JP5043750B2 - Reinforced embankment method - Google Patents
[go: Go Back, main page]

JP5043750B2 - Reinforced embankment method - Google Patents

Reinforced embankment method Download PDF

Info

Publication number
JP5043750B2
JP5043750B2 JP2008136526A JP2008136526A JP5043750B2 JP 5043750 B2 JP5043750 B2 JP 5043750B2 JP 2008136526 A JP2008136526 A JP 2008136526A JP 2008136526 A JP2008136526 A JP 2008136526A JP 5043750 B2 JP5043750 B2 JP 5043750B2
Authority
JP
Japan
Prior art keywords
embankment
wall
sheet material
temporary
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008136526A
Other languages
Japanese (ja)
Other versions
JP2009281104A (en
Inventor
横田善弘
村田富彦
河合寿
吉田浩一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Kosen Co Ltd
Original Assignee
Maeda Kosen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Kosen Co Ltd filed Critical Maeda Kosen Co Ltd
Priority to JP2008136526A priority Critical patent/JP5043750B2/en
Publication of JP2009281104A publication Critical patent/JP2009281104A/en
Application granted granted Critical
Publication of JP5043750B2 publication Critical patent/JP5043750B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、斜面安定のために、既存斜面に沿って盛土壁を構築するする補強盛土工法に関するものであり、特に一旦、応急処置として暫定盛土構造体を構築し、その後に長期的構造物としての補強盛土壁を構築することも可能な補強盛土工法に関するものである。   The present invention relates to a reinforced embankment method for constructing a bank wall along an existing slope in order to stabilize the slope, and in particular, temporarily constructs a temporary bank structure as an emergency measure, and then as a long-term structure. The present invention relates to a reinforced embankment method capable of constructing a reinforced embankment wall.

地震による被災で、道路下の斜面が崩れ落ち、道路が通行禁止になることがある。
道路の通行禁止は、近隣住民らに多大な影響を与えるため、出来るだけ早期に復旧することが望ましい。
崩落した斜面の早期の復旧を図るには、土嚢を使用して、積み上げた土嚢と崩落した斜面との間に盛土を施して、崩落斜面を補強する施工が採用可能である。
しかしながら、土嚢としての材料はポリプロピレンなどの合成樹脂を使用した織布が多く、この素材は天候による劣化が大きく、長期の補強壁としては適さない。
また、斜面の維持管理として雑草などの除去を行う際、斜面に生えた雑草に火を点けて焼き払うという手段が採用される場合もあり、その火力によって土嚢が著しく損傷するというようなことがあり、長期的な補強壁の表面に位置させるのは不適である。
Damage caused by an earthquake may cause the slope under the road to collapse and the road to be banned.
Prohibition of road traffic will have a great impact on neighboring residents, so it is desirable to restore it as soon as possible.
In order to restore the collapsed slope at an early stage, it is possible to use sandbags to apply embankment between the piled sandbags and the collapsed slope to reinforce the collapsed slope.
However, the material for the sandbag is often a woven fabric using a synthetic resin such as polypropylene. This material is greatly deteriorated by the weather and is not suitable as a long-term reinforcing wall.
Also, when weeds are removed for slope maintenance, there are cases where weeds are burned by burning the weeds on the slopes, and the sandbags may be significantly damaged by the thermal power. It is unsuitable to be placed on the surface of a long-term reinforcing wall.

他方、特開2004−218263号公報に記載したような補強盛土工法が開発されている。
同公報に記載された補強盛土工法は、既存斜面から離れて断面L形の壁面材を設置し、この壁面材の背後に盛土を施し、順次盛土の上に壁面材の設置、盛土を繰り返して新たな盛土壁を構築するものである。
壁面材が盛土壁の表面に位置し、対候性は良好で、壁面も美観的に優れている補強盛土壁となる。
しかしながらこのような補強盛土工法の場合の課題は、多数の小型壁面材を人力によって設置するため、施工に手間がかかり、その施工期間が土嚢施工と比較して長期となることである。
したがって、このような壁面材を使用した補強盛土工法を早期の復旧工事に採用することは難しかった。
また、壁面材を所定の高さ毎に設置する必要があるため、降雨などで土工が止まると、壁面材の設置ができなかった。
更に、壁面材付近は小型の転圧機でしか締め固めができなかった。それによって壁面付近は転圧不足となることがあり、盛土完成後に盛土の変形によって、壁面に変形が生じることがあった。
特開2004−218263号公報
On the other hand, a reinforcing embankment method as described in JP-A-2004-218263 has been developed.
The reinforcement embankment method described in the publication is to install a wall material with an L-shaped cross-section away from the existing slope, apply the embankment behind this wall material, and sequentially install the wall material on the embankment and repeat the embankment. A new embankment wall will be constructed.
The wall material is located on the surface of the embankment wall, the weather resistance is good, and the wall surface is also a reinforced embankment wall that is aesthetically pleasing.
However, the problem in the case of such a reinforced embankment method is that a large number of small wall materials are manually installed, so that the construction takes time and the construction period is longer than the sandbag construction.
Therefore, it has been difficult to adopt the reinforced embankment method using such wall materials for early restoration work.
Moreover, since it is necessary to install the wall material at every predetermined height, the wall material could not be installed when the earthwork stopped due to rain or the like.
Furthermore, the vicinity of the wall material could only be compacted with a small compactor. As a result, there may be insufficient rolling pressure near the wall surface, and the wall surface may be deformed by the deformation of the embankment after the embankment is completed.
JP 2004-218263 A

解決しようとする課題は、早期の復旧を可能とする暫定盛土構造体を構築することと、その後、長期的に安定化する補強盛土壁を構築可能な補強盛土工法を提供することである。   The problem to be solved is to construct a temporary embankment structure that enables early restoration and to provide a reinforced embankment method that can construct a reinforced embankment wall that is stabilized in the long term.

本発明にかかる補強盛土工法は、既存斜面から適宜間隔離隔した暫定盛土構造体の予定位置に向って、控えシート材を敷設し、
同じく斜面から適宜間隔離隔して中詰材を詰めた透水性の袋状の拘束体を設置し、
前記控えシート材の端部を、拘束体の下側から暫定盛土構造体の表面側へ廻しかけ、
上側で既存斜面側へ折り返して伸ばし、
前記控えシート材の折り返し部分の上に盛土し、
前記暫定盛土構造体から適宜間隔離隔して補強盛土壁となる壁面材を配置し、
前記控えシート材の折り返し部分を取外して補強盛土壁側へ伸ばし、前記壁面材と連結し、
前記壁面材と暫定補強斜面との間に盛土するものである。
また、本発明にかかる他の補強盛土工法は、暫定盛土構造体を所定高さまで盛土して暫定盛土構造体を構築し、
その後、前記暫定盛土構造体から適宜間隔離隔して補強盛土壁となる壁面材を配置し、
前記控えシート材の折り返し部分を取外して補強盛土壁側へ伸ばし、前記壁面材と連結し、
前記壁面材と暫定盛土構造体との間に盛土する工程を繰り返すものである。
また、本発明にかかる他の補強盛土工法は、拘束体として、樹脂繊維から成る方形箱形で大型の透水性の袋状部材を使用することを特徴とするものである。
また、本発明にかかる他の補強盛土工法は、控えシート材としてジオグリッドを使用したことを特徴とするものである。
更に、本発明にかかる他の補強盛土工法は、壁面材として、断面がL字形となるよう屈曲した鋼製網状材を使用したことを特徴とするものである。
Reinforcing embankment method according to the present invention, laying a copy sheet material toward the planned position of the temporary embankment structure that is appropriately separated from the existing slope,
Similarly, install a water-permeable bag-like restraint filled with filling material at an appropriate distance from the slope,
The end of the sheet material is turned from the lower side of the restraint body to the surface side of the temporary embankment structure,
Fold it over to the existing slope side on the upper side,
Embedding on the folded portion of the recording sheet material,
A wall material to be a reinforcing embankment wall is appropriately separated from the temporary embankment structure,
Remove the folded portion of the backing sheet material and extend it to the reinforcing embankment wall side, and connect with the wall surface material,
Embankment is performed between the wall material and the temporary reinforcing slope.
In addition, another reinforcing embankment method according to the present invention is to construct a temporary embankment structure by embedding the temporary embankment structure to a predetermined height,
Thereafter, a wall material to be a reinforcing embankment wall is appropriately spaced from the provisional embankment structure,
Remove the folded portion of the backing sheet material and extend it to the reinforcing embankment wall side, and connect with the wall surface material,
The step of embedding between the wall material and the temporary embankment structure is repeated.
Further, another reinforcing embankment method according to the present invention is characterized in that a rectangular box-shaped large-sized water-permeable bag-shaped member made of resin fibers is used as a restraint.
Another reinforcing embankment method according to the present invention is characterized in that a geogrid is used as a recording sheet material.
Furthermore, another reinforcing embankment method according to the present invention is characterized in that a steel net-like material bent so as to have an L-shaped cross section is used as a wall surface material.

本発明は以上のような構成を有し、次のうち少なくともいずれか一つの効果を達成するものである。
<a>中詰材を詰めた拘束体を使用して暫定盛土構造体を構築して、早急な斜面の復旧を可能としたため、応急施工として斜面を補強し、道路通行などの早期の復旧を可能とする。
<b>暫定盛土構造体を所定高さまで構築してしまい、その後、壁面材と暫定盛土構造体との間に盛土する工程を繰り返すことで、より緊急性を要する施工に対応できる。
<c>既存斜面から暫定盛土構造体の予定位置にかけて敷いた控えシートを、拘束体の下から暫定盛土構造体表側に廻しかけ、更に既存斜面側に折り返して盛土するため、控えシートが拘束体をアンカーのように定着して、拘束体が土圧を受けるため、強度の大きな暫定盛土構造体となる。
<d>控えシート材を拘束体に廻しかけるため、拘束体の転倒防止、拘束体形状保持、盛土部分のすべり崩壊を抑制する効果を得ることができる。
<e>控えシートの折り返し部分を取外し、補強盛土壁側へ伸ばして壁面材と連結するため、盛土と拘束体とが一体構造体となって壁面材を定着するため、強度の大きな補強盛土壁となる。
<f>前記したように、切り離したシート部分は、壁面材との連結機能を果たすとともに、盛土の補強機能を果たす。また、盛土中に埋設して残置した部分は、暫定盛土構造体の盛土部分の滑り崩落の抑制機能を依然果たすことになる。
<g>透水性を有する拘束体を使用するため、地山側からの水が拘束体を透過して、排出可能である。
<h>大型の箱形の拘束体を使用するため、施工効率が良好で、自立安定性が高く、施工がやり易い。
<i>袋状の拘束体内に予め土砂などの中詰材料を詰めておくことで、現場に運び込んで即施工に使用できる。
<j>壁面近くまで充分な締め固めが可能であり、壁面の変形が生じ難い。
<k>断面L字形の鋼製網状材の壁面材を使用することにより、植生も可能であって、対候性の高い、壁面として景観の良好な補強壁とすることができる。
The present invention has the above-described configuration and achieves at least one of the following effects.
<a> A temporary embankment structure was constructed using a restraint filled with filling material to enable quick restoration of the slope. Therefore, the slope was reinforced as an emergency work, and early restoration such as road traffic was made. Make it possible.
<B> The temporary embankment structure is built up to a predetermined height, and then the step of embedding between the wall material and the temporary embankment structure can be repeated to cope with construction that requires more urgency.
<C> Since the reserve sheet laid from the existing slope to the planned position of the temporary embankment structure is turned to the front side of the temporary embankment structure from the bottom of the restraint body and then folded back to the existing slope side, the restraint sheet is the restraint body. Is anchored like an anchor and the restraint body receives earth pressure, so that a temporary embankment structure with high strength is obtained.
<D> Since the retentive sheet material is turned around the restraint body, it is possible to obtain the effect of preventing the restraint body from falling over, maintaining the restraint body shape, and suppressing slip collapse of the embankment portion.
<E> The reinforced embankment wall with high strength is removed because the folded portion of the backup sheet is removed, extended to the side of the reinforcing embankment wall, and connected to the wall surface material, so that the embankment and the restraint body become an integral structure to fix the wall surface material. It becomes.
<F> As described above, the separated sheet portion performs a function of connecting to the wall surface material and a function of reinforcing the embankment. Moreover, the part embedded and left in the embankment still fulfills the function of suppressing slippage collapse of the embankment part of the temporary embankment structure.
<G> Since a restraint body having water permeability is used, water from the natural mountain side can pass through the restraint body and be discharged.
<H> Since a large box-shaped restraint is used, construction efficiency is good, self-supporting stability is high, and construction is easy to perform.
<I> Packing filling materials such as earth and sand in a bag-like restraint body in advance allows it to be carried to the site and used for immediate construction.
<J> Sufficient compaction is possible up to the vicinity of the wall surface, and the wall surface is hardly deformed.
<K> By using the wall surface material of the steel net-like material having an L-shaped cross section, vegetation is possible, and the wall surface is highly weatherable and can be used as a reinforcing wall with a good landscape.

以下、図に示す実施例に基づき、本発明にかかる補強盛土工法を施工順に沿って、詳細に説明する。
<1> 控えシート材の設置
既存の斜面、例えば地震などで崩落して出来た斜面1から、地形に沿って控えシート材2を敷き、斜面1から離隔する方向へ伸ばす。
本願発明で既存斜面とは、地震などで出来た地山の斜面だけでなく、盛土して構築した斜面も含む。
控えシート材2としては、例えば、鋼製の芯材を通した合成樹脂製の網状シートであるジオグリッドなどが採用可能である。
Hereinafter, based on the Example shown to a figure, the reinforcement embankment method concerning this invention is demonstrated in detail along construction order.
<1> Installation of refrigeration sheet material A refrigeration sheet material 2 is laid along the terrain from an existing slope, for example, a slope 1 that has collapsed due to an earthquake or the like, and is stretched away from the slope 1.
In the present invention, the existing slope includes not only a natural slope made by an earthquake but also a slope constructed by embankment.
As the recording sheet material 2, for example, a geogrid that is a net-like sheet made of synthetic resin through a steel core material can be used.

<2> 拘束体の設置
斜面1から適宜間隔離隔した位置であって、控えシート材2の上に、土砂などの中詰材を詰めた透水性を有する拘束体3を設置する。
実施例では、拘束体3を二段に重ねる。
拘束体3は、例えばポリプロピレン樹脂繊維で形成してあり、図8に示すように、箱状に縫合してある。
箱状の拘束体3であるため、積み上げが容易で、崩れ落ちる可能性が少ない。
この拘束体3の中には、予め土砂などを詰めて保管しておくことで、緊急を要する災害時にも素早く施工に使用できる。
拘束体3の中に詰める中詰材は、土砂に限らず、それに固化材、発砲樹脂などの軽量気泡体などを混合して詰めることができる。
拘束体3の上部は、巾着絞りのようにして上部を封ずる。
この拘束体3が、応急施工する暫定盛土構造体4の表面側に位置することになる。
拘束体3は透水性を有するため、地山側の水を透過させ、盛土構造体4の外へ排出される。
<2> Installation of Restraint Body A restraint body 3 having water permeability, which is a position appropriately spaced from the slope 1 and packed with a filling material such as earth and sand, is installed on the recording sheet material 2.
In the embodiment, the restraining bodies 3 are stacked in two stages.
The restraint body 3 is formed of, for example, polypropylene resin fiber, and is sewn into a box shape as shown in FIG.
Since it is the box-shaped restraint body 3, it is easy to pile up and is less likely to collapse.
The restraint 3 can be used for construction quickly even in the event of an emergency, by prepacking and storing earth and sand.
The filling material to be packed in the restraint body 3 is not limited to earth and sand, and can be packed by mixing a lightweight foam such as a solidified material and a foaming resin.
The upper part of the restraint body 3 is sealed like a drawstring stop.
This restraint body 3 will be located in the surface side of the temporary embankment structure 4 which performs emergency construction.
Since the restraint body 3 has water permeability, the water on the natural ground side is permeated and discharged to the outside of the embankment structure 4.

<3> 盛土
拘束体3の背後、つまりは既存斜面1側に、盛土5を施す。
盛土5は、拘束体3の高さ一杯ではなく、例えば二段に積み上げた拘束体3の一段分の高さまで盛土5する。(図2)
盛土5の背後は、拘束体3ぎりぎりまで締め固めることが可能で、盛土5の変形が生じ難くなる。
<3> Embankment Embankment 5 is applied behind the restraint 3, that is, on the existing slope 1 side.
The embankment 5 is not filled to the full height of the restraining body 3, but is filled up to, for example, the height of one stage of the restraining body 3 stacked in two stages. (Figure 2)
The back of the embankment 5 can be compacted to the limit of the restraining body 3 and deformation of the embankment 5 is difficult to occur.

<4> 控えシート材の折り返し
控えシート材2の端部であって、拘束体3の斜面1とは反対側に伸びた端部を拘束体3の下側から拘束体3、つまりは暫定盛土構造体4の表面側に、拘束体3を巻き込むように廻しかける。
続いて、前記控えシート材2の端部を、既存斜面1側へ折り返して伸ばす。
このように、控えシート材2を拘束体3に廻しかけることによって、拘束体3の転倒防止機能を発揮し、また、拘束体2の形状保持機能も発揮する。
<4> Folding of the backup sheet material The end portion of the backup sheet material 2 that extends to the opposite side of the slope 1 of the restraint 3 from the lower side of the restraint 3, that is, the temporary embankment The restraint 3 is wound around the surface of the structure 4.
Subsequently, the end portion of the recording sheet material 2 is folded back and extended toward the existing slope 1 side.
In this way, by turning the copy sheet material 2 around the restraint body 3, the function of preventing the tipping of the restraint body 3 is exhibited, and the shape holding function of the restraint body 2 is also exhibited.

<5> 盛土
前記した控えシート材2の折り返し部分の上に盛土5する。(図3)
その盛土5の上に、控えシート材2を敷き、拘束体3を積み上げる。
その後、控えシート材2を廻しかけ、折り返すのは前記と同じである。
控えシート材2は上下に重ねる盛土5の間に挟まれるため、盛土5の滑り面を遮断することになり、盛土5のすべり崩落を抑制する。
<5> Embankment Embankment 5 is carried out on the folded part of the above-described recording sheet material 2. (Figure 3)
On the embankment 5, the copy sheet material 2 is laid and the restraint 3 is stacked.
Thereafter, the recording sheet material 2 is turned around and turned back as described above.
Since the recording sheet material 2 is sandwiched between the embankments 5 stacked one above the other, the sliding surface of the embankments 5 is blocked, and slippage of the embankments 5 is suppressed.

<6>作業の繰り返し
以上の作業を繰り返して、拘束体3を積み上げて、暫定盛土構造体4を完成する。
暫定盛土構造体4が出来上がることで、斜面の安定が確保されるため、例えば斜面4上の道路の通行が可能となる。
また、暫定盛土構造体4の表面側に拘束体3が位置しており、その拘束体3は控えシート材2のアンカー機能によって盛土5と一体化して土圧を受けるため、強度の大きな補強斜面4となる。
<6> Repetition of work The above work is repeated, the restraint bodies 3 are stacked, and the temporary embankment structure 4 is completed.
Since the provisional embankment structure 4 is completed, the stability of the slope is ensured, so that, for example, the road on the slope 4 can pass.
Further, the restraint body 3 is located on the surface side of the temporary embankment structure 4, and the restraint body 3 is subjected to earth pressure by being integrated with the embankment 5 by the anchor function of the recording sheet material 2, so that a strong reinforcing slope 4.

<7>補強盛土壁の構築
以上のように施工した暫定盛土構造体4の拘束体3に廻しかけた控えシート材2を、盛土5から露出した部分で切断するなどの手段によって取外し、暫定盛土構造体4から離隔する方向へ伸ばす。
この取り外した控えシート材2の取り外し端部2aに、結束線などを使って壁面材6を連結する。(図5)
つまりは取り外し端部2aが、壁面材6との連結機能を果たすとともに、後に述べる盛土7の補強機能を果たすことになる。(図6)
実施例では壁面材6として、図9に示すような、断面L字形のエキスパンドメタルから成る部材を使用しているが、その他平板状の壁面材6や、様々な従来の壁面材が使用可能である。
また、盛土5の中に残置した部分2bは、盛土5のすべり崩落の抑制効果を発揮する。(図6)
<7> Construction of Reinforced Embankment Wall The temporary sheet material 2 that has been turned around the restraint body 3 of the provisional embankment structure 4 constructed as described above is removed by means such as cutting at a portion exposed from the embankment 5, and the provisional embankment. It extends in a direction away from the structure 4.
The wall surface material 6 is connected to the removal end portion 2a of the removed backup sheet material 2 using a binding wire or the like. (Fig. 5)
In other words, the removal end portion 2a fulfills the connecting function with the wall surface material 6 and the reinforcing function of the embankment 7 described later. (Fig. 6)
In the embodiment, a member made of expanded metal having an L-shaped cross section as shown in FIG. 9 is used as the wall material 6, but other flat wall materials 6 and various conventional wall materials can be used. is there.
Moreover, the part 2b left in the embankment 5 exhibits the effect of suppressing slippage of the embankment 5. (Fig. 6)

<8>盛土
壁面材6の背後、つまりは暫定盛土構造体4側に、壁面材6の高さ分盛土7を施す。
盛土7は控えシート材2の上に載り、その控えシート材2には、拘束体3や、その背後の盛土5の荷重も作用しているため、盛土5、拘束体3、盛土5、壁面材6が一体の構造物として機能し、強度の大きな補強盛土壁8となる。
<8> Embankment The embankment 7 corresponding to the height of the wall surface material 6 is applied behind the wall surface material 6, that is, on the temporary embankment structure 4 side.
The embankment 7 is placed on the backup sheet material 2, and the load of the restraint body 3 and the embankment 5 behind it is acting on the reserve sheet material 2, so the embankment 5, the restraint body 3, the embankment 5, and the wall surface The material 6 functions as an integral structure, and becomes a reinforced embankment wall 8 with high strength.

<9>壁面材の積み上げ
盛土7の上に壁面材6を積み上げ、背後に控えシート材9を敷いて連結する。
その控えシート材9の上に盛土7を施す。
これを繰り返して所要高さまで補強盛土壁8を形成する。
<9> Stacking of wall surface material The wall surface material 6 is stacked on the embankment 7, and the recording sheet material 9 is laid behind and connected.
The embankment 7 is applied on the recording sheet material 9.
By repeating this, the reinforcing embankment wall 8 is formed to the required height.

<10>作業の繰り返し
所要高さまで補強盛土壁8を形成した後、拘束体3に廻しかけていた控えシート材2を適宜位置で切断し、その端部を盛土7の上に敷く。
控えシート材2の端部に壁面材7を連結し、盛土7、壁面材の設置、盛土7を順次繰り返し、補強盛土壁8を完成する。(図7)
<10> Repeating the operation After forming the reinforced embankment wall 8 to the required height, the holding sheet material 2 that has been turned around the restraint 3 is cut at an appropriate position, and its end is laid on the embankment 7.
The wall surface material 7 is connected to the end portion of the recording sheet material 2, the embankment 7, the installation of the wall surface material, and the embankment 7 are sequentially repeated to complete the reinforcing embankment wall 8. (Fig. 7)

以上の実施例では、拘束体3を複数個づつズラして設置したが、図10に示すように、暫定補強斜面4の表面に、拘束体3を真っすぐに積み上げてもよい。
また、以上の実施例では、暫定盛土構造体4を所定高さまで構築した後、壁面材6を配して、構造体4との間に盛土7を繰り返したが、暫定盛土構造体4を一段、或いは数段構築し、順次壁面材6と構造体4との間に盛土7し、続いて暫定盛土構造体4を更に積み上げるような施工も可能である。
また、本発明にかかる補強盛土工法は、崩落した斜面に実施するだけでなく、平坦な地盤に盛土をして既存斜面とし、この既存斜面に対して実施することも可能である。
In the above embodiment, a plurality of the restraining bodies 3 are shifted and installed, but the restraining bodies 3 may be stacked straight on the surface of the provisional reinforcing slope 4 as shown in FIG.
Moreover, in the above Example, after constructing the temporary embankment structure 4 to the predetermined height, the wall material 6 was arranged, and the embankment 7 was repeated between the structures 4, but the temporary embankment structure 4 is one step. Alternatively, it is possible to construct several stages, sequentially fill the wall 7 between the wall material 6 and the structure 4, and then further pile up the temporary bank structure 4.
Further, the reinforcing embankment method according to the present invention can be applied not only to a collapsed slope, but also to an existing slope formed by embankment on a flat ground.

補強盛土工法の施工状態の斜視図Perspective view of the reinforced embankment construction method 施工順序の断面図Cross section of construction sequence 施工順序の断面図Cross section of construction sequence 施工順序の断面図Cross section of construction sequence 施工順序の断面図Cross section of construction sequence 施工順序の断面図Cross section of construction sequence 施工順序の断面図Cross section of construction sequence 拘束体の斜視図Perspective view of restraint 壁面材の斜視図Perspective view of wall material 他の実施例の断面図Cross-sectional view of another embodiment

符号の説明Explanation of symbols

1:既存斜面
2:控えシート材
3:拘束体
4:暫定盛土構造体
5:盛土
6:壁面材
7:盛土
8:補強盛土壁
9:控えシート材
1: Existing slope 2: Retaining sheet material 3: Restraining body 4: Temporary embankment structure 5: Embankment 6: Wall material 7: Embankment 8: Reinforced embankment wall 9: Retaining sheet material

Claims (5)

既存斜面から適宜間隔離隔した暫定盛土構造体の予定位置に向って、控えシート材を敷設し、
同じく斜面から適宜間隔離隔して中詰材を詰めた透水性の袋状の拘束体を設置し、
前記控えシート材の端部を、拘束体の下側から暫定盛土構造体の表面側へ廻しかけ、
上側で既存斜面側へ折り返して伸ばし、
前記控えシート材の折り返し部分の上に盛土し、
前記暫定盛土構造体から適宜間隔離隔して補強盛土壁となる壁面材を配置し、
前記控えシート材の折り返し部分を取外して補強盛土壁側へ伸ばし、前記壁面材と連結し、
前記壁面材と暫定盛土構造体との間に盛土する
補強盛土工法。
For the planned position of the temporary embankment structure that is separated from the existing slope as appropriate, lay down the sheet material,
Similarly, install a water-permeable bag-like restraint filled with filling material at an appropriate distance from the slope,
The end of the sheet material is turned from the lower side of the restraint body to the surface side of the temporary embankment structure,
Fold it over to the existing slope side on the upper side,
Embedding on the folded portion of the recording sheet material,
A wall material to be a reinforcing embankment wall is appropriately separated from the temporary embankment structure,
Remove the folded portion of the backing sheet material and extend it to the reinforcing embankment wall side, and connect with the wall surface material,
A reinforced embankment method for embedding between the wall material and the temporary embankment structure.
既存斜面から適宜間隔離隔した暫定盛土構造体の予定位置に向って、控えシート材を敷設し、
同じく斜面から適宜間隔離隔して中詰材を詰めた透水性の袋状の拘束体を設置し、
前記控えシート材の端部を、拘束体の下側から暫定盛土構造体の表面側へ廻しかけ、
上側で既存斜面側へ折り返して伸ばし、
前記控えシート材の折り返し部分の上に盛土する工程を繰り返して、所定の高さまで盛土をして安定させた後、
前記暫定盛土構造体から適宜間隔離隔して補強盛土壁となる壁面材を配置し、
前記控えシート材の折り返し部分を取外して補強盛土壁側へ伸ばし、前記壁面材と連結し、
前記壁面材と暫定盛土構造体との間に盛土する工程を繰り返す
補強盛土工法。
For the planned position of the temporary embankment structure that is separated from the existing slope as appropriate, lay down the sheet material,
Similarly, install a water-permeable bag-like restraint filled with filling material at an appropriate distance from the slope,
The end of the sheet material is turned from the lower side of the restraint body to the surface side of the temporary embankment structure,
Fold it over to the existing slope side on the upper side,
After repeating the embedding process on the folded portion of the recording sheet material, after embedding and stabilizing to a predetermined height,
A wall material to be a reinforcing embankment wall is appropriately separated from the temporary embankment structure,
Remove the folded portion of the backing sheet material and extend it to the reinforcing embankment wall side, and connect with the wall surface material,
Reinforced embankment method that repeats the process of embedding between the wall material and the temporary embankment structure.
拘束体として、樹脂繊維から成る方形箱形で大型の透水性の袋状部材を使用することを特徴とする請求項1又は2記載の補強盛土工法。   The reinforcing embankment method according to claim 1 or 2, wherein a large-sized water-permeable bag-like member made of a resin fiber is used as the restraint. 控えシート材としてジオグリッドを使用したことを特徴とする請求項1乃至3のいずれか1項に記載の補強盛土工法。   The reinforcing embankment method according to any one of claims 1 to 3, wherein a geogrid is used as the recording sheet material. 壁面材として、断面がL字形となるよう屈曲した鋼製網状材を使用したことを特徴とする請求項1乃至4のいずれか1項に記載の補強盛土工法。   The reinforcing embankment method according to any one of claims 1 to 4, wherein a steel mesh material bent so as to have an L-shaped cross section is used as the wall surface material.
JP2008136526A 2008-05-26 2008-05-26 Reinforced embankment method Active JP5043750B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008136526A JP5043750B2 (en) 2008-05-26 2008-05-26 Reinforced embankment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008136526A JP5043750B2 (en) 2008-05-26 2008-05-26 Reinforced embankment method

Publications (2)

Publication Number Publication Date
JP2009281104A JP2009281104A (en) 2009-12-03
JP5043750B2 true JP5043750B2 (en) 2012-10-10

Family

ID=41451833

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008136526A Active JP5043750B2 (en) 2008-05-26 2008-05-26 Reinforced embankment method

Country Status (1)

Country Link
JP (1) JP5043750B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6049442B2 (en) * 2012-12-25 2016-12-21 大成建設株式会社 Embankment construction method and reinforced earth wall
JP5913701B1 (en) * 2015-08-06 2016-04-27 前田工繊株式会社 Temporary dual-use main soil structure and its construction method
JP6186031B1 (en) * 2016-03-31 2017-08-23 東京インキ株式会社 Honeycomb retaining wall
JP6192763B1 (en) * 2016-03-31 2017-09-06 東京インキ株式会社 Geogrid / Honeycomb Retaining Wall
JP7212881B2 (en) * 2018-11-22 2023-01-26 太平洋セメント株式会社 Safety evaluation method and corrosion sensor for earth retaining structures
JP7051731B2 (en) * 2019-02-01 2022-04-11 公益財団法人鉄道総合技術研究所 Construction method of reinforced embankment and temporary holding member of reinforced embankment
JP2023166081A (en) * 2022-05-09 2023-11-21 共和ハーモテック株式会社 Slope restoration method

Also Published As

Publication number Publication date
JP2009281104A (en) 2009-12-03

Similar Documents

Publication Publication Date Title
JP5043750B2 (en) Reinforced embankment method
US20150299977A1 (en) Gabion system
JP5939970B2 (en) Seismic reinforcement construction method and seismic reinforcement structure
JP6298250B2 (en) Retaining wall connection structure
JP2016156146A (en) Temporary restraining material for embankment reinforced earth wall construction method and its laying method
CN107869152A (en) Reinforced earth bulkhead and its construction method with deformation buffer area
JP5868352B2 (en) How to lay a road on the slope
AU2008302009A1 (en) Particulate material retaining bag for wall constructions and erosion control
JP5714338B2 (en) Embankment reinforced earth wall construction method and temporary restraint material for embankment reinforced earth wall used therefor
JP5500903B2 (en) Retaining wall and how to construct a retaining wall
JP6676462B2 (en) Embankment reinforcement method
JP5702645B2 (en) Method for constructing wall structure and wall structure constructed by the method
JP2018204335A (en) Retaining wall construction method and retaining wall on natural slope
WO2007046142A1 (en) Retaining wall banking structure
KR100679873B1 (en) Construction method of greening retaining wall
JP5100513B2 (en) Reinforced earth wall and its construction method
JP7649037B2 (en) Construction method of retaining wall structure
JP4827165B2 (en) Long sandbag drain reinforcement method
KR20140123350A (en) Soil bag for vegetation and the fence building method which uses
US20200248426A1 (en) Retaining Wall with Reinforced Soil
JP2012031622A (en) Drain structure and construction method of the same
KR101074267B1 (en) A revetment
JP2005232687A (en) Fill reinforcing method
TW201529932A (en) Construction and landfill method for soft foundation and foundation with liquefaction potential, and structural body bag
JP2000319884A (en) Reinforced mud wall structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110519

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120607

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120619

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120712

R150 Certificate of patent or registration of utility model

Ref document number: 5043750

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150720

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250