B2 (en) | Drainage structure of unit building | |
| JP2006063796A (en) | Facility unit | |
| JP2024129691A (en) | Architecture | |
| JP2020007812A (en) | building | |
| JPH08260635A (en) | Drainage structure of building | |
| KR101630236B1 (en) | waterproof cap for draining trap | |
| JP2006307545A (en) | Balcony and residential building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20071226 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20080116 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20080205 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080627 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20101117 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20101124 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110119 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110222 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110420 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110517 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110520 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4750972 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140527 Year of fee payment: 3 |
|
| LAPS | Cancellation because of no payment of annual fees |