JP5086145B2 - Multi-can boiler - Google Patents
Multi-can boiler Download PDFInfo
- Publication number
- JP5086145B2 JP5086145B2 JP2008074910A JP2008074910A JP5086145B2 JP 5086145 B2 JP5086145 B2 JP 5086145B2 JP 2008074910 A JP2008074910 A JP 2008074910A JP 2008074910 A JP2008074910 A JP 2008074910A JP 5086145 B2 JP5086145 B2 JP 5086145B2
- Authority
- JP
- Japan
- Prior art keywords
- boiler
- combustion
- operation priority
- steam
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000002485 combustion reaction Methods 0.000 claims description 93
- 238000000034 method Methods 0.000 claims description 30
- 238000009434 installation Methods 0.000 claims description 14
- 238000001514 detection method Methods 0.000 claims description 12
- 238000002360 preparation method Methods 0.000 description 4
- 230000007423 decrease Effects 0.000 description 3
- 238000010926 purge Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 239000000446 fuel Substances 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 1
Images
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Description
本発明は、必要蒸気量に応じて稼働優先順位の高い順に必要台数分のボイラで燃焼を行い、稼働優先順位は定期的に変更している多缶設置ボイラに関するものである。 The present invention relates to a multi-can installation boiler in which combustion is performed in a required number of boilers in descending order of operation priority in accordance with the required amount of steam, and the operation priority is periodically changed.
複数台の蒸気ボイラと、各ボイラに対して運転の指令を出力する台数制御装置からなり、必要蒸気量に応じて必要台数のボイラを燃焼するということが行われている。この多缶設置システムにおいては、蒸気集合部での蒸気圧力値を計測し、蒸気圧力値に対応させて設定している台数のボイラを燃焼させる。ボイラには稼働優先順位を定めておき、蒸気圧力値が低下してボイラの燃焼台数を増加するという場合には、稼働優先順位の高いボイラから順に燃焼を開始し、蒸気圧力値が上昇してボイラの燃焼台数を減少するという場合には、稼働優先順位の低いボイラから順に燃焼を停止する。この場合、稼働優先順位が上位のボイラは燃焼を行う機会が多くなり、特定のボイラに燃焼が集中すると装置全体としての寿命が短くなるため、稼働優先順位は定期的に変更することで各ボイラの燃焼時間が平均化するようにしている。 It consists of a plurality of steam boilers and a number control device that outputs an operation command to each boiler, and the required number of boilers are combusted according to the required amount of steam. In this multi-can installation system, the steam pressure value at the steam collecting part is measured, and a set number of boilers are burned corresponding to the steam pressure value. If boilers are prioritized for operation and the steam pressure value decreases and the number of boilers burned increases, combustion starts in order of higher operation priority boilers, and the steam pressure value increases. When the number of boilers to be burned is reduced, the combustion is stopped in order from the boiler with the lowest operation priority. In this case, the boilers with higher operating priority have more opportunities to burn, and if the combustion concentrates on a specific boiler, the life of the entire system will be shortened. The burning time is averaged.
稼働優先順位の変更を行う場合、燃焼を行っていたボイラの順位が繰り下がることによって燃焼を停止し、替わりに燃焼を停止していたボイラの順位が繰り上がることによって燃焼を開始することがある。この場合、燃焼を停止することになったボイラでは、燃料供給を停止して燃焼を停止するとすぐに蒸気の供給は停止される。しかし、燃焼を開始することになったボイラでは、燃焼を開始する前にプレパージなど燃焼準備のための時間が必要であり、さらに燃焼を開始しても缶水を加熱して蒸気の供給を開始するまでには時間が必要であるため、燃焼開始の指令を受けてもすぐに蒸気供給を開始することはできない。そのため、稼働優先順位の変更によって燃焼するボイラを変更した場合、新しく燃焼を開始するボイラが蒸気供給を開始するまでの間における蒸気供給量が不足し、蒸気の供給圧力を維持することができなくなることがあるという問題があった。 When changing the operation priority, combustion may be stopped by lowering the order of the boiler that was burning, and combustion may be started by raising the order of the boiler that was stopping combustion instead. . In this case, in the boiler whose combustion is to be stopped, the supply of steam is stopped as soon as the fuel supply is stopped and the combustion is stopped. However, in the boiler that has started combustion, it takes time to prepare for combustion, such as pre-purge, before starting combustion, and even if combustion is started, the can water is heated to start supplying steam. Since it takes time to do so, the steam supply cannot be started immediately even if a command to start combustion is received. Therefore, when the boiler that burns is changed by changing the operation priority, the steam supply amount is insufficient until the boiler that newly starts combustion starts supplying steam, and the supply pressure of steam cannot be maintained. There was a problem that there was something.
そこで、特開2003−302003号公報に記載されている発明では、燃焼開始ボイラに対しては他ボイラの稼働優先順位変更より先行時間T1分先行して稼働優先順位の変更を行うとしている。この発明では、例えば稼働優先順位が第1位となるボイラを一時的に複数台とすることで、燃焼指令を出力するボイラの台数を増加するものであり、このことによって蒸気供給量の不足を防止することができるというものである。 Therefore, in the invention described in Japanese Patent Laid-Open No. 2003-302003, the operation priority is changed for the combustion start boiler ahead of the operation priority change of the other boiler by a preceding time T1. In this invention, for example, the number of boilers that output a combustion command is increased by temporarily setting a plurality of boilers that have the first operating priority, thereby reducing the amount of steam supply. It can be prevented.
しかしボイラは、内部が高温の状態から燃焼を開始した場合と、低温の状態から燃焼を開始した場合では、燃焼開始から蒸気供給開始までの時間が異なる。ボイラ内部が低温であれば、燃焼によって発生させた熱は、まずボイラの温度上昇に使用される。ボイラからの蒸気供給が行われるのは、缶水の温度が上昇し、ボイラ内の蒸気圧力が高まった後であるため、先行時間T1が短いと稼働優先順位の切り換え時に蒸気が不足する。逆にボイラ内部が高温であれば、燃焼開始から蒸気供給開始までの時間は短いため、先行時間T1が長いと蒸気供給が過剰になる。そのため、一定の先行時間T1分先行して燃焼指令を出力するようにしている場合には、ボイラの状態によって蒸気供給が過剰になったり、不足することがあった。 However, in the boiler, the time from the start of combustion to the start of steam supply differs when the combustion starts from a high temperature inside and when the combustion starts from a low temperature. If the inside of the boiler is at a low temperature, the heat generated by the combustion is first used to increase the temperature of the boiler. The steam is supplied from the boiler after the temperature of the can water has risen and the steam pressure in the boiler has increased. Therefore, if the preceding time T1 is short, the steam is insufficient when the operation priority is switched. Conversely, if the inside of the boiler is at a high temperature, the time from the start of combustion to the start of steam supply is short, so if the preceding time T1 is long, the steam supply becomes excessive. For this reason, when the combustion command is output in advance by a certain preceding time T1, the steam supply may become excessive or insufficient depending on the state of the boiler.
また、特開2003−302003号公報に記載されている発明の場合、稼働優先順位の変更はまず新しく第1位になるボイラの順位変更を行い、一定の時間を開けた後に新しく第2位になるボイラの順位を変更するとしていくものである。この場合、稼働優先順位の変更は段階的に行い、各段階でそれぞれ所定時間の維持を行うものであるため、ボイラ設置台数が多くなると、稼働優先順位の変更に要する時間が長くなる。稼働優先順位の変更工程中は蒸気圧力値が不安定になりやすく、ボイラが短時間で発停を繰り返すハンチングが発生することがあった。
本発明が解決しようとする課題は、稼働優先順位の変更工程時に蒸気供給量の変動が発生することを防止しかつ、稼働優先順位の変更工程に要する時間を短縮することにある。 The problem to be solved by the present invention is to prevent the steam supply amount from changing during the operation priority changing process and to reduce the time required for the operation priority changing process.
請求項1に記載の発明は、複数台の蒸気ボイラと、各ボイラに対して運転の指令を出力する台数制御装置からなる多缶設置ボイラであって、台数制御装置は各ボイラに稼働優先順位を設定し、稼働優先順位に基づいて燃焼指令を出力するボイラを選択しており、稼働優先順位は定期的に変更するようにしている多缶設置ボイラにおいて、各ボイラには個々のボイラにおける蒸気圧力値を検出する圧力検出装置を設けており、台数制御装置は稼働優先順位の変更工程時、稼働優先順位の変更前に個々のボイラにおける蒸気圧力値を検出し、蒸気圧力が設定圧力P1より低いボイラに対して燃焼指令を出力して燃焼を行わせることで、ボイラの蒸気圧力を設定圧力P1よりも高くするバックアップ燃焼を行い、その後に稼働優先順位の変更を行うことを特徴とする。
The invention according to
請求項2に記載の発明は、前記の多缶設置ボイラにおいて、台数制御装置は稼働優先順位の変更工程時、
1.蒸気圧力が設定圧力P1より低いボイラに対して燃焼指令を出力して燃焼を行わせることでボイラの蒸気圧力を設定圧力P1よりも高くするバックアップ燃焼を行っておき、2.次に稼働優先順位を繰り上げるボイラから1台を選択し、選択したボイラの稼働優先順位を次期の順位に変更、
3.前記順位変更後ボイラが燃焼を行う順位の場合、当該ボイラの蒸気圧力が設定圧力P2より低ければ、当該ボイラが設定圧力P2よりも高くなるまで燃焼を行い、
4.当該ボイラの蒸気圧力値が設定圧力P2よりも高くなったことを検出後に次のボイラの稼働優先順位を変更する工程に移る制御を行うことを特徴とする。
Invention of
1. 1. Back-up combustion is performed in which the steam pressure of the boiler is made higher than the set pressure P1 by outputting a combustion command to the boiler whose steam pressure is lower than the set pressure P1 to cause combustion. Next, select one of the boilers that will raise the operating priority, and change the operating priority of the selected boiler to the next level.
3. In the case where the boiler is burned after the rank change, if the steam pressure of the boiler is lower than the set pressure P2, combustion is performed until the boiler becomes higher than the set pressure P2,
4). After detecting that the steam pressure value of the boiler has become higher than the set pressure P2, control is performed to shift to a step of changing the operation priority of the next boiler.
請求項3に記載の発明は、前記の多缶設置ボイラにおいて、稼働優先順位の変更工程開始時点で燃焼しているボイラの台数から稼働優先順位変更後に燃焼を行うボイラを選定しておき、稼働優先順位変更後に燃焼を行うボイラであって、かつ蒸気圧力値が設定圧力P1より低いボイラに対してのみ、バックアップ燃焼を行う制御を行うことを特徴とする。
The invention according to
上記のように、稼働優先順位の変更を行う前に、冷缶状態にあったボイラは予熱しておくことで、燃焼指令の出力から蒸気供給開始までの時間を短くすることができるため、稼働優先順位を変更する工程に要する時間を短くすることができる。 As described above, the boiler that was in the cold can state is preheated before changing the operation priority order, so that the time from the output of the combustion command to the start of steam supply can be shortened. The time required for the step of changing the priority order can be shortened.
本発明を実施することで、多缶設置したボイラの稼働優先順位を変更する際に蒸気供給量が不足するということはなく、また稼働優先順位を変更する工程に要する時間を短くすることができる。そのため、ボイラが短時間で発停を繰り返すハンチングが発生しても、ハンチング現象はすぐに終了させることができる。 By implementing the present invention, there is no shortage of steam supply when changing the operation priority of boilers installed in multiple cans, and the time required for the process of changing the operation priority can be shortened. . Therefore, even if hunting occurs in which the boiler repeatedly starts and stops in a short time, the hunting phenomenon can be immediately terminated.
本発明の一実施例を図面を用いて説明する。図1は本発明を実施するボイラの設置状況を示したフローシート、図2は一実施例における制御のフローチャート、図3は一実施例における各ボイラの稼働優先順位の変更状況等を示した状態説明図である。本実施例では、6台のボイラ1を並列に設置しており、各ボイラは順にボイラA・ボイラB・ボイラC・ボイラD・ボイラE・ボイラFと名付けておく。各ボイラからの蒸気配管を蒸気ヘッダ4に接続しておき、蒸気ヘッダ4にはヘッダ圧力検出装置3を設けている。各ボイラ1に対する運転指令は、各ボイラと接続している台数制御装置2から出力するようにしており、台数制御装置2はヘッダ圧力検出装置3とも接続しておく。
An embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a flow sheet showing the installation status of a boiler that implements the present invention, FIG. 2 is a flowchart of control in one embodiment, and FIG. 3 is a status showing a change status of operation priority of each boiler in one embodiment. It is explanatory drawing. In this embodiment, six
各ボイラ1には、それぞれボイラ運転制御装置5を設け、ボイラ運転制御装置5は台数制御装置2と信号線で接続している。ボイラの運転は台数制御装置2がボイラ運転制御装置5へ出力する指令に基づいて行っており、各ボイラではボイラ運転制御装置5がボイラ1の各機器の作動を制御することでボイラは運転する。ボイラ運転制御装置5では、台数制御装置2から燃焼指令を受けると、ボイラの燃焼を開始する。燃焼を開始する場合は、まず燃焼室内へ空気のみを送り込んで燃焼室内を換気するプレパージを行い、続いて着火の工程を行って燃焼を開始し、ボイラ内の缶水を加熱して蒸気の発生を行う。ボイラ運転制御装置5が、台数制御装置2から停止指令を受けると、ボイラの燃焼を停止する。ボイラの燃焼を停止する場合は、燃料の供給を停止して燃焼を停止し、続いて燃焼室内を換気するポストパージを行って運転を停止する。また、各ボイラ1には、個々のボイラにおける蒸気圧力を検出するボイラ圧力検出装置6を設けておき、ボイラ圧力検出装置6とボイラ運転制御装置5は信号線で接続している。ボイラ圧力検出装置6で検出したボイラ圧力値は、ボイラ運転制御装置5を経由して台数制御装置2へ送るようにしておく。
Each
台数制御装置2は、ヘッダ圧力検出装置3で検出した蒸気圧力値に基づいて必要蒸気量を求め、必要台数分のボイラに対して燃焼指令を出力する。各ボイラには稼働優先順位を定めておき、蒸気圧力値が低下して必要蒸気量が増加すると、稼働優先順位の高いボイラから順に燃焼指令の出力をすることで燃焼台数を増加し、蒸気圧力値が上昇して必要蒸気量が減少すると、稼働優先順位の低いボイラから順に燃焼停止指令を出力して燃焼台数を減少することで、必要蒸気量に応じた台数制御を行う。稼働優先順位は24時間経過するごとに変更しており、ボイラごとに燃焼時間の積算値を算出し、燃焼時間が少ないものほど次期の稼働優先順位を高くするように稼働優先順位の変更を行う。
The
図3は、稼働優先順位の変更時における各ボイラの蒸気圧力値変化、稼働優先順位、燃焼指令出力の状況例をタイムチャートにしたものである。図3での稼働優先順位は、ボイラAが第1位から第6位へ、ボイラBが第2位から第5位へ、ボイラCが第3位から第4位へ、ボイラDが第4位から第3位へ、ボイラEが第5位から第2位へ、ボイラFが第6位から第1位へ変更するものとしている。当初はボイラAとボイラBの2台に対して燃焼指令の出力が行われており、他のボイラには燃焼指令の出力は行われていない。燃焼を行っていないボイラは、燃焼停止時間が長いために温度が低下しており、ボイラ圧力検出装置6で検出しているボイラ内圧力は低くなっている。
FIG. 3 is a time chart showing an example of the situation of steam pressure value change, operation priority, and combustion command output of each boiler when the operation priority is changed. The operation priorities in FIG. 3 are as follows: boiler A from 1st to 6th, boiler B from 2nd to 5th, boiler C from 3rd to 4th, boiler D 4th It is assumed that the boiler E is changed from the fifth place to the second place, and the boiler F is changed from the sixth place to the first place. Initially, combustion commands are output to two units, boiler A and boiler B, and combustion commands are not output to the other boilers. The boiler that is not performing combustion has a low temperature because the combustion stop time is long, and the boiler pressure detected by the boiler
稼働優先順位変更時の制御を、図2のフローチャートと図3のタイムチャートに基づいて説明する。稼働優先順位の変更を開始した場合、台数制御装置2は、稼働優先順位変更工程の最初ステップであるS1で現在燃焼を行っているボイラの台数を検出してLに当てはめる。実施例では、ヘッダ圧力検出装置3で検出したヘッダ圧力によって定まるボイラの燃焼台数は2台であるとしておく。そのため、ここではL=2となっている。Lの値は次のステップS2で使用する。ステップS2では、バックアップ燃焼を行うボイラの選定を行う。バックアップ燃焼は、燃焼を開始したボイラが短時間で蒸気供給を行えるようにするため、ボイラが冷缶状態にある場合に、稼働優先順位変更前のボイラにおける蒸気圧力がある程度(設定圧力P1)になるまでボイラの燃焼を行うものである。ステップS2でバックアップ燃焼を行うボイラを決定しており、L=2の場合には、次期の稼働優先順位が2以下のボイラをバックアップ燃焼対象ボイラとする。台数制御装置2では、バックアップ燃焼を行うボイラ、ここではボイラE及びボイラFの圧力を確認し、ボイラ内圧力が圧力P1未満であればステップS4でバックアップ燃焼を行う。図3に記載しているように、ボイラEとボイラFの蒸気圧力は圧力P1よりも低いため、時刻aからボイラEとボイラFの燃焼を開始する。圧力P1は圧力調節範囲の下限値程度に設定しておき、ボイラ圧力検出装置6で検出しているボイラ内の圧力が圧力P1以上になるまでバックアップ燃焼を行う。ボイラE及びボイラFにおけるボイラ内圧力が圧力P1以上になるとステップ5へ移行し、バックアップ準備が完了したかの判断を行う。バックアップ準備は新優先順位がL以下である全てのボイラで行い、バックアップ燃焼が終わっていないボイラがあればステップS2へ戻って対象ボイラの全てが終わるまでループする。
The control at the time of changing the operation priority will be described based on the flowchart of FIG. 2 and the time chart of FIG. When the change of the operation priority is started, the
バックアップ燃焼の対象としていたボイラの全てでバックアップ準備が完了すると、稼働優先順位の変更を開始する。ステップS6では、N=1とし、M=ボイラ台数+1とする。この実施例では、ボイラ台数は6であるため、Mは6+1=7となる。次のステップS7とS8で稼働優先順位を変更する。順位変更は、次期にN位となるボイラと次期にM位となるボイラを対象とする。N=1、M=7の場合、次期1位と次期7位のボイラを新順位に変更するということであるが、稼働優先順位の第7位は存在しないため第1位の方のみ新順位とする。ここではボイラFの稼働優先順位を第6位から第1位に変更する。 When the backup preparation is completed in all the boilers that were the targets of the backup combustion, the operation priority change is started. In step S6, N = 1 and M = the number of boilers + 1. In this embodiment, since the number of boilers is 6, M is 6 + 1 = 7. In the next steps S7 and S8, the operation priority is changed. The rank change is targeted for the boiler that will be Nth in the next term and the boiler that will be Mth in the next term. In the case of N = 1 and M = 7, it means that the boilers of the next and first 7th will be changed to the new rank, but since the 7th rank of the operational priority does not exist, only the 1st rank is the new rank And Here, the operation priority of the boiler F is changed from the sixth place to the first place.
図3では、時刻bでボイラEとボイラFの蒸気圧力は圧力P1に達している。そのため、時刻bでバックアップ準備を完了し、時刻b以降は新1位となるボイラFの稼働優先順位を第1位としている。次のステップS9では、新1位となるボイラFが燃焼を行っているか否かで分岐する。実施例では稼働優先順位の第1位は燃焼を行わせる順位であるため、次はステップS10へ移行する。ステップS10では、ボイラFの蒸気圧力値が設定圧力P2よりも低ければ、圧力P2に達するまでステップ9とステップ10でループする。図3にあるように、時刻bの時点におけるボイラFの蒸気圧力値は圧力P2よりも低いため、蒸気圧力値が圧力P2になるまで待つことになる。圧力P2の値は、ボイラ1から蒸気ヘッダ4への蒸気供給が行われる程度の値、つまりその時の蒸気ヘッダ圧力と同程度にするとよい。
In FIG. 3, the steam pressure of the boiler E and the boiler F has reached pressure P1 at the time b. Therefore, the backup preparation is completed at time b, and the operation priority of the boiler F, which becomes the new highest after time b, is set first. In the next step S9, the process branches depending on whether or not the boiler F, which is the first place, is burning. In the embodiment, the first operation priority order is the order in which combustion is performed, so the process proceeds to step S10. In step S10, if the steam pressure value of the boiler F is lower than the set pressure P2, the process loops between step 9 and step 10 until the pressure P2 is reached. As shown in FIG. 3, since the steam pressure value of the boiler F at the time point b is lower than the pressure P2, the process waits until the steam pressure value becomes the pressure P2. The value of the pressure P2 may be set to a value at which steam is supplied from the
この時に稼働優先順位が第1位となるボイラはボイラAとボイラBの2台となり、第2位のボイラBと合わせて3台のボイラで燃焼を行うことになる。しかしボイラFの蒸気圧力値は圧力P2より小さいため、ボイラFから蒸気ヘッダ4への蒸気供給は行われておらず、実際に蒸気を供給しているのはボイラAとボイラBの2台となっている。ボイラFの蒸気圧力値が圧力P2以上になっていれば、ステップS11へ移行する。次のステップS11では新M位ボイラの燃焼状態で分岐する。しかし現時点のMは7であり、第7位のボイラは存在しないため、新7位のボイラが燃焼しているという条件に当てはまらない。そのため、そのままステップS13に移行する。ステップS13では、全ボイラが次期順位へ変更終了していれば稼働優先順位変更の終了とし、まだ変更していないボイラがあれば、ステップS14でNとMの値をN=N+1とM=M−1にそれぞれ変更する。現時点では、まだ全ボイラの次期順位への変更は終了していないため、NO側のステップS14へ移行し、N=1、M=7であったため、ここでN=2、M=6となって、ステップS7へ戻る。 At this time, the boilers whose operation priority ranks first are two boilers, boiler A and boiler B, and combustion is performed by three boilers together with the second rank boiler B. However, since the steam pressure value of the boiler F is smaller than the pressure P2, steam is not supplied from the boiler F to the steam header 4, and steam is actually supplied from two boilers A and B. It has become. If the steam pressure value of the boiler F is equal to or higher than the pressure P2, the process proceeds to step S11. In the next step S11, the process branches in the combustion state of the new M-th boiler. However, since M at the present time is 7, and there is no 7th boiler, it does not apply to the condition that the new 7th boiler is burning. Therefore, the process proceeds to step S13 as it is. In step S13, if all boilers have been changed to the next order, the operation priority order is changed. If there is a boiler that has not been changed, the values of N and M are set to N = N + 1 and M = M in step S14. Change to -1. At this time, since the change to the next rank of all the boilers has not been completed yet, the process proceeds to step S14 on the NO side, and N = 1 and M = 7. Thus, N = 2 and M = 6. Then, the process returns to step S7.
新2位となるボイラはボイラE、新6位となるボイラはボイラAであるため、今回のステップS7とステップS8ではボイラEの稼働優先順位を第5位から第2位へ、ボイラAの稼働優先順位を第1位から第6位へ変更する。これは図3での時刻cの位置となる。
実施例では第1位と第2位のボイラを燃焼するものとしているため、旧5位から新2位への変更が行われたボイラEは燃焼を行い、旧1位から新6位への変更が行われたボイラAは燃焼を停止する。新2位のボイラEは燃焼中となるため、ステップ9とステップ10でボイラEの蒸気圧力値が圧力P2になるまではループを行う。図3の時刻dでボイラEの蒸気圧力値が圧力P2以上となれば、次のステップS11に移行する。ステップS11では、新6位のボイラAが燃焼していればステップ12へ移行するが、新6位のボイラAは燃焼を停止しているため、ステップS13へ飛ぶ。
Boiler E, the new second-ranked boiler, is boiler A, and boiler A, the sixth-ranked boiler, is the boiler A operating priority from No. 5 to No. 2 at Steps S7 and S8. Change the operating priority from 1st to 6th. This is the position of time c in FIG.
In the embodiment, since the first and second boilers are burned, boiler E, which has been changed from the old 5th place to the new 2nd place, burns and changes from the old 1st place to the new 6th place. The boiler A in which the change has been made stops combustion. Since the new second-ranked boiler E is burning, a loop is performed until the steam pressure value of the boiler E reaches the pressure P2 in
この段階でもまだ全ボイラの次期順位への変更は終了していないため、ステップS14でN=2+1=3、M=6−1=5とし、ステップS7へ戻る。今回のステップ7とステップ8では、ボイラDの稼働優先順位を第4位から第3位に変更し、ボイラBの稼働優先順位を第2位から第5位へ変更する。これは図3では時刻dの部分となる。ボイラBでは稼働優先順位の変更により、燃焼実施から燃焼停止へ変更となる。ボイラDの場合は稼働優先順位変更の前後で燃焼状態に変化はなく、燃焼停止のままとなっている。
Even at this stage, since the change to the next rank of all the boilers has not been completed, N = 2 + 1 = 3 and M = 6-1 = 5 are set in step S14, and the process returns to step S7. In the
このループでは、新3位のボイラDと新5位のボイラBについて制御を行うのであるが、稼働優先順位の第3位は本実施例では燃焼を停止とする順位であるため、ステップS9の判断ではNO側となり、そのままステップS13へ飛ぶことになる。次のステップS14では、N=3+1=4、M=5−1=4となるため、図3の時刻eで最後に残っていたボイラCの稼働優先順位を第3位から第4位へ変更する。第4位も燃焼は停止する順位であるため、ステップS9の分岐ではNO側となり、ステップS13へ飛ぶ。これで全てのボイラについて次期順位への変更が終了となり、稼働優先順位変更の工程を終了する。 In this loop, the control is performed for the new third-ranked boiler D and the new fifth-ranked boiler B. However, since the third rank in the operation priority order is the rank in which combustion is stopped in this embodiment, In the determination, the answer is NO, and the process jumps to step S13 as it is. In the next step S14, since N = 3 + 1 = 4 and M = 5-1 = 4, the operation priority of the last remaining boiler C at time e in FIG. 3 is changed from third to fourth. To do. The fourth place is also the order in which the combustion stops, so at the branch of step S9, it becomes NO and jumps to step S13. This completes the change to the next rank for all the boilers, and the operation priority change process ends.
以上のように、稼働優先順位変更工程の前段階で、冷缶状態にあったボイラの加熱を行っておくことで、実際に稼働優先順位を変更した際に、新しく燃焼を開始したボイラが蒸気供給を開始するまで待つ時間を短くすることができ、蒸気圧力が不安定になる稼働優先順位変更工程に要する時間を短くすることができる。 As described above, by heating the boiler that was in the cold can state before the operation priority change process, when the operation priority is actually changed, the newly started boiler starts steam The time to wait until the supply is started can be shortened, and the time required for the operation priority changing process in which the steam pressure becomes unstable can be shortened.
なお、本実施例では稼働優先順位の変更工程開始時点で燃焼中のボイラ台数を算出し、バックアップ燃焼を行うボイラの台数を決定するようにしている。これに替えて、バックアップ燃焼を行うボイラの台数を設定値としてあらかじめ入力しておき、バックアップ燃焼を行うボイラの台数は毎回固定の値としておいてもよい。 In this embodiment, the number of boilers that are burning is calculated at the start of the operation priority changing process, and the number of boilers that perform backup combustion is determined. Alternatively, the number of boilers that perform backup combustion may be input in advance as a set value, and the number of boilers that perform backup combustion may be a fixed value each time.
1 ボイラ
2 台数制御装置
3 ヘッダ圧力検出装置
4 蒸気ヘッダ
5 ボイラ運転制御装置
6 ボイラ圧力検出装置
1 boiler
2 Number control device
3 Header pressure detector
4 Steam header
5 Boiler operation control device
6 Boiler pressure detection device
Claims (3)
1.蒸気圧力が設定圧力P1より低いボイラに対して燃焼指令を出力して燃焼を行わせることでボイラの蒸気圧力を設定圧力P1よりも高くするバックアップ燃焼を行っておき、2.次に稼働優先順位を繰り上げるボイラから1台を選択し、選択したボイラの稼働優先順位を次期の順位に変更、
3.前記順位変更後ボイラが燃焼を行う順位の場合、当該ボイラの蒸気圧力が設定圧力P2より低ければ、当該ボイラが設定圧力P2よりも高くなるまで燃焼を行い、
4.当該ボイラの蒸気圧力値が設定圧力P2よりも高くなったことを検出後に次のボイラの稼働優先順位を変更する工程に移る制御を行うことを特徴とする多缶設置ボイラ。 In the multi-can installation boiler according to claim 1, the unit control device is in the operation priority changing step,
1. 1. Back-up combustion is performed in which the steam pressure of the boiler is made higher than the set pressure P1 by outputting a combustion command to the boiler whose steam pressure is lower than the set pressure P1 to cause combustion. Next, select one of the boilers that will raise the operating priority, and change the operating priority of the selected boiler to the next level.
3. In the case where the boiler is burned after the rank change, if the steam pressure of the boiler is lower than the set pressure P2, combustion is performed until the boiler becomes higher than the set pressure P2,
4). A multi-can installation boiler, characterized in that after detecting that the steam pressure value of the boiler has become higher than the set pressure P2, the control is shifted to the step of changing the operation priority of the next boiler.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008074910A JP5086145B2 (en) | 2008-03-24 | 2008-03-24 | Multi-can boiler |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008074910A JP5086145B2 (en) | 2008-03-24 | 2008-03-24 | Multi-can boiler |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2009228983A JP2009228983A (en) | 2009-10-08 |
| JP5086145B2 true JP5086145B2 (en) | 2012-11-28 |
Family
ID=41244592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008074910A Expired - Fee Related JP5086145B2 (en) | 2008-03-24 | 2008-03-24 | Multi-can boiler |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5086145B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011099600A (en) * | 2009-11-05 | 2011-05-19 | Samson Co Ltd | Multiple can installed boiler |
| JP5811530B2 (en) * | 2010-12-06 | 2015-11-11 | 三浦工業株式会社 | Controller, boiler and boiler control method |
| JP6119274B2 (en) * | 2013-01-31 | 2017-04-26 | 三浦工業株式会社 | Boiler system |
| JP6102365B2 (en) * | 2013-03-13 | 2017-03-29 | 三浦工業株式会社 | Boiler system |
| CN114992864B (en) * | 2021-02-20 | 2025-04-04 | 芜湖美的厨卫电器制造有限公司 | Gas water heater and control method and storage medium thereof |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0217302A (en) * | 1988-07-02 | 1990-01-22 | Miura Co Ltd | Automatic control device for the number of boilers |
| JPH07109290B2 (en) * | 1989-07-14 | 1995-11-22 | 三浦工業株式会社 | Automatic number control device for equipment such as boilers |
| JP3999024B2 (en) * | 2002-04-11 | 2007-10-31 | 株式会社サムソン | Multi-can installed boiler unit control device |
-
2008
- 2008-03-24 JP JP2008074910A patent/JP5086145B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2009228983A (en) | 2009-10-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5086145B2 (en) | Multi-can boiler | |
| JP5349235B2 (en) | Multi-can boiler | |
| JP2016223686A (en) | Multi-can installed boiler | |
| JP3999024B2 (en) | Multi-can installed boiler unit control device | |
| JP2013234775A (en) | System for controlling number of multi-boiler type through-flow boiler | |
| JP5692807B2 (en) | Multi-can boiler | |
| JP4118206B2 (en) | Number control device in boiler multi-can installation system | |
| JP5465473B2 (en) | Boiler multi-can installation system | |
| JP2861880B2 (en) | Automatic boiler unit control method | |
| JP4059728B2 (en) | Multi-can boiler | |
| JP5410921B2 (en) | Multi-can boiler | |
| JP2010236719A (en) | Multi-can installed boiler | |
| JP5302078B2 (en) | Boiler multi-can installation system | |
| JP2012037096A (en) | Boiler multi-can installation system | |
| JP6289119B2 (en) | Multi-can boiler with air supply valve | |
| JP5541781B2 (en) | Boiler multi-can installation system | |
| JP5230386B2 (en) | Boiler multi-can installation system | |
| JP5455867B2 (en) | Heat medium boiler multi-can installation system | |
| JP5541780B2 (en) | Boiler multi-can installation system | |
| JP2010286180A (en) | Boiler multi-can installation system | |
| JP4533335B2 (en) | Control device for heat source system | |
| JP6399579B2 (en) | Multi-can boiler | |
| JP2011099600A (en) | Multiple can installed boiler | |
| JP7350262B2 (en) | Multi-can installation boiler | |
| JP2012237530A (en) | Control program, control system and control method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20101112 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120824 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20120904 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20120906 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 5086145 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150914 Year of fee payment: 3 |
|
| LAPS | Cancellation because of no payment of annual fees |