JP4916223B2 - Distribution line laying cost calculation support system and information processing method - Google Patents
Distribution line laying cost calculation support system and information processing method Download PDFInfo
- Publication number
- JP4916223B2 JP4916223B2 JP2006155099A JP2006155099A JP4916223B2 JP 4916223 B2 JP4916223 B2 JP 4916223B2 JP 2006155099 A JP2006155099 A JP 2006155099A JP 2006155099 A JP2006155099 A JP 2006155099A JP 4916223 B2 JP4916223 B2 JP 4916223B2
- Authority
- JP
- Japan
- Prior art keywords
- cost
- information
- data
- revenue
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004364 calculation method Methods 0.000 title claims description 116
- 230000010365 information processing Effects 0.000 title claims description 32
- 238000003672 processing method Methods 0.000 title claims description 11
- 238000010276 construction Methods 0.000 claims description 105
- 238000011084 recovery Methods 0.000 claims description 100
- 238000012423 maintenance Methods 0.000 claims description 69
- 230000008439 repair process Effects 0.000 claims description 69
- 230000005611 electricity Effects 0.000 claims description 49
- 238000009434 installation Methods 0.000 claims description 47
- 238000004891 communication Methods 0.000 claims description 40
- 238000000034 method Methods 0.000 claims description 17
- 230000008901 benefit Effects 0.000 claims description 16
- 230000008569 process Effects 0.000 claims description 15
- 150000003839 salts Chemical class 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 9
- 238000012545 processing Methods 0.000 claims description 5
- 230000004044 response Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 21
- 230000008859 change Effects 0.000 description 17
- 238000009418 renovation Methods 0.000 description 8
- 230000003287 optical effect Effects 0.000 description 2
- 238000012935 Averaging Methods 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 210000000707 wrist Anatomy 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
この発明は、配電線を敷設する敷設区間の配電線敷設費用から敷設投資額を決定する配電線投資額の決定支援システムに適用可能な配電線敷設費用の算出支援システム、及び情報処理方法に関するものである。 TECHNICAL FIELD The present invention relates to a distribution line laying cost calculation support system and an information processing method applicable to a distribution line investment amount determination support system that determines a laying investment amount from a distribution line laying cost of a laying section where a distribution line is laid. It is.
詳しくは、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する情報提供装置から提供されたこれらの情報を受信して処理する情報処理装置が、敷設費用算出手段を備え、この敷設費用算出手段が、敷設区間における電力料金収入額と費用回収期間から電力収入総額を算出し、この電力収入総額と維持費に基づいて配電線の敷設費用を算出し、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようにする。 Specifically, the information processing device that receives and processes the information provided from the information providing device that provides the information on the revenue of the electricity bill in the laid section and the maintenance cost for maintaining the distribution line after laying is laid down. A calculating means, and the laying cost calculating means calculates the total power revenue from the amount of power charge revenue in the laid section and the cost collection period, and calculates the laying cost of the distribution line based on the total power revenue and the maintenance cost, Without relying on manual calculation, it is possible to efficiently determine and support distribution line laying investment using the automatically calculated distribution line laying cost.
従来、配電線を敷設する敷設区間で配電線を敷設する費用を決定する場合、作業者自らの手計算により配電線の敷設費用が計算されることが多い。例えば、先ず、作業者は、配電線の敷設区間における電力料金収入額の情報を電力料金収入額管理サーバなどから取得する。取得した電力料金収入額と、敷設区間における配電線を敷設する費用を回収する費用回収期間とから電力収入総額を算出する。次に、配電線の敷設区間における配電線を維持する維持費を過去のデータなどを参照して計算する。最後に、算出されたこの電力収入総額から過去のデータなどから算出された維持費を差し引き、維持費が差し引かれた電力収入総額に基づいて配電線の敷設費用を決定する。 Conventionally, when determining the cost of laying a distribution line in the laying section where the distribution line is laid, the installation cost of the distribution line is often calculated by the operator's own calculation. For example, first, the operator acquires information on the amount of power charge revenue in the distribution section of the distribution line from a power fee revenue management server or the like. The total amount of power revenue is calculated from the acquired power rate revenue and the cost recovery period for recovering the cost of laying the distribution lines in the installed section. Next, a maintenance cost for maintaining the distribution line in the distribution line laying section is calculated with reference to past data and the like. Finally, the maintenance cost calculated from past data or the like is subtracted from the calculated total power revenue, and the distribution line laying cost is determined based on the total power revenue deducted from the maintenance cost.
このような従来の例に関連して、特許文献1には、電力系統から観測される情報に基づき事故復旧手順を自動作成して表示する電力系統事故復旧支援装置が開示されている。この電力系統事故復旧支援装置によれば、事故発生に際して恒久復旧負荷量を求めると共に、負荷減少率データを用いて応急的に復旧すべき応急復旧負荷量を求める。これにより、とりあえず必要な応急復旧負荷と恒久復旧負荷とに分けて復旧操作するので、事故復旧が短時間に、かつ合理的にできる。
In relation to such a conventional example,
ところで、従来例によれば、配電線を新たに敷設する敷設区間に投資される配電線敷設投資額を決定する場合、作業者自らの手動計算により配電線の敷設費用が計算されることが多いので、配電線を敷設する費用を計算するのに多くの時間を必要とする可能性がある。また、計算間違いをおこして正確に配電線の敷設費用を算出できないおそれがある。 By the way, according to the conventional example, when determining the distribution line laying investment amount to be invested in the laying section in which the distribution line is newly laid, the distribution line laying cost is often calculated by the operator's own manual calculation. So it may take a lot of time to calculate the cost of laying the distribution lines. Moreover, there is a possibility that a calculation error is made and the distribution line laying cost cannot be calculated accurately.
また、特許文献1によれば、電力系統から観測される情報を事故の復旧を支援する場合に使用しているが、配電線を敷設する費用を算出する場合には使用されていない。
Further, according to
そこで、本発明は、このような従来例に係る課題を解決したものであって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようにした配電線敷設費用の算出支援システム、及び情報処理方法を提供することを目的とする。 Therefore, the present invention solves the problem related to such a conventional example, and without relying on manual calculation, the distribution line laying investment amount using the automatically calculated distribution line laying cost. It is an object of the present invention to provide a distribution line laying cost calculation support system and an information processing method that can efficiently determine and support the distribution line.
上述した課題を解決するために、本発明に係る請求項1に記載の配電線敷設費用の算出支援システムは、配電線を敷設する敷設区間の配電線敷設費用を算出支援するシステムであって、前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、前記情報処理装置は、少なくとも、前記敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を取得する入力手段と、前記入力手段により入力された当該敷設区間における前記電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出手段と、前記電力収入算出手段により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、前記利益が差し引かれた当該電力収入総額から、前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記配電線の敷設費用として前記標準建設費及び又は最大建設費を算出する敷設費用算出手段とを有することを特徴とするものである。
In order to solve the above-mentioned problem, the distribution line laying cost calculation support system according to
本発明に係る配電線敷設費用の算出支援システムによれば、配電線を敷設する敷設区間の配電線敷設費用を算出支援する場合であって、情報提供装置は、敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有しており、取得要求に対応して電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び維持費の情報を提供する。情報処理装置は、情報提供装置から提供された電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び維持費の情報を受信して配電線を敷設する敷設区間の配電線敷設費用を算出処理する。例えば、情報処理装置は、入力手段、電力収入算出手段、及び敷設費用算出手段を備え、入力手段は、少なくとも、配電線を敷設する敷設区間の情報を入力すると共に、配電線敷設費用を回収する費用回収期間の情報を入力し、通信手段を介して情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び維持費の情報を取得する。電力収入算出手段は、入力手段により入力された敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する。敷設費用算出手段は、電力収入算出手段により算出された電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、利益が差し引かれた当該電力収入総額から、情報提供装置から取得した維持費及び対策費を差し引いた金額を配電線の建設費とし、建設費、重要負荷費、及び復旧困難費を加算した金額を標準建設費とし、建設費、及び利益を加算した金額を最大建設費としたとき、配電線の敷設費用として標準建設費及び又は最大建設費を算出する。従って、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。
According to calculation support system distribution lines laying costs of the present invention, in the case of calculating aid distribution line laying costs laying section for laying distribution lines, the information providing apparatus, the power rate revenues in laying section It has a database that stores annual revenue information, passing current information, parameter information, and maintenance cost information to maintain the distribution line after laying , for each contract type, and the amount of electricity fee revenue corresponding to the acquisition request The annual income information, the passing current information, the parameter information, and the maintenance cost information for each contract type including The information processing device receives the annual revenue information, the passing current information, the parameter information , and the maintenance cost information for each contract type including the electricity fee revenue provided from the information providing device, and installs the distribution line. Calculate distribution line installation costs . For example, the information processing apparatus includes an input unit, a power revenue calculation unit, and a laying cost calculation unit, and the input unit inputs at least information about a laying section in which the distribution line is laid and collects the distribution line laying cost. Enter the information on the cost recovery period , and obtain the annual revenue information, passing current information, parameter information, and maintenance cost information for each contract type including the amount of power fee revenue in the installed section from the information providing device via the communication means. . The power revenue calculation means multiplies the annual revenue information for each contract type including the amount of power charge revenue in the installed section input by the input means by the information of the expense collection period , and the section revenue information for each contract type multiplied a section revenue is calculated by summing the calculated passing current information, parameter information, and power total revenue from the downstream income information cost recovery period is calculated by multiplying. Laying costs calculation means, in order to secure the benefits obtained by multiplying a predetermined ratio with respect to power total revenue calculated by the power revenue calculation means, pulling to the difference of the benefit from the power total income, the distribution line The cost required to protect the plant from natural disasters is taken as a countermeasure cost, and the cost required to maintain sufficient power for facilities necessary to maintain life and life is set as the important load cost, and the power outage The cost of loss of opportunity that occurs from the time of recovery to the time of recovery is regarded as a difficult recovery cost, and the amount obtained by subtracting the maintenance costs and countermeasure costs acquired from the information provision equipment from the total power revenue deducted from profits is the construction cost of the distribution line. When the construction cost, important load cost, and recovery difficult cost are standard construction costs, and the construction cost and the sum of profits are the maximum construction costs, the standard construction costs and It calculates the maximum construction costs. Therefore, it is possible to efficiently determine and support the distribution line laying investment amount by using the automatically calculated distribution line laying cost without depending on manual calculation.
上述した課題を解決するために、本発明に係る請求項7に記載の情報処理方法は、配電線を敷設する敷設区間の配電線敷設費用を決定支援するための情報を処理する方法であって、前記配電線敷設費用の決定支援するシステムが、前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、前記情報処理装置が、入力手段、電力収入算出手段及び、敷設費用算出手段を有し、少なくとも、前記入力手段が、前記配電線を敷設する敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び前記維持費の情報を取得するように操作される入力工程を有し、前記電力収入算出手段が、前記入力工程により入力された当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出工程を有し、前記敷設費用算出手段が、前記電力収入算出工程により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、前記利益が差し引かれた当該電力収入総額から、前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記標準建設費及び又は最大建設費を算出する敷設費用算出工程を有することを特徴とするものである。
In order to solve the above-described problem, an information processing method according to
本発明に係る情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を決定支援する情報を処理する場合であって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。 According to the information processing method of the present invention, it is a case where information for supporting the determination of the distribution line laying cost of the laying section where the distribution line is laid is processed, and is automatically calculated without depending on manual calculation. It becomes possible to efficiently determine and support distribution line laying investment amount using the distribution line laying cost.
本発明に係る配電線敷設費用の算出支援システム及び情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を算出支援する場合であって、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する情報提供装置から提供されたこれらの情報を受信して配電線敷設費用を算出処理する情報処理装置は、敷設費用算出手段を備え、この敷設費用算出手段は、算出された電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から利益を差し引き、利益が差し引かれた当該電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、建設費、重要負荷費、及び復旧困難費を加算した金額を標準建設費とし、建設費、及び利益を加算した金額を最大建設費としたとき、配電線の敷設費用として標準建設費及び又は最大建設費を算出するものである。 According to the distribution line laying cost calculation support system and the information processing method according to the present invention, when calculating and supporting the distribution line laying cost of the laying section in which the distribution line is laid, The information processing apparatus that receives the information provided from the information providing apparatus that provides the maintenance cost information for maintaining the distribution line after laying and calculates the distribution line laying cost includes a laying cost calculation unit, laying costs calculation means, in order to secure the benefits obtained by multiplying a predetermined ratio with respect to the calculated power total income, pull differentially benefit from the power total income, the power revenue gross profit is subtracted The amount obtained by subtracting maintenance costs and countermeasure costs from this is the distribution line construction cost, the sum of the construction cost, important load cost, and difficult recovery cost is the standard construction cost, and the sum of construction cost and profit is the maximum. When the construction cost, and calculates the standard construction costs and or up to construction costs as laying costs distribution line.
この構成によって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。 With this configuration, it is possible to efficiently determine and support the distribution line laying investment amount by using the automatically calculated distribution line laying cost without depending on manual calculation.
続いて、本発明に係る配電線敷設費用の算出支援システム、及び情報処理方法について、図面を参照しながら説明をする。 Next, a distribution line laying cost calculation support system and an information processing method according to the present invention will be described with reference to the drawings.
図1は、本発明に係る実施例としての配電線投資額の決定支援システム100の構成例を示す概念図である。図1に示す配電線投資額の決定支援システム100は、配電線敷設費用の算出支援システムの一例を構成し、投資額決定サーバ1、電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5から構成されている。
FIG. 1 is a conceptual diagram showing a configuration example of a distribution line investment amount
電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5は、情報提供装置の一例であり、通信回線6に接続され、配電線を敷設する敷設区間の配電線敷設費用を決定する場合に、この敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費などの情報を提供する。
The electricity
通信回線6は、通信手段の一例であり、通信接続事業所内に設置されたインターネット接続装置に接続されている。情報を提供するこれら4つのサーバは、例えば、電力事業所に設置されている。
The
電気料金管理サーバ2には、例えば、顧客ごとの電力量料金情報、基本料金情報、契約種別情報、及び重要負荷種別情報が保存されている。これらの情報は、既存の電力系統の情報であり、見込み顧客の情報は含まれていない。勿論、新規に電力を供給する場合、見込み顧客の予想電力量料金情報などを用意してもよい。
The electricity
契約種別情報とは、電気料金のメニューであり、低圧電灯、低圧電力、高圧電力、及びその他などがある。重要負荷種別情報とは、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費の情報であり、この施設には、病院、学校、通信局、電力事業所、水道局、ガス事業所、及び放送局が含まれる。この重要負荷種別情報は、例えば、「病院」、「学校」、「ガス」などと記録されている。これらの顧客料金情報、顧客契約種別情報、及び重要負荷種別情報は、顧客ごとに、顧客名、住所、電話番号、及び契約番号の情報とリンクされており、顧客名、住所、電話番号、又は契約番号を検索キーにして検索可能である。電気料金管理サーバ2は、検索結果の情報を投資額決定サーバ1に送信する。
The contract type information is a menu of electricity charges, such as a low piezoelectric lamp, low voltage power, high voltage power, and others. The important load type information is information on the important load cost for providing sufficient power to the facilities necessary for maintaining life and life. This facility includes hospitals, schools, Includes communication stations, power stations, water stations, gas stations, and broadcasting stations. This important load type information is recorded as, for example, “hospital”, “school”, “gas”, and the like. These customer fee information, customer contract type information, and important load type information are linked to customer name, address, telephone number, and contract number information for each customer, and the customer name, address, telephone number, or Search is possible using the contract number as a search key. The electricity
経理サーバ3には、例えば、簿価情報が保存されている。この簿価情報とは、固定資産の取得原価データであり、例えば、1坪あたりの単価である。この簿価情報は、固定資産の場所情報とリンクされており、固定資産の場所情報を検索キーにして検索可能である。経理サーバ3は、検索結果の情報を投資額決定サーバ1に送信する。
In the
配電設備管理サーバ4には、例えば、電柱番号情報、電柱の設置場所情報、電柱の位置情報、及び自然災害対策情報が保存されている。電柱番号情報とは、電柱ごとに割り振られた番号の情報であり、この電柱番号情報は、例えば、「001−001」と記録されている。電柱の設置場所情報とは、電柱が設置されている場所の情報であり、この電柱の設置場所情報は、例えば、「広島県○○市△△」と記録されている。
In the power distribution
電柱の位置情報とは、電柱の設置場所情報を数値化したものであり、この電柱の位置情報は、例えば、「22,000」、「24,000」と記録されている。電柱間の距離を測定する場合、この電柱の位置情報の絶対値の差が計算され、この差が電柱間の距離となる。自然災害対策情報とは、配電線を自然災害から保護するために必要な対策費の情報であり、この自然災害対策情報には、塩害対策費、強風対策費、雷害対策費、及び雪害対策費が含まれる。この自然災害対策情報は、例えば、電柱ごとに、「強風」、「強風・塩害」などと記録されている。配電設備管理サーバ4は、この対策費の情報を投資額決定サーバ1に送信する。
The position information of the utility pole is obtained by digitizing the installation location information of the utility pole, and the position information of the utility pole is recorded as, for example, “22,000” and “24,000”. When measuring the distance between the utility poles, a difference in absolute value of the position information of the utility pole is calculated, and this difference becomes the distance between the utility poles. Natural disaster countermeasure information is information on countermeasure costs necessary to protect distribution lines from natural disasters. This natural disaster countermeasure information includes salt damage countermeasure costs, strong wind countermeasure expenses, lightning damage countermeasure expenses, and snow damage countermeasures. Cost is included. This natural disaster countermeasure information is recorded as, for example, “strong wind”, “strong wind / salt damage”, etc. for each utility pole. The distribution
配電系統管理サーバ5には、例えば、電柱番号と通過電流情報が保存されている。この通過電流情報とは、通過する電流量であり、通過電流情報は、電柱ごとに記憶されている。この通過電流情報は、電柱番号情報とリンクされており、電柱番号情報を検索キーにして検索可能である。配電系統管理サーバ5は、検索結果の情報を投資額決定サーバ1に送信する。
In the power distribution
投資額決定サーバ1は、情報処理装置の一例であり、通信回線6に接続されている。この通信回線6は、通信接続事業所内に設置されたインターネット接続装置に接続され、投資額決定サーバ1と電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5を接続している。
The investment
投資額決定サーバ1の設置場所は、特に限定されない。インターネットに接続可能な環境であれば、どこでも良い。投資額決定サーバ1には、例えば、ノートパソコンを使用する。この投資額決定サーバ1は、モニタ7、キーボード8、マウス9、及び図示しないUSB(Universal Serial Bus)インターフェースを備えている。マウス9は、このUSBインターフェースに接続されている。
The installation location of the investment
キーボード8、及びマウス9は、入力手段の一例であり、少なくとも、敷設区間を入力すると共に、配電線敷設費用を回収する費用回収期間を入力するようになされる。このキーボード8には、例えば、かな漢字変換などで利用するためのキートップが備えられた106型キーボードが使用される。USBインターフェースには、マウス9が接続され、このマウス9には、例えば、光学式センサーが接地面を断続的にスキャンすることで移動を検出する光学式マウスが使用される。マウス9が平面上で上下左右に移動されると、モニタ7の画面上に表示される図11に示すカーソル60が上下左右に移動する。
The
投資額決定サーバ1は、電気料金管理サーバ2及び配電設備管理サーバ4から提供された電力料金収入額、及び維持費の情報を受信して処理する。投資額決定サーバ1は、図2に示す制御部10を備え、この制御部10は、電力収入算出手段、及び敷設費用算出手段の一例であり、キーボード8、及びマウス9により入力された敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。制御部10は、算出された電力収入総額と維持費に基づいて配電線の敷設費用を算出する。
The investment
また、制御部10は、停電から復旧するまでに発生する機会損失の費用である復旧困難費を復旧現場までの移動距離に応じて算出する。この復旧現場までの移動距離は、配電設備管理サーバ4に記録された電柱の位置情報と営業所の位置情報に基づいて制御部10により算出される。制御部10は、電力収入総額、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の敷設費用を算出する。
In addition, the
具体的には、配電線を建設する建設区間の配電線建設費用を決定する場合、制御部10は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、標準建設費を、建設費、重要負荷費、及び復旧困難費を加算した金額とし、最大建設費を、建設費、及び利益を加算した金額とする。
Specifically, when determining the distribution line construction cost of the construction section for constructing the distribution line, the
これにより、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。 This makes it possible to efficiently invest in the construction of distribution lines without relying on manual calculations, using distribution line standards and maximum construction costs that are automatically calculated according to the importance of countermeasure costs and important load costs. You will be able to support decision making.
また、配電線を改修する改修区間の配電線改修費用を決定する場合、制御部10は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価を差し引いた金額を配電線の改修費とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額とし、最大改修費を、改修費、及び利益を加算した金額とする。これにより、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。
In addition, when determining the distribution line repair cost of the repair section for repairing the distribution line, the
図2は、投資額決定サーバ1の制御部10、及び電気料金管理サーバ2の制御部20の構成例を示すブロック図である。経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5の制御部は、電気料金管理サーバ2の制御部20と同じ構成のため、省略する。
FIG. 2 is a block diagram illustrating a configuration example of the
[投資額決定サーバ1]
図2に示す制御部10は、内蔵モデム11、CPU12、ハードディスク13、RAM14、及びCPUバス15を備えている。
[Investment amount determination server 1]
The
内蔵モデム11は、通信回線6に接続され、通信回線6を介して入力されるアナログデータをデジタルデータに変換してCPUバス15を介してCPU12へ出力する。また、CPU12からCPUバス15を介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して各種サーバへ出力する。
The built-in
CPU12は、CPUバス15に接続され、キーボード8及びマウス9から敷設区間が入力されると共に、配電線敷設費用を回収する費用回収期間が入力される。CPU12は、電気料金管理サーバ2及び配電設備管理サーバ4から送信された電力料金収入額、及び維持費の情報を受信して処理する。CPU12は、キーボード8、及びマウス9により入力なされた敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。CPU12は、算出された電力収入総額と維持費に基づいて配電線の敷設費用を算出する。
The CPU 12 is connected to the
また、CPU12は、停電から復旧するまでに発生する機会損失の費用である復旧困難費を復旧現場までの移動距離に応じて算出する。この復旧現場までの移動距離は、配電設備管理サーバ4に記録された電柱の位置情報と営業所の位置情報に基づいてCPU12により算出される。CPU12は、電力収入総額、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の敷設費用を算出する。
In addition, the CPU 12 calculates a difficult recovery cost, which is a cost of opportunity loss that occurs before recovery from a power failure, according to the travel distance to the recovery site. The movement distance to the restoration site is calculated by the CPU 12 based on the position information of the utility pole and the position information of the sales office recorded in the distribution
具体的には、配電線を建設する建設区間の配電線建設費用を決定する場合、CPU12は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、標準建設費を、建設費、重要負荷費、及び復旧困難費を加算した金額とし、最大建設費を、建設費、及び利益を加算した金額とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。 Specifically, when determining the distribution line construction cost of the construction section for constructing the distribution line, the CPU 12 secures a predetermined percentage of profit from the total power revenue, subtracts the secured profit from the total power revenue, and the profit is The total amount of power revenue deducted from the maintenance and countermeasure costs is the distribution line construction cost, the standard construction cost is the sum of the construction cost, important load cost, and difficult recovery cost, and the maximum construction cost is , Construction cost and profit. As a result, the distribution line construction investment amount can be efficiently determined and supported using the distribution line standard and the maximum construction cost automatically calculated according to the importance such as the countermeasure cost and the important load cost.
また、配電線を改修する改修区間の配電線改修費用を決定する場合、CPU12は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価を差し引いた金額を配電線の改修費とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額とし、最大改修費を、改修費、及び利益を加算した金額とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。 In addition, when determining the distribution line repair cost of the repair section for repairing the distribution line, the CPU 12 secures a predetermined percentage of profit from the total power revenue, subtracts the secured profit from the total power revenue, and the profit is deducted. The total power revenue minus the maintenance cost, countermeasure cost, and book value is the distribution line repair cost, the standard repair cost is the sum of the repair cost, important load cost, and difficult recovery cost, and the maximum repair cost Is the sum of repair costs and profits. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.
ハードディスク13は、CPUバス15を介してCPU12に接続されている。このハードディスク13には、配電線投資額を算出する配電線投資額決定プログラム、対策費や重要負荷費などの重要度を設定するパラメータデータリスト45(図8参照)、及び営業所の位置情報が保存されている。例えば、対策費の塩害対策費には、「2,000」と設定され、対策費の強風対策費には、「4,000」と設定されている。これらの値を各区間長に乗算して各対策を算出する。これにより、パラメータを変更することで、重要度に応じて各対策費を調整できるようになる。パラメータデータリスト45、営業所の位置情報は、CPU12により変更される。
The
RAM14は、CPUバス15を介してCPU12に接続されている。RAM14には、ハードディスク13に保存された配電線投資額決定プログラムがCPU12により展開される。このようにして、投資額決定サーバ1が構成されている。
The
[電気料金管理サーバ2]
電気料金管理サーバ2は、制御部20を備え、この制御部20は、内蔵モデム21、CPU22、RAM23、CPUバス24、及び顧客料金契約DB(DataBase)25を備えている。
[Electricity charge management server 2]
The electricity
内蔵モデム21は、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバス24を介してCPU22へ出力する。また、CPU22からCPUバス24を介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。
The built-in
CPU22は、投資額決定サーバ1から料金収入情報取得要求、及び重要負荷情報取得要求を受信して顧客料金契約DB25を検索し、検索結果の情報を投資額決定サーバ1へ送信する。
The
顧客料金契約DB25は、CPUバス24を介してCPU22に接続されている。この顧客料金契約DB25には、契約番号データ、顧客名データ、住所データ、電話番号データ、基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データが保存されている。基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データは、顧客ごとに、顧客名データ、住所データ、電話番号データ、及び契約番号データとリンクされており、顧客名データ、住所データ、電話番号データ、又は契約番号データを検索キーにして検索可能である。
The customer fee contract DB 25 is connected to the
RAM23は、CPUバス24を介してCPU22に接続されている。このRAM23には、顧客料金契約DB25に保存されている上述したデータがCPU22により展開されている。このようにして、電気料金管理サーバ2が構成されている。
The
[経理サーバ3]
経理サーバ3は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び簿価DB26を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Accounting server 3]
The
内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。
The built-in modem is connected to the
CPUは、投資額決定サーバ1から区間簿価情報取得要求を受信して簿価DB26を検索し、検索結果のデータを投資額決定サーバ1へ送信する。
The CPU receives the section book value information acquisition request from the investment
簿価DB26は、CPUバスを介してCPUに接続されている。この簿価DB26には、場所データ、及び1坪あたりの単価データが保存されている。1坪あたりの単価データは、場所データとリンクされており、場所データを検索キーにして検索可能である。例えば、投資額決定サーバ1から場所データが入力され、この場所データを検索キーにして1坪あたりの単価データがCPUにより検索される。
The
RAMは、CPUバスを介してCPUに接続されている。このRAMには、簿価DB26に保存されている上述したデータがCPUにより展開されている。このようにして、経理サーバ3が構成されている。
The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the
[配電設備管理サーバ4]
配電設備管理サーバ4は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び配電設備DB27及び地図DB28を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Distribution Equipment Management Server 4]
The distribution
内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。
The built-in modem is connected to the
配電設備DB27及び地図DB28は、CPUバスを介してCPUに接続されている。配電設備DB27には、電柱番号データ、電柱の設置場所データ、電柱の位置データ、及び自然災害対策データが保存されている。自然災害対策データは、電柱番号データとリンクされており、この電柱番号データを検索キーにして検索可能である。地図DB28には、住所データ及び位置データが保存されている。位置データは、住所データにリンクされており、この住所データを検索キーにして検索可能である。
The power
RAMは、CPUバスを介してCPUに接続されている。このRAMには、配電設備DB27及び地図DB28に保存されている上述したデータがCPUにより展開されている。
The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the power
CPUは、投資額決定サーバ1から区間内電柱情報取得要求、区間長情報取得要求、自然災害対策情報取得要求、又は到達距離情報取得要求を受信して配電設備DB27を検索し、検索結果のデータを投資額決定サーバ1へ送信する。また、CPUは、配電設備DB27に電柱を追加した場合、地図DB28の住所データを検索し、合致した住所データの位置データを配電設備DB27に追加する。このようにして、配電設備管理サーバ4が構成されている。
The CPU receives the intra-section utility pole information acquisition request, the section length information acquisition request, the natural disaster countermeasure information acquisition request, or the reach distance information acquisition request from the investment
[配電系統管理サーバ5]
配電系統管理サーバ5は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び簿価DB26を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Distribution system management server 5]
The power distribution
内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。
The built-in modem is connected to the
CPUは、投資額決定サーバ1から通過電流情報取得要求を受信して系統システム負荷DB29を検索し、検索結果のデータを投資額決定サーバ1へ送信する。
The CPU receives a passing current information acquisition request from the investment
系統システム負荷DB29は、CPUバスを介してCPUに接続されている。この系統システム負荷DB29には、電柱番号データ、電柱の設置場所データ、及び通過電流データが保存されている。通過電流データは、電柱番号データとリンクされており、電柱番号データを検索キーにして検索可能である。例えば、配電設備管理サーバ4から電柱番号データが入力され、この電柱番号データを検索キーにして通過電流データがCPUにより検索される。
The system
RAMは、CPUバスを介してCPUに接続されている。このRAMには、系統システム負荷DB29に保存されている上述したデータがCPUにより展開されている。このようにして、配電系統管理サーバ5が構成されている。
The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the
図3は、顧客料金契約DB25の顧客料金契約データリスト40の一部分を示す説明図である。図3に示す顧客料金契約データリスト40は、顧客料金契約DB25に保存され、契約番号データ、顧客名データ、住所データ、電話番号データ、基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データから構成されている。 FIG. 3 is an explanatory diagram showing a part of the customer fee contract data list 40 of the customer fee contract DB 25. The customer fee contract data list 40 shown in FIG. 3 is stored in the customer fee contract DB 25, and is contract number data, customer name data, address data, telephone number data, basic charge data, energy charge data, contract type data, and important data. It consists of load type data.
例えば、契約番号データ「001−001−0001」、顧客名データ「○○××」、住所データ「広島県○○市△△・・・」、電話番号データ「082−XXXXXXX」、基本料金データ「XXX」、電力量料金データ「XXXX」、契約種別データ「低圧電力」、及び重要負荷種別データ「病院」と記録されている。 For example, contract number data “001-001-0001”, customer name data “XXXXX”, address data “Hiroshima XX city ΔΔ...”, Telephone number data “082-XXXXXXX”, basic charge data “XXX”, electric energy charge data “XXXX”, contract type data “low voltage power”, and important load type data “hospital” are recorded.
基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データは、顧客ごとに、顧客名データ、住所データ、電話番号データ、及び契約番号データとリンクされており、顧客名データ、住所データ、電話番号データ、又は契約番号データを検索キーにして検索可能である。顧客料金契約データリスト40は、電気料金管理サーバ2のCPU22が、投資額決定サーバ1から料金収入情報取得要求、及び重要負荷情報取得要求を受信した場合に、このCPU22により参照される。
Basic charge data, electric energy charge data, contract type data, and important load type data are linked with customer name data, address data, telephone number data, and contract number data for each customer. Data, telephone number data, or contract number data can be used as a search key. The customer charge contract data list 40 is referred to by the
例えば、投資額決定サーバ1から料金収入情報取得要求を受信した場合、CPU22は、料金収入情報取得要求の受信と同時に電柱の設置場所データを受信し、この電柱の設置場所データを住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この住所データの範囲に含まれる基本料金データ及び電力量料金データの年間収入を契約種別ごとに合計して契約種別ごとの年間収入データを投資額決定サーバ1へ送信する。
For example, when a fee income information acquisition request is received from the investment
具体的には、料金収入情報取得要求を受信した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この住所データの範囲に含まれる基本料金データ及び電力量料金データの年間収入を契約種別(低圧電灯、低圧電力、高圧電力、その他)ごとに合計してこの契約種別ごとの年間収入データを投資額決定サーバ1へ送信する。
Specifically, when a fee income information acquisition request is received, the utility pole location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are searched as address data. Set customer key contract data list 40 as a key and search annual revenue of basic charge data and energy charge data included in this address data range by contract type (low piezoelectric lamp, low voltage power, high voltage power, etc.) In total, annual income data for each contract type is transmitted to the investment
また、投資額決定サーバ1から重要負荷情報取得要求を受信した場合、CPU22は、重要負荷情報取得要求の受信と同時に電柱の設置場所データを受信し、この電柱の設置場所データを検索キーにして顧客料金契約データリスト40を検索し、電柱の設置場所データの範囲内に存在する重要負荷種別ごとの件数データを投資額決定サーバ1へ送信する。
When the important load information acquisition request is received from the investment
具体的には、重要負荷情報取得要求を受信した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この電柱の設置場所データの範囲内に存在する重要負荷(病院、学校、通信、電気、水道、ガス、放送、及びその他)件数データを投資額決定サーバ1へ送信する。このようにして、顧客料金契約データリスト40が構成されて参照されている。
Specifically, when an important load information acquisition request is received, the utility pole location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are searched as address data. Search the customer fee contract data list 40 by setting the key, and record the number of important loads (hospital, school, communication, electricity, water, gas, broadcasting, etc.) existing within the range of the installation location data of this utility pole It transmits to the investment
図4は、簿価DB26の簿価データリスト41の一部分を示す説明図である。図4に示す簿価データリスト41は、簿価DB26に保存され、場所データ、及び1坪あたりの単価データから構成されている。例えば、場所データ「広島県○○市△△・・・」、及び1坪あたりの単価データ「300,000」と記録されている。
FIG. 4 is an explanatory diagram showing a part of the book value data list 41 of the
1坪あたりの単価データは、場所データとリンクされており、場所データを検索キーにして検索可能である。例えば、投資額決定サーバ1から場所データが入力され、この場所データを検索キーにして1坪あたりの単価データが経理サーバ3のCPUにより検索される。簿価データリスト41は、このCPUが、投資額決定サーバ1から区間簿価情報取得要求を受信した場合に、このCPUにより参照される。
Unit price data per tsubo is linked to location data and can be searched using the location data as a search key. For example, location data is input from the investment
例えば、区間簿価情報取得要求を受信した場合、CPUは、区間簿価情報取得要求の受信と同時に場所データを受信し、この場所データを検索キーにして簿価データリスト41を検索し、場所データの範囲内に存在する1坪あたりの単価データを平均して投資額決定サーバ1へ送信する。
For example, when a section book value information acquisition request is received, the CPU receives location data simultaneously with the reception of the section book value information acquisition request, searches the book value data list 41 using this place data as a search key, The unit price data per tsubo existing within the data range is averaged and transmitted to the investment
具体的には、区間簿価情報取得要求を受信した場合、場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を検索キーにして簿価データリスト41を検索し、場所データの範囲内に存在する1坪あたりの単価データを平均した平均値「XXX,XXX」を投資額決定サーバ1へ送信する。このようにして、簿価データリスト41が構成されて参照されている。
Specifically, when a section book value information acquisition request is received, the book value is set using the location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” as search keys. The data list 41 is searched, and an average value “XXX, XXX” obtained by averaging the unit price data per 1 tsubo existing within the place data range is transmitted to the investment
図5は、配電設備DB27の配電設備データリスト42の一部分を示す説明図である。図5に示す配電設備データリスト42は、配電設備DB27に保存され、電柱番号データ、電柱の設置場所データ、電柱の位置データ、及び自然災害対策データから構成されている。
FIG. 5 is an explanatory diagram showing a part of the distribution facility data list 42 of the
例えば、電柱番号データ「001−001」、電柱の設置場所データ「広島県○○市△△・・・」、電柱の位置データ「22000」、及び自然災害対策データ「塩害・強風」と記録されている。 For example, telephone pole number data “001-001”, telephone pole installation location data “Hiroshima XX city △△ ...”, telephone pole position data “22000”, and natural disaster countermeasure data “salt damage / strong wind” are recorded. ing.
自然災害対策データは、電柱番号データとリンクされており、この電柱番号データを検索キーにして検索可能である。配電設備データリスト42は、配電設備管理サーバ4のCPUが、投資額決定サーバ1から区間内電柱情報取得要求、区間長情報取得要求、自然災害対策情報取得要求、又は到達距離情報取得要求を受信を受信した場合に、このCPUにより参照される。
Natural disaster countermeasure data is linked to utility pole number data, and can be searched using this utility pole number data as a search key. In the distribution facility data list 42, the CPU of the distribution
例えば、投資額決定サーバ1から区間内電柱情報取得要求を受信した場合、CPUは、区間内電柱情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データを検出し、検出された電柱の位置データの範囲内に存在する電柱番号データを投資額決定サーバ1へ送信する。
For example, when receiving the intra-section utility pole information acquisition request from the investment
具体的には、区間内電柱情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データ「22,000」、「24,000」を検出し、検出された電柱の位置データの範囲内に存在する電柱番号データを投資額決定サーバ1へ送信する。
Specifically, when an in-section utility pole information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and from the matched utility pole number data The utility pole position data “22,000” and “24,000” are detected, and the utility pole number data existing within the range of the detected utility pole position data is transmitted to the investment
また、投資額決定サーバ1から区間長情報取得要求を受信した場合、CPUは、区間長情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データを検出し、検出された電柱の位置データから区間長データを投資額決定サーバ1へ送信する。
Further, when the section length information acquisition request is received from the investment
具体的には、区間長情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データ「22,000」、「24,000」を検出し、検出された電柱の位置データから区間長データ「2,000」を投資額決定サーバ1へ送信する。
Specifically, when the section length information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the utility pole number data is used as the utility pole number data. Position data “22,000” and “24,000” are detected, and section length data “2,000” is transmitted to the investment
また更に、投資額決定サーバ1から自然災害対策情報取得要求を受信した場合、CPUは、自然災害対策情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの範囲内に存在する自然災害対策データを参照し、該当する自然災害対策データと電柱の位置データから各自然災害対策費における区間長を算出し、対策費ごとの区間長データを投資額決定サーバ1へ送信する。
Furthermore, when receiving a natural disaster countermeasure information acquisition request from the investment
具体的には、自然災害対策情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの範囲内に存在する自然災害対策データを参照し、該当する自然災害対策データ「塩害」、「強風」、「雷害」と電柱の位置データから「塩害」、「強風」、「雷害」における区間長「100」、「250」、「300」を算出し、この自然災害対策費ごとの区間長データ「100」、「250」、「300」を投資額決定サーバ1へ送信する。
Specifically, when a natural disaster countermeasure information acquisition request is received, the distribution facility data list 42 is searched using the power pole number data “001-001” and “001-008” as search keys, and the matching power pole number data Refer to the natural disaster countermeasure data existing within the scope, and from the corresponding natural disaster countermeasure data `` salt damage '', `` strong wind '', `` lightning damage '' and the position data of the power pole in `` salt damage '', `` strong wind '', `` lightning damage '' The section lengths “100”, “250”, and “300” are calculated, and the section length data “100”, “250”, and “300” for each natural disaster countermeasure cost are transmitted to the investment
更にまた、投資額決定サーバ1から到達距離情報取得要求を受信した場合、CPUは、到達距離情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの位置データを投資額決定サーバ1へ送信する。
Furthermore, when receiving the reach distance information acquisition request from the investment
具体的には、到達距離情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの位置データ「22,000」、「24,000」を投資額決定サーバ1へ送信する。このようにして、配電設備データリスト42が構成されて参照されている。
Specifically, when a reach distance information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the position of the matched utility pole number data Data “22,000” and “24,000” are transmitted to the investment
図6は、地図DB28の地図データリスト43の一部分を示す説明図である。図6に示す地図データリスト43は、地図DB28に保存され、住所データ、及び位置データから構成されている。例えば、住所データ「広島県○○市△△・・・」、位置データ「22000」と記録されている。
FIG. 6 is an explanatory diagram showing a part of the map data list 43 of the
位置データは、住所データとリンクされており、この住所データを検索キーにして検索可能である。地図データリスト43は、配電設備管理サーバ4のCPUにより配電設備データリスト42に電柱を追加した場合に、このCPUにより参照されて配電設備データリスト42に電柱の位置データが追加される。
The position data is linked to the address data, and can be searched using this address data as a search key. When the power pole is added to the distribution facility data list 42 by the CPU of the distribution
例えば、配電設備データリスト42に電柱を追加した場合、CPUは、電柱の設置場所データを検索キーにして地図データリスト43の住所データを検索し、合致した住所データの位置データを配電設備データリスト42に電柱の位置データとして追加する。 For example, when a utility pole is added to the distribution facility data list 42, the CPU searches the address data in the map data list 43 using the installation location data of the utility pole as a search key, and the position data of the matched address data is retrieved from the distribution facility data list. 42 is added as position data of the utility pole.
具体的には、配電設備データリスト42に電柱を追加した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を検索キーにして地図データリスト43の住所データを検索し、合致した住所データの位置データ「22,000」、「24,000」を配電設備データリスト42に電柱の位置データとして追加する。このようにして、地図データリスト43が構成されて参照されている。 Specifically, when a power pole is added to the power distribution facility data list 42, search keys for the power pole installation location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are search keys. Thus, the address data in the map data list 43 is searched, and the position data “22,000” and “24,000” of the matched address data are added to the distribution facility data list 42 as the position data of the utility pole. In this way, the map data list 43 is constructed and referenced.
図7は、系統システム負荷DB29の系統システム負荷データリスト44の一部分を示す説明図である。図7に示す系統システム負荷データリスト44は、系統システム負荷DB29に保存され、電柱番号データ、電柱の設置場所データ、及び通過電流データから構成されている。例えば、電柱番号データ「001−001」、電柱の設置場所データ「広島県○○市△△・・・」、及び通過電流データ「150」と記録されている。
FIG. 7 is an explanatory diagram showing a part of the grid system load data list 44 of the grid
通過電流データは、電柱番号データ、及び電柱の設置場所データとリンクされており、例えば、電柱番号データを検索キーにして検索可能である。系統システム負荷データリスト44は、配電系統管理サーバ5のCPUが、通過電流情報取得要求を受信した場合に、このCPUにより参照される。
The passing current data is linked to the utility pole number data and the installation location data of the utility pole, and can be searched using, for example, the utility pole number data as a search key. The system load data list 44 is referred to by the CPU of the distribution
例えば、投資額決定サーバ1から通過電流情報取得要求を受信した場合、CPUは、この通過電流情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして系統システム負荷データリスト44を検索し、合致した電柱番号データの通過電流データを投資額決定サーバ1へ送信する。
For example, when receiving the passing current information acquisition request from the investment
具体的には、通過電流情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして系統システム負荷データリスト44を検索し、合致した電柱番号データの通過電流データ「150」を投資額決定サーバ1へ送信する。このようにして、系統システム負荷データリスト44が構成されて参照されている。
Specifically, when a passing current information acquisition request is received, the grid system load data list 44 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the matching utility pole number data The passing current data “150” is transmitted to the investment
図8は、投資費用の重要度を示すパラメータデータリスト45を示す説明図である。図8に示すパラメータデータリスト45は、ハードディスク13に保存され、縦項目に下流収入データ、維持費データ、対策費データ、重要負荷費データ、復旧困難費データ、及び営業所の位置データが設定され、横項目にパラメータ数値データが設定されている。対策費データは、更に、塩害対策費データ、強風対策費データ、雷害対策費データ、及び雪害対策費データに種類分けされている。また、重要負荷費データも、更に、病院データ、学校データ、通信データ、電気データ、水道データ、ガスデータ、放送データ、及びその他データに種類分けされている。
FIG. 8 is an explanatory diagram showing a parameter data list 45 indicating the importance of the investment cost. The parameter data list 45 shown in FIG. 8 is stored in the
例えば、塩害対策費データは「2,000」、強風対策費データは「4,000」のパラメータ数値データが設定されており、これらのパラメータ数値データは、対策費データを算出する場合に、各区間長に乗算される。これにより、パラメータ数値データを変更することで、重要度に応じて各対策費データを調整できるようになる。このパラメータデータリスト45は、CPU12により変更される。このようにして、パラメータデータリスト45が構成されて参照されている。 For example, parameter numerical data of “2,000” is set for the salt damage countermeasure cost data, and “4,000” is set for the strong wind countermeasure cost data, and these parameter numerical data are used for calculating the countermeasure cost data. Multiply the section length. As a result, by changing the parameter numerical data, each countermeasure cost data can be adjusted according to the importance. The parameter data list 45 is changed by the CPU 12. In this way, the parameter data list 45 is constructed and referenced.
図9は、敷設費用の計算例を示す表計算図である。図9に示す区間収入の表計算図50は、縦項目に契約種別(低圧電灯、低圧電力、高圧電力、及びその他)が設定され、横項目に年間収入及び費用回収期間が設定されている。区間収入は、契約種別ごとの年間収入データの各々に費用回収期間を乗算し、乗算された契約種別ごとの収入データを合計して算出される。この契約種別ごとの年間収入データは、キーボード8により入力された配電線の敷設区間における電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データを受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データを受信して得られる。
FIG. 9 is a table calculation diagram showing an example of calculating the laying cost. In the section calculation chart 50 of section income shown in FIG. 9, the contract type (low piezoelectric lamp, low voltage power, high voltage power, and others) is set in the vertical item, and the annual income and expense collection period are set in the horizontal item. The segment income is calculated by multiplying each of the annual revenue data for each contract type by the expense collection period and totaling the multiplied revenue data for each contract type. The annual income data for each contract type is transmitted to the distribution
下流収入の表計算図51は、横項目に通過電流、パラメータ、及び費用回収期間が設定されている。下流収入は、通過電流データ、パラメータデータ、及び費用回収期間データが乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データをCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5から電柱番号データに対応する通過電流データを受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45を参照して得られる。費用回収期間データは、キーボード8により入力されたデータが使用される。
In the downstream revenue spreadsheet 51, the passage items, parameters, and expense recovery period are set in the horizontal items. The downstream revenue is calculated by multiplying the passing current data, the parameter data, and the cost recovery period data. The passing current data is obtained by transmitting the pole number data input from the
維持費の表計算図52は、横項目に区間長、パラメータ、及び費用回収期間が設定されている。維持費は、区間長データ、パラメータデータ、及び費用回収期間データが乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データをCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から受信して得られる。
In the maintenance cost spreadsheet 52, section lengths, parameters, and cost recovery periods are set in the horizontal items. The maintenance cost is calculated by multiplying the section length data, parameter data, and cost recovery period data. The section length data is obtained by transmitting the power pole number data input from the
対策費の表計算図53は、縦項目に対策費(塩害対策費、強風対策費、雷害対策費、及び雪害対策費)が設定され、横項目に区間長、及びパラメータが設定されている。対策費は、対策費ごとの区間長データと各パラメータデータを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データを受信して得られる。
In the countermeasure calculation table 53, the countermeasure costs (salt damage countermeasure costs, strong wind countermeasure costs, lightning damage countermeasure costs, and snow damage countermeasure costs) are set in the vertical items, and the section length and parameters are set in the horizontal items. . The countermeasure cost is calculated by multiplying the section length data for each countermeasure cost by each parameter data, and summing the multiplied section length data for each countermeasure cost. The section length data for each countermeasure cost is obtained by transmitting the pole number data input from the
利益は、区間収入データと下流収入データを加えた値に0.1を乗算して求められる。重要負荷費の表計算図54は、縦項目に重要負荷(病院、学校、通信、電気、水道、ガス、放送、及びその他)が設定され、横項目に件数、及びパラメータが設定されている。重要負荷費は、各々の重要負荷件数データに各パラメータデータを乗算して最後に合計して算出される。この重要負荷件数データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データを受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から重要負荷件数データを受信して得られる。
The profit is obtained by multiplying the value obtained by adding the section income data and the downstream income data by 0.1. In the important load cost spreadsheet 54, important loads (hospital, school, communication, electricity, water, gas, broadcasting, and others) are set in the vertical items, and the number and parameters are set in the horizontal items. The important load cost is calculated by multiplying each piece of important load number data by each parameter data and finally adding them. As for the important load number data, the power pole number data input from the
復旧困難費の表計算図55は、横項目に現場到着距離、及びパラメータが設定されている。復旧困難費は、現場到着距離データ、及びパラメータデータを乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から区間長データを受信してこの区間長データの中間地点を算出し、この中間地点とパラメータデータリスト45の営業所の位置データとから得られる。
In the spreadsheet 55 of difficult recovery costs, the field arrival distance and parameters are set in the horizontal items. The difficult recovery cost is calculated by multiplying the field arrival distance data and the parameter data. For the field arrival distance data, the pole number data input from the
区間簿価は、キーボード8により入力された電柱番号データがCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データが受信され、受信された電柱の設置場所データが経理サーバ3へ送信され、この経理サーバ3から1坪あたりの単価データの平均値が受信され、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。以上の計算方法に基づいて、配電線の敷設費用を計算できるようになる。
As for the section book value, the power pole number data input from the
図10(a)及び(b)は、敷設費用の算出結果例を示す説明図である。図10(a)に示す建設費の算出結果は、図9で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。 FIGS. 10A and 10B are explanatory diagrams illustrating an example of calculation results of laying costs. The construction cost calculation result shown in FIG. 10A is calculated based on the laying cost calculation example shown in FIG. The total power revenue is “610,000,000”, which is the sum of the segment revenue “310,000,000” and the downstream revenue “300,000,000”. A 10% profit “61,000,000” is secured from the total power revenue, and this secured profit is subtracted from the total power revenue, and the maintenance cost is calculated from the total power revenue “549,000,000” deducted from the profit. The amount obtained by subtracting “50,000,000” and countermeasure costs “2,700,000” is the distribution line construction cost “496,300,000”, and the standard construction cost is the construction cost “496,300,000”. , An important load cost “10,000,000” and a recovery difficult cost “600,000” plus an amount “506,900,000”, and the maximum construction cost is the construction cost “496,300,000”, and The amount “557,300,000” is obtained by adding the profit “61,000,000”. As a result, the distribution line construction investment amount can be efficiently determined and supported using the distribution line standard and the maximum construction cost automatically calculated according to the importance such as the countermeasure cost and the important load cost.
また、(b)に示す改修費の算出結果も、図10で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、同様に、区間収入と下流収入とを加算したもので、「610,000,000」になる。電力収入総額から1割の利益を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額「504,400,000」とし、最大改修費を、改修費、及び利益を加算した金額「554,800,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。 Moreover, the calculation result of the repair cost shown in (b) is also calculated based on the laying cost calculation example shown in FIG. Similarly, the total power revenue is the sum of the segment revenue and the downstream revenue, and is “610,000,000”. Secure 10% profit from the total power revenue, subtract this profit from the total power revenue, and maintain the maintenance cost, countermeasure cost, and book value “2,500,000” from the total power revenue minus the profit. The deducted amount is the distribution line repair cost “493,800,000”, the standard repair cost is the sum of repair cost, important load cost, and difficult recovery cost “504,400,000”, and the maximum repair cost Is the amount “554,800,000” obtained by adding the repair cost and profit. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.
図11は、配電線投資額決定プログラム起動画面のモニタ7における表示例を示す説明図である。図11に示すに示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、ハードディスク13に保存されている配電線投資額決定プログラムがCPU12により起動されて表示される起動画面が表示されている。
FIG. 11 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しとして配電線敷設の費用算出システムM1が表示され、続いて、リンクボタンである建設費用算定L1ボタン、及び改修費用算定L2ボタンが表示されている。
In the upper part of the
マウス9が移動されてカーソル60が建設費用算定L1ボタンにシフトされ、ここでマウス9がクリックされてこの配電線敷設の費用算出システムM1の画面から図12に示す建設費用算定M2の画面へ移動する。また、改修費用算定L2ボタンがクリックされると、この配電線敷設の費用算出システムM1の画面から図15に示す改修費用算定M6へ移動する。これにより、建設費用算定又は改修費用算定の画面が選択できるようになる。
The mouse 9 is moved and the
図12は、建設費用算定画面のモニタ7における表示例を示す説明図である。図12に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図11の建設費用算定L1ボタンがクリックされると表示される建設費用算定画面が表示されている。
FIG. 12 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである建設費用算定M2が表示されている。続いて、リンクボタンである敷設区間・投資額回収期間を入力L3ボタン、パラメータ変更L4ボタン、及び戻るL5ボタンが表示されている。
In the upper part of the
カーソル60が移動されてリンクボタンである敷設区間・投資額回収期間を入力L3ボタンがマウス9によりクリックされると、図13に示す敷設区間・投資額回収期間の入力画面が表示され、パラメータ変更L4ボタンがクリックされると、図18に示すパラメータ変更画面が表示される。これにより、入力画面とパラメータ変更画面が選択できるようになる。戻るL5ボタンがクリックされると、図11に示した起動画面が表示される。
When the
図13は、敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。図13に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図12に示した敷設区間・投資額回収期間を入力L3ボタンがクリックされると表示される敷設区間、投資額回収期間入力画面が表示されている。
FIG. 13 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである建設費用算定M2、敷設区間M3が表示されている。続いて、データを入力する窓である入力窓I1、及び入力窓I2が表示されている。入力窓I1には、敷設区間のスタート地点が入力され、入力窓I2には、エンド地点が入力される。例えば、入力窓I1には、電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力される。
In the upper part of the
入力窓I1、I2の下部には、見出しである投資額回収期間M4が表示され、続いて、入力窓I3が表示されている。入力窓I3には、年単位で投資額回収期間が入力される。例えば、この入力窓I3には、投資額回収期間「10」と入力される。 Below the input windows I1 and I2, an investment amount recovery period M4 as a headline is displayed, and subsequently, an input window I3 is displayed. In the input window I3, an investment amount recovery period is input in units of years. For example, the investment amount collection period “10” is input to the input window I3.
入力窓I3の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図12に示した建設費用算定画面が表示される。クリアL7ボタンがクリックされると、入力窓I1〜I3の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図14に示す建設費用算定の結果画面が表示される。
At the bottom of the input window I3, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the L5 button to which the
このとき、CPU12は、図9に示した表計算図に基づいて建設費用を算定する。例えば、区間収入は、契約種別ごとの年間収入データの各々に費用回収期間データ「10」を乗算し、乗算された契約種別ごとの収入データを合計して算出される。契約種別ごとの年間収入データは、電気料金管理サーバ2へ入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データ「低圧電灯(3,000,000)」、「低圧電力(2,000,000)」、「高圧電力(25,000,000)」、「その他(1,000,000)」を受信して得る。これらの値に基づいて算出された区間収入は、「310,000,000」となる。
At this time, the CPU 12 calculates the construction cost based on the spreadsheet shown in FIG. For example, the segment revenue is calculated by multiplying each of the annual revenue data for each contract type by the expense collection period data “10” and totaling the multiplied revenue data for each contract type. As the annual revenue data for each contract type, the power pole number data “001-001” and “001-008” input to the electricity
下流収入は、例えば、通過電流データ、パラメータデータ、及び費用回収期間データ「10」が乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5からこの電柱番号データに対応する通過電流データ「150」を受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45から参照されてパラメータデータ「200,000」が得られる。これらの値に基づいて算出された下流収入は、「300,000,000」となる。
The downstream income is calculated by multiplying, for example, passing current data, parameter data, and expense recovery period data “10”. As for the passing current data, the power pole number data “001-001” and “001-008” input from the
維持費は、例えば、区間長データ、パラメータデータ「2,500」、及び費用回収期間データ「10」が乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から区間長データ「2,000」を受信して得られる。これらの値に基づいて算出された維持費は、「50,000,000」となる
対策費は、例えば、塩害対策費パラメータデータ「2,000」、強風対策費パラメータデータ「4,000」、雷害対策費パラメータデータ「5,000」、雪害対策費パラメータデータ「3,000」とこれらの対策費ごとの区間長データを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データである塩害対策費データ「100」、強風対策費データ「250」、雷害対策費データ「300」、雪害対策費データ「0」を受信して得られる。これらの値に基づいて算出された対策費は、「2,700,000」となる。
The maintenance cost is calculated, for example, by multiplying the section length data, the parameter data “2,500”, and the cost collection period data “10”. The section length data is transmitted from the distribution
利益は、区間収入データ「310,000,000」と下流収入データ「300,000,000」を加えた値に0.1を乗算して求められる。つまり、利益は、「61,000,000」となる。 The profit is obtained by multiplying the value obtained by adding the section income data “310,000,000” and the downstream income data “300,000,000” by 0.1. That is, the profit is “61,000,000”.
重要負荷費は、例えば、病院、学校、通信、電気、水道、ガス、放送、及びその他のパラメータデータ「2,000,000」と各々の重要負荷件数データを乗算して最後に合計して算出される。重要負荷件数データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から病院件数データ「1」、学校件数データ「2」、通信件数データ「1」、電気件数データ「1」、水道件数データ「0」、ガス件数データ「0」、放送件数データ「0」、及びその他件数データ「0」を受信して得られる。これらの値に基づいて算出された重要負荷費は、「10,000,000」となる。
The important load cost is calculated, for example, by multiplying the important load data by each parameter data “2,000,000” and hospital, school, communication, electricity, water, gas, broadcasting, and other parameter data. Is done. As the important load number data, the power pole number data “001-001” and “001-008” input from the
復旧困難費は、例えば、現場到着距離データとパラメータデータ「60」を乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から位置データ「22,000」、「24,000」を受信してこの位置データの中間地点「23,000」を算出し、この中間地点とパラメータデータリスト45の営業所の位置データ「13,000」から差分を求めて現場到着距離データ「10,000」が得られる。これらの値に基づいて算出された復旧困難費は、「600,000」となる。
The difficult recovery cost is calculated by, for example, multiplying the field arrival distance data and the parameter data “60”. As for the field arrival distance data, the utility pole number data “001-001” and “001-008” input from the
区間簿価は、キーボード8により入力された電柱番号データ「001−001」、「001−008」がCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、受信された電柱の設置場所データを経理サーバ3へ送信し、この経理サーバ3から1坪あたりの単価データの平均値「325,000」を受信し、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。これらの値に基づいて算出された区間簿価は、「2,500,000」となる。
As for the section book value, the telephone pole number data “001-001” and “001-008” input from the
これにより、以上算出された区間収入「310,000,000」、下流収入「300,000,000」、維持費「50,000,000」、対策費「2,700,000」、利益「61,000,000」、重要負荷費「10,000,000」、復旧困難費「600,000」、区間簿価「2,500,000」に基づいて図10(a)に示した建設費が算出される。 Thereby, the section income “310,000,000”, the downstream income “300,000,000”, the maintenance cost “50,000,000”, the countermeasure cost “2,700,000”, and the profit “61” calculated as described above. The construction cost shown in FIG. 10A is based on the critical load cost “10,000,000”, the difficult recovery cost “600,000”, and the section book value “2,500,000”. Calculated.
図14は、建設費用算定の結果画面のモニタ7における表示例を示す説明図である。図14に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図13の決定L6ボタンがクリックされると表示される建設費用算定の結果画面が表示されている。
FIG. 14 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである建設費用算定の結果M5が表示されている。続いて、図10(a)に示した建設費の算出結果が表示されている。この建設費の算出結果は、図13で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。
In the upper part of the
建設費の算出結果の下部には、戻るL5ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図13に示した敷設区間・投資額回収期間の入力画面が表示される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面及び起動画面へ移動できるようになる。
At the bottom of the construction cost calculation result, an L5 button for returning and an L8 button for TOP are displayed. When the L5 button to which the
図15は、改修費用算定画面のモニタ7における表示例を示す説明図である。図15に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図11の改修費用算定L2ボタンがクリックされると表示される改修費用算定画面が表示されている。
FIG. 15 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである改修費用算定M6が表示されている。続いて、リンクボタンである敷設区間・投資額回収期間を入力L9ボタン、パラメータ変更L4ボタン、及び戻るL5ボタンが表示されている。
In the upper part of the
カーソル60が移動されてリンクボタンである敷設区間・投資額回収期間を入力L9ボタンがマウス9によりクリックされると、図16に示す敷設区間・投資額回収期間の入力画面が表示され、パラメータ変更L4ボタンがクリックされると、図18に示すパラメータ変更画面が表示される。戻るL5ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面、パラメータ変更画面、及び起動画面へ移動できるようになる。
When the
図16は、敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。図16に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図15の敷設区間・投資額回収期間を入力L9ボタンがクリックされると表示される敷設区間、投資額回収期間入力画面が表示されている。
FIG. 16 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである改修費用算定M7、敷設区間M3が表示されている。続いて、データを入力する窓である入力窓I1、及び入力窓I2が表示されている。入力窓I1には、敷設区間のスタート地点が入力され、入力窓I2には、エンド地点が入力される。例えば、入力窓I1には、電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力される。
In the upper part of the
入力窓I1、I2の下部には、見出しである投資額回収期間M4が表示され、続いて、入力窓I3が表示されている。この入力窓I3には、年単位で投資額回収期間が入力される。例えば、この入力窓I3には、投資額回収期間「10」と入力される。 Below the input windows I1 and I2, an investment amount recovery period M4 as a headline is displayed, and subsequently, an input window I3 is displayed. In this input window I3, an investment amount recovery period is input in units of years. For example, the investment amount collection period “10” is input to the input window I3.
入力窓I3の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図15に示した改修費用算定画面が表示される。クリアL7ボタンがクリックされると、入力窓I1〜I3の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図17に示す改修費用算定の結果画面が表示される。このとき、CPU12は、図9に示した表計算図に基づいて改修費用を算定する。これにより、図10(b)に示した改修費が算出される。
At the bottom of the input window I3, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the L5 button to which the
図17は、改修費用算定の結果画面のモニタ7における表示例を示す説明図である。図17に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図16の決定L6ボタンがクリックされると表示される改修費用算定の結果画面が表示されている。
FIG. 17 is an explanatory diagram showing a display example on the
ブラウザ62の上部には、見出しである改修費用算定の結果M9が表示されている。続いて、図10(b)に示した改修費の算出結果が表示されている。この改修費の算出結果は、図13で示した敷設費用の計算例に基づいて算出されたものである。
In the upper part of the
電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」、対策費「2,700,000」、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費「493,800,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「504,400,000」とし、最大改修費を、改修費「496,300,000」、及び利益「61,000,000」を加算した金額「554,800,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。 The total power revenue is “610,000,000”, which is the sum of the segment revenue “310,000,000” and the downstream revenue “300,000,000”. A 10% profit “61,000,000” is secured from the total power revenue, and this secured profit is subtracted from the total power revenue, and the maintenance cost is calculated from the total power revenue “549,000,000” deducted from the profit. “50,000,000”, countermeasure costs “2,700,000” and book value “2,500,000” minus the amount of distribution line repair costs “493,800,000”, standard repair costs Is the amount “504,400,000” that is the sum of the repair cost “493,800,000”, the important load cost “10,000,000”, and the difficult recovery cost “600,000”, and the maximum repair cost is The amount is “554,800,000” obtained by adding the repair cost “496,300,000” and the profit “61,000,000”. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.
改修費の算出結果の下部には、戻るL5ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図16に示した敷設区間・投資額回収期間の入力画面が表示される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面及び起動画面へ移動できるようになる。
A L5 button for returning and an L8 button for TOP are displayed at the bottom of the calculation result of the repair cost. When the L5 button to which the
図18は、パラメータ変更選択画面のモニタ7における表示例を示す説明図である。図18に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図12又は図15のパラメータ変更L4ボタンがクリックされると表示されるパラメータ変更選択画面が表示されている。
FIG. 18 is an explanatory diagram showing a display example of the parameter change selection screen on the
ブラウザ62の上部には、見出しであるパラメータ変更M10が表示されている。続いて、チェックボックス付で「下流収入」、「維持費」、「復旧困難費」などの項目が表示されている。該当するチェックボックスがマウス9によりクリックされると、チェックされた項目が選択される。図中では、「復旧困難費」のチェックボックスがチェックされている。複数の選択も可能である。これにより、変更対象のパラメータを一度に選択することができる。
In the upper part of the
これらの項目の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。戻るL5ボタンがクリックされると、図12又は図15に示した画面が表示される。クリアL7ボタンがクリックされると、チェックされたチェックボックスが解除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図19に示すパラメータ変更画面が表示される。これにより、建設費用算定画面、改修費用算定画面、及び起動画面へ移動できるようになる。また、チェックボックスを一度に解除できるようになる。 Below these items, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the return L5 button is clicked, the screen shown in FIG. 12 or FIG. 15 is displayed. When the clear L7 button is clicked, the checked check box is released. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, a parameter change screen shown in FIG. 19 is displayed. Thereby, it becomes possible to move to the construction cost calculation screen, the repair cost calculation screen, and the startup screen. You can also clear the check box at once.
図19は、パラメータ変更画面のモニタ7における表示例を示す説明図である。図19に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図18の決定L6ボタンがクリックされると表示されるパラメータ変更選択画面が表示されている。
FIG. 19 is an explanatory diagram illustrating a display example of the parameter change screen on the
ブラウザ62の上部には、見出しであるパラメータ変更M10が表示されている。続いて、図18でチェックボックスをチェックした復旧困難費M11が表示されている。この復旧困難費M11に続いて、図8に示した現在設定されている復旧困難費のパラメータ「60」が表示され、並んで、パラメータを入力する入力窓I4が表示されている。図中では、この入力窓I4には「80」と入力されている。
In the upper part of the
入力窓I4の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。戻るL5ボタンがクリックされると、図18に示したパラメータ変更選択画面が表示される。クリアL7ボタンがクリックされると、入力窓I4の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図8に示した現在設定されている復旧困難費のパラメータ「60」が「80」に変更される。これにより、投資費用の重要度に応じてパラメータを調整できるようになる。 At the bottom of the input window I4, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the return L5 button is clicked, the parameter change selection screen shown in FIG. 18 is displayed. When the clear L7 button is clicked, the input data in the input window I4 is deleted. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, the currently set difficult recovery cost parameter “60” shown in FIG. 8 is changed to “80”. As a result, the parameters can be adjusted according to the importance of the investment cost.
図20は、投資額決定サーバ1の動作例を示すフローチャートである。ハードディスク13に保存された配電線投資額決定プログラムがCPU12により起動されてRAM14に展開されている。
FIG. 20 is a flowchart illustrating an operation example of the investment
これを配電線の投資額を決定する条件として、図20に示すステップS1で、キーボード8により少なくとも、敷設区間を入力すると共に、配電線敷設費用を回収する費用回収期間を入力するようになされる。例えば、図13に示した入力窓I1には、作業者により電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力され、入力窓I3には、投資額回収期間「10」と入力される。続いてステップS2へ移行する。
As a condition for determining the investment amount of the distribution line, at least the laying section is input by the
ステップS2では、敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。例えば、電力収入総額は区間収入と下流収入を合計したものであり、区間収入は、契約種別ごとの年間収入データの各々に費用回収期間データ「10」を乗算し、乗算された契約種別ごとの収入データを合計して算出される。この契約種別ごとの年間収入データは、電気料金管理サーバ2へ入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データ「低圧電灯(3,000,000)」、「低圧電力(2,000,000)」、「高圧電力(25,000,000)」、「その他(1,000,000)」を受信して得る。これらの値に基づいて算出された区間収入は、「310,000,000」となる。
In step S2, the total amount of power revenue is calculated from the amount of power charge revenue in the installed section and the cost recovery period in the installed section. For example, the total power revenue is the sum of the segment revenue and downstream revenue. The segment revenue is calculated by multiplying the annual revenue data for each contract type by the expense collection period data “10” and multiplying each contract type by Calculated by summing revenue data. As the annual revenue data for each contract type, the power pole number data “001-001” and “001-008” input to the electricity
下流収入は、例えば、通過電流データ、パラメータデータ、及び費用回収期間データ「10」が乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5からこの電柱番号データに対応する通過電流データ「150」を受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45から参照されてパラメータデータ「200,000」が得られる。これらの値に基づいて算出された下流収入は、「300,000,000」となる。従って、電力収入総額は、「610,000,000」となる。続いて、ステップS3へ移行する。
The downstream income is calculated by multiplying, for example, passing current data, parameter data, and expense recovery period data “10”. As for the passing current data, the power pole number data “001-001” and “001-008” input from the
ステップS3では、維持費を算出する。例えば、この維持費は、区間長データ、パラメータデータ「2,500」、及び費用回収期間データ「10」が乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から区間長データ「2,000」を受信して得られる。これらの値に基づいて算出された維持費は、「50,000,000」となる。続いて、ステップS4へ移行する。
In step S3, a maintenance cost is calculated. For example, the maintenance cost is calculated by multiplying the section length data, the parameter data “2,500”, and the cost collection period data “10”. The section length data is transmitted from the distribution
ステップS4では、対策費を算出する。例えば、この対策費は、塩害対策費パラメータデータ「2,000」、強風対策費パラメータデータ「4,000」、雷害対策費パラメータデータ「5,000」、雪害対策費パラメータデータ「3,000」とこれらの対策費ごとの区間長データを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データである塩害対策費データ「100」、強風対策費データ「250」、雷害対策費データ「300」、雪害対策費データ「0」を受信して得られる。これらの値に基づいて算出された対策費は、「2,700,000」となる。続いて、ステップS5へ移行する。
In step S4, a countermeasure cost is calculated. For example, this countermeasure cost includes salt damage countermeasure cost parameter data “2,000”, strong wind countermeasure cost parameter data “4,000”, lightning damage countermeasure cost parameter data “5,000”, snow damage countermeasure cost parameter data “3,000”. Is multiplied by the section length data for each countermeasure cost, and the section length data for each countermeasure cost multiplied is calculated. As section length data for each countermeasure cost, the telephone pole number data “001-001” and “001-008” input from the
ステップS5では、利益を算出する。例えば、この利益は、区間収入データ「310,000,000」と下流収入データ「300,000,000」を加えた値に0.1を乗算して求められる。つまり、利益は、「61,000,000」となる。続いてステップS6へ移行する。 In step S5, profit is calculated. For example, this profit is obtained by multiplying the value obtained by adding the section income data “310,000,000” and the downstream income data “300,000,000” by 0.1. That is, the profit is “61,000,000”. Subsequently, the process proceeds to step S6.
ステップS6では、重要負荷費を算出する。例えば、この重要負荷費は、病院、学校、通信、電気、水道、ガス、放送、及びその他のパラメータデータ「2,000,000」と各々の重要負荷件数データを乗算して最後に合計して算出される。重要負荷件数データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から病院件数データ「1」、学校件数データ「2」、通信件数データ「1」、電気件数データ「1」、水道件数データ「0」、ガス件数データ「0」、放送件数データ「0」、及びその他件数データ「0」を受信して得られる。これらの値に基づいて算出された重要負荷費は、「10,000,000」となる。続いて、ステップS7へ移行する。
In step S6, an important load cost is calculated. For example, this important load cost is calculated by multiplying each important load number data by the hospital, school, communication, electricity, water, gas, broadcasting, and other parameter data “2,000,000” and finally summing them up. Calculated. As the important load number data, the power pole number data “001-001” and “001-008” input from the
ステップS7では、復旧困難費を算出する。例えば、この復旧困難費は、現場到着距離データ、及びパラメータデータ「60」を乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から位置データ「22,000」、「24,000」を受信してこの位置データの中間地点「23,000」を算出し、この中間地点とパラメータデータリスト45の営業所の位置データ「13,000」から差分を求めて現場到着距離データ「10,000」が得られる。これらの値に基づいて算出された復旧困難費は、「600,000」となる。続いて、ステップS8へ移行する。
In step S7, a difficult recovery cost is calculated. For example, this difficult recovery cost is calculated by multiplying the field arrival distance data and the parameter data “60”. As for the field arrival distance data, the utility pole number data “001-001” and “001-008” input from the
ステップS8では、区間簿価を算出する。例えば、この区間簿価は、キーボード8により入力された電柱番号データ「001−001」、「001−008」がCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」が受信され、受信された電柱の設置場所データが経理サーバ3へ送信され、この経理サーバ3から1坪あたりの単価データの平均値「325,000」が受信され、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。これらの値に基づいて算出された区間簿価は、「2,500,000」となる。続いて、ステップS9へ移行する。
In step S8, the section book value is calculated. For example, as for the section book value, the telephone pole number data “001-001” and “001-008” input from the
ステップS9では、建設費又は改修費の算出を判定する。建設費を算出する場合、ステップS10へ移行し、改修費を算出する場合、ステップS11へ移行する。 In step S9, the calculation of the construction cost or the repair cost is determined. When calculating construction costs, the process proceeds to step S10, and when calculating repair costs, the process proceeds to step S11.
ステップS10では、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の建設費用を算出する。例えば、電力収入総額「610,000,000」から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。 In step S10, the construction cost of the distribution line is calculated based on the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. For example, a 10% profit “61,000,000” is secured from the total power revenue “610,000,000”, and the secured profit is subtracted from the total power revenue, and the total power revenue “549” deducted from the profit. , 000,000 "minus maintenance costs" 50,000,000 "and countermeasure costs" 2,700,000 "are the distribution line construction costs" 496,300,000 ", and the standard construction costs are the construction An amount “506,900,000” obtained by adding the cost “496,300,000”, the important load cost “10,000,000”, and the difficult recovery cost “600,000” is set as the maximum construction cost “ The amount is “557,300,000” obtained by adding “496,300,000” and profit “61,000,000”.
ステップS11では、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の改修費用を算出する。例えば、電力収入総額「610,000,000」から1割の利益を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額「504,400,000」とし、最大改修費を、改修費、及び利益を加算した金額「554,800,000」とする。 In step S11, the repair cost of the distribution line is calculated based on the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. For example, 10% of profit is secured from the total power revenue "610,000,000", and this secured profit is subtracted from the total power revenue, and maintenance costs, countermeasure costs, and books are subtracted from the total power revenue minus the profit. The amount after deducting the price “2,500,000” is the distribution line repair cost “493,800,000”, and the standard repair cost is the sum of the repair cost, the important load cost, and the difficult recovery cost “504” “400,000”, and the maximum repair cost is “554,800,000”, which is the sum of the repair cost and profit.
このように、本発明に係る配電線投資額の決定支援システム100及び情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を決定する場合であって、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する電気料金管理サーバ2、及び配電設備管理サーバ4から提供されたこれらの情報を受信して処理する投資額決定サーバ1は、敷設費用を算出するCPU12を備え、このCPU12は、敷設区間における電力料金収入額と費用回収期間から電力収入総額を算出し、この電力収入総額と維持費に基づいて配電線の敷設費用を算出するものである。
Thus, according to the distribution line investment amount
この例では、維持費の他に、配電線を自然災害から保護するために必要な対策費、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費、停電から復旧するまでに発生する機会損失の費用である復旧困難費などに基づいて配電線の敷設費用を算出する。 In this example, in addition to maintenance costs, countermeasure costs necessary to protect distribution lines from natural disasters, and maintenance to supply sufficient power to facilities necessary to maintain life and life The laying cost of distribution lines is calculated based on the important load costs and the difficult recovery costs that are the cost of opportunity loss that occurs before recovery from a power failure.
従って、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。 Therefore, without relying on manual calculation, it is possible to efficiently determine and support distribution line laying investment amount using distribution line laying cost automatically calculated according to the importance such as countermeasure cost and important load cost. become.
本発明は、配電線を敷設する敷設区間の配電線敷設費用から敷設投資額を決定する配電線投資額の決定支援システムに適用して好適である。 INDUSTRIAL APPLICABILITY The present invention is suitable for application to a distribution line investment amount determination support system that determines a laying investment amount from a distribution line laying cost of a laying section in which a distribution line is laid.
1 投資額決定サーバ(情報処理装置)
2 電気料金管理サーバ(情報提供装置)
3 経理サーバ(情報提供装置)
4 配電設備管理サーバ(情報提供装置)
5 配電系統管理サーバ(情報提供装置)
8 キーボード(入力手段)
9 マウス(入力手段)
12 CPU(電力収入算出手段、敷設費用算出手段)
25 顧客料金契約DB
26 簿価DB
27 配電設備DB
28 地図DB
29 系統システム負荷DB
40 顧客料金契約データリスト
41 簿価データリスト
42 配電設備データリスト
43 地図データリスト
44 系統システム負荷データリスト
45 パラメータデータリスト
100 配電線投資額の決定支援システム
1. Investment amount determination server (information processing device)
2 Electricity rate management server (information provision device)
3. Accounting server (information provision device)
4 Power distribution facility management server (information provision device)
5 Distribution system management server (information provision device)
8 Keyboard (input means)
9 Mouse (input means)
12 CPU (power revenue calculation means, laying cost calculation means)
25 Customer fee contract DB
26 Book value DB
27 Power distribution facility DB
28 Map DB
29 System load DB
40 Customer fee contract data list 41 Book value data list 42 Distribution facility data list 43 Map data list 44 Grid system load data list 45
Claims (7)
前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、
前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、
前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、
前記情報処理装置は、
少なくとも、前記敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を取得する入力手段と、
前記入力手段により入力された当該敷設区間における前記電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出手段と、
前記電力収入算出手段により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記配電線を自然災害から保護するために必要な費用を対策費とし、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、
停電から復旧するまでに発生する機会損失の費用を復旧困難費として、
前記利益が差し引かれた当該電力収入総額から、前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、
前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、
前記建設費、及び前記利益を加算した金額を最大建設費としたとき、
前記配電線の敷設費用として前記標準建設費及び又は最大建設費を算出する敷設費用算出手段と
を有することを特徴とする配電線敷設費用の算出支援システム。 A system that supports calculation of the distribution line laying cost of the laying section where the distribution line is laid,
It has a database that stores annual income information for each contract type including the amount of electricity fee revenue in the laid section , passing current information, parameter information, and maintenance cost information for maintaining the distribution line after laying , Correspondingly, an information providing device that provides annual revenue information, passing current information, parameter information, and information on the maintenance cost for each contract type including the amount of revenue of the power charges ,
The distribution of the laying section in which the distribution line is laid by receiving the annual revenue information, the passing current information, the parameter information, and the maintenance cost information for each contract type including the power fee revenue provided from the information providing device. An information processing device for calculating and processing electric wire laying costs ;
Communication means for connecting the information processing device and the information providing device;
The information processing apparatus includes:
At least, and inputs the information of the laying zone, enter information for cost recovery period for collecting the distribution line laying costs, including power rate revenues in the laying section from the information providing apparatus via said communication means Input means for obtaining annual revenue information for each contract type, passing current information, parameter information, and maintenance cost information ;
The annual revenue information for each contract type including the power charge revenue amount in the laid section input by the input means is multiplied by the information of the cost recovery period , and the multiplied section revenue information for each contract type is totaled Power revenue calculation means for calculating the total power revenue from the section revenue calculated as described above and the downstream current calculated by multiplying the information on the passing current information, the parameter information, and the cost recovery period;
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total revenue calculated by the power revenue calculation means, pulling to the difference of the benefit from the power total income,
The cost required to protect the distribution line from natural disasters is taken as a countermeasure cost,
Expenses required to maintain sufficient power for facilities necessary to maintain life and life are considered important burden costs,
The cost of opportunity loss that occurs before recovery from a power outage is considered as a difficult recovery cost.
From the power total income which the benefit is subtracted, the amount obtained by subtracting the maintenance and the measure expense acquired from the information providing apparatus and construction costs of the distribution line,
The construction cost, the important load cost, and the sum of the recovery difficulty cost as standard construction cost,
When the construction cost and the sum of the profits are the maximum construction costs,
A distribution line installation cost calculation support system, comprising: an installation cost calculation means for calculating the standard construction cost and / or the maximum construction cost as the installation cost of the distribution line.
前記配電線を自然災害から保護するために必要な対策費、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費、
及び停電から復旧するまでに発生する機会損失の費用である復旧困難費を算出する情報が含まれ、
前記対策費、重要負荷費及び復旧困難費の各々の情報が前記データベースに記憶され、
当該情報提供装置は、
取得要求に対応して前記対策費、前記重要負荷費、及び前記復旧困難費を算出する情報を前記情報処理装置に提供し、
前記情報処理装置における前記敷設費用算出手段は、
前記電力収入総額、前記維持費、前記対策費、前記重要負荷費、及び前記復旧困難費に基づいて前記配電線の敷設費用を算出することを特徴とする請求項1に記載の配電線敷設費用の算出支援システム。 The information provided by the information providing device includes:
Measure costs necessary to protect the distribution line from natural disasters,
Important load costs for providing sufficient power for facilities necessary to maintain life and life,
And information to calculate the difficult recovery cost, which is the cost of opportunity loss that occurs before recovery from a power outage,
Each information of the countermeasure cost, important load cost and recovery difficult cost is stored in the database,
The information providing device
Providing the information processing apparatus with information for calculating the countermeasure cost, the important load cost, and the recovery difficult cost in response to the acquisition request ;
The laying cost calculation means in the information processing apparatus is
The distribution line laying cost according to claim 1, wherein the distribution line laying cost is calculated based on the total power revenue, the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. Calculation support system.
固定資産の取得原価である簿価を算出する情報が含まれ、
前記簿価を算出する情報が前記データベースに記憶され、
当該情報提供装置は、
取得要求に対応して前記簿価を算出する情報を前記情報処理装置に提供し、
前記情報処理装置における前記敷設費用算出手段は、
前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記利益が差し引かれた当該電力収入総額から前記維持費、前記対策費、及び前記簿価を差し引いた金額を配電線の改修費とし、
前記改修費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準改修費とし、
前記改修費、及び前記利益を加算した金額を最大改修費としたとき、
前記配電線の敷設費用に関して前記標準改修費及び又は最大改修費を算出することを特徴とする請求項1に記載の配電線敷設費用の算出支援システム。 The information provided by the information providing device includes:
Contains information to calculate the book value, which is the cost of the fixed asset,
Information for calculating the book value is stored in the database,
The information providing device
Providing the information processing apparatus with information for calculating the book value in response to an acquisition request;
The laying cost calculation means in the information processing apparatus is
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total income, pulling to the difference of the benefit from the power total income,
The amount obtained by subtracting the maintenance cost, the countermeasure cost, and the book value from the total electric power revenue from which the profit has been deducted is regarded as a distribution line repair cost,
The standard repair cost is the sum of the repair cost, the important load cost, and the recovery difficulty cost,
When the maximum repair cost is the sum of the repair cost and the profit,
2. The distribution line laying cost calculation support system according to claim 1, wherein the standard repair cost and / or the maximum repair cost is calculated with respect to the laying cost of the distribution line.
塩害対策費、強風対策費、雷害対策費、及び雪害対策費が含まれることを特徴とする請求項2又は3に記載の配電線敷設費用の算出支援システム。 The countermeasure costs include
The distribution support laying cost calculation support system according to claim 2 or 3 , characterized by including salt damage countermeasure costs, strong wind countermeasure costs, lightning damage countermeasure costs, and snow damage countermeasure costs.
病院、学校、通信局、電力事業所、水道局、ガス事業所、及び放送局が含まれることを特徴とする請求項1に記載の配電線敷設費用の算出支援システム。 The facility includes
The distribution line laying cost calculation support system according to claim 1 , comprising a hospital, a school, a communication station, a power station, a water station, a gas station, and a broadcasting station.
前記配電線敷設費用の決定支援するシステムが、
前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、
前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、
前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、
前記情報処理装置が、入力手段、電力収入算出手段及び、敷設費用算出手段を有し、
少なくとも、前記入力手段が、
前記配電線を敷設する敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び前記維持費の情報を取得するように操作される入力工程を有し、
前記電力収入算出手段が、
前記入力工程により入力された当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出工程を有し、
前記敷設費用算出手段が、
前記電力収入算出工程により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記配電線を自然災害から保護するために必要な費用を対策費とし、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、
停電から復旧するまでに発生する機会損失の費用を復旧困難費として、
前記利益が差し引かれた当該電力収入総額から、前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、
前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、
前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記標準建設費及び又は最大建設費を算出する敷設費用算出工程を有することを特徴とする情報処理方法。 An information processing method for processing information for determining and supporting a distribution line laying cost of a laying section for laying a distribution line,
A system for supporting the determination of the distribution line laying cost,
It has a database that stores annual income information for each contract type including the amount of electricity fee revenue in the laid section, passing current information, parameter information, and maintenance cost information for maintaining the distribution line after laying, Correspondingly, an information providing device that provides annual revenue information, passing current information, parameter information, and information on the maintenance cost for each contract type including the amount of revenue of the power charges,
The distribution of the laying section in which the distribution line is laid by receiving the annual revenue information, the passing current information, the parameter information, and the maintenance cost information for each contract type including the power fee revenue provided from the information providing device. An information processing device for calculating and processing electric wire laying costs;
Communication means for connecting the information processing device and the information providing device ;
The information processing apparatus has input means, power revenue calculation means, and laying cost calculation means ,
At least the input means
You input the information of the laying section for laying the distribution line, wherein the distribution line laying costs by entering the information for cost recovery period to recover the power toll revenue in the laying section from the information providing apparatus via said communication means possess annual income information for each contract type, including the amount, passing current information, the operation is the input step to acquire the information of the parameter information and the maintenance costs,
The power revenue calculation means,
The annual revenue information for each contract type including the amount of power charge revenue in the laid section input in the input step is multiplied by the information of the expense collection period, and the multiplied section revenue information for each contract type is totaled. possess a section revenue calculated, passing current information, parameter information, and the power revenue calculation step information cost recovery period is calculated power total revenue from the downstream revenue is calculated by multiplying Te,
The installation cost calculating means,
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total revenue calculated by the power revenue calculation step, pull differentially the benefit from the power total income,
The cost required to protect the distribution line from natural disasters is taken as a countermeasure cost,
Expenses required to maintain sufficient power for facilities necessary to maintain life and life are considered important burden costs,
The cost of opportunity loss that occurs before recovery from a power outage is considered as a difficult recovery cost.
From the power total income which the benefit is subtracted, the amount obtained by subtracting the maintenance and the measure expense acquired from the information providing apparatus and construction costs of the distribution line,
The construction cost, the important load cost, and the sum of the recovery difficulty cost as standard construction cost,
An information processing method comprising a laying cost calculation step of calculating the standard construction cost and / or the maximum construction cost when the construction cost and the amount obtained by adding the profits are set as the maximum construction cost.
前記敷設費用算出手段が
前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記利益が差し引かれた当該電力収入総額から前記維持費、前記対策費、及び固定資産の取得原価である簿価を差し引いた金額を配電線の改修費とし、
前記改修費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準改修費とし、
前記改修費、及び前記利益を加算した金額を最大改修費としたとき、
前記配電線の敷設費用に関して前記標準改修費及び又は最大改修費を算出することを特徴とする請求項6に記載の情報処理方法。 During the laying cost calculation process,
To ensure the benefits the laying cost calculation means is obtained by multiplying a predetermined ratio with respect to the power total income, pulling to the difference of the benefit from the power total income,
The amount obtained by subtracting the maintenance cost, the countermeasure cost, and the book value, which is the acquisition cost of fixed assets, from the total power revenue from which the profit has been deducted, is the repair cost of the distribution line,
The standard repair cost is the sum of the repair cost, the important load cost, and the recovery difficulty cost,
When the maximum repair cost is the sum of the repair cost and the profit,
The information processing method according to claim 6, wherein the standard repair cost and / or the maximum repair cost are calculated with respect to the laying cost of the distribution line.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006155099A JP4916223B2 (en) | 2006-06-02 | 2006-06-02 | Distribution line laying cost calculation support system and information processing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006155099A JP4916223B2 (en) | 2006-06-02 | 2006-06-02 | Distribution line laying cost calculation support system and information processing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2007323521A JP2007323521A (en) | 2007-12-13 |
| JP4916223B2 true JP4916223B2 (en) | 2012-04-11 |
Family
ID=38856258
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2006155099A Expired - Fee Related JP4916223B2 (en) | 2006-06-02 | 2006-06-02 | Distribution line laying cost calculation support system and information processing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4916223B2 (en) |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11134387A (en) * | 1997-10-24 | 1999-05-21 | Cardinal Kk | Repayment plan support system, capital investment plan support system, and recording medium |
| JP2003216801A (en) * | 2002-01-18 | 2003-07-31 | Fujitsu Ltd | Commercialization simulation system |
| JP2003271799A (en) * | 2002-03-18 | 2003-09-26 | Tokyo Electric Power Co Inc:The | Power equipment management system |
| JP2004038786A (en) * | 2002-07-05 | 2004-02-05 | Cross Culture Ltd | Simple quote system and simple quote server |
| JP4158730B2 (en) * | 2004-03-16 | 2008-10-01 | 東京電力株式会社 | Distribution line new design support method and apparatus |
| JP2005284457A (en) * | 2004-03-29 | 2005-10-13 | Osaka Gas Co Ltd | Business territory selection system |
-
2006
- 2006-06-02 JP JP2006155099A patent/JP4916223B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2007323521A (en) | 2007-12-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4498535B2 (en) | Housing diagnosis system and housing diagnosis method | |
| CN114778936B (en) | Monitoring method, monitor, system and electronic equipment for electric energy metering abnormality | |
| Fu et al. | Carbon emission assessment for steel structure based on lean construction process | |
| JP2003102134A (en) | Electric power data trading system | |
| WO2010098140A1 (en) | System for estimating the amount of carbon dioxide emitted from construction and method therefor | |
| JP4108011B2 (en) | Instantaneous voltage drop data providing method, estimated loss calculation method, program, and apparatus | |
| JP4916223B2 (en) | Distribution line laying cost calculation support system and information processing method | |
| JP2003303244A (en) | Failure information system | |
| JP5611542B2 (en) | Work time summary system and work time summary method | |
| JP5032426B2 (en) | Depreciable asset price calculation device, depreciable asset price calculation method, depreciable asset price calculation program and fixed asset evaluation value calculation device, fixed asset evaluation value calculation method, and fixed asset evaluation value calculation program | |
| JP2011165088A (en) | Power transaction system and method for controlling the power transaction system | |
| JP4514300B2 (en) | Real estate evaluation support system | |
| JP5642752B2 (en) | Disaster recovery management system | |
| JP4637729B2 (en) | Information processing method, information processing apparatus, and program | |
| JP2005182576A (en) | Maintenance estimation system for house | |
| US20030110116A1 (en) | Money saving service method and money saving service apparatus | |
| JP2018014052A (en) | Facility introduction support system, facility introduction support method, server device and program | |
| CN105137776A (en) | Metering automation terminal control assistant system | |
| JP4948052B2 (en) | Power failure related information provision system | |
| JP2008052461A (en) | Power distribution construction management system | |
| JP2018151738A (en) | System for determining solatium for shortage in power generation amount and program for determining solatium for shortage in power generation amount | |
| JP2006024202A (en) | Decision support system | |
| CN114757658A (en) | Nuclear facility decommissioning simulation process and cost estimation method and system | |
| Abaide et al. | Assessment of the smart grids applied in reducing the cost of distribution system losses | |
| CN110912118A (en) | Low-voltage branch line loss analysis method and monitoring system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20090529 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20100805 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20101228 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110222 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110726 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110914 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120117 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120124 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150203 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4916223 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150203 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |