JP4814968B2 - Rational arrangement method of sheet pile - Google Patents
Rational arrangement method of sheet pile Download PDFInfo
- Publication number
- JP4814968B2 JP4814968B2 JP2009070357A JP2009070357A JP4814968B2 JP 4814968 B2 JP4814968 B2 JP 4814968B2 JP 2009070357 A JP2009070357 A JP 2009070357A JP 2009070357 A JP2009070357 A JP 2009070357A JP 4814968 B2 JP4814968 B2 JP 4814968B2
- Authority
- JP
- Japan
- Prior art keywords
- sheet pile
- pile
- sheet
- retaining wall
- press
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
この発明は、土木や建設工事において地中を掘削する場合に、地中掘削部分の周囲が崩壊しないように、シートパイルを用いて地中に山留め壁を構築するためのシートパイルの合理的配置工法に関する。 This invention is a rational arrangement of a seat pile for constructing a retaining wall in the ground using a seat pile so that the surroundings of the underground excavation portion do not collapse when excavating the ground in civil engineering or construction work. Concerning construction method.
従来、地中に山留め壁を構築するには、H型鋼を用いた親杭を所定の間隔で打設し、隣接する親杭間に横矢板を順次嵌め込んで山留め壁を構築する親杭横矢板工法と、シートパイル(鋼矢板)を連続して打設することで山留め壁を構築するシートパイル工法とがあり、特に、後者のシートパイル工法は、設計条件が等しい任意の掘削断面においては、同一断面形状のシートパイルを用い、このシートパイルを連続的な配置に打設すると共に、掘削底よりも下になる根入れ長さも一定になるようにして山留め壁を構築するようにしている。 Conventionally, in order to construct a retaining wall in the ground, a parent pile using H-shaped steel is driven at a predetermined interval, and a horizontal retaining sheet is sequentially fitted between adjacent parent piles to construct a retaining wall. There is a sheet pile method and a sheet pile method that constructs a retaining wall by continuously placing sheet piles (steel sheet piles). In particular, the latter sheet pile method is used in any excavation section with the same design conditions. In addition, a sheet pile having the same cross-sectional shape is used, and this pile is placed in a continuous arrangement, and the retaining wall is constructed so that the penetration depth below the bottom of the excavation is constant. .
しかし、山留め壁に作用する応力は、深さ方向において変動するため、応力の少ない部位では当然ながら強度過剰となり、従来のシートパイル工法は過大な設計となっているため、その分シートパイルに要する経費が高くつくという問題がある。 However, since the stress acting on the retaining wall fluctuates in the depth direction, the strength is naturally excessive at the part where the stress is low, and the conventional sheet pile construction method is excessively designed. There is a problem of high costs.
そこで、この発明は、山留め壁の構築に当たり、壁体の深さ方向の応力と変形に対応した最適なシートパイルを配置することによって、シートパイルの使用量を低減し、構築コストの削減を実現することができるシートパイルの合理的配置工法を提供することにある。 Therefore, in the construction of the retaining wall, the present invention reduces the usage amount of the sheet pile and reduces the construction cost by arranging the optimum sheet pile corresponding to the stress and deformation in the depth direction of the wall body. An object of the present invention is to provide a rational arrangement method of sheet piles that can be performed.
上記のような課題を解決するため、請求項1の発明は、地面にシートパイルを横つながりに打ち込んで山留め壁を構築するシートパイル工法であって、地面に打ち込むシートパイルを、山留め壁の深さ方向の応力と変形や地盤状況に応じて、掘削底から下の根入れ長さを長くしたシートパイルと、根入れ長さを短くしたシートパイルを混在して設置することにより山留め壁を構築するようにしたものである。
In order to solve the above-described problems, the invention of
請求項2の発明は、地面にシートパイルを横つながりに打ち込んで山留め壁を構築するシートパイル工法であって、地面に打ち込むシートパイルを、山留め壁の深さ方向の応力と変形や地盤状況に応じて、断面形状の異なるものを混在して用いるようにしたものである。
The invention according to
請求項3の発明は、請求項1の発明のシートパイル省力化工法と、請求項2の発明のシートパイル省力化工法を併用して山留め壁を構築するようにしたものである。 According to a third aspect of the present invention, a mountain retaining wall is constructed by combining the sheet pile labor-saving method of the invention of the first aspect and the sheet pile labor-saving method of the second aspect of the invention.
請求項4の発明は、長さの異なるシートパイルをオーガー併用圧入機にて打ち込む場合に、ケーシングに対してシートパイルは、上端をチャックで固定すると共に、下端部は打ち込み方向に係合し、引き抜き方向に離脱する取付け機構で結合して打ち込むようにしたものである。
In the invention of
請求項5の発明は、断面形状の異なるシートパイルを油圧圧入機にて施工する場合に、シートパイルの接続方向の中心線を維持するため、圧入機の反力を確保する圧入済みのシートパイルの上端の内側又は外側に当て板を仮止めし、圧入機の軸線の移動を防止して圧入するようにしたものである。
The invention of
ここで、上記シートパイルを合理的に配置する計画方法を大別すると、地下水がない場合、地下水があり、土圧の釣り合いで根入れ長さが決定される場合、ヒービングにより根入れ長さを延長する必要がある場合、ボイリングにより長さを延長する必要がある場合の四種類があり、それぞれの場合に対応じて、シートパイルの省力化が図れるよう、使用するシートパイルの長さや断面幅サイズを選択し、又は、シートパイルの根入れ長さと断面幅サイズの選択を組合わせることにより、山留め壁を構築するものである。 Here, when the plan method for rationally arranging the sheet piles is roughly divided, if there is no groundwater, there is groundwater, and when the rooting length is determined by the balance of earth pressure, the rooting length is determined by heaving. There are four types of cases where it is necessary to extend the length, and it is necessary to extend the length by boilering. The length and cross-sectional width of the sheet pile to be used can be reduced in accordance with each case. A retaining wall is constructed by selecting the size or combining the selection of the sheet pile rooting length and the cross-sectional width size.
この発明によると、構築せんとする山留め壁の深さ方向の応力と変形や地盤状況に応じて、掘削底から下の根入れ長さを長くしたシートパイルと、根入れ長さを短くしたシートパイルを混在するようにしたので、根入れ長さを長くしたシートパイルが応力負担材となり、根入れ長さを短くしたシートパイルが親杭横矢板工法の横矢板になり、山留め壁の必要とする強度を保ちながら、使用する応力負担材の短尺化を図ることができ、シートパイルの使用量低減によって構築コストの削減を実現することができる。 According to this invention, according to the stress and deformation in the depth direction of the retaining wall to be constructed and the ground conditions, the sheet pile having a longer root penetration length from the bottom of the excavation, and the sheet having a shorter root penetration length Since piles were mixed, the sheet pile with a long rooting length became a stress bearing material, and the sheet pile with a short rooting length became a horizontal sheet pile for the main pile horizontal sheet pile method, which required a retaining wall. The stress bearing material to be used can be shortened while maintaining the strength to be achieved, and the construction cost can be reduced by reducing the amount of sheet pile used.
また、山留め壁の構築において、断面幅の異なるシートパイルを混在して用いることにより、断面幅の狭いシートパイルの使用が可能になり、使用するシートパイルのコスト削減が可能になり、また、根入れ長さの変化と断面幅の異なるシートパイルの組合わせにより、構築コストの更なる削減を実現することができる。 In addition, in the construction of the retaining wall, by using a mixture of sheet piles having different cross-sectional widths, it becomes possible to use sheet piles having a narrow cross-sectional width, and to reduce the cost of the sheet pile to be used. Further reduction in construction cost can be realized by combining sheet piles having different insertion lengths and different cross-sectional widths.
更に、長さの異なるシートパイルをオーガー併用圧入機にて打ち込む場合に、ケーシングに対してシートパイルを簡単に固定化でき、シートパイルを能率よく打ち込むことができると共に、断面形状の異なるシートパイルを油圧圧入機にて施工する場合に、シートパイルの接続方向の中心線を維持するようにすれば、圧入機の移動を極力少なくすることができ、断面形状の異なるシートパイルを効率よく打設することができる。 Furthermore, when sheet piles of different lengths are driven with an auger combined press, the sheet pile can be easily fixed to the casing, the sheet pile can be driven efficiently, and sheet piles with different cross-sectional shapes can be When installing with a hydraulic press machine, if the center line of the connection direction of the sheet pile is maintained, the movement of the press machine can be reduced as much as possible, and sheet piles with different cross-sectional shapes can be placed efficiently. be able to.
以下、この発明の実施の形態を添付図面に基づいて説明する。 Embodiments of the present invention will be described below with reference to the accompanying drawings.
この発明のシートパイルの合理的配置工法(省力化工法)は、土木や建設工事において地中を掘削する場合に、親杭横矢板工法に代えてシートパイル(鋼矢板)を用い、地中掘削部分の周囲が崩壊しないように、地中に山留め壁を構築するためのものである。 The rational arrangement method (labor saving work method) of the seat pile of this invention uses a sheet pile (steel sheet pile) instead of the parent pile sheet pile method when excavating underground in civil engineering and construction work, and excavating underground It is for building a retaining wall in the ground so that the surroundings of the part do not collapse.
この発明のシートパイルの合理的配置工法には、地面に打ち込むシートパイルを、山留め壁の深さ方向の応力と変形や地盤状況に応じて、掘削底から下の根入れ長さを長くしたシートパイルと、根入れ長さを短くしたシートパイルを混在して設置する工法と、山留め壁の深さ方向の応力と変形や地盤状況に応じて、断面幅の異なるものを混在して用いる工法と、シートパイルの根入れ長さと幅断面の異なるものを併用する工法からなり、実際の山留め壁の構築には、壁体の深さ方向の応力と変形、地下水位や地盤状況に応じた最適の工法を採用する。 In the rational arrangement method of the seat pile of this invention, the sheet pile driven into the ground is a sheet having a deeper root penetration depth from the bottom of the excavation according to the stress and deformation in the depth direction of the retaining wall and the ground condition. A method of installing a pile and a sheet pile with a shorter root insertion length, and a method of using a mixture of different cross-sectional widths depending on the stress and deformation in the depth direction of the retaining wall and the ground conditions The construction of the actual retaining wall is the optimum method according to the stress and deformation in the depth direction of the wall body, the groundwater level and the ground condition. Adopt construction method.
シートパイルを用いて山留め壁を構築する場合に、地下水位や地盤状況に応じてシートパイルを合理的に配置する計画方法を大別すると、以下の四種類がある。 When building a retaining wall using a sheet pile, there are the following four types of planning methods for rationally arranging the sheet pile according to the groundwater level and ground conditions.
(1)地下水がない場合:地下水位が掘削底より深いが、掘削部分又は根入れ部分の地盤の強度が低いため、親杭横矢板工法の代わりにシートパイル工法を採用する。 (1) When there is no groundwater: Although the groundwater level is deeper than the bottom of the excavation, the strength of the ground at the excavation part or the basement part is low, so the sheet pile construction method is adopted instead of the main pile side sheet pile construction method.
(2)地下水があり、土圧の釣り合いで根入れ長さが決定される場合:地下水位が掘削底より浅いため、遮水を目的に遮水層に先端を根入れさせる場合(根入れ長さは、土圧の釣り合い検討で決定される)。 (2) When there is groundwater and the penetration length is determined by the balance of earth pressure: The groundwater level is shallower than the bottom of the excavation, so that the tip is rooted in the impermeable layer for the purpose of water shielding This is determined by examining the balance of earth pressure).
(3)ヒービングにより根入れ長さを延長する必要がある場合:根入れ地盤が軟弱粘性土であるため、ヒービングの検討によって、根入れ長さを土圧の釣り合いで決まる長さよりも延長する必要がある場合。 (3) When it is necessary to extend the rooting length by heaving: Since the rooting ground is soft and viscous soil, it is necessary to extend the rooting length beyond the length determined by the balance of earth pressure by examining the heaving. If there is.
(4)ボイリングにより根入れ長さを延長する必要がある場合:地下水位が掘削底よりも浅く、根入れ地盤が砂地盤で適当な遮水層が存在しないため、ボイリングの検討によって、根入れ長さを土圧の釣り合いで決まる長さよりも延長する必要がある場合。 (4) When it is necessary to extend the penetration length by boiling: The groundwater level is shallower than the bottom of excavation, the ground is ground and the appropriate impermeable layer does not exist. When the length needs to be extended beyond the length determined by the balance of earth pressure.
次に、上記した(1)〜(4)の各計画種別ごとの合理化方法を、図1乃至図6のシートパイルの省力化パターンを参酌しながら具体的に説明する。 Next, the rationalization method for each plan type of (1) to (4) described above will be specifically described with reference to the labor saving pattern of the sheet pile of FIGS.
(1)地下水がない場合
掘削部分又は根入れ部分の地盤の強度が低い場合、図7と図8に示す従来の親杭横矢板工法の概念図において、親杭1と横矢板2の代わりに、図1乃至図6と図9乃至図12の概念図のように、この発明では、親杭部シートパイル1aと、このシートパイル1aと同形状の横矢板代わりに用いるシートパイル1bおよび、前記シートパイル1aとは断面形状の異なる親杭部シートパイル1cと、このシートパイル1cと同形状の横矢板代わりに用いるシートパイル1dを用いて山留め壁を構築する。
(1) When there is no groundwater When the strength of the ground of the excavation part or the rooting part is low, in the conceptual diagram of the conventional parent pile horizontal sheet pile method shown in FIGS. 7 and 8, instead of the
図7は従来の親杭横矢板工法における主働土圧と受働土圧の関係を示し、親杭1の受働幅は根入れ部の土質に応じて、掘削部主働土圧の作用幅は図8(a)のように親杭ピッチに相当し、根入れ部主働土圧の作用幅は、図8(b)のように親杭の幅(B)の2〜3倍を採用する。
FIG. 7 shows the relationship between the active earth pressure and the passive earth pressure in the conventional parent pile sheet pile method, and the active width of the
この考えに基づいて、この発明では、シートパイル1枚の受働幅も、シートパイル2〜3枚分とみなし、親杭材として用いるシートパイル1aと横矢板代わりに用いるシートパイル1bの組合わせによって山留め壁を構築するものであり、図9のように、掘削部主働土圧の作用幅は図10(a)のように親杭部シートパイル幅(B)の2倍、根入れ部主働土圧の作用幅は図10(b)のようにシートパイル幅(B)の略2倍となる。
Based on this idea, in the present invention, the active width of one sheet pile is also regarded as two to three sheet piles, and the combination of the
受働幅に2倍を採用する場合は、シートパイルの2枚に1枚を親杭部シートパイル1aとみなし、それを土圧が釣り合う深さまで挿入する。また、他方は横矢板代わりに用いるシートパイル1bとするので、図9のように、掘削底以深への挿入の一部又は全部を省略することができる。
When adopting 2 times as the passive width, one sheet is regarded as the main
同様に、受働幅に3倍を採用する場合は、図11と図12のように、シートパイルの3枚のうち2枚の掘削底以深への挿入の一部又は全部を省略することで横矢板代わりに用いるシートパイル1bとして省力化することができる。
Similarly, when adopting 3 times the passive width, as shown in FIG. 11 and FIG. 12, by omitting part or all of the insertion into the deeper than the bottom of the excavation bottom of the three sheets of the sheet pile, It is possible to save labor as the
この時、親杭部と考えて省力化しないシートパイル1aの強度又は剛性が、断面応力および撓みの検討により不足する場合は、下記の方法で対処する。
At this time, when the strength or rigidity of the
1)当該シートパイル1aに断面性能の大きな部材を適用する。
2)当該シートパイル1aを連続させて図2(a)で示した親杭部シートパイルを1/3枚抜きとする。
3)両者を組合わせることで所望の性能を確保する。
1) A member having a large cross-sectional performance is applied to the
2) Continuing the
3) The desired performance is ensured by combining the two.
なお、省力化するシートパイル1bの根入れ長さが、土圧の釣り合い計算から求まる根入れ長さの1/2以上あれば、省力化するシートパイルも応力負担材と見なせる。
In addition, if the rooting length of the
従って、連続壁として取り扱うことが可能である。ただし、掘削部および根入れ部の土圧作用幅も全て連続となることに留意する。 Therefore, it can be handled as a continuous wall. However, it should be noted that the earth pressure action widths of the excavation part and the base part are all continuous.
(2)地下水があり、土圧の釣り合いのみで根入れ長さが決定される場合
遮水層が掘削底付近、または、根入れ長さの中間位置付近に分布する場合も、上記した地下水がない場合と同様の考えに基づいて、シートパイルを省力化できる。ただし、省力化するシートパイル1bは、遮水層に貫入しておく必要がある。
(2) When there is groundwater and the penetration depth is determined only by the balance of earth pressure Even when the impermeable layer is distributed near the bottom of the excavation or near the middle of the penetration depth, The sheet pile can be saved on the basis of the same idea as the case where there is no sheet pile. However, the
(3)ヒービングにより根入れ長さを延長する必要がある場合
この場合は、掘削底以深の地盤は主に軟弱な粘性土地盤(遮水層でもある)で構成される。省力化する場合の断面としては、親杭代わりの省力化しないシートパイル1aの根入れ長さは、図13に示す通常のヒービングの検討方法を基に決定し、省力化するシートパイル1bも遮水層に貫入しておく必要がある。
(3) When it is necessary to extend the penetration length by heaving In this case, the ground below the bottom of the excavation is mainly composed of a soft, viscous ground (also a water-impervious layer). As a cross-section when saving labor, the base pile length of the
更に、図14または図15の方法において、省力化する部分の土の中抜けの安全性を図16の方法のように、省力化範囲内の円弧すべり面において抑止杭として滑動抵抗を負担する省力化しないシートパイルの曲げ耐力と滑り面以深の受働抵抗を評価することで、シートパイル1bの省力化長さを確保する。
Furthermore, in the method of FIG. 14 or FIG. 15, the safety of the hollowing out of the portion of the labor-saving portion is saved as in the method of FIG. 16 to bear the sliding resistance as a restraining pile on the arc slip surface within the labor-saving range. By evaluating the bending strength and the passive resistance deeper than the sliding surface of the sheet pile that does not change, the labor-saving length of the
シートパイルの根入れ地盤が軟弱粘性土の場合や、根入れ長さがヒービングの検討により延長される場合、省力化したシートパイルの間で土の中抜け現象が発生する可能性がある。土の中抜け現象が局部的に発生すると、地盤がクリープ変形を伴いながら塑性化領域が周囲に広がり、山留め壁全体の滑り破壊に繋がる可能性があるので、省力化範囲の全域で中抜けの安全を確保することが望ましい。 In the case where the ground of the sheet pile is soft and viscous soil, or when the length of the root pile is extended due to consideration of heaving, there is a possibility that an earth drop phenomenon may occur between the labor-saving sheet piles. If the soil dropout phenomenon occurs locally, the plasticization region spreads around the ground with creep deformation, which may lead to slip failure of the entire mountain retaining wall. It is desirable to ensure safety.
ここで、図14(a)と(b)は、省力化する部分の土の中抜けの安全性について、省力化しないシートパイル1aの間のアーチアクションが期待できない内側部分の土の中抜けの概念(プロトジャコノフ法のパラボリックシリンダーの場合)を示している。 Here, FIGS. 14A and 14B are diagrams showing the safety of the hollowing out of the soil in the portion to be labor-saving. It shows the concept (in the case of the Paratocylinder of Proto-Jakonov method).
図15の土の中抜けに関する安全性は、次に示す方法により評価する。 The safety regarding the hollow of the soil in FIG. 15 is evaluated by the following method.
図15に示す試行楔モデルによる土の中抜け判定の概念図に示すように、中抜け土塊を、省力化幅を長方形断面の一辺とし、底面が傾斜する楔モデルに簡易化する。 As shown in the conceptual diagram of the soil void determination by the trial wedge model shown in FIG. 15, the void soil mass is simplified to a wedge model in which the labor saving width is one side of a rectangular cross section and the bottom surface is inclined.
長方形断面の奥行きHは、図14に示したプロトジャコノフ法のパラボリックシリンダー上端面と面積等価とし、底面傾斜角αは検討範囲の平均内部摩擦角Φ、または検討長さlと奥行きHの比より決定する。 The depth H of the rectangular cross section is equivalent to the upper surface of the parabolic cylinder of the protojakonov method shown in FIG. 14, and the bottom surface inclination angle α is the average internal friction angle Φ of the examination range or the ratio of the examination length l to the depth H. Decide more.
この土塊に関し、作用する受働土圧および滑動抵抗の水平成分の合力が滑動力の水平成分の1.2倍以上ある場合、土の中抜けの危険性はないと判定する。シートパイルの根入れ長さの適宜位置において、この検討を繰り返し計算し、省力化長さを確認する。 With respect to this mass, if the resultant force of the acting earth pressure and the horizontal component of the sliding resistance is 1.2 times or more of the horizontal component of the sliding force, it is determined that there is no risk of the hollowing out of the soil. This examination is repeatedly calculated at an appropriate position of the sheet pile depth, and the labor saving length is confirmed.
<省力化しないシートパイルによる抑止効果>
省力化しないシートパイルによる抑止効果は、土の中抜けの判定と同様、シートパイルの根入れ深さの適宜位置において算出する。さらに、図16に示すように、各検討位置での円弧滑り面において、土のせん断抵抗とシートパイルの抑止杭抵抗の合力が、土塊の滑動力の1.2倍以上を確保できる省力化長さを確認する。
<Deterrence effect of sheet pile without labor saving>
The deterrent effect by the sheet pile that does not save labor is calculated at an appropriate position of the depth of the sheet pile, as in the case of the determination of the hollowing out of the soil. Furthermore, as shown in FIG. 16, on the arc sliding surface at each examination position, the combined force of the soil shear resistance and the sheet pile deterrent pile resistance can ensure 1.2 times or more of the sliding force of the soil mass. Check that.
(4)ボイリングにより根入れ長さを延長する必要がある場合
この場合は、根入れ長さは省力化できないが、使用するシートパイルの部材断面を省力化する。例えば、図3又は図5のように、IV型シートパイル1aとこのIV型シートパイル1aよりも部材断面の小さなIII型シートパイル1cを組合わせて配置する。なお、IV型とIII型の呼称は便宜上付設したものである。
(4) When it is necessary to extend the rooting length by boiling In this case, the rooting length cannot be saved, but the section of the member of the sheet pile to be used is saved. For example, as shown in FIG. 3 or FIG. 5, the IV
(4−1)長さや種類の異なるシートパイルを高精度で効率的に打ち込み、或いは、これを引き抜く方法 (4-1) A method of driving sheet piles of different lengths and types with high precision and efficiency, or pulling them out
1)種類の異なるシートパイルを油圧圧入機にて圧入する方法
通常同一のシートパイルで山留め壁を構築する場合、シートパイルのジョイント位置は、図17(a)のように、山留め壁のシートパイル並列方向の中心線上に位置することになる。
1) Method of press-fitting different types of sheet piles with a hydraulic press-fitting machine Normally, when a retaining wall is constructed with the same sheet pile, the joint position of the seat pile is as shown in Fig. 17 (a). It is located on the center line in the parallel direction.
一方、種類(断面形状)の異なるシートパイルを併用する場合には、図17(b)や図17(c)のように、シートパイルの背面側や掘削側と山留め壁の中心線との距離が一定にならない。また、新規のシートパイルを圧入する際には、圧入に必要な反力に圧入済みのシートパイルの支持力を利用する。 On the other hand, when using sheet piles of different types (cross-sectional shapes) together, as shown in FIGS. 17B and 17C, the distance between the back side of the sheet pile or the excavation side and the center line of the retaining wall Is not constant. Further, when press-fitting a new sheet pile, the support force of the press-fitted sheet pile is used as a reaction force necessary for press-fitting.
以上から、種類の異なるシートパイルを高精度で圧入するには、山留め壁の中心線と圧入機の軸線を一致させる必要がある。そのために、反力となる圧入済みのシートパイルの上端の内側または外側に当て板3を取付けて、山留壁の中心線を維持する。
From the above, in order to press-fit different types of sheet piles with high accuracy, it is necessary to match the center line of the retaining wall with the axis of the press-fitting machine. For this purpose, the
例えば、III型シートパイル2bとIV型シートパイル2aを交互に圧入する場合は、IV型の次にIII型を圧入する際は、図17(d)のように、新規に圧入するIII型シートパイル2bと山留め壁の中心線との距離が等しくなるように、反力となる圧入済みのIV型シートパイル2aの内側に当て板3を取り付けて、図18で示す圧入機4の軸線(シートパイルの中心線=シートパイルのジョイント位置)を維持する。
For example, when the III
また、III型シートパイル2bの次にIV型シートパイル2aを圧入する際は、図17(e)と(f)のように、新規に圧入するIV型シートパイル2aと山留め壁の中心線との距離が等しくなるように、反力となる圧入済みのIII型シートパイル2bの外側に当て板3を取付けて、圧入機4の軸線(シートパイルの中心線=シートパイルのジョイント位置)を維持する。
When the IV
図18と図19は、圧入せんとするシートパイルの組合わせ種類と圧入機4の関係および当て板の配置例を具体的に示し、図18は、シートパイルがIII型とIV型を交互になる組み合わせにおいて、図18(a)はIII型シートパイル2bを圧入する施工時の平面状態を示し、先に圧入したIV型シートパイル2aの内面に当て板3を取付け、圧入機4はこの当て板3を介してIV型シートパイル2aをクランプして固定化し、III型シートパイル2bを圧入し、同じく図18(b)は、IV型シートパイル2aを圧入する施工時の平面状態を示し、先に圧入したIII型シートパイル2bの外面に当て板3を取付け、圧入機4はこの当て板3を介してIII型シートパイル2bをクランプして固定化し、IV型シートパイル2aを圧入するものであり、何れも、圧入機4の軸線とシートパイルの中心線を一致させて圧入することができる。
FIG. 18 and FIG. 19 show concretely the relationship between the type of combination of sheet piles to be press-fitted and the press-fitting
また、図19は、シートパイルがIII型−III型−IV型−III型−III型−IV型の組み合わせにおいて、図19(a)はIII型シートパイル2bを圧入する第1の施工時の平面状態を示し、先に圧入したIV型シートパイル2aの内面に当て板3を取付け、圧入機4はこの当て板3を介してIV型シートパイル2aをクランプして固定化し、III型シートパイル2bを圧入し、同じく、図19(b)は、III型シートパイル2bを圧入する第2の施工時の平面状態を示し、先に圧入したIV型シートパイル2aの内面に当て板3を取付け、圧入機4はこの当て板3を介してIV型シートパイル2aをクランプして固定化し、III型シートパイル2bを圧入し、図19(c)は、IV型シートパイル2aを圧入する施工時の平面状態を示し、先に圧入したIII型シートパイル2bの外面に当て板3を取付け、圧入機4はこの当て板3を介してIII型シートパイル2bをクランプして固定化し、IV型シートパイル2aを圧入する。
FIG. 19 shows a combination of sheet piles III-III-IV-III-III-III-IV, and FIG. 19 (a) shows the first construction in which the III-
2)長さの異なるシートパイルをオーガー併用圧入機にて立て込む場合
長さの異なるシートパイルを、シートパイルを固定するチャックを移動させることなしに効率的に建て込む方法として、シートパイルで山留め壁を施工する場合、地盤状況に応じてオーガー併用圧入工法を採用することがある。
2) When setting up piles of sheet piles of different lengths with an auger press-fitting machine, pile up the piles of sheets of different lengths with sheet piles as an efficient way to build them without moving the chuck that fixes the sheet piles. When constructing walls, an auger combined press-in method may be used depending on the ground conditions.
従来は、図21(a)、(b)のように、リーダー5に対してオーガー駆動機6とチャック7を独自に上下動自在となるよう取付け、オーガー駆動機6にケーシング8とその内部で回転させるオーガー9を連結し、前記チャック7をボルト10の締め付けによってケーシング8の任意高さ位置で固定できるようにし、前記ケーシング8の外側に配置したシートパイルを、その上端をチャック7で固持して下端を取付け用プレート(図示省略)でケーシング8に固定し、地盤をアースオーガー9で回転掘進し、同時にシートパイルを建て込むようにしている。
Conventionally, as shown in FIGS. 21A and 21B, the
そのため、シートパイル固定用のチャック7は、シートパイルの長さが異なるごとに適宜位置を移動させる必要があり、作業効率が著しく低下する。
Therefore, it is necessary to move the position of the
長さの異なるシートパイルを、チャックを移動させることなしに建て込む方法として、以下の構造を採用する。 The following structure is adopted as a method of building sheet piles having different lengths without moving the chuck.
図20(a)に示すように、リーダー5に対して上下動自在となるよう取付けたオーガー駆動機6にケーシング8とその内部で回転させるオーガーを連結し、チャック7をオーガー駆動機6とケーシング8の上端間にオーガー駆動機6と一体に上下動するよう取付け、ケーシング8の外側に配置したシートパイル1a又は1bの上端をチャックで固持し、シートパイル1a又は1bの下端とケーシングは、図20(b)のように、シートパイルの打ち込み方向に係合し、ケーシングの引き抜き方向に離脱する取付け機構11で結合する構造になっている。
As shown in FIG. 20 (a), a
この取付け機構11は、一対となる鉤型の取付けプレート11aと11bをシートパイル1a又は1bの下端とケーシング8に固定することによって形成され、ケーシング8には、短尺シートパイル用と長尺シートパイル用のための取付けプレート11aが上下の位置に固定されている。
The
長尺のシートパイルを建て込む場合は、シートパイルの上端をチャック7で固持し、シートパイルの下端に固定した取付け用プレート11bを、ケーシング8の下端取付け用プレート11aと打ち込み方向に係合させることにより、ケーシング8の外側に配置して打ち込むようにする。
When building a long sheet pile, the upper end of the sheet pile is held by the
また、短尺のシートパイルを建て込む場合は、シートパイルの上端をチャック7で固持し、シートパイルの下端に固定した取付け用プレート11bを、ケーシング8の中間に設けた取付け用プレート11aと打ち込み方向に係合させることにより、ケーシング8の外側に配置して打ち込むようにする。
When a short sheet pile is to be built, the mounting
従って、短尺のシートパイルの建て込みにおいても、その上端は、長尺のシートパイルの場合と同一位置になり、シートパイルの長さが異なってもシートパイル固定用チャック7の位置をケーシング8に対して移動させる必要がなくなり、作業効率が向上する。
Therefore, even when a short sheet pile is installed, the upper end thereof is at the same position as that of the long sheet pile, and the position of the sheet
この場合、短尺のシートパイルを建て込む場合も、削孔長は長尺シートパイル建込み時と同一長さの掘削長(空掘りが発生する)となるが、シートパイルの長さは省力化できることになる。 In this case, even when a short sheet pile is built, the drilling length is the same as the length when the long sheet pile is erected (an empty digging occurs), but the sheet pile length is labor-saving. It will be possible.
1a 親杭部シートパイル
1b 横矢板代わりに用いるシートパイル(1aと同じ断面形状)
1c 親杭部シートパイル(1aとは異なる断面形状)
1d 横矢板代わりに用いるシートパイル(1cと同じ断面形状)
2a IV型シートパイル
2b III型シートパイル
3 当て板
4 圧入機
5 リーダー
6 オーガー駆動機
7 チャック
8 ケーシング
9 アースオーガー
10 ボルト
11 取付け機構
1a Master
1c Master pile sheet pile (cross-sectional shape different from 1a)
1d Sheet pile used in place of a sheet pile (same cross-sectional shape as 1c)
2a IV
Claims (3)
掘削底から下の根入れ長さを長くしたシートパイルを水平方向の応力負担材として機能するように間隔をあけて設置し、
掘削底から下の根入れ長さを短くしたシートパイルを前記根入れ長さを長くしたシートパイルの間に主に横矢板として機能するように設置することにより、
山留め壁を深さ方向の応力と変形や地盤状況に応じて必要となる強度を維持しつつ構築することを特徴とするシートパイルの合理的配置工法。 It is a sheet pile construction method that constructs a mountain retaining wall by driving a sheet pile horizontally into the ground,
Install sheet piles with a deeper depth from the bottom of the excavation at intervals so as to function as a stress bearing material in the horizontal direction,
By installing a sheet pile having a shorter root insertion length from the bottom of the excavation so as to function mainly as a sheet pile between the sheet piles having a longer root insertion length ,
A rational construction method for sheet piles, characterized in that the retaining wall is constructed while maintaining the strength required according to the stress and deformation in the depth direction and the ground conditions.
When constructing sheet piles with different cross-sectional widths using a hydraulic press machine, the inner or outer side of the upper end of the press-fitted sheet pile that secures the reaction force of the hydraulic press machine to maintain the center line in the connection direction of the seat pile The rational arrangement method of the seat pile according to claim 2, wherein the pressing plate is temporarily fixed to the base plate, and press-fitting is performed while preventing movement of the axis of the hydraulic press-fitting machine.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009070357A JP4814968B2 (en) | 2009-03-23 | 2009-03-23 | Rational arrangement method of sheet pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009070357A JP4814968B2 (en) | 2009-03-23 | 2009-03-23 | Rational arrangement method of sheet pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2010222818A JP2010222818A (en) | 2010-10-07 |
| JP4814968B2 true JP4814968B2 (en) | 2011-11-16 |
Family
ID=43040301
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009070357A Active JP4814968B2 (en) | 2009-03-23 | 2009-03-23 | Rational arrangement method of sheet pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4814968B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6091440B2 (en) * | 2014-01-27 | 2017-03-08 | 新日鐵住金株式会社 | Steel sheet pile foundation structure |
| JP6286097B1 (en) * | 2017-08-09 | 2018-02-28 | エスケー工業株式会社 | U-type steel sheet pile press-fitting device |
| KR102856004B1 (en) * | 2023-11-28 | 2025-09-05 | 박인수 | Sheet pile construction apparatus and Method for construction sheet pile |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3615601C1 (en) * | 1986-05-09 | 1987-08-06 | Strabag Bau Ag | Pipe support screed for a combined sheet pile |
| JP4198294B2 (en) * | 2000-03-21 | 2008-12-17 | 三和機材株式会社 | Sheet pile placing device |
-
2009
- 2009-03-23 JP JP2009070357A patent/JP4814968B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2010222818A (en) | 2010-10-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5654641B2 (en) | Reinforcement method of existing harbor quay | |
| JP4862908B2 (en) | Retaining wall structure, method for constructing retaining wall structure | |
| JP5503822B2 (en) | Retaining wall and its construction method | |
| KR20170005991A (en) | soil retaining wall using PHC pile and its construction method | |
| KR101377019B1 (en) | Reactive forcing device using guide rail and foundation reinforcing method therewith | |
| JP5421165B2 (en) | Earth retaining structure and its construction method | |
| JP4343080B2 (en) | Continuous underground wall | |
| JP6632028B2 (en) | Concrete assembly retaining wall | |
| JP5190739B2 (en) | Earth retaining wall and its construction method | |
| JP2008231799A (en) | Seismic isolation structure | |
| JP4814968B2 (en) | Rational arrangement method of sheet pile | |
| JP3139588U (en) | Dail pile | |
| JP6650257B2 (en) | Mountain retaining structure and construction method thereof | |
| JP4812324B2 (en) | Retaining wall and its construction method | |
| CN213741134U (en) | Pile foundation joist counterfort retaining wall | |
| JP3899094B2 (en) | Foundation reinforcement method for existing structures by press-fitting steel pipe piles | |
| JP4529631B2 (en) | Underground structure and construction method of underground structure | |
| JP4993132B2 (en) | Foundation reinforcement method for existing structures | |
| CN115652947B (en) | A bridge cap construction support device and method adjacent to a foundation pit | |
| KR20140116695A (en) | The underground structure and pressing device | |
| CN120465959B (en) | A tunnel construction support structure, tunnel structure, and tunnel construction method | |
| JP2007277830A (en) | Core material, continuous underground wall, soil cement wall, continuous underground wall pile, soil cement wall pile, cast-in-place concrete pile, underground structure, and foundation structure of building | |
| KR20140010277A (en) | Semicircular sheet pile and construction method for wall structure of underground using the same | |
| CN223255987U (en) | An H-shaped steel plate reinforced wall based on TRD method | |
| KR102753799B1 (en) | Soil retaning structure for two rows pile using longitudinal prestress |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20110420 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110510 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110628 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110802 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110826 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4814968 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140902 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |