Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5080670B2 - Anchor bolt and method of using anchor bolt - Google Patents
[go: Go Back, main page]

JP5080670B2 - Anchor bolt and method of using anchor bolt - Google Patents

Anchor bolt and method of using anchor bolt Download PDF

Info

Publication number
JP5080670B2
JP5080670B2 JP2011164100A JP2011164100A JP5080670B2 JP 5080670 B2 JP5080670 B2 JP 5080670B2 JP 2011164100 A JP2011164100 A JP 2011164100A JP 2011164100 A JP2011164100 A JP 2011164100A JP 5080670 B2 JP5080670 B2 JP 5080670B2
Authority
JP
Japan
Prior art keywords
nut
anchor bolt
long nut
intermediate member
end side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2011164100A
Other languages
Japanese (ja)
Other versions
JP2011252381A (en
Inventor
不二一 宮田
Original Assignee
有限会社 宮田鉄工
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社 宮田鉄工 filed Critical 有限会社 宮田鉄工
Priority to JP2011164100A priority Critical patent/JP5080670B2/en
Publication of JP2011252381A publication Critical patent/JP2011252381A/en
Application granted granted Critical
Publication of JP5080670B2 publication Critical patent/JP5080670B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、住宅用等の布基礎コンクリートの形成に用いられる相対向する一対の型枠間の空間に鉛直方向に向けて配設され、下側部分が型枠間に打ち込まれるコンクリートに埋設固定され、上側部分がコンクリートから突出するアンカーボルト及びその使用方法に関する。   The present invention is arranged in a vertical direction in a space between a pair of opposing molds used for forming a cloth foundation concrete for a house and the like, and the lower part is embedded and fixed in the concrete to be driven between the molds. The present invention relates to an anchor bolt whose upper portion protrudes from concrete and a method of using the anchor bolt.

従来のアンカーボルトとしては、例えば特許文献1に示すように、上部外周に雄ねじを設けた所要径と長さを有する上筋部材と、上筋部材の下端側にてその外周における径方向の対向位置に溶接固着されて上筋部材に平行かつ反対方向に延設された一対の下筋部材とを備えたものが知られている。このアンカーボルトは、下筋部材を一対の型枠間に水平状態で配設された基礎鉄筋に差し込んで挟むことにより型枠間の中央位置に配置され、上筋部材が一対の型枠の上端側に設けた位置決め金具の中央孔に挿通されて位置決めが行われる。型枠間へコンクリートを打設することにより、下筋部材がコンクリート内に埋設固定され、上筋部材がコンクリート上に突出するようになる。このように形成された布基礎コンクリート上には、建物の木製の土台が配置され、さらに土台の上に柱や筋交いや梁等が組み立てられる。アンカーボルトの上筋部材は、土台の取出し穴を貫通して延びて土台の位置決めを行うと共に、その先端側が柱に取り付けられたホールダウン金具と連結され、柱の立設強度を高めるようになっている。   As a conventional anchor bolt, for example, as shown in Patent Document 1, an upper reinforcing member having a required diameter and length provided with an external thread on the upper outer periphery, and a radial facing on the outer periphery on the lower end side of the upper reinforcing member There is known one provided with a pair of lower bar members which are fixedly welded at positions and extend in parallel to and opposite to the upper bar members. The anchor bolt is arranged at the center position between the molds by inserting the lower reinforcement member between the pair of molds and sandwiched between the foundation reinforcing bars arranged horizontally, and the upper reinforcement member is located at the upper end of the pair of molds. Positioning is performed by being inserted through a central hole of a positioning fitting provided on the side. By placing concrete between the molds, the lower reinforcement member is embedded and fixed in the concrete, and the upper reinforcement member protrudes on the concrete. The wooden foundation of the building is arranged on the fabric foundation concrete formed in this way, and further, pillars, braces, beams and the like are assembled on the foundation. The upper member of the anchor bolt extends through the base take-out hole to position the base, and the tip side of the anchor bolt is connected to a hole-down metal fitting attached to the pillar to increase the standing strength of the pillar. ing.

実開平2−33841号公報Japanese Utility Model Publication No. 2-33381

ところで、土台1上に組み立てられる柱2と筋交い3とは、図6に示すように、筋交い金具4により連結して補強されるようになっているが、土台1上に突出する上筋部材6と筋交い金具4が交差する。そのため、筋交い金具4の取り付けが上筋部材6により邪魔されて困難になり、その結果、筋交い金具4の取付時間が長くなったり取付精度がばらついたりするという問題がある。また、上筋部材があまり長いと、コンクリート打設時の位置決め金具による支持が不安定になるため、従来は上筋部材の長さが抑えられていた。そのため、図7に示すように、上筋部材6を連結するホールダウン金具8の柱2への取付位置が下がり、上筋部材6や筋交い金具4に邪魔されてホールダウン金具8の柱2への取り付けが困難であり、またホールダウン金具8の取り付け位置が制限されることにより、これに取り付けられる上筋部材6の取り付け位置が土台1中央位置からずれるという問題があった。これに対しては、ホールダウン金具8の取り付け位置を上方に移し、上筋部材6に長ナット等を介して筋部材9を継ぎ足してホールダウン金具8に取り付ける等の方法が採られていたが、取り付けの手間が煩雑であり取り付けコストが高価であった。   By the way, as shown in FIG. 6, the pillar 2 and the brace 3 assembled on the base 1 are connected and reinforced by the brace 4, but the upper bar member 6 protruding on the base 1. And the brace 4 intersect. Therefore, the attachment of the brace 4 is obstructed by the upper bar member 6 and becomes difficult. As a result, there is a problem that the attachment time of the brace 4 becomes long or the attachment accuracy varies. Further, if the upper bar member is too long, the support by the positioning metal fittings when placing the concrete becomes unstable, so that the length of the upper bar member has been conventionally suppressed. Therefore, as shown in FIG. 7, the mounting position of the hole-down fitting 8 that connects the upper reinforcing member 6 to the column 2 is lowered, and is obstructed by the upper reinforcing member 6 or the brace 4 to the column 2 of the hole-down fitting 8. Is difficult, and the mounting position of the hole-down fitting 8 is limited, so that there is a problem that the mounting position of the upper bar member 6 attached to the hole-down metal fitting 8 deviates from the center position of the base 1. In response to this, a method has been adopted in which the mounting position of the hole-down fitting 8 is moved upward, and the muscle member 9 is added to the upper reinforcement member 6 via a long nut or the like and attached to the hole-down fitting 8. The mounting effort is complicated and the mounting cost is expensive.

本発明は、上記問題を解決しようとするもので、布基礎コンクリート打設後に、土台上に配設される柱や筋交いに筋交い金具やホールダウン金具を固定する作業を、短時間にかつ精度よく実行できるようにするアンカーボルト及びその使用方法を提供することを目的とする。   The present invention is intended to solve the above-mentioned problem, and after placing the fabric foundation concrete, the work of fixing the braces and hole-down fittings to the columns and braces arranged on the foundation is performed in a short time and with high accuracy. An object of the present invention is to provide an anchor bolt that can be executed and a method of using the anchor bolt.

本発明の構成上の特徴は、所定間隔を隔てて互いに平行に配置された一対の筋部材の一端側にて、筋部材と軸方向を揃えた筒状の長ナット部材が一対の筋部材に挟まれて固定されており、長ナット部材の軸方向一端側が筋部材の一端からわずかに突出すると共に他端側が封止されており、布基礎コンクリート形成用の相対向する一対の型枠間の中央位置にて長ナット部材の一端側を上にして鉛直方向に配設され、型枠間に打設されるコンクリートに埋設固定されるアンカーボルト本体と、長ナット部材の一端に同軸状にかつ逆円錐台状態で重ね合わされる円錐台形で軸孔を有する中間部材と、中間部材の軸孔に挿通されて、先端側のねじ溝により長ナット部材のねじ孔に螺着される中心軸部材と、中心軸部材のねじ溝に螺着されて、長ナット部材との間に中間部材を挟んで固定するナットと、アンカーボルト本体から中心軸部材、ナット及び中間部材が取り外された状態で、長ナット部材のねじ孔に螺着される所定長さの両ねじボルト部材と、を設けたことにある。   The structural feature of the present invention is that a cylindrical long nut member aligned in the axial direction with the muscle member is formed on the pair of muscle members at one end side of the pair of muscle members arranged in parallel with each other at a predetermined interval. It is sandwiched and fixed, and one end side in the axial direction of the long nut member slightly protrudes from one end of the muscle member and the other end side is sealed, between a pair of opposing molds for forming cloth foundation concrete An anchor bolt main body, which is arranged vertically in the middle position with one end side of the long nut member facing upward, and is embedded and fixed in concrete placed between the molds, and coaxially with one end of the long nut member and An intermediate member having a truncated conical shape and having a shaft hole, and a central shaft member that is inserted into the shaft hole of the intermediate member and is screwed into the screw hole of the long nut member by the screw groove on the distal end side; The long nut is screwed into the thread of the central shaft member A nut that fixes the intermediate member with the intermediate member, and a fixed length screw that is screwed into the screw hole of the long nut member with the central shaft member, the nut, and the intermediate member removed from the anchor bolt body. And a screw bolt member.

本発明であるアンカーボルトの使用方法としては、所定間隔を隔てて互いに平行に配置された一対の筋部材の一端側にて、筋部材と軸方向を揃えた筒状の長ナット部材が一対の筋部材に挟まれて固定されており、長ナット部材の軸方向一端側が筋部材の一端からわずかに突出すると共に他端側が封止されたアンカーボルト本体が、布基礎コンクリート形成用の相対向する一対の型枠間の中央位置にて長ナット部材の一端側を上にして鉛直方向に配設され、円錐台形で軸孔を有する中間部材が、長ナット部材の一端に同軸状にかつ逆円錐台状態で重ね合わされ、先端側にねじ溝を有する中心軸部材が、中間部材の軸孔に挿通されて、先端側が長ナット部材のねじ孔に螺着され、ナットが、中心軸部材のねじ溝に螺着されて、中間部材がナットと長ナット部材との間に挟まれて固定され、この状態で型枠間にコンクリートが打設されることにより、アンカーボルト本体と中間部材がコンクリートに埋設され、コンクリート打設後に、中心軸部材、ナット及び中間部材が取り外され、その後、所定長さの両ねじボルト部材が、一端にて長ナット部材のねじ孔に螺着されることを特徴とする。   As a method of using the anchor bolt according to the present invention, a pair of cylindrical long nut members aligned in the axial direction with the muscle members are arranged at one end side of the pair of muscle members arranged in parallel with each other at a predetermined interval. The anchor bolt body, which is sandwiched between the muscle members and fixed, with one end side in the axial direction of the long nut member protruding slightly from one end of the muscle member and the other end side sealed, is opposed to the fabric foundation concrete formation An intermediate member, which is vertically arranged with one end side of the long nut member facing upward at the center position between the pair of molds, is conical and has a shaft hole. A central shaft member that is overlapped in a stand state and has a thread groove on the distal end side is inserted into the shaft hole of the intermediate member, the distal end side is screwed into the thread hole of the long nut member, and the nut is threaded groove on the central shaft member And the intermediate member is The anchor bolt body and the intermediate member are buried in the concrete by placing concrete between the molds in this state, and the anchor bolt body and the intermediate member are buried in the concrete. The intermediate member is removed, and then both screw bolt members of a predetermined length are screwed into the screw holes of the long nut member at one end.

上記のように構成した本発明においては、地面上に相対向して立設される一対の型枠間の空間の中央位置に複数の基礎鉄筋を型枠に平行にかつ水平に配設した状態で、アンカーボルト本体が一対の筋部材の間にて基礎鉄筋に嵌め合わされ、長ナット部材の下端が上側の基礎鉄筋に当たることにより、一対の筋部材の間に基礎鉄筋を挟んだ状態で配置される。さらに、コンクリート打設前に、長ナット部材の上端に中間部材が同軸状にかつ逆円錐台状態で重ね合わされ、中間部材の軸孔を通して先端側にねじ溝を有する中心軸部材が挿入されて、先端側が長ナット部材に螺着されると共に、中心軸部材のねじ溝に螺着されたナットで締め付けることにより中間部材が長ナット部材とナット間に挟まれて固定される。中心軸部材については、型枠上端に取り付けられる位置決め金具の中央孔に挿入することにより、アンカーボルトが移動しないように位置決めされ、その後、コンクリートが中間部材の所定高さ位置まで打設される。このように、コンクリートの打設時に、長ナット部材と中間部材の開口が塞がれているため、内部にコンクリートが流れ込むことはない。また、一対の筋部材が基礎鉄筋を挟んでいるため、アンカーボルトが布基礎コンクリートの幅方向の中央位置に確実に配置される。   In the present invention configured as described above, a state in which a plurality of foundation reinforcing bars are arranged in parallel and horizontally to the formwork at the center position of the space between a pair of formwork erected opposite to each other on the ground. Thus, the anchor bolt body is fitted to the base reinforcing bar between the pair of muscle members, and the lower nut of the long nut member hits the upper foundation reinforcing bar so that the base reinforcing bar is sandwiched between the pair of muscle members. The Furthermore, before placing the concrete, the intermediate member is superimposed on the upper end of the long nut member coaxially and in the inverted truncated cone state, and a central shaft member having a thread groove on the tip side is inserted through the shaft hole of the intermediate member, The front end side is screwed to the long nut member, and the intermediate member is sandwiched and fixed between the long nut member and the nut by tightening with a nut screwed to the thread groove of the central shaft member. The center shaft member is positioned so that the anchor bolt does not move by being inserted into the center hole of the positioning fitting attached to the upper end of the mold, and then the concrete is driven to a predetermined height position of the intermediate member. In this way, when the concrete is placed, the openings of the long nut member and the intermediate member are closed, so that the concrete does not flow into the inside. In addition, since the pair of reinforcing members sandwich the foundation rebar, the anchor bolt is reliably arranged at the center position in the width direction of the fabric foundation concrete.

コンクリートの硬化後、中心軸部材とナットが取り外され、中間部材を取り出すことにより、残されたコンクリートの孔内に長ナット部材の上端が露出した状態となる。中間部材は逆円錐台状態でコンクリートに埋め込まれているため、軸を中心として回転させることによりコンクリートから容易に取り出すことができる。その後、布基礎コンクリート上に建物の木製の土台が配設され、さらにその上に柱や筋交いが配設され、柱と筋交い間に筋交い金具が取り付けられる。その際、土台の取出し穴からアンカーボルトが突出していないため、柱と筋交い間に筋交い金具を取り付ける際に邪魔になるものがないので、筋交い金具の取り付けが短時間にかつ信頼性よく行われる。   After the concrete is hardened, the central shaft member and the nut are removed, and the intermediate member is taken out, so that the upper end of the long nut member is exposed in the remaining concrete hole. Since the intermediate member is embedded in the concrete in the inverted truncated cone state, it can be easily taken out from the concrete by rotating around the axis. Thereafter, the wooden base of the building is disposed on the fabric foundation concrete, and further, columns and braces are disposed thereon, and bracing brackets are attached between the columns and the braces. At that time, since the anchor bolt does not protrude from the extraction hole of the base, there is nothing to obstruct when attaching the brace between the pillar and the brace, so that the brace is attached in a short time and with high reliability.

筋交い金具の取り付け後に、長ナット部材の軸孔に所定長さの両ねじボルト部材が螺着されるが、両ねじボルト部材については、中心軸部材とは関係なくその長さを選択することができる。そのため、ホールダウン金具の柱への取り付け位置についても筋交い金具と交差しない位置に適正に設けることができるため、ホールダウン金具の柱への取り付けが短時間にかつ精度良く行われ、両ねじボルト部材が柱の中央位置に確実に配置される。その結果、本発明においては、アンカーボルト、筋交い金具及びホールディング金具による土台へ取り付けられた柱や筋交いの補強が短時間にかつ信頼性よく行われる。また、中間部材と中心軸部材は複数回の使用が可能なため、部材コストが安価にされる。   After the brace fitting is attached, both screw bolt members of a predetermined length are screwed into the shaft hole of the long nut member, but the length of both screw bolt members can be selected regardless of the central shaft member. it can. For this reason, the mounting position of the hole-down metal fitting to the pillar can be appropriately provided at a position that does not cross the brace fitting, so that the mounting of the hole-down metal fitting to the pillar can be performed in a short time with high accuracy, and both screw bolt members Is securely placed in the center of the column. As a result, in the present invention, the reinforcement of the columns and braces attached to the base by the anchor bolts, bracing brackets, and holding brackets is performed in a short time and with high reliability. Further, since the intermediate member and the central shaft member can be used a plurality of times, the member cost is reduced.

また、本発明において、中間部材が樹脂製であることが好ましい。このように材料として安価で加工の容易な樹脂を用いることにより中間部材が安価に製造されるため、中間部材が安価に提供される。   In the present invention, the intermediate member is preferably made of resin. Thus, since the intermediate member is manufactured at low cost by using an inexpensive and easy-to-process resin as the material, the intermediate member is provided at low cost.

また、本発明において、中間部材のナットとの接触端側に、ナットの外形に合わせた凹みを設けることが好ましい。これにより、スパナ等の工具を用いてナットを取り外す際に、中間部材もナットと一体で回転させて簡単に取り外すことができる。なお、凹みとしてはナットの形状に合わせた六角形が好ましいが、工具で挟めるようにナットの形状の一部に合わせてもよい。   Moreover, in this invention, it is preferable to provide the dent matched with the external shape of the nut in the contact end side with the nut of an intermediate member. Thereby, when removing a nut using tools, such as a spanner, an intermediate member can also be easily removed by rotating integrally with a nut. In addition, although the hexagon matched to the shape of the nut is preferable as the recess, it may be matched to a part of the shape of the nut so as to be sandwiched by a tool.

また、本発明において、ナットが、中心軸部材のねじ溝の所定位置に固定されることが好ましい。これにより、中心軸部材を長ナット部材に取り付ける際に、ナットが中間部材の上端に当接することにより、中心軸部材の長ナット部材への挿入の程度がナットの取付位置を一々調節することなく自動的に決められるので便利である。   Moreover, in this invention, it is preferable that a nut is fixed to the predetermined position of the thread groove of a center shaft member. Thus, when the central shaft member is attached to the long nut member, the nut abuts on the upper end of the intermediate member, so that the degree of insertion of the central shaft member into the long nut member does not adjust the mounting position of the nut one by one. It is convenient because it is determined automatically.

本発明によれば、コンクリート打設時には、アンカーボルト本体の長ナット部材に中間部材と中心軸部材を繋げることにより、適正な高さにコンクリートを打設することができ、コンクリート打設後に、中心軸部材とナットと中間部材を取り外して長ナット部材の軸孔に両ねじボルト部材を取り付けることができる。その結果、本発明においては、布基礎コンクリート上に配設される柱や筋交いに筋交い金具やホールダウン金具を取り付ける際に邪魔になるものがないので、それら金具の取り付けが短時間にかつ信頼性よく行われる。また、本発明によれば、中間部材や中心軸部材は複数回使用が可能なので部材コストを低減でき、中間部材を樹脂製とすることによりさらにコストを安価にできる。さらに、本発明において中間部材のナットとの接触端側に、ナットの外形に合わせた凹みを設けることにより、中間部材をナットと一体で回転させて簡単に取り外すことができる。また、本発明において、ナットが中心軸部材のねじ溝の所定位置に固定されることにより、中心軸部材の長ナット部材への挿入の程度がナットの取付位置を一々調節することなく自動的に決められるので便利である。   According to the present invention, when placing concrete, by connecting the intermediate member and the central shaft member to the long nut member of the anchor bolt main body, the concrete can be placed at an appropriate height. The screw member can be attached to the shaft hole of the long nut member by removing the shaft member, the nut and the intermediate member. As a result, in the present invention, there is no obstacle to attaching the braces and hole-down fittings to the columns and braces arranged on the fabric foundation concrete. Often done. Further, according to the present invention, since the intermediate member and the central shaft member can be used a plurality of times, the member cost can be reduced, and the cost can be further reduced by using the intermediate member made of resin. Furthermore, in the present invention, by providing a recess in accordance with the outer shape of the nut on the contact end side of the intermediate member with the nut, the intermediate member can be easily removed by rotating integrally with the nut. Further, in the present invention, the nut is fixed at a predetermined position of the thread groove of the central shaft member, so that the degree of insertion of the central shaft member into the long nut member is automatically adjusted without adjusting the mounting position of the nut one by one. It is convenient because it can be decided.

本発明の一実施例であるコンクリート打設前におけるアンカーボルトの構成部品の組み合わせを示す分解正面図である。It is a disassembled front view which shows the combination of the structural component of the anchor bolt before the concrete placement which is one Example of this invention. アンカーボルト本体を示す平面図である。It is a top view which shows an anchor bolt main body. アンカーボルトを用いたコンクリート打設時の状態を示す一部破断正面図である。It is a partially broken front view which shows the state at the time of concrete placement using an anchor bolt. コンクリート打設後のアンカーボルト本体の埋設された状態を示す一部破断正面図である。It is a partially broken front view which shows the state by which the anchor bolt main body after the concrete placement was embed | buried. コンクリート打設後のアンカーボルトの最終状態を示す一部破断正面図である。It is a partially broken front view which shows the final state of the anchor bolt after concrete placement. 従来のアンカーボルトと筋交い金具との干渉し合う状態を説明する説明図である。It is explanatory drawing explaining the state which the conventional anchor bolt and a brace | joint mutually interfere. 従来の筋交い金具とホールダウン金具の干渉し合う状態を説明する説明図である。It is explanatory drawing explaining the state which the conventional bracing metal fitting and a hole down metal fitting mutually.

以下、本発明の実施の形態について説明する。図1は一実施例であるコンクリート打設前のアンカーボルトの構成部品を正面図により示し、図2は、アンカーボルト本体を平面図により示したものである。図3は、コンクリート打設時のアンカーボルトの使用状態を一部破断正面図により示し、図4は、コンクリート打設後のアンカーボルト本体の埋設された状態を一部破断正面図により示し、図5は、アンカーボルトの最終の配置状態を一部破断正面図により示したものである。   Embodiments of the present invention will be described below. FIG. 1 is a front view showing components of an anchor bolt before placing concrete according to an embodiment, and FIG. 2 is a plan view showing an anchor bolt body. FIG. 3 shows a partially broken front view of the anchor bolt in use during concrete placement, and FIG. 4 shows a partially broken front view of the anchor bolt body after concrete placement. 5 is a partially broken front view showing the final arrangement state of the anchor bolts.

アンカーボルトは、アンカーボルト本体11を有しており、アンカーボルト本体11に取り付けられる構成部品がコンクリートの打設前と打設後において取り換えられるようになっており、これら両方を合わせた1つの部材である。ここでは、コンクリートの打設前後の両者を区別するため、打設前はアンカーボルト10Aとし、打設後はアンカーボルト10Bで表すものとする。アンカーボルト本体11は、後述する基礎鉄筋23の太さよりわずかに広い所定間隔を隔てて互いに平行に配置された2本の鉄筋製の筋部材12を有しており、両筋部材12の一端側(図1において上端側)間に鉄製の長ナット部材13が筋部材12と軸方向を揃えて挟まれており、両筋部材12に溶接により固定されている。長ナット部材13は、六角柱状で軸心を貫通する軸孔13aにねじ溝が刻まれており、一端側が筋部材12の一端からわずかに突出しており、他端側(図1のて下端側)に樹脂製で薄肉の鍔付き帽子形状のキャップ部材14が嵌め合わされて下端開口が封止されている。なお、キャップ部材14の代わりに高価になるが金属板を溶接等により固定してもよい。長ナット部材13の上端面には中間部材16が重ね合わされる。   The anchor bolt has an anchor bolt main body 11, and a component attached to the anchor bolt main body 11 can be replaced before and after placing concrete, and one member that combines both of them. It is. Here, in order to distinguish between before and after placing concrete, the anchor bolt 10A is shown before placing and the anchor bolt 10B is shown after placing. The anchor bolt main body 11 has two reinforcing bar members 12 arranged in parallel with each other at a predetermined interval slightly wider than the thickness of a basic reinforcing bar 23 described later. An iron long nut member 13 is sandwiched between the bar members 12 in the axial direction between them (on the upper end side in FIG. 1), and is fixed to the bar members 12 by welding. The long nut member 13 has a hexagonal column shape and has a threaded groove formed in a shaft hole 13a penetrating the shaft center. One end side slightly protrudes from one end of the muscle member 12, and the other end side (the bottom end side in FIG. 1). ) And a thin cap-shaped cap member 14 made of a resin is fitted together to seal the lower end opening. In addition, although it becomes expensive instead of the cap member 14, a metal plate may be fixed by welding or the like. An intermediate member 16 is superimposed on the upper end surface of the long nut member 13.

中間部材16は、樹脂製の円錐台形状であり、長ナット部材13の軸孔13aよりわずかに径の大きい軸心を貫通した軸孔16aを有している。中間部材16の大径側の端部には、コンクリートから回転しながら取り出すためのスパナ等で挟むことができる凹部16bが設けられている。凹部16bは、後述するナット19の外周形状に合わせた六角柱形状であるが、これに代えてスパナ等を嵌め合わせ可能なように一部がナット19の外周形状に合わせたものであってもよい。中間部材16は、安価な樹脂を用いることにより安価に製造されるため、安価に提供される。中間部材16は、長ナット部材13の上端面に逆円錐台状態で同軸状に重ね合わされる。中心軸部材18は、長ナット部材13の軸孔13aと同一径の長尺の鉄製丸棒であって下端側の軸方向の所定範囲にねじ溝18aが形成されており、ねじ溝18aにより軸孔13aに螺合可能である。ねじ溝18aの内端側にはナット19が溶接等により固定されている。ねじ溝18aの先端からナット19位置まで長さは、長ナット部材13の軸孔13aと中間部材16の軸孔16aを合わせた長さよりわずかに短くなっている。   The intermediate member 16 has a truncated cone shape made of resin, and has a shaft hole 16 a that penetrates an axis that is slightly larger in diameter than the shaft hole 13 a of the long nut member 13. At the end of the intermediate member 16 on the large diameter side, there is provided a recess 16b that can be sandwiched with a spanner or the like for taking out while rotating from the concrete. The recess 16b has a hexagonal columnar shape that matches the outer peripheral shape of the nut 19 described later. Alternatively, a part of the concave portion 16b matches the outer peripheral shape of the nut 19 so that a spanner or the like can be fitted. Good. Since the intermediate member 16 is manufactured at low cost by using an inexpensive resin, the intermediate member 16 is provided at low cost. The intermediate member 16 is superimposed on the upper end surface of the long nut member 13 coaxially in an inverted truncated cone state. The central shaft member 18 is a long iron round bar having the same diameter as the shaft hole 13a of the long nut member 13, and a screw groove 18a is formed in a predetermined range in the axial direction on the lower end side. It can be screwed into the hole 13a. A nut 19 is fixed to the inner end side of the thread groove 18a by welding or the like. The length from the tip of the screw groove 18a to the position of the nut 19 is slightly shorter than the combined length of the shaft hole 13a of the long nut member 13 and the shaft hole 16a of the intermediate member 16.

両ねじボルト部材21は、長尺の鉄製丸棒であり、軸方向両端から所定長さの範囲にそれぞれねじ溝21aを設けている。両ねじボルト部材21は、コンクリート打設後に、ナット19と共に中心軸部材18が長ナット部材13から取り外され、中間部材16もコンクリートK1,K2から取り外された後、長ナット部材13の軸孔13aにねじ溝21aにて螺着されるようになっている。また、両ねじボルト部材21の他方のねじ溝21aは、柱に取り付けられたホールダウン金具に螺着される。   Both screw bolt members 21 are long iron round bars, and are provided with thread grooves 21a within a predetermined length from both ends in the axial direction. After the concrete bolting, both the screw bolt members 21 are removed from the long nut member 13 together with the nut 19 and the intermediate member 16 is also removed from the concrete K1 and K2, and then the shaft hole 13a of the long nut member 13. The screw groove 21a is used for screwing. The other screw groove 21a of both screw bolt members 21 is screwed to a hole-down fitting attached to the pillar.

次に、アンカーボルト10A,10Bの使用例について説明する。
図3に示すように、地面上に相対向して立設される一対の型枠25間の空間の中央位置に上下2本の基礎鉄筋23を型枠25に平行にかつ水平に配設した状態で、アンカーボルト本体11が一対の筋部材12の間にて基礎鉄筋23に差し込んで嵌め合わされ、長ナット部材13下端に設けたキャップ部材14が上側の基礎鉄筋23に当接することにより、一対の筋部材12の間に基礎鉄筋23を挟んだ状態で配置される。さらに、コンクリート打設前に、長ナット部材13の上端に中間部材16が逆円錐台状態で同軸状に重ね合わされ、その後、ナット19が固定された中心軸部材18が中間部材16の軸孔16aに挿通され、先端側のねじ溝18aにて長ナット部材13に螺着される。その結果、中間部材16が、ナット19によって締め付けられることにより、ナット19と長ナット部材13との間に挟まれて固定される。
Next, usage examples of the anchor bolts 10A and 10B will be described.
As shown in FIG. 3, two upper and lower foundation reinforcing bars 23 are arranged in parallel and horizontally to the mold 25 at the center of the space between a pair of molds 25 that are erected opposite to each other on the ground. In this state, the anchor bolt main body 11 is inserted and fitted into the basic reinforcing bar 23 between the pair of reinforcing members 12, and the cap member 14 provided at the lower end of the long nut member 13 comes into contact with the upper basic reinforcing bar 23, thereby It arrange | positions in the state which pinched | interposed the basic | foundation reinforcement 23 between the muscle members 12 of this. Further, before placing the concrete, the intermediate member 16 is coaxially overlapped with the upper end of the long nut member 13 in the inverted truncated cone state, and then the central shaft member 18 to which the nut 19 is fixed is the shaft hole 16a of the intermediate member 16. And is screwed to the long nut member 13 at the screw groove 18a on the distal end side. As a result, the intermediate member 16 is clamped by the nut 19 and is fixed between the nut 19 and the long nut member 13.

中心軸部材18については、図3に示すように、両型枠25上端に跨って取付治具27により取り付けられる位置決め金具26の中央孔に挿入することにより、アンカーボルト10Aが移動しないように位置決めされ、その後、コンクリートが両型枠25間の中間部材16の上端近傍位置まで打設される。コンクリートの打設においては、まず目標高さ近辺までコンクリートK1が打設され、その後、目標高さまで調整するためにレベラーK2が流し込まれる。なお、コンクリートの打設時に、長ナット部材13の下端開口がキャップ部材14で塞がれているため、長ナット部材13の内部にコンクリートが流れ込むことはない。また、一対の筋部材12が上下2本の基礎鉄筋23を挟んでいるため、アンカーボルト10Aが布基礎コンクリートK1,K2の幅方向の中央位置に確実に配置される。   As shown in FIG. 3, the center shaft member 18 is positioned so that the anchor bolt 10A does not move by being inserted into the center hole of the positioning bracket 26 attached by the mounting jig 27 across the upper ends of both mold frames 25. After that, concrete is driven to a position near the upper end of the intermediate member 16 between the two molds 25. In placing concrete, the concrete K1 is first placed to the vicinity of the target height, and then the leveler K2 is poured to adjust to the target height. In addition, since the lower end opening of the long nut member 13 is closed by the cap member 14 when the concrete is placed, the concrete does not flow into the long nut member 13. In addition, since the pair of reinforcing members 12 sandwich the two upper and lower foundation reinforcing bars 23, the anchor bolt 10A is reliably arranged at the center position in the width direction of the cloth foundation concrete K1, K2.

コンクリートの硬化後、ナット19と共に中心軸部材18が取り外され、中間部材16を取り出すことにより、図4に示すように、残された布基礎コンクリートK1,K2の孔H内に長ナット部材13の上端が露出した状態となる。その後、布基礎コンクリートK1,K2上に建物の木製の土台1が配設され、さらにその上に図6に示すような柱2や筋交い3が配設されるが、その際、土台1の取出し穴からアンカーボルトが突出していないため、柱2と筋交い3間に筋交い金具4を取り付ける際に邪魔になるものがないので、筋交い金具4の取り付けが短時間にかつ信頼性よく行われる。筋交い金具4の取り付け後、図5に示すように、所定長さの両ねじボルト部材21が、一端側にて長ナット部材13の軸孔13aに螺着されてアンカーボルト10Bにされる。   After the concrete is hardened, the central shaft member 18 is removed together with the nut 19 and the intermediate member 16 is taken out. As shown in FIG. 4, the long nut member 13 is inserted into the remaining holes H of the cloth foundation concrete K1 and K2. The upper end is exposed. Thereafter, the wooden base 1 of the building is disposed on the fabric foundation concrete K1 and K2, and the pillar 2 and the brace 3 as shown in FIG. 6 are further disposed thereon. At that time, the base 1 is taken out. Since the anchor bolt does not protrude from the hole, there is nothing that obstructs the attachment of the brace 4 between the pillar 2 and the brace 3. Therefore, the brace 4 is attached in a short time and with high reliability. After the brace 4 is attached, as shown in FIG. 5, both screw bolt members 21 having a predetermined length are screwed into the shaft hole 13a of the long nut member 13 on one end side to become the anchor bolt 10B.

両ねじボルト部材21については、中心軸部材18とは関係なくその長さを選択することができる。そのため、図7に示すようなホールダウン金具8の取り付け位置についても筋交い金具4と交差しない位置に設けることができるため、ホールダウン金具8の柱2への取り付けが短時間にかつ精度良く行われ、両ねじボルト部材21が柱の中央位置に確実に配置される。その結果、本実施例においては、アンカーボルト10B、筋交い金具4及びホールディング金具8による土台1へ取り付けられた柱2や筋交い3の補強が短時間にかつ信頼性よく行われる。また、中間部材16と中心軸部材18は複数回の使用が可能なため、部材コストが安価にされる。また、本実施例においては、一対の筋部材12が基礎鉄筋23を挟んでコンクリート内に埋設されているため、アンカーボルト10Bが上下方向の力を受けたときの変形が抑えられるので、コンクリートにひびが入る等がなく、布基礎コンクリートK1,K2の信頼性を確保することもできる。   The lengths of both screw bolt members 21 can be selected regardless of the central shaft member 18. Therefore, since the mounting position of the hole-down fitting 8 as shown in FIG. 7 can also be provided at a position that does not intersect with the brace fitting 4, the mounting of the hole-down fitting 8 to the pillar 2 is performed in a short time and with high accuracy. Both screw bolt members 21 are securely arranged at the center position of the pillar. As a result, in the present embodiment, the reinforcement of the column 2 and the brace 3 attached to the base 1 by the anchor bolt 10B, the brace 4 and the holding brace 8 is performed in a short time and with high reliability. Further, since the intermediate member 16 and the central shaft member 18 can be used a plurality of times, the member cost is reduced. Further, in this embodiment, since the pair of reinforcing members 12 are embedded in the concrete with the foundation rebar 23 interposed therebetween, deformation when the anchor bolt 10B receives a vertical force is suppressed. There is no crack or the like, and the reliability of the fabric foundation concrete K1, K2 can be secured.

なお、上記実施例において、中間部材の材質は樹脂であるが、これに代えて高価にはなるが金属製とすることも可能である。また、上記実施例においては、ナットが中心軸部材に固定されているが、着脱自在に螺着されてもよい。その他、上記実施例においては、アンカーボルトの具体的形状等については特に限定されるものではなく、本発明の趣旨を逸脱しない範囲において種々変更して実施することができる。   In the above embodiment, the material of the intermediate member is resin, but it can be made of metal although it is expensive instead. Moreover, in the said Example, although the nut is being fixed to the center axis | shaft member, you may detachably screw. In addition, in the said Example, it does not specifically limit about the specific shape of an anchor bolt, etc., In the range which does not deviate from the meaning of this invention, it can change and implement variously.

本発明のアンカーボルトは、コンクリート打設時には、アンカーボルト本体の長ナット部材に中間部材と中心軸部材を繋げることにより、適正な高さにコンクリートを打設することができ、コンクリート打設後に、中心軸部材を取り外し中間部材を取り出して両ねじボルト部材を取り付けることができるため、コンクリート打設後の柱や筋交いへの筋交い金具やホールダウン金具の取り付けが短時間にかつ信頼性よく行われ、また中間部材や中心軸部材は複数回使用が可能で部材コストを低減できるので、有用である。   The anchor bolt of the present invention is capable of placing concrete at an appropriate height by connecting the intermediate member and the central shaft member to the long nut member of the anchor bolt body at the time of placing the concrete. Since the central shaft member can be removed and the intermediate member can be taken out and both screw bolt members can be attached, mounting of bracing brackets and hole-down fittings to pillars and braces after concrete placement is performed in a short time and with high reliability, The intermediate member and the central shaft member are useful because they can be used a plurality of times and the member cost can be reduced.

10A,10B…アンカーボルト、11…アンカーボルト本体、12…筋部材、13…長ナット部材、14…キャップ部材、16…中間部材、18…中心軸部材、19…ナット、21…両ねじボルト部材、23…基礎鉄筋、25…型枠。 DESCRIPTION OF SYMBOLS 10A, 10B ... Anchor bolt, 11 ... Anchor bolt main body, 12 ... Muscle member, 13 ... Long nut member, 14 ... Cap member, 16 ... Intermediate member, 18 ... Center shaft member, 19 ... Nut, 21 ... Both screw bolt member , 23 ... foundation rebar, 25 ... formwork.

Claims (8)

所定間隔を隔てて互いに平行に配置された一対の筋部材の一端側にて、該筋部材と軸方向を揃えた筒状の長ナット部材が該一対の筋部材に挟まれて固定されており、該長ナット部材の軸方向一端側が該筋部材の一端からわずかに突出すると共に他端側が封止されており、布基礎コンクリート形成用の相対向する一対の型枠間の中央位置にて前記長ナット部材の一端側を上にして鉛直方向に配設され、該型枠間に打設されるコンクリートに埋設固定されるアンカーボルト本体と、
前記長ナット部材の一端に同軸状にかつ逆円錐台状態で重ね合わされる円錐台形で軸孔を有する中間部材と、該中間部材の軸孔に挿通されて、先端側のねじ溝により前記長ナット部材のねじ孔に螺着される中心軸部材と、該中心軸部材のねじ溝に螺着されて、前記長ナット部材との間に前記中間部材を挟んで固定するナットと、
前記アンカーボルト本体から前記中心軸部材、ナット及び中間部材が取り外された状態で、前記長ナット部材のねじ孔に螺着される所定長さの両ねじボルト部材と、
を設けたことを特徴とするアンカーボルト。
At one end side of a pair of muscle members arranged in parallel with each other at a predetermined interval, a cylindrical long nut member aligned in the axial direction with the muscle member is sandwiched and fixed between the pair of muscle members. The axial end of the long nut member slightly protrudes from one end of the muscle member and the other end is sealed, and the central position between a pair of opposing molds for forming cloth foundation concrete is An anchor bolt main body that is disposed in the vertical direction with one end side of the long nut member facing upward, and is embedded and fixed in concrete placed between the molds,
An intermediate member having an axial hole in the shape of a truncated cone concentrically and overlapped at one end of the long nut member, and the long nut inserted through the axial hole of the intermediate member and threaded on the tip side A central shaft member that is screwed into a screw hole of the member, a nut that is screwed into a screw groove of the central shaft member, and sandwiches and fixes the intermediate member between the long nut member;
A double screw bolt member having a predetermined length screwed into a screw hole of the long nut member in a state where the central shaft member, the nut and the intermediate member are removed from the anchor bolt main body;
An anchor bolt characterized by providing
前記中間部材が樹脂製であることを特徴とする請求項1に記載のアンカーボルト。   The anchor bolt according to claim 1, wherein the intermediate member is made of resin. 前記中間部材の前記ナットとの接触端側に、該ナットの外形に合わせた凹みを設けることを特徴とする請求項1又は2に記載のアンカーボルト。   3. The anchor bolt according to claim 1, wherein a recess corresponding to an outer shape of the nut is provided on a contact end side of the intermediate member with the nut. 前記ナットが、前記中心軸部材のねじ溝の所定位置に固定されることを特徴とする請求項1から3のいずれか1項に記載のアンカーボルト。   The anchor bolt according to any one of claims 1 to 3, wherein the nut is fixed to a predetermined position of a thread groove of the central shaft member. 所定間隔を隔てて互いに平行に配置された一対の筋部材の一端側にて、該筋部材と軸方向を揃えた筒状の長ナット部材が該一対の筋部材に挟まれて固定されており、該長ナット部材の軸方向一端側が該筋部材の一端からわずかに突出すると共に他端側が封止されたアンカーボルト本体が、布基礎コンクリート形成用の相対向する一対の型枠間の中央位置にて前記長ナット部材の一端側を上にして鉛直方向に配設され、
円錐台形で軸孔を有する中間部材が、前記長ナット部材の一端に同軸状にかつ逆円錐台状態で重ね合わされ、
先端側にねじ溝を有する中心軸部材が、該中間部材の軸孔に挿通されて、先端側が前記長ナット部材のねじ孔に螺着され、
ナットが、前記中心軸部材のねじ溝に螺着されて、前記中間部材が該ナットと前記長ナット部材との間に挟まれて固定され、この状態で前記型枠間にコンクリートが打設されることにより、前記アンカーボルト本体と中間部材がコンクリートに埋設され、
コンクリート打設後に、前記中心軸部材、ナット及び中間部材が取り外され、その後、所定長さの両ねじボルト部材が、一端にて前記長ナット部材のねじ孔に螺着される
ことを特徴とするアンカーボルトの使用方法。
At one end side of a pair of muscle members arranged in parallel with each other at a predetermined interval, a cylindrical long nut member aligned in the axial direction with the muscle member is sandwiched and fixed between the pair of muscle members. The anchor bolt body in which one axial end side of the long nut member slightly protrudes from one end of the muscle member and the other end side is sealed is a center position between a pair of opposing molds for forming cloth foundation concrete. In the vertical direction with one end side of the long nut member up,
An intermediate member having a truncated cone shape and a shaft hole is overlapped on one end of the long nut member coaxially and in an inverted truncated cone shape,
A central shaft member having a thread groove on the distal end side is inserted through the shaft hole of the intermediate member, and the distal end side is screwed into the screw hole of the long nut member,
A nut is screwed into the screw groove of the central shaft member, and the intermediate member is sandwiched and fixed between the nut and the long nut member, and in this state, concrete is placed between the molds. The anchor bolt body and the intermediate member are embedded in the concrete,
After the concrete is cast, the central shaft member, the nut and the intermediate member are removed, and then both screw bolt members of a predetermined length are screwed into the screw holes of the long nut member at one end. How to use anchor bolts.
前記中間部材が樹脂製であることを特徴とする請求項5に記載のアンカーボルトの使用方法。   The method of using an anchor bolt according to claim 5, wherein the intermediate member is made of resin. 前記中間部材の前記ナットとの接触端側に、該ナットの外形に合わせた凹みを設けることを特徴とする請求項5又は6に記載のアンカーボルトの使用方法。   The method for using an anchor bolt according to claim 5 or 6, wherein a recess that matches the outer shape of the nut is provided on a contact end side of the intermediate member with the nut. 前記ナットが、前記中心軸部材のねじ溝の所定位置に固定されることを特徴とする請求項5から7のいずれか1項に記載のアンカーボルトの使用方法。   The method of using an anchor bolt according to any one of claims 5 to 7, wherein the nut is fixed at a predetermined position of a thread groove of the central shaft member.
JP2011164100A 2011-07-27 2011-07-27 Anchor bolt and method of using anchor bolt Expired - Fee Related JP5080670B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011164100A JP5080670B2 (en) 2011-07-27 2011-07-27 Anchor bolt and method of using anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011164100A JP5080670B2 (en) 2011-07-27 2011-07-27 Anchor bolt and method of using anchor bolt

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2009008886U Continuation JP3157817U (en) 2009-12-15 2009-12-15 Anchor bolt

Publications (2)

Publication Number Publication Date
JP2011252381A JP2011252381A (en) 2011-12-15
JP5080670B2 true JP5080670B2 (en) 2012-11-21

Family

ID=45416497

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011164100A Expired - Fee Related JP5080670B2 (en) 2011-07-27 2011-07-27 Anchor bolt and method of using anchor bolt

Country Status (1)

Country Link
JP (1) JP5080670B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003096788A (en) * 2001-09-26 2003-04-03 Miyata Tekko:Kk Anchor bolt

Also Published As

Publication number Publication date
JP2011252381A (en) 2011-12-15

Similar Documents

Publication Publication Date Title
JP6753029B2 (en) Reinforcing bar for attaching vertical bars and how to attach reinforcing vertical bars using the reinforcing bar
JP5961778B1 (en) Anchor bolt installation base
JP5699015B2 (en) Steel pile and structure joint structure
JP2010216196A (en) Anchor bolt installation method for continuous footing, and anchor bolt-tool set
JP5011363B2 (en) Anchor bolt support device
JP5907447B1 (en) Steel column base
JP5080670B2 (en) Anchor bolt and method of using anchor bolt
JP4949870B2 (en) Connecting bracket and connecting structure of foundation and column
JP3157817U (en) Anchor bolt
JP2010261160A (en) Corner brackets and seismic devices
JP4416141B2 (en) How to install seismic isolation devices
JP4915653B2 (en) Anchor bolt positioning jig
JP6349732B2 (en) Method and structure for joining reinforced concrete beam to steel column or column with steel frame
JP4465256B2 (en) Anchor bolt support device
JP2007321499A (en) Reinforcing device of wooden framework house
JP6528276B2 (en) Structural reinforcement members
JP3119315U (en) Side fittings for wooden structures
JP5159942B1 (en) Column base of building
JP4961277B2 (en) Connecting bracket and connecting structure of structural material and column
KR20110007309U (en) Supporting Bar Fixture for Column Formwork
JP5498014B2 (en) Connecting structure of columns with connecting bolts and connecting brackets
JP6646959B2 (en) Column and beam frame and its construction method
KR200412751Y1 (en) Die spacing
JP4970873B2 (en) Vertical member
JP7816729B1 (en) Construction anchor bolt adjustment and fixing device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120813

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120821

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120830

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150907

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5080670

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees