Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4911394B2 - PC sleeper moving cart - Google Patents
[go: Go Back, main page]

JP4911394B2 - PC sleeper moving cart - Google Patents

PC sleeper moving cart Download PDF

Info

Publication number
JP4911394B2
JP4911394B2 JP2010175852A JP2010175852A JP4911394B2 JP 4911394 B2 JP4911394 B2 JP 4911394B2 JP 2010175852 A JP2010175852 A JP 2010175852A JP 2010175852 A JP2010175852 A JP 2010175852A JP 4911394 B2 JP4911394 B2 JP 4911394B2
Authority
JP
Japan
Prior art keywords
sleeper
rail
moving
sleepers
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010175852A
Other languages
Japanese (ja)
Other versions
JP2012036598A (en
Inventor
健新 岡市
Original Assignee
高橋 正次
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高橋 正次 filed Critical 高橋 正次
Priority to JP2010175852A priority Critical patent/JP4911394B2/en
Priority to CN2011102303217A priority patent/CN102418305A/en
Publication of JP2012036598A publication Critical patent/JP2012036598A/en
Application granted granted Critical
Publication of JP4911394B2 publication Critical patent/JP4911394B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

鉄道のレールの軌道整備においてPC枕木を接続し、レールに沿って移動させる枕木の移動台車に関する。   BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sleeper moving carriage that connects PC sleepers and moves along rails in rail track maintenance.

従来、レールの軌道の枕木の間に敷かれるバラストを新しいバラストに交換する(道床交換と称する)軌道整備には、PC枕木を移動させ、ユンボなどの大型の機械が軌道内で動き易くする必要がある。このPC枕木はコンクリート製で、200Kg以上の重さであるため移動させるのに多大な労力を要する。     Conventionally, in order to replace a ballast laid between rail sleepers of a rail track with a new ballast (referred to as a roadbed replacement), it is necessary to move a PC sleeper so that a large machine such as a yumbo can move easily in the track. There is. Since this PC sleeper is made of concrete and has a weight of 200 kg or more, a great deal of labor is required to move it.

現状のレールの軌道整備でのバラスト交換方法を説明する。図7はPC枕木11を用いたレール10の構成を示す。図7の(a)はパンドロール13によりPC枕木11に固定されたレール10、(b)はアンカー14の線バネ12でレールを固定した写真、(c)は線バネ12の写真である。
図7(a)に示すように、PC枕木11の下にバラスト15を敷きつめる。図7(b)に示すように、バラスト15を敷きつめた線路で、PC枕木はアンカーの穴141に線バネ12を嵌めることでレールに固定されている。
線バネ12は、金属棒を図7(c)の示すような形状に折り曲げたバネ機能を有する金具である。
The ballast replacement method in the current rail track maintenance will be explained. FIG. 7 shows a configuration of the rail 10 using the PC sleepers 11. 7A is a rail 10 fixed to the PC sleeper 11 by the pan roll 13, FIG. 7B is a photograph of the rail fixed by the wire spring 12 of the anchor 14, and FIG. 7C is a photograph of the wire spring 12. FIG.
As shown in FIG. 7A, a ballast 15 is placed under the PC sleepers 11. As shown in FIG. 7B, the PC sleepers are fixed to the rails by fitting the wire springs 12 into the holes 141 of the anchors in the track in which the ballast 15 is laid.
The wire spring 12 is a metal fitting having a spring function in which a metal rod is bent into a shape as shown in FIG.

従来の道床交換方法を図5で示す。図5の(a)は、PC枕木のパンドロール13とレール10(左レール10Aと右レール10B)を固定している線バネ12を取り外してユンボ16を入れる前のレール、(b)はユンボ16を入れた後の作業中の俯瞰図、(c)ユンボ16をいれた後の作業中の側面図を示す。 FIG. 5 shows a conventional road bed changing method. (A) of FIG. 5 is the rail before removing the wire spring 12 that fixes the pan roll 13 and the rail 10 (the left rail 10A and the right rail 10B) of the PC sleeper, and the yumbo 16 is inserted, and (b) is the yumbo. An overhead view during work after putting 16 in, (c) A side view during work after putting the yumbo 16 is shown.

PC枕木11とレールを固定する線バネ12を取り外してから、ユンボ16が軌道内に入ってPC枕木11とPC枕木11間のバラスト15を掘り出す。隣接するPC枕木間の一枡のPC枕木11のバラスト15の掘り出しが終わると、ユンボ16の爪161でPC枕木11を、道床の底に蹴り落とし(P1)、ユンボ16が作業し易いように既に蹴り落としたPC枕木116、117の横に仮置きする。そしてユンボ16が続いてバラスト15を掘り出す。次に、蹴り落としたPC枕木117をレール10の上に乗っている専用吊上げ器17で、一本づつ吊上げ(P2)、PC枕木を吊り下げた状態で横に移動して(P3)、PC枕木11をレール10の予め決められたレール10上に配置してPC枕木のアンカーの穴141に線バネ12を嵌めてレール10を固定する。 After the wire spring 12 that fixes the PC sleeper 11 and the rail is removed, the yumbo 16 enters the track and digs out the ballast 15 between the PC sleeper 11 and the PC sleeper 11. When the ballast 15 of the PC sleeper 11 between adjacent PC sleepers has been dug, the PC sleeper 11 is kicked to the bottom of the roadbed with the claws 161 of the yumbo 16 (P1) so that the yumbo 16 can work easily. Temporary placement next to PC sleepers 116, 117 that have already been kicked off. Then Yumbo 16 continues to dig up ballast 15. Next, the PC sleepers 117 that have been kicked off are lifted one by one with the dedicated lifter 17 riding on the rail 10 (P2), moved sideways with the PC sleepers suspended (P3), The sleepers 11 are arranged on the predetermined rails 10 of the rails 10 and the wire springs 12 are fitted into the anchor holes 141 of the PC sleepers to fix the rails 10.

以上の工程を全てのPC枕木について行う、その後、新しいバラスト151を入れて軌道整備を行ない作業が終了する。このようにPC枕木11を道床の底に落として再び上に持ち上げ、PC枕木を元にレールの位置に移動させる必要がある。PC枕木11は重く(200Kg以上)、それを持ち上げて移動させるのに大変な作業負担をしいられている。 The above process is performed for all the PC sleepers. Thereafter, a new ballast 151 is inserted to perform track maintenance and the work is completed. Thus, it is necessary to drop the PC sleeper 11 to the bottom of the roadbed, lift it up again, and move it to the rail position based on the PC sleeper. The PC sleepers 11 are heavy (200 kg or more), and a heavy work load is required to lift and move them.

特開平7−279101公報JP-A-7-279101

従来の道床交換では、PC枕木のアンカー14とレールを固定している線バネ12を取り外してからユンボ16でバラスト15を掘り出してPC枕木11を一本づつ道床の底に蹴り落とし、専用吊上げ器17で道床の底から、一本づつ吊上げて、再び元に位置にPC枕木を移動させ、PC枕木のアンカー14とレールを線バネ12で嵌めるので次のような課題があった。 In the conventional way bed replacement, the anchor 14 and the wire spring 12 that fixes the rail are removed, and then the ballast 15 is dug out by the yumbo 16 and the PC sleepers 11 are kicked one by one to the bottom of the road bed, and a dedicated lifting device. Since the PC sleepers are lifted one by one from the bottom of the road bed at 17 and the PC sleepers are again moved to their original positions and the anchors 14 and rails of the PC sleepers are fitted with the wire springs 12, there are the following problems.

1)PC枕木が重い(200kg以上)ので、持ち上げて移動するのに作業員が2−3名必要で作業負荷は高く非効率である。専用吊上げ器等の重機を使用する必要があり作業費用が、大幅に高くなる。
2)PC枕木11を、ユンボ16で一本づつを蹴り落としてから、専用吊上げ器17で吊り上げて、再びPC枕木を元に位置に配置して、PC枕木11のアンカー14とレールを線バネ12で嵌めて復旧するまで作業時間が長くなる。現状ではPC枕木一本あたり約4〜5分以上かかる。
1) Since PC sleepers are heavy (200 kg or more), 2-3 workers are required to lift and move, and the workload is high and inefficient. It is necessary to use heavy equipment such as a dedicated lifting device, and the work cost is significantly increased.
2) Kick the PC sleepers 11 one by one with the yumbo 16, lift them with the special lifter 17, place them again at the positions based on the PC sleepers, and connect the anchors 14 and rails of the PC sleepers 11 to the wire springs The work time becomes longer until it is fitted and restored at 12. Currently it takes about 4-5 minutes or more per PC sleeper.

レールの軌道の枕木に間に敷かれるバラストを新しいバラストに交換する道床交換においてPC枕木を移動させるためのPC枕木の移動台車であって、
PC枕木の移動台車1は中央筐体63と左側板61、右側板62を備えた略直方体の箱型の中央本体6を有し、左側板61と右側板62に、左側板61と右側板62とPC枕木のアンカーの穴141を貫通させてボルト9を通すためのピン穴8を設けPC枕木を吊り下げて固定するためのPC枕木接続手段と、レール脚面102に当接させ、レール脚面102上を転がって移動させるローラーを備えた移動手段を備え、PC枕木11を移動させるときは、左レール10Aと右レール10Bを夫々固定しているPC枕木のアンカー14の線バネ12を外し、かわりに、左レール10Aと右レール10Bに、夫々PC枕木の移動台車1Aと右レールのPC枕木の移動台車1Bを設置し、PC枕木の移動台車1AとPC枕木の移動台車1BのPC枕木接続手段は、PC枕木を吊り下げて固定し、PC枕木の移動台車1AとPC枕木の移動台車1BはレールAとレールBをはさみ、PC枕木の移動台車1A、PC枕木の移動台車1Bがレールから外れないようにし、PC枕木の移動台車1AとPC枕木の移動台車1Bの移動手段は、夫々左レール10Aと右レール10Bのレール脚面102上を転がすことでPC枕木を移動させ、PC枕木を配置した後、PC枕木の移動台車1からPC枕木の吊り下げ固定を解除することでPC枕木を移動させることを特徴とするPC枕木の移動台車である。
A moving carriage for a PC sleeper for moving a PC sleeper in a roadbed exchange in which a ballast placed between sleepers on a rail track is replaced with a new ballast,
The PC sleeper moving carriage 1 has a substantially rectangular parallelepiped box-shaped central body 6 having a central housing 63, a left side plate 61, and a right side plate 62, and the left side plate 61 and the right side plate 62, the left side plate 61 and the right side plate. 62 and pin holes 8 for passing bolts 9 through the anchor holes 141 of the PC sleepers are provided, PC sleeper connecting means for hanging and fixing the PC sleepers, and the rail sleeper surfaces 102 are brought into contact with the rail leg surfaces. 102. When moving the PC sleeper 11 with a moving means having a roller that rolls over 102, remove the wire spring 12 of the anchor 14 of the PC sleeper that fixes the left rail 10A and the right rail 10B, Instead, a PC trolley moving carriage 1A and a right rail PC trolley moving carriage 1B are installed on the left rail 10A and the right rail 10B, respectively. The connecting means suspends and fixes the PC sleeper, the PC sleeper moving carriage 1A and the PC sleeper moving carriage 1B sandwich the rail A and the rail B, the PC sleeper moving carriage 1A, and the PC sleeper moving carriage 1B are the rails. The moving means of the PC sleeper 1A and the PC sleeper 1B move the PC sleepers by rolling on the rail leg surfaces 102 of the left rail 10A and the right rail 10B, respectively. The PC sleeper moving cart is characterized in that after being placed, the PC sleeper is moved from the PC sleeper moving cart 1 by releasing the hanging suspension of the PC sleeper.

PC枕木接続手段は、PC枕木11のアンカーの穴141とPC枕木の移動台車1のピン穴8にボルト9を貫通させ、ナット91で締め付けて固定することで、PC枕木を吊り下げられるようにしたことを特徴とするPC枕木の移動台車である。 The PC sleeper connecting means allows the PC sleeper to be suspended by passing the bolt 9 through the hole 141 of the anchor of the PC sleeper 11 and the pin hole 8 of the moving carriage 1 of the PC sleeper and tightening and fixing with the nut 91. This is a mobile trolley for PC sleepers.

移動手段は、レール側面101に当接させ、レール側面101に沿って転がる一つ以上のガード・ローラー3と、レールの脚面102に上方から当接させ、レールの脚面102上を転がしながら移動する一つ以上の主ローラー5を備え、ガード・ローラー3をレール側面に当接させながら、主ローラー5はレール脚面102上を転がして移動しえるようにしたことを特徴とするPC枕木の移動台車1である。 The moving means is brought into contact with the rail side surface 101, and is brought into contact with the one or more guard rollers 3 rolling along the rail side surface 101 and the rail leg surface 102 from above, and moves while rolling on the rail leg surface 102. PC sleeper moving carriage characterized in that it has one or more main rollers 5 and the main roller 5 can roll on the rail leg surface 102 while the guard roller 3 is in contact with the rail side surface. 1.

PC枕木の移動台車1は、中央筐体63と左側板61、右側板62を備えた略直方体の箱型の中央本体6を有し、レール脚面102上を移動する移動手段と、PC枕木を接続するためのPC枕木接続手段を設ける。
移動手段は、中央本体6の左側板61にガード・ローラーカバー21を備え、その中に、左ローラー軸311を設け、レール側面101に当接しレール側面を転がる左ガード・ローラー31を取り付け、右側板62にガード・ローラーカバー22を備え、その中に右ローラー軸を322を設け、レール側面に当接しレール側面を転がる左ガード・ローラー32を取り付け、中央本体6に、主ローラー5を覆うための主ローラーカバー4を付け、その下に主ローラー軸51を設け、レールの脚面102に当接し、レール脚面102を転がる主ローラ51を取り付け、移動手段は、ガード・ローラー3をレール側面101に当接させ、レール側面101に沿って転がし、主ローラー5はレールの脚面102に上方から当接させ、レールの脚面102上を転がしながら移動させる。
PC枕木接続手段は、左側板61と右側板62に、左側板61と右側板62とPC枕木のアンカーの穴141を貫通させてボルト9を通すためのピン穴8を設け、PC枕木に取り付けたアンカーの穴141とビン穴8にボルト9を貫通させ、ナット91で締め付けることで、PC枕木11をPC枕木の移動台車1に固定し吊り下げ、PC枕木11を移動させるときは、左レール10A、右レール10Bに固定しているPC枕木のアンカー14の線バネ12を外し、かわりに、左レール10Aと右レール10Bに、夫々PC枕木の移動台車1Aと右レールのPC枕木の移動台車1Bを設置し、PC枕木の移動台車1AとPC枕木の移動台車1Bは、夫々のPC枕木接続手段でPC枕木を吊り下げて固定することで、PC枕木の移動台車1AとPC枕木の移動台車1BはレールAとレールBをはさみ、PC枕木の移動台車1A、PC枕木の移動台車1Bがレールから外れないようにし、PC枕木の移動台車1AとPC枕木の移動台車1Bは、夫々のPC枕木移動手段でレール脚面102上を転がすことでPC枕木を移動する。
PC枕木の配置した後、PC枕木の移動台車1からPC枕木の吊り下げ固定を解除することでPC枕木の移動を行えるようにしたことを特徴とするPC枕木の移動台車であり。
The PC sleeper moving carriage 1 has a substantially rectangular parallelepiped box-shaped central body 6 having a central housing 63, a left side plate 61, and a right side plate 62, a moving means that moves on the rail leg surface 102, and a PC sleeper. PC sleeper connection means for connection is provided.
The moving means is provided with a guard roller cover 21 on the left side plate 61 of the central body 6, in which a left roller shaft 311 is provided, and a left guard roller 31 that contacts the rail side surface 101 and rolls on the rail side surface is attached. In order to cover the main roller 5 on the central body 6, the plate 62 is provided with a guard roller cover 22 and a right roller shaft 322 is provided therein, and a left guard roller 32 that contacts the rail side surface and rolls on the rail side surface is attached. The main roller cover 4 is attached, the main roller shaft 51 is provided below, the main roller 51 which is in contact with the rail leg surface 102 and rolls on the rail leg surface 102 is attached, and the moving means attaches the guard roller 3 to the rail side surface 101. The main roller 5 is brought into contact with the rail leg surface 102 from above, and is rolled along the rail side surface 101. Move while rolling over.
The PC sleeper connecting means is provided with a pin hole 8 for passing the bolt 9 through the left plate 61, the right plate 62, and the anchor hole 141 of the PC sleeper on the left plate 61 and the right plate 62, and is attached to the PC sleeper. When the bolt 9 is passed through the anchor hole 141 and the bin hole 8 and tightened with the nut 91, the PC sleeper 11 is fixed and suspended on the moving carriage 1 of the PC sleeper, and when the PC sleeper 11 is moved, the left rail 10A, the wire spring 12 of the anchor 14 of the PC sleeper fixed to the right rail 10B is removed, and instead of the left rail 10A and the right rail 10B, the PC sleeper moving carriage 1A and the right rail PC sleeper moving carriage, respectively. 1B and PC sleeper moving carriage 1A and PC sleeper moving carriage 1B are suspended by PC sleeper connecting means and fixed, so that PC sleeper moving carriage 1A and P The sleeper moving cart 1B sandwiches the rail A and the rail B so that the PC sleeper moving cart 1A and the PC sleeper moving cart 1B are not removed from the rails. The PC sleepers are moved by rolling on the rail leg surface 102 by each PC sleeper moving means.
After the PC sleepers are arranged, the PC sleepers can be moved by releasing the hanging suspension of the PC sleepers from the PC sleeper 1.

レールの軌道の枕木の間に敷かれるバラストを新しいバラストに交換する道床交換であって、道床交換する範囲のレールのPC枕木のアンカーの穴141から線バネ12を外し、かわりに、道床交換する範囲の全ての左レールAと右レールの全てのPC枕木のアンカー14について、PC枕木の移動台車1を設置し、PC枕木を固定して吊り下げ、PC枕木を吊り下げた状態でPC枕木の移動台車1でレール脚面102上を移動させ、交換するバラストを含む範囲のPC枕木を一箇所に集めた後、その道床交換する範囲のバラスト15を新バラスト151に交換し、その後、移動させたPC枕木をPC枕木の移動台車で、元の位置に戻し、PC枕木とPC枕木の移動台車1を分離し、PC枕木11にアンカーの穴141に線バネ12を挿入して、PC枕木とレールを固定することにより道床効果することを特徴とするPC枕木の移動台車1を用いた道床交換方法である。 It is a roadbed exchange in which the ballast laid between the rail sleepers of the rail is replaced with a new ballast, and the wire spring 12 is removed from the anchor hole 141 of the PC sleeper of the rail in the range of the roadbed exchange, and the roadbed is exchanged instead. For all the left rail A and all the PC sleeper anchors 14 on the range, the PC sleeper 1 is installed, the PC sleeper is fixed and suspended, and the PC sleeper is suspended while the PC sleeper is suspended. After moving on the rail leg surface 102 with the moving carriage 1 and collecting the PC sleepers in the range including the ballast to be replaced, the ballast 15 in the range to be replaced is replaced with the new ballast 151, and then moved. Move the PC sleeper back to its original position with the PC sleeper moving carriage, separate the PC sleeper and the PC sleeper moving carriage 1, and insert the wire spring 12 into the anchor hole 141 in the PC sleeper 11. A ballast exchange method using a mobile carriage 1 of PC sleepers, characterized by ballast effect by fixing the PC sleepers and rails.

PC枕木11を吊り下げ移動させてから、再び元に位置にPC枕木を配置し、線バネ12でアンカー14とレール10を嵌めるまでの時間が短くなる(1分以下)。作業時間は従来のやり方より3〜4分が短縮になる。PC枕木11が25本の場合、作業量として75〜80分短縮になる。 After the PC sleeper 11 is suspended and moved, the PC sleeper is again placed at the original position, and the time until the anchor 14 and the rail 10 are fitted by the wire spring 12 is shortened (1 minute or less). The working time is 3 to 4 minutes shorter than the conventional method. When there are 25 PC sleepers 11, the work amount is shortened by 75 to 80 minutes.

本発明のPC枕木の移動台車の構成(a)上方斜視図 (b)下方斜視図Configuration of moving carriage of PC sleeper of the present invention (a) Upper perspective view (b) Lower perspective view 本発明のPC枕木の移動台車のレールへの取り付け図Fig. 2 is a view of the installation of the PC sleeper of the present invention on the rail of the moving carriage. 本発明のPC枕木の移動台車のレールへの取り付け図(a)レールに吊り下げる前(バラストを取り出す前)(b)レールに吊り下げた状態(バラストを取り出した後)(A) Before hanging on the rail (before taking out the ballast) (b) State hung on the rail (after taking out the ballast) 本発明のPC枕木の移動台車を使用するバラスト交換の施工方法 (a)線バネ12を取り外してからPC枕木をPC枕木の移動台車1に取り付けレールに乗せた状態(b)ユンボ16を入れてバラスト15を掘り出している状態 PC枕木114、115、116、117をPC枕木の移動台車で左側に移動させる。(c)復旧状態:PC枕木の移動台車1を外して、PC枕木のアンカー14とレールに線バネ12を嵌めて新しいバラスト151を入れた復旧状態Method of constructing ballast exchange using the moving cart of the PC sleeper of the present invention (a) A state in which the PC sleeper is mounted on the moving cart 1 of the PC sleeper after the wire spring 12 is removed, and (b) the jumbo 16 is inserted. The state in which the ballast 15 is dug The PC sleepers 114, 115, 116, and 117 are moved to the left side by the moving carriage of the PC sleepers. (C) Restoration state: Restoration state in which the moving carriage 1 of the PC sleeper is removed, the wire spring 12 is fitted to the anchor 14 and the rail of the PC sleeper, and a new ballast 151 is inserted. 従来の施工方法(a)線バネ12を取り外してユンボ16を入る前 (b)ユンボ16を入れた後の作業中の俯瞰図 (c)ユンボ16をいれた後の作業中の前進方向左側の断面図Conventional construction method (a) Before removing the wire spring 12 and inserting the yumbo 16 (b) An overhead view during work after the yumbo 16 is inserted (c) The left side of the forward direction during work after the yumbo 16 is inserted Cross section 従来の専用吊り下げ器17によりPC枕木11を持ち上げる方法A method of lifting the PC sleeper 11 with the conventional dedicated suspender 17 PC枕木11を用いたレール10の構成(a)PC枕木のアンカー14とレールを線バネ12で固定したレール10 (b)アンカー14とレール10を線バネ12で固定した写真 (c)線バネ12の写真Configuration of rail 10 using PC sleeper 11 (a) Rail 10 with PC sleeper anchor 14 and rail fixed by wire spring 12 (b) Photo of anchor 14 and rail 10 fixed by wire spring 12 (c) Wire spring 12 photos

本発明は、PC枕木11を落とす事無く吊上げる事も無くPC枕木を便利に移動する為のPC枕木の移動台車1を提供する。本発明のPC枕木の移動台車の構成と道床交換方法を図1〜図4で説明する。 The present invention provides a moving bed 1 for PC sleepers for conveniently moving a PC sleeper without dropping the PC sleeper 11 without lifting it. The structure of the moving carriage of the PC sleeper of the present invention and the roadbed replacement method will be described with reference to FIGS.

本発明のPC枕木の移動台車の構成を図1に示す。図1(a)は上方斜視図、(b)は下方斜視図を示す。 FIG. 1 shows a configuration of a moving carriage of a PC sleeper according to the present invention. FIG. 1A is an upper perspective view, and FIG. 1B is a lower perspective view.

PC枕木の移動台車1は、中央筐体63と左側板61、右側板62を備えた略直方体の箱型の中央本体6を有し、レール脚面102上を移動する移動手段と、PC枕木を接続するためのPC枕木接続手段を設けている。
移動手段は、中央本体6の左側板61にガード・ローラーカバー21を備え、その中に、左ローラー軸311を設け、レール側面101に当接しレール側面を転がる左ガード・ローラー31を取り付け、右側板62にガード・ローラーカバー22を備え、その中に右ローラー軸を322を設け、レール側面に当接しレール側面を転がる左ガード・ローラー32を取り付け、中央本体6に、主ローラー5を覆うための主ローラーカバー4を付け、その下に主ローラー軸51を設け、レールの脚面102に当接し、レール脚面102を転がる主ローラ51を取り付けている。
移動手段は、ガード・ローラー3をレール側面101に当接させ、レール側面101に沿って転がし、主ローラー5はレールの脚面102に上方から当接させ、レールの脚面102上を転がしながら移動させる。
PC枕木接続手段は、左側板61と右側板62に、左側板61と右側板62とPC枕木のアンカーの穴141を貫通させてボルト9を通すためのピン穴8を設け、PC枕木に取り付けたアンカーの穴141とビン穴8にボルト9を貫通させ、ナット91で締め付けることで、PC枕木11をPC枕木の移動台車1に固定し吊り下げる。
PC枕木11を移動させるときは、左レール10A、右レール10Bに固定しているPC枕木のアンカー14の線バネ12を外し、かわりに、左レール10Aと右レール10Bに、夫々PC枕木の移動台車1Aと右レールのPC枕木の移動台車1Bを設置し、
PC枕木の移動台車1A、PC枕木の移動台車1Bは、夫々のPC枕木接続手段でPC枕木を吊り下げて固定することで、PC枕木の移動台車1AとPC枕木の移動台車1BはレールAとレールBをはさみ、PC枕木の移動台車1A、PC枕木の移動台車1Bがレールから外れないようにし、PC枕木の移動台車1AとPC枕木の移動台車1Bは、夫々のPC枕木移動手段でレール脚面102上を転がすことでPC枕木を移動し、
PC枕木の配置した後、PC枕木の移動台車1からPC枕木の吊り下げ固定を解除することでPC枕木の移動を行えるようにする。
The PC sleeper moving carriage 1 has a substantially rectangular parallelepiped box-shaped central body 6 having a central housing 63, a left side plate 61, and a right side plate 62, a moving means that moves on the rail leg surface 102, and a PC sleeper. PC sleeper connection means for connection is provided.
The moving means is provided with a guard roller cover 21 on the left side plate 61 of the central body 6, in which a left roller shaft 311 is provided, and a left guard roller 31 that contacts the rail side surface 101 and rolls on the rail side surface is attached. In order to cover the main roller 5 on the central body 6, the plate 62 is provided with a guard roller cover 22 and a right roller shaft 322 is provided therein, and a left guard roller 32 that contacts the rail side surface and rolls on the rail side surface is attached. The main roller cover 4 is attached, and a main roller shaft 51 is provided below the main roller cover 4.
The moving means brings the guard roller 3 into contact with the rail side surface 101 and rolls along the rail side surface 101, and the main roller 5 makes contact with the leg surface 102 of the rail from above, and moves while rolling on the rail surface 102. .
The PC sleeper connecting means is provided with a pin hole 8 for passing the bolt 9 through the left plate 61, the right plate 62, and the anchor hole 141 of the PC sleeper on the left plate 61 and the right plate 62, and is attached to the PC sleeper. The bolts 9 are passed through the anchor holes 141 and the bin holes 8 and tightened with the nuts 91, so that the PC sleepers 11 are fixed to the moving cart 1 of the PC sleepers and suspended.
When moving the PC sleeper 11, the wire spring 12 of the PC sleeper anchor 14 fixed to the left rail 10A and the right rail 10B is removed, and instead the PC sleeper is moved to the left rail 10A and the right rail 10B, respectively. Install the cart 1A and the mobile rail 1B of the right rail PC sleeper,
The PC sleeper moving carriage 1A and the PC sleeper moving carriage 1B are suspended by the PC sleeper connecting means and fixed so that the PC sleeper moving carriage 1A and the PC sleeper moving carriage 1B are connected to the rail A. The rail B is sandwiched between the PC sleeper moving carriage 1A and the PC sleeper moving carriage 1B so that they do not come off the rail. The PC sleeper moving carriage 1A and the PC sleeper moving carriage 1B are connected to each other by means of the respective PC sleeper moving means. Move the PC sleeper by rolling over 102,
After the PC sleepers are arranged, the PC sleepers can be moved by releasing the hanging suspension of the PC sleepers from the PC sleeper moving carriage 1.

本発明のPC枕木11の移動台車1のレールへの取り付け方法を図2に示す。本発明のPC枕木の移動台車1は、PC枕木の移動台車1のピン穴8とPC枕木のアンカー14にボルト9を挿入してナット91で締め付けてPC枕木を固定し吊り下げている。レール側面101に2つのガード・ローラー3(左ガード・ローラー31と右ガード・ローラー32)を当接し、レール脚面102に主ローラー51を当接して、レール側面102とレール脚面102に沿って転がる事が出来き、これによりPC枕木1を容易にレール脚面102の任意に位置に移動し配置できる。     A method of attaching the PC sleeper 11 of the present invention to the rail of the movable carriage 1 is shown in FIG. In the mobile trolley 1 of the present invention, a bolt 9 is inserted into the pin hole 8 and the PC sleeper anchor 14 of the PC sleeper 1 and tightened with a nut 91 to fix and suspend the PC sleeper. Two guard rollers 3 (the left guard roller 31 and the right guard roller 32) abut on the rail side surface 101, the main roller 51 abuts on the rail leg surface 102, and roll along the rail side surface 102 and the rail leg surface 102. Thus, the PC sleepers 1 can be easily moved to any position on the rail leg surface 102 and arranged.

本発明のPC枕木11の移動台車1のレールへの取り付け方法を図3に示す。
左レールにPC枕木の移動台車1A、右レールにPC枕木の移動台車1Bを取り付ける。PC枕木の移動台車1A、PC枕木の移動台車1Bは、PC枕木の外側のアンカー14(レールの内側のアンカー14は使用しない)に固定し吊り下げる。すなわち、PC枕木の移動台車1を2台、左レール10Aと右レール10Bの両方に取り付ける。
PC枕木を接続するためのPC枕木接続手段としてPC枕木の移動台車1のピン穴8と、PC枕木のアンカーの穴141にボルト9を通し、ナット91でとめて、PC枕木10とPC枕木の移動台車1を固定する。
アンカーの穴141とピン穴8をボルト9でPC枕木の移動台車1の左右どちらからでも貫通でき、左利きと右利きの作業員が容易にPC枕木11のアンカー14と固定できる。
PC枕木の移動台車1A、PC枕木の移動台車1B、それたに固定されたPC枕木により、PC枕木の移動台車1A、PC枕木の移動台車1Bは左レールAと右レールBを夫々はさむのでPC枕木の移動台車1A、PC枕木の移動台車1Bはレール10から外れなく、PC枕木の重みで、左レールの脚面102と、右レールの脚面102に当接し、転がることができる。
図3(a)は、レールに吊り下げる前(バラストを取り出す前)の状態で、PC枕木11を吊り下げる前にレール側面101に、左ガードー・ローラー31と、右ガードー・ローラー32からなるガードー・ローラー3を当接させている。
図3(b)はPC枕木をレールに吊り下げた状態(バラストを取り出した後)で、PC枕木11を吊り下げてからレール脚面102に主ローラー5を当接させると、右ガード・ローラー31と左ガード・ローラー32がレール側面、主ローラー5がレール脚面102に沿って転がして移動する。
A method of attaching the PC sleeper 11 of the present invention to the rail of the movable carriage 1 is shown in FIG.
A moving carriage 1A for PC sleepers is attached to the left rail, and a moving carriage 1B for PC sleepers is attached to the right rail. The mobile trolley 1A and the mobile trolley 1B of the PC sleeper are fixed and hung on the anchor 14 outside the PC sleeper (the anchor 14 inside the rail is not used). That is, two moving carts 1 of the PC sleepers are attached to both the left rail 10A and the right rail 10B.
As a PC sleeper connecting means for connecting a PC sleeper, a bolt 9 is passed through the pin hole 8 of the moving carriage 1 of the PC sleeper and the hole 141 of the anchor of the PC sleeper, and is fastened with a nut 91. The movable carriage 1 is fixed.
The anchor hole 141 and the pin hole 8 can be penetrated from both the left and right sides of the moving carriage 1 of the PC sleeper with bolts 9, and left-handed and right-handed workers can be easily fixed to the anchor 14 of the PC sleeper 11.
PC sleeper moving carriage 1A, PC sleeper moving carriage 1B, and PC sleeper fixed to it, PC sleeper moving carriage 1A and PC sleeper moving carriage 1B sandwich left rail A and right rail B, respectively. The moving carriage 1A of the sleepers and the moving carriage 1B of the PC sleepers do not come off from the rails 10, but can abut on the leg surfaces 102 of the left rail and the leg surfaces 102 of the right rail with the weight of the PC sleepers and roll.
FIG. 3 (a) shows a guard guard composed of a left guard roller 31 and a right guard roller 32 on the rail side surface 101 before the PC sleeper 11 is suspended before being suspended on the rail (before taking out the ballast). -The roller 3 is in contact.
FIG. 3B shows a state where the PC sleepers are suspended from the rail (after the ballast is taken out), and the main guard 5 is brought into contact with the rail leg surface 102 after the PC sleepers 11 are suspended. The left guard roller 32 rolls along the rail side surface and the main roller 5 moves along the rail leg surface 102.

本発明のPC枕木の移動台車1を使用する施工方法を図4で示す。
図4の(a)は、PC枕木のアンカー14から線バネ12を取り外し、PC枕木の移動台車1に取り付けレール10に乗せた状態である。道床交換をする為に、アンカー14の線バネ12を取り外し、かわりに、アンカー14とPC枕木の移動台車1を、PC枕木の移動台車1の左側板61と右側板62のピン穴8と、アンカーの穴141にボルト9を貫通させて、ナット91で締めて取り付ける。
The construction method which uses the mobile trolley | bogie 1 of the PC sleeper of this invention is shown in FIG.
4A shows a state in which the wire spring 12 is removed from the anchor 14 of the PC sleeper and is mounted on the mounting rail 10 on the moving carriage 1 of the PC sleeper. In order to replace the roadbed, the wire spring 12 of the anchor 14 is removed and, instead, the anchor 14 and the moving carriage 1 of the PC sleeper, the pin holes 8 of the left side plate 61 and the right side board 62 of the moving bed 1 of the PC sleeper, The bolt 9 is passed through the hole 141 of the anchor, and is attached by tightening with a nut 91.

図4(b)はユンボ16を入れてバラスト15を掘り出している状態である。ユンボ16を入れてバラスト15を掘り出し、PC枕木114、115、116、117がPC枕木の移動台車で左側に移動させている。ユンボ16が作業区間内に入り、バラスト15を掘り出して、PC枕木11をPC枕木の移動台車1で吊り下げて、ユンボの爪161で押してPC枕木11を移動させて一箇所に集める。PC枕木が取り除かれるのでユンボ16が作業区間内にはいって、バラスト15の交換を行うことができる。バラス15の交換が終了すると、PC枕木の移動台車1をレール脚面102上を転がして、PC枕木11の元の位置まで戻し、固定して吊り下げていたPC枕木11を元の位置に配置する。   FIG. 4 (b) shows a state where the ballast 15 is dug out by inserting the yumbo 16. The yumbo 16 is put in and the ballast 15 is dug out, and the PC sleepers 114, 115, 116, 117 are moved to the left by the moving carriage of the PC sleepers. The yumbo 16 enters the work section, digs out the ballast 15, suspends the PC sleepers 11 by the moving cart 1 of the PC sleepers, pushes them with the yumbo claws 161, moves the PC sleepers 11 and collects them in one place. Since the PC sleepers are removed, the yumbo 16 can enter the work section and the ballast 15 can be replaced. When the exchange of the ballast 15 is completed, the movable carriage 1 of the PC sleeper is rolled on the rail leg surface 102, returned to the original position of the PC sleeper 11, and the PC sleeper 11 that has been fixedly suspended is placed at the original position. .

図4(c)はPC枕木の移動台車1を外してPC枕木のアンカー14とレール10を線バネ12で嵌めて新しいバラスト151を入れた復旧状態である。PC枕木を吊り下げたPC枕木の移動台車1を外し、アンカー14とレール10を線バネ12で固定することで復旧作業は終了する。 FIG. 4C shows a restored state in which the moving carriage 1 of the PC sleeper is removed, the anchor 14 and the rail 10 of the PC sleeper are fitted with the wire spring 12, and a new ballast 151 is inserted. The restoration work is completed by removing the moving carriage 1 with the PC sleeper suspended from the PC sleeper and fixing the anchor 14 and the rail 10 with the wire spring 12.

このように、本発明のPC枕木の移動台車1は、道床交換する時は、PC枕木とレールに嵌めた線バネ12を取り外して、PC枕木のアンカー14とPC枕木の移動台車1の左側板61と右側板62のピン穴8にボルト9を貫通させてナット91で締める。引き続いてユンボ16でバラスト15を堀り出し、本発明のPC枕木の移動台車1でPC枕木11を固定し吊り下げたら、ガード・ローラー3は、レール側面101に、主ローラー5はレール脚面102に当接し、ユンボの爪161でPC枕木の移動台車1を押すとレール脚面上を転がって移動でき、PC枕木の移動、再配置を簡単に行うことができる。 As described above, when the moving bed 1 of the PC sleeper according to the present invention is used to replace the roadbed, the PC sleeper and the wire spring 12 fitted to the rail are removed, and the PC sleeper anchor 14 and the left side plate of the moving bed 1 of the PC sleeper are removed. Bolts 9 are passed through the pin holes 8 of 61 and the right side plate 62 and tightened with nuts 91. Subsequently, the ballast 15 is dug out by the yumbo 16 and the PC sleeper 11 is fixed and suspended by the moving carriage 1 of the present invention, and the guard roller 3 is placed on the rail side surface 101 and the main roller 5 is placed on the rail leg surface 102. When the PC trolley moving carriage 1 is pushed with the claw 161 of the yumbo, it can roll on the rail leg surface and can be moved and rearranged easily.

鉄道のレールの軌道保守において、バラストを交換するときに必要なPC枕木の移動を、効率、低コストで実現するためのPC枕木の移動台車を提供する。 Provided is a PC sleeper moving cart for realizing the movement of a PC sleeper necessary for exchanging ballast at an efficient and low cost in track maintenance of railroad rails.

1 PC枕木の移動台車
1A 左レールのPC枕木の移動台車
1B 右レールのPC枕木の移動台車
2 ガード・ローラーカバー
21 左ガード・ローラーカバー
22 右ガード・ローラーカバー
3 ガード・ローラー
31 左ガード・ローラー
311 左ローラー軸
32 右ガード・ローラー
322 右ローラー軸
4 主ローラーカバー
5 主ローラー
51 主ローラー軸
6 中央本体
61 左側板
62 右側板
63 中央筐体
7 取手
8 ピン穴
81 左ピン穴
82 右ピン穴
9 ボルト
91ナット
10 レール
10A 左レール
10B 右レール
101 レール側面
102 レール脚面
11 PC枕木
111〜117 PC枕木
12 線バネ
13 パンドロール
14 アンカー
141 アンカーの穴
15 バラスト
151 新バラスト
16 ユンボ
161 ユンボの爪
17 専用吊上げ器




1 PC sleeper carriage 1A Left rail PC sleeper carriage 1B Right rail PC sleeper carriage 2 Guard roller cover 21 Left guard roller cover 22 Right guard roller cover 3 Guard roller 31 Left guard roller 311 Left roller shaft 32 Right guard roller 322 Right roller shaft 4 Main roller cover 5 Main roller 51 Main roller shaft
6 Central body 61 Left side plate 62 Right side plate 63 Central housing 7 Handle 8 Pin hole 81 Left pin hole 82 Right pin hole 9 Bolt 91 Nut 10 Rail 10A Left rail 10B Right rail 101 Rail side surface 102 Rail leg surface 11 PC sleepers 111-117 PC sleeper 12 wire spring
13 Pandroll 14 Anchor 141 Anchor hole 15 Ballast 151 New ballast
16 Yumbo
161 Yumbo's claws 17




Claims (5)

レールの軌道の枕木に間に敷かれるバラストを新しいバラストに交換する道床交換においてPC枕木を移動させるためのPC枕木の移動台車であって、PC枕木の移動台車1は中央筐体63と左側板61、右側板62を備えた略直方体の箱型の中央本体6を有し、左側板61と右側板62に、左側板61と右側板62とPC枕木のアンカーの穴141を貫通させてボルト9を通すためのピン穴8を設け、そのピン穴8を用いてPC枕木を吊り下げて固定するためのPC枕木接続手段と、レール脚面102に当接させ、レール脚面102上を転がって移動させるローラーを備えた移動手段を備え、
PC枕木11を移動させるときは、二つのPC枕木の移動台車1Aと右レールのPC枕木の移動台車1Bにより、レールから外れないように、レールAとレールBをはさみ、夫々のPC枕木接続手段でPC枕木11を固定することによりPC枕木を移動できるようにしたことを特徴とするPC枕木の移動台車。
A moving bed of PC sleepers for moving a PC sleeper in a roadbed exchange in which a ballast placed between rail sleepers of a rail is replaced with a new ballast. The moving bed 1 of a PC sleeper includes a central casing 63 and a left side plate. 61, a substantially rectangular parallelepiped box-shaped central body 6 provided with a right side plate 62. The left side plate 61 and the right side plate 62 are passed through the holes 141 of the left side plate 61, the right side plate 62 and the PC sleeper anchor, and are bolted. 9 is provided with a pin hole 8 through which the PC sleeper 9 is suspended and fixed to a PC sleeper connecting means for fixing the PC sleeper, and the rail leg surface 102 is moved to roll on the rail leg surface 102. A moving means equipped with a roller
When the PC sleeper 11 is moved, the rail A and the rail B are sandwiched between the two PC sleeper moving carts 1A and the right rail PC sleeper moving cart 1B so as to connect the respective PC sleepers. The PC sleeper moving carriage is characterized in that the PC sleeper 11 can be fixed by moving the PC sleeper.
PC枕木接続手段は、PC枕木11のアンカーの穴141とPC枕木の移動台車1のピン穴8にボルト9を貫通させ、ナット91で締め付けて固定することで、PC枕木を吊り下げられるようにしたことを特徴とする請求項1記載のPC枕木の移動台車。The PC sleeper connecting means allows the PC sleeper to be suspended by passing the bolt 9 through the anchor hole 141 of the PC sleeper 11 and the pin hole 8 of the moving bed 1 of the PC sleeper and tightening and fixing with the nut 91. The moving carriage for PC sleepers according to claim 1, wherein: 移動手段は、レール側面101に当接させ、レール側面101に沿って転がる一つ以上のガード・ローラー3と、レールの脚面102に上方から当接させ、レールの脚面102上を転がしながら移動する一つ以上の主ローラー5を備え、ガード・ローラー3をレール側面に当接させながら、主ローラー5はレール脚面102上を転がして移動しえるようにしたことを特徴とする請求項1又は請求項2に記載のPC枕木の移動台車。The moving means is brought into contact with the rail side surface 101, and is brought into contact with the one or more guard rollers 3 rolling along the rail side surface 101 and the rail leg surface 102 from above, and moves while rolling on the rail leg surface 102. The one or more main rollers (5) are provided, and the main roller (5) rolls on the rail leg surface (102) while the guard roller (3) abuts against the rail side surface. Item 3. A moving cart for a PC sleeper according to Item 2. PC枕木の移動台車1は、中央筐体63と左側板61、右側板62を備えた略直方体の箱型の中央本体6を有し、レール脚面102上を移動する移動手段と、PC枕木を接続するためのPC枕木接続手段を設け、移動手段は、中央本体6の左側板61にガード・ローラーカバー21を備え、その中に、左ローラー軸311を設け、レール側面101に当接しレール側面を転がる左ガード・ローラー31を取り付け、右側板62にガード・ローラーカバー22を備え、その中に右ローラー軸322を設け、レール側面に当接しレール側面を転がる左ガード・ローラー32を取り付け、中央本体6に、主ローラー5を覆うための主ローラーカバー4を付け、その下に主ローラー軸51を設け、レールの脚面102に当接し、レール脚面102を転がる主ローラー51を取り付け、
移動手段において、ガード・ローラー3はレール側面101に当接させて、レール側面101に沿って転がり、主ローラー5はレールの脚面102に上方から当接させ、レールの脚面102上を転がるように構成され、
PC枕木接続手段は、左側板61と右側板62に、左側板61と右側板62とPC枕木のアンカーの穴141を貫通させてボルト9を通すためのピン穴8を設け、PC枕木に取り付けたアンカーの穴141とビン穴8にボルト9を貫通させ、ナット91で締め付けることで、PC枕木11をPC枕木の移動台車1に固定し吊り下げできように構成することにより、PC枕木を移動できるようにしたことを特徴とする請求項1から請求項3の何れかに記載のPC枕木の移動台車。
The PC sleeper moving carriage 1 has a substantially rectangular parallelepiped box-shaped central body 6 having a central housing 63, a left side plate 61, and a right side plate 62, a moving means that moves on the rail leg surface 102, and a PC sleeper. PC sleeper connecting means for connecting is provided, and the moving means is provided with a guard roller cover 21 on the left side plate 61 of the central body 6, in which a left roller shaft 311 is provided, abutting against the rail side surface 101, and the rail side surface The left guard roller 31 is attached to the right side plate 62, the right roller shaft 322 is provided therein, the left guard roller 32 that is in contact with the rail side surface and rolls on the rail side surface is attached, A main roller cover 4 for covering the main roller 5 is attached to the main body 6, and a main roller shaft 51 is provided below the main roller cover 5, contacting the leg surface 102 of the rail, and rolling the rail leg surface 102. The main roller 51 is attached that,
In the moving means, the guard roller 3 abuts on the rail side surface 101 and rolls along the rail side surface 101, and the main roller 5 abuts on the rail leg surface 102 from above and rolls on the rail leg surface 102. Configured,
The PC sleeper connecting means is provided with a pin hole 8 for passing the bolt 9 through the left plate 61, the right plate 62, and the anchor hole 141 of the PC sleeper on the left plate 61 and the right plate 62, and is attached to the PC sleeper. By moving the bolt 9 through the anchor hole 141 and the bin hole 8 and tightening with the nut 91, the PC sleeper 11 can be fixed to the moving carriage 1 of the PC sleeper and suspended so that the PC sleeper can be moved. The movable carriage for a PC sleeper according to any one of claims 1 to 3, characterized in that it can be made .
レールの軌道の枕木の間に敷かれるバラストを新しいバラストに交換する道床交換であって、道床交換する範囲のレールのPC枕木のアンカーの穴141から線バネ12を外し、かわりに、道床交換する範囲の全ての左レールAと右レールの全てのPC枕木のアンカー14について、PC枕木の移動台車1を設置し、PC枕木を固定して吊り下げ、PC枕木を吊り下げた状態でPC枕木の移動台車1でレール脚面102上を移動させ、交換するバラストを含む範囲のPC枕木を一箇所に集めた後、その道床交換する範囲のバラスト15を新バラスト151に交換し、その後、移動させたPC枕木をPC枕木の移動台車で、元の位置に戻し、PC枕木とPC枕木の移動台車1を分離し、PC枕木11にアンカーの穴141に線バネ12を挿入して、PC枕木とレールを固定することにより道床交換することを特徴とする請求項1〜4の何れかに記載のPC枕木の移動台車1を用いた道床交換方法。It is a roadbed exchange in which the ballast laid between the rail sleepers of the rail is replaced with a new ballast, and the wire spring 12 is removed from the anchor hole 141 of the PC sleeper of the rail in the range of the roadbed exchange, and the roadbed is exchanged instead. For all the left rail A and all the PC sleeper anchors 14 on the range, the PC sleeper 1 is installed, the PC sleeper is fixed and suspended, and the PC sleeper is suspended while the PC sleeper is suspended. After moving on the rail leg surface 102 with the moving carriage 1 and collecting the PC sleepers in the range including the ballast to be replaced, the ballast 15 in the range to be replaced is replaced with the new ballast 151, and then moved. Move the PC sleeper back to its original position with the PC sleeper moving carriage, separate the PC sleeper and the PC sleeper moving carriage 1, and insert the wire spring 12 into the anchor hole 141 in the PC sleeper 11. , Ballast exchange method using a mobile carriage 1 a PC sleeper according to any one of claims 1 to 4, characterized in that the ballast exchange by fixing the PC sleepers and rails.
JP2010175852A 2010-08-05 2010-08-05 PC sleeper moving cart Expired - Fee Related JP4911394B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2010175852A JP4911394B2 (en) 2010-08-05 2010-08-05 PC sleeper moving cart
CN2011102303217A CN102418305A (en) 2010-08-05 2011-08-05 PC sleeper moving trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010175852A JP4911394B2 (en) 2010-08-05 2010-08-05 PC sleeper moving cart

Publications (2)

Publication Number Publication Date
JP2012036598A JP2012036598A (en) 2012-02-23
JP4911394B2 true JP4911394B2 (en) 2012-04-04

Family

ID=45848872

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010175852A Expired - Fee Related JP4911394B2 (en) 2010-08-05 2010-08-05 PC sleeper moving cart

Country Status (2)

Country Link
JP (1) JP4911394B2 (en)
CN (1) CN102418305A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT518071B1 (en) * 2016-03-07 2017-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Rail fastening means and method for section rehabilitation of a track
JP6674396B2 (en) * 2017-02-06 2020-04-01 公益財団法人鉄道総合技術研究所 Sleeper moving jig
JP6322349B1 (en) * 2017-05-03 2018-05-09 健新 岡市 Sleeper sliding device
JP6871609B2 (en) * 2017-07-03 2021-05-12 東日本旅客鉄道株式会社 Moving equipment for PC sleepers and how to move PC sleepers

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4943792B2 (en) * 2006-09-19 2012-05-30 保線機器整備株式会社 Track cart and ladder-type sleeper transport device

Also Published As

Publication number Publication date
CN102418305A (en) 2012-04-18
JP2012036598A (en) 2012-02-23

Similar Documents

Publication Publication Date Title
JP4911394B2 (en) PC sleeper moving cart
CN101456036B (en) Breast-roll set replacement method and hoisting clamp thereof
CN207812196U (en) Railway work business line maintenance multi-function device
CN202063156U (en) Wheel suspension device for rescuing railway locomotive and vehicle
CN204959513U (en) Trade rail operation train in succession
CN106522563A (en) Building construction member slip mechanism and installation and demounting method thereof
CN114717886A (en) A kind of inlaid wing-rail alloy steel composite frog and method for online replacement of wearing parts
CN205259063U (en) A closed construction platform for going up stride construction of old bridge anticollision barrier of railway
CN107858881A (en) A kind of hundred meters long rail of subway route changes constructing device and method
CN205329558U (en) It becomes straddle mounting trigger not have to dismantle
CN105401495A (en) Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN215289515U (en) Long rail anti-overturning device
CN211255010U (en) Automatic ash removal device for bridge crane track
CN212356306U (en) A 25m steel rail replacement device for extra-long subway tunnels
CN202442877U (en) Track-gauge-variable testbed of window cleaning machine
CN103924489A (en) Tool kit for manually detaching and assembling dual-layer damping fasteners for urban rail and using method of tool kit
CN201896292U (en) Movable type trolley with electricity prevention plate
JP3223401U (en) Portable derailment recovery device
CN202157250U (en) Rail-blocking device for paving long rails in curve-superelevation areas
CN206316579U (en) A kind of railway contact line H profile steel mat jig
CN207419166U (en) A kind of assembled sleeper for shield construction
CN222160791U (en) Double-rail fastener structure with guard rail function
CN113373742B (en) Railway traction type ballast separating and shaping device
CN110903009A (en) Base for sludge dryer
CN201913214U (en) Casting blank collecting bed track beam structure and casting blank collecting bed

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

R155 Notification before disposition of declining of application

Free format text: JAPANESE INTERMEDIATE CODE: R155

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120105

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150127

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees