JP4771138B2 - Joining structure between steel beam and concrete body and its construction method - Google Patents
[go: Go Back, main page]

JP4771138B2 - Joining structure between steel beam and concrete body and its construction method - Google Patents

Joining structure between steel beam and concrete body and its construction method Download PDF

Info

Publication number
JP4771138B2
JP4771138B2 JP2006030906A JP2006030906A JP4771138B2 JP 4771138 B2 JP4771138 B2 JP 4771138B2 JP 2006030906 A JP2006030906 A JP 2006030906A JP 2006030906 A JP2006030906 A JP 2006030906A JP 4771138 B2 JP4771138 B2 JP 4771138B2
Authority
JP
Japan
Prior art keywords
steel
concrete body
steel beam
concrete
coupler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2006030906A
Other languages
Japanese (ja)
Other versions
JP2007211449A (en
Inventor
宏治 山野辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2006030906A priority Critical patent/JP4771138B2/en
Publication of JP2007211449A publication Critical patent/JP2007211449A/en
Application granted granted Critical
Publication of JP4771138B2 publication Critical patent/JP4771138B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、鉄骨梁とコンクリート体との接合構造、およびその接合構造の施工方法に関する。   The present invention relates to a joint structure between a steel beam and a concrete body, and a construction method of the joint structure.

従来より、鉄骨梁とコンクリート柱とをPC鋼材によって圧着接合させる接合構造が提供されている。この接合構造は、コンクリート柱の仕口部内に、鉄骨梁の延在方向に延在するPC鋼材が埋設された構成からなり、このPC鋼材に引張力が導入されるとともにPC鋼材の端部が鉄骨梁端部のエンドプレートに定着されることで、コンクリート柱にプレストレスが付与され、鉄骨梁のエンドプレートがコンクリート体の側面に圧着されるものである。   Conventionally, a joining structure in which a steel beam and a concrete column are joined by pressure bonding using a PC steel material has been provided. This joint structure has a structure in which a PC steel material extending in the extending direction of the steel beam is embedded in the joint portion of the concrete column. A tensile force is introduced into the PC steel material and the end of the PC steel material is By being fixed to the end plate at the end of the steel beam, prestress is applied to the concrete column, and the end plate of the steel beam is pressed against the side surface of the concrete body.

上記した従来の接合構造においては、その圧着面のプレストレスによる支圧を有効に伝達させるために、鉄骨梁のエンドプレートとコンクリート柱の仕口部側面との間に隙間が設けられ、この隙間にモルタルが充填される。このモルタル充填作業は、PC鋼材に引張力を導入する緊張作業の前に行う必要があり、従来の接合構造では、モルタル硬化後にPC鋼材の緊張作業が行われてコンクリート柱にプレストレスが付与される(例えば、特許文献1、2参照。)。
特開平5−331912号公報 特開平7−252884号公報
In the conventional joint structure described above, a gap is provided between the end plate of the steel beam and the side surface of the joint portion of the concrete column in order to effectively transmit the bearing pressure due to the prestress of the crimping surface. Is filled with mortar. This mortar filling operation needs to be performed before the tension work for introducing the tensile force to the PC steel material. In the conventional joint structure, the PC steel material is tensioned after the mortar is hardened and prestress is applied to the concrete column. (For example, refer to Patent Documents 1 and 2.)
Japanese Patent Laid-Open No. 5-331912 Japanese Patent Application Laid-Open No. 7-252884

しかしながら、上記した従来の接合構造では、モルタルが硬化しない限りPC鋼材の緊張作業を行うことができないという制限があるため、この制限が工程上不利になる場合があるという問題がある。また、モルタル充填作業に先立って行う鉄骨梁の位置決め作業が煩雑であるという問題がある。   However, in the above-described conventional joint structure, there is a limitation that the tension work of the PC steel material cannot be performed unless the mortar is hardened, and thus there is a problem that this limitation may be disadvantageous in the process. Moreover, there is a problem that the positioning work of the steel beam performed prior to the mortar filling work is complicated.

本発明は、上記した従来の問題が考慮されたものであり、モルタル充填やモルタル硬化と無関係に工程を決定できるとともに、鉄骨梁の位置決めを容易に行うことができ、工期の短縮を図ることができる鉄骨梁とコンクリート体との接合構造、およびその施工方法を提供することを目的としている。   The present invention takes the above-described conventional problems into consideration, can determine the process regardless of mortar filling and mortar hardening, can easily perform positioning of the steel beam, and can shorten the work period. An object of the present invention is to provide a joint structure between a steel beam and a concrete body, and a construction method thereof.

本発明に係る鉄骨梁とコンクリート体との接合構造は、コンクリート体内にPC鋼材が設置され、該PC鋼材に引張力が導入されるとともに、該PC鋼材の端部が、少なくとも端部が鉄骨からなる鉄骨梁の端部に定着されることで、前記PC鋼材に導入される引張力に対する反力が前記鉄骨梁の端部を介して前記コンクリート体に伝達されて該コンクリート体にプレストレスが付与された状態で、該コンクリート体と前記鉄骨梁とが接合される鉄骨梁とコンクリート体との接合構造において、コンクリート体の内部には、PC鋼材を挿通させるためのシース管が埋設され、該シース管の端部には、先端が鉄骨梁の端面に当接されるとともにその中にPC鋼材が挿通される中空のカプラーが取り付けられ、前記PC鋼材に導入される引張力に対する反力を前記鉄骨梁の端面から前記カプラーおよび前記シース管を介して前記コンクリート体に対して伝達可能とされていることを特徴としている。 In the joining structure of a steel beam and a concrete body according to the present invention, a PC steel material is installed in the concrete body, a tensile force is introduced into the PC steel material, and at least the end portion of the PC steel material is made of a steel frame. By being fixed at the end of the steel beam, the reaction force against the tensile force introduced into the PC steel material is transmitted to the concrete body through the end of the steel beam, and prestress is applied to the concrete body. In the joined structure of the steel beam and the concrete body in which the concrete body and the steel beam are joined, a sheath tube for inserting a PC steel material is embedded inside the concrete body, and the sheath the end of the tube, hollow-tipped coupler is attached to PC steel material is inserted therein while being contact with the end face of the steel beam, versus tensile forces introduced into the PC steel It is characterized in that it is capable transmitting the reaction force to the concrete body through the coupler and the sheath tube from an end face of said steel beam that.

また、本発明に係る鉄骨梁とコンクリート体との接合構造の施工方法は、コンクリート体内にPC鋼材が設置され、該PC鋼材に引張力が導入されるとともに、該PC鋼材の端部が、少なくとも端部が鉄骨からなる鉄骨梁の端部に定着されることで、前記PC鋼材に導入される引張力に対する反力が前記鉄骨梁の端部を介して前記コンクリート体に伝達されて該コンクリート体にプレストレスが付与された状態で、該コンクリート体と前記鉄骨梁とが接合される鉄骨梁とコンクリート体との接合構造の施工方法において、予め、コンクリート体の内部に、PC鋼材を挿通させるためのシース管を埋設させておき、該シース管の端部に、PC鋼材が挿通される中空のカプラーを取り付け、該カプラーの先端に鉄骨梁の端面を当接させるように、コンクリート体の側方に鉄骨梁を配置し、シース管の中にPC鋼材を挿通させる工程を行い、その後、PC鋼材に引張力を導入するとともに、PC鋼材の端部を鉄骨梁の端面に定着させることにより、前記PC鋼材に導入した引張力に対する反力を前記鉄骨梁の端面から前記カプラーおよび前記シース管を介して前記コンクリート体に伝達して該コンクリート体にプレストレスを付与する工程を行うことを特徴としている。 In the construction method of the joint structure between the steel beam and the concrete body according to the present invention, the PC steel material is installed in the concrete body, a tensile force is introduced into the PC steel material, and the end of the PC steel material is at least Since the end is fixed to the end of the steel beam made of steel, a reaction force against the tensile force introduced into the PC steel material is transmitted to the concrete body through the end of the steel beam. In the construction method of the joint structure of the steel beam and the concrete body in which the concrete body and the steel beam are joined in a state where prestress is applied to the steel body, in order to insert the PC steel material into the concrete body in advance The sheath tube is embedded, and at the end of the sheath tube, a hollow coupler through which the PC steel material is inserted is attached, and the end face of the steel beam is brought into contact with the tip of the coupler, The steel beam is placed on the side of the concrete body and the PC steel material is inserted into the sheath tube. After that, tensile force is introduced into the PC steel material and the end of the PC steel material is fixed to the end surface of the steel beam. By performing the process, a reaction force against the tensile force introduced into the PC steel material is transmitted from the end surface of the steel beam to the concrete body via the coupler and the sheath tube, and a prestress is applied to the concrete body. It is characterized by that.

このような特徴により、PC鋼材に引張力を導入するとき、先端が鉄骨梁の端面に当接するカプラーによって、鉄骨梁の端面からの反力がとられ、鉄骨梁の端面からカプラー、シース管を介してコンクリート体に対してプレストレスによる支圧が有効に伝達される。また、鉄骨梁をコンクリート体の側方に配置する際、鉄骨梁の端面をカプラーの先端に当接させるようにして、鉄骨梁の軸線方向の位置が決定される。 Due to these characteristics, when a tensile force is introduced into the PC steel material, the reaction force from the end surface of the steel beam is taken by the coupler whose tip abuts against the end surface of the steel beam, and the coupler and sheath tube are connected from the end surface of the steel beam. The bearing pressure due to the prestress is effectively transmitted to the concrete body . Further, when the steel beam is arranged on the side of the concrete body, the position of the steel beam in the axial direction is determined by bringing the end face of the steel beam into contact with the tip of the coupler.

また、本発明は、上記した鉄骨梁とコンクリート体との接合構造において、鉄骨梁の下方に、該鉄骨梁を支持する梁受け材が設けられていることを特徴としている。   Further, the present invention is characterized in that, in the above-described joint structure between a steel beam and a concrete body, a beam receiving material for supporting the steel beam is provided below the steel beam.

このような特徴により、鉄骨梁をコンクリート体の側方に配置する際、梁受け材の上に鉄骨梁を載せて鉄骨梁を配置することで、鉄骨梁の鉛直方向の位置は決定される。   With such a feature, when the steel beam is arranged on the side of the concrete body, the vertical position of the steel beam is determined by placing the steel beam on the beam receiving member and arranging the steel beam.

また、本発明は、上記した鉄骨梁とコンクリート体との接合構造において、シース管の端部にカプラーが螺合されることで、カプラーが取り付けられていることを特徴としている。   Further, the present invention is characterized in that, in the above-described structure of joining a steel beam and a concrete body, the coupler is attached by screwing the coupler into the end portion of the sheath tube.

このような特徴により、カプラーを回転させてカプラーの締め込み度合いを調整することで、カプラーの先端位置が容易に調整される。   With such a feature, the tip position of the coupler can be easily adjusted by adjusting the degree of tightening of the coupler by rotating the coupler.

また、本発明は、上記した鉄骨梁とコンクリート体との接合構造において、シース管が、中空の異形棒鋼からなることを特徴としている。   Further, the present invention is characterized in that, in the above-described joint structure between a steel beam and a concrete body, the sheath tube is made of a hollow deformed steel bar.

このような特徴により、シース管が埋設されて接合部となる領域の応力が分散し易くなる。   With such a feature, the stress in the region where the sheath tube is embedded and becomes a joint portion is easily dispersed.

本発明に係る鉄骨梁とコンクリート体との接合構造、およびその施工方法によれば、PC鋼材に引張力を導入するとき、その反力が鉄骨梁の端面からカプラー、シース管を介してコンクリート体に対して伝達されるため、鉄骨梁の端面とコンクリート体の側面との間にモルタル等の充填材を充填することなく、PC鋼材に引張力を導入する緊張作業を行うことができる。これによって、モルタル充填やモルタル硬化と無関係に工程を決定でき、工期の短縮を図ることができる。また、鉄骨梁をコンクリート体の側方に配置する際の鉄骨梁の軸線方向位置は、カプラーによって決定されるため、鉄骨梁の位置決めを容易に行うことができ、これによって、工期の短縮を図ることができる。 According to the joining structure between a steel beam and a concrete body and its construction method according to the present invention, when a tensile force is introduced into a PC steel material, the reaction force is transmitted from the end face of the steel beam via a coupler and a sheath tube to the concrete body. to be transmitted to, without filling the filler mortar or the like between the side end face and the concrete bodies of the steel beam, it is possible to perform a tensioning operation to introduce a tensile force into the PC steel. Thereby, a process can be determined irrespective of mortar filling and mortar hardening, and a work period can be shortened. In addition, since the position of the steel beam in the axial direction when the steel beam is arranged on the side of the concrete body is determined by the coupler, the steel beam can be easily positioned, thereby shortening the construction period. be able to.

また、本発明は、鉄骨梁の下方に、鉄骨梁を支持する梁受け材が設けられている構成にすることにより、鉄骨梁をコンクリート体の側方に配置する際の鉄骨梁の鉛直方向位置は、梁受け材によって決定されるため、鉄骨梁の位置決めを容易に行うことができ、これによって、工期の短縮を図ることができる。   Further, the present invention has a structure in which a beam receiving material for supporting the steel beam is provided below the steel beam, so that the vertical position of the steel beam when the steel beam is arranged on the side of the concrete body. Since it is determined by the beam receiving material, the steel beam can be easily positioned, thereby shortening the construction period.

また、本発明は、カプラーをシース管の端部に螺合させることで、カプラーをシース管端部に取り付ける構成とすることにより、カプラーの締め込み度合いを調整することで、カプラーの先端位置が容易に調整されるため、鉄骨梁の軸線方向位置の位置決めを容易に行うことができる。   Further, the present invention is configured to attach the coupler to the end of the sheath tube by screwing the coupler to the end of the sheath tube, thereby adjusting the degree of tightening of the coupler so that the tip position of the coupler can be adjusted. Since it is easily adjusted, the axial position of the steel beam can be easily positioned.

また、本発明は、中空の異形棒鋼からなるシース管を用いる構成とすることにより、シース管が埋設されて接合部となる領域の応力が分散し易くなるため、接合部の耐力にとって有利となる。   Further, according to the present invention, by using a sheath tube made of a hollow deformed steel bar, the stress in the region where the sheath tube is embedded and becomes the joint portion is easily dispersed, which is advantageous for the strength of the joint portion. .

以下、本発明に係る鉄骨梁とコンクリート体との接合構造、およびその施工方法の実施の形態について、図面に基いて説明する。   DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of a joining structure between a steel beam and a concrete body and a construction method thereof according to the present invention will be described based on the drawings.

まず、鉄骨梁1,1とコンクリート体としてのコンクリート柱2との接合構造の構成について説明する。
図1は鉄骨梁1,1とコンクリート柱2との接合構造の断面図であり、図2は図1に示すA−A間の断面図である。
First, the structure of the joining structure of the steel beams 1 and 1 and the concrete pillar 2 as a concrete body will be described.
FIG. 1 is a cross-sectional view of the joint structure between the steel beams 1 and 1 and the concrete column 2, and FIG.

図1,図2に示すように、本実施の形態では、同軸上に延在する2本の鉄骨梁1,1がコンクリート柱2の仕口部2aを挟んで両側にそれぞれ配設されており、本実施の形態に係る接合構造は、コンクリート柱2の仕口部2a内に、鉄骨梁1,1の軸線延長線に沿って延在する複数のPC鋼材3…を設置し、これらのPC鋼材3…に引張力をそれぞれ導入するとともにPC鋼材3…の両端部を両側の鉄骨梁1,1にそれぞれ定着させることで、コンクリート柱2にプレストレスを付与し、鉄骨梁1,1の端面をコンクリート柱2の仕口部2aの側面に対して充填材8を介してそれぞれ圧着させるものである。 As shown in FIGS. 1 and 2, in the present embodiment, two steel beams 1 and 1 extending coaxially are disposed on both sides of the joint portion 2a of the concrete column 2 respectively. In the joint structure according to the present embodiment, a plurality of PC steel materials 3 extending along the axis extension line of the steel beams 1 and 1 are installed in the joint portion 2a of the concrete column 2, and these PCs are installed. The tensile force is introduced into each of the steel members 3 and both ends of the PC steel members 3 are fixed to the steel beams 1 and 1 on both sides, thereby prestressing the concrete column 2 and the end surfaces of the steel beams 1 and 1. it is intended to crimp respectively through the filling material 8 against the side surface of the Joint portion 2a of the concrete column 2.

両側の鉄骨梁1,1は、コンクリート柱2に直交する方向にそれぞれ延在されており、コンクリート柱2に対して垂直にそれぞれ配置されている。鉄骨梁1は、長尺の鋼材4(本実施の形態ではH形鋼)の端部に鋼板等のエンドプレート5が付設された構成からなる。エンドプレート5は、鉄骨梁1(鋼材4)の軸線方向に対して垂直に配置されており、鋼材4の端面に溶接接合されている。なお、このエンドプレート5が鉄骨梁1の端面となっている。   The steel beams 1 and 1 on both sides extend in a direction orthogonal to the concrete column 2 and are arranged perpendicular to the concrete column 2. The steel beam 1 has a configuration in which an end plate 5 such as a steel plate is attached to an end of a long steel material 4 (H-shaped steel in the present embodiment). The end plate 5 is disposed perpendicular to the axial direction of the steel beam 1 (steel material 4), and is welded to the end surface of the steel material 4. The end plate 5 is an end surface of the steel beam 1.

なお、本発明に係る鉄骨梁1は、端部が鉄骨造からなる梁であればよく、梁全体が鉄骨(S)造のもの以外に、端部が鉄骨造で、梁中間部がそれ以外の構造、例えば、プレストレスト鉄筋コンクリート(PRC)造や鉄筋コンクリート(RC)造、鉄骨鉄筋コンクリート(SRC)造、鋼管コンクリート(SC)造からなる梁構造体も含む概念である。   Note that the steel beam 1 according to the present invention may be a beam having an end made of steel, and the entire beam is made of steel (S), the end is made of steel, and the middle part of the beam is other than that. For example, a beam structure including a prestressed reinforced concrete (PRC) structure, a reinforced concrete (RC) structure, a steel reinforced concrete (SRC) structure, and a steel pipe concrete (SC) structure is also included.

コンクリート柱2は、柱全体或いは柱の一部がプレキャスト鉄筋コンクリートからなる柱であり、少なくとも仕口部2aがプレキャスト鉄筋コンクリートで形成されている。コンクリート柱2の仕口部2aには、PC鋼材3を挿通させるためのシース管6…が複数埋設されている。複数のシース管6…は、鉄骨梁1,1の軸線延長線に沿ってそれぞれ延在されており、互いに間隔をあけて平行に配置されている。また、複数のシース管6…は、コンクリート柱2側方に配設された鉄骨梁1のエンドプレート5に対向する位置にそれぞれ配置されており、エンドプレート5の外縁に沿って並べられている。   The concrete column 2 is a column in which the entire column or a part of the column is made of precast reinforced concrete, and at least the joint portion 2a is formed of precast reinforced concrete. A plurality of sheath pipes 6 for inserting the PC steel material 3 are embedded in the joint portion 2a of the concrete column 2. The plurality of sheath tubes 6 are respectively extended along the axial extension lines of the steel beams 1, 1, and are arranged in parallel at intervals. Further, the plurality of sheath pipes 6 are respectively arranged at positions facing the end plate 5 of the steel beam 1 arranged on the side of the concrete column 2, and are arranged along the outer edge of the end plate 5. .

シース管6は、外周面に凹凸が形成された異形棒鋼の中心に、軸方向に延在する貫通孔6aを形成してなる中空の部材であり、その中には、PC鋼材3が挿通されている。シース管6の両端部6b,6bは、外径が拡径されているとともに内周面にネジ山が形成されており、シース管6は、両端にそれぞれ雌ネジが形成された構成になっている。また、シース管6の両端面は、コンクリート柱2(仕口部2a)の側面にそれぞれ面一になっており、シース管6の雌ネジ状の両端部6b,6bは、コンクリート柱2(仕口部2a)の側方に向けてそれぞれ開放されている。   The sheath tube 6 is a hollow member in which a through hole 6a extending in the axial direction is formed in the center of a deformed steel bar having irregularities formed on the outer peripheral surface thereof, and the PC steel material 3 is inserted into the hollow member. ing. Both end portions 6b and 6b of the sheath tube 6 have an outer diameter increased, and a thread is formed on the inner peripheral surface, and the sheath tube 6 has a structure in which female threads are formed at both ends. Yes. Further, both end surfaces of the sheath tube 6 are flush with the side surface of the concrete column 2 (joint portion 2a), and both end portions 6b and 6b of the female tube shape of the sheath tube 6 are connected to the concrete column 2 (finished portion). Each is open toward the side of the mouth 2a).

シース管6の雌ネジ状の両端部6b,6bには、カプラー7,7がそれぞれ取り付けられている。このカプラー7は、雄ネジ部7aの先端にナット状の頭部7bが付設した構成からなる頭付きボルト状の部材である。また、カプラー7は、軸方向に延在する貫通孔7cを有する中空の部材であり、その中にPC鋼材3が挿通される構成となっている。このような構成からなるカプラー7は、その雄ネジ部7aが雌ネジ状のシース管6の両端部6bに螺合されることで取り付けられており、コンクリート柱2の仕口部2aの側面から突出した状態で取り付けられている。突出したカプラー7の先端(頭部7b)は、コンクリート柱2の側方に配置された鉄骨梁1のエンドプレート5に当接されており、このカプラー7によって、エンドプレート5とコンクリート柱2(仕口部2a)の側面との間に所定幅の隙間Cが確保されている。なお、この隙間Cの中に無収縮モルタル等からなる充填材8が充填されており、エンドプレート5とコンクリート柱2(仕口部2a)の側面との間に充填材8が介在された状態になっている。   Couplers 7 and 7 are attached to both ends 6 b and 6 b of the female thread of the sheath tube 6, respectively. The coupler 7 is a headed bolt-like member having a configuration in which a nut-like head 7b is attached to the tip of the male screw portion 7a. The coupler 7 is a hollow member having a through hole 7c extending in the axial direction, and the PC steel material 3 is inserted into the hollow member. The coupler 7 having such a structure is attached by the male screw portion 7a being screwed to both end portions 6b of the female screw-like sheath tube 6, and from the side surface of the joint portion 2a of the concrete column 2. It is attached in a protruding state. The protruding tip (head 7b) of the coupler 7 is in contact with the end plate 5 of the steel beam 1 arranged on the side of the concrete column 2, and the end plate 5 and the concrete column 2 ( A gap C having a predetermined width is secured between the side surface of the joint portion 2a). The gap C is filled with a filler 8 made of non-shrink mortar or the like, and the filler 8 is interposed between the end plate 5 and the side surface of the concrete column 2 (part 2a). It has become.

上記したシース管6および両側のカプラー7,7の中には、PC鋼材3が所定の引張力が導入された状態で挿設されている。このPC鋼材3は、コンクリート柱2の仕口部2aにプレストレスを付与するための緊張材であり、例えば、高張力鋼からなる鋼棒、鋼線、鋼より線、或いは鋼線や鋼より線を束ねたケーブル等である。PC鋼材3の両端部は、カプラー7,7の先端からそれぞれ突出されており、エンドプレート5,5に形成された図示せぬ孔にそれぞれ挿通されてエンドプレート5,5をそれぞれ貫通している。エンドプレート5,5を貫通したPC鋼材3の両端部には、PC鋼材3の端部を掴持して固定する定着具9,9がそれぞれ取り付けられており、PC鋼材3は、引張力が導入された状態で、その両端が鉄骨梁1,1にそれぞれ定着されている。   The PC steel material 3 is inserted into the sheath tube 6 and the couplers 7 and 7 on both sides with a predetermined tensile force introduced. The PC steel material 3 is a tension material for applying prestress to the joint portion 2a of the concrete column 2, and is, for example, a steel bar made of high-tensile steel, a steel wire, a steel strand, or a steel wire or steel. A cable bundled with wires. Both end portions of the PC steel material 3 protrude from the tips of the couplers 7 and 7, respectively, are inserted into holes (not shown) formed in the end plates 5 and 5, and pass through the end plates 5 and 5, respectively. . Fixing tools 9 and 9 for gripping and fixing the end portions of the PC steel material 3 are respectively attached to both ends of the PC steel material 3 penetrating the end plates 5 and 5, and the PC steel material 3 has a tensile force. In the introduced state, both ends thereof are fixed to the steel beams 1 and 1, respectively.

また、両側の鉄骨梁1,1のエンドプレート5,5の下方には、これらの鉄骨梁1,1をそれぞれ支持するための梁受け材10,10がそれぞれ設けられている。梁受け材10は、エンドプレート5の下辺に沿って延在する山形鋼等の鋼材からなり、コンクリート柱2の側面に複数のボルト11…によって固定されている。   Further, below the end plates 5 and 5 of the steel beams 1 and 1 on both sides, beam receiving members 10 and 10 for supporting the steel beams 1 and 1 are respectively provided. The beam receiving member 10 is made of a steel material such as an angle steel extending along the lower side of the end plate 5, and is fixed to the side surface of the concrete column 2 by a plurality of bolts 11.

次に、上記した構成からなる鉄骨梁1,1とコンクリート柱2との接合構造の施工方法について説明する。   Next, a method for constructing a joint structure between the steel beams 1 and 1 and the concrete column 2 having the above-described configuration will be described.

まず、所定位置にコンクリート柱2を構築する工程を行う。具体的には、プレキャストコンクリートからなるコンクリート柱2を所定位置および所定向きに配置し、図示せぬ下側の柱に継手させる。なお、このコンクリート柱2の仕口部2aには、予め、複数のシース管6…が所定位置に埋設されている。   First, the process of constructing the concrete pillar 2 at a predetermined position is performed. Specifically, the concrete pillar 2 made of precast concrete is disposed in a predetermined position and in a predetermined direction, and is joined to a lower pillar (not shown). In addition, a plurality of sheath tubes 6 are embedded in a predetermined position in the joint portion 2a of the concrete column 2 in advance.

次に、雌ネジ状に形成された複数のシース管6…の両端部6bにカプラー7…をそれぞれ取り付け、コンクリート柱2の仕口部2aの両側方に鉄骨梁1,1をそれぞれ配置し、複数のシース管6…の中にPC鋼材3…をそれぞれ挿通させる工程を行う。具体的には、まず、複数のシース管6…の両端部6bにカプラー7…をそれぞれ螺合させ、これらのカプラー7…の先端面が所定位置(鉄骨梁1端面の所望位置)に配置されるように、複数のカプラー7…の締め込み度合いをそれぞれ調整する。一方、梁受け材10,10をコンクリート柱2の仕口部2aの両側面にそれぞれ取り付ける。その後、梁受け材10の上にエンドプレート5を載せて鉄骨梁1を支持させ、コンクリート柱2の両側に鉄骨梁1,1をそれぞれ配置する。このとき、鉄骨梁1,1のエンドプレート5,5を複数のカプラー7…の先端面にそれぞれ当接させるようにして、鉄骨梁1,1の軸方向の位置を調整するとともに、エンドプレート5,5に形成された図示せぬ孔とカプラー7…の貫通孔7c…との孔合わせをして、鉄骨梁1,1の横方向(軸方向に直交する水平方向)の位置を調整する。なお、鉄骨梁1,1の高さ方向の位置は、梁受け材10,10の設置高さを調整することで調整される。その後、エンドプレート5,5の図示せぬ複数の孔にPC鋼材3…をそれぞれ差し込み、カプラー7…の貫通孔7c…およびシース管6…の貫通孔6a…にPC鋼材3…をそれぞれ挿通させる。   Next, the couplers 7 are respectively attached to both end portions 6b of the plurality of sheath tubes 6 formed in a female screw shape, and the steel beams 1 and 1 are respectively arranged on both sides of the joint portion 2a of the concrete column 2. A step of inserting the PC steel materials 3 into the plurality of sheath tubes 6 is performed. Specifically, first, couplers 7 are respectively screwed into both end portions 6b of the plurality of sheath tubes 6, and the tip surfaces of these couplers 7 are arranged at predetermined positions (desired positions of the end surfaces of the steel beam 1). In this manner, the degree of tightening of the plurality of couplers 7 is adjusted. On the other hand, the beam receiving members 10 are attached to both side surfaces of the joint portion 2a of the concrete column 2, respectively. Thereafter, the end plate 5 is placed on the beam receiving member 10 to support the steel beam 1, and the steel beams 1 and 1 are arranged on both sides of the concrete column 2. At this time, the end plates 5, 5 of the steel beams 1, 1 are brought into contact with the front end surfaces of the plurality of couplers 7. , 5 and the through holes 7c of the couplers 7 are aligned with each other to adjust the position of the steel beams 1, 1 in the lateral direction (horizontal direction orthogonal to the axial direction). The position of the steel beams 1 and 1 in the height direction is adjusted by adjusting the installation height of the beam receiving members 10 and 10. Thereafter, the PC steel materials 3 are inserted into a plurality of holes (not shown) of the end plates 5 and 5, respectively, and the PC steel materials 3 are inserted through the through holes 7c of the couplers 7 and the through holes 6a of the sheath tubes 6 respectively. .

次に、鉄骨梁1,1のエンドプレート5,5を複数のカプラー7…の先端にそれぞれ当接させた状態で、複数のPC鋼材3…に引張力をそれぞれ導入するとともに、PC鋼材3…の両端部を鉄骨梁1,1のエンドプレート5,5にそれぞれ定着させる工程を行う。具体的には、一方のエンドプレート5から突出するPC鋼材3の一方の端部に定着具9を取り付けて、他方のエンドプレート5から突出するPC鋼材3の他方の端部に図示せぬ緊張装置を装着させ、この緊張装置によってPC鋼材3を引張って当該PC鋼材3に引張力を導入する。そして、PC鋼材3に所定の引張力が導入されたところで、PC鋼材3の他方の端部に定着具9を取り付け、その後、図示せぬ緊張装置をPC鋼材3から取り外す。この緊張作業を複数のPC鋼材3…についてそれぞれ行う。これにより、コンクリート柱2の仕口部2aにプレストレスが付与され、両側の鉄骨梁1,1のエンドプレート5,5がカプラー7の先端面にそれぞれ圧着される。なお、上記した緊張作業は、複数のPC鋼材3…について1本づつ緊張させてもよく、或いは、2本以上のPC鋼材3…をまとめて一度に緊張させてもよい。 Next, with the end plates 5 and 5 of the steel beams 1 and 1 being brought into contact with the tips of the plurality of couplers 7, respectively, a tensile force is introduced into the plurality of PC steel materials 3. The step of fixing both ends of the steel plate to the end plates 5 and 5 of the steel beams 1 and 1 is performed. Specifically, a fixing tool 9 is attached to one end portion of the PC steel material 3 protruding from one end plate 5, and a tension (not shown) is applied to the other end portion of the PC steel material 3 protruding from the other end plate 5. The apparatus is mounted, and the tensile force is applied to the PC steel material 3 by pulling the PC steel material 3 with the tensioning device. Then, when a predetermined tensile force is introduced into the PC steel material 3, the fixing tool 9 is attached to the other end of the PC steel material 3, and then a tension device (not shown) is removed from the PC steel material 3. This tension work is performed for each of the plurality of PC steel materials 3. As a result, prestress is applied to the joint portion 2 a of the concrete column 2, and the end plates 5, 5 of the steel beams 1, 1 on both sides are respectively crimped to the tip surface of the coupler 7 . In the above-described tensioning operation, the plurality of PC steel materials 3... May be strained one by one, or two or more PC steel materials 3.

次に、コンクリート柱2(仕口部2a)の側面と両側の鉄骨梁1,1のエンドプレート5,5との間に形成された隙間C,Cに充填材8,8をそれぞれ充填する工程を行う。具体的には、エンドプレート5,5の周りに隙間C,Cを塞ぐ図示せぬ型枠を建て込み、この型枠とエンドプレート5とコンクリート柱2の側面とで囲まれた中に充填材8を注入する。そして、充填された充填材8が硬化した後、図示せぬ型枠を脱型する。   Next, the step of filling the fillers 8 and 8 into the gaps C and C formed between the side surface of the concrete column 2 (the joint portion 2a) and the end plates 5 and 5 of the steel beams 1 and 1 on both sides, respectively. I do. Specifically, a mold frame (not shown) that closes the gaps C and C is built around the end plates 5 and 5, and the filler is enclosed by the mold frame, the end plate 5, and the side surface of the concrete pillar 2. 8 is injected. Then, after the filled filler 8 is cured, a mold frame (not shown) is removed.

上記した構成からなる鉄骨梁1,1とコンクリート柱2との接合構造、およびその施工方法によれば、PC鋼材3に引張力を導入するとき、先端が鉄骨梁1,1のエンドプレート5,5に当接する複数のカプラー7…によって、エンドプレート5,5からの反力がとられ、カプラー7…およびシース管6…を介してコンクリート柱2に対してプレストレスによる支圧が有効に伝達される。このため、鉄骨梁1,1のエンドプレート5,5とコンクリート柱2の側面との間に形成された隙間C,Cに充填材8,8を充填する前に、PC鋼材3…に引張力を導入する緊張作業を行うことができる。これによって、充填材8の充填や硬化と無関係に工程を決定でき、工期の短縮を図ることができる。 According to the joining structure of the steel beams 1 and 1 and the concrete column 2 having the above-described structure and the construction method thereof, when the tensile force is introduced into the PC steel material 3, the end plate 5 of the steel beams 1 and 1 has a tip. The reaction force from the end plates 5 and 5 is taken by a plurality of couplers 7 abutting 5, and the bearing pressure due to prestress is effectively transmitted to the concrete column 2 via the couplers 7 and the sheath pipe 6. Is done. For this reason, before the fillers 8 and 8 are filled in the gaps C and C formed between the end plates 5 and 5 of the steel beams 1 and 1 and the side surface of the concrete column 2, the tensile force is applied to the PC steel 3. Can introduce tension work. As a result, the process can be determined regardless of the filling and curing of the filler 8, and the construction period can be shortened.

また、鉄骨梁1,1をコンクリート柱2の側方に配置する際の鉄骨梁1,1の軸線方向の位置は、複数のカプラー7…によって決定される。このため、鉄骨梁1,1の位置決めを容易に行うことができ、これによって、工期の短縮を図ることができる。   Further, the position of the steel beams 1 and 1 in the axial direction when the steel beams 1 and 1 are arranged on the side of the concrete column 2 is determined by the plurality of couplers 7. For this reason, the steel beams 1 and 1 can be positioned easily, thereby shortening the construction period.

また、鉄骨梁1,1の下方に、鉄骨梁1,1を支持する梁受け材10,10が設けられているため、鉄骨梁1,1をコンクリート柱2の側方に配置する際の鉄骨梁1,1の鉛直方向の位置は、梁受け材10,10によって決定される。このため、鉄骨梁1,1の位置決めを容易に行うことができ、これによって、工期の短縮を図ることができる。   Further, since the beam receiving members 10 and 10 for supporting the steel beams 1 and 1 are provided below the steel beams 1 and 1, the steel frame when the steel beams 1 and 1 are arranged on the side of the concrete column 2 is provided. The vertical positions of the beams 1 and 1 are determined by the beam receiving members 10 and 10. For this reason, the steel beams 1 and 1 can be positioned easily, thereby shortening the construction period.

また、雄ネジ部7aを有するカプラー7は、シース管6の雌ネジ状の端部に螺合されることで取り付けられているため、カプラー7の締め込み度合いを調整することで、カプラー7の先端位置が容易に調整される。これにより、鉄骨梁鉄骨梁1,1の軸線方向位置の位置決めを容易に行うことができる。   Further, since the coupler 7 having the male screw portion 7a is attached by being screwed to the female screw-like end portion of the sheath tube 6, adjusting the degree of tightening of the coupler 7 makes it possible to The tip position is easily adjusted. Thereby, positioning of the axial direction position of the steel beam steel beams 1 and 1 can be performed easily.

また、中空の異形棒鋼からなるシース管6…を用いているため、シース管6…が埋設されて接合部となるコンクリート柱2の仕口部2aの応力が分散し易くなる。これは、コンクリート柱2の仕口部2aの耐力にとって有利となる。   In addition, since the sheath pipes 6 made of hollow deformed steel bars are used, the stress of the joint portion 2a of the concrete column 2 that becomes the joint portion is embedded easily by burying the sheath pipes 6. This is advantageous for the yield strength of the joint portion 2a of the concrete column 2.

以上、本発明に係る鉄骨梁とコンクリート体との接合構造、およびその施工方法の実施の形態について説明したが、本発明は上記した実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。例えば、上記した実施の形態では、コンクリート体としてプレキャストコンクリートからなるコンクリート柱2が形成されているが、本発明に係るコンクリート体は、柱だけでなく壁や梁であってもよい。具体的には、コンクリート壁の壁面に鉄骨梁を接合させる接合構造であってもよく、或いは、コンクリート梁(例えば大梁等)の側面に鉄骨梁(例えば小梁等)を接合させる接合構造であってもよい。また、本発明は、プレキャストコンクリートからなるコンクリート体に限定されず、在来工法により構築されるコンクリート体であってもよい。   As mentioned above, although embodiment of the joining structure of the steel beam and concrete body concerning the present invention, and its construction method was described, the present invention is not limited to the above-mentioned embodiment, and does not deviate from the meaning. The range can be changed as appropriate. For example, in the above-described embodiment, the concrete pillar 2 made of precast concrete is formed as the concrete body. However, the concrete body according to the present invention may be not only a pillar but also a wall or a beam. Specifically, it may be a joining structure in which a steel beam is joined to the wall surface of a concrete wall, or a joining structure in which a steel beam (eg, a small beam) is joined to a side surface of a concrete beam (eg, a large beam). May be. Moreover, the present invention is not limited to a concrete body made of precast concrete, and may be a concrete body constructed by a conventional construction method.

また、上記した実施の形態では、コンクリート柱2の両側に鉄骨梁1,1が配設されているが、本発明は、コンクリート体の一方の側方に鉄骨梁が配設されている場合であってもよい。さらに、本発明は、互いに直交する方向に延在されている複数の鉄骨梁がコンクリート柱にそれぞれ接合され、鉄骨梁がコンクリート柱を中心にして平面視L字状又は平面視T字状に配設されていてもよく、或いは、鉄骨梁がコンクリート柱を中心にして平面視十字状に配設されていてもよい。   In the embodiment described above, the steel beams 1 and 1 are disposed on both sides of the concrete column 2. However, the present invention is a case where the steel beam is disposed on one side of the concrete body. There may be. Further, according to the present invention, a plurality of steel beams extending in directions orthogonal to each other are respectively joined to a concrete column, and the steel beam is arranged in an L shape in plan view or a T shape in plan view around the concrete column. Alternatively, the steel beam may be arranged in a cross shape in plan view around the concrete column.

また、上記した実施の形態では、PC鋼材3の両端が、エンドプレート5とカプラー7と定着具9とからなる定着構造によってそれぞれ定着されているが、本発明は、PC鋼材の一方の端部を上記した実施の形態と同様の定着構造によって定着させ、PC鋼材の他方の端部を他の定着構造によって定着させてもよい。   In the embodiment described above, both ends of the PC steel material 3 are fixed by the fixing structure including the end plate 5, the coupler 7, and the fixing tool 9. However, in the present invention, one end portion of the PC steel material is used. May be fixed by a fixing structure similar to that of the above-described embodiment, and the other end of the PC steel material may be fixed by another fixing structure.

また、上記した実施の形態では、シース管6の両端面はコンクリート柱2の側方にそれぞれ開放され、PC鋼材3はコンクリート柱2を貫通した状態で設置されており、PC鋼材3の両端が、コンクリート柱2の外で定着されているが、本発明は、シース管の一方の端面だけがコンクリート柱の側方に開放されており、PC鋼材をコンクリート体に貫通させずに、PC鋼材の他方の端部をコンクリート体の内部に定着させてもよい。   Moreover, in above-mentioned embodiment, the both end surfaces of the sheath pipe | tube 6 are each open | released by the side of the concrete pillar 2, PC steel material 3 is installed in the state which penetrated the concrete pillar 2, and both ends of PC steel material 3 are In the present invention, only one end surface of the sheath tube is open to the side of the concrete column, and the PC steel material is not penetrated into the concrete body. The other end may be fixed inside the concrete body.

また、上記した実施の形態では、鉄骨梁1,1を支持する梁受け材10,10として、コンクリート柱2の側面に取り付けられる鋼材を用いているが、本発明は、コンクリート体以外の場所に取り付けられた梁受け材であってもよく、例えば、仮設足場等に架け渡されたコーベル(腕木)であってもよい。   Moreover, in above-mentioned embodiment, although the steel materials attached to the side surface of the concrete pillar 2 are used as the beam receiving materials 10 and 10 which support the steel beams 1 and 1, this invention is in places other than a concrete body. An attached beam receiving material may be used, and for example, a corbel (arm) spanned on a temporary scaffold or the like may be used.

また、上記した実施の形態では、カプラー7がシース管6の端部に螺合されているが、本発明は、カプラーがシース管の端部に圧入される構成であってもよく、或いは、シース管の端部の内周面とカプラーの基端部の外周面に互いに噛合し合う凹凸がそれぞれ形成され、カプラーがシース管に段階的にグリップされる構成であってもよい。   Further, in the above-described embodiment, the coupler 7 is screwed into the end portion of the sheath tube 6, but the present invention may be configured such that the coupler is press-fitted into the end portion of the sheath tube. Concavities and convexities that mesh with each other are formed on the inner peripheral surface of the end portion of the sheath tube and the outer peripheral surface of the base end portion of the coupler, and the coupler may be gripped stepwise on the sheath tube.

また、上記した実施の形態では、シース管6として、中心に貫通孔6aを有する中空の異形棒鋼が用いられているが、本発明は、中空異形棒鋼以外のものからなるシース管であってもよく、例えば、プラスチック製のシース管であってもよい。   In the embodiment described above, a hollow deformed steel bar having a through hole 6a at the center is used as the sheath tube 6. However, the present invention may be a sheath tube made of a material other than the hollow deformed steel bar. For example, a plastic sheath tube may be used.

また、上記した実施の形態では、シース管6の端部にカプラー7を取り付けた後、鉄骨梁1を配置し、その後、PC鋼材3をシース管6やカプラー7の中に挿通させているが、本発明は、シース管の端部にカプラーを取り付けた後、PC鋼材をシース管やカプラーの中に挿通させ、その後、鉄骨梁を配置してもよく、或いは、PC鋼材をシース管の中に挿通させた後、カプラーの中にPC鋼材を挿通させつつカプラーをシース管の端部に取り付け、その後、鉄骨梁を配置してもよい。   In the embodiment described above, the steel beam 1 is disposed after the coupler 7 is attached to the end of the sheath tube 6, and then the PC steel material 3 is inserted into the sheath tube 6 and the coupler 7. In the present invention, after the coupler is attached to the end of the sheath tube, the PC steel material may be inserted into the sheath tube or the coupler, and then the steel beam may be disposed. Alternatively, the PC steel material may be placed in the sheath tube. After insertion, the coupler may be attached to the end of the sheath tube while inserting the PC steel material into the coupler, and then the steel beam may be disposed.

また、上記した実施の形態では、PC鋼材3に引張力を導入してコンクリート柱2の仕口部2aにプレストレスを付与した後に、鉄骨梁1,1のエンドプレート5,5とコンクリート柱2の側面との間にモルタル等からなる充填材8,8をそれぞれ充填しているが、本発明は、鉄骨梁の端面とコンクリート体の側面との間が中空のままでもよく、充填材を充填しない構成としてもよい。   In the above-described embodiment, after applying a prestress to the joint 2a of the concrete column 2 by introducing a tensile force to the PC steel material 3, the end plates 5, 5 of the steel beams 1, 1 and the concrete column 2 are applied. Fillers 8 and 8 made of mortar or the like are filled between the side surfaces of the steel, but in the present invention, the space between the end surface of the steel beam and the side surface of the concrete body may remain hollow, and the filler is filled. It is good also as a structure which does not.

その他、本発明は、その趣旨を逸脱しない範囲で、上記した実施の形態における構成を周知の構成に置き換えることは可能であり、また、上記した変形例を適宜組み合わせることも可能である。   In addition, in the present invention, the configuration in the above-described embodiment can be replaced with a known configuration without departing from the spirit of the present invention, and the above-described modified examples can be appropriately combined.

本発明に係る実施の形態を説明するための鉄骨梁とコンクリート体との接合部の断面図である。It is sectional drawing of the junction part of the steel beam and concrete body for demonstrating embodiment which concerns on this invention. 図1に示すA−A間の断面図である。It is sectional drawing between AA shown in FIG.

符号の説明Explanation of symbols

1 鉄骨梁
2 コンクリート柱(コンクリート体)
3 PC鋼材
5 エンドプレート(鉄骨梁の端部)
6 シース管
7 カプラー
10 梁受け材
1 Steel beam 2 Concrete pillar (concrete body)
3 PC steel 5 End plate (end of steel beam)
6 Sheath tube 7 Coupler 10 Beam receiving material

Claims (5)

コンクリート体内にPC鋼材が設置され、該PC鋼材に引張力が導入されるとともに、該PC鋼材の端部が、少なくとも端部が鉄骨からなる鉄骨梁の端部に定着されることで、前記PC鋼材に導入される引張力に対する反力が前記鉄骨梁の端部を介して前記コンクリート体に伝達されて該コンクリート体にプレストレスが付与された状態で、該コンクリート体と前記鉄骨梁とが接合される鉄骨梁とコンクリート体との接合構造において、
コンクリート体の内部には、PC鋼材を挿通させるためのシース管が埋設され、
該シース管の端部には、先端が鉄骨梁の端面に当接されるとともにその中にPC鋼材が挿通される中空のカプラーが取り付けられ
前記PC鋼材に導入される引張力に対する反力を前記鉄骨梁の端面から前記カプラーおよび前記シース管を介して前記コンクリート体に対して伝達可能とされていることを特徴とする鉄骨梁とコンクリート体との接合構造。
Is installed PC steel concrete body, with a tensile force to the PC steel member is introduced, that the ends of the PC steel material, is fixed to the end portion of the steel beam which at least an end portion is made of steel, the PC The reaction force against the tensile force introduced into the steel material is transmitted to the concrete body through the end of the steel beam and prestress is applied to the concrete body, and the concrete body and the steel beam are joined together. In the joint structure between a steel beam and a concrete body,
Inside the concrete body, a sheath tube for inserting the PC steel material is embedded,
At the end of the sheath tube, a hollow coupler through which a PC steel material is inserted is attached to the end of the steel tube and the end is in contact with the end surface of the steel beam .
A steel beam and a concrete body , wherein a reaction force against a tensile force introduced into the PC steel material can be transmitted from an end surface of the steel beam to the concrete body through the coupler and the sheath tube. Bonding structure with.
請求項1記載の鉄骨梁とコンクリート体との接合構造において、
鉄骨梁の下方に、該鉄骨梁を支持する梁受け材が設けられていることを特徴とする鉄骨梁とコンクリート体との接合構造。
In the joining structure of the steel beam according to claim 1 and the concrete body,
A joining structure of a steel beam and a concrete body, wherein a beam receiving material for supporting the steel beam is provided below the steel beam.
請求項1または2記載の鉄骨梁とコンクリート体との接合構造において、
シース管の端部にカプラーが螺合されることで、カプラーが取り付けられていることを特徴とする鉄骨梁とコンクリート体との接合構造。
In the joining structure of the steel beam and concrete body according to claim 1 or 2,
A joining structure of a steel beam and a concrete body, wherein the coupler is attached by screwing the coupler into the end of the sheath tube.
請求項1から3のいずれかに記載の鉄骨梁とコンクリート体との接合構造において、
シース管が、中空の異形棒鋼からなることを特徴とする鉄骨梁とコンクリート体との接合構造。
In the joining structure of the steel beam and the concrete body according to any one of claims 1 to 3,
A joining structure of a steel beam and a concrete body, wherein the sheath tube is made of a hollow deformed steel bar.
コンクリート体内にPC鋼材が設置され、該PC鋼材に引張力が導入されるとともに、該PC鋼材の端部が、少なくとも端部が鉄骨からなる鉄骨梁の端部に定着されることで、前記PC鋼材に導入される引張力に対する反力が前記鉄骨梁の端部を介して前記コンクリート体に伝達されて該コンクリート体にプレストレスが付与された状態で、該コンクリート体と前記鉄骨梁とが接合される鉄骨梁とコンクリート体との接合構造の施工方法において、
予め、コンクリート体の内部に、PC鋼材を挿通させるためのシース管を埋設させておき、
該シース管の端部に、PC鋼材が挿通される中空のカプラーを取り付け、該カプラーの先端に鉄骨梁の端面を当接させるように、コンクリート体の側方に鉄骨梁を配置し、シース管の中にPC鋼材を挿通させる工程を行い、
その後、PC鋼材に引張力を導入するとともに、PC鋼材の端部を鉄骨梁の端面に定着させることにより、前記PC鋼材に導入した引張力に対する反力を前記鉄骨梁の端面から前記カプラーおよび前記シース管を介して前記コンクリート体に伝達して該コンクリート体にプレストレスを付与する工程を行うことを特徴とする鉄骨梁とコンクリート体との接合構造の施工方法。
Is installed PC steel concrete body, with a tensile force to the PC steel member is introduced, that the ends of the PC steel material, is fixed to the end portion of the steel beam which at least an end portion is made of steel, the PC The reaction force against the tensile force introduced into the steel material is transmitted to the concrete body through the end of the steel beam and prestress is applied to the concrete body, and the concrete body and the steel beam are joined together. In the construction method of the joint structure between the steel beam and the concrete body,
In advance, a sheath tube for inserting the PC steel material is embedded in the concrete body,
A hollow coupler through which the PC steel material is inserted is attached to the end of the sheath tube, and the steel beam is arranged on the side of the concrete body so that the end surface of the steel beam is brought into contact with the end of the coupler. The process of inserting the PC steel material into the
Thereafter, by introducing a tensile force to the PC steel material and fixing the end of the PC steel material to the end surface of the steel beam, a reaction force against the tensile force introduced to the PC steel material is transmitted from the end surface of the steel beam to the coupler and the A method for constructing a joint structure between a steel beam and a concrete body, wherein a step of applying prestress to the concrete body by transmitting to the concrete body via a sheath tube is performed.
JP2006030906A 2006-02-08 2006-02-08 Joining structure between steel beam and concrete body and its construction method Expired - Lifetime JP4771138B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006030906A JP4771138B2 (en) 2006-02-08 2006-02-08 Joining structure between steel beam and concrete body and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006030906A JP4771138B2 (en) 2006-02-08 2006-02-08 Joining structure between steel beam and concrete body and its construction method

Publications (2)

Publication Number Publication Date
JP2007211449A JP2007211449A (en) 2007-08-23
JP4771138B2 true JP4771138B2 (en) 2011-09-14

Family

ID=38490132

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006030906A Expired - Lifetime JP4771138B2 (en) 2006-02-08 2006-02-08 Joining structure between steel beam and concrete body and its construction method

Country Status (1)

Country Link
JP (1) JP4771138B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948497A (en) * 2017-04-28 2017-07-14 长安大学 The connecting joint structure and construction method of circular steel tube concrete post and steel structure girder

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5442336B2 (en) * 2009-06-29 2014-03-12 岡部株式会社 Joint structure of reinforced concrete beam and steel beam
JP2015014134A (en) * 2013-07-05 2015-01-22 株式会社竹中工務店 Core box of building, building comprising core box, and construction method for core box of building
JP6147628B2 (en) * 2013-09-20 2017-06-14 三井住友建設株式会社 Joint structure of concrete column and steel beam
JP6826510B2 (en) * 2017-08-31 2021-02-03 鹿島建設株式会社 Temporary support member for joining steel beams and joining method of steel beams
CN108301506B (en) * 2017-12-28 2023-08-11 天元建设集团有限公司 Square steel column-concrete beam bracket node connection structure and construction method thereof
CN115045394B (en) * 2022-07-29 2023-08-22 重庆三峡学院 Self-resetting reinforced concrete column-steel beam mixed node
CN117145056B (en) * 2023-09-04 2024-03-22 泰兴市新兴建筑工程有限公司 Hybrid assembly building assembly component and assembly method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0324665Y2 (en) * 1985-04-25 1991-05-29
JPH11190068A (en) * 1997-12-26 1999-07-13 Taisei Corp Building structure
JP3705785B2 (en) * 2002-07-05 2005-10-12 オリエンタル建設株式会社 Precast member provided with joint pipe for joint and method for connecting precast member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948497A (en) * 2017-04-28 2017-07-14 长安大学 The connecting joint structure and construction method of circular steel tube concrete post and steel structure girder

Also Published As

Publication number Publication date
JP2007211449A (en) 2007-08-23

Similar Documents

Publication Publication Date Title
JP5258099B2 (en) Prestressed concrete pile, method for manufacturing the same, and method for connecting pile head and footing
JP5169995B2 (en) Reinforcement structure and reinforcement method for H-shaped steel bolt joint joint
JP4771138B2 (en) Joining structure between steel beam and concrete body and its construction method
JP2009097212A (en) Precast concrete pole and method of joining the same
JP2015134984A (en) Structure and method for joining reinforced concrete beam and reinforced concrete-filled steel pipe column together
JP5261418B2 (en) Method for manufacturing prestressed concrete member
JP2011226071A (en) Reinforcement structure of structural member and reinforcement method thereof
JP2009114755A (en) Joint structure of precast concrete column member, and method for joining precast concrete column members
JP6647721B1 (en) Tensionless PC steel bar concrete beam-column structure
JP5236152B2 (en) Method of joining precast concrete column beams
JP2009002101A (en) Method and structure for joining precast-concrete construction beam-column
JP4964544B2 (en) Joint structure of precast reinforced concrete beam members
JP4029105B2 (en) Connector, PC member manufacturing apparatus and manufacturing method
JP2005325518A (en) Prestress introduction unit and prestress introduction method
JP4423644B2 (en) Hollow precast pillar
JP5947140B2 (en) Prestressed concrete construction method and prestressed concrete structure
KR101598339B1 (en) Fastener for deck plate combine
JP2005090124A (en) Connecting structure for precast floor slab
JP5711035B2 (en) Anchor and anchor fixing method
JP2007211507A (en) Beam structure
JP4953775B2 (en) Prestress introduction device and anchor structure thereof
JP2007270473A (en) Joint structure of composite segment and composite segment
JP6721940B2 (en) Widening structure of existing PC floor slab
JP4311748B2 (en) Tension material fixing device and tension material fixing method
JP4865104B2 (en) Design method for composite structural beams

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101216

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110111

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110310

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110608

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140701

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4771138

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150