JP4861600B2 - Regular inspection support equipment for nuclear power plants - Google Patents
Regular inspection support equipment for nuclear power plants Download PDFInfo
- Publication number
- JP4861600B2 JP4861600B2 JP2003383269A JP2003383269A JP4861600B2 JP 4861600 B2 JP4861600 B2 JP 4861600B2 JP 2003383269 A JP2003383269 A JP 2003383269A JP 2003383269 A JP2003383269 A JP 2003383269A JP 4861600 B2 JP4861600 B2 JP 4861600B2
- Authority
- JP
- Japan
- Prior art keywords
- inspection
- periodic inspection
- camera
- periodic
- control computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007689 inspection Methods 0.000 title claims description 125
- 230000000737 periodic effect Effects 0.000 claims description 71
- 230000008439 repair process Effects 0.000 claims description 33
- 239000002184 metal Substances 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims 1
- 238000000034 method Methods 0.000 description 74
- 230000008569 process Effects 0.000 description 73
- 238000012545 processing Methods 0.000 description 30
- 238000010586 diagram Methods 0.000 description 16
- 230000008520 organization Effects 0.000 description 13
- 230000005856 abnormality Effects 0.000 description 11
- 238000007726 management method Methods 0.000 description 11
- FFBHFFJDDLITSX-UHFFFAOYSA-N benzyl N-[2-hydroxy-4-(3-oxomorpholin-4-yl)phenyl]carbamate Chemical compound OC1=C(NC(=O)OCC2=CC=CC=C2)C=CC(=C1)N1CCOCC1=O FFBHFFJDDLITSX-UHFFFAOYSA-N 0.000 description 10
- 230000002159 abnormal effect Effects 0.000 description 5
- 238000010248 power generation Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 230000007547 defect Effects 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000012216 screening Methods 0.000 description 3
- 230000004913 activation Effects 0.000 description 2
- 238000012550 audit Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000009835 boiling Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 239000003758 nuclear fuel Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、原子力発電所における定期検査支援に関わる。 The present invention relates to periodic inspection support in a nuclear power plant.
図1は、従来の定期検査に関わる概観図である。定期検査が必要な主たる箇所は原子炉建屋(2)内の制御棒等制御機械(6)と測定器(7)と核燃料を内包する原子炉圧力容器(4)である。両端矢印は信号の行き交う様を示す。
原子炉等の運転中を制御するのは隣接する中央制御室(1)で実施する。中央制御室(1)にはプラント総合制御装置(3)があり、盤の上には各種操作ボタンがある。プラント総合制御装置(3)は原子炉建屋(1)内の制御棒等制御機械(6)に信号を送ったり、測定器(7)からの信号を受けて原子炉運転状況を監視したりする。
定期検査時には、原子炉建屋内に扉(9)から各種定期検査器(8)を持ち込む。
定期検査の進み具合等の工程管理は、原子炉発電所敷地内の建物に配置せる定期検査管理計算機(11)により実施する。定期検査管理計算機(11)には多数のLANパソコン(12)がLAN接続されている。
従来の沸騰水型原子炉の定期検査工程を図2に示す(非特許文献1)。
定期検査は、監督機関が認めた審査機関の立会い審査による審査を受けて合否の判定が下される。詳細には図3に示すように、定期検査内容記載表の一例(非特許文献2)のように示される。燃料棒の毛筋程の貫通口漏洩を調べるシッピング検査、安全弁等の分解点検手入れと作動試験、ディーゼル機関外観検査等多岐に亘る。定期検査管理計算機(11)は、定期検査の進捗状況を確認するのに利用される。
Control of the operation of the nuclear reactor or the like is performed in the adjacent central control room (1). The central control room (1) has a plant integrated control device (3), and there are various operation buttons on the panel. The plant integrated control device (3) sends a signal to a control machine (6) such as a control rod in the reactor building (1) or receives a signal from the measuring device (7) to monitor a reactor operation state. .
At the time of periodic inspection, various periodic inspection devices (8) are brought into the reactor building from the door (9).
Process management, such as the progress of periodic inspections, is carried out by a periodic inspection management computer (11) placed in a building on the reactor power plant site. A large number of LAN personal computers (12) are LAN-connected to the periodic inspection management computer (11).
A regular inspection process for a conventional boiling water reactor is shown in FIG. 2 (Non-Patent Document 1).
Periodic inspections are judged by the auditing body approved by the supervisory body, and then passed or rejected. In detail, as shown in FIG. 3, it is shown as an example (non-patent document 2) of the periodic inspection content description table. It covers a wide variety of areas, such as shipping inspections that check for leaks through the fuel rod hair, disassembly and maintenance of safety valves, operation tests, and diesel engine appearance inspections. The periodic inspection management computer (11) is used to confirm the progress of the periodic inspection.
最近、原子力発電所に関わる諸規制が変わり、新品状態での品質が経年劣化しても所要の機能や品質が保てるなら原子力発電所の運転ができるようになってきた。しかし、定期検査等により欠陥が検出されて工事修理をする場合は元より、検査自身にも厳密さが要求され関係各所に報告し、場合によっては申請し許可を得ることが厳格になってきた。勝手に工事や部品の変更や修理をやらない、やらせないといったことが大事になってきた。
第三者的審査組織の審査とは言っても審査者の主観が入る。原子力発電所所有者側の判断と違いが出てくる。双方の見方が相容れない場合は長期に発電が停止し続けることも考えられる。
審査者と原子力発電所所有者側の双方の主観をできるだけ排除し、意見の違いが生じた時は審査が通らなければ発電できない訳であるから当然審査者の意見を入れ、その後で
簡易裁判所が如き(例えば監督機関)に速やかに判断して貰えかつ双方が納得する判断材料を迅速に提供する必要がある。
Recently, various regulations relating to nuclear power plants have changed, and even if the quality under new conditions deteriorates over time, the nuclear power plants can be operated if the required functions and quality can be maintained. However, when defects are detected by periodic inspections, etc., repair work is required, the inspection itself is required to be rigorous and reported to relevant places, and in some cases it has become strict to apply and obtain permission. . It has become important not to perform construction or change or repair parts without permission.
Even if it is an examination by a third party examination organization, the subjectivity of the examiner is included. This is different from the judgment of the nuclear power plant owner. If both sides do not agree, it is possible that power generation will stop for a long time.
The subjectivity of both the examiner and the owner of the nuclear power plant is eliminated as much as possible, and if there is a difference in opinion, it is impossible to generate electricity unless the examination passes. It is necessary to promptly provide such judgment materials (such as supervisory bodies) that can be quickly judged and understood by both parties.
本発明での定期検査内容記載表は、一例として図4に示すように電気工作物はiとして通し番号を付し設備はjとして番号を付すことにより、電気工作物iの設備jの検査を検査(i,j)と表し管理しやすくした。図5に示す電気工作物の検査の進捗状況を示す期間線図は、電気工作物に関する前回定期検査工程図を参照して作成される。図6に示す電気工作物iに属する設備の検査の進捗状況を示す期間線図は、電気工作物iに属する設備に関する前回定期検査工程図を参照して作成される。
図7は本発明の定期検査支援装置に関わる概観図である。図中の太線は情報伝達のための無線や光ケーブル等の接続を示す。
本発明の装置は、本発明の新型定期検査制御計算機(111)にLAN接続せる、中央制御室(1)内での定期検査を監視するために搬入せるカメラ1(121)及び、原子炉建屋(2)内での定期検査時に搬入せる監視するためのカメラ2(131)と定期検査器(8)及び、定期検査時に設置せる搬入出制御装置(140)及び、金具電源キー付きLAN接続のSパソコン(114)及び、金具電源キー付きLAN接続のSiパソコン(115)及び、LAN接続のSijパソコン(116)からなる。外部に接続せるパソコンは、金具電源キー付き外部接続のSSパソコン(113)である。
カメラ1(121)は、中央制御室(1)のプラント総合制御装置(3)で行われる制御棒動作確認試験等を監視記録する。
搬入出制御装置(140)は、新型定期検査制御計算機(111)にLAN接続されている搬入出制御計算機(141)と搬入出監視のカメラ3(142)とゲート(143)とからなり、搬入出制御計算機(141)はゲート(143)とカメラ3(142)をLAN接続し定期検査関連物資に付帯されているICタグから記録を読みとり現品の重量や形状と比較してゲート(143)を自動的に開閉制御しその状況をカメラ3(142)で監視記録する。
定期検査時に原子炉建屋(2)に搬入する定期検査器(8)を新型定期検査制御計算機(111)にLAN接続することにより、新型定期検査制御計算機(111)は電気事業者と第三者的審査組織とが合意に達した内蔵せる審査基準と定期検査器(8)検査の測定値を比較し検査を制御し、この状況をカメラ2(131)で監視記録する。
新型定期検査制御計算機(111)に内蔵するソフトウエアとLAN接続せる上記機器設備により定期検査を制御する。特に、作業順序は処理を施した時刻または送受信した時刻から処理を制御する。規定の電子署名等をチェックして前処理が完結していないならば、後処理の実施は制限され警告が発せられる。
As shown in FIG. 4 as an example, the periodic inspection content description table in the present invention inspects the inspection of the equipment j of the electric work i by attaching the serial number as i for the electric work and the number as j for the equipment. (I, j), which makes it easier to manage. The period diagram showing the progress of the inspection of the electric workpiece shown in FIG. 5 is created with reference to the previous periodic inspection process diagram regarding the electric workpiece. The period diagram indicating the progress of the inspection of the equipment belonging to the electric workpiece i shown in FIG. 6 is created with reference to the previous periodic inspection process diagram regarding the equipment belonging to the electric workpiece i.
FIG. 7 is an overview diagram relating to the periodic inspection support apparatus of the present invention. Thick lines in the figure indicate connections such as wireless and optical cables for information transmission.
The apparatus of the present invention is connected to the new periodic inspection control computer (11 1) of the present invention via a LAN, the camera 1 (121) carried in to monitor the periodic inspection in the central control room (1), and the reactor building (2) Camera 2 (131) and periodic inspection device (8) for monitoring that can be carried in at the time of periodic inspection, and a loading / unloading control device (140) that is installed at the time of periodic inspection, and LAN connection with bracket power key It consists of an S personal computer (114), a LAN connected Si personal computer (115) with a metal power key, and a LAN connected Sij personal computer (116). The externally connected personal computer is an externally connected SS personal computer (113) with a metal power key.
The camera 1 (121) monitors and records a control rod operation confirmation test and the like performed in the plant integrated control device (3) in the central control room (1).
The carry-in / out control device (140) comprises a carry-in / out control computer (141) connected to the new periodic inspection control computer (11) via a LAN, a carry-in / out monitoring camera 3 (142), and a gate (143). The output control computer (141) connects the gate (143) and the camera 3 (142) via LAN, reads the records from the IC tag attached to the periodic inspection-related materials, and compares the weight and shape of the actual product with the gate (143). Open / close control is automatically performed, and the situation is monitored and recorded by the camera 3 (142).
By connecting the periodic inspection device (8), which is carried into the reactor building (2) during the periodic inspection, to the new periodic inspection control computer (11 1) via a LAN, the new periodic inspection control computer (11 1) can be connected to an electric power company and a third party. The inspection standard is controlled by comparing the built-in inspection standard that has been agreed with the general inspection organization and the measured value of the periodic inspection device (8) inspection, and this situation is monitored and recorded by the camera 2 (131).
The periodic inspection is controlled by the above equipment that is connected to the LAN with the software built in the new periodic inspection control computer (11). In particular, the work order is controlled from the time when processing is performed or the time when transmission / reception is performed. If the pre-processing is not completed by checking a prescribed electronic signature or the like, post-processing is restricted and a warning is issued.
電気事業者と第三者的審査組織とが合意に達した審査基準を計算機に託しているため、検査結果と審査結果には思惑といったような人間の個人的判断が入りにくい。
検査状況はカメラで監視記録されているため検査に誤魔化しが少なく、後日の証拠となる。
担当者は淡々と自己職務を遂行すればよく、悩むことがなくなり疲れることが減り間違いが減る。定期検査が早く確実に遂行され管理費用が軽減され発電コスト低減になる。
今回検査作業を実施するに当たり、前回定期検査の録画を見てイメージトレイニングすることができるようになり、作業ミスが減り作業効率が向上する。
審査する側も、審査に誤りや行き過ぎがあれば賠償等の損害を受けるため不用意に審査時間を費やしたり、合否に対して過度の要求が少なくなるため審査が迅速に進む。
審査機関経営者も審査員の過剰審査により損害を蒙る可能性を排除するために、審査機関経営者は審査員に対する瞬時人事権や瞬時最終審査権を持つであろうし、監督機関は審査機関経営者の瞬時任命権を持つことになろうから、審査される電気事業者へ安心感を与えることができる。
Since the electric company and the third-party examination organization have agreed to the computer the examination standards that have been agreed upon, it is difficult for human judgments such as speculation to enter the examination results and examination results.
Since the inspection status is monitored and recorded by the camera, the inspection is less likely to be falsified and becomes evidence later.
The person in charge only needs to perform his / her own duties, and he / she does not have to worry and is less tired and less mistakes. Periodic inspection is performed quickly and reliably, management costs are reduced, and power generation costs are reduced.
In carrying out the inspection work this time, it becomes possible to perform image training by looking at the recording of the previous periodic inspection, thereby reducing work mistakes and improving work efficiency.
Even if the screening side has an error or oversight, the screening time will be inadvertently spent due to damages such as compensation, and the screening will proceed quickly because there will be less demand for pass / fail.
In order to eliminate the possibility that the management of the auditing organization will suffer damage due to excessive auditing by the auditors, the management of the auditing organization will have the right to instantaneous personnel and the final final auditing right to the auditor, and the supervisory authority will manage the auditing organization. It will give a sense of security to the electric utility to be judged.
所内監督者SはSパソコン(1 1 4 ) とS Sパソコン( 1 1 3 ) を管理する。図5に示す電気工作物i毎に施錠と開錠するパスワードを所有する。所内監督者Sは新型定期検査制御計算機( 11 1 )、カメラ1( 1 2 1 ) 、カメラ2( 1 3 1 ) と搬入出制御装置( 1 4 0 ) の電源を管理する。所内監督者Sは電気工作物iの検査に施錠と開錠をするパスワードK iを管理することにより現場責任者S iを管理下に置くが、現場には原則として立ちいれない。外部の審査機関との接触は所内監督者Sのみとし、S Sパソコン( 1 1 3 ) から暗号電子メールにて接触する。
現場責任者S iは電気工作物iに属する設備の検査を管理する。図6に示す電気工作物iの設
備j毎の検査の進捗状況を示す期間線図に沿って管理する。現場責任者S iはS iパソコン(115) を管理し、S i jパソコン( 1 1 6 ) も使用できる。検査( i, j) に施錠と開錠をするパスワードを管理することにより担当者S i jを管理下に置く。電気工作物iが開錠していなければ、図5 に示す電気工作物iの設備jの検査の進捗状況を示す期間線図を開くことはできない。定期検査工程に変更が生じた場合は図5、図6の工程期間線図を修正する権限を有する。
担当者S i jは、検査( i, j) を検査する。担当者S i jはS i jパソコン( 1 1 6 ) を使用できる。S i jパソコン( 1 1 6 ) は無線接続携帯端末として作業現場に持ち込むこともできる。
各人は電子署名を以って作業の指令または終わりとなす。受信者は5分以内に返信する。5
分以内に返信が無い時は、送信者は自分自身と常在者( 例えばカメラを常時モニターしている警備室) に携帯電話連絡する。更に無い時は送信者が受信者の権限を持ち各所に連絡することができる。
定期検査関係者は新型定期検査制御計算機( 111 )にI P接続せるカメラ付携帯電話を持つ義務があり圏外または電源切の場合は新型定期検査制御計算機( 111 )から警備室( 2 0 0 )に警報が発せられる。
審査機関と所内監督者Sと現場責任者S iと担当者S ijの独立を図る。
図8 、図9 、図10はフロー処理図である。図中、破線枠は社内監督者Sの行う処理を表し、長二点鎖線枠は電気工作物iに関わる現場責任者S iの行う処理を表し、実線枠は電気工作物iの設備jに関わる担当者S i jの行う処理を表している。
処理1 ( 5 0 1) は、定期検査開始。
処理2 ( 5 0 2) は、社内監督者Sが定期検査を開始するための処理である。
・社内監督者Sは、S Sパソコン( 1 1 3 ) 、Sパソコン( 1 1 4 ) に電源を金具キーから入れる。
・ Sパソコン( 1 1 4 ) から新型定期検査制御計算機( 1 1 1 ) に電源起動信号を送付する。カメラ1 ( 1 2 1 ) 、カメラ2 ( 1 3 1 ) 、搬入出制御計算機( 1 4 1 ) に起動信号を送付する。カメラ3 ( 1 4 2 ) は自動的に起動する。
警備室( 2 0 0 ) にモニター( 2 1 0 ) の監視を指令する。
・Sパソコン( 1 1 4 ) から社内監督者Sの電子署名により、新型定期検査制御計算機( 11 1 ) に内蔵する電気工作物の前回の図5に示す定期検査工程図から電気工作物iをパスワードO K iで開錠する( 工程期間線青) 。パスワードをK iに変更しK iで再度開錠する。
上記作業を各電気工作物に実施する。
・全現場責任者へ一斉に作業開始指示を電子メール及び携帯電話に送信する。
処理3 ( 5 0 3) は、現場責任者S iが社内監督者Sからの作業開始指示を電子メール及び携帯電話で受信することにより、電気工作物iの定期検査を開始するための処理である。
・現場責任者S iは、S iパソコン( 1 1 5 ) に電源を金具キーから入れる。
・S iパソコン( 1 1 5 ) から現場責任者S iの電子署名により電気工作物iの定期検査を開始する。
・電気工作物iに属する設備の前回の図6に示す定期検査工程図から各設備jをパスワードO
K i jで開錠する( 工程期間線青)。パスワードをK i jに変更しK ijで再度開錠する。
・工程期間線を青から黒に変換する。
・設備j毎の前回定期検査開始日をゼロとした工程期間黒線図の自動作成。
・設備j毎の今回定期検査開始日を今回日とした工程期間黒線図の自動作成。
・現場任者S i管理下の全担当者へ一斉に作業開始指示を電子メール及び携帯電話で送信する。
・( 全現場責任者は本作業を実施する)
処理4 ( 5 0 4) は、担当者S i jが現場責任者S iからの作業開始指示を電子メール及び携帯電話で受信することにより、電気工作物iの設備jの検査(i , j) 検査を開始する。
・担当者S i jは、S i jパソコン( 1 1 6) から電子署名により検査(i , j) の定期検査を開始する。
・検査中の工程期間黒線を赤線に変換する。
・現場写真デジタル撮影後、検査を開始する。
処理5 ( 5 0 5) は、担当社S i jの検査が、
「異常無し」であれば処理6 ( 5 0 6) に行く。
「異常無し」でなければ処理9 ( 5 0 9) に行く。
処理6 ( 5 0 6) は、検査が「異常無し」の場合の担当者S i jの処理である。
・担当者S i jは検査中の工程期間赤線を青点線に変換する。
・現場責任者S iに「異常無し」を電子署名後、電子メール及び携帯電話で送信する。
処理7 ( 5 0 7) は、検査が「異常無し」の場合の現場責任者S iの処理である。
・現場責任者S iは「異常無し」を現場で確認し、S ijパソコン( 1 1 6 ) から工程期間青点線を青実線に変換し、K i jで施錠する。
・現場責任者S iの管理下にある全設備に上記作業を実施する。
処理8 ( 5 0 8) は、電気工作物iに関わる検査が全て「異常無し」の場合の現場責任者S iの処理である。
・現場責任者S iは工程期間線が全て青実線であることを確認したら、電気工作物iの「異
常無し」を現場で確認し、各現場毎にS i jパソコン( 1 1 6 ) から検査前後のデジタル現場写真差異が規定値よりも小さいという比較結果と共に社内監督者Sに電気工作物iの検査完了を電子メールする。
・S iパソコン( 1 1 5 ) の電源を金具キーで切る。
・処理2 4 ( 5 2 4) に行く。
処理9 ( 5 0 9) は、検査が「異常有り」の場合の担当者S i jの処理である。
・担当者S i jは所与の緊急処理をする。例えば失火があった場合大声で周囲に知らせると同時に初期消火に務め、周囲者と発見者は携帯電話火災報知ボタンで警備室( 2 0 0 ) のモニター( 2 1 0 ) 監視者に知らせる。
・事態沈静後、現場責任者S iに「異常有り」を携帯電話または電子メール送信する。
・作業中の工程期間赤線を赤点線に変換する。
処理1 0 ( 5 1 0) は、検査が「異常有り」の場合の現場責任者S iの処理である。
・現場責任者S iは、現場確認後S iパソコン( 1 1 5 ) またはS i jパソコン( 1 1 6 ) で検査( i, j) をK i jで施錠する。
・現場責任者S iは、発電所名や設置場所や出力等の予め定められている形式の異常報告メモ画面の表示をする。
・担当者S i jに「画面埋めよ」と携帯電話及び電子メールで知らせる。
処理1 1 ( 5 1 1) は、担当者S i jがS i jパソコン( 1 1 6 ) で異常報告メモ画面に設備や日時や検査状況等の必要項目を記載し電子署名後、現場責任者S iに携帯電話及び電子メールで知らせる。
処理1 2 ( 5 1 2) は、現場責任者S iが異常報告メモ画面に記載ミスがないことを確認し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理1 3 ( 5 1 3) は、社内監督者SがSパソコン( 1 1 4 ) で異常報告メモに署名後、C D - R OMを介してS Sパソコン( 1 1 3 ) から社外の審査機関にメモを電子送信する。
処理1 4 ( 5 1 4) は、現場責任者S iが担当者S ijと製造メーカ等の関係者を呼び修理に関する検討をした議事録を新型定期検査制御計算機( 1 1 1 ) に入力記憶する。
処理1 5 ( 5 1 5) は、処理1 4 ( 5 1 4) での検討結果が、
「修理必要」であれば処理2 0 ( 5 2 0) に行く。
「修理必要」でなければ処理1 6 ( 5 1 6) に行く。
処理1 6 ( 5 1 6) は、「修理必要」でない場合の現場責任者S iの処理である。現場責任者Siは異常報告メモの表題を「修理不要申請書(案)」と訂正し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理1 7 ( 5 1 7) は、「修理必要」でない場合の社内監督者Sの処理である。
・社内監督者SはSパソコン(1 1 4 ) で「修理不要申請書( 案) 」に電子署名し「修理不要申請書」とする。
・C D - R O Mを介してS Sパソコン( 1 1 3 ) から社外の審査機関に電子送信する。審査機関からの「修理不要受理」を受信する。
審査機関から「修理必要」を受信した場合は、現場責任者S iに審査機関と協議させる。
「修理必要」となった場合は処理2 1 ( 5 2 1 )へ行く。
・Sパソコン( 1 1 4 )から「修理不要受理」を現場責任者S iに携帯電話及び電子メールで知らせ検査続行を指示する。
処理1 8( 5 1 8)は、現場責任者S iが「修理不要受理」を担当者S i jに転送し、パスワードK i jで検査( i , j) を開錠し検査続行を指示する。
処理1 9( 5 1 9)は、担当者S i jが工程期間赤点線を赤線に変換し検査を続行する。
・処理4 5 0 4)へ行く。
処理2 0( 5 2 0)は、処理15 ( 5 1 5 ) の「修理必要」な場合である。
処理2 1( 5 2 1)は、「修理必要」な場合の現場責任者S iの処理である。現場責任者S iは異常報告メモの表題を「修理必要申請書(案)」と訂正し電子署名後、社内監督者Sに携帯電話及び電子メールで知らせる。
処理2 2( 5 2 2)は、「修理必要」な場合の社内監督者Sの処理である。
・社内監督者SはSパソコン(1 1 4 ) で「修理申請書( 案) 」に電子署名し「修理申請書」とする。
・S Sパソコン( 1 1 3 ) から審査機関にC D - R O Mから送信する。審査機関からの「修理申請書受理」を受信する。
・Sパソコン( 1 1 4 ) から「修理申請書受理」を現場責任者S iに電子メールすると共に修理計画書作成指示。
・社内監督者Sは電子署名S ij、S i、Sのある「修理計画書」が入っているC D - R O Mを審査機関に送付する。
・審査機関から「修理計画書受理」を受信後、現場責任者S iに「修理開始」を携帯電話及び電子メールで知らせる。
審査機関から「修理計画書要修正」を受信した場合は、現場責任者S iに審査機関と協議させる。修正した場合は改訂版を「修理計画書」とする。
処理2 3( 5 2 3)は、現場責任者S iが「修理計画書受理」を担当者S i jに転送し、検査( i ,j) をパスワードK ijで開錠し「修理開始」を携帯電話及び電子メールで知らせる。
・修理完了後、処理4 ( 5 0 4 ) に戻る。
処理2 4( 5 2 4)は、処理8 ( 5 0 8 ) の電気工作物iの検査が完了した場合の社内監督者Sの処理である。
・社内監督者Sは現場責任者S iからの完了受信後、検査前後現場写真比較差異小結果を確
認し電子署名後、パスワードK iで電気工作物iの検査に施錠する。
・S Sパソコン( 1 1 3 ) から、電気工作物iの立会い審査を審査機関に申し込む。
・( 電気工作物検査が全て完了し、全ての工程期間線が青線になるまで続ける)
処理2 5 ( 5 2 5) は、審査機関による立会い審査である。
不合格なら社内監督者SがパスワードK iで開錠。処理3 ( 5 0 3 ) に戻る。
合格なら処理2 6 ( 5 2 6 ) に進む。
処理2 6( 5 2 6)は、処理25 ( 5 2 5 ) の審査機関による立会い審査に合格した場合の社内監督者Sの処理である。
・社内監督者Sは全ての電気工作物の工程期間線が青線であることを確認し、定期検査器
( 8 ) 、カメラ1 ( 1 2 1 ) 、カメラ2 ( 1 3 1 ) の撤収を余計な物がないことの確認のための現場掃除機掛けをした写真で確認する。
・搬入出制御計算機( 1 4 1 ) の物質収支確認後電子署名し、電源切信号を送信する。
カメラ3 ( 1 4 2 ) の電源は自動的に切れる。
・S Sパソコン( 1 1 3 ) から定期検査終了を審査機関に電子メールを送信し、総合立会い審査を申し込む。
処理2 7( 5 2 7)は、審査機関による総合立会い審査である。
電気工作物iが不合格ならK iで開錠し処理3 ( 5 0 3 ) に戻る。
合格なら処理2 8 ( 5 2 8 ) に進む。
処理2 8( 5 2 8)社内監督者Sは審査機関から合格書を受理する。
・新型定期検査制御計算機( 1 1 1 ) に電源切信号を送信する。
・S Sパソコン( 1 1 3 ) 、Sパソコン(1 1 4 ) の電源を金具キーで切る。
定期検査終了。
The in-house supervisor S manages the S PC (1 1 4) and the SS PC (1 1 3). Each electric work i shown in FIG. 5 has a password for locking and unlocking. The in-house supervisor S manages the power sources of the new periodic inspection control computer (11 1), the camera 1 (1 2 1), the camera 2 (1 3 1), and the carry-in / out control device (1 4 0). The in-house supervisor S puts the site manager S i under control by managing the password K i for locking and unlocking the inspection of the electric work i, but as a general rule, it cannot stand on the site. Contact with the external reviewing organization is limited to the in-house supervisor S, and contacts are made from the SS personal computer (1 1 3) via encrypted e-mail.
The site manager Si manages the inspection of the equipment belonging to the electric workpiece i. Management is performed in accordance with a period diagram showing the progress of inspection for each facility j of the electric workpiece i shown in FIG. The site manager Si manages the Si personal computer (115) and can also use the S ij personal computer (1 1 6). The person in charge S ij is put under control by managing the password for locking and unlocking in the inspection (i, j). If the electric workpiece i is not unlocked, the period diagram indicating the progress of the inspection of the equipment j of the electric workpiece i shown in FIG. 5 cannot be opened. If there is a change in the periodic inspection process, it has the authority to modify the process period diagrams in FIGS.
The person in charge S ij inspects the inspection (i, j). The person in charge S ij can use the S ij personal computer (1 1 6). The S ij personal computer (1 1 6) can also be brought into the work site as a wireless connection portable terminal.
Each person will sign or end the work with an electronic signature. The recipient will reply within 5 minutes. Five
If there is no response within minutes, the sender contacts the mobile phone to himself and a permanent person (eg, a security room that constantly monitors the camera). When there is no more, the sender has the authority of the receiver and can contact each place.
The person in charge of periodic inspections is obliged to have a camera-equipped mobile phone that can be connected to the new periodic inspection control computer (11 1) by IP, and in the case of out-of-service or power-off, the new periodic inspection control computer (11 1) is transferred to the security room (2 0 0) An alarm is issued.
The inspector, the in-house supervisor S, the site manager S i and the person in charge S ij will become independent.
8, 9 and 10 are flowcharts. In the figure, the broken line frame represents the process performed by the in-house supervisor S, the long two-dot chain line frame represents the process performed by the site manager Si related to the electric workpiece i, and the solid line frame represents the equipment j of the electric workpiece i. It represents the processing performed by the person in charge S ij involved.
Process 1 (5 0 1) starts periodic inspection.
Process 2 (5 0 2) is a process for the internal supervisor S to start a periodic inspection.
・ In-house supervisor S turns on the power to the SS PC (1 1 3) and S PC (1 1 4) from the bracket key.
・ Send a power activation signal from the S PC (1 1 4) to the new periodic inspection control computer (1 1 1). An activation signal is sent to the camera 1 (1 2 1), the camera 2 (1 3 1), and the carry-in / out control computer (1 4 1). Camera 3 (1 4 2) is automatically activated.
Command the guard room (2 0 0) to monitor the monitor (2 1 0).
・ By the electronic signature of the in-house supervisor S from the S personal computer (1 1 4), the electric work i is obtained from the periodic inspection process diagram shown in the previous figure 5 of the electric work built in the new periodic inspection control computer (11 1). Unlock with password OK i (process period line blue). Change password to Ki and unlock again with Ki.
The above work is carried out on each electric workpiece.
・ Send work start instructions to all site managers simultaneously by e-mail and mobile phone.
Process 3 (5 0 3) is a process for the site manager S i to start the periodic inspection of the electrical work i by receiving the work start instruction from the in-house supervisor S by e-mail and mobile phone. is there.
・ The site manager Si turns on the power to the Si personal computer (1 1 5) from the bracket key.
・ Start periodic inspection of electrical work i from the Si personal computer (1 1 5) with the electronic signature of the site manager Si.
・ Each equipment j is password O from the periodic inspection process diagram shown in the previous figure 6 for equipment belonging to electrical work i
Unlock with K ij (process period line blue). Change the password to K ij and unlock again with K ij.
Convert the process period line from blue to black.
・ Automatic creation of a black line diagram of the process period with the previous periodic inspection start date for each equipment j as zero.
・ Automatic creation of a black line diagram of the process period with the current periodic inspection start date for each equipment j as the current date.
・ Send the work start instruction to all persons under the supervision of the on-site manager Si at the same time by e-mail and mobile phone.
・ (All site managers carry out this work)
In process 4 (5 0 4), the person in charge S ij receives the work start instruction from the site manager S i by e-mail and a mobile phone, thereby inspecting the equipment j of the electric workpiece i (i, j). Start inspection.
-The person in charge S ij starts a periodic inspection (i, j) from the S ij personal computer (1 1 6) by electronic signature.
-Convert black line to red line during the process period under inspection.
・ Begin inspection after digital photography of on-site photographs.
Process 5 (5 0 5) is the inspection of the company in charge S ij
If there is no abnormality, go to Process 6 (5 0 6).
If there is no “abnormality”, go to Process 9 (5 0 9).
Process 6 (5 0 6) is the process of the person in charge S ij when the inspection is “no abnormality”.
The person in charge S ij converts the red line during the process being inspected into a blue dotted line.
・ Send “no abnormality” to the site manager Si and send it by e-mail and mobile phone.
Process 7 (5 0 7) is a process of the site manager Si when the inspection is “no abnormality”.
・ The site manager S i checks “no abnormality” on site, converts the blue dotted line from the S ij personal computer (1 16) to the blue solid line, and locks it with K ij.
-Perform the above operations on all facilities under the control of the site manager Si.
Process 8 (5 0 8) is a process of the site manager Si when all the inspections related to the electric workpiece i are “no abnormality”.
・ After confirming that the process period lines are all blue solid lines, the site manager S i confirms that there is no abnormality in the electrical work i at the site and inspects each site from the S ij personal computer (1 16) An e-mail is sent to the in-house supervisor S about the completion of the inspection of the electric work i together with the comparison result that the difference between the front and back digital field photographs is smaller than the prescribed value.
・ Turn off the power of the Si PC (1 1 5) with the bracket key.
・ Go to
Process 9 (5 0 9) is the process of the person in charge S ij when the inspection is “abnormal”.
• The person in charge S ij performs the given emergency process. For example, if there is a misfire, inform the surroundings loudly and at the same time serve as an initial fire extinguisher, and the surrounding person and the discoverer inform the monitor (2 1 0) monitor in the security room (2 0 0) with the mobile phone fire alarm button.
・ After the situation has subsided, send “Abnormal” to the site manager Si.
-Convert the red line during the working process into a red dotted line.
・ The site manager S i locks the inspection (i, j) with K ij on the S i personal computer (1 1 5) or S ij personal computer (1 1 6) after confirming the site.
The site manager Si displays an abnormality report memo screen in a predetermined format such as the power plant name, installation location, and output.
・ Inform the person in charge S ij that “Fill the screen” with a mobile phone or e-mail.
In
In
If “repair is necessary”, go to
If it is not “repair required”, go to
・ In-house supervisor S digitally signs the “Repair Not Required Application Form (Draft)” on the S PC (1 14) and makes it “Repair Not Required Application Form”.
・ Send electronically from an SS PC (1 1 3) to an external examination organization via CD-ROM. Receive "Repair not accepted" from the reviewing organization.
If “repair required” is received from the auditing organization, the site manager Si is consulted with the auditing organization.
If “repair is necessary”, go to
・ Instruct the site manager Si to receive "no repair required" from the S PC (1 1 4) via mobile phone and e-mail, and instruct the inspection to continue.
In the process 18 (5 1 8), the site manager S i transfers “repair not accepted” to the person in charge S ij, unlocks the inspection (i, j) with the password K ij and instructs to continue the inspection.
In process 19 (5 1 9), the person in charge S ij converts the red dotted line into a red line during the process period and continues the inspection.
-Go to process 4 5 0 4).
Process 20 (5 2 0) is a case where “repair is necessary” of process 15 (5 1 5).
Process 22 (5 2 2) is a process of the internal supervisor S when “repair is necessary”.
・ In-house supervisor S electronically signs the “repair application (draft)” on the S PC (1 14) and makes it a “repair application”.
・ Send from CD-ROM from SS PC (1 1 3) to reviewing organization. Receive “Repair Application Acceptance” from the certification body.
-E-mail "Repair Application Acceptance" from the S PC (1 1 4) to the site manager Si and instruct to create a repair plan.
・ In-house supervisor S sends a CD-ROM containing a “repair plan” with electronic signatures S ij, S i, and S to the examination body.
・ After receiving "Repair Plan Acceptance" from the inspection body, inform the site manager Si of "Start Repair" via mobile phone and e-mail.
In the case where “repair plan required correction” is received from the inspection body, the site manager Si is consulted with the inspection body. When amended, the revised version shall be the “Repair Plan”.
・ After repair is completed, return to Process 4 (5 0 4).
Process 24 (5 2 4) is a process of the internal supervisor S when the inspection of the electric workpiece i in process 8 (5 0 8) is completed.
-After receiving the completion from the site manager S i, the in-house supervisor S confirms the results of the comparison of the on-site photos before and after the inspection, and after electronic signature, locks the inspection of the electrical work i with the password Ki.
-Apply for the witnessed examination of electrical work i from the SS personal computer (1 1 3) to the examination body.
・ (Continue until all electrical work inspection is completed and all process period lines become blue lines)
If unsuccessful, internal supervisor S unlocks with password Ki. Return to process 3 (5 0 3).
If it passes, the process proceeds to process 2 6 (5 2 6).
Process 26 (5 26) is the process of the internal supervisor S when it passes the witness examination by the examination body of Process 25 (5 25).
・ In-house supervisor S confirms that the process period line of all electric works is a blue line, and withdraws periodic inspection equipment (8), camera 1 (1 2 1), camera 2 (1 3 1) Check with a photo of a vacuum cleaner on site to confirm that there are no extra items.
-After confirming the material balance of the loading / unloading control computer (1 4 1), digitally sign and send a power off signal.
The camera 3 (1 4 2) is automatically turned off.
-Send an e-mail from the SS PC (1 1 3) to the examination body to confirm the end of the periodic inspection, and apply for a general witness examination.
Process 27 (5 2 7) is a comprehensive witnessed audit by a certification body.
If electric work i is unacceptable, unlock with K i and return to process 3 (5 0 3).
If it passes, proceed to
-Send a power-off signal to the new periodic inspection control computer (1 1 1).
・ Turn off the power of the SS PC (1 1 3) and S PC (1 1 4) with the bracket key.
Periodic inspection ends.
原子炉建屋(2)内にある核燃料を内包し発燃させる原子炉圧力容器(4)において、蓋を開けて定期検査をする際、原子炉圧力容器(4)全液面を監視する広角レンズ付き8mmカメラ1台と原子炉圧力容器(4)全液面を数台で監視する通常レンズ8mmカメラ数台と録画装置とからなることを特徴とする監視装置。異物落下を監視するために液面の波紋を監視することを特徴とする。
小さいものの落下確認は難しい。しかし波紋であるなら大きく長い時間兆候が残るため落下物があったと言うことが確認できる。波紋が生じた時刻とおおよその位置を広角レンズ付き8mmカメラの録画から特定し、その数秒前からの通常レンズ8mmカメラの録画を再生することにより落下物の特定をすることができる。
原子炉圧力容器(4)蓋開け後原子炉圧力容器(4)内を検査しない期間は、原子炉圧力容器(4)への落下物防止のためにプラスチックの透明蓋をするかまたは原子炉圧力容器(4)の周囲に約2mの高さの透明の覆いをする。
原子炉圧力容器(4)の観察は、検査員のポケット等から物が落下するのを防ぐために、自走式通常望遠カメラまたは自走式水中望遠カメラを遠隔操作する。
A wide-angle lens that monitors the entire liquid level of the reactor pressure vessel (4) when performing periodic inspection by opening the lid in the reactor pressure vessel (4) that encloses and burns the nuclear fuel in the reactor building (2) A monitoring device comprising one 8mm camera with a reactor and a reactor pressure vessel (4) several regular lens 8mm cameras that monitor the whole liquid level with several units and a recording device. In order to monitor the fall of the foreign matter, the liquid surface ripple is monitored.
It is difficult to confirm the fall of small objects. However, if it is a ripple, it can be confirmed that there was a fallen object because the sign remains large and long. The time and the approximate position of the ripples are identified from the recording of the 8mm camera with a wide-angle lens, and the fallen object can be identified by playing back the recording of the normal lens 8mm camera several seconds before.
During the period when the reactor pressure vessel (4) is not inspected after the reactor pressure vessel (4) is opened, a plastic transparent lid or a reactor pressure vessel is used to prevent falling objects to the reactor pressure vessel (4). Put a transparent cover about 2m high around (4).
Observation of the reactor pressure vessel (4) is performed by remotely operating a self-propelled normal telephoto camera or a self-propelled underwater telephoto camera in order to prevent an object from falling from an inspector's pocket or the like.
部品性能は経年劣化する。所与の性能が維持できれば使用し続けることができる。維持基準に従って定期検査は厳重にされねばならない。効率よくやらねばコスト上昇となる。検査員が保守的になり萎縮する。担当者は本装置の制御に従って淡々と作業をすればよいから、余計な配慮をすることが不必要になり疲れない。
電力会社は、電力自由化で供給義務がなくなり利益追求のみでも許されるようになった。現在電力会社は火力・原子力・風力発電、配電、分散電源販売、通信事業と多岐に亘る経営を行っている。原子力発電以外を売却し異常なまでに批難されることがある原子力発電だけの専門会社になるか、既存の原子力発電専門会社が一括買い上げしたほうが効率よくなることがあり得る。専門会社が本装置を採用することにより、設備管理点検に手順や連絡上の漏れがなくなり効率がよくなる。効率が良い電子取引的特長を備えた本装置を採用すれば1会社1発電所になっても発電コストは上昇しない。また、検査に不備があったとしても装置の欠陥であり外部委員会の助言を得て改良すればよいから社員が傷つくことが少なくなる。特に、不祥事毎に社長が辞任では人的資源が枯渇する。管理部門上流に行く程希少になる人的資源の保護が図れる。
Component performance degrades over time. If a given performance can be maintained, it can continue to be used. Periodic inspections must be rigorous according to maintenance standards. If you do it efficiently, the cost will increase. The inspector becomes conservative and shrinks. Since the person in charge only needs to work in accordance with the control of this apparatus, it is unnecessary to take extra care and do not get tired.
Electric power companies have become free from power supply obligations due to the liberalization of electric power and are allowed to pursue profits alone. Currently, electric power companies have a wide range of management including thermal power, nuclear power, wind power generation, power distribution, distributed power supply sales, and telecommunications business. It may be more efficient to become a specialized company that only sells non-nuclear power and be criticized to an anomaly, or an existing nuclear power company to purchase in bulk. By adopting this equipment by a specialized company, there will be no omissions in procedures and communication in equipment management inspection, and efficiency will be improved. By adopting this device with efficient electronic trading features, power generation costs will not increase even if one company has one power plant. Moreover, even if there is a defect in the inspection, it is a defect of the device, and it is less likely to hurt employees because it can be improved with the advice of the external committee. In particular, if the president resigns for each scandal, human resources will be exhausted. It is possible to protect human resources that become scarce as you go upstream.
1は中央制御室。
2は原子炉建屋。
3はプラント総合制御装置。
4は原子炉圧力容器。
6は制御棒等制御機械。
7は測定器。
8は定期検査器。
9は扉。
11は定期検査管理計算機。
12はLAN接続パソコン。
13は外部接続パソコン。
14は電子メール接続パソコン。
111は新型定期検査制御計算機。
113はSSパソコン。
114はSパソコン。
115はSiパソコン。
116はSijパソコン。
121はカメラ1。
131はカメラ2。
140は搬入出制御装置。
141は搬入出制御計算機。
142はカメラ3。
143はゲート。
200は警備室。
210はモニター。
501は処理1。
502は処理2。
503は処理3。
504は処理4。
505は処理5。
506は処理6。
507は処理7。
508は処理8。
509は処理9。
510は処理10。
511は処理11。
512は処理12。
513は処理13。
514は処理14。
515は処理15。
516は処理16。
517は処理17。
518は処理18。
519は処理19。
520は処理20。
521は処理21。
522は処理22。
523は処理23。
524は処理24。
525は処理25。
526は処理26。
527は処理27。
528は処理28。
1 is a central control room.
2 is a reactor building.
3 is a plant integrated control device.
4 is a reactor pressure vessel.
6 is a control machine such as a control rod.
7 is a measuring instrument.
8 is a periodic inspection device.
9 is a door.
11 is a periodic inspection management computer.
12 is a LAN connection personal computer.
13 is an externally connected personal computer.
14 is an e-mail connection personal computer.
111 is a new periodic inspection control computer.
113 is an SS personal computer.
114 is an S personal computer.
115 is a Si personal computer.
116 is a Sij personal computer.
Reference numeral 121 denotes a
131 is a
140 is a loading / unloading control device.
141 is a carry-in / out control computer.
Reference numeral 142 denotes a
143 is a gate.
200 is a security room.
210 is a monitor.
Reference numeral 501 denotes
502 is
Reference numeral 506 denotes processing 6.
Reference numeral 507 denotes
Reference numeral 508 denotes processing 8.
510 is process 10.
Reference numeral 511 denotes
512 is
Reference numeral 513 denotes
Reference numeral 514 denotes
Reference numeral 515 denotes
Reference numeral 518 denotes processing 18.
Reference numeral 520 denotes
Reference numeral 521 denotes processing 21.
Reference numeral 523 denotes processing 23.
Reference numeral 525 denotes
Claims (1)
搬入出制御装置(140)は、当該定期検査制御計算機(111)にLAN接続されている搬入出制御計算機(141)及び、カメラ3(142)及び、ゲート(143)からなり、定期検査関連物資に付帯されているICタグから記録を読みとり現品の重量や形状と比較してゲート(143)の開閉を制御しその状況を監視記録し、
定期検査制御計算機(111)は、検査測定値が正常であると言える審査基準を内蔵し、審査基準と定期検査器(8)の測定値を比較することができ、カメラ1(121)とカメラ2(131)を介して定期検査状況を記録でき、修理に関する検討した議事録を入力しておくことができ、
検査誤魔化しを抑制することを特徴とする原子力発電所の定期検査支援装置。 The periodic inspection support device of the nuclear power plant includes a periodic inspection control computer (111), a camera 1 (121) carried into the central control room (1), connected to the periodic inspection control computer (111) by a LAN, and an atom It consists of a camera 2 (131) carried into the furnace building (2), a periodic inspection device (8), a carry-in / out control device (140), and a personal computer with a metal power key.
The carry-in / out control device (140) includes a carry-in / out control computer (141), a camera 3 (142), and a gate (143) connected to the periodic inspection control computer (111) via a LAN. The record is read from the IC tag attached to, and the opening and closing of the gate (143) is controlled and compared with the weight and shape of the actual product, and the situation is monitored and recorded.
The periodic inspection control computer (11 1) has a built-in examination standard that can be said to be normal, and can compare the examination standard with the measurement value of the periodic inspection device (8). 2 (131) can record the status of periodic inspections, and can enter the minutes of examinations regarding repair,
A periodic inspection support device for nuclear power plants, characterized by suppressing inspection errors.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003383269A JP4861600B2 (en) | 2003-11-13 | 2003-11-13 | Regular inspection support equipment for nuclear power plants |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003383269A JP4861600B2 (en) | 2003-11-13 | 2003-11-13 | Regular inspection support equipment for nuclear power plants |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005147774A JP2005147774A (en) | 2005-06-09 |
| JP4861600B2 true JP4861600B2 (en) | 2012-01-25 |
Family
ID=34692036
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003383269A Expired - Fee Related JP4861600B2 (en) | 2003-11-13 | 2003-11-13 | Regular inspection support equipment for nuclear power plants |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4861600B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7379224B2 (en) * | 2020-03-12 | 2023-11-14 | 株式会社東芝 | Periodic inspection process creation support device, periodic inspection process creation support method, and periodic inspection information linkage system |
| CN112967016B (en) * | 2021-03-02 | 2024-10-15 | 岭东核电有限公司 | Nuclear power test process confirmation method, device, computer equipment and storage medium |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09243781A (en) * | 1996-03-07 | 1997-09-19 | Toshiba Corp | Transported goods monitoring device |
| JP3106107B2 (en) * | 1996-11-20 | 2000-11-06 | 株式会社東芝 | Information communication system in plant |
| JP2001228249A (en) * | 2000-02-15 | 2001-08-24 | Toshiba Corp | Article loading / unloading monitoring system |
| JP2003185782A (en) * | 2001-12-18 | 2003-07-03 | Kansai Electric Power Co Inc:The | Process management program and process management system |
| JP2003263475A (en) * | 2002-03-11 | 2003-09-19 | Hitachi Ltd | Pump inspection work support system |
| JP2003307585A (en) * | 2002-04-16 | 2003-10-31 | Okano Valve Mfg Co | Working equipment under highly-dosed and highly- polluted environment |
-
2003
- 2003-11-13 JP JP2003383269A patent/JP4861600B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2005147774A (en) | 2005-06-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6816088B1 (en) | Marine vessel monitoring system | |
| Epperly et al. | A tool for reliability and safety: predict and prevent equipment failures with thermography | |
| JP4861600B2 (en) | Regular inspection support equipment for nuclear power plants | |
| GAS et al. | PUBLIC SERVICE COMMISSION | |
| Balistreri et al. | Operation of the Notified Body according to the Directive 2014/68/UE (PED) during the covid-19 emergency. Case study of a surveillance audit according to module H1 | |
| TWI912940B (en) | Server device of law compliance management system and operation method thereof | |
| Gersinska | Development of an ISO for the design of nuclear power plants against seismic events—ISO 4917 Part 5: Seismic instrumentation | |
| KR20250054425A (en) | Defect handling collaboration system for building quality management | |
| Scaief | Functions and Requirements and Specifications for Replacement of the Computer Automated Surveillance System (CASS) | |
| Overbeck | SUBJECT: PALO VERDE NUCLEAR GENERATING STATION-NRC INTEGRATED INSPECTION REPORT 05000528/2004004, 05000529/2004004, AND 05000530/2004004 Dear Mr. Overbeck: On September 30, 2004, the US Nuclear Regulatory Commission (NRC) completed an | |
| Quinn et al. | SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-247/97-07 AND NOTICE OF VIOLATION | |
| Canadian Nuclear Safety Commission | REGDOC-1.1. 2: Licence Application Guide: Licence to Construct a Nuclear Power Plant | |
| Brewer et al. | Preliminary, Qualitative Human Reliability Analysis For Spent Fuel Handling | |
| Murphy Jr et al. | Independent verification options for inspecting nuclear power plant facilities. Final report | |
| No | UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION | |
| Kojima et al. | Quality assurance activity focused on achieving nuclear safety | |
| Dacimo et al. | SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT 3-NRC INTEGRATED INSPECTION REPORT 05000286/2005002 | |
| Coutu | SUBJECT: KEWAUNEE NUCLEAR POWER PLANT NRC INTEGRATED INSPECTION REPORT 05000305/2003006 | |
| Drayer et al. | Technology of Today and the Challenges for Tomorrow-An Overview of the State of Evolution in Remote Monitoring | |
| Minahan | SUBJECT: COOPER NUCLEAR STATION–NRC INTEGRATED INPSECTION REPORT 05000298/2008002 Dear Mr. Minahan: On March 22, 2008 the US Nuclear Regulatory Commission (NRC) completed an integrated inspection at your Cooper Nuclear Station. The enclosed report documents the inspection | |
| Spina | SUBJECT: NINE MILE POINT NUCLEAR STATION-NRC INTEGRATED INSPECTION REPORT 05000220/2004004 and 05000410/2004004 AND SUPPLEMENTAL INSPECTION FOR WHITE PERFORMANCE INDICATOR | |
| Harden | Enclosures: Inspection Report 05000334/2010004; 05000412/2010004 wi Attachment: Supplemental Information | |
| Leek | NUCLEAR REGULATORY COMMISSION | |
| Dacimo et al. | SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT 3-NRC INTEGRATED INSPECTION REPORT 05000286/2003009 | |
| Rezniczek et al. | Methodological Approach for the Assessment of the Performance of Containment and Surveillance Equipment-Trial Application |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051213 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080414 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090512 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090601 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090707 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090812 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100209 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100323 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20100706 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100720 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20101015 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110920 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110926 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20111101 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20111107 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4861600 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141111 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |