Info

Publication number
JP4902850B2
JP4902850B2 JP2006177353A JP2006177353A JP4902850B2 JP 4902850 B2 JP4902850 B2 JP 4902850B2 JP 2006177353 A JP2006177353 A JP 2006177353A JP 2006177353 A JP2006177353 A JP 2006177353A JP 4902850 B2 JP4902850 B2 JP 4902850B2
Authority
JP
Japan
Prior art keywords
power
power generation
amount
demand
set period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006177353A
Other languages
Japanese (ja)
Other versions
JP2008009570A (en
Inventor
達馬 垣川
卓志 太田
大悟 平野
健三郎 和泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chubu Electric Power Co Inc
Original Assignee
Chubu Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chubu Electric Power Co Inc filed Critical Chubu Electric Power Co Inc
Priority to JP2006177353A priority Critical patent/JP4902850B2/en
Publication of JP2008009570A publication Critical patent/JP2008009570A/en
Application granted granted Critical
Publication of JP4902850B2 publication Critical patent/JP4902850B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To calculate maximum or minimum generation costs of a power plant under a set probability in terms of profit from power trading by an electric company supposed to supply power to fixed consumers. <P>SOLUTION: An energy demand calculation means 12 calculates a probability distribution of total expected energy demand in a set period from total expected energy demand including expected energy demand and set energy in the set period. An integrated power demand calculation means 16 integrates the probability distribution of total expected energy demand in the set period with probability distributions of available power fluctuation in a power plant considering periodic inspection plan changes, unplanned stops and flood fluctuations in the set period, to calculate a probability distribution of integrated power demand in the set period. A generation cost calculation means 16 calculates a probability distribution of unit energy generation costs of the power plant in the set period, and also calculates maximum or minimum unit energy generation costs of the power plant in the set period possible under a set probability. <P>COPYRIGHT: (C)2008,JPO&amp;INPIT

Description

本発明は、発電装置の発電費用を算出する技術に関する。特に、発電装置から固定需要者に電力を供給している状態で、発電装置から供給する電力量を設定期間において増加あるいは減少させる場合の発電装置の発電費用を算出する技術に関する。   The present invention relates to a technique for calculating a power generation cost of a power generation device. In particular, the present invention relates to a technique for calculating the power generation cost of a power generation device when the amount of power supplied from the power generation device is increased or decreased during a set period while power is being supplied from the power generation device to a fixed consumer.

近年、電力の販売(売電)あるいは電力の購入(買電)に関する電力取引が電力市場において自由に行えるようになっている。電力取引を行う場合には、取引期間(売電期間あるいは買電期間)と取引価格(売電価格あるいは買電価格)が決定される。電力取引における取引価格(売電価格あるいは買電価格)は、電力取引に伴う収益性を把握して決定する必要がある。
従来、固定需要者(定常的に電力を供給されている需要者)に電力量を供給する発電設備を管理している電力事業者が、将来の設定期間に追加的に電力量を供給する電力契約を締結する場合、固定需要者の需要電力量や発電設備で使用する燃料の燃料価格として一定値を選択し、選択した需要電力量や燃料価格に基づいて発電費用を算出し、算出した発電費用に基づいて電力契約に対する電力料金を決定していた。
また、発電資産運用のポートフォリオの運用評価を行う場合に、電力市場における電力の取引価格(電力の市場価格)の変動を考慮する技術が知られている。(特許文献1参照)
特開2004−192479号公報
In recent years, power transactions relating to power sales (power sales) or power purchases (power purchase) can be freely performed in the power market. When conducting an electric power transaction, a transaction period (a power sale period or a power purchase period) and a transaction price (a power sale price or a power purchase price) are determined. The transaction price (power selling price or power purchasing price) in the power transaction needs to be determined by grasping the profitability associated with the power transaction.
Conventionally, power companies that manage power generation facilities that supply power to fixed consumers (customers that are constantly supplied with power) supply additional power during future set periods. When signing a contract, select a fixed value as the amount of electricity demanded by fixed consumers and the fuel price of fuel used in power generation facilities, calculate the power generation cost based on the selected amount of electricity demanded and fuel price, and calculate the generated power Based on the cost, the power charge for the power contract was determined.
In addition, there is a known technology that takes into account fluctuations in the transaction price of electric power in the electric power market (electric power market price) when performing operation evaluation of a portfolio of power generation asset management. (See Patent Document 1)
JP 2004-192479 A

複数の発電設備を有し、固定需要者に電力を供給している発電設備を管理している電力事業者(典型的には、電力会社)が、電力市場で売電取引を行う場合には、電力取引に伴う収益性を把握するためのリスク指標が必要である。
このリスク指標として、特許文献1に記載されているような電力の市場価格あるいは電力の市場価格の変動量を用いることが考えられる。しかしながら、実物の電力の授受を前提としている場合には、電力の市場価格の変動よりも、電力取引による発電設備の発電費用の増加分あるいは電力取引による発電設備の発電費用の減少分が、電力取引に伴う収益性に大きく影響する。このため、電力の市場価格あるいは電力の市場価格の変動量は、このような電力取引に伴う収益性を把握するためのリスク指標としては適していない。
また、前記した、需要電力量や燃料価格として一定値を選択し、選択した需要電力量や燃料価格に基づいて算出した発電費用をリスク指標として用いることも考えられるが、電力取引の契約を締結した時点から実際に電力の授受が行われるまでの間に需要電力量や燃料価格が変動するため、電力取引に伴う収益性を正確に把握することができない。
本発明は、このような点に鑑みて創案されたものであり、固定需要者に電力量を供給することを前提としている発電装置を管理している電力事業者が電力取引に伴う収益性を適切に把握することができる発電装置の発電費用を算出する技術を提供することを目的とする。
When a power company (typically a power company) that has multiple power generation facilities and manages the power generation facilities that supply power to fixed consumers conducts a power sale transaction in the power market In addition, there is a need for risk indicators to grasp the profitability associated with power transactions.
As this risk index, it is conceivable to use the market price of electric power or the fluctuation amount of the market price of electric power as described in Patent Document 1. However, if it is assumed that real power will be exchanged, the increase in power generation costs for power generation facilities due to power transactions or the decrease in power generation costs for power generation facilities due to power transactions, rather than fluctuations in the market price of power, Significantly affects profitability associated with transactions. For this reason, the market price of electric power or the fluctuation amount of the market price of electric power is not suitable as a risk index for grasping the profitability associated with such electric power transactions.
In addition, it is conceivable to select a fixed value as the demand power amount or fuel price, and use the power generation cost calculated based on the selected demand power amount or fuel price as a risk index. Since the amount of power demand and the fuel price fluctuate between when the power is actually transferred and when the power is actually transferred, the profitability associated with the power transaction cannot be accurately grasped.
The present invention was devised in view of such a point, and an electric power company that manages a power generation device that is premised on supplying electric power to a fixed consumer has a profitability associated with an electric power transaction. It is an object of the present invention to provide a technique for calculating the power generation cost of a power generation apparatus that can be appropriately grasped.

以下では、「発電装置の単位電力量燃料消費量」は、発電装置が電力を供給している状態で、需要電力量が単位電力量(例えば、1kW×1時間=1kWh)増加した場合に、追加的に発生する燃料消費量を表している。また、「発電装置の単位電力量発電費用(発電装置の限界費用)」は、発電装置が電力を供給している状態で、需要電力量が単位電力量(例えば、1kW×1時間=1kWh)増加した場合に、追加的に発生する発電費用を表している。
前記課題を解決するための本発明の第1発明は、請求項1に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、設定期間における合計想定需要電力量[=(固定需要者の想定需要電力量+設定電力量)あるいは(固定需要者の想定需要電力量−設定電力量)]の確率分布を算出することによって、需要電力量の変動による設定期間における発電装置の単位電力量発電費用の変動を把握している。
本発明は、需要電力量算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。需要電力量算出手段、発電費用算出手段は、各手段の処理をそれぞれ実行する個別の処理装置により構成してもよいし、複数の手段の処理を実行する共通の処理装置により構成してもよい。
記憶手段は、発電設備情報データベースと、需要電力量情報データベースと、燃料価格情報データベースを有している。記憶手段としては、各データベースそれぞれを有する個別の記憶手段により構成してもよいし、複数のデータベースを有する共通の記憶手段により構成してもよい。なお、「記憶手段がデータベースを有している」という表現は、各データベースの情報が記憶手段に記憶されていることを意味し、データベースが記憶手段に物理的に設けられていることを意味するものではない。また、データベースの情報が記憶手段に一時的に記憶される態様も包含される。
発電設備情報データベースには、発電装置の発電費用を算出するために必要な各発電設備の発電設備情報が記憶されている。発電設備情報には、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序、複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量が含まれている。なお、各発電設備の単位電力量燃料消費量に代えて、各発電設備それぞれの単位電力量発電費用(=各発電設備の単位電力量燃料消費量×各発電設備で使用する燃料の単位量当たりの価格)を用いることもできる。
需要電力量情報データベースには、設定期間における需要電力量の確率分布を算出するために必要な需要電力量情報が記憶されている。需要電力量情報には、実績想定需要電力量と実績需要電力量が含まれている。例えば、過去の任意の期間以前に想定した当該期間の需要電力量を示す実績想定需要電力量と、当該期間の実際の需要電力量を示す実績需要電力量が含まれる。実績想定需要電力量と実績需要電力量により、想定需要電力量に対する実際の需要電力量の割合(需要電力量変動率)の確率分布を算出することができる。
燃料価格情報データベースには、各発電設備で使用する燃料の燃料価格を含む燃料価格情報が記憶されている。
入力手段からは、設定期間、設定期間における想定需要電力量及び設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む設定期間における合計想定需要電力量が入力される。「設定期間」としては、典型的には、電力の授受を行う受渡期間の開始日時と終了日時が入力される。設定期間に複数の期間が含まれる場合には、各期間の開始日時と終了日時が入力される。「設定期間における想定需要電力量」は、典型的には、発電装置から定常的に電力を供給されている需要者(固定需要者)の設定期間における需要電力量の想定値が用いられる。「設定期間における設定電力量」は、例えば、設定期間に取り引きされる総電力量(総売電電力量あるいは総買電電力量)が用いられる。「設定期間における想定需要電力量及び設定期間における設定電力量を含む設定期間における合計想定需要電力量」を入力する態様としては、種々の態様を用いることができる。例えば、設定期間内の総想定需要電力量と総設定電力量を合計(加算あるいは減算)した総合計想定需要電力量を入力する態様、設定期間内の各部分期間(例えば、各時間)の合計電力量[=(部分期間の想定需要電力量+部分期間の設定電力量)あるいは(部分期間の想定需要電力量−部分期間の設定電力量)]を入力し、各部分期間の合計電力量を合計して設定期間における総合計想定需要電力量を算出する態様、設定期間内の各部分期間の想定需要電力量及び設定電力量を入力し、各部分期間の想定需要電力量と設定電力量を合計(加算あるいは減算)して各部分期間の合計電力量を算出し、各部分期間の合計電力量を合計して設定期間における総合計想定需要電力量を算出する態様を用いることができる。想定需要電力量、設定電力量、合計想定需要電力量は、単位電力量発電費用を決定する単位期間(例えば、1時間)毎に入力するのが好ましい。
入力手段としては、例えば、キーボード、表示装置に設けられたタッチ式スイッチ、記憶手段に記憶されている情報を読み取る情報読取装置等を用いることができる。また、処理装置に通信回線を介して端末装置が接続可能である場合には、端末装置を入力手段として用いることもできる。
需要電力量算出手段は、入力手段から入力された設定期間における合計想定需要電力量と、需要電力量情報データベースに記憶されている需要電力量情報に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。例えば、需要電力量情報データベースに記憶されている実績想定需要電力量と実績需要電力量に基づいて、実績需要電力量変動率(=任意の期間の実績需要電力量÷当該期間の実績想定需要電力量)を算出する。そして、算出した実績需要電力量変動率に基づいて、実績需要電力量変動率の確率分布を算出する。確率分布を算出する方法としては、典型的には、正規分布を仮定し、正規分布のパラメータである平均値と標準偏差を算出する方法が用いられる。この場合、実績需要電力量変動率の平均値と標準偏差が算出される。そして、設定期間における合計想定需要電力量と、実績需要電力量変動率の確率分布に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。
発電費用算出手段は、需要電力量算出手段で算出された設定期間における合計想定需要電力量の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布(設定期間における発電装置の限界費用の確率分布)を算出する。
発電装置の単位電力量発電費用(発電装置の限界費用)を算出する方法としては、例えば、以下の方法を用いることができる。先ず、起動/停止順序、各発電設備の最大発電可能電力、各発電設備の単位電力量燃料消費量を示す供給曲線と、設定期間内の各時点における合計想定需要電力に対応する需要曲線が交差する位置を判別し、交差する位置に対応する発電設備(限界発電設備)で使用する燃料及び単位電力量燃料消費量を判別する。合計想定需要電力は、設定期間における合計需要電力量により決定される。そして、限界発電設備で使用する燃料及び単位電力量燃料消費量と、限界発電設備で使用する燃料の燃料価格に基づいて、発電装置の単位電力量発電費用(発電装置の限界費用)を算出する。この発電装置の単位電力量発電費用を算出する処理を、設定期間における合計想定需要電力量の確率分布に対して行うことにより、設定期間における発電装置の単位電力量発電費用の確率分布を算出することができる。なお、限界発電設備の判別処理(限界発電設備で使用する燃料及び燃焼消費量の判別処理)は、設定期間内の部分期間毎(例えば、時間毎)に行うのが好ましい。この場合、設定期間における合計想定需要電力量としては、各部分期間(各時間)の合計想定需要電力量を入力するのが好ましい。設定期間内の各時間の合計想定時間需要電力量が入力される場合には、各時間内の各時点における合計想定需要電力は、各時間内の合計想定需要電力量に等しいとみなすことができる。
なお、発電装置の発電費用は、可変費用(各発電設備の単位電力量燃料消費量×燃料価格)だけでなく、固定費用(各発電設備の建設費用、保守・点検費用等)も考慮して算出するのが一般的である。ここで、発電装置の単位電力量発電費用(発電装置の限界費用)は、発電装置が任意の電力を供給している状態から、需要電力量が単位電力量増加した場合に、追加的に発生する発電費用である。したがって、発電装置の単位電力量発電費用(発電装置の限界費用)を算出する際には、固定費用を考慮する必要はない。
そして、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量増加させる場合の発電装置の発電費用の増加分や、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量減少させる場合の発電装置の発電費用の減少分は、設定期間における発電装置の単位電力量発電費用によって決定される。
ここで、例えば、電力事業者が売電取引を行う場合のリスクは、発電装置から供給する電力量を売電取引に係る取引電力量(売電電力量)増加させることによる発電費用の増加分が、取引金額(売電金額)を超えることであり、一方、電力事業者が買電取引を行う場合のリスクは、取引金額(買電金額)が、発電装置から供給する電力量を買電取引に係る取引電力量(買電電力量)減少させることによる発電費用の減少分を超えることである。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)には、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の最大値を算出し、発電装置の発電費用とする。設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の最大値を算出する方法としては、好適には、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値を算出する方法が用いられる。「設定確率で発生する、設定期間における発電装置の単位電力量の最大値を算出する」という記載は、「設定期間において、設定確率のもとで起こりうる、発電装置の単位電力量発電費用の最大値を算出する」ことを意味する。この確率は、一般に「信頼確率」と呼ばれており、必要とされる信頼度に応じて適宜設定される。電力事業者は、設定期間における発電装置の単位電力量発電費用の最大値に基づいて、売電取引におけるリスクを把握することができる。例えば、設定期間における発電装置の単位電力量発電費用の最大値と、単位電力量当たりの売電金額[売電金額が総売電電力量に対する総売電金額である場合には(総売電金額÷総売電電力量)]との差に基づいて、売電取引におけるリスクを把握することができる。あるいは、[設定期間における発電装置の単位電力量発電費用の最大値×売電電力量]と、総売電金額[売電金額が単位電力量当たりの売電金額である場合には(単位電力量当たりの売電金額×総売電電力量)]との差に基づいて、売電取引におけるリスクを把握することができる。
また、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)には、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の最小値を算出し、発電装置の発電費用とする。設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の最小値を算出する方法としては、好適には、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最小値を算出する方法が用いられる。「設定確率で発生する、設定期間における発電装置の単位電力量の最小値を算出する」という記載は、「設定期間において、設定確率のもとで起こりうる、発電装置の単位電力量発電費用の最小値を算出する」ことを意味する。電力事業者は、設定期間における発電装置の単位電力量発電費用の最小値に基づいて、買電取引におけるリスクを把握することができる。例えば、単位電力量当たりの買電金額[買電金額が総買電電力量に対する総買電金額である場合には(総買電金額÷総買電電力量)]と、設定期間における発電装置の単位電力量発電費用の最小値との差に基づいて、買電取引におけるリスクを把握することができる。あるいは、総買電金額[買電金額が単位電力量当たりの売電金額である場合には(単位電力量当たりの買電金額×総買電電力量)]と、[設定期間における発電装置の単位電力量発電費用の最小値×買電電力量]との差に基づいて、買電取引におけるリスクを把握することができる。
なお、電力取引におけるリスクを把握する際には、各発電設備の建設費用や保守・点検費用等を含む発電装置の固定費用も考慮できることが好ましい。例えば、[設定期間における発電装置の単位電力量発電費用の最大値]と[単位電力量に対する売電金額]との差を算出する際、あるいは、[設定期間における発電装置の単位電力量発電費用の最大値×売電電力量]と[売電電力量に対する売電金額]との差を算出する際に、一方の金額に発電装置の固定費用(各発電設備の固定費用)に相当する金額を反映させる方法を用いる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させた場合の、設定期間における発電装置の単位電力量発電費用の確率分布を、想定需要電力量の変動による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、想定需要電力量の変動に起因するリスクを正確に把握することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
In the following, “unit power consumption fuel consumption of power generation device” means that when the power generation device is supplying power and the demand power amount increases (for example, 1 kW × 1 hour = 1 kWh), Represents additional fuel consumption. The “unit power generation cost of power generation device (marginal cost of power generation device)” is a state where the power generation device is supplying power and the demand power is unit power (for example, 1 kW × 1 hour = 1 kWh) This represents the additional power generation cost incurred when increased.
A first invention of the present invention for solving the above-described problems is a power generation cost calculation device for a power generator as described in claim 1. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. Further, by calculating a probability distribution of the total estimated demand power amount [= (assumed demand power amount of fixed consumer + set power amount) or (assumed demand power amount of fixed consumer−set power amount)] in the set period. The change in the unit power generation cost of the power generation apparatus during the set period due to the fluctuation in the demand power amount is grasped.
The present invention includes a demand power amount calculation means, a power generation cost calculation means, a storage means, and an input means. The demand power amount calculating means and the power generation cost calculating means may be configured by individual processing devices that respectively execute processing of each means, or may be configured by a common processing device that executes processing of a plurality of means. .
The storage means includes a power generation facility information database, a demand power amount information database, and a fuel price information database. The storage means may be constituted by individual storage means having each database, or may be constituted by a common storage means having a plurality of databases. The expression “the storage means has a database” means that the information of each database is stored in the storage means, and means that the database is physically provided in the storage means. It is not a thing. Moreover, the aspect in which the information of a database is temporarily memorize | stored in a memory | storage means is also included.
The power generation facility information database stores the power generation facility information of each power generation facility necessary for calculating the power generation cost of the power generation device. In the power generation facility information, the start / stop order indicating the priority order for starting and stopping each of the plurality of power generation facilities, the maximum power that can be generated by each of the plurality of power generation facilities, and the power that can be generated by each of the plurality of power generation facilities Fuel consumption and unit power consumption of each of the plurality of power generation facilities are included. Instead of unit power consumption fuel consumption of each power generation facility, unit power generation cost of each power generation facility (= unit power consumption fuel consumption of each power generation facility x per unit amount of fuel used in each power generation facility) Price).
The demand power amount information database stores demand power amount information necessary for calculating the probability distribution of the demand power amount during the set period. The power demand information includes actual estimated power demand and actual demand power. For example, the actual expected power amount indicating the demand power amount in the period assumed before any past period and the actual demand power amount indicating the actual demand power amount in the period are included. The probability distribution of the ratio of the actual demand power amount to the assumed demand power amount (demand power amount fluctuation rate) can be calculated from the actual estimated demand power amount and the actual demand power amount.
The fuel price information database stores fuel price information including the fuel price of the fuel used in each power generation facility.
From the input means, the total estimated demand power amount in the setting period, including the setting period, the assumed demand power amount in the setting period, and the setting power amount that increases or decreases the amount of power supplied from the power generation device in the setting period from the assumed demand power amount Entered. As the “set period”, typically, a start date and time and an end date and time of a delivery period in which power is transferred are input. When the set period includes a plurality of periods, the start date and time and the end date and time of each period are input. As the “assumed demand power amount in the set period”, typically, an assumed value of the demand power amount in the set period of a consumer (fixed consumer) who is constantly supplied with power from the power generation device is used. As the “set power amount during the set period”, for example, the total power amount (total sold power amount or total purchased power amount) traded during the set period is used. Various modes can be used as the mode of inputting “the total estimated demand power amount in the set period including the assumed demand power amount in the set period and the set power amount in the set period”. For example, a mode of inputting the total estimated power demand amount obtained by summing (adding or subtracting) the total estimated demand power amount and the total set power amount within the set period, and the total of each partial period (for example, each time) within the set period Enter the amount of power [= (Estimated demand energy for partial period + Set amount of energy for partial period) or (Estimated demand energy for partial period-Set amount of energy for partial period)] to calculate the total energy for each partial period. A mode to calculate the total estimated power demand amount in the set period in total, input the assumed demand power amount and the set power amount for each partial period in the set period, and calculate the expected demand power amount and the set power amount for each partial period. It is possible to use a mode in which the total power amount of each partial period is calculated by summing (adding or subtracting), and the total power amount of each partial period is summed to calculate the total total estimated demand power amount in the set period. It is preferable to input the assumed demand power amount, the set power amount, and the total assumed demand power amount every unit period (for example, one hour) for determining the unit power generation cost.
As the input means, for example, a keyboard, a touch switch provided in the display device, an information reading device for reading information stored in the storage means, or the like can be used. Further, when a terminal device can be connected to the processing device via a communication line, the terminal device can also be used as an input unit.
Based on the total assumed demand power amount in the set period input from the input means and the demand power amount information stored in the demand power amount information database, the demand power amount calculation means calculates the total estimated demand power amount in the set period. Probability distribution is calculated. For example, based on the actual estimated demand energy stored in the demand energy information database and the actual demand power, the actual demand power fluctuation rate (= actual demand power in any period ÷ actual estimated demand power in that period Amount). Then, a probability distribution of the actual demand power fluctuation rate is calculated based on the calculated actual demand power fluctuation rate. As a method for calculating the probability distribution, typically, a method is used in which a normal distribution is assumed and an average value and a standard deviation which are parameters of the normal distribution are calculated. In this case, the average value and standard deviation of the actual demand power fluctuation rate are calculated. Then, the probability distribution of the total estimated demand power amount in the setting period is calculated based on the probability distribution of the total estimated demand power amount in the setting period and the actual demand power amount fluctuation rate.
The power generation cost calculation means is stored in the fuel price information database, the probability distribution of the total estimated demand power amount in the set period calculated by the demand power amount calculation means, the power generation facility information stored in the power generation facility information database, and the fuel price information database. Based on the fuel price of each fuel, the probability distribution of the unit power generation cost of the power generator during the set period (probability distribution of the marginal cost of the power generator during the set period) is calculated.
For example, the following method can be used as a method for calculating the unit power generation cost of the power generation device (marginal cost of the power generation device). First, the supply curve indicating the start / stop sequence, the maximum power that can be generated by each power generation facility, the unit power amount fuel consumption of each power generation facility, and the demand curve corresponding to the total estimated power demand at each point in time within the set period The position to be used is determined, and the fuel to be used in the power generation facility (marginal power generation facility) corresponding to the intersecting position and the unit power consumption fuel consumption are determined. The total assumed demand power is determined by the total demand power amount in the set period. Then, the unit power generation cost of the power generator (marginal cost of the power generator) is calculated based on the fuel used in the marginal power generation facility and the fuel consumption of the unit power amount and the fuel price of the fuel used in the limit power generation facility. . The probability distribution of the unit power generation cost of the power generator in the setting period is calculated by performing the process of calculating the unit power generation cost of the power generation apparatus on the probability distribution of the total assumed demand power amount in the setting period. be able to. In addition, it is preferable to perform the determination process of the limit power generation facility (the determination process of the fuel and combustion consumption used in the limit power generation facility) every partial period (for example, every hour) within the set period. In this case, it is preferable to input the total estimated demand power amount of each partial period (each time) as the total estimated demand power amount in the set period. When the total estimated time demand power amount of each time within the set period is input, the total estimated demand power at each time point within each time can be regarded as being equal to the total estimated demand power amount within each time. .
Note that the power generation costs of the power generation equipment take into account not only variable costs (unit power consumption fuel consumption x fuel price of each power generation facility) but also fixed costs (construction costs, maintenance / inspection costs, etc. of each power generation facility). It is common to calculate. Here, the unit power generation cost of the power generation device (marginal cost of the power generation device) is additionally generated when the demand power amount increases from the state where the power generation device supplies arbitrary power. Power generation costs. Therefore, it is not necessary to consider the fixed cost when calculating the unit power generation cost of the power generator (marginal cost of the power generator).
Then, the power generation cost calculating means changes the set power amount (increase or decrease) from the assumed demand power amount during the set period based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. Increase in power generation cost of the power generator when increasing the set power amount from the assumed demand power amount during the set period and the amount of power supplied from the power generator during the set period The decrease in the power generation cost of the power generator when reducing the set power amount from the power amount is determined by the unit power generation cost of the power generator during the set period.
Here, for example, the risk in the case where a power company conducts a power sale transaction is that the increase in power generation cost due to an increase in the amount of power supplied from the power generation device is a transaction power amount (amount of power sold) related to the power sale transaction. However, the risk when a power company conducts a power purchase transaction is that the transaction amount (power purchase amount) is the amount of power supplied from the power generator. This means that the amount of reduction in power generation costs due to a decrease in the amount of transaction power (purchased power) is exceeded.
In the present invention, when the amount of power supplied from the power generation device is increased from the assumed demand power amount during the setting period (for example, in the case of a power sale transaction), the unit power consumption of the power generation device during the setting period Based on the probability distribution, the maximum value of the unit power generation cost of the power generation device in the set period is calculated and used as the power generation cost of the power generation device. Based on the probability distribution of the unit power generation cost of the power generation device in the setting period, as a method of calculating the maximum value of the unit power generation cost of the power generation device in the setting period, preferably, a setting that occurs with the setting probability A method of calculating the maximum value of the unit power generation cost of the power generation device in the period is used. The statement “Calculate the maximum value of the unit power amount of the power generation device during the set period, which occurs at the set probability” is “the unit power amount generation cost of the power generator that can occur under the set probability during the set period”. It means to calculate the maximum value. This probability is generally called “reliability probability”, and is appropriately set according to the required reliability. The electric power company can grasp the risk in the power sale transaction based on the maximum value of the unit power generation cost of the power generation device in the set period. For example, the maximum value of the unit power generation cost of the power generation device in the set period and the power sale amount per unit power amount [when the power sale amount is the total power sale amount relative to the total power sale amount (total power sale amount Based on the difference with ÷ total power sales amount)], it is possible to grasp the risk in power sales transactions. Alternatively, [the maximum value of the unit power generation cost of the power generation device in the set period × the amount of power sold] and the total power sale amount [if the power sale amount is the amount of power sold per unit power amount (the unit power amount The risk in the power sale transaction can be grasped on the basis of the difference between the amount of power sold per unit of power and the total amount of power sold.
In addition, when the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (for example, in the case of a power purchase transaction), the probability distribution of the unit power generation cost of the power generator during the set period Based on the above, the minimum value of the unit power generation cost of the power generation device in the set period is calculated and used as the power generation cost of the power generation device. Based on the probability distribution of the unit power generation cost of the power generation device in the setting period, as a method for calculating the minimum value of the unit power generation cost of the power generation device in the setting period, preferably, a setting that occurs with the setting probability A method of calculating the minimum value of the unit power generation cost of the power generation device in the period is used. The statement “calculate the minimum value of the unit power consumption of the power generation device in the set period that occurs at the set probability” is “the unit power consumption cost of the power generator that can occur under the set probability in the set period”. It means “calculate the minimum value”. The electric power company can grasp the risk in the power purchase transaction based on the minimum value of the unit power generation cost of the power generation device in the set period. For example, the power purchase amount per unit power amount [when the power purchase amount is the total power purchase amount with respect to the total power purchase amount (total power purchase amount / total power purchase amount)], Based on the difference from the minimum value of the electric power generation cost, the risk in the power purchase transaction can be grasped. Alternatively, the total amount of electricity purchased [if the amount of electricity purchased is the amount of electricity sold per unit amount of electricity (the amount of electricity purchased per unit amount of electricity x the total amount of electricity purchased)], It is possible to grasp the risk in the power purchase transaction based on the difference between the minimum value of the power generation cost and the amount of power purchased.
It should be noted that, when grasping the risk in the power transaction, it is preferable that the fixed cost of the power generation apparatus including the construction cost and maintenance / inspection cost of each power generation facility can be taken into consideration. For example, when calculating the difference between [the maximum value of the unit power generation cost of the power generator during the set period] and [the amount of power sold for the unit power amount], or [the unit power generation cost of the power generator during the set period] When calculating the difference between [maximum value of power x amount of electricity sold] and [amount of electricity sold relative to the amount of electricity sold], the amount equivalent to the fixed cost of the generator (the fixed cost of each power generation facility) is reflected in one of the amounts The method to make is used.
In the present invention, when the amount of power supplied from the power generator is changed from the assumed demand power during the set period, the probability distribution of the unit power generation cost of the power generator during the set period is Calculated by grasping the impact of fluctuations. Therefore, the electric power company can accurately grasp the risk due to the fluctuation of the assumed demand power amount in the power sale transaction or the power purchase transaction.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第2発明は、請求項2に記載されたとおりの発電装置の発電費用算出装置である。
本発明では、需要電力量情報データベースには、過去の複数日それぞれの各時間の実績想定時間需要電力量及び実績時間需要電力量と、過去の複数日それぞれの曜日区分と、過去の複数日それぞれが属する月の月区分を含む需要電力量情報が記憶されている。また、入力手段は、設定期間内の各月の各日の各時間の想定時間需要電力量及び設定時間電力量を含む設定期間内の各月の各日の各時間の合計想定需要電力量が入力可能である。
需要電力量算出手段は、入力手段から入力された設定期間内の各月の各日の曜日区分及び各月の月区分と、入力手段から入力された設定期間内の各月の各日の各時間の合計想定時間需要電力量と、需要電力量情報データベースに記憶されている過去の複数日それぞれの各時間の実績想定時間需要電力量及び実績時間需要電力量、各日の曜日区分及び月区分に基づいて、設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布を算出する。例えば、需要電力量情報データベースに記憶されている月区分、曜日区分(例えば、平日、土曜、休日・祝祭日)、時間区分毎の実績想定時間需要電力量及び実績需要電力量に基づいて、設定期間内の各月の月区分、曜日区分、時間区分に対する合計想定時間需要電力量の確率分布のパラメータ(平均値、標準偏差)を算出する。
発電費用算出手段は、需要電力量算出手段で算出された設定期間内の各月の各日の各時間における合計想定時間需要電力量の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。設定期間における発電装置の単位電力量発電費用の確率分布を算出する方法としては、例えば、以下の方法を用いることができる。設定期間内の各月の各日の各時間における合計想定時間需要電力量の確率分布と発電設備情報に基づいて、設定期間内の各月の各日の各時間における限界発電装置の燃料及び単位電力量燃料消費量を判別する処理を設定期間内の全時間にわたって行い、設定期間内の各時間における限界発電設備の単位電力量燃料消費量を燃料毎に合計し、燃料毎の総単位電力量燃料消費量を算出する処理を、予め定めた確率で合計想定需要電力量が発生する複数のシナリオであって、予め定めた確率がそれぞれ異なる複数のシナリオに対して実行する。そして、各シナリオに対する設定期間内の燃料毎の総単位電力量燃料消費量と、各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。
本発明では、過去の月、曜日及び時間毎の実績想定時間需要電力量と実績時間需要電力量に基づいて月、曜日及び時間毎の実績時間需要電力量変動率の確率分布を算出し、算出した月、曜日及び時間毎の実績時間需要電力量変動率の確率分布と、設定期間内の月、曜日及び時間毎の合計想定時間需要電力量に基づいて、設定期間内の各月、各日及び各時間における発電装置の単位電力量発電費用の確率分布を算出し、算出した設定期間内の各月、各日及び各時間における発電装置の単位電力量発電費用の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出している。これにより、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値をより正確に算出することができ、売電取引あるいは買電取引に伴うリスクをより正確に把握することができる。
A second invention of the present invention is a power generation cost calculation device for a power generator as described in claim 2.
In the present invention, the demand power amount information database includes the actual estimated time demand power amount and the actual time demand power amount for each time of each of the past plural days, each day of the past for each of the past plural days, and each of the past plural days. Demand electric energy information including the month division of the month to which the data belongs is stored. In addition, the input means is configured to calculate an estimated time demand power amount for each time of each day of each month in the set period and a total estimated demand power amount for each time of each day of each month in the set period including the set time power amount. It is possible to input.
The demand power amount calculation means includes the day of the week and the month of each month within the set period input from the input means, and the day of each month within the set period input from the input means. Total estimated time demand power amount of time, actual expected time demand power amount and actual time demand power amount of each time for each of the past multiple days stored in the demand power amount information database, each day of the week and month division Based on the above, a probability distribution of the total estimated time demand power amount for each hour of each day of each month within the set period is calculated. For example, based on the monthly segment, day of week segment (for example, weekdays, Saturdays, holidays, and holidays) stored in the demand energy information database, the estimated estimated time demand energy for each time segment, and the actual demand energy The parameters (average value, standard deviation) of the probability distribution of the total estimated time demand power amount for the month, day of week, and time of each month are calculated.
The power generation cost calculation means includes a probability distribution of the total estimated time demand power amount at each time of each day of each month within the set period calculated by the demand power amount calculation means, and the power generation equipment stored in the power generation equipment information database Based on the information and the fuel price of each fuel stored in the fuel price information database, the probability distribution of the unit power generation cost of the power generator in the set period is calculated. For example, the following method can be used as a method of calculating the probability distribution of the unit power generation cost of the power generator in the set period. Based on the probability distribution of the total estimated time demand electricity amount at each hour of each day of each month within the set period and the power generation facility information, the fuel and unit of the marginal power generator at each hour of each day of each month within the set period Power consumption Fuel consumption is determined over the entire period of the set period, and the unit power consumption of the marginal power generation facility at each time within the set period is summed for each fuel, and the total unit power for each fuel The process of calculating the fuel consumption amount is executed for a plurality of scenarios in which the total estimated demand power amount is generated with a predetermined probability, and each of the predetermined probabilities is different. Then, the probability distribution of the unit power generation cost of the power generator in the set period is calculated based on the total unit power fuel consumption for each fuel in the set period for each scenario and the fuel price of each fuel.
In the present invention, the probability distribution of the actual time demand power amount fluctuation rate for each month, day of the week and time is calculated based on the actual estimated time demand power amount and the actual time demand power amount for each past month, day of the week, and time, Each month, each day within the set period based on the probability distribution of the actual hourly demand power fluctuation rate for each month, day of the week and hour and the total estimated time demand energy for each month, day of the week and hour within the set period And the probability distribution of the unit power generation cost of the power generator at each time, and set based on the probability distribution of the unit power generation cost of the power generator at each month, each day and each time within the calculated setting period The probability distribution of the unit power generation cost of the power generator during the period is calculated. Thereby, the maximum value or the minimum value of the unit power amount generation cost of the power generation device in the set period can be calculated more accurately, and the risk associated with the power sale transaction or the power purchase transaction can be grasped more accurately.

本発明の第3発明は、請求項3に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、設定期間における定期点検計画変更を考慮した発電可能電力変動量の確率分布を算出することによって、定期点検計画変更による、設定期間における発電装置の単位電力量発電費用の変動を把握している。
本発明は、定期点検計画変更を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段は、発電設備情報データベースと、定期点検情報データベースと、燃料情報データベースを有している。
発電設備情報データベースには、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量を含む発電設備情報が記憶されている。各発電設備の単位電力量燃料消費量に代えて、各発電設備の単位電力量発電費用(=各発電設備の単位電力量燃料消費量×各発電設備で使用する燃料の燃料価格)を用いることもできる。
定期点検情報データベースには、過去の実績定期点検計画及び実績定期点検を含む定期点検情報が記憶されている。実績定期点検計画は、過去の任意の期間以前に計画された、過去の任意の期間の定期点検計画(発電設備、定期点検時期)を示し、実績定期点検は、当該期間に実際に行われた定期点検(発電設備、定期点検時期)を示す。
燃料価格情報データベースには、各発電設備で使用する燃料の燃料価格を含む燃料価格情報が記憶されている。
入力手段からは、設定期間、設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量、設定期間における定期点検計画、各データベースに記憶される情報が入力される。
定期点検計画変更を考慮した発電可能電力変動量算出手段は、入力手段から入力された設定期間における定期点検計画、定期点検情報データベースに記憶されている実績定期点検計画及び実績定期点検、発電設備情報データベースに記憶されている各発電設備の最大発電可能電力に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
例えば、過去の任意の期間における定期点検計画を考慮した発電装置の実績計画発電可能電力[=各発電設備の実績計画発電可能電力(=発電設備の最大発電可能電力×当該期間における当該発電設備の実績計画稼動可能日数)の合計]と、当該期間における定期点検計画変更を考慮した発電装置の実績発電可能電力[=各発電設備の実績発電可能電力(=発電設備の最大発電可能電力×当該期間における当該発電設備の実績稼動可能日数)の合計]を用いて、定期点検計画変更を考慮した実績発電可能電力変動率[=過去の任意の期間における定期点検計画変更を考慮した発電装置の実績発電可能電力÷当該期間における定期点検計画変更を考慮した発電装置の実績計画発電可能電力]を算出する。そして、定期点検計画変更を考慮した実績発電可能電力変動率を用いて、定期点検計画変更を考慮した実績発電可能電力変動率の確率分布を算出する。そして、定期点検計画変更を考慮した実績発電可能電力変動率と、設定期間における定期点検計画と、各発電設備の最大発電可能電力を用いて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布[=設定期間における発電装置の計画発電可能電力−設定期間における発電装置の発電可能電力の確率分布(=設定期間における発電装置の計画発電可能電力×定期点検計画変更を考慮した実績発電可能電力変動率の確率分布)]を算出する。
統合需要電力算出手段は、設定期間における合計想定需要電力量と、定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出する。
通常、発電装置の単位電力量発電費用(発電装置の限界費用)は、各発電設備の起動/停止順序、各発電設備の最大発電可能電力、各発電設備の単位電力量燃料消費量を示す供給曲線と、需要電力を示す需要曲線が交差する位置に対応する発電設備(限界発電設備)の単位電力量発電費用(=単位電力量燃料消費量×燃料の単位量当たりの価格)によって決定される。このため、発電装置の発電可能電力の減少あるいは増加による供給曲線の変化や、需要電力の減少あるいは増加による需要曲線の移動によって、発電装置の単位電力量発電費用(発電装置の限界費用)は変化する。このように供給曲線と需要曲線に基づいて発電装置の単位電力量発電費用を算出する場合には、発電装置の発電可能電力の変化は、需要電力の変化に置き換えることができる。例えば、発電装置の発電可能電力の減少は、発電可能電力の減少量と等しい増加量を有する需要電力の増加に置き換えることができ、発電装置の発電可能電力の増加は、発電可能電力の増加量と等しい減少量を有する需要電力の減少に置き換えることができる。また、設定期間内の各時点における合計想定需要電力は、設定期間における合計想定需要電力量により決定される。また、複数の確率分布を統合する方法としては、例えば、各確率分布のパラメータである平均値の加算値を平均値とし、各確率分布のパラメータである標準偏差の2乗の和の平方根を標準偏差とする方法を用いることができる。以上により、設定期間における合計想定需要電力量と設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出することができる。
なお、設定期間における定期点検計画を考慮した発電装置の発電可能電力の確率分布を算出する定期点検計画を考慮した発電可能電力算出手段と、設定期間における合計想定需要電力量と定期点検計画を考慮した発電可能電力算出手段で算出された設定期間における定期点検計画を考慮した発電装置の発電可能電力の確率分布を統合して、設定期間における統合需要電力の確率分布を算出する統合需要電力算出手段を用いる態様は、本発明の定期点検計画変更を考慮した発電可能電力変動量算出手段と統合需要電力算出手段を用いる概念に含まれる。
発電費用算出手段は、統合需要電力算出手段で算出された設定期間における統合需要電力の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。例えば、設定期間における統合需要電力の確率分布と、発電設備情報(起動/停止順序、各発電設備の最大発電可能電力、使用燃料、単位電力量燃料消費量)に基づいて、設定期間における各燃料の総単位電力量燃料消費量の確率分布を算出する。例えば、設定期間における統合需要電力の確率分布を設定期間内の各部分期間(例えば、時間)の統合需要電力の確率分布により構成し、部分期間の統合需要電力と発電設備情報に基づいて部分区間毎の限界発電設備(限界発電設備の燃料及び単位電力量燃料消費量)を判別する処理を全設定期間にわたって行う。この全設定期間にわたって部分期間毎の限界発電設備を判別する処理を、予め定めた確率で各部分期間の統合需要電力が発生する複数のシナリオであって、予め定めた確率がそれぞれ異なる複数のシナリオに対して行う。そして、各部分期間の限界発電設備の単位電力量燃料消費量を燃料毎に合計し、設定期間における燃料毎の総単位電力量燃料消費量を算出する処理を、各シナリオに対して行うことによって、設定期間における各燃料の総燃料消費量の確率分布を算出する。さらに、設定期間における燃料毎の総単位電力量燃料消費量の確率分布と、各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用を算出する処理を各シナリオに対して行うことにより、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。
そして、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最大値を算出し、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最小値を算出する。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の、設定期間における発電装置の単位電力量発電費用の確率分布を、定期点検計画変更による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、定期点検計画変更に起因するリスクを正確に把握することができる。
また、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布と設定期間における合計想定需要電力量を統合して統合需要電力の確率分布を算出している。これにより、設定期間における発電装置の単位電力量発電費用を容易に算出することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
A third aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 3. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. In addition, by calculating the probability distribution of the amount of power generation that can be generated in consideration of changes in the periodic inspection plan during the set period, the change in the unit power generation cost of the power generator during the set period due to changes in the periodic inspection plan is grasped. .
The present invention includes a power generation possible power fluctuation calculation means that takes into account the periodic inspection plan change, an integrated demand power calculation means, a power generation cost calculation means, a storage means, and an input means.
The storage means has a power generation facility information database, a periodic inspection information database, and a fuel information database.
The power generation facility information database includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel used by each of the plurality of power generation facilities, and the plurality of power generations The power generation facility information including the unit power consumption fuel consumption of each facility is stored. Instead of unit power consumption of each power generation facility, use unit power generation cost of each power generation facility (= unit power consumption fuel consumption of each power generation facility x fuel price of fuel used in each power generation facility) You can also.
The periodic inspection information database stores periodic inspection information including past actual periodic inspection plans and actual periodic inspections. The actual periodic inspection plan shows the periodic inspection plan (power generation equipment, periodic inspection period) for the past arbitrary period, which was planned before the arbitrary period in the past, and the actual periodic inspection was actually performed during the period. Shows periodic inspection (power generation equipment, periodic inspection period).
The fuel price information database stores fuel price information including the fuel price of the fuel used in each power generation facility.
From the input means, a set period, an assumed demand power amount in the set period, a total assumed demand power amount in the set period including the set power amount, a periodic inspection plan in the set period, and information stored in each database are input.
The power generation fluctuation amount calculation means considering the periodic inspection plan change is the periodic inspection plan for the set period input from the input means, the actual periodic inspection plan and the actual periodic inspection stored in the periodic inspection information database, and the power generation facility information. Based on the maximum power that can be generated by each power generation facility stored in the database, the probability distribution of the amount of power that can be generated by the power generation device taking into account the periodic inspection plan change in the set period is calculated.
For example, the actual planned power generation potential of the power generator considering the periodic inspection plan in an arbitrary period in the past [= the actual planned power generation potential of each power generation facility (= the maximum possible power generation of the power generation facility × the power generation facility in the current period) Total of actual planned operation days)] and actual power generation possible power of the generator considering the periodic inspection plan change in the relevant period [= actual power available power of each power generation equipment (= maximum possible power generation of the power generation equipment x relevant period) The actual power generation fluctuation rate considering the periodic inspection plan change [= actual power generation of the power generator considering the periodic inspection plan change in any past period] [Actual power ÷ Actual planned power generation potential of the power generator considering the periodic inspection plan change during the period] is calculated. Then, a probability distribution of the actual power generation possible power fluctuation rate considering the periodic inspection plan change is calculated using the actual power generation possible power fluctuation rate considering the periodic inspection plan change. Then, using the actual power generation fluctuation rate that takes into account the periodic inspection plan change, the periodic inspection plan in the set period, and the maximum power generation capacity of each power generation facility, Probability distribution of power generation fluctuation amount [= Planned power generation potential of power generator in setting period−Probability distribution of power generation potential of power generation apparatus in setting period (= Planned power generation potential of power generator in setting period × Change in periodic inspection plan) The probability distribution of the actual power generation fluctuation rate taking into account
The integrated demand power calculation means is capable of generating power from the generator considering the total estimated demand power consumption during the set period and the periodic inspection plan change during the set period calculated by the power generation fluctuation fluctuation calculation means considering the periodic inspection plan change. The probability distribution of the power fluctuation amount is integrated, and the probability distribution of the integrated demand power in the set period is calculated.
Usually, the unit power generation cost of the power generator (marginal cost of the power generator) is the supply / startup order of each power generation facility, the maximum power that can be generated by each power generation facility, and the unit power consumption of each power generation facility. Determined by unit power generation cost (= unit power amount fuel consumption x price per unit amount of fuel) of the power generation facility (marginal power generation facility) corresponding to the position where the curve and the demand curve indicating demand power intersect . For this reason, the unit power generation cost of the power generator (marginal cost of the power generator) changes due to a change in the supply curve due to a decrease or increase in the power that can be generated by the power generator and a shift in the demand curve due to a decrease or increase in demand power. To do. Thus, when calculating the unit electric energy generation cost of a power generator based on a supply curve and a demand curve, the change of the electric power which can be generated of a power generator can be replaced with the change of demand power. For example, a decrease in the power that can be generated by the power generator can be replaced with an increase in demand power that has an increase equal to the amount of decrease in the power that can be generated. Can be replaced with a decrease in demand power having a reduction amount equal to. Further, the total estimated demand power at each time point within the set period is determined by the total estimated demand power amount during the set period. In addition, as a method of integrating a plurality of probability distributions, for example, an average value that is a parameter of each probability distribution is used as an average value, and a square root of the sum of squares of standard deviations that are parameters of each probability distribution is standard. A method of making a deviation can be used. As described above, the probability distribution of the integrated demand power in the set period is calculated by integrating the total estimated demand power amount in the set period and the probability distribution of the power generation possible power fluctuation amount in consideration of the change in the periodic inspection plan in the set period. Can do.
It should be noted that the power generation possible power calculation means considering the periodic inspection plan for calculating the probability distribution of the power generation capacity of the generator considering the periodic inspection plan during the set period, the total estimated demand power amount during the set period and the periodic inspection plan are considered Integrated demand power calculation means for calculating the probability distribution of the integrated demand power in the setting period by integrating the probability distribution of the power generation possible power of the power generation apparatus considering the periodic inspection plan in the setting period calculated by the generated power generation power calculation means The aspect using is included in the concept of using the power generation variable amount calculation means and the integrated demand power calculation means in consideration of the periodic inspection plan change of the present invention.
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, the power generation equipment information stored in the power generation equipment information database, and each of the fuel price information databases stored in the fuel price information database. Based on the fuel price of the fuel, the probability distribution of the unit power generation cost of the power generation device in the set period is calculated. For example, each fuel in the set period based on the probability distribution of the integrated demand power in the set period and the power generation facility information (start / stop order, maximum power that can be generated in each power generation facility, fuel used, unit power consumption) The probability distribution of the total unit power consumption fuel consumption is calculated. For example, the integrated demand power probability distribution in the set period is configured by the integrated demand power probability distribution in each partial period (for example, time) within the set period, and the partial section based on the integrated demand power and power generation facility information in the partial period The process of discriminating each marginal power generation facility (fuel of the marginal power generation facility and unit power consumption fuel consumption) is performed over the entire set period. The process of determining the marginal power generation facilities for each partial period over the entire set period is a plurality of scenarios in which integrated demand power for each partial period is generated with a predetermined probability, and a plurality of scenarios with different predetermined probabilities. To do. Then, the unit power consumption fuel consumption of the marginal power generation facilities in each partial period is summed for each fuel, and the process of calculating the total unit power fuel consumption for each fuel in the set period is performed for each scenario. The probability distribution of the total fuel consumption of each fuel in the set period is calculated. Furthermore, for each scenario, a process for calculating the unit power generation cost of the power generator in the set period based on the probability distribution of the total unit power fuel consumption for each fuel in the set period and the fuel price of each fuel is set. By performing, the probability distribution of the unit power generation cost of the power generation device in the set period is calculated.
Then, the power generation cost calculating means changes the set power amount (increase or decrease) from the assumed demand power amount during the set period based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period (for example, in the case of a power sale transaction), the maximum value of the unit power generation cost of the power generator during the set period is calculated. When the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (for example, in the case of a power purchase transaction), the minimum value of the unit power generation cost of the power generator during the set period Is calculated.
In the present invention, when the amount of power supplied from the power generator is changed from the assumed demand power amount during the set period, the probability distribution of the unit power generation cost of the power generator during the set period is affected by the periodic inspection plan change. It is calculated by grasping. Therefore, the electric power company can accurately grasp the risk due to the change in the periodic inspection plan in the power sale transaction, the power purchase transaction, or the like.
Further, the probability distribution of the integrated demand power is calculated by integrating the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the periodic inspection plan change in the setting period and the total assumed demand power amount in the setting period. Thereby, the unit power amount generation cost of the power generation device in the set period can be easily calculated.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第4発明は、請求項4に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、設定期間における計画外停止を考慮した発電可能電力変動量の確率分布を算出することによって、発電設備の計画外停止による設定期間における発電装置の単位電力量発電費用の変動を把握している。
「計画外停止」は、予定していない停止を意味し、典型的には、故障による停止が対応する。
本発明は、計画外停止を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段は、発電設備情報データベースと、燃料価格情報データベースを有している。発電設備情報データベースには、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、複数の発電設備それぞれの故障率を含む発電設備情報が記憶されている。各発電設備の単位電力量燃料消費量に代えて、各発電設備の単位電力量発電費用(=各発電設備の単位電力量燃料消費量×各発電設備で使用する燃料の燃料価格)を用いることもできる。
燃料価格情報データベースには、各発電設備で使用する燃料の燃料価格を含む燃料価格情報が記憶されている。
入力手段からは、設定期間、設定期間における想定需要電力量及び発電装置から供給する電力量を設定期間に想定需要電力量から増加あるいは減少させる設定電力量を含む設定期間における合計想定需要電力量、発電設備情報が入力可能である。
計画外停止を考慮した発電可能電力変動量算出手段は、複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出する。例えば、各発電設備の故障率と最大発電可能電力に基づいて各発電設備の発電可能電力の2項分布を作成する。そして、各発電設備の発電可能電力の2項分布を合成して多項分布を作成し、その平均値と標準偏差を算出する。この多項分布は、発電装置の発電可能電力の確率分布を表している。そして、各発電設備の最大発電可能電力の合計(発電装置の最大発電可能電力)から発電装置の発電可能電力の確率分布を減算することによって、発電装置の発電可能電力変動量の確率分布を算出することができる。
統合需要電力算出手段は、入力手段から入力された設定期間における合計想定需要電力量と、計画外停止を考慮した発電可能電力変動量算出手段で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出する。
ここで、前述したように、各発電設備の起動/停止順序、最大発電可能電力、単位電力量燃料消費量を示す供給曲線と需要電力を示す需要曲線に基づいて発電装置の単位電力量発電費用を算出する場合には、発電装置の発電可能電力の変化は、需要電力の変化に置き換えることができる。また、設定期間内の各時点における合計想定需要電力は、設定期間における合計想定需要電力量により決定される。また、計画外停止を考慮した発電装置の発電可能電力変動量の確率分布は、時期(月や曜日)の影響を受けない。また、複数の確率分布を統合する方法としては、例えば、前述した方法を用いることができる。以上により、設定期間における合計想定需要電力量と設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出することができる。
なお、設定期間における計画外停止を考慮した発電装置の発電可能電力の確率分布を算出する計画外停止を考慮した発電可能電力算出手段と、設定期間における合計想定需要電力量と計画外停止を考慮した発電可能電力算出手段で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力の確率分布を統合して設定期間における統合需要電力の確率分布を算出する統合需要電力算出手段を用いる態様は、本発明の計画外停止を考慮した発電可能電力変動量算出手段と統合需要電力算出手段を用いる概念に含まれる。
発電費用算出手段は、統合需要電力算出手段で算出された設定期間における統合需要電力の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。例えば、前述した方法を用いて、設定期間における燃料毎の総単位電力量燃料消費量の確率分布を算出し、算出した設定期間における燃料毎の総単位電力量燃料消費量の確率分布と各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。
そして、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最大値を算出し、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最小値を算出する。設定期間における発電装置の単位電力量発電費用の最大値及び設定期間における発電装置の単位電力量発電費用の最小値を算出する方法としては、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の、設定期間における発電装置の単位電力量発電費用の確率分布を、発電設備の故障等による計画外停止による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、故障等による計画外停止に起因するリスクを正確に把握することができる。
また、設定期間における計画外停止を考慮した発電可能電力変動量の確率分布と設定期間における合計想定需要電力量を統合して統合需要電力の確率分布を算出している。これにより、発電装置の単位電力量発電費用を容易に算出することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
A fourth aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 4. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. In addition, by calculating the probability distribution of the amount of power that can be generated in consideration of unscheduled outages during the set period, the fluctuations in the unit power generation cost of the power generation equipment during the set period due to unplanned outages of the power generation facilities are grasped .
“Unplanned stop” means an unscheduled stop, and typically a stop due to a failure corresponds.
The present invention includes a power generation possible power fluctuation calculation unit taking into account an unplanned stop, an integrated demand power calculation unit, a power generation cost calculation unit, a storage unit, and an input unit.
The storage means has a power generation facility information database and a fuel price information database. The power generation facility information database includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel used by each of the plurality of power generation facilities, and the plurality of power generations Power generation facility information including the unit power consumption of each facility and the failure rate of each of the plurality of power generation facilities is stored. Instead of unit power consumption of each power generation facility, use unit power generation cost of each power generation facility (= unit power consumption fuel consumption of each power generation facility x fuel price of fuel used in each power generation facility) You can also.
The fuel price information database stores fuel price information including the fuel price of the fuel used in each power generation facility.
From the input means, the total estimated demand power amount in the setting period, including the setting power amount that increases or decreases the estimated power demand amount in the setting period and the power amount supplied from the power generation device from the assumed demand power amount in the setting period, Power generation facility information can be input.
Based on the failure rate of each of the plurality of power generation facilities and the maximum power that can be generated, the power generation fluctuation amount calculation means that takes into account unplanned outages Probability distribution is calculated. For example, a binomial distribution of the power that can be generated by each power generation facility is created based on the failure rate of each power generation facility and the maximum power that can be generated. Then, a binomial distribution of power that can be generated by each power generation facility is synthesized to create a multinomial distribution, and an average value and a standard deviation are calculated. This multinomial distribution represents a probability distribution of power that can be generated by the power generation device. Then, the probability distribution of the power generation fluctuation amount of the power generator is calculated by subtracting the probability distribution of the power that can be generated from the power generator from the sum of the maximum power that can be generated by each power generation facility (maximum power that can be generated by the power generator). can do.
The integrated demand power calculation means is a power generation that takes into account the total estimated demand power input during the set period input from the input means and the unplanned outage during the set period calculated by the power generation fluctuation amount calculation means that takes into account unplanned outages. The probability distribution of the power generation fluctuation amount of the apparatus is integrated, and the probability distribution of the integrated demand power in the set period is calculated.
Here, as described above, the unit power generation cost of the power generation apparatus based on the start / stop order of each power generation facility, the maximum power generation possible power, the supply curve indicating the unit power consumption fuel consumption and the demand curve indicating the demand power Is calculated, the change in the power that can be generated by the power generation device can be replaced with the change in the demand power. Further, the total estimated demand power at each time point within the set period is determined by the total estimated demand power amount during the set period. In addition, the probability distribution of the power generation possible power fluctuation amount of the power generator considering the unplanned stop is not affected by the time (month or day of the week). Further, as a method for integrating a plurality of probability distributions, for example, the method described above can be used. As described above, the probability distribution of the integrated demand power in the setting period can be calculated by integrating the total estimated demand power amount in the setting period and the probability distribution of the power generation possible power fluctuation amount in consideration of the unplanned stop in the setting period. it can.
It should be noted that the power generation possible power calculation means considering the unplanned outage that calculates the probability distribution of the power generation potential of the power generator considering the unplanned outage during the set period, and the total estimated demand power and unplanned outage during the set period are considered Integrated demand power calculation means for calculating the probability distribution of the integrated demand power in the setting period by integrating the probability distribution of the power generation possible power of the power generation apparatus considering the unplanned stop in the setting period calculated by the generated power generation potential calculation means The mode to be used is included in the concept of using the power generation fluctuation amount calculating means and the integrated demand power calculating means considering the unplanned stop of the present invention.
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, the power generation equipment information stored in the power generation equipment information database, and each of the fuel price information databases stored in the fuel price information database. Based on the fuel price of the fuel, the probability distribution of the unit power generation cost of the power generation device in the set period is calculated. For example, using the method described above, the probability distribution of the total unit power fuel consumption for each fuel in the set period is calculated, and the probability distribution of the total unit power fuel consumption for each fuel in the set period calculated and each fuel The probability distribution of the unit power generation cost of the power generation device in the set period is calculated based on the fuel price.
Then, the power generation cost calculating means changes the set power amount (increase or decrease) from the assumed demand power amount during the set period based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period (for example, in the case of a power sale transaction), the maximum value of the unit power generation cost of the power generator during the set period is calculated. When the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (for example, in the case of a power purchase transaction), the minimum value of the unit power generation cost of the power generator during the set period Is calculated. For example, the method described above can be used as a method of calculating the maximum value of the unit power generation cost of the power generator in the set period and the minimum value of the unit power generation cost of the power generator in the set period.
In the present invention, when the amount of power supplied from the power generation device is changed from the assumed demand power amount during the setting period, the probability distribution of the unit power generation cost of the power generation device during the setting period depends on the failure of the power generation facility, etc. Calculated by grasping the impact of unplanned outages. Therefore, the electric power company can accurately grasp the risk due to an unplanned stoppage due to a failure or the like in a power sale transaction or a power purchase transaction.
Further, the probability distribution of the integrated demand power is calculated by integrating the probability distribution of the power generation possible power fluctuation amount considering the unplanned stop in the setting period and the total assumed demand power amount in the setting period. Thereby, the unit power amount generation cost of the power generation device can be easily calculated.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第5発明は、請求項5に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出することによって、出水変動による設定期間における発電装置の単位電力量発電費用の変動を把握している。
本発明では、複数の発電設備には、少なくとも一つの水力発電設備が含まれている。
本発明は、出水変動を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段は、発電設備情報データベースと、出水情報データベースと、燃料価格情報データベースを有している。
発電設備情報データベースには、複数の発電設備それぞれを起動及び停止させる優先順序を示す起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量を含む発電設備情報が記憶されている。各発電設備の単位電力量燃料消費量に代えて、各発電設備の単位電力量発電費用(=各発電設備の単位電力量燃料消費量×各発電設備で使用する燃料の燃料価格)を用いることもできる。
出水情報データベースには、過去に水力発電設備から供給された実績水力発電電力量を含む出水情報が記憶されている。例えば、過去の複数月それぞれの実績月間水力発電電力量を含む出水情報が記憶される。
燃料価格情報データベースには、各発電設備で使用する燃料の燃料価格を含む燃料価格情報が記憶されている。
入力手段は、設定期間、設定期間における想定需要電力量及び発電装置から供給する電力量を設定期間に想定需要電力量から増加あるいは減少させる設定電力量を含む設定期間における合計想定需要電力量、発電設備情報、出水情報等が入力可能である。
出水変動を考慮した発電可能電力変動量算出手段は、出水情報データベースに記憶されている実績水力発電電力量に基づいて、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する。例えば、設定期間内の各月の月区分と同じ月区分の実績月間出水率[任意の月の実績月間出水率=(当該月の実績月間水力発電電力量÷当該月と同じ月区分の平水時の実績月間水力発電電力量)]の確率分布を算出する。そして、設定期間内の各月の出水変動を考慮した水力発電電力量の確率分布[任意の月の水力発電電力量の確率分布=当該月と同じ月区分の平水時の水力発電電力量×当該月と同じ月区分の実績月間出水率の確率分布]を算出する。さらに、設定期間内の各月の各時間の出水変動を考慮した発電装置の時間発電可能電力変動量の確率分布[任意の月の各時間の出水変動を考慮した時間発電可能電力変動量の確率分布=水力発電設備の最大発電可能電力−当該月と同じ月区分の出水変動を考慮した水力発電電力量の確率分布]を算出する。
統合需要電力算出手段は、入力手段から入力された設定期間における合計想定需要電力量と、計画外停止を考慮した発電可能電力変動量算出手段で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出する。
ここで、前述したように、各発電設備の起動/停止順序、最大発電可能電力、単位電力量燃料消費量を示す供給曲線と需要電力を示す需要曲線に基づいて発電装置の単位電力量発電費用を算出する場合には、発電装置の発電可能電力の変化は、需要電力の変化に置き換えることができる。また、設定期間内の各時点における合計想定需要電力は、設定期間における合計想定需要電力量により決定される。また、設定期間内の各時点における合計想定需要電力は、設定期間における合計想定需要電力量により決定される。また、設定期間内の各時点における出水変動を考慮した発電可能電力変動量は、設定期間における出水変動を考慮した発電可能電力変動量の(例えば、設定期間内の各月の各時間の出水変動を考慮した時間発電可能電力変動量)により決定される。また、複数の確率分布を統合する方法としては、例えば、前述した方法を用いることができる。以上により、設定期間における合計想定需要電力量と設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出することができる。
なお、設定期間における出水変動を考慮した発電装置の発電可能電力を算出する出水変動を考慮した発電可能電力算出手段と、設定期間における合計想定需要電力量と出水変動を考慮した発電可能電力算出手段で算出された設定期間における出水変動を考慮した発電装置の発電可能電力を統合して設定期間における統合需要電力を算出する統合需要電力算出手段を用いる態様は、本発明の出水変動を考慮した発電可能電力変動量算出手段と統合需要電力算出手段を用いる概念に含まれる。
発電費用算出手段は、統合需要電力算出手段で算出された設定期間における統合需要電力の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。例えば、前述した方法を用いて、設定期間における燃料毎の総単位電力量燃料消費量の確率分布を算出し、算出した設定期間における燃料毎の総単位電力量燃料消費量の確率分布と各燃料の燃料価格に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。
そして、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最大値を算出し、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最小値を算出する。設定期間における発電装置の単位電力量発電費用の最大値及び設定期間における発電装置の単位電力量発電費用の最小値を算出する方法としては、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の、発電装置の単位電力量発電費用の確率分布を、出水変動による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、出水変動に起因するリスクを正確に把握することができる。
また、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布と設定期間における合計想定需要電力量を統合して統合需要電力の確率分布を算出している。これにより、発電装置の単位電力量発電費用を容易に算出することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
A fifth aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 5. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. In addition, by calculating the probability distribution of the power generation possible power fluctuation amount of the power generation device in consideration of the water discharge fluctuation in the setting period, the fluctuation of the unit power generation cost of the power generation apparatus in the setting period due to the water discharge fluctuation is grasped.
In the present invention, the plurality of power generation facilities include at least one hydropower generation facility.
The present invention includes a power generation possible power fluctuation calculation means taking account of fluctuations in water discharge, an integrated demand power calculation means, a power generation cost calculation means, a storage means, and an input means.
The storage means has a power generation facility information database, a flooding information database, and a fuel price information database.
The power generation facility information database includes a start / stop sequence indicating a priority order for starting and stopping each of the plurality of power generation facilities, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel used by each of the plurality of power generation facilities, and the plurality of power generations The power generation facility information including the unit power consumption fuel consumption of each facility is stored. Instead of unit power consumption of each power generation facility, use unit power generation cost of each power generation facility (= unit power consumption fuel consumption of each power generation facility x fuel price of fuel used in each power generation facility) You can also.
In the water discharge information database, water discharge information including the actual amount of hydroelectric power supplied from the hydroelectric power generation facility in the past is stored. For example, the flood information including the actual monthly hydroelectric power generation amount for each of a plurality of past months is stored.
The fuel price information database stores fuel price information including the fuel price of the fuel used in each power generation facility.
The input means includes a set period, an assumed demand power amount in the set period, and a total assumed demand power amount in the set period, including a set power amount that increases or decreases the assumed power demand amount in the set period from the assumed demand power amount, power generation Equipment information, flood information, etc. can be input.
The power generation fluctuation amount calculation means that takes into account fluctuations in the water discharge is based on the actual hydroelectric power generation amount stored in the water discharge information database, and the probability distribution of the power generation fluctuation amount that can be generated by the power generation equipment in consideration of the water discharge fluctuation in the set period. Is calculated. For example, the actual monthly water discharge rate of the same month segment as the monthly segment of each month within the set period [Actual monthly water discharge rate of any month = (Actual monthly hydroelectric power generation amount in the month ÷ During the same period in the same month segment) The probability distribution of the actual monthly hydropower generation amount)] is calculated. And the probability distribution of hydropower generation amount taking into account the fluctuation of water discharge in each month within the set period [probability distribution of hydropower generation amount of any month = hydropower generation amount during normal water in the same month segment as the month × Probability distribution of actual monthly water discharge rate in the same month segment as the month]. Furthermore, the probability distribution of the hourly power generation fluctuation amount of the power generator considering the water discharge fluctuation of each hour in each month within the set period [the probability of the hourly power generation fluctuation quantity considering the water discharge fluctuation of each hour of any month Distribution = maximum power that can be generated by the hydroelectric power generation facility−probability distribution of hydroelectric power generation amount taking into account fluctuations in the same month segment as the current month].
The integrated demand power calculation means is a power generation that takes into account the total estimated demand power input during the set period input from the input means and the unplanned outage during the set period calculated by the power generation fluctuation amount calculation means that takes into account unplanned outages. The probability distribution of the power generation fluctuation amount of the apparatus is integrated, and the probability distribution of the integrated demand power in the set period is calculated.
Here, as described above, the unit power generation cost of the power generation apparatus based on the start / stop order of each power generation facility, the maximum power generation possible power, the supply curve indicating the unit power consumption fuel consumption and the demand curve indicating the demand power Is calculated, the change in the power that can be generated by the power generation device can be replaced with the change in the demand power. Further, the total estimated demand power at each time point within the set period is determined by the total estimated demand power amount during the set period. Further, the total estimated demand power at each time point within the set period is determined by the total estimated demand power amount during the set period. In addition, the power generation fluctuation amount that takes into account fluctuations in the water discharge at each time point within the set period is the power generation fluctuation amount that takes into account fluctuations in the water discharge period during the setting period (for example, the fluctuation of the water discharge for each hour in each month within the setting period) Is determined by the fluctuation amount of power that can be generated in time). Further, as a method for integrating a plurality of probability distributions, for example, the method described above can be used. As described above, the probability distribution of the integrated demand power in the set period can be calculated by integrating the total estimated demand power amount in the set period and the probability distribution of the power generation possible power fluctuation amount of the power generator in consideration of the fluctuation of the water discharge in the set period. .
It should be noted that the power generation possible power calculation means considering the water discharge fluctuation for calculating the power generation possible power generation apparatus considering the water discharge fluctuation during the set period, and the power generation possible power calculation means considering the total assumed demand amount and the water discharge fluctuation during the setting period. The aspect of using the integrated demand power calculating means for calculating the integrated demand power in the setting period by integrating the power that can be generated by the power generation apparatus in consideration of the fluctuation of the water discharge in the setting period calculated in It is included in the concept using the possible power fluctuation amount calculating means and the integrated demand power calculating means.
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, the power generation equipment information stored in the power generation equipment information database, and each of the fuel price information databases stored in the fuel price information database. Based on the fuel price of the fuel, the probability distribution of the unit power generation cost of the power generation device in the set period is calculated. For example, using the method described above, the probability distribution of the total unit power fuel consumption for each fuel in the set period is calculated, and the probability distribution of the total unit power fuel consumption for each fuel in the set period calculated and each fuel The probability distribution of the unit power generation cost of the power generation device in the set period is calculated based on the fuel price.
Then, the power generation cost calculating means changes the set power amount (increase or decrease) from the assumed demand power amount during the set period based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period (for example, in the case of a power sale transaction), the maximum value of the unit power generation cost of the power generator during the set period is calculated. When the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (for example, in the case of a power purchase transaction), the minimum value of the unit power generation cost of the power generator during the set period Is calculated. For example, the method described above can be used as a method of calculating the maximum value of the unit power generation cost of the power generator in the set period and the minimum value of the unit power generation cost of the power generator in the set period.
In the present invention, the probability distribution of the unit power generation cost of the power generation device when the power amount supplied from the power generation device is changed from the assumed demand power amount during the setting period is calculated by grasping the influence of fluctuations in water discharge. is doing. Therefore, the electric power company can accurately grasp the risk caused by the fluctuation of the water discharge in the power sale transaction, the power purchase transaction or the like.
Further, the probability distribution of the integrated demand power is calculated by integrating the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus in consideration of the water discharge fluctuation in the setting period and the total assumed demand power amount in the setting period. Thereby, the unit power amount generation cost of the power generation device can be easily calculated.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第6発明は、請求項6に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、各発電設備で使用する燃料の燃料価格の変動による設定期間における発電装置の単位電力量発電費用の変動を、設定期間における各発電設備で使用する燃料の燃料価格の確率分布を算出することによって把握している。
本発明は、燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段は、発電設備情報データベースと、燃料価格情報データベースを有している。発電設備情報データベースには、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序と、複数の発電設備それぞれの最大発電可能電力と、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量を含む発電設備情報が記憶されている。
燃料価格情報データベースには、複数の発電設備で使用する各燃料の過去の実績燃料価格を含む燃料価格情報が記憶されている。例えば、過去の複数月それぞれにおける各燃料の実績月間燃料価格(1ヶ月間の平均価格)を含む燃料価格情報が記憶されている。
入力手段は、設定期間と、設定期間における想定需要電力量及び発電装置から供給する電力量を設定期間に想定需要電力量から増加あるいは減少させる設定電力量を含む設定期間における合計想定需要電力量、発電設備情報、燃料価格情報等が入力可能である。
燃料価格算出手段は、燃料価格情報データベースに記憶されている各燃料の実績燃料価格に基づいて、設定期間における各燃料の燃料価格の確率分布を算出可能である。例えば、各燃料の実績燃料価格に基づいて、各燃料の実績燃料価格変動率の確率分布を算出する。そして、各燃料の現時点の実績燃料価格あるいは各燃料の平均実績燃料価格と、現時点から設定期間までの期間と、各燃料の実績燃料価格変動率の確率分布に基づいて、設定期間における各燃料の燃料価格の確率分布を算出する。
発電費用算出手段は、入力手段から入力された設定期間における合計想定需要電力量と、発電設備情報データベースに記憶されている複数の発電設備の起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料及び複数の発電設備それぞれの単位電力量燃料消費量、燃料価格算出手段で算出された設定期間における各燃料の燃料価格の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。設定期間における発電装置の単位電力量発電費用(発電装置の限界費用)を算出する方法としては、例えば、以下の方法を用いることができる。先ず、起動/停止順序、各発電設備の最大発電可能電力、各発電設備の単位電力量燃料消費量を示す供給曲線と、設定期間内の各時点における合計想定需要電力に対応する需要曲線が交差する位置を判別し、交差する位置に対応する発電設備(限界発電設備)で使用する燃料及び単位電力量燃料消費量を判別する。合計想定需要電力は、設定期間における合計需要電力量により決定される。限界発電設備で使用する燃料及び単位電力量燃料消費量を判別する処理は、設定期間内の部分期間毎(例えば、時間毎)に行うのが好ましい。そして、設定期間内の各部分期間毎の限界発電設備の燃料及び電位電力量燃料消費量に基づいて、設定期間における各燃料の総単位電力量燃料消費量を算出する。そして、設定期間における、各燃料の総単位電力量燃料消費量と、燃料価格算出手段で算出された設定期間における各燃料の燃料価格の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。
さらに、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最大値を算出し、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)には、設定期間における発電装置の単位電力量発電費用の最小値を算出する。設定期間における発電装置の単位電力量発電費用の最大値及び設定期間における発電装置の単位電力量発電費用の最小値を算出する方法としては、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から変化させる場合の、発電装置の単位電力量発電費用の確率分布を、燃料価格の変動による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、燃料価格の変動に起因するリスクを正確に把握することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
A sixth aspect of the present invention is a power generation cost calculation device for a power generation device as described in claim 6. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. Also, calculate the probability distribution of the fuel price of the fuel to be used in each power generation facility during the set period, based on the change in the unit power generation cost of the power generator during the set period due to the change in the fuel price of the fuel used in each power generation facility By grasping.
The present invention includes fuel price calculation means, power generation cost calculation means, storage means, and input means.
The storage means has a power generation facility information database and a fuel price information database. The power generation facility information database includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, The power generation facility information including the unit power consumption fuel consumption of each of the power generation facilities is stored.
The fuel price information database stores fuel price information including past actual fuel prices of each fuel used in a plurality of power generation facilities. For example, fuel price information including actual monthly fuel prices (average price for one month) of each fuel in each of a plurality of past months is stored.
The input means includes a set period, a total estimated demand power amount in a set period including a set power amount that increases or decreases the assumed demand power amount in the set period and the power amount supplied from the power generation device from the assumed demand power amount in the set period, Power generation facility information, fuel price information, etc. can be input.
The fuel price calculation means can calculate the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the fuel price information database. For example, the probability distribution of the actual fuel price fluctuation rate of each fuel is calculated based on the actual fuel price of each fuel. Based on the current actual fuel price of each fuel or the average actual fuel price of each fuel, the period from the current time to the set period, and the probability distribution of the actual fuel price fluctuation rate for each fuel, Calculate the probability distribution of fuel prices.
The power generation cost calculation means can calculate the total estimated demand power amount in the set period input from the input means, the start / stop order of the plurality of power generation facilities stored in the power generation facility information database, and the maximum power generation of each of the plurality of power generation facilities The set period based on the power, the fuel used in each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, the fuel consumption, the fuel price probability distribution of each fuel in the set period calculated by the fuel price calculation means The probability distribution of the unit power generation cost of the power generator is calculated. For example, the following method can be used as a method for calculating the unit power generation cost of the power generation device (the marginal cost of the power generation device) during the set period. First, the supply curve indicating the start / stop sequence, the maximum power that can be generated by each power generation facility, the unit power amount fuel consumption of each power generation facility, and the demand curve corresponding to the total estimated power demand at each point in time within the set period The position to be used is determined, and the fuel to be used in the power generation facility (marginal power generation facility) corresponding to the intersecting position and the unit power consumption fuel consumption are determined. The total assumed demand power is determined by the total demand power amount in the set period. The process of determining the fuel used in the limit power generation facility and the unit power consumption fuel consumption is preferably performed for each partial period (for example, every hour) within the set period. Then, based on the fuel of the limit power generation facility and the potential power amount fuel consumption for each partial period within the set period, the total unit power amount fuel consumption amount of each fuel in the set period is calculated. Then, based on the total unit power consumption of each fuel in the set period and the probability distribution of the fuel price of each fuel in the set period calculated by the fuel price calculation means, the unit power amount of the power generator in the set period Calculate the probability distribution of power generation costs.
Further, the power generation cost calculation means changes the set power amount from the assumed demand power amount during the set period (increases or decreases) based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period (for example, in the case of a power sale transaction), the maximum value of the unit power generation cost of the power generator during the set period is calculated. When the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (for example, in the case of a power purchase transaction), the minimum value of the unit power generation cost of the power generator during the set period Is calculated. For example, the method described above can be used as a method of calculating the maximum value of the unit power generation cost of the power generator in the set period and the minimum value of the unit power generation cost of the power generator in the set period.
In the present invention, the probability distribution of the unit power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount during the set period is calculated by grasping the influence of fluctuations in the fuel price. ing. Therefore, the electric power company can accurately grasp the risk due to the fluctuation of the fuel price in the power sale transaction or the power purchase transaction.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第7発明は、請求項7に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の単位電力量発電費用を算出する。また、設定期間における合計想定需要電力量の確率分布を算出するとともに、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを算出し、合計想定需要電力量の確率分布と少なくとも一つの発電可能電力変動量を統合して統合需要電力の確率分布を算出し、さらに、設定期間における各燃料の燃料価格の確率分布を算出することによって、これらの各種変動要因による発電装置の単位電力量発電費用の変動を把握している。
本発明は、定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段及び出水変動を考慮した発電可能電力変動量算出手段のうちの少なくとも一つと、需要電力量算出手段と、統合需要電力算出手段と、燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段には、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序と、複数の発電設備それぞれの最大発電可能電力と、複数の発電設備それぞれで使用する燃料と、複数の発電設備それぞれの単位電力量燃料消費量と、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報と、複数の発電設備それぞれで使用する各燃料の過去の実績燃料価格を含む燃料価格情報が記憶されている。また、記憶手段には、複数の発電設備それぞれの故障率と、過去の実績定期点検計画及び実績定期点検を含む定期点検情報と、過去の実績水力発電電力量を含む出水情報の少なくとも一つが記憶されている。
入力手段は、設定期間と、設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量、起動/停止順序と、複数の発電設備の最大発電可能電力、複数の発電設備で使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、複数の発電設備それぞれの故障率、燃料価格情報、定期点検情報、出水情報、設定期間における定期点検計画を入力可能である。
定期点検計画変更を考慮した発電可能電力変動量算出手段は、入力手段から入力された設定期間における定期点検計画と、記憶手段に記憶されている実績定期点検計画及び実績定期点検、複数の発電設備それぞれの最大発電可能電力に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
計画外停止を考慮した発電可能電力変動量算出手段は、記憶手段に記憶されている複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
出水変動を考慮した発電可能電力変動量算出手段は、記憶手段に記憶されている実績水力発電電力量に基づいて、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段、出水変動を考慮した発電可能電力変動量算出手段の少なくとも一つによって、発電可能電力変動量算出手段が構成される。
設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
需要電力量算出手段は、入力手段から入力された設定期間における合計想定需要電力量と、記憶手段に記憶されている実績想定需要電力量及び実績需要電力量に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。設定期間における合計想定需要電力量の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
統合需要電力算出手段は、需要電力量算出手段で算出された設定期間における合計想定需要電力量の確率分布と、定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量算出手段で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び出水変動を考慮した発電可能電力変動量算出手段で算出された設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、設定期間における統合需要電力の確率分布を算出する。複数の確率分布を統合する方法としては、例えば、前述した方法を用いることができる。
燃料価格算出手段は、記憶手段に記憶されている各燃料の実績燃料価格に基づいて、設定期間における各燃料の燃料価格の確率分布を算出可能である。設定期間における各燃料の燃料価格の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
発電費用算出手段は、統合需要電力算出手段で算出された設定期間における統合需要電力の確率分布と、記憶手段に記憶されている起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量と、燃料価格算出手段で算出された設定期間における各燃料の燃料価格の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用の確率分布を算出する。設定期間における統合需要電力の確率分布、発電設備情報、燃料価格の確率分布に基づいて設定期間における発電装置の単位電力量発電費用の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
さらに、発電費用算出手段は、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の発電装置の発電費用を算出する。発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電取引の場合)の発電装置の発電費用、あるいは、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電取引の場合)の発電装置の発電費用の算出方法として、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の、発電装置の単位電力量発電費用の確率分布を、合計想定需要電力量の変動、定期点検計画変更、計画外停止、出水変動のうちの少なくとも一つの変動による発電可能電力の変動、燃料価格の変動による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、需要電力量の変動、発電可能電力の変動、燃料価格の変動に起因するリスクを正確に把握することができる。
また、設定期間における合計想定需要電力量の確率分布と、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電電力変動量の確率分布のうちの少なくとも一つの発電可能電力変動量を統合して設定期間における統合需要電力の確率分布を算出している。これにより、設定期間における発電装置の単位電力量発電費用を容易に算出することができる。
また、設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の単位電力量発電費用の最大値あるいは最小値を算出している。これにより、売電取引や買電取引における最大リスクを容易に把握することができる。
A seventh aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 7. In the present invention, the unit power generation cost of the power generation device in the setting period is calculated as the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed from the assumed demand power amount in the setting period. In addition, the probability distribution of the total estimated demand power amount during the set period is calculated, the probability distribution of the power generation possible power fluctuation amount considering the periodic inspection plan change during the set period, and the power generation of the power generator considering the unplanned outage Calculate at least one of the probability distribution of the possible power fluctuation amount and the probability distribution of the power generation possible power fluctuation amount of the power generation equipment taking into account the fluctuation of the water discharge, and calculate the probability distribution of the total assumed power demand amount and at least one power generation potential fluctuation By calculating the probability distribution of the integrated demand power by integrating the quantity, and further calculating the probability distribution of the fuel price of each fuel in the set period, the fluctuation of the unit power generation cost of the power generation unit due to these various fluctuation factors I know.
The present invention provides at least one of a power generation power fluctuation amount calculation means considering a periodic inspection plan change, a power generation power fluctuation amount calculation means considering an unplanned stop, and a power generation power fluctuation amount calculation means considering water discharge fluctuation. Demand power amount calculation means, integrated demand power calculation means, fuel price calculation means, power generation cost calculation means, storage means, and input means.
The storage means includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, Includes unit fuel consumption of each power generation facility, information on demand energy including past actual estimated demand and actual power consumption, and past actual fuel prices for each fuel used in each of the multiple power generation facilities Fuel price information is stored. In addition, the storage means stores at least one of a failure rate of each of the plurality of power generation facilities, periodic inspection information including past actual periodic inspection plans and actual periodic inspections, and water discharge information including past actual hydropower generation amount. Has been.
The input means includes a set period, an assumed demand power amount in the set period and a total assumed demand power amount in the set period including the set power amount, a start / stop order, a maximum power that can be generated by a plurality of power generation facilities, and a plurality of power generation facilities. Fuel, unit power consumption of each of a plurality of power generation facilities, failure rate of each of a plurality of power generation facilities, fuel price information, periodic inspection information, flood information, and a periodic inspection plan for a set period can be input.
The power generation fluctuation amount calculation means taking into account the change in the periodic inspection plan includes the periodic inspection plan for the set period input from the input means, the actual periodic inspection plan and the actual periodic inspection stored in the storage means, and a plurality of power generation facilities. Based on the maximum power that can be generated, the probability distribution of the power generation fluctuation amount of the power generation device that takes into account the periodic inspection plan change in the set period is calculated.
The power generation fluctuation amount calculating means that takes into account unplanned outages is a power generation apparatus that takes into account unplanned outages in a set period based on the failure rate and the maximum power that can be generated in each of the plurality of power generation facilities stored in the storage means The probability distribution of the amount of power fluctuation that can be generated is calculated.
Based on the actual hydroelectric power generation amount stored in the storage unit, the power generation fluctuation amount calculation unit that takes into account fluctuations in the water discharge generates a probability distribution of the power generation possible power fluctuation amount of the power generator in consideration of the water discharge fluctuations in the set period. calculate.
Power generation possible power fluctuation calculation means considering the periodic inspection plan change, power generation fluctuation fluctuation calculation means considering unplanned stoppage, power generation fluctuation fluctuation calculation means considering water discharge fluctuation A fluctuation amount calculating means is configured.
Probability distribution of power generation power fluctuation amount considering the periodic inspection plan change during the setting period, probability distribution of power generation power fluctuation amount considering the unplanned outage during the setting period, and water discharge fluctuation during the setting period For example, the method described above can be used as a method of calculating the probability distribution of the power generation variation amount of the generated power generation apparatus.
Based on the total estimated demand power amount in the set period input from the input means, the actual estimated demand power amount stored in the storage means, and the actual demand power amount, the demand power amount calculation means Calculate the probability distribution of electric energy. As a method of calculating the probability distribution of the total assumed demand power amount in the set period, for example, the method described above can be used.
The integrated demand power calculation means includes a probability distribution of the total assumed demand power amount in the set period calculated by the demand power amount calculation means, and a settable period calculated by the power generation fluctuation amount calculation means considering the periodic inspection plan change. Probability distribution of the power generation fluctuation amount of the power generator considering the periodic inspection plan change, power generation possible of the power generation equipment considering the unplanned shutdown during the set period calculated by the power generation fluctuation fluctuation calculation means considering the unplanned shutdown Integrate at least one of the probability distribution of the power fluctuation amount and the probability distribution of the power fluctuation amount that can be generated by the power generation device considering the water discharge fluctuation in the set period calculated by the means for calculating the power generation fluctuation amount considering the water fluctuation fluctuation. Then, the probability distribution of the integrated demand power in the set period is calculated. As a method for integrating a plurality of probability distributions, for example, the method described above can be used.
The fuel price calculation means can calculate the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the storage means. As a method for calculating the probability distribution of the fuel price of each fuel in the set period, for example, the method described above can be used.
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, the start / stop order stored in the storage means, the maximum power that can be generated for each of the plurality of power generation facilities, Based on the fuel used in each of the power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the probability distribution of the fuel price of each fuel in the set period calculated by the fuel price calculation means The probability distribution of the unit power generation cost of the device is calculated. As a method of calculating the probability distribution of the unit power generation cost of the power generation device in the setting period based on the probability distribution of the integrated demand power in the setting period, the power generation facility information, and the probability distribution of the fuel price, for example, the method described above is used. be able to.
Further, the power generation cost calculation means changes the set power amount from the assumed demand power amount during the set period (increases or decreases) based on the probability distribution of the unit power generation cost of the power generator during the set period. ) To calculate the power generation cost of the power generator. The power generation cost of the power generator when the power supplied from the power generator is increased from the assumed demand power during the set period (for example, in the case of a power sale transaction), or the power supplied from the power generator is set during the set period For example, the above-described method can be used as a method for calculating the power generation cost of the power generation apparatus when the set power amount is decreased from the assumed demand power amount (for example, in the case of a power purchase transaction).
In the present invention, when the amount of power supplied from the power generation device is changed from the assumed demand power amount to the set power amount during the set period, the probability distribution of the unit power generation cost of the power generation device is calculated using It is calculated by grasping the effects of fluctuations in power that can be generated and fluctuations in fuel prices due to at least one of inspection plan changes, unplanned outages, and fluctuations in water discharge. Therefore, the power company can accurately grasp the risk caused by fluctuations in the amount of demand power, fluctuations in power that can be generated, and fluctuations in fuel price in power sale transactions, power purchase transactions, and the like.
In addition, the probability distribution of the total estimated demand power during the set period, the probability distribution of the power generation possible power fluctuation amount considering the periodic inspection plan change during the set period, and the power generation of the power generator considering unplanned outages during the set period Probability distribution of possible power fluctuation amount, probability distribution of integrated demand power in setting period by integrating at least one power generation fluctuation amount of power generation probability distribution of power generation equipment considering water discharge fluctuation in setting period Is calculated. Thereby, the unit power amount generation cost of the power generation device in the set period can be easily calculated.
Further, based on the probability distribution of the unit power generation cost of the power generation device in the setting period, the maximum value or the minimum value of the unit power generation cost of the power generation device in the setting period, which is generated with the setting probability, is calculated. Thereby, the maximum risk in a power sale transaction or a power purchase transaction can be easily grasped.

本発明の第8発明は、請求項8に記載されたとおりの発電装置の発電費用算出装置である。
本発明では、リスク指標算出手段と、出力手段を有している。また、入力手段から、設定期間における設定電力量(例えば、売電電力量あるいは買電電力量)に対する設定金額(例えば、単位電力量に対するあるいは設定電力量に対する売電金額あるいは買電金額)を入力可能である。出力手段としては、表示手段、印刷手段、処理装置に通信回線を介して接続されている端末装置等を用いることができる。
リスク指標算出手段は、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、発電費用算出手段で算出された設定期間における発電装置の単位電力量発電費用の最大値と入力手段から入力された設定電力量(売電電力量)を乗算し、乗算結果と入力手段から入力された設定金額(単位電力量に対する売電金額が入力される場合には、[単位電力量に対する売電金額×売電電力量])との差をリスク指標として出力手段に出力する。例えば、乗算値から設定金額を減算した減算結果を、リスク指標として出力手段から出力する。ここで、売電取引に伴うリスク指標を算出する場合には、[設定期間における発電装置の単位電力量発電費用の最大値×売電電力量]と[売電電力量に対する売電金額]との差を算出することは、[設定期間における発電装置の単位電力量発電費用の最大値]と[単位電力量に対する売電金額]との差を算出することと同義である。したがって、[設定期間における発電装置の単位電力量発電費用の最大値と単位電力量に対する売電金額との差をリスク指標として出力手段に出力する]態様は、本発明に包含される。
一方、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、入力手段から入力された設定金額(単位電力量に対する買電金額が入力される場合には、[単位電力量に対する買電金額×買電電力量])と、発電費用算出手段で算出された設定期間における発電装置の単位電力量発電費用の最小値と入力手段から入力された設定電力量(買電電力量)を乗算した乗算結果との差をリスク指標として出力手段に出力する。例えば、設定金額から乗算結果を減算した減算結果をリスク指標として出力手段に出力する。ここで、買電取引に伴うリスク指標を算出する場合には、[買電電力量に対する買電金額]と[設定期間における発電装置の単位電力量発電費用の最小値×買電電力量]との差を算出することは、[単位電力量に対する売電金額]と[設定期間における発電装置の単位電力量発電費用の最小値]との差を算出することと同義である。したがって、[単位電力量に対する買電金額と設定期間における発電装置の単位電力量発電費用の最小値との差をリスク指標として出力手段に出力する]態様は、本発明に包含される。
なお、リスク指標を算出する際には、各発電設備の建設費用や保守・点検費用等を含む発電装置の固定費用も考慮できることが好ましい。例えば、[設定期間における発電装置の単位電力量発電費用の最大値×売電電力量]と[売電電力量に対する売電金額]との差を算出する際、あるいは、[設定期間における発電装置の単位電力量発電費用の最大値]と[単位電力量に対する売電金額]との差を算出する際に、一方の金額に発電装置の固定費用(各発電設備の固定費用)に相当する金額を反映させて算出する方法を用いる。発電装置の固定費用に相当する金額を反映させてリスク指標を算出する態様も、本発明に包含される。
本発明では、電力事業者は、出力手段から出力される値を認識することにより、売電取引時あるいは買電取引時におけるリスク指標を容易に判別することができる。
An eighth aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 8.
In this invention, it has a risk parameter | index calculation means and an output means. In addition, it is possible to input a set amount (for example, a power sale amount or a power purchase amount with respect to a unit power amount or with respect to a set power amount) with respect to a set power amount (for example, a power sale power amount or a power purchase amount) during the set period from the input means. is there. As the output unit, a display unit, a printing unit, a terminal device connected to the processing device via a communication line, or the like can be used.
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the risk index calculation unit is configured to generate the unit power generation cost of the power generation unit during the set period calculated by the power generation cost calculation unit. Is multiplied by the set power amount (power sale power amount) input from the input means, and the multiplication result and the set amount input from the input means (when the power sale amount for the unit power amount is input, The difference between the amount of power sold per unit power amount x the amount of power sold]) is output as a risk index to the output means. For example, a subtraction result obtained by subtracting the set amount from the multiplication value is output from the output means as a risk index. Here, when calculating a risk index associated with a power sale transaction, the difference between [maximum value of unit power generation cost of power generation device in set period × power sale power amount] and [amount of power sale relative to power sale amount] Is equivalent to calculating the difference between [the maximum value of the unit power generation cost of the power generation device in the set period] and [the amount of power sold for the unit power amount]. Therefore, the aspect of [outputting the difference between the maximum value of the unit power generation power generation cost of the power generation apparatus and the amount of power sales with respect to the unit power amount as the risk index to the output unit during the set period] is included in the present invention.
On the other hand, when the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period, the set amount input from the input means (when the amount of power purchased for the unit power amount is input) , [Purchasing power amount per unit power amount x purchased power amount]), the minimum value of the unit power generation cost of the power generator in the setting period calculated by the power generation cost calculation unit, and the set power amount input from the input unit ( The difference from the multiplication result obtained by multiplying (the amount of electric power purchased) is output to the output means as a risk index. For example, a subtraction result obtained by subtracting the multiplication result from the set amount is output to the output unit as a risk index. Here, when calculating the risk index associated with a power purchase transaction, the difference between [the amount of power purchased relative to the amount of power purchased] and [minimum value of the unit power generation cost of the power generator in the set period × the amount of purchased power] Is equivalent to calculating the difference between [the amount of power sold per unit power amount] and [the minimum value of the unit power amount generation cost of the power generator in the set period]. Therefore, an aspect of [outputting the difference between the purchased power amount per unit power amount and the minimum value of the unit power generation cost of the power generation apparatus in the set period to the output means as a risk index] is included in the present invention.
In calculating the risk index, it is preferable to consider the fixed cost of the power generation apparatus including the construction cost and maintenance / inspection cost of each power generation facility. For example, when calculating the difference between [maximum value of unit power amount of power generation device during set period × power sale power amount × amount of power sold for power sale amount] and [unit of power generation device during set period] When calculating the difference between [Maximum amount of electricity generation cost] and [Amount of electricity sold per unit of electricity], the amount equivalent to the fixed cost of the power generation equipment (fixed cost of each power generation facility) is reflected in one amount The method of calculating by using A mode in which the risk index is calculated by reflecting an amount corresponding to the fixed cost of the power generation apparatus is also included in the present invention.
In the present invention, the electric power company can easily determine the risk index at the time of the power sale transaction or the power purchase transaction by recognizing the value output from the output means.

本発明の第9発明は、請求項9に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の想定需要時発電費用と、設定期間における発電装置の合計想定需要時発電費用(合計想定需要電力量=想定需要電力量+設定電力量)の差を算出する。また、需要電力量(想定需要電力量、合計想定需要電力量)の変動による発電装置の発電費用の変動を、設定期間における想定需要電力量の確率分布及び設定期間における合計想定需要電力量の確率分布を算出することによって把握している。
本発明は、需要電力量算出手段と、発電費用算出手段と、記憶手段と、入力手段を有している。
記憶手段には、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、複数の発電設備それぞれで使用する燃料の燃料価格を含む燃料価格情報、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報が記憶されている。
入力手段からは、設定期間、設定期間における想定需要電力量、設定期間における設定電力量、起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、燃料価格情報、需要電力量情報が入力可能である。
需要電力量算出手段は、入力手段から入力された設定期間における想定需要電力量及び設定電力量と、需要電力量情報データベースに記憶されている実績想定需要電力量及び実績需要電力量に基づいて、設定期間における想定需要電力量の確率分布と、設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量の確率分布を算出する。
発電費用算出手段は、需要電力量算出手段で算出された設定期間における想定需要電力量の確率分布あるいは合計想定需要電力量の確率分布と、記憶手段に記憶されている起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量及び各燃料の燃料価格に基づいて、設定期間に発電装置から想定需要電力量を供給するのに要する発電装置の想定需要時発電費用の確率分布、設定期間に発電装置から合計想定需要電力量を供給するのに要する発電装置の合計想定需要時発電費用の確率分布を算出する。
さらに、発電費用算出手段は、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電時)には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の想定需要時発電費用の最大値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の合計想定需要時発電費用の最大値を算出する。そして、設定期間における発電装置の合計想定需要時発電費用の最大値と、設定期間における発電装置の想定需要時発電費用の最大値との差を算出し、算出結果を発電装置の発電費用とする。例えば、設定期間における発電装置の合計想定需要時発電費用の最大値から、設定期間における発電装置の想定需要時発電費用の最大値を減算し、減算結果を発電装置の発電費用とする。
一方、発電装置から供給する電力量を設定期間に装置需要電力量から設定電力量減少させる場合(例えば、買電時)には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の想定需要時発電費用の最小値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の合計想定需要時発電費用の最小値を算出する。そして、設定期間における発電装置の想定需要時発電費用の最小値と、設定期間における発電装置の合計想定需要時発電費用の最小値との差を算出し、算出結果を発電装置の発電費用とする。例えば、設定期間における発電装置の想定需要時発電費用の最小値から、設定期間における発電装置の合計想定需要時発電費用の最小値を減算し、減算結果を発電装置の発電費用とする。
設定期間における想定需要電力量の確率分布及び設定期間における合計想定需要電力量の確率分布を算出する方法、設定期間における発電装置の想定需要時発電費用の確率分布及び設定期間における発電装置の合計想定需要時発電費用の確率分布を算出する方法、設定期間における発電装置の想定需要時発電費用及び設定期間における発電装置の合計想定需要時発電費用の最大値及び最小値を算出する方法としては、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用の変化を、設定期間における合計想定需要電力量の確率分布に基づいて算出した設定期間における発電装置の合計想定需要時発電費用の確率分布と、設定期間における想定需要電力量の確率分布に基づいて算出した設定期間における発電装置の合計想定需要時発電費用の確率分布及び設定期間における発電装置の想定需要時発電費用の確率分布に基づいて算出することにより、合計想定需要電力量や想定需要電力量の変動による影響を把握して算出することができる。したがって、電力事業者は、売電取引や買電取引等における、需要電力量の変動に起因するリスクを正確に把握することができる。
A ninth aspect of the present invention is a power generation cost calculation device for a power generation device as set forth in claim 9. In the present invention, as the power generation cost of the power generation device when the power amount supplied from the power generation device is changed from the assumed demand power amount to the set power amount during the setting period, The difference between the power generation costs at the time of the total assumed demand of the power generators during the period (total assumed demand power amount = assumed demand power amount + set power amount) is calculated. In addition, the fluctuation of the power generation cost of the power generation equipment due to the fluctuation of demand power (assumed demand power, total estimated demand power) is represented by the probability distribution of the assumed demand power during the set period and the probability of the total estimated demand power during the set period. It is grasped by calculating the distribution.
The present invention includes demand power amount calculation means, power generation cost calculation means, storage means, and input means.
The storage means includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, and each of the plurality of power generation facilities The unit power amount fuel consumption amount, the fuel price information including the fuel price of the fuel used in each of the plurality of power generation facilities, the past actual power demand information and the demand power amount information including the actual demand power amount are stored.
From the input means, the setting period, the assumed demand power amount during the setting period, the setting power amount during the setting period, the start / stop order, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel that is used by each of the plurality of power generation facilities, Unit power consumption fuel consumption information, fuel price information, and demand power consumption information of each power generation facility can be input.
The demand power amount calculation means is based on the assumed demand power amount and the set power amount in the set period input from the input means, the actual assumed demand power amount and the actual demand power amount stored in the demand power amount information database, The probability distribution of the assumed demand power amount in the set period and the probability distribution of the total assumed demand power amount in the set period including the assumed demand power amount and the set power amount in the set period are calculated.
The power generation cost calculation means includes a probability distribution of the assumed demand power amount or a probability distribution of the total assumed demand power amount in the set period calculated by the demand power amount calculation means, a start / stop order stored in the storage means, a plurality of Based on the maximum power that can be generated by each power generation facility, the fuel used by each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, the fuel consumption of each fuel, and the fuel price of each fuel, Calculate the probability distribution of power generation cost at the time of assumed demand for the power generation equipment required to supply the amount, and the probability distribution of power generation cost at the total demand demand of the power generation equipment required to supply the total estimated demand power from the power generation equipment during the set period To do.
Further, the power generation cost calculation means, when increasing the set amount of electric power supplied from the power generation device from the assumed demand power amount during the set period (for example, at the time of selling electricity), Based on the probability distribution of the cost, calculate the maximum value of the power generation cost at the assumed demand of the power generator in the set period, and generate the power generation in the set period based on the probability distribution of the total assumed power generation cost of the power generator in the set period Calculate the maximum value of power generation cost during the total estimated demand of the equipment. Then, the difference between the maximum value of the power generation cost at the total assumed demand of the power generation device during the set period and the maximum value of the power generation cost at the time of the assumed power generation of the power generation device during the setting period is calculated, and the calculation result is used as the power generation cost of the power generation device. . For example, the maximum value of the power generation cost at the time of the assumed demand of the power generation device in the setting period is subtracted from the maximum value of the power generation cost at the time of the total power generation demand of the power generation device in the setting period, and the subtraction result is used as the power generation cost of the power generation device.
On the other hand, when the amount of power supplied from the power generation device is reduced from the device demand power amount during the set period (for example, at the time of power purchase), based on the probability distribution of the power generation cost at the time of assumed demand of the power generator during the set period And calculating the minimum value of power generation costs at the time of assumed power generation equipment during the set period, and based on the probability distribution of power generation costs at the time of total assumed power generation equipment during the set time period, Calculate the minimum power generation cost. Then, the difference between the minimum value of the power generation cost at the time of assumed demand of the power generation device in the set period and the minimum value of the power generation cost at the time of the total power generation demand of the power generation device in the setting period is calculated, and the calculation result is used as the power generation cost of the power generation device. . For example, the minimum value of the total estimated demand power generation cost of the power generation device in the setting period is subtracted from the minimum value of the power generation cost at the time of assumed power generation of the power generation device, and the subtraction result is used as the power generation cost of the power generation device.
Probability distribution of assumed power demand during the set period and method for calculating the probability distribution of total estimated power demand during the set period, probability distribution of power generation costs during the assumed demand of the power generator during the set period, and total assumption of the power generator during the set period As a method for calculating the probability distribution of power generation cost during demand, a method for calculating the maximum value and the minimum value of power generation cost at the time of assumed power generation during the set period and the total power generation cost during the set power generation during the set period, for example, The method described above can be used.
In the present invention, the change in the power generation cost of the power generation device when the power amount supplied from the power generation device is changed from the assumed demand power amount during the set period based on the probability distribution of the total assumed demand power amount during the set period. Probability distribution of the total estimated demand power generation cost of the power generation device in the calculated setting period and the probability distribution of the total estimated demand power generation cost of the power generation device in the setting period calculated based on the probability distribution of the assumed demand power amount in the setting period By calculating based on the probability distribution of the power generation cost at the time of assumed demand of the power generation device in the set period, it is possible to grasp and calculate the influence of the total assumed demand power amount and the fluctuation of the assumed demand power amount. Therefore, the electric power company can accurately grasp the risk due to fluctuations in the amount of power demand in power sale transactions, power purchase transactions, and the like.

本発明の第10発明は、請求項10に記載されたとおりの発電装置の発電費用算出装置である。本発明では、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用として、設定期間における発電装置の想定需要時発電費用と設定期間における発電装置の合計想定需要時発電費用(合計想定需要電力量=想定需要電力量+設定電力量)の差を算出する。また、需要電力量(想定需要電力量、合計想定需要電力量)の変動、定期点検計画変更、計画外停止、出水変動のうちの少なくとも一つの変動、燃料価格の変動等による発電装置の発電費用の変動を、設定期間における想定需要電力量の確率分布、設定期間における合計需要電力量の確率分布を算出するとともに、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布の少なくとも一つを算出し、設定期間における想定需要電力量の確率分布、設定期間における合計想定需要電力量の確率分布と設定期間における発電可能電力変動量の確率分布の少なくとも一つを統合して設定期間における想定需要時統合需要電力量の確率分布、設定期間における合計想定需要時統合需要電力量の確率分布を算出し、さらに、設定期間における各燃料の燃料価格の確率分布を算出することによって把握している。
本発明は、定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電電力変動量算出手段及び出水変動を考慮した発電可能電力変動量算出手段の少なくとも一つと、需要電力量算出手段と、統合需要電力算出手段と、燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備えている。
記憶手段には、複数の発電設備それぞれを起動及び停止する優先順序を示す起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、複数の発電設備それぞれで使用する燃料の燃料価格を含む燃料価格情報、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報が記憶されている。また、記憶手段には、複数の発電設備それぞれの故障率、過去の実績定期点検計画及び実績定期点検を含む定期点検情報、過去の実績水力発電電力量を含む出水情報の少なくとも一つが記憶されている。
入力手段は、設定期間、設定期間における想定需要電力量及び設定電力量、起動/停止順序、複数の発電設備の最大発電可能電力、複数の発電設備で使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、燃料価格情報、定期点検情報、複数の発電設備それぞれの故障率、設定期間における定期点検計画、出水情報が入力可能である。
定期点検計画変更を考慮した発電可能電力変動量算出手段は、入力手段から入力された設定期間における定期点検計画と、記憶手段に記憶されている実績定期点検計画及び実績定期点検、複数の発電設備それぞれの最大発電可能電力に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
計画外停止を考慮した発電可能電力変動量算出手段は、記憶手段に記憶されている複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
出水変動を考慮した発電可能電力変動量算出手段は、記憶手段に記憶されている実績水力発電電力量に基づいて、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する。
需要電力量算出手段は、入力手段から入力された設定期間における想定需要電力量及び設定電力量と、記憶手段に記憶されている実績想定需要電力量及び実績需要電力量に基づいて、設定期間における想定需要電力量の確率分布、設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量の確率分布を算出する。
統合需要電力算出手段は、需要電力量算出手段で算出された設定期間における想定需要電力量の確率分布及び設定期間における合計想定需要電力量の確率分布と、定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量算出手段で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び出水変動を考慮した発電可能電力変動量算出手段で算出された設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、設定期間における想定需要時統合需要電力の確率分布及び設定期間における合計想定需要時統合需要電力の確率分布を算出する。
燃料価格算出手段は、記憶手段に記憶されている各燃料の実績燃料価格に基づいて、設定期間における各燃料の燃料価格の確率分布を算出する。
発電費用算出手段は、統合需要電力算出手段で算出された設定期間における想定需要時統合需要電力の確率分布、設定期間における合計想定需要時統合需要電力の確率分布と、記憶手段に記憶されている起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量、燃料価格算出手段で算出された設定期間における各燃料の燃料価格の確率分布に基づいて、設定期間における発電装置の想定需要時発電費用の確率分布、設定期間における発電装置の合計想定需要時発電費用の確率分布を算出する。
さらに、発電費用算出手段は、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電時)には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の想定需要時発電費用の最大値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の合計想定需要時発電費用の最大値を算出する。そして、設定期間における発電装置の合計想定需要時発電費用の最大値と設定期間における発電装置の想定需要時発電費用の最大値との差を算出し、算出結果を発電装置の発電費用とする。例えば、設定期間における発電装置の合計想定需要時発電費用の最大値から、設定期間における発電装置の想定需要時発電費用の最大値を減算し、減算結果を発電装置の発電費用とする。
一方、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電時)には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の想定需要時発電費用の最小値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定期間における発電装置の合計想定需要時発電費用の最小値を算出する。そして、設定期間における発電装置の想定需要時発電費用の最小値と設定期間における発電装置の合計想定需要時発電費用の最小値との差を算出し、算出結果を発電装置の発電費用とする。例えば、設定期間における発電装置の想定需要時発電費用の最小値から、設定期間における発電装置の合計想定需要時発電費用の最小値を減算し、減算結果を発電装置の発電費用とする。
設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する方法、設定期間における想定需要電力量の確率分布及び設定期間における合計想定需要電力量の確率分布を算出する方法、設定期間における想定需要時統合需要電力の確率分布及び設定期間における合計想定需要時統合需要電力の確率分布を算出する方法、設定期間における各燃料の燃料価格の確率分布を算出する方法、設定期間における想定需要時発電費用の確率分布及び設定期間における発電装置の合計想定需要時発電費用の確率分布を算出する方法、設定期間における発電装置の想定需要時発電費用及び設定期間における発電装置の合計想定需要時発電費用の最大値及び最小値を算出する方法としては、例えば、前述した方法を用いることができる。
本発明では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用の変化を、設定期間における想定需要電力量の確率分布及び合計想定需要電力量の確率分布と、設定期間における定期点検計画変更を考慮した発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量の確率分布及び出水変動を考慮した発電可能電力変動量の確率分布の少なくとも一つと、燃料価格の確率分布に基づいて算出した設定期間における発電装置の想定需要時発電費用の確率分布及び設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて算出することにより、需要電力量(想定需要電力量、合計想定需要電力量)の変動、定期点検計画変更、計画外停止及び出水変動の少なくとも一つの変動、燃料価格の変動等による影響を把握して算出している。したがって、電力事業者は、売電取引や買電取引等における、需要電力量の変動、発電装置の発電可能電力の変動、燃料価格の変動に起因するリスクを正確に把握することができる。
また、本発明では、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、出水変動を考慮した発電装置の発電可能電力変動量の確率分布の少なくとも一つと、設定期間における想定需要電力量の確率分布、設定期間における合計想定需要電力量の確率分布を統合して設定期間における想定需要時統合需要電力の確率分布、設定期間における合計想定需要時統合需要電力の確率分布を算出している。これにより、設定期間における発電装置の想定需要時発電費用や設定期間における合計想定需要時発電費用を容易に算出することができる。
A tenth aspect of the present invention is a power generation cost calculation apparatus for a power generation apparatus as set forth in claim 10. In the present invention, as the power generation cost of the power generation device when the power amount supplied from the power generation device is changed from the assumed demand power amount to the set power amount in the setting period, the power generation cost at the time of the assumed demand of the power generation apparatus in the setting period and the setting period The difference between the power generation costs at the time of the total assumed demand of the power generation device (total assumed demand power amount = assumed demand power amount + set power amount) is calculated. In addition, the power generation costs of the generator due to fluctuations in demand electricity (estimated demand electricity, total assumed demand electricity), periodic inspection plan changes, unplanned outages, at least one of fluctuations in water discharge, fluctuations in fuel prices, etc. The probability distribution of the expected power demand during the set period, the probability distribution of the total demand power during the set period, and the probability of the power generation fluctuation that can be generated by the power generator considering the periodic inspection plan change during the set period Calculating at least one of the distribution, the probability distribution of the power generation power fluctuation amount of the power generation apparatus considering the unplanned stop in the set period, and the probability distribution of the power generation power fluctuation amount of the power generation apparatus considering the water discharge fluctuation in the setting period, Probability distribution of estimated demand power during the set period, probability distribution of total estimated demand power during the set period, and probability of power generation fluctuations during the set period Integrate at least one of the cloths to calculate the probability distribution of the integrated demand energy at the time of assumed demand in the set period and the probability distribution of the total demand power at the time of the assumed demand in the set period, and further calculate the fuel of each fuel in the set period It is grasped by calculating the probability distribution of the price.
The present invention includes at least one of a power generation possible power fluctuation calculation means considering a periodic inspection plan change, a power generation possible power fluctuation calculation means considering unplanned stoppage, and a power generation possible power fluctuation calculation means considering water discharge fluctuation. Demand power amount calculation means, integrated demand power calculation means, fuel price calculation means, power generation cost calculation means, storage means, and input means.
The storage means includes a start / stop order indicating a priority order for starting and stopping each of the plurality of power generation facilities, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, and each of the plurality of power generation facilities The unit power amount fuel consumption amount, the fuel price information including the fuel price of the fuel used in each of the plurality of power generation facilities, the past actual power demand information and the demand power amount information including the actual demand power amount are stored. The storage means stores at least one of a failure rate of each of the plurality of power generation facilities, periodic inspection information including past actual periodic inspection plans and actual periodic inspections, and water discharge information including past actual hydroelectric power generation amount. Yes.
The input means are a set period, an assumed demand power amount and a set power amount in the set period, start / stop order, maximum power that can be generated by a plurality of power generation facilities, fuel used by a plurality of power generation facilities, and units of each of the plurality of power generation facilities It is possible to input power consumption, fuel consumption information, fuel price information, periodic inspection information, failure rate of each of a plurality of power generation facilities, periodic inspection plan during a set period, and flood information.
The power generation fluctuation amount calculation means taking into account the change in the periodic inspection plan includes the periodic inspection plan for the set period input from the input means, the actual periodic inspection plan and the actual periodic inspection stored in the storage means, and a plurality of power generation facilities. Based on the maximum power that can be generated, the probability distribution of the power generation fluctuation amount of the power generation device that takes into account the periodic inspection plan change in the set period is calculated.
The power generation fluctuation amount calculating means that takes into account unplanned outages is a power generation apparatus that takes into account unplanned outages in a set period based on the failure rate and the maximum power that can be generated in each of the plurality of power generation facilities stored in the storage means The probability distribution of the amount of power fluctuation that can be generated is calculated.
Based on the actual hydroelectric power generation amount stored in the storage unit, the power generation fluctuation amount calculation unit that takes into account fluctuations in the water discharge generates a probability distribution of the power generation possible power fluctuation amount of the power generator in consideration of the water discharge fluctuations in the set period. calculate.
Based on the estimated demand power amount and the set power amount in the set period input from the input means, and the actual estimated demand power amount and the actual demand power amount stored in the storage means, the demand power amount calculation means The probability distribution of the assumed demand power amount, the assumed demand power amount in the set period, and the probability distribution of the total assumed demand power amount in the set period including the set power amount are calculated.
The integrated demand power calculation means calculates the probability distribution of the assumed demand power amount during the set period calculated by the demand power amount calculation means, the probability distribution of the total estimated demand power amount during the set period, and the power that can be generated taking into account the periodic inspection plan change. Probability distribution of the power generation power fluctuation amount of the power generator considering the periodic inspection plan change in the setting period calculated by the fluctuation amount calculation means, in the setting period calculated by the power generation power fluctuation amount calculation means considering the unplanned stop Probable distribution of the power generation power fluctuation amount of the power generator considering unplanned outages and the power generation power fluctuation amount of the power generation equipment considering the water discharge fluctuation in the set period calculated by the power generation power fluctuation calculation means considering the water discharge fluctuation The probability distribution of the integrated demand power at the time of assumed demand in the set period and the total estimated demand in the set period To calculate the probability distribution at the time of the integrated power demand.
The fuel price calculation means calculates the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the storage means.
The power generation cost calculation means is stored in the storage means and the probability distribution of the integrated demand power during the assumed demand in the set period calculated by the integrated demand power calculation means, the probability distribution of the total estimated demand integrated demand power in the set period, and the storage means Start / stop order, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, unit power consumption of each of the plurality of power generation facilities, and the set period calculated by the fuel price calculation means Based on the probability distribution of the fuel price of each fuel, the probability distribution of the power generation cost at the time of assumed demand of the power generation device in the set period and the probability distribution of the power generation cost at the time of the total assumed demand of the power generation device in the setting period are calculated.
Further, the power generation cost calculation means, when increasing the set amount of electric power supplied from the power generation device from the assumed demand power amount during the set period (for example, at the time of selling electricity), Based on the probability distribution of the cost, calculate the maximum value of the power generation cost at the assumed demand of the power generator in the set period, and generate the power generation in the set period based on the probability distribution of the total assumed power generation cost of the power generator in the set period Calculate the maximum value of power generation cost during the total estimated demand of the equipment. Then, the difference between the maximum value of the power generation cost at the total assumed demand of the power generation device during the set period and the maximum value of the power generation cost at the time of assumed power generation of the power generation device during the set period is calculated, and the calculation result is used as the power generation cost of the power generation device. For example, the maximum value of the power generation cost at the time of the assumed demand of the power generation device in the setting period is subtracted from the maximum value of the power generation cost at the time of the total power generation demand of the power generation device in the setting period, and the subtraction result is used as the power generation cost of the power generation device.
On the other hand, when the amount of power supplied from the power generation device is reduced from the assumed power demand amount during the set period (for example, at the time of power purchase), based on the probability distribution of the power generation cost during the assumed demand of the power generator during the set period And calculating the minimum value of power generation costs at the time of assumed power generation equipment during the set period, and based on the probability distribution of power generation costs at the time of total assumed power generation equipment during the set time period, Calculate the minimum power generation cost. Then, the difference between the minimum value of the power generation cost at the assumed demand of the power generation device during the set period and the minimum value of the power generation cost at the total assumed demand of the power generation device during the setting period is calculated, and the calculation result is used as the power generation cost of the power generation device. For example, the minimum value of the total estimated demand power generation cost of the power generation device in the setting period is subtracted from the minimum value of the power generation cost at the time of assumed power generation of the power generation device, and the subtraction result is used as the power generation cost of the power generation device.
Probability distribution of power generation power fluctuation amount considering the periodic inspection plan change during the setting period, probability distribution of power generation power fluctuation amount considering the unplanned outage during the setting period, and water discharge fluctuation during the setting period For calculating the probability distribution of the power generation fluctuation amount of the generated power generation apparatus, the probability distribution of the assumed demand power amount during the set period, the probability distribution of the total assumed demand power amount during the set period, and the estimated demand time during the set period The probability distribution of integrated demand power and the method of calculating the probability distribution of total demand demand during the set period, the method of calculating the probability distribution of the fuel price of each fuel during the set period, Probability distribution and method for calculating the probability distribution of power generation costs at the time of total demand for the power generation equipment in the set period, in the set period As a method for calculating the maximum value and the minimum value of the total assumed demand power generation costs of the power plant at the assumed demand during power generation cost and setting period of the electrodeposition apparatus, for example, it is possible to use the method described above.
In the present invention, when the amount of power supplied from the power generation device is changed from the assumed demand power amount to the set power amount during the set period, the change in the power generation cost of the power generation apparatus is represented by the probability distribution of the assumed demand power amount and the total assumed demand during the set period. Probability distribution of power amount, probability distribution of power generation fluctuation amount considering change of periodic inspection plan in set period, probability distribution of power generation fluctuation amount considering unplanned stoppage and power generation fluctuation fluctuation considering water discharge fluctuation At least one of the quantity probability distributions, the probability distribution of the power generation cost at the time of the assumed power generation in the set period calculated based on the probability distribution of the fuel price, and the probability distribution of the power generation cost at the time of the total assumed demand of the power generation equipment in the set period By calculating based on the above, fluctuations in demand electric energy (assumed demand electric energy, total estimated electric energy consumption), periodic inspection plan change, unplanned stoppage and fluctuation in water discharge At least one of change, is calculated to understand the impact of fluctuations in fuel prices. Therefore, the power company can accurately grasp the risk caused by fluctuations in the amount of demand power, fluctuations in the power that can be generated by the power generation apparatus, and fluctuations in the fuel price in power sale transactions, power purchase transactions, and the like.
Further, in the present invention, the probability distribution of the power generation possible power fluctuation amount of the power generator considering the periodic inspection plan change in the set period, the probability distribution of the power generation power fluctuation amount of the power generation equipment considering the unplanned stop, and the water discharge fluctuation are considered. Integration of at least one of the probability distributions of the power generation fluctuations of the generated power generator, the probability distribution of the assumed demand power amount in the set period, and the probability distribution of the total assumed demand power amount in the set period to integrate at the assumed demand time in the set period The probability distribution of the demand power and the probability distribution of the integrated demand power during the total assumed demand in the set period are calculated. Thereby, it is possible to easily calculate the power generation cost at the time of assumed demand of the power generation device in the set period and the total power generation cost at the time of assumed demand in the set period.

本発明の第11発明は、請求項11に記載されたとおりの発電装置の発電費用算出装置である。
本発明では、入力手段から、設定期間における設定電力量に対する設定金額(売電料金あるいは買電料金等)を入力可能であるとともに、リスク指標算出手段を有している。
リスク指標算出手段は、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合(例えば、売電時)には、発電費用算出手段で算出された設定期間における発電装置の合計想定需要時発電費用の最大値と設定期間における発電装置の想定需要時発電費用の最大値との差と、入力手段から入力された設定金額との差をリスク指標として出力手段に出力する。例えば、設定期間における発電装置の合計想定需要時発電費用の最大値から、設定期間における発電装置の想定需要時発電費用の最大値を減算し、減算結果を算出する。そして、この減算結果から設定金額を減算し、減算結果をリスク指標として出力手段に出力する。
一方、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合(例えば、買電時)には、発電費用算出手段で算出された設定期間における発電装置の想定需要時発電費用の最小値と設定期間における発電装置の合計想定需要時発電費用の最小値との差と、入力手段から入力された設定金額との差をリスク指標として出力手段に出力する。例えば、設定期間における発電装置の想定需要時発電費用の最小値から、設定期間における発電装置の合計想定需要時発電費用の最小値を減算し、減算結果を算出する。そして、設定金額からこの減算結果を減算し、減算結果をリスク指標として出力手段に出力する。
なお、リスク指標を算出する際には、各発電設備の建設費用や保守・点検費用等を含む発電装置の固定費用も考慮できることが好ましい。例えば、[設定期間における発電装置の合計想定需要時発電費用の最大値−設定期間における発電装置の想定需要時発電費用の最大値]と[売電電力量に対する売電金額]との差を算出する際に、一方の金額に発電装置の固定費用(各発電設備の固定費用)に相当する金額を反映させて算出する方法を用いる。発電装置の固定費用に相当する金額を反映させてリスク指標を算出する態様も、本発明に包含される。
本発明では、設定期間における発電装置の合計想定需要時発電費用の最大値と設定期間における発電装置の想定需要時発電費用の最大値の差と、入力手段から入力された設定金額との差、あるいは、設定期間における発電装置の想定需要時発電費用の最小値と設定期間における発電装置の合計想定需要時発電費用の最小値との差と、入力手段から入力された設定金額との差が出力手段から出力される。これにより、電力事業者は、出力手段から出力される値を認識することにより、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合(売電取引時あるいは買電取引時)のリスク指標を容易に判別することができる。
An eleventh aspect of the present invention is a power generation cost calculation apparatus for a power generation apparatus as set forth in claim 11.
In the present invention, it is possible to input a set amount (such as a power sale fee or a power purchase fee) with respect to the set power amount in the set period from the input means, and has a risk index calculation means.
The risk index calculation means generates power during the set period calculated by the power generation cost calculation means when increasing the set power amount from the assumed demand power amount during the set period (for example, at the time of power sale). Output the difference between the maximum value of power generation cost at the total estimated demand of the equipment and the maximum value of power generation cost at the time of assumed power generation equipment during the set period and the set amount input from the input means to the output means as a risk index To do. For example, the subtraction result is calculated by subtracting the maximum value of the power generation cost at the time of the assumed demand of the power generation device in the setting period from the maximum value of the power generation cost at the total assumed demand of the power generation device in the setting period. Then, the set amount is subtracted from the subtraction result, and the subtraction result is output to the output means as a risk index.
On the other hand, when the amount of power supplied from the power generation device is decreased from the assumed demand power amount during the set period (for example, at the time of power purchase), the assumed demand of the power generator during the set period calculated by the power generation cost calculation means The difference between the minimum value of the hourly power generation cost and the minimum value of the total estimated demand power generation cost during the set period and the set amount input from the input means is output to the output means as a risk index. For example, the subtraction result is calculated by subtracting the minimum value of the total estimated demand power generation cost of the power generation device in the setting period from the minimum value of the power generation cost at the time of assumed power generation of the power generation device. Then, the subtraction result is subtracted from the set amount, and the subtraction result is output to the output means as a risk index.
In calculating the risk index, it is preferable to consider the fixed cost of the power generation apparatus including the construction cost and maintenance / inspection cost of each power generation facility. For example, the difference between [the maximum value of the power generation cost at the total assumed demand of the power generation device in the set period−the maximum value of the power generation cost at the assumed demand of the power generation device in the set period] and [the amount of power sold relative to the amount of power sold] is calculated. At this time, a method is used in which the amount corresponding to the fixed cost of the power generation apparatus (fixed cost of each power generation facility) is reflected in one of the amounts. A mode in which the risk index is calculated by reflecting an amount corresponding to the fixed cost of the power generation apparatus is also included in the present invention.
In the present invention, the difference between the maximum value of the total assumed demand power generation cost of the power generation device in the setting period and the maximum value of the power generation cost at the time of assumed power generation of the power generation device in the setting period, and the difference between the set amount input from the input means, Alternatively, the difference between the minimum value of the power generation cost at the assumed demand of the power generator during the set period and the minimum value of the power generation cost at the total assumed demand of the power generator during the set period and the set amount input from the input means is output. Output from the means. As a result, the electric power company recognizes the value output from the output means, and changes (increases or decreases) the set amount of electric power supplied from the power generation device from the estimated demand amount during the set period (selling). It is possible to easily discriminate the risk index at the time of electricity transaction or electricity purchase transaction.

請求項1〜11に記載の発電装置の発電費用算出装置を用いれば、固定需要者に電力を供給することを前提としている発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化させる場合の発電装置の発電費用を、変動要因を考慮して算出することができる。これにより、電力事業者、特に、固定需要者に電力を供給することを前提としている電力事業者は、電力取引を行う場合のリスクを確実に、容易に把握することができる。   If the power generation cost calculation device for a power generator according to any one of claims 1 to 11 is used, the amount of power supplied from a power generator assumed to supply power to a fixed consumer is calculated from the estimated demand power during a set period. The power generation cost of the power generation apparatus when changing the set power amount can be calculated in consideration of the fluctuation factors. Thereby, the electric power company, especially the electric power company which presupposes supplying electric power to a fixed consumer, can grasp | ascertain easily and reliably the risk in the case of carrying out an electric power transaction.

以下に、本発明の実施の形態を、図面を参照して説明する。
まず、本発明を適用する発電装置(以下、単に「発電装置」という)を説明する。
発電装置は、電力事業者(典型的には、電力会社)により管理されており、固定需要者に電力を供給することを前提としている。
発電装置は、複数の発電設備(「発電ユニット」ともいう)を備えている。発電設備としては、例えば、水力発電設備、原子力発電設備、石炭火力発電設備、LNG(液化天然ガス)火力発電設備、石油火力発電設備等の種々の型式の発電設備が用いられる。各発電設備は、発電可能な最大電力(以下、「最大発電可能電力」という)、使用する燃料、任意の電力量を供給している(発電している)状態から単位電力量(例えば、1kWh)追加的に供給する(発電する)のに要する燃料の消費量(以下、「発電設備の単位電力量燃料消費量」という)が定まっている。
なお、発電設備の単位電力量燃料消費量に、発電設備で使用する燃料の燃料価格を乗算した値[発電設備の単位電力量燃料消費量×燃料価格]は、発電設備が任意の電力量を供給している(発電している)状態から単位電力量追加的に供給する(発電する)のに要する発電費用(以下、「発電設備の単位電力量発電費用」という)を示す。なお、発電装置の発電費用は、可変費用(各発電設備の単位電力量燃料消費量×燃料価格)のみでなく、固定費用(各発電設備の建設費用、保守・点検費用等)も考慮して算出するのが一般的である。ここで、発電装置の単位電力量発電費用(発電装置の限界費用)は、発電装置が任意の電力を供給している状態から、需要電力量が単位電力量増加した場合に、追加的に発生する発電費用である。したがって、発電装置の単位電力量発電費用(発電装置の限界費用)を算出する際には、固定費用を考慮する必要はない。このため、以下では、発電設備の単位電力量発電費用は、固定費用を含んでいないものとして説明する。
Embodiments of the present invention will be described below with reference to the drawings.
First, a power generation apparatus (hereinafter simply referred to as “power generation apparatus”) to which the present invention is applied will be described.
The power generation apparatus is managed by an electric power company (typically, an electric power company), and is assumed to supply electric power to a fixed consumer.
The power generation apparatus includes a plurality of power generation facilities (also referred to as “power generation units”). As the power generation facility, various types of power generation facilities such as a hydropower generation facility, a nuclear power generation facility, a coal thermal power generation facility, an LNG (liquefied natural gas) thermal power generation facility, and an oil thermal power generation facility are used. Each power generation facility supplies a unit power amount (for example, 1 kWh) from a state in which the maximum power that can be generated (hereinafter referred to as “maximum power that can be generated”), the fuel to be used, and an arbitrary amount of power is supplied (generated). ) The amount of fuel required for additional supply (generating electricity) (hereinafter referred to as “unit power consumption fuel consumption of power generation facilities”) has been determined.
Note that the unit power consumption of the power generation facility multiplied by the fuel price of the fuel used in the power generation facility [unit power consumption of the power generation facility fuel consumption x fuel price] The power generation cost required to additionally supply (generate power) unit power from the state of supply (power generation) (hereinafter referred to as “unit power generation cost of power generation facility”) is shown. In addition, the power generation costs of the power generation equipment take into account not only variable costs (unit power consumption fuel consumption x fuel price of each power generation facility) but also fixed costs (construction costs, maintenance / inspection costs, etc. of each power generation facility). It is common to calculate. Here, the unit power generation cost of the power generation device (marginal cost of the power generation device) is additionally generated when the demand power amount increases from the state where the power generation device supplies arbitrary power. Power generation costs. Therefore, it is not necessary to consider the fixed cost when calculating the unit power generation cost of the power generator (marginal cost of the power generator). Therefore, in the following description, it is assumed that the unit power generation cost of the power generation facility does not include a fixed cost.

発電装置から電力を供給する場合、需要電力に応じた電力が発電装置から供給されるように、各発電設備の起動及び停止や出力制御が行われる。ここで、発電設備それぞれを起動及び停止する優先順序(以下「起動/停止順序」という)は予め設定されている。起動/停止順序は、近似的には、供給曲線(「電力供給曲線」ともいう)で表すことができる。
供給曲線の一例を図20に示す。図20において、横軸は、発電装置の発電電力(発電装置から供給する電力)(kW)を表し、縦軸は、各発電設備の単位電力量発電費用(円/kWh)を表している。供給曲線で表される各発電設備の単位電力量発電費用は、各発電設備で使用する燃料の燃料価格を任意の値に設定し、[発電設備の単位電力量燃料消費量×燃料価格]により算出したものである。
なお、実際には、発電設備の効率は発電電力量によって変化するため、発電設備の単位電力量燃料消費量は一定値ではない。すなわち、燃料価格が一定値であっても、発電設備の単位電力量発電費用は、一定値ではない。以下では、説明を簡略化するため、各発電設備の単位電力量発電費用が一定値であるものとして説明する。
When power is supplied from the power generation device, activation and stop of each power generation facility and output control are performed so that power corresponding to the demand power is supplied from the power generation device. Here, a priority order (hereinafter referred to as “start / stop order”) for starting and stopping each power generation facility is set in advance. The start / stop order can be approximately represented by a supply curve (also referred to as a “power supply curve”).
An example of the supply curve is shown in FIG. In FIG. 20, the horizontal axis represents the power generated by the power generator (power supplied from the power generator) (kW), and the vertical axis represents the unit power generation cost (yen / kWh) of each power generation facility. The unit electricity generation cost of each power generation facility represented by the supply curve is set to an arbitrary value for the fuel price of the fuel used in each power generation facility, and [unit power consumption fuel consumption x fuel price of the power generation facility] It is calculated.
Actually, since the efficiency of the power generation facility varies depending on the amount of generated power, the unit power consumption fuel consumption of the power generation facility is not a constant value. That is, even if the fuel price is a constant value, the unit power generation cost of the power generation facility is not a constant value. Hereinafter, in order to simplify the description, it is assumed that the unit power generation cost of each power generation facility is a constant value.

図20に実線で示している供給曲線Wは、発電設備J、K、L1、L2、M1、M2、N1、N2を備えている発電装置に対して設定されたものである。例えば、発電設備Jとして水力発電設備、発電設備Kとして原子力発電設備、発電設備L1、L2として石炭火力発電設備、発電設備M1、M2としてLNG(液化天然ガス)火力発電設備、発電設備N1、N2として石油火力発電設備が用いられる。
図20に示されている供給曲線Wは、例えば、需要電力Xsが、[Xs<Y1]の範囲では発電設備J、[Y1≦Xs<Y2]の範囲では発電設備JとK、[Y2≦Xs<Y3]の範囲では発電設備J、K及びL1、[Y3≦Xs<Y4]の範囲では発電設備J、K、L1及びL2、[Y4≦Xs<Y5]の範囲では発電設備J、K、L1、L2及びM1、[Y5≦Xs<Y6]の範囲では発電設備J、K、L1、L2、M1及びM2、[Y6≦Xs<Y7]の範囲では発電設備J、K、L1、L2、M1、M2及びN1、[Y7≦Xs]の範囲では発電設備J、K、L1、L2、M1、M2、N1及びN2から電力を供給するように設定されていることを表している。すなわち、供給曲線Wは、電力の供給を開始する(発電を開始する)優先順序(起動順序)が発電設備J、K、L1、L2、M1、M2、N1、N2の順に設定され、電力の供給を停止する(発電を停止する)優先順序(停止順序)が発電設備N2、N1、M2、M1、L2、L1、K、Jの順に設定されていることを表している。
A supply curve W indicated by a solid line in FIG. 20 is set for a power generation apparatus including power generation facilities J, K, L1, L2, M1, M2, N1, and N2. For example, hydroelectric power generation facilities as power generation facilities J, nuclear power generation facilities as power generation facilities K, coal-fired power generation facilities as power generation facilities L1 and L2, LNG (liquefied natural gas) thermal power generation facilities as power generation facilities M1 and M2, and power generation facilities N1 and N2 Oil-fired power generation equipment is used.
In the supply curve W shown in FIG. 20, for example, when the demand power Xs is in the range [Xs <Y1], the power generation facility J is in the range [Y1 ≦ Xs <Y2], and the power generation facilities J and K are in the range [Y2 ≦ In the range of Xs <Y3], the power generation facilities J, K, and L1, in the range of [Y3 ≦ Xs <Y4], the power generation facilities J, K, L1, and L2, in the range of [Y4 ≦ Xs <Y5], the power generation facilities J, K , L1, L2 and M1, power generation equipment J, K, L1, L2, M1 and M2 in the range [Y5 ≦ Xs <Y6], and power generation equipment J, K, L1, L2 in the range [Y6 ≦ Xs <Y7]. , M1, M2 and N1, [Y7 ≦ Xs] indicates that the power generation facilities J, K, L1, L2, M1, M2, N1, and N2 are set to supply power. That is, in the supply curve W, the priority order (starting order) for starting power supply (starting power generation) is set in the order of the power generation facilities J, K, L1, L2, M1, M2, N1, and N2. This indicates that the priority order (stop order) for stopping supply (stopping power generation) is set in the order of power generation facilities N2, N1, M2, M1, L2, L1, K, and J.

また、供給曲線は、各発電設備の単位電力量発電費用を表している。
例えば、図20に示す供給曲線Wは、発電設備J、K、L1、L2、M1、M2、N1、N2の単位電力量発電費用(円/kWh)が、それぞれP1、P2、P3、P4、P5、P6、P7、P8であることを表している。単位電力量発電費用は、各発電設備が任意の電力量を供給している状態から単位電力量追加的に供給するのに要する燃料消費量と、各発電設備で使用する燃料の燃料価格に基づいて算出される。供給曲線は、各発電設備で使用する燃料の燃料価格が、予め設定した一定の値であるものとして設定される。なお、水力発電設備Jは、動力として河川の水を使用するため、単位電力量発電費用P1はほぼ「0」に設定されている。
一般的には、単位電力量発電費用が安い発電設備は、起動順序の優先順位が高く設定されるとともに、停止順序の優先順序が低く設定され、単位電力量発電費用が高い発電設備は、起動順序の優先順序が低く設定されるとともに、停止順序の優先順序が高く設定される。
The supply curve represents the unit power generation cost of each power generation facility.
For example, the supply curve W shown in FIG. 20 indicates that the unit power generation costs (yen / kWh) of the power generation facilities J, K, L1, L2, M1, M2, N1, and N2 are P1, P2, P3, P4, respectively. P5, P6, P7, and P8. The unit power generation cost is based on the fuel consumption required to supply additional unit power from the state where each power generation facility supplies an arbitrary amount of power and the fuel price of the fuel used in each power generation facility. Is calculated. The supply curve is set on the assumption that the fuel price of the fuel used in each power generation facility is a predetermined constant value. Since the hydroelectric power generation facility J uses river water as power, the unit power generation cost P1 is set to almost “0”.
In general, power generation equipment with a low unit power generation cost is set to have a high startup order priority, and a stop order priority is set low, and power generation equipment with a high unit power generation cost is started up. The priority order of the order is set low, and the priority order of the stop order is set high.

このような発電装置では、各発電設備は、供給曲線Wと需要電力Xsを示す需要曲線Xsに基づいて各発電設備の起動、停止が制御される。
例えば、図20に示す状態では、需要電力Xsが[Y4≦Xs<Y5]であるため、発電設備J、K、L1、L2、M1から電力を供給するように制御されている。この時、[Y4≦Xs<Y5]の範囲に対応する(供給曲線Wと需要曲線Xsとの交点Zに対応する)発電設備M1より起動順序の優先順序が高く設定されている発電設備J、K、L1、L2は最大発電可能電力を供給するように制御され、[Y4≦Xs<Y5]の範囲に対応する(供給曲線Wと需要曲線Xsとの交点Zに対応する)発電設備M1は、需要電力Xsに応じて発電電力が制御される。
また、供給曲線Wと需要曲線Xsによって囲まれる領域Sの面積によって、発電装置から、需要電力Xsに対応する電力を単位時間(例えば、1h)供給するのに要する発電装置の発電費用、すなわち、発電装置から単位時間(1h)に需要電力量Xs(kWh)を供給するのに要する発電費用が表される。この場合、領域Sを構成する、発電設備K、L1、L2、M1に対応する領域S−K、S−L1、S−L2、S−M1の面積によって、電力を供給している発電設備K、L1、L2、M1それぞれの発電費用が表される。
In such a power generation device, each power generation facility is controlled to start and stop each power generation facility based on the supply curve W and the demand curve Xs indicating the demand power Xs.
For example, in the state shown in FIG. 20, since the demand power Xs is [Y4 ≦ Xs <Y5], the power is controlled to be supplied from the power generation facilities J, K, L1, L2, and M1. At this time, the power generation equipment J corresponding to the range of [Y4 ≦ Xs <Y5] (corresponding to the intersection Z between the supply curve W and the demand curve Xs) is set to have a higher priority in the startup order than the power generation equipment M1, K, L1, and L2 are controlled to supply the maximum power that can be generated, and the power generation facility M1 corresponding to the range of [Y4 ≦ Xs <Y5] (corresponding to the intersection Z of the supply curve W and the demand curve Xs) is The generated power is controlled according to the demand power Xs.
Further, depending on the area of the region S surrounded by the supply curve W and the demand curve Xs, the power generation cost of the power generation apparatus required to supply power corresponding to the demand power Xs from the power generation apparatus for a unit time (for example, 1 h), that is, The power generation cost required to supply the demand power amount Xs (kWh) per unit time (1h) from the power generation device is represented. In this case, the power generation facility K that supplies power according to the areas S-K, S-L1, S-L2, and S-M1 corresponding to the power generation facilities K, L1, L2, and M1 constituting the region S. , L1, L2, and M1 represent power generation costs.

ここで、図20に示す状態で、需要電力Xsが単位電力(例えば、1kW)増加すると、需要電力Xsに対応する(供給曲線Wと需要曲線Xsとの交点Zに対応する)発電設備M1の発電電力(供給電力)が単位電力増加するように制御される。これにより、需要曲線Xsが図20の右方向に移動し、供給曲線Wと需要曲線Xsとの交点Zも図20の右方向に移動する。この場合、図20に示す状態から、発電装置の発電電力(供給電力)を単位時間(例えば、1h)の間単位電力(例えば、1kW)増加させるのに要する発電費用、すなわち、発電装置の発電電力量(供給電力量)を単位時間(例えば、1h)に単位電力量(例えば、1kWh)増加させるのに要する発電費用(「発電装置の単位電力量発電費用」)は、発電設備M1の単位電力量発電費用P5である。
なお、単位電力量は、[単位電力×単位期間]で表される。通常、単位電力として[1kW]が用いられ、単位期間として[1h]が用いられる。したがって、発電設備(発電装置)の発電電力量を単位電力量増加させることは、発電設備(発電装置)の発電電力を、単位期間[1h]の間単位電力[1kW]増加させることと同義である。
Here, when the demand power Xs increases in unit power (for example, 1 kW) in the state shown in FIG. The generated power (supplied power) is controlled to increase by unit power. As a result, the demand curve Xs moves to the right in FIG. 20, and the intersection Z between the supply curve W and the demand curve Xs also moves to the right in FIG. In this case, from the state shown in FIG. 20, the power generation cost required to increase the unit power (for example, 1 kW) for the unit time (for example, 1 h) from the power generation (supply power) of the power generation device, that is, the power generation of the power generation device. The power generation cost (“unit power generation cost of the power generation device”) required to increase the power amount (supply power amount) per unit time (for example, 1 h) per unit time (for example, 1 kWh) is the unit of the power generation facility M1. This is the power generation cost P5.
The unit power amount is represented by [unit power × unit period]. Usually, [1 kW] is used as the unit power, and [1h] is used as the unit period. Therefore, increasing the unit power amount of the power generation facility (power generation device) is synonymous with increasing the unit power [1 kW] of the power generation facility (power generation device) during the unit period [1h]. is there.

このように、発電装置から任意の電力量を供給している状態で、発電装置の発電電力量を単位電力量増加させるために、発電電力量が単位電力量増加制御される発電設備(図20では、発電設備M1)を、「限界発電設備」という。
また、発電装置から任意の電力量を供給している状態で、発電装置の発電電力量を単位電力量増加させるのに要する発電装置の発電費用(発電装置の単位電力量発電費用)、すなわち、限界発電設備の単位電力量発電費用を(図20では、限界発電設備である発電設備M1の単位電力量発電費用P5)を、「限界費用」という。
また、発電装置が任意の電力量を単位期間(例えば、1h)に供給するのに要する発電装置の発電費用(図20では、領域Sの面積で表される、電力を供給している発電設備K、L1、L2、M1の発電費用の合計)を、「総発電費用」という。
また、発電装置が任意の電力量を単位期間に供給するのに要する発電装置の発電費用(総発電費用)を供給電力量(発電電力量)で除算した値を、「平均総発電費用」という。平均総発電費用は、電力を供給している全発電設備(すなわち、発電装置)の、単位供給電力量(単位発電電力量)当たりの発電費用を表している。
また、電力を供給している発電設備の中の火力発電設備(図20では、石炭火力発電設備L1、L2とLNG火力発電設備M1)の発電費用の合計(領域S−L1、S−L2、S−M1の面積の合計で表される発電費用)を、「火力機総発電費用」という。
また、火力機総発電費用を、電力を供給している火力発電設備の供給電力量(発電電力量)の合計(火力機総発電電力量)で除算した値を、「火力機平均発電費用」という。火力機平均発電費用は、電力を供給している火力発電設備の、単位発電電力量当たりの発電費用を表している。
In this way, in a state where an arbitrary amount of power is supplied from the power generation device, in order to increase the power generation amount of the power generation device, the power generation facility in which the power generation amount is controlled to increase in unit power amount (FIG. 20). The power generation facility M1) is referred to as “marginal power generation facility”.
In addition, in a state where an arbitrary amount of power is supplied from the power generation device, the power generation cost of the power generation device (unit power generation cost of the power generation device) required to increase the unit power amount of the power generation power of the power generation device, that is, The unit power generation cost of the limit power generation facility (in FIG. 20, the unit power generation cost P5 of the power generation facility M1 that is the limit power generation facility) is referred to as “marginal cost”.
In addition, the power generation cost of the power generation apparatus required for the power generation apparatus to supply an arbitrary amount of power in a unit period (for example, 1 h) (the power generation facility that supplies power, which is represented by the area S in FIG. 20) The sum of power generation costs of K, L1, L2, and M1) is referred to as “total power generation cost”.
In addition, the value obtained by dividing the power generation cost (total power generation cost) of the power generation device required for the power generation device to supply an arbitrary amount of power per unit period by the supply power amount (power generation power amount) is called “average total power generation cost”. . The average total power generation cost represents the power generation cost per unit supply power amount (unit power generation power amount) of all power generation facilities (that is, power generation devices) supplying power.
In addition, the total power generation costs (areas S-L1, S-L2, and LNG thermal power generation facilities M1 and L1 in FIG. 20) in the power generation facilities that supply power (in FIG. 20, coal thermal power generation facilities L1 and L2 and LNG thermal power generation facilities M1) The power generation cost represented by the sum of the areas of S-M1) is referred to as “thermal power plant total power generation cost”.
In addition, the value calculated by dividing the total cost of thermal power generation by the total amount of power (generated power) of the thermal power generation facility that supplies the power is the “average power generation cost of thermal power” That's it. The thermal power generation average power generation cost represents the power generation cost per unit power generation of the thermal power generation facility that supplies power.

このような、固定需要者への電力の供給を前提としている発電装置を管理している電力事業者(例えば、電力会社)が、電力市場において電力取引(売電取引あるいは買電取引)を行う場合には、電力取引に伴う収益性を把握する必要がある。
将来の取引期間(設定期間)における実物の電力の受け渡しによる清算を前提とする電力取引(売電取引あるいは買電取引)を行う場合、電力取引に係る契約を締結してから実際に実物の電力の受け渡しを行うまでの間における市場価格の変動は電力取引に伴う収益性に殆ど影響を及ぼさず、実際に実物の電力の受け渡しを行う時点での取引電力相当分の発電装置の発電費用の増加分あるいは発電装置の発電費用の減少分が、売電取引あるいは買電取引に伴う収益性に大きく影響する。このため、売電に伴う発電装置の発電費用の増加分あるいは買電に伴う発電装置の発電費用の減少分、すなわち、発電装置から供給している電力量を設定期間において変化(増加あるいは減少)させた場合の設定期間における発電装置の発電費用を知ることが重要である。売電に伴う発電装置の発電費用の増加分あるいは買電に伴う発電装置の発電費用の減少分を知ることによって、売電価格あるいは買電価格を適切に決定することができる。
An electric power company (for example, an electric power company) that manages such a power generation device that presupposes the supply of electric power to a fixed consumer performs an electric power transaction (a power sale transaction or an electric power purchase transaction) in the electric power market. In some cases, it is necessary to grasp the profitability associated with power transactions.
When conducting a power transaction (power sale transaction or power purchase transaction) on the premise of clearing by delivery of real power in the future transaction period (set period), the actual power is actually signed after the contract for the power transaction is concluded. Fluctuations in the market price until the delivery of the power supply has little effect on the profitability associated with the power transaction, and the power generation cost of the generator equivalent to the transaction power at the time of the actual power delivery is increased. Or a decrease in power generation cost of the power generation device greatly affects the profitability associated with a power sale transaction or a power purchase transaction. For this reason, an increase in the power generation cost of the power generation device accompanying power sales or a decrease in the power generation cost of the power generation device due to power purchase, that is, the amount of power supplied from the power generation device changes (increases or decreases) during the set period. It is important to know the power generation cost of the power generation device in the set period when it is allowed to. By knowing the increase in the power generation cost of the power generation device associated with the power sale or the decrease in the power generation cost of the power generation device associated with the power purchase, the power sale price or the power purchase price can be determined appropriately.

ここで、例えば、図21に示すように、発電装置から、固定需要者の単位期間(例えば、1h)当たりの需要電力量Xs(kWh)に対応する電力Xs(kW)を供給している(発電している)状態から、固定需要者の単位期間当たりの需要電力量Xs(kWh)に対応する電力Xs(kW)に、売電取引に係る単位期間当たりの需要電力量に対応する電力が加算された、単位期間当たりの需要電力量Xi(kWh)に対応する電力Xi(kW)を供給する(発電する)状態に移行する場合を考える。この場合、売電取引によって、発電装置の限界費用は、供給曲線Wと電力Xsに対応する需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと電力Xiに対応する需要曲線Xiとの交点Ziに対応する、発電設備N1の単位電力量発電費用P7に増加する。なお、発電装置の単位期間当たりの発電費用(総発電費用)は、供給曲線W、需要曲線Xs、需要曲線Xiによって囲まれる領域Tの面積に対応する費用だけ増加する。
したがって、売電取引による発電装置の発電費用の増加分を示すリスク指標として、売電取引後の限界費用P7や、売電取引による発電装置の発電費用の増加分を示す領域Tの面積に対応する費用を用いることができる。そして、これらのリスク指標を用いることによって、適切な売電価格を決定することができる。
また、例えば、図21に示すように、発電装置から、固定需要者の単位期間当たりの需要電力量Xs(kWh)に対応する電力Xs(kW)を供給している状態から、固定需要者の単位期間当たりの需要電力量Xs(kWh)に対応する電力Xs(kW)に、買電取引に係る単位期間当たりの買電電力量に対応する電力が減算された需要電力量Xd(kWh)に対応する電力Xd(kW)を供給する状態に移行する場合を考える。この場合、買電取引によって、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xdとの交点Zdに対応する、発電設備L1の単位電力量発電費用P3に減少する。なお、発電装置の単位期間当たりの発電費用(総発電費用)は、供給曲線W、需要曲線Xs、需要曲線Xdによって囲まれる領域Qの面積に対応する費用だけ減少する。
したがって、買電取引による発電装置の発電費用の減少分を示すリスク指標として、買電取引後の限界費用P3や、買電取引による発電装置の発電費用の減少分を示す領域Qの面積に対応する費用を用いることができる。そして、これらのリスク指標を用いることによって、適切な買電価格を決定することができる。
Here, for example, as shown in FIG. 21, electric power Xs (kW) corresponding to the demand electric energy Xs (kWh) per unit period (for example, 1 h) of a fixed consumer is supplied from the power generator ( The power corresponding to the demand power per unit period related to the power sale transaction is added to the power Xs (kW) corresponding to the power demand Xs (kWh) per unit period of the fixed consumer Let us consider a case where a transition is made to a state in which electric power Xi (kW) corresponding to the added demand electric energy Xi (kWh) per unit period is supplied (generated). In this case, due to the power sale transaction, the marginal cost of the power generation apparatus is derived from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs corresponding to the power Xs. And the demand curve Xi corresponding to the power Xi increase to the unit power generation cost P7 of the power generation facility N1 corresponding to the intersection Zi. The power generation cost (total power generation cost) per unit period of the power generation apparatus increases by a cost corresponding to the area of the region T surrounded by the supply curve W, the demand curve Xs, and the demand curve Xi.
Therefore, it corresponds to the marginal cost P7 after the power sale transaction and the area T indicating the increase in the power generation cost of the power generator due to the power sale transaction as a risk index indicating the increase in the power generation cost of the power generator due to the power sale transaction. Expenses can be used. And an appropriate electric power selling price can be determined by using these risk indicators.
Further, for example, as shown in FIG. 21, from the state where the power Xs (kW) corresponding to the demand power amount Xs (kWh) per unit period of the fixed consumer is supplied from the power generator, Corresponds to power demand Xd (kWh) obtained by subtracting power Xs (kWh) corresponding to power demand Xs (kWh) per unit period and power corresponding to power consumption per unit period related to the power purchase transaction Let us consider a case of shifting to a state in which power Xd (kW) to be supplied is supplied. In this case, due to the power purchase transaction, the marginal cost of the power generation device is derived from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs, and the supply curve W and the demand curve Xd. To the unit power generation cost P3 of the power generation facility L1 corresponding to the intersection Zd. Note that the power generation cost (total power generation cost) per unit period of the power generation apparatus is reduced by a cost corresponding to the area Q of the region Q surrounded by the supply curve W, the demand curve Xs, and the demand curve Xd.
Therefore, it corresponds to the marginal cost P3 after the power purchase transaction and the area Q indicating the decrease in the power generation cost of the power generation device due to the power purchase transaction as a risk index indicating the decrease in power generation cost of the power generation device due to the power purchase transaction. Expenses can be used. And an appropriate electric power purchase price can be determined by using these risk indicators.

しかしながら、電力取引(売電取引や買電取引)を行う場合には、電力取引に係る契約(売電契約や買電契約)を締結した時期から、実際に電力取引を行う時期(取引時)までの間の変動要因によって、限界費用等が変動することがある。電力取引に係る契約を締結した時期から取引時までの間に限界費用が変動すると、電力取引に伴う収益性が悪化する虞がある。
例えば、売電取引を行う場合、図19に示すように、売電契約を締結する時(売電契約時)に算出した限界費用に基づいて単位電力量当たりの取引価格(売電価格)をh11に決定したが、実際に売電を行う時(売電時)には、限界費用が、売電契約時に決定した単位電力量当たりの取引価格h11より高いh12となることがある。この場合、売電時の限界費用h12と単位電力量当たりの取引価格(売電価格)h11との差[売電時の限界費用h12−単位電力量当たりの取引価格(売電価格)h11]、あるいは、発電装置から供給する単位期間当たりの電力量をXs(kWh)からXi(kWh)に増加させるのに要する設定期間における発電装置の発電費用と売電収入との差[売電時の限界費用h12×取引電力量(売電電力量)−単位電力量当たりの取引価格(売電価格)×取引電力量(売電電力量)]が売電契約に伴う収益性を表す指標、すなわちリスク指標である。
また、買電取引を行う場合、図19に示すように、買電契約を締結する時(買電契約時)に算出した限界費用に基づいて単位電力量当たりの取引価格(買電価格)h21を決定したが、実際に買電を行うとき(買電時)には、限界費用が、買電契約時に決定した単位電力量当たりの取引価格h21より安いh22となることがある。この場合、単位電力量当たりの取引価格(買電価格)h21と買電時の限界費用h22との差[単位電力量当たりの取引価格(買電価格)h21−買電時の限界費用h22]、あるいは、買電支出と発電装置から供給する単位期間当たりの電力量をXs(kWh)からXd(kWh)に減少させる場合の発電装置の発電費用の減少量[単位電力量当たりの取引価格(買電価格)h21×取引電力量(買電電力量)−買電時の限界費用h22×取引電力量(売電電力量)]が買電契約に伴う収益性を表す指標、すなわち、リスク指標である。
However, when conducting a power transaction (a power sale transaction or a power purchase transaction), from the time when the contract (a power sale contract or a power purchase contract) related to the power transaction is concluded, the time when the power transaction is actually performed (at the time of the transaction) The marginal cost etc. may vary depending on the fluctuation factors. If marginal costs fluctuate between the time when a contract for power trading is concluded and the time of trading, there is a risk that profitability associated with power trading will deteriorate.
For example, when conducting a power sale transaction, as shown in FIG. 19, a transaction price (power sale price) per unit electric energy is calculated based on the marginal cost calculated when a power sale contract is concluded (at the time of a power sale contract). Although determined to be h11, when actually selling power (at the time of power sale), the marginal cost may be h12 higher than the transaction price h11 per unit power amount determined at the time of the power sale contract. In this case, the difference between the marginal cost h12 at the time of power sale and the transaction price (power sale price) h11 per unit electric energy [the marginal cost at the time of power sale h12-the transaction price (unit price) h11 per unit electric energy)] Alternatively, the difference between the power generation cost of the power generation device and the power sales revenue during the set period required to increase the amount of power per unit period supplied from the power generation device from Xs (kWh) to Xi (kWh) [at the time of power sale Marginal cost h12 × transaction power amount (power sales amount) −transaction price per unit power amount (power sale price) × transaction power amount (power sale power amount)] is an index representing profitability associated with a power sale contract, that is, a risk index It is.
Further, when performing a power purchase transaction, as shown in FIG. 19, a transaction price (power purchase price) h21 per unit electric energy based on a marginal cost calculated when a power purchase contract is concluded (at the time of a power purchase contract). However, when power is actually purchased (at the time of power purchase), the marginal cost may be h22 which is lower than the transaction price h21 per unit electric energy determined at the time of the power purchase contract. In this case, the difference between the transaction price per unit electric energy (power purchase price) h21 and the marginal cost h22 at the time of power purchase [transaction price per unit power (power purchase price) h21-the marginal cost h22 at the time of power purchase]. Alternatively, the reduction in power generation cost of the power generation apparatus when the power consumption per unit period supplied from the power purchase expenditure and the power generation apparatus is reduced from Xs (kWh) to Xd (kWh) [the transaction price per unit power amount ( Power purchase price) h21 × transaction power amount (power purchase amount) −marginal cost at the time of power purchase h22 × transaction power amount (power sale power amount)] is an index representing profitability associated with a power purchase contract, that is, a risk index. .

以下に、発電装置の限界費用の変動要因について説明する。
発電装置の限界費用は、前述したように、各発電設備の起動/停止順序、各発電設備の最大発電可能電力及び各発電設備の単位電力量発電費用を示す供給曲線Wと単位期間当たりの需要電力量に対応する需要電力を示す需要曲線Xsによって定まる。
ここで、図21に示すように、単位期間当たりの需要電力量に対応する需要電力が、XsからXiに増加した場合を考える。この時、需要曲線は、実線で示す需要曲線Xsの位置から、図21の右方向の、破線で示す需要曲線Xiの位置に移動する。これにより、発電装置の限界費用(発電装置の単位電力量発電費用)は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xiとの交点Ziに対応する、発電設備N1の単位電力量発電費用P7に増加する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Tの面積に対応する費用だけ増加する。
また、図21に示すように、単位期間当たりの需要電力量に対応する需要電力が、XsからXdに減少した場合を考える。この時、需要曲線は、実線で示す需要曲線Xsの位置から、図21の左方向の、一点鎖線で示す需要曲線Xdの位置に移動する。これにより、発電装置の限界費用(発電装置の単位電力量発電費用)は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xdとの交点Zdに対応する、発電設備L1の単位電力量発電費用P3に減少する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Qの面積に対応する費用だけ減少する。
したがって、需要電力量は、発電装置の限界費用を変動させる変動要因である。
Below, the fluctuation factors of the marginal cost of the power generator will be described.
As described above, the marginal cost of the power generation apparatus is the demand per unit period and the supply curve W indicating the start / stop sequence of each power generation facility, the maximum power that can be generated by each power generation facility, and the unit power generation cost of each power generation facility. It is determined by a demand curve Xs indicating demand power corresponding to the amount of power.
Here, as shown in FIG. 21, a case is considered where the demand power corresponding to the demand power amount per unit period increases from Xs to Xi. At this time, the demand curve moves from the position of the demand curve Xs indicated by the solid line to the position of the demand curve Xi indicated by the broken line in the right direction of FIG. As a result, the marginal cost of the power generator (unit power generation cost of the power generator) is calculated from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs. And the power consumption cost P7 of the power generation facility N1 corresponding to the intersection Zi of the demand curve Xi. Note that the power generation cost (total power generation cost) of the power generator increases from the power generation cost corresponding to the area S by the cost corresponding to the area T.
Further, as shown in FIG. 21, a case is considered where the demand power corresponding to the demand power amount per unit period decreases from Xs to Xd. At this time, the demand curve moves from the position of the demand curve Xs indicated by the solid line to the position of the demand curve Xd indicated by the alternate long and short dash line in the left direction of FIG. As a result, the marginal cost of the power generator (unit power generation cost of the power generator) is calculated from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs. And the power curve Pd corresponding to the intersection Zd of the demand curve Xd. Note that the power generation cost (total power generation cost) of the power generation apparatus is reduced from the power generation cost corresponding to the area S by the cost corresponding to the area Q.
Therefore, the amount of power demand is a variable factor that fluctuates the marginal cost of the power generation apparatus.

次に、図22に示すように、供給曲線が、発電装置の発電可能電力の減少により実線で示す供給曲線Wから、一点鎖線で示す供給曲線Wiに変化した場合を考える。供給曲線Wiは、発電設備Jの発電可能電力が、発電可能電力Y1から発電可能電力Y1iに減少したことにより、発電設備Jより起動順序の優先順位が低い発電設備K〜N2が起動する需要電力が、Y1〜Y7からY1i〜Y7iに変化したものである。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、一点鎖線で示す供給曲線Wiと需要曲線Xsとの交点Ziに移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wiと需要曲線Xsとの交点Ziに対応する、発電設備M2の単位電力量発電費用P6に増加する。
また、図22に示すように、供給曲線が、発電装置の発電可能電力の増加により実線で示す供給曲線Wから、破線で示す供給曲線Wdに変化した場合を考える。供給曲線Wdは、発電設備Jの発電可能電力が、発電可能電力Y1から発電可能電力Y1dに増加したことにより、発電設備Jより起動順序の優先順位が低い発電設備K〜N2が起動する需要電力が、Y1〜Y7からY1d〜Y7dに変化したものである。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、破線で示す供給曲線Wdと需要曲線Xsとの交点Zdに移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wdと需要曲線Xsとの交点Zdに対応する、発電設備L2の単位電力量発電費用P4に減少する。
したがって、発電装置の発電可能電力(各発電設備の発電可能電力)は、発電装置の限界費用を変動させる変動要因である。
Next, as shown in FIG. 22, consider a case where the supply curve changes from a supply curve W indicated by a solid line to a supply curve Wi indicated by a one-dot chain line due to a decrease in power that can be generated by the power generation device. The supply curve Wi indicates the demand power at which the power generation facilities K to N2 having a lower priority in the starting order than the power generation facility J are started by reducing the power that can be generated by the power generation facility J from the power generation potential Y1 to the power generation possible power Y1i. Is changed from Y1 to Y7 to Y1i to Y7i. At this time, the intersection between the supply curve and the demand curve moves from the position of the intersection Z between the supply curve W and the demand curve Xs to the intersection Zi between the supply curve Wi and the demand curve Xs indicated by a one-dot chain line. Thereby, the marginal cost of the power generation device corresponds to the intersection Zi between the supply curve Wi and the demand curve Xs from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs. The unit power amount of the power generation facility M2 increases to the power generation cost P6.
Further, as shown in FIG. 22, consider a case where the supply curve changes from a supply curve W indicated by a solid line to a supply curve Wd indicated by a broken line due to an increase in power that can be generated by the power generation device. The supply curve Wd indicates the demand power at which the power generation facilities K to N2 having a lower priority in the starting order than the power generation facility J are started by increasing the power that can be generated by the power generation facility J from the power generation possible power Y1 to the power generation possible power Y1d. Is changed from Y1 to Y7 to Y1d to Y7d. At this time, the intersection between the supply curve and the demand curve moves from the position of the intersection Z between the supply curve W and the demand curve Xs to the intersection Zd between the supply curve Wd and the demand curve Xs indicated by a broken line. Thereby, the marginal cost of the power generator corresponds to the intersection Zd between the supply curve Wd and the demand curve Xs from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs. The unit power amount of the power generation facility L2 is reduced to the power generation cost P4.
Therefore, the power that can be generated by the power generator (the power that can be generated by each power generation facility) is a variable factor that fluctuates the marginal cost of the power generator.

ここで、供給曲線と需要曲線に基づいて発電装置の限界費用を算出する場合には、発電装置の各発電設備の発電可能電力の減少は需要電力の増加とみなすことができる。このため、各発電設備の発電可能電力の減少に対応する発電装置の発電可能電力の増加を、需要電力量の減少に置き換えることができる。例えば、図22において、発電設備Jの発電可能電力の減少にともなって供給曲線を実線で示す供給曲線Wから一点鎖線で示す供給曲線Wiに変更する方法に代えて、需要電力を、需要電力Xsから、発電設備Jの発電可能電力の減少分だけ増加させた需要電力Xiに変更する方法を用いることができる。この場合、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xiの交点Ziに対応する、発電設備M2の単位電力量発電費用P6に増加する。すなわち、発電装置の発電可能電力の減少を、需要電力の増加に置き換えても、発電装置の限界費用は変化しない。
なお、供給曲線をWからWiに変更する場合の発電装置の発電費用の増加分は、需要電力がXsからXiに増加した場合の発電装置の発電費用の増加分(領域Tの面積に対応する費用)と厳密には一致しないが、発電装置の限界費用を算出するうえでは、上記のように発電装置の発電可能電力の減少を、同量の需要電力の増加に置き換えても特に支障はない。
同様に、各発電設備の発電可能電力の増加に対応する発電装置の発電可能電力の増加は需要電力量の減少とみなすことができるから、発電装置の発電可能電力の減少を、需要電力の増加に置き換えることができる。例えば、図22において、発電設備Jの発電可能電力の増加によって供給曲線を実線で示す供給曲線Wから破線で示す供給曲線Wdに変更する方法に代えて、需要電力を、需要電力Xsから、発電設備Jの発電可能電電力の増加分に対応する電力だけ減少させた需要電力Xdに変更する方法を用いることができる。この場合、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xdの交点Zdに対応する、発電設備L2の単位電力量発電費用P4に減少する。すなわち、発電装置の発電可能電力の増加を、需要電力の減少に置き換えても、発電装置の限界費用は変化しない。
なお、供給曲線をWからWdに変更する場合の発電装置の発電費用の減少分は、需要電力がXsからXdに減少した場合の発電装置の発電費用の減少分(領域Qの面積に対応する費用)と厳密には一致しないが、発電装置の限界費用を算出するうえでは、上記のように発電装置の発電可能電力の増加を、同量の需要電力の減少に置き換えても特に支障はない。
以上により、発電装置の発電可能電力の変動(増加あるいは減少)を需要電力の変動(減少あるいは増加)に置き換えることができる。
また、単位期間(例えば、1h)当たりの発電可能電力量の変動量が[発電装置の発電可能電力の変動量×単位期間]で表される場合には、当該単位期間当たりの需要電力量の変動量は、[発電装置の発電可能電力の変動量に等しい需要電力の変動量×単位期間]で表すことができる。
したがって、発電装置の発電可能電力変動量と需要電力量を統合して統合需要電力を算出することにより、発電装置の発電可能電力の変動と需要電力量の変動を統合需要電力の変動として把握することができる。
Here, when the marginal cost of the power generation device is calculated based on the supply curve and the demand curve, a decrease in the power that can be generated by each power generation facility of the power generation device can be regarded as an increase in demand power. For this reason, the increase in the power that can be generated by the power generation apparatus corresponding to the decrease in the power that can be generated in each power generation facility can be replaced with a decrease in the amount of power demand. For example, in FIG. 22, instead of the method of changing the supply curve from the supply curve W indicated by the solid line to the supply curve Wi indicated by the alternate long and short dash line with the decrease in the power that can be generated by the power generation facility J, the demand power is changed to the demand power Xs. From the above, it is possible to use a method of changing to the demand power Xi that is increased by the decrease of the power that can be generated by the power generation facility J. In this case, the marginal cost of the power generator corresponds to the intersection Zi of the supply curve W and the demand curve Xi from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs. , The unit power amount of the power generation facility M2 increases to the power generation cost P6. That is, even if the decrease in the power that can be generated by the power generation device is replaced with the increase in demand power, the marginal cost of the power generation device does not change.
The increase in the power generation cost of the power generation device when the supply curve is changed from W to Wi corresponds to the increase in the power generation cost of the power generation device when the demand power increases from Xs to Xi (corresponding to the area of the region T). Although it is not exactly the same as the cost), in calculating the marginal cost of the power generation device, there is no particular problem even if the decrease in the power generation potential of the power generation device is replaced with an increase in the same amount of demand power as described above. .
Similarly, an increase in the power that can be generated by the power generator corresponding to an increase in the power that can be generated by each power generation facility can be regarded as a decrease in the amount of power required. Can be replaced. For example, in FIG. 22, instead of a method of changing the supply curve from the supply curve W indicated by a solid line to the supply curve Wd indicated by a broken line due to an increase in the power that can be generated by the power generation facility J, the demand power is generated from the demand power Xs. A method of changing to the demand power Xd that is reduced by the power corresponding to the increase in the electric power that can be generated by the facility J can be used. In this case, the marginal cost of the power generator corresponds to the intersection Zd between the supply curve W and the demand curve Xd from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs. The unit power amount of the power generation facility L2 is reduced to the power generation cost P4. That is, even if the increase in the power that can be generated by the power generation device is replaced with the decrease in demand power, the marginal cost of the power generation device does not change.
Note that the decrease in power generation cost of the power generation apparatus when the supply curve is changed from W to Wd corresponds to the decrease in power generation cost of the power generation apparatus when the demand power decreases from Xs to Xd (corresponding to the area of region Q). Although it is not exactly the same as the cost), in calculating the marginal cost of the power generation device, there is no particular problem even if the increase in the power generation potential of the power generation device is replaced with a decrease in the same amount of demand power as described above. .
As described above, the fluctuation (increase or decrease) in the power that can be generated by the power generator can be replaced with the fluctuation (decrease or increase) in demand power.
Further, when the fluctuation amount of the electric power that can be generated per unit period (for example, 1 h) is represented by [the fluctuation amount of the electric power that can be generated by the power generation device × the unit period], the amount of electric power demand per unit period The fluctuation amount can be expressed by [a fluctuation amount of demand power equal to a fluctuation amount of power that can be generated by the power generation apparatus × unit period].
Therefore, by calculating the integrated demand power by integrating the power generation fluctuation amount and the demand power amount of the power generation device, the fluctuation of the power generation potential and the demand power amount of the power generation device are grasped as the fluctuation of the integrated demand power. be able to.

次に、図23に示すように、供給曲線Wと需要曲線Xsの交点Zに対応する発電設備M1の単位電力量発電費用P5(=発電設備M1で使用している燃料の燃料価格Ks×発電設備M1の単位電力量燃料消費量)が発電装置の限界費用として用いられている状態で、発電設備M1で使用する燃料の燃料価格がKsからKiに増加した場合を考える。この時、供給曲線は、燃料価格Ksに対応する発電設備M1の単位電力量発電費用P5を含む、実線で示す供給曲線Wから、燃料価格Kiに対応する発電設備M1の単位電力量発電費用Piを含む、破線で示す供給曲線Wiに変化する。このため、供給曲線と需要曲線Xsとの交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、破線で示す供給曲線Wiと需要曲線Xsとの交点Ziに移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、燃料価格Ksの時の発電設備M1の単位電力量発電費用P5から、供給曲線Wiと需要曲線Xsとの交点Ziに対応する、燃料価格Kiの時の発電設備M1の単位電力量発電費用Piに増加する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Tの面積に対応する費用だけ増加する。
また、図23に示すように、供給曲線Wと需要曲線Xsの交点Zに対応する発電設備M1の単位電力量発電費用P5が発電装置の限界費用として用いられている状態で、発電設備M1で使用する燃料の燃料価格がKsからKdに減少した場合を考える。この時、供給曲線は、燃料価格Ksに対応する発電設備M1の単位電力量発電費用P5を含む、実線で示す供給曲線Wから、燃料価格Kdに対応する発電設備M1の単位電力量発電費用Pdを含む、一点鎖線で示す供給曲線Wdに変化する。このため、供給曲線と需要曲線Xsとの交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、一点鎖線で示す供給曲線Wdと需要曲線Xsとの交点Zdに移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、燃料価格Ksの時の発電設備M1の単位電力量発電費用P5から、供給曲線Wdと需要曲線Xsとの交点Zdに対応する、燃料価格Kdの時の発電設備M1の単位電力量発電費用Pdに減少する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Qの面積に対応する費用だけ減少する。
したがって、各発電設備で使用している燃料の燃料価格は、発電装置の限界費用を変動させる変動要因である。
Next, as shown in FIG. 23, the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs (= the fuel price Ks of the fuel used in the power generation facility M1 × power generation) Consider a case where the fuel price of the fuel used in the power generation facility M1 increases from Ks to Ki in a state where the unit power consumption of the facility M1 is used as the marginal cost of the power generation apparatus. At this time, the supply curve includes the unit power generation cost Pi of the power generation facility M1 corresponding to the fuel price Ki from the supply curve W indicated by the solid line including the unit power generation cost P5 of the power generation facility M1 corresponding to the fuel price Ks. To a supply curve Wi indicated by a broken line. For this reason, the intersection between the supply curve and the demand curve Xs moves from the position of the intersection Z between the supply curve W and the demand curve Xs to the intersection Zi between the supply curve Wi and the demand curve Xs indicated by a broken line. As a result, the marginal cost of the power generation apparatus is derived from the unit power generation cost P5 of the power generation facility M1 at the fuel price Ks corresponding to the intersection Z between the supply curve W and the demand curve Xs, and the supply curve Wi and the demand curve Xs. To the unit power generation cost Pi of the power generation facility M1 corresponding to the intersection Zi with the fuel price Ki. Note that the power generation cost (total power generation cost) of the power generator increases from the power generation cost corresponding to the area S by the cost corresponding to the area T.
Further, as shown in FIG. 23, in the state where the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z of the supply curve W and the demand curve Xs is used as the marginal cost of the power generation device, the power generation facility M1 Consider the case where the fuel price of the fuel used decreases from Ks to Kd. At this time, the supply curve includes the unit power generation cost Pd of the power generation facility M1 corresponding to the fuel price Kd from the supply curve W indicated by the solid line including the unit power generation cost P5 of the power generation facility M1 corresponding to the fuel price Ks. It changes to supply curve Wd shown with a dashed-dotted line. For this reason, the intersection of the supply curve and the demand curve Xs moves from the position of the intersection Z of the supply curve W and the demand curve Xs to the intersection Zd of the supply curve Wd and the demand curve Xs indicated by a one-dot chain line. As a result, the marginal cost of the power generation apparatus is derived from the unit power generation cost P5 of the power generation facility M1 at the fuel price Ks corresponding to the intersection Z of the supply curve W and the demand curve Xs, and the supply curve Wd and the demand curve Xs. To the unit power generation cost Pd of the power generation facility M1 at the time of the fuel price Kd corresponding to the intersection Zd. Note that the power generation cost (total power generation cost) of the power generation apparatus is reduced from the power generation cost corresponding to the area S by the cost corresponding to the area Q.
Therefore, the fuel price of the fuel used in each power generation facility is a variable factor that fluctuates the marginal cost of the power generation apparatus.

発電装置の限界費用の変動要因である需要電力量、発電装置の発電可能電力、各発電設備で使用する燃料の燃料価格の変動によって発電装置の限界費用が変動する状態を図24に示す。
図24では、各発電設備で使用する燃料の燃料価格及び各発電設備の最大発電可能電力が任意の値である供給曲線Wが用いられ、需要電力がXsであり、供給曲線Wと需要曲線Xsとの交点Zに対応する発電設備M1の単位電力量発電費用P5が発電装置の限界費用として用いられている状態で各変動要因が変動した場合を示している。
需要電力がXsからXi1に増加すると、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、供給曲線Wと需要曲線Xi1との交点Zi1に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、燃料価格が任意の値である時の発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xi1との交点Zi1に対応する、燃料価格が任意の値である時の発電設備M2の単位電力量発電費用P6に増加する。すなわち、限界費用は、限界費用P5から、t1だけ高い限界費用P6に増加する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域T1の面積に対応する費用だけ増加する。
この状態から、発電設備M1の発電可能電力が減少すると、供給曲線は、供給曲線Wから供給曲線Wi1に変化する。ここで、発電設備M1の発電可能電力の減少分を需要電力の増加分に置き換えるため、需要電力を、需要電力Xi1から、発電設備M1の発電可能電力の減少分に対応する電力だけ増加した需要電力Xi2に変化させる。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xi1との交点Zi1の位置から、供給曲線Wと需要曲線Xi2との交点Zi2の位置に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xi1との交点Zi1に対応する、燃料価格が任意の値である時の発電設備M2の単位電力量発電費用P6から、供給曲線Wと需要曲線Xi2との交点Zi2に対応する、燃料価格が任意の値である時の発電設備N1の単位電力量発電費用P7に増加する。すなわち、限界費用は、限界費用P6から、t2だけ高い限界費用P7に増加する。なお、前述したように、発電装置の限界費用を算出する際には、発電装置の発電可能電力の減少を、同量の需要電力の増加に置き換えても特に支障はなく、この場合の発電装置の発電費用(総発電費用)は、領域Sと領域T1の総面積に対応する発電費用から、領域T2の面積に対応する費用だけ増加する。
この状態から、発電設備N1で使用する燃料の燃料価格が増加すると、供給曲線は、燃料価格が任意の値である供給曲線Wから、燃料価格が増加した供給曲線Wi2に変化する。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xi2との交点Zi2の位置から、供給曲線Wi2と需要曲線Xi2との交点Zi3の位置に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xi2との交点Zi2に対応する、燃料価格が任意の値である時の発電設備N1の単位電力量発電費用P7から、燃料価格が増加した供給曲線Wi2と需要曲線Xi2との交点Zi3に対応する、燃料価格が増加した時の発電設備N1の単位電力量発電費用Piに増加する。すなわち、限界費用は、限界費用P7から、t3だけ高い限界費用Piに増加する。なお、発電装置の発電費用(総発電費用)は、領域Sと領域T1と領域T2の総面積に対応する発電費用から、領域T3の面積に対応する費用だけ増加する。
FIG. 24 shows a state in which the marginal cost of the power generation device fluctuates due to fluctuations in the amount of demand power, which is a fluctuation factor of the marginal cost of the power generation device, the power that can be generated by the power generation device, and the fuel price of the fuel used in each power generation facility.
In FIG. 24, a supply curve W in which the fuel price of the fuel used in each power generation facility and the maximum power that can be generated in each power generation facility are arbitrary values is used, the demand power is Xs, the supply curve W and the demand curve Xs. This shows a case where each variable factor fluctuates in a state where the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z with the power is used as the marginal cost of the power generation device.
When the demand power increases from Xs to Xi1, the intersection between the supply curve and the demand curve moves from the position of the intersection Z between the supply curve W and the demand curve Xs to the intersection Zi1 between the supply curve W and the demand curve Xi1. As a result, the marginal cost of the power generation apparatus is calculated from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs when the fuel price is an arbitrary value. Corresponding to the intersection Zi1 of the demand curve Xi1 and increases to the unit power generation cost P6 of the power generation facility M2 when the fuel price is an arbitrary value. That is, the marginal cost increases from the marginal cost P5 to a marginal cost P6 that is higher by t1. Note that the power generation cost (total power generation cost) of the power generation device increases from the power generation cost corresponding to the area S by the cost corresponding to the area T1.
From this state, when the power that can be generated by the power generation facility M1 decreases, the supply curve changes from the supply curve W to the supply curve Wi1. Here, in order to replace the decrease in the power that can be generated by the power generation facility M1 with the increase in the demand power, the demand power is increased from the demand power Xi1 by the power corresponding to the decrease in the power that can be generated in the power generation facility M1. The power is changed to Xi2. At this time, the intersection of the supply curve and the demand curve moves from the position of the intersection Zi1 between the supply curve W and the demand curve Xi1 to the position of the intersection Zi2 between the supply curve W and the demand curve Xi2. As a result, the marginal cost of the power generation apparatus is calculated from the unit power generation cost P6 of the power generation facility M2 corresponding to the intersection Zi1 between the supply curve W and the demand curve Xi1 when the fuel price is an arbitrary value. Corresponding to the intersection Zi2 of the demand curve Xi2 and increases to the unit power generation cost P7 of the power generation facility N1 when the fuel price is an arbitrary value. That is, the marginal cost increases from the marginal cost P6 to a marginal cost P7 that is higher by t2. As described above, when calculating the marginal cost of the power generation device, there is no particular problem even if the decrease in the power that can be generated by the power generation device is replaced with an increase in the same amount of demand power. The power generation cost (total power generation cost) increases from the power generation cost corresponding to the total area of the region S and the region T1 by the cost corresponding to the area of the region T2.
When the fuel price of the fuel used in the power generation facility N1 increases from this state, the supply curve changes from the supply curve W where the fuel price is an arbitrary value to the supply curve Wi2 where the fuel price increases. At this time, the intersection between the supply curve and the demand curve moves from the position of the intersection Zi2 between the supply curve W and the demand curve Xi2 to the position of the intersection Zi3 between the supply curve Wi2 and the demand curve Xi2. As a result, the marginal cost of the power generation device is calculated from the unit power generation cost P7 of the power generation facility N1 corresponding to the intersection Zi2 between the supply curve W and the demand curve Xi2 when the fuel price is an arbitrary value. The unit power generation cost Pi of the power generation facility N1 when the fuel price increases corresponding to the intersection Zi3 between the increased supply curve Wi2 and the demand curve Xi2 increases. That is, the marginal cost increases from the marginal cost P7 to a marginal cost Pi that is higher by t3. Note that the power generation cost (total power generation cost) of the power generator increases from the power generation cost corresponding to the total area of the region S, the region T1, and the region T2 by the cost corresponding to the area of the region T3.

一方、発電設備M1の燃料価格が任意の値である単位電力量発電費用P5を発電装置の限界費用として用いている状態から、需要電力がXsからXd1に減少すると、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xsとの交点Zの位置から、供給曲線Wと需要曲線Xd1との交点Zd1に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xsとの交点Zに対応する、燃料価格が任意の値である時の発電設備M1の単位電力量発電費用P5から、供給曲線Wと需要曲線Xd1との交点Zd1に対応する、燃料価格が任意の値である時の発電設備L2の単位電力量発電費用P4に減少する。すなわち、限界費用は、限界費用P5から、q1だけ安い限界費用P4に減少する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Q1の面積に対応する費用だけ減少する。
この状態から、発電設備Kの発電可能電力が増加すると、供給曲線は、供給曲線Wから供給曲線Wd1に変化する。ここで、発電設備Kの発電可能電力の増加分を需要電力の減少分に置き換えるため、需要電力を、需要電力Xd1から、発電設備Kの発電可能電力の増加分に対応する電力だけ減少した需要電力Xd2に変化させる。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xd1との交点Zd1の位置から、供給曲線Wと需要曲線Xd2との交点Zd2の位置に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xd1との交点Zd1に対応する、燃料価格が任意の値である時の発電設備L2の単位電力量発電費用P4から、供給曲線Wと需要曲線Xd2との交点Zd2に対応する、燃料価格が任意の値である時の発電設備L1の単位電力量発電費用P3に減少する。すなわち、限界費用は、限界費用P4から、q2だけ安い限界費用P3に減少する。なお、前述したように、発電装置の限界費用を算出する際には、発電装置の発電可能電力の増加を、同量の需要電力の減少に置き換えても特に支障はなく、この場合の発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用から、領域Q1の面積に対応する発電費用を差し引いた発電費用から、さらに領域Q2の面積に対応する費用だけ減少する。
この状態から、発電設備L1で使用する燃料の燃料価格が減少すると、供給曲線は、燃料価格が任意の値である供給曲線Wから、燃料価格が減少した供給曲線Wd2に変化する。この時、供給曲線と需要曲線との交点は、供給曲線Wと需要曲線Xd2との交点Zd2の位置から、供給曲線Wd2と需要曲線Xd2との交点Zd3の位置に移動する。これにより、発電装置の限界費用は、供給曲線Wと需要曲線Xd2との交点Zd2に対応する、燃料価格が任意の値である時の発電設備L1の単位電力量発電費用P3から、燃料価格が増加した供給曲線Wd2と需要曲線Xi2との交点Zd3に対応する、燃料価格が減少した時の発電設備L1の単位電力量発電費用Pdに減少する。すなわち、限界費用は、限界費用P3から、q3だけ安い限界費用Pdに減少する。なお、発電装置の発電費用(総発電費用)は、領域Sの面積に対応する発電費用(総発電費用)から、領域Q1と領域Q2の総面積に対応する発電費用を差し引いた発電費用から、さらに、領域Q3の面積に対応する費用だけ減少する。
On the other hand, when the demand power is reduced from Xs to Xd1 from the state where the unit power generation cost P5 in which the fuel price of the power generation facility M1 is an arbitrary value is used as the marginal cost of the power generation device, the supply curve and the demand curve The intersection moves from the position of the intersection Z between the supply curve W and the demand curve Xs to the intersection Zd1 between the supply curve W and the demand curve Xd1. As a result, the marginal cost of the power generation apparatus is calculated from the unit power generation cost P5 of the power generation facility M1 corresponding to the intersection Z between the supply curve W and the demand curve Xs when the fuel price is an arbitrary value. Corresponding to the intersection Zd1 between the demand curve Xd1 and the unit electricity generation cost P4 of the power generation facility L2 when the fuel price is an arbitrary value. That is, the marginal cost decreases from the marginal cost P5 to a marginal cost P4 that is cheaper by q1. Note that the power generation cost (total power generation cost) of the power generation apparatus is reduced from the power generation cost corresponding to the area S by the cost corresponding to the area Q1.
From this state, when the power that can be generated by the power generation facility K increases, the supply curve changes from the supply curve W to the supply curve Wd1. Here, in order to replace the increase in the power that can be generated by the power generation facility K with the decrease in the demand power, the demand power is reduced by the power corresponding to the increase in the power that can be generated in the power generation facility K from the demand power Xd1. The power is changed to Xd2. At this time, the intersection of the supply curve and the demand curve moves from the position of the intersection Zd1 between the supply curve W and the demand curve Xd1 to the position of the intersection Zd2 between the supply curve W and the demand curve Xd2. As a result, the marginal cost of the power generation device is calculated from the unit power generation cost P4 of the power generation facility L2 corresponding to the intersection Zd1 between the supply curve W and the demand curve Xd1 when the fuel price is an arbitrary value. Corresponding to the intersection Zd2 between the demand curve Xd2 and the unit power generation cost P3 of the power generation facility L1 when the fuel price is an arbitrary value. That is, the marginal cost decreases from the marginal cost P4 to a marginal cost P3 that is cheaper by q2. As described above, when calculating the marginal cost of the power generation device, there is no particular problem even if the increase in the power that can be generated by the power generation device is replaced with a decrease in the same amount of demand power. The power generation cost (total power generation cost) is reduced by a cost corresponding to the area Q2 from the power generation cost obtained by subtracting the power generation cost corresponding to the area Q1 from the power generation cost corresponding to the area S.
When the fuel price of the fuel used in the power generation facility L1 decreases from this state, the supply curve changes from the supply curve W where the fuel price is an arbitrary value to the supply curve Wd2 where the fuel price decreases. At this time, the intersection between the supply curve and the demand curve moves from the position of the intersection Zd2 between the supply curve W and the demand curve Xd2 to the position of the intersection Zd3 between the supply curve Wd2 and the demand curve Xd2. As a result, the marginal cost of the power generation device is obtained from the unit power generation cost P3 of the power generation facility L1 corresponding to the intersection Zd2 between the supply curve W and the demand curve Xd2 when the fuel price is an arbitrary value. The unit power generation cost Pd of the power generation facility L1 when the fuel price decreases corresponding to the intersection Zd3 between the increased supply curve Wd2 and the demand curve Xi2 is reduced. That is, the marginal cost decreases from the marginal cost P3 to a marginal cost Pd that is cheaper by q3. In addition, the power generation cost (total power generation cost) of the power generation apparatus is calculated by subtracting the power generation cost corresponding to the total area of the region Q1 and the region Q2 from the power generation cost (total power generation cost) corresponding to the area of the region S, Furthermore, the cost corresponding to the area of the region Q3 is reduced.

以上のように、固定需要者に電力を供給することを前提としている発電装置を管理している電力事業者が、電力市場で電力取引を行う場合には、供給している電力量を取引期間において取引電力量だけ増加あるいは減少させた場合の発電装置の限界費用や発電装置の発電費用の増加分あるいは発電装置の発電費用の減少分を、電力取引に伴う収益性を把握するためのリスク指標として用いることができる。例えば、このリスク指標を用いることにより、取引のポートフォリオを構築することができる。
しかしながら、供給している電力量を取引期間において取引電力量だけ増加あるいは減少させた場合の発電装置の限界費用や発電装置の発電費用の増加分あるいは発電装置の発電費用の減少分は、電力取引に係る契約を締結した時期から実際に電力の授受を行う時期までの間の変動要因によって変動することがある。例えば、需要電力量の変動、発電装置の発電可能電力の変動、発電設備で使用する燃料の燃料価格の変動によって変動する。このため、供給している電力量を取引期間において取引電力量だけ増加あるいは減少させた場合の発電装置の限界費用や発電装置の発電費用の増加分あるいは発電装置の発電費用の減少分をリスク指標として用いる場合には、電力取引に係る契約を締結した時期から実際に電力の授受を行う時期までの間の変動要因による変動を考慮する必要がある。
As described above, when a power company that manages a power generation device that is supposed to supply power to a fixed consumer makes a power transaction in the power market, the amount of power supplied is Risk index for grasping profitability associated with power transactions, including the marginal cost of power generation equipment, the increase in power generation cost of power generation equipment, or the decrease in power generation cost of power generation equipment when the amount of transaction power is increased or decreased Can be used as For example, by using this risk index, a portfolio of transactions can be constructed.
However, when the amount of power supplied is increased or decreased by the amount of transaction power during the transaction period, the marginal cost of the power generation device, the increase in power generation cost of the power generation device, or the decrease in power generation cost of the power generation device There may be fluctuations depending on the fluctuation factors from the time the contract is signed to the time when power is actually exchanged. For example, it fluctuates due to fluctuations in the amount of demand power, fluctuations in the power that can be generated by the power generation device, and fluctuations in the fuel price of the fuel used in the power generation equipment. For this reason, the risk indicator is the marginal cost of the power generation device, the increase in power generation cost of the power generation device, or the decrease in power generation cost of the power generation device when the supplied power amount is increased or decreased by the transaction power amount during the transaction period. When using as, it is necessary to consider the fluctuations due to the fluctuation factors from the time when the contract for power trading is concluded to the time when power is actually exchanged.

以下に、本発明の実施の形態を説明する。
図1は、本発明の第1の実施の形態の概略構成を示す図である。本実施の形態は、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合に、設定期間における発電装置の単位電力量発電費用(発電装置の限界費用)を算出するものである。
本実施の形態は、処理装置(処理手段)10、記憶装置(記憶手段)20、入力装置(入力手段)30、表示装置(出力手段)40、印刷装置(出力手段)50等を有している。
Hereinafter, embodiments of the present invention will be described.
FIG. 1 is a diagram showing a schematic configuration of a first embodiment of the present invention. In the present embodiment, when the amount of power supplied from the power generator is changed (increased or decreased) from the assumed power demand during the set period, the unit power generation cost (power generation) of the power generator during the set period The marginal cost of the device is calculated.
This embodiment has a processing device (processing means) 10, a storage device (storage means) 20, an input device (input means) 30, a display device (output means) 40, a printing device (output means) 50, and the like. Yes.

記憶装置20には、発電設備情報データベース20a、需要電力量情報データベース20b、定期点検情報データベース20c、出水情報データベース20d、燃料価格情報データベース20eを有している。なお、一つの記憶装置に各データベースを記憶させるように構成してもよいし、一つの記憶装置に複数のデータベースを記憶させるように構成してもよい。記憶装置20には、これ以外にも、以下で説明する処理を実行するために必要な種々の情報が記憶される。各データベースは、一つの記憶装置に記憶させている情報により構成してもよいし、複数の記憶装置に分散して記憶されている情報により構成してもよい。なお、記憶装置20には、各データベースの情報が記憶されていればよく、各データベースが物理的に設けられていることを要しない。
記憶装置20に記憶される情報は、例えば、入力装置30(入力手段)から入力される。入力装置としては、例えば、キーボード、表示装置40に設けられているタッチ式スイッチ、記憶装置に記憶されている情報を読み取る情報読取装置、測定装置、処理装置に通信回線を介して接続されている端末装置等を用いることができる。
The storage device 20 includes a power generation facility information database 20a, a demand power amount information database 20b, a periodic inspection information database 20c, a water discharge information database 20d, and a fuel price information database 20e. Each database may be stored in one storage device, or a plurality of databases may be stored in one storage device. In addition to this, the storage device 20 stores various information necessary for executing the processing described below. Each database may be configured by information stored in one storage device, or may be configured by information stored in a distributed manner in a plurality of storage devices. The storage device 20 only needs to store information of each database, and does not require that each database is physically provided.
The information stored in the storage device 20 is input from, for example, the input device 30 (input means). As an input device, for example, a keyboard, a touch switch provided in the display device 40, an information reading device that reads information stored in a storage device, a measurement device, and a processing device are connected via a communication line. A terminal device or the like can be used.

発電設備情報データベース20aには、例えば、発電装置を構成している複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、各発電設備が発電可能な最大電力を示す最大発電可能電力と、各発電設備で使用する燃料(燃料区分)と、各発電設備それぞれが供給している電力量を単位電力量(例えば、1kWh)増加するのに要する燃料消費量を示す単位電力量燃料消費量、各発電設備それぞれの故障率等が記憶される。なお、各発電設備の単位電力量燃料消費量に代えて、各発電設備が供給している電力量を単位電力量増加するのに要する発電費用を示す単位電力量発電費用[=燃料価格×単位電力量燃料消費量]を記憶させてもよい。
ここで、前述したように、発電設備の単位電力量燃料消費量は一定値ではないため、発電設備の発電電力量(供給電力量)を複数段階に区切り、各出力区分の発電効率を設定する(例えば、各出力区分の発電効率の平均値を採用する)ことにより、各発電設備の各出力区分の単位電力量燃料消費量を算出して、各発電設備の単位電力量燃料消費量を各発電設備の各出力区分に対応させて発電設備情報データベース20aに記憶させている。なお、本発明では、発電装置の限界費用を算出することを目的としているため、各発電設備の発電電力量と単位電力量燃料消費量との相関関数を用いることなく、各発電設備の単位電力量燃料消費量を各出力区分で一定値として取り扱っても、実用上は支障がない。
In the power generation facility information database 20a, for example, a start / stop order indicating the order of starting and stopping each of the plurality of power generation facilities constituting the power generation apparatus, and maximum power generation indicating the maximum power that each power generation facility can generate is possible. Unit power fuel indicating the electric power, fuel used in each power generation facility (fuel classification), and fuel consumption required to increase the amount of power supplied by each power generation facility each unit power amount (for example, 1 kWh) The consumption amount, the failure rate of each power generation facility, etc. are stored. In addition, instead of the unit power consumption fuel consumption of each power generation facility, the unit power generation cost indicating the power generation cost required to increase the power consumption supplied by each power generation facility [= fuel price x unit [Electric power consumption fuel consumption]] may be stored.
Here, as described above, since the unit power consumption fuel consumption of the power generation facility is not a constant value, the power generation efficiency (supply power amount) of the power generation facility is divided into a plurality of stages, and the power generation efficiency of each output category is set. (For example, by adopting the average value of power generation efficiency of each output category), the unit power consumption fuel consumption of each output category of each power generation facility is calculated and the unit power consumption fuel consumption of each power generation facility is calculated for each It is stored in the power generation facility information database 20a in correspondence with each output category of the power generation facility. In the present invention, since the purpose is to calculate the marginal cost of the power generation device, the unit power of each power generation facility can be used without using the correlation function between the power generation amount of each power generation facility and the unit power amount fuel consumption. Even if the amount of fuel consumption is treated as a constant value for each output category, there is no practical problem.

需要電力量情報データベース20bには、過去の所定期間における実績想定需要電力量と実績需要電力量を含む需要電力量情報が記憶される。
需要電力量情報データベース20bの一例を図2に示す。図2に示す需要電力量情報データベース20bには、1996年4月1日〜2005年3月31日までの期間(過去10年間)における各年の、各月の、各日の、各時間の需要電力情報が記憶されている。
図2に示す需要電力量情報データベース20bには、需要電力情報として、年を示す年区分、月を示す月区分、日を示す日区分、曜日を示す曜日区分、時間を示す時間区分、各時間の実績想定時間需要電力量、実績時間需要電力量が記憶されている。
実績想定時間需要電力量は、該当する時間より以前に、該当する時間の時間需要電力量を想定(予測)したものであり、実績時間需要電力量は、該当する時間の実際の時間需要電力量である。また、実績想定月間需要電力量、実績月間需要電力量は、該当する月の各日の各時間の実績想定時間需要電力量、実績時間需要電力量を合計したものであり、必要な時に実績想定時間需要力量、実績時間需要電力量を合計して算出してもよいし、予め需要電力量情報データベース20bに記憶させておいてもよい。
曜日区分としては、時間需要電力量の1日の変動パターンが異なる曜日、例えば、平日、土曜、日曜・祝祭日の曜日区分が判別可能に記憶される。なお、日曜〜土曜の曜日区分を記憶させ、後で平日、土曜、日曜・祝祭日の曜日区分にまとめてもよいし、平日、土曜、日曜・祝祭日の曜日区分を記憶させてもよい。また、年区分、月区分、日区分、曜日区分は、カレンダー等に記憶されているものを用いることもできる。この場合も、年区分、月区分、日区分、曜日区分等を含む需要電力量情報が記憶されている需要電力量情報データベースが設けられているということができる。
需要電力量情報は、後述する、設定期間(例えば、売電期間、買電期間)における想定需要電力量に基づいて、設定期間における想定需要電力量の確率分布を算出することができるものであればよい。
The demand power amount information database 20b stores demand power amount information including a past estimated power demand amount and a past demand power amount in a predetermined period in the past.
An example of the demand power amount information database 20b is shown in FIG. In the demand power amount information database 20b shown in FIG. 2, the time of each day of each month of each year in the period from April 1, 1996 to March 31, 2005 (the past 10 years) Demand power information is stored.
The demand power amount information database 20b shown in FIG. 2 includes, as demand power information, a year segment indicating a year, a month segment indicating a month, a day segment indicating a day, a day segment indicating a day of the week, a time segment indicating a time, and each time. The actual estimated time demand power amount and the actual time demand power amount are stored.
The actual estimated time demand power amount is an estimate (predicted) of the hourly demand power amount of the corresponding time before the corresponding time, and the actual time demand power amount is the actual hourly demand power amount of the corresponding time. It is. The actual estimated monthly demand power and actual monthly demand power are the sum of the actual estimated hourly demand power and actual hourly demand power for each hour of each day of the relevant month. The time demand power amount and the actual time demand power amount may be calculated in total, or may be stored in the demand power amount information database 20b in advance.
As the day of the week segment, a day of the week in which the daily fluctuation pattern of the hourly demand power amount is different, for example, a week day, Saturday, Sunday / holiday day segment is stored so as to be distinguishable. Note that the day-to-day classification from Sunday to Saturday may be stored and later organized into weekday, Saturday, Sunday / holiday day classification, or the weekday, Saturday, Sunday / holiday day-of-week classification may be stored. Moreover, what is memorize | stored in the calendar etc. can also be used for a year division, a month division, a day division, and a day-of-week division. In this case as well, it can be said that a demand power amount information database storing demand power amount information including year division, month division, day division, day division, and the like is provided.
The demand power amount information can calculate the probability distribution of the assumed demand power amount in the set period based on the assumed demand power amount in the set period (for example, a power sale period, a power purchase period) described later. That's fine.

定期点検情報データベース20cには、過去の所定期間における実績定期点検計画と実績定期点検を含む定期点検情報が記憶される。
定期点検情報データベース20cの一例を図3に示す。図3に示す定期点検情報データベース20cには、2000年4月〜2005年3月までの期間(過去5年間)の各年の、各月の定期点検情報が記憶されている。
図3に示す定期点検情報データベース20cには、定期点検情報として、年を示す年区分、月を示す月区分、実績月間定期点検計画、実績月間定期点検が記憶されている。
実績月間定期点検計画には、該当する月より以前に、該当する月に定期点検を実行することが計画されていた発電設備と定期点検計画日時等が含まれる。実績月間定期点検は、該当する月に実際に定期点検を行った発電設備と定期点検実行日時等が含まれる。
実績計画月間発電可能電力は、発電設備の最大発電可能電力と当該発電設備が該当する月において稼動可能予定日数(定期点検が計画されていない日数)との乗算値[発電設備の最大発電可能電力×当該発電設備の該当する月の稼動可能予定日数]を全発電設備について算出し、合計した値である。稼動可能予定日数は、[該当する月の総日数−当該発電設備の該当する月における定期点検計画日数]により算出することができる。実績月間発電可能電力は、発電設備の最大発電可能電力と当該発電設備の該当する月の稼動可能日数(実際に定期点検が行われなかった日数)との乗算値[発電設備の最大発電可能電力×当該発電設備の該当する月の稼動可能日数]を全発電設備について算出し、合計した値である。稼動可能日数は、[該当する月の総日数−当該発電設備の該当する月における定期点検日数]により算出することができる。実績計画月間発電可能電力と実績月間発電可能電力は、予め算出して定期点検情報データベース20cに記憶させておいてもよいし、必要な時に、実績月間定期点検計画、実績月間定期点検と各発電設備の最大発電可能電力を用いて算出してもよい。
定期点検情報は、後述する、設定期間(例えば、売電期間、買電期間)における定期点検計画に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出することができるものであればよい。
The periodic inspection information database 20c stores periodic inspection information including the actual periodic inspection plan and the actual periodic inspection in the past predetermined period.
An example of the periodic inspection information database 20c is shown in FIG. The periodic inspection information database 20c shown in FIG. 3 stores periodic inspection information for each month in each year of the period from April 2000 to March 2005 (the past five years).
The periodic inspection information database 20c shown in FIG. 3 stores year classification indicating the year, month classification indicating the month, actual monthly periodic inspection plan, and actual monthly periodic inspection as the periodic inspection information.
The actual monthly periodic inspection plan includes the power generation equipment scheduled to perform the periodic inspection in the corresponding month and the periodic inspection plan date and time before the corresponding month. The actual monthly periodic inspection includes the power generation equipment that actually performed the periodic inspection in the corresponding month and the date and time of execution of the periodic inspection.
The actual planned monthly power generation capacity is the product of the maximum power generation capacity of the power generation facility and the number of days that the power generation facility can be operated in the month in which the power generation facility is applicable (the number of days for which periodic inspection is not planned) [maximum power generation capacity of the power generation facility X The estimated number of days that the power generation facility can operate in the corresponding month] is calculated for all the power generation facilities and is the total value. The number of days that can be operated can be calculated by [total number of days in the corresponding month−period of scheduled periodic inspection in the corresponding month of the power generation facility]. Actual monthly power that can be generated is the product of the maximum power that can be generated by the power generation facility and the number of days that the power generation facility can be operated in the corresponding month (the number of days that the periodic inspection was not actually performed) [the maximum power that can be generated by the power generation facility X The number of days that the power generation facility can be operated in the corresponding month] is calculated for all the power generation facilities, and is the total value. The operable days can be calculated by [total number of days in the corresponding month−periodic inspection days in the corresponding month of the power generation facility]. The actual planned monthly power generation potential and the actual monthly power generation potential may be calculated in advance and stored in the periodic inspection information database 20c. When necessary, the actual monthly periodic inspection plan, the actual monthly periodic inspection, and each power generation You may calculate using the electric power which can produce maximum power of an installation.
Periodic inspection information is a probability distribution of the amount of fluctuation in the power generation capacity of the power generator that takes into account changes in the periodic inspection plan during the setting period based on the periodic inspection plan during the setting period (for example, a power sale period, a power purchase period) described later. What is necessary is just to be able to calculate.

出水情報データベース20dには、過去の所定期間における水力発電電力量を含む出水情報が記憶される。
出水情報データベース20dの一例を図4に示す。図4に示す出水情報データベース20dには、1975年4月〜2005年3月までの期間(過去30年間)の各年の、各月の月間水力発電電力量が記憶されている。月間水力発電電力量としては、該当する1ヶ月間に、水力発電設備が発電した(供給した)発電電力量(水力発電電力量)の合計が用いられる。
The water discharge information database 20d stores water discharge information including the amount of hydroelectric power generation in the past predetermined period.
An example of the flood information database 20d is shown in FIG. The water discharge information database 20d shown in FIG. 4 stores the monthly hydroelectric power generation amount for each month in the period from April 1975 to March 2005 (the past 30 years). As the monthly hydroelectric power generation amount, the total of the electric power generation amount (hydroelectric power generation amount) generated (supplied) by the hydroelectric power generation facility during the corresponding month is used.

燃料価格情報データベース20eには、過去の所定期間における各発電設備で使用する燃料の燃料価格情報が記憶される。
燃料価格情報データベース20eの一例を図5に示す。図5に示す燃料価格情報データベース20eには、1995年4月〜2005年3月までの期間(過去10年間)の各年の、各月の実績月間燃料価格が各燃料の区分(例えば、石炭、石油、LNG等)に対応して記憶されている。実績月間燃料価格としては、例えば、各燃料の該当する1ヶ月間の燃料価格の平均値が用いられる。
The fuel price information database 20e stores fuel price information of fuel used in each power generation facility in the past predetermined period.
An example of the fuel price information database 20e is shown in FIG. In the fuel price information database 20e shown in FIG. 5, the actual monthly fuel price of each month in the period from April 1995 to March 2005 (the past 10 years) is classified into each fuel category (for example, coal , Petroleum, LNG, etc.). As the actual monthly fuel price, for example, the average value of the fuel prices for the corresponding month of each fuel is used.

入力装置(入力手段)30は、種々の情報を入力する。例えば、記憶装置20の発電設備情報データベース20aに記憶される発電設備情報(例えば、各発電設備で使用する燃料の区分、各発電設備の各出力区分の単位電力量燃料消費量、単位電力量発電費用、最大発電可能電力、起動/停止順序、故障率)、需要電力量情報データベース20bに記憶される需要電力量情報(例えば、実績想定時間需要電力量、実績時間需要電力量)、定期点検情報データベース20cに記憶される定期点検情報(例えば、実績月間定期点検計画、実績月間定期点検)、出水情報データベース20dに記憶される出水情報(例えば、実績月間水力発電電力量)、燃料価格情報データベース20eに記憶される燃料価格情報(例えば、各燃料の実績月間燃料価格)が入力される。また、設定期間(例えば、売電期間、買電期間)、設定価格(例えば、売電価格、買電価格)、設定期間における想定需要電力量(例えば、設定期間内の各月の各日の各時間の想定時間需要電力量)、発電装置から供給する電力量を設定期間に変化(増加あるいは減少)させる設定電力量(例えば、設定期間内の各月の各日の各時間の時間設定電力量)、設定期間における合計想定需要電力量(例えば、設定期間内の各月の各日の各時間の想定時間需要電力量及び時間設定電力量を含む設定期間内の各月の各日の各時間の合計想定時間需要電力量)、設定期間における定期点検計画等が入力される。また、売電時(売電取引時)における処理を指示する売電時処理指示情報(例えば、売電時リスク指標算出指示情報)あるいは買電時(買電取引時)における処理を指示する買電時処理指示情報(例えば、買電時リスク指標算出指示情報)が入力される。処理装置の各手段は、入力装置30から売電時処理指示情報が入力された場合には売電時の処理を実行し、買電時処理指示情報が入力された場合には買電時の処理を実行する。手段によっては、売電時と買電時で同じ処理を実行する。
入力装置30としては、キーボード、表示装置40の表示部に設けられているタッチスイッチ、記憶媒体に記憶されている情報を読み取り可能な情報読取手段等が用いられる。また、処理装置10に通信回線を介して端末装置等が接続可能である場合には、端末装置等に設けられている入力装置を用いることもできる。
表示装置(表示手段)40は、種々の情報や処理結果等を表示する。
印刷装置(印刷手段)50は、処理結果等を印刷して出力する。
表示装置40や印刷装置50は出力装置(出力手段)として用いられる。
なお、処理装置10に通信回線を介して端末装置等が接続可能である場合には、端末装置の表示装置や印刷装置を表示装置40や印刷装置50として用いることもできる。
The input device (input means) 30 inputs various information. For example, the power generation facility information stored in the power generation facility information database 20a of the storage device 20 (for example, the classification of fuel used in each power generation facility, the unit power consumption of each output category of each power generation facility, the unit power consumption power generation) Cost, maximum power that can be generated, start / stop order, failure rate), power demand information stored in the power demand information database 20b (for example, actual estimated time demand power, actual time demand power), periodic inspection information Regular inspection information stored in the database 20c (for example, actual monthly periodic inspection plan, actual monthly periodic inspection), flood information stored in the flood information database 20d (for example, actual monthly hydropower generation amount), fuel price information database 20e The fuel price information stored in (for example, the actual monthly fuel price of each fuel) is input. In addition, a set period (for example, a power sale period, a power purchase period), a set price (for example, a power sale price, a power purchase price), an assumed demand power amount in the set period (for example, each day of each month in the set period) Estimated power demand for each hour), set power for changing (increasing or decreasing) the amount of power supplied from the power generator during the set period (for example, time set power for each hour of each day of each month within the set period) Amount), the total estimated demand power amount in the set period (for example, each hour of each month in the set period including the estimated time demand power amount and time set power amount of each day of each month in the set period) Total estimated time demand power consumption), periodic inspection plan for the set period, etc. are input. Also, a power selling process instruction information (for example, a power selling risk index calculation instruction information) for instructing a process at the time of power selling (at the time of a power selling transaction) or a buying instruction for instructing a process at the time of power purchasing (at a power purchasing transaction). Electric power processing instruction information (for example, power purchase risk index calculation instruction information) is input. Each means of the processing device executes processing at the time of power selling when power selling time processing instruction information is input from the input device 30, and when power processing time processing instruction information is input, Execute the process. Depending on the means, the same processing is executed at the time of selling power and purchasing power.
As the input device 30, a keyboard, a touch switch provided in a display unit of the display device 40, an information reading unit that can read information stored in a storage medium, or the like is used. When a terminal device or the like can be connected to the processing device 10 via a communication line, an input device provided in the terminal device or the like can be used.
The display device (display unit) 40 displays various information, processing results, and the like.
The printing apparatus (printing unit) 50 prints and outputs the processing result and the like.
The display device 40 and the printing device 50 are used as an output device (output means).
When a terminal device or the like can be connected to the processing device 10 via a communication line, a display device or a printing device of the terminal device can be used as the display device 40 or the printing device 50.

処理装置(処理手段)10は、管理手段11、需要電力量算出手段12、定期点検計画変更を考慮した発電可能電力変動量算出手段13、計画外停止を考慮した発電可能電力変動量算出手段14、出水変動を考慮した発電装置の発電可能電力変動量算出手段15、統合需要電力算出手段16、燃料価格算出手段17、発電費用算出手段18、リスク指標算出手段19等を有している。発電費用算出手段18は、限界発電設備判別手段18a、総限界発電設備単位電力量燃料消費量算出手段18b、総限界発電設備単位電力量発電費用算出手段18c、限界費用算出手段18dを有している。各手段は、ハードウェアで構成することもできるし、ソフトウェアで構成することもできる。また、一つの処理装置によって各手段の処理を実行するように構成してもよい、一つの処理装置によって複数の手段の処理を実行するように構成してもよい。
定期点検計画変更を考慮した発電可能電力変動量算出手段13、計画外停止を考慮した発電可能電力変動量算出手段14、出水変動を考慮した発電装置の発電可能電力変動量算出手段15、統合需要電力算出手段16により、発電装置の発電可能電力変動量算出手段が構成される。
The processing device (processing means) 10 includes a management means 11, a demand power amount calculation means 12, a power generation possible power fluctuation amount calculation means 13 taking into account the periodic inspection plan change, and a power generation possible power fluctuation amount calculation means 14 taking into account an unplanned stop. Further, the power generation device fluctuation generating amount calculation means 15, the integrated demand power calculation means 16, the fuel price calculation means 17, the power generation cost calculation means 18, the risk index calculation means 19 and the like taking account of the fluctuation of the water discharge. The power generation cost calculating means 18 includes a limit power generation facility discriminating means 18a, a total limit power generation facility unit power consumption fuel consumption calculation means 18b, a total limit power generation facility unit power amount power generation cost calculation means 18c, and a limit cost calculation means 18d. Yes. Each unit can be configured by hardware or can be configured by software. Further, the processing of each means may be executed by one processing device, or the processing of a plurality of means may be executed by one processing device.
Electric power generation fluctuating amount calculation means 13 taking into account the periodic inspection plan change, electric power generation fluctuating power calculation means 14 taking into account unplanned outages, electric power generation fluctuating power fluctuation calculating means 15 taking into account fluctuations in water discharge, integrated demand The power calculation means 16 constitutes a power generation fluctuation amount calculation means for the power generator.

管理手段11は、処理装置10全体の処理を管理する。例えば、入力装置30から入力される情報の判別、入力された情報を記憶装置20に記憶する処理、各手段の処理を実行させる処理、算出した情報や記憶装置20に記憶されている情報等を表示装置40や印刷装置50等の出力装置(出力手段)に出力する処理等を実行する。なお、通信回線を介して端末装置が処理装置10に接続可能である場合には、端末装置からの情報を入力する処理や、端末装置に情報を出力する処理を実行する。
需要電力量算出手段12は、需要電力量の変動による影響を把握するためのものである。需要電力量算出手段12は、例えば、設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量[=(想定需要電力量+設定電力量)あるいは(想定需要電力量−設定電力量)]と、需要電力量情報データベース20bに記憶されている需要電力量情報に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。例えば、過去の実績想定需要電力量及び実績需要電力量に基づいて、実績需要電力量変動率の確率分布を算出し、算出した実績需要電力量変動率の確率分布と、設定期間における合計想定需要電力量に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。好適には、過去の実績想定時間需要電力量及び実績時期需要電力量と、設定期間内の各時間の想定時間需要電力量及び設定時間電力量を含む合計想定時間需要電力量に基づいて、設定期間内の各時間の合計想定時間需要電力量の確率分布を算出する。
確率分布を算出する方法としては、典型的には、正規分布を仮定し、正規分布のパラメータである平均値と標準偏差を算出する方法が用いられる。
The management unit 11 manages the processing of the entire processing apparatus 10. For example, determination of information input from the input device 30, processing for storing the input information in the storage device 20, processing for executing the processing of each means, calculated information, information stored in the storage device 20, and the like A process of outputting to an output device (output means) such as the display device 40 or the printing device 50 is executed. When the terminal device can be connected to the processing device 10 via the communication line, processing for inputting information from the terminal device and processing for outputting information to the terminal device are executed.
The demand power amount calculation means 12 is for grasping the influence of fluctuations in the demand power amount. For example, the demand power amount calculation unit 12 may calculate the total estimated demand power amount [= (assumed demand power amount + set power amount) or (assumed demand power amount− Set power amount)] and the demand power amount information stored in the demand power amount information database 20b, the probability distribution of the total assumed demand power amount in the set period is calculated. For example, the probability distribution of the actual demand power fluctuation rate is calculated based on the past actual expected power consumption and the actual demand power consumption, and the calculated probability distribution of the actual demand power fluctuation rate and the total assumed demand in the set period Based on the electric energy, a probability distribution of the total assumed demand electric energy in the set period is calculated. Preferably, the setting is based on the total estimated time demand power amount including the past estimated power demand amount and actual time demand power amount, and the estimated time demand power amount and the set time power amount for each time within the setting period. The probability distribution of the total estimated time demand power amount of each time within the period is calculated.
As a method for calculating the probability distribution, typically, a method is used in which a normal distribution is assumed and an average value and a standard deviation which are parameters of the normal distribution are calculated.

定期点検計画変更を考慮した発電可能電力変動量算出手段13は、計画されていた定期点検が実行されない場合あるいは計画されていた定期点検の期間が延長または短縮される場合の、発電装置の発電可能電力の変動量を把握するためのものである。定期点検計画変更を考慮した発電可能電力変動量算出手段13は、設定期間における定期点検計画と、定期点検情報データベース20bに記憶されている実績定期点検計画及び実績定期点検、発電設備情報データベース20aに記憶されている各発電設備の最大発電可能電力に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する。例えば、実績定期点検計画及び実績定期点検と、各発電設備の最大発電電力に基づいて、定期点検計画変更を考慮した実績発電可能電力変動率を算出する。そして、算出した定期点検計画変更を考慮した実績発電可能電力変動率の確率分布(典型的には、平均値と標準偏差)を算出する。そして、設定期間における定期点検計画と各発電設備の最大発電可能電力に基づいて、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する。設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布は、例えば、[設定期間における定期点検計画を考慮した発電装置の発電可能電力−設定期間における定期点検計画変更を考慮した発電装置の発電可能電力の確率分布(=設定期間における定期点検計画を考慮した発電装置の発電可能電力×実績発電可能電力変動率の確率分布)]により算出される。   The power generation fluctuation amount calculating means 13 taking into account the change in the periodic inspection plan is capable of generating power when the planned periodic inspection is not executed or when the scheduled periodic inspection period is extended or shortened. It is for grasping the fluctuation amount of electric power. The power generation fluctuating power calculation means 13 taking into account the periodic inspection plan change includes the periodic inspection plan in the set period, the actual periodic inspection plan and the actual periodic inspection stored in the periodic inspection information database 20b, and the power generation facility information database 20a. Based on the stored maximum power that can be generated by each power generation facility, a probability distribution of the amount of power that can be generated by the power generation apparatus in consideration of the periodic inspection plan change in the set period is calculated. For example, based on the actual periodic inspection plan and the actual periodic inspection, and the maximum generated power of each power generation facility, the actual power generation possible power fluctuation rate considering the periodic inspection plan change is calculated. Then, a probability distribution (typically, an average value and a standard deviation) of the actual power generation possible power fluctuation rate in consideration of the calculated periodic inspection plan change is calculated. Then, based on the periodic inspection plan in the set period and the maximum electric power that can be generated by each power generation facility, the probability distribution of the power generation fluctuation amount of the power generation apparatus considering the periodic inspection plan change in the set period is calculated. For example, the probability distribution of the amount of fluctuation in the power generation capacity of the power generator considering the periodic inspection plan change in the setting period is [the power generation potential of the power generator considering the periodic inspection plan in the setting period−the periodic inspection plan change in the setting period. The probability distribution of the power that can be generated by the power generation device in consideration (= the power generation potential of the power generation device in consideration of the periodic inspection plan in the set period × probability distribution of the actual power generation fluctuation rate).

計画外停止を考慮した発電可能電力変動量算出手段14は、故障等により発電設備が停止した場合の発電装置の発電可能電力の変動を把握するためのものである。計画外停止を考慮した発電可能電力変動量算出手段14は、発電設備情報データベース20aに記憶されている各発電設備の故障率と各発電設備の最大発電可能電力に基づいて、計画外停止を考慮した発電可能電力変動量の確率分布を算出する。例えば、各発電設備の故障率と最大発電可能電力に基づいて、各発電設備の発電可能電力の2項分布を作成する。そして、各発電設備の発電可能電力の2項分布を合成して全発電設備の発電可能電力の多項分布、すなわち、発電装置の発電可能電力の確率分布を作成する。設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布は、例えば、[設定期間における稼動可能な全発電設備の最大発電可能電力の合計−設定期間における計画外停止を考慮した発電装置の発電可能電力の確率分布]により算出される。   The power generation power fluctuation amount calculation means 14 taking into account unplanned stoppage is for grasping the fluctuation of the power generation capacity of the power generator when the power generation equipment is stopped due to a failure or the like. The power generation fluctuation amount calculation means 14 taking into account unplanned outages considers unplanned outages based on the failure rate of each power generation facility stored in the power generation facility information database 20a and the maximum power generation potential of each power generation facility. The probability distribution of the generated power fluctuation amount is calculated. For example, a binomial distribution of the power that can be generated by each power generation facility is created based on the failure rate of each power generation facility and the maximum power that can be generated. Then, a binomial distribution of the power that can be generated by each power generation facility is synthesized to create a multinomial distribution of the power that can be generated by all the power generation facilities, that is, a probability distribution of the power that can be generated by the power generation apparatus. For example, the probability distribution of the power generation fluctuation amount of the generator that takes into account the unplanned outage during the set period is [the sum of the maximum possible power generation of all power generation facilities that can be operated during the set period minus the unplanned outage during the set period. The probability distribution of the power that can be generated by the generated power generation device] is calculated.

出水変動を考慮した発電可能電力変動量算出手段15は、出水変動による発電装置の発電可能電力の変動(水力発電電力量の変動)を把握するためのものである。出水変動を考慮した発電可能電力変動量算出手段15は、出水情報データベース20dに記憶されている実績水力発電電力量に基づいて、設定期間における出水変動を考慮した発電可能電力の確率分布を算出する。例えば、過去の複数月それぞれの月区分と実績月間水力発電電力量に基づいて、各月の月間出水率[任意の月の月間出水率=当該月の実績月間水力発電電力量÷当該月と同じ月区分の平水時の水力発電電力量(直前の過去30年間の同じ月区分の月間水力発電電力量の平均値)]の確率分布を算出する。また、設定期間内の各月の出水変動を考慮した水力発電電力量の確率分布[設定期間内の任意の月の水力発電電力量の確率分布=当該月と同じ月区分の平水時の水力発電電力量×当該月と同じ月区分の出水率の確率分布]を算出し、設定期間内の各月の各日の各時間の出水変動を考慮した時間水力発電電力量の確率分布[任意の月の各時間の時間水力発電電力量の確率分布=当該月の水力発電電力量の確率分布÷当該月の総時間数]を算出する。そして、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布[設定期間内の任意の月の各時間の出水変動を考慮した発電装置の発電可能電力変動量の確率分布=水力発電設備の最大発電可能電力−当該月の各時間の出水変動を考慮した時間水力発電電力量の確率分布]を算出する。   The power generation possible power fluctuation calculation means 15 taking account of the fluctuation of the water discharge is for grasping the fluctuation of the power generation possible by the power generation apparatus due to the fluctuation of the water discharge (the fluctuation of the amount of hydroelectric power generation). The power generation possible power fluctuation calculation means 15 considering the water discharge fluctuation calculates the probability distribution of the power generation possible power considering the water discharge fluctuation in the set period based on the actual hydropower generation quantity stored in the water discharge information database 20d. . For example, based on the monthly classification of each of the past multiple months and the actual monthly hydroelectric power generation amount, the monthly water discharge rate for each month [monthly water discharge rate for any month = actual monthly hydroelectric power generation amount for the month divided by the same month The probability distribution of the hydroelectric power generation amount during the flat water in the month segment (the average value of the monthly hydroelectric power generation amount in the same month segment in the last 30 years immediately before) is calculated. In addition, the probability distribution of hydroelectric power generation considering the fluctuation of water discharge in each month in the set period [probability distribution of hydroelectric power amount in any month in the set period = hydropower generation during normal water in the same month segment as the month Probability distribution of hourly hydropower generation amount taking into account the fluctuations in the hourly discharge of each day of each month within the set period [Any month] The probability distribution of the amount of hourly hydroelectric power for each hour of the time = the probability distribution of the amount of hydroelectric power generated for the month / the total number of hours of the month] is calculated. Then, the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus in consideration of the water discharge fluctuation in the setting period [the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus in consideration of the water discharge fluctuation of each month in the setting period = The maximum power that can be generated by the hydroelectric power generation facility—the probability distribution of the amount of hourly hydroelectric power generation that takes into account fluctuations in the amount of water discharged each hour of the month.

統合需要電力算出手段16は、発電装置の発電可能電力の変動と需要電力の変動に置き換えるためのものである。統合需要電力算出手段16は、需要電力量算出手段12により算出された設定期間における合計想定需要電力量の確率分布、定期点検計画変更を考慮した発電可能電力変動量算出手段13で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量算出手段14で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、出水変動を考慮した発電可能電力変動量算出手段15で算出された設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を統合し、設定期間における統合需要電力の確率分布を算出する。
発電装置の発電可能電力変動量の確率分布と合計想定需要電力量の確率分布を統合する方法としては、例えば、以下の方法を用いることができる。設定期間内の任意の時間における合計想定時間需要電力量が与えられた場合、当該時間内の各時点における合計想定需要電力は、当該時間における合計想定需要電力量と同じ値であるものとみなすことができる。したがって、設定期間内の任意の時間の各時点における統合需要電力の確率分布は、当該時間における発電装置の発電可能電力変動量と、当該時間における合計想定需要電力量と等しい電力量を有する合計想定需要電力の確率分布を統合することによって算出することができる。複数の確率分布を統合する方法としては、例えば、各確率分布のパラメータである平均値を加算した平均値を平均値とし、各確率分布の標準偏差の2乗の和の平方根を標準偏差とする方法を用いることができる。
The integrated demand power calculation means 16 is for replacing the fluctuations in the power that can be generated by the power generator and the fluctuations in the demand power. The integrated demand power calculation means 16 is the setting calculated by the power generation fluctuation amount calculation means 13 taking into account the probability distribution of the total assumed demand power amount in the setting period calculated by the demand power amount calculation means 12 and the periodic inspection plan change. Probability distribution of the power generation possible power fluctuation amount of the power generator considering the periodic inspection plan change during the period, and the power generation equipment considering the unplanned stop during the set period calculated by the power generation power fluctuation calculation means 14 considering the unplanned stop The probability distribution of the power generation possible power fluctuation amount, the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the water discharge fluctuation in the set period calculated by the power generation power fluctuation amount calculating means 15 considering the water discharge fluctuation, The probability distribution of integrated demand power in the set period is calculated.
For example, the following method can be used as a method of integrating the probability distribution of the power generation fluctuation amount of the power generation device and the probability distribution of the total assumed power demand. When the total estimated time demand power at any time within the set period is given, the total estimated demand power at each point in time is considered to be the same value as the total estimated demand power at that time. Can do. Therefore, the probability distribution of the integrated demand power at each point in time in the set period is the total assumption that has the amount of power that can be generated by the power generation device at that time and the amount of power that is equal to the total estimated demand power at that time. It can be calculated by integrating the probability distribution of demand power. As a method for integrating a plurality of probability distributions, for example, an average value obtained by adding average values as parameters of each probability distribution is set as an average value, and a square root of a sum of squares of standard deviations of the respective probability distributions is set as a standard deviation. The method can be used.

燃料価格算出手段17は、燃料価格の変動による発電費用の変動(発電装置の単位電力量発電費用の変動)を把握するためのものである。燃料価格算出手段17は、燃料価格情報データベース20eに記憶されている各燃料の実績燃料価格に基づいて、設定期間における各燃料の燃料価格の確率分布を算出する。例えば、各燃料の実績月間燃料価格に基づいて、各燃料の実績月間燃料価格変動率[任意の燃料の実績月間燃料価格変動率=任意の燃料の任意の月の実績月間燃料価格÷任意の燃料の任意の月の前月の実績月間燃料価格]の確率分布を算出する。そして、現時点の各燃料の実績月間燃料価格あるいは各燃料の実績燃料価格の平均値と、各燃料の実績月間燃料価格変動率の確率分布と、現時点から設定期間内の各月までの月数に基づいて、設定期間内の各燃料の燃料価格の確率分布を算出する。例えば、現時点から設定期間内の任意の月までの月数をNとした場合、当該月の任意の燃料の燃料価格の平均値を[現時点の実績月間燃料価格×(1+当該燃料の実績月間燃料価格変動率の平均値)]により算出し、当該月の任意の燃料の燃料価格の標準偏差を[(当該燃料の実績月間燃料価格の標準偏差)×(N)1/2]により算出する。 The fuel price calculation means 17 is for grasping the fluctuation of the power generation cost due to the fluctuation of the fuel price (the fluctuation of the unit power generation cost of the power generation device). The fuel price calculation means 17 calculates the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the fuel price information database 20e. For example, based on the actual monthly fuel price for each fuel, the actual monthly fuel price fluctuation rate for each fuel [the actual monthly fuel price fluctuation rate for any fuel = the actual monthly fuel price for any month for any fuel / any fuel The probability distribution of the actual monthly fuel price of the previous month of any month is calculated. Then, the actual monthly fuel price of each fuel or the average value of the actual fuel price of each fuel, the probability distribution of the actual monthly fuel price fluctuation rate of each fuel, and the number of months from the current time to each month within the set period Based on this, the probability distribution of the fuel price of each fuel within the set period is calculated. For example, when N is the number of months from the present time to any month within the set period, the average value of the fuel price of any fuel in that month is calculated as [current actual fuel price x (1 + actual fuel per month for the current fuel] (Average value of price fluctuation rate) N ], and calculate the standard deviation of the fuel price of any fuel in the month by [(standard deviation of actual fuel price of the fuel per month) × (N) 1/2 ] .

発電費用算出手段18は、統合需要電力算出手段16で算出された設定期間における統合需要電力の確率分布(設定期間における合計想定需要電力量の確率分布、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を統合した設定期間における統合需要電力の確率分布)、設定期間における各燃料の燃料価格の確率分布と、発電設備情報に基づいて、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合の、設定期間における発電装置の単位電力量発電費用(発電装置の限界費用)の確率分布を算出する。そして、算出した設定期間における発電装置の限界費用の確率分布に基づいて、設定確率(任意の信頼確率)で発生する、設定期間における発電装置の限界費用の最大値あるいは最小値を算出する。
発電費用算出手段18は、限界発電設備判別手段18a、総限界発電設備単位電力量燃料消費量算出手段18b、総限界発電設備単位電力量発電費用算出手段18c、限界費用算出手段18dを有している。
限界発電設備判別手段16aは、設定期間における限界発電設備を判別する。例えば、設定期間内の各時間の時間統合需要電力に基づいて、設定期間内の各時間の限界発電設備を判別する。
総限界発電設備単位電力量燃料消費量算出手段18bは、設定期間における、限界発電設備で使用する単位電力量燃料消費量を燃料毎に合計する。例えば、限界発電設備判別手段18aで判別された設定期間内の各時間の限界発電設備に基づいて、各発電設備で使用する燃料及び単位電力量燃料消費量を燃料毎に合計し、設定期間における燃料毎の総限界発電設備単位電力量燃料消費量を算出する。
総限界発電設備単位電力量発電費用算出手段18cは、総発電設備単位電力量燃料消費量算出手段18bで算出された設定期間における燃料毎の総限界発電設備単位電力量燃料消費量と、燃料価格算出手段17で算出された設定期間における各燃料の燃料価格の確率分布に基づいて、設定期間における発電装置の単位電力量発電費用(発電装置の限界費用)の確率分布を算出する。
限界費用算出手段18dは、総限界発電設備単位電力量発電費用算出手段18cで算出された設定期間における発電装置の限界費用の確率分布に基づいて、設定確率(任意の信頼確率)で発生する限界費用の最大値あるいは最小値を算出する。
The power generation cost calculation means 18 is a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means 16 (a probability distribution of the total estimated demand power amount in the set period, a power generation considering the periodic inspection plan change in the set period) Probability distribution of power generation fluctuation amount of equipment, probability distribution of power generation fluctuation amount of power generation equipment considering unplanned outage during setting period, probability of power generation fluctuation amount of power generation equipment considering discharge fluctuation during setting period Based on the probability distribution of the integrated demand power in the set period integrating the distribution), the fuel price probability distribution of each fuel in the set period, and the power generation facility information, the expected amount of power supplied from the power generator is set in the set period The unit power generation cost of the power generator during the set period when the set power amount changes (increase or decrease) from the power amount (limit of the power generator) To calculate the probability distribution of use). Then, based on the probability distribution of the marginal cost of the power generation device in the calculated setting period, the maximum value or the minimum value of the marginal cost of the power generation device in the setting period, which is generated with the setting probability (arbitrary reliability probability), is calculated.
The power generation cost calculating means 18 includes a limit power generation facility discriminating means 18a, a total limit power generation facility unit power consumption fuel consumption calculation means 18b, a total limit power generation facility unit power amount power generation cost calculation means 18c, and a limit cost calculation means 18d. Yes.
The limit power generation facility determining unit 16a determines the limit power generation facility in the set period. For example, the limit power generation facility for each time within the set period is determined based on the time integrated demand power for each time within the set period.
The total limit power generation facility unit power consumption fuel consumption calculating means 18b totals the unit power amount fuel consumption used in the limit power generation facility for each fuel in the set period. For example, on the basis of the limit power generation facility at each time within the set period determined by the limit power generation facility determining means 18a, the fuel used in each power generation facility and the unit power amount fuel consumption are totaled for each fuel, Calculate the total power generation unit power consumption fuel consumption for each fuel.
The total marginal power generation facility unit power generation cost calculation means 18c includes the total limit power generation facility unit power consumption fuel consumption for each fuel and the fuel price in the set period calculated by the total power generation unit power consumption fuel consumption calculation means 18b. Based on the probability distribution of the fuel price of each fuel in the set period calculated by the calculation means 17, the probability distribution of the unit power generation cost (the limit cost of the power generator) of the power generator in the set period is calculated.
The marginal cost calculation means 18d is a limit generated with a set probability (arbitrary reliability probability) based on the probability distribution of the marginal cost of the power generation device in the set period calculated by the total marginal power generation facility unit power generation cost calculation means 18c. Calculate the maximum or minimum cost.

リスク指標算出手段19は、発電費用算出手段18で算出された設定期間における発電装置の限界費用の最大値あるいは最小値を用いて、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量変化(増加あるいは減少)させる場合のリスク指標を算出し、表示装置40や印刷装置50等の出力装置(出力手段)に出力する。
例えば、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、[(設定期間における発電装置の限界費用の最大値×設定電力量)−設定価格(売電収入)]をリスク指標として出力し、発電装置から供給している電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、[設定価格(買電支出)−(設定期間における発電装置の限界費用の最小値×設定電力量)]をリスク指標として出力する。
The risk index calculation means 19 uses the maximum value or the minimum value of the marginal cost of the power generation apparatus in the set period calculated by the power generation cost calculation means 18 to calculate the amount of power supplied from the power generation apparatus during the set period. The risk index for changing the set power amount (increase or decrease) from the amount is calculated and output to an output device (output means) such as the display device 40 or the printing device 50.
For example, when increasing the set amount of electric power supplied from the power generation device from the assumed demand power amount during the set period, [(maximum value of the marginal cost of the power set during the set period × set power amount) −set price (Power sales revenue)] is output as a risk index, and when the amount of power supplied from the power generation device is reduced from the assumed power demand amount during the set period, [set price (power purchase expenditure)-( The minimum value of the marginal cost of the power generator during the set period × the set power amount)] is output as a risk index.

次に、処理装置10の、発電費用算出処理を含むリスク指標算出処理を、図6に示すフローチャートを用いて説明する。図6に示す処理は、例えば、入力装置20からリスク指標算出指示情報が入力されることにより開始される。なお、以下では、発電設備情報データベース20a、需要電力量情報データベース20b、定期点検情報データベース20c、出水情報データベース20d、燃料価格情報データベース20eにそれぞれ発電設備情報、需要電力量情報、定期点検情報、出水情報、燃料価格情報が記憶されているものとする。
また、以下では、確率分布を算出する方法として、正規分布を仮定し、正規分布のパラメータである平均値と標準偏差を算出する方法を用いるものとして説明する。
ステップA1では、リスク指標(発電費用)を算出するために必要な入力情報が入力される。入力情報としては、例えば、設定期間(実際に電力の受け渡しを行う売電取引期間、買電取引期間)、設定電力量(売電電力量、買電電力量)、設定価格(売電価格、買電価格)、設定期間における想定需要電力量が入力される。想定需要電力量は、発電装置から電力を供給している固定需要者の設定期間における需要電力量を想定したものである。設定電力量は、例えば売電取引を行う売電電力量あるいは買電取引を行う買電電力量である。発電装置は、売電取引を行う場合には、設定期間において固定需要者の想定需要電力量と設定電力量を加算した電力量を供給し、買電取引を行う場合には、設定期間において固定需要者の想定需要電力量から設定電力量を減算した電力量を供給する。
想定需要電力量及び設定電力量を入力する方法としては、設定期間における想定需要電力量と設定電力量を含む合計想定需要電力量[=(想定需要電力量+設定電力)(売電時)あるいは(想定需要電力量−設定電力)(買電時)]を判別可能であれば、種々の方法を用いることができる。例えば設定期間内の各月の、各日の、各時間の想定時間需要電力量と時間設定電力量を入力する方法を用いることができる。あるいは、複数の時間において想定時間需要電力量や時間設定電力量が同じである場合には、想定時間需要電力量や時間設定電力量を、当該電力量を入力する期間とともに入力する方法を用いることができる。あるいは、設定期間内の各月の、各日の、各時間の合計想定時間需要電力量を入力する方法を用いることもできる。
なお、これらの入力情報は、予め入力しておいてもよいし、発電費用やリスク指標を算出する際に入力してもよい。
また、設定期間を入力する方法としては、設定期間の開始日時と終了日時を入力する方法を用いることもできるし、時間毎に、月区分、日区分、曜日区分(平日、土曜、日曜・祝祭日)、時間区分を入力する方法を用いることもできる。開始日時と終了日時を用いて設定期間を入力する場合には、月区分、日区分、曜日区分は内蔵のカレンダーを用いて判別する。
以下では、設定期間として[2005年5月1日0時〜5月31日23時]が入力されたものとする。
Next, the risk index calculation process including the power generation cost calculation process of the processing apparatus 10 will be described using the flowchart shown in FIG. The process illustrated in FIG. 6 is started, for example, when risk index calculation instruction information is input from the input device 20. In the following, the power generation facility information database 20a, the demand power amount information database 20b, the periodic inspection information database 20c, the water discharge information database 20d, and the fuel price information database 20e are respectively referred to as power generation facility information, power demand information, periodic inspection information, and water discharge. Information and fuel price information are stored.
In the following description, it is assumed that a normal distribution is assumed as a method for calculating a probability distribution, and a method for calculating an average value and a standard deviation that are parameters of the normal distribution is used.
In step A1, input information necessary for calculating a risk index (power generation cost) is input. Input information includes, for example, a set period (a power sale transaction period and a power purchase transaction period in which power is actually transferred), a set power amount (amount of power sold and purchased power), a set price (a power sale price and a power purchase price). Price) and an assumed amount of power demand in the set period. The assumed power demand amount assumes a power demand amount during a set period of a fixed consumer who is supplying power from the power generation device. The set power amount is, for example, the amount of power sold for performing a power sale transaction or the amount of power purchased for performing a power purchase transaction. The power generation device supplies the amount of power that is the sum of the fixed demand's assumed demand power and the set power amount during the set period when performing a power sale transaction, and is fixed during the set period when performing a power purchase transaction. The power amount obtained by subtracting the set power amount from the consumer's assumed demand power amount is supplied.
As a method of inputting the assumed demand power amount and the set power amount, the total assumed demand power amount including the assumed demand power amount and the set power amount in the setting period [= (assumed demand power amount + set power) (at the time of power sale) or If it is possible to determine (assumed demand power amount−set power) (at the time of power purchase)], various methods can be used. For example, it is possible to use a method of inputting the estimated time demand power amount and the time set power amount for each time of each day of each month within the set period. Alternatively, when the estimated time demand power amount and the time set power amount are the same at a plurality of times, use a method of inputting the assumed time demand power amount and the time set power amount together with the period for inputting the power amount. Can do. Or the method of inputting the total estimated time demand electric energy of each time of each day of each month within a setting period can also be used.
Note that these pieces of input information may be input in advance, or may be input when calculating the power generation cost and the risk index.
In addition, as a method of entering the set period, the method of entering the start date and time and end date and time of the set period can be used, and the time, month, day, day of the week (weekdays, Saturdays, Sundays / holidays) ), A method of inputting a time segment can also be used. When the set period is input using the start date and time and the end date and time, the month segment, the day segment, and the day segment are determined using the built-in calendar.
In the following, it is assumed that [2005 May 1, 0:00 to May 31, 23:00] is input as the set period.

ステップA2では、需要電力量算出処理が実行される。需要電力量算出処理では、設定期間における合計想定需要電力量の確率分布を算出する。本実施の形態では、設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布を算出する。ステップA2の処理は、需要電力量算出手段12により実行される。   In step A2, a demand power amount calculation process is executed. In the power demand calculation process, a probability distribution of the total estimated power demand in the set period is calculated. In the present embodiment, the probability distribution of the total estimated time demand power amount for each hour of each day of each month within the set period is calculated. The process of step A2 is executed by the demand power amount calculation means 12.

ステップA2の需要電力量算出処理の詳細を、図7に示すフローチャートにより説明する。
図7に示すステップB1では、設定期間内の各月と同じ月区分の実績月間需要電力量変動率の確率分布を算出する。すなわち、実績月間需要電力量変動率の平均値と標準偏差を算出する。
まず、需要電力量情報データベース20bに記憶されている過去の各年の各月の各日の各時間の実績時間想定需要電力量と実績時間需要電力量を用いて、各年の各月の実績想定月間需要電力量と実績月間需要電力量を算出する。例えば、図2に示す1996年4月1日0時〜1996年4月30日23時それぞれの実績想定時間需要電力量を加算して1996年4月の実績想定月間需要電力量を算出する。また、図2に示す1996年4月1日0時〜1996年4月30日23時それぞれの実績時間需要電力量を加算して1996年4月の実績月間需要電力量を算出する。同様にして、1996年4月〜2005年3月の期間の各月の実績想定月間需要電力量と実績需要電力量を算出する。
次に、同じ月の実績想定月間需要電力量と実績月間需要電力量を用いて、[1式]により、1996年4月〜2005年3月の期間の各月の実績月間需要電力量変動率を算出する(図8参照)。
任意の月の実績月間需要電力量変動率=
当該月の実績月間需要電力量÷当該月の実績想定月間需要電力量 [1式]
例えば、1996年4月の実績想定月間需要電力量と実績月間需要電力量を用いて、1996年4月の実績月間需要電力量変動率を算出する。
次に、同じ月区分の実績月間需要電力量変動率を用いて、各月区分の実績月間需要電力量変動量の平均値と標準偏差を算出する(確率分布を算出する)(図8参照)。例えば、1996年〜2005年の期間の各年の4月の実績月間需要電力量変動率を用いて、4月の月区分の実績月間需要電力量変動率の平均値と標準偏差を算出する。
なお、設定期間として[2005年5月1日0時〜5月31日23時]が入力された場合には、ステップB1では、5月の月区分の実績月間需要電力量変動率の平均値と標準偏差を算出すればよい。
The details of the demand power amount calculation process in step A2 will be described with reference to the flowchart shown in FIG.
In step B1 shown in FIG. 7, the probability distribution of the actual monthly demand power fluctuation rate in the same month segment as each month in the set period is calculated. That is, the average value and standard deviation of the actual monthly demand power fluctuation rate are calculated.
First, the actual results for each month in each year using the actual estimated power demand and actual demand power for each day of each month in the past each year stored in the demand power information database 20b. Calculate the expected monthly demand and actual monthly demand. For example, the actual estimated monthly demand power amount of April 1996 is calculated by adding the actual estimated time demand power amount of April 1, 1996 0:00 to April 30, 1996 23:00 shown in FIG. Further, the actual monthly demand power amount of April 1996 is calculated by adding the actual hourly demand power amounts of April 1, 1996 0:00 to April 30, 1996 23:00 shown in FIG. Similarly, the actual estimated monthly demand power amount and the actual demand power amount for each month in the period from April 1996 to March 2005 are calculated.
Next, the actual monthly demand power fluctuation rate for each month in the period from April 1996 to March 2005 is calculated using [Equation 1] using the actual estimated monthly demand power amount and the actual monthly demand power amount for the same month. Is calculated (see FIG. 8).
Actual monthly demand power fluctuation rate for any month =
Actual monthly demand power for the month ÷ Actual estimated monthly demand power for the month [1 set]
For example, the actual monthly demand power amount fluctuation rate in April 1996 is calculated using the actual estimated monthly demand power amount in April 1996 and the actual monthly demand power amount.
Next, using the actual monthly demand power fluctuation rate of the same month section, the average value and standard deviation of the actual monthly demand power fluctuation amount of each month section are calculated (probability distribution is calculated) (see FIG. 8). . For example, the average value and standard deviation of the actual monthly demand power fluctuation rate for the month of April are calculated using the actual monthly demand power fluctuation rate for April in each year from 1996 to 2005.
If [May 1, 2005, 0:00 to May 31, 23:00] is input as the set period, in step B1, the average value of the actual monthly demand power fluctuation rate in the month of May And calculate the standard deviation.

ステップB2では、設定期間内の各月の各日の各時間の合計想定需要電力量の平均値を算出する。例えば、任意の時間の合計想定時間需要電力量の平均値を、ステップA1で入力した当該時間の合計想定時間需要電力量と、ステップB1で算出した当該時間が属する月と同じ月区分の実績月間需要電力量変動率の平均値を用いて、[2式]により算出する。
任意の時間の合計想定時間需要電力量の平均値=
当該時間の合計想定時間需要電力量×
当該時間が属する月と同じ月区分の実績月間需要電力量変動率の平均値
[2式]
設定期間として[2005年5月1日0時〜5月31日23時]が入力された場合には、2005年5月1日0時〜2005年5月31日23時の期間の各時間の合計想定需要電力量の平均値を算出する。例えば、2005年5月1日0時の合計想定時間需要電力量の平均値は、[2005年5月1日0時の合計想定時間需要電力量×5月の実績月間需要電力量変動率の平均値]により算出する。
In step B2, the average value of the total estimated demand power amount for each hour of each day of each month within the set period is calculated. For example, the average value of the total estimated time demand electric energy of arbitrary time, the total estimated time demand electric energy of the said time input at step A1, and the actual month of the same month division as the month to which the said time calculated at step B1 belongs Using the average value of the power demand fluctuation rate, it is calculated by [Formula 2].
Average value of total estimated time demand energy for any time =
Total estimated time demand electric energy of the time ×
Average value of actual monthly demand energy fluctuation rate in the same month segment as the month to which the time belongs
[2 sets]
If [May 1, 2005 0:00 to May 31, 23:00] is input as the setting period, each hour of the period from May 1, 2005 0:00 to May 31, 2005 23:00 The average value of the total estimated demand energy is calculated. For example, the average value of the total estimated time demand power amount at 0:00 on May 1, 2005 is [the total estimated time demand power amount at 0:00 on May 1, 2005 × the actual monthly demand power fluctuation rate in May. [Average value].

ステップB3では、設定期間内の各月の月間需要電力量の標準偏差を算出する。設定期間内の任意の月の月間需要電力量の標準偏差は、例えば、ステップA1で入力した、当該月の各日の各時間の合計想定時間需要電力量の合計(合計想定月間需要電力量)と、ステップB1で算出した当該月と同じ月区分の実績月間需要電力量変動率の標準偏差を用いて、[3式]により算出する。
設定期間内の任意の月の月間需要電力量の標準偏差=
当該月の各日の各時間の合計想定時間需要電力量の合計×
当該月と同じ月区分の実績月間需要電力量変動率の標準偏差
[3式]
設定期間として、[2005年5月1日0時〜2005年5月31日23時]が入力された場合には、2005年5月の月間需要電力量の標準偏差を算出する。例えば、[2005年5月1日0時〜2005年5月31日23時の期間の各時間の合計想定時間需要電力量の合計×5月の月区分の実績月間需要電力量変動率の標準偏差]により算出する。
In step B3, a standard deviation of monthly demand electric energy for each month within the set period is calculated. The standard deviation of monthly demand power for any month within the set period is, for example, the sum of the total estimated time demand power for each time of each day of the month (total expected monthly demand power) input in step A1. Then, using the standard deviation of the actual monthly demand power fluctuation rate in the same month segment as the month calculated in step B1, the calculation is performed by [Expression 3].
Standard deviation of monthly demand energy for any month within the set period =
Total estimated time demand power amount for each hour of each day of the month ×
Standard deviation of rate of change in actual monthly demand energy in the same month segment as the month
[3 formulas]
If [2005 May 1, 0:00 to May 31, 2005, 23:00] is input as the setting period, the standard deviation of the monthly demand power amount in May 2005 is calculated. For example, [the standard of the actual monthly demand power fluctuation rate of the total estimated time demand power amount of each hour in the period from May 1, 2005 0:00 to May 31, 2005 23: 00 × May month section Deviation].

ステップB4では、設定期間内の各月と同じ月区分の各日の各時間の実績時間需要電力量の標準偏差を、曜日区分毎に算出する。例えば、需要電力量情報データベース20bに記憶されている1996年4月1日0時〜2005年3月31日23時の期間の各時間の実績時間需要電力量の中から5月の平日の0時の実績時間需要電力量を抽出し、抽出した実績時間需要電力量の標準偏差を、5月の月区分の、平日の曜日区分の、0時の時間区分の実績時間需要電力量の標準偏差とする。同様にして、5月の月区分の、平日の曜日区分の、1時〜23時それぞれの時間区分の実績時間需要電力量の標準偏差、5月の月区分の、土曜の曜日区分の、0時〜23時それぞれの時間区分の実績時間需要電力量の標準偏差、5月の月区分の、日曜・祝祭日の曜日区分の、0時〜23時それぞれの時間区分の実績時間需要電力量の標準偏差を算出する(図9参照)。   In step B4, the standard deviation of the actual demand power amount for each time of each day of the same month segment as each month in the set period is calculated for each day segment. For example, from the actual time demand power amount of each time in the period from April 1, 1996 0:00 to March 31, 2005 23:00, stored in the demand power amount information database 20b, 0 on weekdays in May The actual deviation of hourly actual power demand is extracted, and the standard deviation of the extracted actual hourly demand electric energy is the standard deviation of the actual hourly demand electric energy of the midnight hour of the weekly day of the week in the month of May. And Similarly, the standard deviation of the actual hourly demand electric energy of the time segment from 1 o'clock to 23 o'clock in the weekday day segment of the week of the month in May, 0 in the day of the week of the Saturday in the month of May Standard deviation of actual hourly power demand for each time segment from Hours to 23:00 Standard of actual hourly demand energy for each time segment from 0:00 to 23:00 on Sunday / holiday days of May in May The deviation is calculated (see FIG. 9).

ステップB5では、設定期間内の各月の各曜日区分の各時間に、各月と同じ月区分の、各曜日と同じ曜日区分の、各時間と同じ時間区分の実績時間需要電力量の標準偏差を割り付ける。例えば、2005年5月1日(日曜)の0時〜23時それぞれに、ステップB4で算出した、5月の月区分の、日曜・祝祭日の曜日区分の、0時〜23時それぞれの時間区分の実績時間需要電力量の標準偏差を割り付ける。同様にして、2005年5月1日1時〜2005年5月31日23時それぞれに、5月の月区分の、同じ曜日区分の、同じ時間区分の実績時間需要電力量の標準偏差を割り付ける(図10参照)。   In step B5, the standard deviation of the actual hourly demand electric energy of the same time segment as each time of the same day segment as each day of the same month segment for each time of each day segment of each month within the set period Is assigned. For example, the time divisions of 0:00 to 23:00 of the day of Sunday / holiday in the month of May, calculated in step B4, respectively at 0:00 to 23:00 on Sunday, May 1, 2005 Allocate the standard deviation of actual power demand. In the same manner, the standard deviation of the actual hourly demand power amount of the same time segment of the same day segment of the month segment of May is assigned at 1 o'clock on May 1, 2005 to 23 o'clock on May 31, 2005, respectively. (See FIG. 10).

ステップB6では、設定期間内の各月の各日の各時間の合計想定時間需要電力量の標準偏差を算出する。設定期間内の任意の時間の合計想定時間需要電力量の標準偏差は、例えば、ステップB3で算出した当該時間が属する月の月間需要電力量の標準偏差と、ステップB5で当該時間が属する月の各日の各時間に割り付けた実績時間需要電力量の標準偏差を用いて、[4式]により算出する。
設定期間内の任意の時間の合計想定時間需要電力量の標準偏差=
当該時間が属する月の月間需要電力量の標準偏差×
当該時間に割り付けた実績時間需要電力量の標準偏差÷
当該時間が属する月の各時間に割り付けた実績時間需要電力量の標準偏差の合計
[4式]
In step B6, the standard deviation of the total estimated time demand power amount for each hour of each day of each month within the set period is calculated. For example, the standard deviation of the total estimated time demand power amount of any time within the set period is, for example, the standard deviation of the monthly demand power amount of the month to which the time belongs calculated in step B3 and the month to which the time belongs in step B5. It calculates by [Formula 4] using the standard deviation of the actual demand power amount allocated to each time of each day.
Standard deviation of total estimated time demand energy for any time within the set period =
Standard deviation of monthly demand power for the month to which the time belongs ×
Standard deviation of actual power demand allocated to the time ÷
Total standard deviation of actual hourly demand energy allocated to each hour of the month to which the time belongs
[4 formulas]

以上のステップB1〜B6の処理によって、設定期間内の各月の各日の各時間の合計想定時間需要電力量の平均値と標準偏差、すなわち、確率分布が算出される。これにより、設定期間における合計想定時間需要電力量の変動を把握することができる。   Through the processes in steps B1 to B6 described above, the average value and standard deviation of the total estimated time demand power amount for each time of each day of each month in the set period, that is, a probability distribution is calculated. Thereby, the fluctuation | variation of the total estimated time demand electric energy in a setting period can be grasped | ascertained.

図6のフローチャートの説明に戻る。
ステップA3では、設定期間における定期点検計画変更を考慮した発電可能電力変動量の確率分布を算出する。ステップA3の処理は、定期点検計画変更を考慮した発電可能電力変動量算出手段13により実行される。
Returning to the flowchart of FIG.
In step A3, the probability distribution of the power generation possible power fluctuation amount considering the periodic inspection plan change in the set period is calculated. The process of step A3 is executed by the power generation variable amount calculation means 13 taking into account the periodic inspection plan change.

ステップA3の、設定期間における定期点検計画変更を考慮した発電可能電力変動量の確率分布の算出処理の詳細を、図11に示すフローチャートにより説明する。
図11に示すステップC1では、過去の各月の定期点検計画変更を考慮した実績発電可能電力変動率の平均値と標準偏差を算出する。すなわち、定期点検計画変更を考慮した実績発電可能電力変動率の確率分布を算出する。
まず、過去の所定期間の各月の実績計画月間発電可能電力及び実績月間発電可能電力を用いて、各月の定期点検計画変更を考慮した実績発電可能電力変動率を算出する(図12参照)。各月の実績計画月間発電可能電力及び実績月間発電可能電力としては、図3に示す定期点検情報データベース20cに記憶されている各月の実績計画月間発電可能電力及び実績月間発電可能電力、あるいは、図3に示す定期点検情報データベース20cに記憶されている所定期間の各月の実績月間定期点検計画及び実績月間定期点検と各発電設備の発電可能電力を用いて算出したものを用いる。
例えば、2001年4月〜1005年3月の期間の各月の定期点検計画変更を考慮した実績発電可能電力変動率を、[5式]により算出する。
任意の月の定期点検計画変更を考慮した実績発電可能電力変動率=
当該月の実績月間発電可能電力÷
当該月の実績計画月間発電可能電力 [5式]
なお、実績計画月間発電可能電力は、各発電設備の実績計画月間発電可能電力を[6式]により算出し、これを全発電設備について算出して合計することによって得ることができる。
任意の発電設備の任意の月の実績計画月間発電可能電力=
当該発電設備の最大発電可能電力×
当該発電設備の当該月における実績計画稼動可能日数
なお、発電設備の任意の月における実績計画稼動可能日数=
当該月の総日数−当該発電設備の当該月における実績定期点検計画日数
[6式]
また、実績月間発電可能電力は、各発電設備の実績月間発電可能電力を、[7式]により算出し、これを全発電設備について算出して合計することによって得ることができる。
任意の発電設備の任意の月の実績月間発電可能電力=
当該発電設備の最大発電可能電力×
当該発電設備の当該月における実績稼動可能日数
なお、発電設備の任意の月における実績稼動可能日数=
当該月の総日数−当該発電設備の当該月における実績定期点検日数
[7式]
そして、算出した各月の定期点検計画変更を考慮した実績発電可能電力変動率を用いて、定期点検計画変更を考慮した実績発電可能電力変動率の平均値と標準偏差を算出する(図12参照)。
The details of the calculation processing of the probability distribution of the power generation fluctuation amount in consideration of the periodic inspection plan change in the set period in step A3 will be described with reference to the flowchart shown in FIG.
In step C1 shown in FIG. 11, the average value and standard deviation of the actual power generation possible power fluctuation rate considering the regular inspection plan change in the past each month are calculated. That is, the probability distribution of the actual power generation possible power fluctuation rate considering the periodic inspection plan change is calculated.
First, using the actual planned monthly power generation potential and actual monthly power generation potential for each month in the past predetermined period, the actual power generation possible power fluctuation rate considering the periodic inspection plan change for each month is calculated (see FIG. 12). . As the actual planned monthly power generation potential and actual monthly power generation potential for each month, the actual planned monthly power generation potential and actual monthly power generation potential for each month stored in the periodic inspection information database 20c shown in FIG. The data calculated using the actual monthly periodic inspection plan for each month in the predetermined period and the actual monthly periodic inspection stored in the periodic inspection information database 20c shown in FIG.
For example, the actual power generation possible power fluctuation rate considering the periodic inspection plan change in each month in the period from April 2001 to March 2005 is calculated by [Formula 5].
Fluctuation rate of actual power generation that takes into account changes to the regular inspection plan for any month =
Actual power for the month
Actual plan for the month Monthly power generation [5 types]
The actual planned monthly power generation potential can be obtained by calculating the actual planned monthly power generation potential of each power generation facility by [Formula 6], calculating this for all the power generation facilities, and summing them up.
Actual planned monthly power generation capacity for any power generation facility =
Maximum power that can be generated by the power generation facility ×
Actual planned operation days of the power generation facility in the month Note that the actual planned operation days of the power generation facility in any month =
Total number of days in the month-Number of days for scheduled periodic inspection of the power generation facility
[6 formulas]
The actual monthly power generation possible power can be obtained by calculating the actual monthly power generation possible power of each power generation facility by [Equation 7], and calculating and totaling all the power generation facilities.
Actual monthly power generation capacity of any power generation facility =
Maximum power that can be generated by the power generation facility ×
Actual operating days of the power generation facility in the month Note that actual operating days of the power generation facility in any month =
Total number of days in the month-actual number of regular inspection days of the power generation facility in the month
[7 formulas]
Then, the average value and standard deviation of the actual power generation possible power fluctuation rate considering the periodic inspection plan change are calculated using the calculated actual power generation possible power fluctuation rate considering the regular inspection plan change of each month (see FIG. 12). ).

ステップC2では、設定期間内の各月の定期点検計画変更を考慮した発電可能電力の平均値と標準偏差を算出する。すなわち、設定期間内の各月の定期点検計画変更を考慮した発電可能電力の確率分布を算出する。
設定期間内の各月の定期点検計画変更を考慮した発電可能電力の平均値と標準偏差は、例えば、入力装置30から入力された設定期間内の各月の定期点検計画と、発電設備情報データベース20aに記憶されている各発電設備の最大発電可能電力と、ステップC1で算出した定期点検計画変更を考慮した実績発電可能電力変動率の平均値と標準偏差を用いて、[8式]により算出される。
設定期間内の任意の月の定期点検計画変更を考慮した発電可能電力の平均値=
当該月の計画月間発電可能電力×
定期点検計画変更を考慮した実績発電可能電力変動率の平均値
設定期間内の任意の月の定期点検計画変更を考慮した発電可能電力の標準偏差=
当該月の計画月間発電可能電力×
定期点検計画変更を考慮した実績発電可能電力変動率の標準偏差
なお、設定期間内の任意の月の計画月間発電可能電力=
[発電設備の発電可能電力×当該発電設備の当該月における計画稼動可能
日数]を全発電設備について算出して合計
また、設定期間内の任意の月の任意の発電設備の計画稼動可能日数=
当該月の総日数−当該発電設備の当該月における定期点検計画日数
[8式]
In step C2, an average value and a standard deviation of the power that can be generated are calculated in consideration of changes in the periodic inspection plan for each month within the set period. That is, the probability distribution of the power that can be generated in consideration of the change in the periodic inspection plan for each month within the set period is calculated.
For example, the average value and the standard deviation of the power that can be generated in consideration of the change in the regular inspection plan for each month within the set period are, for example, the regular check plan for each month within the set period input from the input device 30, and the power generation facility information database. Calculated by [Equation 8] using the maximum power that can be generated for each power generation facility stored in 20a and the average value and standard deviation of the actual power generation power fluctuation rate considering the periodic inspection plan change calculated in Step C1. Is done.
Average value of electric power that can be generated taking into account changes in the periodic inspection plan for any month within the set period =
Planned monthly power generation possible for the month ×
Average value of the actual power generation fluctuation rate considering the periodic inspection plan change Standard deviation of the power generation potential considering the periodic inspection plan change for any month within the set period =
Planned monthly power generation possible for the month ×
Standard deviation of the actual power generation fluctuation rate considering the periodic inspection plan change Note that the planned monthly power generation potential for any month within the set period =
[Power generation capacity of power generation facility x Planned operation of the power generation facility in the month
The total number of days] is calculated for all power generation facilities. In addition, the number of planned operation days for any power generation facility in any month within the set period =
Total number of days in the month-Number of days scheduled for periodic inspection of the power generation facility in the month
[8 formulas]

ステップC3では、設定期間内の各月の定期点検計画を考慮した発電可能電力変動量の平均値と標準偏差を算出する。すなわち、設定期間内の各月の定期点検計画を考慮した発電可能電力変動量の確率分布を算出する。
設定期間内の各月の定期点検計画を考慮した発電可能電力変動量の平均値と標準偏差は、例えば、当該月の計画月間発電可能電力と、ステップC2で算出した設定期間内の各月の定期点検計画変更を考慮した発電可能電力の平均値と標準偏差を用いて、[9式]により算出する。
設定期間内の任意の月の定期点検計画変更を考慮した発電可能電力変動量の平均値=
当該月の計画月間発電可能電力−
当該月の定期点検計画変更を考慮した発電可能電力の平均値
設定期間内の任意の月の定期点検計画変更を考慮した発電可能電力変動量の標準偏差=
当該月の定期点検計画変更を考慮した発電可能電力の標準偏差
[9式]
なお、ステップC3で算出した、設定期間内の各月の定期点検計画変更を考慮した発電可能電力変動量の平均値と標準偏差は、当該月内の各時点の定期点検計画変更を考慮した発電可能電力変動量の平均値と標準偏差である。
In step C3, an average value and a standard deviation of the power generation fluctuation amount in consideration of the periodic inspection plan for each month within the set period are calculated. That is, the probability distribution of the power generation fluctuation amount is calculated in consideration of the periodic inspection plan for each month within the set period.
For example, the average value and the standard deviation of the power generation fluctuation amount in consideration of the periodic inspection plan for each month within the set period are the planned monthly power generation possible power for the month and the month within the set period calculated in step C2. Use [Equation 9] to calculate the average value and standard deviation of the power that can be generated in consideration of the periodic inspection plan change.
Average value of power generation fluctuation amount considering regular inspection plan change for any month within the set period =
Planned monthly power generation for the month
Average value of electric power that can be generated in consideration of changes in the periodic inspection plan for that month Standard deviation of the fluctuation amount of electric power that can be generated in consideration of changes in the periodic inspection plan for any month within the set period =
Standard deviation of electric power that can be generated in consideration of changes in the periodic inspection plan for the month
[9 formulas]
The average value and standard deviation of the power generation fluctuation amount calculated in step C3 considering the periodic inspection plan change for each month within the set period are the power generation considering the periodic inspection plan change at each time point in the month. The average value and the standard deviation of the possible power fluctuation.

ステップC1〜C3の処理を、最大発電電力400MWである発電設備Aと、最大発電電力300MWである発電設備Bを備える発電装置について説明する。
2000年6月の実績月間定期点検計画では、2000年6月1日〜11日に発電設備Aの定期点検、2000年6月23日〜28日に発電設備Bの定期点検が予定されていたものとする。この場合、2000年6月における、発電装置の実績計画月間発電可能電力は、[6式]により算出される。
すなわち、発電設備Aの実績計画月間発電可能電力[400MW×19日(=30日−11日)=7600MW]と、発電設備Bの実績計画月間発電可能電力[300MW×24日(=30日−6日)=7200MW]を合計した[14800MW]である。
また、2000年6月の実績月間定期点検では、2000年6月1日〜13日に発電設備Aの定期点検、2000年6月23日〜29日に発電設備Bの定期点検が行われたものとする。この場合、2000年6月における、発電装置の実績月間発電可能電力は、[7式]により算出される。
すなわち、発電設備Aの実績月間発電可能電力[400MW×17日(=30日−13日)=6800MW]と、発電設備Bの実績月間発電可能電力[300MW×23日(=30日−7日)=6900MW]を合計した[13700MW]である。
そして、2000年6月における、定期点検計画変更を考慮した実績発電可能電力変動率は、[5式]により算出する。
すなわち、2000年6月における発電装置の実績月間発電可能電力[13700MW]を、2000年6月における発電装置の実績計画月間発電可能電力[14800MW]で除算した[13700MW÷1480MW=0.93]である。
同様の方法を用いて、2000年4月〜2005年3月の期間の各月における実績発電可能電力変動率を算出する。そして、各月における実績発電可能電力変動率を用いて、定期点検計画変更を考慮した実績発電可能電力変動率の平均値と標準偏差を算出する。
また、設定期間[2005年5月1日0時〜2005年5月31日23時]に含まれる2005年5月の定期点検計画では、2005年5月1日〜5日に発電設備Aの定期点検、2005年5月15日〜25日に発電設備Bの定期点検が計画されているものとする。この場合、2005年5月の発電装置の計画月間発電可能電力は、[8式]により算出される。
すなわち、発電設備Aの計画月間発電可能電力[400MW×26日(=31日−5日)=10400MW]と、発電設備Bの計画月間発電可能電力[=300MW×20日(=31日−11日)=6000MW]を合計した[16400MW]である。
次に、設定期間[2005年5月1日0時〜2005年5月31日23時]に含まれる2005年5月における定期点検計画変更を考慮した発電装置の発電可能電力変動量の平均値と標準偏差が、2005年5月の発電装置の計画月間発電可能電力と、定期点検計画変更を考慮した実績発電可能電力変動率の平均値と標準偏差を用いて、[8式]及び[9式]により算出される。
すなわち、2005年5月における、定期点検計画変更を考慮した発電装置の発電可能電力変動量の平均値は、[16400MW−16400MW×(定期点検計画変更を考慮した実績発電可能電力変動率の平均値)]により算出され、定期点検計画変更を考慮した発電装置の発電可能電力変動率の標準編纂は、[16400MW×(定期点検計画変更を考慮した実績発電可能電力変動率の標準偏差)]により算出される。
Processing in steps C1 to C3 will be described for a power generation apparatus including a power generation facility A having a maximum generated power of 400 MW and a power generation facility B having a maximum generated power of 300 MW.
In the June 2000 actual monthly periodic inspection plan, the periodic inspection of power generation facility A was scheduled from June 1 to 11, 2000, and the periodic inspection of power generation facility B was scheduled from June 23 to 28, 2000. Shall. In this case, the actual power generation possible monthly power generation plan of the power generator in June 2000 is calculated by [Expression 6].
That is, the actual planned monthly power generation capacity of the power generation facility A [400 MW × 19 days (= 30 days−11 days) = 7600 MW] and the actual planned monthly power generation capacity of the power generation facility B [300 MW × 24 days (= 30 days− 6 days) = 7200 MW], [14800 MW].
In addition, in the actual monthly periodic inspection in June 2000, the periodic inspection of the power generation facility A was performed from June 1 to 13 in 2000, and the periodic inspection of the power generation facility B was performed from June 23 to 29, 2000. Shall. In this case, the actual monthly power generation potential of the power generation device in June 2000 is calculated by [Expression 7].
That is, the actual monthly power generation possible power generation facility A [400 MW × 17 days (= 30 days-13 days) = 6800 MW] and the actual monthly power generation power generation facility B [300 MW × 23 days (= 30 days-7 days). ) = 6900 MW], [13700 MW].
And the actual power generation possible power fluctuation rate in consideration of the periodic inspection plan change in June 2000 is calculated by [Formula 5].
That is, [13700 MW ÷ 1480 MW = 0.93] obtained by dividing the actual power generation potential [13700 MW] of the power generator in June 2000 by the actual planned power generation potential [14800 MW] of the power generator in June 2000. is there.
Using the same method, the actual power generation possible power fluctuation rate in each month in the period from April 2000 to March 2005 is calculated. Then, using the actual power generation possible power fluctuation rate in each month, the average value and the standard deviation of the actual power generation possible power fluctuation rate in consideration of the periodic inspection plan change are calculated.
In addition, in the periodic inspection plan for May 2005 included in the set period [from May 1, 2005 0 o'clock to May 31, 2005 23 o'clock], It is assumed that a periodic inspection and a periodic inspection of the power generation facility B are planned from May 15 to 25, 2005. In this case, the planned monthly power generation possible for the power generation apparatus in May 2005 is calculated by [Equation 8].
That is, the planned monthly power generation possible power generation facility A [400 MW × 26 days (= 31 days-5 days) = 10400 MW] and the planned monthly power generation potential of the power generation facility B [= 300 MW × 20 days (= 31 days-11). (Day) = 6000 MW], [16400 MW].
Next, the average value of the power generation possible power fluctuation amount of the power generator considering the periodic inspection plan change in May 2005 included in the set period [from May 1, 2005 0:00 to May 31, 2005 23:00] And the standard deviation are [Equation 8] and [9] using the planned monthly power generation potential of the power generation apparatus in May 2005, the average value and standard deviation of the actual power generation possible power fluctuation rate considering the periodic inspection plan change. [Expression]
That is, in May 2005, the average value of the power generation possible power fluctuation amount of the power generator considering the periodic inspection plan change is [16400 MW-16400 MW × (the average value of the actual power generation possible power fluctuation rate considering the periodic inspection plan change). )], And the standard compilation of the power generation fluctuation rate of the power generator considering the periodic inspection plan change is calculated by [16400 MW x (standard deviation of the actual power generation fluctuation rate considering the periodic inspection plan change)] Is done.

以上のステップC1〜C3の処理によって、設定期間内の各月の定期点検計画変更を考慮した発電可能電力変動量の平均値と標準偏差、すなわち、確率分布が算出される。これにより、設定期間内の定期点検計画変更による発電可能電力の変動量を把握することができる。
設定期間内の各月の定期点検計画変更を考慮した発電装置の発電可能電力変動量は、需要電力の変動量に置き換えることができる。したがって、設定期間内の各月の定期点検計画変更を考慮した発電可能電力変動量の確率分布は、需要電力変動量の確率分布として、合計想定時間需要電力量の確率分布と統合される(詳細は後述する)。
Through the processes in steps C1 to C3 described above, the average value and the standard deviation of the power generation fluctuation amount taking into account the periodic inspection plan change for each month within the set period, that is, the probability distribution is calculated. Thereby, the fluctuation | variation amount of the electric power which can be generated by the periodic inspection plan change within a setting period can be grasped | ascertained.
The power generation fluctuation amount of the power generation device considering the periodic inspection plan change in each month within the set period can be replaced with the fluctuation amount of the demand power. Therefore, the probability distribution of the power generation fluctuation amount considering the periodic inspection plan change of each month within the set period is integrated with the probability distribution of the total assumed time demand power amount as the probability distribution of the demand power fluctuation amount (details) Will be described later).

図6のフローチャートの説明に戻る。
ステップA4では、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出する。ステップA4の処理は、計画外停止を考慮した発電可能電力変動量算出手段14により実行される。
Returning to the flowchart of FIG.
In step A4, the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the unplanned stop in the set period is calculated. The process of step A4 is executed by the power generation possible power fluctuation amount calculating means 14 considering an unplanned stop.

ステップA4の計画外停止を考慮した発電装置の発電可能電力変動量の確率分布の算出処理の詳細を、図13に示すフローチャートにより説明する。
図13に示すステップD1では、計画外停止を考慮した各発電設備の発電可能電力の平均値と標準偏差を算出する。すなわち、各発電設備の計画外停止を考慮した発電可能電力の確率分布を算出する。
各発電設備の計画外停止を考慮した発電可能電力の確率分布は、例えば、発電設備情報データベース20aに記憶されている各発電設備の故障率と各発電設備の最大発電可能電力に基づいて算出することができる。各発電設備の故障率としては、日本電力調査委員会が調査した、信頼性のある標準的な故障率を用いるのが好ましい。
そして、各発電設備の故障率と最大発電電力を用いて、各発電設備の発電可能電力の2項分布を作成する。例えば、故障率5%、最大発電可能電力100MWの発電設備Aの場合には、5%で0MW、95%で100MWという発電可能電力の2項分布を作成することができる。また、故障率5%、最大発電可能電力200MWの発電設備Bの場合には、5%で0MW、95%で200MWという発電可能電力の2項分布を作成することができる。
ステップD2では、ステップ1で作成した各発電設備の発電可能電力の2項分布を合成し、全発電設備の発電可能電力の多項分布を作成する。この多項分布の平均値と標準偏差によって発電装置の計画外停止を考慮した発電可能電力の確率分布を算出することができる。
Details of the calculation process of the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the unplanned stop in step A4 will be described with reference to the flowchart shown in FIG.
In step D1 shown in FIG. 13, the average value and the standard deviation of the power that can be generated by each power generation facility taking into account the unplanned outage are calculated. That is, the probability distribution of the power that can be generated in consideration of the unplanned outage of each power generation facility is calculated.
The probability distribution of the power that can be generated in consideration of the unplanned stop of each power generation facility is calculated based on, for example, the failure rate of each power generation facility stored in the power generation facility information database 20a and the maximum power that can be generated by each power generation facility. be able to. As the failure rate of each power generation facility, it is preferable to use a reliable standard failure rate investigated by the Japan Electric Power Research Committee.
Then, using the failure rate of each power generation facility and the maximum generated power, a binomial distribution of the power that can be generated by each power generation facility is created. For example, in the case of the power generation facility A having a failure rate of 5% and a maximum power generation capacity of 100 MW, a binomial distribution of power generation capacity of 5 MW and 0 MW and 95% and 100 MW can be created. Further, in the case of the power generation facility B having a failure rate of 5% and a maximum power generation capability of 200 MW, a binomial distribution of power generation capability of 5 MW and 0 MW and 95% and 200 MW can be created.
In step D2, the binomial distribution of the power that can be generated in each power generation facility created in step 1 is synthesized to create a multinomial distribution of the power that can be generated in all the power generation facilities. Based on the average value and the standard deviation of this multinomial distribution, it is possible to calculate the probability distribution of the power that can be generated in consideration of the unplanned outage of the power generator.

ステップD3では、設定期間における計画外停止を考慮した発電可能電力変動量の平均値と標準偏差を算出する。
設定期間における計画外停止を考慮した発電装置の発電可能電力量変動量の平均値と標準偏差は、例えば、設定期間における発電装置の最大発電可能電力(設定期間に稼動可能な発電設備の最大発電可能電力の和)と、ステップD2で算出した設定期間における計画外停止を考慮した発電装置の発電可能電力の平均値と標準偏差を用いて、[10式]により算出する。
設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の平均値=
設定期間における発電装置の最大発電可能電力−
設定期間における計画外停止を考慮した発電装置の発電可能電力の平均値
設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の標準偏差=
設定期間における計画外停止を考慮した発電装置の発電可能電力の標準偏差
[10式]
In Step D3, an average value and a standard deviation of the power generation possible power fluctuation amount considering an unplanned stop in the set period are calculated.
The average value and standard deviation of the amount of fluctuation in the power generation capacity of the power generator that takes into account unplanned outages during the set period are, for example, the maximum power that can be generated by the power generator during the set period (Equation 10) using the average value and the standard deviation of the power that can be generated by the power generator in consideration of the unplanned outage in the set period calculated in step D2.
Average value of fluctuation amount of power that can be generated by the generator considering the unplanned outage in the set period =
Maximum power that can be generated by the generator during the set period
Average value of electric power that can be generated by the generator considering the unplanned outage during the set period Standard deviation of the amount of power that can be generated by the generator considering the unplanned stop during the set period =
Standard deviation of the power that can be generated by the generator considering the unplanned outage in the set period
[10 formulas]

ステップD1〜D3の処理を、故障率5%、最大発電電力100MWである発電設備Aと、故障率5%、最大発電電力200MWである発電設備Bを備える発電装置について説明する。
故障率5%、最大発電可能電力100MWの発電設備Aの2項分布と、故障率5%、最大発電可能電力200MWの発電設備Bの2項分布を合成した場合には、0.25%(A、B停止)で0MW、4.75%(Aのみ稼動)で100MW、4.75%(Bのみ稼動)で200MW、90.25%(A、B稼動)で300MWという、計画外停止を考慮した発電装置の発電可能電力の多項分布が合成される。この場合、多項分布の平均値は285MW、標準偏差は65MWである。
そして、計画外停止を考慮した発電装置の発電可能電力変動量の平均値は[15MW=300MW−285MW]であり、標準偏差は65MWである。
なお、計画外停止を考慮した発電可能電力の確率分布は、月や曜日等の時期の影響を受けない。
The processing of steps D1 to D3 will be described for a power generation apparatus including a power generation facility A having a failure rate of 5% and a maximum generated power of 100 MW, and a power generation facility B having a failure rate of 5% and a maximum generated power of 200 MW.
When combining the binomial distribution of power generation equipment A with a failure rate of 5% and maximum power generation possible power of 100 MW and the binomial distribution of power generation equipment B with a failure rate of 5% and maximum power generation capability of 200 MW, 0.25% ( A, B stop) 0MW, 4.75% (A only operation) 100MW, 4.75% (B only operation) 200MW, 90.25% (A, B operation) 300MW unplanned stop The multinomial distribution of the power that can be generated by the power generation device considered is synthesized. In this case, the average value of the multinomial distribution is 285 MW, and the standard deviation is 65 MW.
And the average value of the electric power fluctuation amount which can be generated of the power generator considering the unplanned stop is [15 MW = 300 MW-285 MW], and the standard deviation is 65 MW.
Note that the probability distribution of the power that can be generated in consideration of unplanned outages is not affected by the time of the month or day of the week.

以上のステップD1〜D3の処理によって、設定期間における計画外停止を考慮した発電可能電力変動量の平均値と標準偏差、すなわち、確率分布が算出される。これにより、設定期間内の計画外停止による発電可能電力の変動を把握することができる。
設定期間における計画外停止を考慮した発電装置の発電可能電力変動量は、需要電力の変動量に置き換えることができる。したがって、設定期間における計画外停止を考慮した発電可能電力変動量の確率分布は、需要電力変動量の確率分布として、合計想定時間需要電力量の確率分布と統合される(詳細は後述する)。
Through the processes in steps D1 to D3 described above, the average value and standard deviation of the power generation fluctuation amount in consideration of the unplanned stop in the set period, that is, the probability distribution is calculated. Thereby, the fluctuation | variation of the electric power which can be generated by the unplanned stop in a setting period can be grasped | ascertained.
The fluctuation amount of power that can be generated by the power generation apparatus in consideration of the unplanned stop in the set period can be replaced with the fluctuation amount of the demand power. Therefore, the probability distribution of the power generation possible power fluctuation amount considering the unplanned stop in the set period is integrated with the probability distribution of the total assumed time demand power amount as the probability power fluctuation amount probability distribution (details will be described later).

図6のフローチャートに戻る。
ステップA5では、設定期間における出水変動を考慮した発電可能電力変動量の確率分布を算出する。ステップA5の処理は、出水変動を考慮した発電可能電力変動量算出手段15により実行される。
Returning to the flowchart of FIG.
In step A5, the probability distribution of the power generation possible power fluctuation amount considering the water discharge fluctuation in the set period is calculated. The process of step A5 is executed by the power generation possible power fluctuation amount calculation means 15 taking account of fluctuations in the water discharge.

ステップA5の出水変動を考慮した発電可能電力変動量の確率分布の算出処理の詳細を、図14に示すフローチャートにより説明する。
図14に示すステップE1では、設定期間内の各月と同じ月区分の実績月間出水率の平均値と標準偏差を算出する。すなわち、設定期間内の各月と同じ月区分の実績月間出水率の確率分布を算出する。
任意の月の実績月間出水率は、例えば、出水情報データベース20dに記憶されている過去の各月の実績月間水力発電電力量に基づいて、[11式]により算出する。
任意の月の実績月間出水率=当該月の実績月間水力発電電力量÷
当該月と同じ月区分の平水時の水力発電電力量
[11式]
ここで、当該月と同じ月区分の平水時の水力発電電力量は、当該月から直近の過去30年間の、当該月と同じ月区分の実績月間水力発電電力量の平均値である。例えば、20005年1月の実績月間出水率は、2005年1月より直近の過去30年間である1975年〜2004年それぞれの1月の実績水力発電電力量の平均値である(図15参照)。
設定期間として[2005年5月1日0時〜5月31日23時]が入力された場合には、1975年〜2004年それぞれの5月の実績月間出水率の平均値と標準偏差を算出する。
ステップE2では、設定期間内の各月の月間水力発電電力量の平均値と標準偏差を、例えば、[12式]により算出する。
設定期間内の任意の月の月間水力発電電力量の平均値=
当該月の前年における、当該月と同じ月区分の平水時の月間水力発電電力量×
当該月と同じ月区分の実績月間出水率の平均値
設定期間内の任意の月の月間水力発電電力量の標準偏差=
当該月の前年における、当該月と同じ月区分の平水時の月間水力発電電力量×
当該月と同じ月区分の実績月間出水率の標準偏差
[12式]
ステップE3では、設定期間内の各月の各日の各時間の時間水力発電電力量の平均値と標準偏差を、[13式]により算出する。
設定期間内の任意の月の時間水力発電電力量の平均値=
当該月の月間水力発電電力量の平均値÷当該月の総時間数
設定期間内の任意の月の時間水力発電電力量の標準偏差=
当該月の月間水力発電電力量の標準偏差÷当該月の総時間数
[13式]
例えば、設定期間として、[2005年5月1日0時〜2005年5月31日23時]が設定され、5月の実績月間出水率が98%、標準偏差が6%、2004年5月における5月の月間水力発電電力量の平均値(平水時の水力発電電力量)が200万MWhである場合には、2005年5月の月間水力発電電力量の平均値は196万MWh、標準偏差は12万MWh、2005年5月の時間水力発電電力量の平均値は263kWh、標準偏差は16kWhとなる、
Details of the calculation process of the probability distribution of the power generation possible power fluctuation amount in consideration of the water discharge fluctuation in step A5 will be described with reference to the flowchart shown in FIG.
In step E1 shown in FIG. 14, the average value and standard deviation of the actual monthly water discharge rate in the same month segment as each month in the set period are calculated. That is, the probability distribution of the actual monthly water discharge rate in the same month segment as each month within the set period is calculated.
The actual monthly water discharge rate of an arbitrary month is calculated by [Equation 11] based on the actual monthly hydroelectric power generation amount of each past month stored in the water discharge information database 20d, for example.
Actual monthly water discharge rate for any month = Actual monthly hydroelectric power generation for that month ÷
Hydroelectric power generation during flat water in the same month segment as the month
[11 formulas]
Here, the amount of hydroelectric power generation in the same month segment as that month is the average value of the actual monthly hydropower generation amount in the same month segment as the month for the past 30 years from the month. For example, the actual monthly water discharge rate in January 20005 is the average value of actual hydropower generation in January of 1975 to 2004, which is the past 30 years from January 2005 (see FIG. 15). .
When [2005 May 1 0:00 to May 31 23:00] is entered as the set period, the average value and standard deviation of the actual monthly water discharge rates for May from 1975 to 2004 are calculated. To do.
In step E2, the average value and standard deviation of the monthly hydroelectric power generation amount for each month within the set period are calculated by, for example, [Equation 12].
Average value of monthly hydroelectric power generation for any month within the set period =
Monthly hydroelectric power generation amount during normal water in the same month segment as the month in the previous year of the month ×
Average monthly water discharge rate for the same month segment as the current month Standard deviation of monthly hydroelectric power generation for any month within the set period =
Monthly hydroelectric power generation amount during normal water in the same month segment as the month in the previous year of the month ×
Standard deviation of actual monthly water discharge rate in the same month segment as the month
[12 formulas]
In step E3, the average value and standard deviation of the hourly hydroelectric power generation amount for each hour of each day of each month within the set period are calculated by [Equation 13].
Average value of hourly hydroelectric power generation for any month within the set period =
Average value of monthly hydroelectric power for the month ÷ total number of hours of the month Standard deviation of hourly hydroelectric power for any month within the set period =
Standard deviation of monthly hydroelectric power generation for the month ÷ Total number of hours for the month
[13 formulas]
For example, [May 1, 2005 0:00 to May 31, 2005 23:00] is set as the set period, and the actual monthly water discharge rate in May is 98%, the standard deviation is 6%, and May 2004 If the average value of monthly hydroelectric power generation in May (2 hours during normal water) is 2 million MWh, the average value of monthly hydroelectric power generation in May 2005 is 1,960,000 MWh, standard The deviation is 120,000 MWh, the average value of hourly hydroelectric power generation in May 2005 is 263 kWh, and the standard deviation is 16 kWh.

ステップE4では、設定期間における出水変動を考慮した発電可能電力変動量の平均値と標準偏差を算出する。
設定期間内の各月の各日の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量の平均値と標準偏差は、例えば、水力発電設備の最大発電可能電力と、ステップE3で算出した設定期間内の各月の各日の各時間における出水変動を考慮した時間水力発電電力量の平均値と標準偏差を用いて、[14式]により算出する。なお、任意の時間の時間水力発電電力量が与えられた場合、当該時間内の各時点における時間水力発電電力の値が、時間水力発電電力量の値と同じであるとみなすことができる。すなわち、任意の時間の水力発電電力の平均値及び標準偏差の値は、当該時間における時間水力発電電力量の平均値及び標準偏差と同じ値であるとみなすことができる。
設定期間内の任意の月の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量の平均値=
水力発電設備の最大発電可能電力−当該月の時間水力発電電電力の平均値
設定期間内の任意の月の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量の標準偏差=
当該月の時間水力時間水力発電電力の標準偏差
[14式]
In step E4, an average value and a standard deviation of the power generation possible power fluctuation amount considering the water discharge fluctuation in the set period are calculated.
For example, the average value and the standard deviation of the hourly power generation fluctuation amount of the power generation apparatus in consideration of the water discharge fluctuation at each time of each day of each month in the set period are, for example, the maximum power generation possible power of the hydroelectric power generation facility and the step E3. Using the average value and standard deviation of hourly hydroelectric power generation taking into account fluctuations in water discharge at each time of each day of each month within the calculated set period, calculation is performed using [Equation 14]. In addition, when the hourly hydroelectric power generation amount of arbitrary time is given, it can be considered that the value of the hourly hydroelectric power generation at each time point in the time is the same as the value of the hourly hydroelectric power generation amount. That is, the average value and the standard deviation value of the hydroelectric power at an arbitrary time can be regarded as the same value as the average value and the standard deviation of the hourly hydroelectric power generation amount at the time.
Average value of hourly power generation fluctuation amount of power generation device considering fluctuation of water discharge at each hour of any month within the set period =
Maximum power that can be generated by hydroelectric power facilities-Average value of hourly hydroelectric power for the current month Standard deviation of the amount of power that can be generated by the generator in consideration of the fluctuation of water discharge at each time of any month within the set period =
Standard deviation of hourly hydroelectric power generation for the month
[14 formulas]

以上のステップE1〜E3の処理によって、出水変動を考慮した発電可能電力変動量の平均値と標準偏差、すなわち、確率分布が算出される。これにより、設定期間内の出水変動による発電可能電力の変動を把握することができる。
設定期間における出水変動を考慮した発電装置の発電可能電力変動量は、需要電力の変動量に置き換えることができる。したがって、設定期間内の各月の各日の各時間における出水変動を考慮した発電可能電力変動量の確率分布は、需要電力変動量の確率分布として、合計想定時間需要電力量の確率分布と統合される(詳細は後述する)。
Through the processes in steps E1 to E3 described above, the average value and standard deviation of the power generation possible power fluctuation amount considering the water discharge fluctuation, that is, the probability distribution is calculated. Thereby, the fluctuation | variation of the electric power which can be generated by the flooding fluctuation | variation within a setting period can be grasped | ascertained.
The fluctuation amount of power that can be generated by the power generation device in consideration of fluctuations in water discharge during the set period can be replaced with the fluctuation amount of demand power. Therefore, the probability distribution of the power generation fluctuation amount that takes into account the fluctuation of the water discharge at each time of each day of each month within the set period is integrated with the probability distribution of the total expected time demand power amount as the probability distribution of the demand power fluctuation amount. (Details will be described later).

図6に示すフローチャートに戻る。
ステップA6では、設定期間における需要電力量の確率分布と設定期間における発電装置の発電可能電力変動量の確率分布を統合し、発電可能電力変動量の確率分布を需要電力変動量の確率分布に置き換えた、設定期間における統合需要電力の確率分布を算出する。ステップA6の処理は、統合需要電力算出手段16により実行される。
本実施の形態では、ステップA2で算出した設定期間における合計想定需要電力量の確率分布と、ステップA3で算出した設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布と、ステップA4で算出した設定期間における計画外停止を考慮した発電装置の発電可能電力の確率分布と、ステップA5で算出した設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を統合して統合需要電力を算出する。
ここで、設定期間における発電装置の単位電力量発電費用を算出する際には、設定期間内の各月の各日の各時間における平均的な統合時間需要電力を用いるのが好ましい。この場合、供給曲線と各時間における統合時間需要電力を示す需要曲線との交点に対応する発電設備の単位電力量発電費用を、当該時間における発電装置の単位電力量発電費用として算出することができる。このため、本実施の形態では、設定期間内の各月の各日の各時間における合計想定時間需要電力量の確率分布と、設定期間内の各月の各日の各時間における時間発電可能電力変動量の確率分布を統合して、設定期間内の各月の各日の各時間における時間統合需要電力の確率分布を算出している。
前述したように、ステップA2では、設定期間内の各月の各日の各時間の合計想定時間需要電量(固定需要者の当該時間における想定時間需要電力量と当該時間における時間設定電力量を含む)の確率分布を算出している。設定期間内の各月の各日の各時間の時間設定電力量は、入力装置30から、想定時間需要電力量とともに入力されるか、あるいは、合計想定時間需要電力量に包含されて入力される。
ステップA3では、設定期間内の各月における発電装置の定期点検計画変更を考慮した発電可能電力変動量の確率分布を算出している。ここで、設定期間内の任意の月における定期点検計画変更を考慮した発電装置の月間発電可能電力変動量の確率分布[=当該月の計画月間発電可能電力−当該月における定期点検計画変更を考慮した発電装置の月間発電可能電力の確率分布]は、当該月内の各日の各時間の合計想定時間需要電力量の確率分布にそのまま統合することができる。
ステップA4では、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出している。ここで、設定期間における発電装置の計画外停止を考慮した発電可能電力変動量の確率分布は、設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布にそのまま統合することができる。
ステップA5では、設定期間内の任意の月の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量の確率分布を算出している。このため、設定期間内の任意の月の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量[=水力発電設備の最大発電可能電力−設定期間内の任意の月の各時間における出水変動を考慮した発電装置の時間発電可能電力変動量の確率分布]は、設定期間内の当該月の各日の各時間の合計想定時間需要電力量の確率分布にそのまま統合することができる。
複数の確率分布を統合する方法としては、例えば、各確率分布の平均値を加算して統合確率分布の平均値とし、各確率分布の標準偏差の2乗の和の平方項を統合確率分布の標準偏差とする方法を用いることができる。例えば、2005年5月1日0時における合計想定時間需要電力量の平均値が30000MWh、標準偏差が3000MWhであり、当該時間における、出水変動を考慮した発電装置の発電可能電力変動量の平均値が2722MW、標準偏差が167MWである場合には、2005年5月1日0時における統合時間需要電力の確率分布は、以下の平均値及び標準偏差を有する。
統合時間需要電力の平均値=30000MW+2722MW=32722MW
統合時間需要電力の標準偏差=(3000MW+167MW1/2=3005MW
したがって、ステップA5では、設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布と時間発電可能電力変動量を統合した、設定期間内の各月の各日の各時間の統合時間需要電力の確率分布が算出される。
Returning to the flowchart shown in FIG.
In step A6, the probability distribution of the demand power amount in the setting period and the probability distribution of the power generation fluctuation amount of the power generation device in the setting period are integrated, and the probability distribution of the power generation fluctuation amount is replaced with the probability distribution of the demand power fluctuation amount. In addition, the probability distribution of the integrated demand power in the set period is calculated. The process of step A6 is executed by the integrated demand power calculation means 16.
In the present embodiment, the probability distribution of the total assumed demand power amount in the setting period calculated in step A2 and the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the periodic inspection plan change in the setting period calculated in step A3. And the probability distribution of the power generation possible power of the power generation apparatus considering the unplanned stop in the setting period calculated in step A4 and the probability of the power generation possible power fluctuation amount of the power generation apparatus considering the water discharge fluctuation in the setting period calculated in step A5 The integrated demand power is calculated by integrating the distribution.
Here, when calculating the unit power generation cost of the power generation device in the set period, it is preferable to use the average integrated time demand power in each time of each day of each month in the set period. In this case, the unit power generation cost of the power generation facility corresponding to the intersection of the supply curve and the demand curve indicating the integrated time demand power at each time can be calculated as the unit power generation cost of the power generation device at that time. . Therefore, in the present embodiment, the probability distribution of the total estimated time demand power amount at each time of each day of each month within the set period, and the hourly power generation possible power at each time of each day of each month within the set period By integrating the probability distribution of the fluctuation amount, the probability distribution of the time integrated demand power at each time of each day of each month within the set period is calculated.
As described above, in step A2, the total estimated time demand power for each time of each day of each month within the set period (including the expected time demand power for the fixed consumer at that time and the time set power for that time) ) Probability distribution. The time setting power amount for each time of each day of each month within the setting period is input from the input device 30 together with the estimated time demand power amount or included in the total estimated time demand power amount. .
In step A3, the probability distribution of the power generation fluctuation amount that takes into account the change in the periodic inspection plan of the power generation device in each month within the set period is calculated. Here, the probability distribution of the amount of fluctuation in the monthly power generation of the power generator considering the periodic inspection plan change in any month within the set period [= the planned monthly power generation potential of the month-considering the periodic inspection plan change in the month The probability distribution of the monthly power that can be generated by the power generation apparatus] can be directly integrated into the probability distribution of the total estimated time demand power amount for each hour of each day in the month.
In step A4, the probability distribution of the power generation possible power fluctuation amount of the power generator considering the unplanned stop in the set period is calculated. Here, the probability distribution of the amount of power that can be generated in consideration of the unplanned outage of the generator during the set period is directly integrated into the probability distribution of the total estimated time demand power for each hour of each day of each month within the set period. can do.
In step A5, the probability distribution of the hourly power generation fluctuation amount of the power generation apparatus considering the water discharge fluctuation at each time of an arbitrary month within the set period is calculated. For this reason, the amount of fluctuation in the power generation time of the power generator that takes into account fluctuations in the water discharge in each hour of the month within the set period [= maximum power that can be generated by the hydroelectric power generation equipment−in each hour of the month in the set period The probability distribution of the hourly power generation fluctuation amount of the power generation apparatus considering the fluctuation of the water discharge can be directly integrated into the probability distribution of the total estimated time demand power amount for each hour of each day of the month within the set period.
As a method of integrating a plurality of probability distributions, for example, the average value of each probability distribution is added to obtain the average value of the integrated probability distribution, and the square term of the sum of the squares of the standard deviation of each probability distribution is calculated. A method of standard deviation can be used. For example, the average value of the total estimated time demand power amount at 0:00 on May 1, 2005 is 30000 MWh, and the standard deviation is 3000 MWh. Is 2722 MW and the standard deviation is 167 MW, the probability distribution of the integrated time demand power at 0:00 on May 1, 2005 has the following average value and standard deviation.
Average value of integration time demand power = 30000 MW + 2722 MW = 32722 MW
Standard deviation of integrated time demand power = (3000 MW 2 +167 MW 2 ) 1/2 = 3005 MW
Accordingly, in step A5, each day of each month in the set period, in which the probability distribution of the total estimated time demand power amount for each day of each month in the set period and the hourly power generation fluctuation amount are integrated. A probability distribution of time integrated power demand is calculated.

ステップA7では、各発電設備が使用する燃料の燃料価格の確率分布を算出する。ステップA7の処理は、燃料価格算定手段17により実行される。   In step A7, the probability distribution of the fuel price of the fuel used by each power generation facility is calculated. The process of step A7 is executed by the fuel price calculation means 17.

ステップA7の燃料価格の確率分布の算出処理の詳細を、図16に示すフローチャートにより説明する。
図16に示すステップF1では、燃料価格情報データベース20eに記憶されている各燃料の実績月間燃料価格に基づいて、各燃料の各月の実績月間燃料価格変動率を算出する。任意の燃料の任意の月の実績月間燃料価格変動率は、例えば、当該燃料の当該月の実績月間燃料価格と、当該月の前月の実績月間燃料価格を用いて、[15式]により算出する(図17参照)。
任意の燃料の任意の月の実績月間燃料価格変動率=
当該燃料の当該月の実績月間燃料価格÷
当該燃料の当該月の前月の実績月間燃料価格
[15式]
ステップF2では、ステップF1で算出した各燃料の実績月間燃料価格変動率の平均値と標準偏差を算出する(図17参照)。すなわち、各燃料の実績月間燃料価格変動率の確率分布を算出する。
ステップF3では、設定期間内の各月の各燃料の月間燃料価格の平均値と標準偏差を燃料毎に算出する。すなわち、設定期間内の各月の各燃料の月間燃料価格の確率分布を算出する。
設定期間内の任意の月の任意の燃料の月間燃料価格の平均値と標準偏差は、例えば、ステップF2で算出した当該燃料の実績月間燃料価格変動率の平均値と標準偏差を用いて、[16式]により算出する。
設定期間内の任意の月の任意の燃料の月間燃料価格の平均値=
当該燃料の現時点の月間燃料価格×
(当該燃料の月間燃料価格変動率の平均値)
設定期間内の任意の月の任意の燃料の月間燃料価格の標準偏差=
当該燃料の現時点の月間燃料価格×
(当該燃料の月間燃料価格変動率の標準偏差)×(N)1/2
なお、Nは、現時点から当該月までの月数である。
[16式]
なお、任意の燃料の現時点の月間燃料価格に代えて、任意の燃料の現時点における月間燃料価格の平均値を用いることもできる。
Details of the calculation process of the probability distribution of the fuel price in step A7 will be described with reference to the flowchart shown in FIG.
In step F1 shown in FIG. 16, the actual monthly fuel price fluctuation rate of each fuel is calculated based on the actual monthly fuel price of each fuel stored in the fuel price information database 20e. The actual monthly fuel price fluctuation rate of an arbitrary month of an arbitrary fuel is calculated by, for example, [Equation 15] using the actual monthly fuel price of the fuel in the current month and the actual monthly fuel price in the previous month of the current month. (See FIG. 17).
Actual monthly fuel price volatility for any month for any fuel =
Actual monthly fuel price for the month in question ÷
Actual monthly fuel price for the previous month of the fuel concerned
[15 formulas]
In step F2, the average value and standard deviation of the actual monthly fuel price fluctuation rate of each fuel calculated in step F1 are calculated (see FIG. 17). That is, the probability distribution of the actual monthly fuel price fluctuation rate of each fuel is calculated.
In step F3, the average value and standard deviation of the monthly fuel price of each fuel in each month within the set period are calculated for each fuel. That is, the probability distribution of the monthly fuel price of each fuel in each month within the set period is calculated.
For example, the average value and standard deviation of the monthly fuel price of any fuel in any month within the set period can be calculated using, for example, the average value and standard deviation of the actual monthly fuel price fluctuation rate of the fuel calculated in step F2. 16 formula].
Average monthly fuel price for any fuel for any month within the set period =
Current monthly fuel price of the fuel ×
(Average value of monthly fuel price fluctuation rate of the fuel) N
Standard deviation of monthly fuel price for any fuel in any month within the set period =
Current monthly fuel price of the fuel ×
(Standard deviation of the monthly fuel price fluctuation rate of the fuel) x (N) 1/2
Note that N is the number of months from the current month to the current month.
[16 formulas]
Instead of the current monthly fuel price of any fuel, the average value of the current monthly fuel price of any fuel can be used.

以上のステップF1〜F3の処理によって、設定期間における各燃料の燃料価格の平均値と標準偏差、すなわち、確率分布が算出される。これにより、設定期間における燃料価格の変動による発電装置の単位電力量発電費用の変動を把握することができる。   By the processes in steps F1 to F3 described above, the average value and standard deviation of the fuel price of each fuel in the set period, that is, the probability distribution is calculated. Thereby, the fluctuation | variation of the unit electric power generation cost of the power generator by the fluctuation | variation of the fuel price in a setting period can be grasped | ascertained.

図6に示すフローチャートに戻る。
ステップA8では、設定期間における発電装置の発電費用の確率分布を算出する。本実施の形態では、統合需要電力算出手段16で算出した設定期間における統合需要電力の確率分布と、燃料価格算出手段17で算出した設定期間における各燃料の燃料価格の確率分布と、発電設備情報データベース20aに記憶されている発電設備情報(各発電設備の起動/停止順序、各発電設備の最大発電可能電力、各発電設備で使用する燃料及び各発電設備の単位電力量燃料消費量等)に基づいて、設定期間における発電装置の限界費用の確率分布を算出し、算出した発電装置の限界費用の確率分布に基づいて、設定確率(任意の信頼確率)で発生する最大限界費用あるいは最小限界費用を算出する。ステップA7の処理は、発電費用算出手段18により実行される。
本実施の形態では、図1に示すように、発電費用算出手段18は、限界発電設備判別手段18a、総限界発電設備単位電力量燃料消費量算出手段18b、総限界発電設備単位電力量発電費用算出手段18c、限界費用算出手段18dにより構成されている。
Returning to the flowchart shown in FIG.
In step A8, the probability distribution of the power generation cost of the power generation device in the set period is calculated. In the present embodiment, the probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculating means 16, the probability distribution of the fuel price of each fuel in the set period calculated by the fuel price calculating means 17, and the power generation facility information In the power generation facility information stored in the database 20a (starting / stopping order of each power generation facility, maximum power that can be generated by each power generation facility, fuel used in each power generation facility, unit power consumption of each power generation facility, fuel consumption, etc.) Based on the probability distribution of the marginal cost of the generator set during the set period, and based on the calculated marginal cost probability distribution of the generator set, the maximum marginal cost or minimum marginal cost that occurs with the set probability (arbitrary confidence probability) Is calculated. The process of step A7 is executed by the power generation cost calculation means 18.
In the present embodiment, as shown in FIG. 1, the power generation cost calculation means 18 includes a limit power generation facility determination means 18a, a total limit power generation facility unit power consumption fuel consumption calculation means 18b, a total limit power generation facility unit power consumption power generation cost. The calculation means 18c and the marginal cost calculation means 18d are comprised.

限界発電設備判別手段18aは、統合需要電力算出手段16で算出した、設定期間内の各月の各日の各時間における統合時間需要電力の確率分布と、発電設備情報データベース20aに記憶されている発電設備情報(各発電設備の起動/停止順序、各発電設備の最大発電可能電力等)に基づいて、設定期間内の各月の各日の各時間における限界発電設備を判別する。
設定期間内の各月の各日の各時間における限界発電設備を判別する方法としては、例えば、設定期間内の各月の各日の各時間における限界発電設備を全設定期間にわたって判別する処理を、設定期間内の各月の各日の各時間における統合時間需要電力を予め定めた確率(例えば、平均値、+1σ、+2σ、−1σ、−2σの確率、σ:標準偏差)で発生させる複数のシナリオに対して実行する。この場合、例えば、シナリオ1に対して、2005年5月1日0時〜5時の限界発電設備はA、6時〜8時の限界発電設備はC、9時の限界発電設備はB、〜2005年31日23時の限界発電設備はBという限界発電設備の組み合わせが判別される。同様の限界発電設備の組み合わせが他のシナリオに対して判別される。
The marginal power generation facility discriminating means 18a is stored in the power generation facility information database 20a and the probability distribution of the integrated time demand power at each time of each day of each month within the set period calculated by the integrated demand power calculating means 16. Based on the power generation facility information (start / stop order of each power generation facility, maximum power that can be generated by each power generation facility, etc.), the limit power generation facility at each time of each day of each month within the set period is determined.
As a method of determining the marginal power generation facility at each time of each day of each month within the set period, for example, a process of determining the limit power generation facility at each time of each day of each month within the set period over the entire set period. A plurality of times of generating the integrated power demand at each time of each day of each month within the set period with a predetermined probability (for example, average value, probability of + 1σ, + 2σ, −1σ, −2σ, σ: standard deviation) Run for any scenario. In this case, for example, for scenario 1, the limit power generation facility from 0:00 to 5:00 on May 1, 2005 is A, the limit power generation facility from 6:00 to 8:00 is C, the limit power generation facility at 9:00 is B, The limit power generation facility at 23 o'clock on the 31st of 2005 is identified as a combination of the limit power generation facility B. Similar marginal power plant combinations are identified for other scenarios.

総限界発電設備単位電力量燃料消費量算出手段18bは、限界発電設備判別手段18aで判別した、複数のシナリオ毎の設定期間内の各月の各日の各時間における限界発電設備の組み合わせと、発電設備情報データベース20aに記憶されている発電設備情報(各発電設備で使用する燃料の区分、各発電設備の単位電力量燃料消費量等)に基づいて、設定期間における総限界発電設備単位電力量燃料消費量を算出する。
例えば、各シナリオに対する限界発電設備の組み合わせに基づいて、各時間の限界発電設備で使用する燃料の区分及び単位電力量燃料消費量を判別する。この場合、シナリオ1に対して、2005年5月1日0時〜5時では、限界発電設備Aが使用する燃料a、燃料消費量がa1、6時〜8時では、限界発電設備Cで使用する燃料c、燃料消費量がc1、9時では、限界発電設備Bで使用する燃料b、燃料消費量がb1であることが判別される。同様にして、設定期間[2005年5月1日0時〜2005年31日23時]内の各時間における燃料と単位電力量燃料消費量の組み合わせが複数のシナリオ毎に判別される。
そして、各シナリオに対して、設定期間内の各時間の単位電力量燃料消費量を、燃料毎に、設定期間内の月毎に合計する。
The total limit power generation facility unit power consumption fuel consumption calculating means 18b includes a combination of the limit power generation facilities at each time of each day of each month within the set period for each of the plurality of scenarios determined by the limit power generation facility determination means 18a. Based on the power generation facility information stored in the power generation facility information database 20a (the classification of fuel used in each power generation facility, the unit power consumption of each power generation facility, the fuel consumption, etc.), the total limit power generation unit power consumption in the set period Calculate fuel consumption.
For example, based on the combination of the marginal power generation facilities for each scenario, the classification of the fuel used in the marginal power generation facility for each hour and the unit power consumption fuel consumption are determined. In this case, with respect to scenario 1, the fuel a used by the marginal power generation facility A from 0:00 to 5:00 on May 1, 2005, and the marginal power generation facility C when the fuel consumption is a1, 6:00 to 8:00 When the fuel c to be used and the fuel consumption amount are c1 and 9 o'clock, it is determined that the fuel b and the fuel consumption amount to be used in the marginal power generation facility B are b1. Similarly, a combination of fuel and unit power consumption fuel consumption at each time within a set period [from May 1, 2005, 0:00 to 2005, 31, 23 o'clock] is determined for each of a plurality of scenarios.
Then, for each scenario, the unit power consumption fuel consumption for each time within the set period is summed for each fuel and for each month within the set period.

総限界発電設備単位電力量発電費用算出手段18cは、各シナリオに対して、設定期間における総限界発電設備単位電力量発電費用の確率分布、すなわち、設定期間における発電装置の単位電力量発電費用(発電装置の限界費用)の確率分布を算出する。
例えば、総限界発電設備単位電力量燃料消費量算出手段18bで算出された、設定期間における総限界発電設備単位電力量燃料消費量、すなわち、設定期間内の各時間における限界発電設備で使用される各燃料の、設定期間内の月毎の総燃料消費量と、燃料価格算出手段17で算出された、設定期間内の各月における各燃料の燃料価格の確率分布に基づいて、設定期間における総限界発電設備単位電力量発電費用の確率分布を算出する。
例えば、任意のシナリオに対して、燃料aの燃料費用の平均値が200万円、標準偏差が30万円、燃料bの燃料費用の平均値が1000万円、標準偏差が60万円、燃料cの燃料費用の平均値が100万円、標準偏差が20万円である場合には、発電装置の限界費用の平均値は1300万円[=200万円+1000万円+100万円]、標準偏差は70万円[=(30+60+201/2]となる。
The total marginal power generation facility unit power generation cost calculation means 18c calculates, for each scenario, the probability distribution of the total limit power generation facility unit power generation cost in the set period, that is, the unit power generation cost of the power generator in the set period ( Calculate the probability distribution of the marginal cost of the generator.
For example, the total limit power generation facility unit power amount fuel consumption calculation means 18b calculated by the total limit power generation facility unit power amount fuel consumption calculating means 18b is used in the limit power generation facility at each time within the set period, that is, the total limit power generation facility unit power amount fuel consumption in the set period. Based on the total fuel consumption of each fuel for each month in the set period and the probability distribution of the fuel price for each fuel in each month in the set period calculated by the fuel price calculation means 17, Calculate the probability distribution of marginal power generation unit power generation cost.
For example, for an arbitrary scenario, the average fuel cost of fuel a is 2 million yen, the standard deviation is 300,000 yen, the average fuel cost of fuel b is 10 million yen, the standard deviation is 600,000 yen, fuel When the average value of the fuel cost of c is 1 million yen and the standard deviation is 200,000 yen, the average value of the marginal cost of the power generator is 13 million yen [= 2 million yen + 10 million yen + 1 million yen], standard The deviation is 700,000 yen [= (30 2 +60 2 +20 2 ) 1/2 ].

限界費用算出手段18dは、総限界発電設備単位電力量発電費用算出手段18cで複数のシナリオに対して算出された、設定期間における総限界発電設備単位電力量発電費用の確率分布、すなわち、設定期間における発電装置の限界費用の確率分布に基づいて、設定確率(任意の信頼確率)で発生する、設定期間における発電装置の限界費用を算出する。本実施の形態では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、設定期間における発電装置の限界費用の最大値を算出し、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、設定期間における発電装置の限界費用の最小値を算出する。
複数のシナリオに対して算出された設定期間における発電装置の限界費用の確率分布を用いて、設定確率で発生する限界費用の最大値あるいは最小値を算出する方法としては種々の方法を用いることができる。
例えば、平均値の確率で統合時間需要電力を発生させるシナリオに対する限界費用の平均値が3.9円、標準偏差が0.55円、[+(3)1/2σ]の確率で統合時間需要電力を発生させるシナリオに対する限界費用の平均値が4.1円、標準偏差が0.67円、[−(3)1/2σ]の確率で統合時間需要電力を発生させるシナリオに対する限界費用の平均値が3.7円、標準偏差が0.5円である場合には、99%の確率で発生する限界費用は、以下のようにして算出することができる。
P(X,a,b)を、平均値がa、標準偏差がbである正規分布において、X以下の値をとる確率とした場合、
(2/3)×P(X,3.9,0.55)+(1/6)×P(X,4.1,0.67)+(1/6)×P(X,3.7,0.5)=
0.99
を満足するXを求めることによって、99%の確率で発生する限界費用の最大値を算出することができる。
The marginal cost calculation means 18d calculates the probability distribution of the total marginal power generation facility unit power generation cost in the set period calculated by the total limit power generation facility unit power generation cost calculation means 18c, that is, the set period. Based on the probability distribution of the marginal cost of the power generation device in, the marginal cost of the power generation device in the set period, which occurs with the set probability (arbitrary reliability probability), is calculated. In the present embodiment, when the amount of power supplied from the power generation device is increased from the assumed demand power amount during the setting period, the maximum value of the marginal cost of the power generation device during the setting period is calculated and supplied from the power generation device When reducing the set power amount from the assumed demand power amount during the set period, the minimum value of the marginal cost of the power generator during the set period is calculated.
Various methods can be used as a method of calculating the maximum value or the minimum value of the marginal cost generated with the set probability using the probability distribution of the marginal cost of the power generation apparatus in the set period calculated for a plurality of scenarios. it can.
For example, the integration time with the probability that the average value of the marginal cost for the scenario that generates the demand power with the probability of the average value is 3.9 yen, the standard deviation is 0.55 yen, and [+ (3) 1/2 σ] Marginal cost for scenarios that generate integrated time demand power with a probability of 4.1 yen, standard deviation is 0.67 yen, and [− (3) 1/2 σ] is the average marginal cost for scenarios that generate demand power When the average value is 3.7 yen and the standard deviation is 0.5 yen, the marginal cost generated with a probability of 99% can be calculated as follows.
When P (X, a, b) is a probability of taking a value less than or equal to X in a normal distribution with an average value of a and a standard deviation of b,
(2/3) × P (X, 3.9, 0.55) + (1/6) × P (X, 4.1, 0.67) + (1/6) × P (X, 3.7, 0.5) =
0.99
By obtaining X that satisfies the above, it is possible to calculate the maximum value of the marginal cost that occurs with a probability of 99%.

ステップA9では、リスク指標を表示装置40や印刷装置50等の出力手段に出力する。ステップA9の処理は、リスク指標算出手段19により実行される。
本実施の形態では、リスク指標として、入力装置30から入力された設定価格(売電価格、買電価格)と設定期間における発電装置の限界費用との差を算出している。
実物の電力の受け渡しによる清算を前提としている電力事業者が売電取引を行う場合には、図19に示すように、実際に受け渡しを行う時の発電装置の限界費用h12と売電契約時の売電価格h11との差が収益性に大きく影響する。特に、受け渡し時の発電装置の限界費用h12が売電契約時の売電価格h11以上であるか否かが重要である。
したがって、本実施の形態では、発電装置から供給している電力量を設定期間において想定需要電力量から設定電量増加させる場合(売電取引時)には、設定期間における最大限界費用から設定価格(売電価格)を減算した減算値をリスク指標として出力するように構成している。
また、実物の電力の受け渡しによる清算を前提としている電力事業者が買電取引を行う場合には、図19に示すように、買電契約時の買電価格h21と実際に受け渡しを行う時の発電装置の限界費用h22との差が収益性に大きく影響する。特に、買電契約時の買電価格h21が受け渡し時の発電装置の限界費用h22以下であるか否かが重要である。
したがって、本実施の形態では、発電装置から供給している電力量を設定期間において想定需要電力量から設定電力量減少させる場合(買電取引時)には、設定価格(買電価格)から設定期間における最小限界費用を減算した減算値をリスク指標として出力するように構成している。
電力事業者は、電力取引を行う場合、取引価格(設定価格)、取引期間(設定期間)等を入力し、出力手段から出力されるリスク指標、この場合、取引期間(設定期間)における最大限界費用あるいは最小限界費用と取引価格との差によって、取引価格に対するリスクを正確に評価(把握)することができる。
In step A9, the risk index is output to output means such as the display device 40 or the printing device 50. The process of step A9 is executed by the risk index calculation means 19.
In the present embodiment, as the risk index, the difference between the set price (power selling price, power purchased price) input from the input device 30 and the marginal cost of the power generator in the set period is calculated.
When an electric power company that is premised on clearing by delivery of real power carries out a power sale transaction, as shown in FIG. 19, the marginal cost h12 of the power generator when actually delivering it and the power sale contract The difference from the power selling price h11 greatly affects profitability. In particular, it is important whether or not the marginal cost h12 of the power generator at the time of delivery is equal to or higher than the power selling price h11 at the time of the power sale contract.
Therefore, in the present embodiment, when the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period (when selling power), the set price (from the maximum marginal cost during the set period) The subtraction value obtained by subtracting the (electricity selling price) is output as a risk index.
In addition, when a power company premised on liquidation by delivery of real power performs a power purchase transaction, as shown in FIG. 19, the power purchase price h21 at the time of the power purchase contract and the actual power transfer The difference from the marginal cost h22 of the power generator greatly affects profitability. In particular, it is important whether the power purchase price h21 at the time of the power purchase contract is equal to or less than the marginal cost h22 of the power generation apparatus at the time of delivery.
Therefore, in the present embodiment, when the amount of power supplied from the power generator is reduced from the assumed demand power amount during the set period (at the time of a power purchase transaction), the set price (power purchase price) is set. A subtraction value obtained by subtracting the minimum marginal cost in the period is output as a risk index.
When a power company conducts a power transaction, it inputs the transaction price (set price), the transaction period (set period), etc., and the risk index output from the output means, in this case, the maximum limit in the transaction period (set period) The risk for the transaction price can be accurately evaluated (understood) by the difference between the cost or the minimum marginal cost and the transaction price.

以上の実施の形態では、需要電力量算出手段12、定期点検計画変更を考慮した発電可能電力変動量算出手段13、計画外停止を考慮した発電可能電力変動量算出手段14、出水変動を考慮した発電可能電力変動量算出手段15、統合需要電力算出手段16、燃料価格算出手段17により発電装置の発電費用算出装置を構成したが、各手段のうちの一つあるいは複数により発電装置の発電費用算出装置を構成することもできる。すなわち、発電費用の変動要因である、設定期間における需要電力量(合計想定需要電力量)の変動、定期点検計画変更、計画外停止、出水変動、燃料価格の変動のうちの少なくとも一つによる影響を把握するように構成することによっても、本発明の目的を達成することができる。
例えば、需要電力量算出手段と、発電費用算出手段を設け、需要電力量算出手段により、設定期間における合計想定需要電力量の確率分布を算出し、発電費用算出手段により、設定期間における合計想定需要電力量の確率分布に基づいて設定期間における発電費用の確率分布を算出するように構成することができる。
あるいは、定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段、出水変動を考慮した発電可能電力変動量算出手段のうちの少なくとも一つと、統合需要電力算出手段と、発電費用算出手段を設け、統合需要電力算出手段により、設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布、設定期間における出水変動を考慮した発電装置の発電可能電力変動量のうちの少なくとも一つと合計想定需要電力量を統合して設定期間における統合需要電力の確率分布を算出し、発電費用算出手段により、設定期間における統合需要電力の確率分布に基づいて、設定期間における発電費用の確率分布を算出するように構成することができる。
あるいは、燃料価格算出手段と、発電費用算出手段を設け、燃料価格算出手段により、設定期間における燃料価格の確率分布を算出し、発電費用算出手段により、設定期間における燃料価格の確率分布に基づいて、設定期間における発電費用の確率分布を算出するように構成することができる。
このように構成した場合でも、前記した実施の形態と同様の効果を有する。
In the above embodiment, the demand power amount calculation means 12, the power generation power fluctuation amount calculation means 13 considering the periodic inspection plan change, the power generation power fluctuation amount calculation means 14 considering unplanned stoppage, and the water discharge fluctuation are considered. The power generation cost calculation unit 15, the integrated demand power calculation unit 16, and the fuel price calculation unit 17 constitute a power generation cost calculation device for the power generation device. However, one or more of the units calculate the power generation cost for the power generation device. An apparatus can also be constructed. That is, the impact of at least one of the following factors: fluctuations in power demand (total estimated demand) during the set period, periodic inspection plan changes, unplanned outages, flood fluctuations, and fuel price fluctuations The object of the present invention can also be achieved by configuring so as to grasp the above.
For example, a demand power amount calculation means and a power generation cost calculation means are provided, the demand power amount calculation means calculates the probability distribution of the total assumed demand power amount in the set period, and the power generation cost calculation means calculates the total assumed demand in the set period. The power generation cost probability distribution in the set period can be calculated based on the power amount probability distribution.
Alternatively, at least one of a power generation power fluctuation amount calculation means considering a periodic inspection plan change, a power generation power fluctuation amount calculation means considering an unplanned stop, and a power generation power fluctuation amount calculation means considering water discharge fluctuation, An integrated demand power calculation means and a power generation cost calculation means are provided, and the integrated demand power calculation means allows the probability distribution of the power generation fluctuation amount of the power generation equipment considering the periodic inspection plan change in the set period, and the unplanned stop in the set period. Integrated demand in the set period by integrating the total estimated demand energy with at least one of the probability distribution of the power generation possible power fluctuation amount of the power generator considered and the power generation possible power fluctuation amount of the power generator taking into account fluctuations in the settling period The probability distribution of power is calculated, and the power generation cost calculation means calculates the probability distribution for the set period based on the probability distribution of the integrated demand power for the set period. It can be configured to calculate the probability distribution of the power generation cost.
Alternatively, a fuel price calculation means and a power generation cost calculation means are provided, the fuel price calculation means calculates the fuel price probability distribution during the set period, and the power generation cost calculation means based on the fuel price probability distribution during the set period. The probability distribution of the power generation cost in the set period can be calculated.
Even in such a configuration, the same effects as those of the above-described embodiment are obtained.

また、定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出する定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出する計画外停止を考慮した発電可能電力変動量算出手段、出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出する出水変動を考慮した発電可能電力変動量算出手段の少なくとも一つを設けたが、定期点検計画変更を考慮した発電装置の発電可能電力の確率分布を算出する定期点検計画変更を考慮した発電可能電力算出手段、計画外停止を考慮した発電装置の発電可能電力の確率分布を算出する計画外停止を考慮した発電可能電力算出手段、出水変動を考慮した発電装置の発電可能電力の確率分布を算出する出水変動を考慮した発電可能電力算出手段の少なくとも一つを設け、統合需要電力算出手段で統合需要電力を算出する時に、定期点検計画変更を考慮した発電装置の発電可能電力変動量(定期点検計画を考慮した発電装置の発電可能電力−定期点検計画変更を考慮した発電装置の発電可能電力の確率分布)、計画外停止を考慮した発電装置の発電可能電力の変動量(正常時の発電装置の最大発電可能電力−計画外停止を考慮した発電装置の発電可能電力の確率分布)、出水変動を考慮した発電装置の発電可能電力変動量(水力発電設備の最大発電可能電力−出水変動を考慮した発電装置の発電可能電力の確率分布)を算出するように構成することもできる。このような構成も、定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段、出水変動を考慮した発電可能電力変動量算出手段を設ける概念に包含される。   In addition, the power generation power fluctuation amount calculation means considering the periodic inspection plan change for calculating the probability distribution of the power generation power fluctuation amount of the power generation equipment considering the periodic inspection plan change, the power generation capacity of the power generation equipment considering unplanned stoppage Power generation fluctuation calculation means taking into account unplanned outage to calculate the probability distribution of fluctuation amount, Electric power fluctuation fluctuation taking into account water discharge fluctuation to calculate the probability distribution of power generation fluctuation amount of power generation equipment taking into account fluctuations in discharge At least one of the quantity calculation means is provided, but the power generation possible power calculation means that considers the periodic inspection plan change that calculates the probability distribution of the power generation possible power of the power generator considering the periodic inspection plan change, considering the unplanned stop Power generation power calculation means that takes into account unplanned outages to calculate the probability distribution of power generation capability of the power generation equipment, and probability distribution of power generation capability of the power generation equipment taking into account fluctuations in water discharge Provide at least one power generation power calculation means that takes into account fluctuations in the water discharge, and when the integrated demand power is calculated by the integrated demand power calculation means, the amount of power generation fluctuation that can be generated by the power generation equipment considering the periodic inspection plan change (periodic inspection plan) The power generation capacity of the power generator considering the change-the probability distribution of the power generation capacity of the power generator considering the periodic inspection plan change), the fluctuation amount of the power generation power of the power generator considering the unplanned stoppage Maximum power generation potential-Probability distribution of power generation capability of power generation equipment considering unplanned outage), Power generation fluctuation amount of power generation equipment considering water discharge fluctuation (Maximum power generation potential of hydroelectric power generation equipment-Considering water discharge fluctuation) A probability distribution of the power that can be generated by the power generator can also be calculated. Such a configuration is also a concept of providing a power generation possible power fluctuation calculation means considering a periodic inspection plan change, a power generation power fluctuation calculation means considering an unplanned stop, and a power generation power fluctuation calculation means considering a water discharge fluctuation. Is included.

第1の実施の形態では、発電装置から供給している電力量を設定期間に変化させる場合の発電費用として、設定期間における発電装置の単位電力量発電費用(単位電力量発電費用の最大値あるいは最小値)と設定価格との差を算出したが、これ以外の値を算出することもできる。
以下に、本発明の第2の実施の形態を図18に示す。本実施の形態では、発電装置から供給している電力量を設定期間に変化させる場合の発電装置の発電費用として、設定期間に想定需要電力量を発電装置から供給する場合の発電費用を示す想定需要時発電費用と、設定期間に合計想定需要電力量を発電装置から供給する場合の発電費用を示す合計想定需要時発電費用の差を算出している。
第2の実施の形態は、第1の実施の形態と同様に、処理装置110、記憶装置120、入力装置130、表示装置140、印刷装置150等を備えている。
記憶装置120は、第1の実施の形態の記憶装置20と同様に、発電設備情報データベース120a、需要電力量情報データベース120b、定期点検情報データベース120c、出水情報データベース120d、燃料価格情報データベース120eを有している。各データベースに記憶される情報は、第1の実施の形態と同様である。
処理装置110は、管理手段111、需要電力量算出手段112、定期点検計画変更を考慮した発電可能電力変動量算出手段113、計画外停止を考慮した発電可能電力量変動量算出手段114、出水変動を考慮した発電可能電力変動量算出手段115、統合需要電力算出手段116、燃料価格算出手段117、発電費用算出手段118、リスク指標算出手段119を有している。
第2の実施の形態では、発電費用算出手段118とリスク指標算出手段119以外の手段は第1の実施の形態と同様の構成であるため、詳細な説明は省略する。
In the first embodiment, as the power generation cost when the amount of power supplied from the power generation device is changed during the set period, the unit power generation cost of the power generation device during the setting period (the maximum value of the unit power generation cost or The difference between the (minimum value) and the set price is calculated, but other values can also be calculated.
FIG. 18 shows a second embodiment of the present invention. In the present embodiment, it is assumed that the power generation cost of the power generation device when the amount of power supplied from the power generation device is changed during the set period indicates the power generation cost when the assumed demand power amount is supplied from the power generation device during the set period The difference between the power generation cost during demand and the total power generation cost during demand that indicates the power generation cost in the case where the total estimated power demand is supplied from the power generator during the set period is calculated.
Similar to the first embodiment, the second embodiment includes a processing device 110, a storage device 120, an input device 130, a display device 140, a printing device 150, and the like.
Similar to the storage device 20 of the first embodiment, the storage device 120 includes a power generation facility information database 120a, a demand power amount information database 120b, a periodic inspection information database 120c, a flooding information database 120d, and a fuel price information database 120e. is doing. Information stored in each database is the same as that in the first embodiment.
The processing device 110 includes a management unit 111, a demand power amount calculation unit 112, a power generation possible power fluctuation amount calculation unit 113 considering a periodic inspection plan change, a power generation possible power amount fluctuation amount calculation unit 114 considering an unplanned stop, and a discharge fluctuation. Power generation fluctuation amount calculation means 115 taking into account the above, integrated demand power calculation means 116, fuel price calculation means 117, power generation cost calculation means 118, and risk index calculation means 119.
In the second embodiment, since the means other than the power generation cost calculation means 118 and the risk index calculation means 119 have the same configuration as that of the first embodiment, detailed description thereof is omitted.

本実施の形態の動作を説明する。
本実施の形態では、入力装置130から、設定期間、設定期間内の各月の各日の各時間の想定時間需要電力量、設定期間内の各月の各日の各時間に供給する電力量を設定期間に想定需要電力量から変化(増加あるいは減少)させる設定電力量等を入力可能である。
需要電力量算出手段112は、入力装置130から入力された設定期間における想定需要電力量と、需要電力量情報データベースに記憶されている需要電力量情報に基づいて、設定期間における想定需要電力量の確率分布を算出する。例えば、入力装置130から入力された設定期間内の各月の各日の各時間の想定時間需要電力量と、需要電力量情報に基づいて、設定期間内の各月の各日の各時間における想定時間需要電力量の確率分布を算出する。
また、需要電力量算出手段112は、入力装置130から入力された設定期間における想定需要電力量及び設定電力量を含む設定期間における合計想定需要電力量と、需要電力量情報データベースに記憶されている需要電力量情報に基づいて、設定期間における合計想定需要電力量の確率分布を算出する。例えば、入力装置130から入力された設定期間内の各月の各日の各時間における想定時間需要電力量及び設定期間内の各月の各日の各時間の時間設定電力量を含む設定期間内の各月の各日の各時間の合計想定時間需要電力量と、需要電力量情報に基づいて、設定期間内の各月の各日の各時間における合計想定時間需要電力量の確率分布を算出する。
設定期間における想定需要電力量、合計想定需要電力量と需要電力量情報に基づいて、設定期間における想定需要電力量の確率分布、設定期間における合計想定需要電力量の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
The operation of this embodiment will be described.
In the present embodiment, from the input device 130, a set period, an estimated time demand power amount for each day of each month within the set period, and an amount of power supplied at each time of each day of each month within the set period. It is possible to input a set power amount that changes (increases or decreases) from the assumed demand power amount during the set period.
Based on the assumed demand power amount in the set period input from the input device 130 and the demand power amount information stored in the demand power amount information database, the demand power amount calculating unit 112 calculates the estimated demand power amount in the set period. Probability distribution is calculated. For example, based on the estimated time demand power amount of each day of each month within the set period input from the input device 130 and the demand power amount information, at each time of each day of each month within the set period Calculate the probability distribution of the estimated hourly power demand.
Further, the demand power amount calculation means 112 is stored in the demand power amount information database and the total assumed demand power amount in the set period including the assumed demand power amount and the set power amount input from the input device 130. Based on the power demand information, a probability distribution of the total estimated power demand in the set period is calculated. For example, within the set period including the estimated time demand power amount at each time of each day of each month within the set period input from the input device 130 and the time set power amount of each time of each day of each month within the set period Calculates the probability distribution of the total estimated time demand energy for each time of each day of each month within the set period based on the total estimated time demand power amount for each hour of each day of each month To do.
As a method of calculating the probability distribution of the estimated demand power amount in the setting period and the probability distribution of the total estimated demand power amount in the setting period based on the assumed demand power amount in the setting period, the total estimated demand power amount and the demand power amount information For example, the method described above can be used.

統合需要電力算出手段116は、需要電力量算出手段112により算出された設定期間における想定需要電力量の確率分布と、需要電力量算出手段112で算出された設定期間における想定需要電力量の確率分布と、定期点検計画変更を考慮した発電可能電力変動量算出手段113で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量算出手段114で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び出水変動を考慮した発電可能電力変動量算出手段115で算出された設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、設定期間における想定需要時統合需要電力の確率分布を算出する。例えば、設定期間内の各月の各日の各時間の想定需要時統合時間需要電力の確率分布を算出する。
また、統合需要電力算出手段116は、需要電力量算出手段112により算出された設定期間における合計想定需要電力量の確率分布と、定期点検計画変更を考慮した発電可能電力変動量算出手段113で算出された設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、計画外停止を考慮した発電可能電力変動量算出手段114で算出された設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び出水変動を考慮した発電可能電力変動量算出手段115で算出された設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、設定期間における合計想定需要時統合需要電力の確率分布を算出する。例えば、設定期間内の各月の各日の各時間の合計想定需要時時間統合需要電力の確率分布を算出する。
設定期間における想定需要時統合需要電力の確率分布、設定期間における合計想定需要時統合需要電力の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
The integrated demand power calculation means 116 is a probability distribution of the assumed demand power amount in the set period calculated by the demand power amount calculation means 112 and a probability distribution of the assumed demand power amount in the set period calculated by the demand power amount calculation means 112. And the probability distribution of the power generation possible power fluctuation amount of the power generator considering the periodic inspection plan change in the set period calculated by the power generation possible power fluctuation calculation means 113 considering the periodic inspection plan change, and the power generation considering the unplanned stop Probable distribution of the power generation power fluctuation amount of the power generation apparatus considering the unplanned stop in the setting period calculated by the possible power fluctuation amount calculation means 114 and the setting calculated by the power generation power fluctuation amount calculation means 115 considering the water discharge fluctuation Integrate at least one of the probability distributions of the power generation fluctuations of the power generation equipment that takes into account fluctuations in the water discharge during the period. To calculate the probability distribution of the expected demand during the integration power demand that. For example, the probability distribution of the demand power at the time of assumed demand integration time for each time of each day of each month within the set period is calculated.
Also, the integrated demand power calculation means 116 is calculated by the power generation fluctuation amount calculation means 113 taking into account the probability distribution of the total assumed demand power amount in the set period calculated by the demand power amount calculation means 112 and the periodic inspection plan change. Considering the probability distribution of the power generation power fluctuation amount of the power generation apparatus considering the periodic inspection plan change in the set period, and the unplanned stop in the setting period calculated by the power generation power fluctuation calculation means 114 considering the unplanned stop The probability distribution of the power generation possible power fluctuation amount of the power generation apparatus and the probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the water discharge fluctuation in the set period calculated by the power generation power fluctuation amount calculating means 115 considering the water discharge fluctuation. At least one of them is integrated, and the probability distribution of the integrated demand power during the total estimated demand in the set period is calculated. For example, the probability distribution of the total estimated demand time integrated demand power for each time of each day of each month within the set period is calculated.
As a method for calculating the probability distribution of the integrated demand power at the assumed demand in the set period and the probability distribution of the total demand demand integrated demand power in the set period, for example, the method described above can be used.

燃料価格算出手段117は、燃料価格情報データベース120eに記憶されている過去の複数月の各燃料の実績月間燃料価格に基づいて、設定期間内の各月の各燃料の燃料価格の確率分布を算出可能である。
実績月間燃料価格に基づいて、設定期間内の各月の各燃料の燃料価格の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
The fuel price calculation unit 117 calculates the probability distribution of the fuel price of each fuel in each month within the set period based on the past monthly fuel prices of each fuel stored in the fuel price information database 120e. Is possible.
As a method of calculating the probability distribution of the fuel price of each fuel in each month within the set period based on the actual monthly fuel price, for example, the method described above can be used.

発電費用算出手段118は、統合需要電力算出手段116で算出された設定期間における想定需要時統合需要電力の確率分布と、発電設備情報データベースに記憶されている発電設備情報(起動/停止順序、複数の発電設備それぞれの最大発電可能電力、複数の発電設備それぞれで使用する燃料、複数の発電設備それぞれの単位電力量燃料消費量)、燃料価格算出手段117で算出された設定期間内の各月の各燃料の月間燃料価格の確率分布に基づいて、設定期間に発電装置から想定需要電力量を供給するのに要する発電装置の想定需要時発電費用の確率分布を算出する。
また、発電費用算出手段118は、統合需要電力算出手段116で算出された設定期間における合計想定需要時統合需要電力の確率分布と、発電設備情報データベースに記憶されている発電設備情報と、燃料価格算出手段117で算出された設定期間内の各月の各燃料の月間燃料価格の確率分布に基づいて、設定期間に発電装置から合計想定需要電力量を供給するのに要する発電装置の合計想定需要時発電費用の確率分布を算出する。
想定需要時発電費用の確率分布、合計想定需要時発電費用の確率分布を算出する方法としては、例えば、前述した方法を用いることができる。
さらに、発電費用算出手段118は、算出した設定期間における発電装置の想定需要時発電費用の確率分布と、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電装置の発電費用を算出する。
発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の想定需要時発電費用の最大値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の合計想定需要時発電費用の最大値を算出する。そして、設定期間における発電装置の合計想定需要時発電費用の最大値から、設定期間における発電装置の想定需要時発電費用の最大値を減算して減算値を算出する。
また、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の想定需要時発電費用の最小値を算出するとともに、設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の合計想定需要時発電費用の最小値を算出する。そして、設定期間における発電装置の想定需要時発電費用の最小値から、設定期間における発電装置の合計想定需要時発電費用の最小値を減算して減算値を算出する。
設定期間における発電装置の想定需要時発電費用の確率分布、合計想定需要時発電費用の確率分布に基づいて、設定確率で発生する、設定期間における発電装置の想定需要時発電費用の最大値あるいは最小値、設定期間における発電装置の合計想定需要時発電費用の最大値あるいは最小値を算出する方法としては、例えば、前述した方法を用いることができる。
The power generation cost calculation means 118 includes the probability distribution of the assumed demand integrated demand power during the set period calculated by the integrated demand power calculation means 116, and the power generation facility information (start / stop order, multiple items) stored in the power generation facility information database. Power generation capacity of each of the power generation facilities, fuel used by each of the plurality of power generation facilities, unit power consumption of each of the plurality of power generation facilities), and each month within the set period calculated by the fuel price calculation means 117 Based on the probability distribution of the monthly fuel price of each fuel, the probability distribution of the power generation cost at the time of assumed demand of the power generator required to supply the assumed demand power amount from the power generator during the set period is calculated.
In addition, the power generation cost calculation unit 118 includes the probability distribution of the total estimated demand integrated demand power in the set period calculated by the integrated demand power calculation unit 116, the power generation facility information stored in the power generation facility information database, and the fuel price. Based on the probability distribution of the monthly fuel price of each fuel in each month within the set period calculated by the calculation means 117, the total estimated demand of the power generator required to supply the total estimated demand power amount from the power generator during the set period Calculate the probability distribution of hourly power generation costs.
As a method for calculating the probability distribution of the power generation cost at the time of assumed demand and the probability distribution of the power generation cost at the time of the total assumed demand, for example, the method described above can be used.
Furthermore, the power generation cost calculation means 118 supplies power from the power generation device based on the probability distribution of the power generation cost at the time of assumed demand of the power generation device in the calculated setting period and the probability distribution of the power generation cost at the time of the total power generation demand of the power generation device in the setting period. The power generation cost of the power generator is calculated when increasing or decreasing the set power amount from the assumed demand power amount during the set period.
When increasing the set amount of electric power supplied from the power generation device from the assumed demand power amount during the set period, the setting is generated with the set probability based on the probability distribution of the power generation cost at the time of the assumed demand of the power set during the set period. Calculate the maximum value of power generation costs at the time of assumed demand of the power generation equipment during the period, and generate totals of power generation equipment at the set time periods that occur with the set probability based on the probability distribution of the total power generation cost at the time of assumed power generation equipment during the set time period Calculate the maximum value of power generation cost at the time of assumed demand. Then, a subtraction value is calculated by subtracting the maximum value of the power generation cost at the time of the assumed demand of the power generation device in the setting period from the maximum value of the power generation cost at the time of the total power generation demand of the power generation device in the setting period.
In addition, when the amount of power supplied from the power generation device is reduced from the assumed demand power amount during the set period, it is generated with the set probability based on the probability distribution of the power generation cost during the assumed demand of the power generator during the set period. And generating the minimum value of the power generation cost at the time of the assumed demand of the power generation device during the set period, and generating the power generation device at the set time based on the probability distribution of the power generation cost at the time of the total power generation demand during the set time period. Calculate the minimum value of power generation cost during the total estimated demand. Then, the subtracted value is calculated by subtracting the minimum value of the total estimated demand power generation cost of the power generation device in the setting period from the minimum value of the power generation cost at the time of assumed power generation of the power generation device.
The maximum or minimum value of the power generation cost at the time of estimated power generation during the set period, which is generated with the set probability based on the probability distribution of the power generation cost at the time of expected power generation during the set period and the probability distribution of the power generation cost at the total estimated demand. For example, the method described above can be used as a method for calculating the maximum value or the minimum value of the power generation cost at the total assumed demand of the power generation device during the value and setting period.

リスク指標算出手段119は、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、発電費用算出手段で算出された設定期間における発電装置の合計想定需要時発電費用の最大値から、発電費用算出手段で算出された設定期間における発電装置の想定需要時発電費用の最大値を減算した減算値から、入力装置130から入力された設定金額を減算し、減算値をリスク指標として表示装置140や印刷装置150等の出力装置に出力する。
一方、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、発電費用算出手段で算出された設定期間における発電装置の想定需要時発電費用の最小値から発電費用算出手段で算出された設定期間における発電装置の合計想定需要時発電費用の最小値を減算した減算値を、入力装置130から入力された設定金額から減算し、減算値をリスク指標として表示装置140や印刷装置150等の出力装置に出力する。
なお、リスク指標算出手段119は、発電費用算出手段118で算出された設定期間における発電装置の合計想定需要時発電費用の最大値から設定期間における発電装置の想定需要時発電費用の最大値を減算した減算値、あるいは、設定期間における発電装置の想定需要時発電費用の最小値から設定期間における発電装置の合計想定需要時発電費用の最小値を減算した減算値を出力装置に出力してもよい。
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the risk index calculation means 119 is for the total estimated demand of the power generation device during the set period calculated by the power generation cost calculation means. Subtract the set amount input from the input device 130 from the subtracted value obtained by subtracting the maximum value of the power generation cost at the time of assumed power generation of the power generation device in the set period calculated by the power generation cost calculation means from the maximum value of the power generation cost, and subtract The value is output as a risk index to an output device such as the display device 140 or the printing device 150.
On the other hand, when the amount of power supplied from the power generation device is reduced from the assumed demand power amount during the set period, the minimum value of the power generation cost at the time of the assumed demand of the power generator during the set period calculated by the power generation cost calculation means The subtracted value obtained by subtracting the minimum value of the power generation cost at the total estimated demand of the power generator during the set period calculated by the power generation cost calculating means is subtracted from the set amount input from the input device 130, and the subtracted value is displayed as a risk index. The data is output to an output device such as the device 140 or the printing device 150.
The risk index calculation unit 119 subtracts the maximum value of the power generation cost at the time of the assumed demand of the power generation device in the setting period from the maximum value of the power generation cost at the total assumed demand of the power generation device in the setting period calculated by the power generation cost calculation unit 118. Or the subtracted value obtained by subtracting the minimum value of the power generation cost at the total estimated demand of the power generation device during the set period from the minimum value of the power generation cost during the assumed demand of the power generation device during the set period may be output to the output device. .

本実施の形態では、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量増加させる場合には、設定期間における発電装置の合計想定需要時発電費用の最大値から設定期間における発電装置の想定需要時発電費用の最大値を減算した減算値、あるいは、この減算値から入力装置から入力された設定金額を減算した減算値を出力装置に出力する。また、発電装置から供給する電力量を設定期間に想定需要電力量から設定電力量減少させる場合には、設定期間における発電装置の想定需要時発電費用の最小値から設定期間における発電装置の合計想定需要時発電費用の最小値を減算した減算値、あるいは、この減算値を入力装置から入力された設定金額から減算した減算値を出力装置に出力する。これにより、電力事業者は、売電取引や買電取引に伴う収益性を容易に把握することができる。
また、設定期間における定期点検計画の変更、計画外の停止、出水変動のうちの少なくとも一つを考慮した発電可能電力量変動量の確率分布と、設定期間における想定需要電力量の確率分布あるいは合計想定需要電力量の確率分布を統合して統合需要電力の確率分布を算出しているため、発電装置の単位電力量発電費用を容易に算出することができる。
本実施の形態においても、第1の実施の形態と同様に、発電費用の変動要因の少なくとも一つを把握するように構成することができる。
また、各実施の形態ではリスク指標を出力したが、設定期間における発電装置の発電費用(単位電力量発電費用の最大値や最小値、想定需要時発電費用及び合計想定需要時発電費用の最大値や最小値)を出力するように構成することもできる。
In the present embodiment, in the case where the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the maximum power generation cost at the time of the set power generation during the set period is determined from the maximum value during the set period. A subtraction value obtained by subtracting the maximum value of power generation cost at the time of assumed demand of the power generation device, or a subtraction value obtained by subtracting the set amount input from the input device from this subtraction value is output to the output device. In addition, when the amount of power supplied from the power generation device is reduced from the assumed demand power amount during the setting period, the total assumption of the power generation device during the setting period from the minimum value of the power generation cost at the time of the assumed power generation during the setting period. A subtracted value obtained by subtracting the minimum value of power generation cost during demand, or a subtracted value obtained by subtracting the subtracted value from the set amount input from the input device is output to the output device. Thereby, the electric power company can grasp | ascertain easily the profitability accompanying a power sale transaction or a power purchase transaction.
In addition, the probability distribution of the amount of power that can be generated in consideration of at least one of changes to the periodic inspection plan, unscheduled outages, and fluctuations in water discharge during the set period, and the probability distribution or total of the assumed demand power amount during the set period Since the probability distribution of the integrated demand power is calculated by integrating the probability distribution of the assumed demand power amount, the unit power amount generation cost of the power generation apparatus can be easily calculated.
In the present embodiment as well, as in the first embodiment, it can be configured to grasp at least one of the fluctuation factors of the power generation cost.
In each embodiment, the risk index is output, but the power generation cost of the power generation equipment during the set period (maximum value or minimum value of unit power generation power generation cost, estimated power generation cost at demand, and maximum value of total estimated power generation cost at demand) Or a minimum value).

以上の実施の形態では、発電設備の発電費用を、限界発電設備の単位電力量発電費用、すなわち、可変費用のみを基に算出している。しかしながら、発電装置の発電費用は、可変費用だけでなく、発電設備の建設費用や保守・管理費用等の固定費用も考慮して算出するのが一般的である。したがって、電力取引に伴うリスクをより正確に把握するには、固定費用を考慮することができるのが好ましい。
例えば、[設定期間における発電装置の単位電力量発電費用の最大値×売電電力量]と[売電電力量に対する売電金額]との差をリスク指標として算出する際に、一方の金額に発電装置の固定費用(発電設備の固定費用)に相当する金額を反映させる方法を用いる。あるいは、[設定期間における発電装置の単位電力量発電費用の最大値]と[単位電力量に対する売電金額]との差をリスク指標として算出する際に、一方の金額に発電装置の固定費用(発電設備の固定費用)に相当する金額を反映させる方法を用いる。発電装置の固定費用を反映させる方法としては、例えば、前述した方法で算出した設定期間における発電装置の単位電力量発電費用の最大値に、発電装置の固定費用に相当する金額を加算した金額を設定期間における発電装置の単位電力量発電費用の最大値としてリスク指標をする方法、入力手段から入力された、売電取引に係る売電金額(売電電力量に対する売電金額あるいは単位電力量に対する売電金額)から発電装置の固定費用に相当する金額を減算した金額を売電金額として用いてリスク指標を算出する方法、売電取引に係る売電金額(売電電力量に対する売電金額あるいは単位電力量に対する売電金額)から発電装置の固定費用に相当する金額を減算した金額を売電金額として入力手段から入力し、入力された売電金額を用いてリスク指標を算出する方法を用いることができる。
あるいは、[設定期間における合計想定需要時発電費用の最大値−設定期間における想定需要時発電費用の最大値]と[売電電力量に対する売電金額]との差をリスク指標として算出する際に、一方の金額に発電装置の固定費用(発電設備の固定費用)に相当する金額を反映させる方法を用いる。発電装置の固定費用を反映させる方法としては、例えば、[設定期間における合計想定需要時発電費用の最大値]及び[設定期間における想定需要時発電費用の最大値]に、発電装置の固定費用に相当する金額を加算した金額を用いてリスク指標を算出する方法、入力手段から入力された、売電取引に係る売電金額から発電装置の固定費用に相当する金額を減算した金額を売電金額として用いてリスク指標を算出する方法、売電取引に係る売電金額から発電装置の固定費用に相当する金額を減算した金額を減算した金額を売電金額として入力手段から入力し、入力された売電金額を用いてリスク指標を算出する方法を用いることができる。
発電装置の固定費用は、各発電設備の建設費用、保守・点検費用、最大発電可能電力、耐用年数等に基づいて算出される。
In the above embodiment, the power generation cost of the power generation facility is calculated based only on the unit power generation cost of the marginal power generation facility, that is, the variable cost. However, the power generation cost of the power generation apparatus is generally calculated in consideration of not only variable costs but also fixed costs such as construction costs of power generation facilities and maintenance / management costs. Therefore, it is preferable that fixed costs can be taken into account in order to grasp the risks associated with power transactions more accurately.
For example, when calculating the difference between [maximum value of unit power generation power generation cost of power generation device in set period × power sale power amount] and [power sale amount with respect to power sale amount] as a risk index, A method that reflects the amount equivalent to the fixed cost (fixed cost of power generation equipment) is used. Alternatively, when calculating the difference between [the maximum value of the unit power generation cost of the power generation device in the set period] and [the amount of power sold for the unit power amount] as a risk index, the fixed cost ( A method that reflects the amount equivalent to the fixed cost of power generation equipment is used. As a method of reflecting the fixed cost of the power generation device, for example, an amount obtained by adding an amount corresponding to the fixed cost of the power generation device to the maximum value of the unit power generation cost of the power generation device in the setting period calculated by the method described above. A method of calculating a risk index as the maximum value of unit power generation cost of a power generation device in a set period, the amount of power sold related to a power sale transaction input from the input means (the amount of power sold or the amount sold A method of calculating the risk index using the amount obtained by subtracting the amount corresponding to the fixed cost of the power generation device as the amount of electricity sold, the amount of electricity sold for the power sale transaction (the amount of electricity sold or unit power for the amount of electricity sold) Amount of power sold against the amount) is subtracted from the amount corresponding to the fixed cost of the power generator from the input means as the amount of power sold. It is possible to use a method of calculating the click metrics.
Alternatively, when calculating the difference between [the maximum value of the total estimated power generation cost during the set period−the maximum value of the estimated power generation cost during the set period] and [the amount of power sold relative to the amount of power sold] as a risk index, A method of reflecting the amount corresponding to the fixed cost of the power generation apparatus (fixed cost of the power generation equipment) in one amount is used. As a method of reflecting the fixed cost of the power generation device, for example, [maximum value of power generation cost at the total estimated demand in the set period] and [maximum value of power generation cost at the expected demand in the set period] A method for calculating the risk index using the amount obtained by adding the corresponding amount, and the amount of power sold by subtracting the amount corresponding to the fixed cost of the power generator from the amount of power sold for power sale transactions, which is input from the input means The method used to calculate the risk index, the amount obtained by subtracting the amount corresponding to the fixed cost of the power generator from the amount of power sold for power sale transactions, and entered from the input means as the amount of power sold A method of calculating a risk index using the amount of power sold can be used.
The fixed cost of the power generation equipment is calculated based on the construction cost, maintenance / inspection cost of each power generation facility, the maximum power that can be generated, the service life, etc.

本発明は、実施の形態で説明した構成に限定されず、種々の変更、追加、削除が可能である。
出力手段に出力するリスク指標としては、適宜の指標を用いることができる。例えば、第1の実施の形態では、売電時には、設定期間における発電装置の単位電力量発電費用の最大値を、買電時には、設定期間における発電装置の単位電力量発電費用の最小値をリスク指標として用いることができる。また、売電時のリスク指標である、設定期間における発電装置の単位電力量発電費用の最大値と設定期間における設定電力量(売電電力量)との乗算結果と、入力手段から入力された設定金額(単位電力量に対する売電金額が入力される場合には、[単位電力量に対する売電金額×売電電力量])との差を算出する方法としては、適宜の方法を用いることができる。また、買電時のリスク指標である、設定期間における発電装置の単位電力量発電費用の最小値と設定期間における設定電力量(買電電力量)との乗算結果と、入力手段から入力された設定金額(単位電力量に対する買電金額が入力される場合には、[単位電力量に対する買電金額×買電電力量])との差を算出する方法としては、適宜の方法を用いることができる。
処理装置の構成、各手段の構成、記憶装置の構成等は、実施の形態で説明した構成に限定されない。
また、各手段の処理方法(処理内容や処理手順)は、実施の形態で説明した処理方法に限定されない。
また、本発明は、種々の数の、種々の種類の発電設備によって構成される発電装置の発電費用を算出するために用いることができる。
The present invention is not limited to the configuration described in the embodiment, and various changes, additions, and deletions are possible.
As the risk index output to the output means, an appropriate index can be used. For example, in the first embodiment, when selling power, the maximum value of the unit power generation cost of the power generation device in the set period is set as the risk, and at the time of power purchase, the minimum value of the unit power generation cost of the power generation unit in the set period is set as the risk. It can be used as an indicator. In addition, the result of multiplying the maximum value of the unit power generation power generation cost of the power generation device in the set period, which is a risk index at the time of power sale, and the set power amount (power sold power amount) in the set period, and the setting input from the input means An appropriate method can be used as a method of calculating the difference from the amount (when the amount of power sold for the unit power amount is input, [the amount of power sold for the unit power amount × the amount of power sold]). In addition, the result of multiplying the minimum value of the unit power generation cost of the power generation device in the set period, which is a risk index at the time of power purchase, and the set power amount (power purchase amount) in the set period, and the setting input from the input means An appropriate method can be used as a method of calculating the difference from the amount of money (when the amount of power purchased per unit power amount is input [the amount of power purchased per unit power amount × the amount of power purchased)].
The configuration of the processing device, the configuration of each unit, the configuration of the storage device, and the like are not limited to the configurations described in the embodiments.
Further, the processing method (processing content and processing procedure) of each means is not limited to the processing method described in the embodiment.
Further, the present invention can be used to calculate the power generation cost of a power generation apparatus constituted by various numbers of various types of power generation equipment.

本発明の第1の実施の形態の概略構成図である。It is a schematic block diagram of the 1st Embodiment of this invention. 需要電力量情報データベースの一例を示す図である。It is a figure which shows an example of a demand electric energy information database. 定期点検情報データベースの一例を示す図である。It is a figure which shows an example of a regular inspection information database. 出水情報データベースの一例を示す図である。It is a figure which shows an example of a flooding information database. 燃料価格情報データベースの一例を示す図である。It is a figure which shows an example of a fuel price information database. リスク指標算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of a risk parameter | index calculation process. 需要電力量算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of a demand electric energy calculation process. 実績月間需要電力量変動率を説明する図である。It is a figure explaining the actual monthly demand electric energy fluctuation rate. 実績時間需要電量の確率分布を説明する図である。It is a figure explaining the probability distribution of a performance time demand electric energy. 時間需要電力量の標準偏差を説明する図である。It is a figure explaining the standard deviation of time demand electric energy. 定期点検計画変更を考慮した発電可能電力変動量算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of the electric power generation fluctuation amount calculation process which considered the regular inspection plan change. 定期点検計画変更を考慮した実績発電可能電力変動率を説明する図である。It is a figure explaining the actual power generation possible electric power fluctuation rate which considered the periodic inspection plan change. 計画外停止を考慮した発電可能電力変動量算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of the electric power generation variation | change_quantity calculation process in consideration of the unplanned stop. 出水変動を考慮した発電可能電力変動量算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of the electric power generation variation | change_quantity calculation process which considered the discharge | flow_water fluctuation | variation. 実績月間出水率を説明する図である。It is a figure explaining the actual monthly water discharge rate. 燃料価格算出処理の一例を示すフローチャートである。It is a flowchart which shows an example of a fuel price calculation process. 実績月間燃料価格変動率を説明する図である。It is a figure explaining a performance monthly fuel price fluctuation rate. 本発明の第2の実施の形態の概略構成図である。It is a schematic block diagram of the 2nd Embodiment of this invention. 売電取引時及び買電取引時のリスクを説明する図である。It is a figure explaining the risk at the time of a power sale transaction and a power purchase transaction. 供給曲線と限界費用を説明する図である。It is a figure explaining a supply curve and marginal cost. 需要電力量の変動と限界費用の変動の関係を説明する図である。It is a figure explaining the relationship between the fluctuation | variation of demand electric energy, and the fluctuation | variation of marginal cost. 発電可能電力の変動と限界費用の変動の関係を説明する図である。It is a figure explaining the relationship between the fluctuation | variation of the electric power which can be generated, and the fluctuation | variation of marginal cost. 燃料価格の変動と限界費用の変動の関係を説明する図である。It is a figure explaining the relationship between the fluctuation | variation of a fuel price, and the fluctuation | variation of marginal cost. 変動要因(需要電力量、発電可能電力、燃料価格)の変動と限界費用の変動の関係を説明する図である。It is a figure explaining the relationship between the fluctuation | variation of a fluctuation factor (demand electric power amount, electric power which can be generated, fuel price), and the fluctuation | variation of marginal cost.

符号の説明Explanation of symbols

10、110 処理装置(CPU)
11、111 管理手段
12、112 需要電力量算出手段
13、113 定期点検計画変更を考慮した発電可能電力変動量算出手段
14、114 計画外停止を考慮した発電可能電力変動量算出手段
15、115 出水変動を考慮した発電可能電力変動量算出手段
16、116 統合需要電力算出手段
17、117 燃料価格算出手段
18、118 発電費用算出手段
18a 限界発電設備判別手段
18b 総限界発電設備単位電力量燃料消費量算出手段
18c 総限界発電設備単位電力量発電費用算出手段
18d 限界費用算出手段
19、119 リスク指標算出手段
20、120 記憶装置
20a、120a 発電設備情報データベース
20b、120b 需要電力量情報データベース
20c、120c 定期点検情報データベース
20d、120d 出水情報データベース
20e、120e 燃料価格情報データベース
30、130 入力装置(入力手段)
40、140 表示装置(出力手段)
50、150 印刷装置(出力手段)
118a 総燃料消費量算出手段
10, 110 Processing unit (CPU)
11, 111 Management means 12, 112 Demand power amount calculation means 13, 113 Power generation possible power fluctuation amount calculation means 14, 114 taking into account periodic inspection plan change Power generation possible power fluctuation amount calculation means 15, 115 taking into account unplanned stoppage Electric power generation fluctuation amount calculation means 16, 116 taking into account fluctuations Integrated demand power calculation means 17, 117 Fuel price calculation means 18, 118 Power generation cost calculation means 18a Limit power generation facility determination means 18b Total limit power generation facility unit power amount Fuel consumption Calculation means 18c Total limit power generation facility unit power amount power generation cost calculation means 18d Limit cost calculation means 19, 119 Risk index calculation means 20, 120 Storage devices 20a, 120a Power generation facility information databases 20b, 120b Demand power amount information databases 20c, 120c Regular Inspection information database 20d, 120d Flood information Database 20e, 120e fuel price information database 30, 130 input device (input means)
40, 140 Display device (output means)
50, 150 Printing device (output means)
118a Total fuel consumption calculation means

Claims (11)

複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
需要電力量算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段は、発電設備情報データベースと、需要電力量情報データベースと、燃料価格情報データベースを有し、
前記発電設備情報データベースには、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量を含む発電設備情報が記憶されており、
前記需要電力量情報データベースには、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報が記憶されており、
前記燃料価格情報データベースには、前記複数の発電設備それぞれで使用する燃料の燃料価格を示す燃料価格が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記発電設備情報データベースに記憶される発電設備情報と、前記需要電力量情報データベースに記憶される需要電力量情報と、前記燃料価格情報データベースに記憶される燃料価格情報を入力可能であり、
前記需要電力量算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記需要電力量情報データベースに記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における合計想定需要電力量の確率分布を算出し、
前記発電費用算出手段は、
前記需要電力量算出手段で算出された前記設定期間における合計想定需要電力量の確率分布と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電費用を示す発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
A power demand calculation means, a power generation cost calculation means, a storage means, and an input means,
The storage means includes a power generation facility information database, a demand power amount information database, and a fuel price information database,
The power generation facility information database includes a start / stop sequence indicating an order of starting and stopping each of the plurality of power generation facilities, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generation facilities. The power generation facility information including the fuel used by each of the power generation facilities and the unit power consumption indicating the fuel consumption required to increase the amount of power supplied by each of the plurality of power generation facilities is stored. Has been
The demand power amount information database stores demand power amount information including past actual estimated demand power amount and actual demand power amount,
The fuel price information database stores a fuel price indicating a fuel price of fuel used in each of the plurality of power generation facilities,
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. Input the assumed power demand amount, power generation facility information stored in the power generation facility information database, demand power amount information stored in the demand power amount information database, and fuel price information stored in the fuel price information database Is possible,
The demand power amount calculating means is based on the total estimated demand power amount in the set period input from the input means, the actual expected demand power amount and the actual demand power amount stored in the demand power amount information database. , Calculate the probability distribution of the total estimated demand power during the set period,
The power generation cost calculating means is:
Probability distribution of the total estimated demand power amount in the set period calculated by the demand power amount calculation means, the start / stop order stored in the power generation facility information database, and the maximum power that can be generated by each of the plurality of power generation facilities , Based on the fuel used in each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the fuel price of each fuel stored in the fuel price information database, in the set period , Calculate the probability distribution of the unit power generation cost of the power generation device indicating the power generation cost required to increase the unit power amount of power supplied from the power generation device,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
請求項1に記載の発電装置の発電費用算出装置であって、
前記需要電力量情報データベースには、過去の複数日それぞれの時間毎の実績想定時間需要電力量及び実績時間需要電力量と、前記過去の複数日それぞれの曜日区分及び月区分を含む需要電力量情報が記憶されており、
前記入力手段は、前記設定期間内の各月の各日の各時間における想定時間需要電力量及び前記設定期間内の各月の各日の各時間に発電装置から供給する電力量を想定時間需要電力量から増加あるいは減少させる設定時間電力量を含む前記設定期間内の各月の各日の各時間の合計想定時間需要電力量を入力可能であり、
前記需要電力量算出手段は、前記入力手段から入力された設定期間内の各月の各日の曜日区分及び月区分と、前記入力手段から入力された前記設定期間内の各月の各日の各時間の合計想定時間需要電力量と、前記需要電力量情報データベースに記憶されている各日の各時間の実績想定時間需要電力量及び実績時間需要電力量、各日の曜日区分及び月区分に基づいて、前記設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布を算出し、
前記発電費用算出手段は、前記需要電力量算出手段で算出された前記設定期間内の各月の各日の各時間の合計想定時間需要電力量の確率分布と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格情報データベースに記憶されている燃料価格に基づいて、前記設定期間における発電装置の単位電力量発電費用の確率分布を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device according to claim 1,
The demand power amount information database includes demand estimated amount demand power amount and actual time demand power amount for each time in the past plural days, and demand power amount information including day and month divisions in each of the past plural days. Is remembered,
The input means includes an estimated time demand power amount at each hour of each day of each month within the set period and an amount of power supplied from the power generator at each time of each day of the month within the set period. It is possible to input the total estimated time demand power amount of each time of each day of each month within the set period including the set time power amount that is increased or decreased from the power amount,
The demand power amount calculation means includes the day and month classification of each day of each month within the set period input from the input means, and each day of each month within the set period input from the input means. The total estimated time demand power amount of each time and the actual expected time demand power amount and actual time demand power amount of each time stored in the demand power amount information database for each day of the week and month Based on the probability distribution of the total estimated time demand power amount of each hour of each day of each month within the set period,
The power generation cost calculating means is stored in the power generation facility information database and the probability distribution of the total estimated time demand power amount for each time of each day of each month within the set period calculated by the demand power amount calculating means. Starting / stopping order, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, unit power consumption of each of the plurality of power generation facilities, and the fuel price information database A probability distribution of unit power generation cost of the power generation device in the set period based on the fuel price stored in
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
定期点検計画変更を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段は、発電設備情報データベースと、定期点検情報データベースと、燃料価格情報データベースを有し、
前記発電設備情報データベースには、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量を含む発電設備情報が記憶されており、
前記定期点検情報データベースには、過去の実績定期点検計画及び実績定期点検を含む定期点検情報が記憶されており、
前記燃料価格情報データベースには、前記複数の発電設備それぞれで使用する燃料の価格を示す燃料価格が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記発電設備情報データベースに記憶される発電設備情報と、前記定期点検情報データベースに記憶される定期点検情報と、前記燃料価格情報データベースに記憶される燃料価格情報と、前記設定期間における定期点検計画を入力可能であり、
前記定期点検計画変更を考慮した発電可能電力変動量算出手段は、前記入力手段から入力された前記設定期間における定期点検計画と、前記定期点検情報データベースに記憶されている実績定期点検計画及び実績定期点検と、前記発電設備情報データベースに記憶されている前記複数の発電設備それぞれの最大発電可能電力に基づいて、前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記統合需要電力算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を統合し、前記設定期間における統合需要電力の確率分布を算出し、
前記発電費用算出手段は、前記統合需要電力算出手段で算出された前記設定期間における統合需要電力の確率分布と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
A power generation variation calculation means that considers the periodic inspection plan change, an integrated demand power calculation means, a power generation cost calculation means, a storage means, and an input means,
The storage means includes a power generation facility information database, a periodic inspection information database, and a fuel price information database,
The power generation facility information database includes a start / stop sequence indicating an order of starting and stopping each of the plurality of power generation facilities, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generation facilities. The power generation facility information including the fuel used by each of the power generation facilities and the unit power consumption indicating the fuel consumption required to increase the amount of power supplied by each of the plurality of power generation facilities is stored. Has been
The periodic inspection information database stores periodic inspection information including past actual periodic inspection plans and actual periodic inspections,
The fuel price information database stores a fuel price indicating a price of fuel used in each of the plurality of power generation facilities,
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. Assumed power demand, power generation facility information stored in the power generation facility information database, periodic inspection information stored in the periodic inspection information database, fuel price information stored in the fuel price information database, and the setting Periodic inspection plan for the period can be entered,
The power generation fluctuation amount calculating means considering the periodic inspection plan change includes a periodic inspection plan in the set period inputted from the input means, an actual periodic inspection plan and an actual periodicity stored in the periodic inspection information database. Probability distribution of the power generation fluctuation amount of the power generation device considering the inspection and the periodic inspection plan change in the set period based on the maximum power generation capability of each of the plurality of power generation facilities stored in the power generation facility information database To calculate
The integrated demand power calculation means includes a total estimated demand power amount in the set period input from the input means and a periodicity in the set period calculated by the power generation fluctuation amount calculating means considering the periodic inspection plan change. Integrating the probability distribution of the power generation possible power fluctuation amount of the power generator considering the inspection plan change, calculating the probability distribution of the integrated demand power in the set period,
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, a start / stop order stored in the power generation equipment information database, and each of the plurality of power generation equipments Based on the maximum power that can be generated, the fuel used by each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the fuel price of each fuel stored in the fuel price information database Calculating the probability distribution of the unit power generation cost of the power generation device required to increase the unit power amount of the power supplied from the power generation device in the set period,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
計画外停止を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段は、発電設備情報データベースと、燃料価格情報データベースを有し、
前記発電設備情報データベースには、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量と、前記複数の発電設備それぞれの故障率を含む発電設備情報が記憶されており、
前記燃料価格情報データベースには、前記複数の発電設備それぞれで使用する燃料の価格を示す燃料価格が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記発電設備情報データベースに記憶される発電設備情報と、前記燃料価格情報データベースに記憶される燃料価格情報を入力可能であり、
前記計画外停止を考慮した発電可能電力変動量算出手段は、前記発電設備情報データベースに記憶されている前記複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記統合需要電力算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記計画外停止を考慮した発電可能電力変動量算出手段で算出された前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を統合し、前記設定期間における統合需要電力の確率分布を算出し、
前記発電費用算出手段は、前記統合需要電力算出手段で算出された前記設定期間における統合需要電力の確率分布と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格情報データベースに記憶されている各燃料の燃料価格に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
A power generation fluctuation calculation unit that takes into account unplanned outages, an integrated demand power calculation unit, a power generation cost calculation unit, a storage unit, and an input unit,
The storage means includes a power generation facility information database and a fuel price information database,
The power generation facility information database includes a start / stop sequence indicating an order of starting and stopping each of the plurality of power generation facilities, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generation facilities. Fuel used in each of the power generation facilities, unit power consumption indicating the amount of fuel consumed to increase the amount of power supplied by each of the plurality of power generation facilities, and the plurality of power generation facilities Power generation facility information including each failure rate is stored,
The fuel price information database stores a fuel price indicating a price of fuel used in each of the plurality of power generation facilities,
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. It is possible to input an assumed demand power amount, power generation facility information stored in the power generation facility information database, and fuel price information stored in the fuel price information database,
The power generation fluctuation amount calculation means taking into account the unplanned stop is an unplanned stop in a set period based on the failure rate and the maximum power generation possible for each of the plurality of power generation facilities stored in the power generation facility information database. Calculating the probability distribution of the power generation fluctuation amount of the power generator considering the
The integrated demand power calculating means is the unscheduled power consumption calculated in the set period calculated by the total estimated demand power input in the set period input from the input means and the unscheduled power generation fluctuation calculating means in consideration of the unplanned stop. Integrating the probability distribution of the power generation possible power fluctuation amount of the power generator considering the stop, calculating the probability distribution of the integrated demand power in the set period,
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, a start / stop order stored in the power generation equipment information database, and each of the plurality of power generation equipments Based on the maximum power that can be generated, the fuel used by each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the fuel price of each fuel stored in the fuel price information database Calculating the probability distribution of the unit power generation cost of the power generation device required to increase the unit power amount of the power supplied from the power generation device in the set period,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
少なくとも一つの水力発電設備を含む複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
出水変動を考慮した発電可能電力変動量算出手段と、統合需要電力算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段は、発電設備情報データベースと、出水情報データベースを有し、
前記発電設備情報データベースには、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量を含む発電設備情報が記憶されており、
前記出水情報データベースには、過去の実績水力発電電力量を含む出水情報が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記出水情報データベースに記憶される出水情報を入力可能であり、
前記出水変動を考慮した発電可能電力変動量算出手段は、前記出水情報データベースに記憶されている実績水力発電電力量と、前記発電設備情報データベースに記憶されている水力発電設備の最大発電可能電力に基づいて、前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記統合需要電力算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記出水変動を考慮した発電可能電力変動量算出手段で算出された前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を統合し、前記設定期間における統合需要電力の確率分布を算出し、
前記発電費用算出手段は、前記統合需要電力算出手段で算出された前記設定期間における統合需要電力の確率分布と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格情報データベースに記憶されている燃料価格に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
The power generation cost of the power generation device that calculates the power generation cost when the power amount supplied from the power generation device having a plurality of power generation facilities including at least one hydroelectric power generation facility is increased or decreased from the assumed demand power amount during the set period A calculation device,
It includes a power generation fluctuation amount calculation means taking account of fluctuations in the water discharge, an integrated demand power calculation means, a power generation cost calculation means, a storage means, and an input means,
The storage means includes a power generation facility information database and a water discharge information database,
The power generation facility information database includes a start / stop sequence indicating an order of starting and stopping each of the plurality of power generation facilities, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generation facilities. The power generation facility information including the fuel used by each of the power generation facilities and the unit power consumption indicating the fuel consumption required to increase the amount of power supplied by each of the plurality of power generation facilities is stored. Has been
In the flood information database, flood information including past actual hydroelectric power generation amount is stored,
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. It is possible to input the estimated demand electricity amount and the flood information stored in the flood information database,
The power generation power fluctuation amount calculation means taking into account the water discharge fluctuation is the actual hydropower generation amount stored in the water discharge information database and the maximum power generation possible power of the hydroelectric power generation facility stored in the power generation facility information database. Based on the probability distribution of the power generation fluctuation amount of the power generation device in consideration of the water discharge fluctuation in the set period,
The integrated demand power calculating means calculates the total expected demand power amount in the set period input from the input means and the water discharge fluctuation in the set period calculated by the power generation available power fluctuation amount calculating means in consideration of the water discharge fluctuation. Integrating the probability distribution of the power generation fluctuation amount of the power generation device considered, and calculating the probability distribution of the integrated demand power in the set period,
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, a start / stop order stored in the power generation equipment information database, and each of the plurality of power generation equipments The setting based on the maximum power that can be generated, the fuel used in each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the fuel price stored in the fuel price information database Calculate the probability distribution of the unit power generation cost of the power generator required to increase the unit power amount of power supplied from the power generator during the period,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段は、発電設備情報データベースと、燃料価格情報データベースを有し、
前記発電設備情報データベースには、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量を含む発電設備情報が記憶されており、
前記燃料価格情報データベースには、前記複数の発電設備それぞれで使用する各燃料の過去の実績燃料価格を含む燃料価格情報が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記発電設備情報データベースに記憶される発電設備情報と、前記燃料価格情報データベースに記憶される燃料価格情報を入力可能であり、
前記燃料価格算出手段は、前記燃料価格情報データベースに記憶されている各燃料の実績燃料価格に基づいて、前記設定期間における各燃料の燃料価格の確率分布を算出可能であり、
前記発電費用算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記発電設備情報データベースに記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する燃料及び単位電力量燃料消費量を算出し、前記算出した前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する燃料及び単位電力量燃料消費量と、前記燃料価格算出手段で算出された前記設定期間における各燃料の燃料価格の確率分布に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
A fuel price calculation means, a power generation cost calculation means, a storage means, and an input means,
The storage means includes a power generation facility information database and a fuel price information database,
The power generation facility information database includes a start / stop sequence indicating an order of starting and stopping each of the plurality of power generation facilities, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generation facilities. The power generation facility information including the fuel used by each of the power generation facilities and the unit power consumption indicating the fuel consumption required to increase the amount of power supplied by each of the plurality of power generation facilities is stored. Has been
The fuel price information database stores fuel price information including past actual fuel prices of each fuel used in each of the plurality of power generation facilities,
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. It is possible to input an assumed demand power amount, power generation facility information stored in the power generation facility information database, and fuel price information stored in the fuel price information database,
The fuel price calculation means can calculate the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the fuel price information database,
The power generation cost calculation means includes a total assumed demand power amount in the set period input from the input means, a start / stop order stored in the power generation equipment information database, and maximum power generation of each of the plurality of power generation equipment Based on the power, the fuel used in each of the plurality of power generation facilities, and the unit power consumption of each of the plurality of power generation facilities, the power amount supplied from the power generation device in the set period is increased by the unit power amount. Fuel and unit power consumption required for the calculation, and fuel and unit power consumption required to increase the amount of power supplied from the power generation device in the calculated setting period Based on the probability distribution of the fuel price of each fuel in the set period calculated by the fuel price calculating means, Calculating a probability distribution of the unit electric energy generation costs of the power plant that requires amount of power is supplied from the device to increase the unit power amount,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段及び出水変動を考慮した発電可能電力変動量算出手段のうちの少なくとも一つと、需要電力量算出手段と、統合需要電力算出手段と、燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段には、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量と、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報と、前記複数の発電設備それぞれで使用する各燃料の過去の実績燃料価格を含む燃料価格情報が記憶されており、
また、前記記憶手段には、前記複数の発電設備それぞれの故障率、過去の実績定期点検計画及び実績定期点検を含む定期点検情報、過去の実績水力発電電力量を含む出水情報の少なくとも一つが記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量及び前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量を含む前記設定期間における合計想定需要電力量と、前記起動/停止順序と、前記複数の発電設備それぞれの最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれの単位電力量燃料消費量と、前記複数の発電設備それぞれで使用する各燃料の燃料価格と、前記複数の発電設備それぞれの故障率と、過去の実績定期点検計画及び実績定期点検と、過去の実績水力発電電力量を入力可能であり、
前記定期点検計画変更を考慮した発電可能電力変動量算出手段は、前記入力手段から入力された前記設定期間における定期点検計画と、前記記憶手段に記憶されている実績定期点検計画、実績定期点検及び前記複数の発電設備それぞれの最大発電可能電力に基づいて、前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記計画外停止を考慮した発電可能電力変動量算出手段は、前記記憶手段に記憶されている前記複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記出水変動を考慮した発電可能電力変動量算出手段と、前記記憶手段に記憶されている水力発電設備の最大発電可能電力と、前記記憶手段に記憶されている実績水力発電電力量に基づいて、前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記需要電力量算出手段は、前記入力手段から入力された前記設定期間における合計想定需要電力量と、前記記憶手段に記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における合計想定需要電力量の確率分布を算出し、
前記統合需要電力算出手段は、前記需要電力量算出手段で算出された前記設定期間における合計想定需要電力量の確率分布と、前記定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、前記計画外停止を考慮した発電可能電力変動量算出手段で算出された前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び前記出水変動を考慮した発電可能電力変動量算出手段で算出された前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、前記設定期間における統合需要電力の確率分布を算出し、
前記燃料価格算出手段は、前記記憶手段に記憶されている各燃料の実績燃料価格に基づいて、前記設定期間における各燃料の燃料価格の確率分布を算出可能であり、
前記発電費用算出手段は、前記統合需要電力算出手段で算出された前記設定期間における統合需要電力の確率分布と、前記記憶手段に記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料及び前記複数の発電設備それぞれの単位電力量燃料消費量と、前記燃料価格算出手段で算出された前記設定期間における各燃料の燃料価格の確率分布に基づいて、前記設定期間における、発電装置から供給している電力量を単位電力量増加させるのに要する発電装置の単位電力量発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最大値を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の単位電力量発電費用の確率分布に基づいて、前記設定期間における発電装置の単位電力量発電費用の最小値を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
Demand power, at least one of power generation fluctuation calculation means taking into account periodic inspection plan changes, power generation fluctuation fluctuation calculation means taking unplanned outages into consideration, and power generation fluctuation fluctuation calculation means taking into account fluctuations in water discharge An amount calculating means, an integrated demand power calculating means, a fuel price calculating means, a power generation cost calculating means, a storage means, and an input means,
The storage means includes a start / stop order indicating an order in which each of the plurality of power generation facilities is started and stopped, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generations. Fuel used in each facility, unit power consumption indicating the amount of fuel consumed to increase the amount of power supplied by each of the plurality of power generation facilities, and past estimated power demand And fuel price information including the past actual fuel price of each fuel used in each of the plurality of power generation facilities is stored,
In addition, the storage means stores at least one of a failure rate of each of the plurality of power generation facilities, periodic inspection information including past actual periodic inspection plans and actual periodic inspections, and water discharge information including past actual hydroelectric power generation amounts. Has been
The input means includes the set period, a total of the set period including the set amount of electric power to be supplied from the power generator in the set period and the set amount of electric power supplied from the power generation device to be increased or decreased from the assumed amount of demand electric power. Assumed demand power, start / stop order, maximum power that can be generated by each of the plurality of power generation facilities, fuel used by each of the plurality of power generation facilities, and unit power consumption of each of the plurality of power generation facilities Amount, fuel price of each fuel used in each of the plurality of power generation facilities, failure rate of each of the plurality of power generation facilities, past actual periodic inspection plan and actual periodic inspection, and past actual hydroelectric power generation amount Can be entered,
The power generation fluctuation amount calculating means considering the periodic inspection plan change includes a periodic inspection plan in the set period inputted from the input means, an actual periodic inspection plan stored in the storage means, an actual periodic inspection, and Based on the maximum power that can be generated by each of the plurality of power generation facilities, to calculate a probability distribution of the power generation fluctuation amount of the power generation device considering the periodic inspection plan change in the set period,
The power generation fluctuation amount calculating means that takes into account the unscheduled stop is configured to perform an unscheduled stop in the set period based on the failure rate and the maximum power that can be generated in each of the plurality of power generation facilities stored in the storage means. Calculate the probability distribution of the power generation fluctuation amount of the power generation device considered,
Based on the power generation power fluctuation amount calculation means taking into account the water discharge fluctuation, the maximum power generation possible power of the hydroelectric power generation facility stored in the storage means, and the actual hydroelectric power generation amount stored in the storage means, Calculate the probability distribution of the power generation possible power fluctuation amount of the power generator considering the water discharge fluctuation in the set period,
The demand power amount calculating means is configured to set the setting based on the total estimated demand power amount in the setting period input from the input means, the actual estimated demand power amount and the actual demand power amount stored in the storage means. Calculate the probability distribution of the total estimated power demand over the period,
The integrated demand power calculation means is calculated by the power generation fluctuation amount calculation means taking into account the probability distribution of the total estimated demand power amount in the set period calculated by the demand power amount calculation means and the periodic inspection plan change. The probability distribution of the power generation power fluctuation amount of the power generator considering the periodic inspection plan change in the setting period, and the unplanned stop in the setting period calculated by the power generation power fluctuation amount calculation means considering the unplanned stop. Probability distribution of the power generation possible power fluctuation amount of the power generation device considered and the probability of the power generation possible power fluctuation amount of the power generation device considering the water discharge fluctuation in the set period calculated by the power generation power fluctuation amount calculation means considering the water discharge fluctuation Integrating at least one of the distributions, calculating a probability distribution of integrated demand power in the set period,
The fuel price calculation means can calculate the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the storage means,
The power generation cost calculation means includes a probability distribution of the integrated demand power in the set period calculated by the integrated demand power calculation means, a start / stop order stored in the storage means, and a maximum of each of the plurality of power generation facilities Electric power that can be generated, fuel used in each of the plurality of power generation facilities, unit power consumption of each of the plurality of power generation facilities, and fuel price probability of each fuel in the set period calculated by the fuel price calculation means Based on the distribution, calculate a probability distribution of the unit power generation cost of the power generation device required to increase the unit power amount of the power supplied from the power generation device in the set period,
When the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation device during the set period. Calculate the maximum unit power generation cost of the device,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the unit power generation cost of the power generation apparatus during the set period. Calculate the minimum unit power generation cost of the device,
A power generation cost calculation device for a power generation device.
請求項1〜7のいずれかに記載の発電装置の発電費用算出装置であって、
前記入力手段は、前記設定期間における設定電力量に対する設定金額を入力可能であり、
更に、リスク指標算出手段と、出力手段を有し、
前記リスク指標算出手段は、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記発電費用算出手段で算出された前記設定期間における発電装置の単位電力量発電費用の最大値と前記入力手段から入力された前記設定期間における設定電力量とを乗算し、乗算結果と前記入力手段から入力された設定金額との差をリスク指標として前記出力手段に出力し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記発電費用算出手段で算出された前記設定期間における発電装置の単位電力量発電費用の最小値と前記入力手段から入力された前記設定期間における設定電力量とを乗算し、前記入力手段から入力された設定金額と乗算結果との差をリスク指標として前記出力手段に出力する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device according to any one of claims 1 to 7,
The input means can input a set amount for a set power amount in the set period,
Furthermore, it has a risk index calculation means and an output means,
The risk index calculation means includes
When increasing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the maximum value of the unit power generation cost of the power generation apparatus during the set period calculated by the power generation cost calculation means and the input Multiplying the set power amount in the set period input from the means, and outputting the difference between the multiplication result and the set amount input from the input means to the output means as a risk index,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the minimum value of the unit power generation cost of the power generation apparatus during the set period calculated by the power generation cost calculation means and the input Multiplying the set power amount in the set period input from the means, and outputting the difference between the set amount input from the input means and the multiplication result to the output means as a risk index,
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
需要電力量算出手段と、発電費用算出手段と、記憶手段と、入力手段を有し、
前記記憶手段には、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量と、前記複数の発電設備それぞれで使用する各燃料の燃料価格を含む燃料価格情報と、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報が記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量と、前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量と、前記起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量と、前記複数の発電設備それぞれで使用する各燃料の燃料価格と、過去の実績想定需要電力量及び実績需要電力量を入力可能であり、
前記需要電力量算出手段は、
前記入力手段から入力された前記設定期間における想定需要電力量と、前記需要電力量情報データベースに記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における想定需要電力量の確率分布を算出し、
また、前記入力手段から入力された前記設定期間における想定需要電力量及び設定電力量と、前記需要電力量情報データベースに記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における想定需要電力量及び設定電力量を含む前記設定期間における合計想定需要電力量の確率分布を算出し、
前記発電費用算出手段は、
前記需要電力量算出手段で算出された前記設定期間における想定需要電力量の確率分布と、前記記憶手段に記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料、前記複数の発電設備それぞれの単位電力量燃料消費量及び各燃料の燃料価格に基づいて、前記設定期間に発電装置から想定需要電力量を供給するのに要する発電装置の想定需要時発電費用の確率分布を算出し、
また、前記需要電力量算出手段で算出された前記設定期間における合計想定需要電力量の確率分布と、前記記憶手段に記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料、前記複数の発電設備それぞれの単位電力量燃料消費量及び各燃料の燃料価格に基づいて、前記設定期間に発電装置から合計想定需要電力量を供給するのに要する発電装置の合計想定需要時発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の想定需要時発電費用の最大値を算出するとともに、前記算出した前記設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の合計想定需要時発電費用の最大値を算出し、さらに、前記算出した前記設定期間における発電装置の想定需要時発電費用の最大値と前記算出した前記設定期間における発電装置の合計想定需要時発電費用の最大値との差を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の想定需要時発電費用の最小値を算出するとともに、前記算出した前記設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の合計想定需要時発電費用の最小値を算出し、さらに、前記算出した前記設定期間における発電装置の想定需要時発電費用の最小値と前記算出した前記設定期間における発電装置の合計想定需要時発電費用の最小値との差を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
A power demand calculation means, a power generation cost calculation means, a storage means, and an input means,
The storage means includes a start / stop order indicating an order in which each of the plurality of power generation facilities is started and stopped, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generations. Fuel used in each facility, unit power consumption fuel consumption indicating fuel consumption required to increase the amount of power supplied by each of the plurality of power generation facilities, and each of the plurality of power generation facilities Fuel price information including the fuel price of each fuel to be used and demand energy information including past actual estimated demand and actual demand power are stored.
The input means includes the setting period, an assumed demand power amount in the setting period, a setting power amount that increases or decreases the amount of power supplied from the power generation device in the setting period, and the start / stop Units are the order, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel that is used in each of the plurality of power generation facilities, and the amount of power that each of the plurality of power generation facilities supplies. Enter the unit power consumption fuel consumption indicating fuel consumption required to increase the power consumption, the fuel price of each fuel used in each of the plurality of power generation facilities, the past actual estimated demand power, and the actual demand power consumption. Is possible,
The demand power amount calculation means includes:
Based on the estimated demand power amount in the set period input from the input means, the actual expected demand power amount and the actual demand power amount stored in the demand power amount information database, the expected demand power amount in the set period Calculate the probability distribution of
Further, the setting based on the estimated demand power amount and the set power amount in the setting period input from the input means, and the actual estimated demand power amount and the actual demand power amount stored in the demand power amount information database. Calculating the probability distribution of the total assumed demand power amount in the set period including the assumed demand power amount and the set power amount in the period,
The power generation cost calculating means is:
The probability distribution of the assumed demand power amount in the set period calculated by the demand power amount calculation means, the start / stop order stored in the storage means, the maximum power that can be generated by each of the plurality of power generation facilities, the plurality The power generation required to supply the estimated demand power from the power generator during the set period based on the fuel used in each of the power generation facilities, the unit power consumption of each of the plurality of power generation facilities, and the fuel price of each fuel Calculate the probability distribution of power generation costs at the time of expected demand for the equipment,
In addition, the probability distribution of the total assumed demand power amount in the set period calculated by the demand power amount calculation unit, the start / stop order stored in the storage unit, and the maximum power that can be generated by each of the plurality of power generation facilities Based on the fuel used in each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, the fuel consumption of each fuel, and the fuel price of each fuel, the total assumed demand energy is supplied from the power generation device during the set period Calculate the probability distribution of the total estimated power generation cost of the power generation equipment required for
In the case where the amount of power supplied from the power generation device is increased from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the power generation cost during the assumed demand of the power generator during the set period. Calculating the maximum value of the power generation cost at the time of assumed demand of the apparatus, and based on the probability distribution of the power generation cost at the time of the total assumed demand of the power generation equipment in the calculated setting period, A maximum value of the cost is calculated, and further, a maximum value of the power generation cost at the time of the assumed demand of the power generation device in the calculated setting period and a maximum value of the power generation cost at the time of the total power generation demand of the power generation device in the calculated setting period. Calculate the difference,
In the case where the amount of power supplied from the power generation device is decreased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the power generation cost during the assumed demand of the power generator during the set period. Calculating a minimum value of power generation cost at the time of assumed demand of the device, and generating power at the time of total assumed power demand of the power generation device during the set period based on the probability distribution of the power generation cost at the time of the total assumed demand of the power generator during the calculated setting period A minimum value of the cost is calculated, and further, a minimum value of the power generation cost at the time of the assumed demand of the power generation apparatus in the calculated setting period and a minimum value of the power generation cost at the time of the total assumed demand of the power generation apparatus in the calculated setting period Calculate the difference,
A power generation cost calculation device for a power generation device.
複数の発電設備を有する発電装置から供給する電力量を、設定期間に想定需要電力量から設定電力量増加あるいは減少させる場合の発電費用を算出する発電装置の発電費用算出装置であって、
定期点検計画変更を考慮した発電可能電力変動量算出手段、計画外停止を考慮した発電可能電力変動量算出手段及び出水変動を考慮した発電可能電力変動量算出手段の少なくとも一つと、需要電力量算出手段と、統合需要電力算出手段と、燃料価格算出手段と、発電費用算出手段と、記憶手段と、入力手段を備え、
前記記憶手段には、前記複数の発電設備それぞれを起動及び停止する順序を示す起動/停止順序と、前記複数の発電設備それぞれが発電可能な最大電力を示す最大発電可能電力と、前記複数の発電設備それぞれで使用する燃料と、前記複数の発電設備それぞれが供給している電力量を単位電力量増加させるのに要する燃料消費量を示す単位電力量燃料消費量と、過去の実績想定需要電力量及び実績需要電力量を含む需要電力量情報と、前記複数の発電設備それぞれで使用する各燃料の過去の実績燃料価格を含む燃料価格情報が記憶されており、
また、前記記憶手段には、前記複数の発電設備それぞれの故障率、過去の実績定期点検計画及び実績定期点検を含む定期点検情報、過去の実績水力発電電力量を含む出水情報の少なくとも一つが記憶されており、
前記入力手段は、前記設定期間と、前記設定期間における想定需要電力量と、前記設定期間に発電装置から供給する電力量を想定需要電力量から増加あるいは減少させる設定電力量と、前記記憶手段に記憶される起動/停止順序、複数の発電設備それぞれの最大発電可能電力と、複数の発電設備それぞれで使用する燃料と、複数の発電設備それぞれの単位電力量燃料消費量と、燃料価格情報と、前記複数の発電設備それぞれの故障率と、過去の実績定期点検計画及び実績定期点検を含む定期点検情報と、過去の実績水力発電電力量を含む出水情報を入力可能であり、
前記定期点検計画変更を考慮した発電可能電力変動量算出手段は、前記入力手段から入力された前記設定期間における定期点検計画と、前記記憶手段に記憶されている実績定期点検計画及び実績定期点検、前記複数の発電設備それぞれの最大発電可能電力に基づいて、前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記計画外停止を考慮した発電可能電力変動量算出手段は、前記記憶手段に記憶されている前記複数の発電設備それぞれの故障率及び最大発電可能電力に基づいて、前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記出水変動を考慮した発電可能電力変動量算出手段は、前記記憶手段に記憶されている実績水力発電電力量及び水力発電設備の最大発電可能電力に基づいて、前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布を算出し、
前記需要電力量算出手段は、
前記入力手段から入力された前記設定期間における想定需要電力量と、前記記憶手段に記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における想定需要電力量の確率分布を算出し、
また、前記入力手段から入力された前記設定期間における想定需要電力量及び設定電力量と、前記記憶手段に記憶されている実績想定需要電力量及び実績需要電力量に基づいて、前記設定期間における想定需要電力量及び設定電力量を含む前記設定期間における合計想定需要電力量の確率分布を算出し、
前記統合需要電力算出手段は、
前記需要電力量算出手段で算出された前記設定期間における想定需要電力量の確率分布と、前記定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、前記計画外停止を考慮した発電可能電力変動量算出手段で算出された前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び前記出水変動を考慮した発電可能電力変動量算出手段で算出された前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、前記設定期間における想定需要時統合需要電力の確率分布を算出し、
また、前記需要電力量算出手段で算出された前記設定期間における合計想定需要電力量の確率分布と、前記定期点検計画変更を考慮した発電可能電力変動量算出手段で算出された前記設定期間における定期点検計画変更を考慮した発電装置の発電可能電力変動量の確率分布、前記計画外停止を考慮した発電可能電力変動量算出手段で算出された前記設定期間における計画外停止を考慮した発電装置の発電可能電力変動量の確率分布及び前記出水変動を考慮した発電可能電力変動量算出手段で算出された前記設定期間における出水変動を考慮した発電装置の発電可能電力変動量の確率分布のうちの少なくとも一つを統合し、前記設定期間における合計想定需要時統合需要電力の確率分布を算出し、
前記燃料価格算出手段は、前記燃料価格情報データベースに記憶されている各燃料の実績燃料価格に基づいて、前記設定期間における各燃料の燃料価格の確率分布を算出可能であり、
前記発電費用算出手段は、
前記統合需要電力算出手段で算出された前記設定期間における想定需要時統合需要電力の確率分布と、前記記憶手段に記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料、前記複数の発電設備それぞれの単位電力量燃料消費量及び前記燃料価格算出手段で算出された前記設定期間における各燃料の燃料価格の確率分布に基づいて、前記設定期間に発電装置から想定需要電力量を供給するのに要する発電装置の想定需要時発電費用の確率分布を算出し、
また、前記統合需要電力算出手段で算出された前記設定期間における合計想定需要時統合需要電力の確率分布と、前記記憶手段に記憶されている起動/停止順序、前記複数の発電設備それぞれの最大発電可能電力、前記複数の発電設備それぞれで使用する燃料、前記複数の発電設備それぞれの単位電力量燃料消費量及び前記燃料価格算出手段で算出された前記設定期間における各燃料の燃料価格の確率分布に基づいて、前記設定期間に発電装置から合計想定需要電力量を供給するのに要する発電装置の合計想定需要時発電費用の確率分布を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記算出した前記設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の想定需要時発電費用の最大値を算出するとともに、前記算出した前記設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の合計想定需要時発電費用の最大値を算出し、前記算出した前記設定期間における発電装置の合計想定需要時発電費用の最大値と前記算出した前記設定期間における発電装置の想定需要時発電費用の最大値との差を算出し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記算出した前記設定期間における発電装置の想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の想定需要時発電費用の最小値を算出するとともに、前記算出した前記設定期間における発電装置の合計想定需要時発電費用の確率分布に基づいて、前記設定期間における発電装置の合計想定需要時発電費用の最小値を算出し、前記算出した前記設定期間における発電装置の想定需要時発電費用の最小値と前記算出した前記設定期間における発電装置の合計想定需要時発電費用の最小値との差を算出する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device that calculates a power generation cost when increasing or decreasing a set power amount from an assumed demand power amount during a set period for a power amount supplied from a power generation device having a plurality of power generation facilities,
Demand power calculation with at least one of power generation power fluctuation calculation means considering the periodic inspection plan change, power generation fluctuation fluctuation calculation means considering unplanned stoppage and power generation fluctuation fluctuation calculation means considering water discharge fluctuation Means, integrated demand power calculation means, fuel price calculation means, power generation cost calculation means, storage means, input means,
The storage means includes a start / stop order indicating an order in which each of the plurality of power generation facilities is started and stopped, a maximum power that can be generated by each of the plurality of power generation facilities, and the plurality of power generations. Fuel used in each facility, unit power consumption indicating the amount of fuel consumed to increase the amount of power supplied by each of the plurality of power generation facilities, and past estimated power demand And fuel price information including the past actual fuel price of each fuel used in each of the plurality of power generation facilities is stored,
In addition, the storage means stores at least one of a failure rate of each of the plurality of power generation facilities, periodic inspection information including past actual periodic inspection plans and actual periodic inspections, and water discharge information including past actual hydroelectric power generation amounts. Has been
The input means includes the setting period, an assumed demand power amount in the setting period, a set power amount that increases or decreases the expected power amount supplied from the power generation device in the setting period, and the storage means. The stored start / stop order, the maximum power that can be generated by each of the plurality of power generation facilities, the fuel used by each of the plurality of power generation facilities, the unit power consumption of each of the plurality of power generation facilities, the fuel price information, The failure rate of each of the plurality of power generation facilities, periodic inspection information including past actual periodic inspection plan and actual periodic inspection, and water discharge information including past actual hydroelectric power generation amount can be input.
The power generation fluctuation amount calculating means considering the periodic inspection plan change, the periodic inspection plan in the set period inputted from the input means, the actual periodic inspection plan and the actual periodic inspection stored in the storage means, Based on the maximum power that can be generated by each of the plurality of power generation facilities, to calculate a probability distribution of the power generation fluctuation amount of the power generation device considering the periodic inspection plan change in the set period,
The power generation fluctuation amount calculating means that takes into account the unscheduled stop is configured to perform an unscheduled stop in the set period based on the failure rate and the maximum power that can be generated in each of the plurality of power generation facilities stored in the storage means. Calculate the probability distribution of the power generation fluctuation amount of the power generation device considered,
The power generation possible power fluctuation amount calculation means considering the water discharge fluctuation is based on the actual water power generation amount stored in the storage means and the maximum power generation possible power of the hydroelectric power generation equipment, considering the water discharge fluctuation during the set period. Calculate the probability distribution of the power generation fluctuation amount of the power generator,
The demand power amount calculation means includes:
Based on the estimated demand power amount in the set period input from the input means, the actual estimated demand power amount and the actual demand power amount stored in the storage means, the probability distribution of the assumed demand power amount in the set period To calculate
Further, based on the assumed demand power amount and the set power amount in the set period input from the input means, and the actual assumed demand power amount and the actual demand power amount stored in the storage means, the assumption in the set period Calculating a probability distribution of the total assumed demand power amount in the set period including the demand power amount and the set power amount,
The integrated demand power calculating means includes:
Probability distribution of the assumed demand power amount in the set period calculated by the demand power amount calculating means and the periodic inspection plan change in the set period calculated by the power generation fluctuation amount calculating means considering the periodic check plan change The probability distribution of the power generation possible power fluctuation amount of the power generation apparatus considering the power generation, the power generation possible power fluctuation of the power generation equipment considering the unplanned stop during the set period calculated by the power generation power fluctuation amount calculation means considering the unplanned stoppage Integrate at least one of the probability distribution of the amount of electricity and the probability distribution of the amount of change in the amount of power that can be generated by the power generation device taking into account the fluctuation of the amount of water generated in the set period calculated by the means for calculating the amount of change in the amount of power that can be generated in consideration of the fluctuation of the water And calculating the probability distribution of the integrated demand power at the time of assumed demand in the set period,
Further, the probability distribution of the total assumed demand power amount in the set period calculated by the demand power amount calculating means and the periodicity in the set period calculated by the power generation possible power fluctuation amount calculating means considering the periodic inspection plan change. Probability distribution of the power generation fluctuation amount of the power generation device considering the inspection plan change, power generation of the power generation device considering the unplanned stop in the set period calculated by the power generation power fluctuation amount calculation means considering the unplanned stop At least one of the probability distribution of the possible power fluctuation amount and the probability distribution of the power generation possible power fluctuation amount of the power generation device considering the water discharge fluctuation in the set period calculated by the power generation power fluctuation amount calculating means considering the water discharge fluctuation. And calculate the probability distribution of total demand power during the total estimated demand in the set period,
The fuel price calculation means can calculate the probability distribution of the fuel price of each fuel in the set period based on the actual fuel price of each fuel stored in the fuel price information database,
The power generation cost calculating means is:
The probability distribution of assumed demand integrated power demand during the set period calculated by the integrated demand power calculating means, the start / stop order stored in the storage means, the maximum power that can be generated by each of the plurality of power generation facilities, Based on the fuel used in each of the plurality of power generation facilities, the unit power consumption fuel consumption of each of the plurality of power generation facilities and the probability distribution of the fuel price of each fuel in the set period calculated by the fuel price calculation means, Calculating a probability distribution of power generation costs at the time of expected power generation of the power generator required to supply the estimated demand power from the power generator during the set period;
In addition, the probability distribution of total demand demand integrated demand power during the set period calculated by the integrated demand power calculation means, the start / stop order stored in the storage means, the maximum power generation of each of the plurality of power generation facilities Possible power, fuel used in each of the plurality of power generation facilities, unit power consumption fuel consumption of each of the plurality of power generation facilities, and fuel price probability distribution of each fuel in the set period calculated by the fuel price calculation means Based on the total estimated demand power generation cost probability distribution of the power generator required to supply the total estimated demand power from the power generator during the set period,
In the case where the amount of power supplied from the power generation device is increased from the estimated demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the power generation cost during the assumed demand of the power generator during the set period. Calculating the maximum value of the power generation cost at the time of assumed demand of the apparatus, and based on the probability distribution of the power generation cost at the time of the total assumed demand of the power generation equipment in the calculated setting period, The maximum value of the cost is calculated, and the difference between the calculated maximum value of the total estimated demand power generation cost of the power generation device in the set period and the calculated maximum value of the power generation cost at the time of the expected power generation device in the set period is calculated. Calculate
In the case where the amount of power supplied from the power generation device is decreased from the assumed demand power amount during the set period, the power generation during the set period is based on the calculated probability distribution of the power generation cost during the assumed demand of the power generator during the set period. Calculating a minimum value of power generation cost at the time of assumed demand of the device, and generating power at the time of total assumed power demand of the power generation device during the set period based on the probability distribution of the power generation cost at the time of the total assumed demand of the power generator during the calculated setting period A minimum value of the cost is calculated, and a difference between the calculated minimum value of the power generation cost at the time of the assumed demand of the power generation device in the set period and the minimum value of the total power generation cost at the time of the calculated power generation device in the set time period is calculated. calculate,
A power generation cost calculation device for a power generation device.
請求項9または10に記載の発電装置の発電費用算出装置であって、
前記入力手段は、前記設定期間における設定電力量に対する設定金額を入力可能であり、
更に、リスク指標算出手段を有し、
前記リスク指標算出手段は、
発電装置から供給する電力量を前記設定期間に想定需要電力量から増加させる場合には、前記発電費用算出手段で算出された前記設定期間における発電装置の合計想定需要時発電費用の最大値と前記発電費用算出手段で算出された前記設定期間における発電装置の想定需要時発電費用の最大値との差と、前記入力手段から入力された設定金額との差をリスク指標として前記出力手段に出力し、
発電装置から供給する電力量を前記設定期間に想定需要電力量から減少させる場合には、前記前記発電費用算出手段で算出された前記設定期間における発電装置の想定需要時発電費用の最小値と前記発電費用算出手段で算出された前記設定期間における発電装置の合計想定需要時発電費用の最小値との差と、前記入力手段から入力された設定金額との差をリスク指標として前記出力手段に出力する、
ことを特徴とする発電装置の発電費用算出装置。
A power generation cost calculation device for a power generation device according to claim 9 or 10,
The input means can input a set amount for a set power amount in the set period,
Furthermore, it has a risk index calculation means,
The risk index calculation means includes
In the case where the amount of power supplied from the power generation device is increased from the assumed demand power amount during the set period, the maximum value of the total assumed demand power generation cost of the power generation apparatus during the set period calculated by the power generation cost calculation means and the A difference between the maximum value of the power generation cost at the time of assumed demand of the power generation device calculated by the power generation cost calculation means and the set amount input from the input means is output to the output means as a risk index. ,
When reducing the amount of power supplied from the power generation device from the estimated demand power amount during the set period, the minimum value of the power generation cost at the time of assumed demand of the power generation apparatus during the set period calculated by the power generation cost calculation means and the Output to the output means as a risk index the difference between the minimum value of the power generation cost at the time of the total assumed demand of the power generation device calculated by the power generation cost calculation means and the set amount input from the input means To
A power generation cost calculation device for a power generation device.
JP2006177353A 2006-06-27 2006-06-27 Power generation cost calculation device for power generator Expired - Fee Related JP4902850B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006177353A JP4902850B2 (en) 2006-06-27 2006-06-27 Power generation cost calculation device for power generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006177353A JP4902850B2 (en) 2006-06-27 2006-06-27 Power generation cost calculation device for power generator

Publications (2)

Publication Number Publication Date
JP2008009570A JP2008009570A (en) 2008-01-17
JP4902850B2 true JP4902850B2 (en) 2012-03-21

Family

ID=39067756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006177353A Expired - Fee Related JP4902850B2 (en) 2006-06-27 2006-06-27 Power generation cost calculation device for power generator

Country Status (1)

Country Link
JP (1) JP4902850B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101135762B1 (en) 2010-09-24 2012-04-16 한국전력공사 Energy control system and method
EP2790147A4 (en) * 2011-12-06 2015-08-05 Chugoku Electric Power Hydroelectric generation plan adjustment device, hydroelectric generation plan adjustment method and program
CN103336910B (en) * 2013-07-23 2016-06-29 上海申瑞继保电气有限公司 Calculation method of electric power load in annual contract of electric power users
JP6018106B2 (en) * 2014-02-28 2016-11-02 中国電力株式会社 Prediction system, prediction method
JP6018105B2 (en) * 2014-02-28 2016-11-02 中国電力株式会社 Prediction system, prediction method
JP6519215B2 (en) * 2015-02-10 2019-05-29 中国電力株式会社 Power transaction support system, power transaction support method and program
KR101566162B1 (en) 2015-06-22 2015-11-05 김건택 System for hedging risk of fuel cell power generation business according to the increase of gas price
KR101605165B1 (en) 2015-06-22 2016-03-21 김건택 System for hedging risk of fuel cell power generation business according to the increase of gas price
KR102905988B1 (en) * 2019-07-19 2025-12-30 한국전력공사 Pumping power cost verification device and method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004013371A (en) * 2002-06-05 2004-01-15 Mitec Corp Coin identifying device
JP3910948B2 (en) * 2003-08-04 2007-04-25 東京電力株式会社 Information processing method and computer system for power supply plan
JP2005249455A (en) * 2004-03-02 2005-09-15 Hitachi Ltd Prediction method, program thereof, and prediction system

Also Published As

Publication number Publication date
JP2008009570A (en) 2008-01-17

Similar Documents

Publication Publication Date Title
Mendicino et al. Corporate power purchase agreement: Formulation of the related levelized cost of energy and its application to a real life case study
Gil et al. Electricity and natural gas interdependency: comparison of two methodologies for coupling large market models within the European regulatory framework
Martin et al. A stochastic two settlement equilibrium model for electricity markets with wind generation
Hagemann et al. An empirical analysis of liquidity and its determinants in the German intraday market for electricity
JP2015158750A (en) Power supply operation plan development device, method and program
Lopes et al. Demand response in electricity markets: an overview and a study of the price-effect on the Iberian daily market
JP4902850B2 (en) Power generation cost calculation device for power generator
Mukherjee et al. Power-to-gas to meet transportation demand while providing ancillary services to the electrical grid
JP2007058760A (en) Energy trading support system and energy trading support program
Breitschopf et al. Guidelines for assessing costs and benefits of RET deployment
Intini et al. Strategic behaviour by wind generators: An empirical investigation
Werner Electricity market price volatility: the importance of ramping costs
JP6983342B1 (en) Electric power transaction support device
Bublitz Capacity remuneration mechanisms for electricity markets in transition
JP4607632B2 (en) Power transaction evaluation support system, method, and program
Hyun et al. Assessing the impact of a demand-resource bidding market on an electricity generation portfolio and the environment
Chabar et al. Optimization of fuel contracts management and maintenance scheduling for thermal plants under price uncertainty
Saadeh et al. A baseline long term technoeconomic electricity supply model for highly regulated fuel importing countries prone to shortages: Case of Jordan
Sakthivelu et al. Demand response event simulator and risk-aware bidding tool for industrial customers
Zaki et al. A Review of Electricity Tariffs and Enabling Solutions for Optimal Energy Management. Energies 2022, 15, 8527
Logan et al. Evaluating a proposed 20% national renewable portfolio standard
Peña Sánchez et al. The energy policy pricing dilemma: Affordability, volatility, and market signals in electricity tariffs
Sen et al. Decision Aids for Scheduling and Hedging (DASH) in deregulated electricity markets: A stochastic programming approach to power portfolio optimization
Sweeting The effect of falling market concentration on prices, generator behaviour and productive efficiency in the England and Wales electricity market
Andreyevich et al. Impacts of the fairly priced REDD-based CO 2 offset options on the electricity producers and consumers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090401

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111215

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111229

R150 Certificate of patent or registration of utility model

Ref document number: 4902850

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150113

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees