JP4766739B2 - Overhead management computer system - Google Patents
[go: Go Back, main page]

JP4766739B2 - Overhead management computer system - Google Patents

Overhead management computer system Download PDF

Info

Publication number
JP4766739B2
JP4766739B2 JP2000374810A JP2000374810A JP4766739B2 JP 4766739 B2 JP4766739 B2 JP 4766739B2 JP 2000374810 A JP2000374810 A JP 2000374810A JP 2000374810 A JP2000374810 A JP 2000374810A JP 4766739 B2 JP4766739 B2 JP 4766739B2
Authority
JP
Japan
Prior art keywords
charge
department
activity
cost
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000374810A
Other languages
Japanese (ja)
Other versions
JP2002183399A (en
Inventor
健司 森澤
高弘 秋山
修 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Research Institute Ltd
Original Assignee
Japan Research Institute Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Research Institute Ltd filed Critical Japan Research Institute Ltd
Priority to JP2000374810A priority Critical patent/JP4766739B2/en
Publication of JP2002183399A publication Critical patent/JP2002183399A/en
Application granted granted Critical
Publication of JP4766739B2 publication Critical patent/JP4766739B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

【0001】
【技術分野】
この発明は,ABC(Activity-Based Costing)による手法に基づく間接費管理システムに関する。
【0002】
ABCは「活動基準原価計算」と訳される原価計算手法である。従来の原価計算は,投入資源原価(投入原価)を,恣意性が入りやすい配賦基準で製品,サービス等の原価計算対象に割当てるのに対し,ABCでは,投入資源原価(投入原価)を資源作用因(リソース・ドライバ)を用いて,活動(アクティビティ)に割当てた後,原価作用因(コスト・ドライバ)により製品,サービス等の原価計算対象に割当てる,という特徴がある。
【0003】
この方法によれば,従来に比べ間接費をより合理的に配賦することができる。「間接費」とは,製品,サービス等に直接割当てられるコストを除き,これらを生み出すうえで間接的または必要不可欠なすべてのコストまたは費用を指す。これには製造間接費,販売管理費,一般管理費等の分類がある。
【0004】
従来のABCないしはABCによるチャージバックシステムでは,原則的にリソース・ドライバにより間接費を直接アクティビティに割当てていた。リソース・ドライバ量によって割当てることができない場合には,配賦基準を用いていた。しかしながら,この方法には,チャージ元部門内のアクティビティ間で配分割当する考え方がない。そのため,間接費のすべてをアクティビティに割当ることができているとはいえない。
【0005】
間接費のチャージ先部門への配賦に関して言うと,従来のABCによる手法では,あるアクティビティについてのコストドライバ量と,そのアクティビティについて予定されている単価(予定単価)との積により求まる金額(チャージコスト金額)を,そのアクティビティが対象とするチャージ先に配賦する。アクティビティに依存する予定単価を用いるのが原則である。
【0006】
予定単価という言葉が表現しているように,この単価はあらかじめ予想されたものであり,社内的に合意された平均的なものである。たとえばアクティビティが請求事務の場合に,コストドライバ量は請求書枚数,予定単価は請求書1枚当りの処理金額である。したがって,特定のチャージ先部門へのチャージは請求書枚数と予定単価との積により計算される。
【0007】
ところが,チャージ先部門の責任といえるような予定外の事態(トラブルなど)が発生し,請求書処理のために相当の時間超過作業が必要となったとしても,この超過時間についてはABC手法によるとチャージ先部門に配賦することはできない。
【0008】
ABCにおける配賦の基本的考え方は受益者負担である。すなわち,間接部門(チャージ元部門)における労働(サービス)は常に特定のチャージ先部門に向けて行なわれているものであるから,そのチャージコスト金額は該当するチャージ先部門に配賦することになる。
【0009】
しかしながら,全社的な業務または複数のチャージ先部門にわたる業務については何らかの形で配分すべきである。
【0010】
【発明の開示】
この発明は,すべての間接費を複数のアクティビティのいずれか1または複数に割当てることができるシステムを提供する。
【0011】
この発明はまた,時間超過作業が必要になった場合でも,その分のチャージコストをチャージ先部門へ適切に配賦することができるシステムを提供する。
【0012】
この発明はさらに,チャージ先部門が特定できないアクティビティについてもこれを複数のチャージ先部門に適切に配分してチャージすることができるシステムを提供する。
【0013】
さらにこの発明は,チャージ元部門,チャージ先部門のいずれからでも,アクティビティ単位で,チャージレート,コストドライバ量,チャージ金額等を知ることができるシステムを提供することを目的とする。
【0014】
以下,この出願に含まれる発明を便宜的に4つに分けて個々にその概要を,図64から図69を参照して説明する。
【0015】
第1の発明
第1の発明は,間接コストを割当てるべきアクティビティが指定されていない場合,指定することができない場合,指定することが適切でない場合等において,入力された間接コストを複数のアクティビティに所定の比率にしたがって,割当てることに関するものである(これを間接割当てという)。
【0016】
第1の発明を間接費管理システムの形態で図64を参照にして表現すると次のようになる。
【0017】
第1の発明による間接費管理システムは,社員識別番号とその社員の間接コストを発生させる労働についてのアクティビティと,その労働についての労働時間とを入力する入力手段,社員識別番号に対応してその社員の時間単価を記憶した社員別単価記憶手段,社員の属する組織の主要な業務に属するものとして定義された複数のアクティビティを記憶するアクティビティ記憶手段,上記入力手段によって入力された,入力データに含まれるアクティビティがアクティビティ記憶手段に定義されたものとして記憶されている場合には,社員識別番号に対応する時間単価を社員別単価記憶手段から読出し,読出した時間単価と対応する労働時間との積を算出し,この積をアクティビティごとに加算し,アクティビティごとの第1の割当てコスト金額を算出する第1の算出手段,上記入力手段によって入力されたデータに含まれるアクティビティがアクティビティ記憶手段に定義されたものとして記憶されていない場合には,社員識別番号に対応する時間単価を社員別単価記憶手段から読出し,読出した時間単価と対応する労働時間との積を算出し,この積を所定の比率に従って上記の複数のアクティビティに割当ててアクティビティごとの第2の割当てコスト金額を算出する第2の算出手段,ならびに第1の算出手段によって算出された第1の割当てコスト金額と第2の算出手段によって算出された第2の割当てコスト金額との和を算出して,この和をアクティビティごとに記憶するアクティビティ別割当てコスト金額記憶手段を備えている。
【0018】
入力手段,アクティビティ記憶手段および第1の算出手段が従来のABCによる手法を実現するシステムに備えられているものであり,この従来システムによる間接コスト割当て(アクティビティへの割当て)を直接割当てという。
【0019】
間接割当ては,入力手段,配分比率設定手段および第2の演算手段により実現される。直接割当てによる第1の割当てコスト金額と間接割当てによる第2の割当てコスト金額はアクティビティごとに加算されて,アクティビティ別割当てコスト金額記憶手段に記憶される。
【0020】
このようにして,発生したすべての間接コストは,必ず,複数のアクティビティのいずれかに割当てられることになる。すなわち,アクティビティごとに,そのアクティビティで間接コストがどの程度消費されたかを把握することが可能となる。
【0021】
最も一般的には,社員の属する組織が複数のチャージ元部門を含む。各社員は少なくとも一つのチャージ元部門に所属している。このような実施態様では,上記社員別単価記憶手段は社員識別番号に対応してその社員が所属するチャージ元部門を記憶している。上記アクティビティ記憶手段はチャージ元部門ごとに,そのチャージ元部門の業務に属するものとして定義された複数のアクティビティを記憶している。上記第1の算出手段は,入力データに含まれるアクティビティがその入力データに含まれる社員識別番号の社員が所属するチャージ元部門に属するものとして定義されたものである場合に,時間単価と対応する労働時間との積を算出し,この積をアクティビティごとに加算し,アクティビティごとの第1の割当てコスト金額を算出する。上記第2の算出手段は,入力データに含まれるアクティビティがその入力データに含まれる社員識別番号の社員が所属するチャージ元部門に属するものとして定義されたものとして記憶されていない場合に,時間単価と対応する労働時間との積を算出し,この積を所定の比率に従って上記の複数のアクティビティに割当ててアクティビティごとの第2の割当てコスト金額を算出する。
【0022】
好ましい実施態様では,チャージ元部門ごとに上記比率を設定した配分比率設定手段が設けられる。
【0023】
システムの間接割当てに関する部分のみを間接費管理システムとしてより包括的に表現すると次のようになる。
【0024】
この発明による間接費管理システムは,図65に示すように,アクティビティと,アクティビティが消費する経費とを入力する入力手段,所定の組織の主要な業務に属するものとして定義された複数のアクティビティを記憶するアクティビティ記憶手段,上記入力手段によって入力された入力データに含まれるアクティビティがアクティビティ記憶手段に定義されたものとして記憶されていない場合には,その入力データに含まれる経費を所定の比率に従って上記の複数のアクティビティに割当ててアクティビティごとの割当てコスト金額を算出する算出手段,ならびに上記算出手段によってアクティビティごとに算出された割当てコスト金額を,上記アクティビティ記憶手段に記憶されている対応するアクティビティの経費と加算して,この加算結果をアクティビティごとに記憶するアクティビティ別割当てコスト金額記憶手段を備えている。ここで,経費とは,商品,材料等の仕入れ金額,労賃(労働時間と単価との積)等を含む。
【0025】
より一般的な形態では,上記組織が複数のチャージ元部門を含む。この場合に,上記入力手段は経費を消費したチャージ元部門を経費およびアクティビティに関連して入力するものである。上記アクティビティ記憶手段はチャージ元部門ごとに,そのチャージ元部門の業務に属するものとして定義された複数のアクティビティを記憶している。上記算出手段は,上記入力データに含まれるアクティビティがチャージ元部門の業務に属するものとして定義されたものでない場合に,その入力データに含まれる経費を所定の比率に従って上記の複数のアクティビティに割当ててアクティビティごとの割当てコスト金額を算出するものである。
【0026】
好ましい実施態様では,チャージ元部門ごとに上記比率を設定した配分比率設定手段が設けられる。
【0027】
図64に示す各手段と実施例との関係について付言すると,次のような対応関係になる。
【0028】
入力手段:社員PC,勘定系サーバ10,図26〜図33の入力画面
入力手段を情報系サーバ11への入力手段とすれば,勘定系サーバ10の取引明細データファイル10D1(図15),日次作業実績データファイル10D2(図16)
社員別単価記憶手段:勘定系サーバ10の社員マスタ10M3(図7),単価マスタ10M4(図8)
アクティビティ記憶手段:勘定系サーバ10の業務情報マスタ10M5(図9),情報系サーバ11の本社アクティビティマスタ11M1(図10),自動取得マスタ11M2(図11),ABC業務番号マスタ11M3(図12)
第1の算出手段:情報系サーバ11(図50〜図54の処理)
第2の算出手段:情報系サーバ11(図50〜図54の処理)
アクティビティ別割当リスト金額記憶手段:情報系サーバ11の実績コストマスタ11J1(図21)
配分比率設定手段:情報系サーバ11のコストドライバマスタ(図13)
【0029】
第2の発明
第2の発明は間接費のチャージ先部門への配賦に関するものである。上述したように,ABCによる手法では,あるアクティビティについてのコストドライバ量と,そのアクティビティについて予定されている単価(予定単価)との積により求まる金額(チャージコスト金額)を,そのアクティビティが対象とするチャージ先に配賦する。アクティビティに依存する予定単価を用いるのが原則である。
【0030】
予定単価という言葉が表現しているように,この単価はあらかじめ予想されたものであり,社内的に合意された平均的なものである。たとえばアクティビティが請求事務の場合に,コストドライバ量は請求書枚数,予定単価は請求書1枚当りの処理金額である。したがって,特定のチャージ先部門へのチャージは請求書枚数と予定単価との積により計算される。
【0031】
ところが,チャージ先部門の責任といえるような予定外の事態(トラブルなど)が発生し,請求書処理のために相当の時間超過作業が必要となったとしても,この超過時間についてはABC手法によるとチャージ先部門に配賦することはできない。
【0032】
第2の発明は,アクティビティに依存し,あらかじめ予定されたチャージコストの配賦のやり方(これを規定内配賦という)に加えて,予定外の事態に対処するために,(超過)労働時間とその労働を行った人(社員)の時間単価とに依存したチャージコストの配賦のやり方(これを規定外配賦という)を導入してチャージ先部門への適切な配賦を実現するものである。
【0033】
第2の発明を間接費管理システムの形態で図66を参照して表現すると次のようになる。
【0034】
すなわち,第2の発明による間接費管理システムは,規定内チャージに関するコストドライバ量をチャージ先部門,アクティビティおよびチャージ元部門の指定を表わすデータとともに入力する第1の入力手段,アクティビティ別,チャージ元部門別に予定単価を記憶する予定単価記憶手段,上記第1の入力手段によって入力されたアクティビティ別,チャージ元部門別コストドライバ量と上記予定単価記憶手段に記憶されている該当する予定単価との積を算出し,この積を配賦チャージコスト金額としてそのコストドライバ量について指定されたチャージ先部門に配賦する第1の配賦手段,規定外チャージに関するコストドライバ量を,そのコストドライバ量を発生させた活動を行った社員の識別番号およびチャージ先部門に関連する情報を含む規定外情報とともに入力する第2の入力手段,社員識別番号に対応してその社員の単価を記憶する社員別単価記憶手段,上記第2の入力手段によって入力されたコストドライバ量と,上記社員別単価記憶手段に記憶されている該当する単価との積を算出し,この積を配賦チャージコスト金額として,そのコストドライバ量に関連する規定外情報によって指定されるチャージ先部門に配賦する第2の配賦手段,ならびに上記第1および第2の配賦手段によって算出されたチャージコスト金額を,少なくともチャージ先部門別および規定内か規定外かを表わす規定区分別に記憶する配賦チャージコスト金額記憶手段を備えているものである。
【0035】
第1の入力手段,予定単価記憶手段および第1の配賦手段が規定内配賦に関するものである。第2の入力手段,社員別単価記憶手段および第2の配賦手段が規定外配賦に関するものである。そして,すべての配賦されたチャージコスト金額が,チャージ先部門別および規定区分別に,さらに好ましくはアクティビティ別,チャージ元部門別に,配賦チャージコスト金額記憶手段に記憶される。
【0036】
さらに,この配賦チャージコスト金額記憶手段に記憶されたチャージコスト金額の合計が,チャージ先部門ごとに算出され,最終的にチャージ先部門に請求されることになる。
【0037】
このようにして,第2の発明によると,あらかじめ予定されたアクティビティと予定単価による配賦のみならず,予定外の事態が発生してもそれに対処した配賦が可能となる。
【0038】
図66に示す各手段と実施例との関係について付言しておくと,次のような対応関係になる。
【0039】
第1の入力手段:社員PC,勘定系サーバ10
第1の入力手段を情報系サーバ11の処理手段(第1の配賦手段)への入力手段とすれば,実績コストマスタ11J1(図21)
予定単価記憶手段:情報系サーバ11のコストドライバマスタ11M4(図13)
第1の配賦手段:情報系サーバ11(特に図48の規定内チャージ処理C5および配賦処理C6,さらに詳しくは図57〜図63)
第2の入力手段:社員PC,勘定系サーバ10
第1の入力手段を情報系サーバ11の処理手段(第2の配賦手段)への入力手段とすれば,勘定系サーバ10の日次作業実績データファイル10D2(図16),情報系サーバ11の実績自動取得データファイル11D1(図17)
社員別単価記憶手段:勘定系サーバ10の社員マスタ10M3(図7),単価マスタ10M4(図8)
第2の配賦手段:情報系サーバ11(特に図48の規定外チャージ処理C4および配賦処理C6,さらに詳しくは図55,図56,図57〜図63)
配賦チャージコスト金額記憶手段:情報系サーバ11のチャージコストマスタ11J2(図22,図23)
【0040】
第3の発明
ABCにおける配賦の基本的考え方は受益者負担である。すなわち,間接部門(チャージ元部門)における労働(サービス)は常に特定のチャージ先部門に向けて行なわれているものであるから,そのチャージコスト金額は該当するチャージ先部門に配賦することになる。
【0041】
しかしながら,全社的な業務または複数のチャージ先部門にわたる業務については何らかの形で配分すべきである。
【0042】
第3の発明はチャージ先部門が特定できないアクティビティについて,それに関係する複数のチャージ先部門に配分してチャージするものである。
【0043】
第3の発明を間接費管理システムの形態で,図67を参照して表現すると次のようになる。
【0044】
第3の発明による間接費管理システムは,規定内チャージに関するコストドライバ量をアクティビティおよびチャージ元部門の指定を表わすデータとともに入力する入力手段,アクティビティ別,チャージ元部門別に予定単価を記憶する予定単価記憶手段,特定のアクティビティについてコストドライバ量の複数のチャージ先部門への配分比率を記憶した配分比率記憶手段,ならびに上記入力手段によって入力されたアクティビティ別,チャージ元部門別コストドライバ量を,上記配分比率記憶手段に記憶されている該当するアクティビティについての配分比率にしたがって複数のチャージ先部門ごと比率配分し,比率配分されたコストドライバ量と,上記予定単価記憶手段に記憶されている該当する予定単価との積をそれぞれ算出し,これらの積を配賦チャージコスト金額として上記の複数のチャージ先部門に配賦する配賦手段を備えているものである。
【0045】
特定のチャージ元部門のアクティビティについてチャージ先部門の入力を伴わずにコストドライバ量が入力された場合には,あらかじめ設定した配分比率に応じて複数のチャージ先部門にチャージコスト金額が配賦されることになる。
【0046】
上記の各手段と実施例との関係は次の通りである。
【0047】
入力手段:社員PC,勘定系サーバ10
入力手段を情報系サーバ11の処理手段(配賦手段)への入力手段とすれば,実績コストマスタ11J1(図21)
予定単価記憶手段:情報系サーバ11のコストドライバマスタ11M4(図13)
配分比率記憶手段:情報系サーバ11の事業本部投入資源配賦基準データファイル11D3(図19)
配賦手段:情報系サーバ11(特に図48の規定内チャージ処理C5および配賦処理C6,さらに詳しくは図57〜図63)
【0048】
図67に示す入力手段,予定単価記憶手段および配賦手段は図66に示す第1の入力手段,予定単価記憶手段および第1の配賦手段にそれぞれ相当するから,第3の発明の特徴を第2の発明に加えると,図68に示すようになる。
【0049】
すなわち,第2の発明において,さらに特定のアクティビティについてコストドライバ量の複数のチャージ先部門への配分比率を記憶した配分比率記憶手段を設ける。そして,第1の配賦手段を,上記入力手段から入力されるチャージ先部門を伴わないコストドライバ量について,入力されたアクティビティ別,チャージ元部門別コストドライバ量を,上記配分比率記憶手段に記憶されている該当するアクティビティについての配分比率にしたがって複数のチャージ先部門ごとに比率配分し,比率配分されたコストドライバ量と,上記予定単価記憶手段に記憶されている該当する予定単価との積をそれぞれ算出し,これらの積を配賦チャージコスト金額として上記の複数のチャージ先部門に配賦するものとする。
【0050】
このようにして,第2の発明の規定内配賦の一態様として,第3の発明の比率配分を加えることができる。
【0051】
第4の発明
上述のようにして,配賦チャージコスト金額記憶手段には,チャージ先部門別,規定区分別,アクティビティ別,チャージ元部門別にチャージコスト金額が蓄えられるので,これをさまざまな形態で表示することが可能になる。コストドライバ量や予定単価等の表示も可能である。
【0052】
すなわち,第4の発明では図69に示すように,間接費管理システムは,上述したアクティビティ別割当コスト金額記憶手段(図64,65),予定単価記憶手段(図66,67,68)および配賦チャージコスト金額記憶手段(図66,67,68)に加えて,画面編集手段および表示手段を備える。画面編集手段は,上記各種記憶手段に記憶されているデータを出力画面のフォーマットに編集するものであり,たとえば情報系サーバ11,帳票系サーバ12,WEBサーバ13または社員PC(特に帳票系サーバ12)により実現される。表示手段は表示装置または表示装置を備えたコンピュータであり,各種サーバ10,11,12,13または社員PCにより実現される。
【0053】
この表示手段は,一実施態様では,上記配賦チャージコスト金額記憶手段に記憶されたチャージコスト金額を,チャージ先部門別,アクティビティ別またはチャージ元部門別に一覧表にして表示する。
【0054】
他の実施態様では,上記一覧表には予定単価およびコストドライバ量の値が含まれている。
【0055】
さらに他の実施態様では,上記一覧表には規定内と規定外の区別が含まれている。
【0056】
上記予定単価記憶手段が予定単価に対応して予定コストドライバ量を記憶している場合には,予定単価,予定コストドライバ量,入力されたコストドライバ量,予定単価と予定コストドライバ量との積,および予定単価と入力されたコストドライバ量との積を表示手段に表示することができる。
【0057】
他の実施態様では,上記表示手段はさらに,規定外について,社員の単価と入力されたコストドライバ量,および単価とコストドライバ量との積を表示する。
【0058】
上記表示手段はさらに,予定単価と入力されたコストドライバ量との積と,規定外についての社員の単価と入力されたコストドライバ量との積との合計金額を表示する。
【0059】
実施例との関連でいうと,表示手段には情報系サーバ11と社員PCが相当する。
【0060】
表示の例について言及すると,図40は一種のメニュー画面であり,種々の一覧画面を指定することができる。図41はチャージ先部門別一覧が示されており,特定のチャージ先部門について,アクティビティ/タスク別に,チャージレート(予定単価),コストドライバ量,規定内チャージ料金および規定外チャージ料金が表示されている。
【0061】
図42は,チャージ先部門別明細画面で,チャージ先部門からみた配賦実績の詳細を示している。
【0062】
図43は,チャージ元部門別一覧を示し,特定のチャージ元部門について,アクティビティ/タスク別に,チャージレート(予定単価),コストドライバ量,規定内チャージ料金および規定外チャージ料金が示されている。
【0063】
図44は,チャージ元部門別明細画面で,チャージ元部門からみた配賦実績の詳細を示している。
【0064】
図45は,チャージ元部門からみたアクティビティ/タスク別の損益明細を示すものである。
【0065】
<規定内>について,「予定」の行には,予定単価(チャージレート),予定コストドライバ量およびそれらの積(チャージ料金(予定))が,「チャージ」の行には,予定単価(チャージレート),入力コストドライバ量およびそれらの積(チャージ料金(チャージ))がそれぞれ表示されている。
【0066】
<規定外>については,社員の単価(チャージレート),入力コストドライバ量およびそれらの積(チャージ料金)が,2種類の規定外に関して(<規定外/業務番号>と<規定外/部門>)それぞれ表示されている。
【0067】
合計の行には,規定内の各積(チャージ料金)と規定外の各積(チャージ料金)との合計が表示されている。
【0068】
さらに,<規定内>において,「実績」の行には,チャージ料金として,アクティビティ別割当コスト金額記憶手段(図69参照)(実績コストマスタ11J1(図21))(第1発明を参照)に記憶されているコスト金額(チャージ料金)(41,173円)が表示され,予定単価(チャージレート)として,コスト金額(チャージ料金)をコストドライバ量で除した値(41,173/34.0=1,211)が現われている。コストドライバ量には入力コストドライバ量(「チャージ」の行のコストドライバ)(34.0)が使用されている。
【0069】
さらに,「予定損益」の行には,予定単価と予定コストドライバ量との積(<規定内>「予定」の行のチャージ料金,54,000)とコスト金額(<規定内>「実績」の行のチャージ料金,41,173)との差額(12,827)が,「チャージ損益」の行には,予定単価と入力コストドライバ量との積(<規定内>「チャージ」の行のチャージ料金,51,000)と,予定単価と予定コストドライバ量との積(上記54,000)との差額(−3,000)が,「アクティビティ損益」の行には,予定単価と入力コストドライバ量との積(上記51,000)と,コスト金額(上記47,173)との差額(9,827)がそれぞれ算出されて表示されている。
【0070】
このようにして,間接コストのアクティビティへの割当てコスト金額と,同じアクティビティに関してチャージ元部門に配賦したコスト金額とを比較することができる。
【0071】
第1発明から第4発明までを便宜的に個別に説明したが,図64〜図69からも分るように,これらの発明のあらゆる組合せのいずれかによっても間接費管理システム(の一部または全体)が構成される。逆に言えば,第1発明から第4発明のすべての構成を持つ間接費管理システムから,第1発明〜第4発明のいずれか一つまたは複数の構成を除去したシステムもまた,残った機能をもつ間接費管理システムとして意義を持つものとなりうる。
【0072】
また,上記においては,機能ブロック図としてシステムの構成を示したが,このシステムの動作を規定した間接費管理方法,およびこのシステムをコンピュータにより実現するときに用いるコンピュータを制御するためのプログラムも当業者であれば容易に認識することができ,上の説明に含まれていると理解されたい。この発明は,間接費管理方法および間接費管理システムのためのコンピュータ・プログラムを記録した媒体も開示しかつ提供している。
【0073】
後の実施例におけるように,間接費管理システムは最も好ましくはサーバ/クライアント・システムとして実現される。実施例においては複数台のサーバが登場しているが,それらの機能を一台のサーバで実現することももちろん可能である。間接費管理システムの全体を一台のコンピュータで実現することもできるし,サーバ/クライアント構成に限らず,他の構成の下に複数台のコンピュータにより実現することもできる。
【0074】
上記においてアクティビティは,実施例におけるアクティビティ/タスクを含む概念である。
【0075】
【実施例】
この明細書において用いる用語の定義は次の通りである。
【0076】
企業その他の経済主体が営む経済活動,および関連事象の全てを当該経済主体(企業実態)別に把握する為の企業会計の対象またはその範囲を“会計単位”といい,会計単位には利潤追求を目的とする“営利組織”(これを一般に企業という)と,個人,国,地方公共団体の行政機関および学校法人,宗教法人などのように利潤追求を目的としない“非営利組織”がある。
【0077】
営利組織の場合,組織外に対して直接営利活動を行う為に発生するコストを直接費といい,それ以外を間接費というのが一般的な考え方であるが,この発明において“間接費”は,営利組織か否かを問わず,原価の発生が特定製品の生産・販売,サービス(公共サービスを含む)などの最終成果物や,部門等の組織に対して,直接的に認識できず,間接的ないし共通的な消費として認識せざるを得ない原価全てを指すものとする。
【0078】
“投入原価”は,一般的に労務費,材料費などを指すが,この発明では人件費,建物費,機械費,一般経費等のコスト,費用全体を包含したものと定義とする。
【0079】
“配賦基準”は,一般的に投入原価を原価計算対象に割当てる場合の配分方法,割合等を指す。この発明においては,“配賦基準”の一つである“比率配分”を,コストドライバ量の按分に使用している。
【0080】
“アクティビティ”は,最終成果物を生み出す上で必要なすべての行為を指す。一般的な概念では,ビジネス機能のなかには機能,プロセス,活動,タスク等の業務単位や作業単位があるが,どの行為がどの分類となるかの明確な基準はない。この発明では,これらすべてを包含した概念としてアクティビティを定義する。アクティビティには人事企画,人事管理などがあり業務活動上の分類である。
【0081】
一方,これら複数のアクティビティを遂行する組織上の分類がある。例えば,人事総務部,財務経理部などの部門である。この発明ではこれをチャージ元部門と呼ぶ。
【0082】
“リソース・ドライバ”は,間接費をアクティビティに割当てる方法,基準を指し,直接割当てる場合(この発明では,これを直接割当てと呼ぶ)と,資源使用量や配賦基準で活動に割当てる場合(この発明では,これを間接割当てと呼ぶ)がある。例えば,投入原価を経理事務に割当てる際に,当該事務作業に要した時間を用いたならば,作業がリソース・ドライバであり,作業時間がリソース・ドライバ量である。
【0083】
“コスト・ドライバ”は,アクティビティに割当てられた間接費を,最終成果物に割当てる方法,基準を指す。例えば,経理事務に割当てられた投入原価を伝票処理件数を用いて部門に割当てた場合,伝票処理がコスト・ドライバであり,部門別の伝票処理件数がコスト・ドライバ量である。この発明では,コスト・ドライバによる割当てを,配賦あるいはチャージと呼ぶ。
【0084】
“原価計算対象”は,一般的に有形,無形すべての財,サービス,部門等が相当する。この発明においても同様の概念とするが,以下の実施例では,“部門”を使用した説明となっており,これをチャージ先部門と呼ぶ。
【0085】
この実施例の間接費管理(配賦)システムは,ABC(Activity-Based Costing)の考え方を用いて,本社部門の間接費を現業部門に配賦(チャージ)するものである。
【0086】
図1は,間接費管理(配賦)システムの概念モデルを表わすものである。
【0087】
本社部門は,一般の企業における本社部門サービスを提供する部門の集まりであり,人事総務部,経理部,企画部等の部門を指す。本社部門は,企業外に対して直接営利活動を行わないが,営利活動を行う部門(次に説明する現業部門)を支援または統括する役割を持つ,企業としては必要不可欠な部門である。本社部門は,一般的な原価分類からは一般管理費だけが計上される部門であり,ABCの考え方では,間接費配賦上コストの配賦元になることから,チャージ元部門と定義する。
【0088】
これに対し,企業外に対して直接営利活動を行う部門を現業部門という。現業部門は,例えばW事業本部(W事業本部付),X製造部,Y製造部,Z製造部等の製造部門(製造業の場合),または各種のサービス実行部門(サービス業の場合)であり,間接費配賦におけるコスト負担(配賦先)となることから,チャージ先部門と定義する。
【0089】
本社部門および現業部門という用語は,大きなくくりを表現する用語であり,それぞれチャージ元部門およびチャージ先部門の総称であると理解されたい。上述のように,本社部門に含まれる人事総務部,経理部,企画部等もABCの下では部門(間接費配賦の配賦元となる単位)という用語を用いて表現される。このような配賦元となる単位がチャージ元部門である。同じように,現業部門も,間接費配賦の配賦先となる単位である複数の部門(上述のW事業本部,X製造部,Y製造部,Z製造部など)から構成される。配賦先の単位がチャージ先部門である。
【0090】
大きな企業には事業部制をとっている企業がある。この場合には組織上は事業本部の下に複数のチャージ先部門が存在することになるが,事業本部もチャージ先となるので,特にチャージ先としての事業本部を表現するときに事業本部付という用語を用いる。
【0091】
本社部門のアクティビティは,アクティビティ番号およびタスク番号によって特定される。アクティビティ番号は本社部門における基本的な業務活動の単位を特定するものであり,タスク番号はそれを遂行するためのさらに詳細な作業行為を特定するものである。例を示せば,人事関連の業務活動の一つである人事企画は,アクティビティ番号によって特定され,その一要素である人事労務企画はタスク番号によって特定される。
【0092】
アクティビティ番号およびタスク番号は,それぞれ本社部門の業務活動および作業行為の単位を特定すると同時に,現業部門からみれば社内サービスの単位を特定するものであると言える。
【0093】
リソース・ドライバとは,本社部門コストを本社部門アクティビティ/タスク(アクティビティおよびタスクをまとめていうときには,アクティビティ/タスクと表現する)に割当てる場合にもっとも相応しい,または説明力の高い作用因のことであり,本社部門が業務活動に要した時間,定数,一定の割当基準などが用いられる。
【0094】
リソース・ドライバを数量化したものがリソース・ドライバ量であり,時間数,固定値“1”,配分比率などがこれに相当する。例えば,人事労務企画という社内サービス(本社アクティビティ/タスク)に要した時間数が2時間であるとする。作業者の1時間当りの人件費単価が1,500円とすると,この社内サービスに割当てられるコスト(人件費)は1,500×2=3,000円となる。その場合,作業時間がリソース・ドライバであり,作業時間数(2時間)がリソース・ドライバ量である。一方,建物費,機械費等の“経費”を特定の社内サービスにそのまま割当てることがある。この場合,割当てる為の作用因であるリソース・ドライバは“定数”であり,リソース・ドライバ量は“1”となる。これらのリソース・ドライバを用いてコスト(間接費)を割当てることを“直接割当て”という。
【0095】
これに対し,特定の社内サービスを指定しない(で入力した)作業時間数と人件費単価の積によって表わされるコスト(人件費)や,特定の本社部門アクティビティ/タスクを指定せずに経費計上した備品等の一般経費については,直接に割当てるべき本社部門アクティビティ/タスクが無い。そのため,所定の割当基準を用いて,本社部門アクティビティ/タスクにコストを配分割当する必要がある。この場合,リソース・ドライバは割当基準であり,リソース・ドライバ量は配分比率である。この方法でコストを割当てることを“間接割当て”という。
【0096】
上述した直接割当ておよび間接割当てを用いて,チャージ元部門で発生する人件費,建物費,機械費,一般経費等を本社部門のアクティビティ/タスクにすべて割当てる。
【0097】
コスト・ドライバは,前述のリソース・ドライバによって割当てられた社内サービス(アクティビティ/タスク)ごとのコストを,サービスの受益量に応じてチャージ先部門に配賦する(分担させる,分配する)ときの作用因を指す。コスト・ドライバを数量化したものがコスト・ドライバ量である。例えば,チャージ先部門が依頼した伺申請がコスト・ドライバであり,伺申請件数がコスト・ドライバ量である。
【0098】
全社的に受益する社内サービスについては,予め設定した配賦基準によりチャージ先部門別にコスト・ドライバ量を比率配分する場合がある。具体的には,全社向けに行った社内サービスに要した作業時間数を,事業本部別の配賦基準によって比率配分し,その結果をチャージ先部門ごとのコスト・ドライバ量(作業時間数)とするということである。
【0099】
本社部門アクティビティ/タスクのそれぞれにはコスト・ドライバの単位(レート単位)に基づいたサービス単価(予定チャージレート)が設定されている。
【0100】
間接費配賦システムの特徴の一つは,予定チャージレートに,チャージ先部門別の実績コスト・ドライバ量を乗じた結果(実績チャージコスト金額)を該当するチャージ先部門にチャージすることである。
【0101】
例えば人事労務企画という社内サービス(本社アクティビティ/タスク)の利用が『時間』と最も関連性が深いならば,コスト・ドライバは『時間』である。
【0102】
もし1時間当たりの予定チャージレートが2,000円であれば,レート単位は『円/時間』である。これを3時間利用した場合,2,000円×3時間=6,000円が,チャージ先部門にチャージされる。
【0103】
チャージ先を比率配分指定した場合は(複数の事業本部に所定の比率で配分してチャージすること),配賦基準による配分後のコスト・ドライバ量に予定チャージレートを乗じた結果を,配賦基準に設定された事業本部付のチャージ先部門にそれぞれチャージする。
【0104】
チャージ方法(規定区分)には規定内,規定外/業務番号,規定外/部門の3つの方法がある。規定内は,予定チャージレートに実績コスト・ドライバ量を乗じた結果(実績チャージコスト金額)をチャージ先部門にチャージする方法である(コスト・ドライバ量を比率配分する場合を含む)。規定外/業務番号は,指定された業務番号の業務を所管するチャージ先部門に,過労働時間に相当する標準コスト金額をチャージする方法である(詳しくは後述するが,業務番号(プロジェクト)ごとにそれを所管するチャージ先部門をあらかじめ定めておく)。規定外/部門は,指定されたチャージ先部門に,過労働時間に相当する標準コスト金額をチャージする方法である。
【0105】
標準コスト金額とは,チャージ元部門の社員が当該本社部門アクティビティ/タスクに費した時間(これは当該社員が入力する)と,標準単価(後述する単価マスタに定められた人件費単価と建物費単価を加えたもの)との積である。
【0106】
間接費管理(配賦)システムの構成を図2に示す。センター1,本社部門2および本社部門4,ならびに現業部門3および現業部門5の間を社内共有LAN(WAN又はLAN)で結び,データ通信を行うことができるようにネットワークが形成されている。そのうちセンター1と本社部門2と現業部門3の間は,LANで接続されている。また,センター1と本社部門4と現業部門5の間は,WANで接続されている。センター1には勘定系サーバ10,情報系サーバ11,帳票系サーバ12,WEBサーバ13の4つのサーバがあり,その間はLANで接続されている。
【0107】
東京,大阪のように離れた場所に本社部門がそれぞれ存在することを想定して,本社部門2と4が図示されている。現業部門3,5は上述したように事業本部の単位で考えても,チャージ先部門の単位で考えても,さらに細分化した単位で考えても,これらが混在したものと考えてもよく,そのうちの一部が図示されている。センター1は一般的には本社部門2または4の建物に置かれるであろう。
【0108】
勘定系サーバ10は,財務会計を中心とした勘定系の処理を行うものであり,ABCシステムに必要な情報の入力および保有の役割を持つ。
【0109】
情報系サーバ11は,間接費管理(配賦)システムの中心機能である実績収集,加工,配賦等の処理を行うものである。詳しくは後述する。
【0110】
帳票系サーバ12は,間接費管理(配賦)システムで作成された実績情報を帳票イメージで照会に応じて出力する。
【0111】
WEBサーバ13は,社員PCが勘定系サーバ10,情報系サーバ11または帳票サーバ12にアクセスするときの事前チェックを行う。アクセスされるサーバの自動選択,社員番号とパスワードの照合,データの入出力や各種承認機能に対するアクセス権限のチェック等が行なわれる。
【0112】
勘定系サーバ10および情報系サーバ11にはそれぞれデータベースが接続されている。データベースの内容については後述する。
【0113】
本社部門2には部門サーバ20,部門プリンタ201および複数の社員PC202,203等が設けられ,これらがLANにより相互に接続可能である。本社部門4においても部門サーバ40,部門プリンタ401および複数の社員PC402,403が相互に接続可能である。
【0114】
現業部門3には部門サーバ30,部門プリンタ301および複数の社員PC302,303等が設けられ,これらがLANにより相互に接続可能である。現業部門5においても部門サーバ50,部門プリンタ501および複数の社員PC502,503が相互に接続可能である。
【0115】
社員はPCを必要に応じて社内共有LANに接続し,間接費管理(配賦)システム(特に上述したサーバ10,11,12,13)にアクセスすることができる。
【0116】
間接費管理(配賦)システムにおける勘定系サーバ10と情報系サーバ11のデータベース内のマスタファイルおよびデータファイルは図3に示す通りである。
【0117】
勘定系サーバには,5種類のマスタファイルと2種類のトランザクションデータファイルがある。マスタファイルには,部門マスタ(10M1),アクティビティ・タスクマスタ(10M),社員マスタ(10M3),単価マスタ(10M4)および業務情報マスタ(10M5)がある。トランザクションデータファイルには,取引明細データファイル(10D1)および日次作業実績データファイル(10D2)がある。
【0118】
情報系サーバには,5種類のマスタファイルと4種類のコントロールデータファイルと3種類のトランザクションデータファイルがある。マスタファイルには,本社アクティビティマスタ(11M1),自動取得マスタ(11M2),ABC業務番号マスタ(11M3),コストドライバマスタ(11M4)および部門別人員マスタ(11M5)がある。
【0119】
コントロールデータファイルには,実績自動取得データファイル(11D1),実績コストデータファイル(11D2),事業本部投入資源配賦基準ファイル(11D3)およびチャージ比率ファイル(11D4)がある。トランザクションデータファイルには,実績コストマスタ(11J1),チャージコストマスタ(11J2)および配賦実績明細ファイル(11J3)がある。
【0120】
まず,勘定系サーバ10のマスタの役割と意義について個々に説明する。
【0121】
図5は部門マスタ(10M1)を示す。これは本社部門コスト(間接費)のチャージ元部門(計上部門)とチャージ先部門(付替先部門)との間におけるコストのチャージ(付替え)の可否をまとめたものである。
【0122】
部門コードは,コストを計上する最小の管理単位に一つ付与された識別コードである。チャージ元部門であるかチャージ先部門であるかを問わず,すべての部門に部門コードが付与されている。部門コードには,固有の名称(部門名称)が与えられている。
【0123】
グループは,いくつかの部門を束ねた管理単位である。各グループに識別符号が付けられ,これは部門コードの上位階層の識別符号である。この実施例では,グループは事業本部を単位とした集まりと考えることができる。
【0124】
事業本部付識別区分は,間接費を事業本部にチャージするときのチャージ先かどうかを示すものであり,チャージ先である場合に“1”(対象),そうでない場合に“0”(対象外)が設定されている。
【0125】
チャージ元区分は,間接費のチャージ元部門(計上部門)かどうかを示すコードであり,チャージ元部門(一般には本社部門の部門)には“1”(対象)または“2”(対象)が設定されている。“2”はABC配賦(アクティビティごとのチャージ・レートとコスト・ドライバによる配賦)についてのチャージ元部門を示し,“1”はバッチ配賦(間接費を一定の比率で配賦する)に関するチャージ元部門を示している(この実施例では使用されない)。チャージ元区分“0”(対象外)は,チャージ元部門でないことを示し,通常は現業部門がこれに相当する。
【0126】
チャージ先区分は,間接費のチャージ先部門(付替先部門)かどうかを示すコードである。チャージ先部門には“9”(対象)が設定される。初期値は“0”(対象外)である。
【0127】
チャージ元区分においてチャージ元である(コードが“2”または“1”)と設定されている部門についても,図5ではチャージ先部門を示すコード“9”が設定されている。これは,間接費配賦システムでは処理の過程においてチャージ元部門もチャージ元部門になりうることを示している。たとえば,本社部門の企画部が経理部のサービスを受ける場合がある。このようなときには,経理部のアクティビティ/タスクについて企画部がチャージされる。しかしながら経理部から企画部にチャージされた金額を含めて企画部において発生した間接費は最終的には現業部門に配賦されることになる。
【0128】
ABC集約部門コードは,本社部門の部門コードを束ねる役割をもち,アクティビティ・タスクマスタ内のアクティビティ番号,タスク番号を同じABC集約部門コード内では同一に設定することができる。たとえば,本社部門2(たとえば大阪)の人事総務部(部門コード109700)と本社部門4(たとえば東京)の人事総務部(部門コード209700)に同一のABC集約部門コード(一方の部門コード109700を代表として用いる)を付けておく。同じようなアクティビティ,タスクの業務活動を行う部門についてはこのようにABC集約部門コードを用いて束ねておくことができる。
【0129】
図6はアクティビティ・タスクマスタ(10M2)を示す。これは社内の標準的な作業工程(アクティビティ番号およびタスク番号により特定される)を定義したものである。本社部門および現業部門の社員は,いずれもこのアクティビティ番号およびタスク番号を使用して,日々の作業時間を社員PC202,203,302,303,402,403,502または503から入力する。
【0130】
標準的な作業工程は,上4桁がアクティビティ番号であり,下2桁はタスク番号を指す。
【0131】
アクティビティ名称は,アクティビティ番号と一対一の関係にある名称である。タスク名称は,タスク番号と一対一の関係にある名称である。
【0132】
図7は社員マスタ(10M3)を示す。これは間接費管理(配賦)システムで部門コード別,アクティビティ番号別,タスク番号別の標準原価を算出するために必要なすべての社員についての情報を保有する。
【0133】
社員番号は,社員それぞれの固有の識別番号であり,センター1のWEBサーバ13にアクセスする場合に必須のデータである。
【0134】
所属部門コードは,社員のアクティビティ番号別・タスク番号別の作業時間がどの部門に属するかを識別するためのものである。
【0135】
人件費ランクは,全社的に算定された標準単価の階級を表している。人件費ランクに対応する実際の金額は,単価マスタ(図8:10M4)に保有されている。
【0136】
図8は単価マスタ(10M4)を示す。これは社員マスタ(図7:10M3)の人件費ランクの金額情報を保有している。人件費ランクは,人件費単価(円/時間)と建物費単価(円/時間)とから構成されている。人件費単価(円/時間)および建物費単価(円/時間)は,いずれも一時間当たりの標準原価である。これらの和が標準単価になる。
【0137】
図9は業務情報マスタ(10M5)を示す。これはチャージ先部門の営業活動をプロジェクト(業務番号)単位に採算把握するために保有する業務番号単位の情報である。間接費管理(配賦)システムでは,部門(チャージ先部門)以外に,プロジェクト(業務番号)に対するコスト配賦も行うことができる。その場合に,どのプロジェクトかを識別するのが業務番号である。業務名称は,業務番号と一対一の関係にある名称である。
【0138】
業務所管部門コードは,当該業務番号を所管する部門(現業部門)を指す。1つのプロジェクトでも複数の部門にわたるときには,個々の部門に対して別個の業務番号が付けられる(この関連付けデータは別に格納されている(図示略))。
【0139】
次に,勘定系サーバ10のトランザクションデータについて述べる。
【0140】
図15は取引明細データファイル(10D1)を示す。これはすべての会計伝票データファイルであり,チャージ元部門コード,計上年月,管理会計行番号,実績コスト金額,業務番号,明細テキストなどの項目がある。業務番号にデータが設定されている場合,または明細テキストに“ABC=XXXXYY”(XXXX:アクティビティ番号,YY:タスク番号)の設定がある場合,当該実績コスト金額は直接割当ての扱いとなる。
【0141】
図16は日次作業実績データファイル(10D2)を示す。これはチャージ元部門コード別,アクティビティ番号別,タスク番号別に社員が日々入力した作業時間(時間)を保有している。
【0142】
成果物IDは,作業時間(時間)を,特定のプロジェクトや特定の部門のものとして認識したい場合に使用するエリアである。プロジェクトの場合には“W=xxxxx”の形式でデータが設定される。たとえば,プロジェクト:R0095に対し,5時間の作業時間が記憶されている。部門の場合には“B=yyyyyy”の形式でデータが設定される。たとえば,部門:173000に対し,3時間の作業時間が記憶されている。
【0143】
社員の作業時間入力は,後述する勘定系サーバ10の日次作業実績登録画面 (図26:10N1)で行う。
【0144】
情報系サーバ11のマスタについて説明する。
【0145】
図10は本社アクティビティマスタ(11M1)を示す。これは本社部門間接費をどのアクティビティ番号,タスク番号からどのような方法でチャージ先部門に配賦するかという規則を設定するマスタである。データは,チャージ元部門コード別,アクティビティ番号別,タスク番号別に保有される。それ以外の項目についてはABC集約部門コード単位で同一のデータ(内容)が設定されている。ABC集約部門コードは,部門マスタ(図5:10M1)の同項目にリンクしている(同じである)。
【0146】
アクティビティ番号,タスク番号は,アクティビティ・タスクマスタ(図6:10M2)から本社部門の業務活動として相応しいコードが選ばれ,チャージ元部門コード別に設定されている。
【0147】
チャージ元部門コードは,部門マスタ(図5:10M1)のABC集約部門で束ねられたすべての部門コードがリンクする。
【0148】
アクティビティ名称,タスク名称はアクティビティ番号,タスク番号に対応する名称で,アクティビティ・タスクマスタ(図6:10M2)の同項目とリンクしている(同じである)。
【0149】
レート単位は,アクティビティ番号とタスク番号の組み合わせで本社部門の間接費をチャージ先部門にチャージする際の予定チャージレートの(後述する)単位を表している。
【0150】
チャージパターンは,コスト・ドライバのタイプである(種類を表わす)。例を示せば次の通りである。“00”(通常)は,チャージ先部門毎にコスト・ドライバ量を設定する場合に使用する。“02”(事業本部投入資源)は,コスト・ドライバ量をチャージ先部門別に設定せず,チャージ先部門間で間接費をシェア(一定比率)する場合に使用する。“05”(部門社員数)は,コスト・ドライバ量がチャージ先部門別の社員数である場合に使用する。
【0151】
チャージ区分は,チャージする先が部門コードなのか,事業本部付の部門コードなのかを識別するために使用する。
【0152】
属性は,アクティビティ番号,タスク番号がもつ業務的な性格をユーザ(ABCの業務担当者)が設定する場合に使用する。図示の例は0(業務的プロセス)と1(戦略的プロセス)に分別したものである。
【0153】
図11は自動取得マスタ(11M2)を示す。これはチャージ先部門別のコスト・ドライバ量が機械的に(作業者が入力しなくても)取得できる場合に使用するマスタである。ここには,予めいくつかのパターン(データ種別,データ種別枝番)が準備されており,本社アクティビティマスタ(図10:11M1)のアクティビティ番号,タスク番号のうち,自動的に取得できるものについて記述されている。関連キーは,ABC集約部門コード+アクティビティ番号+タスク番号である。データ種別は,自動取得の種類であり,データ種別枝番はさらにコスト・ドライバ量を細分化する種類である。
【0154】
図12はABC業務番号マスタ(11M3)を示す。これは本社部門のアクティビティ番号・タスク番号に本社部門の特定プロジェクト(業務番号)とともに入力された間接費を割当てる場合に使用する。
【0155】
業務番号は,業務情報マスタ(図9:10M5)に登録済みであり,かつ業務番号の業務所管部門コードとチャージ元部門コードは一致している。
【0156】
アクティビティ番号・タスク番号は,本社アクティビティマスタ(図10:11M1)のアクティビティ番号,タスク番号に一致する。
【0157】
業務名称は,業務情報マスタ(図9:10M5)の業務名称と一致する。
【0158】
図13は,コストドライバマスタ(11M4)を示す。これは,ABC集約部門コード別,チャージ元部門コード別,アクティビティ番号別,タスク番号別,計上年度別,月別のチャ−ジ予算(本社部門間接費をチャージ先部門に配賦する予算)を保有している。チャージ予算は,予定チャージレートと予定コスト・ドライバ量から構成されている。これらの積のチャージ元部門ごとの合計がチャージ予算(売上げ予算に相当)である。
【0159】
さらに,このマスタはコスト割当て(リソース・ドライバ)方法を定義する情報を保有している。
【0160】
比率設定区分は,チャージ元部門コードで計上されたコストを,間接割当てする場合の配分基準である。例えば“0”(比率設定通常)は,チャージ元部門コード内のアクティビティ番号・タスク番号間で予め構成比率(パーセント)を設定する方法である。
【0161】
また“2”(日次作業時間比率)は,チャージ元部門コード別,アクティビティ番号別,タスク番号別に入力された作業時間の構成比率を機械的に取得する方法である。参照部門コードは,あるチャージ先部門コードに設定された比率設定区分を,同じABC集約部門コード内の別のチャージ元部門コードが適用する場合に指定する方法である。
【0162】
比率は,比率設定区分が“0”(比率設定通常)の場合に構成比率を設定するエリアである。
【0163】
図14は部門別人員マスタ(11M5)を示す。これは間接費管理(配賦)システムで部門別社員数を算出するために必要な情報を保有する。
【0164】
社員番号は,社員それぞれに固有の識別番号である。部門コードは,社員がどの部門に属するかを認識する為の所属部門コードである。人員は,最大1.0人で,2部門に跨って所属する場合,1.0人を部門間で分割する。
【0165】
情報系サーバ11のコントロールデータファイルについて説明する。
【0166】
図17は実績自動取得データ(11D1)を示す。これはデータ種別別,データ種別枝番別,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別に実績コスト・ドライバ量が“0”(ゼロ)以外のレコードのみ保有している。データ種別,データ種別枝番は,自動取得マスタ(図11:11M2)のそれらとリンクしている。
【0167】
現業部門へのチャージには,通常の方法(規定内)以外に,本社部門で時間を入力した社員の標準単価に作業時間を乗じた金額を,指定されたチャージ先部門コード(規定外/部門)またはチャージ先部門コードが業務所管する業務番号(規定外/業務番号)にチャージする方法がある。これを識別する区分が規定区分であり,“1”(規定内),“2”(規定外/業務番号),“3”(規定外/部門)の3つがある。
【0168】
指定部門コードのエリアは,規定区分が“3”(規定外/部門)の場合や,規定区分が“1”(規定内)ではあるが,部門別社員数のようにチャージ先部門別に実績コスト・ドライバ量がカウントされている場合に,チャージ先の部門コードを保有するエリアである。
【0169】
指定業務番号のエリアは,規定区分が“2”(規定外/業務番号)の場合に,規定外チャージする業務番号を保有するエリアである。
【0170】
実績コストドライバ量は,本社アクティビティマスタ(図10:11M1)のレート単位に従って設定されている。
【0171】
標準コスト金額のエリアは,規定区分が“2”(規定外/業務番号),“3”(規定外/部門)の場合に,規定外の作業時間入力をした社員の社員番号を基に,社員マスタ(図7:10M3)および単価マスタ(図8:10M4)から人件費単価(円/時間)と建物費単価(円/時間)の合計単価を求め,これに作業時間を乗じたものを設定するエリアである。
【0172】
図18は実績コストデータファイル(11D2)を示す。これは勘定系サーバ10にある取引明細データファイル(図15:10D1)と日次作業実績データファイル(図16:10D2)を情報系サーバ11用にまとめたものである。図15の取引明細データファイルの業務番号と明細テキストをアクティビティ番号とタスク番号に置きかえている。
【0173】
管理会計行番号のうち“670”(人件費)(下から第2行)の場合について標準コスト金額の設定について説明する。まず,日次作業実績データ(図16:10D2)のアクティビティ番号別,タスク番号別の作業時間を入力した社員の社員番号(333444)を基に,社員マスタ(図7:10M3)を読む。そこで得られた人件費ランク(B)を基に単価マスタ(図8:10M4)を読み,人件費単価(円/時間)と建物費単価(円/時間)の合計単価(1,400+400=1,800)を求める。これに作業時間を乗じて標準コスト金額が設定される(1,800×(45+5+3)=95,400)。
【0174】
実績コスト金額は次のようにして設定される。後述するMM伝票入力(図27:10N2),(図28:10N3),FI伝票入力(図29:10N4),ワークフロー入力画面(社内売買)(図30:10N5),ワークフロー入力画面(個人立替)(図31:10N6),ワークフロー入力画面(国内出張旅費)(図32:10N7),ワークフロー入力画面(交通費精算)(図33:10N8),アクティビティ・業務番号設定(図35:11N2)によりアクティビティ番号,タスク番号の指定をした場合,経費計上金額は実績コスト金額に設定される。
【0175】
図19は事業本部投入資源配賦基準ファイル(11D3)を示す。これは本社アクティビティマスタ(図10:11M1)のパターンが”02”(事業本部投入資源)の場合,実績コスト・ドライバ量をこの配賦基準に従って配分し,事業本部付部門コードへチャージするために使用する。
【0176】
部門マスタ(図5:10M1)の事業本部付区分が“1”(対象)の事業本部付部門コードについて,配賦基準金額と全部門合計金額を保有している。事業本部付部門コード別の配賦基準金額の合計が全部門合計金額である。
【0177】
端数処理フラグは,実績コスト・ドライバ量の配分時に発生した端数金額を加算する部門コードを決定するフラグである。“1”が設定されている場合,その事業本部別部門コードで端数調整することになる。
【0178】
図20はチャージ比率ファイル(11D4)を示す。これは『コスト・ドライバ量の比率配分によるチャージ』を実現する為に使用するファイルである。計上年月は,比率配分を適用する年月である。チャージパターン別,チャージ区分別,チャージ先部門コード別に比率配分を保有することができる。チャージ対象量,総チャージ対象量は,配分比率の根拠となる値であり,前者は分子,後者は分母となる。
【0179】
端数処理フラグは,実績チャージ金額・ドライバ量の配分時に発生した端数金額を加算する部門コードを決定するフラグである。“1”が設定されている場合,その部門コードで端数調整することになる。
【0180】
具体的な使用方法は次の通りである。チャージコストマスタ(図22・図23:11J2)の中で,チャージ先部門コードが未決定のもの(たとえば,図22の第1行)を対象として,チャージパターン(02),チャージ区分(0)をキーとしてチャージ比率ファイルを読み,チャージ先部門コード(113500と162000)を取得する。それと同時に,チャージコストマスタ(図22・図23:11J2)の実績チャージコスト金額(225,000),実績コスト・ドライバ量(45.0)に,チャージ対象量(6,600,000と4,400,000)を乗算後,計算結果を総チャージ対象量(11,000,000)で除算し,チャージ先部門コード別の実績チャージコスト金額(135,000と90,000),実績コスト・ドライバ量(27.0と18.0)を求め,その結果を配賦実績明細(図24・図25:11J3)の同項目(第1行,第2行)に設定する。
【0181】
最後に,情報系サーバ11のトランザクションデータファイルについて説明する。
【0182】
図21は実績コストマスタ(11J1)を示す。これは,コスト割当て機能の結果として,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別,管理会計行番号別に,間接割当て機能による間接割当コスト金額と,直接割当て機能による直接割当コスト金額を保有するマスタである。
【0183】
そのうち,管理会計行番号が“670”(人件費)のものについては,実績コストデータ(図18:11D2)に保有するアクティビティ番号別,タスク番号別の標準コスト金額が直接割当コスト金額に設定される。これは本社部門間接費の直接割当て機能である。
【0184】
上記以外の管理会計行番号については,後述するMM伝票入力画面(図27:10N2),(図28:10N3),FI伝票入力画面(図29:10N4),ワークフロー入力画面(社内売買)(図30:10N5),ワークフロー入力画面(個人立替)(図31:10N6),ワークフロー入力画面(国内出張旅費)(図32:10N7),ワークフロー入力画面(交通費精算)(図33:10N8),アクティビティ・業務番号設定画面(図35:11N2)によりアクティビティ番号,タスク番号の指定をした場合,経費計上金額(入力された金額)が直接割当コスト金額に設定される。これも本社部門間接費の直接割当て機能である。
【0185】
経費計上時にアクティビティ番号,タスク番号の指定がない場合は,後述する予定チャージレート登録画面(1)(図36:11N3),(図37:11N4)の比率設定区分,比率,参照部門などによって,経費計上金額をアクティビティ番号別,タスク番号別に比率配分後,間接割当コスト金額として設定される。これは,本社部門間接費の間接割当て機能である。比率設定区分,比率,参照部門コード等の情報は,コストドライバマスタ(図13:11M4)に保有されている。
【0186】
図22,図23はチャージコストマスタ(11J2)を示す。これは,計上年月別,チャージ元部門別,アクティビティ番号別,タスク番号別,チャージ先部門コード別に,チャージパターン,チャージ区分,規定区分,指定業務番号,指定部門コード,実績コストドライバ量,予定チャージレート,実績チャージコスト金額,標準コスト金額を保有している。この中で,チャージパターンが“02”(事業本部投入資源)のものは,最終のチャージ先部門コードが決定していない状態にある。規定区分が“2”(規定外/業務番号)の場合には指定業務番号に,“3”(規定外/部門)の場合には指定部門コードにそれぞれ値がセットされる。
【0187】
図24,図25は配賦実績明細ファイル(11J3)を示す。これは,チャージコストマスタ(図22・図23:11J2)のチャージパターンが02(事業本部投入資源)のレコードについて,事業本部投入資源配賦基準(図19:11D3)の部門コード,配賦基準金額,全部門合計金額に基いて実績コストドライバ量を配分し,その結果を実績コストドライバ量に置き換えたものである。
【0188】
間接費配賦システムの入,出力関連図を図4に示す。これらの入,出力画面は基本的には社員PCの表示装置に表示されるが,各種サーバ10〜13の表示装置に表示することもできる。
【0189】
勘定系サーバ10への入力画面には,日次作業実績登録画面(図26:10N1),MM伝票入力画面((図27:10N2),(図28:10N3)),FI伝票入力画面(図29:10N4),4つのワークフロー入力画面((社内売買)(図30:10N5),(個人立替)(図31:10N6),(国内出張旅費)(図32:10N7),(交通費等精算)(図33:10N8))がある。
【0190】
本社部門の社員は,日々これらの画面を使用することにより,作業内容別(アクティビティ番号別,タスク番号別)に作業時間を入力したり,会計伝票を入力する。ここで入力されたデータは,勘定系サーバに保存された後,情報系サーバに渡り,アクティビティ番号別・タスク番号別のコストとして認識される。
【0191】
情報系サーバ11への入力画面には,本社アクティビティマスタ登録画面(図34:11N1),アクティビティ・業務番号設定画面(図35:11N2),予定チャージレート登録画面(1)−1,2((図36:11N3),(図37:11N4)),予定チャージレート登録画面(2)(図38:11N5),実績コストドライバ量登録画面(図39:11N6),出力指示メニューとしてABC実績照会画面(図40:11S1)がある。
【0192】
本社アクティビティマスタ登録画面(図34:11N1),アクティビティ・業務番号設定画面(図35:11N2)は,間接費配賦システムの制度運用を管轄する企画部の特定権限を保有した社員のみがアクセス可能である。各本社部門からの登録や変更の申請内容を社内の認定会議に付議し,了承された場合,企画部の担当社員が申請内容に従って随時,これらの画面に入力する。
【0193】
各本社部門では年一回,次会計年度分の予定チャージレートおよび予定コストドライバ量の予定計画値を,予定チャージレート登録画面(1)−1,2((図36:11N3),(図37:11N4)),予定チャージレート登録画面(2)(図38:11N5)などの画面を使用して入力する。
【0194】
ABC実績照会(図40:11S1)は,以下に述べる帳票系サーバ12の出力画面の指示画面である。本社部門,現業部門のいずれの社員もこの画面にアクセスすることができる。
【0195】
帳票系サーバ12からの出力画面には,チャージ先部門別一覧画面(図41:12S1),チャージ先部門別明細画面(図42:12S2),チャージ元部門別一覧画面(図43:12S3),チャージ元部門別明細画面(図44:12S4),アクティビティ・タスク別ABC損益明細画面(図45:12S5)がある。
【0196】
本社部門,現業部門の社員は,月次の間接費配賦処理後,前記のABC実績照会画面(図40:11S1)でこれらの画面を指定し,アクティビティ番号別,タスク番号別の配賦結果を確認する。
【0197】
まず,勘定系サーバ10の入力画面について,その役割と意義を説明する。
【0198】
図26は日次作業実績登録画面の一例(10N1)を示す。これは日々の作業実績をアクティビティ番号,タスク番号を使用して時間で入力する画面である。部門,登録対象者,作業日は,社員が社員番号と作業日付をもとにWEBサーバにログインした内容をもとに,この画面が選択された時点で設定(表示)される。
【0199】
開始時刻,終了時刻は勤務時間を把握する為に入力する。またこの勤務時間はアクティビティ番号別,タスク番号別の作業時間の合計時間と照合(チェック)される。
【0200】
業務番号を入力するかどうかは任意である。業務番号の入力が無くかつアクティビティ番号別タスク番号別の作業時間入力がある場合(アクティビティ番号とタスク番号の入力は必須である),社員の社員番号をキーとして社員マスタ(図7:10M3を読み,そこで得られた人件費ランクをキーとして単価マスタ(図8:10M4)を読む。そこで得られた人件費単価(円/時間)と建物費単価(円/時間)の合計単価と,アクティビティ番号別,タスク番号別の作業時間を乗じたものが,社員の所属するチャージ元部門コードのアクティビティ番号別,タスク番号別標準コスト金額となる。
【0201】
業務番号の入力があり,かつアクティビティ番号別,タスク番号別の作業時間の入力がある場合,社員の社員番号で(をキーとして)社員マスタ(図7:10M3)を読み,そこで得られた人件費ランクで(をキーとして)単価マスタ(図8:10M4)を読む。そこで得られた人件費単価(円/時間)と建物費単価(円/時間)の合計単価と,アクティビティ番号別,タスク番号別の作業時間を乗じたものが,社員の所属するチャージ元部門コードの標準コスト金額となる。(業務番号とアクティビティ番号/タスク番号とは図35に示す画面における入力により関連づけられている。)
【0202】
業務番号の入力が無い場合にはチャージ元部門コード別,アクティビティ番号別,タスク番号別に標準コスト金額が割当てられるのに対し,業務番号を入力した場合は,業務番号の業務所管部門(チャージ元部門コード)に対して標準コスト金額が割当てられる。
【0203】
成果物IDの入力は任意である。成果物IDの入力の状態によって,実績自動取得データ(図17:11D)に保有する3つの規定区分である“1”(規定内),“2”(規定外/業務番号),“3”(規定外/部門)のいずれかに識別される。
【0204】
成果物IDがブランクの場合,該当アクティビティ番号,タスク番号別の作業時間は,“1”(規定内)のみの扱いとなり,標準コスト金額は1種類のみ作成される。
【0205】
成果物IDに“W=@@@@@(@@@@@は業務番号,たとえばW=R0095)”が入力(設定)された場合,該当アクティビティ番号,タスク番号別の作業時間は,“1”(規定内)と“2”(規定外/業務番号)の両方の扱いとなり,2種類の標準コスト金額が作成される。
【0206】
成果物IDに“B=%%%%%%(%%%%%%はチャージ先部門コード,たとえばB=173000)”が入力(設定)された場合,該当アクティビティ番号別,タスク番号別の作業時間は,“1”(規定内)と“3”(規定外/部門)の両方の扱いとなり,2種類の標準コスト金額が作成される。
【0207】
“1”(規定内)の標準コスト金額は,実績コストデータファイル(図18:11D2)にセットされる。“2”(規定外/業務番号),“3”(規定外/部門)の追加チャージ分の標準コスト金額は,実績自動取得データファイル(図17:11D1)にセットされる。
【0208】
作業概要,本日の作業内容については入力は任意である。
【0209】
図27はMM伝票入力画面1(10N2)を示す(MMはMaterial Management ,在庫購買管理,購買発注,の略)。これは一般経費等を経費計上する画面である。経費計上するチャージ元部門コードは,社員が社員番号をもとにWEBサーバにログインした内容をもとに,この画面が選択された時点で設定(表示)される。
【0210】
購買発注日は,経費伝票の起票日である。仕入先コードは,発注先のコードであり,仕入先名称である。購買発注明細は,一画面で複数行の入力ができるようになっている。明細は十番単位の明細行管理番号である。品目コードは,経費計上時の管理会計行番号にリンクしている。テキストは発注する内容である。購買発注数量は,同一明細行内での発注数量である。納入期日は経費計上の予定日である。正味価格は,消費税を除く本体価格である。
【0211】
図28はMM伝票入力画面2(10N3)を示す。これはMM伝票入力画面1(図27:10N)で明細行を選択することによって,該当の明細にアクティビティ番号,タスク番号の指定をする画面である。
【0212】
明細,品目コード,テキストは,MM伝票入力画面1(図27:10N2)の同一項目と同義である。
【0213】
ABC会計コードに,“ABC=XXXXYY”と設定した場合(直接割当になる),正味価格は,計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“XXXX”,タスク番号別“YY”に,取引明細データファイル(図15:10D1)にセットされ,その後の処理により,実績コストデータファイル(図18:11D2)の実績コスト金額に(として),さらに実績コストマスタ(図21:11J1)の直接割当コスト金額に(として)それぞれ設定される。MM伝票入力画面2(図28:10N3)のABC会計コードに入力がない場合(間接割当となる)と,MM伝票入力画面1(図27:10N2)で,MM伝票入力画面2(図28:10N3)の入力選択をしなかった場合(間接割当となる)は,正味価格は計上年月別,チャージ元部門コード別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0214】
図29はFI伝票入力画面(10N4)を示す(FIはFinantial Accounting,財務会計の略である))。これは勘定コードを使用した,会計伝票形式の入力画面である。いずれにしても,外部への直接の支払に関する金額(経費)の計上はMM伝票またはFI伝票で行なわれる。勘定コードは,管理会計行番号とリンクしている。図29に図示の例では,消耗品の経費を金額“1,500円”,数量“1.0”で,チャージ元部門コード“109700”に,4月16日の起算日で計上している。
【0215】
テキストに,“ABC=XXXXYY”と設定した場合,金額は計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“XXXX”,タスク番号別“YY”に,取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に,実績コストマスタ(図21:11J1)の直接割当コスト金額にそれぞれ設定される。
【0216】
テキストにABC集約部門コードの入力がない場合,金額は計上年月別,チャージ元部門コード別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0217】
次に説明するワークフロー4画面は,社内売買(図30:10N5),個人立替(図31:10N6),国内出張旅費(図32:10N7),交通費等精算(図33:10N8)の入力画面であり,グループウェアソフトを共通的に利用して作成した,経費伺の回議申請用入力画面である。
【0218】
図30はワークフロー入力画面(社内売買)(10N5)を示す。これは社内取引(たとえば,本社部門が現業部門または本社部門から仕入れた場合,システム構築など)を行う場合に使用する申請画面である。申請種別は,この申請が新規のものか既に回議済のものかを指定する。計上年月は,社内取引を社内売上部門データの部門コードと社内仕入部門データの部門コードの両方に共通する年月である。
【0219】
図30に示す例では,企画部(大阪)“109200”が,XY開発第一G部門“106100”から100,000円の社内仕入をする場合の入力を示している。
【0220】
仕入部門データのアクティビティ/タスク(8052/01)に入力があることから,金額10,000は計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“8052”,タスク番号別“01”に,取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に,実績コストマスタ(図21:11J1)の直接割当コスト金額にそれぞれ設定される。
【0221】
アクティビティ/タスクに入力がない場合,金額は計上年月別,チャージ元部門コード別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0222】
コメントは任意入力である。これらの入力後,回議開始ボタンを押せば予め定められた回議ルートでワークフローが起動される。キャンセルボタンを押せば,入力内容が破棄され画面が終了する。
【0223】
図31はワークフロー入力画面(個人立替)(10N6)を示す。これは部門の経費を個人が立て替えた場合に事後申請を行い,部門の経費に付け替えるための画面である。
【0224】
図31に示す例は,立替者の社員番号“333444”,社員名“特許太郎”が,単価1,000円の立替品名“ケーブル”を1個,消費税込みで1,050円で立替購入し,税区分“仮払消費税(5%)”,本体価格合計1,000円,消費税50円のあわせて1,050円の立替金合計を,勘定科目名“消耗品”として,部門コード“108400”,部門名“情報システム部(大阪)”に経費付替したものである。経費(任意入力)のアクティビティ/タスクに入力があることから,立替金合計は計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“8055”,タスク番号別“01”に,取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に,実績コストマスタ(図21:11J1)の直接割当コスト金額に設定される。アクティビティ/タスクに入力がない場合,立替金合計は計上年月別,チャージ元部門別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0225】
備考,購入理由,コメントは任意入力である。これらの入力後,回議開始ボタンを押せば予め定められた回議ルートでワークフローが起動される。キャンセルボタンを押せば,入力内容が破棄され画面が終了する。
【0226】
図32はワークフロー入力画面(国内出張旅費)(10N7)を示す。これは国内出張時の旅費・交通費を申請するための入力画面である。申請種別は,この申請が新規のものか既に回議済のものかを指定する。
【0227】
図32に図示の例は,社員番号 “333444”,社員名 “特許太郎”が,部門コード“209701“,部門名”人事総務部(東京その他)“を経費負担部門として,1999年4月1日の9:00から18:00の日程で,人事システム改定打合せの出張理由で大阪本社に出張したものである。アクティビティ/タスクに入力があることから,出張旅費は計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“8001”,タスク番号別“19”に,取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に,実績コストマスタ(図21:11J1)の直接割当コスト金額にそれぞれ設定される。
【0228】
アクティビティ/タスクに入力がない場合,出張旅費は計上年月別,チャージ元部門コード別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0229】
コメントは任意入力である。これらの入力後,回議開始ボタンを押せば予め定められた回議ルートでワークフローが起動される。キャンセルボタンを押せば,入力内容が破棄され画面が終了する。
【0230】
図33はワークフロー入力画面(交通費等精算)(10N8)を示す。これは市内交通費を実費立替後に申請し,立替分の本体価格合計を部門の経費に付け替えるための画面である。この例は,立替者の社員番号“333444”,社員名“特許太郎”が,1999年4月15日に,YY年度決算打合せの目的でXX会計社に地下鉄で○から△まで乗車した際の一般交通費600円を,本体価格571円,消費税29円で部門コード“110800”,部門名名称“財務経理部(大阪)”に経費付替したものである。経費(任意入力)のアクティビティ/タスクに入力があることから,600円は計上年月別,チャージ元部門コード別,管理会計行番号別,アクティビティ番号別“8007”,タスク番号別“07”に,取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に,実績コストマスタ(図21:11J1)の直接割当コスト金額にそれぞれ設定される。
【0231】
アクティビティ/タスクに入力がない場合,600円は計上年月別,チャージ元部門コード別,管理会計行番号別に取引明細データファイル(図15:10D1),実績コストデータファイル(図18:11D2)の実績コスト金額に設定される。
【0232】
コメントは任意入力である。これらの入力後,回議開始ボタンを押せば予め定められた回議ルートでワークフローが起動される。キャンセルボタンを押せば,入力内容が破棄され画面が終了する。
【0233】
次に,情報系サーバ11の入力画面について説明する。
【0234】
図34は本社アクティビティマスタ登録(修正,追加)画面(11N1)を示す。これは間接費管理(配賦)システムの中で最も重要なマスタ情報を設定する画面である。設定項目は,ABC集約部門コード別,チャージ元部門コード別,アクティビティ番号別,タスク番号別の,アクティビティ名称,タスク名称,コストドライバ名称,レート単位,チャージパターン,チャージ区分,属性,データ種別,データ種別枝番である。ここでの入力データは,本社アクティビティマスタ(図10:11M1),自動取得マスタ(図11:11M2)に設定される。
【0235】
図35はアクティビティ・業務番号設定(修正,追加)画面(11N2)を示す。これはチャージ元部門で発生する経費が業務番号単位にデータ上識別されている場合,経費計上金額を,チャージ元部門コード別,アクティビティ番号別,タスク番号別に直接割当てするための画面である。
【0236】
ここでの関連付けした内容は,ABC業務番号マスタ(図12:11M3)に設定される。すなわち,業務番号を入力すれば,アクティビティ番号,タスク番号を入力しなくても,この画面で定義されたアクティビティ/タスクに直接割当てされることになる。
【0237】
直接割当ては,ABC業務番号マスタ(図12:11M3)に設定されている業務番号で,取引明細データファイル(図15:10D1)の業務番号を検索し,経費計上金額をチャージ元部門コード,アクティビティ番号,タスク番号の情報を基に,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別,管理会計行番号別に,実績コストマスタ(図21:11J1)の直接割当コスト金額に設定することにより実現する。
【0238】
図35の例は,チャージ元部門コード“109700”,チャージ元部門名称“人事総務部(大阪)”のアクティビティ番号“8000”,タスク番号“01”に,業務番号“R0097”を関連付けしたものである。取引明細データファイル(図15:10D1)の業務番号“R0097”が,アクティビティ番号“8000”,タスク番号“01”に関連付けられた結果として(図15の第3行),実績コストマスタ(図21:11J1)に,計上年月“199904”,チャージ元部門コード別“109700”,アクティビティ番号“8000”,タスク番号“01”,直接割当コスト金額“3,000円”が設定される(図21の第2行)。
【0239】
アクティビティ・業務番号の設定がなく,かつ業務番号のみが入力された場合,前述の予定チャージレート登録画面(1)(図36:11N3),(図37:11N4)の比率設定区分,比率,参照部門コードの内容により,経費計上金額は実績コストマスタ(図21:11J1)の間接割当コスト金額にアクティビティ番号別,タスク番号別に比率配分された結果が設定される。(上述のように,アクティビティ番号,タスク番号が入力されれば直接割当となる。)
【0240】
業務番号は,チャージ元部門コードが業務所管部門コードと等しいかを業務情報マスタ(図9:10M5)で照合し,存在した場合にのみ関連付けが可能である。業務名称は業務情報マスタ(図9:10M5)の業務名称をさらに詳細に定義する場合に使用する。
【0241】
図36は予定チャージレート登録(修正,追加)画面(1)―1(11N3)を示す。これは入力年度別,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別に予定チャージレートと予定コストドライバ量を登録する画面である。
【0242】
入力年度,チャージ元部門を基にこの画面を選択した時点で,本社アクティビティマスタ(図10:11M1),コストドライバマスタ(図13:11M4)の登録内容から画面上のすべての項目が編集され,表示される。また,ここでの登録内容は,コストドライバマスタ(図13:11M4)に設定される。
【0243】
比率設定区分は,チャージ元部門コードで計上されたコストを,間接割当てする場合に使用する配分基準である。例えば“0”(比率設定通常)は,チャージ元部門コード内のアクティビティ番号・タスク番号間で予め構成比率(パーセント)を設定する方法である。図示の例では,チャージ元部門コード“109700”,チャージ元部門名称“人事総務部(大阪)”で定義されているアクティビティ番号・タスク番号のうち,“8000−01”,“8001−01”,“8001−19”についてそれぞれ50%,30%,20%の比率が設定されている。
【0244】
比率のエリアは,比率設定区分が“0”(比率設定通常)の場合にのみ,構成比率を設定するエリアである。この場合,このチャージ元部門コードで計上されたコストは,直接割当て指定分コストを除き,これらのアクティビティ番号別,タスク番号別に比率により配分されることになる。
【0245】
この結果を実績コストマスタ(図21:11J1)で示せば,次のようになっている。計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別に間接割当コスト金額を合計すると,チャージ元部門“109700”においては,“8000−01”,“8001−01”,“8001−19”でそれぞれ68,623円,41,173円,27,450円であり,上記で設定した50%,30%,20%の比率となっている。
【0246】
参照部門コードは,あるチャージ先部門コードに設定された比率設定区分を,同じABC集約部門内の別のチャージ元部門コードが適用する場合に使用する。この例は,以降の予定チャージレート登録画面(1)−2(図37:11N4)で示す。
【0247】
図37は予定チャージレート登録画面(1)−2(11N4)を示す。これは予定チャージレート登録画面(1)で,比率設定区分が“1”(比率設定部門参照)の場合の例である。
【0248】
入力年度別,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別に予定チャージレートと予定コストドライバ量を登録する画面である。
【0249】
入力年度,チャージ元部門を元にこの画面を選択した時点で,本社アクティビティマスタ(図10:11M1),コストドライバマスタ(図13:11M4)の登録内容から画面上のすべての項目が編集され表示される。また,ここでの登録内容は,コストドライバマスタ(図13:11M4)に設定される。
【0250】
比率設定区分は,チャージ元部門コードで計上されたコストを,間接割当てする場合に使用する配分基準である。この例では,チャージ元部門コード“209701”,チャージ元部門名称“人事総務部(東京その他)”が,同一のABC集約部門設定であるチャージ元部門コード“109700”,チャージ元部門名称“人事総務部(大阪)”のアクティビティ番号・タスク番号間構成比率(パーセント)の比率を参照することにより,チャージ元部門コード“209701”で計上したコストのうち間接割当コスト金額を,“8000―01”,“8001−01”,“8001−19”で50%,30%,20%に配分される。
【0251】
比率設定区分にはこれ以外に,日次作業時間のチャージ元部門コード内のアクティビティ番号別,タスク番号別の構成比率である“2”(日次作業時間比率)や,“2”で設定された部門の日次作業時間比率を参照する“3”(日次作業時間比率部門参照),さらに,日次作業時間から算出したアクティビティ番号別,タスク番号別の標準コスト金額のチャージ元部門コード内の構成比率を求めた“4”(日次作業時間金額比率)や,“4”で設定された部門の日次作業時間金額比率を参照する“5”(日次作業時間金額比率部門参照)などがある。これらの情報は,コストドライバマスタ(図13:11M4)および,日次作業実績データファイル(図16:10D2)の計上年月別,部門コード別,アクティビティ番号別タスク番号別の作業時間(時間),標準コスト金額を使用して比率を算出する。
【0252】
図38は予定チャージレート登録画面(2)(11N5)を示す。これは入力年度別,計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別に予定チャージレートと予定コストドライバ量を登録する画面である。予定チャージレート登録画面(1)―1(図36:11N3)が,チャージ元部門コード別アクティビティ番号別,タスク番号別に入力するのに対し,予定チャージレート登録画面(2)(図38:11N5)は,ABC集約部門コードとアクティビティ番号,タスク番号を予め決めておき,ABC集約部門で束ねられたチャージ元部門別コードに入力するとことができる。
【0253】
入力年度,ABC集約部門コード,アクティビティ番号,タスク番号を基にこの画面を選択した時点で,本社アクティビティマスタ(図10:11M1),コストドライバマスタ(図13:11M4)の登録内容から画面上のすべての項目が編集され表示される。また,ここでの登録内容は,コストドライバマスタ(図13:11M4)に設定される。
【0254】
コピー指示は,例えばチャージ元部門コード“109700”の計上年月別の予定チャージレート,予定コストドライバ量をチャージ元部門コード“209700”にすべてコピーしたい場合,コピー元のコピー指示エリアに“C”,コピー先指示エリアに“P”を指定する。コピー元の指定は1つのみ可能であるが,コピー先の指定は複数可能である。
【0255】
図39は実績コストドライバ量登録画面(11N6)を示す。これはチャージ先部門に対する配賦(チャージ)を行う場合の実績コストドライバ量を,自動取得ではなく計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別,チャージ先部門コード別に実績値登録するための画面である。すなわち,月間集計を手入力し,個人が入力した時間データよりもこの入力が優先する。
【0256】
この画面は計上年月,チャージ元部門コードを選択することにより,チャージ元部門の,実績値登録型のアクティビティ番号,タスク番号,アクティビティ名称,タスク名称,レート単位,予定コストドライバ量が予め表示される。
【0257】
ABC集約部門コード,アクティビティ番号,タスク番号で,本社アクティビティマスタ(図10:11M1)を検索し,チャージパターンが“00”(通常)の場合で,かつ自動取得マスタ(図11:11M2)に存在しない場合,実績値登録型となり,画面表示されることになる。予定コストドライバ量は,コストドライバマスタ(図13:11M4)の該当計上年月から設定される。
【0258】
実績入力コストドライバ量をチャージ先部門別に入力した結果は,チャージコストマスタ(図22:11J2)に計上年月別,チャージ元部門コード別,アクティビティ番号別,タスク番号別,チャージ先部門別の実績コストドライバ量として設定される。
【0259】
さらに,情報系サーバ11の出力画面には次のものがある。
【0260】
図40はABC実績照会画面(メニュー画面)(11S1)を示す。これは,帳票系サーバ12のチャージ先部門別一覧表示画面(図41:12S1),チャージ先部門別明細表示画面(図42:12S2),チャージ元部門別一覧表示画面(図43:12S3),チャージ元部門別明細表示画面(図44:12S4),アクティビティ・タスク別ABC損益明細表示画面(図45:12S5)の選択メニュー画面である。ラジオボタンにより,いずれかの帳票(表示画面)を選択する。
【0261】
対象年月は,照会するデータの計上年月を4桁の西暦年と2桁の月で指定する。
【0262】
チャージ先部門別一覧表示画面(図41:12S1),チャージ先部門別明細表示画面(図42:12S2)を選択した場合,部門指定区分は“1”(部門コード)または“3”(グループ)が指定できる。
【0263】
チャージ元部門別一覧表示画面(図43:12S3),チャージ元部門別明細表示画面(図44:12S4),アクティビティ・タスク別ABC損益明細表示画面(図45:12S5)を選択した場合,部門指定区分は“1”(部門コード)または“2”(ABC集約部門)が指定できる。
【0264】
部門指定区分が“1”(部門コード)の場合は,対象部門は部門マスタ(図5:10M1)の部門コードが指定できる。
【0265】
部門指定区分が“2”(ABC集約部門)の場合は,対象部門は部門マスタ(10M1)のABC集約部門が指定できる。
【0266】
部門指定区分が“3”(グループ)の場合は,対象部門は部門マスタ(10M1)のグループが指定できる。
【0267】
アクティビティ・タスクは,チャージ先部門別明細表示画面(図42:12S2),チャージ元部門別明細表示画面(図44:12S4)を選択する場合に必須である。アクティビティ・タスク別ABC損益明細表示画面(図45:12S5)を選択する場合は任意である。それ以外を選択する場合は入力不可である。
【0268】
最後に,帳票系サーバ12の出力画面について説明する。
【0269】
図41はチャージ先部門別一覧表示画面(12S1)を示す。これはABC実績照会表示画面(図40:11S1)で指定された条件で配賦実績明細(図24・25:11J3)を抽出し,チャージ先部門から見た配賦実績の一覧照会をする画面である。
【0270】
図示の例は,対象年月を1999年4月,部門指定区分を“1”(部門コード),対象部門を“173000”で指定し,配賦実績明細(図24・25:11J3)の計上年月が“199904”,チャージ先部門コードが“173000”のレコードを抽出し照会したものである。
【0271】
対象部門は部門マスタ(図5:10M1)の部門名称,部門コードより表示される。部門指定区分は“1”(部門コード)のため“部門コード指定”が表示される。
【0272】
アクティビティ名,タスク名,番号,ドライバー名,レート単位は,本社アクティビティマスタ(図10:11M1)のそれぞれアクティビティ名称,タスク名称,アクティビティ番号,タスク番号,コストドライバ名称,レート単位が表示される。
【0273】
チャージレート,コストドライバ,規定内チャージ料金(円),規定外チャージ料金(円)は,配賦実績明細(図24・25:11J3)のそれぞれ予定チャージレート,実績コストドライバ量,実績チャージコスト金額,標準コスト金額が表示される。
【0274】
表示行は,明細行の他にチャージ元部門の小計行とチャージ先部門の合計行があり,規定内チャージ料金(円)と規定内チャージ料金(円)のみ合計表示される。
【0275】
図42はチャージ先部門別明細表示画面(12S2)を示す。これはABC実績照会表示画面(図40:11S1)で指定された条件でチャージコストマスタ(図22・図23:11J2),配賦実績明細(図24・25:11J3)を抽出し,チャージ先部門から見た配賦実績の明細照会をする画面である。
【0276】
図示の例は,対象年月を1999年4月,部門指定区分を“1”(部門コード),対象部門を“173000”,アクティビティ・タスクを“8001−01”で指定し,チャージコストマスタ(図22・23:11J2),配賦実績明細(図24・25:11J3)の,計上年月“199904”,チャージ先部門コード“173000”,アクティビティ番号“8001”,タスク番号“01”のレコードを抽出し照会したものである。
【0277】
対象部門は部門マスタ(図5:10M1)の部門名称,部門コードが表示される。部門指定区分は“1”(部門コード)のため“部門コード指定”が表示される。
【0278】
アクティビティ名,タスク名,番号,ドライバー名,レート単位,チャージパターン,チャージ区分は,本社アクティビティマスタ(図10:11M1)のそれぞれアクティビティ名称,タスク名称,アクティビティ番号,タスク番号,コストドライバ名称,レート単位,チャージパターン,チャージ区分が表示される。
【0279】
規定内は,配賦実績明細(図24・25:11J3)の規定区分が“1”(規定内)のレコードが表示される。チャージ元部門の部門名称は,部門マスタ(図5:10M1)より取得し表示される。チャージ元部門コード,チャージレート,コストドライバ,チャージ料金(円)は,配賦実績明細(図24・25:11J3)のそれぞれチャージ元部門,予定チャージレート,実績コストドライバ量,実績チャージコスト金額が表示される。
【0280】
規定外がある場合,チャージコストマスタ(図22・23:11J2)の規定区分が“2”(規定外/業務番号),“3”(規定外/部門)のレコードがそれぞれ表示される。図示の例では,規定区分“3”(規定外/部門)が抽出されたため,規定外の表示は,部門:173000となっている。規定区分が“2”(規定外/業務番号)の場合は,業務番号:XXXXXの形式の表示となる。
【0281】
規定外チャージについては,チャージ元部門コード,チャージレート,コストドライバ,チャージ料金(円)は,チャージコストマスタ(図22・23:11J2)のそれぞれ指定部門,予定チャージレート,実績コストドライバ量,標準コスト金額が表示される。
【0282】
表示行は,明細行の他にチャージ元部門の小計行とチャージ先部門の合計行がありチャージ料金(円)のみ合計表示される。
【0283】
図43はチャージ元部門別一覧表示画面(図43:12S3)を示す。これはABC実績照会画面(図40:11S1)で指定された条件で配賦実績明細(図24・25:11J3)を抽出し,チャージ元部門から見た配賦実績の一覧照会をする画面である。
【0284】
図示の例は,対象年月を1999年4月,部門指定区分を“1”(部門コード),対象部門を“109700”で指定し,配賦実績明細(図24・25:11J3)の計上年月が“199904“,チャージ元部門コードが”109700“のレコードを抽出し照会したものである。
【0285】
対象部門は部門マスタ(図5:10M1)の部門名称,部門コードが表示される。部門指定区分は“1”(部門コード)のため“部門コード指定”が表示される。
【0286】
アクティビティ名,タスク名,番号,ドライバー名,レート単位は,本社アクティビティマスタ(図10:11M1)のそれぞれアクティビティ名称,タスク名称,アクティビティ番号,タスク番号,コストドライバ名称,レート単位が表示される。
【0287】
チャージレート,コストドライバ,規定内チャージ料金(円),規定外チャージ料金(円)は,配賦実績明細(図24・25:11J3)のそれぞれ予定チャージレート,実績コストドライバ量,実績チャージコスト金額,標準コスト金額が表示される。
【0288】
表示行は,明細行の他にチャージ元部門コードの合計行があり,規定内チャージ料金(円)と規定内チャージ料金(円)のみ合計表示される。
【0289】
図44はチャージ元部門別明細表示画面(図44:12S4)を示す。これはABC実績照会画面(図40:11S1)で指定された条件でチャージコストマスタ(図22・23:11J2),配賦実績明細(図24・25:11J3)を抽出し,チャージ元部門から見た配賦実績の明細照会をする画面である。
【0290】
図示の例は,対象年月を1999年4月,部門指定区分を“1”(部門コード),対象部門を“109700”,アクティビティ・タスクを“8001−01”で指定し,チャージコストマスタ(図22・23:11J2),配賦実績明細(図24・25:11J3)の,計上年月“199904“,チャージ先部門コード”109700“,アクティビティ番号”8001“,タスク番号”01“のレコードを抽出し照会したものである。
【0291】
対象部門は部門マスタ(図5:10M1)の部門名称,部門コードが表示される。部門指定区分は“1”(部門コード)のため“部門コード指定”が表示される。
【0292】
アクティビティ名,タスク名,番号,ドライバー名,レート単位,チャージパターン,チャージ区分は,本社アクティビティマスタ(図10:11M1)のそれぞれアクティビティ名称,タスク名称,アクティビティ番号,タスク番号,コストドライバ名称,レート単位,チャージパターン,チャージ区分が表示される。
【0293】
チャージ先部門は,規定内については配賦実績明細(図24・25:11J3)のチャージ先部門を,規定外についてはチャージコストマスタ(図22・23:11J2)の指定部門を基に部門マスタ(図5:10M1)より部門名称を取得後表示される。
【0294】
規定内は,配賦実績明細(図24・25:11J3)の規定区分“1”(規定内)のレコードが,規定内行に表示される。チャージレート,コストドライバ,チャージ料金(円)は,配賦実績明細(図24・25:11J3)のそれぞれ予定チャージレート,実績コストドライバ量,実績チャージコスト金額が表示される。
【0295】
規定外がある場合,チャージコストマスタ(図22・23:11J2)の規定区分“2”(規定外/業務番号),“3”(規定外/部門)のレコードがそれぞれ表示される。
【0296】
図示の例では,チャージ先部門が“106100”,部門名称“XY開発第一G”で規定区分が“2”(規定外/業務番号),チャージ先部門コードが“173000”,部門名称“QRマーケティング第一G”で規定区分“3”(規定外/部門)が抽出されたため,それぞれ規定外業務番号行,規定外部門行に表示される。
【0297】
規定外チャージについては,チャージレート,コストドライバ,チャージ料金(円)は,チャージコストマスタ(図22・23:11J2)のそれぞれ予定チャージレート,実績コストドライバ量,標準コスト金額が表示される。
【0298】
表示行は,明細行の他にチャージ元部門の合計行があり,コストドライバ,チャージ料金(円)は規定内,規定外業務番号,規定外部門ごとの合計が表示され,チャージレートはそれぞれの行のチャージ料金(円)をコストドライバで除算した結果が表示される。
【0299】
図45はアクティビティ・タスク別ABC損益明細表示画面(12S5)を示す。これは,ABC実績照会画面(図40:11S1)で指定された条件で,実績コストマスタ(図21:11J1),コストドライバマスタ(図13:11M4),チャージコストマスタ(図22・23:11J2),配賦実績明細(図24・25:11J3)を抽出し,チャージ元部門から見たアクティビティ番号別,タスク番号別の損益明細照会をする画面である。表示の条件は,実績コストマスタ(図21:11J1)チャージコストマスタ(図22・23:11J2),配賦実績明細(図24・25:11J3)のいずれかに“0”以外の実績があることである。
【0300】
図示の例は,対象年月を1999年4月,部門指定区分を“1”(部門コード),対象部門を“109700”,アクティビティ・タスクを“8001−01”で指定し照会したものである。
【0301】
集約部門はチャージ元部門を束ねる部門コードで部門マスタ(図26:10M1)の部門名称を取得後表示される。
【0302】
アクティビティ名,タスク名,番号,ドライバー名,レート単位,チャージパターン,チャージ区分は,本社アクティビティマスタ(図10:11M1)のそれぞれアクティビティ名称,タスク名称,アクティビティ番号,タスク番号,コストドライバ名称,レート単位,チャージパターン,チャージ区分が表示される。
【0303】
規定内の実績行は,実績コストマスタ(図21:11J1)の間接割当コスト金額と直接割当コスト金額を加算したものがチャージ料金(円)に表示される。配賦実績明細(図24・25:11J3)の実績コストドライバ量がコストドライバに表示される。チャージレートは,チャージ料金(円)をコストドライバで除算した結果が表示される。
【0304】
規定内の予定行は,コストドライバマスタ(図13:11M4)の予定チャージレート,予定コストドライバ量がそれぞれチャージレート,コストドライバに表示され,これらを乗算した結果が,チャージ料金(円)に表示される。
【0305】
規定内のチャージ行は,配賦実績明細(図24・25:11J3)の予定チャージレート,実績コストドライバ量,実績チャージコスト金額がそれぞれチャージレート,コストドライバ,チャージ料金(円)に表示される。
【0306】
規定内の予定損益行は,上記規定内の予定行のチャージ料金(円)から実績行のチャージ料金(円)を減算した結果がチャージ料金(円)に表示される。
【0307】
規定内のチャージ損益行は,上記規定内のチャージ行のコストドライバ,チャージ料金(円)から予定行のコストドライバ,チャージ料金(円)を減算した結果がそれぞれコストドライバ,チャージ料金(円)に表示される。
【0308】
規定内のアクティビティ損益行は,上記規定内のチャージ行のコストドライバ,チャージ料金(円)から実績行のコストドライバ,チャージ料金(円)を減算した結果がそれぞれコストドライバ,チャージ料金(円)に表示される。
【0309】
規定外/業務番号行は,チャージの考え方のみである。チャージコストマスタ(図22・23:11J2)の規定区分が“2”(規定外/業務番号)の予定チャージレート,実績コストドライバ量,標準コスト金額がそれぞれチャージレート,コストドライバ,チャージ料金(円)に表示される。
【0310】
規定外/部門号行についても,チャージの考え方のみである。チャージコストマスタ(図22・23:11J2)の規定区分が“3”(規定外/部門)の予定チャージレート,実績コストドライバ量,標準コスト金額がそれぞれチャージレート,コストドライバ,チャージ料金(円)に表示される。
【0311】
表示行は,明細行の他にチャージ元部門,集約部門の合計行があり,コストドライバ,チャージ料金(円)について規定内,規定外業務番号,規定外部門の合計値が表示される。その際,損益表示行を除きチャージレートはチャージ料金(円)をコストドライバで除算した結果が表示される。
【0312】
間接費管理(配賦)システムの処理には,大きく次の4つの処理から構成されている。
【0313】
勘定系実績登録処理(PA),情報系実績登録処理(PB),メイン処理(PC),出力処理(PD)の4つである。
【0314】
勘定系実績登録処理(図46:PA)は,図4の間接費管理(配賦)システムの入・出力関連図上の勘定系サーバ10への登録処理を指し,入力データを,勘定系サーバ10に保存する処理である。
【0315】
情報系実績登録処理(図47:PB)は,図4の間接費管理(配賦)システムの入・出力関連図上の情報系サーバ11への登録処理を指し,入力データを,情報系サーバ11に保存する処理である。
【0316】
メイン処理(図48:PC)は,月次のバッチ処理である(一般に月末に1回行なわれる)。主な内容は以下の2点である。その第一は,勘定系実績登録処理(図46:PA),情報系実績登録処理(図47:PB)で入力されたデータをもとに,アクティビティ番号別,タスク番号別に実績コストを振分ける処理である。第二は,予定チャージレートと,実績コストドライバ量を乗じた金額を,チャージ先部門に配賦(チャージ)する処理である。
【0317】
出力処理(図49:PD)は,図4の間接費管理(配賦)システムの入・出力関連図上の情報系サーバ11の照会指示処理(図40,ABC実績照会:11S1),帳票サーバ12での照会処理を指し,メイン処理(図48:PC)の配賦結果を表示する処理である。
【0318】
図46は勘定系実績登録処理(PA)を示す。これは勘定系サーバ10に対し,間接費管理(配賦)システムで必要な会計データを随時登録する処理(勘定系サーバ実績値登録:A1)である。
【0319】
勘定系サーバ実績値登録(A1)の入力画面には,前述の日次作業実績登録画面(図26:10N1),MM伝票入力画面(図27・28:10N2,10N3),FI伝票入力画面(図29:10N4),ワークフロー入力画面(社内売買)(図30:10N5)ワークフロー入力画面(個人立替)(図31:10N6),ワークフロー入力画面(国内出張旅費)(図32:10N7),ワークフロー入力画面(交通費等精算)(図33:10N8)がある。この関係は,図4の入・出力関連図に示されている。
【0320】
図47は情報系実績登録処理(PB)を示す。これは情報系サーバ11に対し,実績データ登録を月次に行う処理(実績値登録:B2)である。実績値登録(B2)には,実績コストドライバ量登録(図39:11N6)がある。
【0321】
図48はメイン処理(PC)を示す。これは,月初に前月分の勘定系サーバ10の取引明細データファイル(図15:10D1),日次作業実績データファイル(図16:10D2),情報系サーバ11の実績自動取得データファイル(図17:11D1)に,勘定系サーバ10の各種マスタ(図5〜9:10M1〜10M5)と情報系サーバ11の各種マスタ(図10〜14:11M1〜11M5)の情報を貼付け後,情報系サーバ11に実績コストマスタ(図21:11J1),チャージコストマスタ(図22・23:11J2),配賦実績明細ファイル(図24・25:11J3)を作成する処理である。
【0322】
C1は実績コスト金額取得処理を示す。これは,勘定系サーバ10の取引明細データファイル(図15:10D1)よりチャージ元部門コード別,管理会計行番号別の実績コスト金額を取得し,実績コストデータファイル(図18:11D2)を作成する処理である。その際,明細テキストにABC=アクティビティ番号+タスク番号で指定されているか,又は業務番号がABC業務番号マスタ(図12:11M3)に登録され,かつアクティビティ番号,タスク番号が取得できる場合は,直接割当てとし,アクティビティ番号,タスク番号を実績コストデータファイル(図18:11D2)にセットする。
【0323】
勘定系サーバ10の日次作業実績データファイル(図16:10D2)よりチャージ元部門コード別,アクティビティ番号別,タスク番号別,社員番号別に作業時間を合計する。勘定系サーバ10の社員マスタ(図7:10M3)を社員番号で読込み,人件費ランクを取得する。さらに勘定系サーバ10の単価マスタ(図8:10M4)を人件費ランクで読込み,人件費単価(円/時間)と建物費単価(円/時間)を取得後加算し,社員番号毎の標準コスト単価(円/時間)を求める。次に標準コスト単価(円/時間)と,合計された作業時間を乗算し,直接割当てコストとして標準コスト金額を算出する。これを実績コストデータファイル(図18:11D2)の標準コスト金額にセットする。さらにチャージ元部門コード,管理会計行番号“人件費”,アクティビティ番号,タスク番号をセットし,実績コストデータファイル(図18:11D2)を作成する。
【0324】
勘定系サーバ10の取引明細データファイル(図15:10D1)より作成された実績コストデータファイル(図18:11D2)の内,管理会計行番号が“人件費”の間接割当て分の実績コスト金額から,勘定系サーバ10の日次作業実績データファイル(図16:10D2)より作成された直接割当て分の標準コスト金額(上記)を減算し,間接割当ての一部を直接割当てに置換する。
【0325】
図50〜図54は実績コスト振分処理(C2)を示す。まず,直接割当て分の実績コスト金額を,指定されたチャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号の直接コスト金額へセットし,実績コストマスタ(図21:11J1)を作成する。
【0326】
間接割当て分の実績コスト金額の設定は以下の通りである。まず,コストドライバマスタ(図13:11M4)の比率設定区分と参照部門からチャージ元部門コード別,アクティビティ番号別,タスク番号別の比率(振分比率)を取得する。次に,実績コスト金額に取得した振分比率を乗算した計算結果を,チャージ部門コード別,アクティビティ番号別,タスク番号別,管理会計行番号別の実績コスト金額に設定し,実績コストマスタ(図21:11J1)を作成する。
【0327】
間接割当時の比率設定区分は以下の7種類ある。
【0328】
▲1▼比率設定通常:チャージ元部門毎にアクティビティ番号,タスク番号に対し,実績コスト金額を振分けるための比率(振分比率)を事前登録する。
▲2▼比率設定部門参照:他のチャージ元部門が比率設定通常で事前登録した振分比率を参照使用する。
▲3▼日次作業時間比率:毎月,チャージ元部門毎に日次作業実績データファイル(図16:10D2)に入力されたアクティビティ番号,タスク番号毎の合計作業時間の比率を振分比率として使用する。
▲4▼日次作業時間比率参照:他のチャージ元部門が日次作業時間比率で取得した振分比率を参照使用する。
▲5▼日次作業コスト比率:毎月,チャージ元部門毎に日次作業実績データファイル(図16:10D2)に入力された作業時間と標準コスト単価を乗算し,標準コスト金額を計算する。さらにアクティビティ番号,タスク番号毎の合計標準コスト金額の比率を振分比率として使用する。
▲6▼日次作業コスト比率参照:他のチャージ元部門が日次作業時間比率で取得した振分比率を参照使用する。
▲7▼均等:チャージ元部門毎に本社アクティビティマスタ(図10:11M1)に登録されているアクティビティ番号・タスク番号で振り分ける。
【0329】
図50において,実績コストデータ読込み(C201)では,情報系サーバ11の実績コストデータファイル(図16:11D2)をチャージ元部門コード,管理会計行番号毎に読込む。
【0330】
実績コストマスタ出力(C202)は,直接割当てとなったコストを出力する処理である。まず,実績コスト金額を実績コストマスタ(図21:11J1)の直接コスト金額へセットする。次にチャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号をセットし,実績コストマスタ(図21:11J1)を作成する。
【0331】
比率設定区分取得(C203)では,情報系サーバ11のコストドライバマスタ(図13:11M4)をチャージ元部門コードで1件読込み,比率設定区分を取得する。
【0332】
図51において,均等割情報取得(C204)では,情報系サーバ11の本社アクティビティマスタ(図10:11M1)をチャージ元部門コードで読込み,アクティビティ番号・タスク番号毎の登録件数を取得する。
【0333】
アクティビティ番号・タスク番号取得(C205)では,本社アクティビティマスタ(図10:11M1)をチャージ元部門コードで読込み,アクティビティ番号・タスク番号を取得する。
【0334】
実績コスト金額振分1(C206)では,実績コスト金額を均等割情報取得(C204)の登録件数で除算したものを,実績コスト振分金額とする。
【0335】
実績コストマスタ出力(C207)は,間接割当てとなったコストを出力する処理である。まず,実績コスト振分金額を実績コストマスタ(図21:11J1)の間接コスト金額へセットする。次に,チャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号をセットし,実績コストマスタ(図21:11J1)を作成する。
【0336】
実績コストマスタ端数調整(C208)では,チャージ元部門コード,管理会計行番号をキーに実績コスト振分金額を合計し,その合計金額と実績コスト金額との差額を同一キーの最も小さいアクティビティ番号,タスク番号の実績コストマスタ(図21:11J1)へ加算する。
【0337】
図52において,比率対象部門セット1(C209)では,チャージ元部門コードをメモリの比率参照部門エリアへセットする。
【0338】
比率対象部門セット2(C210)では,コストドライバマスタ(図13:11M4)をチャージ元部門コードで読込み,取得した参照部門を比率参照部門エリアへセットする。
【0339】
比率取得(C211)では,比率参照部門エリアのチャージ元部門コードで情報系サーバ11のコストドライバマスタ(図13:11M4)を読込み,比率が0以外のアクティビティ番号,タスク番号,比率を取得する。
【0340】
実績コスト金額振分2(C212)では,実績コスト金額と比率取得(C211)の比率(%)を乗算し,かつ100で除算したものを,実績コスト振分金額とする。
【0341】
実績コストマスタ出力(C213)は,間接割当てとなったコストを出力する処理である。まず,実績コスト振分金額を実績コストマスタ(図21:11J1)の間接コスト金額へセットする。次に,チャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号をセットし,実績コストマスタ(図21:11J1)を作成する。
【0342】
図53において,時間比率対象部門セット1(C214)では,チャージ元部門をメモリの時間比率参照部門エリアへセットする。
【0343】
時間比率対象部門セット2(C215)では,コストドライバマスタ(図13:11M4)をチャージ元部門コードで読込み,取得した参照部門を時間比率参照部門エリアへセットする。
【0344】
対象アクティビティ・タスク取得(C216)では,情報系サーバ11の本社アクティビティマスタ(図10:11M1)をチャージ元部門コードで読込み,登録されているアクティビティ番号・タスク番号を取得する。
【0345】
日次作業合計時間取得(C217)では,時間比率参照部門と対象アクティビティ・タスク取得(C216)で取得したアクティビティ番号,タスク番号をキーとして勘定系サーバ10の日次作業実績データファイル(図16:10D2)を読込み,作業時間を合計し,合計時間を取得する。
【0346】
日次作業時間取得(C218)では,勘定系サーバ10の日次作業実績データファイル(図16:10D2)を時間比率参照部門と対象アクティビティ・タスク取得(C216)で取得したアクティビティ番号,タスク番号で読込み,作業時間を取得する。
【0347】
実績コスト金額振分3(C219)では,実績コスト金額と日次作業時間取得(C218)の作業時間を乗算し,この乗算結果を日次作業合計時間取得(C217)の合計時間で除算したものを,実績コスト振分金額とする。
【0348】
実績コストマスタ出力(C220)は,間接割当てとなったコストを出力する処理である。まず,実績コスト振分金額を実績コストマスタ(図21:11J1)の間接コスト金額へセットする。次に,チャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号をセットし,実績コストマスタ(図21:11J1)を作成する。
【0349】
図54において,コスト比率対象部門セット1(C221)では,チャージ元部門コードをコスト比率参照部門エリアへセットする。
【0350】
コスト比率対象部門セット2(C222)では,コストドライバマスタ(図13:11M4)をチャージ元部門コードで読込み,取得した参照部門をコスト比率参照部門エリアへセットする。
【0351】
対象アクティビティ・タスク取得(C223)では,情報系サーバ11の本社アクティビティマスタ(図10:11M1)をチャージ元部門で読込み,登録されているアクティビティ番号,タスク番号を取得する。
【0352】
標準コスト合計金額取得(C224)では,情報系サーバ11の実績コストデータファイル(図18:11D2)を,コスト比率参照部門と対象アクティビティ・タスク取得(C223)で取得したアクティビティ番号,タスク番号で読込み,標準コスト金額を合計し,合計標準コストを取得する。
【0353】
標準コスト金額取得(C225)では,情報系サーバ11の実績コストデータ(図18:11D2)をコスト比率参照部門と対象アクティビティ・タスク取得(C223)で取得したアクティビィティ番号,タスク番号で読込み,標準コスト金額を取得する。
【0354】
実績コスト金額振分4(C226)では,実績コスト金額と標準コスト金額取得(C225)の標準コスト金額を乗算し,乗算結果を標準コスト合計金額取得(C224)の合計標準コストで除算したものを,実績コスト振分金額とする。
【0355】
実績コストマスタ出力(C227)は,間接割当てとなったコストを出力する処理である。まず,実績コスト振分金額を実績コストマスタ(図21:11J1)の間接コスト金額へセットする。次に,チャージ元部門コード,アクティビティ番号,タスク番号,管理会計行番号をセットし,実績コストマスタ(図21:11J1)を作成する。
【0356】
図48に戻って自動コストドライバ量取得処理(C3)は,情報系サーバ11の自動取得マスタ(図11:11M2)のデータ種別,データ種別枝番毎に,勘定系サーバ10の取引明細データファイル(図15:10D1),日次作業実績データファイル(図16:10D2)等のデータからチャージ元部門コード又はチャージ先部門コード毎の実績コストドライバ量を取得する処理である。
【0357】
自動取得マスタ(図11:11M2)のABC集約部門コード,アクティビティ番号,タスク番号,規定区分“1”(規定内),取得したチャージ元部門コード,チャージ先部門コード(指定部門コード),実績コストドライバ量を,規定内データとして,情報系サーバの実績自動取得データファイル(図17:11D1)に出力する(書込む)。
【0358】
図55〜図56は規定外チャージ処理(C4)(図48)を示す。まず,勘定系サーバ10の日次作業実績データファイル(図16:10D2)の成果物IDに対して部門指定(B=部門コード)又は,業務番号指定(W=業務番号)がされている場合,チャージ元部門コード別,アクティビティ番号別,タスク番号別,社員番号別の作業時間と,実績コスト金額取得(C1)と同様の方法で取得した標準コスト単価を乗算し,標準コスト金額を求める。さらに,チャージ元部門コード,アクティビティ番号,タスク番号,指定された部門コード,指定された業務番号,規定区分“2”(規定外/部門)“3”(規定外/業務番号),求めた標準コスト金額を,規定外データとして,情報系サーバ11の実績自動取得データファイル(図17:11D1)に出力する(書込む)。
【0359】
指定された部門コード,又は指定された業務番号からチャージ先部門コードを取得し,チャージ元部門コード,アクティビティ番号,タスク番号,チャージ先部門コード,規定区分,指定業務番号,指定部門コード,標準コスト金額を,チャージコストマスタ(図22・図23:11J2)に出力する(書込む)。
【0360】
図55において,日次作業実績データ読込み(C401)では,勘定系サーバ10の日次作業実績データファイル(図16:10D2)をチャージ元部門コード別,アクティビティ番号別,タスク番号別,社員番号別,成果物ID別に読込む。
【0361】
チャージ元区分のチェック(C402)では,勘定系サーバ10の部門マスタ(図5:10M1)をチャージ元部門で読込み,チャージ元区分を取得する。
【0362】
アクティビティ・タスクの存在チェック(C403)では,情報系サーバ11の本社アクティビティマスタ(図10:11M1)をチャージ元部門,アクティビティ番号タスク番号で読込む。
【0363】
図56において,業務情報マスタ存在チェック(C404)では,勘定系サーバ10の業務情報マスタ(図9:10M5)を業務番号で読込み,業務所管部門コードを取得する。
【0364】
チャージ先部門チェック(C405)では,指定部門コード,又は業務情報マスタ存在チェック(C404)で取得した業務所管部門コードをチャージ先部門コードとして,勘定系サーバ10の部門マスタ(図5:10M1)を読込み,チャージ先区分を取得する。
【0365】
人件費ランク取得(C406)では,勘定系サーバ10の社員マスタ(図7:10M3)を社員番号で読込み,人件費ランクを取得する。
【0366】
標準コスト単価取得(C407)では,勘定系サーバ10の単価マスタ(図8:10M4)を人件費ランクで(をキーとして)読込み,人件費単価(円/時間)と建物費単価(円/時間)を取得する。人件費単価(円/時間)と建物費単価(円/時間)を加算し,その加算結果をメモリの標準コスト単価(円/時間)エリアへセットする。
【0367】
標準コスト金額計算(C408)では,作業時間と標準コスト単価取得(C407)で計算した標準コスト単価(円/時間)を乗算し,標準コスト金額を求める。
【0368】
実績自動取得データ出力(C409)では,チャージ元部門コード,アクティビティ番号,タスク番号,指定された部門コード,指定された業務番号,規定区分“2”(規定外/部門)又は“3”(規定外/業務番号),標準コスト金額を,規定外データとして,情報系サーバの実績自動取得データファイル(図17:11D1)へ出力する(書込む)。
【0369】
チャージコストマスタ出力(C410)では,チャージ元部門,アクティビティ番号タスク番号,チャージ先部門,規定区分,指定業務番号,指定部門,標準コスト金額をチャージコストマスタ(図22・23:11J2)へ出力する(書込む)。
【0370】
図48の規定内チャージ処理(C5)では,まず,情報系サーバ11の実績自動取得データファイル(図17:11D1)の規定区分を判定し,“1”(規定内)のとき,チャージ元部門コード,アクティビティ番号,タスク番号で(をキーとして)情報系サーバ11のコストドライバマスタ(図13:11M4)を読込む。次に,取得した予定チャージレートと実績コストドライバ量を乗算することにより実績チャージ金額を求める。最後に,チャージ元部門コード,アクティビティ番号,タスク番号,チャージ先部門コード,規定区分,実績チャージ金額を,チャージコストマスタ(図22・23:11J2)へ出力する(書込む)。
【0371】
図57〜図63は配賦処理を示す。情報系サーバ11のチャージコストマスタ(図223:11J2)のチャージ先部門コードがセット済みの場合,チャージ元部門コード,アクティビティ番号,タスク番号,チャージ先部門コード,規定区分,実績チャージ金額を,配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0372】
チャージ先部門コードがセットされていない場合は,チャージ区分により配賦される実績チャージコスト金額を計算する。次に,チャージパターンにより,チャージ先部門コード毎の比率(チャージ比率)を取得する。さらに,実績チャージコスト金額に取得したチャージ比率を乗算した計算結果をチャージ先部門コードの実績チャージコスト金額として,配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0373】
チャージ区分の例を示せば以下の通りである。
▲1▼全額対象:実績チャージコスト金額を全額,比率配賦する。
▲2▼半額対象:実績チャージコスト金額の半分は指定されたチャージ先部門へチャージし,残りの半分を比率配賦する。
【0374】
チャージパターンの例を示せば以下の通りである。
▲1▼事業本部投入資源:アクティビティ番号,タスク番号毎にチャージ先部門に対し実績チャージコスト金額を各々チャージするための比率(事業本部別の投入コストを基準とした比率)を事前登録する。
▲2▼事業本部均等:部門マスタ(図5:10M1)のチャージ先区分が“9”(対象)かつ事業本部付区分が“1”(対象)の数によって均等割する。
▲3▼部門社員人数:部門別人員マスタ(図14:11M5)から求めたチャージ先部門毎の合計社員数を,配賦対象となる部門(チャージ先部門)の総社員数で除算し,比率をチャージ比率として使用する。
【0375】
図57において,事業本部投入資源配賦基準読込み(C601)では,情報系サーバ11の事業本部投入資源配賦基準ファイル(図19:11D3)をチャージ先部門毎に読込む。
【0376】
チャージ比率ファイル作成1(C602)では,事業本部投入資源配賦基準読込み(C601)で取得したチャージ先部門コード,配賦基準金額,全部門合計金額を,チャージ比率ファイル(図20:11D4)のチャージ先部門コード,チャージ対象量,総チャージ対象量へそれぞれセット(チャージパターンを“02”とする)する。
【0377】
図58において,部門マスタ読込み(C603)では,勘定系サーバ10の部門マスタ(図5:10M1)を読込み,チャージ先区分“9”(対象)の部門コード・事業本部付識別区分を取得する。
【0378】
チャージ比率ファイル作成2(C604)では,チャージパターン“03”と部門マスタ読込み(C603)で取得した部門コードを,チャージ比率ファイル(図20:11D4)のチャージパターン(“03”),チャージ先部門コードへそれぞれセットし,さらにチャージ対象量へ“1”をセットする。
【0379】
チャージ比率ファイル更新1(C605)では,同一キー(チャージパターン“03”)のチャージ比率ファイル(図20:11D4)のチャージ対象量を合計し,その後,その合計を総チャージ対象量へセットし,チャージ比率ファイル(図20:11D4)を更新する。
【0380】
図59において,部門別人員マスタ読込み(C606)では,情報系サーバ11の部門別人員マスタ(図14:11M5)を読込み,部門コード毎の人員数を合計する。
【0381】
チャージ先区分取得(C607)では,勘定系サーバ10の部門マスタ(図5:10M1)を部門コードで読込み,チャージ先区分を取得する。
【0382】
チャージ比率ファイル作成3(C608)では,チャージパターン“05”と,部門別人員マスタ読込み(C606)で取得した部門コード,人員数をチャージ比率ファイル(図20:11D4)のチャージパターン,チャージ先部門コード,チャージ対象量へそれぞれセットする。
【0383】
チャージ比率ファイル更新2(C609)では,同一キー(チャージパターン“05”)のチャージ比率ファイル(図20:11D4)のチャージ対象量を合計し,その後,合計を総チャージ対象量へセットし,チャージ比率ファイル(図20:11D4)を更新する。
【0384】
図60において,チャージコストマスタ読込み(C610)では,情報系サーバ11のチャージコストマスタ(図22・23:11J2)を読込む。
【0385】
配賦実績明細出力1(C611)では,チャージ元部門,アクティビティ番号,タスク番号,チャージ先部門,規定区分,指定業務番号,指定部門コード,実績チャージコスト金額,実績コストドライバ量を,配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0386】
配賦前処理(C612)では,実績チャージコスト金額を配賦前コスト金額エリアにセットし実績コストドライバ量を配賦前コストドライバ量エリアにセットする。
【0387】
配賦処理1(C613)では,配賦前金額に1/2を乗算し,計算実績チャージコスト金額エリアにセットする。さらに配賦前コスト金額エリアからその計算結果を減算する。次に,配賦前コストドライバ量エリアの内容に1/2乗算し,計算実績コストドライバ量エリアにセットする。さらに配賦前コストドライバ量エリアからその計算結果を減算する。
【0388】
配賦実績明細出力2(C614)では,チャージ元部門,アクティビティ番号,タスク番号,半額対象として指定されたチャージ先部門コード,規定区分と計算実績チャージコスト金額,計算実績コストドライバ量を配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0389】
図61において,チャージ比率ファイル読込み1(C615)では,チャージ比率ファイル(図20:11D4)をチャージパターン“02”で読込み,チャージ先部門コード,チャージ対象量,総チャージ対象量を取得する。
【0390】
配賦処理2(C616)では,事業本部投入資源割配賦を行う。チャージ先部門コード毎に配賦前コスト金額エリアの金額とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し,計算実績チャージコスト金額エリアへセットする。配賦前ドライバ量とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し,計算実績コストドライバ量エリアへセットする。
【0391】
配賦実績明細出力3(C617)では,チャージ元部門,アクティビティ番号,タスク番号,チャージ先部門,規定区分と計算実績チャージコスト金額,計算実績コストドライバ量を配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0392】
図62において,チャージ比率ファイル読込み2(C618)では,チャージ比率ファイル(図20:11D4)をチャージパターン“03”で読込み,チャージ先部門コード,チャージ対象量,総チャージ対象量を取得する。
【0393】
配賦処理3(C619)では,事業本部均等割配賦を行う。チャージ先部門コード毎に配賦前コスト金額エリアの金額とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し計算実績チャージコスト金額エリアへセットする。配賦前ドライバ量とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し,計算実績コストドライバ量エリアへセットする。
【0394】
配賦実績明細出力4(C620)では,チャージ元部門,アクティビティ番号,タスク番号,チャージ先部門,規定区分と計算実績チャージコスト金額,計算実績コストドライバ量を配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0395】
図63において,チャージ比率ファイル読込み3(C621)では,チャージ比率ファイル(図20:11D4)をチャージパターン“05”で読込み,チャージ先部門コード,チャージ対象量,総チャージ対象量を取得する。
【0396】
配賦処理4(C622)では,部門社員人数割配賦を行う。チャージ先部門コード毎に配賦前コスト金額エリアの金額とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し計算実績チャージコスト金額エリアへセットする。配賦前ドライバ量とチャージ対象量を乗算する。その計算結果を総チャージ対象量で除算し,計算実績コストドライバ量エリアへセットする。
【0397】
配賦実績明細出力5(C623)では,チャージ元部門,アクティビティ番号,タスク番号,チャージ先部門,規定区分と計算実績チャージコスト金額,計算実績コストドライバ量を配賦実績明細ファイル(図24・25:11J3)へ出力する(書込む)。
【0398】
図49は出力処理(PD)を示す。これは,前述のメイン処理(PC)で作成された情報系サーバ11のデータベース(実績コストマスタ:図21:11J1チャージコストマスタ:図22・23:11J2,配賦実績明細ファイル:図24・25:11J3)を読込み,配賦結果の照会を随時行うことが可能な処理(実績照会:D1)である。
【0399】
実績照会(D1)の出力画面には,前述のABC実績照会画面(図40:11S1),チャージ先部門別一覧表示画面(図41:12S1),チャージ先部門別明細表示画面(図42:12S2),チャージ元部門別一覧表示画面(図43:12S3),チャージ元部門別明細表示画面(図44:12S4),アクティビティ・タスク別ABC損益明細表示画面(図45:12S5)がある。この関係は図4の間接費管理(配賦)システムの入・出力関連図に示されている。
【0400】
実施例の特徴
1.間接割当て
間接費(間接コスト)(経費)を割当てるべきアクティビティ/タスクが指定されていない場合,指定することができない場合,または指定することが適切でない場合に間接割当てが行なわれる。
【0401】
たとえば,チャージ元部門で必要な物品を購入し,その物品を複数のアクティビティ/タスクで使用する場合に,その物品の購入費用を特定のアクティビティ/タスクのみに直接に割当てるのは適当ではない。チャージ元部門の社員が複数のアクティビティ/タスクに有用な研修に参加した場合,社員が複数のアクティビティ/タスクに共通の作業をした場合等において,研修費用や社員の人件費を特定のアクティビティ/タスクに割当てるのは困難であるし,適当でない。さらに,社員がもし,日次作業実績登録(図26:10N1)において作業時間を入力しなかった場合には,その作業時間についての人件費を特定のアクティビティ/タスクに割当てることはできない(もっとも,上記実施例では社員の作業時間とアクティビティ番号およびタスク番号は入力することが必須であるから,人件費については必ず直接割当てが可能であるが,人件費を間接割当ての対象とすることもできる)。
【0402】
間接割当てとは,チャージ元部門に計上された上記のような特定のアクティビティ/タスクに割当てるのが適当でない,できない,またはすべきでない間接費(これを間接割当対象の間接費という)を,そのチャージ元部門内の複数のアクティビティ/タスクに所定の配分基準(リソース・ドライバ)で配分割当てすることである。配分基準は具体的には配分比率(ドライバ量)で数量化される。
【0403】
配分比率には次の7種類がある。
【0404】
(1)チャージ元部門ごとにアクティビティ間配分比率を任意にあらかじめ設定すること(図36の比率設定区分=0(比率設定通常))
(2)上記(1)で設定された他のチャージ元部門のアクティビティ間配分比率をそのまま適用(採用,援用)すること(図37の比率設定区分=1(比率設定部門参照))
(3)チャージ元部門ごとに,アクティビティ間配分比率として,チャージ元部門のアクティビティ別日次作業実績入力時間(たとえば図26のような)の時間比率を用いること
(4)上記(3)で設定された他のチャージ元部門のアクティビティ間配分比率をそのまま適用すること
(5)チャージ元部門ごとに,アクティビティ間配分比率として,チャージ元部門のアクティビティ別日次作業実績入力時間にそれぞれ単価を乗算して人件費(標準コスト)をそれぞれ求め,それらの比率を用いること
(6)上記(5)で設定された他のチャージ元部門のアクティビティ間配分比率をそのまま適用すること
(7)上記(1)〜(6)の何れも選択されなかった場合に,チャージ元部門で計上された間接費を,そのチャージ元部門内の全アクティビティに均等に割当てること
【0405】
上記実施例にしたがって,間接割当ての処理を具体的に説明する。
【0406】
間接割当てを直接割当てと比較して分りやすくするために図26(10N1)を参照すると,この日次作業実績登録画面では社員は社員番号とともに,アクティビティ番号,タスク番号を入力して,そのアクティビティ/タスクのために費した作業時間を入力するから,作業時間に基づいて人件費が算出され,その人件費が,入力されたアクティビティ番号,タスク番号のアクティビティ/タスクに直接に割当てられる。これが直接割当てである。
【0407】
図28(10N3)のMM伝票入力2画面または図29(10N4)のFI伝票入力画面でABC会計コード“ABC=XXXXYY”が入力された場合にも,このABC会計コードによってアクティビティ番号,タスク番号が入力されるから,直接割当てが行なわれる。
【0408】
これらの入力画面において,もし,ABC会計コードが入力されなかった場合には,間接割当てになる。この場合にも,チャージ元の部門コードが入力されていることが必要である。
【0409】
業務番号を入力したときにも直接割当となる。業務番号からアクティビティ番号,タスク番号を取得することができるからである(図12のABC業務マスタ11M3を参照)。
【0410】
図18(11D2)の実績コストデータを参照する。これは特定のチャージ元部門(チャージ元部門コード=109700)の間接費を表わしている。第1行目の実績コスト金額51,064円についてはアクティビティ番号もタスク番号も無い。したがって,この金額の経費は間接割当ての対象となる。第2行目の実績コスト金額1,000円については,アクティビティ番号=8000,タスク番号=01が入力されているので,直接割当ての対象である。
【0411】
図13(11M4)のコストドライバマスタを参照すると,チャージ元部門コード=109700のチャージ元部門については,3種類のアクティビティ番号/タスク番号の組が設定され,これらについて比率設定区分コードとして“0”(比率設定通常)が設定されている。比率設定区分コード“0”は上述した(1)の配分比率設定に相当する。そして,アクティビティ番号/タスク番号が8000/01,8001/01,8001/19についての配分比率は50,30,20である。(念の為にいえば,図13において,比率設定区分=“2”(日次作業時間比率)は上記(3)の配分比率設定に,比率設定区分=“1”(比率設定部門参照),参照部門コード=109700は上記(2)の配分比率設定にそれぞれ対応する。)
【0412】
したがって,間接割当てによると,上記の51,064円を,アクティビティ/タスク,8000/01,8001/01,8001/19に50対30対20の割合で配分することになる。この結果は,25,532円,15,319円,10,213円となり,これは図21(11J1)実績コストマスタの間接割当コスト金額の第1行目,第5行目,第8行目に格納されている。第1行目には,上述した直接割当コスト金額1,000円も格納されている。
【0413】
このような間接割当ての処理は図50および図52(実績コスト振分処理)に示されている。
【0414】
図50において,図18に示す実績コストデータが1レコード(1行)ずつ読込まれる(C201)。第1行目にはアクティビティ番号もタスク番号も記述されていない(「アクティビティ番号・タスク番号毎に実績コスト金額が入力有り」で「いいえ」)。
【0415】
第1行目のチャージ元部門コードは109700であるから,このコードをキーとして,図13のコストドライバマスタから比率設定区分を読取る(C203)。読取った比率設定区分は“0”であるから,図52に示す処理に進む。
【0416】
チャージ元部門コード109700を比率参照部門エリアにセットし(C209),この比率参照部門エリアのチャージ元部門コード109700をキーとして,図13のコストドライバマスタから,アクティビティ番号,タスク番号および比率(0を除く)を読出す(C211)。
【0417】
読出した比率を用いて,アクティビティ番号/タスク番号ごとに,次のようにして配分を行う(実績コスト金額振分2)(C212)。
【0418】
アクティビティ番号/タスク番号
8000/01 51,064円×50/100=25,532円
8001/01 51,064円×30/100=15,319円
8001/19 51,064円×20/100=10,213円
【0419】
この結果を,図21の実績コストマスタに書込む(C213)。
【0420】
2.規定外チャージ
ABCによる間接費配賦(チャージ)システムでは,一般的に,間接費をチャージ先部門に配賦するやり方が決っている。たとえば,経費伝票1枚当りの処理(アクティビティ/タスク)の単価(予定チャージ・レート)と年間の予定使用枚数(コスト・ドライバ量)とをあらかじめ定めておけば,これらの積が経費伝票処理についてのチャージ予算額(本社部門の収入予算)ということになる。また,人事考課というアクティビティ/タスクについて社員一人1時間当りの単価(予定チャージ・レート)と年間の作業時間数(コスト・ドライバ量)とをあらかじめ定めておけば,これらの積が人事考課についての予算額ということになる。上記の予定チャージ・レートについては平均的な,または社内で合意された金額が定められる。
【0421】
このように,アクティビティ/タスクごとに予定チャージ・レートをあらかじめ定めておき,実際の作業量(実績コスト・ドライバ量)を計測(社員による入力を含む)することにより,チャージすべき金額をそれらの積により求めることができる。
【0422】
最も一般的には,実際の作業ごとに,実績コスト・ドライバ量を計測するときにその経費をチャージすべき部門(チャージ先部門)を定める。このことにより,チャージ先部門ごとにチャージ金額が求まる。この実施例では,チャージ先部門ごとに実績コスト・ドライバ量を設定すること以外に,あるアクティビティ/タスクの作業についてのチャージ金額を複数のチャージ先部門に分けてチャージする(配賦する)やり方もある(次の「3.コストドライバ量の比率分配」で詳述する)。このような配賦のやり方をチャージ・パターンという。
【0423】
図10に示す本社アクティビティマスタ(11M1)は先に説明したように,本社部門における各アクティビティ/タスクから生じる間接費をどのような方法でチャージ先部門に配賦するかの規則を定めたものである。
【0424】
図13のコストドライバマスタ(11M4)は,チャージ元部門ごとに,アクティビティ/タスクごとに,予定チャージ・レートと予定コストドライバ量(これらの積は間接費についての予算を表わす)とを定めたものである。
【0425】
このように,チャージ元部門およびアクティビティ/タスクごとにあらかじめ定められた予定チャージ・レート(コスト・ドライバおよびコスト・ドライバ量の単位を含む)(および,必要ならばチャージ・パターン)にしたがって,チャージ先部門ごとに間接費をチャージすることを規定内チャージという。
【0426】
しかしながら,チャージ元部門における作業が予定通りに進行するとは限らない。何らかのトラブルが発生し,予定外の作業が必要となり,作業時間がかなり超過してしまうことがある。このトラブルがチャージ先部門の責に帰すべき事由により発生したとするならば,この追加の作業について発生した経費はそのチャージ先部門の負担とすべきである。
【0427】
情況の変化により,1または複数の部門が所管する新たなプロジェクトが組まれ,そのために本社部門の社員も作業を行い,間接費が発生することもある。この経費はプロジェクトを所管する部門が負担すべきである。
【0428】
このようにあらかじめ定めた規定内チャージ以外に,チャージ先部門に負担させるべき間接費をそのチャージ先部門にチャージすることを規定外チャージという(必ずしも全額を負担させず,一部を負担させるようにしてもよい)。
【0429】
まず規定内チャージの一例について具体的に説明する。図39に示す実績コスト・ドライバ量登録画面(11N6)において(これはチャージ・パターンが“00”(通常)の場合である),1999年4月分として,チャージ元部門109700がチャージ先部門173000を指定して,アクティビティ番号/タスク番号8001/19の実績コスト・ドライバ量6(時間)を入力したとする(第1行目)。
【0430】
図48のC5において,実績自動取得データ・ファイルの規定区分が“1”(規定内)の場合には,図13のコストドライバマスタにおいて,該当するチャージ元部門(109700),アクティビティ番号/タスク番号(8001/19)の4月分の予定チャージ・レート(9,100円)が読出される。図39の画面で入力された実績コスト・ドライバ量(6時間)とこの予定チャージ・レート(9,100円)との積が算出され,この結果(54,600円)が図22および図23のチャージコストマスタに登録される(第10行目参照)。
【0431】
次に規定外チャージの例について説明する。図26に示す日次作業実績登録画面において,社員番号333444を持つ社員(部門コードは109700)が,アクティビティ番号/タスク番号として8001/01を指定し,成果物IDとしてW=R0095(プロジェクトIDまたは業務番号)を,作業時間として5時間を入力するとともに,成果物IDとしてB=173000(チャージ先部門コード)を,その作業時間として3時間を入力したとする。これらの入力されたデータは,まず,図16の日次作業実績データ・ファイル(10D2)に格納される(第2行目および第3行目参照)。
【0432】
図55に示す規定外チャージ処理において,この日次作業実績データ・ファイル(図16)からデータが1レコードずつ(1行ずつ)読取られる(C401)。成果物IDの上2桁が“W=”または“B=”の場合には,図5の部門マスタを参照して,チャージ元部門(109700)がABC配賦の対象である部門であることを確認する(チャージ元区分コード=“2”)(C402)。
【0433】
続いて,アクティビティ/タスクの存在チェック(C403)ののち(規定外チャージであってもアクティビティ/タスクは規定内チャージのものに含まれていなければならない),再び成果物IDの上2桁が“B=”であるかどうかをみる。
【0434】
成果物IDが“B=”でない場合,すなわち“W=”の場合には,そのプロジェクトの業務所管部門(チャージ先部門)を知るために図9の業務情報マスタ(10M5)を参照する(C404)。
【0435】
成果物IDの上2桁が“B=”の場合にはそれに続くコードはチャージ先部門(173000)であり,“W=”の場合には上記のC404でチャージ先部門を取得した。このようなチャージ先部門がチャージ先の対象であることを図5の部門マスタで確認する(チャージ先区分=“9”)(C405)。
【0436】
社員番号333444をキーとして図7の社員マスタからその社員の人件費ランク(B)を取得し(C406),さらに図8の単価マスタから人件費ランクBに相当する単価を取得する。標準コスト単価=人件費単価(1,400円)+建物費単価(400円)=1,800円を計算する(C407)。
【0437】
続いて,標準コスト金額=標準コスト単価(1,800円)×時間(5時間)=9,000円(W=R0095の場合),および1,800円×3時間=5,400円(B=173000の場合)を算出する(C408)。
【0438】
このようにして求めた標準コスト金額を実績自動取得データ・ファイル(図17)へ書込む(第2行目および第3行目を参照)(C409)。また,チャージコストマスタ(図22,図23)に標準コスト金額を含む必要なデータを格納する(C410)(第3行目および第8行目参照)。
【0439】
このようにして算出された規定外のチャージ・レート,コスト・ドライバおよびチャージ料金は,図45に示すようにチャージ元部門に関して表示される。
【0440】
3.コストドライバ量の比率配分
上述したように実績コストドライバ量と予定チャージレートとの積をチャージコスト金額とするのが規定内チャージである。規定内チャージでは,原則として,実績コストドライバ量がチャージ先部門別に(チャージ先部門コードを伴って)入力されるので,チャージコスト金額はチャージ先部門ごとに算出される。これは受益者負担の考え方に依るものである。すなわち,特定のアクティビティ/タスクを利用した部門は利用した量に相当する金額を負担すべきであるというものである。
【0441】
ところが全社的な管理業務のように,アクティビティ/タスク利用量(使用量)(コストドライバ量)が会社全体では把握できるが,部門別には捉えられないものがある。特定のアクティビティ/タスクの利用量について全社的に把握するのではなく,複数の部門に関して把握するのが妥当なものもある。
【0442】
このような場合には,コスト金額を複数の(全社内のすべての部門でもよい)部門に分担させることが妥当である。部門ごとに規模(売上高,人数等)が異なるので,均等に分担させるのは妥当ではなく,分担の比率(配分比率という)をあらかじめ定めておくのがよい。アクティビティ/タスクの利用の部門ごとの度合はアクティビティ/タスクによっても異なるので,配分比率はアクティビティ/タスクごに定めておく。
【0443】
具体的には,特定のアクティビティ/タスクについてのコストドライバ量を,あらかじめ定められた比率にしたがって複数のチャージ先部門ごとに配分し,チャージ先部門ごとに配分されたコストドライバ量に,そのアクティビティ/タスクについての予定チャージレート(そのアクティビティ/タスクの属するチャージ元部門について定められた予定チャージレート)を乗じて得られる金額を,チャージ先部門ごとのチャージコスト金額とする。
【0444】
なお,特定のアクティビティ/タスクについてのコストドライバ量のうちの所定量(または所定割合)を指定されたチャージ先部門にチャージし,残りのコストドライバ量を配分比率で複数のチャージ先部門にチャージするようにしてもよい。
【0445】
上述した間接費管理システムでは,具体的には,コストドライバ量についてチャージ先部門が入力されていない場合に,そのコストドライバ量の比率配分チャージが行なわれる(もちろん,比率が設定されていることが前提である)。
【0446】
図20はチャージ比率ファイル(11D4)を示している。このファイルにおいて,チャージ先部門コード113500,162000について,それぞれチャージ対象量6,600,000,4,400,000が設定され,総チャージ対象量として11,000,000が設定されている。
【0447】
これらの数値は配分比率を示すもので,図19の事業本部投入資源配賦基準(11D3)に由来する。この図には3つの事業本部付部門コード100900,113500および162000が設定されているが,部門コード100900については配賦基準金額は0である。他の2つの部門コード113500および162000について,上述した数値が配賦基準金額および全部門合計金額として設定されている。これらの金額は,たとえば各事業部の経費(間接費のみならず営業費等も含む)を示すものである。この実施例ではこの金額を利用して配分比率としている。すなわち,事業本部付部門コード113500と162000の部門の配分比率は6対4である。
【0448】
図57を参照して,図19の事業本部投入資源配賦基準(11D3)を一行ずつ読込む(C601)。配賦基準金額が0でない行について,読込んだ事業本部付部門コード,配賦基準金額および全部門合計金額をそれぞれ,図20のチャージ比率ファイル(11D4)においてチャージ先部門コード,チャージ対象量および総チャージ対象量としてセットするとともに,チャージパターンを02に,チャージ区分を0にセットする(C602)。これにより,チャージ比率ファイルの第1行および第2行が作成される。
【0449】
図60において,図22,図23に示すチャージコストマスタ(11J2)を1行ずつ読込む(C610)。第1行のレコードについては,チャージ先部門コードが設定されていないから,配賦前処理(C612)に進む。
【0450】
配賦前処理では,先に読込んだ第1行目のレコードの実績チャージコスト金額225,000をメモリのワークエリア内の配賦前コスト金額エリアに,実績コストドライバ量45.0を配賦前ドライバ量エリアにそれぞれセットする。
【0451】
先に読込んだ第1行目のレコードのチャージ区分は0であるから,図61の処理に進む。チャージパターンは02(事業本部投入資源)であるから,図20に示すチャージ比率ファイル(11D4)のチャージパターン02のレコード(第1行および第2行)を読込む(C615)。
【0452】
チャージ比率ファイルから読込んだ2行のレコードのそれぞれについて,チャージ先部門コードごとに,配賦前コスト金額エリアの金額225,000にそれぞれチャージ対象量(6,600,000,4,400,000)を乗算し,その結果を総チャージ対象量(11,000,000)で割る。これにより,135,000および90,000を得る。同じように,配賦前ドライバ量エリアの45.0に,それぞれチャージ対象量を乗算し,その結果を総チャージ対象量で除算する。これにより,27.0および18.0を得る。金額225,000とコストドライバ量45.0がそれぞれ6対4でチャージ先部門コード113500,162000に比率配分されたことになる。
【0453】
これらの比率配分結果は,図24および図25の配賦実績明細ファイル(11J3)の第1行目および第2行目の実績チャージコスト金額および実績コストドライバ量としてセットされる(C617)。
【図面の簡単な説明】
【図1】間接費配賦システム(間接費管理システム)の概念モデルを示す。
【図2】間接費配賦システム(間接費管理システム)の構成を示すブロック図である。
【図3】間接費配賦システム(間接費管理システム)のデータベースの関連図である。
【図4】間接費配賦システム(間接費管理システム)の入出力関連図である。
【図5】部門マスタの一例を示す。
【図6】アクティビティ・タスクマスタの一例を示す。
【図7】社員マスタの一例を示す。
【図8】単価マスタの一例を示す。
【図9】業務情報マスタの一例を示す。
【図10】本社アクティビティマスタの一例を示す。
【図11】自動取得マスタの一例を示す。
【図12】ABC業務番号マスタの一例を示す。
【図13】コストドライバマスタの一例を示す。
【図14】部門別人員マスタの一例を示す。
【図15】取引明細データファイルの一例を示す。
【図16】日次作業実績データファイルの一例を示す。
【図17】実績自動取得データファイルの一例を示す。
【図18】実績コストデータファイルの一例を示す。
【図19】事業本部投入資源配賦基準データファイルの一例を示す。
【図20】チャージ比率ファイルの一例を示す。
【図21】実績コストマスタの一例を示す。
【図22】チャージコストマスタの一例を示す。
【図23】チャージコストマスタの一例を示す。
【図24】配賦実績明細ファイルの一例を示す。
【図25】配賦実績明細ファイルの一例を示す。
【図26】日次作業実績登録画面の一例を示す。
【図27】MM伝票入力画面の一例を示す。
【図28】MM伝票入力画面の一例を示す。
【図29】F1伝票入力画面の一例を示す。
【図30】ワークフロー入力画面の一例を示す。
【図31】ワークフロー入力画面の一例を示す。
【図32】ワークフロー入力画面の一例を示す。
【図33】ワークフロー入力画面の一例を示す。
【図34】本社アクティビティマスタ登録画面の一例を示す。
【図35】アクティビティ・業務番号設定画面の一例を示す。
【図36】予定チャージレート登録画面の一例を示す。
【図37】予定チャージレート登録画面の一例を示す。
【図38】予定チャージレート登録画面の一例を示す。
【図39】実績コストドライバ量登録画面の一例を示す。
【図40】ABC実績照会画面の一例を示す。
【図41】チャージ先部門別一覧画面の一例を示す。
【図42】チャージ先部門別明細画面の一例を示す。
【図43】チャージ元部門別一覧画面の一例を示す。
【図44】チャージ元部門別明細画面の一例を示す。
【図45】アクティビティ・タスク別ABC損益明細画面の一例を示す。
【図46】ABC会計処理(勘定系サーバ)のフローチャートである。
【図47】ABC会計処理(情報系サーバ)のフローチャートである。
【図48】ABC会計処理(情報系サーバ)のフローチャートである。
【図49】ABC会計処理(情報系サーバ,帳票系サーバ)のフローチャートである。
【図50】実績コスト振分処理のフローチャートである。
【図51】実績コスト振分処理のフローチャートである。
【図52】実績コスト振分処理のフローチャートである。
【図53】実績コスト振分処理のフローチャートである。
【図54】実績コスト振分処理のフローチャートである。
【図55】規定外チャージ処理のフローチャートである。
【図56】規定外チャージ処理のフローチャートである。
【図57】配賦処理のフローチャートである。
【図58】配賦処理のフローチャートである。
【図59】配賦処理のフローチャートである。
【図60】配賦処理のフローチャートである。
【図61】配賦処理のフローチャートである。
【図62】配賦処理のフローチャートである。
【図63】配賦処理のフローチャートである。
【図64】第1発明の機能ブロック図である。
【図65】第1発明の機能ブロック図である。
【図66】第2発明の機能ブロック図である。
【図67】第3発明の機能ブロック図である。
【図68】第2発明と第3発明の機能ブロック図である。
【図69】第4発明の機能ブロック図である。
【符号の説明】
10 勘定系サーバ
11 情報系サーバ
12 帳票系サーバ
13 WEBサーバ
20,30,40,50 部門サーバ
202,203,302,303,402,403 社員PC
10M1 部門マスタ
10M2 アクティビティ・マスタ
10M3 社員マスタ
10M4 単価マスタ
10M5 業務情報マスタ
10D1 取引明細データファイル
10D2 日次作業実績データファイル
11M1 本社アクティビティマスタ
11M2 自動取得マスタ
11M3 ABC業務番号マスタ
11M4 コストドライバマスタ
11M5 部門別人員マスタ
11D1 実績自動取得データファイル
11D2 実績コストデータファイル
11D3 事業本部投入資源配賦基準ファイル
11D4 チャージ比率ファイル
11J1 実績コストマスタ
11J2 チャージコストマスタ
11J3 配賦実績明細ファイル
[0001]
【Technical field】
The present invention relates to an indirect cost management system based on a method based on ABC (Activity-Based Costing).
[0002]
ABC is a costing method translated as “activity-based costing”. In the conventional cost calculation, the input resource cost (input cost) is allocated to the cost calculation target of products, services, etc. on the basis of easy allocation, whereas in ABC, the input resource cost (input cost) is assigned to the resource. There is a feature that after assigning to an activity (activity) using an agent (resource driver), it is assigned to a cost calculation object such as a product or service by a cost agent (cost driver).
[0003]
According to this method, the overhead cost can be allocated more rationally than in the past. “Indirect costs” refers to all costs or expenses that are indirect or indispensable in generating these, except for costs directly assigned to products, services, etc. This includes classifications such as manufacturing overhead, sales and administrative expenses, and general administrative expenses.
[0004]
In a conventional chargeback system using ABC or ABC, in principle, the overhead is directly assigned to the activity by the resource driver. Allocation criteria were used when allocation was not possible due to resource driver volume. However, this method has no concept of allocating allocation among activities in the charge source department. Therefore, it cannot be said that all of the overhead costs can be allocated to activities.
[0005]
With regard to the allocation of indirect costs to the charging department, the conventional ABC method is the amount obtained by the product of the cost driver amount for a certain activity and the unit price (planned unit price) planned for that activity (charge) (Cost amount) is allocated to the charge destination targeted by the activity. In principle, the planned unit price depending on the activity is used.
[0006]
As the term planned unit price expresses, this unit price is predicted in advance and is an average agreed internally. For example, when the activity is billing, the cost driver amount is the number of bills, and the planned unit price is the processing amount per bill. Therefore, the charge to a specific charge destination department is calculated by the product of the number of bills and the planned unit price.
[0007]
However, even if an unscheduled situation (trouble etc.) that can be said to be the responsibility of the charging department occurs, and even if a considerable amount of overtime work is required for invoice processing, this overtime is determined by the ABC method. It cannot be allocated to the charge department.
[0008]
The basic idea of allocation in ABC is the beneficiary's burden. In other words, since labor (service) in the indirect department (charge source department) is always directed to a specific charge destination department, the charge cost amount is allocated to the relevant charge department. .
[0009]
However, company-wide work or work across multiple charging departments should be allocated in some form.
[0010]
DISCLOSURE OF THE INVENTION
The present invention provides a system that can allocate all overhead costs to any one or more of a plurality of activities.
[0011]
The present invention also provides a system capable of appropriately allocating the charge cost corresponding to the charge destination department even when the overtime work is required.
[0012]
The present invention further provides a system capable of appropriately distributing and charging an activity for which a charge destination department cannot be specified to a plurality of charge destination departments.
[0013]
Furthermore, an object of the present invention is to provide a system capable of knowing a charge rate, a cost driver amount, a charge amount, etc. in an activity unit from either a charge source department or a charge destination department.
[0014]
Hereinafter, the inventions included in this application will be divided into four for convenience, and their outlines will be individually described with reference to FIGS.
[0015]
1st invention
In the first invention, when an activity to which an indirect cost is to be assigned is not specified, when it cannot be specified, or when it is inappropriate to specify, an input indirect cost is set to a predetermined ratio to a plurality of activities. Therefore, it is about allocation (this is called indirect allocation).
[0016]
The first invention in the form of an overhead management system can be expressed as follows with reference to FIG.
[0017]
The indirect cost management system according to the first invention is an input means for inputting an employee identification number, an activity relating to labor that causes the indirect cost of the employee, and a working hour relating to the labor, and corresponds to the employee identification number. Included in the input data input by the input means, the unit price storage means by employee that stores the hourly unit price of the employee, the activity storage means that stores a plurality of activities defined as belonging to the main business of the organization to which the employee belongs If the activity is stored as defined in the activity storage means, the hourly unit price corresponding to the employee identification number is read from the employee unit price storage means, and the product of the read hourly unit price and the corresponding working hours is calculated. Calculate and add this product for each activity to get the first allocation cost for each activity If the activity included in the data input by the first calculating means for calculating the amount and the input means is not stored as defined in the activity storing means, the hourly unit price corresponding to the employee identification number is set as the employee Read from the separate unit price storage means, calculate the product of the read hourly unit price and the corresponding working time, assign this product to the plurality of activities according to a predetermined ratio, and calculate the second allocated cost amount for each activity The sum of the second calculation means and the first allocation cost amount calculated by the first calculation means and the second allocation cost amount calculated by the second calculation means is calculated, and this sum is used as an activity. An activity-specific allocated cost amount storage unit is provided for storing each activity.
[0018]
The input means, the activity storage means, and the first calculation means are provided in a system that realizes the conventional ABC method, and indirect cost assignment (assignment to an activity) by this conventional system is called direct assignment.
[0019]
Indirect allocation is realized by input means, distribution ratio setting means, and second calculation means. The first allocation cost amount by direct allocation and the second allocation cost amount by indirect allocation are added for each activity and stored in the activity-specific allocation cost storage unit.
[0020]
In this way, all indirect costs incurred are always assigned to one of a plurality of activities. That is, for each activity, it is possible to grasp how much indirect cost is consumed in the activity.
[0021]
Most commonly, an organization to which an employee belongs includes multiple charge source departments. Each employee belongs to at least one charge source department. In such an embodiment, the employee unit price storage means stores the charge source department to which the employee belongs in correspondence with the employee identification number. The activity storage means stores, for each charge source department, a plurality of activities defined as belonging to the business of the charge source department. The first calculating means corresponds to the unit price per hour when the activity included in the input data is defined as belonging to the charge source department to which the employee of the employee identification number included in the input data belongs. The product with the working hours is calculated, and this product is added for each activity to calculate the first allocated cost amount for each activity. When the activity included in the input data is not stored as defined as belonging to the charge source department to which the employee of the employee identification number included in the input data belongs, the second calculation means is And a corresponding working time is calculated, and this product is allocated to the plurality of activities according to a predetermined ratio to calculate a second allocated cost amount for each activity.
[0022]
In a preferred embodiment, a distribution ratio setting means for setting the ratio for each charge source department is provided.
[0023]
Only the part related to the indirect allocation of the system can be expressed more comprehensively as an overhead management system as follows.
[0024]
As shown in FIG. 65, the overhead management system according to the present invention stores an input means for inputting an activity and an expense consumed by the activity, and a plurality of activities defined as belonging to a main business of a predetermined organization. If the activity included in the input data input by the input means is not stored as defined in the activity storage means, the expense included in the input data is determined according to a predetermined ratio. A calculation means for assigning to a plurality of activities and calculating an allocation cost amount for each activity, and an allocation cost amount calculated for each activity by the calculation means is added to the expense of the corresponding activity stored in the activity storage means. And this And a by Activity allocation cost amount storage means for storing the addition result to each activity. Here, the expense includes the purchase price of goods, materials, etc., labor wage (product of working hours and unit price), and the like.
[0025]
In a more general form, the organization includes a plurality of charge source departments. In this case, the input means inputs the charge source department that has consumed the expenses in relation to the expenses and activities. The activity storage means stores, for each charge source department, a plurality of activities defined as belonging to the business of the charge source department. When the activity included in the input data is not defined as belonging to the business of the charge source department, the calculation means allocates the expense included in the input data to the plurality of activities according to a predetermined ratio. The allocation cost amount for each activity is calculated.
[0026]
In a preferred embodiment, a distribution ratio setting means for setting the ratio for each charge source department is provided.
[0027]
If it adds about the relationship between each means shown in FIG. 64, and an Example, it will become the following correspondence.
[0028]
Input means: employee PC, account server 10, input screens of FIGS.
If the input means is an input means to the information system server 11, the transaction details data file 10D1 (FIG. 15) and the daily work result data file 10D2 (FIG. 16) of the account system server 10 are used.
Unit price storage means by employee: employee master 10M3 (FIG. 7), unit price master 10M4 (FIG. 8) of the accounting server 10
Activity storage means: business information master 10M5 (FIG. 9) of the accounting server 10, head office activity master 11M1 (FIG. 10), automatic acquisition master 11M2 (FIG. 11), ABC business number master 11M3 (FIG. 12) of the information server 11.
1st calculation means: Information system server 11 (process of FIGS. 50-54)
Second calculation means: information system server 11 (process of FIGS. 50 to 54)
Allocation list amount storage means by activity: Actual cost master 11J1 of the information server 11 (FIG. 21)
Distribution ratio setting means: cost driver master of information system server 11 (FIG. 13)
[0029]
Second invention
The second invention relates to the allocation of overhead costs to the charging department. As described above, in the ABC method, the activity targets the amount (charge cost amount) obtained by the product of the cost driver amount for a certain activity and the unit price (planned unit price) planned for the activity. Allocate to the charge destination. In principle, the planned unit price depending on the activity is used.
[0030]
As the term planned unit price expresses, this unit price is predicted in advance and is an average agreed internally. For example, when the activity is billing, the cost driver amount is the number of bills, and the planned unit price is the processing amount per bill. Therefore, the charge to a specific charge destination department is calculated by the product of the number of bills and the planned unit price.
[0031]
However, even if an unscheduled situation (trouble etc.) that can be said to be the responsibility of the charging department occurs, and even if a considerable amount of overtime work is required for invoice processing, this overtime is determined by the ABC method. It cannot be allocated to the charge department.
[0032]
The second invention depends on the activity, and in addition to the pre-scheduled charge cost allocation method (referred to as allocation within the regulation), in order to deal with unscheduled situations, (excess) working hours To implement appropriate allocation to the charging department by introducing a charge cost allocation method (this is referred to as non-regulated allocation) that depends on the hourly unit price of the person (employee) who performed the labor It is.
[0033]
The second invention can be expressed in the form of an overhead management system with reference to FIG. 66 as follows.
[0034]
That is, the indirect cost management system according to the second invention is the first input means for inputting the cost driver amount relating to the charge within the regulation together with the data indicating the designation of the charge destination department, the activity and the charge source department, the activity-specific charge source department Separately, the planned unit price storage means for storing the planned unit price, the product of the activity-specific cost driver amount input by the first input means and the charge source department-specific cost driver amount and the corresponding scheduled unit price stored in the scheduled unit price storage means The first allocation means that allocates this product as the allocation charge cost amount to the charge destination department specified for the cost driver amount, and generates the cost driver amount for the cost driver amount related to unspecified charges. Identification number of the employee who performed the activity and information related to the charge department Second input means for inputting together with non-regulated information, employee unit price storage means for storing the employee's unit price corresponding to the employee identification number, cost driver amount input by the second input means, and the employee Calculate the product with the corresponding unit price stored in the separate unit price storage means, and allocate this product as the allocation charge cost amount to the charge destination department specified by the extra information related to the cost driver amount Allocation charge cost for storing the second allocation means, and the charge cost amount calculated by the first and second allocation means, at least for each charge-destination department and for each specified category indicating whether it is within or outside the regulation It is provided with a money amount storage means.
[0035]
The first input unit, the scheduled unit price storage unit, and the first allocation unit relate to the allocation within the regulation. The second input means, the unit price storing means for each employee, and the second allocation means relate to unspecified distribution. Then, all the allocated charge cost amounts are stored in the allocated charge cost amount storage means for each charge destination department and each regulation category, more preferably for each activity and each charge source department.
[0036]
Furthermore, the sum of the charge cost amounts stored in the allocated charge cost amount storage means is calculated for each charge destination department, and finally charged to the charge destination department.
[0037]
In this way, according to the second invention, not only the allocation based on the activity scheduled in advance and the planned unit price, but also the allocation that copes with the occurrence of an unscheduled situation becomes possible.
[0038]
If the relationship between each means shown in FIG. 66 and the embodiment is added, the following correspondence relationship is obtained.
[0039]
First input means: employee PC, account server 10
If the first input means is an input means to the processing means (first distribution means) of the information system server 11, the actual cost master 11J1 (FIG. 21)
Scheduled unit price storage means: cost driver master 11M4 of the information system server 11 (FIG. 13)
First allocation means: information system server 11 (particularly, the in-regulation charge process C5 and the allocation process C6 in FIG.
Second input means: employee PC, account server 10
If the first input means is an input means to the processing means (second distribution means) of the information system server 11, the daily work result data file 10D2 (FIG. 16) of the account system server 10, the information system server 11 Automatic acquisition data file 11D1 (FIG. 17)
Unit price storage means by employee: employee master 10M3 (FIG. 7), unit price master 10M4 (FIG. 8) of the accounting server 10
Second allocation means: information system server 11 (particularly, the non-regulated charge processing C4 and allocation processing C6 in FIG. 48, more specifically FIG. 55, FIG. 56, FIG. 57 to FIG. 63)
Allocation charge cost amount storage means: charge cost master 11J2 of the information server 11 (FIGS. 22 and 23)
[0040]
Third invention
The basic idea of allocation in ABC is the beneficiary's burden. In other words, since labor (service) in the indirect department (charge source department) is always directed to a specific charge destination department, the charge cost amount is allocated to the relevant charge department. .
[0041]
However, company-wide work or work across multiple charging departments should be allocated in some form.
[0042]
According to the third aspect of the present invention, an activity whose charge destination department cannot be specified is distributed and charged to a plurality of charge destination departments related thereto.
[0043]
The third invention in the form of an overhead management system can be expressed as follows with reference to FIG.
[0044]
An indirect cost management system according to a third aspect of the invention is an input means for inputting a cost driver amount relating to a charge within a regulation together with data representing designation of an activity and a charge source department, a planned unit price memory for storing a planned unit price for each activity and each charge source department Means, a distribution ratio storage means for storing the distribution ratio of the cost driver amount to a plurality of charge destination departments for a specific activity, and the activity-specific and charge source department-specific cost driver quantity input by the input means According to the distribution ratio for the corresponding activity stored in the storage means, the ratio is distributed for each of the plurality of charge destination departments, the cost driver amount distributed in proportion, the corresponding planned unit price stored in the planned unit price storage means, To calculate the product of The product as distribution charge cost amounts are those provided with a distribution means to distribute the plurality of charge destination sector described above.
[0045]
When the cost driver amount is input without the input of the charge destination department for the activity of a specific charge source department, the charge cost amount is allocated to multiple charge destination departments according to the preset distribution ratio It will be.
[0046]
The relationship between each means described above and the embodiment is as follows.
[0047]
Input means: employee PC, account server 10
If the input means is an input means to the processing means (distribution means) of the information system server 11, the actual cost master 11J1 (FIG. 21)
Scheduled unit price storage means: cost driver master 11M4 of the information system server 11 (FIG. 13)
Distribution ratio storage means: business headquarters input resource allocation reference data file 11D3 of the information system server 11 (FIG. 19)
Allocation means: Information system server 11 (particularly, the in-regulation charge process C5 and the allocation process C6 of FIG.
[0048]
The input means, scheduled unit price storage means and distribution means shown in FIG. 67 correspond to the first input means, scheduled unit price storage means and first allocation means shown in FIG. 66, respectively. When added to the second invention, it becomes as shown in FIG.
[0049]
That is, in the second invention, there is further provided a distribution ratio storage means for storing a distribution ratio of the cost driver amount to a plurality of charge destination departments for a specific activity. Then, the first allocation means stores the input cost driver quantity for each activity and charge source department for the cost driver quantity not accompanied by the charge destination department input from the input means in the distribution ratio storage means. In accordance with the allocation ratio for the corresponding activity, the ratio is allocated to each of the plurality of charge destination departments, and the product of the allocated cost driver amount and the corresponding scheduled unit price stored in the scheduled unit price storage means is calculated. Each of these products is calculated, and these products are allocated to the plurality of charge destination departments as the allocation charge cost amount.
[0050]
In this manner, the ratio distribution of the third invention can be added as one aspect of the allocation within the regulation of the second invention.
[0051]
4th invention
As described above, the allocation charge cost amount storage means stores the charge cost amount for each charge destination department, each regulation category, each activity, and each charge source department. This can be displayed in various forms. It becomes possible. It is also possible to display the cost driver amount and the planned unit price.
[0052]
That is, in the fourth invention, as shown in FIG. 69, the overhead cost management system includes the above-described activity-specific allocated cost amount storage means (FIGS. 64 and 65), scheduled unit price storage means (FIGS. 66, 67 and 68) and distribution. In addition to the charging cost amount storage means (FIGS. 66, 67 and 68), screen editing means and display means are provided. The screen editing means edits data stored in the above various storage means into an output screen format. For example, the information system server 11, the form system server 12, the WEB server 13, or the employee PC (particularly the form system server 12). ). The display means is a display device or a computer equipped with the display device, and is realized by various servers 10, 11, 12, 13 or employee PCs.
[0053]
In one embodiment, the display means displays the charge cost amounts stored in the allocated charge cost amount storage means as a list for each charge destination department, each activity, or each charge source department.
[0054]
In another embodiment, the list includes values for scheduled unit prices and cost driver amounts.
[0055]
In yet another embodiment, the list includes a distinction between specified and unspecified.
[0056]
If the planned unit price storage means stores the planned cost driver quantity corresponding to the planned unit price, the planned unit price, the planned cost driver quantity, the input cost driver quantity, the product of the planned unit price and the planned cost driver quantity , And the product of the planned unit price and the input cost driver amount can be displayed on the display means.
[0057]
In another embodiment, the display means further displays the unit price of the employee and the input cost driver amount, and the product of the unit price and the cost driver amount, outside the specification.
[0058]
The display means further displays the total amount of the product of the scheduled unit price and the input cost driver amount, and the product of the unspecified unit price of the employee and the input cost driver amount.
[0059]
In relation to the embodiment, the information server 11 and the employee PC correspond to the display means.
[0060]
Referring to an example of display, FIG. 40 is a kind of menu screen, and various list screens can be designated. FIG. 41 shows a list by charge destination department. For a specific charge destination department, a charge rate (scheduled unit price), a cost driver amount, an in-regulation charge fee, and an out-of-regulation charge fee are displayed for each activity / task. Yes.
[0061]
FIG. 42 shows the details of the allocation results as seen from the charge destination department on the charge destination department detail screen.
[0062]
FIG. 43 shows a list by charge source department, and for a specific charge source department, a charge rate (planned unit price), a cost driver amount, an in-regulation charge fee, and an out-of-regulation charge fee are shown for each activity / task.
[0063]
FIG. 44 shows the details of the allocation result viewed from the charge source department on the charge source department specific screen.
[0064]
FIG. 45 shows profit / loss details by activity / task as seen from the charge source department.
[0065]
Regarding <within rules>, the "planned" line contains the planned unit price (charge rate), the planned cost driver amount and their product (charge fee (planned)), and the "charge" line contains the planned unit price (charge). Rate), input cost driver amount, and their product (charge fee).
[0066]
For <Non-regulated>, the unit price (charge rate), input cost driver amount, and their product (charge fee) of the employees are two types of non-regulated (<Non-standard / business number> and <Non-standard / department>) ) Each is displayed.
[0067]
In the total row, the total of each product within the regulation (charge fee) and each product outside the regulation (charge fee) is displayed.
[0068]
Further, in <within regulation>, the "actual" line includes the activity-based allocated cost amount storage means (see FIG. 69) (actual cost master 11J1 (FIG. 21)) (see the first invention) as a charge fee. The stored cost amount (charge fee) (41,173 yen) is displayed, and the value (41,173 / 34.0) obtained by dividing the cost amount (charge fee) by the cost driver amount as the planned unit price (charge rate). = 1, 211) appears. As the cost driver amount, the input cost driver amount (cost driver in the “charge” row) (34.0) is used.
[0069]
Further, the line of “scheduled profit / loss” includes the product of the planned unit price and the planned cost driver amount (<prescription> charge charge of “schedule”, 54,000) and the cost amount (<prescription> “actual”). The charge amount (12, 827) with the charge charge in the line of No. 41, 173) is the product of the scheduled unit price and the input cost driver amount (<within the regulation> The difference (−3,000) between the charge charge (51,000) and the product of the planned unit price and the planned cost driver amount (above 54,000) is the planned unit price and the input cost in the “activity profit / loss” line. The difference (9,827) between the product of the driver amount (above 51,000) and the cost amount (above 47,173) is calculated and displayed.
[0070]
In this way, it is possible to compare the cost amount allocated to the activity of the indirect cost and the cost amount allocated to the charge source department for the same activity.
[0071]
The first to fourth inventions have been individually described for convenience, but as can be seen from FIGS. 64 to 69, any combination of these inventions can be used as part of the overhead management system (part or The whole) is configured. In other words, a system in which any one or more of the configurations of the first to fourth inventions are removed from the overhead management system having all the configurations of the first to fourth inventions is also a remaining function. It can be meaningful as an overhead management system with
[0072]
In the above description, the system configuration is shown as a functional block diagram. However, an overhead management method that defines the operation of the system and a program for controlling the computer used when the system is realized by a computer are also included. It should be understood that it can be easily recognized by a vendor and is included in the above description. The present invention also discloses and provides a medium on which a computer program for an overhead management method and system is recorded.
[0073]
As in later embodiments, the overhead management system is most preferably implemented as a server / client system. Although a plurality of servers have appeared in the embodiment, it is of course possible to realize these functions with a single server. The entire overhead management system can be realized by a single computer, or can be realized not only by the server / client configuration but also by a plurality of computers under other configurations.
[0074]
In the above, the activity is a concept including the activity / task in the embodiment.
[0075]
【Example】
Definitions of terms used in this specification are as follows.
[0076]
The object or scope of corporate accounting for grasping all the economic activities conducted by companies and other economic entities and all related events by the relevant economic entity (actual status) is called “accounting unit”. There are target “profit organizations” (generally called corporations) and “non-profit organizations” that do not aim to pursue profits, such as individuals, the national government, local governments, school corporations, and religious corporations.
[0077]
In the case of a for-profit organization, the general idea is that the cost that is incurred for conducting profit-making activities directly outside the organization is called the direct cost, and the other is the indirect cost. , Regardless of whether it is a for-profit organization, the generation of costs is not directly recognized by the final product such as production / sales of specific products, services (including public services), and organizations such as departments, All costs that must be recognized as indirect or common consumption.
[0078]
“Input cost” generally refers to labor costs, material costs, etc., but in the present invention, it is defined as including costs such as personnel costs, building costs, machine costs, general costs, etc. and overall costs.
[0079]
“Allocation standard” generally refers to the allocation method, ratio, etc., when the input cost is allocated to the cost calculation object. In the present invention, “ratio allocation”, which is one of “allocation criteria”, is used to apportion the cost driver amount.
[0080]
“Activity” refers to all actions necessary to produce the final product. In general concepts, business functions include business units and units of work such as functions, processes, activities, and tasks, but there is no clear standard for which actions fall into which category. In the present invention, an activity is defined as a concept including all of these. Activities include personnel planning and personnel management, and are classified as business activities.
[0081]
On the other hand, there are organizational classifications that perform these multiple activities. For example, departments such as the Human Resources and General Affairs Department and the Finance and Accounting Department. In the present invention, this is called a charge source department.
[0082]
“Resource driver” refers to the method and standard for allocating overhead costs to activities, when directly allocating (in this invention, this is called direct allocation), and when allocating to activities based on resource usage or allocation criteria (this In the invention, this is called indirect allocation). For example, when assigning the input cost to accounting work, if the time required for the work is used, the work is a resource driver, and the work time is the resource driver amount.
[0083]
“Cost driver” refers to the method and criteria for assigning the overhead assigned to an activity to the final product. For example, when the input cost assigned to accounting affairs is assigned to a department using the number of slip processing, the slip processing is a cost driver, and the number of slip processing by department is the cost driver amount. In the present invention, the allocation by the cost driver is called allocation or charge.
[0084]
"Cost calculation object" generally corresponds to all tangible and intangible goods, services, departments, etc. In the present invention, the same concept is used. However, in the following embodiments, “department” is used for explanation, and this is called a charge destination department.
[0085]
The overhead cost management (allocation) system of this embodiment allocates (charges) the overhead cost of the head office department to the in-service department using the concept of ABC (Activity-Based Costing).
[0086]
FIG. 1 shows a conceptual model of an overhead management (allocation) system.
[0087]
The head office department is a group of departments that provide head office department services in general companies, and refers to departments such as the Human Resources & General Affairs Department, the Accounting Department, and the Planning Department. The head office department is an indispensable department for a company that does not directly conduct profit-making activities outside the company, but has the role of supporting or supervising the department that conducts profit-making activities (the working department described below). The head office department is a department in which only general administrative expenses are recorded from the general cost classification, and in the ABC concept, it is an allocation source of costs in the allocation of overhead costs, so it is defined as a charge source department.
[0088]
On the other hand, a department that directly conducts profit-making activities outside the company is called an on-site department. The current business department is, for example, a manufacturing department (in the case of the manufacturing industry) such as the W Business Headquarters (with the W Business Headquarters), the X Manufacturing Department, the Y Manufacturing Department, or the Z Manufacturing Department, or various service execution departments (in the case of the service industry). Yes, because it is a cost burden (allocation destination) in the allocation of indirect costs, it is defined as the charge destination department.
[0089]
It should be understood that the terms headquarters department and in-service department are terms that express a large round, and are a collective term for the charge source department and the charge destination department, respectively. As described above, the personnel and general affairs department, accounting department, planning department, etc. included in the head office department are also expressed using the term department (unit serving as an allocation source of overhead expenses allocation) under ABC. The unit that becomes such an allocation source is the charge source department. Similarly, the in-service department is also composed of a plurality of departments (the above-mentioned W business headquarters, X manufacturing department, Y manufacturing department, Z manufacturing department, etc.), which are units to which allocation of overhead costs is allocated. The allocation unit is the charge department.
[0090]
Some large companies have a division system. In this case, there will be multiple charge departments under the business headquarters in the organization, but since the business headquarters will also be the charge destination, it is especially called the business headquarters when expressing the business headquarters as the charge destination. Use terminology.
[0091]
The activities of the head office department are specified by the activity number and task number. The activity number identifies a basic unit of business activity in the head office department, and the task number identifies a more detailed work action for performing the activity number. For example, a personnel plan that is one of personnel-related business activities is specified by an activity number, and a personnel / labor plan that is one element thereof is specified by a task number.
[0092]
The activity number and task number respectively specify the unit of business activity and work action of the head office department, and at the same time, it can be said to specify the unit of in-house service from the viewpoint of the in-service department.
[0093]
A resource driver is an agent that is most appropriate or descriptive when assigning headquarters costs to headquarters activities / tasks (represented as activities / tasks when activities and tasks are combined) The time required for the head office department to perform business activities, a fixed number, a fixed allocation standard, etc. are used.
[0094]
The resource driver amount is a quantified resource driver, which corresponds to the number of hours, a fixed value “1”, a distribution ratio, and the like. For example, it is assumed that the number of hours required for an in-house service (head office activity / task) called personnel / labor planning is two hours. If the labor unit cost per hour of the worker is 1,500 yen, the cost (personnel cost) allocated to this in-house service is 1,500 × 2 = 3,000 yen. In this case, the work time is a resource driver, and the number of work hours (2 hours) is the resource driver amount. On the other hand, “expenses” such as building costs and machine costs may be directly assigned to specific in-house services. In this case, the resource driver that is an action factor for allocation is “constant”, and the resource driver amount is “1”. Assigning a cost (indirect cost) using these resource drivers is called “direct assignment”.
[0095]
In contrast, a specific in-house service was not specified (entered in), and the cost (personnel cost) represented by the product of the number of hours worked and the unit cost of labor costs, or a specific head office department activity / task was recorded as an expense For general expenses such as equipment, there is no head office department activity / task to be assigned directly. For this reason, it is necessary to allocate and allocate costs to head office department activities / tasks using a predetermined allocation standard. In this case, the resource driver is an allocation criterion, and the resource driver amount is an allocation ratio. Assigning costs by this method is called “indirect assignment”.
[0096]
Using the above-described direct allocation and indirect allocation, all personnel costs, building costs, machine costs, general costs, etc. generated in the charge source department are allocated to the activities / tasks of the head office department.
[0097]
The cost driver is an action when allocating (sharing or distributing) the cost of each internal service (activity / task) allocated by the resource driver to the charge destination department according to the amount of benefit of the service. Indicates the cause. The cost driver amount is obtained by quantifying the cost driver. For example, the request application requested by the charging department is a cost driver, and the number of request applications is the cost driver amount.
[0098]
For in-house services that can be benefited company-wide, there are cases where the cost / driver amount is proportionately distributed by charge destination department according to a preset allocation standard. Specifically, the work hours required for in-house services provided to the entire company are proportionately allocated according to the allocation criteria for each business headquarters, and the result is calculated as the cost / driver amount (work hours) for each charge destination department. Is to do.
[0099]
A service unit price (scheduled charge rate) based on a cost driver unit (rate unit) is set for each head office department activity / task.
[0100]
One of the features of the indirect cost allocation system is that the result of multiplying the scheduled charge rate by the actual cost / driver amount for each charge destination department (the actual charge cost amount) is charged to the corresponding charge destination department.
[0101]
For example, if the use of an in-house service (head office activity / task) called HR / labor planning is most closely related to “time”, the cost driver is “time”.
[0102]
If the scheduled charge rate per hour is 2,000 yen, the rate unit is “yen / hour”. If this is used for 3 hours, 2,000 yen x 3 hours = 6,000 yen will be charged to the charging department.
[0103]
If the charge destination is specified as a ratio distribution (distribution to a plurality of business headquarters with a predetermined ratio), the result of multiplying the cost / driver amount after allocation according to the allocation criteria by the planned charge rate is allocated. Charge each charge department with business headquarters set as standard.
[0104]
There are three charging methods (regulated categories): specified, non-specified / business number, and non-specified / department. Within the regulations, the result of multiplying the planned charge rate by the actual cost / driver amount (actual charge cost amount) is charged to the charging department (including the case where the cost / driver amount is distributed in proportion). Non-standard / business number is a method of charging a standard cost amount equivalent to overtime to the charge department that is responsible for the business of the specified business number (details will be described later, but for each business number (project)). The charge department that has jurisdiction over it is determined in advance). Non-regulation / department is a method of charging a standard charge amount corresponding to overtime to a designated charge destination department.
[0105]
The standard cost amount is the time spent by the employee of the charge source department for the activity / task of the head office department (this is input by the employee), the standard unit price (the personnel cost unit price and the building cost specified in the unit price master described later) Product of unit price).
[0106]
The configuration of the overhead cost management (allocation) system is shown in FIG. A network is formed so that the center 1, the head office department 2, the head office department 4, and the current business department 3 and the current business department 5 are connected by an in-house shared LAN (WAN or LAN) to perform data communication. Among them, the center 1, the head office department 2 and the current business department 3 are connected by a LAN. The center 1, the head office department 4, and the current business department 5 are connected by a WAN. The center 1 has four servers, an accounting server 10, an information server 11, a form server 12, and a WEB server 13, and these are connected by a LAN.
[0107]
Head office departments 2 and 4 are illustrated on the assumption that the head office departments exist in remote places such as Tokyo and Osaka. As described above, the in-service divisions 3 and 5 may be considered as a mixture of the business headquarters unit, the charge-destination unit unit, the subdivided unit unit, Some of them are shown. Center 1 will typically be located in the building of headquarters department 2 or 4.
[0108]
The accounting server 10 performs accounting processing centering on financial accounting, and has a role of inputting and holding information necessary for the ABC system.
[0109]
The information system server 11 performs processing such as record collection, processing, and allocation, which are the central functions of the overhead management (allocation) system. Details will be described later.
[0110]
The form server 12 outputs the performance information created by the overhead management (allocation) system as a form image in response to the inquiry.
[0111]
The WEB server 13 performs a preliminary check when the employee PC accesses the account server 10, the information server 11, or the form server 12. Automatic selection of the server to be accessed, collation of employee number and password, data input / output and access authority check for various approval functions, etc. are performed.
[0112]
A database is connected to each of the accounting server 10 and the information server 11. The contents of the database will be described later.
[0113]
The head office department 2 is provided with a department server 20, a department printer 201, a plurality of employee PCs 202, 203, and the like, which can be connected to each other via a LAN. In the head office department 4, the department server 40, the department printer 401, and the plurality of employee PCs 402 and 403 can be connected to each other.
[0114]
The working department 3 is provided with a department server 30, a department printer 301, a plurality of employee PCs 302 and 303, and the like, which can be connected to each other via a LAN. The department server 50, the department printer 501, and the plurality of employee PCs 502 and 503 can also be connected to each other in the working department 5.
[0115]
Employees can connect a PC to an in-house shared LAN as needed, and access an indirect cost management (allocation) system (particularly, the servers 10, 11, 12, and 13 described above).
[0116]
The master file and data file in the database of the accounting server 10 and the information server 11 in the overhead management (allocation) system are as shown in FIG.
[0117]
There are five types of master files and two types of transaction data files in the accounting server. The master file includes a department master (10M1), an activity / task master (10M), an employee master (10M3), a unit price master (10M4), and a business information master (10M5). The transaction data file includes a transaction details data file (10D1) and a daily work performance data file (10D2).
[0118]
In the information system server, there are five types of master files, four types of control data files, and three types of transaction data files. The master file includes a head office activity master (11M1), an automatic acquisition master (11M2), an ABC business number master (11M3), a cost driver master (11M4), and a departmental personnel master (11M5).
[0119]
The control data file includes an actual result acquisition data file (11D1), an actual cost data file (11D2), a business headquarters input resource allocation reference file (11D3), and a charge ratio file (11D4). The transaction data file includes an actual cost master (11J1), a charge cost master (11J2), and an allocation actual detail file (11J3).
[0120]
First, the role and significance of the master of the accounting server 10 will be described individually.
[0121]
FIG. 5 shows the department master (10M1). This is a summary of whether or not the cost of the head office department costs (indirect costs) can be charged (assigned) between the charge source department (recording department) and the charge destination department (replacement destination department).
[0122]
The department code is an identification code assigned to the smallest management unit that records the cost. Regardless of whether it is a charge source department or a charge destination department, a department code is assigned to all departments. A unique name (department name) is given to the department code.
[0123]
A group is a management unit that combines several departments. Each group is given an identification code, which is an identification code in the upper hierarchy of the department code. In this embodiment, the group can be considered as a group with the business headquarters as a unit.
[0124]
The division with business headquarters indicates whether it is a charge destination when charging overhead costs to the business headquarters. If it is a charge destination, “1” (target), otherwise “0” (not applicable) ) Is set.
[0125]
The charge source category is a code indicating whether it is a charge source department (accounting department) of indirect costs. The charge source department (generally the head office department) has “1” (target) or “2” (target). Is set. “2” indicates the charge source department for ABC allocation (charge rate for each activity and allocation by cost driver), and “1” relates to batch allocation (allocation of overhead at a certain ratio) Shows the source department (not used in this example). The charge source category “0” (not applicable) indicates that it is not a charge source department, and this is normally equivalent to an in-service department.
[0126]
The charge destination category is a code indicating whether or not it is a charge destination department (distribution destination department) of overhead costs. “9” (target) is set in the charge department. The initial value is “0” (not applicable).
[0127]
For the department set as the charge source in the charge source category (code is “2” or “1”), the code “9” indicating the charge destination department is set in FIG. This indicates that the charge source department can also become the charge source department in the process of the overhead cost allocation system. For example, the planning department in the head office department may receive services from the accounting department. In such a case, the planning department is charged for the activities / tasks of the accounting department. However, indirect costs incurred in the planning department, including the amount charged from the accounting department to the planning department, will eventually be allocated to the working department.
[0128]
The ABC aggregation department code has a role of bundling department codes of the head office department, and the activity number and task number in the activity / task master can be set to be the same in the same ABC aggregation department code. For example, the same ABC aggregation department code (one department code 109700) is represented by the personnel department (department code 109700) of the head office department 2 (eg Osaka) and the personnel department (department code 209700) of the head office department 4 (eg Tokyo). Used as). Departments performing similar activity and task business activities can be bundled using the ABC aggregation department code in this way.
[0129]
FIG. 6 shows the activity / task master (10M2). This defines a standard work process (specified by activity number and task number) in the company. The employees in the head office department and the in-service department use these activity numbers and task numbers to input daily work hours from the employee PC 202, 203, 302, 303, 402, 403, 502 or 503.
[0130]
In the standard work process, the first 4 digits are the activity number and the last 2 digits are the task number.
[0131]
The activity name has a one-to-one relationship with the activity number. The task name is a name having a one-to-one relationship with the task number.
[0132]
FIG. 7 shows the employee master (10M3). This holds information about all employees necessary to calculate standard costs for each department code, activity number, and task number in the overhead management (allocation) system.
[0133]
The employee number is a unique identification number of each employee, and is essential data when accessing the WEB server 13 of the center 1.
[0134]
The department code is used to identify which department the work time of each employee's activity number / task number belongs to.
[0135]
The personnel cost rank represents the standard unit price class calculated for the entire company. The actual amount corresponding to the personnel cost rank is held in the unit price master (FIG. 8: 10M4).
[0136]
FIG. 8 shows the unit price master (10M4). This holds the amount information of the personnel cost rank of the employee master (FIG. 7: 10M3). The labor cost rank is composed of a labor cost unit price (yen / hour) and a building cost unit price (yen / hour). The labor cost unit price (yen / hour) and the building cost unit price (yen / hour) are both standard costs per hour. These sums become the standard unit price.
[0137]
FIG. 9 shows a business information master (10M5). This is information for each business number held in order to ascertain the profitability of the business activities of the charging department in units of projects (business numbers). In the indirect cost management (allocation) system, it is possible to allocate a cost to a project (business number) in addition to a department (charge destination department). In that case, the business number identifies which project. The business name is a name having a one-to-one relationship with the business number.
[0138]
The business department code indicates the department (current business department) having jurisdiction over the business number. When a single project spans multiple departments, a separate business number is assigned to each department (this association data is stored separately (not shown)).
[0139]
Next, transaction data of the accounting server 10 will be described.
[0140]
FIG. 15 shows a transaction details data file (10D1). This is all accounting slip data files, and includes items such as a charge source department code, date of recording, management accounting line number, actual cost amount, business number, and detailed text. When data is set for the business number, or when “ABC = XXXXYY” (XXXX: activity number, YY: task number) is set in the detail text, the actual cost amount is handled as direct allocation.
[0141]
FIG. 16 shows a daily work performance data file (10D2). This holds the work hours (hours) entered by employees every day by charge source department code, activity number, and task number.
[0142]
The product ID is an area used when it is desired to recognize the work time (time) as that of a specific project or a specific department. In the case of a project, data is set in the format of “W = xxxx”. For example, a work time of 5 hours is stored for the project: R0095. In the case of a department, data is set in a format of “B = yyyyyy”. For example, a work time of 3 hours is stored for a department: 173000.
[0143]
The work time input of the employee is performed on the daily work result registration screen (FIG. 26: 10N1) of the account server 10 described later.
[0144]
The master of the information system server 11 will be described.
[0145]
FIG. 10 shows the head office activity master (11M1). This is a master for setting a rule as to how to allocate the overhead cost of the head office department to which department of charge from which activity number and task number. Data is held by charge source department code, activity number, and task number. For the other items, the same data (contents) is set for each ABC aggregation department code. The ABC aggregation department code is linked to the same item in the department master (FIG. 5: 10M1) (the same).
[0146]
As the activity number and task number, a code suitable for the business activity of the head office department is selected from the activity / task master (FIG. 6: 10M2), and is set for each charge source department code.
[0147]
The charge source department code is linked to all department codes bundled in the ABC aggregation department of the department master (FIG. 5: 10M1).
[0148]
The activity name and task name are names corresponding to the activity number and task number, and are linked to the same item in the activity / task master (FIG. 6: 10M2) (the same).
[0149]
The rate unit represents a unit (to be described later) of a planned charge rate when charging the overhead cost of the head office department to the charge destination department by a combination of the activity number and the task number.
[0150]
The charge pattern is a cost driver type (represents a kind). An example is as follows. “00” (normal) is used when the cost driver amount is set for each charge destination department. “02” (resources input by the business headquarters) is used when the cost / driver amount is not set for each charging department, but the indirect costs are shared (a fixed ratio) between the charging departments. “05” (number of department employees) is used when the cost driver quantity is the number of employees in each charge department.
[0151]
The charge category is used to identify whether the charging destination is a department code or a department code with a business headquarters.
[0152]
The attribute is used when the user (ABC business person in charge) sets the business characteristics of the activity number and task number. The illustrated example is divided into 0 (business process) and 1 (strategic process).
[0153]
FIG. 11 shows the automatic acquisition master (11M2). This is a master used when the cost / driver amount for each charging department can be acquired mechanically (even if the operator does not input it). Here, several patterns (data type, data type branch number) are prepared in advance, and descriptions of the activity number and task number of the head office activity master (FIG. 10: 11M1) that can be automatically acquired are described. Has been. The related key is ABC aggregation department code + activity number + task number. The data type is an automatic acquisition type, and the data type branch number is a type that further subdivides the cost / driver amount.
[0154]
FIG. 12 shows the ABC business number master (11M3). This is used when the overhead number entered with the specific project (business number) of the head office department is assigned to the activity number / task number of the head office department.
[0155]
The business number has been registered in the business information master (FIG. 9: 10M5), and the business department code of the business number and the charge source department code match.
[0156]
The activity number / task number matches the activity number and task number of the head office activity master (FIG. 10: 11M1).
[0157]
The business name matches the business name of the business information master (FIG. 9: 10M5).
[0158]
FIG. 13 shows the cost driver master (11M4). This includes charge budgets for each ABC aggregation department code, each charge source department code, each activity number, each task number, each fiscal year, and each month (a budget for allocating head office department overhead to the charge department). is doing. The charge budget is composed of a planned charge rate and a planned cost / driver amount. The sum of these products for each charge source department is the charge budget (equivalent to the sales budget).
[0159]
Further, this master has information defining a cost allocation (resource driver) method.
[0160]
The ratio setting category is an allocation standard in the case of indirectly allocating the cost recorded by the charge source department code. For example, “0” (ratio setting is normal) is a method of setting a configuration ratio (percentage) in advance between the activity number and task number in the charge source department code.
[0161]
“2” (daily work time ratio) is a method of mechanically acquiring the work time composition ratio input by charge source department code, activity number, and task number. The reference department code is a method for specifying the ratio setting category set in a certain charge destination department code when another charge source department code in the same ABC aggregation department code is applied.
[0162]
The ratio is an area for setting the composition ratio when the ratio setting category is “0” (normal ratio setting).
[0163]
FIG. 14 shows a department-specific personnel master (11M5). This holds the information necessary to calculate the number of employees by department in the overhead management (allocation) system.
[0164]
The employee number is an identification number unique to each employee. The department code is a department code for recognizing which department an employee belongs to. The maximum number of personnel is 1.0, and when belonging to two departments, 1.0 persons are divided between departments.
[0165]
The control data file of the information system server 11 will be described.
[0166]
FIG. 17 shows performance automatic acquisition data (11D1). This holds only records whose actual cost / driver amount is other than “0” (zero) for each data type, each data type branch number, each recording date, each charge source department code, each activity number, and each task number. The data type and data type branch number are linked to those of the automatic acquisition master (FIG. 11: 11M2).
[0167]
In addition to the usual method (within regulations), the charge to the working department is calculated by multiplying the standard unit price of the employee who entered time at the head office department by the work time, and the specified department code (non-regulation / department) ) Or charging to the business number (non-standard / business number) managed by the business department code. A classification for identifying this is a regulation classification, and there are three categories: “1” (within regulation), “2” (non-regulation / business number), and “3” (non-regulation / department).
[0168]
The area of the designated department code is the actual cost for each charge destination department, such as the number of employees by department, even if the regulation classification is “3” (non-regulation / department) or the regulation classification is “1” (within regulation). • This area holds the department code of the charge destination when the driver amount is counted.
[0169]
The designated business number area is an area that holds a business number to be charged outside the standard when the standard classification is “2” (non-standard / business number).
[0170]
The actual cost driver amount is set according to the rate unit of the head office activity master (FIG. 10: 11M1).
[0171]
The area of the standard cost amount is based on the employee number of the employee who entered the non-standard work hours when the standard category is “2” (non-standard / business number) and “3” (non-standard / department). Calculate the total unit cost of the labor cost unit price (yen / hour) and the building cost unit price (yen / hour) from the employee master (Figure 7: 10M3) and unit price master (Figure 8: 10M4), and multiply this by the work time. This is the area to set.
[0172]
FIG. 18 shows the actual cost data file (11D2). This is a summary of the transaction details data file (FIG. 15: 10D1) and the daily work performance data file (FIG. 16: 10D2) in the account server 10 for the information server 11. The business number and the detailed text in the transaction detail data file in FIG. 15 are replaced with the activity number and the task number.
[0173]
The setting of the standard cost amount will be described in the case of “670” (personnel expenses) (second line from the bottom) among the management accounting line numbers. First, the employee master (FIG. 7: 10M3) is read based on the employee number (333444) of the employee who entered the work time for each activity number and task number in the daily work performance data (FIG. 16: 10D2). Based on the labor cost rank (B) obtained there, the unit price master (FIG. 8: 10M4) is read, and the total unit cost (1,400 + 400 = 1) of the labor cost unit price (yen / hour) and the building cost unit price (yen / hour). , 800). The standard cost amount is set by multiplying this by the work time (1,800 × (45 + 5 + 3) = 95,400).
[0174]
The actual cost amount is set as follows. MM slip input (FIG. 27: 10N2), (FIG. 28: 10N3), FI slip input (FIG. 29: 10N4), workflow input screen (in-house trading) (FIG. 30: 10N5), workflow input screen (personal change), which will be described later (Fig. 31: 10N6), workflow input screen (domestic business trip expenses) (Fig. 32: 10N7), workflow input screen (transportation expense settlement) (Fig. 33: 10N8), activity / business number setting (Fig. 35: 11N2) When the number and task number are specified, the expense recording amount is set to the actual cost amount.
[0175]
FIG. 19 shows a business headquarters input resource allocation reference file (11D3). This is because when the pattern of the headquarters activity master (Fig. 10: 11M1) is "02" (resources input by business headquarters), the actual cost / driver amount is allocated according to this allocation standard and charged to the business unit headquarters department code. use.
[0176]
With respect to the department code with business headquarters whose division with business headquarters in the department master (FIG. 5: 10M1) is “1” (target), the allocation base amount and the total amount of all departments are held. The total allocation base amount for each department code with business headquarters is the total amount for all departments.
[0177]
The fraction processing flag is a flag for determining a department code to which the fractional amount generated when the actual cost / driver amount is allocated is added. When “1” is set, the fraction is adjusted with the division-specific division code.
[0178]
FIG. 20 shows the charge ratio file (11D4). This is a file used to realize “charge by cost / driver amount ratio distribution”. The recording date is the date on which the ratio allocation is applied. Ratio distribution can be held by charge pattern, charge category, and charge destination department code. The charge amount and the total charge amount are values that serve as the basis for the distribution ratio, with the former being the numerator and the latter being the denominator.
[0179]
The fraction processing flag is a flag for determining a department code to which the fractional amount generated when the actual charge amount / driver amount is allocated is added. When “1” is set, the fraction is adjusted by the department code.
[0180]
The specific usage is as follows. Among charge cost masters (FIG. 22 / FIG. 23: 11J2) whose charge destination department code is undecided (for example, the first row in FIG. 22), charge pattern (02), charge classification (0) Is used as a key to read the charge ratio file and acquire the charge destination department codes (113500 and 162000). At the same time, the actual charge cost amount (225,000) and the actual cost / driver amount (45.0) of the charge cost master (FIG. 22 / FIG. 23: 11J2) are added to the charge target amount (6,600,000, 4, (400,000) and then dividing the calculation result by the total charge target amount (11,000,000), the actual charge cost amount (135,000 and 90,000) by charge destination department code, the actual cost driver The quantity (27.0 and 18.0) is obtained, and the result is set in the same item (first line, second line) of the allocation result details (FIG. 24, FIG. 25: 11J3).
[0181]
Finally, the transaction data file of the information system server 11 will be described.
[0182]
FIG. 21 shows the actual cost master (11J1). This is because, as a result of the cost allocation function, the indirect allocation cost amount by the indirect allocation function and the direct allocation by the direct allocation function, by the recording date, by charge source department code, by activity number, by task number, and by management accounting line number The master who owns the cost amount.
[0183]
Among them, for the management accounting line number “670” (personnel cost), the standard cost amount for each activity number and task number held in the actual cost data (FIG. 18: 11D2) is set as the directly allocated cost amount. The This is a direct allocation function for head office department overhead.
[0184]
For management accounting line numbers other than the above, MM slip input screen (FIG. 27: 10N2), (FIG. 28: 10N3), FI slip input screen (FIG. 29: 10N4), workflow input screen (in-house sales) (see FIG. 30: 10N5), workflow input screen (personal change) (FIG. 31: 10N6), workflow input screen (domestic business trip expenses) (FIG. 32: 10N7), workflow input screen (transportation expense adjustment) (FIG. 33: 10N8), activity When the activity number and task number are specified on the business number setting screen (FIG. 35: 11N2), the expense recording amount (input amount) is set as the directly allocated cost amount. This is also a direct allocation function for head office department overhead.
[0185]
If the activity number and task number are not specified at the time of expense recording, the planned charge rate registration screen (1) (FIG. 36: 11N3) and (FIG. 37: 11N4), which will be described later, The expense amount is set as an indirect allocation cost amount after the ratio is allocated by activity number and task number. This is an indirect allocation function for head office department overhead costs. Information such as the ratio setting category, ratio, and reference department code is stored in the cost driver master (FIG. 13: 11M4).
[0186]
22 and 23 show the charge cost master (11J2). This is by charge date, charge source department, activity number, task number, charge destination department code, charge pattern, charge category, specified category, designated business number, designated department code, actual cost driver amount, scheduled charge We have rate, actual charge cost amount, and standard cost amount. Among these, the charge pattern of “02” (resources input by the business headquarters) is in a state where the final charge destination department code is not determined. When the specified category is “2” (non-standard / business number), the specified business number is set. When the specified category is “3” (non-standard / business number), the specified department code is set.
[0187]
24 and 25 show the allocation result detailed file (11J3). This is because the charge code of the charge cost master (FIGS. 22 and 23: 11J2) has a charge pattern of 02 (resources input by the business headquarters), the department code and allocation criteria of the business headquarters resource allocation criteria (FIG. 19: 11D3). The actual cost driver amount is allocated based on the total amount and the total amount of all departments, and the result is replaced with the actual cost driver amount.
[0188]
Figure 4 shows an input / output relationship diagram of the overhead allocation system. These input / output screens are basically displayed on the display device of the employee PC, but can also be displayed on the display devices of the various servers 10 to 13.
[0189]
The input screen to the account server 10 includes a daily work result registration screen (FIG. 26: 10N1), an MM slip input screen ((FIG. 27: 10N2), (FIG. 28: 10N3)), an FI slip input screen (FIG. 29: 10N4), four workflow input screens ((in-house sales) (FIG. 30: 10N5), (personal replacement) (FIG. 31: 10N6), (domestic business trip travel expenses) (FIG. 32: 10N7), (FIG. 33: 10N8)).
[0190]
Employees in the head office department use these screens every day to enter work hours for each work content (by activity number and by task number) or to enter accounting slips. The data input here is stored in the accounting server and then transferred to the information server, where it is recognized as a cost for each activity number and each task number.
[0191]
The input screen to the information system server 11 includes a head office activity master registration screen (FIG. 34: 11N1), an activity / business number setting screen (FIG. 35: 11N2), a scheduled charge rate registration screen (1) -1, 2 (( 36: 11N3), (FIG. 37: 11N4)), scheduled charge rate registration screen (2) (FIG. 38: 11N5), actual cost driver amount registration screen (FIG. 39: 11N6), ABC result inquiry screen as output instruction menu (FIG. 40: 11S1).
[0192]
The headquarters activity master registration screen (Fig. 34: 11N1) and activity / business number setting screen (Fig. 35: 11N2) can be accessed only by employees who have the specific authority of the planning department that manages the system operation of the overhead allocation system. It is. When the contents of registration or change application from each head office department are submitted to the internal accreditation meeting and approved, the employee in charge of the planning department inputs them on these screens as needed.
[0193]
In each head office department, once a year, the planned charge rate and planned cost value for the next fiscal year are displayed in the planned charge rate registration screens (1) -1 and 2 ((FIG. 36: 11N3), (FIG. 37). : 11N4)), scheduled charge rate registration screen (2) (FIG. 38: 11N5).
[0194]
The ABC result inquiry (FIG. 40: 11S1) is an instruction screen on the output screen of the form server 12 described below. This screen can be accessed by employees in both the head office department and the working department.
[0195]
The output screen from the form server 12 includes a list screen for each charge destination department (FIG. 41: 12S1), a detailed screen for each charge destination department (FIG. 42: 12S2), a list screen for each charge source department (FIG. 43: 12S3), There are a charge source department detail screen (FIG. 44: 12S4) and an activity / task ABC profit / loss detail screen (FIG. 45: 12S5).
[0196]
Employees in the head office division and in-service division specify these screens on the ABC performance inquiry screen (Fig. 40: 11S1) after the monthly overhead allocation process, and allocate results by activity number and task number. Confirm.
[0197]
First, the role and significance of the input screen of the accounting server 10 will be described.
[0198]
FIG. 26 shows an example (10N1) of the daily work record registration screen. This is a screen for inputting daily work results by time using activity numbers and task numbers. The department, registration target, and work date are set (displayed) when this screen is selected based on the contents of the employee logging in to the WEB server based on the employee number and work date.
[0199]
The start time and end time are input to grasp the working hours. Also, this working time is checked (checked) with the total work time for each activity number and each task number.
[0200]
Whether to enter a business number is optional. When there is no business number input and there is work time input by activity number and task number (input of the activity number and task number is mandatory), the employee master number is used as a key to read the employee master (see Figure 7: 10M3) Then, the unit price master (Fig. 8: 10M4) is read using the labor cost rank obtained there as a key, the total unit price of the labor cost unit price (yen / hour) and building cost unit price (yen / hour) obtained there, and the activity number. Multiplying the work time for each task number is the standard cost amount for each activity number and task number of the charge source department code to which the employee belongs.
[0201]
If there is a work number input and an operation time by task number or task number is entered, the employee master number (Figure 7: 10M3) is read with the employee number of the employee (as a key), and the personnel obtained there The unit price master (FIG. 8: 10M4) is read with the expense rank (using as a key). The charge source department code to which the employee belongs is the product of the total unit cost of the labor cost unit price (yen / hour) and building cost unit price (yen / hour) obtained, and the work time by activity number and task number. Standard cost amount. (The business number and the activity number / task number are related by the input on the screen shown in FIG. 35.)
[0202]
If the business number is not entered, the standard cost amount is assigned for each charge source department code, activity number, and task number, whereas when the business number is entered, the business department in charge of the business number (charge source department) Standard cost amount is assigned to the code.
[0203]
The input of the product ID is arbitrary. Depending on the input state of the product ID, the three automatic classifications “1” (within regulation), “2” (non-regulation / business number), “3”, which are stored in the automatic record data (FIG. 17: 11D) (Non-regulation / department).
[0204]
When the product ID is blank, the work time for each activity number and task number is handled as “1” (within the regulation), and only one type of standard cost amount is created.
[0205]
When “W = @@@@@ (@@@@@ is a business number, for example W = R0095)” is entered (set) in the product ID, the work time for each activity number and task number is “ Both “1” (within regulation) and “2” (out of regulation / business number) are handled, and two types of standard cost amounts are created.
[0206]
When “B = %%%%%% (%%%%%% is the charge department code, for example, B = 173000)” is entered (set) in the product ID, it is classified by activity number and task number. The work time is handled as both “1” (within regulation) and “3” (out of regulation / department), and two types of standard cost amounts are created.
[0207]
The standard cost amount of “1” (within regulation) is set in the actual cost data file (FIG. 18: 11D2). The standard cost amount for the additional charge of “2” (non-standard / business number) and “3” (non-standard / department) is set in the result automatic acquisition data file (FIG. 17: 11D1).
[0208]
Input of the work summary and today's work content is optional.
[0209]
FIG. 27 shows an MM slip input screen 1 (10N2) (MM is an abbreviation for Material Management, inventory purchase management, purchase order). This is a screen for recording general expenses. The charge source department code for recording expenses is set (displayed) when this screen is selected based on the contents of the employee logging into the WEB server based on the employee number.
[0210]
The purchase order date is the date of drafting the expense slip. The supplier code is a supplier code and is a supplier name. Purchase order details can be entered in multiple lines on a single screen. The detail is a detail line management number in tenth unit. The item code is linked to the management accounting line number at the time of expense recording. The text is the content to be ordered. The purchase order quantity is the order quantity in the same detail line. The delivery date is the scheduled date for expense recording. The net price is the base price excluding consumption tax.
[0211]
FIG. 28 shows the MM slip input screen 2 (10N3). This is a screen for designating an activity number and a task number for the corresponding detail by selecting a detail line on the MM slip input screen 1 (FIG. 27: 10N).
[0212]
Details, item codes, and text are synonymous with the same items on the MM slip input screen 1 (FIG. 27: 10N2).
[0213]
When “ABC = XXXXYY” is set in the ABC accounting code (direct allocation), the net price is “XXXX”, task number, by accounting month, by charge source department code, by management accounting line number, by activity number. In another “YY”, it is set in the transaction details data file (FIG. 15: 10D1), and the actual cost amount in the actual cost data file (FIG. 18: 11D2) is further (as) and further the actual cost master (FIG. 21: 11J1) is set to (as) the direct allocation cost amount. When there is no input in the ABC accounting code on the MM slip input screen 2 (FIG. 28: 10N3) (indirect allocation), the MM slip input screen 2 (FIG. 28: FIG. 28: 10N2) 10N3) input selection is not made (indirect allocation), the net price is by transaction date data file, by charge source department code, by management accounting line number (Figure 15: 10D1), actual cost data Set to the actual cost amount of the file (FIG. 18: 11D2).
[0214]
FIG. 29 shows an FI slip input screen (10N4) (FI is an abbreviation for Final Accounting). This is an accounting slip format input screen using an account code. In any case, the amount (expense) related to the direct payment to the outside is recorded in the MM slip or FI slip. The account code is linked to the management accounting line number. In the example shown in FIG. 29, the expense of the consumable item is recorded as the amount “1,500 yen”, the quantity “1.0”, and the charge source department code “109700” on the calculation date of April 16. .
[0215]
When “ABC = XXXXXYY” is set in the text, the transaction amount data file is recorded in “YXXX” for each transaction year, month, charge source department code, management accounting line number, activity number “XXXX”, and task number “YY”. (FIG. 15: 10D1), the actual cost amount of the actual cost data file (FIG. 18: 11D2), and the direct allocation cost amount of the actual cost master (FIG. 21: 11J1).
[0216]
If the ABC aggregation department code is not entered in the text, the transaction amount data file (FIG. 15: 10D1) and the actual cost data file (FIG. 18: 11D2) are calculated according to the recording date, charge source department code, and management accounting line number. Is set to the actual cost amount.
[0217]
The workflow 4 screen to be described next is an input screen for internal sales (FIG. 30: 10N5), personal replacement (FIG. 31: 10N6), domestic business trip travel expenses (FIG. 32: 10N7), and settlement of transportation expenses (FIG. 33: 10N8). It is an input screen for application for reconsideration of expense inquiry created by using groupware software in common.
[0218]
FIG. 30 shows a workflow input screen (in-house sales) (10N5). This is an application screen used for internal transactions (for example, when the head office department purchases from the current business department or the head office department, system construction, etc.). The application type specifies whether this application is new or has already been reconciled. The date of recording is the date common to both the department code of the internal sales department data and the department code of the internal purchasing department data.
[0219]
In the example shown in FIG. 30, the planning department (Osaka) “109200” indicates an input in the case of in-house purchase of 100,000 yen from the XY development first G department “106100”.
[0220]
Since there is an input in the activity / task (8052/01) of the purchase department data, the amount 10,000 is recorded by year, charge source department code, management accounting line number, activity number “8052”, task number Separately, “01” is set to the actual cost amount in the transaction details data file (FIG. 15: 10D1) and the actual cost data file (FIG. 18: 11D2), and the direct allocation cost amount in the actual cost master (FIG. 21: 11J1). Is done.
[0221]
If there is no input in the activity / task, the amount is the actual cost of the transaction details data file (Fig. 15: 10D1) and the actual cost data file (Fig. 18: 11D2) by the recording date, by the charge source department code, by the management accounting line number Set to the amount.
[0222]
Comments are optional. After these inputs, the workflow is started up by a predetermined retrace route by pressing a replay start button. If the cancel button is pressed, the input contents are discarded and the screen is terminated.
[0223]
FIG. 31 shows a workflow input screen (personal change) (10N6). This is a screen for making a post application when an individual changes the department's expense and replacing it with the department's expense.
[0224]
In the example shown in FIG. 31, the employee number “333444” of the reimburser and the employee name “Taro Taro” purchase a refurbishment product name “cable” with a unit price of 1,000 yen for 1,050 yen including consumption tax. , Tax category “Temporary payment consumption tax (5%)”, Body price total 1,000 yen, Consumption tax 50 yen, and the total advance of 1,050 yen as account name “Consumables”, Department code The expenses are replaced with “108400” and the department name “Information System Department (Osaka)”. Since there is an input in the activity / task of the expense (optional input), the total of the advance payment is classified by recording date, by charge source department code, by management accounting line number, by activity number “8055”, by task number “01” , The actual cost amount in the transaction details data file (FIG. 15: 10D1) and the actual cost data file (FIG. 18: 11D2) is set to the direct allocation cost amount in the actual cost master (FIG. 21: 11J1). When there is no input in the activity / task, the total of the advance payment is the actual value in the transaction details data file (Fig. 15: 10D1) and the actual cost data file (Fig. 18: 11D2) by recording date, charge source department, management accounting line number Set to cost amount.
[0225]
Remarks, reason for purchase, and comments are optional. After these inputs, the workflow is started up by a predetermined retrace route by pressing a replay start button. If the cancel button is pressed, the input contents are discarded and the screen is terminated.
[0226]
FIG. 32 shows a workflow input screen (domestic business trip expenses) (10N7). This is an input screen for applying for travel and transportation expenses for domestic business trips. The application type specifies whether this application is new or has already been reconciled.
[0227]
In the example shown in FIG. 32, the employee number “333444”, the employee name “Taro Patent” has the department code “209701”, and the department name “HR General Affairs Department (Tokyo and others)” as the expense-bearing department, April 1, 1999 A business trip was made to Osaka headquarters for the reason of the business trip for the personnel system revision meeting on the day from 9:00 to 18:00. Since there is an input in the activity / task, the travel expenses are recorded in the transaction details data file (Figure) by the recording date, by charge source department code, by management accounting line number, by activity number “8001”, and by task number “19”. 15: 10D1), the actual cost amount of the actual cost data file (FIG. 18: 11D2), and the direct allocation cost amount of the actual cost master (FIG. 21: 11J1).
[0228]
If there is no input in the activity / task, the travel expenses are recorded in the transaction details data file (Fig. 15: 10D1) and actual cost data file (Fig. 18: 11D2) by recording date, charge source department code, management accounting line number Set to cost amount.
[0229]
Comments are optional. After these inputs, the workflow is started up by a predetermined retrace route by pressing a replay start button. If the cancel button is pressed, the input contents are discarded and the screen is terminated.
[0230]
FIG. 33 shows a workflow input screen (accounting for transportation expenses, etc.) (10N8). This is a screen for applying for city transportation expenses after the actual expenses have been replaced, and replacing the total body price for replacement with the expenses of the department. In this example, the employee number “333444” of the reimbursement employee and the employee name “Taro Tokkyo” were boarded on April 15th, 1999, from XX to △ on the subway for the purpose of meeting YY financial results. The general transportation cost of 600 yen is replaced with the department code “110800” and the department name “Financial and Accounting Department (Osaka)” with a body price of 571 yen and a consumption tax of 29 yen. Because there is an input in the activity / task of the expense (optional input), 600 yen is classified into “8007” by task number, “8007” by task number, by accounting source line code, by management accounting line number, “07” by task number, The transaction cost data file (FIG. 15: 10D1) and the actual cost data file (FIG. 18: 11D2) are set to the actual cost amount and the actual cost master (FIG. 21: 11J1) direct allocation cost amount.
[0231]
If there is no input in the activity / task, 600 yen is recorded by transaction date data file (Fig. 15: 10D1) and actual cost data file (Fig. 18: 11D2) by recording date, charge source department code, management accounting line number Set to cost amount.
[0232]
Comments are optional. After these inputs, the workflow is started up by a predetermined retrace route by pressing a replay start button. If the cancel button is pressed, the input contents are discarded and the screen is terminated.
[0233]
Next, the input screen of the information system server 11 will be described.
[0234]
FIG. 34 shows the head office activity master registration (correction, addition) screen (11N1). This is a screen for setting the most important master information in the overhead management (allocation) system. Setting items are: ABC aggregation department code, charge source department code, activity number, task number, activity name, task name, cost driver name, rate unit, charge pattern, charge category, attribute, data type, data It is a type branch number. The input data here is set in the head office activity master (FIG. 10: 11M1) and the automatic acquisition master (FIG. 11: 11M2).
[0235]
FIG. 35 shows an activity / business number setting (modification, addition) screen (11N2). This is a screen for directly allocating an expense amount by charge source department code, activity number, and task number when expenses generated in the charge source department are identified in the data of each business number.
[0236]
The associated contents here are set in the ABC business number master (FIG. 12: 11M3). In other words, if a business number is entered, it is directly assigned to the activity / task defined on this screen without entering the activity number and task number.
[0237]
In direct allocation, the business number set in the ABC business number master (Fig. 12: 11M3) is searched for the business number in the transaction details data file (Fig. 15: 10D1), and the expense recording amount is determined as the charge source department code and activity. Based on the number and task number information, set to the directly allocated cost amount of the actual cost master (Fig. 21: 11J1) by recording date, by charge source department code, by activity number, by task number, by management accounting line number It is realized by doing.
[0238]
In the example of FIG. 35, the activity number “8000” and the task number “01” associated with the charge source department code “109700”, the charge source department name “HR General Affairs Department (Osaka)” are associated with the business number “R0097”. is there. As a result of the business number “R0097” in the transaction details data file (FIG. 15: 10D1) being associated with the activity number “8000” and the task number “01” (third line in FIG. 15), the actual cost master (FIG. 21). : 11J1), the recording date “199904”, the charge source department code-specific “109700”, the activity number “8000”, the task number “01”, and the direct allocation cost amount “3,000 yen” are set (FIG. 21). 2nd line).
[0239]
If no activity / business number is set and only the business number is entered, the ratio setting category, ratio, and reference in the above-described scheduled charge rate registration screen (1) (FIG. 36: 11N3) and (FIG. 37: 11N4) Depending on the contents of the department code, the expense recording amount is set as a result of ratio distribution by activity number and task number to the indirectly allocated cost amount of the actual cost master (FIG. 21: 11J1). (As described above, if an activity number or task number is entered, direct assignment is made.)
[0240]
The business number can be correlated only when it is present in the business information master (FIG. 9: 10M5) by checking whether the charge source department code is equal to the business department code. The business name is used when the business name of the business information master (FIG. 9: 10M5) is defined in more detail.
[0241]
FIG. 36 shows a scheduled charge rate registration (correction, addition) screen (1) -1 (11N3). This is a screen for registering the scheduled charge rate and the planned cost driver amount for each input year, each recording date, each charge source department code, each activity number, and each task number.
[0242]
When this screen is selected based on the input year and the charge source department, all items on the screen are edited from the registered contents of the head office activity master (FIG. 10: 11M1) and cost driver master (FIG. 13: 11M4). Is displayed. Also, the registration contents here are set in the cost driver master (FIG. 13: 11M4).
[0243]
The ratio setting category is an allocation standard used when the cost recorded by the charge source department code is indirectly allocated. For example, “0” (ratio setting is normal) is a method of setting a configuration ratio (percentage) in advance between the activity number and task number in the charge source department code. In the illustrated example, among the activity numbers and task numbers defined by the charge source department code “109700” and the charge source department name “Personnel Administration Department (Osaka)”, “8000-01”, “8001-01”, Ratios of 50%, 30%, and 20% are set for “8001-19”, respectively.
[0244]
The ratio area is an area for setting the configuration ratio only when the ratio setting category is “0” (normal ratio setting). In this case, the cost recorded by the charge source department code is distributed by the ratio for each activity number and task number, except for the direct allocation designated cost.
[0245]
If this result is shown by the actual cost master (FIG. 21: 11J1), it is as follows. When the indirect allocation cost amounts are totaled by recording date, charge source department code, activity number, and task number, in the charge source department “109700”, “8000-01”, “8001-01”, “8001-19” "Are 68,623 yen, 41,173 yen, 27,450 yen, respectively, and the ratios set above are 50%, 30%, and 20%.
[0246]
The reference department code is used when another charge source department code in the same ABC aggregation department applies the ratio setting classification set in a certain charge destination department code. This example is shown in the subsequent scheduled charge rate registration screen (1) -2 (FIG. 37: 11N4).
[0247]
FIG. 37 shows the scheduled charge rate registration screen (1) -2 (11N4). This is an example of the case where the ratio setting category is “1” (refer to the ratio setting department) on the scheduled charge rate registration screen (1).
[0248]
This is a screen for registering the planned charge rate and the planned cost driver amount for each input year, each recording date, each charge source department code, each activity number, and each task number.
[0249]
When this screen is selected based on the input year and charge source department, all items on the screen are edited and displayed from the registered contents of the head office activity master (Fig. 10: 11M1) and cost driver master (Fig. 13: 11M4). Is done. Also, the registration contents here are set in the cost driver master (FIG. 13: 11M4).
[0250]
The ratio setting category is an allocation standard used when the cost recorded by the charge source department code is indirectly allocated. In this example, the charge source department code “209701” and the charge source department name “HR General Affairs Department (Tokyo and others)” have the same ABC aggregation department setting, the charge source department code “109700”, the charge source department name “HR General Affairs”. By referring to the ratio of the activity number / task number composition ratio (percent) of “part (Osaka)”, the indirect allocation cost amount among the costs recorded by the charge source department code “209701” is set to “8000-01”, “8001-01” and “8001-19” are allocated to 50%, 30%, and 20%.
[0251]
In addition to this, the ratio setting category is set to "2" (daily work time ratio) or "2", which is the composition ratio for each activity number and task number in the charge source department code of the daily work time. In the charge source department code of the standard cost amount by activity number and task number calculated from the daily work time. "4" (Daily work time amount ratio) for which the composition ratio was calculated, and "5" (Daily work time amount ratio section reference) for referring to the daily work time amount ratio of the department set in "4" and so on. These pieces of information include work hours (hours) by cost driver master (FIG. 13: 11M4) and daily work performance data file (FIG. 16: 10D2) by recording date, by department code, by task number by activity number, Calculate the ratio using the standard cost amount.
[0252]
FIG. 38 shows the scheduled charge rate registration screen (2) (11N5). This is a screen for registering the scheduled charge rate and the planned cost driver amount for each input year, each recording date, each charge source department code, each activity number, and each task number. The scheduled charge rate registration screen (1) -1 (FIG. 36: 11N3) is input by the charge source department code by activity number and by task number, whereas the scheduled charge rate registration screen (2) (FIG. 38: 11N5) Can determine the ABC aggregation department code, activity number, and task number in advance, and input them into the charge source department code bundled in the ABC aggregation department.
[0253]
When this screen is selected based on the input year, ABC aggregation department code, activity number, and task number, the registration information of the head office activity master (Fig. 10: 11M1) and cost driver master (Fig. 13: 11M4) is displayed on the screen. All items are edited and displayed. Also, the registration contents here are set in the cost driver master (FIG. 13: 11M4).
[0254]
For example, if the charge source department code “109700” is scheduled to be copied to the charge source department code “209700”, the scheduled charge rate and the planned cost driver amount for each recording date, “C”, Specify “P” in the copy destination instruction area. Only one copy source can be specified, but a plurality of copy destinations can be specified.
[0255]
FIG. 39 shows an actual cost driver amount registration screen (11N6). This is the actual cost driver amount when allocating (charging) to the charging destination department, not the automatic acquisition, but the actual value by accounting year, charging source department code, activity number, task number, and charging destination department code. This is a screen for registration. That is, the input is prioritized over the time data manually input by the month and entered by the individual.
[0256]
This screen displays the activity number, task number, activity name, task name, rate unit, and planned cost driver amount of the charge source department in advance by selecting the recording date and charge source department code. The
[0257]
The headquarters activity master (Fig. 10: 11M1) is searched by ABC aggregation department code, activity number, and task number, and the charge pattern is "00" (normal) and exists in the automatic acquisition master (Fig. 11: 11M2) If not, the result value registration type will be displayed on the screen. The planned cost driver amount is set from the corresponding recording date of the cost driver master (FIG. 13: 11M4).
[0258]
The result of inputting the actual input cost driver amount by charge destination department is the actual cost by charge date master, by charge source department code, by activity number, by task number, by charge destination department in the charge cost master (FIG. 22: 11J2). Set as driver amount.
[0259]
Further, the output screen of the information system server 11 includes the following.
[0260]
FIG. 40 shows an ABC performance inquiry screen (menu screen) (11S1). This includes a charge destination department list display screen (FIG. 41: 12S1), a charge destination department details display screen (FIG. 42: 12S2), a charge source department list display screen (FIG. 43: 12S3), It is a selection menu screen of a charge source department detail display screen (FIG. 44: 12S4) and an activity / task ABC profit / loss detail display screen (FIG. 45: 12S5). Select one of the forms (display screen) using the radio button.
[0261]
For the target date, specify the date of recording of the data to be inquired with a 4-digit year and a 2-digit month.
[0262]
When the charge destination department list display screen (FIG. 41: 12S1) and the charge destination department details display screen (FIG. 42: 12S2) are selected, the department designation category is “1” (department code) or “3” (group). Can be specified.
[0263]
When the charge source department list display screen (FIG. 43: 12S3), the charge source department detail display screen (FIG. 44: 12S4), and the activity / task ABC profit / loss detail display screen (FIG. 45: 12S5) are selected The classification can be designated as “1” (department code) or “2” (ABC aggregation department).
[0264]
When the department designation category is “1” (department code), the department code of the department master (FIG. 5: 10M1) can be designated as the target department.
[0265]
When the department designation category is “2” (ABC aggregation department), the ABC department in the department master (10M1) can be designated as the target department.
[0266]
When the department designation category is “3” (group), the department of the department master (10M1) can be designated as the target department.
[0267]
The activity / task is indispensable when selecting a charge destination department detail display screen (FIG. 42: 12S2) and a charge source department detail display screen (FIG. 44: 12S4). The ABC profit / loss statement display screen for each activity / task (FIG. 45: 12S5) is optional. If any other option is selected, input is not possible.
[0268]
Finally, the output screen of the form server 12 will be described.
[0269]
FIG. 41 shows a charge destination department list display screen (12S1). This is a screen that extracts the allocation result details (Fig. 24, 25: 11J3) under the conditions specified on the ABC result inquiry display screen (Fig. 40: 11S1) and makes a list inquiry of the allocation results viewed from the charge destination department It is.
[0270]
In the example shown in the figure, the target date is April 1999, the department designation category is specified as “1” (department code), the target department is designated as “173000”, and the allocation result details (FIG. 24, 25: 11J3) are recorded. This is a record in which the date is “199904” and the charge department code is “173000”.
[0271]
The target department is displayed from the department name and department code of the department master (FIG. 5: 10M1). Since the department designation category is “1” (department code), “department code designation” is displayed.
[0272]
As the activity name, task name, number, driver name, and rate unit, the activity name, task name, activity number, task number, cost driver name, and rate unit of the head office activity master (FIG. 10: 11M1) are displayed.
[0273]
The charge rate, cost driver, in-regulation charge fee (yen), and non-regulation charge fee (yen) are the estimated charge rate, actual cost driver amount, and actual charge cost amount of the actual allocation details (FIGS. 24 and 25: 11J3), respectively. , Standard cost amount is displayed.
[0274]
In addition to the detail line, the display lines include a subtotal line for the charge source department and a total line for the charge destination department, and only the charge charge within the standard (yen) and the charge charge within the standard (yen) are displayed in total.
[0275]
FIG. 42 shows a charge destination department detail display screen (12S2). This is because the charge cost master (FIGS. 22 and 23: 11J2) and the allocation result details (FIGS. 24 and 25: 11J3) are extracted under the conditions specified on the ABC result inquiry display screen (FIG. 40: 11S1), and the charge destination It is a screen which carries out the detailed inquiry of the allocation performance seen from the department.
[0276]
In the illustrated example, the target date is April 1999, the department designation category is “1” (department code), the target department is “173000”, the activity / task is designated “8001-01”, and the charge cost master ( 22/23: 11J2), allocation record details (FIG. 24/25: 11J3), date of recording “199904”, charging department code “173000”, activity number “8001”, task number “01” Is extracted and queried.
[0277]
For the target department, the department name and department code of the department master (FIG. 5: 10M1) are displayed. Since the department designation category is “1” (department code), “department code designation” is displayed.
[0278]
The activity name, task name, number, driver name, rate unit, charge pattern, charge classification are the activity name, task name, activity number, task number, cost driver name, rate unit of the head office activity master (FIG. 10: 11M1), respectively. , Charge pattern and charge category are displayed.
[0279]
Within the regulations, records whose allocation category of the actual allocation details (FIGS. 24 and 25: 11J3) is “1” (within regulations) are displayed. The department name of the charge source department is acquired from the department master (FIG. 5: 10M1) and displayed. The charge source department code, charge rate, cost driver, and charge charge (yen) include the charge source department, the scheduled charge rate, the actual cost driver amount, and the actual charge cost amount in the actual allocation details (FIGS. 24 and 25: 11J3). Is displayed.
[0280]
When there is a non-standard, records with a charge category (2) (non-standard / business number) and “3” (non-standard / department) in the charge cost master (FIG. 22: 23 J2) are displayed. In the example shown in the figure, the regulation classification “3” (non-regulation / department) has been extracted, so the non-regulation display is department: 173000. When the regulation category is “2” (non-regulation / business number), it is displayed in the format of business number: XXXX.
[0281]
For non-regulated charges, the charge source department code, charge rate, cost driver, and charge charge (yen) are designated department, scheduled charge rate, actual cost driver amount, standard of charge cost master (Fig.22 ・ 23: 11J2), respectively. The cost amount is displayed.
[0282]
In addition to the detail line, the display line includes a subtotal line of the charge source department and a total line of the charge destination department, and only the charge fee (yen) is displayed in total.
[0283]
FIG. 43 shows a charge source department list display screen (FIG. 43: 12S3). This is a screen that extracts the allocation result details (Fig. 24, 25: 11J3) under the conditions specified on the ABC result inquiry screen (Fig. 40: 11S1) and makes a list inquiry of the allocation results viewed from the charge source department. is there.
[0284]
In the example shown in the figure, the target date is April 1999, the department designation category is “1” (department code), the target department is designated “109700”, and the allocation result details (FIG. 24, 25: 11J3) are recorded. This is a record in which the date is “199904” and the charge source department code is “109700”.
[0285]
For the target department, the department name and department code of the department master (FIG. 5: 10M1) are displayed. Since the department designation category is “1” (department code), “department code designation” is displayed.
[0286]
As the activity name, task name, number, driver name, and rate unit, the activity name, task name, activity number, task number, cost driver name, and rate unit of the head office activity master (FIG. 10: 11M1) are displayed.
[0287]
The charge rate, cost driver, in-regulation charge fee (yen), and non-regulation charge fee (yen) are the estimated charge rate, actual cost driver amount, and actual charge cost amount of the actual allocation details (FIGS. 24 and 25: 11J3), respectively. , Standard cost amount is displayed.
[0288]
In addition to the detail line, there is a total line of the charge source department code, and only the specified charge charge (yen) and the specified charge charge (yen) are displayed in total.
[0289]
FIG. 44 shows a charge source department detail display screen (FIG. 44: 12S4). This extracts the charge cost master (Figs. 22 and 23: 11J2) and the allocation results details (Figs. 24 and 25: 11J3) under the conditions specified on the ABC results inquiry screen (Fig. 40: 11S1), and from the charge source department This is a screen for inquiring about the details of the actual allocation seen.
[0290]
In the illustrated example, the target date is April 1999, the department designation category is “1” (department code), the target department is “109700”, the activity task is designated “8001-01”, and the charge cost master ( 22/23: 11J2), allocation record details (FIG. 24/25: 11J3), date of recording “199904”, charge destination department code “109700”, activity number “8001”, task number “01” Is extracted and queried.
[0291]
For the target department, the department name and department code of the department master (FIG. 5: 10M1) are displayed. Since the department designation category is “1” (department code), “department code designation” is displayed.
[0292]
The activity name, task name, number, driver name, rate unit, charge pattern, charge classification are the activity name, task name, activity number, task number, cost driver name, rate unit of the head office activity master (FIG. 10: 11M1), respectively. , Charge pattern and charge category are displayed.
[0293]
The charge-destination department is based on the charge-destination department of the allocation performance details (FIGS. 24 and 25: 11J3) within the regulations, and the department master based on the designated department of the charge cost master (FIGS. 22 and 23: 11J2) when the regulations are not specified (FIG. 5: 10M1) is displayed after the department name is acquired.
[0294]
Within the regulation, the record of the regulation classification “1” (within regulation) of the allocation result details (FIGS. 24 and 25: 11J3) is displayed in the regulation line. As the charge rate, cost driver, and charge charge (yen), the scheduled charge rate, actual cost driver amount, and actual charge cost amount of the allocation actual item details (FIG. 24, 25: 11J3) are displayed.
[0295]
When there is a non-standard, records of the regulation category “2” (non-standard / business number) and “3” (non-standard / department) of the charge cost master (FIG. 22: 23 J2) are displayed.
[0296]
In the illustrated example, the charge destination department is “106100”, the department name is “XY development first G”, the regulation category is “2” (non-regulation / business number), the charge destination department code is “173000”, and the department name is “QR”. Since the regulation classification “3” (non-regulation / department) is extracted in the marketing first G ”, it is displayed in the non-regulation work number line and the non-regulation department line, respectively.
[0297]
For non-regulated charges, the charge rate, cost driver, and charge fee (yen) are displayed as the scheduled charge rate, actual cost driver amount, and standard cost amount of the charge cost master (FIG. 22: 23 J2), respectively.
[0298]
In addition to the detail line, the display line includes the total line of the charge source department, the cost driver and charge charge (yen) are displayed within the regulation, non-regular work number, and the total for each non-regulation department. Displays the result of dividing the row charge charge (yen) by the cost driver.
[0299]
FIG. 45 shows an ABC profit / loss statement display screen (12S5) by activity / task. This is a condition specified on the ABC result inquiry screen (FIG. 40: 11S1), the result cost master (FIG. 21: 11J1), the cost driver master (FIG. 13: 11M4), the charge cost master (FIGS. 22 and 23: 11J2). ), An allocation result detail (FIG. 24, 25: 11J3) is extracted, and a profit and loss detail inquiry by activity number and task number viewed from the charge source department is performed. The display condition is that the actual cost master (FIG. 21: 11J1), the charge cost master (FIGS. 22 and 23: 11J2), and the allocation actual details (FIGS. 24 and 25: 11J3) have a result other than “0”. That is.
[0300]
In the example shown in the figure, the target date is April 1999, the department designation category is “1” (department code), the target department is “109700”, and the activity / task is designated as “8001-01”. .
[0301]
The aggregation department is displayed after obtaining the department name of the department master (FIG. 26: 10M1) with the department code that bundles the charge source departments.
[0302]
The activity name, task name, number, driver name, rate unit, charge pattern, charge classification are the activity name, task name, activity number, task number, cost driver name, rate unit of the head office activity master (FIG. 10: 11M1), respectively. , Charge pattern and charge category are displayed.
[0303]
In the actual result line within the regulations, the sum of the indirect allocation cost amount and the direct allocation cost amount of the actual cost master (FIG. 21: 11J1) is displayed in the charge fee (yen). The actual cost driver amount of the actual allocation details (FIGS. 24 and 25: 11J3) is displayed on the cost driver. The charge rate is the result of dividing the charge fee (yen) by the cost driver.
[0304]
In the scheduled line within the regulations, the planned charge rate and the planned cost driver amount of the cost driver master (FIG. 13: 11M4) are displayed in the charge rate and the cost driver, respectively, and the result of multiplying them is displayed in the charge charge (yen). Is done.
[0305]
In the charge line within the regulations, the planned charge rate, actual cost driver amount, and actual charge cost amount of the allocation actual details (FIG. 24, 25: 11J3) are displayed in the charge rate, cost driver, and charge fee (yen), respectively. .
[0306]
For the planned profit / loss line within the regulations, the result of subtracting the charge charge (yen) for the actual line from the charge charge (yen) for the planned line within the regulations is displayed in the charge charge (yen).
[0307]
The charge charge profit / loss banks within the regulations are the cost driver and charge charges (yen) subtracted from the cost drivers and charge charges (yen) of the above regulations, respectively. Is displayed.
[0308]
The activity profit / loss banks within the regulations are the cost driver and charge charges (yen) subtracted from the cost drivers and charge charges (yen), and the results of subtracting the charge driver (yen) from the actual line. Is displayed.
[0309]
The non-standard / business number line is only the concept of charge. Scheduled charge rate, actual cost driver amount, and standard cost amount of charge cost master (Figures 22 and 23: 11J2) specified category “2” (non-specified / business number) are charge rate, cost driver, charge fee (yen respectively) ) Is displayed.
[0310]
For the non-regulation / department line, only the charge concept is used. Scheduled charge rate, actual cost driver amount, and standard cost amount of charge cost master (Figures 22 and 23: 11J2) are “3” (non-specified / department) are charge rate, cost driver, and charge fee (yen), respectively. Is displayed.
[0311]
In addition to the detail lines, the display lines include a total line for the charge source department and the aggregate department, and the cost driver and charge charge (yen) are displayed within the specified, non-specified business number, and the total value of the non-specified department. At that time, the result of dividing the charge charge (yen) by the cost driver is displayed as the charge rate, excluding the profit / loss display line.
[0312]
The processing of the indirect cost management (allocation) system mainly comprises the following four processes.
[0313]
There are four types: account system result registration process (PA), information system result registration process (PB), main process (PC), and output process (PD).
[0314]
The account system result registration process (FIG. 46: PA) refers to the registration process to the account system server 10 on the input / output related diagram of the overhead management (allocation) system of FIG. 10 to save.
[0315]
The information system result registration process (FIG. 47: PB) indicates the registration process to the information system server 11 on the input / output relation diagram of the overhead management (allocation) system of FIG. 11 is a process of storing the data in the memory 11.
[0316]
The main process (FIG. 48: PC) is a monthly batch process (generally performed once at the end of the month). The main contents are the following two points. First, based on the data input in the account system result registration process (FIG. 46: PA) and the information system result registration process (FIG. 47: PB), the actual cost is distributed by activity number and task number. It is processing. The second is a process of allocating (charging) the amount obtained by multiplying the scheduled charge rate and the actual cost driver amount to the charge destination department.
[0317]
The output process (FIG. 49: PD) is an inquiry instruction process (FIG. 40, ABC result inquiry: 11S1) of the information system server 11 on the input / output related diagram of the overhead management (allocation) system of FIG. 12 is a process for displaying the allocation result of the main process (FIG. 48: PC).
[0318]
FIG. 46 shows the account system result registration process (PA). This is a process (accounting server actual value registration: A1) for registering the accounting data necessary for the overhead server (allocation) system at any time with respect to the accounting server 10.
[0319]
The input screen of the account server actual value registration (A1) includes the daily work result registration screen (FIG. 26: 10N1), the MM slip input screen (FIGS. 27 and 28: 10N2, 10N3), the FI slip input screen ( Fig. 29: 10N4), workflow input screen (in-house sales) (Fig. 30: 10N5) workflow input screen (personal replacement) (Fig. 31: 10N6), workflow input screen (domestic business trip expenses) (Fig. 32: 10N7), workflow input There is a screen (settlement of transportation expenses etc.) (FIG. 33: 10N8). This relationship is shown in the input / output relation diagram of FIG.
[0320]
FIG. 47 shows information system result registration processing (PB). This is a process (actual value registration: B <b> 2) for performing monthly data registration on the information server 11. The actual value registration (B2) includes actual cost driver amount registration (FIG. 39: 11N6).
[0321]
FIG. 48 shows the main process (PC). The transaction details data file (FIG. 15: 10D1), daily work result data file (FIG. 16: 10D2) of the account server 10 for the previous month, and the result automatic acquisition data file (FIG. 17) of the information server 11 at the beginning of the month. : 11D1), after pasting information of various masters of the accounting server 10 (FIGS. 5-9: 10M1 to 10M5) and various masters of the information server 11 (FIGS. 10-14: 11M1 to 11M5), the information server 11 The actual cost master (FIG. 21: 11J1), the charge cost master (FIGS. 22 and 23: 11J2), and the allocation actual detail file (FIGS. 24 and 25: 11J3).
[0322]
C1 indicates actual cost amount acquisition processing. This obtains the actual cost amount for each charge source department code and management accounting line number from the transaction details data file (FIG. 15: 10D1) of the accounting server 10, and creates the actual cost data file (FIG. 18: 11D2). It is processing to do. At that time, if ABC = activity number + task number is specified in the detailed text, or if the business number is registered in the ABC business number master (FIG. 12: 11M3) and the activity number and task number can be acquired, directly The activity number and task number are set in the actual cost data file (FIG. 18: 11D2).
[0323]
From the daily work result data file of the accounting server 10 (FIG. 16: 10D2), the work time is totaled by charge source department code, activity number, task number, and employee number. The employee master (FIG. 7: 10M3) of the accounting server 10 is read with the employee number, and the personnel cost rank is acquired. Furthermore, the unit price master of the accounting server 10 (FIG. 8: 10M4) is read in the labor cost rank, the labor cost unit price (yen / hour) and the building cost unit price (yen / hour) are acquired and added, and the standard cost for each employee number Calculate the unit price (yen / hour). Next, the standard cost unit price (yen / hour) is multiplied by the total work time to calculate the standard cost amount as the direct allocation cost. This is set to the standard cost amount of the actual cost data file (FIG. 18: 11D2). Further, the charge source department code, the management accounting line number “personnel expense”, the activity number, and the task number are set, and an actual cost data file (FIG. 18: 11D2) is created.
[0324]
From the actual cost amount for the indirect allocation of the management accounting line number “personnel cost” in the actual cost data file (FIG. 18: 11D2) created from the transaction details data file (FIG. 15: 10D1) of the accounting server 10 The standard cost amount (above) for direct allocation created from the daily work result data file (FIG. 16: 10D2) of the accounting server 10 is subtracted, and a part of indirect allocation is replaced with direct allocation.
[0325]
50 to 54 show the actual cost distribution process (C2). First, the actual cost amount for direct allocation is set to the direct cost amount of the designated charge source department code, activity number, task number, and management accounting line number, and the actual cost master (FIG. 21: 11J1) is created.
[0326]
The setting of the actual cost amount for indirect allocation is as follows. First, the ratio (distribution ratio) for each charge source department code, activity number, and task number is acquired from the ratio setting category and reference department of the cost driver master (FIG. 13: 11M4). Next, the calculation result obtained by multiplying the actual cost amount by the acquired distribution ratio is set to the actual cost amount for each charge department code, activity number, task number, and management accounting line number. 21: 11J1).
[0327]
There are seven types of ratio setting categories at the time of indirect allocation.
[0328]
(1) Ratio setting normal: A ratio (distribution ratio) for distributing the actual cost amount to the activity number and task number for each charge source department is pre-registered.
(2) Ratio setting department reference: The distribution ratio that is pre-registered by other charge source departments in the normal ratio setting is referred to and used.
(3) Daily work time ratio: Uses the ratio of the total work time for each task number and activity number entered in the daily work result data file (Fig. 16: 10D2) for each charge source department as the distribution ratio. To do.
(4) Refer to the daily work time ratio: The distribution ratio acquired by the other charge source department at the daily work time ratio is used as a reference.
(5) Daily work cost ratio: Every month, for each charge source department, the work time input in the daily work performance data file (FIG. 16: 10D2) is multiplied by the standard cost unit price to calculate the standard cost amount. Furthermore, the ratio of the total standard cost amount for each activity number and task number is used as the distribution ratio.
(6) Reference daily work cost ratio: Reference and use the distribution ratio acquired by the other charge source department at the daily work time ratio.
(7) Equal: Sort by activity number / task number registered in the head office activity master (FIG. 10: 11M1) for each charge source department.
[0329]
50, in the actual cost data reading (C201), the actual cost data file (FIG. 16: 11D2) of the information system server 11 is read for each charge source department code and management accounting line number.
[0330]
The actual cost master output (C202) is a process for outputting the directly assigned cost. First, the actual cost amount is set to the direct cost amount of the actual cost master (FIG. 21: 11J1). Next, the charge source department code, activity number, task number, and management accounting line number are set, and an actual cost master (FIG. 21: 11J1) is created.
[0331]
In the ratio setting category acquisition (C203), the cost driver master (FIG. 13: 11M4) of the information system server 11 is read with the charge source department code, and the ratio setting category is acquired.
[0332]
In FIG. 51, in the per capita allocation information acquisition (C204), the head office activity master (FIG. 10: 11M1) of the information system server 11 is read with the charge source department code, and the registration number for each activity number / task number is acquired.
[0333]
In the activity number / task number acquisition (C205), the head office activity master (FIG. 10: 11M1) is read with the charge source department code, and the activity number / task number is acquired.
[0334]
In the actual cost amount allocation 1 (C206), the actual cost amount divided by the number of registrations of the per capita information acquisition (C204) is set as the actual cost amount allocation amount.
[0335]
The actual cost master output (C207) is a process for outputting the cost that has been indirectly allocated. First, the actual cost allocation amount is set to the indirect cost amount of the actual cost master (FIG. 21: 11J1). Next, the charge source department code, activity number, task number, and management accounting line number are set, and the actual cost master (FIG. 21: 11J1) is created.
[0336]
In the actual cost master fraction adjustment (C208), the actual cost allocation amount is totaled using the charge source department code and the management accounting line number as keys, and the difference between the total amount and the actual cost amount is the smallest activity number of the same key, The task number is added to the actual cost master (FIG. 21: 11J1).
[0337]
52, in the ratio target department set 1 (C209), the charge source department code is set in the ratio reference department area of the memory.
[0338]
In the ratio target department set 2 (C210), the cost driver master (FIG. 13: 11M4) is read with the charge source department code, and the acquired reference department is set in the ratio reference department area.
[0339]
In the ratio acquisition (C211), the cost driver master (FIG. 13: 11M4) of the information system server 11 is read with the charge source department code in the ratio reference department area, and the activity number, task number, and ratio other than the ratio 0 are acquired.
[0340]
In actual cost amount allocation 2 (C212), the actual cost amount is calculated by multiplying the actual cost amount by the ratio (%) of the ratio acquisition (C211) and dividing by 100.
[0341]
The actual cost master output (C213) is a process of outputting the cost that has been indirectly allocated. First, the actual cost allocation amount is set to the indirect cost amount of the actual cost master (FIG. 21: 11J1). Next, the charge source department code, activity number, task number, and management accounting line number are set, and the actual cost master (FIG. 21: 11J1) is created.
[0342]
In FIG. 53, in the time ratio target department set 1 (C214), the charge source department is set in the time ratio reference department area of the memory.
[0343]
In the time ratio target department set 2 (C215), the cost driver master (FIG. 13: 11M4) is read with the charge source department code, and the acquired reference department is set in the time ratio reference department area.
[0344]
In the target activity / task acquisition (C216), the head office activity master (FIG. 10: 11M1) of the information system server 11 is read with the charge source department code, and the registered activity number / task number is acquired.
[0345]
In the daily work total time acquisition (C217), the daily work result data file of the accounting server 10 (FIG. 16: FIG. 16) using the time ratio reference department and the activity number and task number acquired in the target activity / task acquisition (C216) as keys. 10D2) is read, the work time is totaled, and the total time is acquired.
[0346]
In the daily work time acquisition (C218), the daily work result data file (FIG. 16: 10D2) of the accounting server 10 is obtained with the time ratio reference department and the activity number and task number acquired in the target activity / task acquisition (C216). Read and get work time.
[0347]
In actual cost amount allocation 3 (C219), the actual cost amount is multiplied by the work time of daily work time acquisition (C218), and the result of multiplication is divided by the total time of daily work total time acquisition (C217). Is the actual cost allocation amount.
[0348]
The actual cost master output (C220) is a process of outputting the cost that has been indirectly allocated. First, the actual cost allocation amount is set to the indirect cost amount of the actual cost master (FIG. 21: 11J1). Next, the charge source department code, activity number, task number, and management accounting line number are set, and the actual cost master (FIG. 21: 11J1) is created.
[0349]
54, in the cost ratio target department set 1 (C221), the charge source department code is set in the cost ratio reference department area.
[0350]
In the cost ratio target department set 2 (C222), the cost driver master (FIG. 13: 11M4) is read with the charge source department code, and the acquired reference department is set in the cost ratio reference department area.
[0351]
In the target activity / task acquisition (C223), the head office activity master (FIG. 10: 11M1) of the information system server 11 is read by the charge source department, and the registered activity number and task number are acquired.
[0352]
In the standard cost total amount acquisition (C224), the actual cost data file (FIG. 18: 11D2) of the information system server 11 is read with the activity number and task number acquired in the cost ratio reference department and target activity / task acquisition (C223). , Total the standard cost amount and obtain the total standard cost.
[0353]
In the standard cost amount acquisition (C225), the actual cost data (FIG. 18: 11D2) of the information system server 11 is read with the activity number and task number acquired in the cost ratio reference department and target activity / task acquisition (C223). Get the cost amount.
[0354]
Actual cost amount allocation 4 (C226) is obtained by multiplying the actual cost amount by the standard cost amount of standard cost amount acquisition (C225) and dividing the multiplication result by the total standard cost of standard cost total amount acquisition (C224). , Actual cost allocation amount.
[0355]
The actual cost master output (C227) is a process of outputting the cost that has been indirectly allocated. First, the actual cost allocation amount is set to the indirect cost amount of the actual cost master (FIG. 21: 11J1). Next, the charge source department code, activity number, task number, and management accounting line number are set, and the actual cost master (FIG. 21: 11J1) is created.
[0356]
Returning to FIG. 48, the automatic cost driver amount acquisition processing (C3) is performed in the transaction details data file of the account server 10 for each data type and data type branch number of the automatic acquisition master (FIG. 11: 11M2) of the information server 11. (FIG. 15: 10D1), a process of acquiring the actual cost driver amount for each charge source department code or charge destination department code from data such as a daily work result data file (FIG. 16: 10D2).
[0357]
ABC acquisition department code, activity number, task number, regulation category “1” (within regulation), acquired charge source department code, charge destination department code (designated department code), actual cost of automatic acquisition master (FIG. 11: 11M2) The amount of drivers is output (written) to the automatic record data file (FIG. 17: 11D1) of the information system server as specified data.
[0358]
55 to 56 show the non-standard charge processing (C4) (FIG. 48). First, when a department designation (B = department code) or a work number designation (W = work number) is made for the deliverable ID of the daily work result data file (FIG. 16: 10D2) of the accounting server 10 Multiply the work time for each charge source department code, for each activity number, for each task number, and for each employee number by the standard cost unit price acquired in the same manner as the actual cost amount acquisition (C1) to obtain the standard cost amount. In addition, the charge source department code, activity number, task number, designated department code, designated business number, specified category “2” (non-standard / department) “3” (non-standard / business number), obtained standard The cost amount is output (written) to non-regulated data as a result automatic acquisition data file (FIG. 17: 11D1) of the information system server 11.
[0359]
The charge department code is acquired from the specified department code or specified business number, and the charge source department code, activity number, task number, charge destination department code, specified category, specified business number, specified department code, standard cost The amount is output (written) to the charge cost master (FIG. 22, FIG. 23: 11J2).
[0360]
In FIG. 55, in the daily work performance data reading (C401), the daily work performance data file (FIG. 16: 10D2) of the accounting server 10 is classified by charge source department code, activity number, task number, and employee number. , Read by product ID.
[0361]
In the charge source category check (C402), the department master (FIG. 5: 10M1) of the accounting server 10 is read by the charge source sector, and the charge source category is acquired.
[0362]
In the activity / task existence check (C403), the head office activity master (FIG. 10: 11M1) of the information system server 11 is read with the charge source department and activity number task number.
[0363]
56, in the business information master existence check (C404), the business information master (FIG. 9: 10M5) of the accounting server 10 is read with the business number, and the business department code is acquired.
[0364]
In the charge destination department check (C405), the department master (FIG. 5: 10M1) of the accounting server 10 is set with the designated department code or the business department code acquired in the business information master existence check (C404) as the charge department code. Read and acquire the charge destination category.
[0365]
In the labor cost rank acquisition (C406), the employee master (FIG. 7: 10M3) of the account server 10 is read with the employee number, and the labor cost rank is acquired.
[0366]
In the standard cost unit price acquisition (C407), the unit price master (FIG. 8: 10M4) of the accounting server 10 is read with the labor cost rank (using as a key), and the labor cost unit price (yen / hour) and the building cost unit price (yen / hour). ) To get. The labor cost unit price (yen / hour) and the building cost unit price (yen / hour) are added, and the addition result is set in the standard cost unit price (yen / hour) area of the memory.
[0367]
In the standard cost amount calculation (C408), the standard cost amount is obtained by multiplying the work time and the standard cost unit price (yen / hour) calculated in the standard cost unit price acquisition (C407).
[0368]
In the automatic results acquisition data output (C409), the charge source department code, activity number, task number, designated department code, designated business number, regulation category “2” (non-regulation / department) or “3” (regulation) (Outside / business number) and the standard cost amount are output (written) to the automatic record data file (FIG. 17: 11D1) of the information system server as unspecified data.
[0369]
In the charge cost master output (C410), the charge source department, activity number task number, charge destination department, specified classification, designated business number, designated department, and standard cost amount are output to the charge cost master (FIG. 22: 23: 11J2). (Write).
[0370]
In the specified charge processing (C5) of FIG. 48, first, the specified classification of the result automatic acquisition data file (FIG. 17: 11D1) of the information system server 11 is determined, and when it is “1” (specified), the charge source department The cost driver master (FIG. 13: 11M4) of the information server 11 is read with the code, activity number, and task number (using as keys). Next, the actual charge amount is obtained by multiplying the acquired scheduled charge rate by the actual cost driver amount. Finally, the charge source department code, the activity number, the task number, the charge destination department code, the specified category, and the actual charge amount are output (written) to the charge cost master (FIGS. 22 and 23: 11J2).
[0371]
57 to 63 show the allocation process. When the charge destination department code of the charge cost master (FIG. 223: 11J2) of the information system server 11 has been set, the charge source department code, activity number, task number, charge destination department code, specified category, actual charge amount are allocated. It outputs (writes) to the allocation result details file (FIGS. 24 and 25: 11J3).
[0372]
When the charge department code is not set, the actual charge cost amount allocated by the charge category is calculated. Next, the ratio (charge ratio) for each charge destination department code is acquired from the charge pattern. Further, the calculation result obtained by multiplying the actual charge cost amount by the acquired charge ratio is output (written) as the actual charge cost amount of the charge-destination department code to the allocation actual result detailed file (FIG. 24, 25: 11J3).
[0373]
An example of charge classification is as follows.
(1) All amount target: All amount of actual charge cost is allocated in proportion.
(2) Half price target: Half of the actual charge cost is charged to the designated department, and the remaining half is allocated as a ratio.
[0374]
An example of the charge pattern is as follows.
{Circle around (1)} Business Headquarters Input Resource: A ratio (a ratio based on the input cost of each business headquarters) for charging the actual charge cost amount to the charge destination department for each activity number and task number is pre-registered.
{Circle around (2)} Business Headquarters Equal: Divide evenly according to the number of departments master (FIG. 5: 10M1) charge destination classification is “9” (target) and business headquarters classification is “1” (target).
(3) Number of employees in each department: Divide the total number of employees for each charge-destination department obtained from the department-specific personnel master (Fig. 14: 11M5) by the total number of employees in the department to be allocated (charge-destination department), and calculate the ratio. Used as charge ratio.
[0375]
In FIG. 57, in the business headquarters input resource allocation standard reading (C601), the business headquarters input resource allocation standard file (FIG. 19: 11D3) of the information server 11 is read for each charge destination department.
[0376]
In the charge ratio file creation 1 (C602), the charge destination department code, the allocation standard amount, and the total amount of all departments acquired in the business unit input resource allocation standard reading (C601) are stored in the charge ratio file (FIG. 20: 11D4). Set to charge destination department code, charge target amount, and total charge target amount (charge pattern is set to “02”).
[0377]
58, in the department master reading (C603), the department master (FIG. 5: 10M1) of the accounting server 10 is read, and the department code / business division identification classification of the charge destination classification “9” (target) is acquired.
[0378]
In charge ratio file creation 2 (C604), the charge pattern “03” and the department code acquired by reading the department master (C603) are used as the charge pattern (“03”) and charge destination department of the charge ratio file (FIG. 20: 11D4). Set each to the code, and set “1” to the charge amount.
[0379]
In the charge ratio file update 1 (C605), the charge target amounts in the charge ratio file (FIG. 20: 11D4) of the same key (charge pattern “03”) are summed, and then the sum is set to the total charge target amount. The charge ratio file (FIG. 20: 11D4) is updated.
[0380]
In FIG. 59, department-specific personnel master reading (C606) reads the department-specific personnel master (FIG. 14: 11M5) of the information system server 11, and totals the number of personnel for each department code.
[0381]
In the charge destination category acquisition (C607), the department master (FIG. 5: 10M1) of the account server 10 is read with the department code to acquire the charge destination category.
[0382]
In the charge ratio file creation 3 (C608), the charge pattern “05”, the department code and the number of persons acquired in the department-specific personnel master reading (C606) are the charge pattern of the charge ratio file (FIG. 20: 11D4), and the charge destination department. Set to the code and charge amount respectively.
[0383]
In charge ratio file update 2 (C609), the charge target amounts in the charge ratio file (FIG. 20: 11D4) of the same key (charge pattern “05”) are summed, and then the total is set to the total charge target amount. The ratio file (FIG. 20: 11D4) is updated.
[0384]
In FIG. 60, in the charge cost master reading (C610), the charge cost master (FIG. 22, 23: 11J2) of the information system server 11 is read.
[0385]
In the allocation result detailed output 1 (C611), the charge source department, activity number, task number, charge destination department, specified category, specified business number, specified department code, actual charge cost amount, actual cost driver amount are allocated. Output (write) to the detail file (FIGS. 24 and 25: 11J3).
[0386]
In the pre-allocation process (C612), the actual charge cost amount is set in the pre-allocation cost amount area, and the actual cost driver amount is set in the pre-allocation cost driver amount area.
[0387]
In the allocation process 1 (C613), the pre-allocation amount is multiplied by 1/2 and set in the calculation result charge cost amount area. Further, the calculation result is subtracted from the pre-allocation cost amount area. Next, the contents of the pre-allocation cost driver amount area are multiplied by 1/2 and set in the calculation result cost driver amount area. Further, the calculation result is subtracted from the pre-allocation cost driver amount area.
[0388]
In the allocation result detailed output 2 (C614), the charge source department, activity number, task number, charge destination department code designated as a half price target, regulation category and calculation actual charge cost amount, calculation actual cost driver amount are allocated. Output (write) to the detail file (FIGS. 24 and 25: 11J3).
[0389]
61, in the charge ratio file reading 1 (C615), the charge ratio file (FIG. 20: 11D4) is read with the charge pattern “02”, and the charge destination department code, the charge target amount, and the total charge target amount are acquired.
[0390]
In allocation process 2 (C616), business headquarters input resource allocation is performed. Multiply the amount in the pre-allocation cost amount area by the charge target amount for each charge destination department code. The calculation result is divided by the total charge target amount and set in the calculation actual charge cost amount area. Multiply the driver amount before allocation by the charge target amount. The calculation result is divided by the total charge target amount and set in the calculation result cost driver amount area.
[0390]
In the allocation result detailed output 3 (C617), the charge source department, activity number, task number, charge destination department, specified category, calculation actual charge cost amount, and calculation actual cost driver amount are allocated in the actual allocation result file (FIGS. 24 and 25). : 11J3) is output (written).
[0392]
In FIG. 62, in the charge ratio file reading 2 (C618), the charge ratio file (FIG. 20: 11D4) is read with the charge pattern “03” to acquire the charge destination department code, the charge target amount, and the total charge target amount.
[0393]
In the allocation process 3 (C619), the business headquarters are equally allocated. Multiply the amount in the pre-allocation cost amount area by the charge target amount for each charge destination department code. The calculation result is divided by the total charge target amount and set in the calculation result charge cost amount area. Multiply the driver amount before allocation by the charge target amount. The calculation result is divided by the total charge target amount and set in the calculation result cost driver amount area.
[0394]
In the allocation result detailed output 4 (C620), the charge source department, activity number, task number, charge destination department, regulation category, calculation actual charge cost amount, and calculation actual cost driver amount are allocated in the actual allocation result file (FIGS. 24 and 25). : 11J3) is output (written).
[0395]
In FIG. 63, in the charge ratio file reading 3 (C621), the charge ratio file (FIG. 20: 11D4) is read with the charge pattern “05” to acquire the charge destination department code, the charge target amount, and the total charge target amount.
[0396]
In the allocation process 4 (C622), the division employee number allocation is performed. Multiply the amount in the pre-allocation cost amount area by the charge target amount for each charge destination department code. The calculation result is divided by the total charge target amount and set in the calculation result charge cost amount area. Multiply the driver amount before allocation by the charge target amount. The calculation result is divided by the total charge target amount and set in the calculation result cost driver amount area.
[0397]
In the allocation result detailed output 5 (C623), the charge source department, activity number, task number, charge destination department, regulation category, calculation actual charge cost amount, and calculation actual cost driver amount are allocated in the actual allocation detail file (FIGS. 24 and 25). : 11J3) is output (written).
[0398]
FIG. 49 shows output processing (PD). This is the database of the information system server 11 created by the main processing (PC) described above (actual cost master: FIG. 21: 11J1 charge cost master: FIG. 22/23: 11J2, allocation actual result detailed file: FIG. 24/25 : 11J3), and the allocation result can be inquired at any time (result inquiry: D1).
[0399]
The output screen of the result inquiry (D1) includes the above-described ABC result inquiry screen (FIG. 40: 11S1), the list display screen for each charge destination department (FIG. 41: 12S1), and the detail display screen for each charge destination department (FIG. 42: 12S2). ), A charge source department list display screen (FIG. 43: 12S3), a charge source department detail display screen (FIG. 44: 12S4), and an activity / task ABC profit / loss detail display screen (FIG. 45: 12S5). This relationship is shown in the input / output relation diagram of the overhead management (allocation) system in FIG.
[0400]
Example features
1. Indirect allocation
Indirect allocation is performed when an activity / task to which an indirect cost (indirect cost) (expense) is to be allocated is not specified, cannot be specified, or is not appropriate.
[0401]
For example, when purchasing a necessary item in a charge source department and using the item for a plurality of activities / tasks, it is not appropriate to directly assign the purchase cost of the item to a specific activity / task. When an employee in the charge source department participates in a training that is useful for multiple activities / tasks, or when an employee performs work common to multiple activities / tasks, the training costs and employee labor costs are specified for specific activities / tasks. It is difficult and unsuitable to assign to Furthermore, if the employee does not enter the work time in the daily work record registration (FIG. 26: 10N1), the labor cost for the work time cannot be assigned to a specific activity / task (although, In the above example, it is essential to enter the employee's work time, activity number, and task number. Therefore, personnel costs can always be assigned directly, but personnel costs can also be subject to indirect assignment.) .
[0402]
An indirect allocation is an indirect cost that is not appropriate, should or should not be allocated to a specific activity / task as described above that is recorded in the charge source department (this is called the indirect cost subject to indirect allocation) Allocation is allocated to a plurality of activities / tasks in the charge source department according to a predetermined allocation standard (resource driver). Specifically, the allocation standard is quantified by an allocation ratio (driver amount).
[0403]
There are the following seven types of distribution ratios.
[0404]
(1) Arbitrarily setting the distribution ratio between activities for each charge source department (ratio setting category = 0 in FIG. 36 (normal ratio setting))
(2) Apply (adopt, use) the inter-activity allocation ratio of other charge source departments set in (1) above (ratio setting category = 1 in FIG. 37 (see ratio setting department))
(3) For each charge source department, use a time ratio of daily work results input time by activity (for example, as shown in FIG. 26) as the distribution ratio between activities.
(4) Apply the inter-activity allocation ratio of other charge source departments set in (3) above.
(5) For each charge source department, calculate the labor cost (standard cost) by multiplying the daily work result input time by activity of the charge source department by the unit price as the distribution ratio between activities, and use those ratios.
(6) Apply the inter-activity allocation ratio of other charge source departments set in (5) above as they are
(7) If none of the above (1) to (6) is selected, the indirect costs recorded in the charge source department are allocated equally to all activities in the charge source department.
[0405]
The indirect allocation process will be specifically described according to the above embodiment.
[0406]
Referring to FIG. 26 (10N1) to make indirect assignment easier to understand than direct assignment, in this daily work record registration screen, an employee enters an activity number and a task number together with the employee number, and the activity / task Since the work time spent for the task is input, the labor cost is calculated based on the work time, and the labor cost is directly assigned to the entered activity number and the activity / task of the task number. This is a direct assignment.
[0407]
Even when the ABC accounting code “ABC = XXXXYY” is entered on the MM slip input 2 screen of FIG. 28 (10N3) or the FI slip input screen of FIG. 29 (10N4), the activity number and task number are also set by this ABC accounting code. Since it is entered, direct allocation is performed.
[0408]
In these input screens, if an ABC accounting code is not input, indirect allocation is performed. Also in this case, it is necessary that the department code of the charge source is input.
[0409]
Direct assignment when a business number is entered. This is because the activity number and task number can be acquired from the business number (see the ABC business master 11M3 in FIG. 12).
[0410]
The actual cost data in FIG. 18 (11D2) is referred to. This represents the overhead of a specific charge source department (charge source department code = 109700). The actual cost amount 51,064 yen in the first row has neither an activity number nor a task number. Therefore, this amount of expense is subject to indirect allocation. The actual cost amount of 1,000 yen in the second row is the target of direct allocation because activity number = 8000 and task number = 01 are entered.
[0411]
Referring to the cost driver master of FIG. 13 (11M4), for the charge source department with charge source department code = 109700, three types of activity number / task number pairs are set, and “0” is set as the ratio setting category code for these. (Ratio setting is normal) is set. The ratio setting classification code “0” corresponds to the distribution ratio setting (1) described above. The distribution ratios for the activity numbers / task numbers 8000/01, 8001/01, 8001/19 are 50, 30, and 20. (As a reminder, in FIG. 13, the ratio setting category = “2” (daily work time ratio) is the same as the allocation ratio setting in (3) above, and the ratio setting category = “1” (see the ratio setting department) , Reference department code = 109700 corresponds to the distribution ratio setting in (2) above.)
[0412]
Therefore, according to indirect allocation, the above 51,064 yen is allocated to activities / tasks 8000/01, 8001/01, 8001/19 at a ratio of 50:30:20. The result is 25,532 yen, 15,319 yen, 10,213 yen, which is the first, fifth, and eighth lines of the indirect allocation cost amount of FIG. 21 (11J1) actual cost master. Stored in In the first row, the above-mentioned direct allocation cost amount of 1,000 yen is also stored.
[0413]
Such indirect allocation processing is shown in FIGS. 50 and 52 (actual cost allocation processing).
[0414]
50, the actual cost data shown in FIG. 18 is read one record (one line) at a time (C201). In the first line, neither an activity number nor a task number is described ("No" for "actual cost amount input for each activity number / task number").
[0415]
Since the charge source department code on the first line is 109700, the ratio setting classification is read from the cost driver master of FIG. 13 using this code as a key (C203). Since the read ratio setting category is “0”, the processing proceeds to FIG.
[0416]
The charge source department code 109700 is set in the ratio reference department area (C209). Using the charge source department code 109700 of this ratio reference department area as a key, the activity number, task number and ratio (0 is set from the cost driver master of FIG. Excluding) is read (C211).
[0417]
Using the read ratio, distribution is performed as follows for each activity number / task number (actual cost amount allocation 2) (C212).
[0418]
Activity number / task number
8000/01 51,064 yen x 50/100 = 25,532 yen
8001/01 51,064 yen x 30/100 = 15,319 yen
8001/19 51,064 yen × 20/100 = 10,213 yen
[0419]
This result is written in the actual cost master of FIG. 21 (C213).
[0420]
2. Extra charge
In the overhead cost allocation (charge) system using ABC, generally, a method of allocating overhead costs to a charge destination department is determined. For example, if the unit price (scheduled charge rate) of the processing (activity / task) per expense slip and the expected number of used annuals (cost / driver amount) are determined in advance, these products will be used for the expense slip processing. Charge budget amount (income budget of the head office department). In addition, if the activities / tasks called personnel evaluations are determined in advance, the unit price per hour (scheduled charge rate) and the number of hours of work (cost / driver amount) per employee are determined in advance. This is the budget amount. The estimated charge rate above is set to an average or internally agreed amount.
[0421]
In this way, the scheduled charge rate is determined in advance for each activity / task, and the actual amount of work (actual cost / driver amount) is measured (including input by employees), so that the amount of money to be charged It can be obtained by product.
[0422]
Most generally, for each actual work, a department (charged department) to which the expenses should be charged when the actual cost / driver amount is measured is determined. As a result, a charge amount is obtained for each charge destination department. In this embodiment, in addition to setting the actual cost / driver amount for each charge destination department, there is also a method of charging (allocating) the charge amount for the work of a certain activity / task divided into a plurality of charge destination departments. Yes (detailed in “3. Cost Driver Amount Ratio Distribution” below). This allocation method is called a charge pattern.
[0423]
As described above, the head office activity master (11M1) shown in FIG. 10 defines the rules for how to allocate the indirect costs resulting from each activity / task in the head office department to the charge destination department. is there.
[0424]
The cost driver master (11M4) in FIG. 13 defines a planned charge rate and a planned cost driver amount (these products represent a budget for overhead costs) for each activity / task for each charge source department. It is.
[0425]
In this way, the charging destination is determined according to the predetermined charge rate (including the cost driver and the unit of the cost driver amount) (and charge pattern if necessary) determined in advance for each charge source department and activity / task. Charging overhead costs for each department is called charge within the rules.
[0426]
However, work in the charge source department does not always proceed as planned. Some trouble occurs, unscheduled work is required, and the work time may be significantly exceeded. If this trouble occurs for reasons that should be attributed to the charge department, the expenses incurred for this additional work should be borne by the charge department.
[0427]
Due to changes in the situation, a new project is created under the jurisdiction of one or more departments, which may cause employees in the head office department to work and incur overhead costs. This expense should be borne by the department responsible for the project.
[0428]
In addition to the pre-specified charge set in advance as described above, charging the indirect cost to be charged to the charge-destination department is called non-standard charge. May be)
[0429]
First, an example of the regulation charge will be specifically described. In the actual cost / driver amount registration screen (11N6) shown in FIG. 39 (this is a case where the charge pattern is “00” (normal)), the charge source department 109700 is the charge destination department 173000 for April 1999. And the actual cost / driver amount 6 (time) of the activity number / task number 8001/19 is input (first line).
[0430]
In C5 of FIG. 48, when the specified classification of the result automatic acquisition data file is “1” (within specification), the corresponding charge source department (109700), activity number / task number in the cost driver master of FIG. The planned charge rate (9,100 yen) for April of (8001/19) is read. The product of the actual cost / driver amount (6 hours) input on the screen of FIG. 39 and the scheduled charge rate (9,100 yen) is calculated, and the result (54,600 yen) is shown in FIGS. (See the 10th line).
[0431]
Next, an example of extra charge will be described. In the daily work result registration screen shown in FIG. 26, an employee having an employee number 333444 (department code is 109700) specifies 8001/01 as an activity number / task number, and W = R0095 (project ID or It is assumed that 5 hours is input as the work time, B = 173000 (charged department code) is input as the product ID, and 3 hours is input as the work time. These input data are first stored in the daily work performance data file (10D2) in FIG. 16 (see the second and third lines).
[0432]
In the non-regulated charge process shown in FIG. 55, data is read from the daily work performance data file (FIG. 16) one record at a time (one line at a time) (C401). If the first two digits of the product ID are “W =” or “B =”, the charge source department (109700) is the department that is the target of ABC allocation with reference to the department master in FIG. Is confirmed (charge source classification code = “2”) (C402).
[0433]
Subsequently, after the activity / task existence check (C403) (the activity / task must be included in the charge within the specification even if the charge is not specified), the first two digits of the product ID are again “ Check if B = ”.
[0434]
When the product ID is not “B =”, that is, “W =”, the business information master (10M5) in FIG. 9 is referred to in order to know the business department (charge destination department) of the project (C404). ).
[0435]
When the first two digits of the product ID are “B =”, the subsequent code is the charge destination department (173000), and when “W =”, the charge destination department is acquired in C404. The department master in FIG. 5 confirms that such a charge destination department is the charge destination target (charge destination category = “9”) (C405).
[0436]
The employee cost rank (B) of the employee is acquired from the employee master of FIG. 7 using the employee number 333444 as a key (C406), and the unit price corresponding to the personnel cost rank B is acquired from the unit price master of FIG. Standard cost unit price = personnel cost unit price (1,400 yen) + building cost unit price (400 yen) = 1800 yen is calculated (C407).
[0437]
Subsequently, standard cost amount = standard cost unit price (1,800 yen) × time (5 hours) = 9,000 yen (in the case of W = R0095), and 1,800 yen × 3 hours = 5,400 yen (B = 173000) is calculated (C408).
[0438]
The standard cost amount obtained in this way is written into the result automatic acquisition data file (FIG. 17) (see the second and third lines) (C409). The necessary data including the standard cost amount is stored in the charge cost master (FIGS. 22 and 23) (C410) (see the third and eighth lines).
[0439]
The charge rates, cost drivers, and charge charges that are calculated in this way are displayed for the charge source department as shown in FIG.
[0440]
3. Ratio distribution of cost driver amount
As described above, the charge within the regulation is the product of the actual cost driver amount and the planned charge rate as the charge cost amount. In charge within the regulation, as a general rule, the actual cost driver amount is input for each charge destination department (with the charge destination department code), so the charge cost amount is calculated for each charge destination department. This depends on the beneficiary's approach. That is, a department that uses a specific activity / task should bear an amount corresponding to the amount used.
[0441]
However, as in company-wide management operations, activity / task usage (usage) (cost driver amount) can be grasped by the entire company, but there are things that cannot be grasped by department. There are some cases where it is appropriate to grasp the usage of specific activities / tasks for a plurality of departments rather than for the whole company.
[0442]
In such a case, it is appropriate to share the cost amount among multiple departments (or all departments in the entire company). Since the scale (sales, number of people, etc.) varies from department to department, it is not appropriate to share evenly, and it is better to pre-determine the share ratio (called the distribution ratio). Since the degree of activity / task use for each department varies depending on the activity / task, the allocation ratio is determined for each activity / task.
[0443]
Specifically, the cost driver amount for a specific activity / task is allocated to a plurality of charge destination departments according to a predetermined ratio, and the activity / task is assigned to the cost driver amount allocated to each charge destination department. The amount obtained by multiplying the scheduled charge rate for the task (scheduled charge rate determined for the charge source department to which the activity / task belongs) is set as the charge cost amount for each charge destination department.
[0444]
In addition, a predetermined amount (or a predetermined ratio) of the cost driver amount for a specific activity / task is charged to a specified charge destination department, and the remaining cost driver amounts are charged to a plurality of charge destination departments at a distribution ratio. You may do it.
[0445]
Specifically, in the above-described indirect cost management system, when the charge destination department is not entered for the cost driver amount, the ratio driver charge of the cost driver amount is performed (of course, the ratio may be set). Is a premise).
[0446]
FIG. 20 shows the charge ratio file (11D4). In this file, charge target amounts 6,600,000, 4,400,000 are set for charge destination department codes 113500 and 162000, respectively, and 11,000,000 is set as a total charge target amount.
[0447]
These numerical values indicate distribution ratios and are derived from the business headquarters input resource allocation standard (11D3) in FIG. In this figure, three business divisional department codes 100900, 113500, and 162000 are set, but for the department code 100900, the allocation reference amount is zero. For the other two department codes 113500 and 162000, the above-described numerical values are set as the allocation reference amount and the total amount of all departments. These amounts indicate, for example, expenses of each business division (including not only indirect expenses but also operating expenses). In this embodiment, this amount is used as the distribution ratio. That is, the distribution ratio of the divisions with division codes 113500 and 162000 with business headquarters is 6: 4.
[0448]
Referring to FIG. 57, the business headquarters input resource allocation standard (11D3) in FIG. 19 is read line by line (C601). For the line where the allocation base amount is not 0, the read department code with business headquarters, the allocation base amount, and the total amount of all departments are stored in the charge ratio file (11D4) of FIG. The total charge target amount is set, the charge pattern is set to 02, and the charge category is set to 0 (C602). As a result, the first and second lines of the charge ratio file are created.
[0449]
In FIG. 60, the charge cost master (11J2) shown in FIGS. 22 and 23 is read line by line (C610). Since the charge destination department code is not set for the record in the first row, the process proceeds to the pre-allocation process (C612).
[0450]
In the pre-allocation process, the actual charge cost amount 225,000 of the first record read first is allocated to the pre-allocation cost amount area in the memory work area, and the actual cost driver amount 45.0 is allocated. Set in the previous driver amount area.
[0451]
Since the charge classification of the record in the first row read first is 0, the process proceeds to the process of FIG. Since the charge pattern is 02 (resources input by the business headquarters), the record (first line and second line) of the charge pattern 02 in the charge ratio file (11D4) shown in FIG. 20 is read (C615).
[0452]
For each of the two lines of records read from the charge ratio file, the charge target amount (6,600,000, 4,400,000) is added to the amount 225,000 in the pre-allocation cost amount area for each charge destination department code. ) And the result is divided by the total charge amount (11,000,000). This gives 135,000 and 90,000. Similarly, 45.0 in the driver amount area before allocation is multiplied by the charge target amount, and the result is divided by the total charge target amount. This gives 27.0 and 18.0. This means that the amount 225,000 and the cost driver amount 45.0 are allocated to the charge destination department codes 113500 and 162000 in a ratio of 6 to 4, respectively.
[0453]
These ratio distribution results are set as the actual charge cost amount and the actual cost driver amount in the first and second lines of the allocation result detail file (11J3) in FIGS. 24 and 25 (C617).
[Brief description of the drawings]
FIG. 1 shows a conceptual model of an indirect cost allocation system (indirect cost management system).
FIG. 2 is a block diagram showing a configuration of an indirect cost allocation system (indirect cost management system).
FIG. 3 is a related diagram of a database of an indirect cost allocation system (indirect cost management system).
FIG. 4 is an input / output related diagram of an indirect cost allocation system (indirect cost management system).
FIG. 5 shows an example of a department master.
FIG. 6 shows an example of an activity / task master.
FIG. 7 shows an example of an employee master.
FIG. 8 shows an example of a unit price master.
FIG. 9 shows an example of a business information master.
FIG. 10 shows an example of a head office activity master.
FIG. 11 shows an example of an automatic acquisition master.
FIG. 12 shows an example of an ABC business number master.
FIG. 13 shows an example of a cost driver master.
FIG. 14 shows an example of a department-specific personnel master.
FIG. 15 shows an example of a transaction details data file.
FIG. 16 shows an example of a daily work performance data file.
FIG. 17 shows an example of an automatic record acquisition data file.
FIG. 18 shows an example of an actual cost data file.
FIG. 19 shows an example of a business headquarters input resource allocation reference data file.
FIG. 20 shows an example of a charge ratio file.
FIG. 21 shows an example of an actual cost master.
FIG. 22 shows an example of a charge cost master.
FIG. 23 shows an example of a charge cost master.
FIG. 24 shows an example of an allocation result detail file.
FIG. 25 shows an example of an allocation result detail file.
FIG. 26 shows an example of a daily work record registration screen.
FIG. 27 shows an example of an MM slip input screen.
FIG. 28 shows an example of an MM slip input screen.
FIG. 29 shows an example of an F1 slip input screen.
FIG. 30 shows an example of a workflow input screen.
FIG. 31 shows an example of a workflow input screen.
FIG. 32 shows an example of a workflow input screen.
FIG. 33 shows an example of a workflow input screen.
FIG. 34 shows an example of a head office activity master registration screen.
FIG. 35 shows an example of an activity / business number setting screen.
FIG. 36 shows an example of a scheduled charge rate registration screen.
FIG. 37 shows an example of a scheduled charge rate registration screen.
FIG. 38 shows an example of a scheduled charge rate registration screen.
FIG. 39 shows an example of an actual cost driver amount registration screen.
FIG. 40 shows an example of an ABC performance inquiry screen.
FIG. 41 shows an example of a charge destination department list screen.
FIG. 42 shows an example of a detail screen for each charge destination department.
FIG. 43 shows an example of a charge source department list screen.
FIG. 44 shows an example of a charge source department detail screen.
FIG. 45 shows an example of ABC profit / loss statement screen by activity / task.
FIG. 46 is a flowchart of ABC accounting processing (account server).
FIG. 47 is a flowchart of ABC accounting processing (information system server).
FIG. 48 is a flowchart of ABC accounting processing (information server).
FIG. 49 is a flowchart of ABC accounting processing (information server, form server).
FIG. 50 is a flowchart of actual cost distribution processing.
FIG. 51 is a flowchart of an actual cost distribution process.
FIG. 52 is a flowchart of an actual cost distribution process.
FIG. 53 is a flowchart of actual cost distribution processing.
FIG. 54 is a flowchart of an actual cost distribution process.
FIG. 55 is a flowchart of non-regulated charge processing.
FIG. 56 is a flowchart of non-regulated charge processing.
FIG. 57 is a flowchart of an allocation process.
FIG. 58 is a flowchart of an allocation process.
FIG. 59 is a flowchart of an allocation process.
FIG. 60 is a flowchart of an allocation process.
FIG. 61 is a flowchart of an allocation process.
FIG. 62 is a flowchart of an allocation process.
FIG. 63 is a flowchart of an allocation process.
FIG. 64 is a functional block diagram of the first invention.
FIG. 65 is a functional block diagram of the first invention.
FIG. 66 is a functional block diagram of the second invention.
FIG. 67 is a functional block diagram of the third invention.
FIG. 68 is a functional block diagram of the second and third inventions.
FIG. 69 is a functional block diagram of the fourth invention.
[Explanation of symbols]
10 Account Server
11 Information server
12 Form server
13 WEB server
20, 30, 40, 50 department server
202, 203, 302, 303, 402, 403 Employee PC
10M1 department master
10M2 activity master
10M3 employee master
10M4 unit price master
10M5 business information master
10D1 transaction data file
10D2 Daily work results data file
11M1 Headquarters activity master
11M2 automatic acquisition master
11M3 ABC business number master
11M4 cost driver master
11M5 Department-specific personnel master
11D1 results automatic acquisition data file
11D2 Actual cost data file
11D3 Business Division Input Resource Allocation Standards File
11D4 charge ratio file
11J1 Actual cost master
11J2 charge cost master
11J3 Allocation result details file

Claims (15)

組織が複数の部門を含み,上記複数の部門は直接的な営利活動を行うチャージ先部門と,直接的な営利活動を行わずに上記営利活動を行うチャージ先部門を支援するチャージ元部門とに区分されており,上記チャージ先部門のために上記チャージ元部門において行われる業務活動に要するコストを,上記チャージ先部門の間接費とする配賦処理を行う間接費管理コンピュータ・システムであって,
あらかじめ定められる業務活動範囲内で行われた業務活動について,その業務活動における活動量を表すデータの入力を,上記チャージ先部門,上記業務活動の種類および上記チャージ元部門を表わすデータの入力とともに受付ける第1の入力手段,
上記業務活動の種類および上記チャージ元部門別に予定単価を記憶する予定単価記憶手段,
上記第1の入力手段から受付けられた活動量と上記予定単価記憶手段に記憶されている該当する予定単価との積を算出し,この積を上記第1の入力手段から受付けられた上記チャージ先部門の間接費とする第1の配賦手段,
あらかじめ定められる業務活動範囲を超えて行われた業務活動について,その業務活動における活動量を表すデータの入力を,その業務活動を行った社員の識別番号および上記チャージ先部門を表すデータの入力とともに受付ける第2の入力手段,
社員識別番号に対応してその社員の単位活動量に対する単価を記憶する社員別単価記憶手段,
上記第2の入力手段から受付けられた活動量と上記社員別単価記憶手段に記憶されている該当する単価との積を算出し,この積を第2の入力手段から受付けられた上記チャージ先部門の間接費とする第2の配賦手段,ならびに
上記第1および第2の配賦手段によって算出された2つの間接費を,少なくともチャージ先部門別第1の配賦手段によって算出された金額であるか,第2の配賦手段によって算出された金額であるかを区別して記憶する配賦記憶手段,
を備えた間接費管理コンピュータ・システム。
The organization includes a plurality of departments, and the plurality of departments include a charge-destination department that directly performs profit-making activities and a charge-source department that supports the charge-destination departments that perform the profit-making activities without performing direct profit-making activities. An indirect cost management computer system for performing allocation processing, in which the cost required for the business activities performed in the charge source department for the charge destination department is defined as an indirect cost of the charge destination department,
For business activities undertaken within the business activity range defined in advance, the input of data representative of the amount of activity in the business activities, the charge destination sector, together with the input data representing the type and the charge source sector of the business activity First input means to accept ,
By type and the charge based on sector of the business activities, planned unit price storage means for storing the planned unit price,
The product of the activity amount received from the first input means and the corresponding scheduled unit price stored in the scheduled unit price storage means is calculated, and this product is the charge destination received from the first input means. The first means of allocation as overhead for the department,
For business activities carried out beyond the predetermined business activity scope, input data indicating the amount of activity in the business activity, along with the identification number of the employee who performed the business activity and the data indicating the above charge department Second input means to accept ,
Unit- by-employee storage means for storing the unit price for the employee's unit activity corresponding to the employee identification number,
The product of the amount of activity received from the second input means and the corresponding unit price stored in the unit price storage means for each employee is calculated, and this product is received from the second input means. A second allocation means for indirect costs , and
Two overhead calculated by said first and second distribution means, by at least a charge destination sector, or is the amount calculated by the first distribution means, calculated by the second distribution means Allocation storage means for distinguishing and storing whether the amount is
Overhead management computer system with
上記配賦記憶手段は,上記間接費を,上記業務活動の種類別および上記チャージ元部門別に記憶する,
請求項に記載の間接費管理コンピュータ・システム。
The allocation storage means stores the overhead cost according to the type of business activity and the charge source department.
The overhead management computer system according to claim 1 .
上記配賦記憶手段に記憶された間接費の上記チャージ先部門ごとの合計を算出する算出手段をさらに備えた請求項1または2に記載の間接費管理コンピュータ・システム。 The allocation overhead management computer system according to claim 1 or 2 further comprising calculating means for calculating the sum of each the charge destination sector of the stored overhead in the storage means. 上記配賦記憶手段に記憶された間接費を,チャージ先部門別,業務活動の種類別またはチャージ元部門別に一覧表にして表示する表示手段をさらに備えた請求項に記載の間接費管理コンピュータ・システム。 The indirect cost management computer according to claim 2 , further comprising a display means for displaying the indirect cost stored in the allocation storage means as a list by charge destination department, business activity type or charge source department. System. 上記一覧表には上記予定単価および活動量の値が含まれている,請求項に記載の間接費管理コンピュータ・システム。The above table contains the value of the expected unit price and amount of activity, overhead management computer system of claim 4. 上記一覧表には第1の配賦手段によって算出された金額であるか,第2の配賦手段によって算出された金額であるかの区別が含まれている,請求項またはに記載の間接費管理コンピュータ・システム。6. The list according to claim 4 or 5 , wherein the list includes a distinction between amounts calculated by a first allocation means and amounts calculated by a second allocation means. Overhead management computer system. 上記予定単価記憶手段が予定単価に対応して予定活動量を記憶するものであり,
予定単価,予定活動量,第1の入力手段によって受付けられた活動量,上記予定単価と上記予定活動量との積,および上記予定単価と第1の入力手段から入力された活動量との積を表示する表示装置をさらに備えている,
請求項に記載の間接費管理コンピュータ・システム。
The scheduled unit price storage means stores a scheduled activity amount corresponding to the scheduled unit price,
Planned bid, expected activity level, activity amount received by the first input means, the product of the expected unit price and product of the expected activity level, and the expected unit price and amount of activity input from the first input means A display device for displaying
The overhead management computer system according to claim 1 .
上記表示装置がさらに,上記社員単価,上記第2の入力手段によって受付けられた活動量,および上記社員単価と上記第2の入力手段によって受付けられた活動量との積を表示するものである,請求項に記載の間接費管理コンピュータ・システム。The display device further displays the employee unit price, the amount of activity accepted by the second input means, and the product of the employee unit price and the amount of activity accepted by the second input means . The overhead management computer system according to claim 7 . 上記表示装置がさらに,予定単価と第1の入力手段によって受付けられた活動量との積と,上記社員単価と第2の入力手段によって受付けられた活動量との積の合計金額を表示するものである,請求項に記載の間接費管理コンピュータ・システム。The display device further displays the total amount of the product of the scheduled unit price and the amount of activity accepted by the first input means and the product of the unit price of the employee and the amount of activity accepted by the second input means. The overhead management computer system according to claim 8 , wherein: 上記表示装置がさらに,上記2つの積の差を表示するものである,請求項に記載の間接費管理コンピュータ・システム。The overhead management computer system according to claim 9 , wherein the display device further displays a difference between the two products . 上記予定単価記憶手段が予定単価に対応して予定活動量を記憶するものであり,
業務活動の種類ごとにその業務活動に割当てられたコスト金額を記憶する業務活動別割当てコスト金額記憶手段,ならびに
特定の業務活動に関して,予定単価,予定活動量,第1の入力手段によって受け付けられた活動量,上記予定単価と上記予定活動量との積,および上記予定単価と第1の入力手段から入力された活動量との積,ならびに上記コスト金額を表示する表示装置をさらに備えている,
請求項またはに記載の間接費管理コンピュータ・システム。
The scheduled unit price storage means stores a scheduled activity amount corresponding to the scheduled unit price,
Assigned cost amount storage means by business activity that stores the cost amount allocated to the business activity for each type of business activity , and for specific business activities, it was accepted by the planned unit price, planned activity amount, and the first input means activity, further comprising a display device for displaying product, as well as the cost price of the product, and the expected unit price and amount of activity input from the first input means and said scheduled bid and the expected amount of activity,
The overhead management computer system according to claim 1 or 2 .
上記表示装置は,上記コスト金額を上記第1の入力手段によって入力された活動量で除して得られる単価を表示するものである,請求項11に記載の間接費管理コンピュータ・システム。12. The indirect cost management computer system according to claim 11 , wherein the display device displays a unit price obtained by dividing the cost amount by the amount of activity input by the first input means . 上記表示装置は,上記予定単価と上記予定活動量との積と上記コスト金額との差,上記予定単価と第1の入力手段から入力された活動量との積と上記コスト金額との差,または上記予定単価と上記予定活動量との積と上記予定単価と第1の入力手段から入力された活動量との積との差を表示するものである,請求項11に記載の間接費管理コンピュータ・システム。The display device includes a difference between a product of the scheduled unit price and the scheduled activity amount and the cost amount , a difference between a product of the scheduled unit price and the activity amount input from the first input means and the cost amount , The overhead management according to claim 11 , wherein a difference between a product of the scheduled unit price and the scheduled activity amount and a product of the scheduled unit price and the activity amount input from the first input means is displayed. Computer system. 組織が複数の部門を含み,上記複数の部門は直接的な営利活動を行うチャージ先部門と,直接的な営利活動を行わずに上記営利活動を行うチャージ先部門を支援するチャージ元部門とに区分されており,上記チャージ先部門のために上記チャージ元部門において行われる業務活動に要するコストを,上記チャージ先部門に配賦する処理を行う間接費管理コンピュータ・システムとして,上記コンピュータ・システムを機能させるためのプログラムを格納した媒体であって
第1の入力手段が,あらかじめ定められる業務活動範囲内で行われた業務活動について,その業務活動における活動量を表すデータの入力を,上記チャージ先部門,上記業務活動の種類および上記チャージ元部門を表わすデータの入力とともに受付け,
予定単価記憶手段が,上記業務活動の種類別および上記チャージ元部門別に,予定単価を記憶し,
第1の配賦手段が,受付けられた活動量と上記予定単価記憶手段に記憶されている該当する予定単価との積を算出し,この積を第1の入力手段から受付けられた上記チャージ先部門の間接費とし
第2の入力手段が,あらかじめ定められる業務活動範囲を超えて行われた業務活動については,その業務活動における活動量を表すデータの入力を,その業務活動を行った社員の識別番号および上記チャージ先部門を表すデータの入力とともに受付け,
社員別単価記憶手段が,社員識別番号に対応してその社員の単位活動量に対する単価を記憶し,
第2の配賦手段が,受付けられた活動量と上記社員別単価記憶手段に記憶されている該当する単価との積を算出し,この積を第2の入力手段から受付けられた上記チャージ先部門の間接費とし
配賦金額記憶手段が,算出された2つの間接費を,少なくともチャージ先部門別に,上記第1の配賦手段によって算出された金額であるか,上記第2の配賦手段によって算出された金額であるかを区別して記憶する
ように上記コンピュータ・システムを機能させるためのプログラムを格納した媒体。
The organization includes a plurality of departments, and the plurality of departments include a charge-destination department that directly performs profit-making activities and a charge-source department that supports the charge-destination departments that perform the profit-making activities without performing direct profit-making activities. The above-mentioned computer system is used as an indirect cost management computer system that performs processing for allocating the costs required for the business activities performed in the charge source department for the charge destination department to the charge destination department. A medium storing a program for functioning ,
For a business activity performed within a predetermined business activity range, the first input means inputs data indicating the amount of activity in the business activity , the charge destination department, the type of business activity, and the charge source part. Accepted with input of data representing the gate ,
The scheduled unit price storage means stores the scheduled unit price for each type of business activity and each charge source department,
The first allocating means calculates the product of the accepted activity amount and the corresponding scheduled unit price stored in the scheduled unit price storage means, and this product is the charge destination received from the first input means. As department overhead ,
For business activities conducted by the second input means exceeding the predetermined business activity range, input of data representing the amount of activity in the business activity is performed, the identification number of the employee who performed the business activity, and the above charge Accepted with input of data representing the previous department
The employee unit price storage means stores the unit price for the unit activity amount of the employee corresponding to the employee identification number,
The second allocation means calculates the product of the received activity amount and the corresponding unit price stored in the employee unit price storage means, and this product is the charge destination received from the second input means. As department overhead ,
The allocation amount storage means determines whether the calculated two overhead costs are the amounts calculated by the first allocation means , at least for each charge destination department , or the amount calculated by the second allocation means A medium storing a program for causing the computer system to function so as to discriminately store it.
上記プログラムが,上記2つの間接費を表示装置に表示するようにコンピュータ・システムを制御するものである,請求項14に記載の媒体。The medium according to claim 14 , wherein the program controls the computer system to display the two overhead costs on a display device .
JP2000374810A 2000-12-08 2000-12-08 Overhead management computer system Expired - Fee Related JP4766739B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000374810A JP4766739B2 (en) 2000-12-08 2000-12-08 Overhead management computer system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000374810A JP4766739B2 (en) 2000-12-08 2000-12-08 Overhead management computer system

Publications (2)

Publication Number Publication Date
JP2002183399A JP2002183399A (en) 2002-06-28
JP4766739B2 true JP4766739B2 (en) 2011-09-07

Family

ID=18843930

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000374810A Expired - Fee Related JP4766739B2 (en) 2000-12-08 2000-12-08 Overhead management computer system

Country Status (1)

Country Link
JP (1) JP4766739B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4597570B2 (en) * 2004-05-13 2010-12-15 エスアーペー アーゲー Accounting apparatus, expense distribution method, and computer program
JP2007293740A (en) * 2006-04-27 2007-11-08 Hitachi Software Eng Co Ltd Distribution processing system and program
JP2010282524A (en) * 2009-06-08 2010-12-16 Hitachi Ltd Overhead allocation calculation system
JP7783163B2 (en) * 2022-12-27 2025-12-09 株式会社オービック Indirect cost allocation device, indirect cost allocation method, and indirect cost allocation program

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3283099B2 (en) * 1993-05-07 2002-05-20 オークマ株式会社 Numerical controller with manufacturing cost recording function
JP3035235B2 (en) * 1996-12-27 2000-04-24 株式会社亀田医療情報研究所 Medical business management support system
JP2000003389A (en) * 1998-06-12 2000-01-07 Price Waterhouse Activity cost calculation system
JP3695152B2 (en) * 1998-06-23 2005-09-14 株式会社日立製作所 Cost index calculation device
JP4226171B2 (en) * 1998-11-17 2009-02-18 富士通株式会社 Accounting system for processing transaction data, method thereof, and storage medium storing program therefor

Also Published As

Publication number Publication date
JP2002183399A (en) 2002-06-28

Similar Documents

Publication Publication Date Title
CN111815283B (en) Information system engineering supervision enterprise business management system
CN112950162B (en) Information system engineering supervision work distribution management information system
CN111815424B (en) Information system engineering supervision project cost accounting management system
CN111815168B (en) Information system engineering supervision project quality management system
CN111815281B (en) Information system project supervision project bid management system
US6381587B1 (en) Method and system for standardizing and reconciling invoices from vendors
US8015113B2 (en) Administering contracts over data network
JP5172354B2 (en) Project information planning / scope change management information and business information synergy system and method
US20160048785A1 (en) A computer implemented system and method for project controls
JPH09245097A (en) Group travel planning and management system
CA2404941A1 (en) System and method for managing purchasing contracts
US20060294235A1 (en) Management and data handling system and method
KR20070004162A (en) How to build integrated management database of construction status information using schedule management program
US20030074284A1 (en) System and method for forecasting material requirements and managing the accessability of the materials
JP2004094943A (en) Integrated management information management system
KR20140099349A (en) To analyze and estimate the integration costs that apply to defense portal system and method.
CN112150115A (en) Project man-hour management method, system, equipment and storage medium
JP3143974U (en) Accounting information system
JP2005216013A (en) Integrated job management system
JP2005301770A (en) Building information management system, building information management program and recording medium
JP4766739B2 (en) Overhead management computer system
US7389276B1 (en) Method of determining pricing to ensure profitability
AU2021107090A4 (en) Computer implemented system and method for vendor invoice management in integrated enterprise environment for construction companies
Luszczak Production Control
Iyer Effective SAP SD

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101116

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110117

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110614

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110614

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140624

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees