- JP4861203B2 JP4861203B2 JP2007009329A JP2007009329A JP4861203B2 JP 4861203 B2 JP4861203 B2 JP 4861203B2 JP 2007009329 A JP2007009329 A JP 2007009329A JP 2007009329 A JP2007009329 A JP 2007009329A JP 4861203 B2 JP4861203 B2 JP 4861203B2
- Authority
- JP
- Japan
- Prior art keywords
- fence
- water
- layer
- muddy water
- depth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims description 135
- 238000000034 method Methods 0.000 title claims description 21
- 238000011156 evaluation Methods 0.000 title claims description 11
- 239000010410 layer Substances 0.000 claims description 69
- 238000013517 stratification Methods 0.000 claims description 31
- 238000009434 installation Methods 0.000 claims description 25
- 238000005194 fractionation Methods 0.000 claims description 15
- 239000002344 surface layer Substances 0.000 claims description 9
- 239000012530 fluid Substances 0.000 claims description 8
- 238000012876 topography Methods 0.000 claims description 7
- 230000001133 acceleration Effects 0.000 claims description 3
- 230000005484 gravity Effects 0.000 claims description 2
- 239000002352 surface water Substances 0.000 claims description 2
- 238000009826 distribution Methods 0.000 description 28
- 230000000694 effects Effects 0.000 description 12
- 238000004088 simulation Methods 0.000 description 10
- 238000004458 analytical method Methods 0.000 description 7
- 238000011144 upstream manufacturing Methods 0.000 description 7
- 230000009194 climbing Effects 0.000 description 6
- 238000002474 experimental method Methods 0.000 description 6
- 238000003860 storage Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 238000005273 aeration Methods 0.000 description 4
- 238000006424 Flood reaction Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 239000013049 sediment Substances 0.000 description 2
- 238000003756 stirring Methods 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 235000015097 nutrients Nutrition 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Landscapes
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
Description
本発明は、ダム貯水池に代表される洪水時の濁水化等の成層破壊による水質障害の発生を防止、抑制するための濁水対策用のフェンスの設置位置の評価方法及びその評価方法を用いた濁水対策用のフェンスの設置方法に関する。 The present invention relates to a method for evaluating the location of a fence for muddy water countermeasures for preventing and suppressing the occurrence of water quality failure due to stratification destruction such as turbidity during floods as represented by dam reservoirs, and muddy water using the evaluation method It is related with the installation method of the fence for a countermeasure.
ダム貯水池などの閉鎖性水域では、降雨による大規模な出水が発生した場合に、集水域から土粒子など大量の濁質が流入して貯留水が濁水化することで、放流水が長期間にわたって濁水化する、いわゆる濁水長期化現象が発生することが問題となっている。これは、平水時に貯水池に流入する清澄な河川の水であっても、出水時には掃流土砂により濁水化するためである。このような河川の濁水化は、河川のBOD,T-N,T-P,SSなどの数値を測定することにより確認され報告されている(例えば、非特許文献1参照。)。そして、この非特許文献1では、出水時の河川水質は掃流土砂による濁度だけでなく栄養塩濃度も上昇すると報告されている。
In closed water areas such as dam reservoirs, when large-scale flooding occurs due to rainfall, a large amount of turbidity such as soil particles flows from the catchment area and the stored water becomes turbid. The problem is that the so-called muddy water prolongation phenomenon occurs. This is because even clear river water that flows into the reservoir at the time of normal water becomes turbid due to the discharged sediment at the time of water discharge. Such river muddy water has been confirmed and reported by measuring numerical values such as BOD, T-N, T-P, and SS of rivers (for example, see Non-Patent Document 1). And in this
このような貯水池の洪水時の濁水長期化対策の一つとして、図1に示すように、ダム1の上流の貯水池2内の両岸に差し渡すようにして浮上式のフェンス3を設置した貯水設備が提案されている(例えば、非特許文献1、2または特許文献1参照。)。ここで、フェンス3は、フェンス本体30と、このフェンス本体30の一側縁を貯水池2内で浮上させるためのフロート31と、フェンス本体30の他側縁を湖底に向けて沈降させる重り32とから大略構成され、この重り32を固定した他側縁はフェンス3の最深部を形成することになる。
As one of the countermeasures for prolonging muddy water at the time of flood in such a reservoir, as shown in FIG. 1, a reservoir in which a floating
このような貯水設備によれば、貯水池2内に浮上式のフェンス3を設置することにより、貯水池2はフェンス3を境界として上流側2aと下流側2bとに区分される。貯水池2内に流入する流入水は上流側2aより最深部32の下をくぐり抜けて流れ、フェンス3により遮られた下流側2bの上層部では、流入水の流れの生じにくい部分を発生させることができる。以下、このフェンス下流の流入水の流れの生じにくい上層部の部分を分画層4と呼称し、その下方の部分を下層流入層5と呼称する。
According to such a water storage facility, by installing the
このように洪水時に備えて浮上式のフェンス3を設置すれば、洪水時の流入水は上流側2aから下流側2bへ流れてダム1から放水される際に、下流側2bでは主に下層流入層5を流れる。この下層流入層5の上層にあたる分画層4では、フェンス3の作用により成層が保護され、流入水が汚染されても汚染されずに維持されることができる。これにより、分画層4に滞留する滞留水の量を多くすれば、貯水池2内の貯留水の大部分が汚染から回避されることにより、放流水の濁水化期間の短縮化を図ることができる。
If the
このようなフェンス3の有無や、フェンス3を追加設置した場合の濁水化期間に与える影響は、非定常二次元モデルを用いたシミュレーションにより解析されている(例えば、非特許文献1参照。)。そこでは出水規模やフェンスあるいは選択取水対策の効果が内部フルード数との関係で検証され、フェンスを設置しない場合(無対策時)には、小規模かつ成層破壊の可能性が小さい出水でも濁水長期化が生じると報告され、フェンスの有効性が確認されている。
The presence / absence of the
また、貯水池2における洪水時の濁水シミュレーションも検討されている(例えば、非特許文献3参照。)。
濁水長期化対策には、フェンスの設置が有効であることは確認されているが、フェンスを浮上させて設置する際に、どのような仕様のフェンス(例えば、フェンス深さh)を何処に(又は湖底2cから最深部32までの距離=開口高さ)に設置すればよいかについては十分な検討がなされていない。設置者が設置環境を考慮して適宜判断して経験と勘により設置しているのが現状である。
Although it has been confirmed that the installation of a fence is effective as a countermeasure against prolonged muddy water, when a fence is levitated and installed, what type of fence (for example, fence depth h) is placed where ( Or sufficient examination is not made about whether it should install in the distance from the
フェンス仕様(フェンス深さh)が不適切であれば、分画層の有効体積を十分に確保できない。濁水長期化対策を講じる必要があるダム貯水池等では、洪水規模、地形等の濁水化に影響する諸条件がさまざまであるため、最適なフェンス仕様や設置位置を評価判断する基本的考法の提案が望まれる。 If the fence specification (fence depth h) is inappropriate, the effective volume of the fraction layer cannot be secured sufficiently. In dam reservoirs, etc. that need to take measures to prolong muddy water, there are various conditions that affect muddy water such as flood scale and topography. Therefore, a basic method for evaluating and determining the optimal fence specifications and installation location is proposed. Is desired.
また、非特許文献1には、フェンス3の有無や、フェンス3を追加設置した場合の濁水化期間に与える影響が現状フェンスとの関係で非定常二次元モデルを用いたシミュレーションにより解析されているが、フェンスを浮上させて設置する際に、フェンスをどこに設置すればよいか、またはフェンス深さをどの程度にすればよいかについては具体的に検討されていない。
Further, in
また、非特許文献3には、貯水池2における洪水時の濁水シミュレーションが検討されているだけであり、同様にフェンスを浮上させて設置する際に、フェンスをどこに設置し、またはフェンス深さをどの程度にすればよいかについては検討されていない。
In addition, Non-Patent
ダム貯水池等においては、洪水規模、地形等の濁水化に影響する諸条件がさまざまであるため全ての条件を考慮して濁水対策用のフェンスの設置位置やフェンス深さを評価したのでは、入力情報が膨大となり、かつ、条件が複雑となるとの課題がある。 In dam reservoirs, etc., there are various conditions that affect muddy water generation such as flood scale and topography. There is a problem that information is enormous and conditions are complicated.
現在、こうしたシミュレーション解析によるフェンスの設置位置やフェンス深さについての評価方法は、用いるモデルの適用性の整理を含め、明確化されていないと考えられる。 At present, the evaluation method of the fence installation position and fence depth by such simulation analysis is considered to be unclear including the arrangement of the model to be used.
そこで、本発明の目的は、必要とする入力データを絞っても設置位置の評価が定量的に行える濁水対策用のフェンスの設置位置の評価方法を提供することにある。 Therefore, an object of the present invention is to provide a method for evaluating the installation position of a fence for countermeasures against muddy water, which can quantitatively evaluate the installation position even if necessary input data is narrowed down.
そこで、本発明者等は、必要とする入力データを絞っても濁水対策用のフェンスのフェンス仕様及び設置位置の評価が行える手法について検討したところ、独自に実施した2次元水理実験の知見に基づいて、洪水規模および成層状態に応じた最適なフェンス仕様と設置位置の設定方法が提供できることを認め本発明に到達した。 Therefore, the present inventors examined a method for evaluating the fence specification and installation position of a fence for countermeasures against muddy water even if the necessary input data is narrowed down. Based on this, the present inventors have recognized that an optimum fence specification and installation position setting method according to flood scale and stratification can be provided.
すなわち、本発明は、濁水対策用のフェンスを貯水池の両岸に差し渡すように浮上させて配設することにより該フェンスの下流側の上層にフェンスにより分画された分画層を形成させ、濁水をフェンスをくぐり抜けて分画層下方の下層を流下させることにより貯水池の汚濁の長期化を避ける濁水対策用のフェンスの設置位置の評価方法であって、
浮上式のフェンス設置時に下流側表層に確保される分画層の安定度に注目した水理的指標を用いることにより、濁水対策用のフェンスの設置位置又はフェンス深さが適切であるか否かを定量的に評価する濁水対策用のフェンスの設置位置の評価方法である。
That is, the present invention forms a fractionation layer that is fractionated by a fence on the upper layer on the downstream side of the fence by placing the fence for preventing muddy water so as to pass over both banks of the reservoir. A method for evaluating the position of a fence for muddy water countermeasures that avoids prolonged pollution of the reservoir by passing through muddy water through the fence and flowing down the lower layer below the fractionation layer,
Whether the installation position or depth of the fence for muddy water countermeasures is appropriate by using a hydraulic index that focuses on the stability of the fractionation layer secured on the downstream surface layer when the floating fence is installed Is a method for evaluating the position of a fence for muddy water countermeasures.
この水理的指標は、次式(I)で示されるフルード数又は次式(II)で示されるリチャードソン数が例示される。 This hydraulic index is exemplified by the Froude number represented by the following formula (I) or the Richardson number represented by the following formula (II).
ここで、Fd:内部フルード数
Ri:リチャードソン数
v:流入流速(m/s)
g:重力加速度(9.8m/s2)
ρ1:下層水密度(g/cm3)
ρ2:上層水(下流側表層水)密度(g/cm3)
h:濁水対策用のフェンス深さ(m)である。
Where Fd: number of internal fluids
Ri: Richardson number
v: Inflow velocity (m / s)
g: Gravity acceleration (9.8m / s 2 )
ρ 1 : Lower layer water density (g / cm 3 )
ρ 2 : Upper layer water (downstream surface water) density (g / cm 3 )
h: Fence depth (m) for muddy water countermeasures.
このような濁水対策用のフェンスの設置位置の評価方法は、濁水対策用のフェンスの設置方法に応用することができる。例えば、前記水理的指標は、濁水流入量、貯水池の地形及び成層条件に関する関数であり、前記濁水流入量及び前記成層条件を設定することにより前記フェンスを設置すべき位置の必要な最低全水深条件を算出し、該算出された最低全水深条件を満たす位置に前記フェンスを設置することができる。 Such an evaluation method of the installation position of a fence for muddy water countermeasures can be applied to a method for installing a fence for muddy water countermeasures. For example, the hydraulic index is a function of turbid water inflow, reservoir topography, and stratification conditions, and setting the turbid water inflow and stratification conditions sets the minimum required total water depth at which the fence should be installed. Conditions can be calculated, and the fence can be installed at a position that satisfies the calculated minimum total water depth condition.
ここで、この成層条件は、例えば、成層厚さ及び前記成層を形成する成層水と該成層の下層を形成する下層水との水密度差である。 Here, the stratification condition is, for example, a stratification thickness and a water density difference between stratification water forming the stratification and lower layer water forming the lower layer of the stratification.
本発明に従えば、必要とする入力データを絞っても設置位置の評価が定量的に行える。これにより、必要データを絞ったマクロ的解析を行うことにより、濁水対策用のフェンス設置の対策計画段階等において、簡易で合理的な評価を行うことが可能となる。また、一般に大きな作業量を必要とする詳細な数値シミュレーションを大幅に合理化することが可能となる。 According to the present invention, the installation position can be quantitatively evaluated even if necessary input data is narrowed down. As a result, a simple and rational evaluation can be performed at the planning stage of countermeasures for the installation of fences for muddy water countermeasures, etc., by conducting a macro analysis focusing on necessary data. In addition, detailed numerical simulation that generally requires a large amount of work can be greatly rationalized.
以下に、本発明を実施するための最良の形態について、貯水池模型を用いた水理実験の概要について説明する。
[水理実験の概要]
(貯水池模型)
まず、図2は、図1の浮上式のフェンスを設置した貯水設備を水理模型により説明するための水理実験に利用される貯水池模型を横断面により説明する図である。以下の説明では、図1に示す貯水設備と同一機能を有する部位部材は、貯水池模型においても説明の簡略化のために同一番号乃至は同一名称を付して詳細な説明は省略することがある。
Below, the outline of the hydraulic experiment using a reservoir model is demonstrated about the best form for implementing this invention.
[Outline of hydraulic experiment]
(Reservoir model)
First, FIG. 2 is a diagram for explaining a reservoir model used for a hydraulic experiment for explaining the water storage facility provided with the floating fence shown in FIG. In the following description, the part member having the same function as the water storage facility shown in FIG. 1 is given the same number or the same name in the reservoir model to simplify the description, and detailed description may be omitted. .
この図2において、符号2は長手方向に延びる長方形の容器により構成された貯水池の模型(貯水池模型2)であり、この貯水池模型2は、ダムにより堰き止められた貯水池の要部を説明している。この貯水池模型2では、両岸に差し渡すようにして浮上式のフェンス3が設置されている。このフェンス3は、実施設においては、フェンス本体30と、フェンス本体30の一側縁を貯水池2内で浮上させるためのフロート31と、フェンス本体30の他側縁を湖底2cに向けて沈降させる重りとにより大略構成され、この重りを固定した他側縁はフェンス3の最深部32を形成している。
In FIG. 2,
また、予備実験による実験流量内でフェンスが流水に対してほぼ鉛直姿勢を保つことを確認した上で、実験模型では、モデルの簡略化のため不透水性の剛体フェンスを用いた。 In addition, after confirming that the fence maintained an almost vertical posture against the running water within the experimental flow rate in the preliminary experiment, an impermeable rigid fence was used in the experimental model to simplify the model.
このような貯水池模型2では、フェンス3を境界として上流側2aと下流側2bとに区分され、貯水池2内に流入する流入水は上流側2aより最深部32の下をくぐり抜けて下層流入層5を流れる。フェンス3により遮られた下流側2bの上層部には、流入水の流れの生じにくい分画層4が形成されている。
In such a
ここで、符号Hは貯水池模型2(又は貯水池2)の全水深、符号hはフェンス深さ、符号dはフェンス3の開口高さ(湖底2cから最深部32までの距離)であり、H=h+dを満たす。また、ρ1は下層流入層5の密度、ρ2は分画層4の密度(上層水密度)であり、一般に上層水密度ρ2は、温度の低い濁水流入水からなる下層水密度ρ1よりも低密度(ρ1>ρ2)である。
Here, symbol H is the total water depth of the reservoir model 2 (or reservoir 2), symbol h is the fence depth, symbol d is the opening height of the fence 3 (distance from the
この水理実験に採用した貯水池模型2の原型としては、幅200m、水深30m、最大設定流量750m3/秒の貯水池2を想定した。この貯水池2を横断して配設されたフェンスからフェンス幅15mを切り出して貯水池原型量とし、この貯水池原型量に対してフルード数相似で1/50の2次元水路による水理模型量とした。フェンスとしては深さ5m、10m、15mの3種類を用意し、これらの貯水池原型量及び水理模型量の詳細を表1に示した。
As a prototype of the
(実験)
純水に添加した食塩濃度差により下層水密度ρ1の密度を変化させるとともに流動状態および成層状態の変化を目視により観測するために下層水(流入水)のみに染料を添加して着色させた。
(Experiment)
In order to change the density of the lower layer water density ρ 1 due to the difference in salt concentration added to the pure water and to visually observe the change of the flow state and the stratified state, the dye was added to only the lower layer water (inflow water) and colored. .
表2に記載のとおり、上層水密度ρ2と下層水密度ρ1との密度差(ρ1−ρ2)Δρ及び濁水の流量を計画値に従って変化させた。貯水池模型2の適宜の箇所に電導度測定装置及び流速計を配設し、そのときの流入流速、電導度を測定した。その結果、貯水池横断方向の流速分布及び電導度分布の変化は無視できる程度に小さいことを大略確認し、また、フェンス下流の成層状態を示す密度ρ1、ρ2は計画値と大略同じであった。
As shown in Table 2, the density difference (ρ 1 −ρ 2 ) Δρ between the upper layer water density ρ 2 and the lower layer water density ρ 1 and the flow rate of muddy water were changed according to the planned values. An electrical conductivity measuring device and an anemometer were disposed at appropriate locations on the
つぎに、表2に記載の条件で、フェンス深さh、密度差Δρ、流量をそれぞれ変化させた場合の界面位置(躍層位置)の変動状況(成層界面上昇量)を可視化された下層水(流入水)と無色の上層水との境目を、フェンス位置を起点として25m地点、50m地点、75m地点、100m地点、150m地点、200m地点、250m地点について目視によりスケールで計測した。
(結果)
実験結果の解析から、成層界面位置は、図3に示すように、流動時には、下層静止時に対してフェンスによる分画層と下層水との成層界面の上昇が見られた。
Next, under the conditions shown in Table 2, the lower layer water visualized the fluctuation state (stratified interface rise amount) of the interface position (climbing layer position) when the fence depth h, density difference Δρ, and flow rate were changed, respectively. The boundary between (inflow water) and colorless upper layer water was measured on a scale by visual observation at 25 m, 50 m, 75 m, 100 m, 150 m, 200 m, and 250 m points starting from the fence position.
(result)
From the analysis of the experimental results, as shown in FIG. 3, the position of the stratification interface showed an increase in the stratification interface between the fractionated layer and the lower layer water due to the fence when the lower layer was stationary, as shown in FIG.
成層界面の上昇量ΔUは、流下方向でやや変化しているが、流下方向に配置した複数の計測点の変化量を平均させ、結果を表2に併せて示し、また、フェンス深さhごとに界面上昇量ΔUと流量との関係を整理し、図4(密度差Δρ:1000ppm)及び図5(密度差Δρ:2000ppm)にまとめた。 Although the amount of increase ΔU at the stratification interface slightly changes in the flow direction, the change amounts of a plurality of measurement points arranged in the flow direction are averaged, and the results are also shown in Table 2, and for each fence depth h FIG. 4 (density difference Δρ: 1000 ppm) and FIG. 5 (density difference Δρ: 2000 ppm) are summarized in FIG.
図4及び図5から、同一密度差Δρ及び同一フェンス深さhを対比すると、流量が大きくなるほど界面上昇量ΔUの増大が確認された。また、図4と図5との対比から、他の条件が同一であれば、密度差Δρが大きくなるほど界面上昇量ΔUが小さくなる傾向が認められた。 From FIG. 4 and FIG. 5, when the same density difference Δρ and the same fence depth h are compared, it is confirmed that the interface rise amount ΔU increases as the flow rate increases. Further, from the comparison between FIG. 4 and FIG. 5, it was recognized that the interface rise amount ΔU tended to decrease as the density difference Δρ increased if the other conditions were the same.
しかしながら、フェンス深さhに対しては、同一密度差Δρでは、フェンス深さh=10mとフェンス深さh=15mを対比するとフェンス深さh=15mの方が界面上昇量ΔUの増大傾向が確認され、全水深は一定のため、下層流入流速が大きくなるためと考えられたが、フェンス深さh=5mでは、フェンス深さh=10mの場合よりも変化が増大していた。 However, for the fence depth h, at the same density difference Δρ, when the fence depth h = 10 m and the fence depth h = 15 m are compared, the fence depth h = 15 m tends to increase the interface rise amount ΔU. It was confirmed that because the total water depth was constant, it was thought that the lower layer inflow velocity was larger, but the change was greater at the fence depth h = 5 m than at the fence depth h = 10 m.
以上の結果より、フェンス深さhの決定は、下層流入流速により単純に評価できないことが確認され、かつ、全水深が一定であれば、フェンス深さhに最適値が存在し、また、フェンス深さhを一定とすれば、成層状態が安定するために必要な全水深の必要条件があることが示唆された。 From the above results, it is confirmed that the determination of the fence depth h cannot be simply evaluated by the lower layer inflow velocity, and if the total water depth is constant, an optimum value exists for the fence depth h. It was suggested that if the depth h is constant, there is a requirement for the total water depth necessary to stabilize the stratified state.
そこで、本発明者等は、得られた結果を成層界面上昇量と内部フルード数又はリチャードソン数との関係で整理することを試み、結果を図6及び図7に示した。ここで、内部フルード数Fd及びリチャードソン数Riは、図2で定義される下記式(I)及び式(II)である。 Therefore, the present inventors tried to organize the obtained results by the relationship between the amount of increase in the stratification interface and the number of internal fluids or the number of Richardsons, and the results are shown in FIGS. Here, the internal fluid number Fd and the Richardson number Ri are the following formulas (I) and (II) defined in FIG.
この結果、成層界面の上昇量ΔUは、図6及び図7に示すとおり、流入流速と成層強度との関係の指標である内部フルード数Fdに比例し、リチャードソン数Riに反比例した関係を有することが確認できた。 As a result, as shown in FIGS. 6 and 7, the amount of increase ΔU at the stratification interface is proportional to the internal fluid number F d , which is an index of the relationship between the inflow velocity and the stratification strength, and inversely proportional to the Richardson number R i. It was confirmed that the
これにより、このような内部フルード数またはリチャードソン数と成層界面上昇量の関係を用いれば、密度差(Δρ=ρ1−ρ2)、濁水の流入流量(又は流入流速)等の簡易に設定又は測定可能な値から、フェンス深さhや設置位置によるフェンスの成層保持効果の定量的な評価が可能と考えられた。 This makes it easy to set the density difference (Δρ = ρ 1 −ρ 2 ), turbid water inflow rate (or inflow velocity), etc., using the relationship between the internal fluid number or Richardson number and the stratified interface rise. Or, from the measurable value, it was considered that the fence stratification retention effect by the fence depth h and the installation position could be quantitatively evaluated.
つぎに、具体的な実施例について説明するが、本発明はこの実施例には限定されない。
(実施例1)
貯水池等においては、温度分布を計測した別の多くのデータより、初期の成層状態の厚み(躍層位置)は、大略一定であることが確認されている。そこで、この実施例1では、初期の躍層位置が一定であることを利用し、この躍層位置をフェンス深さとして設定した場合のフェンス位置を設定する例である。
Next, specific examples will be described, but the present invention is not limited to these examples.
Example 1
In reservoirs and the like, it has been confirmed that the thickness of the initial stratification state (cracking position) is substantially constant from many other data obtained by measuring the temperature distribution. Therefore, in the first embodiment, the fact that the initial climbing layer position is constant is used, and the fence position is set when this climbing layer position is set as the fence depth.
まず、フェンス設置対象としての貯水池の鉛直方向の密度分布を測定する。貯水池に滞留する水の鉛直方向の密度分布は水平方向に略一様であるので、これにより初期の成層状態の厚み(躍層位置)hを設定する。また、この密度分布の測定結果より上層水密度ρ2と下層水密度ρ1の密度差Δρ(ρ1−ρ2)を求め、密度差Δρ(kg/m3)と下層密度ρ1(kg/m3)との比Δρ/ρ1を把握する。 First, the vertical density distribution of the reservoir as the fence installation target is measured. Since the vertical density distribution of the water staying in the reservoir is substantially uniform in the horizontal direction, the initial stratified thickness (climbing position) h is set. Further, the density difference Δρ (ρ 1 −ρ 2 ) between the upper layer water density ρ 2 and the lower layer water density ρ 1 is obtained from the measurement result of the density distribution, and the density difference Δρ (kg / m 3 ) and the lower layer density ρ 1 (kg The ratio Δρ / ρ 1 to / m 3 ) is grasped.
ついでこれらの値から、成層強度の水理的指標として,(Δρ/ρ1)*g=g’(m/s2)を演算し、設定した躍層位置(フェンス深さ)h(m)を用いてg’h(m2/s2)を算出する。ここで、gは重力加速度(m/s2)である。 Then, from these values, (Δρ / ρ 1 ) * g = g '(m / s 2 ) is calculated as a hydraulic index of stratification strength, and the set stratum position (fence depth) h (m) Is used to calculate g′h (m 2 / s 2 ). Here, g is the gravitational acceleration (m / s 2 ).
つぎに、式(I)のフルード数Fdについて、許容値aを設定して式(I’)とする。 Next, an allowable value a is set for the Froude number F d of the formula (I) to obtain the formula (I ′).
この式(I’)を流入流速v(m/s)について整理すると式(III)となる。 When this formula (I ') is arranged with respect to the inflow velocity v (m / s), formula (III) is obtained.
この式(III)より流入速度v(m/s)の最大値である流入速度の限界条件(最大流速)を求める。 From this equation (III), the limit condition (maximum flow velocity) of the inflow velocity which is the maximum value of the inflow velocity v (m / s) is obtained.
つぎに、貯水池等の単位幅流量をQ(m2/s),全水深をH(m),開口高さをd(m)(d=H−h)とすれば、流入流速vは、v=Q/d= Q/(H−h)(m/s)と一般化される。これにより、式(I)のフルード数Fdについて許容値aを設定し式(I’’)を得る。 Next, if the unit width flow rate of a reservoir or the like is Q (m 2 / s), the total water depth is H (m), and the opening height is d (m) (d = H−h), the inflow velocity v is v = Q / d = Generalized as Q / (H−h) (m / s). As a result, the allowable value a is set for the Froude number F d of equation (I) to obtain equation (I ″).
この式(I’’)を全水深Hで整理すると、式(IV)となる。 When this formula (I ″) is arranged at the total water depth H, formula (IV) is obtained.
この式(IV)において、フェンス深さhは測定された密度分布より設定された躍層位置であり、また、単位幅流量Qの値を設定すれば、全水深Hの最小値、すなわち、必要な全水深Hが算出される。 In this formula (IV), the fence depth h is the climax position set from the measured density distribution, and if the value of the unit width flow rate Q is set, the minimum value of the total water depth H, that is, necessary The total water depth H is calculated.
これにより、フェンス深さ及び単位幅流量を所定の値に設定すれば必要な全水深Hが求められるので、この全水深Hを最低全水深条件として、この全水深Hを満たす位置からフェンスの設置を選定すればよいことになる。通常、貯水池の湖底2cは、傾斜しているので全水深Hは設置位置より異なる。この全水深H(又は開口高さd)を満足させる湖底2cの特定位置にフェンス3を設置させれば、全水深H(最低全水深条件)を満足させることができ、これにより、全水深Hを満たすフェンス3の設置位置を特定することができる。
(実施例2)
つぎに、初期の成層状態の厚み(躍層位置)が、用いるフェンス3のフェンス深さhと一致していない場合の実施例について説明する。
Accordingly, if the fence depth and the unit width flow rate are set to predetermined values, the necessary total water depth H is obtained. Therefore, the fence is installed from the position satisfying this total water depth H, with this total water depth H as the minimum total water depth condition. It will be sufficient to select. Usually, since the bottom 2c of the reservoir is inclined, the total water depth H differs from the installation position. If the
(Example 2)
Next, an example in which the initial stratified thickness (climbing layer position) does not match the fence depth h of the
実際の貯水池等では成層状態がフェンス深さhと必ずしも一致しておらず、設置したフェンス深さhが分画層形成の上で有効に働いていない状況も考えられる。また、昼間は日射等の影響により表層の水温が上昇して、さらに気象条件等によりその程度は大きく異なる場合も想定される。 In an actual reservoir or the like, the stratified state does not necessarily coincide with the fence depth h, and the installed fence depth h may not work effectively in the formation of the fractional layer. In addition, the water temperature of the surface layer rises due to the influence of solar radiation during the daytime, and the degree may vary greatly depending on weather conditions.
そこで、この実施例では、初期の成層状態の厚み(躍層位置)がフェンス深さhと一致していない一例として、図8の温度分布9に示すように、分画層4の鉛直方向(深度方向)の温度分布が表層付近に行くに従って温度上昇が見られる貯水設備に本発明に係る評価法を適応する実施例を説明する。 Therefore, in this embodiment, as an example in which the initial stratified thickness (climbing layer position) does not match the fence depth h, as shown in the temperature distribution 9 of FIG. An embodiment will be described in which the evaluation method according to the present invention is applied to a water storage facility in which a temperature increase is observed as the temperature distribution in the depth direction) approaches the surface layer.
このような、温度分布9を有する貯水設備において、初期密度分布を2成層場に置き換えて仮定した解析を行ってもよいが、フェンス3の最深部32と略同一深さとなる下流側2bの分画層4の底面4a付近に撹拌装置(表層内循環流発生装置)としての一台または複数台の曝気装置8を配設する。
In such a water storage facility having a temperature distribution 9, an analysis assuming that the initial density distribution is replaced with a two-stratified field may be performed. However, the
このような曝気装置8を配設すれば、曝気装置8から排出される気泡8aにより分画層4内の滞留水は鉛直方向に撹拌できる。これにより分画層4の鉛直方向(深度方向)の温度分布は、無対策時の温度分布9が表層に向けて急激に温度が上昇しているのに対して、対策時の温度分布9’は、分画層4内の鉛直方向に略均一な温度分布を呈することになる。
If such an
このような表層内循環流発生装置を用いた密度分布改善技術を適用すれば、フェンス深さに対して成層厚みが極端に薄い場合において、成層厚みを厚くすることにより、成層状態の厚み(躍層位置)とフェンス深さとを一致させることができる。 If the density distribution improvement technology using such a circulating flow generator in the surface layer is applied, when the stratification thickness is extremely thin relative to the fence depth, by increasing the stratification thickness, Layer position) and fence depth can be matched.
また、このような密度分布改善技術を適用すれば、分画層4の密度分布は、初期の成層状態の密度分布とは異なるので、実施例1に従って、再び全水深Hを算出すれば、総合的にこの密度分布改善技術が、対象貯水池に適切であったか否かを数値をもって定量的に評価を行うこともできる。これにより、上述の実施例1の適用が可能となり、大略のフェンス設置位置を求めることができる。
(濁水対策検討システムの概要)
以上に説明した知見に基づき、図9に示すような本発明に係る濁水対策検討システムが提案される。この図9において検討に基本的に必要な情報は、濁水流入量、貯水池等の地形(水深)および初期条件における成層状態を示す鉛直密度分布である。濁水流入量、貯水池等の地形(水深)からは流速が演算され、また、初期条件における成層状態を示す鉛直密度分布は水温を計測することにより把握可能である。
Further, if such a density distribution improving technique is applied, the density distribution of the
(Outline of muddy water countermeasure study system)
Based on the knowledge explained above, a muddy water countermeasure examination system according to the present invention as shown in FIG. 9 is proposed. The basic information necessary for the examination in FIG. 9 is the turbid water inflow, the topography (water depth) of the reservoir, etc., and the vertical density distribution indicating the stratified state in the initial conditions. The flow velocity is calculated from the turbid water inflow and the topography (water depth) of the reservoir, etc., and the vertical density distribution indicating the stratified state in the initial condition can be grasped by measuring the water temperature.
これらの絞られた必要な情報を用いて、濁水対策用のフェンスによる分画層の安定性についての上述の式(I)又は式(II)で定義される水理的指標(フルード数又はリチャードソン数)を算出し、整理する。 Using these squeezed necessary information, the hydraulic index (Froude number or Richard) defined by the above formula (I) or (II) for the stability of the fractionation layer by the fence for countermeasures against muddy water Calculate the number of sons).
これらの水理的指標は,成層を増強する技術的手段を講じる場合などの特別の場合を除いては一定とみなし、この水理的指標として一定の許容値を想定すれば、濁水化現象に影響する諸要素が異なる状況下においても,濁水化抑制効果に関係する許容流速や最適なフェンス深さ等について、統一的かつ定量的な検討,評価が可能となる。 These hydraulic indicators are considered to be constant except in special cases such as when technical measures to enhance stratification are taken. It is possible to conduct a unified and quantitative examination and evaluation of the allowable flow velocity and the optimum fence depth related to the turbidation control effect even under different circumstances.
例えば、水理的指標を表す関係式(式Iまたは式II)において成層条件及び流入量に関する要素を固定することにより,フェンス深さhと全水深Hとの関係に基づいて設置位置(開口高さd)による対策効果を数値により定量的に比較評価することができ、これにより、フェンスの最適な設置場所の導入計画策定が可能となる。 For example, by fixing the elements related to the stratification condition and the inflow rate in the relational expression (Formula I or Formula II) representing the hydraulic index, the installation position (opening height) is based on the relationship between the fence depth h and the total water depth H. It is possible to quantitatively compare and evaluate the countermeasure effect according to (d) by numerical values, and thereby, it is possible to formulate an introduction plan for the optimum installation location of the fence.
また、上述の式(I)又は式(II)において、事前あるいは追加的な検討により想定される水理的指標の許容値aを設定することにより,許容される流入流速(許容流量)を求めることができ、これにより、想定される流入量における上述の対策効果が有効であるか否かの評価も可能となる。 In addition, in the above formula (I) or formula (II), an allowable inflow velocity (allowable flow rate) is obtained by setting an allowable value a of a hydraulic index assumed in advance or by additional examination. Thus, it is possible to evaluate whether or not the above-described countermeasure effect on the assumed inflow amount is effective.
さらに、初期成層条件がフェンス深さhと一致しない場合等には、貯水池内の密度分布を改善する技術(例えば表層内循環流発生装置)の適用を考慮することも有効と考えられ、これにより対策効果の増強提案も行える。 Furthermore, in cases where the initial stratification conditions do not match the fence depth h, it is considered effective to consider the application of a technology that improves the density distribution in the reservoir (for example, a circulating flow generator in the surface layer). Proposals can be made to increase the effectiveness of countermeasures.
さらに、貯水池の地形等の条件が複雑でその影響が考えられる場合には、その影響を評価するために数値シミュレーション等の高度化解析技術が必要となる場合もある。このような場合、本発明に係る上述の導入計画策定、対策効果の評価、対策効果の増強提案などの評価方法を事前に採用して総合評価することにより、数値シミュレーション等の高精度化技術の解析ケースを絞り込むことができる。これにより、本発明は、これらの高精度化技術に付加的に利用でき、効率的な解析が可能となる。 Furthermore, when conditions such as reservoir topography are complex and their effects are considered, sophisticated analysis techniques such as numerical simulation may be required to evaluate the effects. In such a case, by adopting an overall evaluation method such as the above-described introduction plan formulation, evaluation of countermeasure effects, and proposal for enhancement of countermeasure effects according to the present invention, it is possible to improve the accuracy of technology such as numerical simulation. Analysis cases can be narrowed down. As a result, the present invention can be additionally used for these high-precision techniques, and efficient analysis becomes possible.
以上、本発明を図面に基づいて説明したが、実際の効果の程度を評価するためは、各指標の値と実測結果との関連付けが必要と考えられる。また、この検討は単純化した流動条件を前提としていることから、洪水時の流入密度流の実態を確認した上で行うことが望ましいと考えられる。 As described above, the present invention has been described with reference to the drawings. However, in order to evaluate the actual effect level, it is considered necessary to associate the value of each index with the actual measurement result. In addition, since this study is based on the assumption of simplified flow conditions, it is desirable to confirm the actual state of inflow density flow during floods.
さらに、複雑な地形影響の評価等の必要に応じて、注目した鉛直混合過程を反映した数値シミュレーション等により予測精度を上げることも考えられる。 Furthermore, it is also possible to increase the prediction accuracy by numerical simulation reflecting the noted vertical mixing process, etc., as necessary for evaluating complicated terrain effects.
この検討フローによれば,ダム貯水池等の濁水対策用のフェンスによる濁水化抑制効果を最大化するための最適な設置位置,設置水深等を迅速・容易に判断することができると考えられる。 According to this study flow, it is considered possible to quickly and easily determine the optimal installation position, installation water depth, etc. for maximizing the muddy water suppression effect by fences for muddy water countermeasures such as dam reservoirs.
1:ダム
2:貯水池(貯水池模型)
2a:上流側
2b:下流側
2c:湖底
3:フェンス
30:フェンス本体
31:フロート(浮体)
32:重り(最深部)
4:分画層
4a:底面(分画層4と下層流入層5との成層界面)
5:下層流入層
8:撹拌装置(曝気装置又は表層内循環流発生装置)
9:温度分布(無対策時の温度分布)
9’:温度分布(対策時の温度分布)
1: Dam 2: Reservoir (reservoir model)
2a:
32: Weight (deepest part)
4:
5: Lower inflow layer 8: Stirring device (aeration device or surface layer circulating flow generation device)
9: Temperature distribution (temperature distribution when no measures are taken)
9 ': Temperature distribution (Temperature distribution during countermeasures)
Claims (4)
浮上式のフェンス設置時に下流側表層に確保される分画層の安定度に注目した水理的指標を用いることにより、濁水対策用のフェンスの設置位置又はフェンスの深さが適切であるか否かを定量的に評価する濁水対策用のフェンスの設置位置の評価方法。 A fence for preventing turbid water is levitated and arranged so as to pass to both banks of the reservoir, so that a fraction layer separated by the fence is formed on the upper layer downstream of the fence, and the turbid water passes through the fence. A method for evaluating the location of a fence for muddy water countermeasures that avoids lengthening of reservoir pollution by flowing down the lower layer below the fractionation layer,
Whether the location of the fence or the depth of the fence for muddy water countermeasures is appropriate by using a hydraulic index that focuses on the stability of the fractionation layer secured on the downstream surface layer when the floating fence is installed The evaluation method of the installation position of the fence for the muddy water countermeasure which evaluates quantitatively.
Ri:リチャードソン数
v:流入流速(m/s)
g:重力加速度(9.8m/s2)
ρ1:下層水密度(g/cm3)
ρ2:上層水(下流側表層水)密度(g/cm3)
h:フェンス深さ(m)である。 The hydraulic index is a Froude number represented by the following formula (I) or a Richardson number represented by the following formula (II): Evaluation methods.
Ri: Richardson number
v: Inflow velocity (m / s)
g: Gravity acceleration (9.8m / s 2 )
ρ 1 : Lower layer water density (g / cm 3 )
ρ 2 : Upper layer water (downstream surface water) density (g / cm 3 )
h: Fence depth (m).
前記水理的指標は、濁水流入量、貯水池の地形及び成層条件に関する関数であり、前記濁水流入量及び前記成層条件を設定することにより前記フェンスを設置すべき位置の必要な最低全水深条件を算出し、該算出された最低全水深条件を満たす位置に前記フェンスを設置することを特徴とする濁水対策用のフェンスの設置方法。 A method for installing a fence for muddy water countermeasures using the method for evaluating the installation position of the fence for muddy water countermeasures according to claim 1 or 2,
The hydraulic index is a function related to the amount of muddy water inflow, the topography of the reservoir, and the stratification conditions. By setting the amount of muddy water inflow and the stratification conditions, the minimum total water depth necessary for the position where the fence should be installed is determined. A fence installation method for muddy water countermeasures, characterized in that the fence is installed at a position that satisfies the calculated minimum total water depth condition.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007009329A JP4861203B2 (en) | 2007-01-18 | 2007-01-18 | Method for evaluating the location of a fence for muddy water countermeasures and method for installing a fence for muddy water countermeasures using the evaluation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2007009329A JP4861203B2 (en) | 2007-01-18 | 2007-01-18 | Method for evaluating the location of a fence for muddy water countermeasures and method for installing a fence for muddy water countermeasures using the evaluation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2008174967A JP2008174967A (en) | 2008-07-31 |
| JP4861203B2 true JP4861203B2 (en) | 2012-01-25 |
Family
ID=39702171
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2007009329A Active JP4861203B2 (en) | 2007-01-18 | 2007-01-18 | Method for evaluating the location of a fence for muddy water countermeasures and method for installing a fence for muddy water countermeasures using the evaluation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4861203B2 (en) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS61155508A (en) * | 1984-12-26 | 1986-07-15 | Oyo Chishitsu Kk | Cleaning method of turbid water in dam |
| JPH1060874A (en) * | 1996-08-15 | 1998-03-03 | Shiden Gijutsu Consultant:Kk | Water quality improvement device for closed water area by fence |
| JP3632000B2 (en) * | 2001-12-28 | 2005-03-23 | ゼニヤ海洋サービス株式会社 | Inflow adjustment fence for water quality improvement |
| JP2008174966A (en) * | 2007-01-18 | 2008-07-31 | Yonden Gijutsu Consultant:Kk | Stratification stabilizing device using fence coping with muddy water |
-
2007
- 2007-01-18 JP JP2007009329A patent/JP4861203B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2008174967A (en) | 2008-07-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Sukhodolov et al. | Case study: Effect of submerged aquatic plants on turbulence structure in a lowland river | |
| Juez et al. | Transport of suspended sediments under the influence of bank macro‐roughness | |
| An et al. | Three-dimensional modeling of turbid density currents in Imha Reservoir, South Korea | |
| Francalanci et al. | Effect of seepage-induced nonhydrostatic pressure distribution on bed-load transport and bed morphodynamics | |
| Helal et al. | Sustainability of a navigation channel in the Nile River: A case study in Egypt | |
| Anjum et al. | Investigating the turbulent flow behaviour through partially distributed discontinuous rigid vegetation in an open channel | |
| Tariq et al. | 3D numerical modeling of flow characteristics in an open channel having in-line circular vegetation patches with varying density under submerged and emergent flow conditions | |
| Gumiere et al. | MHYDAS‐Erosion: A distributed single‐storm water erosion model for agricultural catchments | |
| Jirka et al. | Mixing models for water quality management in rivers: continuous and instantaneous pollutant releases | |
| Becker et al. | Modelling the effects of thermal stratification on the oxygen budget of an impounded river | |
| Langford et al. | Upstream hydraulics of a run-of-the river hydropower facility for fish entrainment risk assessment | |
| Gerger et al. | Applicability of several soft computing approaches in modeling oxygen transfer efficiency at baffled chutes | |
| Chen et al. | Velocity distribution in open channels with submerged aquatic plant | |
| Jung et al. | Effect of abrupt topographical characteristic change on water quality in a river | |
| JP4861203B2 (en) | Method for evaluating the location of a fence for muddy water countermeasures and method for installing a fence for muddy water countermeasures using the evaluation method | |
| Meile | Influence of macro-roughness of walls on steady and unsteady flow in a channel | |
| Hirshfield | The impact of ice conditions on local scour around bridge piers | |
| Taherian et al. | Overview of outfall discharge modeling with a focus on turbulence modeling approaches | |
| Zhang et al. | Influence of vegetation lodging on the flow regime and resistance characteristic of overland flow | |
| Modalavalasa et al. | Experimental Insights Into the Hydraulic Behaviour of Sinuous Channel due to Vegetated Floodplain Corridor | |
| Morri et al. | Modeling the impact of riparian vegetation on flow structure and bed sediment distribution in rivers | |
| Duarte et al. | Pollutant dispersion modelling for Portuguese river water uses protection linked to tracer dye experimental data | |
| Li | Influence of submerged channel obstructions on flow patterns, turbulence, and bed morphology under ice cover-experimental study and numerical simulation | |
| Zhang et al. | Longitudinal mean velocity and turbulent kinetic energy within an emergent canopy in nonuniform flows | |
| Witt et al. | Standard Modular Hydropower: Case Study on Modular Facility Design |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20091211 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20110513 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20111101 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20111104 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4861203 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141111 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |