Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4861665B2 - Elevator hoist renewal method and elevator system - Google Patents
[go: Go Back, main page]

JP4861665B2 - Elevator hoist renewal method and elevator system - Google Patents

Elevator hoist renewal method and elevator system Download PDF

Info

Publication number
JP4861665B2
JP4861665B2 JP2005260824A JP2005260824A JP4861665B2 JP 4861665 B2 JP4861665 B2 JP 4861665B2 JP 2005260824 A JP2005260824 A JP 2005260824A JP 2005260824 A JP2005260824 A JP 2005260824A JP 4861665 B2 JP4861665 B2 JP 4861665B2
Authority
JP
Japan
Prior art keywords
machine
new
existing
bed
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005260824A
Other languages
Japanese (ja)
Other versions
JP2007070082A (en
Inventor
晃司 須田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Priority to JP2005260824A priority Critical patent/JP4861665B2/en
Publication of JP2007070082A publication Critical patent/JP2007070082A/en
Application granted granted Critical
Publication of JP4861665B2 publication Critical patent/JP4861665B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)

Description

本発明は、ビル等に設置されたエレベータシステムにおけるエレベータ巻上機のリニューアル方法及びこのリニューアル方法でリニューアルされたエレベータシステムに関する。 The present invention relates to an elevator system that has been renewed by renewal method and this renewal process of the elevator hoisting machine in an elevator system that is installed in a building or the like.

ビルやマンション等に設置されたエレベータシステムにおいては、設置時点から十数年が経過すると、エレベータシステムを構成しているエレベータ昇降路内を上下移動するエレベータのかごや、エレベータ昇降路の上側に設けられた機械室に設置されたかごをロープを介して上下移動させる巻上機や、巻上機を駆動制御する制御盤等の各構成部材が老朽化したり、機能が最新のシステムに対して、見劣りするようになる。   In an elevator system installed in a building or condominium, etc., after ten years have passed since the installation, the elevator car that moves up and down in the elevator hoistway constituting the elevator system or the elevator hoistway above the elevator hoistway is installed. Each component of the hoisting machine that moves the car installed in the machine room up and down via a rope and the control panel that drives and controls the hoisting machine is obsolete or inferior to the latest system To come.

したがって、既設の各構成部材についてそれぞれ高機能を有した新規の構成部材に更新するリニューアルを実施する必要がある。この場合、一般的に、エレベータシステムを構成する全部の構成部材を同時にリニューアルすることはなく、改修費用に対する効果等を考慮して、機能に直結する電動機や減速器やシープ等が組込まれた巻上機、及びこの巻上機を制御する制御盤に限って、リニューアルすることが実施されている。   Therefore, it is necessary to carry out a renewal for updating each existing component member to a new component member having a high function. In this case, in general, all the components constituting the elevator system are not renewed at the same time, and considering the effect on the repair cost, etc., a winding incorporating a motor, a speed reducer, a sheep, or the like directly connected to the function. Renewal is carried out only for the upper machine and the control panel for controlling the hoisting machine.

また、リニューアルすべきエレベータが設置されたビルやマンション等においては、従業員や住民が存在するので、短期間にリニューアルを完了する必要がある。   In addition, since there are employees and residents in buildings and apartments where elevators to be renewed are installed, it is necessary to complete the renewal in a short time.

上述した機械室内に設置された既設の巻上機を新規の巻上機に更新するリニューアル手法が特許文献1に提唱されている。   Patent Document 1 proposes a renewal method for updating an existing hoisting machine installed in the machine room to a new hoisting machine.

図7(a)は、リニューアル前の機械室内に設置された巻上機の断面模式図である。機械室の床1の上面は、シンダーコンクリート2で覆われている。このシンダーコンクリート2に、一対のマシンビーム3の下部が埋込固定されている。この一対のマシンビーム3の上面に、これと直交する方向に一対の横ビーム4が取付けられており、この横ビーム4の上面に、電動機や減速器やシープ等が組込まれた巻上機5が固定されている。   Fig.7 (a) is a cross-sectional schematic diagram of the winding machine installed in the machine room before renewal. The upper surface of the floor 1 of the machine room is covered with cinder concrete 2. The lower part of a pair of machine beams 3 is embedded and fixed in the cinder concrete 2. A pair of transverse beams 4 are attached to the upper surfaces of the pair of machine beams 3 in a direction orthogonal thereto, and a hoisting machine 5 in which an electric motor, a speed reducer, a sheep, and the like are incorporated on the upper surface of the transverse beams 4. Is fixed.

このような既設の巻上機5を高い機能を有した新規の巻上機にリニューアルする場合において、既設の巻上機5の取付寸法と、新規の巻上機の取付寸法が異なることが一般的である。このような場合、巻上機のリニューアルを実施する場合、マシンビーム3、横ビーム)4も同時に、新規の巻上機の取付寸法に合致した寸法を有する新規のマシンビーム、横ビームに交換する必要がある。   When renewing such an existing hoisting machine 5 to a new hoisting machine having a high function, the installation dimensions of the existing hoisting machine 5 are generally different from the mounting dimensions of the new hoisting machine. Is. In such a case, when the rewinding of the hoisting machine is performed, the machine beam 3 and the transverse beam 4) are simultaneously replaced with a new machine beam and a transverse beam having dimensions that match the mounting dimensions of the new hoisting machine. There is a need.

しかし、マシンビーム3の下部は、床1のシンダーコンクリート2に埋込固定されているので、この既設のマシンビーム3を新規のマシンビームに取替えるには、大きな騒音を伴う工事を実施する必要があるので、図7(a)の既設の巻上機5、既設の横ビーム4のみを除去する。   However, since the lower part of the machine beam 3 is embedded and fixed in the cinder concrete 2 of the floor 1, in order to replace the existing machine beam 3 with a new machine beam, it is necessary to carry out construction with a large noise. Therefore, only the existing hoisting machine 5 and the existing transverse beam 4 in FIG. 7A are removed.

次に、図7(b)に示すように、既設の一対のマシンビーム3の隣接位置に、シンダーコンクリート2を貫通して下端が床1に固定した支持台6を設ける。既設の一対のマシンビーム3と支持台6との上面に新規の横ビーム8を取付け、この新規の横ビーム8の上面に、この横ビーム8に対して直交する方向に、新規のマシンビーム9を二層分だけ積層する。1層目のマシンビーム9と2層目のマシンビーム9との間には、防振部材10が介挿されている。そして、この新規のマシンビーム9の上面に既設の巻上機11を固定する。   Next, as shown in FIG. 7 (b), a support base 6 having a lower end fixed to the floor 1 through the cinder concrete 2 is provided at a position adjacent to the existing pair of machine beams 3. A new transverse beam 8 is attached to the upper surfaces of the pair of existing machine beams 3 and the support base 6, and a new machine beam 9 is formed on the upper surface of the new transverse beam 8 in a direction perpendicular to the transverse beam 8. Are stacked in two layers. An anti-vibration member 10 is interposed between the first-layer machine beam 9 and the second-layer machine beam 9. Then, the existing hoisting machine 11 is fixed to the upper surface of the new machine beam 9.

このように、支持台6を設けることにより、既設のマシンビーム3を機械室の床1に残した状態で、既設の巻上機5を新規の巻上機11にリニューアルすることが可能となる。
特許第2728156号公報
As described above, by providing the support base 6, it is possible to renew the existing hoisting machine 5 to the new hoisting machine 11 while leaving the existing machine beam 3 on the floor 1 of the machine room. .
Japanese Patent No. 2728156

しかしながら図7(a)、(b)に示すエレベータ巻上機のリニューアル手法においても、まだ解消すべき次のような課題があった。   However, the elevator hoist renewal method shown in FIGS. 7A and 7B also has the following problems to be solved.

すなわち、既設の巻上機、既設の横ビーム、その他巻上機に付随した構成部品について、それらを撤去した後にエレベータの機械室から搬出し、階段などを経由、または建物近辺よりクレーン車を使用して、不要となったこれらの用品を搬出し、廃棄物として破棄しなければならなかった。   In other words, existing hoisting machines, existing transverse beams, and other components attached to the hoisting machine are removed and then removed from the elevator's machine room, via stairs, or using a crane truck from the vicinity of the building Then, these unnecessary items had to be taken out and discarded as waste.

近年、環境保護の観点から産業廃棄物の削減が強く求められる中で、エレベータのリニューアル工事においてもできるだけ廃棄物を抑制することが求められている。   In recent years, reduction of industrial waste is strongly demanded from the viewpoint of environmental protection, and it is also demanded to suppress waste as much as possible in renewal work of elevators.

さらに既設の不要部材の搬出、新規の必要部材の搬入に際して、機械室に至る経路が狭いので、搬出入の時間的制約でクレーン車が使用できない等の理由が発生するが、機械室に搬出入する用品が大きいと経路の確保の為、建物の一部を壊して機械室に至る経路を拡張し、さらに専用の搬送治具を使用し、大掛かりな搬出入作業を余儀なくされる。これらの付帯工事を削減させることは工事費の削減にも直結する為、不要となる旧巻上機に関連した構成部材をリニューアル後のエレベータシスムにできるだけ流用できることが求められている。   In addition, when unloading existing unnecessary members or loading new necessary members, the route to the machine room is narrow, which may cause reasons such as the inability to use a crane truck due to time restrictions on loading and unloading. If the equipment to be used is large, the route to the machine room is expanded to secure a route, and a large carrying-in / out operation is required by using a dedicated transfer jig. Reducing these incidental works directly leads to a reduction in construction costs. Therefore, it is required that diverting components related to the old hoisting machine can be used as much as possible for the elevator system after renewal.

さらに、前述したリニューアル手法においては、支持台6を床1に固定するために、床1の上面を覆うシンダーコンクリート2の一部を除去する工事が必要であり、騒音問題が生じる。   Further, in the above-described renewal method, in order to fix the support base 6 to the floor 1, a work for removing a part of the cinder concrete 2 covering the upper surface of the floor 1 is necessary, which causes a noise problem.

本発明はこのような事情に鑑みてなされたものであり、エレベータシステムの機能低下を招くことなく、巻上機のリニューアルに伴う不要部材の発生量を極力抑制でき、かつ新規の各構成部材の機械室に対する搬入を容易にでき、もって、巻上機に対するリニューアル工事期間を短縮でき、このエレベータシステムが組み込まれたビルやマンションのエレベータ利用者に対するサービス低下を極力抑制できるエレベータ巻上機のリニューアル方法及びこのリニューアル方法でリニューアルされたエレベータシステムを提供することを目的とする。 The present invention has been made in view of such circumstances, and it is possible to suppress the generation amount of unnecessary members accompanying renewal of the hoisting machine as much as possible without degrading the function of the elevator system. Elevator hoist renewal method that makes it easy to carry into the machine room, shortens the renewal work period for the hoist, and minimizes service degradation for elevator users in buildings and condominiums that incorporate this elevator system. Another object of the invention is to provide an elevator system which is renewed by the renewal process.

上記課題を解消するために、本発明は、エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床にマシンビームの下部が埋設され、このマシンビームの上面にマシンベッドが取付けられ、このマシンベッドの上面に、かごを上下移動させる巻上機が固定されたエレベータシステムにおけるエレベータ巻上機のリニューアル方法において、既設のマシンベッドの上面に固定された既設の巻上機を除去するステップと、この既設の巻上機が上面から除去された既設のマシンベッドの上面に、新規の巻上機を固定可能な新規のマシンベッドを取付けるステップと、この取付けられた新規のマシンベッドの上面に、新規の巻上機を固定するステップとを備えている。   In order to solve the above-described problems, the present invention is configured such that a lower part of a machine beam is embedded in a floor of a machine room provided above an elevator hoistway in which an elevator car moves up and down, and a machine bed is provided on the upper surface of the machine beam. In the method of renewing an elevator hoisting machine in an elevator system in which the hoisting machine for moving the car up and down is fixed on the upper surface of the machine bed, the existing hoisting machine fixed on the upper surface of the existing machine bed Removing, installing a new machine bed capable of fixing the new hoist on the upper surface of the existing machine bed from which the existing hoist has been removed from the upper surface, and the new machine installed A step of fixing a new hoist on the upper surface of the bed.

このように構成されたエレベータ巻上機のリニューアル方法においては、既設の巻上機を既設のマシンベッドの上面から除去した後に、この既設のマシンベッドの上面に新規の巻上機に対応する新規のマシンベッドを取付ける。そして、この新規のマシンベッドの上面に新規の巻上機が固定される。   In the renewal method of the elevator hoisting machine configured as described above, after removing the existing hoisting machine from the upper surface of the existing machine bed, a new hoisting machine corresponding to the new hoisting machine is installed on the upper surface of the existing machine bed. Install the machine bed. A new hoisting machine is fixed to the upper surface of the new machine bed.

したがって、このリニューアル方法で除去される構成部材は既設の巻上機のみとなるので、このリニューアル方法で除去される構成部材を最小限に抑制できる。また、機械室の床に対する工事を実施しないので、騒音問題が生じることを未然に防止できる。   Therefore, since only the existing hoisting machine is removed by this renewal method, the constituent members removed by this renewal method can be minimized. In addition, since no work is performed on the floor of the machine room, it is possible to prevent noise problems from occurring.

また、別の発明は、上述した発明のエレベータ巻上機のリニューアル方法において、新規のマシンベッドは複数の部材に分解可能な構造を有している。さらに、新規のマシンベッドを複数の部材に分解した状態で、機械室に搬入するステップと、この機械室に搬入された複数の部材を新規のマシンベッドに組立てるステップとを有している。そして、新規のマシンベッドを取付けるステップは、既設の巻上機が除去された既設のマシンベッドの上面に、組立てられた新規のマシンベッドを取付ける。   Further, according to another invention, in the above-described method for renewing an elevator hoisting machine, the new machine bed has a structure that can be disassembled into a plurality of members. Furthermore, it has the step which carries in the machine room in the state which decomposed | disassembled the new machine bed into the several member, and the step which assembles the several member carried in this machine room to a new machine bed. In the step of attaching the new machine bed, the assembled new machine bed is attached to the upper surface of the existing machine bed from which the existing hoisting machine has been removed.

このように構成されたエレベータ巻上機のリニューアル方法においては、新規のマシンベッドは複数の部材に分解可能であるので、複数の部材に分解した状態で機械室に搬入でき、機械室への狭い通路を搬送できるので、機械室に臨時に外部に開かれた搬入口を形成し、外部から大型クレーン等を用いて、新規のマシンベッドを臨時の搬入口から機械室に搬入する大がかりな作業を実施する必要がない。   In the renewal method of the elevator hoisting machine configured as described above, the new machine bed can be disassembled into a plurality of members. Since the passage can be transported, a large entrance is opened in the machine room temporarily, and a large-scale crane is used from the outside to carry a new machine bed from the temporary entrance into the machine room. There is no need to implement.

また、別の発明は、上述した発明のエレベータ巻上機のリニューアル方法において、新規のマシンベッドを取付けるステップは、既設の巻上機が除去された既設のマシンベッドの上面に、複数の新規のマシンベッドを積層して取付けるようにしている。   According to another aspect of the present invention, in the elevator hoist renewal method described above, the step of attaching a new machine bed includes a plurality of new hoisting machines on the upper surface of the existing machine bed from which the existing hoisting machine has been removed. Machine beds are stacked and installed.

また、別の発明は、エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床にマシンビームの下部が埋設され、このマシンビームの上面にマシンベッドが取付けられ、このマシンベッドの上面に、かごを上下移動させる巻上機が固定されたエレベータシステムにおけるエレベータ巻上機のリニューアル方法において、
既設のマシンベッドの上面に固定された既設の巻上機を除去するステップと、既設のマシンビームの上面に取付けられた既設のマシンベッドを除去するステップと、複数の部材に分解可能な構造を有し、上面に新規の巻上機を固定可能な新規のマシンベッドを、複数の部材に分解した状態で、機械室に搬入するステップと、この機械室に搬入された複数の部材を前記新規のマシンベッドに組立てるステップと、既設のマシンベッドが上面から除去された既設のマシンビームの上面に、組立てられた新規のマシンベッドを取付けるステップと、この既設のマシンビームの上面に取付けられた新規のマシンベッドの上面に、新規の巻上機を固定するステップとを備えている。
According to another invention, a lower part of a machine beam is embedded in a floor of a machine room provided above an elevator hoistway where an elevator car moves up and down, and a machine bed is attached to the upper surface of the machine beam. In the renewal method of the elevator hoisting machine in the elevator system in which the hoisting machine for moving the car up and down is fixed on the upper surface of the bed,
A step of removing an existing hoisting machine fixed to the upper surface of an existing machine bed, a step of removing an existing machine bed attached to the upper surface of an existing machine beam, and a structure that can be disassembled into a plurality of members A new machine bed having an upper surface capable of fixing a new hoisting machine in a state of being disassembled into a plurality of members, and a plurality of members carried into the machine chambers, A step of assembling the existing machine bed, a step of attaching the new machine bed assembled on the upper surface of the existing machine beam from which the existing machine bed has been removed from the upper surface, and a new step mounted on the upper surface of the existing machine beam. And a step of fixing a new hoisting machine on the upper surface of the machine bed.

このように構成されエレベータ巻上機のリニューアル方法においては、除去される構成部材は既設の巻上機と既設のマシンベッドである。そして、新規のマシンベッドは複数の部材に分解した状態で機械室に搬入される。   In the renewal method of the elevator hoisting machine configured as described above, the components to be removed are the existing hoisting machine and the existing machine bed. And a new machine bed is carried into a machine room in the state decomposed | disassembled into the some member.

また、別の発明は、リニューアル後のエレベータシステムである。そして、このエレベータシステムは、エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床に下部が埋設された既設のマシンビームと、この既設のマシンビームの上面に取付けられ、上面にかごを上下移動させるための巻上機を固定するための既設のマシンベッドと、この既設のマシンベッドの上面に取付けられ、上面にかごを上下移動させるための新規の巻上機を固定するための新規のマシンベッドと、この新規のマシンベッドの上面に固定され上面にかごを上下移動させるための新規の巻上機と、機械室内に設置され、この新規の巻上機を駆動制御する新規の制御盤とを備えている。   Another invention is an elevator system after renewal. And this elevator system is attached to the upper surface of the existing machine beam with the lower part embedded in the floor of the machine room provided above the elevator hoistway where the elevator car moves up and down, An existing machine bed for fixing the hoisting machine for moving the car up and down on the upper surface, and a new hoisting machine for moving the car up and down attached to the upper surface of the existing machine bed are fixed. A new machine bed, a new hoisting machine fixed to the upper surface of the new machine bed and moving the car up and down on the upper surface, and a drive control of the new hoisting machine installed in the machine room And a new control panel.

このように構成されたリニューアル後のエレベータシステムにおいては、既設のエレベータシステムから少ない改修費用で高性能のエレベータシステムを実現できる。   In the elevator system after the renewal configured as described above, a high-performance elevator system can be realized from the existing elevator system with a small repair cost.

本発明においては、既設の巻上機を既設のマシンベッドの上面から除去した後に、この既設のマシンベッドの上面に新規のマシンベッドを取付け、この新規のマシンベッドの上面に新規の巻上機を固定している。   In the present invention, after removing the existing hoisting machine from the upper surface of the existing machine bed, a new machine bed is attached to the upper surface of the existing machine bed, and the new hoisting machine is installed on the upper surface of the new machine bed. Is fixed.

したがって、このリニューアル方法で除去される構成部材を最小限に抑制でき、また、機械室の床に対する工事を実施しないので、騒音問題が生じることを未然に防止でき、かつ新規の各構成部材の機械室に対する搬入を容易にできる。また、少ない改修費用で、巻上機に対するリニューアル工事期間を短縮でき、このエレベータシステムが組込まれたビルやマンションのエレベータ利用者に対するサービス低下を極力抑制できる。   Therefore, the components removed by this renewal method can be suppressed to a minimum, and since no work is performed on the floor of the machine room, noise problems can be prevented from occurring, and each new component machine can be prevented. Carrying into the room can be done easily. In addition, the renewal work period for the hoisting machine can be shortened with a small renovation cost, and the service degradation for elevator users of buildings and condominiums where this elevator system is incorporated can be suppressed as much as possible.

以下、本発明の各実施形態を図面を用いて説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(第1実施形態)
図1(a)〜(e)は、本発明の第1実施形態に係わるエレベータ巻上機のリニューアル方法の各リニューアル工程を示す断面模式図である。
(First embodiment)
FIGS. 1A to 1E are schematic cross-sectional views showing each renewal step of the renewal method for an elevator hoist according to the first embodiment of the present invention.

図1(a)は、リニューアル前の巻上機が設置された機械室の断面模式図である。エレベータのかごが上下移動するエレベータ昇降路20の上側に設けられた機械室21の床22の上面はシンダーコンクリート23で覆われている。このシンダーコンクリート23に既設のマシンビーム24の下部が埋込固定されている。この既設のマシンビーム24の一方端近傍に設けられた軸25aにそらせシープ25が枢支されている。このそらせシープ25にメインロープ26が懸架されている。   Fig.1 (a) is a cross-sectional schematic diagram of the machine room in which the winding machine before renewal was installed. The upper surface of the floor 22 of the machine room 21 provided on the upper side of the elevator hoistway 20 where the elevator car moves up and down is covered with cinder concrete 23. The lower part of the existing machine beam 24 is embedded and fixed to the cinder concrete 23. A sheep 25 is pivotally supported by a shaft 25a provided near one end of the existing machine beam 24. A main rope 26 is suspended from the deflecting sheep 25.

既設のマシンビーム24の上面に既設のマシンベッド27が取付られており、この既設のマシンベッド27の上面に既設の巻上機28が固定されている。既設の巻上機28には電動機や減速器や主シープや取付部材等が組込まれている。そして主シープには前記メインロープ26が懸架されている。このメインロープ26の両端には、エレベータ昇降路20の図示しないかご及び釣合重りが取付けられている。また、機械室21内には、既設の巻上機28を駆動制御する図示しない既設の制御盤が配設されている。したがって、既設の巻上機28は既設の制御盤の駆動制御に基づいて、前記かごをエレベータ昇降路20内で上下移動させる。   An existing machine bed 27 is attached to the upper surface of the existing machine beam 24, and an existing hoisting machine 28 is fixed to the upper surface of the existing machine bed 27. The existing hoisting machine 28 incorporates an electric motor, a speed reducer, a main sheep, a mounting member, and the like. The main rope 26 is suspended from the main sheep. A car and a counterweight (not shown) of the elevator hoistway 20 are attached to both ends of the main rope 26. In the machine room 21, an existing control panel (not shown) that drives and controls the existing hoisting machine 28 is disposed. Therefore, the existing hoisting machine 28 moves the car up and down in the elevator hoistway 20 based on the drive control of the existing control panel.

このような構成のリニューアル前のエレベータシステムにおける既設の巻上機28を、寸法形状の異なる高性能の新規の巻上機29にリニューアルする場合、先ず、エレベータ昇降路20内のかごを例えば1階等の基準階に固定し、メインロープ26を主シープ及びそらせシープ25から取外す。さらに、そらせシープ25を既設のマシンビーム24の軸25aから一時的に取外す。そして、図1(b)に示すように、既設の巻上機28を既設のマシンベッド27の上面から除去する。   When the existing hoisting machine 28 in the elevator system before renewal having such a configuration is renewed to a new high-performance hoisting machine 29 having a different size and shape, first, the car in the elevator hoistway 20 is, for example, the first floor. The main rope 26 is removed from the main sheep and the deflecting sheep 25. Further, the deflecting sheep 25 is temporarily removed from the shaft 25a of the existing machine beam 24. Then, as shown in FIG. 1 (b), the existing hoisting machine 28 is removed from the upper surface of the existing machine bed 27.

その後、図1(c)に示すように、既設の巻上機28が除去された既設のマシンベッド27の上面に、新規の巻上機29の寸法形状に対応する形状を有した新規のマシンベッド30を取付ける。そして、図1(d)に示すように、新規のマシンベッド30の上面に電動機や減速器や主シープや取付部材等が組込まれている新規の巻上機29を固定する。図1(d)に示すように、そらせシープ25をマシンビーム24の軸25aに取付け、メインロープ26を新規の巻上機29の主シープ及びそらせシープ25に懸架する。   Thereafter, as shown in FIG. 1C, a new machine having a shape corresponding to the size and shape of the new hoisting machine 29 on the upper surface of the existing machine bed 27 from which the existing hoisting machine 28 has been removed. Install the bed 30. And as shown in FIG.1 (d), the new winding machine 29 in which the electric motor, the reduction gear, the main sheep, the attachment member, etc. are incorporated in the upper surface of the new machine bed 30 is fixed. As shown in FIG. 1 (d), the deflecting sheep 25 is attached to the shaft 25 a of the machine beam 24, and the main rope 26 is suspended from the main sheep and the deflecting sheep 25 of the new hoisting machine 29.

最後に、図示しない既設の制御盤を図示しない新規の制御盤に交換して、新規の制御盤と新規の巻上機29の電動機とを電力線及び信号線で接続する。   Finally, an existing control panel (not shown) is replaced with a new control panel (not shown), and the new control panel and the new hoisting machine 29 motor are connected by a power line and a signal line.

このように構成された第1実施形態のエレベータ巻上機のリニューアル方法においては、図1(a)〜(e)に示すように、既設の巻上機28を既設のマシンベッド27の上面から除去した後に、この既設のマシンベッド27の上面に新規のマシンベッド30を取付ける。この新規のマシンベッド30の上面に新規の巻上機29が固定される。   In the elevator hoist renewal method of the first embodiment configured as described above, as shown in FIGS. 1A to 1E, the existing hoisting machine 28 is moved from the upper surface of the existing machine bed 27. After the removal, a new machine bed 30 is attached to the upper surface of the existing machine bed 27. A new hoisting machine 29 is fixed to the upper surface of the new machine bed 30.

したがって、最終的に、このリニューアル方法で除去される構成部材は既設の巻上機29のみとなるので、このリニューアル方法で除去される構成部材を最小限に抑制できる。また、機械室21の床22及びシンダーコンクリート23に対する工事を実施しないので、騒音問題が生じることを未然に防止できる。   Therefore, since the constituent members removed by this renewal method are only the existing hoisting machine 29, the constituent members removed by this renewal method can be minimized. Moreover, since the construction for the floor 22 and the cinder concrete 23 of the machine room 21 is not carried out, it is possible to prevent noise problems from occurring.

(第2実施形態)
図2は本発明の第2実施形態に係わる新規の巻上機29が組込まれたリニューアル後のエレベータシステムの要部を取出して示す詳細断面図である。前述した図1(e)の断面模試図と同一部分には、同一符号が付されている。
(Second Embodiment)
FIG. 2 is a detailed sectional view showing a main part of the elevator system after renewal in which a new hoisting machine 29 according to the second embodiment of the present invention is incorporated. The same parts as those in the cross-sectional schematic diagram of FIG.

この第2実施形態のエレベータシステムにおいては、エレベータのかごが上下移動するエレベータ昇降路20の上側に設けられた機械室21の床22の上面はシンダーコンクリート23で覆われている。このシンダーコンクリート23に既設のマシンビーム24の下部が埋込固定されている。この既設のマシンビーム24の一方端近傍に設けられた軸25aにそらせシープ25が枢支されている。このそらせシープ25にメインロープ26が懸架されている。   In the elevator system of the second embodiment, the upper surface of the floor 22 of the machine room 21 provided on the upper side of the elevator hoistway 20 in which the elevator car moves up and down is covered with cinder concrete 23. The lower part of the existing machine beam 24 is embedded and fixed to the cinder concrete 23. A sheep 25 is pivotally supported by a shaft 25a provided near one end of the existing machine beam 24. A main rope 26 is suspended from the deflecting sheep 25.

既設のマシンビーム24の上面に防振部材31a、31b、31cを介して既設のマシンベッド27が取付られており、この既設のマシンベッド27の上面に同一構成の2台の新規のマシンベッド30a、30bが、相互間に防振部材32a、32bを挟んで積層されている。具体的には、下側の新規のマシンベッド30aが、既設のマシンベッド27に対してボルト/ナット37で固定されている。   An existing machine bed 27 is attached to the upper surface of the existing machine beam 24 via vibration isolation members 31a, 31b, and 31c, and two new machine beds 30a having the same configuration are mounted on the upper surface of the existing machine bed 27. , 30b are stacked with vibration isolating members 32a, 32b sandwiched therebetween. Specifically, the lower new machine bed 30 a is fixed to the existing machine bed 27 with bolts / nuts 37.

また、既設のマシンベッド27内における新規のマシンベッド30a、30bの端部が当接する位置に、新規の巻上機29の重量を支えるための補強アングル36が紙面に直交する方向に、このリニューアル作業の一環として、追加取付されている。   In addition, the renewal is performed in a direction in which the reinforcement angle 36 for supporting the weight of the new hoisting machine 29 is perpendicular to the paper surface at a position where the ends of the new machine beds 30a and 30b come into contact with each other in the existing machine bed 27. Additional installation as part of the work.

積層された2台の新規のマシンベッド30a、30bのうちの上側の新規のマシンベッド30bの上面には、新規の巻上機29が、取付部材33を介して、複数のボルト/ナット35で固定されている。新規の巻上機29の主シープ34には前記メインロープ26が懸架されている。このメインロープ26の両端には、エレベータ昇降路20の図示しないかご及び釣合重りが取付けられている。また、機械室21内には、新規の巻上機29を駆動制御する図示しない新規の制御盤が配設されている。したがって、新規の巻上機29は新規の制御盤の駆動制御に基づいて、前記かごをエレベータ昇降路20内で上下移動させる。   On the upper surface of the upper new machine bed 30b of the two stacked new machine beds 30a, 30b, a new hoisting machine 29 is attached with a plurality of bolts / nuts 35 via an attachment member 33. It is fixed. The main rope 26 is suspended from the main sheep 34 of the new hoisting machine 29. A car and a counterweight (not shown) of the elevator hoistway 20 are attached to both ends of the main rope 26. Further, a new control panel (not shown) for driving and controlling the new hoisting machine 29 is disposed in the machine room 21. Therefore, the new hoisting machine 29 moves the car up and down in the elevator hoistway 20 based on the drive control of the new control panel.

図3は、上側に位置する新規のマシンベッド30bの詳細構成図であり、図3(a)は斜視図、図3(b)は上面図、図3(c)は正面図である。   FIG. 3 is a detailed configuration diagram of the new machine bed 30b located on the upper side, FIG. 3 (a) is a perspective view, FIG. 3 (b) is a top view, and FIG. 3 (c) is a front view.

この新規のマシンベッド30bは、略コ字状型断面形状を有した4枚の金属板38a、38b、38c、38dで上下端開口の角筒を形成し、この角筒内に2枚の補強用の金属板38e、38fを介在させたものである。金属板38a〜38f相互間は、ボルト/ナット39で固定されている。したがって、各ボルト/ナット39を取外すことにより、この新規のマシンベッド30bを6枚の金属板38a〜38fに分解可能である。   In this new machine bed 30b, four metal plates 38a, 38b, 38c, and 38d having a substantially U-shaped cross section form a square tube with upper and lower end openings, and two reinforcing plates are provided in the square tube. Metal plates 38e and 38f for use are interposed. The metal plates 38a to 38f are fixed with bolts / nuts 39. Therefore, by removing each bolt / nut 39, the new machine bed 30b can be disassembled into six metal plates 38a to 38f.

なお、下側の新規のマシンベッド30aも、上側の新規のマシンベッド30bとほぼ同一構成を有する。   The lower new machine bed 30a has substantially the same configuration as the upper new machine bed 30b.

このように構成された第2実施形態のエレベータシステムにおいては、図1(a)に示す既設のエレベータシステムから、既設の巻上機28及び既設の制御盤を新規の巻上機29及び新規の制御盤に変更して、新規のマシンベッド30a、30bを追加するのみであるので、少ない改修費用で高性能のエレベータシステムを実現できる。   In the elevator system according to the second embodiment configured as described above, the existing hoisting machine 28 and the existing control panel are replaced with a new hoisting machine 29 and a new one from the existing elevator system shown in FIG. Since only the new machine beds 30a and 30b are added to the control panel, a high-performance elevator system can be realized with a small repair cost.

さらに、新規のマシンベッド30a、30bを、図3に示すように、それぞれ6枚の金属板38a〜38fに分解可能であるので、リニューアル工事の際には、新規のマシンベッド30a、30bをそれぞれ6枚の金属板38a〜38fに分解した状態で、狭い通路を経て機械室21に搬入できる。そして、機械室21内において、ボルト/ナット39を用いて新規のマシンベッド30a、30bを組立てればよい。   Furthermore, since the new machine beds 30a and 30b can be disassembled into six metal plates 38a to 38f, respectively, as shown in FIG. 3, the new machine beds 30a and 30b are respectively replaced during the renewal work. In a state of being disassembled into six metal plates 38a to 38f, it can be carried into the machine room 21 through a narrow passage. In the machine room 21, new machine beds 30a and 30b may be assembled using bolts / nuts 39.

したがって、機械室21に新規のマシンベッド30a、30bを搬入するに際して、例えば、建物の一部を壊して拡張し、さらに専用の搬送治具を使用し、大掛かりな搬出入作業を実施する必要はなく、機械室21に新規のマシンベッド30a、30bを簡単に搬入できる。よって、リニューアル工事期間を短縮できるとともにリニューアル工事費用を節減できる。   Therefore, when loading new machine beds 30a and 30b into the machine room 21, it is necessary to carry out large-scale loading / unloading work by, for example, destroying and expanding a part of the building and using a dedicated transfer jig. The new machine beds 30a and 30b can be easily carried into the machine room 21. Therefore, the renewal work period can be shortened and the renewal work cost can be reduced.

なお、この実施形態においては、ロープ26がそらせシープ25位置で大きく屈曲して、そらせシープ26に過大な負荷が掛かることを防止するために、2つの新規のマシンベッド30a、30bを積層した。しかし、図1(e)に示すように、1つの新規のマシンベッド30のみであってもよいことは言うまでもない。   In this embodiment, two new machine beds 30a and 30b are stacked in order to prevent the rope 26 from being bent greatly at the position of the deflecting sheep 25 and applying an excessive load to the deflecting sheep 26. However, it goes without saying that only one new machine bed 30 may be provided as shown in FIG.

(第3実施形態)
図4は、本発明の第3実施形態に係わるエレベータ巻上機のリニューアル方法で採用される新規のマシンベッド40の詳細構成図であり、図4(a)は斜視図、図4(b)は上面図、図4(c)はこの新規のマシンベッド40を矩形から菱形に変形した状態を示す上面図である。
(Third embodiment)
FIG. 4 is a detailed configuration diagram of a new machine bed 40 employed in the elevator hoist renewal method according to the third embodiment of the present invention. FIG. 4 (a) is a perspective view and FIG. 4 (b). Is a top view, and FIG. 4C is a top view showing a state in which the new machine bed 40 is deformed from a rectangle to a diamond.

この新規のマシンベッド40は、略コ字状型断面形状を有した互いに平行に配設された2本の下側アングル材41a、41bの上面に、この2本の下側アングル材41a、41b間を連結するように配設された互いに平行する4本の上側アングル材42a、42b、42c、42dが連結ピン45で接続されている。したがって、2本の下側アングル材41a、41bと4本の上側アングル材42a〜42dとの水平方向の交差角θは図4(c)に示すように任意に変更可能である。   This new machine bed 40 has two lower angle members 41a, 41b on the upper surfaces of two lower angle members 41a, 41b arranged in parallel with each other and having a substantially U-shaped cross section. Four upper angle members 42 a, 42 b, 42 c, 42 d arranged in parallel to each other and connected to each other are connected by a connecting pin 45. Therefore, the horizontal crossing angle θ between the two lower angle members 41a and 41b and the four upper angle members 42a to 42d can be arbitrarily changed as shown in FIG.

このように構成された新規のマシンベッド40において、この新規のマシンベッド40を機械室21へ搬入する時には、図4(c)に示すように、この新規のマシンベッド40を菱形に変形してこの新規のマシンベッド40の幅を狭くさせることによって、この新規のマシンベッド40を機械室21に容易に搬入できる。   In the new machine bed 40 configured as described above, when the new machine bed 40 is carried into the machine room 21, the new machine bed 40 is transformed into a diamond shape as shown in FIG. By reducing the width of the new machine bed 40, the new machine bed 40 can be easily carried into the machine room 21.

そして、この新規のマシンベッド40を図1(c)に示すように、既設のマシンベッド27上に取付ける場合においては、図4(a)、図4(b)に示すように、2本の下側アングル材41a、41bと4本の上側アングル材42a〜42dとの水平方向の交差角θを90°にして、新規のマシンベッド40の外形を直方体形状に戻す。   When the new machine bed 40 is mounted on the existing machine bed 27 as shown in FIG. 1 (c), as shown in FIG. 4 (a) and FIG. The horizontal crossing angle θ between the lower angle members 41a and 41b and the four upper angle members 42a to 42d is set to 90 °, and the outer shape of the new machine bed 40 is returned to the rectangular parallelepiped shape.

したがって、図3に示した第2実施形態の新規のマシンベッド30a、30bと同様に、大掛かりな搬出入作業を実施する必要はなく、機械室21に新規のマシンベッド40を簡単に搬入できる。よって、リニューアル工事期間を短縮できるとともにリニューアル工事費用を節減できる。   Therefore, like the new machine beds 30a and 30b of the second embodiment shown in FIG. 3, it is not necessary to carry out a large carry-in / out operation, and the new machine bed 40 can be easily carried into the machine room 21. Therefore, the renewal work period can be shortened and the renewal work cost can be reduced.

さらに、この新規のマシンベッド40は機械室21で簡単に正規の使用状態に復元できるので、リニューアル工事をより効率的に実施できる。   Furthermore, since this new machine bed 40 can be easily restored to the normal use state in the machine room 21, the renewal work can be carried out more efficiently.

(第4実施形態)
図5は、本発明の第4実施形態に係わるエレベータ巻上機のリニューアル方法で採用される新規のマシンベッド46の詳細構成図であり、図5(a)は上面図、図5(b)は正面図、図5(c)はこの新規のマシンベッド46の組立図である。
(Fourth embodiment)
FIG. 5 is a detailed configuration diagram of a new machine bed 46 employed in the elevator hoist renewal method according to the fourth embodiment of the present invention. FIG. 5 (a) is a top view and FIG. 5 (b). FIG. 5C is an assembly view of the new machine bed 46. FIG.

この新規のマシンベッド46は、4個の貫通孔49a、49b、49c、49dが穿設された2枚の金属板47a、47bと、両端が各貫通孔49a、49b、49c、49dに挿入され、2枚の金属板47a、47bを連結する4本の軸棒48a、48b、48c、48dとで構成されている。   This new machine bed 46 has two metal plates 47a, 47b each having four through holes 49a, 49b, 49c, 49d, and both ends inserted into the respective through holes 49a, 49b, 49c, 49d. It is composed of four shaft rods 48a, 48b, 48c, 48d that connect two metal plates 47a, 47b.

この新規のマシンベッド46は、図5(c)に示すように、2枚の金属板47a、47bと4本の軸棒48a、48b、48c、48dとに簡単に分解可能であるので、リニューアル工事の際には、新規のマシンベッド46を2枚の金属板47a、47bと4本の軸棒48a、48b、48c、48dとに分解した状態で、狭い通路を経て機械室21に搬入できる。そして、機械室21内において、図5(c)に示す手順で図5(a)、(b)に示す直方体形状の新規のマシンベッド46に組立てればよい。   This new machine bed 46 can be easily disassembled into two metal plates 47a, 47b and four shaft bars 48a, 48b, 48c, 48d as shown in FIG. 5 (c). At the time of construction, the new machine bed 46 can be carried into the machine room 21 through a narrow passage while being disassembled into two metal plates 47a, 47b and four shaft rods 48a, 48b, 48c, 48d. . Then, the machine room 21 may be assembled into a new rectangular parallelepiped machine bed 46 shown in FIGS. 5A and 5B according to the procedure shown in FIG.

したがって、図3に示した第2実施形態の新規のマシンベッド30a、30bと同様に、大掛かりな搬出入作業を実施する必要はなく、機械室21に新規のマシンベッド46を簡単に搬入できる。よって、リニューアル工事期間を短縮できるとともにリニューアル工事費用を節減できる。   Therefore, similarly to the new machine beds 30a and 30b of the second embodiment shown in FIG. 3, it is not necessary to perform a large carry-in / out operation, and the new machine bed 46 can be easily carried into the machine room 21. Therefore, the renewal work period can be shortened and the renewal work cost can be reduced.

(第5実施形態)
図6(a)〜(e)は、本発明の第5実施形態に係わるエレベータ巻上機のリニューアル方法の各リニューアル工程を示す断面模式図である。図1(a)〜(e)に示す第1実施形態に係わるエレベータ巻上機のリニューアル方法と同一部分には、同一符号を付して重複する部分の詳細説明を省略する。
(Fifth embodiment)
FIGS. 6A to 6E are schematic cross-sectional views showing each renewal step of the renewal method for an elevator hoist according to the fifth embodiment of the present invention. The same parts as those of the elevator hoist renewal method according to the first embodiment shown in FIGS. 1A to 1E are denoted by the same reference numerals, and detailed description of the overlapping parts is omitted.

この第5実施形態においては、先ず、かごを基準階に固定し、メインロープ26を主シープ及びそらせシープ25から取外す。さらに、そらせシープ25を既設のマシンビーム24の軸25aから一時的に取外す。そして、図6(b)に示すように、既設の巻上機28を既設のマシンベッド27の上面から除去する。さらに、図6(c)に示すように、既設のマシンベッド27を既設のマシンビーム24の上面から除去する。   In the fifth embodiment, first, the car is fixed to the reference floor, and the main rope 26 is removed from the main sheep and the deflected sheep 25. Further, the deflecting sheep 25 is temporarily removed from the shaft 25a of the existing machine beam 24. Then, as shown in FIG. 6 (b), the existing hoisting machine 28 is removed from the upper surface of the existing machine bed 27. Further, as shown in FIG. 6C, the existing machine bed 27 is removed from the upper surface of the existing machine beam 24.

その後、図6(d)に示すように、既設のマシンベッド27が除去された後の既設のマシンビーム24の上面に新規のマシンベッド30を取付ける。そして、図6(d)に示すように、新規のマシンベッド30の上面に電動機や減速器や主シープや取付部材等が組込まれている新規の巻上機29を固定する。その後、そらせシープ25をマシンビーム24の軸25aに取付け、メインロープ26を新規の巻上機29の主シープ及びそらせシープ25に懸架する。   Thereafter, as shown in FIG. 6D, a new machine bed 30 is attached to the upper surface of the existing machine beam 24 after the existing machine bed 27 is removed. Then, as shown in FIG. 6 (d), a new hoisting machine 29 in which an electric motor, a speed reducer, a main sheep, an attachment member, and the like are incorporated is fixed to the upper surface of the new machine bed 30. Thereafter, the deflector sheep 25 is attached to the shaft 25 a of the machine beam 24, and the main rope 26 is suspended from the main sheep and the deflector sheep 25 of the new hoisting machine 29.

最後に、図示しない既設の制御盤を図示しない新規の制御盤に交換して、新規の制御盤と新規の巻上機29の電動機と電力線及び信号線で接続する。   Finally, an existing control panel (not shown) is replaced with a new control panel (not shown), and the new control panel and the motor of the new hoisting machine 29 are connected to each other through power lines and signal lines.

このように構成された第5実施形態のエレベータ巻上機のリニューアル方法においては、図6(a)〜(e)に示すように、既設の巻上機28及び既設のマシンベッド27を既設のマシンビーム24の上面から除去した後に、この既設のマシンビーム24の上面に新規のマシンベッド30を取付ける。この新規のマシンベッド30の上面に新規の巻上機29が固定される。   In the elevator hoist renewal method of the fifth embodiment configured as described above, as shown in FIGS. 6A to 6E, an existing hoisting machine 28 and an existing machine bed 27 are installed. After removal from the upper surface of the machine beam 24, a new machine bed 30 is attached to the upper surface of the existing machine beam 24. A new hoisting machine 29 is fixed to the upper surface of the new machine bed 30.

したがって、最終的に、このリニューアル方法で除去される構成部材は既設の巻上機29、既設のマシンベッド27のみとなるので、このリニューアル方法で除去される構成部材を抑制できる。さらに、新規のマシンベッド30は前述したように、6枚の金属板38a〜38fに分解可能であるので、この新規のマシンベッド30を機械室21に容易に搬入可能である。   Therefore, since the constituent members removed by this renewal method are only the existing hoisting machine 29 and the existing machine bed 27, the constituent members removed by this renewal method can be suppressed. Furthermore, since the new machine bed 30 can be disassembled into the six metal plates 38 a to 38 f as described above, the new machine bed 30 can be easily carried into the machine room 21.

したがって、図1(a)〜(e)に示す第1実施形態に係わるエレベータ巻上機のリニューアル方法とほぼ同じ作用効果を奏することが可能である。   Therefore, it is possible to achieve substantially the same operational effects as the elevator hoist renewal method according to the first embodiment shown in FIGS.

本発明の第1実施形態に係わるエレベータ巻上機のリニューアル方法の各リニューアル工程を示す断面模式図Sectional schematic diagram which shows each renewal process of the renewal method of the elevator hoisting machine concerning 1st Embodiment of this invention. 本発明の第2実施形態に係わるリニューアル後のエレベータシステムの要部を取出して示す詳細断面図Detail sectional drawing which takes out and shows the principal part of the elevator system after renewal concerning 2nd Embodiment of this invention 同リニューアル後のエレベータシステムに組込まれた新規のマシンベッドの概略構成を示す図The figure which shows schematic structure of the new machine bed built in the elevator system after the renewal 本発明の第3実施形態に係わる新規のマシンベッドの概略構成を示す図The figure which shows schematic structure of the new machine bed concerning 3rd Embodiment of this invention. 本発明の第4実施形態に係わる新規のマシンベッドの概略構成を示す図The figure which shows schematic structure of the novel machine bed concerning 4th Embodiment of this invention. 本発明の第5実施形態に係わるエレベータ巻上機のリニューアル方法の各リニューアル工程を示す断面模式図Sectional schematic diagram which shows each renewal process of the renewal method of the elevator hoisting machine concerning 5th Embodiment of this invention 従来のエレベータ巻上機のリニューアル方法の各リニューアル工程を示す断面模式図Cross-sectional schematic diagram showing each renewal process of the conventional elevator hoist renewal method

符号の説明Explanation of symbols

20…エレベータ昇降路、21…機械室、22…床、23…シンダーコンクリート、24…既設のマシンビーム、25…そらせシープ、26…メインロープ、27…既設のマシンベッド、28…既設の巻上機、29…新規の巻上機、30,30a,30b,40,46…新規のマシンベッド、31a,31b,31c,32a,32b…防振部材、33…取付部材、34…主シープ、35,37,39…ボルト/ナット、36…補強アングル、38a〜38f、47a,47b…金属板、41a,41b…下側アングル材、42a,42b…上側アングル材、45…連結ピン、48a〜48d…軸棒   DESCRIPTION OF SYMBOLS 20 ... Elevator hoistway, 21 ... Machine room, 22 ... Floor, 23 ... Cinder concrete, 24 ... Existing machine beam, 25 ... Warp sheep, 26 ... Main rope, 27 ... Existing machine bed, 28 ... Existing winding 29 ... New hoisting machine, 30, 30a, 30b, 40, 46 ... New machine bed, 31a, 31b, 31c, 32a, 32b ... Anti-vibration member, 33 ... Mounting member, 34 ... Main sheep, 35 , 37, 39 ... bolts / nuts, 36 ... reinforcing angles, 38a to 38f, 47a, 47b ... metal plates, 41a, 41b ... lower angle members, 42a, 42b ... upper angle members, 45 ... connecting pins, 48a-48d ... shaft bar

Claims (5)

エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床にマシンビームの下部が埋設され、このマシンビームの上面にマシンベッドが取付けられ、このマシンベッドの上面に、前記かごを上下移動させる巻上機が固定されたエレベータシステムにおけるエレベータ巻上機のリニューアル方法において、
既設のマシンベッドの上面に固定された既設の巻上機を除去するステップと、
この既設の巻上機が上面から除去された既設のマシンベッドの上面に、新規の巻上機を固定可能な新規のマシンベッドを取付けるステップと、
この取付けられた新規のマシンベッドの上面に、前記新規の巻上機を固定するステップと
を備えたことを特徴とするエレベータ巻上機のリニューアル方法。
The lower part of the machine beam is embedded in the floor of the machine room provided above the elevator hoistway where the elevator car moves up and down, and the machine bed is mounted on the upper surface of the machine beam. In the renewal method of the elevator hoisting machine in the elevator system in which the hoisting machine that moves up and down is fixed,
Removing the existing hoisting machine fixed to the upper surface of the existing machine bed;
Attaching a new machine bed capable of fixing the new hoisting machine to the upper surface of the existing machine bed from which the existing hoisting machine has been removed from the upper surface;
A method of renewing an elevator hoisting machine, comprising: a step of fixing the new hoisting machine on an upper surface of the attached new machine bed.
前記新規のマシンベッドは複数の部材に分解可能な構造を有し、
前記新規のマシンベッドを複数の部材に分解した状態で、前記機械室に搬入するステップと、この機械室に搬入された複数の部材を前記新規のマシンベッドに組立てるステップとを有し、
前記新規のマシンベッドを取付けるステップは、前記既設の巻上機が除去された既設のマシンベッドの上面に、前記組立てられた新規のマシンベッドを取付ける
ことを特徴とする請求項1記載のエレベータ巻上機のリニューアル方法。
The novel machine bed has a structure that can be disassembled into a plurality of members,
In a state in which the new machine bed is disassembled into a plurality of members, the step of carrying into the machine room, and the step of assembling the plurality of members carried into the machine room into the new machine bed,
The elevator winding according to claim 1, wherein the step of attaching the new machine bed includes attaching the assembled new machine bed to an upper surface of the existing machine bed from which the existing hoisting machine has been removed. How to renew the aircraft.
前記新規のマシンベッドを取付けるステップは、前記既設の巻上機が除去された既設のマシンベッドの上面に、複数の新規のマシンベッドを積層して取付ける
ことを特徴とする請求項1又は2記載のエレベータ巻上機のリニューアル方法。
3. The step of attaching the new machine bed includes stacking and attaching a plurality of new machine beds on the upper surface of the existing machine bed from which the existing hoisting machine has been removed. To renew the elevator hoisting machine.
エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床にマシンビームの下部が埋設され、このマシンビームの上面にマシンベッドが取付けられ、このマシンベッドの上面に、前記かごを上下移動させる巻上機が固定されたエレベータシステムにおけるエレベータ巻上機のリニューアル方法において、
既設のマシンベッドの上面に固定された既設の巻上機を除去するステップと、
既設のマシンビームの上面に取付けられた既設のマシンベッドを除去するステップと、
複数の部材に分解可能な構造を有し、上面に新規の巻上機を固定可能な新規のマシンベッドを、前記複数の部材に分解した状態で、前記機械室に搬入するステップと、
この機械室に搬入された複数の部材を前記新規のマシンベッドに組立てるステップと、
前記既設のマシンベッドが上面から除去された既設のマシンビームの上面に、前記組立てられた新規のマシンベッドを取付けるステップと、
この既設のマシンビームの上面に取付けられた新規のマシンベッドの上面に、前記新規の巻上機を固定するステップと
を備えたことを特徴とするエレベータ巻上機のリニューアル方法。
The lower part of the machine beam is embedded in the floor of the machine room provided above the elevator hoistway where the elevator car moves up and down, and the machine bed is mounted on the upper surface of the machine beam. In the renewal method of the elevator hoisting machine in the elevator system in which the hoisting machine that moves up and down is fixed,
Removing the existing hoisting machine fixed to the upper surface of the existing machine bed;
Removing the existing machine bed attached to the upper surface of the existing machine beam;
Carrying a new machine bed having a structure that can be disassembled into a plurality of members and capable of fixing a new hoisting machine on the upper surface into the machine room in a state of being disassembled into the plurality of members;
Assembling a plurality of members carried into the machine room into the new machine bed;
Attaching the assembled new machine bed to the upper surface of the existing machine beam from which the existing machine bed has been removed from the upper surface;
A method for renewing an elevator hoisting machine, comprising: a step of fixing the new hoisting machine to an upper face of a new machine bed attached to the upper face of the existing machine beam.
エレベータのかごが上下移動するエレベータ昇降路の上側に設けられた機械室の床に下部が埋設された既設のマシンビームと、
この既設のマシンビームの上面に取付けられ、上面に前記かごを上下移動させるための巻上機を固定するための既設のマシンベッドと、
この既設のマシンベッドの上面に取付けられ、上面に前記かごを上下移動させるための新規の巻上機を固定するための新規のマシンベッドと、
この新規のマシンベッドの上面に固定され、上面に前記かごを上下移動させるための新規の巻上機と、
前記機械室内に設置され、前記新規の巻上機を駆動制御する新規の制御盤と
を備えたことを特徴とするエレベータシステム。
An existing machine beam in which the lower part is embedded in the floor of the machine room provided above the elevator hoistway where the elevator car moves up and down;
An existing machine bed which is attached to the upper surface of the existing machine beam and fixes the hoisting machine for moving the car up and down on the upper surface;
A new machine bed that is attached to the upper surface of the existing machine bed and fixes a new hoisting machine for moving the car up and down on the upper surface;
A new hoisting machine fixed to the upper surface of the new machine bed and moving the car up and down on the upper surface;
An elevator system comprising: a new control panel installed in the machine room and drivingly controlling the new hoisting machine.
JP2005260824A 2005-09-08 2005-09-08 Elevator hoist renewal method and elevator system Expired - Fee Related JP4861665B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005260824A JP4861665B2 (en) 2005-09-08 2005-09-08 Elevator hoist renewal method and elevator system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005260824A JP4861665B2 (en) 2005-09-08 2005-09-08 Elevator hoist renewal method and elevator system

Publications (2)

Publication Number Publication Date
JP2007070082A JP2007070082A (en) 2007-03-22
JP4861665B2 true JP4861665B2 (en) 2012-01-25

Family

ID=37931871

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005260824A Expired - Fee Related JP4861665B2 (en) 2005-09-08 2005-09-08 Elevator hoist renewal method and elevator system

Country Status (1)

Country Link
JP (1) JP4861665B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8232388B2 (en) 2007-12-20 2012-07-31 Roquette Freres Granulated maltitol for direct compression and method of preparation thereof

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013179423A1 (en) 2012-05-30 2013-12-05 三菱電機株式会社 Hoisting machine base of elevator and elevator device
JP6579736B2 (en) * 2014-08-12 2019-09-25 三菱電機株式会社 Renovation method of machine room-less elevator and machine room-less elevator
JP6806660B2 (en) * 2017-11-16 2021-01-06 三菱電機株式会社 How to repair a machine roomless elevator
JP6989041B1 (en) * 2021-02-09 2022-01-05 三菱電機株式会社 How to replace the hoisting machine stand and hoisting machine parts
CN116101869A (en) * 2022-11-11 2023-05-12 北京云梯科技有限公司 A method for retrofitting an asynchronous traction machine elevator

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62200681A (en) * 1986-02-26 1987-09-04 シャープ株式会社 Thin film el device
JP2573618B2 (en) * 1987-09-18 1997-01-22 興和株式会社 Therapeutic laser device
JP2001089051A (en) * 1999-09-17 2001-04-03 Hitachi Ltd elevator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8232388B2 (en) 2007-12-20 2012-07-31 Roquette Freres Granulated maltitol for direct compression and method of preparation thereof
US8518185B2 (en) 2007-12-20 2013-08-27 Roquette Freres Granulated maltitol for direct compression and method of preparation thereof

Also Published As

Publication number Publication date
JP2007070082A (en) 2007-03-22

Similar Documents

Publication Publication Date Title
JP6883397B2 (en) How to build a roof structure
JP4861665B2 (en) Elevator hoist renewal method and elevator system
CN118524983A (en) Construction hoist device and method
JP2008285282A (en) Elevator car
JP4610386B2 (en) Elevator control panel renewal method
JP6833070B2 (en) Elevator and its repair method
KR102074098B1 (en) Factory Frame Module Construction Structure and Method
JP3274793B2 (en) Power plant construction method
JP4694859B2 (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
KR100788000B1 (en) Beam structure for tower crane installation and construction method
JP4445366B2 (en) Reinforcement method for tower crane mount
JP7430400B2 (en) Transfer crane elevating construction method and elevating post
JP2005022874A (en) Prefabrication element installed in elevator hoistway and corresponding hoistway, assembly installed in elevator hoistway and method for fabricating such assembly
JP3990341B2 (en) Elevator installation structure for intermediate seismic isolated building construction
JP2003166350A (en) Temporary curing method for mobile safety curing trolley and roof construction
JP4834317B2 (en) How to replace the elevator
JP5301508B2 (en) Climbing crane support method and support jig
JP4698184B2 (en) Climbing crane support method and support jig
JP3236063B2 (en) Unit building
JP6956651B2 (en) Lifting method of escalator truss
JPH11180655A (en) Elevator equipment
JP3210188B2 (en) Elevator car floor
JPH1171075A (en) Elevator car
JP2009062147A (en) Renewal method for elevator, and structure for elevator renewal
JP5199566B2 (en) Mechanical parking device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110420

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111011

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111107

R150 Certificate of patent or registration of utility model

Ref document number: 4861665

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141111

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees