JP4874889B2 - Steel sheet pile structure repair method and work boat for repair - Google Patents
[go: Go Back, main page]

JP4874889B2 - Steel sheet pile structure repair method and work boat for repair - Google Patents

Steel sheet pile structure repair method and work boat for repair Download PDF

Info

Publication number
JP4874889B2
JP4874889B2 JP2007202263A JP2007202263A JP4874889B2 JP 4874889 B2 JP4874889 B2 JP 4874889B2 JP 2007202263 A JP2007202263 A JP 2007202263A JP 2007202263 A JP2007202263 A JP 2007202263A JP 4874889 B2 JP4874889 B2 JP 4874889B2
Authority
JP
Japan
Prior art keywords
water stop
work
sheet pile
steel sheet
stop box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007202263A
Other languages
Japanese (ja)
Other versions
JP2009035961A (en
Inventor
光明 宮田
和光 本澤
浩一朗 山田
晴喜 谷口
圭一 北角
勝之 池信
光志 平下
勇 西畑
Original Assignee
株式会社アイ・エイチ・アイ・アムテック
深田サルベージ建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アイ・エイチ・アイ・アムテック, 深田サルベージ建設株式会社 filed Critical 株式会社アイ・エイチ・アイ・アムテック
Priority to JP2007202263A priority Critical patent/JP4874889B2/en
Publication of JP2009035961A publication Critical patent/JP2009035961A/en
Application granted granted Critical
Publication of JP4874889B2 publication Critical patent/JP4874889B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Description

本発明は、港湾の岸壁や護岸等における水中構造物として鋼製矢板を使用した構造物、すなわち鋼製矢板構造物の検査、補修、補強工事等の補修作業を、所定の作業空間を確保する止水箱を用いて行う補修工法と、この補修工法に使用する補修用作業船に関するものである。   The present invention secures a predetermined work space for repair work such as inspection, repair, reinforcement work, etc. of a structure using a steel sheet pile as an underwater structure on a quay or revetment of a harbor. The present invention relates to a repair method using a water stop box and a repair work boat used for the repair method.

港湾の岸壁等において水中構造物として鋼製矢板を使用した鋼製矢板構造物は、竣工後、かなりの年月が経過したものが多くて老朽化しており、その劣化状態に適した補修、補強工事が必要になる。特に、腐蝕や損傷の多い干満帯や飛沫帯等の鋼製矢板構造物の気液変動部での検査、補修、補強工事においては、従来のダイバーによる水中工事は困難であることから、気中工事を可能にできるように海水の影響を受けない所定の作業空間を確保することが望まれ、その要望に応えるために、前面開放形の止水箱を鋼製矢板構造物に当接させて所定の作業空間を確保する工法が開発され提案されている。   Steel sheet pile structures that use steel sheet piles as underwater structures on the quay of a port, etc., have been aged for many years after completion, and are repaired and reinforced according to their deteriorated state. Construction is required. In particular, it is difficult to perform underwater construction using conventional divers in the inspection, repair, and reinforcement work of steel sheet pile structures such as corroded and damaged strips, which are often corroded and damaged, in the gas-liquid fluctuation area. It is desirable to secure a predetermined working space that is not affected by seawater so that construction can be performed. In order to meet this demand, a water-stop box with an open front is brought into contact with the steel sheet pile structure to determine the predetermined space. A construction method to secure a working space has been developed and proposed.

例えば、下記の特許文献1には、前面が開放形状をなす箱体の底板部の前端部及び両側板部の前端部に、鋼製矢板に対して当接するチューブ状のシール材を設けておいて、該シール材を鋼製矢板に当接させて箱体と鋼製矢板の間を止水し所定の作業空間を保有して補修作業することが提案されている。   For example, in Patent Document 1 below, a tube-shaped sealing material that comes into contact with a steel sheet pile is provided at the front end portion of the bottom plate portion of the box body whose front surface is open and the front end portions of both side plate portions. It has been proposed that the sealing material is brought into contact with a steel sheet pile to stop the water between the box and the steel sheet pile and to carry out repair work while retaining a predetermined work space.

また、特許文献2には、前面が開放形状をなす箱体の底板部及び両側板部の前端部にそれぞれゴム材や発泡樹脂等の弾性体を装着しておいて、該弾性体を鋼製矢板の表面に当接させることで箱体と鋼製矢板の間を止水し所定の作業空間を保有する止水箱を用いて補修作業することが提案されている。   In Patent Document 2, elastic bodies such as rubber material and foamed resin are respectively attached to the bottom plate portion of the box whose front surface is open and the front end portions of both side plate portions, and the elastic bodies are made of steel. It has been proposed to perform repair work using a water stop box that keeps water between the box body and the steel sheet pile by bringing it into contact with the surface of the sheet pile and holds a predetermined work space.

従来、前記特許文献1及び特許文献2等に開示される従来工法においては、前記止水箱を岸壁近くの陸部に設置したクレーン等により吊り上げて岸壁側から海側に降ろし、これを岸壁の鋼製矢板構造物に当接させるように操作して設置している。
実開昭62−163532号公報 特開2003−212186号公報
Conventionally, in the conventional methods disclosed in Patent Document 1 and Patent Document 2 and the like, the water stop box is lifted by a crane or the like installed on a land portion near the quay and lowered from the quay side to the sea side, and this is steel of the quay. It is operated and installed so as to contact the sheet pile structure.
Japanese Utility Model Publication No. 62-163532 JP 2003-212186 A

陸上側からのクレーンによる従来の設置作業では、クレーンの操作者からは設置個所の状態を確認できないため、設置状況の確認を水中のダイバーに頼る必要があり、設置作業が行い難く、前記止水箱の設置に時間がかかる。また、岸壁近くの陸部にクレーン車を設置する必要があり、それに耐える強度が要求されるが、港湾の陸部表面のコンクリート舗装部分も劣化が進行していて必要とする強度を保持できない虞がある上、岩場等の起伏の激しい地形や狭小なスペースしかなく、クレーン車が入れないない場合には前記止水箱を設置できない、等といった問題が生じている。そのため、止水箱を使用する場合の作業性を著しく損ない、労力と時間のかかる作業になっており、鋼製矢板構造物の補修がコスト高なものになっている。   In conventional installation work with a crane from the land side, the crane operator cannot confirm the state of the installation location, so it is necessary to rely on an underwater diver to check the installation status, and the installation work is difficult to perform. Takes time to install. In addition, it is necessary to install a crane truck in the land near the quay, and the strength to withstand it is required. In addition, there are problems such as the fact that there are only undulating terrain such as rocky places and a small space, and the water stop box cannot be installed when a crane truck cannot be put in. Therefore, the workability when using a water stop box is remarkably impaired, and the work is labor intensive and time consuming, and repair of the steel sheet pile structure is expensive.

さらに、補修、補強などの補修作業においては、錆落としや付着物除去等により剥離屑片が発生するが、これをそのまま海中に放出して廃棄すると、港湾内の海中を汚染すると言う問題もあることから、その廃棄処理が容易に行えることも望まれている。   Furthermore, in repair work such as repair and reinforcement, exfoliation debris is generated due to rust removal and deposit removal, etc., but there is also a problem that if this is released into the sea as it is and discarded, it will contaminate the sea in the harbor. Therefore, it is also desired that the disposal process can be easily performed.

本発明は、上記の課題を解決するためになしたものであり、上記の鋼製矢板構造物の補修、すなわち検査、補修、補強等の各工事を含む補修作業を、専用の作業船を利用して、該作業船すなわち海側からの作業で止水箱を所定の箇所に容易に設置して行える補修工法と、これに使用する専用の補修用作業船を提供するものである。    The present invention has been made to solve the above-mentioned problems, and repairs of the steel sheet pile structure, that is, repair work including each work such as inspection, repair, reinforcement, etc. is performed using a dedicated work ship. Thus, the present invention provides a repair method that can be performed by easily installing a water stop box at a predetermined location by the work from the sea, that is, a dedicated work ship for repair.

さらには、補修作業における錆落としや付着物除去等による剥離屑片等を一時的に貯留しておくことができ、該剥離屑片等を港湾内の海中に放出する問題をも解消できる補修用作業船を提供するものである。   Furthermore, it is possible to temporarily store exfoliation debris from rust removal and deposit removal etc. during repair work, and to repair the problem of releasing the exfoliation debris etc. into the sea in the harbor. A work ship is provided.

上記の課題を解決する本発明の鋼製矢板構造物の補修工法は、前面開放形の補修作業用の止水箱を、補修対象の岸壁の鋼製矢板構造物の一部を囲むように該止水箱の前面を当接させ、該止水箱により所定の作業空間を確保して補修作業を行う鋼製矢板構造物の補修工法であって、前記補修作業用の止水箱と、該止水箱を舷側より外方に吊り上げる吊り上げ移動装置とを備える補修用作業船を、補修対象の岸壁に対し所定の間隔を保有するように繁留しておいて、前記吊り上げ移動装置により吊り上げた前記止水箱を、前記作業船側から補修対象の岸壁の鋼製矢板構造物に近づけるとともに、作業船と岸壁との間から水中における所定の高さ位置に降ろし、該止水箱の前面を鋼製矢板構造物と対向させて、該止水箱の前面を鋼製矢板構造物に当接させるとともに該止水箱内の水を排出して所定の作業空間を確保するように設置して行う補修作業であって、前記作業船の一方の舷側に沿って複数の止水箱を準備しておき、前記複数の止水箱を、該止水箱の横幅よりも狭い間隔をおいて並列して前記鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行い、次に、前記各止水箱を、前記設置位置間の部分に移動させて、該止水箱を鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行うことを特徴とする。
The steel sheet pile structure repair method of the present invention that solves the above-mentioned problems includes a front open-type water stop box for repair work that surrounds a part of the steel sheet pile structure on the quay to be repaired. A repair method for a steel sheet pile structure in which a front surface of a water box is brought into contact and a predetermined work space is secured by the water stop box to perform repair work, the water stop box for the repair work, and the water stop box on the side A repair work ship equipped with a lifting and moving device that lifts more outwardly is allowed to stay so as to maintain a predetermined interval with respect to the quay to be repaired, and the water stop box lifted by the lifting and moving device is While approaching the steel sheet pile structure of the quay to be repaired from the work ship side, it is lowered to a predetermined height in water from between the work ship and the quay, and the front surface of the water stop box is opposed to the steel sheet pile structure. The front of the water stop box against the steel sheet pile structure And discharging the water in該止water box with to a repair work performed installed to ensure a predetermined work space, previously preparing a plurality of water stop box along one broadside of the work ship The plurality of water stop boxes are installed in contact with the steel sheet pile structure in parallel with an interval narrower than the lateral width of the water stop box, and repair work is performed for each water stop box. Each said water stop box is moved to the part between the said installation positions, this water stop box is made to contact | abut to a steel sheet pile structure, and repair work is performed for each water stop box .

この発明の補修工法によれば、例えば港湾の岸壁における補修対象の鋼製矢板構造物の所定の個所に補修作業用の止水箱を設置する際、海側の補修用作業船から作業者が設置個所を確認しながら吊り上げ移動装置を操作して、吊り上げた止水箱を所定の舷側と岸壁の間の所定の位置に移動させて、かつ岸壁における鋼製矢板構造物の所定の個所に当接させることができ、止水箱の設置作業を容易に行うことができる。   According to the repair method of the present invention, for example, when installing a water stop box for repair work at a predetermined location of a steel sheet pile structure to be repaired at a quay of a harbor, an operator installs it from a repair ship on the sea side. Operate the lifting and moving device while checking the location to move the suspended water stop box to a specified position between the specified anchor side and the quay, and to abut the specified location of the steel sheet pile structure on the quay It is possible to install the water stop box easily.

また、前記止水箱を補修用作業船と岸壁との間に設置するので、前記作業船が強風や海面波に対する防護の役目を果たし、前記止水箱の設置作業の際、あるいはその後の補修作業の際、前記止水箱に対する風や波の影響を軽減でき、安全に補修作業できることにもなる。   In addition, since the water stop box is installed between the repair work ship and the quay, the work ship plays a role of protecting against strong winds and sea waves, and during the work of installing the water stop box or subsequent repair work. At this time, the influence of wind and waves on the water stop box can be reduced, and repair work can be performed safely.

また、前記作業船の一方の舷側に沿って複数の止水箱を準備しておき、複数の止水箱を、前記鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行うので、補修作業の効率が向上する。
In addition , a plurality of water stop boxes are prepared along one side of the work boat, a plurality of water stop boxes are installed in contact with the steel sheet pile structure, and repair work is performed for each water stop box. It is performed, thereby improving the efficiency of repair work.

また、前記複数の止水箱を、該止水箱の横幅よりも狭い間隔をおいて並列して前記鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行い、次に、前記各止水箱を、前回の設置位置間の前記間隔部分に移動させて、該止水箱を鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行うので、鋼製矢板構造物の補修作業をさらに効率よく行える。
Further , the plurality of water stop boxes are installed in parallel with a gap narrower than the width of the water stop box in contact with the steel sheet pile structure, and repair work is performed for each water stop box. , the respective waterproofing box, is moved to the gap portion between the previous installation position, the該止water box installed is brought into contact with the steel sheet pile structure, since the repair work in each water stop boxes, steel Repair work of sheet pile structures can be performed more efficiently.

また、本発明は、前記鋼製矢板構造物の補修工法に用いる補修用作業船、すなわち前面開放形の補修作業用の止水箱を、補修対象の岸壁の鋼製矢板構造物の一部を囲むように該止水箱の前面を当接させ、該止水箱により所定の作業空間を確保して補修作業を行うための補修用作業船であって、少なくとも一方の舷側から突出して該舷側と岸壁との間に所定の間隔を保有して繋留するための間隔保有手段と、底板部、後板部および両側板部により形成され且つ排水用ポンプを備える前面開放形の前記補修作業用の止水箱と、該止水箱を吊り上げ移動できる吊り上げ移動装置とを備えてなり、前記吊り上げ移動装置は、吊り上げた前記止水箱を、作業船側から補修対象の岸壁の鋼製矢板構造物に近づけるように移動させるとともに、作業船と岸壁との間から水中における所定の高さ位置に降ろして、該止水箱の前面を鋼製矢板構造物と対向させるように設けられてなり、前記作業船の甲板上には、一方の舷側に沿って移動可能なハンドリングタワーが設置されており、前記吊り上げ移動装置として、前記ハンドリングタワーから舷側外方に突出する水平支持材上に、該水平支持材に沿って移動可能なクレーン装置を備え、該クレーン装置の本体部より垂下した2本のフック付き吊り手段により、前記止水箱を2点支持して吊り上げるように設けられてなる補修用作業船を特徴とする。この補修用作業船を用いることにより、各止水箱を2点支持状態で吊り上げて揺動や回動を抑制しながら舷側外方へ吊り出すことができ、鋼製矢板構造物の所定位置に容易に当接し設置することができる。
Further, the present invention surrounds a part of the steel sheet pile structure on the quay to be repaired, that is, a repair work ship used for the repair method of the steel sheet pile structure, that is, a water stop box for repair work with an open front. The watercraft is a repair work ship for bringing a front face of the waterstop box into contact and securing a predetermined work space by the waterstop box to perform repair work, and projecting from at least one side of the waterside, A space retaining means for retaining and anchoring at a predetermined distance, and a water stop box for the repair work of the front open type formed by a bottom plate portion, a rear plate portion and both side plate portions and provided with a drainage pump; A lifting and moving device capable of lifting and moving the water stop box, and the lifting and moving device moves the lifted water stop box from the work ship side so as to approach the steel sheet pile structure to be repaired. , Work boat and quay Drop off from between a predetermined height position in the water, Ri name provided to the front of該止water box so as to face the steel sheet pile structure, on the deck of the working ship, along one broadside A movable handling tower is provided, and the lifting and moving device includes a crane device movable along the horizontal support material on a horizontal support material protruding outward from the handling tower from the handling tower, A repair work ship is provided which is provided so as to support and lift the water stop box at two points by two hook-suspended means hanging from the main body of the crane device. By using this repair work ship, each water stop box can be lifted in a two-point support state and can be hung outward while restraining rocking and turning, and can be easily placed in place on the steel sheet pile structure. It can contact and be installed.

また、本発明は、前記作業船の少なくとも一方の舷側に沿って所定の間隔をおいて複数の止水箱を備えるとともに、前記複数の止水箱を2点支持状態で吊り上げ移動が可能な複数の吊り上げ移動装置を備え、各吊り上げ移動装置により吊り上げた止水箱を舷側外方へ吊り出し可能に設けられてなるものである。   In addition, the present invention includes a plurality of water stopping boxes provided at predetermined intervals along at least one side of the work boat, and the plurality of water stopping boxes can be lifted and moved in a two-point supported state. It is provided with a moving device, and is provided so that the water stop box lifted by each lifting and moving device can be hung outward from the heel side.

これにより、作業船側からの作業で、前記複数の止水箱を、それぞれ吊り上げ移動装置により揺動や回動を抑制しながら安定性よく吊り上げて移動させることができ、鋼製矢板構造物の所定の個所に容易に当接し設置することができる。そして、各止水箱内での補修作業が完了すれば、前記各止水箱を、各吊り上げ移動装置により吊り上げて設置位置から外し、前回の設置個所の間の非補修個所との対応位置に移動させ、前記同様に設置して補修作業を行うことができ、ひいては長い岸壁の鋼製矢板構造物の補修作業を効率よく行うことができる。   Thereby, in the work from the work ship side, each of the plurality of water stop boxes can be lifted and moved with stability while suppressing swinging and turning by the lifting and moving device, respectively. It can be easily brought into contact with the place. When the repair work in each water stop box is completed, each water stop box is lifted by each lifting and moving device, removed from the installation position, and moved to a position corresponding to the non-repaired position between the previous installation points. Thus, it can be installed and repaired in the same manner as described above. As a result, the repair work of the steel sheet pile structure with a long quay can be efficiently performed.

また、前記作業船は、鋼製矢板構造物より剥離除去した剥離屑片の回収用コンベアと、該剥離屑片の一次貯蔵庫が設けられてなるものとする。これにより、錆落としや付着物除去等により発生した剥離屑片等を、海中に放出することなく一旦回収しておいて作業船により、所定の廃棄位置に輸送して廃棄することができることになり、ひいては港湾内の海中を汚染することもなくなる。   Moreover, the said work ship shall be provided with the conveyor for collection | recovery of the peeling waste pieces peeled and removed from the steel sheet pile structure, and the primary storage of this peeling waste pieces. As a result, exfoliation scraps generated by removing rust, removing attached substances, etc. can be recovered once without being released into the sea and transported to a predetermined disposal position by a work ship for disposal. As a result, the sea in the harbor will not be polluted.

また、前記補修用作業船は、補修作業のための高圧洗浄器、サンドブラスト装置及びコンプレッサーなどが搭載されてなるものとする。これにより、補修対象の鋼製矢板構造物の付着物除去等の清掃作業を容易に行える。   Further, the repair work ship is equipped with a high pressure washer, a sand blasting device, a compressor and the like for repair work. Thereby, cleaning operations such as removal of deposits on the steel sheet pile structure to be repaired can be easily performed.

前記補修用作業船は、前記舷側と岸壁の間の間隔保有手段が、先端部に弾性体が取設されてなるステイが前記舷側より突出して岸壁に当接することにより所定の間隔を保有し得るフェンダーであり、上下2段に設けられてなるものが好ましく、さらには、前記フェンダーが、前記ステイの先端部に舷側と平行な水平の軸心を持つローラが付設されたローラ型フェンダーであり、前記ローラが岸壁に当接した状態で上下に転動可能に設けられてなるものが好ましい。   In the repair work ship, the space holding means between the quay side and the quay can hold a predetermined distance by a stay having an elastic body installed at the tip projecting from the shore side and coming into contact with the quay. It is a fender, preferably provided in two upper and lower tiers.Further, the fender is a roller type fender in which a roller having a horizontal axis parallel to the heel side is attached to the tip of the stay. It is preferable that the roller is provided so as to be able to roll up and down in contact with the quay.

これにより、前記フェンダーが岸壁に弾力的に当接することで、作業船の舷側と岸壁の間隔を一定の間隔に保持でき、特に先端部にローラを有するローラ型フェンダーの場合、潮の干満による海面の上下変動にも難なく追従でき、前記間隔を一定に安定性よく保持できる。   As a result, the fender is elastically abutted against the quay, so that the distance between the dock side of the work ship and the quay can be kept constant, especially in the case of a roller type fender having a roller at the tip, the sea surface due to tides It is possible to follow up and down fluctuations without difficulty and to keep the interval constant and stable.

上記したように本発明の鋼製矢板構造物の補修工法によれば、専用の補修用作業船を利用して、該作業船側すなわち海側からの作業で、作業空間を確保するための補修作業用の止水箱を、その設置個所を確認しながら所定の個所に容易に設置できるので、前記止水箱の設置時間を大幅に短縮でき、また、岸壁近くの陸部が岩場等の起伏の激しい地形であったり、狭小なスペースしかない場合であっても、前記止水箱を問題なく設置して補修作業を行うことができる。そのため、補修作業用の止水箱を使用する場合の作業時間及び労力を大幅に削減でき、ひいては鋼製矢板構造物の補修作業の効率化、合理化、低コスト化を図ることができる。   As described above, according to the steel sheet pile structure repair method of the present invention, using a dedicated repair work ship, repair work for securing a work space by work from the work ship side, that is, from the sea side. The water stop box can be easily installed at the specified location while checking its installation location, so the installation time of the water stop box can be greatly shortened, and the land near the quay has a rough terrain such as a rocky place. Even if there is only a small space, the water stop box can be installed without any problem for repair work. Therefore, the work time and labor when using the water stop box for repair work can be greatly reduced, and the efficiency, rationalization, and cost reduction of the repair work of the steel sheet pile structure can be achieved.

また、本発明の補修用作業船によれば、前記の補修工法の実施を容易にし、補修効率を向上でき、さらには、前記作業船を利用して、錆落としや付着物除去等により発生した剥離屑片等を、海中に放出することなく所定の廃棄位置に輸送して廃棄することができることにもなり、港湾の海中汚染の低減にも寄与できる。   In addition, according to the repair work ship of the present invention, it is possible to facilitate the implementation of the repair method and improve the repair efficiency, and further, the work ship is used for removing rust, removing deposits, and the like. The peeled debris can be transported to a predetermined disposal position and discarded without being released into the sea, which can contribute to the reduction of sea pollution in the harbor.

次に、本発明の実施の形態を図面に示す実施例に基づいて説明する。   Next, embodiments of the present invention will be described based on examples shown in the drawings.

図1は、本発明の鋼製矢板構造物の検査、補修、補強工事等の補修工法において使用する補修用作業船の概略平面図、図2は同作業船の概略を示す側面図、図3は止水箱を吊り上げた状態の一部の拡大側面図、図4は同上の一部の正面図、図5は止水箱を設置した状態の略示断面図、図6及び図7は間隔保有手段部分の略示拡大図、図8(a)(b)は止水箱の設置状態の説明図である。   FIG. 1 is a schematic plan view of a repair work ship used in a repair method such as inspection, repair, reinforcement work, etc. of a steel sheet pile structure of the present invention, FIG. 2 is a side view showing an outline of the work ship, FIG. Fig. 4 is a partially enlarged side view of a state in which the water stop box is lifted, Fig. 4 is a front view of a part of the same, Fig. 5 is a schematic sectional view of the state in which the water stop box is installed, and Figs. FIG. 8A and FIG. 8B are explanatory views of the installation state of the water stop box.

図において、1は艀形の補修用作業船であり、従来の作業台船等と同様に構成されてなり、自力航行によりあるいは曳航されることにより海上の任意の場所に移動できるようになっている。この作業船1には、少なくとも一方の舷側1aと岸壁50との間に、止水箱設置に必要な所定の間隔Sを保有して繋留するための間隔保有手段2と、前記岸壁50における鋼製矢板構造物51に当接して設置することで所定の作業空間を確保するための補修作業用の止水箱3と、該止水箱3を吊り上げ移動できる1もしくは複数台の吊り上げ移動装置4とを備えている。   In the figure, reference numeral 1 denotes a dredged repair work boat, which is configured in the same manner as a conventional work table ship, etc., and can move to any place on the sea by self-navigation or by towing. Yes. The work ship 1 includes a space holding means 2 for holding a predetermined space S necessary for installing a water stop box between at least one side 1a and the quay wall 50, and steel made on the quay wall 50. A water stop box 3 for repair work for securing a predetermined work space by being installed in contact with the sheet pile structure 51, and one or a plurality of lifting and moving devices 4 capable of lifting and moving the water stop box 3 are provided. ing.

前記間隔保有手段2としては、前記作業船1の少なくとも一方の舷側1aの一部、好ましくは前後部(船首側と船尾側)の2個所において、それぞれステイ21が前記舷側1aより側方に突出してその先端部がコンクリート等の岸壁50に対し当接することにより、舷側1aと岸壁50との間に前記止水箱3を降下させ設置するのに必要な間隔S(例えば止水箱の前後方向幅が最大1.5mの場合、2〜4mの間隔)を保有し得る緩衝機能を持つフェンダー20よりなる。   As the space holding means 2, stays 21 protrude laterally from the dredging side 1 a at a part of at least one dredging side 1 a of the work boat 1, preferably at two positions on the front and rear portions (the bow side and the stern side). When the leading end of the lever abuts against the quay 50 such as concrete, an interval S (for example, the width in the front-rear direction of the water proof box) is required to lower and install the water stop box 3 between the shore side 1a and the pier 50. In the case of a maximum of 1.5 m, the fender 20 has a buffering function capable of holding an interval of 2 to 4 m.

前記フェンダー20は、岸壁50における鋼製矢板構造物51の表面位置よりも突出している縁部端面50aに当接する位置に設けられるのが望ましいが、一つのフェンダーであると、潮位の変動によって前記縁部端面50aに当接できないことがあるので、通常、図6及び図7のように、前記フェンダー20は間隔をおいて上下2段に設けられ、潮位の変動があっても少なくともいずれか一方が前記縁部端面50aに当接できるように設けられる。もちろん、上下方向の寸法によっては一つのフェンダーを設けることも、また一つのフェンダーを上下動可能に設けることもできる。図中のWLは海水面を示している。   The fender 20 is preferably provided at a position that contacts the edge end surface 50a protruding from the surface position of the steel sheet pile structure 51 on the quay 50. Since the edge part end face 50a may not be contacted, the fenders 20 are usually provided in two upper and lower stages at intervals as shown in FIGS. 6 and 7, and at least one of the fenders varies even if the tide level fluctuates. Is provided so as to be able to contact the edge end surface 50a. Of course, depending on the dimension in the vertical direction, one fender can be provided, or one fender can be provided to be movable up and down. WL in the figure indicates the sea level.

いずれの場合も、緩衝機能を保有させるために、前記ステイ21の先端部には、タイヤに使用される強度のあるゴム材等の弾性体を取設して、岸壁50に対して弾力的に当接できるようにしておくのが好ましい。   In any case, in order to have a buffer function, an elastic body such as a strong rubber material used for the tire is provided at the tip of the stay 21 so as to be elastic with respect to the quay 50. It is preferable to allow contact.

図6及び図7の場合は、前記間隔保有手段2としての上下2段のフェンダー20が、先端部に舷側1aと平行な水平の軸心を持つローラ22が付設されたローラ型フェンダーであり、前記ローラ22が岸壁50に対し当接した状態で上下に転動可能に設けられており、これにより、潮位の変動による前記作業船1の上下動に伴って前記フェンダー20がスムーズに上下動できるようになっている。前記ローラ22は、剛体のローラであっても構わないが、実施上はゴム材等の弾性体よりなるものが、岸壁50に対する当接時の衝撃を吸収でき好ましい。   In the case of FIGS. 6 and 7, the upper and lower two-stage fenders 20 as the space holding means 2 are roller-type fenders each having a roller 22 having a horizontal axis parallel to the heel side 1 a attached to the tip. The roller 22 is provided so as to be able to roll up and down while being in contact with the quay 50, so that the fender 20 can smoothly move up and down as the work boat 1 moves up and down due to fluctuations in tide level. It is like that. The roller 22 may be a rigid roller, but in practice, a roller made of an elastic material such as a rubber material is preferable because it can absorb an impact when contacting the quay 50.

また、前記ステイ21の先端側部材21aを、基部側部材21bに対し進退自在に挿嵌構成し、該ステイ21の突出長さ、すなわち舷側1aと岸壁50との間隔Sを適宜調整し設定できるように構成するのが好ましい。   In addition, the distal end side member 21a of the stay 21 can be inserted into and retracted from the base side member 21b, and the protruding length of the stay 21, that is, the distance S between the heel side 1a and the quay wall 50 can be adjusted and set as appropriate. It is preferable to configure as described above.

図中の11a.11bは、前記作業船1に設置されたウインチ12に連結された綱や索条等の繋留用の連結部材であり、該連結部材11a.11bを陸上の連結用突起部に連結したり、或いは錨を降ろしたりして、前記作業船1を岸壁50近くの海上に前記間隔Sを保有して適宜繋留できるように設けられている。   11a. 11b is a connecting member for anchoring a rope, a rope, or the like connected to the winch 12 installed in the work boat 1, and the connecting members 11a. 11b is connected to a land-use connecting projection, or a dredger is lowered, so that the work boat 1 is provided on the sea near the quay 50 with the space S and can be appropriately anchored.

前記止水箱3は、平面矩形の底板部31、該底板部31の後端部に連結された後板部32と、該底板部31の両側に連結されかつ前記後板部32に連結された両側板部33,33とにより、鋼製矢板構造物51との対向側になる前面及び上面が開放形をなす箱本体30が構成されてなる。前記底板部31、後板部32及び両側板部33,33は、相互に溶接手段等により一体に連結され、該連結部分からは水が浸入しないように構成される。   The water stop box 3 has a flat rectangular bottom plate portion 31, a rear plate portion 32 connected to the rear end portion of the bottom plate portion 31, and is connected to both sides of the bottom plate portion 31 and connected to the rear plate portion 32. A box body 30 having an open front surface and an upper surface that are opposed to the steel sheet pile structure 51 is configured by the side plate portions 33 and 33. The bottom plate portion 31, the rear plate portion 32, and the side plate portions 33, 33 are integrally connected to each other by welding means or the like, and are configured so that water does not enter from the connection portion.

前記底板部31の前端部は、鋼製矢板構造物51の表面の凹部51aと凸部51bに略対応する凹凸形状をなすとともに、前記両側板部33,33は、前記底板部31の前端部が鋼製矢板構造物51に当接するときに、前記両側板部33,33の前端部が鋼製矢板構造物51の凹部51aの内底面に当接するように形成されている。通常、これらの底板部31及び左右両側板部33,33の前端部には、鋼製矢板構造物51に対する当接時の緩衝及び気密性保持のために弾性体(図示省略)が付設されている。これらの弾性体は、通常のゴム材のほか、スポンジ状ゴム材や中空のチューブ状物を利用することもできる。   The front end portion of the bottom plate portion 31 has a concavo-convex shape substantially corresponding to the concave portion 51 a and the convex portion 51 b on the surface of the steel sheet pile structure 51, and the both side plate portions 33 and 33 are front end portions of the bottom plate portion 31. Is formed so that the front end portions of the side plate portions 33, 33 are in contact with the inner bottom surface of the recess 51 a of the steel sheet pile structure 51. Usually, an elastic body (not shown) is attached to the front end portions of the bottom plate portion 31 and the left and right side plate portions 33, 33 for buffering and maintaining airtightness when contacting the steel sheet pile structure 51. Yes. As these elastic bodies, in addition to a normal rubber material, a sponge-like rubber material or a hollow tube-like material can be used.

前記箱本体30の内部には、前記底板部31上に網体等の作業用床体34が設置されるとともに、前記床体34の下部に浸入した水を排水するための排水ポンプ35が設けられ、さらに、前記箱本体30を岸壁50の鋼製矢板構造物51の側に引き寄せるためのレバーブロック等の牽引手段や連結部材36を係止するための係止部37が設けられている。また、前記両側板部33,33の上端部等の所要の個所に、クレーン等の係止用フックを係止するための環状の係止部38が設けられている。   A work floor body 34 such as a net is installed on the bottom plate portion 31 inside the box body 30, and a drain pump 35 for draining water that has entered the lower portion of the floor body 34 is provided. Further, a pulling means such as a lever block for pulling the box body 30 toward the steel sheet pile structure 51 of the quay wall 50 and a locking portion 37 for locking the connecting member 36 are provided. Further, an annular locking portion 38 for locking a locking hook such as a crane is provided at a required location such as the upper end portion of the both side plate portions 33 and 33.

図の場合、前記構成の複数の止水箱3が、前記作業船1の甲板上の前記一方の舷側1aの近くに設定された仮置き部分に、前面を舷側外方に向けて並列して、特には前記舷側1aの長さ方向に該止水箱3の横幅Wより狭い間隔をおいて横列状に並列して、それぞれ後述する吊り上げ移動装置4により適宜に吊り上げ可能に配置されている。   In the case of the figure, a plurality of water-stop boxes 3 having the above-mentioned configuration are arranged in parallel with the front side facing the outer side of the dredging side in the temporary placement part set near the one side of the dredging side 1a on the deck of the work boat 1, In particular, they are arranged in a row in the longitudinal direction of the heel side 1a at intervals narrower than the lateral width W of the water stop box 3 so as to be appropriately lifted by the lifting and moving devices 4 described later.

前記吊り上げ移動装置4は、前記止水箱3を吊り上げて移動しかつ舷側外方に吊り出すことができるものであれば、どのような構成の装置であってもよいが、図示する実施例の場合は、次のように構成されている。   The lifting and moving device 4 may be any device as long as it can lift and move the water stop box 3 and hang it outward from the heel side, but in the case of the illustrated embodiment Is configured as follows.

前記作業船1の甲板上には、一方の舷側1aに沿って、特に前記止水箱3の仮置き部より内方側に移動用レール41が設けられるとともに、該レール41上を移動可能なハンドリングタワー42が設置されており、該ハンドリングタワー42の前後部に間隔をおいて、それぞれ前記舷側1a外方の海側に所要長さ分(例えば2〜5m)突出する平行な2本一組の水平支持材43、43が設けられている。そして、前記吊り上げ移動装置4として、前後部の各組2本の水平支持材43,43上には、それぞれフック付き吊り手段44を有するホイスト型のクレーン装置45が長手方向に移動可能に架け渡して備えられ、各クレーン装置45の本体部45aより垂下した各組2本のフック付きの吊り手段44により、前記レール41よりも舷側1a側に仮置き配置されている前記止水箱3を2点支持状態で吊り上げて、舷側1aに対し直交する外方へ吊り出せるように設けられている。44aは前記吊り手段44の係止用フックを示す。
On the deck of the work boat 1, a moving rail 41 is provided along the one side 1 a, particularly on the inner side of the temporary storage portion of the water stop box 3, and handling is possible on the rail 41. A tower 42 is installed, and a pair of parallel two pairs projecting a required length (for example, 2 to 5 m) to the sea side outside the shore side 1a with a space between the front and rear portions of the handling tower 42. Horizontal support members 43 and 43 are provided. As the lifting and moving device 4, a hoist type crane device 45 having hooking means 44 with hooks is laid over the two horizontal support members 43 and 43 at the front and rear portions so as to be movable in the longitudinal direction. Two sets of water-stopping boxes 3 that are temporarily placed on the heel side 1a side of the rail 41 by two hanging means 44 with hooks each hanging from the main body 45a of each crane device 45 are provided. It is provided so that it can be lifted in a supported state and hung outwards perpendicular to the heel side 1a. Reference numeral 44 a denotes a hook for locking the suspension means 44.

また、前記ハンドリングタワー42の前後二つのクレーン装置45の間隔は、前記止水箱3の仮置き部における該止水箱3の配置間隔の約2倍に設定され、二つのクレーン装置45により、一つおきの二つの止水箱3を同時に吊り上げ移動できるように構成されている。また各組2本の水平支持材43,43備えられているクレーン装置45の2本の吊り手段44の間隔は、吊り上げ対象の止水箱3の横幅に応じて調整できるように設けられる。その手段として、2本一組の前記水平支持材43,43の上にクレーン装置45を架け渡して載せておいて、水平支持材43,43のスライド調整により前記間隔を調整できるように構成することができる。
Further, the distance between the two crane devices 45 before and after the handling tower 42 is set to be approximately twice the arrangement interval of the water stop boxes 3 in the temporary placement portion of the water stop box 3. It is comprised so that every two water stop boxes 3 can be lifted and moved simultaneously. Further, the distance between the two suspension means 44 of the crane device 45 provided on the two horizontal support members 43, 43 is provided so as to be adjustable according to the lateral width of the water stop box 3 to be lifted. As a means for this , a crane device 45 is laid over and placed on a pair of the horizontal support members 43 , 43 , and the interval can be adjusted by slide adjustment of the horizontal support members 43, 43. be able to.

前記吊り上げ移動装置4としては、前記の水平支持材43,43備えられて一方向に移動できるクレーン装置に限らず、自走式のクレーンや旋回可能なクレーンを利用することもできる。
The lifting and moving device 4 is not limited to a crane device that is provided on the horizontal support members 43 and 43 and can move in one direction, and a self-propelled crane or a swingable crane can also be used.

前記作業船1の甲板上には、補修作業における錆落としや牡蠣等の付着物除去により発生する剥離屑片を回収するための回収用コンベアが設けられ、補修作業により発生した剥離屑片を作業船1内の一時貯蔵庫6に搬送するように設けられている。図の場合、前記回収用コンベア5は、前記ハンドリングタワー42の移動用のレール41及び止水箱3の仮置き部よりも舷側1a側において該舷側1aに沿って設けられた第1のベルトコンベア5aと、これに直交する第2のベルトコンベア5bとよりなる。   A recovery conveyor is provided on the deck of the work ship 1 to recover the debris generated by removal of rust removal and oyster deposits during repair work. It is provided so as to be transported to a temporary storage 6 in the ship 1. In the case of the figure, the recovery conveyor 5 is a first belt conveyor 5a provided along the heel side 1a on the heel side 1a side with respect to the rail 41 for movement of the handling tower 42 and the temporary storage part of the water stop box 3. And a second belt conveyor 5b orthogonal thereto.

前記作業船1には、前記の各構成のほかに、清水タンク7、高圧洗浄器8、コンプレッサー9、サンドブラスト装置13とサンドブラスト用の砂置き場14が装備され、さらに燃料タンク15や発電機室16、倉庫17、作業員の休憩所18や現場管理事務所19等が必要に応じて設定される。このほか、作業船1には、補修工事に必要な機器類や機材一式が装備される。   In addition to the above components, the work boat 1 is equipped with a fresh water tank 7, a high pressure washer 8, a compressor 9, a sand blasting device 13 and a sand blasting place 14, and further a fuel tank 15 and a generator chamber 16. A warehouse 17, a worker resting place 18, a site management office 19, and the like are set as necessary. In addition, the work boat 1 is equipped with equipment and a set of equipment necessary for repair work.

次に、前記の補修用作業船1を用いる本発明の補修工法について説明する。   Next, the repair method of the present invention using the repair work boat 1 will be described.

まず、補修工事を実施する岸壁50が存する港湾において、該港湾内の補修工事対象の岸壁50近くの海上に前記作業船1を一方の舷側1aを所定の間隔を保有させて接岸させるようにして繋留する。この際、作業船1に備えるウインチ12の操作で繋留用の綱や索条等の連結部材11a.11bの長さを調整して位置決めする。同時に、前記作業船1の一方の舷側1aに設けた間隔保有手段2としてのフェンダー20を構成するステイ21の先端部、例えば図6及び図7のようにローラ22を、岸壁50の海側の縁部端面50aに当接させるようにして、補修対象の岸壁50と作業船1の舷側1aとの間に所定の間隔Sを保有するように繋留する(図1)。これにより潮位の変動にも問題なく対応できる。   First, in a port where there is a quay 50 where repair work is to be performed, the work boat 1 is brought into contact with the berth 1a on the sea near the quay 50 to be repaired in the port while maintaining a predetermined interval on one side. Tether. At this time, the connection members 11a. The position of 11b is adjusted and positioned. At the same time, the tip of the stay 21 constituting the fender 20 as the space holding means 2 provided on one side 1a of the work ship 1, for example, the roller 22 as shown in FIGS. Attaching to the edge end surface 50a is anchored so as to maintain a predetermined distance S between the quay wall 50 to be repaired and the side 1a of the work boat 1 (FIG. 1). This can cope with fluctuations in tide level without any problems.

前記のように作業船1を所定位置にセットした状態において、作業船1上の前記舷側1a近くの仮置き部に並列して配置されている前記止水箱3を、吊り上げ移動装置4としてハンドリングタワー42より突出する前後部それぞれ2本一組の水平支持材43,43備えられているクレーン装置45により吊り上げる(図3及び図4)。すなわち、該クレーン装置45の各組2本の吊り手段44の係止用フック44aを止水箱3の両側板部33の上端部に有する係止部38に係止して吊り上げる。この際、クレーン装置45の2本の吊り手段44の間隔を、止水箱3の横幅に応じて予め調整し設定しておく。
In the state where the work boat 1 is set at a predetermined position as described above, the water stop box 3 arranged in parallel with the temporary storage portion on the work boat 1 near the side 1a is used as a lifting and moving device 4 as a handling tower. The front and rear portions projecting from 42 are lifted by a crane device 45 provided on a set of horizontal support members 43, 43 (FIGS. 3 and 4). That is, the hooks 44 a for locking the two hanging means 44 of each set of the crane device 45 are locked to the locking portions 38 at the upper ends of the side plate portions 33 of the water stop box 3 and lifted. At this time, the interval between the two suspension means 44 of the crane device 45 is adjusted and set in advance according to the lateral width of the water stop box 3.

こうして、前記クレーン装置45の2本の吊り手段44のフック44aを止水箱3の係止部38に係止してクレーン装置45を作動することにより、2点支持状態で揺動や回転を生じさせずに吊り上げることができる。   In this way, the hooks 44a of the two suspension means 44 of the crane device 45 are locked to the locking portion 38 of the water stop box 3 and the crane device 45 is operated, so that swinging or rotation occurs in a two-point supported state. Can be lifted without being

前記のように吊り上げた状態において、前記移動用レール41上のハンドリングタワー42の移動により、前記吊り上げた止水箱3を岸壁50における補修対象の鋼製矢板構造物51の位置に対してほぼ合わせてから、前記水平支持材43上のクレーン装置45を、該水平支持材43に沿って先端側へ移動させ、作業船1側から確認しながら、吊り上げた状態の前記止水箱3を、舷側1aの外方へ吊り出し前記鋼製矢板構造物51に近づけるとともに、水中の所定の高さ位置に降下させて前記鋼製矢板構造物51に対向させ、できるだけ鋼製矢板構造物51に接近させるようにする。   In the state of being lifted as described above, the lifted water stop box 3 is approximately aligned with the position of the steel sheet pile structure 51 to be repaired on the quay 50 by the movement of the handling tower 42 on the moving rail 41. Then, the crane device 45 on the horizontal support member 43 is moved to the front end side along the horizontal support member 43, and the water-stopping box 3 in a state of being lifted is confirmed on the side 1a while checking from the work ship 1 side. The steel sheet pile structure 51 is hung outward and brought close to the steel sheet pile structure 51 and lowered to a predetermined height in water so as to face the steel sheet pile structure 51 so as to be as close to the steel sheet pile structure 51 as possible. .

この状態において、前記止水箱3及び鋼製矢板構造物51における設置個所を確認し位置合わせしながら、前記止水箱3の前面、すなわち底板部31、両側板部33,33の前端部を前記鋼製矢板構造物51に対し当接させる。この当接は、補修用作業船1に備える押圧手段(図示せず)を利用して前記止水箱3を後背部から押圧するか、あるいは前記のようにクレーン装置45により接近させた止水箱3を、チェーンブロック等の牽引手段を利用して鋼製矢板構造物51に引きつけるようにする。そして、前記止水箱3内の海水を排水ポンプ35で排出することにより、該止水箱3に作用する水圧を利用して該止水箱3の前端部を前記鋼製矢板構造物51の表面に対し強く密着させるようにして水密性を確保し、所定の作業空間を確保する。通常、この状態において、図5のように牽引手段や連結部材36により鋼製矢板構造物51に対し装着した状態に保持しておく。   In this state, while confirming and positioning the installation locations in the water stop box 3 and the steel sheet pile structure 51, the front end of the water stop box 3, that is, the bottom plate portion 31, and the front end portions of the both side plate portions 33, 33 are connected to the steel plate. It abuts against the sheet pile structure 51. This abutment uses the pressing means (not shown) provided in the repair work boat 1 to press the water stop box 3 from the back, or the water stop box 3 brought closer by the crane device 45 as described above. Is attracted to the steel sheet pile structure 51 by using a pulling means such as a chain block. And by discharging the seawater in the water stop box 3 with the drainage pump 35, the front end of the water stop box 3 is made to the surface of the steel sheet pile structure 51 using the water pressure acting on the water stop box 3. The water tightness is ensured by tightly adhering, and a predetermined work space is secured. Normally, in this state, the steel sheet pile structure 51 is held by the traction means or the connecting member 36 as shown in FIG.

なお、前記のように止水箱3の設置作業が作業船1と岸壁50との間で行われることになるために、作業船1が強風や波浪に対する防護の役目を果たし、波浪等の影響を軽減できて、比較的安全に且つ容易に設置作業を行うことができる。   In addition, since the installation work of the water stop box 3 is performed between the work ship 1 and the quay 50 as described above, the work ship 1 serves to protect against strong winds and waves, and the effects of waves and the like are affected. It can be reduced, and the installation operation can be performed relatively safely and easily.

次に、前記のように止水箱3を設置した状態において、前記吊り上げ移動装置4であるクレーン装置45の吊り手段44を前記止水箱3の係止部38から外し、該クレーン装置45を水平支持材43上の位置に戻し、その後、ハンドリングタワー42を別の止水箱3の位置に移動させて、前記同様にクレーン装置45の2本の吊り手段44により、該止水箱3を2点支持状態で吊り上げ、該止水箱3を前記同様の操作手順で岸壁50における鋼製矢板構造物51の所定の位置に設置する。   Next, in the state where the water stop box 3 is installed as described above, the suspension means 44 of the crane device 45 which is the lifting and moving device 4 is removed from the locking portion 38 of the water stop box 3 and the crane device 45 is horizontally supported. After returning to the position on the material 43, the handling tower 42 is moved to the position of another water stop box 3, and the water stop box 3 is supported at two points by the two suspension means 44 of the crane device 45 as described above. The water stop box 3 is installed at a predetermined position of the steel sheet pile structure 51 on the quay 50 by the same operation procedure as described above.

このようにして、例えば図8(a)のように、岸壁50における鋼製矢板構造物51に対し四つの止水箱3を一定の間隔で設置した状態で、錆落としや付着物除去等の清掃作業、補修や補強作業を行う。この際、錆落としや付着物除去等により発生した剥離屑片等は、海中に放出することなく、作業船1上の回収用コンベア5により一時貯蔵庫6に搬送して貯蔵しておき、全体の補修作業の完了後に作業船1により、所定の廃棄位置に輸送して廃棄する。   Thus, for example, as shown in FIG. 8 (a), cleaning is performed such as removing rust and removing deposits in a state where the four water stop boxes 3 are installed at regular intervals with respect to the steel sheet pile structure 51 on the quay 50. Work, repair and reinforcement work. At this time, exfoliation debris generated by removing rust, removing attached matter, etc. is transported to the temporary storage 6 by the recovery conveyor 5 on the work ship 1 and stored without being released into the sea. After the repair work is completed, the work ship 1 transports it to a predetermined disposal position and discards it.

前記各止水箱3内の長さ範囲内での補修作業が完了すると、前記吊り上げ移動装置4としての前記クレーン装置45により各止水箱3を吊り上げ状態にして、鋼製矢板構造物51に対する固定を外し、前記クレーン装置45を後退させて各止水箱3を作業船1の仮置き部に戻す。続いて、前記ハンドリングタワー42を移動させて、水平支持材43上のクレーン装置45の位置を、前回の止水箱3の設置位置間の部分に移動させ、前記同様に、各止水箱3をクレーン装置45により吊り上げ移動し、舷側1a外方へ吊り出して前記鋼製矢板構造物51に近づけるとともに、鋼製矢板構造物51や止水箱3を確認しながら、水中の所定の高さ位置に降下させて前記鋼製矢板構造物51に対向させ且つ当接させて、該止水箱3を鋼製矢板構造物51の表面における前回の設置位置間の部分、つまり未補修個所を囲むように設置する〔図8(b)〕。こうして、前回の未補修個所の補修作業を行う。これにより、図8(a)及び(b)の止水箱3の設置状態での1サイクル分の長さ範囲の補修作業が完了する。図中のL0 は1サイクルの補修作業の長さを示し、L1 は各止水箱3毎の補修作業の長さを示す。 When the repair work within the length range in each water stop box 3 is completed, each water stop box 3 is lifted by the crane device 45 as the lifting movement device 4 and fixed to the steel sheet pile structure 51. Then, the crane device 45 is retracted and each water stop box 3 is returned to the temporary storage portion of the work boat 1. Subsequently, the handling tower 42 is moved to move the position of the crane device 45 on the horizontal support member 43 to a portion between the previous installation positions of the water stop box 3. It is lifted and moved by the device 45, hung outward from the heel side 1a, brought close to the steel sheet pile structure 51, and lowered to a predetermined height position in the water while checking the steel sheet pile structure 51 and the water stop box 3. The steel sheet pile structure 51 is opposed to and brought into contact with the steel sheet pile structure 51, and the water stop box 3 is installed so as to surround a portion between the previous installation positions on the surface of the steel sheet pile structure 51, that is, an unrepaired portion. FIG. 8 (b)]. In this way, the previous unrepaired part is repaired. Thereby, the repair work of the length range for 1 cycle in the installation state of the water stop box 3 of Fig.8 (a) and (b) is completed. In the figure, L0 indicates the length of the repair work for one cycle, and L1 indicates the length of the repair work for each water stop box 3.

前記1サイクルの長さL0 の補修作業が完了すると、前記クレーン装置45により各止水箱3を一旦作業船1上の仮置き部に戻した後、前記ハンドリングタワー42を、鋼製矢板構造物51における前記補修作業完了範囲に続く前記と同じ長さL0 の部分に移動させて、前記同様に、各止水箱3を鋼製矢板構造物51に対し当接設置して補修作業を行う。この補修作業が完了すると、次に、前記作業船1を、前記補修作業が完了した前記長さL0 の部分に続く鋼製矢板構造物51に対応する位置に移動させて、上記同様に各止水箱3を補修対象の鋼製矢板構造物51に対し当接設置して補修作業を行う。これにより、かなり長い岸壁50における鋼製矢板構造物51の補修作業を容易に効率よく且つ安全に行える。   When the repair work for the length L0 of one cycle is completed, the water stopping boxes 3 are once returned to the temporary storage portion on the work boat 1 by the crane device 45, and then the handling tower 42 is moved to the steel sheet pile structure 51. In the same manner as described above, the water stop box 3 is brought into contact with the steel sheet pile structure 51 to perform the repair work. When this repair work is completed, the work boat 1 is then moved to a position corresponding to the steel sheet pile structure 51 following the portion of the length L0 where the repair work has been completed. The water box 3 is in contact with the steel sheet pile structure 51 to be repaired for repair work. Thereby, the repair work of the steel sheet pile structure 51 on the considerably long quay 50 can be performed easily and efficiently.

特に、鋼製矢板構造物51の補修作業のための止水箱3の設置作業を、海側の作業船1から、吊り上げた止水箱3や設置個所を確認しながら安全に容易に行え、設置作業を効率化でき、また岸壁50のある陸部が岩場等の起伏の激しい地形であったり、狭小なスペースしかない場合であっても、前記止水箱を問題なく設置して補修作業を行うことができる。   In particular, the installation work of the water stop box 3 for repairing the steel sheet pile structure 51 can be safely and easily performed while checking the suspended water stop box 3 and the installation location from the work boat 1 on the sea side. Even if the land where the quay 50 is located is a rough terrain such as a rocky place or there is only a small space, the water stop box can be installed without any problems for repair work. it can.

しかも、上記の補修作業における錆落としや付着物除去により発生した剥離屑片等を、海中に放出することなく所定の廃棄位置に輸送して廃棄することができるため、港湾の海中汚染の低減にも寄与できる。   In addition, it is possible to transport and dispose of debris generated by rust removal and deposit removal in the above repair work to a predetermined disposal location without being released into the sea, thus reducing sea pollution at the port. Can also contribute.

本発明の鋼製矢板構造物の補修工法及び補修用作業船は、港湾における岸壁の鋼製矢板構造物の検査、清掃、補修及び補強等の作業に好適に利用でき、鋼湾以外の岸壁における鋼製矢板構造物の補修作業にも好適に利用できる。   The steel sheet pile structure repair work method and repair work ship of the present invention can be suitably used for work such as inspection, cleaning, repair and reinforcement of the steel sheet pile structure of the quay in the harbor, and in the quay other than the steel bay. It can also be suitably used for repairing steel sheet pile structures.

本発明の鋼製矢板構造物の検査、補修、補強工事等の補修工法において使用する補修用作業船の概略平面図である。It is a schematic plan view of the repair work ship used in repair methods, such as a test | inspection of steel sheet pile structure of this invention, repair, and reinforcement construction. 同作業船の概略を示す側面図である。It is a side view which shows the outline of the work ship. 止水箱を吊り上げた状態の一部の拡大側面図である。It is a partial enlarged side view of the state which lifted the water stop box. 同上一部の正面図である。It is a partial front view same as the above. 止水箱を設置した状態の略示断面図である。It is a schematic sectional drawing of the state which installed the water stop box. 間隔保有手段としてのフェンダー部分の略示拡大図である。It is a schematic enlarged view of a fender portion as an interval holding means. 同上の潮位が変化した状態の略示拡大図である。It is a schematic enlarged view of a state where the tide level has changed. (a)及び(b)は止水箱の設置状態の説明図である。(A) And (b) is explanatory drawing of the installation state of a water stop box.

符号の説明Explanation of symbols

1…補修用作業船、1a…舷側、2…間隔保有手段、3…止水箱、4…吊り上げ移動装置、5…回収用コンベア、5a…第1のベルトコンベア、5b…第2のベルトコンベア、6…一時貯蔵庫、7…清水タンク、8…高圧洗浄器、9…コンプレッサー、11a.11b…繋留用の連結部材、12…ウインチ、13…サンドプラスト装置、14…砂置き場、15…年利用タンク、16…発電機室、17…倉庫、18…休憩所、19…現場管理事務所、20…フェンダー、21…ステイ、21a…先端側部材、21b…基部側部材、22…ローラ、30…箱本体、31…底板部、32…後板部、33…側板部、34…床体、35…排水ポンプ、36…連結部材、37…係止部、38…係止部、41…移動用レール、42…ハンドリングタワー、43…水平支持材、44…吊り手段、44a…係止用フック45…クレーン装置、45a…本体部、50…岸壁、51…鋼製矢板構造物、S…間隔。   DESCRIPTION OF SYMBOLS 1 ... Work ship for repair, 1a ... Side side, 2 ... Space holding means, 3 ... Water stop box, 4 ... Lifting movement apparatus, 5 ... Recovery conveyor, 5a ... 1st belt conveyor, 5b ... 2nd belt conveyor, 6 ... Temporary storage, 7 ... Fresh water tank, 8 ... High pressure washer, 9 ... Compressor, 11a. 11b: connecting member for anchoring, 12 ... winch, 13 ... sand plast device, 14 ... sand storage place, 15 ... year tank, 16 ... generator room, 17 ... warehouse, 18 ... rest area, 19 ... site management office , 20 ... fender, 21 ... stay, 21a ... tip side member, 21b ... base side member, 22 ... roller, 30 ... box body, 31 ... bottom plate part, 32 ... rear plate part, 33 ... side plate part, 34 ... floor body 35 ... Drain pump, 36 ... Connecting member, 37 ... Locking portion, 38 ... Locking portion, 41 ... Rail for movement, 42 ... Handling tower, 43 ... Horizontal support material, 44 ... Suspension means, 44a ... For locking Hook 45 ... crane device, 45a ... main body, 50 ... quay, 51 ... steel sheet pile structure, S ... spacing.

Claims (7)

前面開放形の補修作業用の止水箱を、補修対象の岸壁の鋼製矢板構造物の一部を囲むように該止水箱の前面を当接させ、該止水箱により所定の作業空間を確保して補修作業を行う鋼製矢板構造物の補修工法であって、
前記補修作業用の止水箱と、該止水箱を舷側より外方に吊り上げる吊り上げ移動装置とを備える補修用作業船を、補修対象の岸壁に対し所定の間隔を保有するように繁留しておいて、
前記吊り上げ移動装置により吊り上げた前記止水箱を、前記作業船側から補修対象の岸壁の鋼製矢板構造物に近づけるとともに、作業船と岸壁との間から水中における所定の高さ位置に降ろし、該止水箱の前面を鋼製矢板構造物と対向させて、該止水箱の前面を鋼製矢板構造物に当接させるとともに該止水箱内の水を排出して所定の作業空間を確保するように設置して行う補修作業であって、
前記作業船の一方の舷側に沿って複数の止水箱を準備しておき、
前記複数の止水箱を、該止水箱の横幅よりも狭い間隔をおいて並列して前記鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行い、次に、前記各止水箱を、前記設置位置間の部分に移動させて、該止水箱を鋼製矢板構造物に当接させて設置し、各止水箱毎に補修作業を行うことを特徴とする鋼製矢板構造物の補修工法。
A water stop box for repair work with an open front is brought into contact with the front face of the water stop box so as to surround a part of the steel sheet pile structure of the quay to be repaired, and a predetermined work space is secured by the water stop box. Repair method of steel sheet pile structure for repair work,
A repair work vessel comprising the water stop box for repair work and a lifting and moving device for lifting the water stop box outward from the anchor side is bred so as to maintain a predetermined distance from the quay to be repaired. And
The water stop box lifted by the lifting and moving device is brought close to the steel sheet pile structure of the quay to be repaired from the work ship side, and is lowered to a predetermined height in water from between the work ship and the quay. The front of the water box is opposed to the steel sheet pile structure, and the front of the water stop box is brought into contact with the steel sheet pile structure, and the water in the water stop box is discharged to secure a predetermined work space. Repair work to be performed,
Prepare a plurality of water stop boxes along one side of the work boat,
The plurality of water stop boxes are installed in parallel with a narrower interval than the water stop box in contact with the steel sheet pile structure, and repair work is performed for each water stop box. A steel sheet pile, wherein each water stop box is moved to a portion between the installation positions, the water stop box is placed in contact with a steel sheet pile structure, and repair work is performed for each water stop box. Repair method for structures.
前面開放形の補修作業用の止水箱を、補修対象の岸壁の鋼製矢板構造物の一部を囲むように該止水箱の前面を当接させ、該止水箱により所定の作業空間を確保して補修作業を行うための補修用作業船であって、
少なくとも一方の舷側から突出して該舷側と岸壁との間に所定の間隔を保有して繋留するための間隔保有手段と、底板部、後板部および両側板部により形成され且つ排水用ポンプを備える前面開放形の前記補修作業用の止水箱と、該止水箱を吊り上げ移動できる吊り上げ移動装置とを備えてなり、
前記吊り上げ移動装置は、吊り上げた前記止水箱を、作業船側から補修対象の岸壁の鋼製矢板構造物に近づけるように移動させるとともに、作業船と岸壁との間から水中における所定の高さ位置に降ろして、該止水箱の前面を鋼製矢板構造物と対向させるように設けられ
前記作業船の甲板上には、一方の舷側に沿って移動可能なハンドリングタワーが設置されており、前記吊り上げ移動装置として、前記ハンドリングタワーから舷側外方に突出する水平支持材上に、該水平支持材に沿って移動可能なクレーン装置を備え、該クレーン装置の本体部より垂下した2本のフック付き吊り手段により、前記止水箱を2点支持して吊り上げるように設けられてなることを特徴とする鋼製矢板構造物の補修用作業船。
A water stop box for repair work with an open front is brought into contact with the front face of the water stop box so as to surround a part of the steel sheet pile structure of the quay to be repaired, and a predetermined work space is secured by the water stop box. Repair work ship for performing repair work,
A distance retaining means for projecting from at least one anchor side and retaining a predetermined distance between the anchor side and the quay wall, a bottom plate portion, a rear plate portion, and both side plate portions, and includes a drainage pump. Comprising a water stop box for the repair work of the front open type, and a lifting and moving device capable of lifting and moving the water stop box,
The lifting and moving device moves the suspended water-stopping box from the work ship side so as to approach the steel sheet pile structure of the quay to be repaired, and at a predetermined height position in the water from between the work ship and the quay. Down, provided so that the front of the water stop box faces the steel sheet pile structure ,
On the deck of the work ship, a handling tower is provided that can move along one side of the ship. As the lifting and moving device, the horizontal support material that protrudes outward from the side of the handling tower is placed on the horizontal support material. A crane apparatus movable along a support member is provided, and the water stop box is supported by two points suspended by two hooking means suspended from the main body of the crane apparatus so as to be lifted. A work ship for repairing steel sheet pile structures.
前記作業船の少なくとも一方の舷側に沿って所定の間隔をおいて複数の止水箱を備えるとともに、前記複数の止水箱を2点支持状態で吊り上げ移動が可能な複数の吊り上げ移動装置を備え、各吊り上げ移動装置により吊り上げた止水箱を舷側外方へ吊り出し可能に設けられてなる請求項に記載の鋼製矢板構造物の補修用作業船。 A plurality of water stop boxes provided at predetermined intervals along at least one side of the work ship, and a plurality of lifting and moving devices capable of lifting and moving the plurality of water stop boxes in a two-point supported state, The work boat for repairing a steel sheet pile structure according to claim 2 , wherein the water stop box lifted by the lifting and moving device is provided so as to be able to be lifted outwardly from the heel side. 前記作業船には、鋼製矢板構造物より剥離除去した剥離屑片の回収用コンベアと、該剥離屑片の一時貯蔵庫が設けられてなる請求項2又は3のいずれか1項に記載の鋼製矢板構造物の補修用作業船。 The steel according to any one of claims 2 and 3 , wherein the work ship is provided with a conveyor for recovering exfoliated debris peeled and removed from the steel sheet pile structure and a temporary storage for the exfoliated debris. Work boat for repairing sheet pile structures. 前記作業船には、補修作業のための高圧洗浄器、サンドブラスト装置及びコンプレッサーが搭載されてなる請求項のいずれか1項に記載の鋼製矢板構造物の補修用作業船。 The work ship for repairing a steel sheet pile structure according to any one of claims 2 to 4 , wherein the work ship is equipped with a high-pressure washing device, a sandblasting device, and a compressor for repair work. 前記舷側と岸壁の間の間隔保有手段が、先端部に弾性体が取設されてなるステイが前記舷側より突出して岸壁に当接することにより所定の間隔を保有し得るフェンダーであり、上下2段に設けられてなる請求項のいずれか1項に記載の鋼製矢板構造物の補修用作業船。 The space holding means between the shore side and the quay is a fender that can hold a predetermined space by a stay having an elastic body installed at the tip protruding from the heel side and abutting against the quay. A work ship for repairing a steel sheet pile structure according to any one of claims 2 to 5 . 前記フェンダーが、前記ステイの先端部に舷側と平行な水平の軸心を持つローラが付設されたローラ型フェンダーであり、前記ローラが岸壁に当接した状態で上下に転動可能に設けられてなる請求項に記載の鋼製矢板構造物の補修用作業船。 The fender is a roller type fender in which a roller having a horizontal axis parallel to the heel side is attached to the tip of the stay, and the roller is provided so as to be able to roll up and down while in contact with the quay. A work ship for repairing a steel sheet pile structure according to claim 6 .
JP2007202263A 2007-08-02 2007-08-02 Steel sheet pile structure repair method and work boat for repair Active JP4874889B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007202263A JP4874889B2 (en) 2007-08-02 2007-08-02 Steel sheet pile structure repair method and work boat for repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007202263A JP4874889B2 (en) 2007-08-02 2007-08-02 Steel sheet pile structure repair method and work boat for repair

Publications (2)

Publication Number Publication Date
JP2009035961A JP2009035961A (en) 2009-02-19
JP4874889B2 true JP4874889B2 (en) 2012-02-15

Family

ID=40438115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007202263A Active JP4874889B2 (en) 2007-08-02 2007-08-02 Steel sheet pile structure repair method and work boat for repair

Country Status (1)

Country Link
JP (1) JP4874889B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6283571B2 (en) * 2014-05-30 2018-02-21 若築建設株式会社 Fixing work box
JP7619585B1 (en) 2024-03-19 2025-01-22 水ing株式会社 How to maintain underwater equipment

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62242007A (en) * 1986-04-14 1987-10-22 Toa Harbor Works Co Ltd Repairing device for steel sheet pile
JP2003119793A (en) * 2001-10-10 2003-04-23 Otake Kogyo:Kk Underwater working method, working can and working device
JP2003212186A (en) * 2002-01-23 2003-07-30 Ihi Amtec Co Ltd Water-stopping box for repairing under water structure and repairing method for under water structure using the same

Also Published As

Publication number Publication date
JP2009035961A (en) 2009-02-19

Similar Documents

Publication Publication Date Title
CA2407139C (en) Temporary floatation stabilization device and method
JP5132435B2 (en) Installation method of water stop box and water stop box
CN112728212B (en) Offshore immersed pipe of sewage sea area discharge pipe and underwater installation construction method
US10919606B2 (en) Seabed base structure and method for installation of same
JP2010261165A (en) Temporary structure and construction method of incidental facilities for coastal construction
JP4874889B2 (en) Steel sheet pile structure repair method and work boat for repair
CN211172124U (en) Floating platform device for pile foundation construction
JP6401937B2 (en) Working scaffold and installation method
CA3033586C (en) Harbour plant and method for mooring a floating body in a harbour plant
JP5301410B2 (en) Repair method for pier structure
JP2012077578A (en) Work scaffolding and method for constructing the same
CN111470001A (en) Method for building ultra-large ship
JPH09195281A (en) How to install caisson at sea
JPH0840351A (en) Offshore joining method for large-scale floating unit
JP4094392B2 (en) Floating pier and evacuation device and evacuation method of floating pier
CN223304955U (en) Dock protection device for ultra-close underwater operation
KR102953112B1 (en) Construction method of anchoring device for floating structure
KR102245582B1 (en) Method for footing Jack up Barge using Mudmat
JP2001003332A (en) Caisson laying method and caisson laying floater
JPH11139385A (en) Bottomless floating body construction
Carroll Marina breakwater retrofitted wave attenuation, Kings Pier, Hobart
Joshi CAISSON CONSTRUCTIONS AN INNOVATIVE APPROACH
HK40023314A (en) Harbour plant and method for mooring a floating body in a harbour plant
KR20040067528A (en) Method for pulling of a sunken caisson
JPS6133095B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100430

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110714

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110726

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110915

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111025

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111124

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141202

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4874889

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141202

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141202

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250