Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5082371B2 - Combined cooling device - Google Patents
[go: Go Back, main page]

JP5082371B2 - Combined cooling device - Google Patents

Combined cooling device Download PDF

Info

Publication number
JP5082371B2
JP5082371B2 JP2006278362A JP2006278362A JP5082371B2 JP 5082371 B2 JP5082371 B2 JP 5082371B2 JP 2006278362 A JP2006278362 A JP 2006278362A JP 2006278362 A JP2006278362 A JP 2006278362A JP 5082371 B2 JP5082371 B2 JP 5082371B2
Authority
JP
Japan
Prior art keywords
cooling
vacuum
cold air
vacuum cooling
cooled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006278362A
Other languages
Japanese (ja)
Other versions
JP2008096029A (en
Inventor
暁 若狭
幸博 一色
将平 西内
淳一 牟田
康 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP2006278362A priority Critical patent/JP5082371B2/en
Publication of JP2008096029A publication Critical patent/JP2008096029A/en
Application granted granted Critical
Publication of JP5082371B2 publication Critical patent/JP5082371B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Freezing, Cooling And Drying Of Foods (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Cold Air Circulating Systems And Constructional Details In Refrigerators (AREA)

Description

この発明は、真空冷却と冷風冷却とを可能とした複合冷却装置および複合冷却方法に関する。   The present invention relates to a composite cooling apparatus and a composite cooling method that enable vacuum cooling and cold air cooling.

従来、食品を冷却する装置として、食品を冷風により冷却するブラストチラーと称される冷風冷却装置と、食品を真空冷却する真空冷却装置とが知られている。   Conventionally, a cold air cooling device called a blast chiller for cooling food with cold air and a vacuum cooling device for cooling food with vacuum are known as devices for cooling food.

前記冷風冷却装置による冷却は、冷風と食品表面との対流伝熱による冷却が主のため、冷却時間が、たとえば90分と長時間を要する課題があり、かつ食品の表面と中心部とを均一に冷却することが困難である。   The cooling by the cold air cooling device is mainly due to cooling by convection heat transfer between the cold air and the food surface, so there is a problem that the cooling time takes 90 minutes, for example, and the food surface and the central part are uniform. It is difficult to cool down.

一方、真空冷却装置は、約20℃程度までは、急速冷却が可能であるが、その後は冷却速度が急速に低下するために、市場に出回っている冷却能力の低い装置では、チルド域までの冷却は困難となっていた。仮に、チルド域まで冷却しようとすると真空冷却手段の冷却能力,すなわち到達真空度を大幅に高める必要がある。一般に、真空冷却装置の使用において、チルド域まで冷却する必要がないものも多くあり、かつ、通常の真空冷却においては冷却速度の点からも増強した冷却能力を必要としない。よって、チルド域までの冷却だけのために真空冷却手段の冷却能力を高いものとするのは、経済的ではない。   On the other hand, the vacuum cooling device is capable of rapid cooling up to about 20 ° C. However, since the cooling rate decreases rapidly thereafter, the devices with low cooling capacity on the market reach the chilled range. Cooling has been difficult. If it is attempted to cool down to the chilled region, it is necessary to significantly increase the cooling capacity of the vacuum cooling means, that is, the ultimate vacuum. In general, many vacuum cooling devices do not need to be cooled to the chilled region, and ordinary vacuum cooling does not require an increased cooling capacity from the viewpoint of the cooling rate. Therefore, it is not economical to increase the cooling capacity of the vacuum cooling means only for cooling to the chilled region.

ところで、真空冷却と冷風冷却とを可能とした複合冷却装置としては、特許文献1に記載のものが知られている。この複合冷却装置は、被冷却物を先ず冷風冷却により冷却した後、真空冷却により所定温度まで冷却するものである。この従来技術は、短時間冷却を課題とせず、冷風冷却→真空冷却の順で冷却を行っているので、チルド域の低温まで冷却しようとすると、冷却時間が長くなるとともに、真空冷却手段の冷却能力を大きいものとしなければならず、真空冷却手段の装置が大掛かりなものとなる課題があった。   By the way, the thing of patent document 1 is known as a compound cooling device which enabled vacuum cooling and cold air cooling. In this composite cooling device, an object to be cooled is first cooled by cold air cooling and then cooled to a predetermined temperature by vacuum cooling. In this conventional technology, cooling is not performed for a short time, and cooling is performed in the order of cold air cooling → vacuum cooling. Therefore, when cooling to a low temperature in the chilled region, the cooling time becomes longer and the cooling of the vacuum cooling means is reduced. There is a problem that the capacity must be increased and the apparatus for the vacuum cooling means becomes large.

特開2002−318051公報JP 2002-318051 A

この出願の発明者等は、前記の課題を解決すべく、研究開発を重ねた結果、真空冷却手段と冷風冷却手段のそれぞれの冷却特性を活かし、真空冷却工程後に冷風冷却工程を行うことにより、チルド域までの冷却を短時間で実現可能な複合冷却装置を特願2006−10880にて提案している。   The inventors of this application, as a result of repeated research and development to solve the above-mentioned problems, by utilizing the cooling characteristics of the vacuum cooling means and the cold air cooling means, by performing the cold air cooling process after the vacuum cooling process, Japanese Patent Application No. 2006-10880 proposes a composite cooling device capable of realizing cooling to a chilled region in a short time.

この出願の発明者等は、さらに研究開発を続けた結果、つぎの課題を見出した。すなわち、真空冷却工程を行う真空冷却手段の冷却能力が低い場い場合、被冷却物の初期温度(初期品温)が低いと真空冷却工程を実行しても冷却時間の短縮にさほど効果がない真空冷却工程を行うことになり、効率的でなく、省エネルギーに反することが分かった。   The inventors of this application have found the following problems as a result of further research and development. In other words, when the cooling capacity of the vacuum cooling means for performing the vacuum cooling process is low, even if the vacuum cooling process is executed if the initial temperature (initial product temperature) of the object to be cooled is low, the cooling time is not very effective. It was found that a vacuum cooling process was performed, which was not efficient and contrary to energy saving.

また、前記提案の複合冷却装置は、真空冷却手段を、冷却室と接続される減圧器の作動により第一真空冷却工程を実行するように構成される第一真空冷却手段と、冷却室を低圧下で密閉状態として冷却用熱交換器により被冷却物からの蒸気を凝縮することで第二真空冷却工程を実行するように構成される第二真空冷却手段とを含んで構成するとともに、記真空冷却工程を、第一真空冷却工程と第二真空冷却工程とを含んで構成している。こうした構成の複合冷却装置においては、初期品温が低いと、第二真空冷却工程前の空気排除
工程がうまく行われず、結果として第二真空冷却工程が効果的に行えないという課題を見出した。
In the proposed combined cooling apparatus, the vacuum cooling means includes a first vacuum cooling means configured to execute the first vacuum cooling step by the operation of a decompressor connected to the cooling chamber, and the cooling chamber has a low pressure. together constitute and a second vacuum cooling unit configured to perform a second vacuum cooling step by condensing steam from the cooling object by cooling heat exchanger as a closed state under the previous SL The vacuum cooling process includes a first vacuum cooling process and a second vacuum cooling process. In the composite cooling device having such a configuration, when the initial product temperature is low, the air evacuation process before the second vacuum cooling process is not performed well, and as a result, the second vacuum cooling process cannot be effectively performed.

この発明が解決しようとする主たる課題は、効率良く、短時間で低温冷却を可能とすることである。また、付随的課題は、第二真空冷却工程を効果的に行うことにより短時間で冷却を可能とすることである。   The main problem to be solved by the present invention is to enable low temperature cooling efficiently and in a short time. Moreover, an incidental problem is enabling cooling in a short time by performing a 2nd vacuum cooling process effectively.

この発明は、前記課題を解決するためになされたもので、請求項1に記載の発明は、冷却室内の被冷却物を真空冷却する真空冷却手段と、冷却用熱交換器により冷却した空気に
より前記被冷却物を冷風冷却する冷風冷却手段と、前記真空冷却手段および前記冷風冷却手段を制御する制御器とを備える複合冷却装置であって、
前記被冷却物の初期温度を検出する検出手段を備え、
前記制御器は、前記検出手段による検出値が前記真空冷却手段の真空冷却能力に応じて設定される設定値を超える時、前記真空冷却手段による真空冷却工程後に前記冷風冷却手段による冷風冷却工程を行う第一冷却パターンと、前記検出値が設定値以下の時、前記真空冷却工程を行うことなく前記冷風冷却工程を行う第二冷却パターンとを行い、前記真空冷却工程から冷風冷却工程への切換タイミングを、前記真空冷却手段の後期の真空冷却速度が前記冷風冷却手段の冷風冷却速度より低下するタイミングとしたことを特徴としている。
The present invention has been made to solve the above-mentioned problems, and the invention according to claim 1 includes a vacuum cooling means for vacuum-cooling an object to be cooled in a cooling chamber and air cooled by a cooling heat exchanger. A combined cooling device comprising a cold air cooling means for cooling the object to be cooled, and a controller for controlling the vacuum cooling means and the cold air cooling means,
A detecting means for detecting an initial temperature of the object to be cooled;
When the detected value by the detecting means exceeds a set value set according to the vacuum cooling capacity of the vacuum cooling means, the controller performs a cold air cooling process by the cold air cooling means after the vacuum cooling process by the vacuum cooling means. a first cooling pattern carried out, when the detected value is below the set value, the have row and a second cooling pattern for performing the cold air cooling step without vacuum cooling process, from the vacuum cooling step to cool the cooling step The switching timing is characterized in that the latter vacuum cooling rate of the vacuum cooling means is lower than the cold air cooling rate of the cold air cooling means .

請求項1に記載の発明によれば、初期品温が高い場合は、前記第一冷却パターンにより冷却を行い、初期品温が低い場合には、前記第二冷却パターンにより冷却を行なうので、冷却効果の低い真空冷却運転を行わないことにより、省エネルギーと短時間冷却とを実現することができる。しかも、第一冷却パターンの運転においては、真空冷却手段の真空能力を考慮した冷却運転を行うことができる。
According to the first aspect of the present invention, when the initial product temperature is high, cooling is performed by the first cooling pattern, and when the initial product temperature is low, cooling is performed by the second cooling pattern. By not performing the low-efficiency vacuum cooling operation, energy saving and short-time cooling can be realized. Moreover, in the operation of the first cooling pattern, a cooling operation can be performed in consideration of the vacuum capacity of the vacuum cooling means.

請求項2に記載の発明は、請求項1において、前記切換タイミングは、前記真空冷却手段による冷却時間,前記冷却室内の圧力,同温度,被冷却物の温度のいずれか、または前記冷却室内の圧力,前記冷却室内の温度,被冷却物の温度のいずれかの変化量を検出し、前記検出値の一つまたは複数が各設定値となったときであることを特徴としている。According to a second aspect of the present invention, in the first aspect, the switching timing is any one of a cooling time by the vacuum cooling means, a pressure in the cooling chamber, the same temperature, a temperature of an object to be cooled, or a temperature in the cooling chamber. A change amount of any one of the pressure, the temperature in the cooling chamber, and the temperature of the object to be cooled is detected, and one or a plurality of the detected values become the respective set values.

請求項に記載の発明は、請求項1において、前記真空冷却手段は、前記冷却室と接続される減圧器の作動により第一真空冷却工程を実行するように構成される第一真空冷却手段と、前記第一真空冷却手段で空気排除工程を行った後に密閉状態として冷却用熱交換器により前記被冷却物からの蒸気を凝縮することで第二真空冷却工程を実行するように構成される前記第二真空冷却手段とを含んで構成され、前記真空冷却工程は、前記第一真空冷却工程と前記第二真空工程とを含むことを特徴としている。 A third aspect of the present invention is the first vacuum cooling means according to the first aspect, wherein the vacuum cooling means is configured to perform a first vacuum cooling step by an operation of a decompressor connected to the cooling chamber. And the second vacuum cooling step is performed by condensing the vapor from the object to be cooled by the heat exchanger for cooling in a sealed state after performing the air exclusion step by the first vacuum cooling means. The second vacuum cooling means is included, and the vacuum cooling step includes the first vacuum cooling step and the second vacuum step.

請求項に記載の発明によれば、請求項1による効果に加えて、被冷却物に含まれる水分が少ない、すなわち空気排除が効果的に行われていない状態での第二真空冷却工程の実行を防止することができるという効果を奏する。 According to the third aspect of the present invention, in addition to the effect of the first aspect, the second vacuum cooling step in the state where the moisture contained in the object to be cooled is small, that is, the air is not effectively eliminated. There is an effect that execution can be prevented.

さらに、請求項5に記載の発明は、冷却室内の被冷却物を真空冷却する真空冷却工程と、前記被冷却物を冷風冷却する冷風冷却工程とを行う複合冷却方法であって、前記被冷却物の初期温度が高い時、前記真空冷却工程後に前記冷風冷却工程を行い、前記初期品温が低い時、前記真空冷却工程を行うことなく前記冷風冷却工程を行うことを特徴としている。   Furthermore, the invention according to claim 5 is a composite cooling method comprising a vacuum cooling step for vacuum cooling the object to be cooled in a cooling chamber and a cold air cooling step for cooling the object to be cooled with cold air, When the initial temperature of the product is high, the cold air cooling step is performed after the vacuum cooling step, and when the initial product temperature is low, the cold air cooling step is performed without performing the vacuum cooling step.

請求項5に記載の発明によれば、初期品温が高い場合は、前記第一冷却パターンにより冷却を行い、初期品温が低い場合には、前記第二冷却パターンにより冷却を行うので、冷却効果の低い真空冷却運転を行わないことにより、省エネルギーと短時間冷却とを実現することができる。   According to the fifth aspect of the present invention, when the initial product temperature is high, cooling is performed by the first cooling pattern, and when the initial product temperature is low, cooling is performed by the second cooling pattern. By not performing the low-efficiency vacuum cooling operation, energy saving and short-time cooling can be realized.

この発明によれば、効率的でない真空冷却工程を行うことなく、被冷却物を短時間で低温まで冷却することができるという効果を奏する。   According to the present invention, the object to be cooled can be cooled to a low temperature in a short time without performing an inefficient vacuum cooling step.

つぎに、この発明の実施の形態について説明する。この発明の実施の形態は、冷風冷却と真空冷却とによって被冷却物を冷却可能な複合冷却装置に適用される。   Next, an embodiment of the present invention will be described. The embodiment of the present invention is applied to a composite cooling device capable of cooling an object to be cooled by cold air cooling and vacuum cooling.

この実施の形態を具体的に説明する。この実施の形態は、冷却室内の被冷却物を真空冷却する真空冷却手段と、前記被冷却物を冷風冷却する冷風冷却手段と、前記真空冷却手段および前記冷風冷却手段を制御する制御器とを備える複合冷却装置であって、前記被冷却物の初期温度を検出する検出手段を備え、前記制御器は、前記検出手段による検出値が設定値を越える時、前記真空冷却手段による真空冷却工程後に前記冷風冷却手段による冷風冷却工程を順次行う第一冷却パターンと、前記検出手段による検出値が設定値以下の時、前記真空冷却工程を行うことなく前記冷風冷却工程を行う第二冷却パターンとを行うことを特徴としている。前記設定値は、冷却パターンの選択のための設定値であるので、選択設定値と称することができる。   This embodiment will be specifically described. In this embodiment, a vacuum cooling means for cooling the object to be cooled in a cooling chamber, a cold air cooling means for cooling the object to be cooled, and a controller for controlling the vacuum cooling means and the cold air cooling means are provided. A composite cooling device comprising detection means for detecting an initial temperature of the object to be cooled, wherein the controller, after a detected value by the detection means exceeds a set value, after a vacuum cooling step by the vacuum cooling means A first cooling pattern for sequentially performing the cold air cooling process by the cold air cooling means, and a second cooling pattern for performing the cold air cooling process without performing the vacuum cooling process when the detection value by the detection means is a set value or less. It is characterized by doing. Since the set value is a set value for selecting a cooling pattern, it can be referred to as a selected set value.

この実施の形態においては、前記真空冷却手段の真空冷却能力(真空冷却特性)により真空冷却可能な被冷却物の温度(以下、品温という。)が決まるので、前記設定値は、この冷却可能温度に応じて設定されている。冷却運転の開始の際には、前記検出手段により、冷却開始時の品温(以下、初期品温という。)を検出し、この検出値が前記設定値以下かどうかで、前記制御器は、前記第一冷却パターンと前記第二冷却パターンとを選択する。初期品温の値に拘わらず真空冷却工程,冷風冷却工程を行うと、初期品温が前記設定値以下の時は、前記真空冷却手段を作動させても効果的な真空冷却が行われないまま前記真空冷却手段を作動させ、冷却時間が長くなる。この実施の形態によれば、初期品温が前記設定値以下の時は、前記第二冷却パターンを行う、すなわち前記真空冷却工程を行わず前記冷風冷却工程を行うので、冷却効果の低い状態で前記真空冷却手段を作動させることがないので、省エネルギーとなるとともに、冷却時間を短縮できる。   In this embodiment, since the temperature of the object to be cooled (hereinafter referred to as product temperature) is determined by the vacuum cooling capability (vacuum cooling characteristics) of the vacuum cooling means, the set value can be cooled. It is set according to the temperature. At the start of cooling operation, the detection means detects the product temperature at the start of cooling (hereinafter referred to as initial product temperature), and whether the detected value is equal to or less than the set value, the controller The first cooling pattern and the second cooling pattern are selected. When the vacuum cooling process and the cold air cooling process are performed regardless of the initial product temperature value, when the initial product temperature is equal to or lower than the set value, effective vacuum cooling is not performed even if the vacuum cooling means is operated. The vacuum cooling means is activated and the cooling time becomes longer. According to this embodiment, when the initial product temperature is equal to or lower than the set value, the second cooling pattern is performed, that is, the cold air cooling process is performed without performing the vacuum cooling process, so that the cooling effect is low. Since the vacuum cooling means is not operated, energy is saved and the cooling time can be shortened.

この実施の形態において、前記真空冷却手段による冷却は、被冷却物の周囲の圧力を品温に相当する圧力以下とすることで、被冷却物内の水分を蒸発させることにより被冷却物を冷却するものである。この冷却は、被冷却物の表面と中心部との温度差が少ない、均一冷却である。この真空冷却特性は、前期の真空冷却速度が速く、後期の真空冷却速度が前期のそれと比較して鈍化するものである。この真空冷却特性は、前記真空冷却手段により決まる時間−圧力特性であり、品温は、初期工程を除いてほぼこの真空冷却特性に沿ったカーブを描いて指数関数的に低下して行く。   In this embodiment, the cooling by the vacuum cooling means cools the object to be cooled by evaporating the water in the object to be cooled by setting the pressure around the object to be cooled to a pressure corresponding to the product temperature or less. To do. This cooling is uniform cooling with a small temperature difference between the surface and the center of the object to be cooled. This vacuum cooling characteristic is such that the vacuum cooling rate in the previous period is high and the vacuum cooling rate in the latter period is slower than that in the previous period. This vacuum cooling characteristic is a time-pressure characteristic determined by the vacuum cooling means, and the product temperature decreases exponentially while drawing a curve substantially along the vacuum cooling characteristic except for the initial step.

また、前記冷風冷却手段の冷風冷却特性は、冷風冷却速度が前期の真空冷却速度より遅く、後期の鈍化した真空冷却速度よりも早いものとしている。この冷風冷却は、被冷却物の表面において周囲の空気と間接熱交換することによる冷却である。このため、被冷却物を短時間では均一冷却はできない。また、冷風冷却特性は、前記冷風冷却手段による時間
−品温特性であり、品温の低下の傾きが前記真空冷却特性のそれより緩かな特性曲線としている。
The cold air cooling characteristics of the cold air cooling means are such that the cold air cooling rate is slower than the vacuum cooling rate of the previous period and faster than the slowed vacuum cooling rate of the latter period. This cold air cooling is cooling by indirect heat exchange with the surrounding air on the surface of the object to be cooled. For this reason, the object to be cooled cannot be uniformly cooled in a short time. The cold air cooling characteristic is a time-product temperature characteristic by the cold air cooling means, and the slope of the decrease in the product temperature is a characteristic curve that is gentler than that of the vacuum cooling characteristic.

前記制御器は、こうした特性を有する前記真空冷却手段および前記冷風冷却手段を用いて記第一冷却パターンを行う。すなわち、前記真空冷却手段による真空冷却工程を行った後に前記冷風冷却手段による冷風冷却工程を行うことで、被冷却物をチルド域まで短時間で冷却する。前記真空冷却工程の前期は、真空冷却速度が速く、品温は急速に低下する。前記真空冷却工程の後期となると真空冷却速度が低下するので、前記真空冷却工程に代えて前記冷風冷却工程が実行される。前記冷風冷却工程における冷風冷却速度は、前記真空冷却工程の前期の真空冷却速度より遅いが、チルド域まで冷却することができる。   The controller performs the first cooling pattern using the vacuum cooling means and the cold air cooling means having such characteristics. In other words, the object to be cooled is cooled to the chilled region in a short time by performing the cold air cooling process by the cold air cooling means after performing the vacuum cooling process by the vacuum cooling means. In the first half of the vacuum cooling step, the vacuum cooling rate is fast, and the product temperature decreases rapidly. Since the vacuum cooling rate decreases at the later stage of the vacuum cooling step, the cold air cooling step is executed instead of the vacuum cooling step. The cold air cooling rate in the cold air cooling step is slower than the vacuum cooling rate in the previous period of the vacuum cooling step, but can be cooled to a chilled region.

前記の真空冷却工程から冷風冷却工程への切り換えタイミングは、好ましくは、後期の真空冷却速度が冷風冷却速度より低下するタイミングとする。   The timing for switching from the vacuum cooling step to the cold air cooling step is preferably a timing at which the latter vacuum cooling rate is lower than the cold air cooling rate.

この真空冷却工程から冷風冷却工程への切り換えは、前記真空冷却手段による冷却時間,前記冷却室内の圧力,同温度,被冷却物の温度のいずれかを検出する検出手段を備え、前記検出手段の検出値が設定値となったとき、前記制御器により行うように構成することができる。また、前記検出手段により、前記冷却室内の圧力,前記冷却室内の温度,被冷却物の温度のいずれかの変化量を検出し、この検出値が設定値となったとき、前記真空冷却工程から前記冷風冷却工程へ切り換えるように構成することができる。また、複数の検出値が各設定値となったとき(複数条件を満たしたとき)に前記切り換えを行うように構成することができる。   The switching from the vacuum cooling process to the cold air cooling process includes a detecting means for detecting any one of a cooling time by the vacuum cooling means, a pressure in the cooling chamber, the same temperature, and a temperature of the object to be cooled. When the detected value reaches the set value, the controller can be configured to perform the operation. The detecting means detects any amount of change in the pressure in the cooling chamber, the temperature in the cooling chamber, or the temperature of the object to be cooled, and when the detected value reaches a set value, It can comprise so that it may switch to the said cold wind cooling process. Further, the switching can be performed when a plurality of detection values become the set values (when a plurality of conditions are satisfied).

そして、前記の「後期の真空冷却速度が冷風冷却速度より低下する」冷風切換タイミングは、前記真空冷却工程における真空冷却速度を連続的に監視し、前記冷風冷却工程における冷風冷却速度と比較して、前者が後者より遅くなるタイミングとすることができる。このタイミングは、後期の真空冷却速度が冷風冷却速度と等しくなるタイミングを挟んで前後に若干の幅を持たせて設定することができる。また、前記冷風切換タイミングは、前記冷却室内の圧力または温度が、前記真空冷却特性による最終到達圧力または温度に設定値を加えた値となったときとすることができる。前記最終到達圧力(温度)とは、真空冷却特性によって無限の時間を要するが最終的に到達可能な圧力(温度)を意味する。   Then, the “cold air switching timing at which the latter-stage vacuum cooling rate is lower than the cold air cooling rate” continuously monitors the vacuum cooling rate in the vacuum cooling step, and compares it with the cold air cooling rate in the cold air cooling step. The timing when the former is later than the latter can be set. This timing can be set with a slight width before and after the timing at which the latter vacuum cooling rate becomes equal to the cooling air cooling rate. The cold air switching timing may be when the pressure or temperature in the cooling chamber becomes a value obtained by adding a set value to the final pressure or temperature due to the vacuum cooling characteristics. The final ultimate pressure (temperature) means a pressure (temperature) that can be finally reached, although an infinite time is required depending on the vacuum cooling characteristics.

また、前記冷風切換タイミングは、予め実験により、冷却開始から「後期の真空冷却速度が冷風冷却速度より低下する」までの経過時間(冷却時間),前記冷却室内の圧力,前記冷却室内の温度,被冷却物の温度,または前記冷却室内の圧力,同温度および前記被冷却物の温度のいずれかの変化量を設定値として求めておき、前記検出手段による検出値が前記設定値となったときとすることができる。   In addition, the cold air switching timing is determined in advance by experiments from the start of cooling until the “late vacuum cooling rate falls below the cold air cooling rate” (cooling time), the pressure in the cooling chamber, the temperature in the cooling chamber, When the temperature of the object to be cooled or the amount of change in the pressure in the cooling chamber, the same temperature, or the temperature of the object to be cooled is obtained as a set value, and the value detected by the detection means becomes the set value It can be.

さらに、前記冷風切換タイミングは、前記真空冷却工程と前記冷風冷却工程に要する時間(設定冷却時間)と到達すべき冷却温度(設定冷却温度)とを設定した場合、これらの設定冷却時間,前記真空冷却特性,前記冷風冷却特性とから設定することができる。この設定の概要は、つぎの通りである。時間(横軸)−温度(縦軸)特性において、前記設定冷却時間と前記設定冷却温度によって定められる最終到達ポイントが終点となるように冷風冷却特性曲線(時間−温度特性曲線)を時間を遡る方向へ引く、そして、真空冷却特性に対応する時間−品温特性曲線と交わる点を前記冷風切換タイミングとする。こうしたタイミングの設定により、決められた時間で、決められた温度まで、確実に冷却を行うことができる。   Further, when the cold air switching timing is set with the time required for the vacuum cooling process and the cold air cooling process (set cooling time) and the cooling temperature to be reached (set cooling temperature), the set cooling time, the vacuum It can be set from the cooling characteristics and the cold air cooling characteristics. The outline of this setting is as follows. In the time (horizontal axis) -temperature (vertical axis) characteristic, the cold air cooling characteristic curve (time-temperature characteristic curve) is traced back so that the final point determined by the set cooling time and the set cooling temperature is the end point. The point that is drawn in the direction and intersects the time-product temperature characteristic curve corresponding to the vacuum cooling characteristic is defined as the cold air switching timing. By setting the timing as described above, the cooling can be reliably performed to the determined temperature in the determined time.

つぎに、この実施の形態の各構成要素について説明する。前記冷却室は、被冷却物を収容する密閉空間を形成するとともに、被冷却物を出し入れすることができるものであれば
、その形式、種類および大きさは問わない。この冷却室は、冷却槽,冷却区画、冷却容器などと称することができる。前記被冷却物は、好ましくは食材とするが、これに限定されるものではない。
Next, each component of this embodiment will be described. The cooling chamber may be of any type, type, and size as long as it forms a sealed space for accommodating the object to be cooled and can take in and out the object to be cooled. This cooling chamber can be referred to as a cooling tank, a cooling compartment, a cooling container, or the like. The object to be cooled is preferably a food, but is not limited thereto.

前記真空冷却手段は、前記冷却室と接続される減圧ラインと、この減圧ライン中に設けられる減圧手段(減圧器)とを含んで構成される。この減圧器は、好ましくは、真空ポンプまたは水エゼクタとし、さらに好ましくは、上流側に蒸気凝縮用の熱交換器を備えないものとする。これにより、前記真空冷却手段の真空冷却能力(この真空冷却能力は、前記減圧器を水封式真空ポンプとした場合、封水の温度により決まる。)は低くなるが、前記減圧器の構成を簡素化できる。また、この減圧器は、蒸気エゼクタ,蒸気凝縮用の熱交換器および真空ポンプまたは水エゼクタを組み合わせたものとすることができる。前記真空ポンプは、好ましくは水封式真空ポンプとする。   The vacuum cooling means includes a decompression line connected to the cooling chamber, and a decompression means (a decompressor) provided in the decompression line. The decompressor is preferably a vacuum pump or a water ejector, and more preferably does not include a heat exchanger for vapor condensation upstream. This lowers the vacuum cooling capacity of the vacuum cooling means (this vacuum cooling capacity is determined by the temperature of the sealed water when the pressure reducer is a water-sealed vacuum pump). It can be simplified. The decompressor may be a combination of a steam ejector, a heat exchanger for steam condensation, and a vacuum pump or water ejector. The vacuum pump is preferably a water ring vacuum pump.

前記冷風冷却手段は、被冷却物を冷風により冷却するものである。この冷風冷却手段は、好ましくは、前記冷却室内の空気を冷却する冷却用熱交換器と、前記冷却室内の空気を循環させるファンと、被冷却物と前記冷却用熱交換器との間に前記ファンによって空気の循環流が形成されるように循環路を形成する循環路形成部材とから構成される。前記循環路は、好ましくは、前記熱交換器および前記ファンを前記冷却室内に配置することで、前記冷却室内に形成するが、前記熱交換器および/または前記ファンを前記冷却室外へ配置し、これらと前記冷却室とを通風ダクトにてつなぐことで、循環路を構成することができる。   The cold air cooling means cools an object to be cooled with cold air. Preferably, the cold air cooling means includes a cooling heat exchanger that cools the air in the cooling chamber, a fan that circulates the air in the cooling chamber, and the object to be cooled and the cooling heat exchanger. It is comprised from the circulation path formation member which forms a circulation path so that the circulation flow of air may be formed with a fan. The circulation path is preferably formed in the cooling chamber by disposing the heat exchanger and the fan in the cooling chamber, but the heat exchanger and / or the fan is disposed outside the cooling chamber, A circulation path can be formed by connecting these and the cooling chamber with a ventilation duct.

前記冷却用熱交換器は、被冷却物を冷風冷却によりチルド域まで冷却可能な低温(たとえば−10℃以下)とすることができる熱交換器であればよいが、好ましくは、冷凍機のコンデンシングユニットから供給される液化冷媒を蒸発して間接熱交換により前記冷却室内の空気を冷却する蒸発器から構成する。しかしながら、この冷却用熱交換器は、冷水製造装置(チラー)から供給される冷水、またはブラインチラーから供給されるブラインを冷媒とする熱交換器とすることができる。   The cooling heat exchanger may be any heat exchanger that can be cooled to a low temperature (for example, −10 ° C. or lower) that can cool the object to be cooled to the chilled region by cooling with cold air. And an evaporator that evaporates the liquefied refrigerant supplied from the cooling unit and cools the air in the cooling chamber by indirect heat exchange. However, the heat exchanger for cooling can be a heat exchanger that uses cold water supplied from a cold water production apparatus (chiller) or brine supplied from a branler as a refrigerant.

前記制御器は、予め記憶した前記冷却プログラムにより前記真空冷却手段および前記冷風冷却手段の作動を制御する。前記冷却プログラムには、前記第一冷却パターンと前記第二冷却パターンとを初期品温に応じて選択するプログラムを少なくとも含んでいる。また、この冷却プログラムには、前記第一冷却パターンおよび前記第二冷却パターンの選択プログラムに加えて、真空冷却のみを行うプログラム,冷風冷却,真空冷却および冷風冷却を順次行うプログラム,冷風冷却のみを行うプログラム、冷風冷却および真空冷却を順次行うプログラムを含ませ、これらのプログラムを被冷却物の種類や前記設定冷却温度に応じて選択的に実行するように構成することができる。   The controller controls operations of the vacuum cooling means and the cold air cooling means according to the cooling program stored in advance. The cooling program includes at least a program for selecting the first cooling pattern and the second cooling pattern according to the initial product temperature. In addition to the first cooling pattern and the second cooling pattern selection program, the cooling program includes a program that performs only vacuum cooling, a program that performs cooling air cooling, vacuum cooling and cooling air cooling in sequence, and only cooling air cooling. A program to be executed, a program for sequentially performing cold air cooling and vacuum cooling can be included, and these programs can be configured to be selectively executed according to the type of the object to be cooled and the set cooling temperature.

以上説明したこの発明の実施の形態の変形例として、前記真空冷却手段を、第一真空冷却特性を有する第一真空冷却手段と第二真空冷却特性を有する第二真空冷却手段とを備えるものとすることができる。この場合、前記第一冷却パターンの真空冷却工程を前記第一真空冷却手段による第一真空冷却工程および前記第二真空冷却手段による第二真空冷却工程を含むものとし、前記第二冷却パターンは、前記第一真空冷却工程および前記第二真空冷却工程を行わないように構成する。   As a modification of the embodiment of the present invention described above, the vacuum cooling means includes a first vacuum cooling means having a first vacuum cooling characteristic and a second vacuum cooling means having a second vacuum cooling characteristic. can do. In this case, the vacuum cooling process of the first cooling pattern includes a first vacuum cooling process by the first vacuum cooling means and a second vacuum cooling process by the second vacuum cooling means, and the second cooling pattern is The first vacuum cooling step and the second vacuum cooling step are not performed.

この変形例においても、前記と同様に、冷却時間,前記冷却室内の圧力,同温度および被冷却物の温度のいずれかを検出するか,または前記冷却室内の圧力,同温度および前記被冷却物の温度のいずれかの変化量を検出する検出手段を備え、前記制御器は、前記検出手段の検出値が第一設定値となったとき(真空切換タイミング)、前記第一真空冷却工程から前記第二真空冷却工程へ切り換え、前記検出値が第二設定値となったとき(冷風切換
タイミング)、前記第二真空冷却工程から前記冷風冷却工程へ切り換えるように構成することができる。この変形例においても、複数の検出値が各設定値となったとき(複数の条件を満たしたとき)に前記切り換えを行うように構成することができる。
In this modified example, as described above, either the cooling time, the pressure in the cooling chamber, the same temperature, and the temperature of the object to be cooled are detected, or the pressure, the same temperature, and the object to be cooled in the cooling chamber are detected. Detecting means for detecting any amount of change in the temperature of the controller when the detected value of the detecting means reaches a first set value (vacuum switching timing) from the first vacuum cooling step Switching to the second vacuum cooling process, and when the detected value becomes the second set value (cold air switching timing), the second vacuum cooling process can be switched to the cold air cooling process. This modification can also be configured to perform the switching when a plurality of detected values become set values (when a plurality of conditions are satisfied).

この変形例において、好ましくは、前記第一真空冷却手段は、前期の真空冷却速度が速く、後期で真空冷却速度が鈍化する第一真空冷却特性を有し、前記第二真空冷却手段は、前期の真空冷却速度が速く、後期で真空冷却速度が鈍化する第二真空冷却特性を有し、前記冷風冷却手段は、その冷風冷却特性を冷風冷却速度が前記第一真空冷却手段および前記第二真空冷却手段の前期の真空冷却速度より遅く、後期の鈍化した真空冷却速度より早いものとする。   In this modification, preferably, the first vacuum cooling means has a first vacuum cooling characteristic in which the vacuum cooling rate in the previous period is high and the vacuum cooling rate in the latter period is slowed down, and the second vacuum cooling means is in the previous period. The vacuum cooling rate of the first vacuum cooling means has the second vacuum cooling characteristic that the vacuum cooling rate of the latter is slow, and the vacuum cooling rate decreases later, and the cold air cooling means has the cold air cooling characteristics of the first vacuum cooling means and the second vacuum. It is assumed that the cooling means is slower than the vacuum cooling rate in the previous period and faster than the slowed vacuum cooling rate in the latter period.

そして、好ましくは、前記第二真空冷却手段による後期の真空冷却速度が前記冷風冷却手段による冷風冷却速度より低下するタイミングで前記第二真空冷却工程から前記冷風冷却工程へ切り換えるように構成するが、これに限定されるものではない。   And preferably, it is configured to switch from the second vacuum cooling step to the cold air cooling step at a timing when the latter vacuum cooling rate by the second vacuum cooling unit is lower than the cold air cooling rate by the cold air cooling unit, It is not limited to this.

この第二真空冷却工程から前記冷風冷却工程への冷風切換タイミングは、前記冷風切換タイミングと同様であり説明を省略する。前記真空冷却手段による冷却時間は、前記第一真空冷却手段による冷却開始からの時間、または前記第二真空冷却手段による冷却開始からの時間とすることができる。   The cold air switching timing from the second vacuum cooling step to the cold air cooling step is the same as the cold air switching timing, and the description thereof is omitted. The cooling time by the vacuum cooling means can be the time from the start of cooling by the first vacuum cooling means or the time from the start of cooling by the second vacuum cooling means.

また、前記第一真空冷却工程から前記第二真空冷却工程への真空切換タイミングは、好ましくは、前記第一真空冷却手段による後期の真空冷却速度が前記冷風冷却手段による冷風冷却速度より低下するタイミングとするが、これに限定されるものではない。   The vacuum switching timing from the first vacuum cooling step to the second vacuum cooling step is preferably a timing at which a late vacuum cooling rate by the first vacuum cooling means is lower than a cold air cooling rate by the cold air cooling means. However, the present invention is not limited to this.

この変形例においては、まず前記第一真空冷却工程により急速冷却を行い、真空冷却速度が低下すると、前記第二真空冷却工程により急速冷却を行い、真空冷却速度が低下すると前記冷風冷却工程へ移行する。   In this modification, first, rapid cooling is performed by the first vacuum cooling step, and when the vacuum cooling rate is reduced, rapid cooling is performed by the second vacuum cooling step, and when the vacuum cooling rate is reduced, the process proceeds to the cold air cooling step. To do.

この変形例によれば、急速で均一冷却が可能な真空冷却工程を実行した後に、低温まで冷却可能な冷風冷却工程を行うので、前記真空冷却手段および前記冷風冷却手段の冷却能力を増強することなく、短時間で被冷却物を低温まで冷却することができる。また、真空冷却工程を前記第一真空冷却手段と前記第二真空冷却手段とで、二段階により行っているので、真空冷却開始当初から過大な冷却能力で真空冷却するものと比較して、真空冷却手段の作動に必要なエネルギーを削減できるとともに、急激な冷却で被冷却物の品質低下が問題になる食材では、品質の低下を抑えることができる。   According to this modified example, after the vacuum cooling process capable of rapid and uniform cooling is performed, the cooling air cooling process capable of cooling to a low temperature is performed, so that the cooling capacity of the vacuum cooling means and the cold air cooling means is enhanced. The object to be cooled can be cooled to a low temperature in a short time. In addition, since the vacuum cooling process is performed in two stages by the first vacuum cooling means and the second vacuum cooling means, the vacuum cooling process is performed in a vacuum compared with the case of vacuum cooling with an excessive cooling capacity from the beginning of the vacuum cooling. In addition to reducing the energy required for the operation of the cooling means, it is possible to suppress the deterioration of quality in foods in which the quality of the object to be cooled is a problem due to rapid cooling.

前記第一真空冷却手段および前記第二真空冷却手段は、比較的冷却能力の小さい複合冷却装置に好適な第一態様として、つぎのように構成することができる。すなわち、前記冷風冷却手段は、前記冷却室内の空気を冷却用熱交換器との間接熱交換により冷却するように構成する。そして、前記第一真空冷却手段は、前記冷却室と接続される減圧器の作動により第一真空冷却を実行するように構成する。また、前記第二真空冷却手段は、前記冷却室を低圧下で密閉状態として前記冷却用熱交換器により被冷却物からの蒸気を凝縮することにより第二真空冷却工程を実行するように構成される。前記冷却用熱交換器は、チルド域まで被冷却物を冷却可能なものであればよいが、好ましくは、冷凍機から供給される冷媒の蒸発により冷却作用をなすものとする。   The first vacuum cooling means and the second vacuum cooling means can be configured as follows as a first aspect suitable for a composite cooling device having a relatively small cooling capacity. That is, the cold air cooling means is configured to cool the air in the cooling chamber by indirect heat exchange with the cooling heat exchanger. And said 1st vacuum cooling means is comprised so that 1st vacuum cooling may be performed by the action | operation of the decompressor connected with the said cooling chamber. The second vacuum cooling means is configured to perform the second vacuum cooling step by condensing steam from the object to be cooled by the cooling heat exchanger with the cooling chamber sealed under a low pressure. The The cooling heat exchanger is not particularly limited as long as it can cool the object to be cooled to the chilled region, but preferably performs a cooling action by evaporation of the refrigerant supplied from the refrigerator.

前記第一真空冷却手段の減圧器は、真空ポンプまたは水エゼクタとすることができ、好ましくは蒸気凝縮用の熱交換器を備えないものとする。前記真空ポンプは、好ましくは、水封式真空ポンプとする。   The decompressor of the first vacuum cooling means may be a vacuum pump or a water ejector, and preferably does not include a heat exchanger for vapor condensation. The vacuum pump is preferably a water ring vacuum pump.

前記第二真空冷却手段は、前記冷却室を密閉するために前記減圧器を備える減圧ラインにおいて、前記冷却室と前記減圧器との間に開閉弁を設け、第二真空冷却手段の作動時に前記開閉弁を閉じることで、前記冷却室内を密閉状態とすることができる。   The second vacuum cooling means is provided with an open / close valve between the cooling chamber and the pressure reducer in a pressure reducing line including the pressure reducer to seal the cooling chamber, and the second vacuum cooling means is operated when the second vacuum cooling means is operated. By closing the on-off valve, the cooling chamber can be sealed.

前記第一真空冷却手段の作動とは、前記開閉弁を開き、前記減圧器を運転することであり、前記第二冷却手段の作動とは、前記冷却室が低圧下の状態を作った後に前記開閉弁を閉じ、前記冷却用熱交換器を作動させる,すなわち冷媒を供給して冷却作用を行わせることである。   The operation of the first vacuum cooling means is to open the on-off valve and operate the pressure reducer, and the operation of the second cooling means is the operation after the cooling chamber is in a low pressure state. The on-off valve is closed and the cooling heat exchanger is operated, that is, the refrigerant is supplied to perform the cooling action.

前記第二真空冷却工程においては、減圧下で,密閉の空間内で被冷却物から蒸気が発生し、発生した蒸気が前記冷却用熱交換器の表面で凝縮し、被冷却物からの蒸発を促進する。この第二真空冷却工程の作用を確実なものとするためには、前記冷却室内に蒸気の凝縮を妨げる空気が存在しないことが重要である。このため、前記第一真空冷却工程の前または前記第二真空冷却工程の前に空気排除工程を設けることが望ましい。この空気排除工程は、好ましくは、前記減圧器を作動させ排気を行いながら、前記冷却室へ蒸気または温水を供給して前記冷却室内を蒸気で満たすことにより、空気を排除するように構成する。また、この空気排除工程は、前記排気→前記給蒸→前記排気の順に行い、これを1回乃至複数回繰り返すことに行うように構成することができる。   In the second vacuum cooling step, steam is generated from the object to be cooled in a sealed space under reduced pressure, and the generated steam is condensed on the surface of the cooling heat exchanger to evaporate from the object to be cooled. Facilitate. In order to ensure the action of the second vacuum cooling step, it is important that there is no air in the cooling chamber that prevents vapor condensation. For this reason, it is desirable to provide an air exclusion process before the first vacuum cooling process or before the second vacuum cooling process. This air exclusion step is preferably configured to exclude air by supplying steam or hot water to the cooling chamber and filling the cooling chamber with steam while operating the decompressor and exhausting. Moreover, this air exclusion process can be configured to be performed in the order of the exhaust gas → the steam supply → the exhaust gas, and this may be performed once or a plurality of times.

前記第二真空冷却工程は、前記冷却用熱交換器を冷風冷却用だけでなく、被冷却物からの蒸気を凝縮するコールドトラップとして用いて行われることになる。これにより、前記減圧器として蒸気エゼクタを設ける必要がなくなるとともに、場合によっては、減圧器の上流側に設ける蒸気凝縮用の熱交換器(凝縮用熱交換器)を省略することができ、前記真空冷却手段の構成を簡素化できる。   The second vacuum cooling step is performed using the cooling heat exchanger not only for cooling cold air but also as a cold trap for condensing steam from the object to be cooled. As a result, it is not necessary to provide a steam ejector as the decompressor, and in some cases, a steam condensation heat exchanger (condensation heat exchanger) provided on the upstream side of the decompressor can be omitted. The configuration of the cooling means can be simplified.

また、前記第一真空冷却手段および前記第二真空冷却手段は、比較的冷却能力の大きい複合冷却装置に好適な第二態様として、つぎのように構成することができる。すなわち、前記減圧ラインと、この減圧ライン中に設けられる蒸気エゼクタ,凝縮用熱交換器および前記減圧器とを設けたものとする。そして、前記第一真空冷却手段は、前記減圧器の作動により第一真空冷却工程を実行するように構成する。また、前記第二真空冷却手段は、前記減圧器の作動に加えて、前記蒸気エゼクタおよび前記凝縮用熱交換器を作動させることにより第二真空冷却工程を実行するように構成する。前記冷風冷却手段は、前記冷却室内の空気を前記冷却用熱交換器との間接熱交換により冷却するように構成する。   Further, the first vacuum cooling means and the second vacuum cooling means can be configured as follows as a second aspect suitable for a composite cooling apparatus having a relatively large cooling capacity. That is, the decompression line, the steam ejector provided in the decompression line, the heat exchanger for condensation, and the decompressor are provided. And said 1st vacuum cooling means is comprised so that a 1st vacuum cooling process may be performed by the action | operation of the said pressure reduction device. Further, the second vacuum cooling means is configured to execute the second vacuum cooling step by operating the steam ejector and the condensing heat exchanger in addition to the operation of the decompressor. The cold air cooling means is configured to cool the air in the cooling chamber by indirect heat exchange with the cooling heat exchanger.

この第二態様の前記第一真空冷却手段の作動、すなわち前記減圧器の作動により前記第一真空冷却工程が行われる。前記第二真空冷却手段の作動、すなわち前記減圧器の作動により前記第二真空冷却工程が行われる。   The first vacuum cooling step is performed by the operation of the first vacuum cooling means of the second aspect, that is, the operation of the decompressor. The second vacuum cooling step is performed by the operation of the second vacuum cooling means, that is, the operation of the decompressor.

以上説明した変形例によれば、初期品温が前記設定値以下の時は、前記第二冷却パターンが行われる。この冷却パターンでは、前記真空冷却工程を行わず前記冷風冷却工程を行うので、前記真空冷却手段を不必要に作動させることがなく、省エネルギーとなるとともに、冷却時間を短縮できる。また、前記第二冷却パターンの実行時には、温水または蒸気を供給する空気排除工程を行わないので、空気排除のための温水または蒸気供給手段の容量を小さくできる。   According to the modification described above, the second cooling pattern is performed when the initial product temperature is equal to or lower than the set value. In this cooling pattern, since the cooling air cooling process is performed without performing the vacuum cooling process, the vacuum cooling means is not operated unnecessarily, energy saving and cooling time can be shortened. In addition, when the second cooling pattern is executed, the air exclusion process for supplying hot water or steam is not performed, so that the capacity of the hot water or steam supply means for eliminating air can be reduced.

なお、この発明は、前記実施の形態に限定されるものではない。前記実施の形態においては、前記第一冷却パターンと前記第二冷却パターンとを前記制御手段により自動的に切り換えるように構成しているが、初期品温を作業者が測定して、その結果に基づき前記第一冷却パターンと前記第二冷却パターンとを手動で切り換えるように構成することができる。   The present invention is not limited to the above embodiment. In the embodiment, the first cooling pattern and the second cooling pattern are automatically switched by the control means. However, the operator measures the initial product temperature, Based on this, the first cooling pattern and the second cooling pattern can be manually switched.

以下、この発明の具体的実施例1を図面に基づいて詳細に説明する。図1は、同実施例1の冷却装置としての複合冷却装置1の概略構成図であり、図2は、同実施例1による制御手順の要部を説明するフローチャート図である。   Hereinafter, a specific embodiment 1 of the present invention will be described in detail with reference to the drawings. FIG. 1 is a schematic configuration diagram of a composite cooling device 1 as a cooling device of the first embodiment, and FIG. 2 is a flowchart illustrating a main part of a control procedure according to the first embodiment.

前記複合冷却装置1は、真空冷却と冷風冷却とを行うことができる冷却装置であり、種々の冷却パターンを選択的に実行できるとともに、被冷却物温度(以下、品温という。)がチルド域の低温となるように被冷却物3を短時間で冷却できる特徴を有している。   The composite cooling device 1 is a cooling device that can perform vacuum cooling and cold air cooling, can selectively execute various cooling patterns, and has an object temperature to be cooled (hereinafter referred to as a product temperature) in a chilled region. The cooling target 3 can be cooled in a short time so that the temperature becomes low.

前記複合冷却装置1は、冷却室2と、この冷却室2内の被冷却物3を真空冷却する真空冷却手段4と、前記被冷却物3を冷風冷却する冷風冷却手段5と、前記真空冷却手段4および前記冷風冷却手段5とを制御する制御手段としての制御器6とを主要部として備える。   The composite cooling device 1 includes a cooling chamber 2, a vacuum cooling means 4 for cooling the object to be cooled 3 in the cooling chamber 2, a cold air cooling means 5 for cooling the object 3 to be cooled, and the vacuum cooling. A controller 6 as a control means for controlling the means 4 and the cold air cooling means 5 is provided as a main part.

そして、前記制御器6には、ソフトウエアによるタイマー7を備えている。前記制御器6は、前記真空冷却手段4および前記冷風冷却手段5などを制御し、前記真空冷却手段4による真空冷却工程後に前記冷風冷却手段5による冷風冷却工程を順次行う第一冷却パターンと、前記真空冷却工程を行うことなく前記冷風冷却工程を行う第二冷却パターンとを初期品温に応じて選択する冷却プログラムを実行するように構成されている。   The controller 6 is provided with a timer 7 by software. The controller 6 controls the vacuum cooling means 4 and the cold air cooling means 5 and the like, a first cooling pattern for sequentially performing the cold air cooling process by the cold air cooling means 5 after the vacuum cooling process by the vacuum cooling means 4; A cooling program for selecting a second cooling pattern for performing the cold air cooling step without performing the vacuum cooling step according to an initial product temperature is executed.

つぎに、この複合冷却装置1の各構成要素について説明する。前記冷却室2は、被冷却物3を収容する密閉空間を形成し、被冷却物3を出し入れするための開口とこれを開閉する扉(いずれも図示省略)を備えている。また、前記冷却室2は、区画壁8により内部を上部の第一領域81と下部の第二領域82とに区画している。前記第一領域81には、被冷却物3が収容され、前記第二領域82には、前記冷風冷却手段5の一部を構成する冷却用熱交換器9が配置されている。被冷却物3は、容器に収容した食材である。   Next, each component of the composite cooling device 1 will be described. The cooling chamber 2 forms a sealed space in which the object to be cooled 3 is accommodated, and includes an opening for taking in and out the object to be cooled 3 and a door for opening and closing the object (both not shown). The cooling chamber 2 is divided into an upper first region 81 and a lower second region 82 by a partition wall 8. In the first area 81, the object to be cooled 3 is accommodated, and in the second area 82, the cooling heat exchanger 9 constituting a part of the cold air cooling means 5 is arranged. The to-be-cooled object 3 is the foodstuff accommodated in the container.

前記冷却用熱交換器9は、冷凍機10の冷媒を液化するコンデンサ(図示省略)を有するコンデンシングユニット11から供給される液化冷媒を蒸発させることにより冷却作用をなす周知の蒸発器にて構成されている。   The cooling heat exchanger 9 is a well-known evaporator that performs a cooling action by evaporating the liquefied refrigerant supplied from a condensing unit 11 having a condenser (not shown) that liquefies the refrigerant of the refrigerator 10. Has been.

この冷凍機10は、前記冷却用熱交換器9を除霜する除霜手段を備えている。この除霜手段は、冷媒の流れを逆転させるなどにより、前記コンデンシングユニット11から前記冷却用熱交換器9へホットガスを流して除霜するホットガスデフロストと称される周知の構成である。   The refrigerator 10 includes defrosting means for defrosting the cooling heat exchanger 9. This defrosting means has a well-known configuration called hot gas defrost for defrosting by flowing hot gas from the condensing unit 11 to the cooling heat exchanger 9 by reversing the flow of the refrigerant.

前記区画壁8は前記冷却室2に対して着脱自在に構成されており、前記扉を開いて、前記区画壁8を外すと前記冷却用熱交換器9が前記冷却室2の被冷却物出し入れ用の開口から露出するように構成されている。前記冷却用熱交換器9を洗浄するには、前記区画壁8を外して露出状態とすることにより、前記冷却用熱交換器9をこの複合冷却装置1に備え付けの洗浄機(図示省略)を用いて丸洗いすることができる。   The partition wall 8 is configured to be detachable with respect to the cooling chamber 2. When the door is opened and the partition wall 8 is removed, the cooling heat exchanger 9 takes in and out the object to be cooled in the cooling chamber 2. It is comprised so that it may expose from the opening for use. In order to clean the cooling heat exchanger 9, the partition wall 8 is removed and exposed so that a cleaning machine (not shown) provided with the cooling heat exchanger 9 in the composite cooling device 1 is used. Can be used to wash.

そして、前記冷風冷却手段5は、被冷却物3を冷風により冷却するものである。この冷風冷却手段5は、前記冷却室2内の空気を冷却するための前記冷却用熱交換器9と、前記冷却室2外に配置されるモータ12によって駆動される空気循環手段としてファン13とを含む。   The cold air cooling means 5 cools the object 3 to be cooled with cold air. The cold air cooling means 5 includes a cooling heat exchanger 9 for cooling the air in the cooling chamber 2, and a fan 13 as an air circulation means driven by a motor 12 disposed outside the cooling chamber 2. including.

そして、前記冷却室2の構成壁と前記区画壁8との間に第一開口(または隙間)141,第二開口(または隙間)142を設けて、前記冷却室2内に空気の循環経路(符号省略
)を形成することにより、冷風冷却機能をなすように構成している。この実施例1では、前記区画壁8は前記冷却室2の構成壁とで前記循環経路構成部材を構成する。なお、前記ファン13から出た空気がショートパスして戻らないように、前記ファン13と前記区画壁8および前記冷却室2の構成壁との間に遮蔽部材(図示省略)を設けるとともに、前記冷却用熱交換器9と前記区画壁8および前記冷却室2の構成壁との間にも遮蔽部材(図示省略)を設けている。
A first opening (or gap) 141 and a second opening (or gap) 142 are provided between the constituent wall of the cooling chamber 2 and the partition wall 8, and an air circulation path (in the cooling chamber 2 ( In this case, the cooling air cooling function is achieved. In the first embodiment, the partition wall 8 constitutes the circulation path constituting member with the constituent wall of the cooling chamber 2. A shielding member (not shown) is provided between the fan 13 and the partition wall 8 and the constituent walls of the cooling chamber 2 so that the air emitted from the fan 13 does not return through a short path. A shielding member (not shown) is also provided between the cooling heat exchanger 9 and the partition walls 8 and the constituent walls of the cooling chamber 2.

前記真空冷却手段4は、前期の真空冷却速度が早く(速くまたは高くと称することができる。)、後期で真空冷却速度が鈍化する第一真空冷却特性を有する第一真空冷却手段41と、前期の真空冷却速度が早く、後期で真空冷却速度が鈍化する第二真空冷却特性を有する第二真空冷却手段42とから構成されている。   The vacuum cooling means 4 has a first vacuum cooling means 41 having a first vacuum cooling characteristic in which the vacuum cooling rate in the previous period is fast (can be referred to as fast or high), and the vacuum cooling rate decreases in the later stage, The second vacuum cooling means 42 has a second vacuum cooling characteristic in which the vacuum cooling rate is high and the vacuum cooling rate decreases later.

前記第一真空冷却手段41および前記第二真空冷却手段42は、具体的には、つぎのように構成される。すなわち、前記第一真空冷却手段41は、前記冷却室2と接続される減圧ライン15と、この減圧ライン15中に設けられる減圧手段としての水封式の真空ポンプ16と、前記冷却室2および前記真空ポンプ16の間に位置して閉時に前記冷却室2を密閉保持する開閉弁17とを含んで構成される。   Specifically, the first vacuum cooling means 41 and the second vacuum cooling means 42 are configured as follows. That is, the first vacuum cooling means 41 includes a decompression line 15 connected to the cooling chamber 2, a water-sealed vacuum pump 16 as a decompression means provided in the decompression line 15, the cooling chamber 2 and An opening / closing valve 17 is provided between the vacuum pumps 16 and keeps the cooling chamber 2 hermetically closed when closed.

前記減圧ライン15は、図1に示すように前記冷却室2の底壁の中央部と接続されている。前記底壁は、周端部から中央部へ向けて下向きに傾斜形成されているので、前記減圧ライン15は、前記底壁の一番低い箇所に接続されている。この構成により後記のドレン排出動作において、ドレンを速やかに排出することができる。   The decompression line 15 is connected to the central portion of the bottom wall of the cooling chamber 2 as shown in FIG. Since the bottom wall is inclined downward from the peripheral end portion toward the center portion, the decompression line 15 is connected to the lowest portion of the bottom wall. With this configuration, drain can be quickly discharged in the drain discharge operation described later.

この第一真空冷却手段41は、前記開閉弁17を開いた状態で前記真空ポンプ16を作動(運転)させることにより第一真空冷却工程を実行するように構成される。前記開閉弁17は、開閉だけの弁としているが、開度が調整可能な弁とすることができる。前記減圧ライン15には、必要に応じて前記冷却室2方向への流れを阻止する逆止弁(図示省略)を設けることができる。こうした構成による第一真空冷却手段41の第一真空冷却特性は、前期の真空冷却速度が早く、後期で真空冷却速度が鈍化するものとなっている。   The first vacuum cooling means 41 is configured to perform the first vacuum cooling step by operating (operating) the vacuum pump 16 with the on-off valve 17 open. The on-off valve 17 is a valve that only opens and closes, but can be a valve whose opening degree can be adjusted. The decompression line 15 may be provided with a check valve (not shown) for preventing the flow in the direction of the cooling chamber 2 as necessary. The first vacuum cooling characteristic of the first vacuum cooling means 41 having such a configuration is such that the vacuum cooling rate in the previous period is fast and the vacuum cooling rate is slowed in the latter period.

また、前記第二真空冷却手段42は、前記冷却室2内を低圧下で密閉状態として前記冷却用熱交換器9により被冷却物からの蒸気を凝縮する機能を有し、第二真空冷却工程を実行するように構成される。この第二真空冷却手段42を構成する要素は、前記冷却室2,前記冷却用熱交換器9,前記開閉弁17および前記第一真空冷却手段41である。前記冷却室2内を低圧下で密閉状態とするには、前記第一真空冷却工程後に、前記開閉弁17を閉じることで実現される。こうした構成による第二真空冷却手段42の第二真空冷却特性は、前記第一真空冷却特性と同様に、前期の真空冷却速度が早く、後期で真空冷却速度が鈍化するものとなっている。   The second vacuum cooling means 42 has a function of condensing steam from the object to be cooled by the cooling heat exchanger 9 with the inside of the cooling chamber 2 sealed under a low pressure, and a second vacuum cooling step Configured to perform. The elements constituting the second vacuum cooling means 42 are the cooling chamber 2, the cooling heat exchanger 9, the on-off valve 17, and the first vacuum cooling means 41. Closing the inside of the cooling chamber 2 under a low pressure is realized by closing the on-off valve 17 after the first vacuum cooling step. As with the first vacuum cooling characteristic, the second vacuum cooling characteristic of the second vacuum cooling means 42 having such a configuration is such that the vacuum cooling rate in the first half is fast and the vacuum cooling rate is slowed in the second half.

そして、前記冷風冷却手段5の冷風冷却特性について説明すると、前記第一温度設定値以上の温度域の特性(第一冷風冷却特性)は、前記第一温度設定値以上の温度域では被冷却物3からの自然蒸発が支配的であるので真空冷却速度より早く、前記第二温度設定値以下の温度域の特性(第二冷風冷却特性)は、冷風冷却速度が前記第一真空冷却手段41および前記第二真空冷却手段42の前期の真空冷却速度より遅く、後期の鈍化した真空冷却速度よりも早いものとしている。   Then, the cold air cooling characteristic of the cold air cooling means 5 will be described. The characteristic of the temperature range above the first temperature set value (first cold air cooling characteristic) is the object to be cooled in the temperature range above the first temperature set value. Since the natural evaporation from 3 is dominant, the characteristic of the temperature range (second cold air cooling characteristic) that is faster than the vacuum cooling rate and lower than the second temperature set value is the same as that of the first vacuum cooling means 41 and The second vacuum cooling means 42 is slower than the previous vacuum cooling rate and faster than the later slowed vacuum cooling rate.

この実施例1においては、初期品温が低い場合でも、前記第二真空冷却工程の作用を可能とするために、前記第一真空冷却工程の中期または後期に空気排除工程を実行するように構成している。より具体的には、前記冷却室2内圧力が前記真空ポンプ16の減圧能力限界に対応する圧力(限界圧力)となる前に、前記限界圧力に相当する温度以上の40℃
の温水を前記冷却室2内へ注入するように構成している。注入された温水は、前記冷却室2内の圧力がその温水の飽和蒸気圧力以下まで減圧された時点から蒸発し始め、発生した蒸気により、前記冷却室2内の空気を室外へ排出することができる。
In the first embodiment, in order to enable the operation of the second vacuum cooling step even when the initial product temperature is low, the air exclusion step is executed in the middle or later stage of the first vacuum cooling step. doing. More specifically, before the internal pressure of the cooling chamber 2 reaches a pressure (limit pressure) corresponding to the pressure reduction capacity limit of the vacuum pump 16, it is 40 ° C. above the temperature corresponding to the limit pressure.
The hot water is injected into the cooling chamber 2. The injected hot water starts to evaporate from the time when the pressure in the cooling chamber 2 is reduced to a temperature equal to or lower than the saturated steam pressure of the hot water, and the generated steam can discharge the air in the cooling chamber 2 to the outside. it can.

この空気排除工程における温水注入のタイミングは、前記第一真空冷却工程開始からの経過時間を前記タイマー7により計測し、この計測値が設定値(注入タイミング)となった時としている。前記の温水注入タイミングは、前記冷却室2内圧力が設定値まで下がったときとすることができる。   The timing of the hot water injection in the air exclusion process is the time when the elapsed time from the start of the first vacuum cooling process is measured by the timer 7 and the measured value becomes a set value (injection timing). The warm water injection timing can be set when the pressure in the cooling chamber 2 is lowered to a set value.

前記冷却室2内への温水注入手段としての温水供給手段18は、温水を前記冷却室2内へ供給するための第一給水ライン19と、温水供給源(温水器または温水発生器)20と、温水供給を制御する第一給水弁21とを設けて構成されている。   A hot water supply means 18 as a means for injecting hot water into the cooling chamber 2 includes a first water supply line 19 for supplying hot water into the cooling chamber 2, a hot water supply source (a hot water heater or a hot water generator) 20, The first water supply valve 21 for controlling the hot water supply is provided.

また、前記冷却室2は、真空冷却工程後に前記冷却室2内を負圧から大気圧に復圧する復圧手段22を備えている。この復圧手段22は、前記冷却室2と接続される復圧ライン23と、この復圧ライン23途中に設ける復圧弁24および除菌フィルター25とを含んで構成される。前記復圧弁24は、復圧速度を調整するために開度が調整可能な弁とするが、開閉のみの弁とすることができる。また、前記復圧ライン23には、前記冷却室2内から外方向への流れを阻止する逆止弁(図示省略)を設けることができる。   The cooling chamber 2 is provided with a return pressure means 22 for returning the pressure in the cooling chamber 2 from negative pressure to atmospheric pressure after the vacuum cooling step. The return pressure means 22 includes a return pressure line 23 connected to the cooling chamber 2, and a return pressure valve 24 and a sterilization filter 25 provided in the middle of the return pressure line 23. The return pressure valve 24 is a valve whose opening degree can be adjusted in order to adjust the return pressure speed, but can be a valve only for opening and closing. Further, the return pressure line 23 can be provided with a check valve (not shown) that prevents the outward flow from the inside of the cooling chamber 2.

前記第一真空冷却手段41は、前記冷却室2内の気体を排出する排気機能に加えて、前記冷風冷却工程時に前記冷却用熱交換器9にて生ずる凝縮水(ドレン)を前記冷却室2外へ排出するドレン排出機能をもなすように構成されている。すなわち、前記冷風冷却工程時に前記開閉弁17を開き、前記真空ポンプ16を作動させる動作を間欠的に行うように構成している。   The first vacuum cooling means 41, in addition to the exhaust function for discharging the gas in the cooling chamber 2, condensate water (drain) generated in the cooling heat exchanger 9 during the cold air cooling process. It is configured to have a drain discharge function for discharging to the outside. That is, the on-off valve 17 is opened during the cold air cooling step, and the operation of operating the vacuum pump 16 is performed intermittently.

前記制御器6は、予め記憶した前記冷却プログラムにより前記第一真空冷却手段41,前記第二真空冷却手段42,前記温水供給手段18および前記冷風冷却手段5の作動などを制御するように構成されている。   The controller 6 is configured to control the operation of the first vacuum cooling means 41, the second vacuum cooling means 42, the hot water supply means 18 and the cold air cooling means 5 according to the cooling program stored in advance. ing.

前記冷却プログラムなどの制御を行うために、被冷却物3の品温を検出する品温センサ26,前記冷却室2内の圧力(温度)を検出する室内圧力センサ27,前記冷凍機10の冷媒回路の圧力および温度をそれぞれ検出する冷媒圧力センサ28,冷媒温度センサ29を備えている。これらのセンサは、前記制御器6と接続されて、前記コンデンシングユニット11,前記モータ12,前記真空ポンプ16、前記開閉弁17,前記第一給水弁21,前記復圧弁24などを制御する。   In order to control the cooling program and the like, a product temperature sensor 26 for detecting the product temperature of the object 3 to be cooled, an indoor pressure sensor 27 for detecting the pressure (temperature) in the cooling chamber 2, and the refrigerant of the refrigerator 10 A refrigerant pressure sensor 28 and a refrigerant temperature sensor 29 are provided for detecting the pressure and temperature of the circuit, respectively. These sensors are connected to the controller 6 to control the condensing unit 11, the motor 12, the vacuum pump 16, the on-off valve 17, the first water supply valve 21, the return pressure valve 24, and the like.

前記冷却プログラムには、初期品温が選択設定値(たとえば約40℃)を越える時、前記真空冷却手段41,42による真空冷却工程および前記冷風冷却手段5による冷風冷却工程を行う第一冷却パターンと、初期品温が前記選択設定値以下の時、前記真空冷却工程を行うことなく(パスして)前記冷風冷却工程を実行する第二冷却パターンとを含んで構成されている。   The cooling program includes a first cooling pattern for performing a vacuum cooling process by the vacuum cooling means 41 and 42 and a cold air cooling process by the cold air cooling means 5 when the initial product temperature exceeds a selected set value (for example, about 40 ° C.). And a second cooling pattern that executes the cold air cooling step without performing (passing) the vacuum cooling step when the initial product temperature is equal to or lower than the selected set value.

つぎに、前記第一冷却パターンにおける前記第一真空冷却工程から前記第二真空冷却工程への切換タイミング(以下、真空切換タイミングという。)および前記第二真空冷却工程から前記冷風冷却工程への切換タイミング(以下、冷風切換タイミングという。)について説明する。   Next, switching timing from the first vacuum cooling step to the second vacuum cooling step in the first cooling pattern (hereinafter referred to as vacuum switching timing) and switching from the second vacuum cooling step to the cold air cooling step. Timing (hereinafter referred to as cold air switching timing) will be described.

前記真空切換タイミングおよび前記冷風切換タイミングは、それぞれ前記第一真空冷却特性および前記第二真空冷却特性を踏まえて、予め実験により、求めておく。前記真空冷
却切換タイミングは、前記第一真空工程開始から前記第一真空冷却工程の後期の真空冷却速度が前記冷風冷却工程の冷風冷却速度近傍に達するまでの経過時間(冷却時間)を第一切換設定値として求めておき、検出手段としての前記タイマー7による計測値が前記第一切換設定値となったときとしている。
The vacuum switching timing and the cold air switching timing are obtained in advance by experiments in consideration of the first vacuum cooling characteristics and the second vacuum cooling characteristics, respectively. The vacuum cooling switching timing is a first switching of the elapsed time (cooling time) from the start of the first vacuum process until the late vacuum cooling rate of the first vacuum cooling process reaches the vicinity of the cold air cooling rate of the cold air cooling process. It is obtained as a set value, and it is assumed that the measured value by the timer 7 as the detecting means becomes the first switching set value.

また、前記冷風切換タイミングは、前記第二真空冷却工程開始から前記第二真空冷却工程の後期の真空冷却速度が前記冷風冷却工程の冷風冷却速度近傍に達するまでの経過時間(冷却時間)を第二切換設定値として求めておき、前記タイマー7による計測値が前記第二切換設定値となった時としている。そして、前記室内圧力センサ27の検出値が第二真空強制終了圧力値以下、または前記品温センサ26の検出値が第二真空強制終了温度値以下となった時には、前記第二真空冷却工程を強制的に終了するように構成している。   Further, the cold air switching timing is an elapsed time (cooling time) from the start of the second vacuum cooling process until the latter vacuum cooling rate of the second vacuum cooling process reaches the vicinity of the cold air cooling speed of the cold air cooling process. Two switching setting values are obtained, and the time when the measured value by the timer 7 becomes the second switching setting value. When the detected value of the indoor pressure sensor 27 is equal to or lower than the second vacuum forced end pressure value or the detected value of the product temperature sensor 26 is equal to or lower than the second vacuum forced end temperature value, the second vacuum cooling step is performed. It is configured to forcibly terminate.

前記第一切換設定値および前記第二切換設定値は、冷却時間(前記タイマー7による計測時間)によらずに、前記冷却室2内の圧力,前記冷却室2内の温度,前記近傍に達したときの被冷却物3の温度のいずれかにより,または前記冷却室2内の圧力,前記冷却室2内の温度,被冷却物3の温度のいずれかの変化量(変化速度)により求めることができる。そして、前記室内圧力センサ27により室内圧力または室内温度を検出するか、前記品温センサ26により品温を検出するかして、検出値が前記第一切換設定値となったとき、前記第一真空冷却工程から前記第二真空冷却工程へ切り換え、前記検出値が前記第二切換設定値となったとき、前記第二真空冷却工程から前記冷風冷却工程へ切り換えるように構成することができる。   The first switching set value and the second switching set value reach the pressure in the cooling chamber 2, the temperature in the cooling chamber 2, and the vicinity, regardless of the cooling time (measurement time by the timer 7). Or the temperature of the object to be cooled 3 or the amount of change (rate of change) of the pressure in the cooling chamber 2, the temperature in the cooling chamber 2, or the temperature of the object to be cooled 3. Can do. Then, when the indoor pressure sensor 27 detects the indoor pressure or the indoor temperature, or the product temperature sensor 26 detects the product temperature, when the detected value becomes the first switching set value, Switching from the vacuum cooling process to the second vacuum cooling process can be configured to switch from the second vacuum cooling process to the cold air cooling process when the detected value becomes the second switching set value.

品温により前記第一,第二切換設定値を設定する場合には、各第一切換設定値,前記第二切換設定値をそれぞれ前記第一温度設定値,前記第二温度設定値とすることができる。   When setting the first and second switching setting values according to the product temperature, the first switching setting value and the second switching setting value are set as the first temperature setting value and the second temperature setting value, respectively. Can do.

さらに、前記第一切換設定値および前記第二切替設定値は、前記タイマー7による計測時間と、前記冷却室2内の圧力,前記冷却室2内の温度,被冷却物3の温度のいずれかまたはこれらの複数の組み合わせと、前記冷却室2内の圧力,前記冷却室2内の温度,被冷却物3の温度のいずれかの変化量またはこれらの組み合わせとを適宜組み合わせにより設定することができる。   Further, the first switching setting value and the second switching setting value are any one of the measurement time by the timer 7, the pressure in the cooling chamber 2, the temperature in the cooling chamber 2, and the temperature of the object 3 to be cooled. Alternatively, a combination of a plurality of these and the amount of change in the pressure in the cooling chamber 2, the temperature in the cooling chamber 2, the temperature of the object 3 to be cooled, or a combination thereof can be set as appropriate. .

ところで、図1を参照して、この実施例1においては、前記ファン13を前記第二領域82に前記冷却用熱交換器9に対向するように配置し、前記冷却室2外へ配置したモータ12により駆動するように構成している。このため、前記ファン13と前記モータ12とを連結し前記冷却室壁51を貫通する前記モータ12の回転軸52部分において、真空冷却工程時に真空漏れを生じないように、前記モータ12を前記冷却室2内空間に対して気密に遮断するシール手段50を備えている。   By the way, referring to FIG. 1, in the first embodiment, the fan 13 is disposed in the second region 82 so as to face the cooling heat exchanger 9, and is disposed outside the cooling chamber 2. 12 to drive. For this reason, the motor 12 is cooled to prevent the vacuum leakage at the rotating shaft 52 portion of the motor 12 that connects the fan 13 and the motor 12 and penetrates the cooling chamber wall 51 during the vacuum cooling process. Sealing means 50 for hermetically blocking the space in the chamber 2 is provided.

また、前記前記冷却用熱交換器9と前記コンデンシングユニット11を接続する冷媒配管39,39が前記冷却室3の室壁51を貫通する箇所は、シールパッキン53にて気密にシールしている。このシールパッキン53は、コンプレッションフィッティングとすることができる。   Further, portions where the refrigerant pipes 39, 39 connecting the cooling heat exchanger 9 and the condensing unit 11 penetrate the chamber wall 51 of the cooling chamber 3 are hermetically sealed by a seal packing 53. . The seal packing 53 can be a compression fitting.

以下に、この実施例1の動作を図1および図2に基づき以下に説明する。   The operation of the first embodiment will be described below with reference to FIGS. 1 and 2.

<準備段階および運転開始>
前記複合冷却装置1の使用者は、前記扉を開いて前記冷却室2内へ被冷却物3を収容し、被冷却物3に前記品温センサ26を差し込み、前記扉を閉じて密閉状態とする。この状態では、前記開閉弁17,前記第一給水弁21,前記復圧弁24は、全て閉状態で、前記モータ12,前記真空ポンプ16,前記コンデンシングユニット11は、全て作動(運転
)停止状態である。前記蒸気発生源20は、予め作動状態としておくことができる。この状態で、使用者は、運転スイッチ(図示省略)により運転を開始する。
<Preparation stage and start of operation>
The user of the combined cooling device 1 opens the door, accommodates the object to be cooled 3 in the cooling chamber 2, inserts the product temperature sensor 26 into the object to be cooled 3, closes the door, and closes the door. To do. In this state, the on-off valve 17, the first water supply valve 21, and the return pressure valve 24 are all closed, and the motor 12, the vacuum pump 16, and the condensing unit 11 are all in an operating (operation) stopped state. It is. The steam generation source 20 can be in an operating state in advance. In this state, the user starts operation by an operation switch (not shown).

<第一冷却パターン>
図2を参照して、処理ステップS1(以下、処理ステップSNは、単にSNと称する。)において、初期品温が選択設定値以下かどうかを判定する。今、初期品温が50℃とすると、S1でNOが判定され、処理はS2へ移行し第一冷却パターンが実行される。
<First cooling pattern>
Referring to FIG. 2, in processing step S1 (hereinafter, processing step SN is simply referred to as SN), it is determined whether or not the initial product temperature is equal to or lower than a selected set value. If the initial product temperature is 50 ° C., NO is determined in S1, the process proceeds to S2, and the first cooling pattern is executed.

(第一真空冷却工程)
S2において、前記第一真空冷却工程が行われる。この第一真空冷却工程S2は、つぎのように行われる。前記開閉弁17を開き、前記第一給水弁21を閉じ、前記復圧弁24を閉じて、前記真空ポンプ16を作動させる。すると、前記冷却室2内の気体は、前記減圧ライン15を通して室外へ排出される。前記冷却室2内の圧力は、前記第一真空冷却特性に沿って低下し、この圧力低下に従って、被冷却物3からの蒸気の蒸発により、被冷却物3の温度が70℃から低下して行く。この品温低下速度は、初期において急速で、温度の低下とともに、後期において鈍化して行く。
(First vacuum cooling process)
In S2, the first vacuum cooling step is performed. This first vacuum cooling step S2 is performed as follows. The on-off valve 17 is opened, the first water supply valve 21 is closed, the return pressure valve 24 is closed, and the vacuum pump 16 is operated. Then, the gas in the cooling chamber 2 is discharged to the outside through the decompression line 15. The pressure in the cooling chamber 2 decreases along with the first vacuum cooling characteristic, and the temperature of the object to be cooled 3 decreases from 70 ° C. due to evaporation of the vapor from the object to be cooled 3 according to this pressure decrease. go. This product temperature decrease rate is rapid in the initial stage, and becomes slower in the later stage as the temperature decreases.

この第一真空冷却工程S2において、前記タイマー7の計測値が前記注入タイミングとなると前記制御器6は、前記第一給水弁21を所定時間だけ開いて、前記温水供給源20から前記冷却室2内へ所定量の温水を供給する。そして、前記冷却室2内の圧力がその温水の飽和蒸気圧力以下まで減圧されると、供給された温水が蒸発し始める。こうして発生した蒸気とともに前記冷却室2内の空気が前記減圧ライン15を通して室外へ排出される。こうして、前記冷却室2内の空気排除が行われる。   In the first vacuum cooling step S2, when the measured value of the timer 7 reaches the injection timing, the controller 6 opens the first water supply valve 21 for a predetermined time, and from the hot water supply source 20 to the cooling chamber 2. A predetermined amount of warm water is supplied inside. When the pressure in the cooling chamber 2 is reduced to a temperature equal to or lower than the saturated steam pressure of the hot water, the supplied hot water starts to evaporate. The air in the cooling chamber 2 together with the steam thus generated is discharged to the outside through the decompression line 15. Thus, air in the cooling chamber 2 is removed.

そして、前記タイマー7による計測時間が前記第一切換設定値に達すると、S3の第二真空冷却工程へ移行する。この移行時点における真空冷却速度は、前記冷風冷却手段5の冷風冷却特性による冷却速度より低くなっている。また、この移行時点の品温は、約20℃である。   When the time measured by the timer 7 reaches the first switching set value, the process proceeds to the second vacuum cooling step of S3. The vacuum cooling rate at the time of this transition is lower than the cooling rate due to the cold air cooling characteristics of the cold air cooling means 5. The product temperature at the time of this transition is about 20 ° C.

(第二真空冷却工程)
前記第二真空冷却工程S3では、前記開閉弁17,前記第一給水弁21および前記復圧弁24を閉じて、前記真空ポンプ16を停止するとともに、前記コンデンシングユニット11を作動させる。前記コンデンシングユニット11の作動により、前記冷却用熱交換器9内の温度を約−10℃とする。このコンデンシングユニット11による前記冷却用熱交換器9の温度低下には起動から所定の時間を要するので、前記第一切換設定値の所定時間前に前記コンデンシングユニット11を起動させておくことが望ましい。
(Second vacuum cooling process)
In the second vacuum cooling step S3, the on-off valve 17, the first water supply valve 21 and the return pressure valve 24 are closed, the vacuum pump 16 is stopped, and the condensing unit 11 is operated. By the operation of the condensing unit 11, the temperature in the cooling heat exchanger 9 is set to about −10 ° C. Since the temperature reduction of the cooling heat exchanger 9 by the condensing unit 11 requires a predetermined time from the start, the condensing unit 11 may be started a predetermined time before the first switching set value. desirable.

この第二真空冷却工程S3においては、前記冷却室2内は、低圧で密封され、前記冷却室2内の蒸気は、前記冷却用熱交換器9へ移動して、ここで凝縮し、前記冷却室2内の圧力は、低圧状態を維持する。その結果、被冷却物3から蒸気が連続的に発生し、品温が低下して行く。この品温低下は、前記第二真空冷却特性に沿ってなされ、初期において急速に行われ、温度の低下とともに、後期において低下速度が鈍化して行く。前記タイマー7による計測時間が前記第二切換設定値に達すると、S4の復圧工程へ移行する。この移行時点における真空冷却速度は、前記冷風冷却手段5の第二冷風冷却特性による冷却速度より低くなっている。また、この移行時点の品温は、約10℃である。   In the second vacuum cooling step S3, the inside of the cooling chamber 2 is sealed at a low pressure, and the steam in the cooling chamber 2 moves to the cooling heat exchanger 9, where it condenses, The pressure in the chamber 2 maintains a low pressure state. As a result, steam is continuously generated from the object 3 to be cooled, and the product temperature decreases. This product temperature decrease is made in accordance with the second vacuum cooling characteristic, and is rapidly performed in the initial stage, and the rate of decrease is slowed down in the later stage as the temperature decreases. When the time measured by the timer 7 reaches the second switching set value, the process proceeds to the pressure-recovery step of S4. The vacuum cooling rate at the time of the transition is lower than the cooling rate due to the second cold air cooling characteristic of the cold air cooling means 5. Moreover, the product temperature at the time of this transition is about 10 ° C.

前記第二真空冷却工程S3において、前記冷却用熱交換器9に着霜すると、前記制御器6は除霜動作を行う。着霜は、前記冷媒圧力センサ28または前記冷媒温度センサ29により前記冷凍機10の低圧側の圧力または温度を検出することにより行い、検出値が着霜と判定できる設定値となるとホットガスを前記冷却用熱交換器9へ供給することにより除
霜が行われる。この除霜動作により、前記冷却用熱交換器9の凝縮作用を良好に維持することができ、前記第二真空冷却工程による冷却を着霜による影響を受けずに効果的に行うことができる。
In the second vacuum cooling step S3, when the cooling heat exchanger 9 is frosted, the controller 6 performs a defrosting operation. The frost formation is performed by detecting the pressure or temperature on the low pressure side of the refrigerator 10 by the refrigerant pressure sensor 28 or the refrigerant temperature sensor 29, and when the detected value becomes a set value that can be determined as frost formation, The defrosting is performed by supplying the heat exchanger 9 for cooling. By this defrosting operation, the condensation action of the cooling heat exchanger 9 can be maintained satisfactorily, and the cooling by the second vacuum cooling step can be effectively performed without being affected by frost formation.

(復圧工程)
前記復圧工程S4は、前記復圧弁24を開くことで行う。これにより、外気が前記復圧ライン23を通して前記冷却室2内へ導入され、前記冷却室2内が大気圧に復帰する。この復圧工程は、前記室内圧力センサ27により検出され、大気圧を検出すると、復圧工程を終了し、S5の冷風冷却工程へ移行する。この実施例1においては、前記復圧工程中は、前記コンデンシングユニット11をの作動を継続し、前記ファン13の作動を停止しておく。しかしながら、必要に応じて、前記コンデンシングユニット11の作動を停止し、前記ファン13を作動させるように構成することができる。
(Return pressure process)
The return pressure step S4 is performed by opening the return pressure valve 24. As a result, outside air is introduced into the cooling chamber 2 through the return pressure line 23, and the inside of the cooling chamber 2 returns to atmospheric pressure. This return pressure process is detected by the indoor pressure sensor 27. When the atmospheric pressure is detected, the return pressure process is terminated and the process proceeds to the cold air cooling process of S5. In the first embodiment, the operation of the condensing unit 11 is continued and the operation of the fan 13 is stopped during the decompression process. However, if necessary, the operation of the condensing unit 11 can be stopped and the fan 13 can be operated.

(冷風冷却工程)
前記冷風冷却工程S5では、前記開閉弁17,前記第一給水弁21および前記復圧弁24を閉じて、前記真空ポンプ16を停止するとともに、前記コンデンシングユニット11および前記ファン13を作動させる。これにより、前記冷却室2内において前記ファン13→前記冷却用熱交換器9→前記第二開口142→前記被冷却物3→前記第一記開口141→前記ファン13の一点破線矢視の冷風循環流が形成される。この循環流により、前記冷却室2内の空気は、前記冷却用熱交換器9により冷却されて温度低下し、前記被冷却物3を対流伝熱により冷却する。こうした冷風冷却により、品温が約3℃となるまで冷却される。品温が3℃まで低下したことを前記品温センサ26により検出すると、前記冷風冷却工程S5を終了する。
(Cooling air cooling process)
In the cold air cooling step S5, the on-off valve 17, the first water supply valve 21 and the return pressure valve 24 are closed, the vacuum pump 16 is stopped, and the condensing unit 11 and the fan 13 are operated. Thereby, in the cooling chamber 2, the fan 13 → the cooling heat exchanger 9 → the second opening 142 → the object to be cooled 3 → the first opening 141 → the cold air as indicated by the one-dot broken line arrow of the fan 13. A circulating flow is formed. Due to this circulation flow, the air in the cooling chamber 2 is cooled by the cooling heat exchanger 9 and the temperature is lowered, and the object to be cooled 3 is cooled by convection heat transfer. By such cold air cooling, the product is cooled until the product temperature becomes about 3 ° C. When the product temperature sensor 26 detects that the product temperature has decreased to 3 ° C., the cold air cooling step S5 is terminated.

この冷風冷却工程においては、被冷却物3および前記冷却用熱交換器9の表面から凝縮水(ドレン)が発生し、前記冷却室2内底部に貯留する。このドレンは、つぎのようにして排出される。前記開閉弁17を開き、前記真空ポンプ16を作動させる。すると、前記ドレンは、前記減圧ライン15を通して前記冷却室2外へ排出される。このドレン排出時、前記復圧弁24を開くことにより、ドレンの排出をスムーズに行うことができる。前記第一冷風冷却工程S21において発生したドレンも、同様にして前記冷却室2外へ排出される。   In this cold air cooling step, condensed water (drain) is generated from the surface of the object to be cooled 3 and the heat exchanger 9 for cooling, and is stored in the inner bottom of the cooling chamber 2. This drain is discharged as follows. The on-off valve 17 is opened and the vacuum pump 16 is operated. Then, the drain is discharged out of the cooling chamber 2 through the decompression line 15. When the drain is discharged, the drain pressure can be discharged smoothly by opening the return pressure valve 24. The drain generated in the first cold air cooling step S21 is also discharged out of the cooling chamber 2 in the same manner.

(冷却運転終了)
この冷風冷却工程S5が終了すると、使用者は、前記運転スイッチを操作して、冷却運転を停止して、前記冷却室2内の被冷却物3を取り出すことができる。
(End of cooling operation)
When this cold air cooling step S5 is completed, the user can operate the operation switch to stop the cooling operation and take out the object to be cooled 3 in the cooling chamber 2.

この第一冷却パターンにおいて、初期品温が約70℃以上では、被冷却物3の温度が高く、被冷却物3からの自然蒸発が支配的であるので、前記真空冷却手段4を作動させることによる真空冷却が効果的に行われない。したがって、前記冷風冷却工程S5と同様な冷風冷却工程を前記第一真空冷却工程の前に設けることにより、被冷却物3の粗熱取りを行うように構成することが望ましい。こうすることにより、真空冷却でなく、冷風冷却により粗熱取りを行っているので、効果的な被冷却物3の冷却を行うことができ、全冷却時間を短縮することができる。   In this first cooling pattern, when the initial product temperature is about 70 ° C. or higher, the temperature of the object to be cooled 3 is high, and natural evaporation from the object to be cooled 3 is dominant, so the vacuum cooling means 4 is operated. The vacuum cooling by is not performed effectively. Therefore, it is desirable that the cold air cooling process similar to the cold air cooling process S5 is provided before the first vacuum cooling process so that the object 3 to be cooled is subjected to rough heat removal. By carrying out like this, since the rough heat removal is performed not by vacuum cooling but by cold air cooling, the cooled object 3 can be effectively cooled, and the total cooling time can be shortened.

<第二冷却パターン>
初期品温が前記選択設定値以下の場合、S1において、YESが判定され、前記第二冷却パターンが行われ、処理は、S6へ移行する。S6において、冷風冷却工程S6が実行される。この冷風冷却工程S6は、前記冷風冷却工程S5と同様に、前記開閉弁17,前記第一給水弁21および前記復圧弁24を閉じて、前記真空ポンプ16を停止するとともに、前記コンデンシングユニット11および前記ファン13を作動させて行われる。すな
わち、図1の一点破線矢視の冷風循環流が形成され、この冷風循環流により、被冷却物3を冷却する。この冷風冷却工程S6も、前記品温センサ26による検出値が設定冷却温度となることで終了する。
<Second cooling pattern>
When the initial product temperature is equal to or lower than the selected set value, YES is determined in S1, the second cooling pattern is performed, and the process proceeds to S6. In S6, a cold air cooling step S6 is performed. In the cold air cooling step S6, as in the cold air cooling step S5, the on-off valve 17, the first water supply valve 21 and the return pressure valve 24 are closed to stop the vacuum pump 16, and the condensing unit 11 And the fan 13 is operated. In other words, a cold air circulation flow as shown by the dashed line in FIG. This cold air cooling step S6 is also terminated when the value detected by the product temperature sensor 26 reaches the set cooling temperature.

以上のように構成される実施例1によれば、つぎの作用効果を奏する。初期品温が前記選択設定値以下の時は、前記第二冷却パターンが行われる、すなわち前記真空冷却工程を行わず前記冷風冷却工程を行うので、前記真空冷却手段を不必要に作動させることがなく、省エネルギーを実現できるとともに、冷却時間を短縮できる。また、前記第二冷却パターンの実行時には、前記第二真空冷却工程を効果的に行うための温水または蒸気を供給する空気排除工程を行わないので、空気排除のための温水または蒸気許給手段の容量を小さくできる。   According to the first embodiment configured as described above, the following operational effects are obtained. When the initial product temperature is equal to or lower than the selected set value, the second cooling pattern is performed, that is, since the cold air cooling process is performed without performing the vacuum cooling process, the vacuum cooling means may be operated unnecessarily. Energy saving and cooling time can be shortened. In addition, when the second cooling pattern is executed, an air exclusion process for supplying hot water or steam for effectively performing the second vacuum cooling process is not performed. Capacity can be reduced.

また、前記真空冷却工程を前記第一真空冷却手段41による外部コールドトラップを用いた第一真空冷却工程と前記第二真空冷却手段42による内部コールドトラップを用いた第二真空冷却工程とで、二段階により行っているので、前記真空冷却手段4の減圧手段を簡素なものとすることができる。また、真空冷却開始当初から過大な冷却能力で真空冷却するものと比較して、真空冷却手段の作動に必要なエネルギーを削減できるとともに、急激な冷却で被冷却物の品質低下が問題になる食材では、品質の低下を抑えることができる。   In addition, the vacuum cooling process is divided into a first vacuum cooling process using an external cold trap by the first vacuum cooling means 41 and a second vacuum cooling process using an internal cold trap by the second vacuum cooling means 42. Since it is performed in stages, the pressure reducing means of the vacuum cooling means 4 can be simplified. In addition, the energy required for the operation of the vacuum cooling means can be reduced compared to the one that starts vacuum cooling with an excessive cooling capacity from the beginning of vacuum cooling, and the quality of the object to be cooled becomes a problem due to rapid cooling. Then, deterioration of quality can be suppressed.

また、前記第一真空冷却工程中に空気排除工程を行っているので、前記第二真空冷却工程における前記冷却用熱交換器表面での蒸気の凝縮を効率よく行うことができる。   Moreover, since the air exclusion process is performed during the first vacuum cooling process, the steam can be efficiently condensed on the surface of the cooling heat exchanger in the second vacuum cooling process.

また、冷風冷却用の前記冷却用熱交換器9を前記第二真空冷却手段42の蒸気凝縮用のコールドトラップと兼用しているので、真空冷却手段の設備を簡素化でき、複合冷却装置のイニシャルコストを低減することができる。   Further, since the cooling heat exchanger 9 for cooling the cold air is also used as a cold trap for condensing the vapor of the second vacuum cooling means 42, the equipment of the vacuum cooling means can be simplified, and the composite cooling device initials Cost can be reduced.

つぎに、この発明の実施例2の複合冷却装置1を図3に基づき説明する。この実施例3は、ハード構成に関しては、基本構成を前記実施例1の構成(図1)と同じにしているが、前記温水供給手段18の代わりに給蒸手段55を設けている点で異なる。そして、前記冷却プログラムの構成に関しても基本的には前記実施例1と同じであるが、前記真空冷却工程の構成を異ならせている。また、前記循環経路構成部材の構成を異ならせている。以下、異なる点を中心に説明する。   Next, a composite cooling device 1 according to Embodiment 2 of the present invention will be described with reference to FIG. In the third embodiment, the basic configuration is the same as that of the first embodiment (FIG. 1), except that a steam supply means 55 is provided instead of the hot water supply means 18. . The configuration of the cooling program is basically the same as that of the first embodiment, but the configuration of the vacuum cooling process is different. Moreover, the structure of the said circulation path | route structural member is varied. Hereinafter, different points will be mainly described.

前記給蒸手段55の構成について説明する。図3を参照して、この給蒸手段55は、冷却室2内へ蒸気および温水を供給するように冷却室2と接続されている。この給蒸手段55は、温水タンク56により構成される。この温水タンク56には、第二給水弁57を介して水が供給され、ヒータ58により所定温度に温められて温水として貯留される。この実施例2では、前記温水タンク56は、前記冷却室2の下部に第二給蒸ライン59を介して接続されており、その中途には第二給蒸弁60が設けられている。この第二給蒸弁60は、前記第二給蒸ライン59を開閉するものであり、この実施例2ではモータバルブから構成される。   The configuration of the steam supply means 55 will be described. Referring to FIG. 3, the steam supply means 55 is connected to the cooling chamber 2 so as to supply steam and hot water into the cooling chamber 2. The steam supply means 55 is constituted by a hot water tank 56. Water is supplied to the hot water tank 56 through the second water supply valve 57, warmed to a predetermined temperature by the heater 58, and stored as hot water. In the second embodiment, the hot water tank 56 is connected to the lower part of the cooling chamber 2 via a second steam supply line 59, and a second steam supply valve 60 is provided in the middle thereof. The second steam supply valve 60 opens and closes the second steam supply line 59. In the second embodiment, the second steam supply valve 60 includes a motor valve.

前記冷却室2内の減圧状態で前記第二給蒸弁60を開くことで、差圧により、前記温水タンク56内の蒸気は温水を伴って前記冷却室2内へ自然に供給される。このように温水をも前記冷却室2内へ供給することで、前記温水タンク56の水の濃縮を防止することができる。この濃縮防止により、濃縮水のブロー(排出)を無くすか、回数を減らすことができる。前記冷却室2内に供給された温水は、減圧下で一層蒸発を促されて、前記冷却室2内に蒸気を充満させる。その一方で、余分な温水や、蒸気の凝縮水は、前記第一真空冷
却手段41により外部へ直ちに排出される。前記第二給蒸弁60は、前記タイマーにより所定の注入タイミングとなると開き、前記タイマー7による計測時間が設定値となり、かつ前記温水タンク56内温度が設定値以下となると閉じるように制御される。ところで、前記冷却室2内へ蒸気および温水を供給することで、後述する前記冷却用熱交換器9の除霜を図ることもできる。
By opening the second steam supply valve 60 in a reduced pressure state in the cooling chamber 2, the steam in the hot water tank 56 is naturally supplied into the cooling chamber 2 with hot water due to the differential pressure. Thus, by supplying warm water also into the cooling chamber 2, concentration of water in the warm water tank 56 can be prevented. By preventing this concentration, blow (discharge) of concentrated water can be eliminated or the number of times can be reduced. The hot water supplied into the cooling chamber 2 is further evaporated under reduced pressure to fill the cooling chamber 2 with steam. On the other hand, excess warm water and steam condensate are immediately discharged to the outside by the first vacuum cooling means 41. The second steam supply valve 60 is controlled to open when the predetermined injection timing is reached by the timer, and to close when the time measured by the timer 7 becomes a set value and the temperature in the hot water tank 56 becomes a set value or less. . By the way, by supplying steam and hot water into the cooling chamber 2, the cooling heat exchanger 9 described later can be defrosted.

つぎに、前記真空冷却工程について説明する。この実施例2においては、前記第二真空冷却工程中に前記ファン13を駆動するように構成するとともに、前記第一真空冷却工程の初期において、前記ファン13を駆動するように構成している。前記第一真空冷却工程の初期とは、前記冷却室2内の圧力が設定圧力以下となるまで期間を意味し、この実施例2では、前記冷却室2内の圧力を検出するセンサ(図示省略)により前記期間を制御するように構成している。   Next, the vacuum cooling process will be described. In the second embodiment, the fan 13 is driven during the second vacuum cooling step, and the fan 13 is driven at the initial stage of the first vacuum cooling step. The initial stage of the first vacuum cooling step means a period until the pressure in the cooling chamber 2 becomes equal to or lower than a set pressure. In the second embodiment, a sensor for detecting the pressure in the cooling chamber 2 (not shown) ) To control the period.

つぎに、前記循環経路構成部材の構成について説明する。この実施例2においては、前記循環経路構成部材の一部として、筒状のファンガイド30と、このファンガイド30と前記区画壁8および前記冷却室2の底壁との間を遮蔽する第一遮蔽部材31と、前記冷却用熱交換器9と前記区画壁8および前記冷却室2壁との間を遮蔽する第二遮蔽部材32と、冷風を被冷却物3に対してほぼ均等に供給するための穴開き板からなる第一送風ガイド33,第二送風ガイド34を備えている。   Next, the configuration of the circulation path constituting member will be described. In the second embodiment, as a part of the circulation path constituting member, a cylindrical fan guide 30 and a first shield that shields the fan guide 30 from the partition wall 8 and the bottom wall of the cooling chamber 2. The shielding member 31, the second shielding member 32 that shields between the cooling heat exchanger 9 and the partition wall 8 and the cooling chamber 2 wall, and the cold air are supplied to the object 3 to be cooled substantially evenly. The 1st ventilation guide 33 which consists of a perforated board for this, and the 2nd ventilation guide 34 are provided.

前記第一送風ガイド33は、被冷却物3を冷却した後の冷風を前記区画壁8の第一開口141へほぼ均等に戻す機能をなし、前記第二送風ガイド34は、前記区画壁8の第二開口142からの冷風を被冷却物3へ向けてほぼ均等に案内、供給するする機能を有するように構成されている。前記送風ガイド33,34は、前記区画壁8と別体にして着脱自在に連結されている。前記ファンガイド30,前記第一遮蔽部材31および前記第二遮蔽部材32は、冷風のショートパスを防止する機能をなすものであり、これらも着脱自在に構成されている。   The first air blowing guide 33 has a function of returning the cold air after cooling the article 3 to be cooled almost uniformly to the first opening 141 of the partition wall 8, and the second air blowing guide 34 is formed on the partition wall 8. It is configured to have a function of guiding and supplying the cold air from the second opening 142 almost uniformly toward the object to be cooled 3. The air blowing guides 33 and 34 are detachably connected separately from the partition wall 8. The fan guide 30, the first shielding member 31, and the second shielding member 32 have a function of preventing a short path of cold air, and these are also detachable.

この発明は、前記実施例1,2に限定されるものではなく、例えば、前記実施例1,2では前記第一真空冷却手段41および前記第二真空冷却手段42とから真空冷却手段4を構成しているが、前記第二真空冷却手段41のみで前記真空冷却手段4を構成することができる。また、前記冷却室2内の構成要素の配置は種々変更可能である。   The present invention is not limited to the first and second embodiments. For example, in the first and second embodiments, the first vacuum cooling means 41 and the second vacuum cooling means 42 constitute the vacuum cooling means 4. However, the vacuum cooling means 4 can be constituted only by the second vacuum cooling means 41. The arrangement of the components in the cooling chamber 2 can be variously changed.

この発明の実施例1の概略構成を説明する説明図である。It is explanatory drawing explaining schematic structure of Example 1 of this invention. 同実施例1の冷却プログラムを説明するフローチャート図である。It is a flowchart figure explaining the cooling program of the Example 1. FIG. この発明の実施例2の概略構成を説明する説明図である。It is explanatory drawing explaining schematic structure of Example 2 of this invention.

符号の説明Explanation of symbols

1 複合冷却装置
2 冷却室
3 被冷却物
4 真空冷却手段
5 冷風冷却手段
6 制御器
13 ファン
18 温水供給手段
35 給蒸手段
41 第一真空冷却手段
42 第二真空冷却手段
DESCRIPTION OF SYMBOLS 1 Composite cooling device 2 Cooling chamber 3 Object to be cooled 4 Vacuum cooling means 5 Cold air cooling means 6 Controller 13 Fan 18 Hot water supply means 35 Steaming means 41 First vacuum cooling means 42 Second vacuum cooling means

Claims (3)

冷却室内の被冷却物を真空冷却する真空冷却手段と、冷却用熱交換器により冷却した空気により前記被冷却物を冷風冷却する冷風冷却手段と、前記真空冷却手段および前記冷風冷却手段を制御する制御器とを備える複合冷却装置であって、
前記被冷却物の初期温度を検出する検出手段を備え、
前記制御器は、前記検出手段による検出値が前記真空冷却手段の真空冷却能力に応じて設定される設定値を超える時、前記真空冷却手段による真空冷却工程後に前記冷風冷却手段による冷風冷却工程を行う第一冷却パターンと、前記検出値が設定値以下の時、前記真空冷却工程を行うことなく前記冷風冷却工程を行う第二冷却パターンとを行い、前記真空冷却工程から冷風冷却工程への切換タイミングを、前記真空冷却手段の後期の真空冷却速度が前記冷風冷却手段の冷風冷却速度より低下するタイミングとしたことを特徴とする複合冷却装置。
A vacuum cooling means for vacuum-cooling the object to be cooled in the cooling chamber, a cold air cooling means for cooling the object to be cooled with air cooled by a cooling heat exchanger, and controlling the vacuum cooling means and the cold air cooling means. A combined cooling device comprising a controller,
A detecting means for detecting an initial temperature of the object to be cooled;
When the detected value by the detecting means exceeds a set value set according to the vacuum cooling capacity of the vacuum cooling means, the controller performs a cold air cooling process by the cold air cooling means after the vacuum cooling process by the vacuum cooling means. a first cooling pattern carried out, when the detected value is below the set value, the have row and a second cooling pattern for performing the cold air cooling step without vacuum cooling process, from the vacuum cooling step to cool the cooling step The composite cooling device characterized in that the switching timing is a timing at which the vacuum cooling rate in the latter stage of the vacuum cooling means is lower than the cold air cooling rate of the cold air cooling means .
前記切換タイミングは、前記真空冷却手段による冷却時間,前記冷却室内の圧力,同温度,被冷却物の温度のいずれか、または前記冷却室内の圧力,前記冷却室内の温度,被冷却物の温度のいずれかの変化量を検出し、前記検出値の一つまたは複数が各設定値となったときであることを特徴とする請求項1に記載の複合冷却装置。 The switching timing may be one of the cooling time by the vacuum cooling means, the pressure in the cooling chamber, the same temperature, the temperature of the object to be cooled, or the pressure in the cooling chamber, the temperature in the cooling chamber, and the temperature of the object to be cooled. The composite cooling device according to claim 1 , wherein any change amount is detected and one or more of the detected values become set values . 前記真空冷却手段は、前記冷却室と接続される減圧器の作動により第一真空冷却工程を実行するように構成される第一真空冷却手段と、前記第一真空冷却手段で空気排除工程を行った後に密閉状態として冷却用熱交換器により前記被冷却物からの蒸気を凝縮することで第二真空冷却工程を実行するように構成される前記第二真空冷却手段とを含んで構成され、前記真空冷却工程は、前記第一真空冷却工程と前記第二真空工程とを含むことを特徴とする請求項1に記載の複合冷却装置。 The vacuum cooling means performs a first vacuum cooling means configured to execute a first vacuum cooling process by operation of a decompressor connected to the cooling chamber, and performs an air exclusion process with the first vacuum cooling means. And the second vacuum cooling means configured to perform a second vacuum cooling step by condensing the vapor from the object to be cooled by a cooling heat exchanger as a sealed state, The composite cooling device according to claim 1 , wherein the vacuum cooling step includes the first vacuum cooling step and the second vacuum step .
JP2006278362A 2006-10-12 2006-10-12 Combined cooling device Expired - Fee Related JP5082371B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006278362A JP5082371B2 (en) 2006-10-12 2006-10-12 Combined cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006278362A JP5082371B2 (en) 2006-10-12 2006-10-12 Combined cooling device

Publications (2)

Publication Number Publication Date
JP2008096029A JP2008096029A (en) 2008-04-24
JP5082371B2 true JP5082371B2 (en) 2012-11-28

Family

ID=39379056

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006278362A Expired - Fee Related JP5082371B2 (en) 2006-10-12 2006-10-12 Combined cooling device

Country Status (1)

Country Link
JP (1) JP5082371B2 (en)

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0636723B2 (en) * 1986-02-17 1994-05-18 日空工業株式会社 How to cool cooked rice
JPS633159A (en) * 1986-06-20 1988-01-08 児玉 俊一 Differential pressure cooling method and device for article to be cooled such as food
JPH04198681A (en) * 1990-11-29 1992-07-20 Kanaden:Kk Cooling system
JP2797906B2 (en) * 1993-06-28 1998-09-17 三菱自動車工業株式会社 Work cooling device
JPH07146045A (en) * 1993-11-24 1995-06-06 Miura Co Ltd Vacuum cooling equipment
JPH07280407A (en) * 1994-04-13 1995-10-27 Miura Co Ltd Vacuum cooling apparatus
JPH1140212A (en) * 1997-07-23 1999-02-12 Honda Motor Co Ltd Electric vehicle battery cooling method and device
JP4234854B2 (en) * 1999-08-20 2009-03-04 株式会社サムソン Vacuum cooling device with stepwise cooling
JP3491892B2 (en) * 2001-04-17 2004-01-26 株式会社日本ベネックス Cooling system
JP2003004353A (en) * 2001-06-21 2003-01-08 Miura Co Ltd Method and equipment for cooling
JP3917413B2 (en) * 2001-11-28 2007-05-23 福島工業株式会社 Food processing equipment
JP2004198047A (en) * 2002-12-19 2004-07-15 Miura Co Ltd Vacuum cooling device control method, and vacuum cooling device
JP2004347173A (en) * 2003-05-20 2004-12-09 Ryonetsu Kogyo Kk Automatic cooling device
JP2005295961A (en) * 2004-04-16 2005-10-27 Miura Co Ltd Food machinery
JP2006164540A (en) * 2004-12-02 2006-06-22 Nittetsu Elex Co Ltd Device and method for reproducing lead battery
JP2006181001A (en) * 2004-12-27 2006-07-13 Miura Co Ltd Steaming/refrigerating system and steaming system

Also Published As

Publication number Publication date
JP2008096029A (en) 2008-04-24

Similar Documents

Publication Publication Date Title
JP5115609B2 (en) Cooling system
KR20080094889A (en) Cooling system
CN101371089A (en) Composite cooling device
JP2010133569A (en) Composite cooling device
WO2007094141A1 (en) Cooling device
CN101384872A (en) cooling device
JP5082371B2 (en) Combined cooling device
KR20050081870A (en) Method and apparatus for defrost
JP4923964B2 (en) Cooling system
JP2008096077A (en) Composite cooling device
WO2007083562A1 (en) Composite cooling apparatus
JP4737718B2 (en) Combined cooling device
JP4655311B2 (en) Combined cooling device
JP2008101891A (en) Cooling device
JP4748388B2 (en) Combined cooling device
JP4930896B2 (en) Composite cooling method and composite cooling apparatus
JP2018162960A (en) Food machine having vacuum cooling function
KR100398639B1 (en) A cubic cooling system of kim-chi storage
KR100406042B1 (en) The installing structure of evaporating-tube at door in kim-chi storage
KR100469781B1 (en) Kim-ch refrigerator installed a evaporating-tube at door
JP2008157489A (en) Cooling device
KR200297813Y1 (en) Controlling apparatus of refrigerants in kim-chi storage
KR100905087B1 (en) How to defrost refrigerator
KR100488761B1 (en) Solid cooling system for Kim-chi storage
JP2007240137A (en) Cooler

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090723

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20090723

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110526

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110615

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110627

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20120110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120229

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20120229

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20120323

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120618

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120619

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120807

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120820

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150914

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees