How to erect pillars for buildings Download PDF

Info

Publication number
JP5203779B2
JP5203779B2 JP2008098850A JP2008098850A JP5203779B2 JP 5203779 B2 JP5203779 B2 JP 5203779B2 JP 2008098850 A JP2008098850 A JP 2008098850A JP 2008098850 A JP2008098850 A JP 2008098850A JP 5203779 B2 JP5203779 B2 JP 5203779B2
Authority
JP
Japan
Prior art keywords
column
bracket
building
pillar
eaves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2008098850A
Other languages
Japanese (ja)
Other versions
JP2009249905A (en
Inventor
悟 小島
憲昭 岩瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bunka Shutter Co Ltd
Original Assignee
Bunka Shutter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bunka Shutter Co Ltd filed Critical Bunka Shutter Co Ltd
Priority to JP2008098850A priority Critical patent/JP5203779B2/en
Publication of JP2009249905A publication Critical patent/JP2009249905A/en
Application granted granted Critical
Publication of JP5203779B2 publication Critical patent/JP5203779B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、建物の外部に設置される建物付設物のための柱を立設する方法に係り、例えば、集合住宅の外廊下や外階段、建物のバルコニやベランダ等のための柱に利用することができるものである。   The present invention relates to a method for erecting a pillar for a building accessory installed outside a building, and is used, for example, as a pillar for an outer corridor or an outer staircase of an apartment house, a balcony or a veranda of a building, etc. It is something that can be done.

建物の外部に設置される外廊下等の付設物のための柱のなかには、下記の特許文献1に示されているように、基礎から建物の軒まで達するものがある。このような柱では、従来、建物の軒が施工された後に、柱の下端部を基礎に固定する作業と、柱の上端部を軒部材に固定する作業とが行われている。
特開平8−109674号公報(図6)
Some pillars for attachments such as an outside corridor installed outside the building reach from the foundation to the eaves of the building as shown in Patent Document 1 below. In such a column, conventionally, after the eaves of a building are constructed, an operation of fixing the lower end portion of the column to the foundation and an operation of fixing the upper end portion of the column to the eave member are performed.
Japanese Patent Laid-Open No. 8-109674 (FIG. 6)

しかし、この従来の柱の立設方法によると、柱の施工作業は、軒の施工作業が終了した後でなければ行うことができない。これによると、軒の施工作業が遅れた場合には、柱の立設作業を行う時期も遅れることになり、建物付設物の全体工期にも影響を与えることになる。   However, according to this conventional column erecting method, the column construction work can be performed only after the eave construction work is completed. According to this, when the construction work of the eaves is delayed, the time for performing the column standing work is also delayed, which affects the entire construction period of the building attachment.

本発明の目的は、柱の立設作業を、軒の施工作業が終了していないときに行えるようになる建物付設物用柱の立設方法を提供するところにある。   An object of the present invention is to provide a method for erecting a pillar for a building-attached object that enables the erecting work of a pillar to be performed when the eaves construction work has not been completed.

本発明に係る建物付設物用柱の立設方法は、建物の軒が施工される前に、この建物の外部に設置される建物付設物のための柱の上端部に、この上端部を前記建物の軒部材に固定するためのブラケットを取り付けるとともに、前記柱の下端部を基礎に固定してこの柱を自立させるための柱下端部固定工程と、前記建物の軒が施工された後に、前記ブラケットを前記建物の軒部材に結合させることにより、前記柱の上端部を前記ブラケットを介して前記軒部材に固定するための柱上端部固定工程と、を含んでいることを特徴とするものである。   In the method of erecting a pillar for a building accessory according to the present invention, before the eaves of a building are constructed, the upper end portion is placed on the upper end portion of the pillar for a building accessory installed outside the building. Attaching a bracket for fixing to the eaves member of the building, fixing the lower end of the column to the foundation and making the column self-supporting, and after the eaves of the building are constructed, A column upper end portion fixing step for fixing the upper end portion of the column to the eave member through the bracket by coupling a bracket to the eave member of the building. is there.

この建物付設物用柱の立設方法によると、建物の軒が施工される前に、この建物の外部に設置される建物付設物のための柱の上端部に、この上端部を建物の軒部材に固定するためのブラケットを取り付けるとともに、柱の下端部を基礎に固定してこの柱を自立させるための柱下端部固定工程が実施されるため、柱の下端部を基礎に固定してこの柱を自立させるための作業を、言い換えると柱の立設作業を、軒の施工作業が終了していないときに行えるようになり、これにより、建物付設物についての作業のうち、少なくとも柱に関する作業を軒の施工作業よりも先行させて行うことができるようになる。   According to this standing method for building attachment pillars, before the building eaves are constructed, this upper end is placed on the upper end of the pillar for building attachments installed outside this building. Attach the bracket for fixing to the member, and fix the lower end of the column to the foundation and fix the lower end of the column to make this column self-supporting. The work to make the pillars self-supporting, in other words, the work of standing the pillars can be performed when the eaves construction work is not completed. Can be performed prior to the eaves construction work.

そして、この建物付設物用柱の立設方法では、柱下端部固定工程において、柱の上端部に、この上端部を建物の軒部材に固定するためのブラケットを取り付けているため、軒の施工作業終了後に、ブラケットを介して柱の上端部を軒部材に固定する作業を直ちに行うこともできる。   And in this standing method of the pillar for building accessories, in the column lower end fixing step, the bracket for fixing the upper end to the building eaves member is attached to the upper end of the column. After the work is completed, the work of fixing the upper end of the column to the eaves member via the bracket can be performed immediately.

以上の建物付設物用柱の立設方法において、この方法には、柱下端部固定工程と柱上端部固定工程との間に行われる柱支持工程が含まれるようにし、この柱支持工程を、柱の長さ方向の途中部に、建物に端部が結合されていて柱の側へ延びている支持部材を結合することにより、この支持部材によって柱を支持するための工程としてもよい。   In the above-described method for erecting a column for an attachment to a building, this method includes a column support step performed between the column lower end portion fixing step and the column upper end portion fixing step. It is good also as a process for supporting a pillar by this supporting member by combining a supporting member which is joined to the building and is extended to the pillar side in the middle of the length direction of the pillar.

これによると、柱の下端部を前述の基礎に固定してこの柱を自立させるための柱下端部固定工程は実施されているが、柱の上端部をブラケットを介して前記軒部材に固定するための柱上端部固定工程が実施されていなくても、支持部材によって柱を支持することができるため、柱の立設状態を一層確実に確保することができる。   According to this, although the column lower end part fixing process for fixing the lower end part of the column to the above-mentioned foundation and making this column self-supporting is carried out, the upper end part of the column is fixed to the eaves member via the bracket. Even if the column upper end fixing step is not performed, the column can be supported by the support member, so that the standing state of the column can be more reliably ensured.

なお、このように柱下端部固定工程と柱上端部固定工程との間に柱支持工程が行われるようにした場合には、支持部材の端部を建物に結合する作業は、柱の下端部を基礎に固定してこの柱を自立させるための柱下端部固定工程が実施される前に行ってもよく、この柱下端部固定工程が実施された後に行ってもよい。また、端部が建物に結合された支持部材を、水平なブレース等の部材で建物に連結支持させてもよい。   In addition, when the column support step is performed between the column lower end portion fixing step and the column upper end portion fixing step in this way, the operation of connecting the end portion of the support member to the building is performed at the lower end portion of the column. It may be performed before the column lower end portion fixing step for fixing the column to the base and allowing the column to stand on its own, or may be performed after the column lower end portion fixing step is performed. Further, the support member whose end is coupled to the building may be connected and supported to the building by a member such as a horizontal brace.

また、本発明に係る建物付設物用柱の立設方法において、柱下端部固定工程を、柱の下端部と前述した基礎との間に高さ調整手段を配置して行い、柱上端部固定工程を、高さ調整手段によって柱の上端部の高さ位置を高くすることにより、前述のブラケットを軒部材に当接させて行うようにしてもよい。   Further, in the method for erecting a pillar for a building accessory according to the present invention, the column lower end fixing step is performed by arranging a height adjusting means between the lower end of the column and the foundation described above to fix the column upper end. You may make it perform a process by making the above-mentioned bracket contact | abut to an eaves member by making the height position of the upper end part of a pillar high with a height adjustment means.

これによると、柱下端部固定工程の終了時における柱の上端部の高さ位置は、本来の高さ位置よりも低いため、建物の軒の施工作業を柱に影響されずに所定どおりに行えることになり、また、軒の施工作業が終了したときには、柱の上端部の高さ位置を高さ調整手段によって高くすることにより、ブラケットを軒部材に当接させることができ、これにより、ブラケットを介して柱の上端部を軒部材に固定するための柱上端部固定工程を一層確実に行うことができる。   According to this, since the height position of the upper end of the column at the end of the column lower end fixing process is lower than the original height position, the construction work of the building eaves can be performed as prescribed without being affected by the column. In addition, when the eave construction work is completed, the bracket can be brought into contact with the eaves member by raising the height position of the upper end portion of the column by the height adjusting means. The column upper end portion fixing step for fixing the upper end portion of the column to the eaves member can be performed more reliably.

本発明に係る建物付設物用柱の立設方法において、上述したように、柱下端部固定工程を、柱の下端部と前述した基礎との間に高さ調整手段を配置して行い、柱上端部固定工程を、高さ調整手段によって柱の上端部の高さ位置を高くすることにより、前述のブラケットを軒部材に当接させて行うようにした場合には、この建物付設物用柱の立設方法に、柱下端部固定工程と柱上端部固定工程との間に行われる柱支持工程が含まれるようにし、この柱支持工程を、柱の長さ方向の途中部に、建物に端部が結合されていて柱の側へ延びている支持部材を結合することにより、この支持部材によって柱を支持するための工程とするとともに、この支持工程では、柱と支持部材とが1個の結合具で結合され、この結合具を、支持部材の長さ方向と直交又は略直交する方向であって水平方向又は略水平方向を軸方向とする軸部を有しているものとしてもよい。   In the method for erecting a column for a building accessory according to the present invention, as described above, the column lower end portion fixing step is performed by arranging a height adjusting means between the lower end portion of the column and the foundation described above. When the above-mentioned bracket is brought into contact with the eaves member by increasing the height position of the top end of the column by the height adjusting means by the height adjusting means, this building attachment column The column support step is performed between the column lower end fixing step and the column upper end fixing step, and this column support step is applied to the building in the middle of the column length direction. By joining the supporting members whose ends are joined and extending to the side of the column, the column is supported by the supporting member, and in this supporting step, one column and one supporting member are provided. This connector is connected to the longitudinal direction of the support member. Or as having a shaft portion and the axial direction in the horizontal direction or a substantially horizontal direction to a direction substantially orthogonal.

これによると、上述したように、柱下端部固定工程を、柱の下端部と基礎との間に高さ調整手段を配置して行い、柱上端部固定工程を、高さ調整手段によって柱の上端部の高さ位置を高くすることにより、ブラケットを軒部材に当接させて行うようにしても、柱と支持部材とが1個の結合具で結合され、この結合具は、支持部材の長さ方向と直交又は略直交する方向であって水平方向又は略水平方向を軸方向とする軸部を有しているものとなっているため、高さ調整手段によって柱の上端部の高さ位置を高くするときに、結合具の軸部を中心として柱と支持部材との間で回動が生ずることが許容され、これにより、高さ調整手段によって柱の上端部の高さ位置を高くする作業をより確実に行えることになる。   According to this, as described above, the column lower end fixing step is performed by arranging the height adjusting means between the column lower end and the foundation, and the column upper end fixing step is performed by the height adjusting means. Even if the bracket is brought into contact with the eaves member by increasing the height position of the upper end portion, the pillar and the support member are coupled by a single coupling tool. Since it has a shaft portion that is orthogonal or substantially orthogonal to the length direction and has the horizontal direction or the substantially horizontal direction as the axial direction, the height of the upper end of the column is adjusted by the height adjusting means. When the position is increased, it is allowed that rotation occurs between the column and the support member around the shaft portion of the coupler. Accordingly, the height adjustment means increases the height position of the upper end portion of the column. Work can be performed more reliably.

なお、上述の1個の結合具とは、1個のボルトやビス、リベット等でもよく、また、1個の結合具は、ボルトと、このボルトに螺合されるナットとの組み合わせからなるものでもよく、1個の結合具がこの組み合わせからなるものである場合には、前述の結合具の軸部とは、ボルトの軸部のことである。   In addition, the above-mentioned one coupling tool may be one bolt, a screw, a rivet or the like, and one coupling tool is a combination of a bolt and a nut screwed to the bolt. Alternatively, when one coupler is formed of this combination, the above-described shaft portion of the coupler is a shaft portion of a bolt.

また、このように柱下端部固定工程と柱上端部固定工程との間に柱支持工程が行われるようにした場合にも、支持部材の端部を建物に結合する作業は、前述の高さ調整手段を用いて行う柱下端部固定工程が実施される前に行ってもよく、この柱下端部固定工程が実施された後に行ってもよい。また、端部が建物に結合された支持部材を、水平なブレース等の部材で建物に連結支持させてもよい。   Even when the column supporting step is performed between the column lower end fixing step and the column upper end fixing step in this way, the operation of connecting the end of the supporting member to the building is performed at the height described above. It may be performed before the column lower end fixing step performed using the adjusting means, or may be performed after the column lower end fixing step is performed. Further, the support member whose end is coupled to the building may be connected and supported to the building by a member such as a horizontal brace.

また、上述したように柱下端部固定工程と柱上端部固定工程との間に行われる柱支持工程を、柱の長さ方向の途中部に、建物に端部が結合されていて柱の側へ延びている支持部材を結合することにより、この支持部材によって柱を支持するための工程とする場合においては、支持部材は、柱を支持するだけのために特別に用意された施工治具などの部材でもよく、あるいは、建物付設物の構造材でもよく、この構造材は、例えば、梁部材等である。   In addition, as described above, the column supporting step performed between the column lower end portion fixing step and the column upper end portion fixing step is performed in the middle of the column length direction, with the end portion coupled to the building and the column side. In the case where the column is supported by the support member by connecting the support member extending to the support member, the support member is a construction jig specially prepared only for supporting the column. Or a structural material of a building accessory, and this structural material is, for example, a beam member or the like.

支持部材を梁部材等の構造材とすると、建物付設物を構成する梁部材等の構造材が支持部材として利用されるため、部材の兼用化を図ることができ、柱を支持するだけのために特別の部材を用意する必要がなくなる。   If the support member is a structural member such as a beam member, the structural member such as the beam member that constitutes the building attachment is used as the support member. Therefore, the member can be shared, and only to support the column. There is no need to prepare a special member.

また、このように建物付設物を構成する梁部材等の構造材を支持部材として利用する場合には、前述の柱上端部固定工程の前に、建物付設物を構成する手摺り部材等の構成部材を上記構造材に取り付ける作業を行い、これにより、柱の上端部を前述のブラケットを介して軒部材に固定する作業を除き、建物付設物の施工作業の全部又は略全部又は一部を、柱上端部固定工程の前に終了するようにしてもよい。   In addition, when a structural member such as a beam member that constitutes a building accessory is used as a support member in this way, the structure of the handrail member or the like that constitutes the building accessory before the above-described column upper end fixing step. The work of attaching the member to the structural material is performed, and thereby, the work of fixing the building attachments is entirely or substantially all or a part, except for the work of fixing the upper end of the column to the eaves member via the bracket. You may make it complete | finish before a pillar upper-end part fixing process.

もちろん、建物付設物を構成する手摺り部材等の構成部材を上記構造材に取り付ける作業は、柱の上端部をブラケットを介して軒部材に固定する作業を行った後に実施してもよい。   Of course, the operation of attaching the structural members such as the handrail members constituting the building attachment to the structural material may be performed after the operation of fixing the upper end of the column to the eaves member via the bracket.

また、本発明に係る建物付設物用柱の立設方法において、柱上端部固定工程が、ブラケットを軒部材に結合具で結合することによって行われる場合には、この結合を、ブラケットを軒部材に取り付ける位置を定める位置出し作業の後に行われるようにしてもよい。   Further, in the method for erecting a building accessory column according to the present invention, when the column upper end fixing step is performed by joining the bracket to the eaves member with a coupling tool, this coupling is performed using the bracket as the eaves member. It may be performed after the positioning operation for determining the position to be attached to the.

これによると、軒部材に結合具で結合される際のブラケットの位置は、位置出し作業によって正確な位置に設定されているため、ブラケットを結合具によって軒部材の正確な位置に結合することができる。   According to this, since the position of the bracket when it is coupled to the eaves member by the coupling tool is set to an accurate position by the positioning operation, the bracket can be coupled to the accurate position of the eave member by the coupling tool. it can.

なお、上記位置出し作業は、例えば、けがき作業によって行うことができ、また、この位置出し作業は、けがき作業に限らず、塗料の塗布等によっても行ってもよい。   The positioning operation can be performed by, for example, a scribing operation, and the positioning operation is not limited to the scribing operation, and may be performed by application of a paint or the like.

また、本発明に係る建物付設物用柱の立設方法に、柱上端部固定工程の後に行われる工程であって、柱の表面に柱カバーを取り付けるための柱カバー取付工程が含まれるようにしてもよい。   Further, the method for erecting a column for a building accessory according to the present invention includes a column cover attaching step for attaching the column cover to the surface of the column, which is a step performed after the column upper end fixing step. May be.

本発明に係る建物付設物用柱の立設方法に、この柱カバー取付工程が含まれ、また、柱下端部固定工程で柱の上端部にブラケットを取り付ける作業が、柱の上端部にブラケットを止着具で止着することによって行われる場合には、柱カバー取付工程では、柱上端部固定工程の後に、上記止着具を柱の上端部とブラケットから取り外し、この止着具によって柱カバーを柱の上端部とブラケットとに止着すること、及び上記止着具によって柱の上端部をブラケットに止着することが実施されるようにしてもよい。   The column cover attaching step is included in the method for erecting a building accessory column according to the present invention, and the work of attaching the bracket to the upper end of the column in the column lower end fixing step is performed by attaching the bracket to the upper end of the column. When it is performed by fastening with a fastener, in the pillar cover attaching step, after the pillar upper end fixing step, the fastener is removed from the pillar upper end and the bracket, and the pillar cover is covered with the fastener. May be fixed to the upper end portion of the column and the bracket, and the upper end portion of the column may be fixed to the bracket by the fastener.

これによると、柱下端部固定工程で柱の上端部にブラケットを取り付けるために用いていた止着具を利用して、柱カバー取付工程において、柱カバーを柱の上端部とブラケットとに止着することと、柱の上端部をブラケットに止着することと、を行うことができ、止着具の有効利用を達成することができる。   According to this, in the column cover mounting process, the column cover is fixed to the upper end portion of the column and the bracket using the fastener used to mount the bracket to the upper end portion of the column in the column lower end fixing step. And fixing the upper end portion of the column to the bracket, and effective use of the fastener can be achieved.

なお、このように止着具の有効利用を達成して柱カバーの取付工程を行う場合には、ブラケットに、止着具を柱の上端部とブラケットから取り外しても、柱の内部に残る入れ子部を設けておくことが好ましい。   In addition, when the attachment of the column cover is performed by achieving effective use of the fasteners in this way, even if the fastener is removed from the upper end of the column and the bracket, the nesting that remains in the column remains. It is preferable to provide a part.

これによると、柱下端部固定工程で柱の上端部にブラケットを取り付けるために用いられていた止着具が、柱カバー取付工程で取り外されることになっても、柱上端部固定工程で柱上端部を軒部材に固定したブラケットには、柱の内部に挿入されている入れ子部が設けられているため、柱とブラケットとが分離状態になることが防がれ、このため、止着具により、柱カバーが柱の上端部とブラケットとに止着されることと、柱の上端部とブラケットとが止着されることと、が実施されるまで、柱とブラケットとの一体性を確保することができる。   According to this, even if the fastener used to attach the bracket to the upper end of the column in the column lower end fixing step is to be removed in the column cover mounting step, the column upper end in the column upper end fixing step. The bracket with the part fixed to the eaves member is provided with a nesting part that is inserted into the pillar, so that the pillar and the bracket are prevented from being separated from each other. The column cover is secured to the upper end of the column and the bracket, and the upper end of the column and the bracket are fixed to ensure the integrity of the column and the bracket. be able to.

以上説明した本発明に係る建物付設物用柱の立設方法は、建物の外部に設置される任意の建物付設物のための柱に利用することができ、この柱は、例えば、集合住宅の外廊下や外階段、建物のバルコニやベランダ等のための柱でもよい。   The method for erecting a building accessory column according to the present invention described above can be used as a column for an arbitrary building accessory installed outside the building. It may be a pillar for an outer corridor, an outer staircase, a building balcony or a veranda.

本発明によると、建物付設物のための柱の立設作業を、建物の軒の施工作業が終了していないときに行えるという効果を得られる。   ADVANTAGE OF THE INVENTION According to this invention, the effect that the standing work of the pillar for building attachments can be performed when the construction work of the eaves of a building is not complete | finished can be acquired.

以下に本発明を実施するための形態を図面に基づいて説明する。本実施形態は、建物付設物が図1及び図2で示されている集合住宅200のための外廊下201になっている場合であり、図1及び図2では、この外廊下201へ昇降するための外階段は省略されている。   EMBODIMENT OF THE INVENTION Below, the form for implementing this invention is demonstrated based on drawing. This embodiment is a case where the building accessory is an outer corridor 201 for the apartment house 200 shown in FIG. 1 and FIG. 2. In FIG. 1 and FIG. The outside staircase for this is omitted.

図1は、外廊下201の図2で示されている柱1の表面と、外廊下201の図2で示されている構造材になっている妻梁部材2の表面とにカバー3,4が被せられたときを示している。図2に示されているとおり、柱1は、集合住宅200の外部において、柱1のための基礎となっている基礎コンクリート5と、集合住宅200の軒6との間に立設されており、妻梁部材2は、集合住宅200の外壁と、柱1の長さ方向途中部との間に架設されている。また、図1及び図2の紙面裏側には、柱1と同様の複数本の柱が、基礎コンクリート5と集合住宅200の軒6との間に立設されており、これらの柱と集合住宅200の外壁との間にも、妻梁部材2と同様の妻梁部材が架設されている。   FIG. 1 shows covers 3 and 4 on the surface of the pillar 1 shown in FIG. 2 of the outer corridor 201 and the surface of the end beam member 2 which is the structural material shown in FIG. 2 of the outer corridor 201. Is shown when it is put on. As shown in FIG. 2, the pillar 1 is erected outside the apartment house 200 between the foundation concrete 5 that is the foundation for the pillar 1 and the eaves 6 of the apartment house 200. The end beam member 2 is installed between the outer wall of the apartment house 200 and the middle portion in the length direction of the column 1. 1 and 2, a plurality of pillars similar to the pillar 1 are erected between the foundation concrete 5 and the eaves 6 of the apartment house 200. These pillars and the apartment house A beam beam member similar to the beam beam member 2 is installed between the outer wall 200 and the wall 200.

柱1を含むそれぞれの柱の下端部は、高さ調整手段7を介して基礎コンクリート5に固定され、これらの柱の上端部は、上端ブラケット8を介して軒6を構成している軒部材9に固定されている。また、図2に示されているように、妻梁部材2を含むそれぞれの妻梁部材の集合住宅200側の端部は、集合住宅200の外壁に打ち付けられて固定された打付部材となっているベース部材10にボルト等の結合具11で結合され、これらの妻梁部材の柱側の端部は、後述するようにブラケットを介して柱1を含むそれぞれの柱に結合されている。また、それぞれの柱は、外廊下201の構造材となっている桁梁部材12(図5及び図6も参照)で連結されており、この桁梁部材12の表面にもカバー13(図5及び図6を参照)が被せられている。   The lower end portion of each column including the column 1 is fixed to the foundation concrete 5 through the height adjusting means 7, and the upper end portion of these columns forms the eaves 6 through the upper end bracket 8. 9 is fixed. Further, as shown in FIG. 2, the end portion of each of the end beam members including the end beam member 2 on the side of the apartment house 200 is a striking member fixed by being hit against the outer wall of the apartment house 200. The base member 10 is coupled with a coupling tool 11 such as a bolt, and the column-side ends of these beam members are coupled to respective columns including the column 1 through brackets as will be described later. Each column is connected by a beam member 12 (see also FIGS. 5 and 6) which is a structural material of the outer corridor 201, and a cover 13 (FIG. 5) is also provided on the surface of the beam member 12. And FIG. 6).

図2に示されているように、ベース部材10と桁梁部材12との間には、複数本の根太14が妻梁部材2と平行に架設され、これらの根太14の上に外廊下201の床部材15が配置されている。また、それぞれの妻梁部材のうち、外廊下201の外輪郭を形成している妻梁部材2と、桁梁部材12とには、手摺り16が立設配置されている。   As shown in FIG. 2, a plurality of joists 14 are installed between the base member 10 and the beam members 12 in parallel with the beam members 2, and the outer corridor 201 is placed on these joists 14. Floor member 15 is disposed. In addition, handrails 16 are erected on the beam member 2 and the beam member 12 that form the outer contour of the outer corridor 201 among the beam members.

図1に示されているように、外廊下201が施工された後においては、外廊下201の下部には、基礎コンクリート5が埋設される仕上げコンクリート17が打設されており、それぞれの柱の表面に取り付けられている柱カバー3は、下端部がこの仕上げコンクリート17の上面まで達するものとなっている。   As shown in FIG. 1, after the outer corridor 201 is constructed, the finish concrete 17 in which the foundation concrete 5 is embedded is placed in the lower part of the outer corridor 201, and The column cover 3 attached to the surface has a lower end that reaches the upper surface of the finished concrete 17.

図3には、柱1の下端部が高さ調整手段7を介して基礎コンクリート5に固定されている構造が示され、図4には、この高さ調整手段7の分解斜視図が示されている。これらの図で示すように、高さ調整手段7は、基礎コンクリート5に取り付けられたベースプレート20と、柱1の下端部に溶接で取り付けられた調整プレート21と、ベースプレート20に下端部が溶接で結合されてベースプレート20から立設された2本のねじ軸部材22と、これらのねじ軸部材22に螺合された下ナット23と、調整プレート21に2個形成された孔21Aに挿入され、これらの孔21Aから調整プレート21の上側に突出したそれぞれのねじ軸部材22の部分に螺合される上ナット24とを含んで構成されている。なお、本実施形態では、下ナット23と調整プレート21との間には下座金25が配置され、上ナット24と調整プレート21との間には下座金26が配置されている。   FIG. 3 shows a structure in which the lower end portion of the pillar 1 is fixed to the foundation concrete 5 via the height adjusting means 7, and FIG. 4 shows an exploded perspective view of the height adjusting means 7. ing. As shown in these drawings, the height adjusting means 7 includes a base plate 20 attached to the foundation concrete 5, an adjustment plate 21 attached to the lower end portion of the column 1 by welding, and a lower end portion welded to the base plate 20. The two screw shaft members 22 that are connected and erected from the base plate 20, the lower nut 23 that is screwed to these screw shaft members 22, and the two holes 21 </ b> A that are formed in the adjustment plate 21, The upper nut 24 is configured to be screwed into each screw shaft member 22 protruding from the hole 21A to the upper side of the adjustment plate 21. In the present embodiment, a lower washer 25 is disposed between the lower nut 23 and the adjustment plate 21, and a lower washer 26 is disposed between the upper nut 24 and the adjustment plate 21.

また、基礎コンクリート5へのベースプレート20の取り付けは、下部を基礎コンクリート5に埋設させた2本のねじ軸部材27をベースプレート20に設けた孔に通し、ベースプレート20の上側に突出したこれらのねじ軸部材27の部分に座金28、ナット29を挿入し、ナット29の回転締付作業を行うことによって実施されている。   In addition, the base plate 20 is attached to the foundation concrete 5 by passing two screw shaft members 27 whose lower portions are embedded in the foundation concrete 5 through holes provided in the base plate 20 and projecting these screw shafts above the base plate 20. This is implemented by inserting a washer 28 and a nut 29 into the member 27 and performing a rotary tightening operation of the nut 29.

以上のよう構成されている高さ調整手段7では、高さ調整手段7のねじ軸部材22に螺合させた下ナット23と上ナット24を回転させてこれらのナット23,24で調整プレート21を上下から締め付けることにより、柱1の下端部は、上下ナット23,24と調整プレート21の上下方向の位置に応じた高さ位置において、基礎コンクリート5に固定されることになる。   In the height adjusting means 7 configured as described above, the lower nut 23 and the upper nut 24 screwed into the screw shaft member 22 of the height adjusting means 7 are rotated, and the adjusting plate 21 is rotated by these nuts 23, 24. By tightening from above and below, the lower end of the column 1 is fixed to the foundation concrete 5 at a height position corresponding to the vertical positions of the upper and lower nuts 23 and 24 and the adjustment plate 21.

また、柱1の高さ位置を調整する場合には、上ナット24を緩め、調整プレート21が載っている下ナット23を回転させることにより、調整プレート21を上下動させ、この後、上ナット24を回転させて調整プレート21をナット23,24で上下から締め付けることにより、柱1は新たな高さ位置となって基礎コンクリート5に固定されることになる。   When adjusting the height position of the pillar 1, the upper nut 24 is loosened and the lower nut 23 on which the adjustment plate 21 is placed is rotated to move the adjustment plate 21 up and down. By rotating 24 and tightening the adjustment plate 21 from above and below with the nuts 23 and 24, the column 1 becomes a new height and is fixed to the foundation concrete 5.

図2で説明したように集合住宅200の外壁に固定されているベース部材10には、妻梁部材2の集合住宅200側の端部が結合されており、図5には、この妻梁部材2の柱1側の端部と、この柱1とを結合している構造が示され、図6には、この結合構造の分解斜視図が示されている。図6に示されているとおり、柱1の長さ方向の所定位置には、言い換えると、柱1における妻梁部材2が配置される高さ位置には、中間ブラケット30が取り付けられ、この中間ブラケット30は、柱1における前記集合住宅200の外壁と対面する面に溶接で結合されたベース部31と、このベース部31に集合住宅200側へ突出して結合された取付部32とからなる平面視でT字形状となっている。取付部32には、3個のボルト33〜35が挿入される3個の孔32A〜32Cが形成されているとともに、妻梁部材4にも3個の孔2A〜2Cが形成されている。   As described with reference to FIG. 2, the base member 10 fixed to the outer wall of the apartment house 200 is coupled to the end of the end beam 200 on the side of the apartment house 200, and FIG. 2 shows an end portion on the side of the pillar 1 and a structure connecting the pillar 1, and FIG. 6 shows an exploded perspective view of the connecting structure. As shown in FIG. 6, an intermediate bracket 30 is attached to a predetermined position in the length direction of the column 1, in other words, at a height position where the end beam member 2 is disposed in the column 1. The bracket 30 is a plane composed of a base portion 31 joined to a surface of the pillar 1 facing the outer wall of the apartment house 200 by welding, and an attachment portion 32 protruding and joined to the base portion 31 toward the apartment house 200 side. It has a T-shape when viewed. Three holes 32A to 32C into which the three bolts 33 to 35 are inserted are formed in the attachment portion 32, and three holes 2A to 2C are also formed in the end beam member 4.

3個のボルト33〜35のうち、1個のボルト33は、孔32Aと孔2Aとに外廊下201の内側から外側へ挿入され、孔2Aから突出したボルト33の部分にナット36が螺合されることにより、妻梁部材2の柱1側の端部は、中間ブラケット30の取付部32を介して柱1に結合される。また、ボルト34,35は、孔32B,32Cと孔2B,2Cとに外廊下201の内側から外側へ挿入されるとともに、妻梁部材カバー取付ブラケット40のベース部41の孔41A,41Bにも挿入され、これらの孔41A,41Bから突出したボルト34,35の部分にナット37,38が螺合されることにより、妻梁部材カバー取付ブラケット40は、妻梁部材2の柱1側の端部と共に、中間ブラケット30の取付部32を介して柱1に結合されることになり、また、この妻梁部材カバー取付ブラケット40は、中間ブラケット30に取り付けられたことにもなる。   Of the three bolts 33 to 35, one bolt 33 is inserted into the hole 32A and the hole 2A from the inside to the outside of the outer corridor 201, and the nut 36 is screwed into the portion of the bolt 33 protruding from the hole 2A. By doing so, the end portion of the end beam member 2 on the column 1 side is coupled to the column 1 via the attachment portion 32 of the intermediate bracket 30. The bolts 34 and 35 are inserted into the holes 32B and 32C and the holes 2B and 2C from the inside to the outside of the outer corridor 201, and are also inserted into the holes 41A and 41B of the base 41 of the cross beam member cover mounting bracket 40. When the nuts 37 and 38 are screwed into the bolts 34 and 35 protruding from the holes 41A and 41B, the end beam member cover mounting bracket 40 is attached to the end of the end beam side 2 of the end beam member 2. Together with the portion, the intermediate beam 30 is coupled to the column 1 via the attachment portion 32, and the cross beam member cover attachment bracket 40 is attached to the intermediate bracket 30.

また、柱1には、以上の妻梁部材2と妻梁部材カバー取付ブラケット40の場合と同様の構造により、中間ブラケット30のベース部31における取付部32よりも桁梁部材12の部分を介して、桁梁部材12と桁梁部材カバー取付ブラケット50が結合されるようになっている。   In addition, the column 1 has a structure similar to the case of the above-mentioned beam member 2 and the beam member cover mounting bracket 40 described above, with the beam member 12 being interposed more than the mounting portion 32 in the base portion 31 of the intermediate bracket 30. Thus, the beam member 12 and the beam member cover mounting bracket 50 are coupled.

これを具体的に説明すると、中間ブラケット30のベース部31における取付部32よりも桁梁部材12の部分には、3個のボルト43〜45が挿入される3個の孔が形成されている(図6では、取付部32の孔32Bに相当する孔31Bだけが示されている。)とともに、桁梁部材12にも3個の孔が形成されている。3個のボルト43〜45のうち、1個のボルト43は、ベース部31の3個の孔のうちの1個の孔と、桁梁部材12の3個の孔のうちの1個の孔とに外廊下201の内側から外側へ挿入され、桁梁部材12の1個の孔から突出したボルト43の部分にナット46が螺合されることにより、桁梁部材12の柱1側の端部は、中間ブラケット30のベース部31を介して柱1に結合される。また、ボルト44,45は、ベース部31の3個の孔のうちの2個の孔と、桁梁部材12の3個の孔のうちの2個の孔とに外廊下201の内側から外側へ挿入されるとともに、桁梁部材カバー取付ブラケット50のベース部51の孔51A,51Bにも挿入され、これらの孔51A,51Bから突出したボルト44,45の部分にナット47,48が螺合されることにより、桁梁部材カバー取付ブラケット50は、桁梁部材12の柱1側の端部と共に、中間ブラケット30のベース部31を介して柱1に結合されることになり、また、この桁梁部材カバー取付ブラケット50は、中間ブラケット30に取り付けられたことにもなる。   Specifically, three holes into which the three bolts 43 to 45 are inserted are formed in the portion of the beam member 12 rather than the attachment portion 32 in the base portion 31 of the intermediate bracket 30. (In FIG. 6, only the hole 31B corresponding to the hole 32B of the attachment portion 32 is shown), and three beams are also formed in the beam member 12. Of the three bolts 43 to 45, one bolt 43 is one of the three holes of the base portion 31 and one of the three holes of the beam member 12. The nut 46 is inserted into the outer corridor 201 from the inner side to the outer side, and the nut 46 is screwed into the portion of the bolt 43 projecting from one hole of the beam member 12, whereby the end of the beam member 12 on the column 1 side. The part is coupled to the pillar 1 via the base part 31 of the intermediate bracket 30. In addition, the bolts 44 and 45 are arranged on the outside from the inside of the outer corridor 201 to two of the three holes of the base portion 31 and two of the three holes of the beam member 12. Are inserted into the holes 51A and 51B of the base portion 51 of the beam member cover mounting bracket 50, and the nuts 47 and 48 are screwed into the bolts 44 and 45 protruding from the holes 51A and 51B. As a result, the beam member cover mounting bracket 50 is coupled to the column 1 through the base portion 31 of the intermediate bracket 30 together with the end portion of the beam member 12 on the column 1 side. The girder member cover mounting bracket 50 is also attached to the intermediate bracket 30.

なお、本実施形態では、それぞれのボルト33〜35、ナット36〜38、ボルト43〜45、ナット46〜48についての座金53〜58,63〜68が用いられている。   In this embodiment, washers 53 to 58 and 63 to 68 for the respective bolts 33 to 35, nuts 36 to 38, bolts 43 to 45, and nuts 46 to 48 are used.

以上説明した中間ブラケット30と同様の中間ブラケットは、柱1以外の前述した柱にも設けられており、この柱に、中間ブラケット30と同様の中間ブラケットを介して、妻梁部材2と同様の前述した妻梁部材の柱側の端部が結合され、また、中間ブラケット30と同様の中間ブラケットには、桁梁部材カバー取付ブラケット50と同様の桁梁部材カバー取付ブラケットが取り付けられている。   The intermediate bracket similar to the intermediate bracket 30 described above is also provided in the above-described columns other than the column 1, and the same as the cross beam member 2 is connected to this column via the intermediate bracket similar to the intermediate bracket 30. The column-side end of the beam member described above is coupled, and a beam beam member cover mounting bracket similar to the beam beam member cover mounting bracket 50 is attached to an intermediate bracket similar to the intermediate bracket 30.

なお、中間ブラケット30と同様の中間ブラケットとなっていて、外廊下201の外輪郭を形成しない妻梁部材の柱側の端部を柱に結合するための中間ブラケットには、妻梁部材カバー取付ブラケットは取り付けられない。   In addition, it is an intermediate bracket similar to the intermediate bracket 30, and the beam bracket member cover is attached to the intermediate bracket for connecting the column-side end of the beam beam member that does not form the outer contour of the outer corridor 201 to the column. The bracket cannot be attached.

妻梁部材カバー取付ブラケット40のベース部41と、桁梁部材カバー取付ブラケット50を含むそれぞれの桁梁部材カバー取付ブラケットのベース部51には、これらのベース部41,51を外廊下201の外側から覆っているカバー取付部42,52が結合されており、これらのカバー取付部42,52の上下端部に折り曲げによる係止部42A,42B,53A,52Bが形成されている。妻梁部材カバー取付ブラケット40の係止部42Aと42Bの間に前述した妻梁部材カバー4が挿入係止されることにより、妻梁部材カバー取付ブラケット40に、妻梁部材2の表面を覆うための妻梁部材カバー4が取り付けられ、桁梁部材カバー取付ブラケット50を含むそれぞれの桁梁部材カバー取付ブラケットの係止部52Aと52Bの間に前述した桁梁部材カバー13が挿入係止されることにより、桁梁部材カバー取付ブラケット50を含むそれぞれの桁梁部材カバー取付ブラケットに、桁梁部材12を覆うための桁梁部材カバー13が取り付けられる。   In the base part 41 of the beam beam member cover mounting bracket 40 and the base part 51 of each beam beam member cover mounting bracket including the beam beam member cover mounting bracket 50, these base parts 41, 51 are arranged outside the outer corridor 201. The cover attaching portions 42 and 52 covering the cover are joined together, and locking portions 42A, 42B, 53A and 52B are formed at the upper and lower ends of the cover attaching portions 42 and 52 by bending. By inserting and locking the aforementioned beam member cover 4 between the locking portions 42A and 42B of the beam member cover mounting bracket 40, the surface of the beam member 2 is covered by the beam member cover mounting bracket 40. The beam beam member cover 4 is attached, and the beam beam member cover 13 described above is inserted and locked between the locking portions 52A and 52B of each beam beam member cover mounting bracket including the beam beam member cover mounting bracket 50. Thus, the beam member cover 13 for covering the beam member 12 is attached to each beam member cover mounting bracket including the beam member cover mounting bracket 50.

なお、図2には、妻梁部材2に、妻梁部材カバー取付ブラケット40と同様の構造となっているブラケット70が取り付けられていることが示されており、妻梁部材カバー4はこのブラケット70にも取り付けられている。   In FIG. 2, it is shown that the bracket 70 having the same structure as the end beam member cover mounting bracket 40 is attached to the end beam member 2, and the end beam member cover 4 is attached to this bracket. 70 is also attached.

図7には、前述した上端ブラケット8を介して柱1の上端部が軒部材9に固定されている構造が示され、図8には、この上端ブラケット8を柱1の上端部に取り付けるための構造の分解斜視図が示されている。図8に示されているように、上端ブラケット8は、軒部材9に止着されるベース部81と、このベース部81に下向きに結合され、中空部材になっている柱1の内部に柱1の上面から挿入される入れ子部82とを有している。   FIG. 7 shows a structure in which the upper end portion of the column 1 is fixed to the eaves member 9 via the upper end bracket 8 described above, and FIG. 8 shows that the upper end bracket 8 is attached to the upper end portion of the column 1. An exploded perspective view of the structure is shown. As shown in FIG. 8, the upper end bracket 8 includes a base portion 81 fixed to the eave member 9, and a column that is coupled downward to the base portion 81 and is a hollow member. 1 and a nesting portion 82 inserted from the upper surface.

板金の折り曲げ品になっているこの入れ子部82には、互いに対面する2個の内面においてナット83,84が溶接で結合され、また、入れ子部82には、これらのナット83,84と一致する位置において孔85が形成されている。また、入れ子部82が柱1の内部に挿入されたときに孔85と一致する柱1の2箇所には、孔86が形成され、これらの孔86に、柱1の上端部に上端ブラケット8を止着するための止着具となっているボルト87,88が挿入され、これらのボルト87,88が入れ子部82の孔85にも挿入されてナット83,84に螺入されることにより、上端ブラケット8は柱1の上端部にボルト87,88で止着される。   Nuts 83 and 84 are joined to the nesting portion 82, which is a bent product of sheet metal, by welding on two inner surfaces facing each other, and the nesting portion 82 coincides with the nuts 83 and 84. A hole 85 is formed at the position. In addition, holes 86 are formed at two positions of the column 1 that coincide with the holes 85 when the nesting portion 82 is inserted into the column 1, and the upper end bracket 8 is formed at the upper end of the column 1 in these holes 86. The bolts 87 and 88 which are fastening devices for fastening the bolts are inserted, and these bolts 87 and 88 are also inserted into the holes 85 of the insert portion 82 and screwed into the nuts 83 and 84. The upper end bracket 8 is fixed to the upper end portion of the column 1 with bolts 87 and 88.

なお、本実施形態では、ボルト87,88についての座金89,90とスプリングワッシャー91,92が用いられている。   In this embodiment, washers 89 and 90 and spring washers 91 and 92 for the bolts 87 and 88 are used.

図9には、上端ブラケット8を図1、図2及び図7で示されている軒部材9に結合するための構造が示されている。ボルト87,88で柱の上端部に取り付けられる上端ブラケット8のベース部81には、このベース部81を軒部材9に結合するための結合具になっているねじ込み部材93〜96を挿入するための孔81A〜81Dが設けられ、これらの孔81A〜81Dに挿入されたねじ込み部材93〜96を軒部材9にねじ込むことにより、上端ブラケット8は軒部材9に結合され、これにより、柱1の上端部は、上端ブラケット8を介して軒部材9に固定される。   FIG. 9 shows a structure for connecting the upper end bracket 8 to the eaves member 9 shown in FIGS. 1, 2, and 7. In order to insert screw members 93 to 96 serving as a coupling tool for coupling the base portion 81 to the eave member 9, the base portion 81 of the upper end bracket 8 attached to the upper end portion of the column with bolts 87 and 88. The upper end bracket 8 is coupled to the eave member 9 by screwing the screw members 93 to 96 inserted into the holes 81A to 81D into the eave member 9, thereby The upper end portion is fixed to the eaves member 9 via the upper end bracket 8.

なお、本実施形態では、ねじ込み部材93〜96についての座金97〜100が用いられている。   In this embodiment, washers 97 to 100 for the screw-in members 93 to 96 are used.

また、上端ブラケット8は、柱1以外のそれぞれの柱の上端部にも、上述した柱1への上端ブラケット8の取付構造と同じ構造で取り付けられ、さらに、柱1以外のそれぞれの柱の上端部に取り付けられた上端ブラケット8は、上述した軒部材9への上端ブラケット8の結合構造と同じ構造で結合されている。   The upper end bracket 8 is attached to the upper end portion of each column other than the column 1 with the same structure as the mounting structure of the upper end bracket 8 to the column 1 described above. The upper end bracket 8 attached to the part is coupled with the same structure as the coupling structure of the upper end bracket 8 to the eaves member 9 described above.

次に、図1及び図2で示す集合住宅200の軒6が施工される前に、建物付設物となっている外廊下201のための柱1を含むそれぞれの柱についての立設作業方法を説明する。   Next, before the eaves 6 of the apartment house 200 shown in FIG. 1 and FIG. 2 are constructed, a standing work method for each pillar including the pillar 1 for the outer corridor 201 which is a building accessory is described. explain.

集合住宅200の軒6が施工される前に、先ずはじめに、柱1を含むそれぞれの柱の上面の開口部から上端ブラケット8の入れ子部82を挿入し、この上端ブラケット8をそれぞれの柱の上端部にボルト87,88で止着しておく。次いで、図3及び図4で説明したように、柱1を含むそれぞれの柱の下端部を高さ調整手段7を介して基礎コンクリート5に固定する作業を行い、これにより、柱1を含むそれぞれの柱を自立させる。   Before the eaves 6 of the housing complex 200 are constructed, first, the nesting portion 82 of the upper end bracket 8 is inserted from the opening on the upper surface of each column including the column 1, and the upper end bracket 8 is connected to the upper end of each column. The bolts 87 and 88 are fixed to the part. Next, as described in FIG. 3 and FIG. 4, an operation of fixing the lower end portion of each column including the column 1 to the foundation concrete 5 through the height adjusting means 7 is performed, thereby each including the column 1. Make the pillars independent.

この柱の自立作業を行うとき、図3の2点鎖線で示されているとおりに、高さ調整手段7の下ナット23の高さ位置を、基礎コンクリート5に固定されたベースプレート20の上面に下ナット23が当たる位置23’まで下げておき、これにより、それぞれの柱の下端部に取り付けられている調整プレート21の高さ位置を最下位の位置21’としておくことにより、柱1を含むそれぞれの柱は一層確実に自立することになる。   When this column is self-supporting, the height position of the lower nut 23 of the height adjusting means 7 is placed on the upper surface of the base plate 20 fixed to the foundation concrete 5 as indicated by a two-dot chain line in FIG. The column 1 is included by lowering to the position 23 ′ where the lower nut 23 comes into contact, thereby setting the height position of the adjustment plate 21 attached to the lower end of each column as the lowest position 21 ′. Each pillar will be more independent.

集合住宅200の軒6の施工作業が終了して、軒部材9が配置された軒6が出来上がった後に、高さ調整手段7の上ナット24を緩めて回転させることにより、この上ナット24をねじ軸部材22に沿って上昇させるとともに、下ナット23を回転させることによって上昇させることにより調整プレート21も上昇させ、これにより、柱1を含むそれぞれの柱の高さ位置を高くし、それぞれの柱の上端部に取り付けられている上端ブラケット8のベース部81を軒部材9に当てる。   After the construction work of the eaves 6 of the housing complex 200 is completed and the eaves 6 on which the eaves members 9 are arranged are completed, the upper nuts 24 are loosened and rotated to rotate the upper nuts 24. While raising along the screw shaft member 22 and raising it by rotating the lower nut 23, the adjustment plate 21 is also raised, thereby increasing the height position of each pillar including the pillar 1, The base portion 81 of the upper end bracket 8 attached to the upper end portion of the column is applied to the eave member 9.

そして、このように上端ブラケット8のベース部81を軒部材9に当てた後に、あるいは、上端ブラケット8のベース部81を軒部材9に当てる前に、上端ブラケット8を軒部材9に取り付ける位置を定める位置出し作業をけがき作業によって行い、この位置出し作業で定められた正確な位置に上端ブラケット8のベース部81を軒部材9に当て、このベース部81を図9で示したねじ込み部材93〜96によって軒部材9に結合する。   Then, after the base portion 81 of the upper end bracket 8 is applied to the eave member 9 in this way, or before the base portion 81 of the upper end bracket 8 is applied to the eave member 9, the position where the upper end bracket 8 is attached to the eave member 9 is determined. The positioning operation determined is performed by a scribing operation, and the base portion 81 of the upper end bracket 8 is applied to the eaves member 9 at an accurate position determined by the positioning operation, and this base portion 81 is screwed in a member 93 shown in FIG. It couple | bonds with the eaves member 9 by ~ 96.

この後、妻梁部材2を含むそれぞれの妻梁部材の集合住宅200側の端部を、集合住宅の外壁に固定されたベース部材10に結合具11で結合する作業を行うとともに、これらの妻梁部材の柱側の端部を、前述したように、中間ブラケット30を含むそれぞれの中間ブラケットを介して、柱1を含むそれぞれの柱の長さ方向の途中部に結合する作業を行い、外廊下201の外輪郭を形成する妻梁部材2のための中間ブラケット30に妻梁部材カバー取付ブラケット40を取り付け、また、妻梁部材2には、図2で示されているブラケット70を取り付ける。次いで、中間ブラケット30を含むそれぞれの中間ブラケットを介して、柱1を含むそれぞれの柱の長さ方向の途中部に、桁梁部材12の柱側の端部を結合する作業を行い、この桁梁部材12によってそれぞれの柱同士を連結するとともに、それぞれの中間ブラケットに桁梁部材カバー取付ブラケット50を取り付ける。   Thereafter, the work of connecting the end portions of each of the beam members including the beam members 2 on the side of the apartment house 200 to the base member 10 fixed to the outer wall of the apartment house with the coupler 11 is performed. As described above, the end of the beam member on the column side is joined to the middle part in the length direction of each column including the column 1 through each intermediate bracket including the intermediate bracket 30 and The cross beam member cover mounting bracket 40 is attached to the intermediate bracket 30 for the cross beam member 2 forming the outer contour of the corridor 201, and the bracket 70 shown in FIG. 2 is attached to the cross beam member 2. Next, the column side end of the beam member 12 is joined to the middle part of each column including the column 1 in the longitudinal direction through each intermediate bracket including the intermediate bracket 30. The columns 12 are connected to each other by the beam member 12 and the beam beam member cover mounting bracket 50 is attached to each intermediate bracket.

そして、妻梁部材カバー取付ブラケット40とブラケット70とに、外廊下201の外輪郭を形成している妻梁部材2の表面を覆うための妻梁部材カバー4を取り付ける作業、及び桁梁部材カバー取付ブラケット50を含むそれぞれの桁梁部材カバー取付ブラケットに、外廊下201の外輪郭を形成している桁梁部材12の表面を覆うための桁梁部材カバー13を取り付ける作業を行い、また、集合住宅200の外壁に固定されたベース部材10と桁梁部材12との間に複数本の根太14を架設する作業と、これらの根太14の上に外廊下201の床部材15を配置する作業とを行い、さらに、外廊下201の外輪郭を形成している妻梁部材2と桁梁部材12とに、手摺り16を立設配置する作業も行う。   And the operation | work which attaches the cross beam member cover 4 for covering the surface of the cross beam member 2 which forms the outer outline of the outer corridor 201 to the cross beam member cover mounting bracket 40 and the bracket 70, and a girder beam member cover An operation of attaching the beam beam member cover 13 for covering the surface of the beam beam member 12 forming the outer contour of the outer corridor 201 to each beam beam member cover mounting bracket including the mounting bracket 50 is performed. An operation of laying a plurality of joists 14 between the base member 10 and the beam member 12 fixed to the outer wall of the house 200, and an operation of arranging the floor members 15 of the outer corridor 201 on these joists 14. In addition, an operation is also performed in which the handrail 16 is erected on the beam member 2 and the beam member 12 forming the outer contour of the outer corridor 201.

また、柱1を含むそれぞれの柱の表面に、図1で示した柱カバー3を含むそれぞれの柱カバーを取り付ける作業も行う。この作業を柱1について示している図10で説明すると、上端ブラケット8を柱1の上端部に取り付けていたボルト87,88をこれらの柱1と上端ブラケット8から取り外し、この後、ボルト87,88が挿入されていた柱1の孔86の位置と一致して柱カバー3に形成されている孔101にボルト87,88を挿入するとともに、柱1の孔86にもボルト87,88を挿入し、これにより、ボルト87,88により、柱カバー3を柱1の上端部と上端ブラケット8とに止着し、また、ボルト87,88により、柱1の上端部に上端ブラケット8を再度止着する。また、柱カバー3の上端部以外の部分は、柱カバー3に形成された孔102と柱1に形成された孔103とに圧入状態で挿入されるピン部材104により、柱1に固定する。   Moreover, the operation | work which attaches each pillar cover containing the pillar cover 3 shown in FIG. 1 to the surface of each pillar containing the pillar 1 is also performed. This operation will be described with reference to FIG. 10 showing the column 1. The bolts 87 and 88 having the upper end bracket 8 attached to the upper end portion of the column 1 are removed from these columns 1 and the upper end bracket 8. Bolts 87 and 88 are inserted into the holes 101 formed in the column cover 3 so as to coincide with the positions of the holes 86 in the column 1 where the 88 has been inserted, and the bolts 87 and 88 are also inserted into the holes 86 in the column 1. Thus, the column cover 3 is fixed to the upper end portion of the column 1 and the upper end bracket 8 by the bolts 87 and 88, and the upper end bracket 8 is again fixed to the upper end portion of the column 1 by the bolts 87 and 88. To wear. Further, the portion other than the upper end portion of the column cover 3 is fixed to the column 1 by a pin member 104 that is inserted into a hole 102 formed in the column cover 3 and a hole 103 formed in the column 1 in a press-fitted state.

なお、上述したように上端ブラケット8を柱1の上端部に取り付けていたボルト87,88を取り外しても、前述したとおり、柱1の内部には、上端ブラケット8の入れ子部82が挿入されているため、柱1が、軒部材9にねじ込み部材93〜96で結合されている上端ブラケット8に対してずれるおそれはない。   Even if the bolts 87 and 88 that attached the upper end bracket 8 to the upper end portion of the column 1 are removed as described above, the nesting portion 82 of the upper end bracket 8 is inserted into the column 1 as described above. Therefore, there is no possibility that the pillar 1 is displaced with respect to the upper end bracket 8 connected to the eaves member 9 by the screw members 93 to 96.

なお、本実施形態に係る柱カバー3は、図10で示されているように、2分割された部材によって形成されている。また、柱カバー3が柱1の高さ方向における妻梁部材2及び桁梁部材12の間で上下に分断されている場合には、妻梁部材2及び桁梁部材12よりも下側の柱カバーは、ピン部材104と同様の部材によって柱1に取り付けられる。   In addition, the pillar cover 3 according to the present embodiment is formed by a member divided into two, as shown in FIG. Further, when the column cover 3 is divided vertically between the beam member 2 and the beam member 12 in the height direction of the column 1, the column below the beam member 2 and the beam member 12. The cover is attached to the pillar 1 by a member similar to the pin member 104.

以上説明した本実施形態に係る柱の立設方法によると、集合住宅200の軒6が施工される前に、柱1を含むそれぞれの柱の上端部に上端ブラケット8を取り付けてから、それぞれの柱の下端部を高さ調整手段7を介して基礎コンクリート5に固定し、これによってこれらの柱を自立させるための柱下端部固定工程を行い、そして、集合住宅200の軒6が施工された後に、この軒6を形成している軒部材9にねじ込み部材93〜96でそれぞれの上端ブラケット8を結合することにより、柱1を含むそれぞれの柱の上端部を、上端ブラケット8を介して軒部材9に固定するための柱上端部固定工程を行うため、柱1を含むそれぞれの柱を基礎コンクリート5の上に自立させる作業を、軒6の施工作業が終了していないときに行えるようになる。このため、集合住宅200の外廊下201についての作業のうち、柱に関する作業を、集合住宅200の軒6の施工作業よりも先行させて行うことができるようになり、外廊下201の施工作業についての全体工期を短縮できる。   According to the column erecting method according to the present embodiment described above, the upper end bracket 8 is attached to the upper end of each column including the column 1 before the eaves 6 of the apartment house 200 are constructed, The lower end portion of the column is fixed to the foundation concrete 5 through the height adjusting means 7, thereby performing the column lower end portion fixing process for making these columns self-supporting, and the eaves 6 of the apartment house 200 were constructed. Later, by connecting the upper end brackets 8 to the eave members 9 forming the eaves 6 with screw members 93 to 96, the upper end portions of the respective columns including the columns 1 are connected to the eaves via the upper end brackets 8. In order to perform the column upper end fixing process for fixing to the member 9, the work for allowing each column including the column 1 to stand on the foundation concrete 5 can be performed when the construction work of the eaves 6 is not completed. Na . For this reason, among the work on the outer corridor 201 of the apartment house 200, the work related to the pillar can be performed prior to the construction work of the eaves 6 of the apartment house 200. The overall construction period can be shortened.

そして、この柱の立設方法では、上述の柱下端部固定工程において、それぞれの柱の上端部に、これらの上端部を軒部材9に固定するための上端ブラケット8を取り付けているため、軒6の施工作業終了後に、それぞれの上端ブラケット8を介して、それぞれの柱の上端部を軒部材9に固定する作業を直ちに行うこともできる。   In this column standing method, since the upper end bracket 8 for fixing these upper end portions to the eave members 9 is attached to the upper end portions of the respective columns in the above-described column lower end portion fixing step, the eaves are provided. After completion of the construction work 6, the work of fixing the upper end portions of the respective columns to the eaves member 9 can be performed immediately via the respective upper end brackets 8.

また、上述の柱下端部固定工程は、それぞれの柱の下端部を高さ調整手段7を介して基礎コンクリート5に固定することによって行われ、上述の柱上端部固定工程を、高さ調整手段7によってそれぞれの柱の上端部の高さ位置を高くすることにより、それぞれの上端ブラケット8を軒部材9に当接させて行うようにしているため、これらの上端ブラケット8を介してそれぞれの柱の上端部を軒部材9に固定する作業を一層確実に行うことができる。   Moreover, the above-mentioned column lower end part fixing step is performed by fixing the lower end portion of each column to the foundation concrete 5 via the height adjusting means 7, and the above-described column upper end portion fixing step is performed as the height adjusting means. 7, the height position of the upper end portion of each column is increased so that each upper end bracket 8 is brought into contact with the eaves member 9, so that each column is interposed via these upper end brackets 8. The work which fixes the upper end part of this to the eaves member 9 can be performed more reliably.

また、柱下端部固定工程の終了時におけるそれぞれの柱の上端部の高さ位置は、柱上端部固定工程の終了時の高さ位置よりも低いため、集合住宅200の軒6の施工作業を、それぞれ柱に影響されずに所定どおりに行えることになる。   Moreover, since the height position of the upper end part of each pillar at the time of completion | finish of a column lower end part fixing process is lower than the height position at the time of completion | finish of a column upper end part fixing process, construction work of the eaves 6 of the apartment house 200 is performed. , Each can be done as expected without being affected by the pillars.

さらに本実施形態によると、柱上端部固定工程では、上端ブラケット8を軒部材9に取り付ける位置を定める位置出し作業がけがき作業によって行われ、この後に、上端ブラケット8をねじ込み部材93〜96で軒部材9に取り付けているため、軒部材9にねじ込み部材93〜96で結合される上端ブラケット8の位置を、位置出し作業によって正確な位置に設定することができることになり、このため、上端ブラケット8を介して軒部材9に固定されたそれぞれの柱の上端部の位置を、一層正確な位置とすることができる。   Further, according to the present embodiment, in the column upper end fixing step, the positioning operation for determining the position for attaching the upper end bracket 8 to the eave member 9 is performed by the scribing operation, and thereafter, the upper end bracket 8 is screwed by the screw members 93 to 96. Since it is attached to the member 9, the position of the upper end bracket 8 coupled to the eave member 9 by the screw members 93 to 96 can be set to an accurate position by the positioning operation. The position of the upper end part of each pillar fixed to the eaves member 9 via can be made into a more exact position.

また、柱上端部固定工程の後に行われる工程となっていて、それぞれの柱の表面に柱カバーを取り付けるための柱カバー取付工程において、柱1を含むそれぞれの柱の表面に、柱カバー3を含むそれぞれの柱カバーを取り付ける作業は、柱1について示している図10で説明したように、上端ブラケット8を柱1の上端部に取り付けていたボルト87,88をこれらの柱1と上端ブラケット8から取り外した後に、柱カバー3の孔101にこれらのボルト87,88を挿入するとともに、柱1の孔86にもボルト87,88を挿入することによって行い、これにより、ボルト87,88により、柱カバー3を柱1の上端部と上端ブラケット8とに止着するとともに、ボルト87,88により、柱1の上端部に上端ブラケット8を再度止着するため、ボルト87,88の再利用によって柱カバー3を柱1に取り付けることを行え、ボルト87,88の有効利用を達成することができる。   In addition, in the column cover attaching step for attaching the column cover to the surface of each column, the column cover 3 is attached to the surface of each column including the column 1 in a step performed after the column upper end fixing step. As shown in FIG. 10 showing the column 1, the operation of attaching each column cover including the bolts 87 and 88, in which the upper end bracket 8 is attached to the upper end portion of the column 1, is used. Is removed by inserting the bolts 87 and 88 into the hole 101 of the pillar cover 3 and inserting the bolts 87 and 88 into the hole 86 of the pillar 1. The column cover 3 is fixed to the upper end portion of the column 1 and the upper end bracket 8, and the upper end bracket 8 is fixed again to the upper end portion of the column 1 by the bolts 87 and 88. Because, performed by attaching the pillar cover 3 to the column 1 by recycling of the bolt 87, 88, it is possible to achieve effective utilization of bolts 87, 88.

また、上端ブラケット8には、ボルト87,88を柱1の上端部と上端ブラケット8から取り外しても、柱1の内部に残る入れ子部82が設けられているため、ボルト87,88が、上述の柱カバー取付工程において、一旦取り外されることになっても、柱上端部固定工程で軒部材9に固定した上端ブラケット8と柱1とがずれることはなく、ボルト87,88により、柱カバー3が柱1の上端部と上端ブラケット8とに止着されることと、柱1の上端部と上端ブラケット8とが止着されることと、が実施されるまで、柱1と上端ブラケット8との一体性を確保することができる。   Further, the upper end bracket 8 is provided with a nesting portion 82 that remains inside the column 1 even if the bolts 87 and 88 are removed from the upper end portion of the column 1 and the upper end bracket 8. In the column cover attaching step, the upper end bracket 8 fixed to the eaves member 9 in the column upper end fixing step and the column 1 are not displaced from each other, and the column cover 3 is secured by the bolts 87 and 88. Until the upper end of the column 1 is fastened to the upper end bracket and the upper end bracket 8 and the upper end of the column 1 is fastened to the upper end bracket 8. Can be ensured.

以上説明した実施形態では、集合住宅200側のそれぞれの端部がベース部材10に結合されていて柱側へ延びる部材となっている妻梁部材2を含むそれぞれの妻梁部材の柱側の端部を、中間ブラケット30を含むそれぞれの中間ブラケットを介して、それぞれの柱に結合する作業は、柱上端部固定工程の後で行っていたが、この作業を、柱下端部固定工程と柱上端部固定工程との間で行うようにしてもよい。   In the above-described embodiment, the column-side end of each beam member including the beam member 2 in which each end portion on the apartment house 200 side is coupled to the base member 10 and extends to the column side. The operation of connecting the portion to each column via each intermediate bracket including the intermediate bracket 30 was performed after the column upper end portion fixing step. You may make it carry out between part fixing processes.

これよると、柱上端部固定工程で柱1を含むそれぞれの柱の上端部が上端ブラケット8を介して軒部材9に固定される前に、集合住宅から柱側へ延びている部材となっている妻梁部材2を含むそれぞれの妻梁部材により、それぞれの柱の長さ方向の途中部を支持すること、すなわち、柱支持工程を実施することができ、これにより、それぞれの柱の上端部が上端ブラケット8を介して軒部材9に固定されるまで、それぞれの妻梁部材2を支持部材として利用して、それぞれの柱の自立を補助することができる。   According to this, before the upper end portion of each column including the column 1 is fixed to the eave member 9 through the upper end bracket 8 in the column upper end portion fixing step, the member extends from the apartment house to the column side. It is possible to support the middle part in the length direction of each column by the respective beam members including the existing beam members 2, that is, to carry out the column support process, and thereby the upper end portion of each column. Until each is fixed to the eaves member 9 via the upper end bracket 8, each supporting beam member 2 can be used as a supporting member to assist the self-supporting of each column.

また、それぞれの妻梁部材は外廊下201の構造材となっているため、それぞれの柱の支持を外廊下201の構造材を有効に活用して行える。   In addition, since each of the beam members is a structural material of the outer corridor 201, each pillar can be supported by effectively using the structural material of the outer corridor 201.

また、この柱支持工程において、妻梁部材2を含むそれぞれの妻梁部材の柱側の端部を、中間ブラケット30を含むそれぞれの中間ブラケットを介して、それぞれの柱に結合する作業を、1本の妻梁部材ごとに図6で示した1個のボルト33とナット36を用いて行うことにより、柱下端部固定工程を、それぞれ柱の下端部と基礎コンクリート5との間に高さ調整手段7を配置して行い、柱上端部固定工程を、高さ調整手段7によってそれぞれの柱の上端部の高さ位置を高くすることにより、上端ブラケット8を軒部材9に当接させて行うようにしても、1本の妻梁部材ごとに用いられたボルト33は、柱の支持部材となっているそれぞれの妻梁部材の長さ方向と直交又は略直交する方向であって水平方向又は略水平方向を軸方向とする軸部を有しているものとなっているため、高さ調整手段7によって柱の上端部の高さ位置を高くするときに、ボルト33の軸部を中心として柱と妻梁部材との間で回動が生ずることが許容されることになり、これにより、高さ調整手段7によって柱の上端部の高さ位置を高くする作業をより確実に行えることになる。   Further, in this column support step, the work of connecting the column-side end of each beam member including the beam member 2 to each column via each intermediate bracket including the intermediate bracket 30 is 1 By using one bolt 33 and nut 36 shown in FIG. 6 for each end beam member, the column lower end fixing step is adjusted between the lower end of the column and the foundation concrete 5 respectively. The means 7 is disposed and the column upper end fixing step is performed by increasing the height position of the upper end of each column by the height adjusting means 7 so that the upper end bracket 8 is brought into contact with the eaves member 9. Even if it does so, the volt | bolt 33 used for every one cross beam member is a direction orthogonal or substantially orthogonal to the length direction of each cross beam member used as the support member of a pillar, and is horizontal or Shaft part with the horizontal direction as the axial direction Therefore, when the height adjustment means 7 increases the height position of the upper end portion of the column, it rotates between the column and the end beam member around the shaft portion of the bolt 33. As a result, the height adjusting means 7 can more reliably perform the work of increasing the height position of the upper end portion of the column.

このように、1個のボルト33とナット36を用いて、妻梁部材2を含むそれぞれの妻梁部材でそれぞれの柱の長さ方向の途中を支持するための柱支持工程を、柱下端部固定工程と柱上端部固定工程との間で行うようにした場合には、前述した2個のボルト34,35とナット37,38により、妻梁部材2を含むそれぞれの妻梁部材の柱側の端部を、柱2を含むそれぞれの柱に中間ブラケットを介して結合する作業は、上記柱支持工程の次に実施する柱上端部固定工程の後に行うこととする。   In this way, the column supporting step for supporting the middle of each column in the length direction with each beam member including the beam member 2 by using one bolt 33 and nut 36 is performed at the bottom end of the column. When it is performed between the fixing step and the column upper end portion fixing step, the above-described two bolts 34 and 35 and nuts 37 and 38 are used for the column side of each beam member including the beam member 2. The operation | work which couple | bonds this edge part with each pillar containing the pillar 2 via an intermediate bracket shall be performed after the pillar upper-end part fixing process implemented after the said pillar support process.

但し、中間ブラケットに端部が結合される桁梁部材12を介して柱同士を連結する作業を含む外廊下201についての残りの作業は、柱支持工程に引き続いて実施してもよく、柱上端部固定工程を行った後に実施してもよい。   However, the remaining work for the outer corridor 201 including the work for connecting the columns to each other through the beam member 12 whose end is coupled to the intermediate bracket may be performed subsequent to the column support process. You may implement after performing a part fixing process.

なお、上記残りの作業が柱支持工程に引き続いて実施される場合には、この残りの作業に柱カバー取付工程が含まれていてもよく、含まれていなくてもよく、含まれていない場合には、柱上端部固定工程を行った後に、柱カバー取付工程を実施する。   In addition, when the remaining work is carried out following the pillar support process, the remaining work may or may not include the pillar cover mounting process. The column cover attaching step is performed after the column upper end portion fixing step.

本発明は、建物の外部に設置される、例えば、外廊下や外階段、バルコニ、ベランダ等の建物付設物のための柱を立設するために利用することができる。   INDUSTRIAL APPLICABILITY The present invention can be used to erect pillars for building accessories such as outer corridors, outer stairs, balconies, and verandas that are installed outside a building.

図1は、本発明の一実施形態に係る柱の立設方法が適用された建物付設物となっている集合住宅の外廊下を示す側面図である。FIG. 1 is a side view showing an outer corridor of an apartment house that is a building accessory to which a column erecting method according to an embodiment of the present invention is applied. 図2は、図1で示されている仕上げコンクリートの打設前であって、図1で示されている外廊下の柱のカバーと、外廊下の構造材である梁部材のカバーとが取り付けられる前を示す図1と同様の図である。FIG. 2 shows a state in which the cover of the pillar in the outer corridor shown in FIG. 1 and the cover of the beam member, which is a structural material of the outer corridor, are attached before the finishing concrete shown in FIG. It is a figure similar to FIG. 図3は、柱の下端部を高さ調整手段を介して基礎コンクリートに固定するための構造を示す側面図である。FIG. 3 is a side view showing a structure for fixing the lower end portion of the column to the foundation concrete via the height adjusting means. 図4は、図3で示されている高さ調整手段の分解斜視図である。4 is an exploded perspective view of the height adjusting means shown in FIG. 図5は、図2で示されている柱と妻梁部材との結合構造を示す斜視図である。FIG. 5 is a perspective view showing a coupling structure between the pillar and the end beam member shown in FIG. 図6は、図5で示されている結合構造の分解斜視図である。6 is an exploded perspective view of the coupling structure shown in FIG. 図7は、図2で示されている上端ブラケットを介して柱1の上端部を軒部材に固定するための構造を示す斜視図である。FIG. 7 is a perspective view showing a structure for fixing the upper end portion of the column 1 to the eaves member via the upper end bracket shown in FIG. 図8は、図7で示されている上端ブラケットを柱の上端部に取り付けるための構造を示す分解斜視図である。FIG. 8 is an exploded perspective view showing a structure for attaching the upper end bracket shown in FIG. 7 to the upper end portion of the column. 図9は、図7及び図8で示されている上端ブラケットを図1、図2及び図7で示されている軒部材に結合するための構造を示す斜視図である。FIG. 9 is a perspective view showing a structure for coupling the upper end bracket shown in FIGS. 7 and 8 to the eaves member shown in FIGS. 1, 2, and 7. 図10は、柱の表面に柱カバーを取り付ける作業を示す斜視図である。FIG. 10 is a perspective view showing an operation of attaching the column cover to the surface of the column.

符号の説明Explanation of symbols

1 柱
2 構造材である妻梁部材
3 柱カバー
4 妻梁部材カバー
5 基礎である基礎コンクリート
6 軒
7 高さ調整手段
8 柱の上端部を軒部材に固定するためのブラケットである上端ブラケット
9 軒部材
40 妻梁部材カバー取付ブラケット
50 桁梁部材カバー取付ブラケット
82 入れ子部
87,88 上端ブラケットを柱の上端部に止着するための止着具であるボルト
93〜96 上端ブラケットを軒部材に結合するための結合具であるねじ込み部材
200 建物である集合住宅
201 建物付設物である外廊下
DESCRIPTION OF SYMBOLS 1 Column 2 Structural member 3 Beam cover 4 Column cover 4 Beam beam member cover 5 Foundation concrete 6 foundation 7 Height adjustment means 8 Upper end bracket 9 which is a bracket for fixing the upper end part of a column to an eave member 9 Eaves member 40 Tail beam member cover mounting bracket 50 Girder beam member cover mounting bracket 82 Nested portion 87,88 Bolts 93 to 96 for fixing the upper end bracket to the upper end of the column 93 to 96 The upper end bracket is used as the eave member Screwed member that is a coupling tool for coupling 200 Housing complex that is a building 201 Exterior corridor that is a building accessory

Claims (5)

建物の軒が施工される前に、この建物の外部に設置される建物付設物のための柱の上端部に、この上端部を前記建物の軒部材に固定するためのブラケットを取り付けるとともに、前記柱の下端部を基礎に固定してこの柱を自立させるための柱下端部固定工程と、
前記建物の軒が施工された後に、前記ブラケットを前記建物の軒部材に結合させることにより、前記柱の上端部を前記ブラケットを介して前記軒部材に固定するための柱上端部固定工程と、
を含んでおり、
前記柱下端部固定工程は、前記柱の下端部と前記基礎との間に高さ調整手段を配置して行われ、前記柱上端部固定工程は、前記高さ調整手段によって前記柱の上端部の高さ位置を高くすることにより、前記ブラケットを前記軒部材に当接させて行われ、
前記柱下端部固定工程と前記柱上端部固定工程との間に行われる柱支持工程を含んでおり、
この柱支持工程は、前記柱の長さ方向の途中部に、前記建物に端部が結合されていて前記柱の側へ延びている支持部材を結合することにより、この支持部材によって前記柱を支持するための工程であり、
前記柱支持工程では、前記柱と前記支持部材とが1個の結合具で結合され、この結合具は、前記支持部材の長さ方向と直交又は略直交する方向であって水平方向又は略水平方向を軸方向とする軸部を有しているものであることを特徴とする建物付設物用柱の立設方法。
Before the eaves of the building are constructed, a bracket for fixing the upper end to the eaves member of the building is attached to the upper end of the pillar for the building accessory installed outside the building, and Column lower end fixing process for fixing the lower end of the column to the foundation and making the column independent,
After the eaves of the building are constructed, a column upper end fixing step for fixing the upper end of the column to the eaves member via the bracket by coupling the bracket to the eaves member of the building;
The includes,
The column lower end fixing step is performed by arranging a height adjusting unit between the column lower end and the foundation, and the column upper end fixing step is performed by the height adjusting unit. By increasing the height position of the bracket, the bracket is brought into contact with the eaves member,
Including a column support step performed between the column lower end portion fixing step and the column upper end portion fixing step;
In this column supporting step, an end portion of the column is coupled to the building and a supporting member extending to the column side is coupled to the middle portion of the column in the longitudinal direction. It is a process for supporting,
In the column support step, the column and the support member are coupled with one coupling tool, and the coupling tool is a direction orthogonal or substantially orthogonal to the length direction of the support member, and is horizontal or substantially horizontal. A method for erecting a pillar for a building accessory , comprising a shaft portion whose direction is an axial direction .
請求項1に記載の建物付設物用柱の立設方法において、前記支持部材は、前記建物付設物の構造材であることを特徴とする建物付設物用柱の立設方法。 The method for erecting a column for a building accessory according to claim 1 , wherein the support member is a structural material of the building accessory. 請求項1又は2に記載の建物付設物用柱の立設方法において、前記柱上端部固定工程は、前記ブラケットを前記軒部材に結合具で結合することによって行われ、この結合は、前記ブラケットを前記軒部材に取り付ける位置を定める位置出し作業の後に行われることを特徴とする建物付設物用柱の立設方法。 3. The method for erecting a pillar for a building accessory according to claim 1 , wherein the column upper end fixing step is performed by coupling the bracket to the eaves member with a coupling tool, and the coupling is performed by the bracket. It is performed after the positioning work which determines the position which attaches to the said eaves member, The standing installation method of the pillar for buildings attachments characterized by the above-mentioned. 請求項1〜3のいずれかに記載の建物付設物用柱の立設方法において、
前記柱上端部固定工程の後に行われる工程であって、前記柱の表面に柱カバーを取り付けるための柱カバー取付工程を含んでおり、
前記柱下端部固定工程で前記柱の上端部に前記ブラケットを取り付ける作業は、前記柱の上端部に前記ブラケットを止着具で止着することによって行われ、前記柱カバー取付工程では、前記柱上端部固定工程の後に、前記止着具を前記柱の上端部と前記ブラケットから取り外し、この止着具によって前記柱カバーを前記柱の上端部と前記ブラケットとに止着すること、及び前記止着具によって前記柱の上端部を前記ブラケットに止着することが実施されることを特徴とする建物付設物用柱の立設方法。
In the standing installation method of the pillar for building attachments in any one of Claims 1-3 ,
A step performed after the column upper end fixing step, including a column cover attaching step for attaching a column cover to the surface of the column;
The operation of attaching the bracket to the upper end of the column in the column lower end fixing step is performed by fixing the bracket to the upper end of the column with a fastener, and in the column cover attaching step, the column After the upper end fixing step, the fastener is removed from the upper end of the column and the bracket, and the column cover is fixed to the upper end of the column and the bracket by the fastener, and the stop A method for erecting a pillar for a building-attached object, characterized in that the upper end of the pillar is fastened to the bracket by a fitting.
請求項4に記載の建物付設物用柱の立設方法において、前記ブラケットには、前記止着具を前記柱の上端部と前記ブラケットから取り外しても、前記柱の内部に残る入れ子部が設けられていることを特徴する建物付設物用柱の立設方法。 5. The method for erecting a pillar for a building accessory according to claim 4 , wherein the bracket is provided with a nesting portion that remains inside the pillar even if the fastener is removed from the upper end of the pillar and the bracket. A method for erecting a pillar for a building accessory characterized by being built.
JP2008098850A 2008-04-07 2008-04-07 How to erect pillars for buildings Active JP5203779B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008098850A JP5203779B2 (en) 2008-04-07 2008-04-07 How to erect pillars for buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008098850A JP5203779B2 (en) 2008-04-07 2008-04-07 How to erect pillars for buildings

Publications (2)

Publication Number Publication Date
JP2009249905A JP2009249905A (en) 2009-10-29
JP5203779B2 true JP5203779B2 (en) 2013-06-05

Family

ID=41310862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008098850A Active JP5203779B2 (en) 2008-04-07 2008-04-07 How to erect pillars for buildings

Country Status (1)

Country Link
JP (1) JP5203779B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH083201B2 (en) * 1991-06-18 1996-01-17 株式会社園田製作所 Structure of the outer corridor of the building
JPH0714532Y2 (en) * 1991-12-26 1995-04-10 株式会社サンレール Handrail support device
JP3448359B2 (en) * 1994-08-02 2003-09-22 ミサワホーム株式会社 Unit type building with attached unit and its construction method
JP2004209026A (en) * 2003-01-06 2004-07-29 Nakamura:Kk Building struts

Also Published As

Publication number Publication date
JP2009249905A (en) 2009-10-29

Similar Documents

Publication Publication Date Title
US10119265B2 (en) Building frame connector and method of use
JP5203779B2 (en) How to erect pillars for buildings
JP6313553B2 (en) Mounting method for temporary roofing for roof and temporary roofing for roof
JPH1046803A (en) Eaves scaffolding fixture and eaves unit
KR200378136Y1 (en) Assembly stairs handrail
JP5749665B2 (en) building
RU2809840C1 (en) Fastening system for rafters of hip and broach roofs
JP7569204B2 (en) Entrance porch
JP5118789B2 (en) Temporary material connector
JP2010163766A (en) Joint structure between column and beam, and method for rebuilding unit building
JP3171389B2 (en) Joints for vertical and horizontal members
JP7303712B2 (en) unit building
JP2660953B2 (en) Construction method
JPS6217550Y2 (en)
JP2000303550A (en) Construction method for prefabricated house
JP3123949U (en) Seismic reinforcement frame for wooden houses from outside
JP3505272B2 (en) Prop support brackets and post erecting method
JP2024035981A (en) Floor structure of steel corridor stair unit
WO2017212817A1 (en) Passageway structure for prefabricated houses
JP5918677B2 (en) Roof structure
JP6535238B2 (en) Column structure of the building
JP2003213912A (en) Advancing/receding-adjusting and level adjusting implement
JP2018016964A (en) Stair foundation structure, stairs, and stairs construction method
JP2002276117A (en) Prop installation structure
JP4564409B2 (en) Additional beam structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120803

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120828

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130214

R150 Certificate of patent or registration of utility model

Ref document number: 5203779

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160222

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250