JP4916223B2 - Distribution line laying cost calculation support system and information processing method - Google Patents
[go: Go Back, main page]

JP4916223B2 - Distribution line laying cost calculation support system and information processing method - Google Patents

Distribution line laying cost calculation support system and information processing method Download PDF

Info

Publication number
JP4916223B2
JP4916223B2 JP2006155099A JP2006155099A JP4916223B2 JP 4916223 B2 JP4916223 B2 JP 4916223B2 JP 2006155099 A JP2006155099 A JP 2006155099A JP 2006155099 A JP2006155099 A JP 2006155099A JP 4916223 B2 JP4916223 B2 JP 4916223B2
Authority
JP
Japan
Prior art keywords
cost
information
data
revenue
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006155099A
Other languages
Japanese (ja)
Other versions
JP2007323521A (en
Inventor
周造 尺田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006155099A priority Critical patent/JP4916223B2/en
Publication of JP2007323521A publication Critical patent/JP2007323521A/en
Application granted granted Critical
Publication of JP4916223B2 publication Critical patent/JP4916223B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、配電線を敷設する敷設区間の配電線敷設費用から敷設投資額を決定する配電線投資額の決定支援システムに適用可能な配電線敷設費用の算出支援システム、及び情報処理方法に関するものである。   TECHNICAL FIELD The present invention relates to a distribution line laying cost calculation support system and an information processing method applicable to a distribution line investment amount determination support system that determines a laying investment amount from a distribution line laying cost of a laying section where a distribution line is laid. It is.

詳しくは、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する情報提供装置から提供されたこれらの情報を受信して処理する情報処理装置が、敷設費用算出手段を備え、この敷設費用算出手段が、敷設区間における電力料金収入額と費用回収期間から電力収入総額を算出し、この電力収入総額と維持費に基づいて配電線の敷設費用を算出し、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようにする。   Specifically, the information processing device that receives and processes the information provided from the information providing device that provides the information on the revenue of the electricity bill in the laid section and the maintenance cost for maintaining the distribution line after laying is laid down. A calculating means, and the laying cost calculating means calculates the total power revenue from the amount of power charge revenue in the laid section and the cost collection period, and calculates the laying cost of the distribution line based on the total power revenue and the maintenance cost, Without relying on manual calculation, it is possible to efficiently determine and support distribution line laying investment using the automatically calculated distribution line laying cost.

従来、配電線を敷設する敷設区間で配電線を敷設する費用を決定する場合、作業者自らの手計算により配電線の敷設費用が計算されることが多い。例えば、先ず、作業者は、配電線の敷設区間における電力料金収入額の情報を電力料金収入額管理サーバなどから取得する。取得した電力料金収入額と、敷設区間における配電線を敷設する費用を回収する費用回収期間とから電力収入総額を算出する。次に、配電線の敷設区間における配電線を維持する維持費を過去のデータなどを参照して計算する。最後に、算出されたこの電力収入総額から過去のデータなどから算出された維持費を差し引き、維持費が差し引かれた電力収入総額に基づいて配電線の敷設費用を決定する。   Conventionally, when determining the cost of laying a distribution line in the laying section where the distribution line is laid, the installation cost of the distribution line is often calculated by the operator's own calculation. For example, first, the operator acquires information on the amount of power charge revenue in the distribution section of the distribution line from a power fee revenue management server or the like. The total amount of power revenue is calculated from the acquired power rate revenue and the cost recovery period for recovering the cost of laying the distribution lines in the installed section. Next, a maintenance cost for maintaining the distribution line in the distribution line laying section is calculated with reference to past data and the like. Finally, the maintenance cost calculated from past data or the like is subtracted from the calculated total power revenue, and the distribution line laying cost is determined based on the total power revenue deducted from the maintenance cost.

このような従来の例に関連して、特許文献1には、電力系統から観測される情報に基づき事故復旧手順を自動作成して表示する電力系統事故復旧支援装置が開示されている。この電力系統事故復旧支援装置によれば、事故発生に際して恒久復旧負荷量を求めると共に、負荷減少率データを用いて応急的に復旧すべき応急復旧負荷量を求める。これにより、とりあえず必要な応急復旧負荷と恒久復旧負荷とに分けて復旧操作するので、事故復旧が短時間に、かつ合理的にできる。   In relation to such a conventional example, Patent Document 1 discloses a power system accident recovery support apparatus that automatically creates and displays an accident recovery procedure based on information observed from the power system. According to the power system accident recovery support apparatus, a permanent recovery load amount is obtained when an accident occurs, and an emergency recovery load amount that should be restored quickly is obtained using load reduction rate data. As a result, the recovery operation is divided into the necessary emergency recovery load and permanent recovery load for the time being, so that the accident can be recovered in a short time and reasonably.

特開平07−227041号公報(第4頁、第2図)Japanese Patent Application Laid-Open No. 07-227041 (page 4, FIG. 2)

ところで、従来例によれば、配電線を新たに敷設する敷設区間に投資される配電線敷設投資額を決定する場合、作業者自らの手動計算により配電線の敷設費用が計算されることが多いので、配電線を敷設する費用を計算するのに多くの時間を必要とする可能性がある。また、計算間違いをおこして正確に配電線の敷設費用を算出できないおそれがある。   By the way, according to the conventional example, when determining the distribution line laying investment amount to be invested in the laying section in which the distribution line is newly laid, the distribution line laying cost is often calculated by the operator's own manual calculation. So it may take a lot of time to calculate the cost of laying the distribution lines. Moreover, there is a possibility that a calculation error is made and the distribution line laying cost cannot be calculated accurately.

また、特許文献1によれば、電力系統から観測される情報を事故の復旧を支援する場合に使用しているが、配電線を敷設する費用を算出する場合には使用されていない。   Further, according to Patent Document 1, information observed from the power system is used when assisting recovery from an accident, but is not used when calculating the cost of installing a distribution line.

そこで、本発明は、このような従来例に係る課題を解決したものであって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようにした配電線敷設費用の算出支援システム、及び情報処理方法を提供することを目的とする。   Therefore, the present invention solves the problem related to such a conventional example, and without relying on manual calculation, the distribution line laying investment amount using the automatically calculated distribution line laying cost. It is an object of the present invention to provide a distribution line laying cost calculation support system and an information processing method that can efficiently determine and support the distribution line.

上述した課題を解決するために、本発明に係る請求項1に記載の配電線敷設費用の算出支援システムは、配電線を敷設する敷設区間の配電線敷設費用を算出支援するシステムであって、前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、前記情報処理装置は、少なくとも、前記敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を取得する入力手段と、前記入力手段により入力された当該敷設区間における前記電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出手段と、前記電力収入算出手段により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、前記利益が差し引かれた当該電力収入総額から前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記配電線の敷設費用として前記標準建設費及び又は最大建設費を算出する敷設費用算出手段とを有することを特徴とするものである。
In order to solve the above-mentioned problem, the distribution line laying cost calculation support system according to claim 1 according to the present invention is a system that supports the calculation of the distribution line laying cost of the laying section in which the distribution line is laid. It has a database that stores annual income information for each contract type including the amount of electricity fee revenue in the laid section , passing current information, parameter information , and maintenance cost information for maintaining the distribution line after laying , Correspondingly, an information providing device that provides annual revenue information, passing current information, parameter information, and maintenance cost information for each contract type including the power fee revenue, and the power fee provided from the information providing device annual income information for each contract type including revenues, passing current information, parameter information, and laying distribution line laying section for laying the power distribution line to receive the information of the maintenance Comprising an information processing apparatus for calculating processing use, and communication means for connecting said information providing device and the information processing apparatus, at least, and inputs the information of the laying period, the distribution line laid Input the information of the cost recovery period for recovering the cost , annual revenue information for each contract type including the amount of power charge revenue in the laid section from the information providing device via the communication means, passing current information, parameter information, and The input means for acquiring the maintenance cost information, and the annual revenue information for each contract type including the power charge revenue amount in the laid section input by the input means is multiplied by the information of the cost recovery period, and multiplied. the contract and the section revenue calculated by summing interval income information for each type, passing current information, parameter information, and information of the multiplication of the cost recovery period is A power revenue calculation means for calculating a power total revenue from the downstream revenue calculated Te, in order to secure the benefits obtained by multiplying a predetermined ratio with respect to the power total revenue calculated by the power revenue calculation means , pull to the difference between the profit from the power revenue total, it said the measures cost the expenses necessary to protect the distribution line from natural disasters, enough power to the facilities necessary to maintain the life and life From the total amount of power revenue from which the profit has been subtracted, from the information provision device , the cost of the maintenance to supply as an important load cost, the cost of opportunity loss that occurs before recovery from a power failure as the difficult recovery cost The amount obtained by subtracting the acquired maintenance cost and the countermeasure cost is the construction cost of the distribution line, and the sum of the construction cost, the important load cost, and the difficult recovery cost is the standard construction cost. And a construction cost calculation means for calculating the standard construction cost and / or the maximum construction cost as the construction cost of the distribution line, when the construction cost and the amount obtained by adding the profit are set as the maximum construction cost. It is.

本発明に係る配電線敷設費用の算出支援システムによれば、配電線を敷設する敷設区間の配電線敷設費用を算出支援する場合であって、情報提供装置は、敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有しており、取得要求に対応して電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び維持費の情報を提供する。情報処理装置は、情報提供装置から提供された電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び維持費の情報を受信して配電線を敷設する敷設区間の配電線敷設費用を算出処理する。例えば、情報処理装置は、入力手段、電力収入算出手段、及び敷設費用算出手段を備え、入力手段は、少なくとも、配電線を敷設する敷設区間の情報を入力すると共に、配電線敷設費用を回収する費用回収期間の情報を入力し、通信手段を介して情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び維持費の情報を取得する。電力収入算出手段は、入力手段により入力された敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間情報が乗算されて算出される下流収入とから電力収入総額を算出する。敷設費用算出手段は、電力収入算出手段により算出された電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、利益が差し引かれた当該電力収入総額から、情報提供装置から取得した維持費及び対策費を差し引いた金額を配電線の建設費とし、建設費、重要負荷費、及び復旧困難費を加算した金額を標準建設費とし、建設費、及び利益を加算した金額を最大建設費としたとき、配電線の敷設費用として標準建設費及び又は最大建設費を算出する。従って、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。
According to calculation support system distribution lines laying costs of the present invention, in the case of calculating aid distribution line laying costs laying section for laying distribution lines, the information providing apparatus, the power rate revenues in laying section It has a database that stores annual revenue information, passing current information, parameter information, and maintenance cost information to maintain the distribution line after laying , for each contract type, and the amount of electricity fee revenue corresponding to the acquisition request The annual income information, the passing current information, the parameter information, and the maintenance cost information for each contract type including The information processing device receives the annual revenue information, the passing current information, the parameter information , and the maintenance cost information for each contract type including the electricity fee revenue provided from the information providing device, and installs the distribution line. Calculate distribution line installation costs . For example, the information processing apparatus includes an input unit, a power revenue calculation unit, and a laying cost calculation unit, and the input unit inputs at least information about a laying section in which the distribution line is laid and collects the distribution line laying cost. Enter the information on the cost recovery period , and obtain the annual revenue information, passing current information, parameter information, and maintenance cost information for each contract type including the amount of power fee revenue in the installed section from the information providing device via the communication means. . The power revenue calculation means multiplies the annual revenue information for each contract type including the amount of power charge revenue in the installed section input by the input means by the information of the expense collection period , and the section revenue information for each contract type multiplied a section revenue is calculated by summing the calculated passing current information, parameter information, and power total revenue from the downstream income information cost recovery period is calculated by multiplying. Laying costs calculation means, in order to secure the benefits obtained by multiplying a predetermined ratio with respect to power total revenue calculated by the power revenue calculation means, pulling to the difference of the benefit from the power total income, the distribution line The cost required to protect the plant from natural disasters is taken as a countermeasure cost, and the cost required to maintain sufficient power for facilities necessary to maintain life and life is set as the important load cost, and the power outage The cost of loss of opportunity that occurs from the time of recovery to the time of recovery is regarded as a difficult recovery cost, and the amount obtained by subtracting the maintenance costs and countermeasure costs acquired from the information provision equipment from the total power revenue deducted from profits is the construction cost of the distribution line. When the construction cost, important load cost, and recovery difficult cost are standard construction costs, and the construction cost and the sum of profits are the maximum construction costs, the standard construction costs and It calculates the maximum construction costs. Therefore, it is possible to efficiently determine and support the distribution line laying investment amount by using the automatically calculated distribution line laying cost without depending on manual calculation.

上述した課題を解決するために、本発明に係る請求項7に記載の情報処理方法は、配電線を敷設する敷設区間の配電線敷設費用を決定支援するための情報を処理する方法であって、前記配電線敷設費用の決定支援するシステムが、前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、前記情報処理装置が、入力手段、電力収入算出手段及び、敷設費用算出手段を有し、少なくとも、前記入力手段が、前記配電線を敷設する敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び前記維持費の情報を取得するように操作される入力工程をし、前記電力収入算出手段が前記入力工程により入力された当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出工程をし、前記敷設費用算出手段が前記電力収入算出工程により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、前記配電線を自然災害から保護するために必要な費用を対策費とし、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、停電から復旧するまでに発生する機会損失の費用を復旧困難費として、前記利益が差し引かれた当該電力収入総額から前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記標準建設費及び又は最大建設費を算出する敷設費用算出工程を有することを特徴とするものである。
In order to solve the above-described problem, an information processing method according to claim 7 of the present invention is a method of processing information for determining and supporting distribution line laying costs of a laying section for laying distribution lines. The system for supporting the determination of the distribution line laying cost is the annual income information for each contract type including the amount of revenues of electricity charges in the laid section, the passing current information, the parameter information, and the maintenance cost for maintaining the distribution line after laying. Information providing apparatus for providing annual income information, passing current information, parameter information, and maintenance cost information for each contract type including the power fee revenue in response to an acquisition request And receiving annual revenue information, passing current information, parameter information, and maintenance cost information for each contract type including the amount of power revenue provided from the information providing device. Comprising an information processing apparatus for calculating handle distribution line laying costs laying section for laying out a serial distribution lines, and communication means for connecting said information providing device and the information processing apparatus, the information processing apparatus, an input unit, power revenue calculation means and having a laying costs calculation means, an input of at least said input means inputs the information of the laying section for laying the distribution line, information of cost recovery period for collecting the distribution line laying costs Then, it is operated to acquire annual revenue information, passing current information, parameter information, and information on the maintenance cost for each contract type including the amount of power fee revenue in the laid section from the information providing device via the communication means. that have a input step, the power revenue calculation means, annual income information for each contract type including a power toll revenue amount for input the laying period by the input step Multiplying the information of the expense recovery period, the section income calculated by summing the multiplied section income information for each contract type, the passing current information, the parameter information, and the information of the expense recovery period are multiplied. power revenue calculation step of calculating a power total revenue from the downstream revenue calculated possess, the laying cost calculation means multiplies the predetermined ratio with respect to the power total revenue calculated by the power revenue calculation step in order to ensure the benefits to be obtained, required to pull to the difference between the profit from the power revenue total, the measures cost the expenses necessary in order to protect the distribution line from natural disasters, to maintain the life and life The cost for providing sufficient power to the facility is regarded as an important load cost, and the loss of opportunity that occurs before recovery from a power outage is regarded as a difficult recovery cost. Amount of money from the power force total income, the amount obtained by subtracting the maintenance costs and the measures cost acquired from the information providing apparatus and construction costs of distribution lines, the construction costs, the critical load costs, and which is obtained by adding the restoration difficult expenses And a construction cost calculation step of calculating the standard construction cost and / or the maximum construction cost, where the construction cost and the amount obtained by adding the profit are the maximum construction cost. is there.

本発明に係る情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を決定支援する情報を処理する場合であって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。   According to the information processing method of the present invention, it is a case where information for supporting the determination of the distribution line laying cost of the laying section where the distribution line is laid is processed, and is automatically calculated without depending on manual calculation. It becomes possible to efficiently determine and support distribution line laying investment amount using the distribution line laying cost.

本発明に係る配電線敷設費用の算出支援システム及び情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を算出支援する場合であって、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する情報提供装置から提供されたこれらの情報を受信して配電線敷設費用を算出処理する情報処理装置は、敷設費用算出手段を備え、この敷設費用算出手段は、算出された電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から利益を差し引き、利益が差し引かれた当該電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、建設費、重要負荷費、及び復旧困難費を加算した金額を標準建設費とし、建設費、及び利益を加算した金額を最大建設費としたとき、配電線の敷設費用として標準建設費及び又は最大建設費を算出するものである。 According to the distribution line laying cost calculation support system and the information processing method according to the present invention, when calculating and supporting the distribution line laying cost of the laying section in which the distribution line is laid, The information processing apparatus that receives the information provided from the information providing apparatus that provides the maintenance cost information for maintaining the distribution line after laying and calculates the distribution line laying cost includes a laying cost calculation unit, laying costs calculation means, in order to secure the benefits obtained by multiplying a predetermined ratio with respect to the calculated power total income, pull differentially benefit from the power total income, the power revenue gross profit is subtracted The amount obtained by subtracting maintenance costs and countermeasure costs from this is the distribution line construction cost, the sum of the construction cost, important load cost, and difficult recovery cost is the standard construction cost, and the sum of construction cost and profit is the maximum. When the construction cost, and calculates the standard construction costs and or up to construction costs as laying costs distribution line.

この構成によって、手動計算に依存することなく、自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。   With this configuration, it is possible to efficiently determine and support the distribution line laying investment amount by using the automatically calculated distribution line laying cost without depending on manual calculation.

続いて、本発明に係る配電線敷設費用の算出支援システム、及び情報処理方法について、図面を参照しながら説明をする。   Next, a distribution line laying cost calculation support system and an information processing method according to the present invention will be described with reference to the drawings.

図1は、本発明に係る実施例としての配電線投資額の決定支援システム100の構成例を示す概念図である。図1に示す配電線投資額の決定支援システム100は、配電線敷設費用の算出支援システムの一例を構成し、投資額決定サーバ1、電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5から構成されている。   FIG. 1 is a conceptual diagram showing a configuration example of a distribution line investment amount determination support system 100 as an embodiment according to the present invention. A distribution line investment amount determination support system 100 shown in FIG. 1 constitutes an example of a distribution line laying cost calculation support system, and includes an investment amount determination server 1, an electricity rate management server 2, an accounting server 3, and a distribution facility management server 4. And the power distribution system management server 5.

電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5は、情報提供装置の一例であり、通信回線6に接続され、配電線を敷設する敷設区間の配電線敷設費用を決定する場合に、この敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費などの情報を提供する。   The electricity rate management server 2, the accounting server 3, the distribution facility management server 4, and the distribution system management server 5 are examples of information providing devices, and are connected to the communication line 6 and installed in the laying section where the distribution line is laid. When determining the cost, it provides information such as the amount of revenue from the electricity charge in this laid section and the maintenance cost for maintaining the distribution line after laying.

通信回線6は、通信手段の一例であり、通信接続事業所内に設置されたインターネット接続装置に接続されている。情報を提供するこれら4つのサーバは、例えば、電力事業所に設置されている。   The communication line 6 is an example of a communication means, and is connected to an internet connection device installed in a communication connection office. These four servers that provide information are installed in, for example, an electric power office.

電気料金管理サーバ2には、例えば、顧客ごとの電力量料金情報、基本料金情報、契約種別情報、及び重要負荷種別情報が保存されている。これらの情報は、既存の電力系統の情報であり、見込み顧客の情報は含まれていない。勿論、新規に電力を供給する場合、見込み顧客の予想電力量料金情報などを用意してもよい。   The electricity charge management server 2 stores, for example, power charge information, basic charge information, contract type information, and important load type information for each customer. These pieces of information are existing power system information and do not include information on prospective customers. Of course, when power is newly supplied, information on the expected electric energy charge of the prospective customer may be prepared.

契約種別情報とは、電気料金のメニューであり、低圧電灯、低圧電力、高圧電力、及びその他などがある。重要負荷種別情報とは、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費の情報であり、この施設には、病院、学校、通信局、電力事業所、水道局、ガス事業所、及び放送局が含まれる。この重要負荷種別情報は、例えば、「病院」、「学校」、「ガス」などと記録されている。これらの顧客料金情報、顧客契約種別情報、及び重要負荷種別情報は、顧客ごとに、顧客名、住所、電話番号、及び契約番号の情報とリンクされており、顧客名、住所、電話番号、又は契約番号を検索キーにして検索可能である。電気料金管理サーバ2は、検索結果の情報を投資額決定サーバ1に送信する。   The contract type information is a menu of electricity charges, such as a low piezoelectric lamp, low voltage power, high voltage power, and others. The important load type information is information on the important load cost for providing sufficient power to the facilities necessary for maintaining life and life. This facility includes hospitals, schools, Includes communication stations, power stations, water stations, gas stations, and broadcasting stations. This important load type information is recorded as, for example, “hospital”, “school”, “gas”, and the like. These customer fee information, customer contract type information, and important load type information are linked to customer name, address, telephone number, and contract number information for each customer, and the customer name, address, telephone number, or Search is possible using the contract number as a search key. The electricity rate management server 2 transmits the search result information to the investment amount determination server 1.

経理サーバ3には、例えば、簿価情報が保存されている。この簿価情報とは、固定資産の取得原価データであり、例えば、1坪あたりの単価である。この簿価情報は、固定資産の場所情報とリンクされており、固定資産の場所情報を検索キーにして検索可能である。経理サーバ3は、検索結果の情報を投資額決定サーバ1に送信する。   In the accounting server 3, for example, book value information is stored. The book value information is acquisition cost data of fixed assets, for example, unit price per tsubo. This book value information is linked to the fixed asset location information, and can be searched using the fixed asset location information as a search key. The accounting server 3 transmits search result information to the investment amount determination server 1.

配電設備管理サーバ4には、例えば、電柱番号情報、電柱の設置場所情報、電柱の位置情報、及び自然災害対策情報が保存されている。電柱番号情報とは、電柱ごとに割り振られた番号の情報であり、この電柱番号情報は、例えば、「001−001」と記録されている。電柱の設置場所情報とは、電柱が設置されている場所の情報であり、この電柱の設置場所情報は、例えば、「広島県○○市△△」と記録されている。   In the power distribution facility management server 4, for example, telephone pole number information, telephone pole installation location information, telephone pole position information, and natural disaster countermeasure information are stored. The utility pole number information is information of numbers assigned to each utility pole, and this utility pole number information is recorded, for example, “001-001”. The installation location information of the utility pole is information on the location where the utility pole is installed, and this installation location information of the utility pole is recorded, for example, “Hiroshima Prefecture ○○ City Δ △”.

電柱の位置情報とは、電柱の設置場所情報を数値化したものであり、この電柱の位置情報は、例えば、「22,000」、「24,000」と記録されている。電柱間の距離を測定する場合、この電柱の位置情報の絶対値の差が計算され、この差が電柱間の距離となる。自然災害対策情報とは、配電線を自然災害から保護するために必要な対策費の情報であり、この自然災害対策情報には、塩害対策費、強風対策費、雷害対策費、及び雪害対策費が含まれる。この自然災害対策情報は、例えば、電柱ごとに、「強風」、「強風・塩害」などと記録されている。配電設備管理サーバ4は、この対策費の情報を投資額決定サーバ1に送信する。   The position information of the utility pole is obtained by digitizing the installation location information of the utility pole, and the position information of the utility pole is recorded as, for example, “22,000” and “24,000”. When measuring the distance between the utility poles, a difference in absolute value of the position information of the utility pole is calculated, and this difference becomes the distance between the utility poles. Natural disaster countermeasure information is information on countermeasure costs necessary to protect distribution lines from natural disasters. This natural disaster countermeasure information includes salt damage countermeasure costs, strong wind countermeasure expenses, lightning damage countermeasure expenses, and snow damage countermeasures. Cost is included. This natural disaster countermeasure information is recorded as, for example, “strong wind”, “strong wind / salt damage”, etc. for each utility pole. The distribution facility management server 4 transmits information on the countermeasure cost to the investment amount determination server 1.

配電系統管理サーバ5には、例えば、電柱番号と通過電流情報が保存されている。この通過電流情報とは、通過する電流量であり、通過電流情報は、電柱ごとに記憶されている。この通過電流情報は、電柱番号情報とリンクされており、電柱番号情報を検索キーにして検索可能である。配電系統管理サーバ5は、検索結果の情報を投資額決定サーバ1に送信する。   In the power distribution system management server 5, for example, utility pole numbers and passing current information are stored. This passing current information is the amount of current passing through, and the passing current information is stored for each power pole. This passing current information is linked to the telephone pole number information and can be searched using the telephone pole number information as a search key. The power distribution system management server 5 transmits information on the search result to the investment amount determination server 1.

投資額決定サーバ1は、情報処理装置の一例であり、通信回線6に接続されている。この通信回線6は、通信接続事業所内に設置されたインターネット接続装置に接続され、投資額決定サーバ1と電気料金管理サーバ2、経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5を接続している。   The investment amount determination server 1 is an example of an information processing apparatus and is connected to the communication line 6. The communication line 6 is connected to an Internet connection device installed in a communication connection office, and includes an investment amount determination server 1, an electricity rate management server 2, an accounting server 3, a distribution facility management server 4, and a distribution system management server 5. Connected.

投資額決定サーバ1の設置場所は、特に限定されない。インターネットに接続可能な環境であれば、どこでも良い。投資額決定サーバ1には、例えば、ノートパソコンを使用する。この投資額決定サーバ1は、モニタ7、キーボード8、マウス9、及び図示しないUSB(Universal Serial Bus)インターフェースを備えている。マウス9は、このUSBインターフェースに接続されている。   The installation location of the investment amount determination server 1 is not particularly limited. It can be anywhere as long as it can be connected to the Internet. For the investment amount determination server 1, for example, a notebook personal computer is used. The investment amount determination server 1 includes a monitor 7, a keyboard 8, a mouse 9, and a USB (Universal Serial Bus) interface (not shown). The mouse 9 is connected to this USB interface.

キーボード8、及びマウス9は、入力手段の一例であり、少なくとも、敷設区間を入力すると共に、配電線敷設費用を回収する費用回収期間を入力するようになされる。このキーボード8には、例えば、かな漢字変換などで利用するためのキートップが備えられた106型キーボードが使用される。USBインターフェースには、マウス9が接続され、このマウス9には、例えば、光学式センサーが接地面を断続的にスキャンすることで移動を検出する光学式マウスが使用される。マウス9が平面上で上下左右に移動されると、モニタ7の画面上に表示される図11に示すカーソル60が上下左右に移動する。   The keyboard 8 and the mouse 9 are examples of input means, and at least input a laying section and a cost collection period for collecting a distribution line laying cost. As the keyboard 8, for example, a 106-type keyboard provided with a key top for use in Kana-Kanji conversion or the like is used. A mouse 9 is connected to the USB interface, and for example, an optical mouse that detects movement by an optical sensor intermittently scanning the ground plane is used. When the mouse 9 is moved vertically and horizontally on the plane, the cursor 60 shown in FIG. 11 displayed on the screen of the monitor 7 moves vertically and horizontally.

投資額決定サーバ1は、電気料金管理サーバ2及び配電設備管理サーバ4から提供された電力料金収入額、及び維持費の情報を受信して処理する。投資額決定サーバ1は、図2に示す制御部10を備え、この制御部10は、電力収入算出手段、及び敷設費用算出手段の一例であり、キーボード8、及びマウス9により入力された敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。制御部10は、算出された電力収入総額と維持費に基づいて配電線の敷設費用を算出する。   The investment amount determination server 1 receives and processes the information on the electricity fee income and the maintenance cost provided from the electricity rate management server 2 and the distribution facility management server 4. The investment amount determination server 1 includes a control unit 10 shown in FIG. 2, and this control unit 10 is an example of a power revenue calculation unit and a laying cost calculation unit, and a laying section input by a keyboard 8 and a mouse 9. The total amount of power revenue is calculated from the amount of power charge revenue in and the cost recovery period in the installed section. The control unit 10 calculates the distribution line laying cost based on the calculated total power revenue and the maintenance cost.

また、制御部10は、停電から復旧するまでに発生する機会損失の費用である復旧困難費を復旧現場までの移動距離に応じて算出する。この復旧現場までの移動距離は、配電設備管理サーバ4に記録された電柱の位置情報と営業所の位置情報に基づいて制御部10により算出される。制御部10は、電力収入総額、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の敷設費用を算出する。   In addition, the control unit 10 calculates a difficult recovery cost, which is a cost of opportunity loss that occurs before recovery from a power failure, according to the travel distance to the recovery site. The moving distance to the restoration site is calculated by the control unit 10 based on the position information of the utility pole and the position information of the sales office recorded in the distribution facility management server 4. The control unit 10 calculates the distribution line laying cost based on the total power revenue, the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost.

具体的には、配電線を建設する建設区間の配電線建設費用を決定する場合、制御部10は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、標準建設費を、建設費、重要負荷費、及び復旧困難費を加算した金額とし、最大建設費を、建設費、及び利益を加算した金額とする。   Specifically, when determining the distribution line construction cost of the construction section for constructing the distribution line, the control unit 10 secures a predetermined percentage of profit from the total power revenue, and subtracts the secured profit from the total power revenue, The total construction cost of the distribution line is the total power revenue minus profits minus the maintenance and countermeasure costs, and the standard construction cost is the sum of construction costs, important load costs, and difficult recovery costs. The cost is the sum of construction cost and profit.

これにより、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。   This makes it possible to efficiently invest in the construction of distribution lines without relying on manual calculations, using distribution line standards and maximum construction costs that are automatically calculated according to the importance of countermeasure costs and important load costs. You will be able to support decision making.

また、配電線を改修する改修区間の配電線改修費用を決定する場合、制御部10は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価を差し引いた金額を配電線の改修費とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額とし、最大改修費を、改修費、及び利益を加算した金額とする。これにより、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。   In addition, when determining the distribution line repair cost of the repair section for repairing the distribution line, the control unit 10 secures a predetermined percentage of profit from the total power revenue, subtracts the secured profit from the total power revenue, and subtracts the profit. The total amount of electricity revenue minus the maintenance cost, countermeasure cost, and book value is the distribution line repair cost, and the standard repair cost is the sum of the repair cost, important load cost, and difficult recovery cost. The repair cost is the sum of the repair cost and profit. This makes it possible to efficiently invest in distribution line renovation investment using the standard and maximum renovation costs of distribution lines that are automatically calculated according to the importance of countermeasure costs and important load costs, without relying on manual calculations. You will be able to support decision making.

図2は、投資額決定サーバ1の制御部10、及び電気料金管理サーバ2の制御部20の構成例を示すブロック図である。経理サーバ3、配電設備管理サーバ4、及び配電系統管理サーバ5の制御部は、電気料金管理サーバ2の制御部20と同じ構成のため、省略する。   FIG. 2 is a block diagram illustrating a configuration example of the control unit 10 of the investment amount determination server 1 and the control unit 20 of the electricity rate management server 2. The control units of the accounting server 3, the distribution facility management server 4, and the distribution system management server 5 are omitted because they have the same configuration as the control unit 20 of the electricity rate management server 2.

[投資額決定サーバ1]
図2に示す制御部10は、内蔵モデム11、CPU12、ハードディスク13、RAM14、及びCPUバス15を備えている。
[Investment amount determination server 1]
The control unit 10 shown in FIG. 2 includes a built-in modem 11, CPU 12, hard disk 13, RAM 14, and CPU bus 15.

内蔵モデム11は、通信回線6に接続され、通信回線6を介して入力されるアナログデータをデジタルデータに変換してCPUバス15を介してCPU12へ出力する。また、CPU12からCPUバス15を介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して各種サーバへ出力する。   The built-in modem 11 is connected to the communication line 6, converts analog data input via the communication line 6 into digital data, and outputs the digital data to the CPU 12 via the CPU bus 15. Also, digital data output from the CPU 12 via the CPU bus 15 is converted into analog data and output to various servers via the communication line 6.

CPU12は、CPUバス15に接続され、キーボード8及びマウス9から敷設区間が入力されると共に、配電線敷設費用を回収する費用回収期間が入力される。CPU12は、電気料金管理サーバ2及び配電設備管理サーバ4から送信された電力料金収入額、及び維持費の情報を受信して処理する。CPU12は、キーボード8、及びマウス9により入力なされた敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。CPU12は、算出された電力収入総額と維持費に基づいて配電線の敷設費用を算出する。   The CPU 12 is connected to the CPU bus 15 and receives an installation period from the keyboard 8 and the mouse 9 and an expense collection period for collecting distribution line installation expenses. The CPU 12 receives and processes the information on the electricity fee income and the maintenance cost transmitted from the electricity rate management server 2 and the distribution facility management server 4. The CPU 12 calculates the total amount of power revenue from the power fee revenue amount in the laying section input by the keyboard 8 and the mouse 9 and the cost collection period in the laying section. The CPU 12 calculates the distribution line laying cost based on the calculated total power revenue and the maintenance cost.

また、CPU12は、停電から復旧するまでに発生する機会損失の費用である復旧困難費を復旧現場までの移動距離に応じて算出する。この復旧現場までの移動距離は、配電設備管理サーバ4に記録された電柱の位置情報と営業所の位置情報に基づいてCPU12により算出される。CPU12は、電力収入総額、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の敷設費用を算出する。   In addition, the CPU 12 calculates a difficult recovery cost, which is a cost of opportunity loss that occurs before recovery from a power failure, according to the travel distance to the recovery site. The movement distance to the restoration site is calculated by the CPU 12 based on the position information of the utility pole and the position information of the sales office recorded in the distribution facility management server 4. The CPU 12 calculates the distribution line laying cost based on the total power revenue, maintenance cost, countermeasure cost, important load cost, and recovery difficulty cost.

具体的には、配電線を建設する建設区間の配電線建設費用を決定する場合、CPU12は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費及び対策費を差し引いた金額を配電線の建設費とし、標準建設費を、建設費、重要負荷費、及び復旧困難費を加算した金額とし、最大建設費を、建設費、及び利益を加算した金額とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。   Specifically, when determining the distribution line construction cost of the construction section for constructing the distribution line, the CPU 12 secures a predetermined percentage of profit from the total power revenue, subtracts the secured profit from the total power revenue, and the profit is The total amount of power revenue deducted from the maintenance and countermeasure costs is the distribution line construction cost, the standard construction cost is the sum of the construction cost, important load cost, and difficult recovery cost, and the maximum construction cost is , Construction cost and profit. As a result, the distribution line construction investment amount can be efficiently determined and supported using the distribution line standard and the maximum construction cost automatically calculated according to the importance such as the countermeasure cost and the important load cost.

また、配電線を改修する改修区間の配電線改修費用を決定する場合、CPU12は、電力収入総額から所定割合の利益を確保し、確保された利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価を差し引いた金額を配電線の改修費とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額とし、最大改修費を、改修費、及び利益を加算した金額とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。   In addition, when determining the distribution line repair cost of the repair section for repairing the distribution line, the CPU 12 secures a predetermined percentage of profit from the total power revenue, subtracts the secured profit from the total power revenue, and the profit is deducted. The total power revenue minus the maintenance cost, countermeasure cost, and book value is the distribution line repair cost, the standard repair cost is the sum of the repair cost, important load cost, and difficult recovery cost, and the maximum repair cost Is the sum of repair costs and profits. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.

ハードディスク13は、CPUバス15を介してCPU12に接続されている。このハードディスク13には、配電線投資額を算出する配電線投資額決定プログラム、対策費や重要負荷費などの重要度を設定するパラメータデータリスト45(図8参照)、及び営業所の位置情報が保存されている。例えば、対策費の塩害対策費には、「2,000」と設定され、対策費の強風対策費には、「4,000」と設定されている。これらの値を各区間長に乗算して各対策を算出する。これにより、パラメータを変更することで、重要度に応じて各対策費を調整できるようになる。パラメータデータリスト45、営業所の位置情報は、CPU12により変更される。   The hard disk 13 is connected to the CPU 12 via the CPU bus 15. The hard disk 13 includes a distribution line investment amount determination program for calculating a distribution line investment amount, a parameter data list 45 (see FIG. 8) for setting importance levels such as countermeasure costs and important load costs, and location information of sales offices. Saved. For example, “2,000” is set for the salt damage countermeasure cost of the countermeasure cost, and “4,000” is set for the strong wind countermeasure cost of the countermeasure cost. Each measure is calculated by multiplying each section length by these values. Thereby, it becomes possible to adjust each countermeasure cost according to the importance by changing the parameter. The parameter data list 45 and the location information of the sales office are changed by the CPU 12.

RAM14は、CPUバス15を介してCPU12に接続されている。RAM14には、ハードディスク13に保存された配電線投資額決定プログラムがCPU12により展開される。このようにして、投資額決定サーバ1が構成されている。   The RAM 14 is connected to the CPU 12 via the CPU bus 15. In the RAM 14, a distribution line investment amount determination program stored in the hard disk 13 is expanded by the CPU 12. In this way, the investment amount determination server 1 is configured.

[電気料金管理サーバ2]
電気料金管理サーバ2は、制御部20を備え、この制御部20は、内蔵モデム21、CPU22、RAM23、CPUバス24、及び顧客料金契約DB(DataBase)25を備えている。
[Electricity charge management server 2]
The electricity charge management server 2 includes a control unit 20, which includes a built-in modem 21, CPU 22, RAM 23, CPU bus 24, and customer charge contract DB (DataBase) 25.

内蔵モデム21は、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバス24を介してCPU22へ出力する。また、CPU22からCPUバス24を介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。   The built-in modem 21 is connected to the communication line 6, converts analog data input from the investment amount determination server 1 via the communication line 6 into digital data, and outputs the digital data to the CPU 22 via the CPU bus 24. Also, the digital data output from the CPU 22 via the CPU bus 24 is converted into analog data and output to the investment amount determination server 1 via the communication line 6.

CPU22は、投資額決定サーバ1から料金収入情報取得要求、及び重要負荷情報取得要求を受信して顧客料金契約DB25を検索し、検索結果の情報を投資額決定サーバ1へ送信する。   The CPU 22 receives the fee income information acquisition request and the important load information acquisition request from the investment amount determination server 1, searches the customer fee contract DB 25, and transmits search result information to the investment amount determination server 1.

顧客料金契約DB25は、CPUバス24を介してCPU22に接続されている。この顧客料金契約DB25には、契約番号データ、顧客名データ、住所データ、電話番号データ、基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データが保存されている。基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データは、顧客ごとに、顧客名データ、住所データ、電話番号データ、及び契約番号データとリンクされており、顧客名データ、住所データ、電話番号データ、又は契約番号データを検索キーにして検索可能である。   The customer fee contract DB 25 is connected to the CPU 22 via the CPU bus 24. In this customer fee contract DB 25, contract number data, customer name data, address data, telephone number data, basic charge data, electric energy charge data, contract type data, and important load type data are stored. Basic charge data, electric energy charge data, contract type data, and important load type data are linked with customer name data, address data, telephone number data, and contract number data for each customer. Data, telephone number data, or contract number data can be used as a search key.

RAM23は、CPUバス24を介してCPU22に接続されている。このRAM23には、顧客料金契約DB25に保存されている上述したデータがCPU22により展開されている。このようにして、電気料金管理サーバ2が構成されている。   The RAM 23 is connected to the CPU 22 via the CPU bus 24. In the RAM 23, the above-described data stored in the customer fee contract DB 25 is expanded by the CPU 22. In this way, the electricity rate management server 2 is configured.

[経理サーバ3]
経理サーバ3は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び簿価DB26を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Accounting server 3]
The accounting server 3 includes a not-shown internal modem, CPU, RAM, CPU bus, and book value DB 26. Since the built-in modem, CPU, RAM, and CPU bus have the same configuration as the electricity rate management server 2, they are omitted.

内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。   The built-in modem is connected to the communication line 6, converts analog data input from the investment amount determination server 1 via the communication line 6 into digital data, and outputs the digital data to the CPU via the CPU bus. Also, digital data output from the CPU via the CPU bus is converted into analog data and output to the investment amount determination server 1 via the communication line 6.

CPUは、投資額決定サーバ1から区間簿価情報取得要求を受信して簿価DB26を検索し、検索結果のデータを投資額決定サーバ1へ送信する。   The CPU receives the section book value information acquisition request from the investment amount determination server 1, searches the book value DB 26, and transmits search result data to the investment amount determination server 1.

簿価DB26は、CPUバスを介してCPUに接続されている。この簿価DB26には、場所データ、及び1坪あたりの単価データが保存されている。1坪あたりの単価データは、場所データとリンクされており、場所データを検索キーにして検索可能である。例えば、投資額決定サーバ1から場所データが入力され、この場所データを検索キーにして1坪あたりの単価データがCPUにより検索される。   The book value DB 26 is connected to the CPU via the CPU bus. The book value DB 26 stores place data and unit price data per 1 tsubo. Unit price data per tsubo is linked to location data and can be searched using the location data as a search key. For example, location data is input from the investment amount determination server 1, and the CPU searches for unit price data per tsubo using the location data as a search key.

RAMは、CPUバスを介してCPUに接続されている。このRAMには、簿価DB26に保存されている上述したデータがCPUにより展開されている。このようにして、経理サーバ3が構成されている。   The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the book value DB 26 is expanded by the CPU. In this way, the accounting server 3 is configured.

[配電設備管理サーバ4]
配電設備管理サーバ4は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び配電設備DB27及び地図DB28を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Distribution Equipment Management Server 4]
The distribution facility management server 4 includes a not-shown built-in modem, CPU, RAM, CPU bus, distribution facility DB 27 and map DB 28. Since the built-in modem, CPU, RAM, and CPU bus have the same configuration as the electricity rate management server 2, they are omitted.

内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。   The built-in modem is connected to the communication line 6, converts analog data input from the investment amount determination server 1 via the communication line 6 into digital data, and outputs the digital data to the CPU via the CPU bus. Also, digital data output from the CPU via the CPU bus is converted into analog data and output to the investment amount determination server 1 via the communication line 6.

配電設備DB27及び地図DB28は、CPUバスを介してCPUに接続されている。配電設備DB27には、電柱番号データ、電柱の設置場所データ、電柱の位置データ、及び自然災害対策データが保存されている。自然災害対策データは、電柱番号データとリンクされており、この電柱番号データを検索キーにして検索可能である。地図DB28には、住所データ及び位置データが保存されている。位置データは、住所データにリンクされており、この住所データを検索キーにして検索可能である。   The power distribution facility DB 27 and the map DB 28 are connected to the CPU via the CPU bus. The distribution facility DB 27 stores utility pole number data, utility pole installation location data, utility pole position data, and natural disaster countermeasure data. Natural disaster countermeasure data is linked to utility pole number data, and can be searched using this utility pole number data as a search key. The map DB 28 stores address data and position data. The position data is linked to the address data and can be searched using this address data as a search key.

RAMは、CPUバスを介してCPUに接続されている。このRAMには、配電設備DB27及び地図DB28に保存されている上述したデータがCPUにより展開されている。   The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the power distribution facility DB 27 and the map DB 28 are expanded by the CPU.

CPUは、投資額決定サーバ1から区間内電柱情報取得要求、区間長情報取得要求、自然災害対策情報取得要求、又は到達距離情報取得要求を受信して配電設備DB27を検索し、検索結果のデータを投資額決定サーバ1へ送信する。また、CPUは、配電設備DB27に電柱を追加した場合、地図DB28の住所データを検索し、合致した住所データの位置データを配電設備DB27に追加する。このようにして、配電設備管理サーバ4が構成されている。   The CPU receives the intra-section utility pole information acquisition request, the section length information acquisition request, the natural disaster countermeasure information acquisition request, or the reach distance information acquisition request from the investment amount determination server 1 and searches the power distribution facility DB 27, and the search result data Is transmitted to the investment amount determination server 1. In addition, when the power pole is added to the power distribution facility DB 27, the CPU searches the address data in the map DB 28 and adds the position data of the matched address data to the power distribution facility DB 27. In this way, the distribution facility management server 4 is configured.

[配電系統管理サーバ5]
配電系統管理サーバ5は、図示しない内蔵モデム、CPU、RAM、CPUバス、及び簿価DB26を備えている。内蔵モデム、CPU、RAM及びCPUバスは電気料金管理サーバ2と同じ構成なので省略する。
[Distribution system management server 5]
The power distribution system management server 5 includes a built-in modem, CPU, RAM, CPU bus, and book value DB 26 (not shown). Since the built-in modem, CPU, RAM, and CPU bus have the same configuration as the electricity rate management server 2, they are omitted.

内蔵モデムは、通信回線6に接続され、通信回線6を介して投資額決定サーバ1から入力されるアナログデータをデジタルデータに変換してCPUバスを介してCPUへ出力する。また、CPUからCPUバスを介して出力されるデジタルデータをアナログデータに変換して通信回線6を介して投資額決定サーバ1へ出力する。   The built-in modem is connected to the communication line 6, converts analog data input from the investment amount determination server 1 via the communication line 6 into digital data, and outputs the digital data to the CPU via the CPU bus. Also, digital data output from the CPU via the CPU bus is converted into analog data and output to the investment amount determination server 1 via the communication line 6.

CPUは、投資額決定サーバ1から通過電流情報取得要求を受信して系統システム負荷DB29を検索し、検索結果のデータを投資額決定サーバ1へ送信する。   The CPU receives a passing current information acquisition request from the investment amount determination server 1, searches the system load DB 29, and transmits search result data to the investment amount determination server 1.

系統システム負荷DB29は、CPUバスを介してCPUに接続されている。この系統システム負荷DB29には、電柱番号データ、電柱の設置場所データ、及び通過電流データが保存されている。通過電流データは、電柱番号データとリンクされており、電柱番号データを検索キーにして検索可能である。例えば、配電設備管理サーバ4から電柱番号データが入力され、この電柱番号データを検索キーにして通過電流データがCPUにより検索される。   The system system load DB 29 is connected to the CPU via the CPU bus. The grid system load DB 29 stores utility pole number data, utility pole installation location data, and passing current data. The passing current data is linked with the pole number data, and can be searched using the pole number data as a search key. For example, utility pole number data is input from the distribution facility management server 4, and the passing current data is retrieved by the CPU using the utility pole number data as a search key.

RAMは、CPUバスを介してCPUに接続されている。このRAMには、系統システム負荷DB29に保存されている上述したデータがCPUにより展開されている。このようにして、配電系統管理サーバ5が構成されている。   The RAM is connected to the CPU via the CPU bus. In the RAM, the above-described data stored in the system load DB 29 is expanded by the CPU. In this way, the power distribution system management server 5 is configured.

図3は、顧客料金契約DB25の顧客料金契約データリスト40の一部分を示す説明図である。図3に示す顧客料金契約データリスト40は、顧客料金契約DB25に保存され、契約番号データ、顧客名データ、住所データ、電話番号データ、基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データから構成されている。   FIG. 3 is an explanatory diagram showing a part of the customer fee contract data list 40 of the customer fee contract DB 25. The customer fee contract data list 40 shown in FIG. 3 is stored in the customer fee contract DB 25, and is contract number data, customer name data, address data, telephone number data, basic charge data, energy charge data, contract type data, and important data. It consists of load type data.

例えば、契約番号データ「001−001−0001」、顧客名データ「○○××」、住所データ「広島県○○市△△・・・」、電話番号データ「082−XXXXXXX」、基本料金データ「XXX」、電力量料金データ「XXXX」、契約種別データ「低圧電力」、及び重要負荷種別データ「病院」と記録されている。   For example, contract number data “001-001-0001”, customer name data “XXXXX”, address data “Hiroshima XX city ΔΔ...”, Telephone number data “082-XXXXXXX”, basic charge data “XXX”, electric energy charge data “XXXX”, contract type data “low voltage power”, and important load type data “hospital” are recorded.

基本料金データ、電力量料金データ、契約種別データ、及び重要負荷種別データは、顧客ごとに、顧客名データ、住所データ、電話番号データ、及び契約番号データとリンクされており、顧客名データ、住所データ、電話番号データ、又は契約番号データを検索キーにして検索可能である。顧客料金契約データリスト40は、電気料金管理サーバ2のCPU22が、投資額決定サーバ1から料金収入情報取得要求、及び重要負荷情報取得要求を受信した場合に、このCPU22により参照される。   Basic charge data, electric energy charge data, contract type data, and important load type data are linked with customer name data, address data, telephone number data, and contract number data for each customer. Data, telephone number data, or contract number data can be used as a search key. The customer charge contract data list 40 is referred to by the CPU 22 when the CPU 22 of the electricity charge management server 2 receives the charge income information acquisition request and the important load information acquisition request from the investment amount determination server 1.

例えば、投資額決定サーバ1から料金収入情報取得要求を受信した場合、CPU22は、料金収入情報取得要求の受信と同時に電柱の設置場所データを受信し、この電柱の設置場所データを住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この住所データの範囲に含まれる基本料金データ及び電力量料金データの年間収入を契約種別ごとに合計して契約種別ごとの年間収入データを投資額決定サーバ1へ送信する。   For example, when a fee income information acquisition request is received from the investment amount determination server 1, the CPU 22 receives the utility pole installation location data simultaneously with the reception of the fee income information acquisition request, and searches for the utility pole installation location data as address data. The customer fee contract data list 40 is searched with the key set, and the annual income of the basic charge data and the energy charge data included in the address data range is totaled for each contract type to obtain the annual revenue data for each contract type. It transmits to the investment amount determination server 1.

具体的には、料金収入情報取得要求を受信した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この住所データの範囲に含まれる基本料金データ及び電力量料金データの年間収入を契約種別(低圧電灯、低圧電力、高圧電力、その他)ごとに合計してこの契約種別ごとの年間収入データを投資額決定サーバ1へ送信する。   Specifically, when a fee income information acquisition request is received, the utility pole location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are searched as address data. Set customer key contract data list 40 as a key and search annual revenue of basic charge data and energy charge data included in this address data range by contract type (low piezoelectric lamp, low voltage power, high voltage power, etc.) In total, annual income data for each contract type is transmitted to the investment amount determination server 1.

また、投資額決定サーバ1から重要負荷情報取得要求を受信した場合、CPU22は、重要負荷情報取得要求の受信と同時に電柱の設置場所データを受信し、この電柱の設置場所データを検索キーにして顧客料金契約データリスト40を検索し、電柱の設置場所データの範囲内に存在する重要負荷種別ごとの件数データを投資額決定サーバ1へ送信する。   When the important load information acquisition request is received from the investment amount determination server 1, the CPU 22 receives the utility pole installation location data simultaneously with the reception of the important load information acquisition request, and uses the utility pole installation location data as a search key. The customer fee contract data list 40 is searched, and the number data for each important load type existing within the range of the power pole installation location data is transmitted to the investment amount determination server 1.

具体的には、重要負荷情報取得要求を受信した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を住所データとして検索キーに設定して顧客料金契約データリスト40を検索し、この電柱の設置場所データの範囲内に存在する重要負荷(病院、学校、通信、電気、水道、ガス、放送、及びその他)件数データを投資額決定サーバ1へ送信する。このようにして、顧客料金契約データリスト40が構成されて参照されている。   Specifically, when an important load information acquisition request is received, the utility pole location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are searched as address data. Search the customer fee contract data list 40 by setting the key, and record the number of important loads (hospital, school, communication, electricity, water, gas, broadcasting, etc.) existing within the range of the installation location data of this utility pole It transmits to the investment amount determination server 1. In this way, the customer fee contract data list 40 is constructed and referenced.

図4は、簿価DB26の簿価データリスト41の一部分を示す説明図である。図4に示す簿価データリスト41は、簿価DB26に保存され、場所データ、及び1坪あたりの単価データから構成されている。例えば、場所データ「広島県○○市△△・・・」、及び1坪あたりの単価データ「300,000」と記録されている。   FIG. 4 is an explanatory diagram showing a part of the book value data list 41 of the book value DB 26. The book value data list 41 shown in FIG. 4 is stored in the book value DB 26, and is composed of location data and unit price data per tsubo. For example, the place data “Hiroshima XX city ΔΔ...” And unit price data “300,000” per 1 tsubo are recorded.

1坪あたりの単価データは、場所データとリンクされており、場所データを検索キーにして検索可能である。例えば、投資額決定サーバ1から場所データが入力され、この場所データを検索キーにして1坪あたりの単価データが経理サーバ3のCPUにより検索される。簿価データリスト41は、このCPUが、投資額決定サーバ1から区間簿価情報取得要求を受信した場合に、このCPUにより参照される。   Unit price data per tsubo is linked to location data and can be searched using the location data as a search key. For example, location data is input from the investment amount determination server 1, and unit price data per tsubo is searched by the CPU of the accounting server 3 using the location data as a search key. The book value data list 41 is referred to by the CPU when the CPU receives a section book value information acquisition request from the investment amount determination server 1.

例えば、区間簿価情報取得要求を受信した場合、CPUは、区間簿価情報取得要求の受信と同時に場所データを受信し、この場所データを検索キーにして簿価データリスト41を検索し、場所データの範囲内に存在する1坪あたりの単価データを平均して投資額決定サーバ1へ送信する。   For example, when a section book value information acquisition request is received, the CPU receives location data simultaneously with the reception of the section book value information acquisition request, searches the book value data list 41 using this place data as a search key, The unit price data per tsubo existing within the data range is averaged and transmitted to the investment amount determination server 1.

具体的には、区間簿価情報取得要求を受信した場合、場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を検索キーにして簿価データリスト41を検索し、場所データの範囲内に存在する1坪あたりの単価データを平均した平均値「XXX,XXX」を投資額決定サーバ1へ送信する。このようにして、簿価データリスト41が構成されて参照されている。   Specifically, when a section book value information acquisition request is received, the book value is set using the location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” as search keys. The data list 41 is searched, and an average value “XXX, XXX” obtained by averaging the unit price data per 1 tsubo existing within the place data range is transmitted to the investment amount determination server 1. In this way, the book value data list 41 is constructed and referred to.

図5は、配電設備DB27の配電設備データリスト42の一部分を示す説明図である。図5に示す配電設備データリスト42は、配電設備DB27に保存され、電柱番号データ、電柱の設置場所データ、電柱の位置データ、及び自然災害対策データから構成されている。   FIG. 5 is an explanatory diagram showing a part of the distribution facility data list 42 of the distribution facility DB 27. The distribution facility data list 42 shown in FIG. 5 is stored in the distribution facility DB 27, and is composed of utility pole number data, utility pole installation location data, utility pole position data, and natural disaster countermeasure data.

例えば、電柱番号データ「001−001」、電柱の設置場所データ「広島県○○市△△・・・」、電柱の位置データ「22000」、及び自然災害対策データ「塩害・強風」と記録されている。   For example, telephone pole number data “001-001”, telephone pole installation location data “Hiroshima XX city △△ ...”, telephone pole position data “22000”, and natural disaster countermeasure data “salt damage / strong wind” are recorded. ing.

自然災害対策データは、電柱番号データとリンクされており、この電柱番号データを検索キーにして検索可能である。配電設備データリスト42は、配電設備管理サーバ4のCPUが、投資額決定サーバ1から区間内電柱情報取得要求、区間長情報取得要求、自然災害対策情報取得要求、又は到達距離情報取得要求を受信を受信した場合に、このCPUにより参照される。   Natural disaster countermeasure data is linked to utility pole number data, and can be searched using this utility pole number data as a search key. In the distribution facility data list 42, the CPU of the distribution facility management server 4 receives an intra-section utility pole information acquisition request, an interval length information acquisition request, a natural disaster countermeasure information acquisition request, or a reach distance information acquisition request from the investment amount determination server 1. Is received by this CPU.

例えば、投資額決定サーバ1から区間内電柱情報取得要求を受信した場合、CPUは、区間内電柱情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データを検出し、検出された電柱の位置データの範囲内に存在する電柱番号データを投資額決定サーバ1へ送信する。   For example, when receiving the intra-section utility pole information acquisition request from the investment amount determination server 1, the CPU receives the utility pole number data simultaneously with the reception of the intra-section utility pole information acquisition request, and uses the utility pole number data as a search key to distribute power distribution equipment. The data list 42 is searched, the pole position data is detected from the matched pole number data, and the pole number data existing within the range of the detected pole position data is transmitted to the investment amount determination server 1.

具体的には、区間内電柱情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データ「22,000」、「24,000」を検出し、検出された電柱の位置データの範囲内に存在する電柱番号データを投資額決定サーバ1へ送信する。   Specifically, when an in-section utility pole information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and from the matched utility pole number data The utility pole position data “22,000” and “24,000” are detected, and the utility pole number data existing within the range of the detected utility pole position data is transmitted to the investment amount determination server 1.

また、投資額決定サーバ1から区間長情報取得要求を受信した場合、CPUは、区間長情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データを検出し、検出された電柱の位置データから区間長データを投資額決定サーバ1へ送信する。   Further, when the section length information acquisition request is received from the investment amount determination server 1, the CPU receives the utility pole number data simultaneously with the reception of the section length information acquisition request, and uses this utility pole number data as a search key as a distribution facility data list. 42 is searched, the position data of the power pole is detected from the matched power pole number data, and the section length data is transmitted to the investment amount determination server 1 from the detected position data of the power pole.

具体的には、区間長情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データから電柱の位置データ「22,000」、「24,000」を検出し、検出された電柱の位置データから区間長データ「2,000」を投資額決定サーバ1へ送信する。   Specifically, when the section length information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the utility pole number data is used as the utility pole number data. Position data “22,000” and “24,000” are detected, and section length data “2,000” is transmitted to the investment amount determination server 1 from the detected position data of the utility pole.

また更に、投資額決定サーバ1から自然災害対策情報取得要求を受信した場合、CPUは、自然災害対策情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの範囲内に存在する自然災害対策データを参照し、該当する自然災害対策データと電柱の位置データから各自然災害対策費における区間長を算出し、対策費ごとの区間長データを投資額決定サーバ1へ送信する。   Furthermore, when receiving a natural disaster countermeasure information acquisition request from the investment amount determination server 1, the CPU receives power pole number data simultaneously with the reception of the natural disaster countermeasure information acquisition request, and uses this telephone pole number data as a search key to distribute power. The facility data list 42 is searched, the natural disaster countermeasure data existing within the range of the matched utility pole number data is referred, and the section length in each natural disaster countermeasure cost is calculated from the corresponding natural disaster countermeasure data and the power pole position data. The section length data for each countermeasure cost is transmitted to the investment amount determination server 1.

具体的には、自然災害対策情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの範囲内に存在する自然災害対策データを参照し、該当する自然災害対策データ「塩害」、「強風」、「雷害」と電柱の位置データから「塩害」、「強風」、「雷害」における区間長「100」、「250」、「300」を算出し、この自然災害対策費ごとの区間長データ「100」、「250」、「300」を投資額決定サーバ1へ送信する。   Specifically, when a natural disaster countermeasure information acquisition request is received, the distribution facility data list 42 is searched using the power pole number data “001-001” and “001-008” as search keys, and the matching power pole number data Refer to the natural disaster countermeasure data existing within the scope, and from the corresponding natural disaster countermeasure data `` salt damage '', `` strong wind '', `` lightning damage '' and the position data of the power pole in `` salt damage '', `` strong wind '', `` lightning damage '' The section lengths “100”, “250”, and “300” are calculated, and the section length data “100”, “250”, and “300” for each natural disaster countermeasure cost are transmitted to the investment amount determination server 1.

更にまた、投資額決定サーバ1から到達距離情報取得要求を受信した場合、CPUは、到達距離情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの位置データを投資額決定サーバ1へ送信する。   Furthermore, when receiving the reach distance information acquisition request from the investment amount determination server 1, the CPU receives the utility pole number data simultaneously with the receipt of the reach distance information acquisition request, and uses the utility pole number data as a search key to distribute the distribution facility data. The list 42 is searched, and the position data of the matched utility pole number data is transmitted to the investment amount determination server 1.

具体的には、到達距離情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして配電設備データリスト42を検索し、合致した電柱番号データの位置データ「22,000」、「24,000」を投資額決定サーバ1へ送信する。このようにして、配電設備データリスト42が構成されて参照されている。   Specifically, when a reach distance information acquisition request is received, the distribution facility data list 42 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the position of the matched utility pole number data Data “22,000” and “24,000” are transmitted to the investment amount determination server 1. In this way, the distribution facility data list 42 is constructed and referenced.

図6は、地図DB28の地図データリスト43の一部分を示す説明図である。図6に示す地図データリスト43は、地図DB28に保存され、住所データ、及び位置データから構成されている。例えば、住所データ「広島県○○市△△・・・」、位置データ「22000」と記録されている。   FIG. 6 is an explanatory diagram showing a part of the map data list 43 of the map DB 28. A map data list 43 shown in FIG. 6 is stored in the map DB 28 and is composed of address data and position data. For example, address data “Hiroshima Prefecture XX City ΔΔ...” And position data “22000” are recorded.

位置データは、住所データとリンクされており、この住所データを検索キーにして検索可能である。地図データリスト43は、配電設備管理サーバ4のCPUにより配電設備データリスト42に電柱を追加した場合に、このCPUにより参照されて配電設備データリスト42に電柱の位置データが追加される。   The position data is linked to the address data, and can be searched using this address data as a search key. When the power pole is added to the distribution facility data list 42 by the CPU of the distribution facility management server 4, the map data list 43 is referred to by the CPU and the position data of the power pole is added to the distribution facility data list 42.

例えば、配電設備データリスト42に電柱を追加した場合、CPUは、電柱の設置場所データを検索キーにして地図データリスト43の住所データを検索し、合致した住所データの位置データを配電設備データリスト42に電柱の位置データとして追加する。   For example, when a utility pole is added to the distribution facility data list 42, the CPU searches the address data in the map data list 43 using the installation location data of the utility pole as a search key, and the position data of the matched address data is retrieved from the distribution facility data list. 42 is added as position data of the utility pole.

具体的には、配電設備データリスト42に電柱を追加した場合、電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を検索キーにして地図データリスト43の住所データを検索し、合致した住所データの位置データ「22,000」、「24,000」を配電設備データリスト42に電柱の位置データとして追加する。このようにして、地図データリスト43が構成されて参照されている。   Specifically, when a power pole is added to the power distribution facility data list 42, search keys for the power pole installation location data “Hiroshima XX City △△ ...” and “Hiroshima XX City □□ ...” are search keys. Thus, the address data in the map data list 43 is searched, and the position data “22,000” and “24,000” of the matched address data are added to the distribution facility data list 42 as the position data of the utility pole. In this way, the map data list 43 is constructed and referenced.

図7は、系統システム負荷DB29の系統システム負荷データリスト44の一部分を示す説明図である。図7に示す系統システム負荷データリスト44は、系統システム負荷DB29に保存され、電柱番号データ、電柱の設置場所データ、及び通過電流データから構成されている。例えば、電柱番号データ「001−001」、電柱の設置場所データ「広島県○○市△△・・・」、及び通過電流データ「150」と記録されている。   FIG. 7 is an explanatory diagram showing a part of the grid system load data list 44 of the grid system load DB 29. The grid system load data list 44 illustrated in FIG. 7 is stored in the grid system load DB 29 and includes telephone pole number data, telephone pole installation location data, and passing current data. For example, telephone pole number data “001-001”, telephone pole installation location data “Hiroshima XX City ΔΔ...”, And passing current data “150” are recorded.

通過電流データは、電柱番号データ、及び電柱の設置場所データとリンクされており、例えば、電柱番号データを検索キーにして検索可能である。系統システム負荷データリスト44は、配電系統管理サーバ5のCPUが、通過電流情報取得要求を受信した場合に、このCPUにより参照される。   The passing current data is linked to the utility pole number data and the installation location data of the utility pole, and can be searched using, for example, the utility pole number data as a search key. The system load data list 44 is referred to by the CPU of the distribution system management server 5 when the CPU of the distribution system management server 5 receives the passing current information acquisition request.

例えば、投資額決定サーバ1から通過電流情報取得要求を受信した場合、CPUは、この通過電流情報取得要求の受信と同時に電柱番号データを受信し、この電柱番号データを検索キーにして系統システム負荷データリスト44を検索し、合致した電柱番号データの通過電流データを投資額決定サーバ1へ送信する。   For example, when receiving the passing current information acquisition request from the investment amount determination server 1, the CPU receives the utility pole number data simultaneously with the reception of the passing current information acquisition request, and uses the utility pole number data as a search key to load the system system load. The data list 44 is searched, and the passing current data of the matched utility pole number data is transmitted to the investment amount determination server 1.

具体的には、通過電流情報取得要求を受信した場合、電柱番号データ「001−001」、「001−008」を検索キーにして系統システム負荷データリスト44を検索し、合致した電柱番号データの通過電流データ「150」を投資額決定サーバ1へ送信する。このようにして、系統システム負荷データリスト44が構成されて参照されている。   Specifically, when a passing current information acquisition request is received, the grid system load data list 44 is searched using the utility pole number data “001-001” and “001-008” as search keys, and the matching utility pole number data The passing current data “150” is transmitted to the investment amount determination server 1. In this way, the grid system load data list 44 is constructed and referenced.

図8は、投資費用の重要度を示すパラメータデータリスト45を示す説明図である。図8に示すパラメータデータリスト45は、ハードディスク13に保存され、縦項目に下流収入データ、維持費データ、対策費データ、重要負荷費データ、復旧困難費データ、及び営業所の位置データが設定され、横項目にパラメータ数値データが設定されている。対策費データは、更に、塩害対策費データ、強風対策費データ、雷害対策費データ、及び雪害対策費データに種類分けされている。また、重要負荷費データも、更に、病院データ、学校データ、通信データ、電気データ、水道データ、ガスデータ、放送データ、及びその他データに種類分けされている。   FIG. 8 is an explanatory diagram showing a parameter data list 45 indicating the importance of the investment cost. The parameter data list 45 shown in FIG. 8 is stored in the hard disk 13, and downstream revenue data, maintenance cost data, countermeasure cost data, important load cost data, difficult recovery cost data, and sales office position data are set in the vertical items. Parameter numerical data is set in the horizontal item. The countermeasure cost data is further classified into salt damage countermeasure cost data, strong wind countermeasure cost data, lightning damage countermeasure cost data, and snow damage countermeasure cost data. The important load cost data is further classified into hospital data, school data, communication data, electrical data, water data, gas data, broadcast data, and other data.

例えば、塩害対策費データは「2,000」、強風対策費データは「4,000」のパラメータ数値データが設定されており、これらのパラメータ数値データは、対策費データを算出する場合に、各区間長に乗算される。これにより、パラメータ数値データを変更することで、重要度に応じて各対策費データを調整できるようになる。このパラメータデータリスト45は、CPU12により変更される。このようにして、パラメータデータリスト45が構成されて参照されている。   For example, parameter numerical data of “2,000” is set for the salt damage countermeasure cost data, and “4,000” is set for the strong wind countermeasure cost data, and these parameter numerical data are used for calculating the countermeasure cost data. Multiply the section length. As a result, by changing the parameter numerical data, each countermeasure cost data can be adjusted according to the importance. The parameter data list 45 is changed by the CPU 12. In this way, the parameter data list 45 is constructed and referenced.

図9は、敷設費用の計算例を示す表計算図である。図9に示す区間収入の表計算図50は、縦項目に契約種別(低圧電灯、低圧電力、高圧電力、及びその他)が設定され、横項目に年間収入及び費用回収期間が設定されている。区間収入は、契約種別ごとの年間収入データの各々に費用回収期間を乗算し、乗算された契約種別ごとの収入データを合計して算出される。この契約種別ごとの年間収入データは、キーボード8により入力された配電線の敷設区間における電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データを受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データを受信して得られる。   FIG. 9 is a table calculation diagram showing an example of calculating the laying cost. In the section calculation chart 50 of section income shown in FIG. 9, the contract type (low piezoelectric lamp, low voltage power, high voltage power, and others) is set in the vertical item, and the annual income and expense collection period are set in the horizontal item. The segment income is calculated by multiplying each of the annual revenue data for each contract type by the expense collection period and totaling the multiplied revenue data for each contract type. The annual income data for each contract type is transmitted to the distribution facility management server 4 by the CPU 12 as the power pole number data in the distribution section of the distribution line input by the keyboard 8, and the installation location data of the utility pole is transmitted from the distribution facility management server 4. The power pole installation location data is transmitted to the electricity rate management server 2 by the CPU 12 and the annual income data for each contract type is received from the electricity rate management server 2.

下流収入の表計算図51は、横項目に通過電流、パラメータ、及び費用回収期間が設定されている。下流収入は、通過電流データ、パラメータデータ、及び費用回収期間データが乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データをCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5から電柱番号データに対応する通過電流データを受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45を参照して得られる。費用回収期間データは、キーボード8により入力されたデータが使用される。   In the downstream revenue spreadsheet 51, the passage items, parameters, and expense recovery period are set in the horizontal items. The downstream revenue is calculated by multiplying the passing current data, the parameter data, and the cost recovery period data. The passing current data is obtained by transmitting the pole number data input from the keyboard 8 to the distribution system management server 5 by the CPU 12 and receiving the passing current data corresponding to the pole number data from the distribution system management server 5. The parameter data is obtained with reference to the parameter data list 45 shown in FIG. As the expense collection period data, data input from the keyboard 8 is used.

維持費の表計算図52は、横項目に区間長、パラメータ、及び費用回収期間が設定されている。維持費は、区間長データ、パラメータデータ、及び費用回収期間データが乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データをCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から受信して得られる。   In the maintenance cost spreadsheet 52, section lengths, parameters, and cost recovery periods are set in the horizontal items. The maintenance cost is calculated by multiplying the section length data, parameter data, and cost recovery period data. The section length data is obtained by transmitting the power pole number data input from the keyboard 8 to the distribution facility management server 4 by the CPU 12 and receiving from the distribution facility management server 4.

対策費の表計算図53は、縦項目に対策費(塩害対策費、強風対策費、雷害対策費、及び雪害対策費)が設定され、横項目に区間長、及びパラメータが設定されている。対策費は、対策費ごとの区間長データと各パラメータデータを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データを受信して得られる。   In the countermeasure calculation table 53, the countermeasure costs (salt damage countermeasure costs, strong wind countermeasure costs, lightning damage countermeasure costs, and snow damage countermeasure costs) are set in the vertical items, and the section length and parameters are set in the horizontal items. . The countermeasure cost is calculated by multiplying the section length data for each countermeasure cost by each parameter data, and summing the multiplied section length data for each countermeasure cost. The section length data for each countermeasure cost is obtained by transmitting the pole number data input from the keyboard 8 to the distribution facility management server 4 by the CPU 12 and receiving the section length data for each countermeasure cost from the distribution facility management server 4. .

利益は、区間収入データと下流収入データを加えた値に0.1を乗算して求められる。重要負荷費の表計算図54は、縦項目に重要負荷(病院、学校、通信、電気、水道、ガス、放送、及びその他)が設定され、横項目に件数、及びパラメータが設定されている。重要負荷費は、各々の重要負荷件数データに各パラメータデータを乗算して最後に合計して算出される。この重要負荷件数データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データを受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から重要負荷件数データを受信して得られる。   The profit is obtained by multiplying the value obtained by adding the section income data and the downstream income data by 0.1. In the important load cost spreadsheet 54, important loads (hospital, school, communication, electricity, water, gas, broadcasting, and others) are set in the vertical items, and the number and parameters are set in the horizontal items. The important load cost is calculated by multiplying each piece of important load number data by each parameter data and finally adding them. As for the important load number data, the power pole number data input from the keyboard 8 is transmitted by the CPU 12 to the power distribution facility management server 4, and the power pole installation location data is received from the power distribution facility management server 4. Is transmitted to the electricity charge management server 2 and the important load number data is received from the electricity charge management server 2.

復旧困難費の表計算図55は、横項目に現場到着距離、及びパラメータが設定されている。復旧困難費は、現場到着距離データ、及びパラメータデータを乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データをCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から区間長データを受信してこの区間長データの中間地点を算出し、この中間地点とパラメータデータリスト45の営業所の位置データとから得られる。   In the spreadsheet 55 of difficult recovery costs, the field arrival distance and parameters are set in the horizontal items. The difficult recovery cost is calculated by multiplying the field arrival distance data and the parameter data. For the field arrival distance data, the pole number data input from the keyboard 8 is transmitted to the distribution facility management server 4 by the CPU 12, and the section length data is received from the distribution facility management server 4 to calculate the intermediate point of the section length data. Then, it is obtained from this intermediate point and the location data of the sales office in the parameter data list 45.

区間簿価は、キーボード8により入力された電柱番号データがCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データが受信され、受信された電柱の設置場所データが経理サーバ3へ送信され、この経理サーバ3から1坪あたりの単価データの平均値が受信され、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。以上の計算方法に基づいて、配電線の敷設費用を計算できるようになる。   As for the section book value, the power pole number data input from the keyboard 8 is transmitted by the CPU 12 to the power distribution facility management server 4, the power pole installation location data is received from the power distribution facility management server 4, and the received power pole location location data is received. Is transmitted to the accounting server 3, the average value of unit price data per tsubo is received from the accounting server 3, and the unit price data per tsubo is multiplied by the basis number data calculated from the section length data. . For example, the basis number data is set as the basis number data “7.7” when the section length data is “2,000”. Based on the above calculation method, the laying cost of the distribution line can be calculated.

図10(a)及び(b)は、敷設費用の算出結果例を示す説明図である。図10(a)に示す建設費の算出結果は、図9で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。   FIGS. 10A and 10B are explanatory diagrams illustrating an example of calculation results of laying costs. The construction cost calculation result shown in FIG. 10A is calculated based on the laying cost calculation example shown in FIG. The total power revenue is “610,000,000”, which is the sum of the segment revenue “310,000,000” and the downstream revenue “300,000,000”. A 10% profit “61,000,000” is secured from the total power revenue, and this secured profit is subtracted from the total power revenue, and the maintenance cost is calculated from the total power revenue “549,000,000” deducted from the profit. The amount obtained by subtracting “50,000,000” and countermeasure costs “2,700,000” is the distribution line construction cost “496,300,000”, and the standard construction cost is the construction cost “496,300,000”. , An important load cost “10,000,000” and a recovery difficult cost “600,000” plus an amount “506,900,000”, and the maximum construction cost is the construction cost “496,300,000”, and The amount “557,300,000” is obtained by adding the profit “61,000,000”. As a result, the distribution line construction investment amount can be efficiently determined and supported using the distribution line standard and the maximum construction cost automatically calculated according to the importance such as the countermeasure cost and the important load cost.

また、(b)に示す改修費の算出結果も、図10で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、同様に、区間収入と下流収入とを加算したもので、「610,000,000」になる。電力収入総額から1割の利益を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額「504,400,000」とし、最大改修費を、改修費、及び利益を加算した金額「554,800,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。   Moreover, the calculation result of the repair cost shown in (b) is also calculated based on the laying cost calculation example shown in FIG. Similarly, the total power revenue is the sum of the segment revenue and the downstream revenue, and is “610,000,000”. Secure 10% profit from the total power revenue, subtract this profit from the total power revenue, and maintain the maintenance cost, countermeasure cost, and book value “2,500,000” from the total power revenue minus the profit. The deducted amount is the distribution line repair cost “493,800,000”, the standard repair cost is the sum of repair cost, important load cost, and difficult recovery cost “504,400,000”, and the maximum repair cost Is the amount “554,800,000” obtained by adding the repair cost and profit. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.

図11は、配電線投資額決定プログラム起動画面のモニタ7における表示例を示す説明図である。図11に示すに示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、ハードディスク13に保存されている配電線投資額決定プログラムがCPU12により起動されて表示される起動画面が表示されている。   FIG. 11 is an explanatory diagram showing a display example on the monitor 7 of the distribution line investment amount determination program activation screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 11, and a distribution line investment amount determination program stored in the hard disk 13 is started and displayed on the browser 62 by the CPU 12. The startup screen is displayed.

ブラウザ62の上部には、見出しとして配電線敷設の費用算出システムM1が表示され、続いて、リンクボタンである建設費用算定L1ボタン、及び改修費用算定L2ボタンが表示されている。   In the upper part of the browser 62, a distribution line laying cost calculation system M1 is displayed as a headline, followed by a construction cost calculation L1 button and a repair cost calculation L2 button which are link buttons.

マウス9が移動されてカーソル60が建設費用算定L1ボタンにシフトされ、ここでマウス9がクリックされてこの配電線敷設の費用算出システムM1の画面から図12に示す建設費用算定M2の画面へ移動する。また、改修費用算定L2ボタンがクリックされると、この配電線敷設の費用算出システムM1の画面から図15に示す改修費用算定M6へ移動する。これにより、建設費用算定又は改修費用算定の画面が選択できるようになる。   The mouse 9 is moved and the cursor 60 is shifted to the construction cost calculation L1 button. Here, the mouse 9 is clicked to move from the screen of the distribution line laying cost calculation system M1 to the construction cost calculation M2 screen shown in FIG. To do. Further, when the repair cost calculation L2 button is clicked, the screen moves from the distribution line laying cost calculation system M1 to the repair cost calculation M6 shown in FIG. As a result, a screen for calculating construction costs or calculating repair costs can be selected.

図12は、建設費用算定画面のモニタ7における表示例を示す説明図である。図12に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図11の建設費用算定L1ボタンがクリックされると表示される建設費用算定画面が表示されている。   FIG. 12 is an explanatory diagram showing a display example on the monitor 7 of the construction cost calculation screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 12, and the browser 62 displays a construction cost calculation screen that is displayed when the construction cost calculation L1 button in FIG. 11 is clicked. Yes.

ブラウザ62の上部には、見出しである建設費用算定M2が表示されている。続いて、リンクボタンである敷設区間・投資額回収期間を入力L3ボタン、パラメータ変更L4ボタン、及び戻るL5ボタンが表示されている。   In the upper part of the browser 62, a construction cost calculation M2 as a headline is displayed. Subsequently, an input section L3 button, a parameter change L4 button, and a return L5 button are displayed as link buttons.

カーソル60が移動されてリンクボタンである敷設区間・投資額回収期間を入力L3ボタンがマウス9によりクリックされると、図13に示す敷設区間・投資額回収期間の入力画面が表示され、パラメータ変更L4ボタンがクリックされると、図18に示すパラメータ変更画面が表示される。これにより、入力画面とパラメータ変更画面が選択できるようになる。戻るL5ボタンがクリックされると、図11に示した起動画面が表示される。   When the cursor 60 is moved and the link section is clicked to enter the laying section / investment amount collection period L3 button is clicked by the mouse 9, the input screen for the laying section / investment amount collection period shown in FIG. When the L4 button is clicked, a parameter change screen shown in FIG. 18 is displayed. Thereby, an input screen and a parameter change screen can be selected. When the return L5 button is clicked, the startup screen shown in FIG. 11 is displayed.

図13は、敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。図13に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図12に示した敷設区間・投資額回収期間を入力L3ボタンがクリックされると表示される敷設区間、投資額回収期間入力画面が表示されている。   FIG. 13 is an explanatory diagram showing a display example on the monitor 7 of the installation section and investment amount collection period input screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 13, and this browser 62 is displayed when the entry section 3 and the investment amount recovery period shown in FIG. 12 are clicked on the L3 button. The laying section and investment amount collection period input screen is displayed.

ブラウザ62の上部には、見出しである建設費用算定M2、敷設区間M3が表示されている。続いて、データを入力する窓である入力窓I1、及び入力窓I2が表示されている。入力窓I1には、敷設区間のスタート地点が入力され、入力窓I2には、エンド地点が入力される。例えば、入力窓I1には、電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力される。   In the upper part of the browser 62, the construction cost calculation M2 and the laying section M3, which are headings, are displayed. Subsequently, an input window I1 and an input window I2, which are windows for inputting data, are displayed. The start point of the laying section is input to the input window I1, and the end point is input to the input window I2. For example, the utility pole number “001-001” is input to the input window I1, and the utility pole number “001-008” is input to the input window I2.

入力窓I1、I2の下部には、見出しである投資額回収期間M4が表示され、続いて、入力窓I3が表示されている。入力窓I3には、年単位で投資額回収期間が入力される。例えば、この入力窓I3には、投資額回収期間「10」と入力される。   Below the input windows I1 and I2, an investment amount recovery period M4 as a headline is displayed, and subsequently, an input window I3 is displayed. In the input window I3, an investment amount recovery period is input in units of years. For example, the investment amount collection period “10” is input to the input window I3.

入力窓I3の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図12に示した建設費用算定画面が表示される。クリアL7ボタンがクリックされると、入力窓I1〜I3の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図14に示す建設費用算定の結果画面が表示される。   At the bottom of the input window I3, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the L5 button to which the cursor 60 is moved and returned is clicked with the mouse 9, the construction cost calculation screen shown in FIG. 12 is displayed. When the clear L7 button is clicked, the input data in the input windows I1 to I3 is deleted. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, a construction cost calculation result screen shown in FIG. 14 is displayed.

このとき、CPU12は、図9に示した表計算図に基づいて建設費用を算定する。例えば、区間収入は、契約種別ごとの年間収入データの各々に費用回収期間データ「10」を乗算し、乗算された契約種別ごとの収入データを合計して算出される。契約種別ごとの年間収入データは、電気料金管理サーバ2へ入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データ「低圧電灯(3,000,000)」、「低圧電力(2,000,000)」、「高圧電力(25,000,000)」、「その他(1,000,000)」を受信して得る。これらの値に基づいて算出された区間収入は、「310,000,000」となる。   At this time, the CPU 12 calculates the construction cost based on the spreadsheet shown in FIG. For example, the segment revenue is calculated by multiplying each of the annual revenue data for each contract type by the expense collection period data “10” and totaling the multiplied revenue data for each contract type. As the annual revenue data for each contract type, the power pole number data “001-001” and “001-008” input to the electricity rate management server 2 are transmitted to the distribution facility management server 4 by the CPU 12, and the distribution facility management server 4 The telephone pole installation location data “Hiroshima XX city △△ ...” and “Hiroshima XX city □□ ...” are received, and the power pole installation location data is sent to the electricity rate management server 2 by the CPU 12. And the annual income data “low piezoelectric lamp (3,000,000)”, “low voltage power (2,000,000)”, “high voltage power (25,000,000) for each contract type. ) "And" Other (1,000,000) ". The section income calculated based on these values is “310,000,000”.

下流収入は、例えば、通過電流データ、パラメータデータ、及び費用回収期間データ「10」が乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5からこの電柱番号データに対応する通過電流データ「150」を受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45から参照されてパラメータデータ「200,000」が得られる。これらの値に基づいて算出された下流収入は、「300,000,000」となる。   The downstream income is calculated by multiplying, for example, passing current data, parameter data, and expense recovery period data “10”. As for the passing current data, the power pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the power distribution system management server 5 by the CPU 12, and the power distribution number management server 5 corresponds to the power pole number data. Is obtained by receiving the passing current data “150”. The parameter data is referred to from the parameter data list 45 shown in FIG. 8 to obtain the parameter data “200,000”. The downstream income calculated based on these values is “300,000,000”.

維持費は、例えば、区間長データ、パラメータデータ「2,500」、及び費用回収期間データ「10」が乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から区間長データ「2,000」を受信して得られる。これらの値に基づいて算出された維持費は、「50,000,000」となる
対策費は、例えば、塩害対策費パラメータデータ「2,000」、強風対策費パラメータデータ「4,000」、雷害対策費パラメータデータ「5,000」、雪害対策費パラメータデータ「3,000」とこれらの対策費ごとの区間長データを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データである塩害対策費データ「100」、強風対策費データ「250」、雷害対策費データ「300」、雪害対策費データ「0」を受信して得られる。これらの値に基づいて算出された対策費は、「2,700,000」となる。
The maintenance cost is calculated, for example, by multiplying the section length data, the parameter data “2,500”, and the cost collection period data “10”. The section length data is transmitted from the distribution facility management server 4 to the distribution facility management server 4 by transmitting the pole number data “001-001” and “001-008” input from the keyboard 8 to the distribution facility management server 4. 000 "is obtained. The maintenance cost calculated based on these values is “50,000,000”. The countermeasure costs are, for example, salt damage countermeasure cost parameter data “2,000”, strong wind countermeasure cost parameter data “4,000”, Multiply the lightning damage countermeasure cost parameter data “5,000” and the snow damage countermeasure cost parameter data “3,000” by the section length data for each of these countermeasure expenses, and total the section length data for each of the multiplied countermeasure expenses. Calculated. As section length data for each countermeasure cost, the telephone pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the distribution facility management server 4 by the CPU 12, and the countermeasure cost is transmitted from the distribution facility management server 4. It is obtained by receiving salt damage countermeasure cost data “100”, strong wind countermeasure cost data “250”, lightning damage countermeasure cost data “300”, and snow damage countermeasure cost data “0”, which are section length data for each. The countermeasure cost calculated based on these values is “2,700,000”.

利益は、区間収入データ「310,000,000」と下流収入データ「300,000,000」を加えた値に0.1を乗算して求められる。つまり、利益は、「61,000,000」となる。   The profit is obtained by multiplying the value obtained by adding the section income data “310,000,000” and the downstream income data “300,000,000” by 0.1. That is, the profit is “61,000,000”.

重要負荷費は、例えば、病院、学校、通信、電気、水道、ガス、放送、及びその他のパラメータデータ「2,000,000」と各々の重要負荷件数データを乗算して最後に合計して算出される。重要負荷件数データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から病院件数データ「1」、学校件数データ「2」、通信件数データ「1」、電気件数データ「1」、水道件数データ「0」、ガス件数データ「0」、放送件数データ「0」、及びその他件数データ「0」を受信して得られる。これらの値に基づいて算出された重要負荷費は、「10,000,000」となる。   The important load cost is calculated, for example, by multiplying the important load data by each parameter data “2,000,000” and hospital, school, communication, electricity, water, gas, broadcasting, and other parameter data. Is done. As the important load number data, the power pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the power distribution equipment management server 4 by the CPU 12, and the power pole installation location data is transmitted from the power distribution equipment management server 4. "Hiroshima XX city △△ ..." and "Hiroshima XX city □□ ..." are received, and the installation location data of this utility pole is transmitted to the electricity rate management server 2, and this electricity rate management server Hospital number data “1”, school number data “2”, communication number data “1”, electricity number data “1”, water number data “0”, gas number data “0”, broadcast number data “0” , And other count data “0”. The important load cost calculated based on these values is “10,000,000”.

復旧困難費は、例えば、現場到着距離データとパラメータデータ「60」を乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から位置データ「22,000」、「24,000」を受信してこの位置データの中間地点「23,000」を算出し、この中間地点とパラメータデータリスト45の営業所の位置データ「13,000」から差分を求めて現場到着距離データ「10,000」が得られる。これらの値に基づいて算出された復旧困難費は、「600,000」となる。   The difficult recovery cost is calculated by, for example, multiplying the field arrival distance data and the parameter data “60”. As for the field arrival distance data, the utility pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the distribution facility management server 4 by the CPU 12, and the location data “22, 000 ”and“ 24,000 ”are received, the intermediate point“ 23,000 ”of the position data is calculated, and the difference is obtained from the intermediate point and the position data“ 13,000 ”of the sales office in the parameter data list 45. Thus, the field arrival distance data “10,000” is obtained. The difficult recovery cost calculated based on these values is “600,000”.

区間簿価は、キーボード8により入力された電柱番号データ「001−001」、「001−008」がCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、受信された電柱の設置場所データを経理サーバ3へ送信し、この経理サーバ3から1坪あたりの単価データの平均値「325,000」を受信し、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。これらの値に基づいて算出された区間簿価は、「2,500,000」となる。   As for the section book value, the telephone pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the power distribution equipment management server 4 by the CPU 12, and the power pole installation location data “ Hiroshima Prefecture ○○ City △△ ・ ・ ・ ”and“ Hiroshima Prefecture ○○ City □□ ・ ・ ・ ”are received, and the received power pole installation location data is transmitted to the accounting server 3. The average value “325,000” of the unit price data per tsubo is received, and the unit price data per tsubo is multiplied by the basis number data calculated from the section length data. For example, the basis number data is set as the basis number data “7.7” when the section length data is “2,000”. The section book value calculated based on these values is “2,500,000”.

これにより、以上算出された区間収入「310,000,000」、下流収入「300,000,000」、維持費「50,000,000」、対策費「2,700,000」、利益「61,000,000」、重要負荷費「10,000,000」、復旧困難費「600,000」、区間簿価「2,500,000」に基づいて図10(a)に示した建設費が算出される。   Thereby, the section income “310,000,000”, the downstream income “300,000,000”, the maintenance cost “50,000,000”, the countermeasure cost “2,700,000”, and the profit “61” calculated as described above. The construction cost shown in FIG. 10A is based on the critical load cost “10,000,000”, the difficult recovery cost “600,000”, and the section book value “2,500,000”. Calculated.

図14は、建設費用算定の結果画面のモニタ7における表示例を示す説明図である。図14に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図13の決定L6ボタンがクリックされると表示される建設費用算定の結果画面が表示されている。   FIG. 14 is an explanatory diagram showing a display example on the monitor 7 of the construction cost calculation result screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 14, and the browser 62 displays a construction cost calculation result screen that is displayed when the decision L6 button in FIG. 13 is clicked. Yes.

ブラウザ62の上部には、見出しである建設費用算定の結果M5が表示されている。続いて、図10(a)に示した建設費の算出結果が表示されている。この建設費の算出結果は、図13で示した敷設費用の計算例に基づいて算出されたものである。電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大建設費用を利用して配電線建設投資額を効率よく決定支援できるようになる。   In the upper part of the browser 62, a construction cost calculation result M5, which is a headline, is displayed. Subsequently, the calculation result of the construction cost shown in FIG. 10A is displayed. This construction cost calculation result is calculated based on the laying cost calculation example shown in FIG. The total power revenue is “610,000,000”, which is the sum of the segment revenue “310,000,000” and the downstream revenue “300,000,000”. A 10% profit “61,000,000” is secured from the total power revenue, and this secured profit is subtracted from the total power revenue, and the maintenance cost is calculated from the total power revenue “549,000,000” deducted from the profit. The amount obtained by subtracting “50,000,000” and countermeasure costs “2,700,000” is the distribution line construction cost “496,300,000”, and the standard construction cost is the construction cost “496,300,000”. , An important load cost “10,000,000” and a recovery difficult cost “600,000” plus an amount “506,900,000”, and the maximum construction cost is the construction cost “496,300,000”, and The amount “557,300,000” is obtained by adding the profit “61,000,000”. As a result, the distribution line construction investment amount can be efficiently determined and supported using the distribution line standard and the maximum construction cost automatically calculated according to the importance such as the countermeasure cost and the important load cost.

建設費の算出結果の下部には、戻るL5ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図13に示した敷設区間・投資額回収期間の入力画面が表示される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面及び起動画面へ移動できるようになる。   At the bottom of the construction cost calculation result, an L5 button for returning and an L8 button for TOP are displayed. When the L5 button to which the cursor 60 is moved and returned is clicked by the mouse 9, the input screen for the laying section / investment amount collection period shown in FIG. 13 is displayed. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. Thereby, it becomes possible to move to the input screen and the startup screen.

図15は、改修費用算定画面のモニタ7における表示例を示す説明図である。図15に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図11の改修費用算定L2ボタンがクリックされると表示される改修費用算定画面が表示されている。   FIG. 15 is an explanatory diagram showing a display example on the monitor 7 of the repair cost calculation screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 15, and the browser 62 displays a repair cost calculation screen that is displayed when the repair cost calculation L2 button of FIG. 11 is clicked. Yes.

ブラウザ62の上部には、見出しである改修費用算定M6が表示されている。続いて、リンクボタンである敷設区間・投資額回収期間を入力L9ボタン、パラメータ変更L4ボタン、及び戻るL5ボタンが表示されている。   In the upper part of the browser 62, a repair cost calculation M6 which is a heading is displayed. Subsequently, an input section L9 button, a parameter change L4 button, and a return L5 button are displayed, which are link buttons.

カーソル60が移動されてリンクボタンである敷設区間・投資額回収期間を入力L9ボタンがマウス9によりクリックされると、図16に示す敷設区間・投資額回収期間の入力画面が表示され、パラメータ変更L4ボタンがクリックされると、図18に示すパラメータ変更画面が表示される。戻るL5ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面、パラメータ変更画面、及び起動画面へ移動できるようになる。   When the cursor 60 is moved and the link section is clicked to input the laying section / investment amount collection period L9 button is clicked with the mouse 9, the input screen for the laying section / investment amount collection period shown in FIG. When the L4 button is clicked, a parameter change screen shown in FIG. 18 is displayed. When the return L5 button is clicked, the startup screen shown in FIG. 11 is displayed. Thereby, it becomes possible to move to the input screen, the parameter change screen, and the startup screen.

図16は、敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。図16に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図15の敷設区間・投資額回収期間を入力L9ボタンがクリックされると表示される敷設区間、投資額回収期間入力画面が表示されている。   FIG. 16 is an explanatory diagram showing a display example on the monitor 7 of the installation section and investment amount collection period input screen. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 16, and the installed section displayed when the input L9 button is clicked on the installed section / investment amount collection period of FIG. The investment amount collection period input screen is displayed.

ブラウザ62の上部には、見出しである改修費用算定M7、敷設区間M3が表示されている。続いて、データを入力する窓である入力窓I1、及び入力窓I2が表示されている。入力窓I1には、敷設区間のスタート地点が入力され、入力窓I2には、エンド地点が入力される。例えば、入力窓I1には、電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力される。   In the upper part of the browser 62, the repair cost calculation M7 and the laying section M3, which are headings, are displayed. Subsequently, an input window I1 and an input window I2, which are windows for inputting data, are displayed. The start point of the laying section is input to the input window I1, and the end point is input to the input window I2. For example, the utility pole number “001-001” is input to the input window I1, and the utility pole number “001-008” is input to the input window I2.

入力窓I1、I2の下部には、見出しである投資額回収期間M4が表示され、続いて、入力窓I3が表示されている。この入力窓I3には、年単位で投資額回収期間が入力される。例えば、この入力窓I3には、投資額回収期間「10」と入力される。   Below the input windows I1 and I2, an investment amount recovery period M4 as a headline is displayed, and subsequently, an input window I3 is displayed. In this input window I3, an investment amount recovery period is input in units of years. For example, the investment amount collection period “10” is input to the input window I3.

入力窓I3の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図15に示した改修費用算定画面が表示される。クリアL7ボタンがクリックされると、入力窓I1〜I3の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図17に示す改修費用算定の結果画面が表示される。このとき、CPU12は、図9に示した表計算図に基づいて改修費用を算定する。これにより、図10(b)に示した改修費が算出される。   At the bottom of the input window I3, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the L5 button to which the cursor 60 is moved and returned is clicked with the mouse 9, the repair cost calculation screen shown in FIG. 15 is displayed. When the clear L7 button is clicked, the input data in the input windows I1 to I3 is deleted. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, the result screen of the repair cost calculation shown in FIG. 17 is displayed. At this time, the CPU 12 calculates the repair cost based on the spreadsheet shown in FIG. Thereby, the repair cost shown in FIG. 10B is calculated.

図17は、改修費用算定の結果画面のモニタ7における表示例を示す説明図である。図17に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図16の決定L6ボタンがクリックされると表示される改修費用算定の結果画面が表示されている。   FIG. 17 is an explanatory diagram showing a display example on the monitor 7 of the result screen of the repair cost calculation. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 17, and the browser 62 displays a result screen of the repair cost calculation that is displayed when the decision L6 button in FIG. 16 is clicked. Yes.

ブラウザ62の上部には、見出しである改修費用算定の結果M9が表示されている。続いて、図10(b)に示した改修費の算出結果が表示されている。この改修費の算出結果は、図13で示した敷設費用の計算例に基づいて算出されたものである。   In the upper part of the browser 62, the result M9 of the repair cost calculation, which is the headline, is displayed. Subsequently, the calculation result of the repair cost shown in FIG. 10B is displayed. The calculation result of the repair cost is calculated based on the laying cost calculation example shown in FIG.

電力収入総額は、区間収入「310,000,000」と下流収入「300,000,000」とを加算したもので、「610,000,000」になる。この電力収入総額から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」、対策費「2,700,000」、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費「493,800,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「504,400,000」とし、最大改修費を、改修費「496,300,000」、及び利益「61,000,000」を加算した金額「554,800,000」とする。これにより、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の標準及び最大改修費用を利用して配電線改修投資額を効率よく決定支援できるようになる。   The total power revenue is “610,000,000”, which is the sum of the segment revenue “310,000,000” and the downstream revenue “300,000,000”. A 10% profit “61,000,000” is secured from the total power revenue, and this secured profit is subtracted from the total power revenue, and the maintenance cost is calculated from the total power revenue “549,000,000” deducted from the profit. “50,000,000”, countermeasure costs “2,700,000” and book value “2,500,000” minus the amount of distribution line repair costs “493,800,000”, standard repair costs Is the amount “504,400,000” that is the sum of the repair cost “493,800,000”, the important load cost “10,000,000”, and the difficult recovery cost “600,000”, and the maximum repair cost is The amount is “554,800,000” obtained by adding the repair cost “496,300,000” and the profit “61,000,000”. As a result, it is possible to efficiently determine and support distribution line renovation investment using the distribution line standard and maximum renovation cost that are automatically calculated according to the importance such as countermeasure costs and important load costs.

改修費の算出結果の下部には、戻るL5ボタン、及びTOPへL8ボタンが表示されている。カーソル60が移動されて戻るL5ボタンがマウス9によりクリックされると、図16に示した敷設区間・投資額回収期間の入力画面が表示される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。これにより、入力画面及び起動画面へ移動できるようになる。   A L5 button for returning and an L8 button for TOP are displayed at the bottom of the calculation result of the repair cost. When the L5 button to which the cursor 60 is moved and returned is clicked with the mouse 9, the input screen for the laying section / investment amount collection period shown in FIG. 16 is displayed. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. Thereby, it becomes possible to move to the input screen and the startup screen.

図18は、パラメータ変更選択画面のモニタ7における表示例を示す説明図である。図18に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図12又は図15のパラメータ変更L4ボタンがクリックされると表示されるパラメータ変更選択画面が表示されている。   FIG. 18 is an explanatory diagram showing a display example of the parameter change selection screen on the monitor 7. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 18, and a parameter change selection screen that is displayed when the parameter change L4 button in FIG. 12 or 15 is clicked is displayed on the browser 62. Has been.

ブラウザ62の上部には、見出しであるパラメータ変更M10が表示されている。続いて、チェックボックス付で「下流収入」、「維持費」、「復旧困難費」などの項目が表示されている。該当するチェックボックスがマウス9によりクリックされると、チェックされた項目が選択される。図中では、「復旧困難費」のチェックボックスがチェックされている。複数の選択も可能である。これにより、変更対象のパラメータを一度に選択することができる。   In the upper part of the browser 62, a parameter change M10 which is a heading is displayed. Subsequently, items such as “downstream income”, “maintenance costs”, and “recovery costs” are displayed with check boxes. When the corresponding check box is clicked with the mouse 9, the checked item is selected. In the figure, the “Recovery Difficult Cost” check box is checked. Multiple selections are possible. Thereby, the parameters to be changed can be selected at once.

これらの項目の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。戻るL5ボタンがクリックされると、図12又は図15に示した画面が表示される。クリアL7ボタンがクリックされると、チェックされたチェックボックスが解除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図19に示すパラメータ変更画面が表示される。これにより、建設費用算定画面、改修費用算定画面、及び起動画面へ移動できるようになる。また、チェックボックスを一度に解除できるようになる。   Below these items, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the return L5 button is clicked, the screen shown in FIG. 12 or FIG. 15 is displayed. When the clear L7 button is clicked, the checked check box is released. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, a parameter change screen shown in FIG. 19 is displayed. Thereby, it becomes possible to move to the construction cost calculation screen, the repair cost calculation screen, and the startup screen. You can also clear the check box at once.

図19は、パラメータ変更画面のモニタ7における表示例を示す説明図である。図19に示すモニタ7の表示画面61にはブラウザ62が表示されており、このブラウザ62には、図18の決定L6ボタンがクリックされると表示されるパラメータ変更選択画面が表示されている。   FIG. 19 is an explanatory diagram illustrating a display example of the parameter change screen on the monitor 7. A browser 62 is displayed on the display screen 61 of the monitor 7 shown in FIG. 19, and a parameter change selection screen that is displayed when the decision L6 button in FIG. 18 is clicked is displayed on the browser 62.

ブラウザ62の上部には、見出しであるパラメータ変更M10が表示されている。続いて、図18でチェックボックスをチェックした復旧困難費M11が表示されている。この復旧困難費M11に続いて、図8に示した現在設定されている復旧困難費のパラメータ「60」が表示され、並んで、パラメータを入力する入力窓I4が表示されている。図中では、この入力窓I4には「80」と入力されている。   In the upper part of the browser 62, a parameter change M10 which is a heading is displayed. Subsequently, the difficult recovery cost M11 whose check box is checked in FIG. 18 is displayed. Subsequent to this difficult recovery cost M11, the currently set difficult recovery cost parameter “60” shown in FIG. 8 is displayed, and an input window I4 for inputting parameters is displayed. In the figure, “80” is input to the input window I4.

入力窓I4の下部には、戻るL5ボタン、決定L6ボタン、クリアL7ボタン、及びTOPへL8ボタンが表示されている。戻るL5ボタンがクリックされると、図18に示したパラメータ変更選択画面が表示される。クリアL7ボタンがクリックされると、入力窓I4の入力データが削除される。TOPへL8ボタンがクリックされると、図11に示した起動画面が表示される。決定L6ボタンがクリックされると、図8に示した現在設定されている復旧困難費のパラメータ「60」が「80」に変更される。これにより、投資費用の重要度に応じてパラメータを調整できるようになる。   At the bottom of the input window I4, a return L5 button, a decision L6 button, a clear L7 button, and an L8 button to TOP are displayed. When the return L5 button is clicked, the parameter change selection screen shown in FIG. 18 is displayed. When the clear L7 button is clicked, the input data in the input window I4 is deleted. When the L8 button is clicked on TOP, the startup screen shown in FIG. 11 is displayed. When the decision L6 button is clicked, the currently set difficult recovery cost parameter “60” shown in FIG. 8 is changed to “80”. As a result, the parameters can be adjusted according to the importance of the investment cost.

図20は、投資額決定サーバ1の動作例を示すフローチャートである。ハードディスク13に保存された配電線投資額決定プログラムがCPU12により起動されてRAM14に展開されている。   FIG. 20 is a flowchart illustrating an operation example of the investment amount determination server 1. A distribution line investment amount determination program stored in the hard disk 13 is activated by the CPU 12 and expanded in the RAM 14.

これを配電線の投資額を決定する条件として、図20に示すステップS1で、キーボード8により少なくとも、敷設区間を入力すると共に、配電線敷設費用を回収する費用回収期間を入力するようになされる。例えば、図13に示した入力窓I1には、作業者により電柱番号「001−001」と入力され、入力窓I2には、電柱番号「001−008」と入力され、入力窓I3には、投資額回収期間「10」と入力される。続いてステップS2へ移行する。   As a condition for determining the investment amount of the distribution line, at least the laying section is input by the keyboard 8 and the cost collection period for collecting the distribution line laying cost is input at step S1 shown in FIG. . For example, the utility pole number “001-001” is input by the operator to the input window I1 shown in FIG. 13, the utility pole number “001-008” is input to the input window I2, and the input window I3 has The investment amount recovery period “10” is entered. Subsequently, the process proceeds to step S2.

ステップS2では、敷設区間における電力料金収入額と、敷設区間における費用回収期間とから電力収入総額を算出する。例えば、電力収入総額は区間収入と下流収入を合計したものであり、区間収入は、契約種別ごとの年間収入データの各々に費用回収期間データ「10」を乗算し、乗算された契約種別ごとの収入データを合計して算出される。この契約種別ごとの年間収入データは、電気料金管理サーバ2へ入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データをCPU12により電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から契約種別ごとの年間収入データ「低圧電灯(3,000,000)」、「低圧電力(2,000,000)」、「高圧電力(25,000,000)」、「その他(1,000,000)」を受信して得る。これらの値に基づいて算出された区間収入は、「310,000,000」となる。   In step S2, the total amount of power revenue is calculated from the amount of power charge revenue in the installed section and the cost recovery period in the installed section. For example, the total power revenue is the sum of the segment revenue and downstream revenue. The segment revenue is calculated by multiplying the annual revenue data for each contract type by the expense collection period data “10” and multiplying each contract type by Calculated by summing revenue data. As the annual revenue data for each contract type, the power pole number data “001-001” and “001-008” input to the electricity rate management server 2 are transmitted to the distribution facility management server 4 by the CPU 12, and this distribution facility management server 4 receives the power pole installation location data “Hiroshima XX City △△ ...” and “Hiroshima Prefecture XX City □□ ...”, and the CPU 12 stores the power pole installation location data in the electricity rate management server 2. And the annual revenue data “low piezoelectric lamp (3,000,000)”, “low voltage power (2,000,000)”, “high voltage power (25,000,000)” for each contract type. 000) "and" Other (1,000,000) ". The section income calculated based on these values is “310,000,000”.

下流収入は、例えば、通過電流データ、パラメータデータ、及び費用回収期間データ「10」が乗算されて算出される。通過電流データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電系統管理サーバ5に送信し、この配電系統管理サーバ5からこの電柱番号データに対応する通過電流データ「150」を受信して得られる。パラメータデータは、図8に示したパラメータデータリスト45から参照されてパラメータデータ「200,000」が得られる。これらの値に基づいて算出された下流収入は、「300,000,000」となる。従って、電力収入総額は、「610,000,000」となる。続いて、ステップS3へ移行する。   The downstream income is calculated by multiplying, for example, passing current data, parameter data, and expense recovery period data “10”. As for the passing current data, the power pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the power distribution system management server 5 by the CPU 12, and the power distribution number management server 5 corresponds to the power pole number data. Is obtained by receiving the passing current data “150”. The parameter data is referred to from the parameter data list 45 shown in FIG. 8 to obtain the parameter data “200,000”. The downstream income calculated based on these values is “300,000,000”. Accordingly, the total power revenue is “610,000,000”. Subsequently, the process proceeds to step S3.

ステップS3では、維持費を算出する。例えば、この維持費は、区間長データ、パラメータデータ「2,500」、及び費用回収期間データ「10」が乗算されて算出される。区間長データは、キーボード8から入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4に送信し、この配電設備管理サーバ4から区間長データ「2,000」を受信して得られる。これらの値に基づいて算出された維持費は、「50,000,000」となる。続いて、ステップS4へ移行する。   In step S3, a maintenance cost is calculated. For example, the maintenance cost is calculated by multiplying the section length data, the parameter data “2,500”, and the cost collection period data “10”. The section length data is transmitted from the distribution facility management server 4 to the distribution facility management server 4 by transmitting the pole number data “001-001” and “001-008” input from the keyboard 8 to the distribution facility management server 4. 000 "is obtained. The maintenance cost calculated based on these values is “50,000,000”. Subsequently, the process proceeds to step S4.

ステップS4では、対策費を算出する。例えば、この対策費は、塩害対策費パラメータデータ「2,000」、強風対策費パラメータデータ「4,000」、雷害対策費パラメータデータ「5,000」、雪害対策費パラメータデータ「3,000」とこれらの対策費ごとの区間長データを乗算し、乗算された対策費ごとの区間長データを合計して算出される。対策費ごとの区間長データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から対策費ごとの区間長データである塩害対策費データ「100」、強風対策費データ「250」、雷害対策費データ「300」、雪害対策費データ「0」を受信して得られる。これらの値に基づいて算出された対策費は、「2,700,000」となる。続いて、ステップS5へ移行する。   In step S4, a countermeasure cost is calculated. For example, this countermeasure cost includes salt damage countermeasure cost parameter data “2,000”, strong wind countermeasure cost parameter data “4,000”, lightning damage countermeasure cost parameter data “5,000”, snow damage countermeasure cost parameter data “3,000”. Is multiplied by the section length data for each countermeasure cost, and the section length data for each countermeasure cost multiplied is calculated. As section length data for each countermeasure cost, the telephone pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the distribution facility management server 4 by the CPU 12, and the countermeasure cost is transmitted from the distribution facility management server 4. It is obtained by receiving salt damage countermeasure cost data “100”, strong wind countermeasure cost data “250”, lightning damage countermeasure cost data “300”, and snow damage countermeasure cost data “0”, which are section length data for each. The countermeasure cost calculated based on these values is “2,700,000”. Subsequently, the process proceeds to step S5.

ステップS5では、利益を算出する。例えば、この利益は、区間収入データ「310,000,000」と下流収入データ「300,000,000」を加えた値に0.1を乗算して求められる。つまり、利益は、「61,000,000」となる。続いてステップS6へ移行する。   In step S5, profit is calculated. For example, this profit is obtained by multiplying the value obtained by adding the section income data “310,000,000” and the downstream income data “300,000,000” by 0.1. That is, the profit is “61,000,000”. Subsequently, the process proceeds to step S6.

ステップS6では、重要負荷費を算出する。例えば、この重要負荷費は、病院、学校、通信、電気、水道、ガス、放送、及びその他のパラメータデータ「2,000,000」と各々の重要負荷件数データを乗算して最後に合計して算出される。重要負荷件数データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」を受信し、この電柱の設置場所データを電気料金管理サーバ2へ送信し、この電気料金管理サーバ2から病院件数データ「1」、学校件数データ「2」、通信件数データ「1」、電気件数データ「1」、水道件数データ「0」、ガス件数データ「0」、放送件数データ「0」、及びその他件数データ「0」を受信して得られる。これらの値に基づいて算出された重要負荷費は、「10,000,000」となる。続いて、ステップS7へ移行する。   In step S6, an important load cost is calculated. For example, this important load cost is calculated by multiplying each important load number data by the hospital, school, communication, electricity, water, gas, broadcasting, and other parameter data “2,000,000” and finally summing them up. Calculated. As the important load number data, the power pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the power distribution equipment management server 4 by the CPU 12, and the power pole installation location data is transmitted from the power distribution equipment management server 4. "Hiroshima XX city △△ ..." and "Hiroshima XX city □□ ..." are received, and the installation location data of this utility pole is transmitted to the electricity rate management server 2, and this electricity rate management server Hospital number data “1”, school number data “2”, communication number data “1”, electricity number data “1”, water number data “0”, gas number data “0”, broadcast number data “0” , And other count data “0”. The important load cost calculated based on these values is “10,000,000”. Subsequently, the process proceeds to step S7.

ステップS7では、復旧困難費を算出する。例えば、この復旧困難費は、現場到着距離データ、及びパラメータデータ「60」を乗算して算出される。現場到着距離データは、キーボード8により入力された電柱番号データ「001−001」、「001−008」をCPU12により配電設備管理サーバ4へ送信し、この配電設備管理サーバ4から位置データ「22,000」、「24,000」を受信してこの位置データの中間地点「23,000」を算出し、この中間地点とパラメータデータリスト45の営業所の位置データ「13,000」から差分を求めて現場到着距離データ「10,000」が得られる。これらの値に基づいて算出された復旧困難費は、「600,000」となる。続いて、ステップS8へ移行する。   In step S7, a difficult recovery cost is calculated. For example, this difficult recovery cost is calculated by multiplying the field arrival distance data and the parameter data “60”. As for the field arrival distance data, the utility pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the distribution facility management server 4 by the CPU 12, and the location data “22, 000 ”and“ 24,000 ”are received, the intermediate point“ 23,000 ”of the position data is calculated, and the difference is obtained from the intermediate point and the position data“ 13,000 ”of the sales office in the parameter data list 45. Thus, the field arrival distance data “10,000” is obtained. The difficult recovery cost calculated based on these values is “600,000”. Subsequently, the process proceeds to step S8.

ステップS8では、区間簿価を算出する。例えば、この区間簿価は、キーボード8により入力された電柱番号データ「001−001」、「001−008」がCPU12により配電設備管理サーバ4へ送信され、この配電設備管理サーバ4から電柱の設置場所データ「広島県○○市△△・・・」、「広島県○○市□□・・・」が受信され、受信された電柱の設置場所データが経理サーバ3へ送信され、この経理サーバ3から1坪あたりの単価データの平均値「325,000」が受信され、この1坪あたりの単価データと区間長データから算出される坪数データとが乗算されて得られる。例えば、坪数データは、区間長データが「2,000」のとき、坪数データ「7.7」と設定する。これらの値に基づいて算出された区間簿価は、「2,500,000」となる。続いて、ステップS9へ移行する。   In step S8, the section book value is calculated. For example, as for the section book value, the telephone pole number data “001-001” and “001-008” input from the keyboard 8 are transmitted to the distribution facility management server 4 by the CPU 12, and the distribution pole management server 4 installs the utility poles. Location data “Hiroshima XX city △△ ...” and “Hiroshima XX city □□ ...” are received, and the received utility pole installation location data is transmitted to the accounting server 3, and this accounting server The average value “325,000” of the unit price data per 1 tsubo is received from 3 and is obtained by multiplying the unit price data per 1 tsubo and the basis number data calculated from the section length data. For example, the basis number data is set as the basis number data “7.7” when the section length data is “2,000”. The section book value calculated based on these values is “2,500,000”. Subsequently, the process proceeds to step S9.

ステップS9では、建設費又は改修費の算出を判定する。建設費を算出する場合、ステップS10へ移行し、改修費を算出する場合、ステップS11へ移行する。   In step S9, the calculation of the construction cost or the repair cost is determined. When calculating construction costs, the process proceeds to step S10, and when calculating repair costs, the process proceeds to step S11.

ステップS10では、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の建設費用を算出する。例えば、電力収入総額「610,000,000」から1割の利益「61,000,000」を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額「549,000,000」から維持費「50,000,000」及び対策費「2,700,000」を差し引いた金額を配電線の建設費「496,300,000」とし、標準建設費を、建設費「496,300,000」、重要負荷費「10,000,000」、及び復旧困難費「600,000」を加算した金額「506,900,000」とし、最大建設費を、建設費「496,300,000」、及び利益「61,000,000」を加算した金額「557,300,000」とする。   In step S10, the construction cost of the distribution line is calculated based on the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. For example, a 10% profit “61,000,000” is secured from the total power revenue “610,000,000”, and the secured profit is subtracted from the total power revenue, and the total power revenue “549” deducted from the profit. , 000,000 "minus maintenance costs" 50,000,000 "and countermeasure costs" 2,700,000 "are the distribution line construction costs" 496,300,000 ", and the standard construction costs are the construction An amount “506,900,000” obtained by adding the cost “496,300,000”, the important load cost “10,000,000”, and the difficult recovery cost “600,000” is set as the maximum construction cost “ The amount is “557,300,000” obtained by adding “496,300,000” and profit “61,000,000”.

ステップS11では、維持費、対策費、重要負荷費、及び復旧困難費に基づいて配電線の改修費用を算出する。例えば、電力収入総額「610,000,000」から1割の利益を確保し、確保されたこの利益を電力収入総額から差し引き、利益が差し引かれた電力収入総額から維持費、対策費、及び簿価「2,500,000」を差し引いた金額を配電線の改修費「493,800,000」とし、標準改修費を、改修費、重要負荷費、及び復旧困難費を加算した金額「504,400,000」とし、最大改修費を、改修費、及び利益を加算した金額「554,800,000」とする。   In step S11, the repair cost of the distribution line is calculated based on the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. For example, 10% of profit is secured from the total power revenue "610,000,000", and this secured profit is subtracted from the total power revenue, and maintenance costs, countermeasure costs, and books are subtracted from the total power revenue minus the profit. The amount after deducting the price “2,500,000” is the distribution line repair cost “493,800,000”, and the standard repair cost is the sum of the repair cost, the important load cost, and the difficult recovery cost “504” “400,000”, and the maximum repair cost is “554,800,000”, which is the sum of the repair cost and profit.

このように、本発明に係る配電線投資額の決定支援システム100及び情報処理方法によれば、配電線を敷設する敷設区間の配電線敷設費用を決定する場合であって、敷設区間における電力料金収入額、及び敷設後の配電線を維持する維持費の情報を提供する電気料金管理サーバ2、及び配電設備管理サーバ4から提供されたこれらの情報を受信して処理する投資額決定サーバ1は、敷設費用を算出するCPU12を備え、このCPU12は、敷設区間における電力料金収入額と費用回収期間から電力収入総額を算出し、この電力収入総額と維持費に基づいて配電線の敷設費用を算出するものである。   Thus, according to the distribution line investment amount determination support system 100 and the information processing method according to the present invention, when determining the distribution line laying cost of the laying section in which the distribution line is laid, The investment amount determination server 1 that receives and processes the information provided from the electricity rate management server 2 that provides the revenue amount and the maintenance cost for maintaining the distribution line after laying, and the distribution facility management server 4 The CPU 12 includes a CPU 12 for calculating the laying cost. The CPU 12 calculates the total power revenue from the amount of power charge revenue and the cost recovery period in the laying section, and calculates the laying cost of the distribution line based on the total power revenue and the maintenance cost. To do.

この例では、維持費の他に、配電線を自然災害から保護するために必要な対策費、生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費、停電から復旧するまでに発生する機会損失の費用である復旧困難費などに基づいて配電線の敷設費用を算出する。   In this example, in addition to maintenance costs, countermeasure costs necessary to protect distribution lines from natural disasters, and maintenance to supply sufficient power to facilities necessary to maintain life and life The laying cost of distribution lines is calculated based on the important load costs and the difficult recovery costs that are the cost of opportunity loss that occurs before recovery from a power failure.

従って、手動計算に依存することなく、対策費や重要負荷費などの重要度に応じて自動的に算出された配電線の敷設費用を利用して配電線敷設投資額を効率よく決定支援できるようになる。   Therefore, without relying on manual calculation, it is possible to efficiently determine and support distribution line laying investment amount using distribution line laying cost automatically calculated according to the importance such as countermeasure cost and important load cost. become.

本発明は、配電線を敷設する敷設区間の配電線敷設費用から敷設投資額を決定する配電線投資額の決定支援システムに適用して好適である。   INDUSTRIAL APPLICABILITY The present invention is suitable for application to a distribution line investment amount determination support system that determines a laying investment amount from a distribution line laying cost of a laying section in which a distribution line is laid.

本発明に係る実施例としての配電線投資額の決定支援システム100の構成例を示す概念図である。It is a conceptual diagram which shows the structural example of the determination support system 100 of the distribution line investment amount as an Example which concerns on this invention. 投資額決定サーバ1の制御部10、及び電気料金管理サーバ2の制御部20の構成例を示すブロック図である。It is a block diagram which shows the structural example of the control part 10 of the investment amount determination server 1, and the control part 20 of the electricity bill management server 2. FIG. 顧客料金契約DB25の顧客料金契約データリスト40の一部分を示す説明図である。It is explanatory drawing which shows a part of customer fee contract data list 40 of customer fee contract DB25. 簿価DB26の簿価データリスト41の一部分を示す説明図である。It is explanatory drawing which shows a part of book value data list 41 of book value DB26. 配電設備DB27の配電設備データリスト42の一部分を示す説明図である。It is explanatory drawing which shows a part of power distribution equipment data list 42 of power distribution equipment DB27. 地図DB28の地図データリスト43の一部分を示す説明図である。It is explanatory drawing which shows a part of map data list 43 of map DB28. 系統システム負荷DB29の系統システム負荷データリスト44の一部分を示す説明図である。It is explanatory drawing which shows a part of system | strain system load data list | wrist 44 of system | strain system load DB29. 投資費用の重要度を示すパラメータデータリスト45を示す説明図である。It is explanatory drawing which shows the parameter data list 45 which shows the importance of investment expense. 敷設費用の計算例を示す表計算図である。It is a table calculation figure which shows the example of calculation of laying cost. (a)及び(b)は、敷設費用の算出結果例を示す説明図である。(A) And (b) is explanatory drawing which shows the example of a calculation result of laying expense. 配電線投資額決定プログラム起動画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of the distribution line investment amount determination program starting screen. 建設費用算定画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of a construction cost calculation screen. 敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of an installation area and an investment amount collection | recovery period input screen. 建設費用算定の結果画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of the result screen of construction cost calculation. 改修費用算定画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of the repair expense calculation screen. 敷設区間、投資額回収期間入力画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of an installation area and an investment amount collection | recovery period input screen. 改修費用算定の結果画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of the result screen of repair expense calculation. パラメータ変更選択画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of a parameter change selection screen. パラメータ変更画面のモニタ7における表示例を示す説明図である。It is explanatory drawing which shows the example of a display in the monitor 7 of a parameter change screen. 投資額決定サーバ1の動作例を示すフローチャートである。3 is a flowchart showing an operation example of an investment amount determination server 1.

符号の説明Explanation of symbols

1 投資額決定サーバ(情報処理装置)
2 電気料金管理サーバ(情報提供装置)
3 経理サーバ(情報提供装置)
4 配電設備管理サーバ(情報提供装置)
5 配電系統管理サーバ(情報提供装置)
8 キーボード(入力手段)
9 マウス(入力手段)
12 CPU(電力収入算出手段、敷設費用算出手段)
25 顧客料金契約DB
26 簿価DB
27 配電設備DB
28 地図DB
29 系統システム負荷DB
40 顧客料金契約データリスト
41 簿価データリスト
42 配電設備データリスト
43 地図データリスト
44 系統システム負荷データリスト
45 パラメータデータリスト
100 配電線投資額の決定支援システム
1. Investment amount determination server (information processing device)
2 Electricity rate management server (information provision device)
3. Accounting server (information provision device)
4 Power distribution facility management server (information provision device)
5 Distribution system management server (information provision device)
8 Keyboard (input means)
9 Mouse (input means)
12 CPU (power revenue calculation means, laying cost calculation means)
25 Customer fee contract DB
26 Book value DB
27 Power distribution facility DB
28 Map DB
29 System load DB
40 Customer fee contract data list 41 Book value data list 42 Distribution facility data list 43 Map data list 44 Grid system load data list 45 Parameter data list 100 Distribution line investment amount decision support system

Claims (7)

配電線を敷設する敷設区間の配電線敷設費用を算出支援するシステムであって、
前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、
前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、
前記情報処理装置と前記情報提供装置を接続する通信手段とを備え、
前記情報処理装置は、
少なくとも、前記敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を取得する入力手段と、
前記入力手段により入力された当該敷設区間における前記電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出手段と、
前記電力収入算出手段により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記配電線を自然災害から保護するために必要な費用を対策費とし、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、
停電から復旧するまでに発生する機会損失の費用を復旧困難費として、
前記利益が差し引かれた当該電力収入総額から前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、
前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、
前記建設費、及び前記利益を加算した金額を最大建設費としたとき、
前記配電線の敷設費用として前記標準建設費及び又は最大建設費を算出する敷設費用算出手段と
を有することを特徴とする配電線敷設費用の算出支援システム。
A system that supports calculation of the distribution line laying cost of the laying section where the distribution line is laid,
It has a database that stores annual income information for each contract type including the amount of electricity fee revenue in the laid section , passing current information, parameter information, and maintenance cost information for maintaining the distribution line after laying , Correspondingly, an information providing device that provides annual revenue information, passing current information, parameter information, and information on the maintenance cost for each contract type including the amount of revenue of the power charges ,
The distribution of the laying section in which the distribution line is laid by receiving the annual revenue information, the passing current information, the parameter information, and the maintenance cost information for each contract type including the power fee revenue provided from the information providing device. An information processing device for calculating and processing electric wire laying costs ;
Communication means for connecting the information processing device and the information providing device;
The information processing apparatus includes:
At least, and inputs the information of the laying zone, enter information for cost recovery period for collecting the distribution line laying costs, including power rate revenues in the laying section from the information providing apparatus via said communication means Input means for obtaining annual revenue information for each contract type, passing current information, parameter information, and maintenance cost information ;
The annual revenue information for each contract type including the power charge revenue amount in the laid section input by the input means is multiplied by the information of the cost recovery period , and the multiplied section revenue information for each contract type is totaled Power revenue calculation means for calculating the total power revenue from the section revenue calculated as described above and the downstream current calculated by multiplying the information on the passing current information, the parameter information, and the cost recovery period;
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total revenue calculated by the power revenue calculation means, pulling to the difference of the benefit from the power total income,
The cost required to protect the distribution line from natural disasters is taken as a countermeasure cost,
Expenses required to maintain sufficient power for facilities necessary to maintain life and life are considered important burden costs,
The cost of opportunity loss that occurs before recovery from a power outage is considered as a difficult recovery cost.
From the power total income which the benefit is subtracted, the amount obtained by subtracting the maintenance and the measure expense acquired from the information providing apparatus and construction costs of the distribution line,
The construction cost, the important load cost, and the sum of the recovery difficulty cost as standard construction cost,
When the construction cost and the sum of the profits are the maximum construction costs,
A distribution line installation cost calculation support system, comprising: an installation cost calculation means for calculating the standard construction cost and / or the maximum construction cost as the installation cost of the distribution line.
前記情報提供装置が提供する情報には、
前記配電線を自然災害から保護するために必要な対策費、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための重要負荷費、
及び停電から復旧するまでに発生する機会損失の費用である復旧困難費を算出する情報が含まれ、
前記対策費、重要負荷費及び復旧困難費の各々の情報が前記データベースに記憶され、
当該情報提供装置は、
取得要求に対応して前記対策費、前記重要負荷費、及び前記復旧困難費を算出する情報を前記情報処理装置に提供し、
前記情報処理装置における前記敷設費用算出手段は、
前記電力収入総額、前記維持費、前記対策費、前記重要負荷費、及び前記復旧困難費に基づいて前記配電線の敷設費用を算出することを特徴とする請求項1に記載の配電線敷設費用の算出支援システム。
The information provided by the information providing device includes:
Measure costs necessary to protect the distribution line from natural disasters,
Important load costs for providing sufficient power for facilities necessary to maintain life and life,
And information to calculate the difficult recovery cost, which is the cost of opportunity loss that occurs before recovery from a power outage,
Each information of the countermeasure cost, important load cost and recovery difficult cost is stored in the database,
The information providing device
Providing the information processing apparatus with information for calculating the countermeasure cost, the important load cost, and the recovery difficult cost in response to the acquisition request ;
The laying cost calculation means in the information processing apparatus is
The distribution line laying cost according to claim 1, wherein the distribution line laying cost is calculated based on the total power revenue, the maintenance cost, the countermeasure cost, the important load cost, and the difficult recovery cost. Calculation support system.
前記情報提供装置が提供する情報には、
固定資産の取得原価である簿価を算出する情報が含まれ、
前記簿価を算出する情報が前記データベースに記憶され、
当該情報提供装置は、
取得要求に対応して前記簿価を算出する情報を前記情報処理装置に提供し、
前記情報処理装置における前記敷設費用算出手段は、
前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記利益が差し引かれた当該電力収入総額から前記維持費、前記対策費、及び前記簿価を差し引いた金額を配電線の改修費とし、
前記改修費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準改修費とし、
前記改修費、及び前記利益を加算した金額を最大改修費としたとき、
前記配電線の敷設費用に関して前記標準改修費及び又は最大改修費を算出することを特徴とする請求項1に記載の配電線敷設費用の算出支援システム。
The information provided by the information providing device includes:
Contains information to calculate the book value, which is the cost of the fixed asset,
Information for calculating the book value is stored in the database,
The information providing device
Providing the information processing apparatus with information for calculating the book value in response to an acquisition request;
The laying cost calculation means in the information processing apparatus is
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total income, pulling to the difference of the benefit from the power total income,
The amount obtained by subtracting the maintenance cost, the countermeasure cost, and the book value from the total electric power revenue from which the profit has been deducted is regarded as a distribution line repair cost,
The standard repair cost is the sum of the repair cost, the important load cost, and the recovery difficulty cost,
When the maximum repair cost is the sum of the repair cost and the profit,
2. The distribution line laying cost calculation support system according to claim 1, wherein the standard repair cost and / or the maximum repair cost is calculated with respect to the laying cost of the distribution line.
前記対策費には、
塩害対策費、強風対策費、雷害対策費、及び雪害対策費が含まれることを特徴とする請求項2又は3に記載の配電線敷設費用の算出支援システム。
The countermeasure costs include
The distribution support laying cost calculation support system according to claim 2 or 3 , characterized by including salt damage countermeasure costs, strong wind countermeasure costs, lightning damage countermeasure costs, and snow damage countermeasure costs.
前記施設には、
病院、学校、通信局、電力事業所、水道局、ガス事業所、及び放送局が含まれることを特徴とする請求項に記載の配電線敷設費用の算出支援システム。
The facility includes
The distribution line laying cost calculation support system according to claim 1 , comprising a hospital, a school, a communication station, a power station, a water station, a gas station, and a broadcasting station.
配電線を敷設する敷設区間の配電線敷設費用を決定支援するための情報を処理する情報処理方法であって、
前記配電線敷設費用の決定支援するシステムが、
前記敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び敷設後の当該配電線を維持する維持費の情報を記憶するデータベースを有し、取得要求に対応して前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を提供する情報提供装置と、
前記情報提供装置から提供された前記電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報、及び前記維持費の情報を受信して前記配電線を敷設する敷設区間の配電線敷設費用を算出処理する情報処理装置と、
前記情報処理装置と前記情報提供装置を接続する通信手段とを備え
前記情報処理装置が、入力手段、電力収入算出手段及び、敷設費用算出手段を有し、
少なくとも、前記入力手段が、
前記配電線を敷設する敷設区間の情報を入力すると共に、前記配電線敷設費用を回収する費用回収期間の情報を入力し、前記通信手段を介して前記情報提供装置から当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報、通過電流情報、パラメータ情報及び前記維持費の情報を取得するように操作される入力工程をし、
前記電力収入算出手段が
前記入力工程により入力された当該敷設区間における電力料金収入額を含む契約種別ごとの年間収入情報の各々に費用回収期間の情報を乗算し、乗算された前記契約種別ごとの区間収入情報を合計して算出される区間収入と、通過電流情報、パラメータ情報、及び費用回収期間の情報が乗算されて算出される下流収入とから電力収入総額を算出する電力収入算出工程をし、
前記敷設費用算出手段が
前記電力収入算出工程により算出された前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記配電線を自然災害から保護するために必要な費用を対策費とし、
生活・生命を維持するために必要な施設に対して十分に電力を供給するように整備するための費用を重要負荷費とし、
停電から復旧するまでに発生する機会損失の費用を復旧困難費として、
前記利益が差し引かれた当該電力収入総額から前記情報提供装置から取得した前記維持費及び前記対策費を差し引いた金額を配電線の建設費とし、
前記建設費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準建設費とし、
前記建設費、及び前記利益を加算した金額を最大建設費としたとき、前記標準建設費及び又は最大建設費を算出する敷設費用算出工程を有することを特徴とする情報処理方法。
An information processing method for processing information for determining and supporting a distribution line laying cost of a laying section for laying a distribution line,
A system for supporting the determination of the distribution line laying cost,
It has a database that stores annual income information for each contract type including the amount of electricity fee revenue in the laid section, passing current information, parameter information, and maintenance cost information for maintaining the distribution line after laying, Correspondingly, an information providing device that provides annual revenue information, passing current information, parameter information, and information on the maintenance cost for each contract type including the amount of revenue of the power charges,
The distribution of the laying section in which the distribution line is laid by receiving the annual revenue information, the passing current information, the parameter information, and the maintenance cost information for each contract type including the power fee revenue provided from the information providing device. An information processing device for calculating and processing electric wire laying costs;
Communication means for connecting the information processing device and the information providing device ;
The information processing apparatus has input means, power revenue calculation means, and laying cost calculation means ,
At least the input means
You input the information of the laying section for laying the distribution line, wherein the distribution line laying costs by entering the information for cost recovery period to recover the power toll revenue in the laying section from the information providing apparatus via said communication means possess annual income information for each contract type, including the amount, passing current information, the operation is the input step to acquire the information of the parameter information and the maintenance costs,
The power revenue calculation means,
The annual revenue information for each contract type including the amount of power charge revenue in the laid section input in the input step is multiplied by the information of the expense collection period, and the multiplied section revenue information for each contract type is totaled. possess a section revenue calculated, passing current information, parameter information, and the power revenue calculation step information cost recovery period is calculated power total revenue from the downstream revenue is calculated by multiplying Te,
The installation cost calculating means,
To ensure the benefits derived by multiplying a predetermined ratio with respect to the power total revenue calculated by the power revenue calculation step, pull differentially the benefit from the power total income,
The cost required to protect the distribution line from natural disasters is taken as a countermeasure cost,
Expenses required to maintain sufficient power for facilities necessary to maintain life and life are considered important burden costs,
The cost of opportunity loss that occurs before recovery from a power outage is considered as a difficult recovery cost.
From the power total income which the benefit is subtracted, the amount obtained by subtracting the maintenance and the measure expense acquired from the information providing apparatus and construction costs of the distribution line,
The construction cost, the important load cost, and the sum of the recovery difficulty cost as standard construction cost,
An information processing method comprising a laying cost calculation step of calculating the standard construction cost and / or the maximum construction cost when the construction cost and the amount obtained by adding the profits are set as the maximum construction cost.
前記敷設費用算出工程の際に、
前記敷設費用算出手段が
前記電力収入総額に対して所定割合を乗算して得られる利益を確保するために、当該電力収入総額から前記利益を差し引き、
前記利益が差し引かれた当該電力収入総額から前記維持費、前記対策費、及び固定資産の取得原価である簿価を差し引いた金額を配電線の改修費とし、
前記改修費、前記重要負荷費、及び前記復旧困難費を加算した金額を標準改修費とし、
前記改修費、及び前記利益を加算した金額を最大改修費としたとき、
前記配電線の敷設費用に関して前記標準改修費及び又は最大改修費を算出することを特徴とする請求項6に記載の情報処理方法。
During the laying cost calculation process,
To ensure the benefits the laying cost calculation means is obtained by multiplying a predetermined ratio with respect to the power total income, pulling to the difference of the benefit from the power total income,
The amount obtained by subtracting the maintenance cost, the countermeasure cost, and the book value, which is the acquisition cost of fixed assets, from the total power revenue from which the profit has been deducted, is the repair cost of the distribution line,
The standard repair cost is the sum of the repair cost, the important load cost, and the recovery difficulty cost,
When the maximum repair cost is the sum of the repair cost and the profit,
The information processing method according to claim 6, wherein the standard repair cost and / or the maximum repair cost are calculated with respect to the laying cost of the distribution line.
JP2006155099A 2006-06-02 2006-06-02 Distribution line laying cost calculation support system and information processing method Expired - Fee Related JP4916223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006155099A JP4916223B2 (en) 2006-06-02 2006-06-02 Distribution line laying cost calculation support system and information processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006155099A JP4916223B2 (en) 2006-06-02 2006-06-02 Distribution line laying cost calculation support system and information processing method

Publications (2)

Publication Number Publication Date
JP2007323521A JP2007323521A (en) 2007-12-13
JP4916223B2 true JP4916223B2 (en) 2012-04-11

Family

ID=38856258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006155099A Expired - Fee Related JP4916223B2 (en) 2006-06-02 2006-06-02 Distribution line laying cost calculation support system and information processing method

Country Status (1)

Country Link
JP (1) JP4916223B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11134387A (en) * 1997-10-24 1999-05-21 Cardinal Kk Repayment plan support system, capital investment plan support system, and recording medium
JP2003216801A (en) * 2002-01-18 2003-07-31 Fujitsu Ltd Commercialization simulation system
JP2003271799A (en) * 2002-03-18 2003-09-26 Tokyo Electric Power Co Inc:The Power equipment management system
JP2004038786A (en) * 2002-07-05 2004-02-05 Cross Culture Ltd Simple quote system and simple quote server
JP4158730B2 (en) * 2004-03-16 2008-10-01 東京電力株式会社 Distribution line new design support method and apparatus
JP2005284457A (en) * 2004-03-29 2005-10-13 Osaka Gas Co Ltd Business territory selection system

Also Published As

Publication number Publication date
JP2007323521A (en) 2007-12-13

Similar Documents

Publication Publication Date Title
JP4498535B2 (en) Housing diagnosis system and housing diagnosis method
CN114778936B (en) Monitoring method, monitor, system and electronic equipment for electric energy metering abnormality
Fu et al. Carbon emission assessment for steel structure based on lean construction process
JP2003102134A (en) Electric power data trading system
WO2010098140A1 (en) System for estimating the amount of carbon dioxide emitted from construction and method therefor
JP4108011B2 (en) Instantaneous voltage drop data providing method, estimated loss calculation method, program, and apparatus
JP4916223B2 (en) Distribution line laying cost calculation support system and information processing method
JP2003303244A (en) Failure information system
JP5611542B2 (en) Work time summary system and work time summary method
JP5032426B2 (en) Depreciable asset price calculation device, depreciable asset price calculation method, depreciable asset price calculation program and fixed asset evaluation value calculation device, fixed asset evaluation value calculation method, and fixed asset evaluation value calculation program
JP2011165088A (en) Power transaction system and method for controlling the power transaction system
JP4514300B2 (en) Real estate evaluation support system
JP5642752B2 (en) Disaster recovery management system
JP4637729B2 (en) Information processing method, information processing apparatus, and program
JP2005182576A (en) Maintenance estimation system for house
US20030110116A1 (en) Money saving service method and money saving service apparatus
JP2018014052A (en) Facility introduction support system, facility introduction support method, server device and program
CN105137776A (en) Metering automation terminal control assistant system
JP4948052B2 (en) Power failure related information provision system
JP2008052461A (en) Power distribution construction management system
JP2018151738A (en) System for determining solatium for shortage in power generation amount and program for determining solatium for shortage in power generation amount
JP2006024202A (en) Decision support system
CN114757658A (en) Nuclear facility decommissioning simulation process and cost estimation method and system
Abaide et al. Assessment of the smart grids applied in reducing the cost of distribution system losses
CN110912118A (en) Low-voltage branch line loss analysis method and monitoring system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090529

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20100805

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20101228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110726

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110914

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120117

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120124

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150203

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4916223

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150203

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees