JP4832072B2 - Steel pipe tower interior rust prevention method - Google Patents
[go: Go Back, main page]

JP4832072B2 - Steel pipe tower interior rust prevention method - Google Patents

Steel pipe tower interior rust prevention method Download PDF

Info

Publication number
JP4832072B2
JP4832072B2 JP2005362762A JP2005362762A JP4832072B2 JP 4832072 B2 JP4832072 B2 JP 4832072B2 JP 2005362762 A JP2005362762 A JP 2005362762A JP 2005362762 A JP2005362762 A JP 2005362762A JP 4832072 B2 JP4832072 B2 JP 4832072B2
Authority
JP
Japan
Prior art keywords
steel pipe
tower
barrel
steel
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005362762A
Other languages
Japanese (ja)
Other versions
JP2007162406A (en
Inventor
豊 中野
忠範 有吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2005362762A priority Critical patent/JP4832072B2/en
Publication of JP2007162406A publication Critical patent/JP2007162406A/en
Application granted granted Critical
Publication of JP4832072B2 publication Critical patent/JP4832072B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Description

本発明は、鋼管鉄塔内部防錆方法に関し、特に、主柱材を鋼管で構成された架空送電線用鉄塔などの中空鋼管鉄塔の鋼管内部の腐食を防止するのに好適な鋼管鉄塔内部防錆方法に関する。   TECHNICAL FIELD The present invention relates to a steel pipe tower internal rust prevention method, and in particular, a steel pipe tower internal rust prevention suitable for preventing corrosion inside a steel pipe of a hollow steel pipe steel tower such as an overhead power transmission line steel tower having a main column made of steel pipe. Regarding the method.

近年、経年した架空送電線用鉄塔において、鋼管内部腐食に起因するトラブル事例が全国的に数多く報告されるようになってきた。これらのトラブルの大きな原因としては、以下に示すものが考えられる。
(1)外気と内部温度との差による管路内結露
(2)雨滴浸透などによる内部湿潤状態の継続
(3)小型昆虫類の侵入・営巣による局部発錆
(4)内部メッキ処理工程時のムラ
In recent years, many cases of trouble caused by internal corrosion of steel pipes have been reported nationwide in aged towers for overhead power transmission lines. The major causes of these troubles are as follows.
(1) Condensation in the pipeline due to the difference between the outside air and the internal temperature (2) Continuation of the internal wet state due to raindrop infiltration, etc. (3) Local rusting due to invasion / nesting of small insects (4) During the internal plating process village

現行での対策方法として、鋼管内部の塗装(内部コーティング含む。)および該当する鋼管部材の取替えが一般的に行われている。
また,主目的は鋼材の節約にあるが、充填材工法といった観点では、鋼管内部にコンクリートを充填するMC鉄塔が一部で採用されている。
さらに、省力化といった観点からの先行技術として、下記の特許文献1には、鉄塔頂部位置に取り付けられる鋼管鉄塔の主柱材内部防錆装置であって、送風機と除湿機と配管やホースなどを備え、送風機および除湿機へ絶えず電力を供給するために太陽電池と風力発電機および蓄電池を備える主柱材内部防錆装置が開示されている。この主柱材内部防錆装置では、鋼管鉄塔の主柱材において鉄塔頂部の端部より絶えず乾燥気体を送り込み、鋼管内部を通り抜けた乾燥気体が鋼管鉄塔主柱材最下部に備えられた遮水板の排水溝から排気されることにより、鋼管内部を乾燥状態にする。
特開2002−242332号公報
As a current countermeasure method, painting (including internal coating) inside a steel pipe and replacement of the corresponding steel pipe member are generally performed.
Moreover, although the main purpose is to save steel materials, from the viewpoint of the filler construction method, some MC steel towers are used to fill the steel pipes with concrete.
Furthermore, as a prior art from the viewpoint of labor saving, the following Patent Document 1 discloses a rust preventive device inside a main pillar material of a steel pipe tower attached to the top position of a steel tower, including a blower, a dehumidifier, a pipe, a hose, and the like. In order to continuously supply electric power to a blower and a dehumidifier, a main pillar material internal rust prevention device including a solar battery, a wind power generator, and a storage battery is disclosed. In this main column material internal rust prevention device, dry gas is continuously sent from the end of the steel tower in the main column material of the steel pipe tower, and the dry gas passing through the inside of the steel pipe is provided at the bottom of the steel pipe tower main column material. The inside of the steel pipe is dried by being exhausted from the drainage groove of the plate.
JP 2002-242332 A

しかしながら、鋼管内部の塗装および鋼管部材の取替えは、抜本的な解決策とはいえずかつ高コストであるという問題があった。
また、MC鉄塔への変更を図ろうとすると,コンクリート充填による荷重増に伴う基礎の安定性の喪失ばかりか、膨大なコストを覚悟しなければならないという問題があった。
さらには、上記の特許文献1に開示されている鋼管鉄塔の主柱材内部防錆装置は、太陽光や風力発電設備の発生電力によって、湿潤状態である鋼管内部を蒸発および乾燥させようとする技術であるが、発電設備のメンテナンスコストが大きく、かつ、湿潤が進む曇天または雨天時には発電できないという問題がある。
However, painting the inside of the steel pipe and replacing the steel pipe member are not fundamental solutions and have a problem of high cost.
In addition, when trying to change to the MC tower, there was a problem that not only the stability of the foundation was lost due to the load increase due to concrete filling, but also a huge cost had to be prepared.
Furthermore, the main columnar material internal rust prevention device disclosed in the above-mentioned Patent Document 1 tries to evaporate and dry the inside of the steel pipe in a wet state by the generated electric power of sunlight or wind power generation equipment. Although it is a technology, there is a problem that the maintenance cost of the power generation equipment is large, and power generation cannot be performed in wet or cloudy weather.

本発明の目的は、基礎の安定性が良好でありかつ低コスト化が図れる鋼管鉄塔内部防錆方法を提供することにある。   An object of the present invention is to provide a method for preventing rust inside a steel pipe tower that has good foundation stability and can reduce costs.

本発明の鋼管鉄塔内部防錆方法は、既設の中空鋼管鉄塔の鋼管内部の腐食を防止するために用いられる鋼管鉄塔内部防錆方法であって、前記中空鋼管鉄塔を構成する鉄塔鋼管(1)の内部空間に挿入した押出機(10)によって合成樹脂を押し出しながら該押出機を徐々に引き上げていって、該鉄塔鋼管の内部空間を該鉄塔鋼管の底部から頂部まで該押し出した合成樹脂で充填することを特徴とする
ここで、前記押出機が、先端部にダイス(12)が取り付けられたバレル(11)と、該バレルの先端部および後端部の外面に取り付けられたガイドローラ(131〜138)と、前記バレルの後端側の内部に設けられたモータ(14)と、前記バレルの内部に設けられたかつ前記モータによって回転される押出スクリュー(15)と、前記バレルの前記押出スクリューおよび前記ダイスが取り付けられた部分の内面に設けられた加熱用ヒータ(16)と、前記バレルの先端の外面に取り付けられたカメラ(17)とを備えてもよい。
前記押出機が、ケーブル(20)の先端に取り付けられており、該ケーブルには、パイロットロープ(21)が中心部を通されているとともに、電源ケーブル(22)、原材料導入管(23)、発泡剤導入管(24)およびモニタケーブル(25)が該パイロットロープを囲むように通されていてもよい。
前記パイロットロープの一端が前記押出機の前記バレルの後端部に固定されており、ウインチ(41)を用いて前記ケーブルを巻き取ったり巻き戻したりすることにより該押出機を引き上げたり降ろしたりし、前記電源ケーブルの先端部が前記バレルの後端から該バレルの内部に挿入されたのち前記モータおよび前記加熱用ヒータに接続されており、該電源ケーブルの末端に接続された発電機(43)から該モータおよび該加熱用ヒータに該電源ケーブルを介して電力を供給し、前記原材料導入管および前記発泡剤導入管の先端部が前記バレルの後端から該バレルの内部に挿入されており、該原材料導入管および該発泡剤導入管の末端が材料供給機(42)に接続されており、該材料供給機から該原材料導入管および該発泡剤導入管を介して前記バレルの内部に原材料および発泡剤をそれぞれ供給し、前記モニタケーブルの先端が前記カメラに接続され、該モニタケーブルの末端がモニタ(44)に接続されており、該モニタケーブルを介して該モニタから該カメラに電力を供給するとともに該カメラから前記モニタに画像データを送信してもよい。
メッキ処理された鋼管部材(63)の内部空間に合成樹脂を充填し、前記鋼管部材の中心部の前記充填された合成樹脂を削り取って、該鋼管部材の内壁面にのみ前記合成樹脂を残すことを特徴としてもよい。
前記合成樹脂が、汎用プラスチック、汎用エンプラおよびスーパーエンプラを含む熱可塑性樹脂および熱硬化性樹脂のうちから、軽量性、漏出性および特性安定性を総合評価して選定されてもよい。
前記合成樹脂が発泡スチロールであってもよい。
Steel tower internal anticorrosive method of the present invention is a steel pipe steel tower internal anticorrosive method used to prevent corrosion of the steel pipe inside the hollow steel towers already set, towers steel tube (1 constituting the hollow steel tube tower The extruder is gradually pulled up while extruding the synthetic resin by the extruder (10) inserted in the internal space of the steel tower, and the internal space of the steel tower pipe is made of the synthetic resin extruded from the bottom to the top of the steel tower steel pipe. and wherein the filling.
Here, the extruder includes a barrel (11) having a die (12) attached to a front end portion thereof, and guide rollers (13 1 to 13 8 ) attached to outer surfaces of a front end portion and a rear end portion of the barrel. A motor (14) provided in the rear end side of the barrel, an extrusion screw (15) provided in the barrel and rotated by the motor, the extrusion screw and the die of the barrel There may be provided a heater (16) provided on the inner surface of the portion to which is attached, and a camera (17) attached to the outer surface of the tip of the barrel.
The extruder is attached to the tip of a cable (20). A pilot rope (21) is passed through the center of the cable, and a power cable (22), a raw material introduction pipe (23), A blowing agent introduction pipe (24) and a monitor cable (25) may be passed through the pilot rope.
One end of the pilot rope is fixed to the rear end of the barrel of the extruder, and the extruder is pulled up and down by winding and unwinding the cable using a winch (41). And a generator (43) connected to the motor and the heater for heating after the front end of the power cable is inserted into the barrel from the rear end of the barrel, and connected to the end of the power cable. Power is supplied to the motor and the heater for heating from the power cable, and the raw material introduction pipe and the foaming agent introduction pipe are inserted into the barrel from the rear end of the barrel, Ends of the raw material introduction pipe and the foaming agent introduction pipe are connected to a material supply machine (42), and the raw material introduction pipe and the foaming agent introduction pipe are connected from the material supply machine. The raw material and the foaming agent are respectively supplied to the inside of the barrel, the tip of the monitor cable is connected to the camera, and the end of the monitor cable is connected to the monitor (44), and the monitor cable is connected to the monitor via the monitor cable. In addition, power may be supplied from the camera to the camera and image data may be transmitted from the camera to the monitor.
Filling the inner space of the plated steel pipe member (63) with synthetic resin, scraping off the filled synthetic resin at the center of the steel pipe member, leaving the synthetic resin only on the inner wall surface of the steel pipe member May be a feature.
The synthetic resin may be selected from a thermoplastic resin including a general-purpose plastic, a general-purpose engineering plastic, and a super engineering plastic, and a thermosetting resin by comprehensively evaluating lightness, leakage, and characteristic stability.
The synthetic resin may be a polystyrene foam.

本発明の鋼管鉄塔内部防錆方法は、以下に示す効果を奏する。
(1)中空鋼管鉄塔を構成する鉄塔鋼管の内部空間に軽量性、漏出性および特性安定性を総合評価して選定された合成樹脂を充填することにより、合成樹脂の軽量性から鉄塔および基礎の補強対策が不要になるとともに、合成樹脂の特性安定性からトータルコスト面でも非常に有利となる。
(2)充填材として使用する合成樹脂は、成形が自在でありかつ軽量であるため、PM柱などの腐食対策充填材としても使用することができる。
(3)一部の合成樹脂は溶解復元も可能であるので、地中先行管路の劣化および損傷防止のための充填材としても期待できる。
(4)合成樹脂の押出機の一層の小型化や工夫によって、中空鋼管鉄塔の腹材などの内部空間に合成樹脂を充填することも可能であり、腹材の防錆のほかに風騒音対策にも寄与する。
(5)新設の鉄塔については、メーカにおける製作段階において鋼管部材に合成樹脂を充填することにより、現場施工と比較して高品質充填が実現できるとともに、充填材として使用する合成樹脂を目的に合わせて選定することにより、更なる軽量化のための削孔も可能となる。
The steel pipe tower internal rust prevention method of the present invention has the following effects.
(1) Filling the internal space of the steel tower pipes that make up the hollow steel pipe tower with a synthetic resin selected based on a comprehensive evaluation of lightness, leakage, and characteristic stability, it is possible to reduce the In addition to eliminating the need for reinforcement measures, the stability of the characteristics of the synthetic resin is extremely advantageous in terms of total cost.
(2) Since the synthetic resin used as a filler is freely moldable and lightweight, it can also be used as a corrosion countermeasure filler such as a PM column.
(3) Since some synthetic resins can be reconstituted, they can be expected as fillers for preventing deterioration and damage of underground underground conduits.
(4) By further downsizing and improving the synthetic resin extruder, it is also possible to fill the internal space such as the belly of a hollow steel pipe tower with synthetic resin. Also contributes.
(5) For new steel towers, filling steel pipe members with synthetic resin at the manufacturing stage of the manufacturer can achieve high-quality filling compared to on-site construction, and match the synthetic resin used as the filler to the purpose. This makes it possible to drill holes for further weight reduction.

基礎の安定性が良好でありかつ低コスト化が図れるという目的を、中空鋼管鉄塔を構成する鉄塔鋼管または鋼管部材の内部に発砲スチロールなどの合成樹脂を充填することにより実現した。
すなわち、本発明の鋼管鉄塔内部防錆方法は、従来のMC鉄塔と同様に、中空鋼管鉄塔を構成する鉄塔鋼管または鋼管部材の内部空間そのものを取り除くことによって結露、雨滴浸透および小型昆虫類侵入を防ぐことを基本的な発想の柱としているが、基礎の安定性および低コスト化の観点から、コンクリートとは全く視点を変えて、以下に示す要件をすべて満足する充填材として発泡スチロールを中心とした合成樹脂を採用したことを特徴とする。
(1)軽量であること
(2)安価であること
(3)漏れ出ないこと
(4)特性変化がないこと
(5)多種の鋼管サイズに対応できること
(6)現場施工が容易であること
(7)安全であること
The objectives of good foundation stability and low cost were realized by filling a steel pipe or steel pipe member constituting a hollow steel pipe tower with a synthetic resin such as foamed polystyrene.
That is, the steel pipe tower internal rust prevention method of the present invention removes condensation, raindrop infiltration, and small insect invasion by removing the steel tower steel pipe or the internal space itself of the steel pipe member constituting the hollow steel pipe tower as in the conventional MC tower. The basic idea is to prevent it, but from the standpoint of stability of the foundation and cost reduction, the viewpoint of the foundation is completely different from concrete, and foam polystyrene is mainly used as a filler that satisfies all the following requirements. It is characterized by adopting synthetic resin.
(1) Light weight (2) Inexpensive (3) No leakage (4) No change in characteristics (5) Able to handle various steel pipe sizes (6) Easy on-site construction ( 7) Be safe

以下、本発明の鋼管鉄塔内部防錆方法の実施例について、図面を参照して説明する。
本発明の第1の実施例による鋼管鉄塔内部防錆方法は、既設の中空鋼管鉄塔を構成する鉄塔鋼管の内部空間を合成樹脂で充填することにより中空鋼管鉄塔の鋼管内部の腐食を防止するものである。
なお、本明細書では、図1に示す鉄塔鋼管1のように、複数個の鋼管部材を組み合わせて中空鋼管鉄塔の1本の主柱を構成している部分を「鉄塔鋼管」と称する。
Hereinafter, the Example of the steel pipe tower internal rust prevention method of this invention is described with reference to drawings.
The steel pipe tower internal rust prevention method according to the first embodiment of the present invention prevents corrosion inside the steel pipe of the hollow steel pipe tower by filling the internal space of the steel tower steel pipe constituting the existing hollow steel pipe tower with synthetic resin. It is.
In addition, in this specification, like the steel tower steel pipe 1 shown in FIG. 1, the part which comprises one main pillar of a hollow steel pipe steel tower combining several steel pipe members is called "steel steel pipe."

充填材として用いる合成樹脂は、汎用プラスチック(塩化ビニル樹脂、耐熱塩化ビニル樹脂、ポリエチレン、ポリプロピレン、ポリスチレン、ABS樹脂、AS樹脂、ポリメチルメタアクリレートおよびポリ塩化ビリニデンなど)、汎用エンプラ(ポリアミド、ポリエチレンテレフタレート、ポリアセタール、ポリカーボネート、変性ポリフェニレンオキサイド、ポリブチレンテレフタレート、超高分子量ポリエチレンおよびポリフッ化ビリニデンなど)およびスーパーエンプラ(ポリサルフォン、ポリエーテルサルホン、ポリフェニレンサルファイド、ポリアリレート、ポリエーテルイミド、ポリエーテルエーテルケトン、ポリイミドおよびポリテトラフロロエチレンなど)のような熱可塑性樹脂や、フェノール、ユリア、ガラス繊維強化プラスチック、メラミン、不飽和ポリエステル、エポキシ、シリコーンおよびポリウレタンのような熱硬化性樹脂から選定すればよい。
ただし、軽量性、漏出性および特性安定性を総合評価すると、表1に示すような特徴を有する発泡スチロール(ポリスチレン)を充填材として選定することが好ましい。
以下では、充填材として発泡スチロールを選定した場合を例として説明する。
Synthetic resins used as fillers are general-purpose plastics (vinyl chloride resin, heat-resistant vinyl chloride resin, polyethylene, polypropylene, polystyrene, ABS resin, AS resin, polymethyl methacrylate, polyvinylidene chloride, etc.), general-purpose engineering plastics (polyamide, polyethylene terephthalate) , Polyacetal, polycarbonate, modified polyphenylene oxide, polybutylene terephthalate, ultrahigh molecular weight polyethylene and poly (vinylidene fluoride)) and super engineering plastics (polysulfone, polyethersulfone, polyphenylene sulfide, polyarylate, polyetherimide, polyetheretherketone, polyimide) And polytetrafluoroethylene), phenol, urea, glass fiber reinforced Plastics, melamine, unsaturated polyester, epoxy, may be selected from thermosetting resins such as silicone and polyurethane.
However, when comprehensively evaluating lightness, leakage, and characteristic stability, it is preferable to select polystyrene foam (polystyrene) having the characteristics shown in Table 1 as a filler.
Below, the case where a polystyrene foam is selected as a filler is demonstrated as an example.

Figure 0004832072
Figure 0004832072

次に、本実施例による鋼管鉄塔内部防錆方法において使用する機材について、図1乃至図3を参照して説明する。
本実施例による鋼管鉄塔内部防錆方法では、図1に示すように、押出機10、ケーブル20、ウインチ41、材料供給機42、発電機43およびモニタ44を使用する。
Next, the equipment used in the steel pipe tower internal rust prevention method according to this embodiment will be described with reference to FIGS.
In the steel pipe tower internal rust prevention method according to the present embodiment, as shown in FIG. 1, an extruder 10, a cable 20, a winch 41, a material supply machine 42, a generator 43 and a monitor 44 are used.

ここで、押出機10は、図2に示すように、先端部にダイス12が取り付けられた外径100mm程度の円筒状のバレル11と、バレル11の先端部および後端部の外周面にそれぞれ4個ずつ取り付けられたガイドローラ131〜138(図3の紙面手前および奥に取り付けられたガイドローラ132,134,136,138は不図示)と、バレル11の後端側の内部に設けられたモータ14と、バレル11の内部に設けられたかつモータ14によって回転される押出スクリュー15と、バレル11の押出スクリュー15およびダイス12が取り付けられた部分の内周面に設けられた加熱用ヒータ16と、バレル11の先端の外周面に取り付けられたCCDカメラ17とを備える。 Here, as shown in FIG. 2, the extruder 10 has a cylindrical barrel 11 having an outer diameter of about 100 mm with a die 12 attached to the front end portion, and outer peripheral surfaces of the front end portion and the rear end portion of the barrel 11. Four guide rollers 13 1 to 13 8 ( four guide rollers 13 2 , 13 4 , 13 6 , and 13 8 attached to the front and back of FIG. 3 are not shown) and the rear end side of the barrel 11 Provided on the inner peripheral surface of the portion of the barrel 11 to which the extrusion screw 15 and the die 12 are attached. And a CCD camera 17 attached to the outer peripheral surface at the tip of the barrel 11.

ケーブル20は、図1に示すように、中空鋼管鉄塔の他の鉄塔鋼管や地面にロープなどを介して固定された複数個のケーブル支持具3を用いて、地上から他の鉄塔鋼管に沿って鉄塔鋼管1の頂部まで張られたのち、先端に押出機10が取り付けられて鉄塔鋼管1の内部空間に挿入される。
また、ケーブル20には、図3に示すように、パイロットロープ21が中心部を通されているとともに、電源ケーブル22、原材料導入管23、発泡剤導入管24およびモニタケーブル25がパイロットロープ21を囲むように通されている。
As shown in FIG. 1, the cable 20 uses a plurality of cable supports 3 fixed to the other steel tower steel pipe or the ground via a rope or the like along the other steel tower steel pipe from the ground. After being stretched to the top of the steel tower steel pipe 1, an extruder 10 is attached to the tip and inserted into the internal space of the steel tower steel pipe 1.
As shown in FIG. 3, the pilot rope 21 is passed through the center of the cable 20, and the power cable 22, the raw material introduction pipe 23, the foaming agent introduction pipe 24 and the monitor cable 25 are connected to the pilot rope 21. It is passed to surround.

図2に示すようにパイロットロープ21の一端は押出機10のバレル11の後端部に固定されており、ウインチ41(図1参照)を用いてケーブル20を巻き取ったり巻き戻したりすることにより押出機10を引き上げたり降ろしたりすることができる。このとき、ガイドローラ131〜138が鉄塔鋼管1の内壁面を転がって押出機10は引き上げられたり降ろされたりするため、鉄塔鋼管1の内部空間の中心線に沿って押出機10を引き上げたり降ろしたりすることができる。 As shown in FIG. 2, one end of the pilot rope 21 is fixed to the rear end portion of the barrel 11 of the extruder 10, and the cable 20 is wound or unwound by using the winch 41 (see FIG. 1). The extruder 10 can be raised or lowered. At this time, since the guide rollers 13 1 to 13 8 roll on the inner wall surface of the steel tower steel pipe 1 and the extruder 10 is pulled up or down, the extruder 10 is pulled up along the center line of the internal space of the steel tower steel pipe 1. Can be lowered or lowered.

電源ケーブル22の先端部はバレル11の後端からバレル11の内部に挿入されたのちモータ14および加熱用ヒータ16に接続されており、また、電源ケーブル22の末端は発電機43(図1参照)に接続されている。これにより、発電機43からモータ14および加熱用ヒータ16に電源ケーブル22を介して電力を供給することができる。   The front end of the power cable 22 is inserted into the barrel 11 from the rear end of the barrel 11 and then connected to the motor 14 and the heater 16 for heating. The end of the power cable 22 is connected to the generator 43 (see FIG. 1). )It is connected to the. Thereby, electric power can be supplied from the generator 43 to the motor 14 and the heater 16 via the power cable 22.

原材料導入管23および発泡剤導入管24の先端部はバレル11の後端からバレル11の内部に挿入されており、また、原材料導入管23および発泡剤導入管24の末端は材料供給機42に接続されている。これにより、材料供給機42から原材料導入管23および発泡剤導入管24を介して押出機10のバレル11の内部にポリスチレン樹脂(原材料)および発泡剤(揮発性発泡剤)をそれぞれ供給することができる。   The leading ends of the raw material introduction pipe 23 and the foaming agent introduction pipe 24 are inserted into the barrel 11 from the rear end of the barrel 11, and the ends of the raw material introduction pipe 23 and the foaming agent introduction pipe 24 are connected to the material feeder 42. It is connected. Thereby, the polystyrene resin (raw material) and the foaming agent (volatile foaming agent) can be supplied from the material supply machine 42 into the barrel 11 of the extruder 10 through the raw material introduction pipe 23 and the foaming agent introduction pipe 24, respectively. it can.

モニタケーブル25の先端部はバレル11の外周面に取り付けられており、また、モニタケーブル25の先端はCCDカメラ17に接続され、モニタケーブル25の末端はモニタ44(図1参照)に接続されている。これにより、CCDカメラ17に電力を供給するとともにCCDカメラ17からの画像データをモニタ44に送信することができる。   The tip of the monitor cable 25 is attached to the outer peripheral surface of the barrel 11, the tip of the monitor cable 25 is connected to the CCD camera 17, and the end of the monitor cable 25 is connected to the monitor 44 (see FIG. 1). Yes. Thereby, power can be supplied to the CCD camera 17 and image data from the CCD camera 17 can be transmitted to the monitor 44.

次に、本実施例による鋼管鉄塔内部防錆方法における作業手順について、図1を参照して説明する。
鉄塔鋼管1の頂部に張られたケーブル20の先端に押出機10が取り付けられると、作業員は、ウインチ41を用いてケーブル20を巻き戻すことにより、押出機10を鉄塔鋼管1の内部空間を鉄塔鋼管1の底部まで徐々に降ろしていく。
Next, the work procedure in the steel pipe tower internal rust prevention method by a present Example is demonstrated with reference to FIG.
When the extruder 10 is attached to the tip of the cable 20 stretched on the top of the steel tower 1, the operator rewinds the cable 20 using the winch 41, so that the extruder 10 can be moved through the inner space of the steel tower 1. The steel pipe is gradually lowered to the bottom of the steel pipe 1.

その後、作業員は、モニタ44の電源を入れたのち、発電機43の電源を入れて、押出機10のモータ14を駆動させて押出スクリュー15を回転させるとともに加熱用ヒータ16をオンさせる。続いて、作業員は、材料供給機42の電源を入れて、ポリスチレン樹脂および発泡剤を押出機10のバレル11の内部に供給する。これにより、ポリスチレン樹脂と発泡剤とが加熱用ヒータ16によって加熱されながら押出スクリュー15によって混ぜ合わされて、発泡スチロール30(図2参照)が生成される。生成された発泡スチロール30は、押出スクリュー15によってダイス12の方に進み、ダイス12によって成形されて押出機10から押し出される。   Thereafter, the worker turns on the power of the monitor 44, turns on the power of the generator 43, drives the motor 14 of the extruder 10 to rotate the extrusion screw 15, and turns on the heater 16 for heating. Subsequently, the worker turns on the power of the material supply machine 42 and supplies the polystyrene resin and the foaming agent to the inside of the barrel 11 of the extruder 10. Thereby, the polystyrene resin and the foaming agent are mixed by the extrusion screw 15 while being heated by the heater 16, and the polystyrene foam 30 (see FIG. 2) is generated. The produced polystyrene foam 30 advances toward the die 12 by the extrusion screw 15, is molded by the die 12, and is extruded from the extruder 10.

作業員は、モニタ44に映し出されるCCDカメラ17からの画像を監視しながら、ウインチ41を用いてケーブル20を巻き取って押出機10を徐々に引き上げる。これにより、鉄塔鋼管1の底部から頂部までの内部空間が発泡スチロール30で充填される。   While monitoring the image from the CCD camera 17 displayed on the monitor 44, the worker winds up the cable 20 using the winch 41 and gradually raises the extruder 10. Thereby, the internal space from the bottom of the steel tower steel pipe 1 to the top is filled with the expanded polystyrene 30.

なお、試算の一例では、鉄塔鋼管1の内部空間を発泡スチロール30で充填した場合には、0.116t/脚の荷重増(Wt)となるが,鉄塔鋼管1を支える基礎2に与える影響については全く問題ないレベルであった。   In addition, in an example of the trial calculation, when the inner space of the steel tower steel pipe 1 is filled with the expanded polystyrene 30, the load increase (Wt) is 0.116 t / leg, but the influence on the foundation 2 that supports the steel tower steel pipe 1 is as follows. There was no problem at all.

次に、本発明の第2の実施例による鋼管鉄塔内部防錆方法について、図4および図5を参照して説明する。
本実施例による鋼管鉄塔内部防錆方法は、新設線路の建設および鉄塔建替時に、鉄塔メーカでの鉄塔製作工程の終盤において合成樹脂充填工程を組み入れることにより、現場での充填作業をなくすとともに高品質充填を図るものである。
Next, a steel pipe tower internal rust prevention method according to a second embodiment of the present invention will be described with reference to FIGS.
The steel pipe tower internal rust prevention method according to the present embodiment eliminates the on-site filling work by incorporating a synthetic resin filling process at the end of the tower production process at the tower manufacturer when constructing a new railway line and rebuilding the tower. Quality filling is intended.

本実施例による鋼管鉄塔内部防錆方法においては、図4(a)に示すように鋼管61および鋼板62を用意したのち、図4(b)に示すように鋼管61および鋼板62の原寸取りを行う。続いて、原寸取りした鋼管61および鋼板62を切断、加工および溶接して、図4(c)に示すような鋼管部材63を製作する。続いて、図4(d)に示すように、複数個の鋼管部材63をつなぎ合わせて中空鋼管鉄塔を仮組みしたのち、仮組した中空鋼管鉄塔の検査を行う。   In the steel pipe tower internal rust prevention method according to the present embodiment, after preparing the steel pipe 61 and the steel plate 62 as shown in FIG. 4 (a), the original dimensions of the steel pipe 61 and the steel plate 62 are taken as shown in FIG. 4 (b). Do. Subsequently, the steel pipe 61 and the steel plate 62 that have been dimensionally cut are cut, processed, and welded to produce a steel pipe member 63 as shown in FIG. Subsequently, as shown in FIG. 4 (d), a plurality of steel pipe members 63 are joined together to temporarily assemble a hollow steel pipe tower, and then the temporarily assembled hollow steel pipe tower is inspected.

その後、仮組みした中空鋼管鉄塔をばらして、すべての鋼管部材63にメッキ処理を施す。続いて、図5(a)に示すように、メッキ処理が施された鋼管部材63の内部空間に充填材押出機70を用いて発泡スチロール82を充填する。続いて、図5(b)に示すように、鋼管部材63の中心部の発泡スチロール82を削孔機械71により削り取って、図5(c)に示すように、鋼管部材63の内壁面にのみ発泡スチロール82を残す。これにより、発泡スチロール82を鋼管部材63の内部空間すべてに充填させる場合よりも、鋼管部材63の軽量化を図ることができるので、基礎2(図1参照)の安定性を更に向上させることができる。   Thereafter, the temporarily assembled hollow steel pipe steel tower is released, and all the steel pipe members 63 are plated. Subsequently, as shown in FIG. 5A, the foamed polystyrene 82 is filled into the internal space of the steel pipe member 63 that has been subjected to the plating process by using a filler extruder 70. Subsequently, as shown in FIG. 5 (b), the foamed polystyrene 82 at the center of the steel pipe member 63 is scraped off by the drilling machine 71, and as shown in FIG. 5 (c), the foamed polystyrene is applied only to the inner wall surface of the steel pipe member 63. Leave 82. Thereby, since the weight reduction of the steel pipe member 63 can be achieved rather than the case where the foamed polystyrene 82 is filled in the entire interior space of the steel pipe member 63, the stability of the foundation 2 (see FIG. 1) can be further improved. .

以上説明したように、本発明の鋼管鉄塔内部防錆方法は、たとえば、架空送電線用鉄塔などの中空鋼管鉄塔の鋼管内部の腐食を防止するのに利用することができる。   As described above, the steel pipe tower internal rust prevention method of the present invention can be used, for example, to prevent corrosion inside a steel pipe of a hollow steel pipe tower such as an overhead power transmission line tower.

本発明の第1の実施例による鋼管鉄塔内部防錆方法を説明するための図である。It is a figure for demonstrating the steel pipe tower internal rust prevention method by the 1st Example of this invention. 図1に示した押出機10の構成を説明するための図である。It is a figure for demonstrating the structure of the extruder 10 shown in FIG. 図1に示したケーブル20の構成を説明するための図である。It is a figure for demonstrating the structure of the cable 20 shown in FIG. 本発明の第2の実施例による鋼管鉄塔内部防錆方法を説明するための図である。It is a figure for demonstrating the steel pipe tower internal rust prevention method by the 2nd Example of this invention. 本発明の第2の実施例による鋼管鉄塔内部防錆方法を説明するための図である。It is a figure for demonstrating the steel pipe tower internal rust prevention method by the 2nd Example of this invention.

符号の説明Explanation of symbols

1 鉄塔鋼管
2 基礎
3 ケーブル支持具
10 押出機
11 バレル
12 ダイス
131〜138 ガイドローラ
14 モータ
15 押出スクリュー
16 加熱用ヒータ
17 CCDカメラ
20 ケーブル
21 パイロットロープ
22 電源ケーブル
23 原材料導入管
24 発泡剤導入管
25 モニタケーブル
30,82 発泡スチロール
41 ウインチ
42 材料供給機
43 発電機
44 モニタ
61 鋼管
62 鋼板
63 鋼管部材
70 充填材押出機
71 削孔機械
82 発泡スチロール
1 tower steel pipe 2 basis 3 cable support 10 extruder 11 barrel 12 die 131-134 8 guide rollers 14 motor 15 extruder screw 16 heater 17 CCD camera 20 cable 21 pilot rope 22 power cable 23 raw inlet tube 24 blowing agent Introduction pipe 25 Monitor cable 30, 82 Styrofoam 41 Winch 42 Material supply machine 43 Generator 44 Monitor 61 Steel pipe 62 Steel plate 63 Steel pipe member 70 Filler extruder 71 Drilling machine 82 Styrofoam

Claims (7)

既設の中空鋼管鉄塔の鋼管内部の腐食を防止するために用いられる鋼管鉄塔内部防錆方法であって、
前記中空鋼管鉄塔を構成する鉄塔鋼管(1)の内部空間に挿入した押出機(10)によって合成樹脂を押し出しながら該押出機を徐々に引き上げていって、該鉄塔鋼管の内部空間を該鉄塔鋼管の底部から頂部まで該押し出した合成樹脂で充填する、
ことを特徴とする、鋼管鉄塔内部防錆方法。
A steel pipe tower internal rust prevention method used to prevent corrosion inside the steel pipe of the existing hollow steel pipe tower,
The extruder is gradually pulled up while extruding the synthetic resin by the extruder (10) inserted into the internal space of the steel tower steel pipe (1) constituting the hollow steel pipe steel tower, and the internal space of the steel tower steel pipe is drawn into the steel tower steel pipe Filled with the extruded synthetic resin from the bottom to the top,
A method for preventing rust inside a steel pipe tower.
前記押出機が、
先端部にダイス(12)が取り付けられたバレル(11)と、
該バレルの先端部および後端部の外面に取り付けられたガイドローラ(131〜138)と、
前記バレルの後端側の内部に設けられたモータ(14)と、
前記バレルの内部に設けられた、かつ、前記モータによって回転される押出スクリュー(15)と、
前記バレルの前記押出スクリューおよび前記ダイスが取り付けられた部分の内面に設けられた加熱用ヒータ(16)と、
前記バレルの先端の外面に取り付けられたカメラ(17)と、
を備えることを特徴とする、請求項1記載の鋼管鉄塔内部防錆方法。
The extruder is
A barrel (11) with a die (12) attached to the tip;
Guide rollers (13 1 to 13 8 ) attached to the outer surfaces of the front and rear ends of the barrel;
A motor (14) provided inside the rear end of the barrel;
An extrusion screw (15) provided inside the barrel and rotated by the motor;
A heater for heating (16) provided on an inner surface of a portion to which the extrusion screw and the die of the barrel are attached;
A camera (17) attached to the outer surface of the barrel tip;
The steel pipe tower internal rust prevention method of Claim 1 characterized by the above-mentioned.
前記押出機が、ケーブル(20)の先端に取り付けられており、
該ケーブルには、パイロットロープ(21)が中心部を通されているとともに、電源ケーブル(22)、原材料導入管(23)、発泡剤導入管(24)およびモニタケーブル(25)が該パイロットロープを囲むように通されている、
ことを特徴とする、請求項1または2記載の鋼管鉄塔内部防錆方法。
The extruder is attached to the tip of the cable (20);
A pilot rope (21) is passed through the center of the cable, and a power cable (22), a raw material introduction pipe (23), a foaming agent introduction pipe (24), and a monitor cable (25) are connected to the pilot rope. Passed through,
The steel pipe tower internal rust prevention method of Claim 1 or 2 characterized by the above-mentioned.
前記パイロットロープの一端が前記押出機の前記バレルの後端部に固定されており、ウインチ(41)を用いて前記ケーブルを巻き取ったり巻き戻したりすることにより該押出機を引き上げたり降ろしたりし、
前記電源ケーブルの先端部が前記バレルの後端から該バレルの内部に挿入されたのち前記モータおよび前記加熱用ヒータに接続されており、該電源ケーブルの末端に接続された発電機(43)から該モータおよび該加熱用ヒータに該電源ケーブルを介して電力を供給し、
前記原材料導入管および前記発泡剤導入管の先端部が前記バレルの後端から該バレルの内部に挿入されており、該原材料導入管および該発泡剤導入管の末端が材料供給機(42)に接続されており、該材料供給機から該原材料導入管および該発泡剤導入管を介して前記バレルの内部に原材料および発泡剤をそれぞれ供給し、
前記モニタケーブルの先端が前記カメラに接続され、該モニタケーブルの末端がモニタ(44)に接続されており、該モニタケーブルを介して該モニタから該カメラに電力を供給するとともに該カメラから前記モニタに画像データを送信する、
ことを特徴とする、請求項3記載の鋼管鉄塔内部防錆方法。
One end of the pilot rope is fixed to the rear end of the barrel of the extruder, and the extruder is pulled up and down by winding and unwinding the cable using a winch (41). ,
From the generator (43) connected to the end of the power cable, the front end of the power cable is connected to the motor and the heater after being inserted into the barrel from the rear end of the barrel. Supplying electric power to the motor and the heater for heating via the power cable;
The raw material introduction pipe and the leading end of the foaming agent introduction pipe are inserted into the barrel from the rear end of the barrel, and the ends of the raw material introduction pipe and the foaming agent introduction pipe are connected to the material feeder (42). Connected to each of the raw material introduction pipe and the foaming agent introduction pipe through the raw material introduction pipe and the foaming agent introduction pipe, respectively.
The end of the monitor cable is connected to the camera, and the end of the monitor cable is connected to a monitor (44), and power is supplied from the monitor to the camera via the monitor cable and the monitor is connected to the monitor. Send image data to
The steel pipe tower internal rust prevention method of Claim 3 characterized by the above-mentioned.
メッキ処理された鋼管部材(63)の内部空間に合成樹脂を充填し、
前記鋼管部材の中心部の前記充填された合成樹脂を削り取って、該鋼管部材の内壁面にのみ前記合成樹脂を残す、
ことを特徴とする、鋼管鉄塔内部防錆方法。
Fill the inner space of the plated steel pipe member (63) with synthetic resin,
Scraping off the filled synthetic resin at the center of the steel pipe member, leaving the synthetic resin only on the inner wall surface of the steel pipe member;
A method for preventing rust inside a steel pipe tower.
前記合成樹脂が、汎用プラスチック、汎用エンプラおよびスーパーエンプラを含む熱可塑性樹脂および熱硬化性樹脂のうちから、軽量性、漏出性および特性安定性を総合評価して選定されることを特徴とする、請求項1乃至5記載の鋼管鉄塔内部防錆方法。 The synthetic resin is selected from a general-purpose plastic, a thermoplastic resin including a general engineering plastic and a super engineering plastic, and a thermosetting resin, and is selected by comprehensively evaluating lightness, leakage, and characteristic stability. The steel pipe tower internal rust prevention method of Claim 1 thru | or 5 . 前記合成樹脂が発泡スチロールであることを特徴とする、請求項6記載の鋼管鉄塔内部防錆方法。 The steel pipe tower internal rust prevention method according to claim 6 , wherein the synthetic resin is polystyrene foam.
JP2005362762A 2005-12-16 2005-12-16 Steel pipe tower interior rust prevention method Expired - Fee Related JP4832072B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005362762A JP4832072B2 (en) 2005-12-16 2005-12-16 Steel pipe tower interior rust prevention method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005362762A JP4832072B2 (en) 2005-12-16 2005-12-16 Steel pipe tower interior rust prevention method

Publications (2)

Publication Number Publication Date
JP2007162406A JP2007162406A (en) 2007-06-28
JP4832072B2 true JP4832072B2 (en) 2011-12-07

Family

ID=38245632

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005362762A Expired - Fee Related JP4832072B2 (en) 2005-12-16 2005-12-16 Steel pipe tower interior rust prevention method

Country Status (1)

Country Link
JP (1) JP4832072B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101049614B1 (en) 2009-06-29 2011-07-14 이형우 Lantern with warm air heater
JP6362866B2 (en) * 2014-01-14 2018-07-25 東京電力ホールディングス株式会社 Method to prevent corrosion of steel pipe structures
JP7724731B2 (en) * 2022-02-25 2025-08-18 株式会社イノアック住環境 Manufacturing method for foam-filled steel pipe

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5175971A (en) * 1991-06-17 1993-01-05 Mccombs P Roger Utility power pole system
JP3012205B2 (en) * 1996-10-28 2000-02-21 早川ゴム株式会社 Soundproof vibration control structure of tubular body
JPH11350790A (en) * 1998-06-08 1999-12-21 Showa Alum Corp Hollow pole having damping function and method of manufacturing the same
JP2000303722A (en) * 1999-04-20 2000-10-31 Urashima Kenzai Kk Corrosion preventive structure of buried part of metallic column
JP2001262776A (en) * 2000-03-22 2001-09-26 Nippon Steel Corp High strength steel sheet
JP2006316585A (en) * 2005-05-16 2006-11-24 Kenichi Yasuda Anticorrosive reinforcing method of steel pipe column

Also Published As

Publication number Publication date
JP2007162406A (en) 2007-06-28

Similar Documents

Publication Publication Date Title
US10519685B2 (en) Hybrid concrete-composite tower for a wind turbine and method of manufacturing
CN103331919B (en) A kind of high rigidity, the preparation method of high intensity tank body
JPH08501739A (en) Elongated structural member and method and apparatus for manufacturing the same
KR101612924B1 (en) Safety profile of the manufacturing equipment for joining multi-walled sewer
JP4832072B2 (en) Steel pipe tower interior rust prevention method
KR102212943B1 (en) Additive manufacturing of pipes
CN104309960A (en) Method for manufacturing large fiber reinforced plastic storage tank
KR101547232B1 (en) Spray-lining Mobile Apparatus for Rehabilitation of Deteriorated Pipes
KR20030093941A (en) Manufacturing method and Manufacturing apparatus for Composite multi wall pipe and Composite multi wall pipe manufactured thereby
CN104329518A (en) Foamed reinforced plastic winding pipe, manufacturing method of foamed reinforced plastic winding pipe and special equipment for foamed reinforced plastic winding pipe
CN119458989A (en) High-density polyethylene steel wire reinforced hollow wall winding pipe, production equipment and process
KR102913149B1 (en) Manufacturing system of cable pre-installed in duct
KR101627772B1 (en) Safety profile of multi-walled sewer bonding
KR101618778B1 (en) Safety profile of the bonding method of manufacturing multi-wall sewer
US20070125032A1 (en) Structural assembly and a method for its manufacture
KR101206779B1 (en) Mobile production apparaus for resin hume pipe
KR20110127477A (en) Water and sewage pipe which French can connect
KR100780674B1 (en) Glass Fiber Reinforced Synthetic Resin Double Wall Pipe
KR101111447B1 (en) Glass fiber cladding manufacturing method
KR101583355B1 (en) the manufacturing method of jointless polyethylene pipe and the manufacturing apparatus thereof and the pipeline repair method using the jointless polyethylene pipe
JP2007106596A (en) Glass roving winding body winder and molding method of glass roving winding body
JP5053937B2 (en) Rehabilitation of existing pipes
KR100311687B1 (en) A Plastic Pipe and a Process therefor
KR101090294B1 (en) Water and sewage pipes for multiple complex structures
KR101265770B1 (en) Molding device of DC double wall pipe and making method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081006

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110427

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110511

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110914

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110920

R150 Certificate of patent or registration of utility model

Ref document number: 4832072

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140930

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140930

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees