JP4837849B2 - Construction method of soil cement composite pile - Google Patents
Construction method of soil cement composite pile Download PDFInfo
- Publication number
- JP4837849B2 JP4837849B2 JP2001251132A JP2001251132A JP4837849B2 JP 4837849 B2 JP4837849 B2 JP 4837849B2 JP 2001251132 A JP2001251132 A JP 2001251132A JP 2001251132 A JP2001251132 A JP 2001251132A JP 4837849 B2 JP4837849 B2 JP 4837849B2
- Authority
- JP
- Japan
- Prior art keywords
- soil cement
- steel pipe
- pile
- pipe pile
- length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002689 soil Substances 0.000 title claims description 153
- 239000004568 cement Substances 0.000 title claims description 135
- 239000002131 composite material Substances 0.000 title claims description 35
- 238000010276 construction Methods 0.000 title claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 79
- 239000010959 steel Substances 0.000 claims description 79
- 238000000034 method Methods 0.000 claims description 15
- 230000000052 comparative effect Effects 0.000 description 30
- 238000007596 consolidation process Methods 0.000 description 10
- 230000000694 effects Effects 0.000 description 10
- 239000000463 material Substances 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 3
- 238000009933 burial Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000008267 milk Substances 0.000 description 2
- 210000004080 milk Anatomy 0.000 description 2
- 235000013336 milk Nutrition 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 241000257465 Echinoidea Species 0.000 description 1
- 238000013019 agitation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
【0001】
【産業上の利用分野】
この発明は、造成されたソイルセメント柱体に鋼管杭を挿入するソイルセメント杭の造成方法に関するものであり、特に詳しくは、造成されたソイルセメント柱体に翼付鋼管杭を挿入するソイルセメント合成杭の造成方法に関するものである。
【0002】
【従来の技術】
下端が支持層に達するソイルセメント柱体を地中に形成し、鋼管などを前記ソイルセメント柱体中に挿入してソイルセメント合成杭とすることは、例えば特開平1−250523号公報に記載されているように公知である。
【0003】
【発明が解決しようとする課題】
軟弱粘性土層が存在する地盤中において、上記の従来工法は構造物の不同沈下を防止するためには有用な工法である。しかし、地盤中に支持層に至るまでの長いソイルセメント杭を構築することは、注入する固化材量が増加して材料費が増え、更に深く掘削するので施工時間もかかり、大きな施工機械を必要とするため、コスト高となるばかりか、注入する固化材量と水が増加する分だけ、地上に排出される排土量も増加し、その処理費も増加する。また、鋼管杭を支持層まで埋設するため、埋設時間と鋼管杭の材料費が増加する。
【0004】
この発明の目的は、軟弱粘性土層が存在する地盤であっても下端を支持層に達していなくとも軟弱土層の圧密沈下を緩和し、構造物の沈下量を許容沈下量の範囲内に収めることができ、かつ地表部近辺における水平抵抗が上記の公知のものより更に優れたソイルセメント合成杭の造成方法を提供することである。
【0005】
【課題を解決するための手段】
1番目の発明は図1に示すように、軟弱粘性土層が存在する地盤において造成されたソイルセメント柱体に少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭を挿入するソイルセメント合成杭の造成方法であって、翼付鋼管杭の中空部が該中空部内の空気が浮力として働くように空洞状態をなし、翼付鋼管杭の下部に存在するソイルセメント柱体の長さ(Ls)が、鋼管杭の長さの0.5〜3倍の長さであり、かつソイルセメント柱体の最下部が支持地盤に達していないソイルセメント合成杭の造成方法である。
【0006】
2番目の発明は、軟弱粘性土層が存在する地盤において構造物を多数のソイルセメント合成杭によって支持するような設計に用いられるソイルセメント合成杭の造成方法であって、そのソイルセメント合成杭における鋼管杭として少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭を使用し、多数のソイルセメント柱体の最下部が支持地盤に達していなく、前記多数のソイルセメント柱体の先端を結んだ面が下方に突出する凸形状をなし、各翼付鋼管杭の中空部が該中空部内の空気が浮力として働くように空洞状態をなし、各翼付鋼管杭の下部に存在するソイルセメント柱体の長さ(Ls)が鋼管杭の長さの0.5〜3倍の長さで、かつソイルセメント柱の相互間隔(B)がソイルセメント柱体の直径の2〜20倍の長さを有するようにソイルセメント合成杭を造成するソイルセメント合成杭の造成方法である。
【0007】
上記のいずれの造成方法においても少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭が使用される。それ故、鋼管杭の中間部に翼部が存在してもよく、また存在しなくともよい。
【0008】
【発明の実施の形態】
この鋼管杭の長さは、図2に模式的に示すように、杭頭に水平荷重が作用したときに鋼管杭に発生する曲げモーメントや剪断応力がほぼ零になる深さまでの長さ以上であればよく、図3に模式的に示すように、構造物を支える全てのソイルセメント合成杭において構造荷重を周面摩擦力で支えるだけの長さ以上であればよい。
【0009】
このような長さ以上であれば鋼管杭の長さとしては充分である。しかし、鋼管杭の部分の長さを必要以上に長くすると、鋼管杭の材料費が高価になり、鋼管の埋設時間が余計にかかってしまうので避けるべきである。
【0010】
この鋼管杭が存在する部分も造成されたソイルセメント柱体に少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭を挿入されたソイルセメント合成杭となっているので、従来の頭部付近に翼部を持たない鋼管杭を使用したソイルセメント合成杭に比して、地表部近辺における水平抵抗が更に優れたソイルセメント合成杭となる。
【0011】
一方、ソイルセメント柱の長さ(Ls)は、鋼管杭の長さ0.5倍〜3倍の長さだけ翼付鋼管杭の下部に存在する長さであり、かつソイルセメント柱の最下部が支持地盤に達していない長さである。
【0012】
この長さが鋼管杭長の0.5倍未満であると、圧密沈下の恐れがある軟弱粘性土層の層厚に対して、ソイルセメント長が短いので、軟弱粘性土層の圧密沈下を低減する効果が少ない。その結果、構造物の沈下量は、例えば日本建築学会の「建築基礎構造設計指針」の4.4節に示された許容沈下量(特に杭基礎に対する許容値)の範囲を越える恐れがある。逆に鋼管杭長の3倍を超えると、構造物の沈下量は、前記の許容沈下量の範囲に収まるが、ソイルセメント柱が長いことによる前記したように施工面でも費用面でも不利な面が生じるので避けるべきである。
【0013】
また、この発明では使用される鋼管杭が少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭であり、翼部とソイルセメント柱体との付着効果により翼付鋼管杭とソイルセメント柱体が一体化され、杭頭部に作用する荷重が翼部を介して滑らかにソイルセメント柱に伝達され、更に地盤に伝達されるため、図3に示したように鋼管杭が存在する部分で大きな周面摩擦力を発揮して構造物を支持することができる。
【0014】
さらに、この発明では使用される鋼管杭が少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭であり、この杭がソイルセメント柱体に挿入されるので、上部構造物の荷重は、翼付鋼管杭の軸部を介して杭底部に伝達され、杭底部の翼部を介してソイルセメント柱体に伝達されるが、その荷重に対して鋼管杭の下部に存在するソイルセメント柱体の支持力により抵抗するため、杭底部にソイルセメント柱体が存在しない場合に比べて大きな鉛直支持力を発揮する。
【0015】
なお、翼付鋼管杭の底面が底板により閉塞されている場合には、鋼管杭の中空部は空洞状態で存在させることができ、この鋼管杭の中空部の空洞内にある空気が浮力として働き、沈下抑制効果が向上する。
【0016】
更に、軟弱粘性土層が存在する地盤において構造物を多数のソイルセメント合成杭によって支持するような設計に用いられる場合は、ソイルセメント合成杭における鋼管杭として少なくとも頭部付近と杭底部付近に翼部が存在する翼付鋼管杭を使用し、ソイルセメント柱体の最下部が支持地盤に達していなく、翼付鋼管杭の下部に存在するソイルセメント柱体の長さ(Ls)が、鋼管杭の長さの0.5倍〜3倍の長さでかつ、ソイルセメント柱の相互の間隔(B)がソイルセメント柱の直径の2〜20倍の長さとなるようにソイルセメント合成杭を造成することが好ましい。
【0017】
このような間隔でソイルセメント合成杭を造成すると、鋼管杭の下部に存在するソイルセメント柱とその周辺に存在する軟弱軟性土層とが複合した地盤、すなわち複合地盤を形成する。
【0018】
その結果、複合地盤は、ソイルセメント柱が全く存在しない軟弱粘性土層に比べると、剛性が高くなるので、圧密沈下現象が緩和され、構造物の不同沈下を防止することができる。
【0019】
なお、ソイルセメント柱の相互の間隔(B)がソイルセメント柱の直径の2倍未満であると、互いのソイルセメント合成杭が接近して存在するために、ソイルセメント合成杭1本当たりの周面摩擦による支持力が小さくなる。その結果、所定の支持力を得るためには、多数本のソイルセメント合成杭を施工する必要があり、不経済になる。
【0020】
逆に、ソイルセメント柱の相互の間隔(B)がソイルセメント柱の直径20倍を超えると、ソイルセメント合成杭1本が負担すべき荷重が大きくなり、翼付鋼管杭の長さを長くしたり、翼付鋼管杭の鋼管部の径や肉厚を大きくしたり、翼を大きくしたりする必要があり、不経済になるばかりであり、また、ソイルセメント合成杭が存在している深度区間にある軟弱粘土地盤を拘束する効果が小さくなり、圧密沈下量を低減する効果が低下してしまう。
【0021】
念のために、上記した翼付鋼管杭の下部に存在するソイルセメント柱体の長さ(Ls)やソイルセメント柱の相互の間隔(B)の実際の長さを下記に具体的に例示する。
【0022】
例えば、鋼管杭の長さが10メートルである場合鋼管杭の長さの0.5倍〜3倍の長さは、5メートル〜30メートルの範囲となる。従ってこの場合は、翼付鋼管杭の下部に存在するソイルセメント柱体の長さ(Ls)を5メートル〜30メートルの範囲とすればよい。勿論、この範囲であればよく、例えば図4に示すように長さを変化させてもよい。
【0023】
一方、ソイルセメント柱体の直径を0.6メートルとすると、ソイルセメント柱体の相互の間隔(B)がソイルセメント柱体の直径の2〜20倍の長さは、1.2メートル〜12メートルとなる。
【0024】
なお、例えば図5に示すように、構造物の高さが異なる部分が存在する場合は、同じ高さが続いている部分では、同じ条件でソイルセメント合成杭を築造することが好ましい。構造の高さが高い部分では、それだけ杭に荷重がかかるので、杭本数を多くしたり、ソイルセメント合成杭の長さ、特に翼付鋼管杭の下部に存在するソイルセメント柱体の長さを長くすることが好ましい。但し、上記の長さ要件の範囲内で。
【0025】
勿論、構造物の高さが低い部分では、高い部分に比べてそれだけ杭にかかる荷重が少ないので、杭本数を少なくしたり、ソイルセメント合成杭の長さ、特に翼付鋼管杭の下部に存在するソイルセメント柱体の長さを短くしたりすることが好ましい。但し、上記の長さ要件の範囲内で。
【0026】
以上に記載したソイルセメント合成杭の造成方法は、例えば、図6に示すように、翼付き鋼管杭の下部部分に砂層が存在し、砂層で支持力が発揮される場合であっても、その砂層の下に圧密沈下現象を生じやすい軟弱粘性土層が存在する場合は、この軟弱粘性土層に達するソイルセメント柱を造成することにより、この発明の効果が発揮されるので、この発明の方法が適用できる。
【0027】
なお、この発明におけるソイルセメント柱の造成方法は、機械式深層混合処理方法で造成することが好ましいが、噴射式や、置換式の深層混合処理工法などで造成することができる。
【0028】
更に、この発明において翼付鋼管杭の下部に存在するソイルセメント柱体を造成する際に、投入する固化材量を多くしたり、セメントミルクの濃度を濃くして、ソイルセメント柱の強度を高くしてもよい。
【0029】
【実施例】
[実施例1]
この実施例1と比較例で使用した翼付鋼管杭は、図7に示すように杭頭部付近と杭底部付近および杭中間部に螺旋状の翼部を有する鋼管杭であり、杭底は閉塞させており、長さは6メートルであり、鋼管杭本体(即ち、翼部が存在しない鋼管部)の外径は267.4ミリメートルであり、翼部の外径は500ミリメートルである。
【0030】
ソイルセメント柱体の造成は、図8(a)に示すように、先端に掘削翼1と攪拌翼2を少なくとも複数枚有するロッド3を駆動部4により回転させて地盤を掘削できる装置を具備するソイルセメント施工機6を用いて、下方に軟弱粘性土が堆積する地盤5に対し、ロッド3の下端部からセメントミルクを吐出しながら掘進し、同(b)に示すように外径700ミリメートル、深さ12メートルのソイルセメント柱体7を実施例用に造成した。
【0031】
このソイルセメント柱7の中に前記した翼9付鋼管杭10を埋設する。同図(c)は埋設中の姿を示し、沈設後の姿を同図(d)に示す。このようにして造成したソイルセメント合成杭11が造成される。
【0032】
図9においてソイルセメント柱体の造成深さを翼付鋼管杭の長さより少し長い程度にしたのが比較例1であり、ソイルセメント柱体の造成深さを支持層までに達するようにしたのが比較例2である。
【0033】
このようにソイルセメント柱の長さを変えて構造物を支える杭とした姿を図9に示す。
【0034】
ケース1が比較例であり、ケース2が実施例1であり、ケース3が比較例2である。
【0035】
このケース1,ケース2,ケース3の場合における構造物の沈下量の経時変化を図10に示す。
【0036】
ケース1の場合の沈下量は、ケース2およびケース3に比べて大きい。ケース2の場合の沈下量は、ケース3よりも少し大きいが許容沈下量の範囲であり、しかも建物端部と中央部でも均等に沈下し不同沈下を生じなかった。
【0037】
更に上記実施例と同じソイルセメント柱を造成し、翼部が存在しない長さ6メートル、鋼管部の外径267.4ミリメートルの鋼管杭を使用し、比較例3のソイルセメント合成杭を造成した。
【0038】
他方、実施例に使用した翼付鋼管杭を地盤中に直接ねじり込んで、比較例4の杭とした。
【0039】
これら3条件の杭を使用して杭頭部に水平荷重をかけて杭頭部の水平変位量を測定した。
【0040】
その結果を図11に示す。菱形印で示す本実施例の場合の水平変位量は、三角印で示す比較例の4の水平変位量よりも小さく、かつ破線で示した比較例3の水平変位量よりも小さく、優れた水平支持力性能が発揮された。
【0041】
[実施例2]
実施例1と同じ条件のソイルセメント合成杭をソイルセメント柱体の相互間隔を1メートル(ソイルセメント柱体の直径の約1.5倍)で施工し、実施例2とした。
【0042】
同様なソイルセメント柱体の相互間隔で、比較例1と比較例2と同じ条件でソイルセメント合成杭を施工し、これらを比較例とした。
【0043】
この条件でも圧密沈下量の低減効果の優劣は、実施例1と比較例1や比較例2との優劣差と同じように、実施例2の場合が優れていた。
【0044】
[実施例3]
実施例1と同じ条件のソイルセメント合成杭をソイルセメント柱体の相互間隔を1.4メートル(ソイルセメント柱体の直径の約2倍)で施工し、実施例3とした。
【0045】
同様なソイルセメント柱体の相互間隔で、比較例1と比較例2と同じ条件でソイルセメント合成杭を施工し、これらを比較例とした。
【0046】
この条件でも圧密沈下量の低減効果の優劣は、実施例1と比較例1や比較例2との優劣差と同じように、実施例3の場合が優れていた。
【0047】
[実施例4]
実施例1と同じ条件のソイルセメント合成杭をソイルセメント柱体の相互間隔を14メートル(ソイルセメント柱体の直径の約20倍)で施工し、実施例4とした。
【0048】
同様なソイルセメント柱体の相互間隔で、比較例1や比較例2と同じ条件でソイルセメント合成杭を施工し、これらを比較例とした。
【0049】
この条件でも圧密沈下量の低減効果の優劣は、実施例1と比較例1や比較例2との優劣差と同じように、実施例4の場合が優れていた。
【0050】
[実施例5]
実施例1と同じ条件のソイルセメント合成杭をソイルセメント柱体の相互間隔を18.5メートル(ソイルセメント柱体の直径の約25倍)で施工し、実施例5とした。
【0051】
同様なソイルセメント柱体の相互間隔で、比較例1や比較例2と同じ条件でソイルセメント合成杭を施工し、これらを比較例とした。
【0052】
この条件でも圧密沈下量の低減効果の優劣は、実施例1と比較例1や比較例2との優劣差と同じように、実施例5の場合が優れていた。
【0053】
[実施例6]
実施例2,実施例3,実施例4,実施例5の条件のソイルセメント合成杭の1本当たりの鉛直支持力と実施例1の鉛直支持力とを比較した結果、実施例3,実施例4および実施例5は実施例1と同じ鉛直支持力を発揮したが、実施例2の場合は、実施例1の鉛直支持力に比較すると小さな値を示した。
【0054】
[実施例7]
実施例2,実施例3,実施例4,実施例5の条件のソイルセメント合成杭群の上に同一の形状の建築物が構築されると仮定し、沈下量を算定した。
【0055】
その結果、沈下量は、実施例2,実施例3,実施例4,実施例5の順で少しづつ大きくなったが、それは翼付鋼管杭の下部に存在するソイルセメント柱体の深度区間における沈下量の差であり、ソイルセメント柱体より下方の軟弱粘性土層の沈下量には差が生じていなかった。
【0056】
また、実施例2,実施例3,実施例4の沈下量は許容沈下量の範囲内であり、実施例5の場合の沈下量は、許容沈下量よりやや大きい値を示した。
【0057】
【発明の効果】
この発明の造成方法に従うと、地盤中に軟弱粘性土層が存在するにも係わらず、軟弱軟性土層の沈下量を低減させることができ、構造物の沈下量を許容沈下量の範囲に収めることができ、従来工法のように支持層に至るまでの長いソイルセメント柱体を構築することがないので、注入する固化材料が少なくなり、従来のように深く掘削する必要がないので、小さな施工機械で施工することができ、施工時間が短くなり、コストも安くすることができる。
【0058】
また、地表部近辺における水平抵抗が、従来のものよりも、更に優れたソイルセメント合成杭とすることができる。
【図面の簡単な説明】
【図1】 この発明によって造成されたソイルセメント合成杭を構造物とともに示す図である。
【図2】 鋼管部の長さを水平荷重と鋼管に作用するモーメントとせん断力で定める例を示す図である。
【図3】 鋼管部の長さを鉛直荷重と支持力によって定める例を示す図である。
【図4】 この発明によって造成されたソイルセメント合成杭を構造物とともに示す図である。
【図5】 この発明によって造成されたソイルセメント合成杭を構造物とともに示す図である。
【図6】 中間に砂層がある場合に本発明によって造成されたソイルセメント合成杭を構造物とともに示す図である。
【図7】 この発明に使用する翼付鋼管杭の例を示す図である。
【図8】 この発明のソイルセメント合成杭の施工手順を示す図である。
【図9】 この発明の実施例と比較例のソイルセメント合成杭を構造物とともに示す図である。
【図10】 沈下量の経時変化を示すグラフである。
【図11】 水平荷重と水平変位量のグラフである。
【符号の説明】
1…掘削部、2…攪拌翼、3…掘削ロッド、4…駆動部、5…地盤、6…ソイルセメント柱体造成装置、7…ソイルセメント柱体、9…翼部、10…翼付鋼管杭、11…ソイルセメント合成杭[0001]
[Industrial application fields]
The present invention relates to a method for constructing a soil cement pile in which a steel pipe pile is inserted into a formed soil cement column, and more particularly, a soil cement composition in which a bladed steel pipe pile is inserted into a formed soil cement pillar. It relates to the method of building piles.
[0002]
[Prior art]
It is described in, for example, JP-A-1-250523, that a soil cement pillar having a lower end reaching a support layer is formed in the ground, and a steel pipe or the like is inserted into the soil cement pillar to form a soil cement composite pile. As is known.
[0003]
[Problems to be solved by the invention]
In the ground where a soft and viscous soil layer exists, the above conventional method is a useful method for preventing the uneven settlement of the structure. However, constructing a long soil cement pile up to the support layer in the ground increases the amount of solidified material to be injected and increases the material cost, and it takes more time for construction because it requires deeper excavation and requires large construction machinery. Therefore, not only the cost is increased, but the amount of soil discharged to the ground is increased by the amount of solidified material and water to be injected, and the treatment cost is also increased. Moreover, since the steel pipe pile is buried up to the support layer, the burial time and the material cost of the steel pipe pile increase.
[0004]
The object of the present invention is to relieve the consolidation settlement of the soft soil layer even if the soft soil soil layer exists even if the lower end does not reach the support layer, and the amount of settlement of the structure is within the allowable settlement range. An object of the present invention is to provide a method for producing a soil cement synthetic pile that can be stored and has a horizontal resistance in the vicinity of the ground surface portion that is further superior to the above known one.
[0005]
[Means for Solving the Problems]
As shown in FIG. 1, the first invention inserts a winged steel pipe pile having wings at least near the head and the bottom of the pile into a soil cement pillar formed on the ground where a soft viscous soil layer exists. A method for constructing a soil cement composite pile, wherein the hollow portion of the winged steel pipe pile is hollow so that air in the hollow portion acts as buoyancy, and the length of the soil cement column existing below the winged steel pipe pile The length (Ls) is 0.5 to 3 times the length of the steel pipe pile, and the soil cement composite pile has a lowermost part of the soil cement column that does not reach the supporting ground.
[0006]
The second invention is a method for constructing a soil cement synthetic pile used in a design in which a structure is supported by a large number of soil cement synthetic piles in the ground where a soft and viscous soil layer exists. using the winged steel pipe pile is present wings around at least the head and near the Kuisoko section as steel pipe pile, the bottom of a number of soil cement pillar does not reach to the supporting ground, of the large number of soil cement pillar The surface connecting the tips has a convex shape protruding downward, and the hollow part of each winged steel pipe pile is in a hollow state so that the air in the hollow part acts as buoyancy, and exists in the lower part of each winged steel pipe pile The length of soil cement columns (Ls) is 0.5 to 3 times the length of steel pipe piles, and the mutual spacing (B) of soil cement columns is 2 to 20 times the diameter of soil cement columns. Has a length of Sea urchin is a reclamation process of soil cement synthetic pile to construct a soil cement synthetic pile.
[0007]
In any of the above forming methods, a winged steel pipe pile having wings at least near the head and near the pile bottom is used. Therefore, a wing part may exist in the middle part of a steel pipe pile, and does not need to exist.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
As shown schematically in Fig. 2, the length of this steel pipe pile is not less than the length to the depth at which the bending moment and shear stress generated in the steel pipe pile when the horizontal load is applied to the pile head are almost zero. As shown schematically in FIG. 3, it is sufficient that the length is sufficient to support the structural load with the peripheral friction force in all the soil cement composite piles that support the structure.
[0009]
If it is more than such length, it is enough as the length of a steel pipe pile. However, if the length of the steel pipe pile is made longer than necessary, the material cost of the steel pipe pile becomes high, and the time for embedding the steel pipe will be excessive, and should be avoided.
[0010]
This steel pipe pile part is also a soil cement composite pile in which a winged steel pipe pile with wings at least near the head and the bottom of the pile is inserted into the soil cement pillars that have been created. Compared to a soil cement composite pile using steel pipe piles that do not have wings near the head, the soil cement composite pile is more excellent in horizontal resistance near the ground surface.
[0011]
On the other hand, the length (Ls) of the soil cement column is the length existing in the lower part of the winged steel pipe pile by the length of 0.5 to 3 times the length of the steel pipe pile, and the lowermost part of the soil cement column. Is the length that does not reach the supporting ground.
[0012]
If this length is less than 0.5 times the length of the steel pipe pile, the soil cement length is shorter than the thickness of the soft viscous soil layer that may cause consolidation settlement, thus reducing the consolidation settlement of the soft viscous soil layer. There is little effect to do. As a result, the subsidence amount of the structure may exceed the range of the allowable subsidence amount (especially the permissible value for pile foundations) shown in Section 4.4 of the “Building Foundation Structural Design Guidelines” of the Architectural Institute of Japan. On the contrary, if the steel pipe pile length exceeds 3 times, the amount of settlement of the structure will be within the range of the allowable settlement, but it is disadvantageous in terms of construction and cost as mentioned above due to the long soil cement column. Should be avoided.
[0013]
In the present invention, the steel pipe pile used is a winged steel pipe pile having wings at least near the head and the bottom of the pile, and the winged steel pipe pile and the soil are bonded to each other by the adhesion effect between the wing and the soil cement column. The cement pillar is integrated, and the load acting on the pile head is smoothly transmitted to the soil cement pillar via the wings and further to the ground, so there is a steel pipe pile as shown in FIG. The structure can be supported by exerting a large peripheral frictional force at the portion.
[0014]
Furthermore, in this invention, the steel pipe pile used is a winged steel pipe pile having wings at least near the head and the bottom of the pile, and since this pile is inserted into the soil cement column, the load on the upper structure Is transmitted to the bottom of the pile through the shaft of the winged steel pipe pile, and is transmitted to the soil cement pillar through the wing at the bottom of the pile. In order to resist by the supporting force of the column, it exerts a large vertical supporting force compared to the case where there is no soil cement column at the bottom of the pile.
[0015]
When the bottom of the winged steel pipe pile is closed by the bottom plate, the hollow part of the steel pipe pile can be present in a hollow state, and the air in the hollow part of the steel pipe pile acts as buoyancy. , The settlement suppression effect is improved.
[0016]
Furthermore, when it is used in a design where the structure is supported by a large number of soil cement composite piles in the ground where soft clay soil exists, the wings are at least near the head and the pile bottom as steel pipe piles in the soil cement composite piles. The winged steel pipe pile with a part is used, the bottom part of the soil cement column does not reach the supporting ground, and the length (Ls) of the soil cement pillar existing at the lower part of the winged steel pipe pile is the steel pipe pile. Soil cement composite piles were created so that the distance between the soil cement columns (B) was 2 to 20 times the diameter of the soil cement columns. It is preferable to do.
[0017]
When soil cement composite piles are constructed at such intervals, a ground in which the soil cement columns existing at the lower part of the steel pipe pile and the soft and soft soil layers present around the composite are formed, that is, a composite ground is formed.
[0018]
As a result, since the composite ground has higher rigidity than a soft viscous soil layer in which no soil cement column is present, the consolidation settlement phenomenon is alleviated and the uneven settlement of the structure can be prevented.
[0019]
If the distance (B) between the soil cement columns is less than twice the diameter of the soil cement columns, the soil cement composite piles are close to each other. Support force due to surface friction is reduced. As a result, in order to obtain a predetermined bearing capacity, it is necessary to construct a large number of soil cement composite piles, which is uneconomical.
[0020]
Conversely, if the distance (B) between the soil cement columns exceeds 20 times the diameter of the soil cement columns, the load that one soil cement composite pile should bear increases, and the length of the winged steel pipe pile increases. It is necessary to increase the diameter and thickness of the steel pipe part of the winged steel pipe pile or to enlarge the wing, which is not economical, and the depth section where the soil cement composite pile exists The effect of restraining the soft clay ground in the area is reduced, and the effect of reducing the consolidation settlement is reduced.
[0021]
As a precaution, the length (Ls) of the soil cement columns existing in the lower part of the above-described winged steel pipe pile and the actual length of the mutual interval (B) between the soil cement columns are specifically exemplified below. .
[0022]
For example, when the length of the steel pipe pile is 10 meters, the length of 0.5 times to 3 times the length of the steel pipe pile is in the range of 5 meters to 30 meters. Therefore, in this case, the length (Ls) of the soil cement column existing in the lower part of the winged steel pipe pile may be set in the range of 5 to 30 meters. Of course, it may be within this range. For example, the length may be changed as shown in FIG.
[0023]
On the other hand, when the diameter of the soil cement column is 0.6 m, the distance (B) between the soil cement columns is 2 to 20 times the diameter of the soil cement column is 1.2 m to 12 m. Meter.
[0024]
For example, as shown in FIG. 5, when there are portions where the heights of the structures are different, it is preferable to construct the soil cement synthetic piles under the same conditions in the portions where the same height continues. In the part where the height of the structure is high, the load is applied to the pile as much, so the number of piles can be increased or the length of the soil cement composite pile, especially the length of the soil cement column existing in the lower part of the winged steel pipe pile. It is preferable to make it longer. However, within the above length requirements.
[0025]
Of course, in the part where the height of the structure is low, the load applied to the pile is less than that in the high part, so the number of piles can be reduced or the length of the soil cement composite pile, especially in the lower part of the winged steel pipe pile It is preferable to shorten the length of the soil cement column. However, within the above length requirements.
[0026]
For example, as shown in FIG. 6, the soil cement synthetic pile described above has a sand layer in the lower portion of the winged steel pipe pile, and even when the supporting force is exhibited by the sand layer, When a soft viscous soil layer that tends to cause a consolidation settlement phenomenon exists under the sand layer, the effect of the present invention is exhibited by creating a soil cement column that reaches the soft viscous soil layer. Is applicable.
[0027]
In addition, although the creation method of the soil cement pillar in this invention is preferably created by a mechanical deep layer mixing treatment method, it can be created by a jet type or a substitution type deep layer treatment method.
[0028]
Furthermore, in the present invention, when the soil cement column body existing in the lower part of the winged steel pipe pile is created, the amount of solidified material to be added is increased, or the concentration of cement milk is increased to increase the strength of the soil cement column. May be.
[0029]
【Example】
[Example 1]
The winged steel pipe pile used in Example 1 and the comparative example is a steel pipe pile having spiral wings in the vicinity of the pile head, near the pile bottom and in the middle of the pile as shown in FIG. It is closed, the length is 6 meters, the outer diameter of the steel pipe pile body (i.e., the steel pipe part without the wing part) is 267.4 millimeters, and the outer diameter of the wing part is 500 millimeters.
[0030]
As shown in FIG. 8A, the soil cement column body is provided with a device capable of excavating the ground by rotating a
[0031]
The
[0032]
In FIG. 9, the construction depth of the soil cement column body was made slightly longer than the length of the winged steel pipe pile in Comparative Example 1, and the construction depth of the soil cement column body was reached to the support layer. Is Comparative Example 2.
[0033]
FIG. 9 shows a pile that supports the structure by changing the length of the soil cement pillar in this way.
[0034]
[0035]
FIG. 10 shows the change over time of the amount of settlement of the structure in
[0036]
The amount of settlement in
[0037]
Further, the same soil cement column as in the above example was constructed, and a steel pipe pile having a length of 6 meters and an outer diameter of 267.4 mm without a wing portion was used, and a soil cement composite pile of Comparative Example 3 was constructed. .
[0038]
On the other hand, the winged steel pipe pile used in the example was directly twisted into the ground to obtain a pile of Comparative Example 4.
[0039]
Using the piles of these three conditions, a horizontal load was applied to the pile head, and the horizontal displacement of the pile head was measured.
[0040]
The result is shown in FIG. The horizontal displacement amount in the case of the present embodiment indicated by the rhombus marks is smaller than the horizontal displacement amount of the comparative example 4 indicated by the triangle marks and smaller than the horizontal displacement amount of the comparative example 3 indicated by the broken line, and has excellent horizontal The bearing capacity performance was demonstrated.
[0041]
[Example 2]
A soil cement composite pile having the same conditions as in Example 1 was constructed with the mutual distance between the soil cement pillars being 1 meter (about 1.5 times the diameter of the soil cement pillars).
[0042]
Soil cement composite piles were constructed under the same conditions as in Comparative Example 1 and Comparative Example 2 with the same spacing between the soil cement pillars, and these were used as comparative examples.
[0043]
Even in this condition, the superiority or inferiority of the reduction effect of the consolidation settlement amount was excellent in the case of Example 2 as in the superiority or inferiority difference between Example 1 and Comparative Example 1 or Comparative Example 2.
[0044]
[Example 3]
A soil cement composite pile having the same conditions as in Example 1 was constructed with the mutual distance between the soil cement pillars being 1.4 meters (about twice the diameter of the soil cement pillars).
[0045]
Soil cement composite piles were constructed under the same conditions as in Comparative Example 1 and Comparative Example 2 with the same spacing between the soil cement pillars, and these were used as comparative examples.
[0046]
Even in this condition, the superiority or inferiority of the reduction effect of the consolidation settlement amount was excellent in the case of Example 3 as in the superiority / inferiority difference between Example 1 and Comparative Example 1 or Comparative Example 2.
[0047]
[Example 4]
A soil cement composite pile having the same conditions as in Example 1 was constructed with the mutual distance between the soil cement pillars being 14 meters (about 20 times the diameter of the soil cement pillars).
[0048]
Soil cement composite piles were constructed under the same conditions as in Comparative Example 1 and Comparative Example 2 with the same spacing between the soil cement pillars, and these were used as comparative examples.
[0049]
Even in this condition, the superiority or inferiority of the reduction effect of the consolidation settlement amount was excellent in the case of Example 4 as in the superiority or inferiority difference between Example 1 and Comparative Example 1 or Comparative Example 2.
[0050]
[Example 5]
A soil cement composite pile having the same conditions as in Example 1 was constructed with a mutual interval between the soil cement pillars of 18.5 meters (about 25 times the diameter of the soil cement pillars).
[0051]
Soil cement composite piles were constructed under the same conditions as in Comparative Example 1 and Comparative Example 2 with the same spacing between the soil cement pillars, and these were used as comparative examples.
[0052]
Even in this condition, the superiority or inferiority of the reduction effect of the consolidation settlement amount was excellent in the case of Example 5 as in the superiority or inferiority difference between Example 1 and Comparative Example 1 or Comparative Example 2.
[0053]
[Example 6]
As a result of comparing the vertical supporting force per one of the soil cement composite piles of the conditions of Example 2, Example 3, Example 4 and Example 5, with the vertical supporting force of Example 1, Example 3 and Example 4 and Example 5 exhibited the same vertical support force as Example 1, but in the case of Example 2, a smaller value than that of Example 1 was shown.
[0054]
[Example 7]
The amount of settlement was calculated on the assumption that a building having the same shape was constructed on the soil cement composite pile group under the conditions of Example 2, Example 3, Example 4, and Example 5.
[0055]
As a result, the amount of subsidence increased little by little in the order of Example 2, Example 3, Example 4, and Example 5, but this was in the depth section of the soil cement column existing at the bottom of the winged steel pipe pile. There was a difference in the amount of settlement, and there was no difference in the amount of settlement in the soft viscous soil layer below the soil cement column.
[0056]
Moreover, the amount of subsidence of Example 2, Example 3, and Example 4 was in the range of allowable subsidence amount, and the amount of subsidence in Example 5 showed a value a little larger than allowable subsidence amount.
[0057]
【The invention's effect】
According to the creation method of the present invention, the amount of settlement of the soft and soft soil layer can be reduced despite the presence of the soft and viscous soil layer in the ground, and the amount of settlement of the structure falls within the allowable amount of settlement. Since there is no need to construct a long soil cement pillar that reaches the support layer unlike the conventional method, the amount of solidified material to be injected is reduced, and it is not necessary to dig deeply as in the conventional method. Construction can be done with a machine, construction time is shortened, and cost can be reduced.
[0058]
Moreover, it can be set as the soil cement synthetic | combination pile in which the horizontal resistance in the vicinity of a ground part is further superior to the conventional one.
[Brief description of the drawings]
FIG. 1 is a view showing a soil cement composite pile constructed according to the present invention together with a structure.
FIG. 2 is a diagram showing an example in which the length of a steel pipe portion is determined by a horizontal load, a moment acting on the steel pipe, and a shearing force.
FIG. 3 is a diagram showing an example in which the length of a steel pipe portion is determined by a vertical load and a supporting force.
FIG. 4 is a view showing a soil cement synthetic pile constructed according to the present invention together with a structure.
FIG. 5 is a view showing a soil cement synthetic pile constructed according to the present invention together with a structure.
FIG. 6 is a diagram showing a soil cement synthetic pile constructed according to the present invention together with a structure when a sand layer is present in the middle.
FIG. 7 is a view showing an example of a winged steel pipe pile used in the present invention.
FIG. 8 is a diagram showing a construction procedure of a soil cement synthetic pile according to the present invention.
FIG. 9 is a view showing a soil cement synthetic pile according to an embodiment of the present invention and a comparative example together with a structure.
FIG. 10 is a graph showing changes over time in the amount of settlement.
FIG. 11 is a graph of horizontal load and horizontal displacement.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001251132A JP4837849B2 (en) | 2001-08-22 | 2001-08-22 | Construction method of soil cement composite pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001251132A JP4837849B2 (en) | 2001-08-22 | 2001-08-22 | Construction method of soil cement composite pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003064664A JP2003064664A (en) | 2003-03-05 |
| JP4837849B2 true JP4837849B2 (en) | 2011-12-14 |
Family
ID=19079832
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001251132A Expired - Lifetime JP4837849B2 (en) | 2001-08-22 | 2001-08-22 | Construction method of soil cement composite pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4837849B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103821060A (en) * | 2014-03-06 | 2014-05-28 | 河海大学 | Construction method of conventional expressway soft foundation treating technology |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5557503B2 (en) * | 2009-10-01 | 2014-07-23 | 株式会社大林組 | Steel pipe pile insertion method |
| TW201204901A (en) * | 2010-06-07 | 2012-02-01 | Jfe Steel Corp | Basis pile group |
| JP5558314B2 (en) * | 2010-11-04 | 2014-07-23 | 株式会社テノックス九州 | Construction method of soil cement composite pile |
| CN103132512B (en) * | 2013-03-22 | 2014-12-10 | 东南大学 | Layering mixing pile machine for reinforcing soft soil foundations |
| JP2013249730A (en) * | 2013-09-18 | 2013-12-12 | Ohbayashi Corp | Method of inserting steel pipe pile |
| CN103741680A (en) * | 2013-12-23 | 2014-04-23 | 广西科技大学 | Manufacturing method for powder sprayed pile |
| JP2015218460A (en) * | 2014-05-15 | 2015-12-07 | 株式会社竹中工務店 | Ground improvement structure |
| CN113532378A (en) * | 2021-07-28 | 2021-10-22 | 中国民航大学 | A soft soil foundation settlement monitoring device |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62268422A (en) * | 1986-05-14 | 1987-11-21 | Nippon Kokan Kk <Nkk> | Friction pile |
| JPH01250523A (en) * | 1988-03-30 | 1989-10-05 | Kubota Ltd | Foundation pile construction |
| JP2731806B2 (en) * | 1990-11-20 | 1998-03-25 | 新日本製鐵株式会社 | Construction method of soil cement composite pile |
| JPH0565714A (en) * | 1991-09-06 | 1993-03-19 | Asahi Chem Ind Co Ltd | Steel tubular pile |
| JP2866248B2 (en) * | 1992-04-13 | 1999-03-08 | 株式会社テノックス | Construction method of hollow pipe pile |
| JP2709445B2 (en) * | 1995-02-06 | 1998-02-04 | 株式会社国土基礎 | Steel pipe pile and method of burying steel pipe pile |
| JPH09268554A (en) * | 1996-03-27 | 1997-10-14 | Nippon Sogo Bosui Kk | Foundation pile construction method and equipment |
| JP3450774B2 (en) * | 1999-12-08 | 2003-09-29 | 株式会社国土基礎 | Steel pipe pile and its burial method |
-
2001
- 2001-08-22 JP JP2001251132A patent/JP4837849B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103821060A (en) * | 2014-03-06 | 2014-05-28 | 河海大学 | Construction method of conventional expressway soft foundation treating technology |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003064664A (en) | 2003-03-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6740276B2 (en) | Foundation pile and method of constructing foundation using the foundation pile | |
| CN109440778A (en) | Active two-way inclined pile foundation pit support method | |
| JP2015183364A (en) | Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means | |
| JP4837849B2 (en) | Construction method of soil cement composite pile | |
| JP3850802B2 (en) | Steel pile and its construction method | |
| JP4984308B2 (en) | Ready-made pile | |
| JP5464510B2 (en) | Submarine foundation for offshore structures and construction method thereof | |
| CN211200426U (en) | Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall | |
| JP3639294B1 (en) | Seismic reinforcement structure for structures | |
| JP4391292B2 (en) | Reinforcement structure for floating structures | |
| CN109440779A (en) | Active X-shaped foundation pit supporting method with double rows of piles | |
| JPH11280067A5 (en) | ||
| JPH0547685B2 (en) | ||
| JP4029191B2 (en) | Subsidence suppression structure, construction method of settlement suppression structure | |
| JP2005282063A (en) | Composite site construction pile, its construction method, and composite field construction pile construction device | |
| JP2007032044A (en) | Support structure for foundation pile and steel pipe pile | |
| CN111254939A (en) | Foundation pit enclosure strengthening method for soft soil foundation | |
| JP4713297B2 (en) | Foundation structure and construction method of foundation structure | |
| JP4572284B2 (en) | Method of burying ready-made piles | |
| CN103334428A (en) | Disc type cast-in-place concrete pile and construction process for same | |
| JP2013057194A (en) | Rotary penetration steel pipe pile and construction method of foundation pile having foot protection | |
| JP4960492B2 (en) | Foundation structure and construction method of foundation structure | |
| JP2020066875A (en) | Foundation pile, foundation structure, structural body, and installation method of foundation pile | |
| JP4584512B2 (en) | Ready-made pile with soil cement synthetic blade | |
| JP3514183B2 (en) | Embedded pile and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080423 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20100520 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110412 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110613 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110927 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110929 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141007 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4837849 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |