JP5054322B2 - Method and machine for removing defective rail sections of a track - Google Patents
Method and machine for removing defective rail sections of a track Download PDFInfo
- Publication number
- JP5054322B2 JP5054322B2 JP2006090909A JP2006090909A JP5054322B2 JP 5054322 B2 JP5054322 B2 JP 5054322B2 JP 2006090909 A JP2006090909 A JP 2006090909A JP 2006090909 A JP2006090909 A JP 2006090909A JP 5054322 B2 JP5054322 B2 JP 5054322B2
- Authority
- JP
- Japan
- Prior art keywords
- rail
- machine
- auxiliary
- track
- separation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Description
本発明は、1回目の分離切断によって1つの遊間並びに2つのレール端部を形成し、2回目の分離切断後に、1つの補助レールを2つのレール端部に溶接するようになっている、実際のレール応力並びに実際のレール温度を有する、溶接された軌道のレールから、欠陥のあるレール部分を取り除くための方法、並びにレール溶接を準備するための機械に関する。 In the present invention, one gap and two rail ends are formed by the first separation and cutting, and one auxiliary rail is welded to the two rail ends after the second separation and cutting. The present invention relates to a method for removing defective rail portions from a rail of a welded track having a rail stress of as well as an actual rail temperature, and a machine for preparing rail welding.
アメリカ合衆国特許第4929816号明細書、英国特許第0326794号明細書、アメリカ合衆国特許第4983801号明細書、並びに同第6515249号明細書により、レール端部を溶接するための多くの方法若しくは装置が公知である。 From U.S. Pat. No. 4,929,816, British Patent No. 0326794, U.S. Pat. No. 4,983,801, and U.S. Pat. No. 6,515,249, many methods or devices for welding rail ends are known. .
またアメリカ合衆国特許第546979号明細書によれば、特別な機械でレールを敷設箇所まで搬送することが公知である。第1及び第2の機械によって、レール引き寄せ装置及び溶接装置が準備される。
本発明の課題は、冒頭に述べた方法を改良して、目標レール応力を得るために、効果的な形式で多数の溶接をも実施することができるような方法を提供することである。 The object of the present invention is to provide a method in which a number of welds can also be carried out in an effective manner in order to improve the method described at the outset and to obtain the target rail stress.
本発明によればこの課題は、冒頭で述べた方法において、イ)1回目の分離切断後に2つのレール端部を、これらのレール端部を互いに結合するレール引き寄せ装置によって掴み、かつ引張力を加えながら互いに引き寄せて、遊間(レール継ぎ目)を取り除き、ロ)この際に、2回目の分離切断後の2つのレール端部に補助レールの両端部を溶接した後の目標応力を形成するために必要な、補助レールの長さを、制御及び計算ユニットによって計算しかつ選択するために、2つのレール端部を引き寄せるために必要な引張力fと実際のレール温度を記録し、ハ)2回目の分離切断を、補助レールの選択された長さに基づいて計算された間隔で、1回目の分離切断から間隔を保って、相応に距離を測定しながら実施することにより解決される。 According to the present invention, this problem is solved in the method described in the beginning. B) After the first separation and cutting, the two rail ends are gripped by a rail pulling device that connects the rail ends to each other, and the tensile force is increased. In order to form the target stress after welding both ends of the auxiliary rail to the two rail ends after the second separation and cutting In order to calculate and select the required length of the auxiliary rail by the control and calculation unit , record the pulling force f required to pull the two rail ends and the actual rail temperature, c) the second time the separation cutting, the calculation interval based on the selected length of the auxiliary rail, at a distance from the first separation cut is solved by implementing while measuring the correspondingly distance.
本発明の方法の特徴によれば、欠陥のあるレール部分を取り除くことに関連して、実際のレール応力と目標レール応力との間の差を検出することができる。検出された差を考慮して、取り除こうとする遊間の必要な長さが、補助部材(補助レール)の長さに合わせて正確に規定することができる。長さに関連して正確に準備された補助レールによって、目標レール応力が得られると共に、必要な2回の溶接過程を迅速に実施することができる。有利な形式で、欠陥のあるレール部分の取り除きも、また長さに関連して正確に規定された補助レールの準備も、溶接過程とはまったく無関係に独立して行うことができる。溶接準備も、また溶接自体も最適な効率で実施することができる。 According to the method features of the present invention, the difference between the actual rail stress and the target rail stress can be detected in connection with removing the defective rail portion. In consideration of the detected difference, the required length of the play to be removed can be accurately defined according to the length of the auxiliary member (auxiliary rail). Auxiliary rails that are precisely prepared in relation to the length provide the desired rail stress and allow the required two welding processes to be carried out quickly. In an advantageous manner, the removal of the defective rail part and the preparation of the auxiliary rail, precisely defined with respect to the length, can be carried out independently of the welding process. Both the welding preparation and the welding itself can be carried out with optimum efficiency.
本発明の別の課題は、特に高い作業効率で、目標レール応力を有する高価値の溶接を行うための最適な準備が得られる、レール溶接を準備するための機械を提供することである。 Another object of the present invention is to provide a machine for preparing rail welding, which provides an optimal preparation for performing high-value welding with a target rail stress, particularly with high work efficiency.
この課題は本発明によれば、請求項3に記載した特徴、即ち、レール溶接を準備するための、レール走行機構によって軌道上を走行可能な機械フレームを備えた機械において、イ)複数の補助レールを貯蔵するためのレール貯蔵装置が設けられており、ロ)駆動装置に、補助レールを掴んで下ろすための、高さ調節可能、かつ回転可能なクレーンジブが設けられており、ハ)機械長手方向に延在する鋸ガイド上で調節可能に支承された、高さ調節可能なレール切断鋸が設けられており、ニ)2つのレール端部を掴んで引き寄せるために形成された、互いに間隔を保って配置された2対のレールキャッチを備えた、機械フレーム上で前記駆動装置によって高さ調節可能に支承されたレール引き寄せ装置が設けられており、ホ)レール走行機構の直近に配置され、かつ機械フレームに固定された1対の昇降支柱が設けられており、該1対の昇降支柱は、軌道上に下降させて設置することができ、かつ隣接するレール走行機構を軌道から持ち上げることができるようになっていることによって解決された。 This object is according to the invention in the machine according to claim 3, i.e. in a machine with a machine frame capable of running on a track by a rail running mechanism for preparing rail welding. A rail storage device for storing the rail is provided, and b) the drive device is provided with a height adjustable and rotatable crane jib for grasping and lowering the auxiliary rail, and c) the machine length A height-adjustable rail cutting saw mounted on a directionally extending saw guide, d) spaced apart from each other, formed to grip and pull the two rail ends maintaining with a rail catch of 2 pairs arranged, and the drive device height adjustably pulled supported by the rail by the device are provided on the machine frame, e) of the rail traveling mechanisms A pair of elevating struts arranged in the vicinity and fixed to the machine frame are provided, and the pair of elevating struts can be installed while being lowered on the track, and adjacent rail running mechanisms can be installed. It was solved by being able to lift from orbit.
レール引き寄せ装置によって、実際のレール応力とレール応力の目標値との間の差を正確に検出するために、得られた遊間が用いられる。これによって、本発明の特徴を有する機械は、長さが正確に規定された補助レールを準備することができ、それによって、次いで行われるレール端部との溶接によって自動的に目標レール応力が得られる。取り除こうとする、欠陥のあるレール部分の正確な長さを得るために、ガイドに沿って摺動可能に支承されたレール切断鋸が特に有利である。これによって、補助部材を溶接することによって最終的に高品質の溶接を得るために、2つのレール端部のための、互いに正確に平行に延在する切断面の製作も可能である。 The resulting clearance is used by the rail puller to accurately detect the difference between the actual rail stress and the target value of the rail stress. This allows a machine having the features of the present invention to prepare an auxiliary rail with a precisely defined length, whereby the target rail stress is automatically obtained by subsequent welding with the rail end. It is done. In order to obtain the exact length of the defective rail part to be removed, a rail cutting saw slidably mounted along the guide is particularly advantageous. This also makes it possible to produce cut surfaces that extend exactly parallel to one another for the two rail ends in order to finally obtain a high-quality weld by welding the auxiliary members.
その他の請求項ならびに図面には、本発明のさらに別の利点が示されている。 Other claims and drawings show further advantages of the present invention.
次に、図面に描かれた実施例に基づき本発明について詳しく説明する。図面中、
図1は、レール溶接を準備するための機械装置の側面図、
図2は、2つのレール端部を引き寄せるためのレール引き寄せ装置の平面図、
図3(a)乃至図3(m)は、種々異なる走行区分における機械装置の概略的な側面図である。
Next, the present invention will be described in detail based on embodiments illustrated in the drawings. In the drawing,
FIG. 1 is a side view of a mechanical device for preparing rail welding,
FIG. 2 is a plan view of a rail pulling device for pulling two rail ends,
FIG. 3A to FIG. 3M are schematic side views of the mechanical device in various traveling sections.
図1に示した機械装置1は、第1の機械2と、この第1の機械2に連結器3を介して解除可能に連結された第2の機械4と、作業走行中にこの第2の機械4によって搬送可能な第3の機械5とから構成されている。これらの機械2,4,5は、レール走行機構6によって軌道7上を走行可能なそれぞれ1つの機械フレーム8を有していて、それぞれ走行駆動装置9を備えている。
1 includes a
駆動装置11に、補助レール14を掴んで下ろすための、高さ調節可能、かつ回転可能なクレーンジブ12が設けられている。第1の機械2は、運転室10と、駆動装置11によって高さ調節可能及び回転可能なクレーンジブ12との間に、レール貯蔵装置13を有している。この第1の機械2は、異なる長さの複数の補助レール14を搬送し、かつ貯蔵するために構成されている。機械フレーム8の下側で端部側の2つのレール走行機構6間に、機械長手方向15に延在する鋸ガイド16が設けられており、該鋸ガイド16に、レール切断鋸17が駆動装置18によって摺動可能に支承されている。レール切断鋸17を摺動させた場合に、その摺動距離は、距離測定装置41によって記録される。各レール走行機構6の直近に、符号21で示された1対の昇降支柱22が機械フレーム8に結合されており、この昇降支柱22は、駆動装置23によって軌道7上に下降させることができる。
The drive device 11 is provided with a
駆動装置19によって高さ調節可能に機械フレーム8に固定されたレール引き寄せ装置20は、軌道7のレール25の2つのレール端部24を掴むように構成されている。装置26は、犬釘(レール釘)を打ち込むか若しくは引き抜くために設けられている。高さ調節可能な研磨装置27は、レール腹部を研磨するために用いられる。
A
第2の機械4は、アンチクリーパー(Schienenanker)を解除するための高さ調節可能な装置28と、レール25に付着するタイプレートとを備えている。 前方のレール走行機構6の前に高さ調節可能な搬送装置30が設けられており、この搬送装置30によって、第3の機械5が軌道敷設箇所に搬送されるようになっている。この第3の機械5は、同様に、アンチクリーパーを解除するための装置28を備えている。
図2に詳しく示されているレール引き寄せ装置20は、機械長手方向15で互いに間隔を保って配置された、2つのレール端部24を掴むために構成された2対のレールキャッチ32を有している。2つの駆動装置33を負荷することによって、レール端部24を互いに引き寄せることができる。そのために必要な力は、力測定装置34によって記録可能である。実際のレール温度を検出するために温度センサ装置35が設けられている。この温度センサ装置35は、力測定装置34と同様に、メモリー媒体37を有する制御及び計算ユニット38に接続されている。メモリー媒体37内に、レール貯蔵装置13に貯蔵された補助レールの種々異なる長さ、並びにそれぞれの識別特徴が記憶されている。2つのレール端部24間の互いの間隔によって規定された遊間39を測定するために距離測定装置40が設けられている。
The
次に、図3(a)乃至図3(m)を用いて、欠陥のあるレール部分42を取り除くための、及び溶接を準備するための方法について説明する。この場合、一点鎖線によって、図3(a)乃至図3(m)に記載された定置の、取り除こうとするレール部分42によって規定された、軌道7における敷設箇所43が示されている。機械装置1は、矢印44によって示された方向で走行し、敷設箇所43の前で停止する(図3a)。第3の機械5を軌道7上に載せた後で(図3b)、機械5が図3(c)に示した終端位置に達するまで、(図面では敷設箇所43の左に位置する)アンチクリーパーが装置28によって解除される。
Next, a method for removing the
これと平行して、第2の機械4が敷設箇所43に向かって走行せしめられ、この場合、相応の装置28(図平面で敷設箇所43の右に位置している)によってアンチクリーパーが解除される(図3d)。アンチクリーパーが解除されるレール区分の長さは、距離測定ホイールによって検出され、無線で制御及び計算ユニット38に伝達される。このレール区分の領域内においては犬釘も取り除かれるか若しくは緩められる。下降されたローラ29によって、枕木から僅かに持ち上げられたレールのレール底部からタイプレートが解除される。
In parallel with this, the
第1の機械2は、敷設箇所43に向かって走行せしめられ、1回目の分離切断を実施したいレール25の箇所をマーキング(罫書き)する(図3e)。
The
図3fによれば、続いて、レール切断鋸17がマーキングされた箇所上に位置決めされて1回目の分離切断が実施され、この1回目の分離切断によって、遊間39(図2参照)を形成する、互いに間隔を保っている2つのレール端部24が形成される。機械フレーム8に調節可能に支承された、回転可能なワイヤブラシ45は、溶接装置のために設けられた接触箇所を最適化するために、2つのレール端部24のレール腹部に押しつけられる。第1の機械2の端部に位置決めされたレール走行機構6は、所属の昇降支柱22を下降させることによって、軌道7から僅かに上昇せしめられる。
According to FIG. 3 f , the rail cutting saw 17 is subsequently positioned on the marked part, and the first separation cutting is performed, and a clearance 39 (see FIG. 2) is formed by the first separation cutting. two rail ends 2 4 are at a distance from each other is formed. A
レール引き寄せ装置20は2つのレール端部24上に載せられ(図3g若しくは図2)、それによって、2つのレール端部24は、遊間39が取り除かれるまで、2つの駆動装置33によって負荷されて、互いに引き寄せられる。このために必要な引張力fは、力測定装置34によって登録され、記録される。犬釘を取り除いてもまだレールが緊締されている場合に生じる、引張力の測定誤差を確実に避けるために、レール区分が緊張解除された状態になるまで、2つのレール端部は繰り返し引き寄せられる。これと平行して、温度測定装置35によって、実際のレール温度が測定され、また距離測定装置40によって遊間の長さlが測定される。第2及び第3の機械4,5は、その間に、必要な長さの枕木アンカを解除するために、次の欠陥のあるレール部分に走行せしめられる。
制御及び計算ユニット38に伝達された測定値、並びにメモリー媒体37内に記憶された、最適な溶接のために用意された、貯蔵してある補助レール14の長さに基づいて、自動的に、適当な補助レール14が計算される。レール切断鋸17は、その摺動距離を測定しながら、制御及び計算ユニット38によって計算された、取り除こうとするレール部分42のための長さが得られるまで、前方に送られる。この長さは、選択された補助レール14の長さ、並びに実際のレール温度と記憶された平均温度との間の差を考慮して、計算される。補助レール14の必要な長さにおいては、2回の火花突き合わせ溶接によって発生する焼き減り並びに押し潰し後のレール短縮を考慮して、最終的にこのような短縮にも拘わらず補助レール14の溶接によって所望の目標レール応力が得られるようにする必要がある。2回目の分離切断を、補助レール14の選択された長さに基づいて計算された間隔で、1回目の分離切断から間隔を保って、相応に距離を測定して実施する。レール切断鋸17による2回目の分離切断(図3h)後、及び犬釘を取り除いた後に、分離された欠陥のあるレール部分42が取り去られる。勿論、特に適当な補助レール4が存在していない場合にも、長い補助レール14から一部を適当な長さに切り離すことも可能である。
Automatically based on the measured values transmitted to the control and
クレーンジブ12によって、制御及び計算ユニット38によって選択された補助レール14が軌道7上に載せられ、この際に、一端部がレール端部24に合わせて位置決めされる(図3i、図3j)。補助レール14の第2の端部は、第2のレール端部24に関連して、場合によっては(実際温度と中立温度との差に関連して)重ねて配置される。軌道7上に位置決めされた補助レール14の位置を確保するために、相応の犬釘が枕木に打ち込まれる(図3k)。
The
図3(l)に示されているように、第1の機械2は、持ち上げられたレール走行機構6が下降された後で、レール端部24が研磨装置27によって処理できる程度まで前進走行せしめられる。次いで(図3m)、機械2はさらに、次の敷設箇所43まで走行され、この敷設箇所43で前記作業段階が繰り返される。
As shown in FIG. 3 (l), the
補助レール14のための2つの溶接は、次の詳しく図示していない溶接機械によって火花突き合わせ溶接法で実施され、この場合、関連した測定データが無線又はフロッピーディスクを用いて制御及び計算ユニット38によって制御ユニット又は溶接機械に伝達される。
The two welds for the
1 機械装置、 2 第1の機械、 3 連結器、 4 第2の機械、 5 第3の機械、 6 レール走行機構、 7 軌道、 8 機械フレーム、 9 走行駆動装置、 10 運転室、 11 駆動装置、 12 クレーンジブ、 13 レール貯蔵装置、 14 補助レール、 15 機械長手方向、 16 鋸ガイド、 17 レール切断鋸、 18,19 駆動装置、 20 レール引き寄せ装置、 21 1対の昇降支柱、 22 昇降支柱、 23 駆動装置、 24 レール端部、 25 レール、 26 装置、 27 研磨装置、 28 高さ調節可能な装置、 29 ローラ、 30 ローラ、 31 レールキャッチの対、 32 レールキャッチ、 33 駆動装置、 34 力測定装置、 35 温度測定装置、 36 ライン、 37 メモリー媒体、 38 制御及び計算ユニット、 39 遊間(レール継ぎ目)、 40,41 距離測定装置、 42 レール部分、 43 敷設箇所、 44 矢印、 45 ワイヤブラシ
DESCRIPTION OF
Claims (6)
イ)1回目の分離切断後に2つのレール端部(24)を、これらのレール端部(24)を互いに結合するレール引き寄せ装置(20)によって掴み、かつ引張力を加えながら互いに引き寄せて、遊間(39)を取り除き、
ロ)この際に、2回目の分離切断後の2つのレール端部(24)に補助レール(14)の両端部を溶接した後の目標応力を形成するために必要な、補助レール(14)の長さを、制御及び計算ユニット(38)によって計算しかつ選択するために、2つのレール端部(24)を引き寄せるために必要な引張力fと実際のレール温度を記録し、
ハ)2回目の分離切断を、補助レール(14)の選択された長さに基づいて計算された間隔で、1回目の分離切断から間隔を保って、相応に距離を測定して実施することを特徴とする、軌道の欠陥のあるレール部分を取り除くための方法。 The first separation cut forms one gap (39) and two rail ends (24), and after the second separation cut, one auxiliary rail (14) is welded to the two rail ends (24). to the trajectory (7), having an actual rail stress and the actual rail temperature, the welded rails (25), Oite to how to remove the rail portion (42) defective,
B) After the first separation and cutting, the two rail end portions (24) are gripped by the rail pulling device (20) that couples the rail end portions (24) to each other, and are pulled toward each other while applying a tensile force. Remove (39)
B) At this time, the auxiliary rail (14) necessary for forming the target stress after welding both ends of the auxiliary rail (14) to the two rail end portions (24) after the second separation and cutting. Record the tensile force f required to pull the two rail ends (24) and the actual rail temperature in order to be calculated and selected by the control and calculation unit (38) ,
C) The second separation cut is performed at an interval calculated from the selected length of the auxiliary rail (14), keeping the interval from the first separation cut and measuring the distance accordingly. A method for removing a defective rail portion of a track characterized by:
イ)複数の補助レール(14)を貯蔵するためのレール貯蔵装置(13)が設けられており、
ロ)駆動装置(11)に、補助レール(14)を掴んで下ろすための、高さ調節可能、かつ回転可能なクレーンジブ(12)が設けられており、
ハ)機械長手方向に延在する鋸ガイド(16)上で調節可能に支承された、高さ調節可能なレール切断鋸(17)が設けられており、
ニ)2つのレール端部(24)を掴んで引き寄せるために形成された、互いに間隔を保って配置された2対(31)のレールキャッチ(32)を備えた、機械フレーム(8)上で駆動装置(19)によって高さ調節可能に支承されたレール引き寄せ装置(20)が設けられており、
ホ)レール走行機構(6)の直近に配置され、かつ機械フレーム(8)に固定された1対(21)の昇降支柱(22)が設けられており、該1対の昇降支柱(22)は、軌道(7)上に下降させて設置することができ、かつ隣接するレール走行機構(6)を軌道(7)から持ち上げることができるようになっている、
ことを特徴とする、レール走行機構上で走行可能な機械フレームを備えた機械。 In a machine with a machine frame (8) capable of running on a track (7) by a rail running mechanism (6) for preparing rail welding,
A) A rail storage device (13) for storing a plurality of auxiliary rails (14) is provided,
B) The drive device (11) is provided with a crane jib (12) capable of adjusting the height and rotating for grasping and lowering the auxiliary rail (14),
C) a height-adjustable rail cutting saw (17) is provided, which is adjustably mounted on a saw guide (16) extending in the machine longitudinal direction;
D) On the machine frame (8) with two pairs (31) of rail catches (32) spaced apart from each other, formed to grip and pull the two rail ends (24) A rail pulling device (20) supported by the drive device (19) so as to be adjustable in height is provided,
E) A pair of elevating struts (22) disposed in the immediate vicinity of the rail travel mechanism (6) and fixed to the machine frame (8) are provided, and the pair of elevating struts (22) Can be lowered and installed on the track (7), and the adjacent rail traveling mechanism (6) can be lifted from the track (7).
A machine provided with a machine frame that can run on a rail running mechanism.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT5332005A AT501272B8 (en) | 2005-03-30 | 2005-03-30 | METHOD FOR REMOVING DAMAGED RAILWAYS OF A TRAIL AND MACHINE |
| ATA533/2005 | 2005-03-30 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2006283553A JP2006283553A (en) | 2006-10-19 |
| JP5054322B2 true JP5054322B2 (en) | 2012-10-24 |
Family
ID=36763387
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2006090909A Expired - Fee Related JP5054322B2 (en) | 2005-03-30 | 2006-03-29 | Method and machine for removing defective rail sections of a track |
Country Status (7)
| Country | Link |
|---|---|
| JP (1) | JP5054322B2 (en) |
| CN (1) | CN100564677C (en) |
| AT (1) | AT501272B8 (en) |
| AU (1) | AU2006201318B8 (en) |
| CA (1) | CA2541132C (en) |
| RU (1) | RU2298610C1 (en) |
| UA (1) | UA87824C2 (en) |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006049408B4 (en) * | 2006-10-16 | 2013-03-14 | Stahlberg Roensch GmbH | Method and device for replacing a defective or worn rail piece |
| RU2364674C1 (en) * | 2008-01-10 | 2009-08-20 | Михаил Михайлович Берзин | Method for repair of railway track rails without their dismantling off railway bed |
| CN107083727B (en) * | 2017-06-19 | 2018-12-21 | 绍兴顶多纺织有限公司 | A kind of waste and old railway disassembly vehicle |
| CN107825530A (en) * | 2017-11-20 | 2018-03-23 | 嘉善信息技术工程学校 | A kind of machine and wood cutting |
| CN109989308B (en) * | 2017-12-29 | 2024-05-10 | 中国铁建高新装备股份有限公司 | Seamless rail welding repair vehicle with independent running workshops and repair method |
| FR3076840B1 (en) * | 2018-01-15 | 2020-01-03 | Matisa Materiel Industriel S.A. | LOCKING DEVICE FOR AN IMPROVED RAILWAY APPARATUS |
| CN111321641B (en) * | 2018-12-13 | 2021-08-24 | 中车沈阳机车车辆有限公司 | Rail collection device and long steel rail transport vehicle set |
| CN109457560B (en) * | 2018-12-25 | 2024-04-02 | 中铁六局集团有限公司 | Rail carrying device for shield tunnel construction |
| DE202019102984U1 (en) * | 2019-05-27 | 2020-08-28 | Robel Bahnbaumaschinen Gmbh | Cut-off machine for cutting through a rail of a track |
| DE102019120231A1 (en) | 2019-07-26 | 2021-01-28 | RIGA MAINZ GmbH & Co. KG | Method and device for replacing bridge structures in track systems |
| CN111877060A (en) * | 2020-07-14 | 2020-11-03 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Ballastless track bed structure part replacement method |
| CN115217005B (en) * | 2022-08-22 | 2025-05-13 | 中建八局第三建设有限公司 | A construction method for dismantling existing railways under complex municipal road operation conditions |
| CN115837539B (en) * | 2023-02-28 | 2023-05-09 | 烟台市固光焊接材料有限责任公司 | Automatic welding equipment for railway construction |
| CN117005253B (en) * | 2023-07-05 | 2026-03-31 | 苏州轨道交通建设有限公司 | A multi-functional subway track construction vehicle |
| CN117536032B (en) * | 2024-01-10 | 2024-03-26 | 中铁二局集团有限公司 | Dismantling equipment and method for destroying bridge suspension sleeper |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT351576B (en) * | 1977-06-16 | 1979-08-10 | Plasser Bahnbaumasch Franz | MOBILE DEVICE FOR LAYING TRACKS |
| FR2447421A2 (en) * | 1979-01-24 | 1980-08-22 | Delachaux C | DEVICE FOR ADJUSTING THE ALIGNMENT AND THE INTERSECTION DISTANCE OF TWO END OF TRACKS |
| JPS6040401A (en) * | 1983-08-11 | 1985-03-02 | 照陽興産有限会社 | Rail laying method |
| AT402830B (en) * | 1990-05-02 | 1997-09-25 | Plasser Bahnbaumasch Franz | RAIL DRAWING DEVICE FOR THE LENGTH SHIFTING OF RAILS OF LAYED RAILWAYS |
| JPH0791801B2 (en) * | 1992-04-13 | 1995-10-09 | 大淀ヂ−ゼル株式会社 | Rail seam spacing correction device |
| DE4225788C2 (en) * | 1992-08-01 | 1999-11-04 | Stahlberg, Roensch Gmbh & Co Kg | Method and device for producing a complete track |
| AT406970B (en) * | 1993-09-17 | 2000-11-27 | Plasser Bahnbaumasch Franz | MACHINE FOR PREPARING WELDING WORK ON A TRACK |
| US6637727B1 (en) * | 2002-04-22 | 2003-10-28 | Templeton, Kenly & Co. | Rail puller including a clamping beam and two clamping members and a method thereof |
-
2005
- 2005-03-30 AT AT5332005A patent/AT501272B8/en not_active IP Right Cessation
-
2006
- 2006-03-27 RU RU2006109367/11A patent/RU2298610C1/en not_active IP Right Cessation
- 2006-03-28 CA CA002541132A patent/CA2541132C/en not_active Expired - Fee Related
- 2006-03-29 UA UAA200603432A patent/UA87824C2/en unknown
- 2006-03-29 JP JP2006090909A patent/JP5054322B2/en not_active Expired - Fee Related
- 2006-03-29 AU AU2006201318A patent/AU2006201318B8/en not_active Ceased
- 2006-03-30 CN CNB2006100738124A patent/CN100564677C/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| AT501272A4 (en) | 2006-08-15 |
| CA2541132C (en) | 2009-12-15 |
| AT501272B8 (en) | 2007-02-15 |
| AT501272B1 (en) | 2006-08-15 |
| RU2298610C1 (en) | 2007-05-10 |
| JP2006283553A (en) | 2006-10-19 |
| CN1840780A (en) | 2006-10-04 |
| UA87824C2 (en) | 2009-08-25 |
| CN100564677C (en) | 2009-12-02 |
| AU2006201318B8 (en) | 2011-03-24 |
| AU2006201318B2 (en) | 2010-12-02 |
| CA2541132A1 (en) | 2006-09-30 |
| AU2006201318A1 (en) | 2006-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5054322B2 (en) | Method and machine for removing defective rail sections of a track | |
| US7478596B2 (en) | Method and machine for replacing damaged rail sections of a track | |
| CN1865594B (en) | Welding machine and welding method for welding track rails | |
| EP2094912B1 (en) | Self-propelled rail unloading machine | |
| BRPI0905226A2 (en) | process and device for bonding metal strips | |
| US6158353A (en) | Method of performing a tie replacement operation | |
| US9920487B2 (en) | Track maintenance apparatus and method | |
| US4457234A (en) | Track lifting and lining device | |
| CN108291371A (en) | Tamping tool and method for correcting position of track | |
| JPH0130964B2 (en) | ||
| WO2019228304A1 (en) | Manufacturing tool for welding u-shaped rib of orthotropic plate unit, and assembly line and method | |
| US7470871B2 (en) | Machine for welding rails of a track | |
| JP2012158875A (en) | Method and device for forming joint of lining concrete | |
| JPS624481B2 (en) | ||
| CN107905045A (en) | A kind of rail maintenance project car | |
| US6655296B2 (en) | Method of renewing damaged ties of a track | |
| CA2369512C (en) | A machine including a ballast clearing device, and a method | |
| JP2022111551A (en) | Method of removing concrete floor slab | |
| KR20120110530A (en) | Auto preheating device of weld zone | |
| JP7026630B2 (en) | Welding assemblies and methods for welding track rails | |
| KR101045966B1 (en) | Winding coil position correction device | |
| CN108368679B (en) | Method for renewing the ties of a track consisting of rails and ties and track-laying machine | |
| CN101293313A (en) | Single side welding device | |
| EP1842962B1 (en) | Method of removing damaged portions of a rail and machine for preparing rails for welding | |
| JPH05154695A (en) | Positioning / temporary attachment device for long length materials |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20081126 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20101101 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20101228 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110902 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20111202 |
|
| A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20111207 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20111228 |
|
| A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20120106 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120117 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120628 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120727 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5054322 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150803 Year of fee payment: 3 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |