JP4986574B2 - Concrete member installation structure - Google Patents
[go: Go Back, main page]

JP4986574B2 - Concrete member installation structure - Google Patents

Concrete member installation structure Download PDF

Info

Publication number
JP4986574B2
JP4986574B2 JP2006295205A JP2006295205A JP4986574B2 JP 4986574 B2 JP4986574 B2 JP 4986574B2 JP 2006295205 A JP2006295205 A JP 2006295205A JP 2006295205 A JP2006295205 A JP 2006295205A JP 4986574 B2 JP4986574 B2 JP 4986574B2
Authority
JP
Japan
Prior art keywords
bolt
concrete member
groove
concrete
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006295205A
Other languages
Japanese (ja)
Other versions
JP2008111281A (en
Inventor
秀明 森田
和重 吉岡
Original Assignee
千葉窯業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 千葉窯業株式会社 filed Critical 千葉窯業株式会社
Priority to JP2006295205A priority Critical patent/JP4986574B2/en
Publication of JP2008111281A publication Critical patent/JP2008111281A/en
Application granted granted Critical
Publication of JP4986574B2 publication Critical patent/JP4986574B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Retaining Walls (AREA)
  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、分割製造された一方のコンクリート部材に他方のコンクリート部材を据付けるコンクリート部材の据付構造に関する。   The present invention relates to a concrete member installation structure in which the other concrete member is installed on one of the separately manufactured concrete members.

周知のように、ボックスカルバートやL字状の擁壁ブロックなどのコンクリート製品は、大型のタイプの一体成形が困難なことから、所定の型枠を用いて、各コンクリート部材が分割製造され、かかるコンクリート部材を施工現場で接合して構築されている。   As is well known, since concrete products such as box culverts and L-shaped retaining wall blocks are difficult to be integrally molded in a large type, each concrete member is divided and manufactured using a predetermined formwork. It is constructed by joining concrete members at the construction site.

図13に基づき概略説明すれば、ボックスカルバート1は、複数個がPC鋼棒などを用いて連結され、内部に中空部を有する閉鎖断面に形成されている。具体的には、前記各ボックスカルバート1は、上辺を構成するコ字状の上壁ブロック2と、両側辺を構成する一対のL字状の側壁ブロック3と、底辺を構成する低壁ブロック4とを備え、前記上壁ブロック2と前記両側壁ブロック3とが分割製造されている。   If it demonstrates roughly based on FIG. 13, the box culvert 1 will be formed in the closed cross section which several are connected using a PC steel bar etc. and has a hollow part inside. Specifically, each box culvert 1 includes a U-shaped upper wall block 2 constituting an upper side, a pair of L-shaped side wall blocks 3 constituting both sides, and a low wall block 4 constituting a bottom side. The upper wall block 2 and the both side wall blocks 3 are separately manufactured.

そして、施工現場では、前記両側壁ブロック3を、所定間隔をおいて設置するとともに、両側壁ブロック3の下端部間に前記底壁ブロック4を現場打ちのコンクリートで形成されている。   At the construction site, the both side wall blocks 3 are installed at a predetermined interval, and the bottom wall block 4 is formed between the lower end portions of the both side wall blocks 3 with concrete made in the field.

このコンクリート打設後には、図14に示すように、前記上壁ブロック2をクレーン5で吊り上げるとともに、図15に示すように、前記両側壁ブロック3の上端部6のガイドピン7に前記上壁ブロックの両脚部8のガイドピン用孔9を嵌入させ、前記両脚部8を前記両側壁ブロック3の上端部6に据え付けている。   After the concrete placement, as shown in FIG. 14, the upper wall block 2 is lifted by a crane 5 and, as shown in FIG. 15, the upper wall is placed on the guide pin 7 of the upper end portion 6 of the both side wall blocks 3. The guide pin holes 9 of the both leg portions 8 of the block are fitted, and the both leg portions 8 are installed on the upper end portions 6 of the both side wall blocks 3.

この据付作業後にPC鋼棒孔61にPC鋼棒を挿通するとともに、PC鋼棒の上下端部にナットを締結して、前記両脚部8を前記両側壁ブロック3の上端部6に連結している。   After this installation work, the PC steel rod is inserted into the PC steel rod hole 61, nuts are fastened to the upper and lower ends of the PC steel rod, and the both leg portions 8 are connected to the upper end portions 6 of the both side wall blocks 3. Yes.

なお、本発明は、先行技術調査を行うことなく、公知・公用の技術の問題を解決すべく開発した発明であり、出願人の知っている先行技術は公知文献発明ではなく、先行技術文献情報は存在しない。   The present invention has been developed to solve the problems of known and public technologies without conducting prior art searches, and the prior art known to the applicant is not a known literature invention but prior art document information. Does not exist.

しかしながら、従来は、クレーン操作によって、両脚部8を両側壁ブロック3の上端部6に据え付けていることから、図16に示すように、両者6.8間に長手方向の位置ずれが生じることが多い。   However, conventionally, both the leg portions 8 are installed on the upper end portions 6 of the both side wall blocks 3 by crane operation, and therefore, as shown in FIG. Many.

この場合には、バール10を用いて、前記両脚部8の据付位置を調整しているものの、両者3.8の接合面を損傷するおそれがある。また、人力で据付位置を調整せざるを得ないので、正確な位置調整が困難なばかりか、作業性が悪く、施工コストが高騰するおそれもあった。   In this case, although the installation position of the both leg portions 8 is adjusted by using the burl 10, there is a possibility that the joint surface of both 3.8 is damaged. In addition, since the installation position must be adjusted manually, accurate position adjustment is difficult, workability is poor, and construction costs may increase.

請求項1〜7の発明は、前記課題を解決すべく創作された技術的思想であって、請求項1記載の発明は、分割製造されたコンクリート製品を施工現場で構築するにあたって、一方のコンクリート部材に他方のコンクリート部材を据え付けるコンクリート部材の据付構造であって、一方の前記コンクリート部材の側面に設置された据付治具に、他方のコンクリート部材の側面の送り部材を案内するガイド溝を設け、このガイド溝が上方向に向かって開口し、溝底側の下溝と該下溝から開口部に向かって溝幅が拡張している上溝とを備え、他方の前記コンクリート部材を一方の前記コンクリート部材に向かって降下させたときに前記送り部材を前記ガイド溝の溝壁に沿って上溝から下溝に案内して、一方の前記コンクリート部材上に他方の前記コンクリート部材を据え付けることを特徴としている。 The inventions of claims 1 to 7 are technical ideas created in order to solve the above-mentioned problems, and the invention of claim 1 is a concrete method for constructing a concrete product that has been separately manufactured at a construction site. on the member a mounting structure of a concrete member mounting the other concrete element, on one of the mounting jig placed on the side surface of the concrete member, a guide groove for guiding the feeding member side of the other concrete element The guide groove includes a lower groove on the groove bottom side and an upper groove having a groove width extending from the lower groove toward the opening, and the other concrete member is used as one concrete member. The feed member is guided from the upper groove to the lower groove along the groove wall of the guide groove when being lowered toward It is characterized by mounting the Nkurito member.

したがって、他方コンクリート部材をクレーンなどで降下させると送り部材が溝壁に沿って案内され、他方のコンクリート部材を一方のコンクリート部材の正確な位置に据え付けることができる。 Therefore, when the other concrete member is lowered by a crane or the like, the feeding member is guided along the groove wall, and the other concrete member can be installed at an accurate position on one concrete member.

請求項2記載の発明は、前記送り部材は一方の前記コンクリート部材の側面に埋設されたナットにボルトの軸部を締結してなることを特徴としている。 According to a second aspect of the invention, the feed member is characterized and a signed benzalkonium the shank of the bolt to the nut embedded in the side surface of one of the concrete member.

したがって、ガイド溝の開口部にボルトを合わせてクレーンなどで降下させるだけで、ボルトが溝壁に沿って下溝に案内される。これにより他方のコンクリート部材が一方のコンクリート部材に長手方向の位置ずれを生じることなく据付けられる。 Therefore, the bolt is guided along the groove wall to the lower groove simply by aligning the bolt with the opening of the guide groove and lowering the bolt with a crane or the like . Thereby, the other concrete member is installed on the one concrete member without causing a positional shift in the longitudinal direction.

請求項3記載の発明は、前記ボルトは、二段ボルトであって、前記ナットに軸部が締結される継ボルトと、この継ボルトの頭部の筒状ナットに締結される引寄ボルトとにより構成され、前記筒状ナットを前記上溝の溝壁に沿って下溝内に案内して、前記筒状ナットに前記引寄ボルトの軸部が順次螺入させて、前記他方のコンクリート部材が一方の前記コンクリート部材に引寄せられることを特徴としている。 According to a third aspect of the present invention, the bolt is a two-stage bolt, a joint bolt having a shaft portion fastened to the nut, and an attracting bolt fastened to a cylindrical nut at a head of the joint bolt. The cylindrical nut is guided into the lower groove along the groove wall of the upper groove, and the shaft portion of the drawing bolt is sequentially screwed into the cylindrical nut. It is drawn to the concrete member.

したがって、継ボルトを上溝の溝壁に沿って案内して長手方向の位置ずれが解消されるほか、引寄ボルトの軸部を螺入させて他方のコンクリート部材の幅方向の位置ずれが解消される。   Therefore, the joint bolt is guided along the groove wall of the upper groove to eliminate the longitudinal displacement, and the shaft portion of the drawing bolt is screwed to eliminate the displacement in the width direction of the other concrete member. The

請求項4記載の発明は、前記下溝の内周縁と前記引寄ボルトの頭部との間に、前記引寄ボルトの締付圧力を緩和する緩衝部材を介装したことを特徴としている。   The invention described in claim 4 is characterized in that a buffer member for relaxing the tightening pressure of the drawing bolt is interposed between the inner peripheral edge of the lower groove and the head of the drawing bolt.

この緩衝部材の一態様としては、例えば断面コ字状のチャンネル部材が用いられるが、引寄ボルトの締付圧力を緩和できれば、その部材の如何を問わない。また、ボルトが二段構成なため、引寄ボルトに通常ボルトが使用でき、特注ボルトを用意する必要がない。   As one mode of the buffer member, for example, a channel member having a U-shaped cross section is used, but any member may be used as long as the tightening pressure of the drawing bolt can be reduced. Moreover, since the bolt has a two-stage configuration, a normal bolt can be used as the drawing bolt, and it is not necessary to prepare a custom-made bolt.

請求項5記載の発明は、前記据付治具の両側端部に補強部を立設するとともに、この補強部間に前記緩衝部材を支持する台座を設けたことを特徴としている。   The invention described in claim 5 is characterized in that a reinforcing portion is erected at both end portions of the installation jig, and a pedestal for supporting the buffer member is provided between the reinforcing portions.

この補強部によって据付治具が補強され、また台座に緩衝部材を仮置きして引寄ボルトの締結作業が行える。   The installation jig is reinforced by this reinforcing portion, and a buffer member is temporarily placed on the pedestal so that the drawing bolt can be fastened.

請求項6記載の発明は、一方の前記コンクリート部材の側面に埋設されたナットに、前記据付治具の他端部を介して、送りボルトの軸部を締結することによって、前記据付治具が他方の前記コンクリート部材を押し戻すことを特徴としている。   According to the sixth aspect of the present invention, the fastening jig is fastened to the nut embedded in the side surface of one of the concrete members by fastening the shaft portion of the feed bolt via the other end of the fitting jig. The other concrete member is pushed back.

したがって、継ボルトを上溝の溝壁に沿って案内して長手方向の位置ずれが解消されるほか、送りボルトの軸部をナットに締結して他方のコンクリート部材の幅方向の位置ずれが解消される。   Therefore, the joint bolt is guided along the groove wall of the upper groove to eliminate the longitudinal displacement, and the shaft portion of the feed bolt is fastened to the nut to eliminate the displacement in the width direction of the other concrete member. The

請求項7記載の発明は、前記両コンクリート部材のいずれかの据付面に緩衝材を設けたことを特徴としている。   The invention described in claim 7 is characterized in that a cushioning material is provided on the installation surface of either of the two concrete members.

この緩衝材には、例えばゴム材などが使用され、両コンクリート部材の据付時の衝撃が緩和される。   For example, a rubber material or the like is used as the cushioning material, and the impact during installation of both concrete members is reduced.

なお、前記両コンクリートの一態様としては、一方の前記コンクリート部材の据付面に前記両コンクリート部材を連結接合する連結ボルトの下端部が埋設され、他方の前記コンクリート部材の据付面には前記連結ボルトの上端部が挿通可能なインサート器具が埋設されているタイプが用いられる。   In addition, as one aspect of the two concretes, a lower end portion of a connection bolt for connecting and joining the two concrete members is embedded in an installation surface of one concrete member, and the connection bolt is installed on the installation surface of the other concrete member. A type is used in which an insert device into which the upper end portion of the insert can be inserted is embedded.

このタイプによれば、一方の前記コンクリート部材の側面に作業穴が形成されているので、前記インサート器具に挿通された前記連結ボルトの上端部には連結ナットが締結される。したがって、PC鋼棒を用いて連結する必要がなく、作業工程が簡素化され、作業性が向上する。   According to this type, since the working hole is formed in the side surface of one of the concrete members, a connection nut is fastened to the upper end portion of the connection bolt inserted through the insert device. Therefore, it is not necessary to connect using a PC steel rod, the work process is simplified, and workability is improved.

請求項1〜7記載の発明によれば、他方のコンクリート部材を一方のコンクリート部材の正確な位置に据え付けられることから、据付後にバールを用いて位置調整をする必要がなく、据付位置の調整が簡単で、コンクリート製品の施工効率が向上する。   According to invention of Claims 1-7, since the other concrete member can be installed in the exact position of one concrete member, it is not necessary to adjust a position using a bar after installation, and adjustment of an installation position is possible. It is simple and improves the construction efficiency of concrete products.

特に、請求項2記載の発明によれば、ボルト頭部を上溝の開口部にボルト頭部を合わせてクレーンを降ろすだけで、長手方向の位置ずれを生じることなく他方のコンクリート部材を据え付けられるので、作業が容易である。   In particular, according to the second aspect of the present invention, the other concrete member can be installed without causing any positional displacement in the longitudinal direction by simply lowering the crane with the bolt head aligned with the opening of the upper groove and the bolt head. Easy to work.

請求項3.6記載の発明によれば、他方のコンクリート部材の長手方向の位置ずれのほかに幅方向の位置ずれも解消でき、より正確な位置に他方のコンクリート部材を据え付けることができる。   According to the invention of claim 3.6, in addition to the positional deviation in the longitudinal direction of the other concrete member, the positional deviation in the width direction can be eliminated, and the other concrete member can be installed at a more accurate position.

請求項4記載の発明によれば、引寄ボルトの締付荷重が緩和されるので、据付治具の過度の荷重が防止される。また、引寄ボルトに特注ボルトを使用する必要がなく、この点でコストが抑制される。   According to the fourth aspect of the present invention, since the tightening load of the drawing bolt is eased, an excessive load of the installation jig is prevented. Further, it is not necessary to use a custom bolt for the drawing bolt, and the cost is suppressed in this respect.

請求項5記載の発明によれば、据付治具に必要荷重が確保されるので、無理なく引寄作業ができ、また台座に緩衝部材を置いて作業が行えるので、引寄ボルトの締結作業が容易に行える。   According to the invention described in claim 5, since the necessary load is secured on the installation jig, the drawing work can be carried out without difficulty, and the work can be carried out by placing the buffer member on the pedestal. Easy to do.

請求項7記載の発明によれば、据付時の衝撃が緩和されるので、据付面の破損が防止される。   According to the seventh aspect of the invention, the impact during installation is mitigated, so that the installation surface is prevented from being damaged.

図1〜図11は、本発明の実施形態に係るコンクリート部材の据付構造を示している。ここでは前記ボックスカルバート1の側壁ブロック6(一方のコンクリート部材)の上端部に、上壁ブロック2の脚部8(他方のコンクリート部材)が据付治具16を用いて据付けられている。このボックスカルバート1は、背景技術で示したものと同一なため、同一の符号を用いて説明する。   1 to 11 show a concrete member installation structure according to an embodiment of the present invention. Here, the leg portion 8 (the other concrete member) of the upper wall block 2 is installed on the upper end portion of the side wall block 6 (one concrete member) of the box culvert 1 using the installation jig 16. Since this box culvert 1 is the same as that shown in the background art, it will be described using the same reference numerals.

なお、図1〜図11では、各ボックスカルバート1の右辺を構成する側壁ブロック3の上端部6に、上壁ブロック2の右側の脚部8が据付けられた状態を示しているが、左辺の前記上端部6と左側の前記脚部8も同様な構造で据付けられている。
(1)側壁ブロック6・脚部8
前記側壁ブロック3の上端部6と前記脚部8とは、図1に示すように、それぞれの外側面19.15に、有底筒状のインサートナット20が対向して埋設されている。具体的には、前記脚部8の外側面16には一つのインサートナット20が埋設されている一方、前記側壁ブロック3の上端部6には上下に二つのインサートナット20が埋設されている。
1 to 11 show a state where the right leg 8 of the upper wall block 2 is installed on the upper end 6 of the side wall block 3 constituting the right side of each box culvert 1. The upper end 6 and the left leg 8 are also installed in the same structure.
(1) Side wall block 6 and leg 8
As shown in FIG. 1, the upper end portion 6 and the leg portion 8 of the side wall block 3 are each embedded with a bottomed cylindrical insert nut 20 facing each other on the outer side surface 19.15. Specifically, one insert nut 20 is embedded in the outer side surface 16 of the leg portion 8, while two insert nuts 20 are embedded in the upper end portion 6 of the side wall block 3 vertically.

この側壁ブロック3のインサートナット20の内周面には、前記据付治具16をセットする送りボルト22の軸部23が締結されている。一方、前記脚部8のインサートナット20には、継ボルト24の軸部25が締結されている。   A shaft portion 23 of a feed bolt 22 for setting the installation jig 16 is fastened to the inner peripheral surface of the insert nut 20 of the side wall block 3. On the other hand, the shaft portion 25 of the joint bolt 24 is fastened to the insert nut 20 of the leg portion 8.

この継ボルト24の頭部には、前記脚部8の外側面19から突出する筒状ナット29が一体形成されている。この筒状ナット29の雌ねじには、チャンネル部材(緩衝部材)18を介して、前記脚部8を前記側壁ブロックの上端部6に引寄せる引寄ボルト17の軸部28が締結されている。この意味で前記継ボルト24と前記引寄ボルト17とで二段ボルト状に構成されている。
(2)据付治具16
前記据付治具16は、図1に示すように、前記前記脚部8の外側面と前記側壁ブロック3の上端部6の外側面に亙って配置されている。具体的には、前記据付治具16は、図2(a)〜(c)に示すように、長方形状に形成されたガイド板30と、このガイド板30の両側端部に立設された補強部37と、前記ガイド板30の背面に溶接された補強板45と、前記各補強部37の外面に取り付けられたグリップ38と、前記ガイド板30の中央部に形成されたボルト挿通用の貫通孔31と、前記両補強部37間に溶接されて前記チャンネル部材18を支持する台座39と、前記ガイド板30の前記側壁ブロック2側の一端部21に半球状に形成された切欠溝32と、前記ガイド板30の前記脚部8側の他端部27に形成されて前記筒状ナット29を誘導案内するガイド溝33とを有している。
A cylindrical nut 29 protruding from the outer side surface 19 of the leg 8 is integrally formed at the head of the joint bolt 24. A shaft portion 28 of an attracting bolt 17 that draws the leg portion 8 toward the upper end portion 6 of the side wall block is fastened to a female screw of the cylindrical nut 29 via a channel member (buffer member) 18. In this sense, the joint bolt 24 and the drawing bolt 17 are formed in a two-stage bolt shape.
(2) Installation jig 16
As shown in FIG. 1, the installation jig 16 is disposed over the outer surface of the leg portion 8 and the outer surface of the upper end portion 6 of the side wall block 3. Specifically, as shown in FIGS. 2 (a) to 2 (c), the installation jig 16 is erected on a rectangular guide plate 30 and on both side ends of the guide plate 30. Reinforcing portion 37, reinforcing plate 45 welded to the back surface of guide plate 30, grip 38 attached to the outer surface of each reinforcing portion 37, and bolt insertion formed at the center of guide plate 30 A through hole 31, a pedestal 39 that is welded between the reinforcing portions 37 to support the channel member 18, and a notch groove 32 that is formed in a hemispherical shape at one end 21 on the side wall block 2 side of the guide plate 30. And a guide groove 33 that is formed in the other end portion 27 of the guide plate 30 on the leg portion 8 side and guides and guides the cylindrical nut 29.

このガイド溝33は、図2(a)(b)に示すように、前記筒状ナット29の位置決め用の下溝34と、前記筒状ナット29の引き送り用の上溝35とを有し、この両者34.35とが上下に連続形成されている。   As shown in FIGS. 2A and 2B, the guide groove 33 has a lower groove 34 for positioning the cylindrical nut 29 and an upper groove 35 for feeding the cylindrical nut 29. Both 34.35 are formed continuously up and down.

このうち前記下溝34は、図1.2に示すように、前記筒状ナット29の外径よりもやや大きな溝幅に設定されているとともに、溝壁が溝底から前記上溝に向かって1度〜5度前後の角度で傾斜している。   Of these, as shown in FIG. 1.2, the lower groove 34 is set to have a groove width slightly larger than the outer diameter of the cylindrical nut 29, and the groove wall extends once from the groove bottom toward the upper groove. Inclined at an angle of ~ 5 degrees.

この前記下溝34と前記貫通孔31と前記切欠溝32とは同一ライン(位置決めライン)上に形成されている。この前記貫通孔31・前記切欠溝32には、それぞれ前記送りボルト22の軸部23が挿通されている。この軸部23は前記インサートナット20に締結され、前記ガイド板30が前記側壁ブロック2の上端部6の外側面15にセットされている。   The lower groove 34, the through hole 31, and the notch groove 32 are formed on the same line (positioning line). The shaft portion 23 of the feed bolt 22 is inserted into the through hole 31 and the notch groove 32, respectively. The shaft portion 23 is fastened to the insert nut 20, and the guide plate 30 is set on the outer surface 15 of the upper end portion 6 of the side wall block 2.

一方、前記上溝35の溝幅は、前記下溝34から開口部27に向かって次第に拡張形成されているとともに、前記上溝35の溝壁36は、3度〜10度前後の角度で傾斜している。これにより前記溝壁36は、図2(a)に示すように、前記筒状ナット29を前記下溝37に向かって案内するスライド面として機能している。   On the other hand, the groove width of the upper groove 35 is gradually expanded from the lower groove 34 toward the opening 27, and the groove wall 36 of the upper groove 35 is inclined at an angle of about 3 to 10 degrees. . Thereby, the groove wall 36 functions as a slide surface for guiding the cylindrical nut 29 toward the lower groove 37 as shown in FIG.

したがって、前記側壁ブロック3の上端部6に前記脚部8を据え付けるときには、図1に示すように、前記筒状ナット29が、前記上溝35の溝壁36に沿ってスライドして前記下溝34に誘導案内され、前記下溝34内に入り込んでいる。   Therefore, when the leg portion 8 is installed on the upper end portion 6 of the side wall block 3, the cylindrical nut 29 slides along the groove wall 36 of the upper groove 35 as shown in FIG. It is guided and guided into the lower groove 34.

なお、前記グリップ38は、図2(a)に示すように、コ字状に形成され、前記各補強部37の外面に両端部が溶接されている。また、前記台座39は、図3に示すように、断面L字状に形成され、図2(c)に示すように、一端部が前記ガイド板30の上面に溶接されている一方、他端部の高さが前記補強部37と同等に設定されている。
(3)チャネル部材18・引寄ボルト17
前記チャンネル部材18は、図4(a)〜(c)に示すように、断面コ字状に形成され、長方形状の上板40と、この上板40の側端に立設された脚板41とを有し、図1に示すように、内部に前記筒状ナット29を収容している。
As shown in FIG. 2A, the grip 38 is formed in a U shape, and both end portions are welded to the outer surface of each reinforcing portion 37. Further, the pedestal 39 is formed in an L-shaped cross section as shown in FIG. 3, and one end thereof is welded to the upper surface of the guide plate 30 as shown in FIG. The height of the part is set equal to that of the reinforcing part 37.
(3) Channel member 18 and drawing bolt 17
As shown in FIGS. 4A to 4C, the channel member 18 is formed in a U-shaped cross section, and has a rectangular upper plate 40 and a leg plate 41 erected on the side end of the upper plate 40. As shown in FIG. 1, the cylindrical nut 29 is accommodated therein.

具体的には、前記上板40の中心部には、前記引寄ボルト17の軸部28が挿通される挿通孔43が形成されている一方、前記両脚板41は、前記下溝34の内周縁上に載置されている。   Specifically, an insertion hole 43 through which the shaft portion 28 of the drawing bolt 17 is inserted is formed at the center of the upper plate 40, while the both leg plates 41 are formed at the inner peripheral edge of the lower groove 34. It is placed on top.

前記引寄ボルト17の軸部28は、図1に示すように、前記挿通孔43に挿通されているとともに、前記筒状ナット29の内周面に締結されている。したがって、前記引寄ボルト17の頭部44を回転させることによって、図5(a)(b)に示すように、前記ボルト17の軸部28が前記筒状ナット29の内周に順次螺入している。これにより前記筒状ナット29が、前記ボルト17の頭部44の方向に引寄せられている。   As shown in FIG. 1, the shaft portion 28 of the drawing bolt 17 is inserted into the insertion hole 43 and fastened to the inner peripheral surface of the cylindrical nut 29. Therefore, by rotating the head portion 44 of the drawing bolt 17, the shaft portion 28 of the bolt 17 is sequentially screwed into the inner periphery of the cylindrical nut 29 as shown in FIGS. is doing. As a result, the cylindrical nut 29 is drawn toward the head 44 of the bolt 17.

なお、ボルトが二段構成なため、引寄ボルト17の軸部28の長さが継ボルト24に補完され、引寄ボルト17に通常ボルトが使用でき、特注ボルトを用意する必要がなく、コストが抑制される。
(3)両ブロック2.3の据付作業
そこで、側壁ブロック3の上端部15に上壁ブロック2の脚部8を据付ける場合には、まず、従来と同様に、施工現場で分割製造された両側壁ブロック3を、所定間隔をおいて設置するとともに、両側壁ブロック3の下端部間に底壁ブロック4をコンクリート打設する。このコンクリート打設後に上壁ブロック2をクレーン5で吊り上げて、側壁ブロック3の上端部6付近に吊り下ろす。
In addition, since the bolt has a two-stage configuration, the length of the shaft portion 28 of the drawing bolt 17 is complemented by the joint bolt 24, and a normal bolt can be used for the drawing bolt 17, and it is not necessary to prepare a custom-made bolt. Is suppressed.
(3) Installation work of both blocks 2.3 Therefore, when installing the leg portion 8 of the upper wall block 2 on the upper end portion 15 of the side wall block 3, first, it was divided and manufactured at the construction site as in the past. The both side wall blocks 3 are installed at a predetermined interval, and the bottom wall block 4 is placed between the lower ends of the both side wall blocks 3. After the concrete placement, the upper wall block 2 is lifted by the crane 5 and hung near the upper end portion 6 of the side wall block 3.

つぎに、脚部8のインサートナット20に継ボルト24の軸部23を締結する一方、筒状ナット29を上溝35の開口部の位置に合わせながら、側壁ブロック3のインサートナット20に送りボルト22の軸部23を螺合して、図6(a)に示すように、据付治具16を側壁ブロック3の外側面15にセットする。   Next, the shaft 23 of the joint bolt 24 is fastened to the insert nut 20 of the leg 8, while the feed nut 22 is fed to the insert nut 20 of the side wall block 3 while aligning the cylindrical nut 29 with the position of the opening of the upper groove 35. 6 are screwed together, and the installation jig 16 is set on the outer surface 15 of the side wall block 3 as shown in FIG.

この上溝35の溝径は、開口部に向かって拡張しているため、位置決めが容易で、作業性がよい。また、据付治具16には、グリップ38が取り付けられているので、側壁ブロック3に取り付けることが容易である。   Since the groove diameter of the upper groove 35 is expanded toward the opening, positioning is easy and workability is good. Moreover, since the grip 38 is attached to the installation jig 16, it is easy to attach it to the side wall block 3.

このとき両ブロック2.3間には、図6(a)に示すように、矢印P方向(施工方向・長手方向)の位置ずれが生じることが多いが、上壁ブロック2を吊り下げていくと、筒状ナット26が上溝35の溝壁36に沿って筒状ナット29が誘導案内されつつ、図6(b)に示すように、筒状ナット29が下溝34内に入り込み、前記矢印P方向の位置ずれが自動的に解消される。   At this time, as shown in FIG. 6A, there is often a positional shift in the direction of arrow P (construction direction / longitudinal direction) between both blocks 2.3, but the upper wall block 2 is suspended. The cylindrical nut 29 is guided and guided along the groove wall 36 of the upper groove 35 while the cylindrical nut 29 enters the lower groove 34 as shown in FIG. Directional misalignment is automatically resolved.

したがって、脚部8の前記矢印P方向の位置ずれは、従来のようにバール10を用いて修正するまでもなく、上壁ブロック3をクレーン5で吊り降ろすだけで簡単に解消される。   Therefore, the positional deviation of the leg portion 8 in the direction of the arrow P can be easily eliminated by simply hanging the upper wall block 3 with the crane 5 without having to be corrected using the bar 10 as in the prior art.

これによりバール10で両者6.8の据付面6a.8aを損傷させることなく、前記矢印P方向の位置ずれを正確に修正でき、この点で作業工程が簡素化され、かつ施工コストも抑制される。   As a result, the installation surface 6a. The position shift in the direction of the arrow P can be corrected accurately without damaging 8a. In this respect, the work process is simplified and the construction cost is also suppressed.

また、両ブロック2.3間に幅方向の位置ずれが生じている場合には、クレーン5を止めて修正作業を行う。すなわち、両ブロック6.8間に、図7の矢印Q方向の位置ずれが生じている場合には、送りボルト22の軸部23をインサートナット20に締め付ける。これにより脚部8が、図7(b)に示すように、脚部8がガイド板30に押し戻され、前記矢印P方向の位置ずれが解消される。(図7〜図11では、グリップ38・台座39・補強板45は省略している。)。   Further, when there is a positional deviation in the width direction between both blocks 2.3, the crane 5 is stopped and the correction work is performed. That is, when there is a positional shift in the direction of arrow Q in FIG. 7 between both blocks 6.8, the shaft portion 23 of the feed bolt 22 is fastened to the insert nut 20. As a result, the leg portion 8 is pushed back to the guide plate 30 as shown in FIG. 7B, and the positional deviation in the arrow P direction is eliminated. (In FIGS. 7-11, the grip 38, the base 39, and the reinforcement board 45 are abbreviate | omitted).

一方、クレーン5で上壁ブロック2を吊り上げたときに、図8に示すように、上壁ブロック2が内方向に撓み、これにより両ブロック6.8間に、図9(b)の矢印R方向(幅方向)の位置ずれが生じることが多い。   On the other hand, when the upper wall block 2 is lifted by the crane 5, as shown in FIG. 8, the upper wall block 2 bends inward, so that the arrow R in FIG. In many cases, displacement in the direction (width direction) occurs.

この場合には、図10(a)(b)に示すように、チャンネル部材18の両脚板41を下溝34の内周縁に当てて、引寄ボルト17の軸部28を上板40の挿通孔43に挿通する。   In this case, as shown in FIGS. 10A and 10B, both leg plates 41 of the channel member 18 are brought into contact with the inner peripheral edge of the lower groove 34, and the shaft portion 28 of the pulling bolt 17 is inserted into the insertion hole of the upper plate 40. 43 is inserted.

この引寄ボルト17の頭部44を回転させれば、軸部28が筒状ナット29の内周面に順次螺入するため、継ボルト24が引寄ボルト17の頭部44の方向に引寄せられ、これに追従して上壁ブロック2の脚部8が開脚し、図11(a)(b)に示すように、前記矢印R方向の位置ずれが解消される。したがって、上壁ブロック2の肉厚量や鉄筋本数などを増加させることなく、前記矢印Q方向の位置ずれが解消でき、製造コストが低減される。   When the head portion 44 of the drawing bolt 17 is rotated, the shaft portion 28 is sequentially screwed into the inner peripheral surface of the cylindrical nut 29, so that the joint bolt 24 is pulled in the direction of the head portion 44 of the drawing bolt 17. Following this, the leg portion 8 of the upper wall block 2 opens, and the positional deviation in the arrow R direction is eliminated as shown in FIGS. 11 (a) and 11 (b). Therefore, the positional deviation in the arrow Q direction can be eliminated without increasing the thickness of the upper wall block 2 or the number of reinforcing bars, and the manufacturing cost is reduced.

この引寄ボルト17の頭部44の締付荷重は、チャンネル部材18によって緩衝されているため、ガイド板30への過度の荷重が防止される。このガイド板30は、補強部37と補強板45とで補強されているため、必要強度が確保され、安全性にも支障がない。   Since the tightening load of the head 44 of the drawing bolt 17 is buffered by the channel member 18, an excessive load on the guide plate 30 is prevented. Since the guide plate 30 is reinforced by the reinforcing portion 37 and the reinforcing plate 45, the required strength is ensured and the safety is not hindered.

そして、前記矢印P.Q.R方向の位置ずれを解消した後に、脚部8を側壁ブロック3の上端部6に接合するまで吊り下ろし、これにより筒状ナット26が下溝34の溝壁に案内され、上壁ブロック2の脚部8が側壁ブロック3の上端部6の正確な位置に据え付けられる。   The arrow P.P. Q. After eliminating the displacement in the R direction, the leg portion 8 is suspended until it is joined to the upper end portion 6 of the side wall block 3, whereby the cylindrical nut 26 is guided to the groove wall of the lower groove 34, and the leg of the upper wall block 2 is The part 8 is installed at the exact position of the upper end 6 of the side wall block 3.

したがって、熟練工などを要せずして、簡単かつ正確に上壁ブロック2の脚部8を側壁ブロック3の上端部6に据え付けることができ、この点で精度の高いボックスカルバート1が構築できる。
(2)連結の態様
図12は、据付後のコンクリート部材の連結状態を示している。ここでは前記側壁ブロック3の上端部6に前記上壁ブロック2の脚部8を据付けた後に、ボルト17.送りボルト22.継手ボルトを緩めてガイド板30を、両者6.8の外側面15.19から取外すとともに、連結部材60によって両者6.8が上下に連結されている。
Accordingly, the leg portion 8 of the upper wall block 2 can be easily and accurately installed on the upper end portion 6 of the side wall block 3 without requiring a skilled worker, and in this respect, a highly accurate box culvert 1 can be constructed.
(2) Aspect of connection FIG. 12 shows a connected state of the concrete member after installation. Here, after installing the leg portion 8 of the upper wall block 2 on the upper end portion 6 of the side wall block 3, the bolts 17. Feed bolt 22. The joint bolts are loosened to remove the guide plate 30 from the outer side surface 15.19 of both 6.8, and the both 6.8 are connected vertically by the connecting member 60.

この図12でも、各ボックスカルバート1の右辺を構成する側壁ブロック3の上端部6に、上壁ブロック2の右側の脚部8が連結された状態を示しているが、左辺の前記上端部6と左側の前記脚部8も同様な構造で連結されている。   FIG. 12 also shows a state in which the right leg 8 of the upper wall block 2 is connected to the upper end 6 of the side wall block 3 constituting the right side of each box culvert 1, but the upper end 6 on the left side is shown. The left leg 8 is also connected with the same structure.

前記連結部材60は、図12(a)(b)に示すように、上下端部に雄ねじが形成された連結ボルト50と、この連結ボルト50の上端部が挿通されるインサート器具51と、前記連結ボルト50の上端部に締結される連結ナット59とを主体に構成されている。   As shown in FIGS. 12 (a) and 12 (b), the connecting member 60 includes a connecting bolt 50 having male screws formed at the upper and lower ends, an insert device 51 through which the upper end of the connecting bolt 50 is inserted, The main part is a connection nut 59 fastened to the upper end of the connection bolt 50.

前記インサート器具51は、図12(a)に示すように、縦断面凸状に形成され、中央部には上下方向に前記連結ボルト50の上端部52が挿通される挿通孔55が形成されている一方、両端部には上下方向に前記脚部8内の鉄筋56が挿通される挿通孔57が形成され、前記脚部8の据付面8aの長手方向の複数箇所に埋設されている。   As shown in FIG. 12 (a), the insert instrument 51 is formed in a convex shape in the longitudinal section, and an insertion hole 55 through which the upper end portion 52 of the connecting bolt 50 is inserted in the vertical direction is formed in the center portion. On the other hand, insertion holes 57 through which the reinforcing bars 56 in the leg portions 8 are inserted are formed in both end portions in the vertical direction, and are embedded in a plurality of locations in the longitudinal direction of the mounting surface 8 a of the leg portions 8.

前記連結ボルト50は、上下端部52.53の外径が異なる大きさに形成され、下端部53が、前記側壁ブロック3の据付面6aの前記インサート器具51に対応した位置に埋設されている一方、上端部52の外径は前記挿通孔57の内径よりも小さく設定されている。   The connecting bolt 50 is formed in a size in which the outer diameters of the upper and lower end portions 52.53 are different, and the lower end portion 53 is embedded at a position corresponding to the insert device 51 on the installation surface 6a of the side wall block 3. On the other hand, the outer diameter of the upper end portion 52 is set smaller than the inner diameter of the insertion hole 57.

また、前記連結ボルト50の下端部53は、前記側壁ブロック3の上端部52のインサートナット54の内周の雌ねじに締結されている一方、前記上端部52は、前記上端部52の端面から突出している。   The lower end 53 of the connecting bolt 50 is fastened to the internal thread of the insert nut 54 of the upper end 52 of the side wall block 3, while the upper end 52 protrudes from the end surface of the upper end 52. ing.

そして、前記連結ボルト50の上端部52には、前記脚部8の外側面19に形成された連結作業穴58内で連結ナット59が締結されている。この連結作業穴58は、前記各インサート器具51に対応して複数個が形成されているとともに、各連結作業穴58間に前記インサートナット20が埋設されている。   A connecting nut 59 is fastened to the upper end 52 of the connecting bolt 50 in a connecting work hole 58 formed in the outer side surface 19 of the leg 8. A plurality of connection work holes 58 are formed corresponding to the respective insert instruments 51, and the insert nuts 20 are embedded between the connection work holes 58.

したがって、各連結ボルト50の上端部52を、各インサート器具51の挿通孔55に案内しつつ、各連結作業用孔58内で連結ナット59を締結して、上壁ブロック2の脚部8と側壁ブロック3の上端部6とが連結されている。この意味で、ガイドピン7・ガイドピン用孔9の役割と同時に両者8.9の連結の役割が兼用される。   Therefore, the upper end portion 52 of each connection bolt 50 is guided to the insertion hole 55 of each insert tool 51, and the connection nut 59 is fastened in each connection operation hole 58, and the leg portion 8 of the upper wall block 2 is connected. The upper end portion 6 of the side wall block 3 is connected. In this sense, both the role of the guide pin 7 and the guide pin hole 9 and the connecting role of both 8.9 are shared.

これによりガイドピン7・ガイドピン用孔9を用いることなく、両者8.9の連結作業が行え、作業工程が簡素化される。このとき連結ボルト50の上端部52の外径は、挿通孔55の内径よりも小さく設定されているため、位置決めが容易であって、作業性も向上する。
(3)その他
本発明は、上記実施形態に限定されるものではなく、例えば前記両側壁ブロックの上端面6aに、ゴム材などの緩衝材を設けることもできる。この場合には、前記脚部8を据え付けるときの衝撃が緩和され、両面6a.8aの損傷が防止される。また、前記脚部8を前記側壁ブロック3の上端部6に連結した後には前記脚部8の荷重が緩和され、この点でも両面6a.8aの損傷が防止される。
Thus, the connecting operation of both 8.9 can be performed without using the guide pin 7 and the guide pin hole 9, thereby simplifying the operation process. At this time, since the outer diameter of the upper end portion 52 of the connecting bolt 50 is set smaller than the inner diameter of the insertion hole 55, positioning is easy and workability is improved.
(3) Others The present invention is not limited to the above embodiment. For example, a cushioning material such as a rubber material may be provided on the upper end surface 6a of the both side wall blocks. In this case, the impact when the legs 8 are installed is alleviated, and both sides 6a. Damage to 8a is prevented. Further, after the leg portion 8 is connected to the upper end portion 6 of the side wall block 3, the load on the leg portion 8 is relieved. Damage to 8a is prevented.

なお、本発明は、前記ジョイント式ボックスカルバート1のほか、他のコンクリート製品、例えばL字状の擁壁ブロックなどの据付にも使用することもできる。   In addition to the joint box culvert 1, the present invention can also be used for installation of other concrete products such as an L-shaped retaining wall block.

本発明の実施形態の据付構造を示す縦断面図。The longitudinal cross-sectional view which shows the installation structure of embodiment of this invention. (a)は据付治具の正面図、(b)は据付治具の平面図、(c)は(a)のA−A線断面図。(A) is a front view of an installation jig, (b) is a plan view of the installation jig, and (c) is a cross-sectional view taken along line AA of (a). (a)は台座の側面図、(b)は台座の背面図、(c)は台座の底面図。(A) is a side view of a pedestal, (b) is a rear view of the pedestal, and (c) is a bottom view of the pedestal. (a)はチャンネル部材の平面図、(b)はチャンネル部材の底面図、(c)はチャンネル部材の側面図。(A) is a top view of a channel member, (b) is a bottom view of a channel member, (c) is a side view of a channel member. (a)は引寄ボルトの軸部が筒状ナットに螺入前の横断面図、(b)は引寄ボルトの軸部が筒状ナットに螺入後の横断面図。(A) is a cross-sectional view before the shaft portion of the drawing bolt is screwed into the cylindrical nut, and (b) is a cross-sectional view after the shaft portion of the drawing bolt is screwed into the cylindrical nut. (a)はガイド溝の開口部に筒状ナットを合わせた状態を示す側面図、(b)は脚部を吊り下ろした状態を示す側面図。(A) is a side view which shows the state which fitted the cylindrical nut to the opening part of the guide groove, (b) is a side view which shows the state which suspended the leg part. 幅方向(矢印Q方向)の位置ずれが生じた状態を示す縦断面図。The longitudinal cross-sectional view which shows the state which the position shift of the width direction (arrow Q direction) produced. (a)は上壁ブロックをクレーンで吊り上げる前の正面図、(b)は上壁ブロックが撓んだ状態を示す正面図。(A) is a front view before lifting an upper wall block with a crane, (b) is a front view which shows the state which the upper wall block bent. (a)は幅方向(矢印R方向)の位置ずれが生じた状態を示す側面図、(b)は(a)のB−B線断面図。(A) is a side view which shows the state which the position shift of the width direction (arrow R direction) produced, (b) is the BB sectional drawing of (a). (a)はチャンネル部材を当てて引寄ボルトを筒状ナットに螺合した状態を示す側面図、(b)は(a)のC−C線断面図。(A) is a side view which shows the state which applied the channel member and screwed the drawing bolt in the cylindrical nut, (b) is CC sectional view taken on the line of (a). (a)は脚部の引寄完了後の状態を示す側面図、(b)は(a)のD−D線断面図。(A) is a side view which shows the state after drawing of a leg part, (b) is the DD sectional view taken on the line of (a). (a)は、コンクリート部材の連結状態を示す縦断面図、(b)は、連結部材の平面図。(A) is a longitudinal cross-sectional view which shows the connection state of a concrete member, (b) is a top view of a connection member. ボックスカルバートの斜視図。The perspective view of a box culvert. 上壁ブロックをクレーンで吊るした状態を示す斜視図。The perspective view which shows the state which suspended the upper wall block with the crane. 上壁ブロックと側壁ブロックの接合部の拡大図。The enlarged view of the junction part of an upper wall block and a side wall block. バールを用いて据付位置の調整する状態を示す側面図。The side view which shows the state which adjusts an installation position using a bar.

符号の説明Explanation of symbols

1…ボックスカルバート
2…上壁ブロック(一方のコンクリート製品)
3…側壁ブロック(他方のコンクリート製品)
16…据付治具
17…引寄ボルト
18…チャンネル部材(緩衝部材)
20…ナット
21…ガイド板の一端部(据付治具の一端部)
22…送りボルト
23…送りボルトの軸部
24…継ボルト
25…継ボルトの軸部
27…ガイド板の他端部(据付治具の他端部)
28…引寄ボルトの軸部
29…筒状ナット
33…ガイド溝
34…下溝
35…上溝
36…上溝の溝壁
37…補強部
39…台座
1 ... Box culvert 2 ... Upper wall block (one concrete product)
3. Side wall block (the other concrete product)
16 ... Installation jig 17 ... Drawing bolt 18 ... Channel member (buffer member)
20 ... Nut 21 ... One end of the guide plate (one end of the installation jig)
22 ... Feed bolt 23 ... Feed bolt shaft 24 ... Joint bolt 25 ... Joint bolt shaft 27 ... Other end of the guide plate (the other end of the installation jig)
28 ... Shaft part of the drawing bolt 29 ... Cylindrical nut 33 ... Guide groove 34 ... Lower groove 35 ... Upper groove 36 ... Groove wall of upper groove 37 ... Reinforcement part 39 ... Base

Claims (7)

分割製造されたコンクリート製品を施工現場で構築するにあたって、一方のコンクリート部材に他方のコンクリート部材を据え付けるコンクリート部材の据付構造であって、
一方の前記コンクリート部材の側面に設置された据付治具に、他方のコンクリート部材の側面の送り部材を案内するガイド溝を設け、
このガイド溝が上方向に向かって開口し、溝底側の下溝と該下溝から開口部に向かって溝幅が拡張している上溝とを備え、
他方の前記コンクリート部材を一方の前記コンクリート部材に向かって降下させたときに前記送り部材を前記ガイド溝の溝壁に沿って上溝から下溝に案内して、
一方の前記コンクリート部材上に他方の前記コンクリート部材を据え付けることを特徴とするコンクリート部材の据付け構造。
When constructing a concrete product that has been divided and manufactured at a construction site, it is a concrete member installation structure in which the other concrete member is installed on one concrete member,
In the installation jig installed on the side surface of one of the concrete members, a guide groove for guiding the feeding member on the side surface of the other concrete member is provided,
The guide groove opens upward, and includes a lower groove on the groove bottom side and an upper groove whose groove width extends from the lower groove toward the opening,
When the other concrete member is lowered toward the one concrete member, the feeding member is guided from the upper groove to the lower groove along the groove wall of the guide groove,
An installation structure for a concrete member, wherein the other concrete member is installed on one concrete member .
前記送り部材は、一方の前記コンクリート部材の側面に埋設されたナットにボルトの軸部を締結してなることを特徴とする請求項1記載のコンクリート部材の据付構造。 The feed member is installed structural concrete member according to claim 1, wherein the fastening to a benzalkonium the shaft portion of the bolt on one of the nut embedded in the side surface of the concrete member. 前記ボルトは、二段ボルトであって、前記ナットに軸部が締結される継ボルトと、この継ボルトの頭部の筒状ナットに締結される引寄ボルトとにより構成され、
前記筒状ナットを前記上溝の溝壁に沿って下溝内に案内して、前記筒状ナットに前記引寄ボルトの軸部が順次螺入させて、
前記他方のコンクリート部材が一方の前記コンクリート部材に引寄せられることを特徴とする請求項2記載のコンクリート部材の据付構造。
The bolt is a two-stage bolt, and includes a joint bolt with a shaft portion fastened to the nut, and a pulling bolt fastened to a cylindrical nut at the head of the joint bolt,
The cylindrical nut is guided into the lower groove along the groove wall of the upper groove, and the shaft portion of the drawing bolt is sequentially screwed into the cylindrical nut.
3. The concrete member installation structure according to claim 2, wherein the other concrete member is attracted to the one concrete member.
前記下溝の内周縁と前記引寄ボルトの頭部との間に、前記引寄ボルトの締付圧力を緩和する緩衝部材を介装したことを特徴とする請求項3記載のコンクリート部材の据付構造。   4. The concrete member installation structure according to claim 3, wherein a buffer member for relaxing a tightening pressure of the drawing bolt is interposed between an inner peripheral edge of the lower groove and a head of the drawing bolt. . 前記据付治具の両側端部に補強部を立設するとともに、この補強部間に前記緩衝部材を支持する台座を設けたことを特徴とする請求項4記載のコンクリート部材の据付構造。   5. The concrete member installation structure according to claim 4, wherein a reinforcing portion is erected at both end portions of the installation jig, and a pedestal for supporting the buffer member is provided between the reinforcement portions. 一方の前記コンクリート部材の側面に埋設されたナットに、前記据付治具の他端部を介して、送りボルトの軸部を締結することによって、
前記据付治具が他方の前記コンクリート部材を押し戻すことを特徴とする請求項2〜5のいずれか記載のコンクリート部材の据付構造。
By fastening the shaft portion of the feed bolt to the nut embedded in the side surface of one of the concrete members via the other end portion of the installation jig,
6. The concrete member installation structure according to any one of claims 2 to 5, wherein the installation jig pushes back the other concrete member.
前記両コンクリート部材のいずれかの据付面に緩衝材を設けたことを特徴とする請求項1〜6のいずれか記載のコンクリート部材の据付構造。   The concrete member installation structure according to any one of claims 1 to 6, wherein a cushioning material is provided on any installation surface of the both concrete members.
JP2006295205A 2006-10-31 2006-10-31 Concrete member installation structure Active JP4986574B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006295205A JP4986574B2 (en) 2006-10-31 2006-10-31 Concrete member installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006295205A JP4986574B2 (en) 2006-10-31 2006-10-31 Concrete member installation structure

Publications (2)

Publication Number Publication Date
JP2008111281A JP2008111281A (en) 2008-05-15
JP4986574B2 true JP4986574B2 (en) 2012-07-25

Family

ID=39443944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006295205A Active JP4986574B2 (en) 2006-10-31 2006-10-31 Concrete member installation structure

Country Status (1)

Country Link
JP (1) JP4986574B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102963847A (en) * 2012-11-18 2013-03-13 苏州蓝王机床工具科技有限公司 Quick disassembling and assembling mechanism of working platform of overhead working truck
CN104295107A (en) * 2014-10-13 2015-01-21 深圳万科前田建筑技术有限公司 Precast concrete member position adjustment device and method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6445311B2 (en) * 2014-11-21 2018-12-26 株式会社ホクコン Box culvert and its construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6115146Y2 (en) * 1981-05-19 1986-05-12
JPH02101235A (en) * 1988-10-06 1990-04-13 Nejino Mizutani:Kk Drawing method for on-site construction of concrete guide groove and device therefor
JPH0387598U (en) * 1989-12-19 1991-09-05
JP2878267B1 (en) * 1998-03-31 1999-04-05 植村技研工業株式会社 Concrete box for underground structures
JP2000018227A (en) * 1998-07-03 2000-01-18 Hazama Gumi Ltd Double bolt and position adjustment tool
JP4384804B2 (en) * 2000-11-29 2009-12-16 三井ホーム株式会社 Tightened structure in housing and its hardware
JP2003082749A (en) * 2001-09-10 2003-03-19 Matsuoka Concrete Industry Co Ltd Concrete block for gutter and connecting method of concrete block for gutter
JP4835905B2 (en) * 2005-03-22 2011-12-14 有限会社 創友 Flexible box culvert

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102963847A (en) * 2012-11-18 2013-03-13 苏州蓝王机床工具科技有限公司 Quick disassembling and assembling mechanism of working platform of overhead working truck
CN104295107A (en) * 2014-10-13 2015-01-21 深圳万科前田建筑技术有限公司 Precast concrete member position adjustment device and method

Also Published As

Publication number Publication date
JP2008111281A (en) 2008-05-15

Similar Documents

Publication Publication Date Title
KR101514395B1 (en) Supporting device of slab form
CN210598199U (en) Accurate quick PC post mounting tool
KR20200109559A (en) Bracket for fixing exterior pannel
EP1621678A1 (en) Screw jack for structures for easily adjusting its angle
JP4986574B2 (en) Concrete member installation structure
JP4449876B2 (en) Large-section tunnel structure and its construction method
CN209099788U (en) Positioning device and prefabricated component mounting structure
JP6340645B1 (en) Splice plate holding jig
JP2016069837A (en) Engagement auxiliary jig and fitting method for joint part
KR101722021B1 (en) System pillar form
KR20130129151A (en) Clamp of system support for construction
US12203576B1 (en) Interlocking conduit holder and spacer
KR200344123Y1 (en) Strut Preloading Jack and Structure for Supporting Strut using thereof
KR20210078119A (en) Supporter for installating horizontal member of supporting system
KR20230136576A (en) Combined guide unit for sheet pile construction and construction method of sheet pile using it.
KR200275103Y1 (en) fixing structure of slab support pipe for building
JP4449875B2 (en) Large-section tunnel structure and its construction method
JP2012241473A (en) Support material for temporary scaffold plate and method of installing temporary scaffold using the same
JP6607476B1 (en) Tightening device
JP4697873B2 (en) Connector
KR200386882Y1 (en) A supporter fixing unit for mould
JP3137986U (en) Water thread retainer
JP2017227016A (en) Beam main bar moving jig
KR101360361B1 (en) Supporter for mold
JP3605580B2 (en) Support bracket

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090807

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110914

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111129

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120417

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120424

R150 Certificate of patent or registration of utility model

Ref document number: 4986574

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150511

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250