JP4859692B2 - Tunnel internal structure construction method - Google Patents
[go: Go Back, main page]

JP4859692B2 - Tunnel internal structure construction method - Google Patents

Tunnel internal structure construction method Download PDF

Info

Publication number
JP4859692B2
JP4859692B2 JP2007022619A JP2007022619A JP4859692B2 JP 4859692 B2 JP4859692 B2 JP 4859692B2 JP 2007022619 A JP2007022619 A JP 2007022619A JP 2007022619 A JP2007022619 A JP 2007022619A JP 4859692 B2 JP4859692 B2 JP 4859692B2
Authority
JP
Japan
Prior art keywords
tunnel
culvert
soil
fluidized
internal structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007022619A
Other languages
Japanese (ja)
Other versions
JP2008190133A (en
Inventor
実 米沢
雅由 中川
康一 玉田
悦弘 須田
勝利 藤崎
敏之 豊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2007022619A priority Critical patent/JP4859692B2/en
Publication of JP2008190133A publication Critical patent/JP2008190133A/en
Application granted granted Critical
Publication of JP4859692B2 publication Critical patent/JP4859692B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

本発明は、トンネル内部構造構築方法に関するものである。   The present invention relates to a tunnel internal structure construction method.

従来、土圧式シールド機を用いて鉄道や道路などに使用するトンネルを構築する際に、シールド掘進と同時に、シールド掘進により発生した掘削土に硬化剤を添加した硬化剤混合土を利用してトンネルの内路床を形成したり、プレキャスト部材等からなるトンネル内路床の内部に掘削土を投入したりする方法があった(例えば、特許文献1参照)。   Conventionally, when building tunnels for railways, roads, etc. using earth pressure type shield machines, tunnels are made using hardener mixed soil in which hardener is added to excavated soil generated by shield excavation at the same time as shield excavation. There has been a method of forming an inner roadbed or putting excavated soil into the inside of a tunnel roadbed made of a precast member or the like (see, for example, Patent Document 1).

また、泥水シールド機を用いてトンネルを構築する際に、掘削土を改質してトンネル内部構造の構築に用いるための方法や装置があった(例えば、特許文献2、特許文献3参照)。   Moreover, when constructing a tunnel using a muddy water shield machine, there has been a method and an apparatus for modifying excavated soil and using it for constructing a tunnel internal structure (see, for example, Patent Document 2 and Patent Document 3).

特開昭60−226999号公報JP 60-226999 A 特許第2527289号公報Japanese Patent No. 2527289 実開平5−47097号公報Japanese Utility Model Publication No. 5-47097

しかしながら、トンネル内空のうち、トンネルの構築中に作業空間として使用できる部分は限られており、工期を短縮するためには、トンネル内空を効率的に使用する必要があった。   However, the portion of the tunnel interior that can be used as a work space during the construction of the tunnel is limited, and in order to shorten the construction period, it was necessary to efficiently use the tunnel interior.

本発明は、このような問題に鑑みてなされたもので、その目的とするところは、トンネル内部構造内に切羽への搬送路を確保できるトンネル内部構造構築方法を提供することにある。
The present invention has been made in view of such problems, and an object of the present invention is to provide a tunnel internal structure construction method that can secure a transport path to the face in the tunnel internal structure.

前述した目的を達成するための第1の発明は、トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、を具備し、前記工程(b)で、前記トンネル掘削土を、硬化後の強度が異なる複数の流動化処理土に改質し、前記工程(c)で、前記複数の流動化処理土のうち、硬化後の強度が低いものを下層に、高いものを上層に用いて埋め戻すことを特徴とするトンネル内部構造構築方法である。 The first invention for achieving the above-described object is the step (a) of installing a culvert to be used as a transport path in the lower part of the tunnel while digging the tunnel, and tunnel excavation soil in the tunnel. A step (b) of reforming the fluidized soil into a fluidized soil, and a step (c) of backfilling the fluidized soil in the tunnel to a level covering the culvert , wherein the step (b) The tunnel excavated soil is modified into a plurality of fluidized soils having different strengths after curing, and in the step (c), a lower one of the plurality of fluidized soils having a lower strength after curing is used as a lower layer. In addition, the tunnel internal structure construction method is characterized in that a high-priced material is used for the upper layer and backfilled .

第2の発明は、トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、を具備し、前記カルバートは、下半部と上半部とからなり、外周面に設けられた凸部と底版の上面とにPC定着箱を有し、前記工程(a)で、前記下半部と前記上半部とを継手を用いて一体化し、前記下半部同士および前記上半部同士をPC鋼棒を用いてトンネル軸方向に緊結することを特徴とするトンネル内部構造構築方法である。The second invention includes a step (a) of installing a culvert to be used as a conveying path while digging a tunnel, and reforming the tunnel excavated soil into fluidized treated soil in the tunnel. And (c) backfilling the fluidized soil into the tunnel to a level covering the culvert, the culvert comprising a lower half and an upper half And having a PC fixing box on the convex portion provided on the outer peripheral surface and the upper surface of the bottom plate, and in the step (a), the lower half and the upper half are integrated using a joint, and the lower half It is a tunnel internal structure construction method characterized in that the parts and the upper half parts are fastened together in the tunnel axis direction using a PC steel rod.

第3の発明は、トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、を具備し、前記工程(a)で、前記トンネルのセグメントにアングル材を固定し、前記アングル材を用いて前記カルバートの位置決めを行うことを特徴とするトンネル内部構造構築方法である。The third invention includes a step (a) of installing a culvert to be used as a conveying path while digging a tunnel, and modifying the tunnel excavated soil into fluidized soil in the tunnel. And (c) a step of backfilling the fluidized soil into the tunnel to a level covering the culvert. In the step (a), an angle material is formed on the tunnel segment. And the culvert is positioned by using the angle member.

第4の発明は、トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、を具備し、前記工程(a)で、前記カルバートを、搬送台車を用いて搬送し、前記搬送台車を跨ぐように配置され、セグメント上を自走する外枠部と、前記外枠部内に固定された仮受架台と、前記外枠部に設けられ、前記カルバートを上下動および回転させるカルバート保持部と、を具備するカルバート組立装置を使用して設置することを特徴とするトンネル内部構造構築方法である。The fourth invention includes a step (a) of installing a culvert to be used as a conveyance path while digging a tunnel in the lower part of the tunnel, and modifying the tunnel excavated soil into fluidized soil in the tunnel. And (c) backfilling the fluidized soil in the tunnel to a level covering the culvert, and in the step (a), the culvert is transported by a carriage. An outer frame portion that is disposed so as to straddle the conveyance carriage, and that is self-propelled on a segment; a temporary support base that is fixed in the outer frame portion; and A tunnel internal structure construction method characterized by being installed using a culvert assembling apparatus comprising a culvert holding section that moves up and down and rotates.

本発明では、流動化処理土の上に無筋コンクリート基層を設ける工程(d)をさらに設けてもよい。また、工程(b)では、例えば、流動化処理土のテーブルフロー値を160mm以上210mm以下に、ブリージング率を1%以下に設定する。また、工程(a)では、必要に応じて、カルバートの底面とトンネルのセグメントとの間に、調整ライナ、スペーサ、注入材等を設置する。
カルバート組立装置は、搬送台車で所定の位置まで搬送されたカルバートを、カルバート保持部で持ち上げて仮受架台に仮置きし、搬送台車の移動後に、カルバート保持部で回転および下降させて所定の位置に据え付ける。
In the present invention, a step (d) of providing an unreinforced concrete base layer on the fluidized soil may be further provided. In the step (b), for example, the table flow value of the fluidized soil is set to 160 mm or more and 210 mm or less, and the breathing rate is set to 1% or less. In the step (a), an adjustment liner, a spacer, an injection material, and the like are installed between the bottom surface of the culvert and the tunnel segment as necessary.
The culvert assembling apparatus lifts the culvert transported to a predetermined position by the transport carriage and temporarily places it on the temporary support stand. After the transport carriage is moved, it is rotated and lowered by the culvert support section to the predetermined position. To install.

本発明では、トンネルを掘進しつつ、搬送路として用いるためのカルバートを、トンネル内の下部に設置する。そして、トンネルの掘進と並行して、トンネル内で、トンネル掘削土を流動化処理土に改質し、トンネル内に、カルバートを覆うレベルまで流動化処理土を埋め戻す。   In the present invention, a culvert for use as a conveyance path is installed in the lower part of the tunnel while digging the tunnel. In parallel with the tunnel excavation, the tunnel excavated soil is reformed into fluidized soil in the tunnel, and the fluidized soil is backfilled in the tunnel to a level covering the culvert.

本発明によれば、トンネル内部構造内に切羽への搬送路を確保できるトンネル内部構造構築方法を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, the tunnel internal structure construction method which can ensure the conveyance path to a face in a tunnel internal structure can be provided.

以下、図面に基づいて、本発明の実施の形態について詳細に説明する。図1は、内部構造を構築中のトンネル3の軸方向の断面図である。図1では、矢印Aに示す方向がトンネル3の切羽側であり、矢印Bに示す方向が立坑側である。図2は、カルバート組立装置13を用いてアーチカルバート11を設置する際の各工程を示す図である。図3は、トンネル3内にカルバート11を設置した状態を示す図である。図3は、図1のC−Cによる断面図である。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a sectional view in the axial direction of a tunnel 3 whose internal structure is being constructed. In FIG. 1, the direction shown by the arrow A is the face side of the tunnel 3, and the direction shown by the arrow B is the shaft side. FIG. 2 is a diagram illustrating each process when the arch culvert 11 is installed using the culvert assembling apparatus 13. FIG. 3 is a diagram showing a state in which the culvert 11 is installed in the tunnel 3. 3 is a cross-sectional view taken along the line CC of FIG.

図1、図3に示すように、トンネル3は、シールド機(図示せず)を用いて、地山1内に掘削される。トンネル3の内部には、搬送台車9aを用いてセグメント5が搬送される。搬送されたセグメント5は、トンネル3の内壁に沿って組み立てられる。トンネル3の掘削土8は、トンネル3の内壁に取付けられたベルトコンベア7を用いて、掘削方向後方に運搬される。 As shown in FIGS. 1 and 3, the tunnel 3 is excavated in the natural ground 1 using a shield machine (not shown). The segment 5 is transported inside the tunnel 3 by using a transport carriage 9a. The transported segment 5 is assembled along the inner wall of the tunnel 3. The excavated soil 8 of the tunnel 3 is conveyed backward in the excavation direction by using a belt conveyor 7 attached to the inner wall of the tunnel 3.

トンネル3の掘削方向後方では、切羽から適切な距離をおいて、内部構造の構築が開始される。内部構造を構築するには、図1から図3に示すように、搬送台車9bを用いて、アーチカルバート下半部11a、アーチカルバート上半部11bをカルバート組立箇所18まで搬送する。搬送台車9bは、セグメント5上を走行する。アーチカルバート下半部11a、アーチカルバート上半部11bは、プレキャスト製の部材である。なお、アーチカルバート下半部11a、アーチカルバート上半部11bは、セグメント5と同時に搬送される。   Behind the excavation direction of the tunnel 3, the construction of the internal structure is started at an appropriate distance from the face. In order to construct the internal structure, as shown in FIGS. 1 to 3, the lower half part 11 a of the arch culvert and the upper half part 11 b of the arch culvert 11 b are transported to the culvert assembly part 18 using the transport carriage 9 b. The transport carriage 9b travels on the segment 5. The arch culvert lower half 11a and the arch culvert upper half 11b are precast members. The arch culvert lower half 11 a and the arch culvert upper half 11 b are transported simultaneously with the segment 5.

アーチカルバート下半部11a、アーチカルバート上半部11bをカルバート組立箇所18まで搬送した後、カルバート組立装置13を用いて、アーチカルバート下半部11aとアーチカルバート上半部11bとからなるアーチカルバート11を組み立てる。 After conveying the lower half part 11a of the arch culvert and the upper half part 11b of the arch culvert to the culvert assembly part 18, the arch culvert 11 composed of the lower half part 11a of the arch culvert and the upper half part 11b of the arch culvert is used by using the culvert assembly device 13. Assemble.

図1および図2に示すように、カルバート組立装置13は、外枠部12、カルバート保持部14、仮受架台16、走行手段20等からなる。外枠部12は、例えば、トンネル軸方向に所定の長さを有する門型の部材であり、搬送台車9bを跨ぐように配置される。 As shown in FIGS. 1 and 2, the culvert assembling apparatus 13 includes an outer frame portion 12, a culvert holding portion 14, a temporary support base 16, traveling means 20, and the like. The outer frame portion 12 is, for example, a gate-shaped member having a predetermined length in the tunnel axis direction, and is disposed so as to straddle the transport carriage 9b.

走行手段20は、外枠部12の両側面12aの下端部に設けられた走行手段20a、両側面12aの外側に張り出して設けられた走行手段20bからなる。カルバート組立装置13は、走行手段20を用いて、セグメント5上をトンネル軸方向に自走する。 The traveling means 20 includes a traveling means 20 a provided at the lower end portion of the both side surfaces 12 a of the outer frame portion 12, and a traveling means 20 b provided so as to protrude outward from the both side surfaces 12 a. The culvert assembling apparatus 13 self-travels on the segment 5 in the tunnel axis direction using the traveling means 20.

カルバート保持部14は、アーチカルバート下半部11aおよびアーチカルバート上半部11bを保持する機構であり、外枠部12に支持される。カルバート保持部14は、図1の矢印Iに示すように、カルバート組立装置13内をトンネル軸方向に移動可能である。また、カルバート保持部14は、保持したアーチカルバート下半部11a、アーチカルバート上半部11bを、図1の矢印Jに示すように上下動させたり、矢印Kに示すように回転させたりする。 The culvert holding part 14 is a mechanism for holding the arch culvert lower half part 11 a and the arch culvert upper half part 11 b and is supported by the outer frame part 12. As shown by an arrow I in FIG. 1, the culvert holding unit 14 is movable in the culvert assembling apparatus 13 in the tunnel axis direction. Further, the culvert holding part 14 moves the held arch culvert lower half part 11a and the arch culvert upper half part 11b up and down as indicated by an arrow J in FIG.

仮受架台16は、外枠部12の両側面12aの内側に、側面12aに略垂直に固定された一対の板状部材である。仮受架台16は、カルバート組立装置13の後部の所定の位置に設けられる。 The temporary support base 16 is a pair of plate-like members that are fixed substantially vertically to the side surface 12 a inside the both side surfaces 12 a of the outer frame portion 12. The temporary support stand 16 is provided at a predetermined position on the rear portion of the culvert assembling apparatus 13.

図2の(a)図は、アーチカルバート11bを持ち上げる工程を示す図である。アーチカルバート11を組み立てる際には、まず、搬送台車9bに載置されたアーチカルバート上半部11b(図1)を、カルバート保持部14を用いて保持する。そして、カルバート保持部14を用いてアーチカルバート上半部11bを持ち上げ、回転させ、立坑方向へ移動させて、図2の(a)図に示すように、仮受架台16上に一時仮置きする。   FIG. 2A is a diagram illustrating a process of lifting the arch culvert 11b. When assembling the arch culvert 11, first, the arch culvert upper half 11 b (FIG. 1) placed on the transport carriage 9 b is held using the culvert holding portion 14. Then, the arch culvert upper half portion 11b is lifted using the culvert holding portion 14, rotated, moved in the shaft direction, and temporarily placed on the temporary support base 16 as shown in FIG. .

図2の(b)図は、アーチカルバート下半部11aを持ち上げる工程を示す図である。アーチカルバート上半部11bを仮受架台16上に仮置きした後、搬送台車9bに載置されたアーチカルバート下半部11a(図1)上までカルバート保持部14を移動させる。次に、アーチカルバート下半部11aをカルバート保持部14を用いて保持し、図2の(b)図に示すように、搬送台車9bの走行に支障がない高さまで上昇させる。そして、全ての荷卸が完了した搬送台車9を立坑側へ通過させる。   FIG. 2B is a diagram showing a process of lifting the lower half portion 11a of the arch culvert. After temporarily placing the arch culvert upper half portion 11b on the temporary support base 16, the culvert holding portion 14 is moved onto the arch culvert lower half portion 11a (FIG. 1) placed on the transport carriage 9b. Next, the lower half portion 11a of the arch culvert 11a is held by using the culvert holding portion 14, and as shown in FIG. And the conveyance trolley 9 in which all unloading was completed is passed to the shaft side.

図2の(c)図は、アーチカルバート下半部11aをセグメント5上に設置する工程を示す図である。搬送台車9を立坑側へ通過させた後、アーチカルバート下半部11aを、カルバート保持部14を用いて回転させ、立坑方向へ移動させて、図1および図2の(c)図に示すように、セグメント5上に設置する。   FIG. 2C is a diagram illustrating a process of installing the arch culvert lower half 11 a on the segment 5. After passing the carriage 9 to the shaft side, the lower half portion 11a of the arch culvert is rotated using the culvert holding portion 14 and moved in the shaft direction, as shown in FIG. And installed on the segment 5.

図4は、アーチカルバート11の周方向の断面図である。図4は、図3の範囲Eに示す部分の拡大図である。図5は、アーチカルバート11の斜視図である。図6は、アングル材37周辺の断面図である。図6は図4の範囲Fに示す部分の拡大図である。   FIG. 4 is a sectional view of the arch culvert 11 in the circumferential direction. FIG. 4 is an enlarged view of a portion indicated by a range E in FIG. FIG. 5 is a perspective view of the arch culvert 11. FIG. 6 is a cross-sectional view around the angle member 37. FIG. 6 is an enlarged view of a portion indicated by a range F in FIG.

アーチカルバート下半部11aをセグメント5上に設置する際には、図4に示すように、トンネル3の下部のセグメント5の内側に、アングル材37を固定する。アングル材37は、アーチカルバート下半部11aの底版27の両外隅部28の設置予定位置に固定される。 When installing the lower half part 11a of the arch culvert on the segment 5, an angle member 37 is fixed inside the segment 5 at the lower part of the tunnel 3 as shown in FIG. The angle member 37 is fixed to the planned installation positions of both outer corners 28 of the bottom plate 27 of the lower half portion 11a of the arch culvert.

図6に示すように、セグメント5では、アングル材37の設置位置に、雌ネジ45が埋設される。アングル材37はボルト穴50を有する。アングル材37は、ボルト穴50に挿入したボルト47をセグメント5の雌ネジ45にねじ込み、ボルト47で締め付けることにより、セグメント5に固定される。アングル材37とセグメント5との間にはワッシャ49が配置される。 As shown in FIG. 6, in the segment 5, a female screw 45 is embedded at the installation position of the angle member 37. The angle member 37 has a bolt hole 50. The angle member 37 is fixed to the segment 5 by screwing the bolt 47 inserted into the bolt hole 50 into the female screw 45 of the segment 5 and fastening with the bolt 47. A washer 49 is disposed between the angle member 37 and the segment 5.

セグメント5にアングル材37を固定した後、アングル材37により位置決めを行って、トンネル3の下部のセグメント5上にアーチカルバート下半部11aを設置する。そして、アーチカルバート下半部11aの底版27の底面41とセグメント5との間に注入材43を注入する。 After fixing the angle member 37 to the segment 5, positioning is performed by the angle member 37, and the arch culvert lower half part 11 a is installed on the segment 5 at the lower part of the tunnel 3. Then, an injection material 43 is injected between the bottom surface 41 of the bottom plate 27 of the lower half portion 11 a of the arch culvert and the segment 5.

トンネル3では、セグメント5の組立時に上下方向の位置ずれが生じる場合があるが、アーチカルバート下半部11aの底面41とセグメント5との間に注入材43を注入することにより、アーチカルバート下半部11aの上下方向の位置ずれを防止することができる。また、アングル材37を用いることにより、アーチカルバート下半部11aのトンネル周方向の位置ずれを防止することができる。 In the tunnel 3, the vertical displacement may occur when the segment 5 is assembled. By injecting the injection material 43 between the bottom surface 41 of the lower half part 11 a of the arch culvert 11 and the segment 5, the lower half part of the arch culvert It is possible to prevent the vertical displacement of the portion 11a. Further, by using the angle member 37, it is possible to prevent the displacement of the arch culvert lower half 11a in the tunnel circumferential direction.

図2の(d)図は、アーチカルバート上半部11bをアーチカルバート下半部11a上に設置する工程を示す図である。アーチカルバート下半部11aをセグメント5上に設置した後、カルバート保持部14を、仮受架台16に仮置きされたアーチカルバート上半部11b(図2の(a)図)上まで移動させる。次に、アーチカルバート上半部11bを、カルバート保持部14を用いて保持し、立坑方向へ移動させて、図1および図2の(d)図に示すように、アーチカルバート下半部11a上に設置する。そして、図4、図5に示すように、アーチカルバート下半部11aとアーチカルバート上半部11bとを、モルタル充填式鉄筋継手35を用いて一体化する。 FIG. 2D is a diagram showing a process of installing the arch culvert upper half 11b on the arch culvert lower half 11a. After the arch culvert lower half part 11a is installed on the segment 5, the culvert holding part 14 is moved onto the arch culvert upper half part 11b (FIG. 2A) temporarily placed on the temporary support base 16. Next, the arch culvert upper half part 11b is held by using the culvert holding part 14 and moved in the shaft direction, and as shown in FIGS. 1 and 2 (d), on the arch culvert lower half part 11a. Install in. Then, as shown in FIGS. 4 and 5, the lower half part 11 a of the arch culvert and the upper half part 11 b of the arch culvert are integrated using a mortar filling type reinforcing bar joint 35.

図4に示すように、カルバート下半部11aは、底版27の上面29の2箇所にPC定着箱25aを有する。図5に示すように、アーチカルバート下半部11a同士は、PC鋼棒31aを用いてトンネル3の軸方向に緊結される。図4、図5に示すように、PC鋼棒31aはPC定着箱25aを用いて定着される。 As shown in FIG. 4, the culvert lower half 11 a has PC fixing boxes 25 a at two locations on the upper surface 29 of the bottom plate 27. As shown in FIG. 5, the arch culvert lower half portions 11a are fastened together in the axial direction of the tunnel 3 using a PC steel rod 31a. As shown in FIGS. 4 and 5, the PC steel rod 31a is fixed using a PC fixing box 25a.

図4に示すように、アーチカルバート上半部11bは、外周面33の2箇所に設けられた凸部39にPC定着箱25bを有する。図5に示すように、アーチカルバート上半部11b同士は、PC鋼棒31bを用いてトンネル3の軸方向に緊結される。図4、図5に示すように、PC鋼棒31bはPC定着箱25bを用いて定着される。 As shown in FIG. 4, the arch culvert upper half portion 11 b has PC fixing boxes 25 b on convex portions 39 provided at two locations on the outer peripheral surface 33. As shown in FIG. 5, the arch culvert upper half portions 11b are fastened together in the axial direction of the tunnel 3 using a PC steel rod 31b. As shown in FIGS. 4 and 5, the PC steel bar 31b is fixed using a PC fixing box 25b.

アーチカルバート上半部11bでは、PC定着箱25bを外周面33に設けられた凸部39に設けることにより、PC鋼棒31bの定着時の作業性を向上させることができる。   In the upper half portion 11b of the arch culvert, the workability at the time of fixing the PC steel rod 31b can be improved by providing the PC fixing box 25b on the convex portion 39 provided on the outer peripheral surface 33.

アーチカルバート11の内部23は、トンネル3を構築するための資材や機器等を立坑側と切羽側との間で運搬するための搬送路として用いられる。また、パイプスペースとしても用いられる。 The interior 23 of the arch culvert 11 is used as a transport path for transporting materials and equipment for constructing the tunnel 3 between the shaft side and the face side. It is also used as a pipe space.

図7は、トンネル3内に下層流動化処理土17を埋め戻した状態を示す図である。図7は、図1の矢印D−Dによる断面図である。図8は、内部構造を構築中のトンネル3の軸方向の断面図を示す。図8は、図1の矢印Bに示す方向(掘削方向後方)の続きを示す図である。図8では、矢印Gに示す方向がトンネル3の切羽側であり、矢印Hに示す方向が立坑側である。   FIG. 7 is a view showing a state in which the lower layer fluidized soil 17 is backfilled in the tunnel 3. FIG. 7 is a cross-sectional view taken along arrow DD in FIG. FIG. 8 shows a cross-sectional view in the axial direction of the tunnel 3 during construction of the internal structure. FIG. 8 is a diagram illustrating a continuation of the direction indicated by the arrow B in FIG. 1 (backward in the excavation direction). In FIG. 8, the direction shown by the arrow G is the face side of the tunnel 3, and the direction shown by the arrow H is the shaft side.

図8に示すように、トンネル3を掘削して生じた掘削土8は、ベルトコンベア7により、トンネル3内の掘削方向後方の流動化処理土作成箇所61まで運搬される。流動化処理土作成箇所61には、コンクリートポンプ、移動式バッチャープラント、自走式土質改良機等からなる流動化処理土作成装置59が設置される。   As shown in FIG. 8, the excavated soil 8 produced by excavating the tunnel 3 is transported by the belt conveyor 7 to the fluidized treated soil creation location 61 behind the tunnel 3 in the excavating direction. In the fluidized soil creation site 61, a fluidized soil creation device 59 including a concrete pump, a mobile batcher plant, a self-propelled soil improvement machine, and the like is installed.

流動化処理土作成箇所61まで運搬された掘削土8は、流動化処理土作成装置59により、加水され、セメント等の固化材を添加され、混合されて、泥水状の流動化処理土に改質される。本実施の形態では、掘削土8を、硬化後の強度が異なる2種類の流動化処理土に改質する。この時、各流動化処理土のテーブルフロー値を160mm以上210mm以下に、ブリージング率を1%以下に設定するのが望ましい。 The excavated soil 8 transported to the fluidized soil creation site 61 is hydrated by a fluidized soil creation device 59, added with a solidifying material such as cement, mixed, and converted into a muddy fluidized soil. Quality. In the present embodiment, the excavated soil 8 is modified into two types of fluidized soils having different strengths after hardening. At this time, it is desirable to set the table flow value of each fluidized soil to 160 mm to 210 mm and the breathing rate to 1% or less.

流動化処理土作成箇所61で流動化処理土を作成した後、流動化処理土をトンネル3の掘削方向前方に搬送する。そして、カルバート組立箇所18の掘削方向後方に位置する流動化処理土打設箇所19で打設して、流動化処理土層63(図8)を形成する。流動化処理土打設箇所19の切羽側の端部には、移動型枠15が配置される。   After creating the fluidized soil at the fluidized soil creation location 61, the fluidized soil is transported forward in the excavation direction of the tunnel 3. And it casts in the fluidization processing soil placement location 19 located in the back of the excavation direction of the culvert assembly location 18, and the fluidization processing soil layer 63 (FIG. 8) is formed. The movable mold 15 is disposed at the end of the fluidized soil placement site 19 on the face side.

流動化処理土層63を形成するには、まず、図1、図7に示すように、2種類の流動化処理土のうち硬化後の強度が低い下層流動化処理土17を用いて、トンネル3の内空21の下部を埋め戻す。下層流動化処理土17は、例えば、アーチカルバート上半部11bの一部が隠れるレベルまで埋め戻される。このとき、予め折りたたんでおいた高強度プラスチック網を展張させて下層流動化処理土17中に配置することにより、不等沈下を抑制してもよい。 In order to form the fluidized soil layer 63, first, as shown in FIG. 1 and FIG. 7, the lower layer fluidized soil 17 having a low strength after curing is used. The lower part of the inner space 21 of 3 is refilled. For example, the lower layer fluidized soil 17 is backfilled to a level at which a part of the upper half of the arch culvert 11b is hidden. At this time, unequal settlement may be suppressed by expanding a high strength plastic net that has been folded in advance and placing it in the lower layer fluidized soil 17.

図9は、トンネル3内に無筋コンクリート基層55を設けた状態を示す図である。図9は、図8に示す矢印I−Iによる断面図である。下層流動化処理土17によりトンネル3の内空21の下部を埋め戻した後、図8、図9に示すように、2種類の流動化処理土のうち硬化後の強度が高い上層流動化処理土53を用いて、トンネル3の内空21の下層流動化処理土17の上方を埋め戻す。上層流動化処理土53は、アーチカルバート11を覆うレベルまで埋め戻される。 FIG. 9 is a view showing a state in which an unreinforced concrete base layer 55 is provided in the tunnel 3. FIG. 9 is a cross-sectional view taken along arrows II shown in FIG. After the lower part of the inner space 21 of the tunnel 3 is backfilled by the lower layer fluidized soil 17, as shown in FIGS. 8 and 9, the upper layer fluidized processing having a high strength after curing of the two types of fluidized soil. Using the soil 53, the upper part of the lower layer fluidized soil 17 in the inner space 21 of the tunnel 3 is refilled. The upper layer fluidized soil 53 is backfilled to a level covering the arch culvert 11.

アーチカルバート11の外周面33に設けられた凸部39は、アーチカルバート11の表面と流動化処理土層63との抵抗を増加させる。流動化処理土打設箇所19は、上層流動化処理土53の施工後、施工車両に開放される。 The convex portion 39 provided on the outer peripheral surface 33 of the arch culvert 11 increases the resistance between the surface of the arch culvert 11 and the fluidized soil layer 63. The fluidization treatment soil placement site 19 is opened to the construction vehicle after the construction of the upper layer fluidization treatment soil 53.

流動化処理土打設箇所19の掘削方向後方に位置する無筋コンクリート打設箇所57では、流動化処理土層63の上層流動化処理土53の上面に無筋コンクリートを打設し、無筋コンクリート基層55を形成する。無筋コンクリート基層55は、上載荷重を分散し、アーチカルバート11の上方の部分と、側方の部分の埋め戻し部の不等沈下を減少させる。無筋コンクリート基層55を打設した後、舗装等を行って、内部構造63を完成する。 In the unreinforced concrete placement location 57 located behind the fluidization treatment soil placement location 19 in the excavation direction, unreinforced concrete is placed on the upper surface of the fluidization treatment soil 53 in the upper layer of the fluidization treatment soil layer 63, A concrete base layer 55 is formed. The unreinforced concrete base layer 55 disperses the loading load and reduces uneven settlement of the upper portion of the arch culvert 11 and the backfill portion of the side portion. After placing the unreinforced concrete base layer 55, paving or the like is performed to complete the internal structure 63.

このように、本実施の形態によれば、搬送台車9を用いて、セグメント5、アーチカルバート下半部11a、アーチカルバート上半部11bを同時に搬送し、トンネル3の掘進と並行してアーチカルバート11を組み立てることにより、工期が短縮される。また、トンネル3の掘進と並行して掘削土8を流動化処理土に改質し、アーチカルバート11を覆うレベルまで流動化処理土を埋め戻すことにより、掘削土8の転用に伴う処理費用の低減が可能となる。さらに、掘削土8を有効に利用することにより、周辺環境への負荷や、ダンプによる搬出量を軽減できる。 Thus, according to the present embodiment, the transport cart 9 is used to simultaneously transport the segment 5, the lower half portion 11a of the arch culvert, and the upper half portion 11b of the arch culvert, and in parallel with the excavation of the tunnel 3, By assembling 11, the construction period is shortened. Further, in parallel with the excavation of the tunnel 3, the excavated soil 8 is reformed to the fluidized treated soil, and the fluidized treated soil is backfilled to a level covering the arch culvert 11, thereby reducing the processing cost associated with the diversion of the excavated soil 8. Reduction is possible. Furthermore, by effectively using the excavated soil 8, it is possible to reduce the load on the surrounding environment and the amount carried out by dumping.

また、アーチカルバート11をトンネル3内の下部に設置した後、流動化処理土を埋め戻すことにより、流動化処理土の埋め戻し前に切羽への搬送路を確保でき、短期施工が可能となる。 In addition, by installing the arch culvert 11 in the lower part of the tunnel 3 and then backfilling the fluidized soil, the transport path to the face can be secured before the fluidized soil is backfilled, and short-term construction is possible. .

なお、図3では、アーチカルバート下半部11aの底面41とトンネル3のセグメント5との間に注入材43を注入したが、注入材43のかわりに調整ライナ、スペーサ等を設置してもよい。調整ライナ、スペーサ等を用いた場合にも、セグメント5の組立誤差によるアーチカルバート下半部11aの上下方向の位置ずれを防止し、アーチカルバート11を所定の位置に設置することができる。 In FIG. 3, the injection material 43 is injected between the bottom surface 41 of the lower half portion 11 a of the arch culvert 11 and the segment 5 of the tunnel 3, but an adjustment liner, a spacer, or the like may be installed instead of the injection material 43. . Even when an adjustment liner, a spacer, or the like is used, it is possible to prevent the vertical displacement of the lower half portion 11a of the arch culvert 11a due to the assembly error of the segment 5, and to install the arch culvert 11 at a predetermined position.

また、本実施の形態では、掘削土8を2種類の流動化処理土に改質したが、1種類の流動化処理土に改質してアーチカルバート11を覆うレベルまで埋め戻してもよい。また、3種類以上の流動化処理土に改質し、硬化後の強度が低いものを下層に、高いものを上層に用いてアーチカルバート11を覆うレベルまで埋め戻してもよい。流動化処理土作成箇所の位置は、図8に示すものに限らない。 Further, in the present embodiment, the excavated soil 8 is modified into two types of fluidized soil, but may be modified to one type of fluidized soil and backfilled to a level covering the arch culvert 11. Further, it may be modified to three or more types of fluidized soil and backfilled to a level covering the arch culvert 11 by using a low-strength after hardening in the lower layer and a higher one in the upper layer. The position of the fluidized soil creation place is not limited to that shown in FIG.

以上、添付図面を参照しながら本発明にかかるトンネル内部構造構築方法の好適な実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although preferred embodiment of the tunnel internal structure construction method concerning this invention was described referring an accompanying drawing, this invention is not limited to this example. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims, and these are naturally within the technical scope of the present invention. It is understood that it belongs.

内部構造を構築中のトンネル3の軸方向の断面図A sectional view in the axial direction of the tunnel 3 which is building the internal structure カルバート組立装置13を用いてアーチカルバート11を設置する際の各工程を示す図The figure which shows each process at the time of installing the arch culvert 11 using the culvert assembly apparatus 13 トンネル3内にカルバート11を設置した状態を示す図The figure which shows the state which installed the culvert 11 in the tunnel 3 アーチカルバート11の周方向の断面図Cross section in the circumferential direction of the arch culvert 11 アーチカルバート11の斜視図Perspective view of arch culvert 11 アングル材37周辺の断面図Sectional view around the angle member 37 トンネル3内に下層流動化処理土17を埋め戻した状態を示す図The figure which shows the state which filled back the lower layer fluidization processing soil 17 in the tunnel 3 内部構造を構築中のトンネル3の軸方向の断面図A sectional view in the axial direction of the tunnel 3 which is building the internal structure トンネル3内に無筋コンクリート55を打設した状態を示す図The figure which shows the state which laid the unreinforced concrete 55 in the tunnel 3

符号の説明Explanation of symbols

1………地山
3………トンネル
5………セグメント
11………アーチカルバート
11a………アーチカルバート下半部
11b………アーチカルバート上半部
12………外枠部
13………カルバート組立装置
14………カルバート保持部
16………仮受架台
17………下層流動化処理土
25a、25b………PC定着箱
27………底版
29………上面
31a、31b………PC鋼棒
33………外周面
35………モルタル充填式鉄筋継手
37………アングル材
39………凸部
41………底面
43………注入材
53………上層流動化処理土
55………無筋コンクリート基層
63………流動化処理土層
65………内部構造
1 ......... Takeyama 3 ......... Tunnel 5 ......... Segment 11 ......... Arch culvert 11a ......... Lower half of arch culvert 11b ......... Upper half of arch culvert 12 ......... Outer frame 13 ... ... Calvert assembly device 14 ......... Calvert holding part 16 ......... Temporary stand 17 ......... Lower layer fluidized soil 25a, 25b ......... PC fixing box 27 ......... Bottom plate 29 ......... Upper surface 31a, 31b ... ...... PC steel rod 33 ......... Outer peripheral surface 35 ......... Mortar-filled steel bar joint 37 ......... Angle material 39 ......... Protrusions 41 ......... Bottom surface 43 ......... Injection material 53 ......... Upper layer fluidization Treated soil 55 ………… Unreinforced concrete base layer 63 ………… Fluidized treated soil layer 65 ……… Internal structure

Claims (7)

トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、
前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、
前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、
を具備し、
前記工程(b)で、前記トンネル掘削土を、硬化後の強度が異なる複数の流動化処理土に改質し、
前記工程(c)で、前記複数の流動化処理土のうち、硬化後の強度が低いものを下層に、高いものを上層に用いて埋め戻すことを特徴とするトンネル内部構造構築方法。
A step (a) of installing a culvert for use as a transport path in the lower part of the tunnel while digging the tunnel;
(B) modifying the tunnel excavated soil into fluidized soil within the tunnel;
Backfilling the fluidized soil into the tunnel to a level covering the culvert (c);
Equipped with,
In the step (b), the tunnel excavated soil is modified into a plurality of fluidized soils having different strengths after hardening,
In the step (c), among the plurality of fluidized soils, a method of constructing a tunnel internal structure is provided by using a lower strength after curing and a higher one as a top layer to backfill .
トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、A step (a) of installing a culvert for use as a transport path in the lower part of the tunnel while digging the tunnel;
前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、  (B) modifying the tunnel excavated soil into fluidized soil within the tunnel;
前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、  Backfilling the fluidized soil into the tunnel to a level covering the culvert (c);
を具備し、Comprising
前記カルバートは、下半部と上半部とからなり、外周面に設けられた凸部と底版の上面とにPC定着箱を有し、  The culvert has a lower half part and an upper half part, and has a PC fixing box on the convex part provided on the outer peripheral surface and the upper surface of the bottom plate,
前記工程(a)で、前記下半部と前記上半部とを継手を用いて一体化し、前記下半部同士および前記上半部同士をPC鋼棒を用いてトンネル軸方向に緊結することを特徴とするトンネル内部構造構築方法。  In the step (a), the lower half and the upper half are integrated using a joint, and the lower halves and the upper halves are fastened together in the tunnel axis direction using a PC steel rod. The tunnel internal structure construction method characterized by this.
トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、A step (a) of installing a culvert for use as a transport path in the lower part of the tunnel while digging the tunnel;
前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、  (B) modifying the tunnel excavated soil into fluidized soil within the tunnel;
前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、  Backfilling the fluidized soil into the tunnel to a level covering the culvert (c);
を具備し、Comprising
前記工程(a)で、前記トンネルのセグメントにアングル材を固定し、前記アングル材を用いて前記カルバートの位置決めを行うことを特徴とするトンネル内部構造構築方法。In the step (a), an angle member is fixed to a segment of the tunnel, and the culvert is positioned using the angle member, and the tunnel internal structure construction method is characterized.
トンネルを掘進しつつ、搬送路として用いるためのカルバートを前記トンネル内の下部に設置する工程(a)と、A step (a) of installing a culvert for use as a transport path in the lower part of the tunnel while digging the tunnel;
前記トンネル内で、トンネル掘削土を流動化処理土に改質する工程(b)と、  (B) modifying the tunnel excavated soil into fluidized soil within the tunnel;
前記トンネル内に、前記カルバートを覆うレベルまで前記流動化処理土を埋め戻す工程(c)と、  Backfilling the fluidized soil into the tunnel to a level covering the culvert (c);
を具備し、Comprising
前記工程(a)で、前記カルバートを、搬送台車を用いて搬送し、  In the step (a), the culvert is transported using a transport carriage,
前記搬送台車を跨ぐように配置され、セグメント上を自走する外枠部と、  An outer frame portion that is arranged so as to straddle the transport carriage, and that runs on the segment,
前記外枠部内に固定された仮受架台と、  A temporary cradle fixed in the outer frame part;
前記外枠部に設けられ、前記カルバートを上下動および回転させるカルバート保持部と、  A culvert holding part provided on the outer frame part for vertically moving and rotating the culvert;
を具備するカルバート組立装置を使用して設置することを特徴とするトンネル内部構造構築方法。A tunnel internal structure construction method characterized by being installed using a culvert assembling apparatus.
前記流動化処理土の上に無筋コンクリート基層を設ける工程(d)をさらに具備することを特徴とする請求項1から請求項4のいずれかに記載のトンネル内部構造構築方法。 The tunnel internal structure construction method according to any one of claims 1 to 4, further comprising a step (d) of providing an unreinforced concrete base layer on the fluidized soil. 前記工程(b)で、前記流動化処理土のテーブルフロー値を160mm以上210mm以下に、ブリージング率を1%以下に設定することを特徴とする請求項1から請求項5のいずれかに記載のトンネル内部構造構築方法。 The said process (b) WHEREIN: The table flow value of the said fluidization processing soil is set to 160 mm or more and 210 mm or less, and a breathing rate is set to 1% or less, The Claim 1 characterized by the above-mentioned. Tunnel internal structure construction method. 前記工程(a)で、前記カルバートの底面と前記トンネルのセグメントとの間に、調整ライナ、スペーサ、注入材等を設置することを特徴とする請求項1から請求項6のいずれかに記載のトンネル内部構造構築方法。 In the step (a), the between the segments of the bottom surface and the tunnel of the culvert, adjusting liner, a spacer, placing the injection material or the like from claim 1, wherein according to claim 6 Tunnel internal structure construction method.
JP2007022619A 2007-02-01 2007-02-01 Tunnel internal structure construction method Expired - Fee Related JP4859692B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007022619A JP4859692B2 (en) 2007-02-01 2007-02-01 Tunnel internal structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007022619A JP4859692B2 (en) 2007-02-01 2007-02-01 Tunnel internal structure construction method

Publications (2)

Publication Number Publication Date
JP2008190133A JP2008190133A (en) 2008-08-21
JP4859692B2 true JP4859692B2 (en) 2012-01-25

Family

ID=39750473

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007022619A Expired - Fee Related JP4859692B2 (en) 2007-02-01 2007-02-01 Tunnel internal structure construction method

Country Status (1)

Country Link
JP (1) JP4859692B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110454197A (en) * 2019-08-23 2019-11-15 中铁十一局集团第五工程有限公司 Tunnel inverted arch subregion operation break-down streamlined construction method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4805200B2 (en) * 2007-03-20 2011-11-02 清水建設株式会社 Arched precast version in shield tunnel
JP4694523B2 (en) * 2007-03-20 2011-06-08 清水建設株式会社 Construction method of road tunnel in shield tunnel
CN109162720A (en) * 2018-08-24 2019-01-08 中铁十六局集团第三工程有限公司 A kind of twin spans freely-supported inverted arch trestle construction method
JP2020063570A (en) * 2018-10-16 2020-04-23 大成建設株式会社 Precast floor slab, precast floor slab structure and construction method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60226999A (en) * 1984-04-23 1985-11-12 大豊建設株式会社 Tunnel construction method
JP2527289B2 (en) * 1992-06-22 1996-08-21 住友大阪セメント株式会社 Method and device for recycling shield excavated soil
JP2603401B2 (en) * 1992-06-22 1997-04-23 住友大阪セメント株式会社 Use of excavated soil by mud shield machine
JP2506610B2 (en) * 1993-10-19 1996-06-12 大豊建設株式会社 Shield tunnel construction method
JP3443597B2 (en) * 1994-07-19 2003-09-02 太平洋セメント株式会社 Flowable backfill material
JP2856345B2 (en) * 1994-09-10 1999-02-10 太平洋セメント株式会社 Filling material and filling method
JP3598061B2 (en) * 2000-12-20 2004-12-08 智一 奥田 Level adjuster
JP2005336716A (en) * 2004-05-24 2005-12-08 Nishimatsu Constr Co Ltd Muddy water treatment facility and shield tunnel construction method for muddy water shield method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110454197A (en) * 2019-08-23 2019-11-15 中铁十一局集团第五工程有限公司 Tunnel inverted arch subregion operation break-down streamlined construction method

Also Published As

Publication number Publication date
JP2008190133A (en) 2008-08-21

Similar Documents

Publication Publication Date Title
JP7178243B2 (en) Tunnel lining construction method
JP4859692B2 (en) Tunnel internal structure construction method
JP2020041381A (en) Invert construction method in tunnel
JP2010121404A (en) Construction method of multiple tunnel and structure of multiple tunnel
CN106050277A (en) Strengthening process for soft-plastic collapsing body karst tunnel
JP6529378B2 (en) Invert construction method, tunnel construction method and Teruha crane for tunnel
KR100562121B1 (en) Non-adhesive tunnel structure construction method and tunnel structure
JP2008180014A (en) Tunnel construction method
JP5315555B2 (en) Continuously installed belt conveyor, underpass structure building construction apparatus including the belt conveyor, and element towing excavation method using the underpass structure building construction apparatus
JP7182176B2 (en) Tunnel lining method
JP4694523B2 (en) Construction method of road tunnel in shield tunnel
JP2008308854A (en) Method of constructing ballast part in tunnel and the ballast part
CN111074893B (en) Construction system and construction method for concrete cushion layer of river dike and dyke
KR101072401B1 (en) Lining construction device capable of parallel tunneling work and lining construction method using the same
JP7261409B2 (en) Tunnel lining method
JP6475554B2 (en) Construction method of shaft and construction method of underground storage tank
JP4805200B2 (en) Arched precast version in shield tunnel
JP5073960B2 (en) Construction method of underground structure and underground structure
JP4537228B2 (en) Shallow buried method using fluidized soil
JP5791553B2 (en) Road reinforcement method
KR101455202B1 (en) Construction method of an underground structure using lower member installed temporary system
JP2014040703A (en) Existent construction ground improvement structure
JP5147616B2 (en) Construction method of underground wall
JP6718767B2 (en) Composite of soil structure and concrete structure and its construction method
CN111139832B (en) Pouring template system for concrete cushion layer of river dike and dyke and construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091202

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110524

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110525

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110722

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111101

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111101

R150 Certificate of patent or registration of utility model

Ref document number: 4859692

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141111

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees