Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5124303B2 - Bridge girder rearrangement method and apparatus - Google Patents
[go: Go Back, main page]

JP5124303B2 - Bridge girder rearrangement method and apparatus - Google Patents

Bridge girder rearrangement method and apparatus Download PDF

Info

Publication number
JP5124303B2
JP5124303B2 JP2008026511A JP2008026511A JP5124303B2 JP 5124303 B2 JP5124303 B2 JP 5124303B2 JP 2008026511 A JP2008026511 A JP 2008026511A JP 2008026511 A JP2008026511 A JP 2008026511A JP 5124303 B2 JP5124303 B2 JP 5124303B2
Authority
JP
Japan
Prior art keywords
bridge girder
jack
tip
temporary support
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008026511A
Other languages
Japanese (ja)
Other versions
JP2009185519A (en
Inventor
真史 薮野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Infrastructure Systems Co Ltd
Original Assignee
IHI Infrastructure Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Infrastructure Systems Co Ltd filed Critical IHI Infrastructure Systems Co Ltd
Priority to JP2008026511A priority Critical patent/JP5124303B2/en
Publication of JP2009185519A publication Critical patent/JP2009185519A/en
Application granted granted Critical
Publication of JP5124303B2 publication Critical patent/JP5124303B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明はベント架設工法に適した橋桁盛り替え方法及び装置に関するものである。   The present invention relates to a bridge girder replacement method and apparatus suitable for a vent erection method.

ベント架設工法では、永久構造物である橋台や橋脚とは別に所要数の支保工を設置し、この支保工によって一つのブロックが10〜12mの長さの橋桁を下方から支えて、隣り合う橋桁を互いに連結した後、支保工を撤去する。   In the vent erection method, a required number of support works are installed separately from the abutments and piers, which are permanent structures, and a single block supports a bridge girder with a length of 10-12m by this support work. After connecting to each other, the support work is removed.

橋桁の架設時には、隣り合う橋桁の相対的な位置の調整や、自重による撓みを見込んだ反り返りを橋桁に付与しておくために、支保工に対して橋桁を上下に変位させる盛り替えを行っている。   When installing the bridge girder, repositioning the bridge girder up and down with respect to the support works in order to adjust the relative position of the adjacent girder and to give the bridge girder a bend that allows for bending due to its own weight. Yes.

図5、図6は従来の橋桁盛り替え方法の一例であり、仮受架台1と打上用のジャッキ2とを橋桁長手方向に並ぶように支保工3の頂部に設置し、仮受架台1、及びジャッキ2により橋桁4を下方から支える。   5 and 6 show an example of a conventional bridge girder replacement method. The temporary support base 1 and the launching jack 2 are installed on the top of the support 3 so as to be aligned in the longitudinal direction of the bridge girder. The bridge girder 4 is supported from below by the jack 2.

仮受架台1は複数の部材を積み重ねたもので、最上の部材と橋桁4の下側フランジ5との間には、所要枚数のライナプレート6が介在させてあり、また、下側フランジ5の打上個所には、ジャッキ2に対向するようにベースプレート7を設けている。   The temporary support base 1 is formed by stacking a plurality of members, and a required number of liner plates 6 are interposed between the uppermost member and the lower flange 5 of the bridge girder 4. A base plate 7 is provided at the launch position so as to face the jack 2.

そして、集中荷重に起因した橋桁4の変形を避けるために、仮受架台1は橋桁4の垂直補剛材8の取付個所に合わせて設置されている。   And in order to avoid the deformation | transformation of the bridge girder 4 resulting from concentrated load, the temporary support stand 1 is installed according to the attachment location of the vertical stiffener 8 of the bridge girder 4. FIG.

支保工3のところで橋桁4を上方へ変位させる場合には、ジャッキ2を伸ばして橋桁4の重量を当該ジャッキ2で受け、この状態で部材数を増やすことにより仮受架台1を高くした後、ジャッキ2を縮めて橋桁4の重量を仮受架台1で受ける盛り替えを行う。   When the bridge girder 4 is displaced upward at the support work 3, the jack 2 is extended and the weight of the bridge girder 4 is received by the jack 2, and the temporary support base 1 is raised by increasing the number of members in this state. The jack 2 is shrunk to receive the weight of the bridge girder 4 at the temporary support stand 1.

支保工3のところで橋桁4を下方へ変位させる場合には、ジャッキ2を伸ばして橋桁4の重量を当該ジャッキ2で受け、この状態で部材数を減らすことにより仮受架台1を低くした後、ジャッキ2を縮めて橋桁4の重量を仮受架台1で受ける盛り替えを行う。   When the bridge girder 4 is displaced downward at the support work 3, the jack 2 is extended and the weight of the bridge girder 4 is received by the jack 2. In this state, the temporary support base 1 is lowered by reducing the number of members. The jack 2 is shrunk to receive the weight of the bridge girder 4 at the temporary support stand 1.

このような盛り替え方法とは別に、大型の重量構造物の段階的な嵩上げ作業を行うためのジャッキアップ工法も提案されている(例えば、特許文献1参照)。
特開2001−171986号公報
Apart from such a reordering method, a jack-up method for performing a stepwise raising operation of a large heavy structure has also been proposed (see, for example, Patent Document 1).
JP 2001-171986

支保工3の頂部はあまり広くないので、ジャッキ2の打上個所には既設の垂直補剛材8が存在しないことが事例が殆どであり、通常は、ジャッキ2の打上個所に合わせて追加の垂直補剛材9を橋桁4に取り付け、当該橋桁4の変形を防がなくてはならない。   Since the top of the support 3 is not so wide, in most cases the existing vertical stiffener 8 does not exist at the launching point of the jack 2, and usually an additional vertical according to the launching point of the jack 2 The stiffener 9 must be attached to the bridge girder 4 to prevent the bridge girder 4 from being deformed.

支保工3の頂部を拡大して、ジャッキ2の打上個所が既設の垂直補剛材8に合うようにするという手立ても考えられるが、実際のところ現実的ではない。   Although it is conceivable to enlarge the top of the support 3 so that the launching portion of the jack 2 matches the existing vertical stiffener 8, it is not practical in practice.

ジャッキ2は複数基を用意しない限り、仮受架台1が受ける橋桁4の重量を上回る打上能力を一基のジャッキ2に具備させる必要がある。   Unless a plurality of jacks 2 are prepared, it is necessary to provide a single jack 2 with a launch capability that exceeds the weight of the bridge girder 4 received by the temporary support base 1.

本発明は上述した実情に鑑みてなしたもので、主にジャッキの打上能力が橋桁の重量を上回らなくても橋桁盛り替えを行えるようにすることを目的としている。   The present invention has been made in view of the above-described circumstances, and an object of the present invention is to make it possible to perform bridge girder repositioning even if the jacking ability does not exceed the weight of the bridge girder.

上記目的を達成するため、本発明の橋桁盛り替え方法では、支保工または橋脚である柱体の頂部に設けた支点部材に、橋桁長手方向に延びる天秤梁の中間部分を載せ、複数の部材を積み重ねた中間仮受架台を、前記支点部材の橋桁横方向に並ぶように柱体の頂部に設置し、前記天秤梁の一端部分に複数の部材を積み重ねた先端仮受架台を設置し、同天秤梁の他端部分にジャッキを載せて、これら中間仮受架台、先端仮受架台、及びジャッキにより橋桁の下面を支持し、ジャッキを伸張させて橋桁の重量を先端仮受架台及びジャッキで受け、この状態で部材数を増加、あるいは減少させることにより中間仮受架台の高さを調整する工程と、ジャッキを縮小させて橋桁の重量を中間仮受架台及びジャッキで受け、この状態で部材数を増加、あるいは減少させることにより先端仮受架台の高さを調整する工程とを交互に行う。   In order to achieve the above object, in the bridge girder replacement method of the present invention, the intermediate part of the balance beam extending in the longitudinal direction of the bridge girder is mounted on the fulcrum member provided on the top of the columnar body that is a support or bridge pier, and a plurality of members are mounted. The stacked intermediate cradle is placed on the top of the column so that it is aligned in the bridge girder lateral direction of the fulcrum member, and the tip temporary cradle is placed on one end of the balance beam. Place a jack on the other end of the beam, support the lower surface of the bridge girder with these intermediate temporary support stand, tip temporary support stand, and jack, extend the jack and receive the weight of the bridge girder with the tip temporary support stand and jack, In this state, the height of the intermediate cradle is adjusted by increasing or decreasing the number of members, and the weight of the bridge girder is received by the intermediate temporary cradle and the jack by reducing the jack. Increase, or Performing the step of adjusting the tip provisional 受架 stand height by reducing alternately.

また、支保工または橋脚である柱体の頂部より橋桁長手方向へ突き出すのに充分な全長を有する天秤梁を用い、中間仮受架台、先端仮受架台、及びジャッキが橋桁の下面を支持する位置を、当該橋桁の垂直補剛材の取付個所に合わせる。   Also, using a balance beam that has a full length enough to protrude in the bridge girder longitudinal direction from the top of the column that is a support or a bridge pier, the intermediate temporary support stand, the tip temporary support stand, and the position where the jack supports the lower surface of the bridge girder Align with the vertical stiffener attachment point of the bridge girder.

これに加えて、中間仮受架台からジャッキまでの間隔を、中間仮受架台から先端仮受架台までの間隔に比べて長く設定する。   In addition, the distance from the intermediate temporary support base to the jack is set longer than the distance from the intermediate temporary support base to the tip temporary support base.

更に、橋桁への先端仮受架台の接触面積を、天秤梁への先端仮受架台の接触面積に比べて広く設定する。   Furthermore, the contact area of the tip temporary support to the bridge girder is set wider than the contact area of the tip temporary support to the balance beam.

そして、本発明の橋桁盛り替え装置は、支保工または橋脚である柱体の頂部に設置される支点部材と、橋桁長手方向に延びて中間部分が前記支点部材に載る天秤梁と、積み重ねた複数の部材を要素として前記支点部材の橋桁横方向に並ぶように柱体の頂部に設置される中間仮受架台と、積み重ねた複数の部材を要素として前記天秤梁の一端部分に設置される先端仮受架台と、同天秤梁の他端部分に設置されるジャッキとを備え、これら中間仮受架台、先端仮受架台、及びジャッキにより橋桁の下面を支持可能に構成している。   And the bridge girder reordering device of the present invention is a supporting member or a fulcrum member installed at the top of the pillar body which is a pier, a balance beam extending in the longitudinal direction of the bridge girder and having a middle portion mounted on the fulcrum member, and a plurality of stacked An intermediate temporary support installed at the top of the column so that the members of the fulcrum are arranged in the horizontal direction of the bridge girder as elements, and a temporary tip installed at one end portion of the balance beam using the stacked members as elements. A cradle and a jack installed at the other end of the balance beam are provided, and the intermediate temporary cradle, the tip temporary cradle, and the jack are configured to support the lower surface of the bridge girder.

本発明の橋桁盛り替え方法及び装置によれば、下記のような優れた効果を奏し得る。   According to the bridge girder rearrangement method and apparatus of the present invention, the following excellent effects can be obtained.

(1)盛り替え時には橋桁の重量を、中間仮受架台とジャッキ、あるいは先端仮受架台とジャッキのいずれかの組み合わせによって分担するので、ジャッキの打上能力が橋桁の重量を上回らなくても盛り替えを行うことができ、ジャッキの小型化が図れる。   (1) Since the weight of the bridge girder is shared by any combination of the intermediate temporary support base and jack, or the tip temporary support base and jack at the time of replacement, even if the jacking capacity does not exceed the weight of the bridge girder The jack can be downsized.

(2)支保工の頂部より橋桁長手方向へ突き出す全長の天秤梁を用い、ジャッキの打上個所や先端仮受架台の支持位置を既設の垂直補剛材に合わせれば、特に追加の垂直補剛材を橋桁に取り付ける必要がなくなり、付帯的な作業を削減できる。   (2) Additional vertical stiffeners can be obtained by using a full-scale balance beam that protrudes from the top of the support in the longitudinal direction of the bridge girder and aligning the jack launch location and the tip support stand with the existing vertical stiffeners. It is no longer necessary to attach the to the bridge girder, and incidental work can be reduced.

(3)中間仮受架台からジャッキまでの間隔を、中間仮受架台から先端仮受架台までの間隔に比べて長く設定すれば、これら間隔比に応じてジャッキの打上能力の軽減がされ、ジャッキの小型化が図れる。   (3) If the distance from the intermediate temporary support base to the jack is set longer than the distance from the intermediate temporary support base to the tip temporary support base, the jacking ability will be reduced according to the interval ratio, and the jack will be reduced. Can be miniaturized.

(4)橋桁への先端仮受架台の接触面積を意図的に拡げれば、先端仮受架台が担う重量が分散するため、追加の垂直補剛材を橋桁に取り付ける必要がなくなり、付帯的な作業を削減できる。   (4) If the contact area of the tip temporary cradle to the bridge girder is intentionally increased, the weight of the tip temporary cradle is dispersed, so there is no need to attach an additional vertical stiffener to the bridge girder. Work can be reduced.

以下、本発明の実施の形態を図面に基づき説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1、図2は本発明の橋桁盛り替え方法の第1の例であり、図中、図5、図6の従来例と同じ符号を付した部分は同一物を表している。   FIGS. 1 and 2 show a first example of the bridge girder rearrangement method of the present invention. In the figure, the same reference numerals as those in the conventional examples of FIGS. 5 and 6 denote the same parts.

この橋桁盛り替え方法では、井桁構造の天秤梁10と、ゴムプレートよりなる支点部材11と、複数の部材を積み重ねた中間仮受架台12、同じく複数の部材を積み重ねた先端仮受架台13と、ジャッキ14とを備えた橋桁盛り替え装置を用いる。   In this bridge girder rearrangement method, a balance beam 10 having a cross girder structure, a fulcrum member 11 made of a rubber plate, an intermediate temporary support base 12 in which a plurality of members are stacked, a tip temporary support base 13 in which a plurality of members are also stacked, A bridge girder changing device equipped with a jack 14 is used.

天秤梁10は、橋桁長手方向に延びて支保工3の頂部より橋桁長手方向へ突き出すのに充分な全長を有し且つ橋桁横方向(橋桁の長手に対して直角な水平方向/図2で左右方向)に並ぶ一対の主梁15と、橋桁横方向に延びて前記主梁15の端部下面を相互に連結する副梁16とで構成されている。   The balance beam 10 extends in the longitudinal direction of the bridge girder and has a total length sufficient to protrude from the top of the support 3 in the longitudinal direction of the bridge girder, and in the lateral direction of the bridge girder (horizontal direction perpendicular to the longitudinal length of the bridge girder / left and right in FIG. 2). A pair of main beams 15 arranged in the direction) and sub beams 16 extending in the lateral direction of the bridge girder and connecting the bottom surfaces of the end portions of the main beams 15 to each other.

橋桁4の盛り替えにあたっては、二つの支点部材11を支保工3の頂部に橋桁横方向に並べて設置し、天秤梁10の主梁15の長手方向中間部分を支点部材11に載せ、更に、支保工3の頂部の支点部材11の間に中間仮受架台12を設置する。   When the bridge girder 4 is rearranged, the two fulcrum members 11 are installed side by side in the bridge girder lateral direction on the top of the support 3, the longitudinal intermediate portion of the main beam 15 of the balance beam 10 is placed on the fulcrum member 11, and further supported An intermediate temporary support base 12 is installed between the fulcrum members 11 at the top of the work 3.

そして、天秤梁10の一端の副梁16に先端仮受架台13を設置し、天秤梁10の他端の副梁16にジャッキ14を載せて、これら中間仮受架台12、先端仮受架台13、及びジャッキ14により橋桁4を下方から支える。   Then, the tip temporary support base 13 is installed on the secondary beam 16 at one end of the balance beam 10, and the jack 14 is placed on the secondary beam 16 at the other end of the balance beam 10, and the intermediate temporary support base 12, the tip temporary support base 13. , And the jack 14 supports the bridge girder 4 from below.

中間仮受架台12及び先端仮受架台13の最上の部材と橋桁4の下側フランジ5との間には、高さを微調整するために所要枚数のライナプレート17,18が介在させてあり、当該ライナプレート17,18も仮受架台12,13の要素となっている。   Between the uppermost member of the intermediate temporary support stand 12 and the tip temporary support stand 13 and the lower flange 5 of the bridge girder 4, a required number of liner plates 17 and 18 are interposed in order to finely adjust the height. The liner plates 17 and 18 are also elements of the temporary support bases 12 and 13.

また、ジャッキ2と下側フランジ5のベースプレート7との間には、ゴムプレートよりなる支点部材19が介在させてある。   Further, a fulcrum member 19 made of a rubber plate is interposed between the jack 2 and the base plate 7 of the lower flange 5.

支保工3のところで橋桁4を上方に変位させる場合には、ジャッキ14を伸ばして橋桁4の重量を先端仮受架台13及びジャッキ14で受けると、ジャッキ14側が僅かに下降するように天秤梁10が傾き、ライナプレート17が橋桁4の下側フランジ5から離れるので、この状態で部材数を増やすか、あるいは部材を入れ替えて中間仮受架台12を高くする盛り替えを行う。   When the bridge girder 4 is displaced upward at the support 3, when the jack 14 is extended and the weight of the bridge girder 4 is received by the tip temporary mount 13 and the jack 14, the balance beam 10 so that the jack 14 side is slightly lowered. Since the liner plate 17 is separated from the lower flange 5 of the bridge girder 4 in this state, the number of members is increased in this state, or the members are replaced and the intermediate temporary support 12 is raised.

引き続いて、ジャッキ14を縮めて橋桁4の重量を中間仮受架台12及びジャッキ14で受けると、ジャッキ14側が僅かに上昇するように天秤梁10が傾き、ライナプレート18が橋桁4の下側フランジ5から離れるので、この状態で部材数を増やすか、あるいは部材を入れ替えて先端仮受架台13を高くする盛り替えを行う。   Subsequently, when the jack 14 is shrunk and the weight of the bridge girder 4 is received by the intermediate temporary support 12 and the jack 14, the balance beam 10 is tilted so that the jack 14 side is slightly raised, and the liner plate 18 is lowered on the lower flange of the bridge girder 4. In this state, the number of members is increased, or the members are replaced and the tip temporary support base 13 is raised.

すなわち、中間仮受架台12を高くする工程と、先端仮受架台13を高くする工程とを交互に行えば、支保工3のところで橋桁4が段階的に上方へ変位する。   That is, the bridge girder 4 is displaced upward in stages at the support 3 by alternately performing the process of raising the intermediate temporary support 12 and the process of raising the tip temporary support 13.

支保工3のところで橋桁4を下方に変位させる場合には、ジャッキ14を伸ばして橋桁4の重量を先端仮受架台13及びジャッキ14で受けると、ジャッキ14側が僅かに下降するように天秤梁10が傾き、ライナプレート17が橋桁4の下側フランジ5から離れるので、この状態で部材数を減らすか、あるいは部材を入れ替えて中間仮受架台12を低くする盛り替えを行う。   When the bridge girder 4 is displaced downward at the support 3, when the jack 14 is extended and the weight of the bridge girder 4 is received by the tip temporary support 13 and the jack 14, the balance beam 10 so that the jack 14 side is slightly lowered. Since the liner plate 17 is separated from the lower flange 5 of the bridge girder 4, the number of members is reduced in this state, or replacement is performed to lower the intermediate temporary support 12 by replacing the members.

引き続いて、ジャッキ14を縮めて橋桁4の重量を中間仮受架台12及びジャッキ14で受けると、ジャッキ14側が僅かに上昇するように天秤梁10が傾き、ライナプレート18が橋桁4の下側フランジ5から離れるので、この状態で部材数を減らすか、あるいは部材を入れ替えて先端仮受架台13の低くする盛り替えを行う。   Subsequently, when the jack 14 is shrunk and the weight of the bridge girder 4 is received by the intermediate temporary support 12 and the jack 14, the balance beam 10 is tilted so that the jack 14 side is slightly raised, and the liner plate 18 is lowered on the lower flange of the bridge girder 4. In this state, the number of members is reduced, or the members are replaced and the tip temporary support stand 13 is lowered.

すなわち、中間仮受架台12を低くする工程と、先端仮受架台13を低くする工程とを交互に行えば、支保工3のところで橋桁4が段階的に下方へ変位する。   That is, if the step of lowering the intermediate temporary support base 12 and the step of lowering the tip temporary support base 13 are alternately performed, the bridge girder 4 is displaced downward stepwise at the support 3.

盛り替え時には橋桁4の重量を、中間仮受架台12及び先端仮受架台13のいずれかとジャッキ14とで分担するので、当該ジャッキ14の打上能力が橋桁4の重量を上回っていなくても盛り替えが行える。   Since the weight of the bridge girder 4 is shared by either the intermediate temporary support stand 12 or the tip temporary support stand 13 and the jack 14 at the time of reordering, even if the launching ability of the jack 14 does not exceed the weight of the bridge girder 4 Can be done.

具体的には、支点部材11中心から先端仮受架台13中心までの距離と、支点部材11中心からジャッキ14中心までの距離との比が1:1であるのならば、先端仮受架台13とジャッキ14は、橋桁4の重量を1:1の割合、つまり半分ずつ負担することになる。   Specifically, if the ratio of the distance from the center of the fulcrum member 11 to the center of the temporary tip support stand 13 and the distance from the center of the fulcrum member 11 to the center of the jack 14 is 1: 1, the tip temporary support base 13 The jack 14 bears the weight of the bridge beam 4 at a ratio of 1: 1, that is, half each.

また、天秤梁10の主梁15は、支保工3の頂部より橋桁長手方向へ突出するのに充分な全長を有しているので、ジャッキ14の打上個所や先端仮受架台13の支持位置を既設の垂直補剛材8に合わせることができ、追加の垂直補剛材9(図5、図6(a)参照)を橋桁4に取り付けなくてもよい。   Further, the main beam 15 of the balance beam 10 has a sufficient length so as to protrude in the longitudinal direction of the bridge girder from the top of the support 3, so that the launching position of the jack 14 and the support position of the tip temporary support base 13 are set. It can be matched with the existing vertical stiffener 8, and the additional vertical stiffener 9 (see FIGS. 5 and 6A) does not have to be attached to the bridge girder 4.

前述した天秤梁10が傾く動きは、支点部材11,19がゴムプレートであるので容易に許容される。   The above-described tilting movement of the balance beam 10 is easily allowed because the fulcrum members 11 and 19 are rubber plates.

支点部材11は、支保工3に対する主梁15の滑り止めの役割を果たし、支点部材19は、ジャッキ14のロッドに対するベースプレート7の滑り止めの役割を果たす。   The fulcrum member 11 serves to prevent the main beam 15 from slipping with respect to the support work 3, and the fulcrum member 19 serves to prevent the base plate 7 from slipping against the rod of the jack 14.

更に、支保工3に代えて永久構造物である橋脚への橋桁4の据付作業にも適用することができ、この場合、中間仮受架台12のところが橋桁4の支承位置となる。   Furthermore, it can be applied to the installation work of the bridge girder 4 to the bridge pier which is a permanent structure in place of the support work 3, and in this case, the position of the intermediate temporary support stand 12 becomes the support position of the bridge girder 4.

図3は本発明の橋桁盛り替え方法の第2の例であり、天秤梁10、支点部材11、中間仮受架台12、先端仮受架台13、ジャッキ14は、図1、図2に示す第1の例と同構造だが、第2の例と第1の例との相違は、図1に比べて図3のほうが橋桁4の垂直補剛材8の間隔が広くなって点にある。   FIG. 3 shows a second example of the bridge girder replacement method of the present invention. The balance beam 10, the fulcrum member 11, the intermediate temporary support base 12, the tip temporary support base 13, and the jack 14 are shown in FIGS. Although the same structure as the first example, the difference between the second example and the first example is that the vertical stiffener 8 of the bridge girder 4 is wider in FIG. 3 than in FIG.

従って、ジャッキ14の打上個所や先端仮受架台13の支持位置を既設の垂直補剛材8に合わせることができないが、前述したように、先端仮受架台13とジャッキ14が橋桁4の重量を半分ずつ分担するため集中荷重は大きくならず、追加の垂直補剛材9(図5、図6(a)参照)を橋桁4に取り付けなくてもよい。   Therefore, although the launch position of the jack 14 and the support position of the tip temporary support base 13 cannot be matched with the existing vertical stiffener 8, the tip temporary support base 13 and the jack 14 increase the weight of the bridge girder 4 as described above. Since the load is shared by half, the concentrated load does not increase, and the additional vertical stiffener 9 (see FIGS. 5 and 6A) need not be attached to the bridge girder 4.

図4は本発明の橋桁盛り替え方法の第3の例であり、橋桁4、支点部材11、中間仮受架台12、ジャッキ14は、図3に示す第2の例と同構造だが、第3の例と第2の例との相違は、図1に比べて図4のほうが天秤梁10の主梁15が長い点と、先端仮受架台13(図1、図3参照)とは別形状の先端仮受架台20を用いた点にある。   FIG. 4 shows a third example of the bridge girder replacement method of the present invention. The bridge girder 4, the fulcrum member 11, the intermediate temporary support stand 12, and the jack 14 have the same structure as the second example shown in FIG. The difference between this example and the second example is that the main beam 15 of the balance beam 10 is longer in FIG. 4 than in FIG. 1, and is different in shape from the tip temporary support base 13 (see FIGS. 1 and 3). This is in the point of using the tip temporary support stand 20 of.

具体的には、支点部材11中心から先端仮受架台20中心までの距離と、支点部材11中心からジャッキ14中心までの距離との比を1:2とし、先端仮受架台20とジャッキ14が橋桁4の重量を2:1の割合で分担するようにしたので、ジャッキ14の打上能力がより小さくても対応できることになる。   Specifically, the ratio of the distance from the center of the fulcrum member 11 to the center of the temporary temporary support base 20 and the distance from the center of the fulcrum member 11 to the center of the jack 14 is 1: 2, and the temporary temporary support base 20 and the jack 14 are Since the weight of the bridge girder 4 is shared at a ratio of 2: 1, even if the launching ability of the jack 14 is smaller, it can be handled.

先端仮受架台20は複数の部材を積み重ねたもので、最上の部材の平面形状が大きく、所要枚数のライナプレート21を介して天秤梁10の一端の副梁16に設置されている。   The tip temporary support stand 20 is a stack of a plurality of members, and the uppermost member has a large planar shape, and is installed on the sub-beam 16 at one end of the balance beam 10 via a required number of liner plates 21.

支保工3のところで橋桁4を上方、あるいは下方に変位させる盛り替え工程は、先述の第1の例と同様な手順によって行うが、ただし、先端仮受架台20の最上の部材に対しては組み替えをしない。   The reordering process for displacing the bridge girder 4 upward or downward at the support 3 is performed by the same procedure as in the first example described above, except that the uppermost member of the tip temporary support base 20 is rearranged. Do not do.

先端仮受架台20の最上の平面形状が大きい部材を、橋桁4の下側フランジ5に広範囲にわたって当接させることで、先端仮受架台20が担う重量が分散するため、追加の垂直補剛材9(図5、図6(a)参照)を橋桁4に取り付けなくてもよい。   An additional vertical stiffener is provided because the weight of the tip temporary mount 20 is dispersed by bringing a member having a large uppermost planar shape of the tip temporary mount 20 into contact with the lower flange 5 of the bridge girder 4 over a wide range. 9 (see FIG. 5 and FIG. 6A) may not be attached to the bridge girder 4.

なお、本発明の橋桁盛り替え方法及び装置は、上述の実施の形態のみに限定されるものではなく、本発明の要旨を逸脱しない範囲において変更を加え得ることは勿論である。   The bridge girder replacement method and apparatus of the present invention is not limited to the above-described embodiment, and it is needless to say that changes can be made without departing from the scope of the present invention.

本発明の橋桁盛り替え方法及び装置は、橋梁や高速道路などの建設に適用することができる。   The bridge girder replacement method and apparatus of the present invention can be applied to the construction of bridges and highways.

本発明の橋桁盛り替え方法の第1の例を示す概念図である。It is a conceptual diagram which shows the 1st example of the bridge girder rearrangement method of this invention. 図1のIIa−IIa及びIIb−IIb矢視図である。It is the IIa-IIa and IIb-IIb arrow directional view of FIG. 本発明の橋桁盛り替え方法の第2の例を示す概念図である。It is a conceptual diagram which shows the 2nd example of the bridge girder rearrangement method of this invention. 本発明の橋桁盛り替え方法の第3の例を示す概念図である。It is a conceptual diagram which shows the 3rd example of the bridge girder rearrangement method of this invention. 従来の橋桁盛り替え方法の一例を示す概念図である。It is a conceptual diagram which shows an example of the conventional bridge girder rearrangement method. 図5のVIa−VIa及びVIb−VIb矢視図である。FIG. 6 is a view taken along arrows VIa-VIa and VIb-VIb in FIG. 5.

符号の説明Explanation of symbols

3 支保工(柱体)
4 橋桁
10 天秤梁
11 支点部材
12 中間仮受架台
13 先端仮受架台
14 ジャッキ
20 先端仮受架台
3 Support work (column)
4 Bridge Girder 10 Balance Beam 11 Supporting Point Member 12 Intermediate Temporary Stand 13 End Temporary Stand 14 Jack 20 Tip Temporary Stand

Claims (5)

支保工または橋脚である柱体の頂部に設けた支点部材に、橋桁長手方向に延びる天秤梁の中間部分を載せ、複数の部材を積み重ねた中間仮受架台を、前記支点部材の橋桁横方向に並ぶように柱体の頂部に設置し、前記天秤梁の一端部分に複数の部材を積み重ねた先端仮受架台を設置し、同天秤梁の他端部分にジャッキを載せて、これら中間仮受架台、先端仮受架台、及びジャッキにより橋桁の下面を支持し、ジャッキを伸張させて橋桁の重量を先端仮受架台及びジャッキで受け、この状態で部材数を増加、あるいは減少させることにより中間仮受架台の高さを調整する工程と、ジャッキを縮小させて橋桁の重量を中間仮受架台及びジャッキで受け、この状態で部材数を増加、あるいは減少させることにより先端仮受架台の高さを調整する工程とを交互に行うことを特徴とする橋桁盛り替え方法。   Place the intermediate part of the balance beam extending in the longitudinal direction of the bridge girder on the fulcrum member provided on the top of the column that is the support or the pier, Installed at the top of the column so that they are lined up, installed a tip temporary cradle with a plurality of members stacked on one end of the balance beam, placed a jack on the other end of the balance beam, and these intermediate temporary cradle Support the lower surface of the bridge girder with the tip temporary support base and jack, extend the jack to receive the weight of the bridge girder with the tip temporary support base and jack, and increase or decrease the number of members in this state to intermediate provisional Adjusting the height of the gantry and reducing the jack to receive the weight of the bridge girder with the intermediate temporary cradle and jack, and adjusting the height of the tip temporary cradle by increasing or decreasing the number of members in this state Process Bridge girder prime replacement method characterized by performing alternately. 支保工または橋脚である柱体の頂部より橋桁長手方向へ突き出すのに充分な全長を有する天秤梁を用い、中間仮受架台、先端仮受架台、及びジャッキが橋桁の下面を支持する位置を、当該橋桁の垂直補剛材の取付個所に合わせる請求項1に記載の橋桁盛り替え方法。   Using a balance beam that has a full length enough to protrude in the bridge girder longitudinal direction from the top of the column that is a support or a bridge pier, the intermediate temporary support stand, the tip temporary support stand, and the position where the jack supports the lower surface of the bridge girder, The bridge girder rearrangement method according to claim 1, wherein the bridge girder is relocated to the installation location of the vertical stiffener of the bridge girder. 中間仮受架台からジャッキまでの間隔を、中間仮受架台から先端仮受架台までの間隔に比べて長く設定する請求項1、2のいずれかに記載の橋桁盛り替え方法。   The bridge girder replacement method according to any one of claims 1 and 2, wherein an interval from the intermediate temporary support base to the jack is set longer than an interval from the intermediate temporary support base to the tip temporary support base. 橋桁への先端仮受架台の接触面積を、天秤梁への先端仮受架台の接触面積に比べて広く設定する請求項1〜3のいずれかに記載の橋桁盛り替え方法。   The bridge girder replacement method according to any one of claims 1 to 3, wherein a contact area of the tip temporary support to the bridge girder is set wider than a contact area of the tip temporary support to the balance beam. 支保工または橋脚である柱体の頂部に設置される支点部材と、橋桁長手方向に延びて中間部分が前記支点部材に載る天秤梁と、積み重ねた複数の部材を要素として前記支点部材の橋桁横方向に並ぶように柱体の頂部に設置される中間仮受架台と、積み重ねた複数の部材を要素として前記天秤梁の一端部分に設置される先端仮受架台と、同天秤梁の他端部分に設置されるジャッキとを備え、これら中間仮受架台、先端仮受架台、及びジャッキにより橋桁の下面を支持可能に構成したことを特徴とする橋桁盛り替え装置。
A fulcrum member installed on the top of a column that is a support or a bridge pier, a balance beam extending in the longitudinal direction of the bridge girder and having an intermediate portion mounted on the fulcrum member, and a plurality of stacked members as elements, the side of the bridge girder of the fulcrum member An intermediate temporary stand placed on the top of the column so as to line up in the direction, a tip temporary stand placed on one end portion of the balance beam with a plurality of stacked members as elements, and the other end portion of the balance beam A bridge girder re-arrangement device comprising: a jack installed on the bridge girder, and a structure in which the lower surface of the bridge girder can be supported by the intermediate temporary cradle, the tip temporary cradle, and the jack.
JP2008026511A 2008-02-06 2008-02-06 Bridge girder rearrangement method and apparatus Expired - Fee Related JP5124303B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008026511A JP5124303B2 (en) 2008-02-06 2008-02-06 Bridge girder rearrangement method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008026511A JP5124303B2 (en) 2008-02-06 2008-02-06 Bridge girder rearrangement method and apparatus

Publications (2)

Publication Number Publication Date
JP2009185519A JP2009185519A (en) 2009-08-20
JP5124303B2 true JP5124303B2 (en) 2013-01-23

Family

ID=41069025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008026511A Expired - Fee Related JP5124303B2 (en) 2008-02-06 2008-02-06 Bridge girder rearrangement method and apparatus

Country Status (1)

Country Link
JP (1) JP5124303B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284079A (en) * 2016-08-08 2017-01-04 中交三公局桥梁隧道工程有限公司 A kind of bridge break post replace classification synchronize integral jacking construction method

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767140B (en) * 2012-07-27 2015-07-15 中铁二十一局集团第三工程有限公司 Construction method for rapidly mounting and dismounting temporary support of continuous girder bridge pier
JP2017031755A (en) * 2015-08-05 2017-02-09 大成建設株式会社 Base-isolated building construction method
JP2021056037A (en) * 2019-09-27 2021-04-08 井関農機株式会社 Crop weighing system for crop container
CN113699890A (en) * 2021-08-27 2021-11-26 上海市基础工程集团有限公司 Automatic compensation method for temporary support elevation for bridge prefabricated assembly component
CN114086485B (en) * 2021-12-30 2024-04-23 中铁大桥局武汉桥梁特种技术有限公司 Construction method for replacing large-span high-speed rail continuous beam support
JP7650838B2 (en) 2022-03-02 2025-03-25 鹿島建設株式会社 How to replace the girder
CN114837103B (en) * 2022-04-27 2023-09-05 中交路桥建设有限公司 Double jacking and pushing installation method for steel box girder
CN116044210A (en) * 2022-12-21 2023-05-02 深圳市路桥建设集团有限公司 A pad copy tooling and temporary support system for constructing temporary support
CN117127513A (en) * 2023-09-06 2023-11-28 中交第二航务工程局有限公司 An installation method for multi-box section multi-span continuous steel-concrete composite beams

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4295028B2 (en) * 2003-06-30 2009-07-15 三菱重工鉄構エンジニアリング株式会社 Heavy lifting / lowering device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284079A (en) * 2016-08-08 2017-01-04 中交三公局桥梁隧道工程有限公司 A kind of bridge break post replace classification synchronize integral jacking construction method

Also Published As

Publication number Publication date
JP2009185519A (en) 2009-08-20

Similar Documents

Publication Publication Date Title
JP5124303B2 (en) Bridge girder rearrangement method and apparatus
JP4563413B2 (en) Bridge girder construction method
JP5178443B2 (en) Truss type setting beam
KR101248838B1 (en) A lifting jack of upper structure of bridge and method for changing bridge bearings using them
JP5346523B2 (en) Mounting method and joint structure
JP2009073599A (en) Tower crane support structure and climbing method
KR20130040409A (en) System and method for launching upper structure of bridege
JP6028984B2 (en) How to replace the pier
KR100699413B1 (en) Channel bridge construction method with deflection correction
KR100726163B1 (en) Superstructure Supporting Device of Bridge
CN110565983A (en) building jacking and shifting method
KR100661375B1 (en) Bracket structure for bridge device maintenance
JP7009724B2 (en) Column-beam frame repair method and repair column-beam frame
JP4475536B2 (en) Non-uniform subsidence correction support structure and unequal subsidence correction method
JP5209327B2 (en) Bridge overhang construction method and overhang construction structure
CN119392629A (en) A method for resetting and correcting a pier column after the pier column is tilted
CN107245954A (en) A kind of Mid and minor spans steel box girder bridge construction method
KR102490192B1 (en) Bridge upper structure and the method constructing bridge upper structure using the same
JP7136309B2 (en) Superstructure material transportation equipment and superstructure material transportation method
CN116575341A (en) Partial pressure correction method of damping shock-isolation rubber bearing after cast-in-place beam is bridged
KR101586376B1 (en) Structure lifting method using steel pipe member with lifting jack
KR100544334B1 (en) Jack Supporting Device for Lifting Superstructure of Bridge
JP6621161B1 (en) Prestress introduction method for seismic isolation device replacement
KR101009719B1 (en) Integration method of upper structure and lower structure
CN115924758B (en) A self-retractable flip-up chamfered pyramid-shaped climbing claw and its use method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20091218

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20101110

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20101213

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20101213

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120224

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20121016

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20121029

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151102

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5124303

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees