Ground reinforcement structure, construction method of ground reinforcement structure Download PDF

Info

Publication number
JP5217225B2
JP5217225B2 JP2007112207A JP2007112207A JP5217225B2 JP 5217225 B2 JP5217225 B2 JP 5217225B2 JP 2007112207 A JP2007112207 A JP 2007112207A JP 2007112207 A JP2007112207 A JP 2007112207A JP 5217225 B2 JP5217225 B2 JP 5217225B2
Authority
JP
Japan
Prior art keywords
ground
filler
hole
bag body
reinforcement structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2007112207A
Other languages
Japanese (ja)
Other versions
JP2008267009A (en
Inventor
山本  彰
真一 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2007112207A priority Critical patent/JP5217225B2/en
Publication of JP2008267009A publication Critical patent/JP2008267009A/en
Application granted granted Critical
Publication of JP5217225B2 publication Critical patent/JP5217225B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

本発明は、地盤補強構造、及びその地盤補強構造の施工方法に関する。 The present invention relates to a soil reinforcing structure, and construction how the soil reinforcement structure.

従来より、軟弱な地盤の沈下や斜面の崩壊を防止するために、地盤を硬質安定化させて改良する地盤補強工法が行われており、例えば、特許文献1又は2に開示されるような工法が提案されている。   Conventionally, in order to prevent subsidence of soft ground and collapse of slopes, a ground reinforcement method for improving the ground by stabilizing the ground has been performed. For example, a method as disclosed in Patent Document 1 or 2 Has been proposed.

特許文献1には、ボーリングにより削孔した孔内に鋼棒等の補強材を挿入し、孔内面と補強材との間隙にモルタルやグラウトセメント等を注入して補強材と地盤を一体化させて地盤補強構造を構築する、いわゆるネイリングと呼ばれる工法が開示されている。   In Patent Document 1, a reinforcing material such as a steel rod is inserted into a hole drilled by boring, and mortar or grout cement is injected into the gap between the hole inner surface and the reinforcing material to integrate the reinforcing material and the ground. Thus, a so-called nailing method for constructing a ground reinforcing structure is disclosed.

また、特許文献2には、特殊な形状の混練オーガ機によって攪拌した地盤に、攪拌機の中空軸を通してセメントミルクを注入しながら攪拌混合を続けて地中にソイルセメント柱体を造設し、更に掘削攪拌した土砂範囲の先端の地盤に、前記中空軸の中空部に芯材を挿入して設置することにより、地盤補強構造を構築するソイルセメント工法が開示されている。
特開2004−27813号公報 特開平5−222733号公報
Further, in Patent Document 2, a soil cement column is built in the ground by continuing stirring and mixing while pouring cement milk through the hollow shaft of the stirrer into the ground stirred by a specially shaped kneading auger. A soil cement construction method is disclosed in which a ground reinforcing structure is constructed by inserting and installing a core material in the hollow portion of the hollow shaft on the ground at the end of the excavated and stirred earth and sand range.
JP 2004-27813 A JP-A-5-222733

しかしながら、特許文献1又は2に開示される地盤補強工法では、地盤補強構造を構築する地盤の透水性が高い場合に、当該地盤に流動状態のモルタルやコンクリートセメント等のグラウト材を注入すると、注入したグラウト材が固化する前に周辺地盤に逸散してしまう。そのため、充分な強度を有する地盤補強構造を構築するために大量のグラウト材を充填しなければならず、施工コスト及び施工時間を要する。   However, in the ground reinforcement method disclosed in Patent Document 1 or 2, when the ground for constructing the ground reinforcement structure has high water permeability, when a grout material such as mortar or concrete cement in a fluid state is injected into the ground, The grouting material will dissipate to the surrounding ground before it solidifies. Therefore, in order to construct a ground reinforcing structure having sufficient strength, a large amount of grout material must be filled, which requires construction cost and construction time.

本発明は、上記の点に鑑みてなされたものであり、簡易な構成で、地盤に形成された孔に充填する充填材を、周辺地盤へ逸散させることなく固化させて構築することが可能な地盤補強構造、及びその地盤補強構造の施工方法を提供することを目的とする。 The present invention has been made in view of the above points, and with a simple configuration, it is possible to construct the filler filling the hole formed in the ground by solidifying it without escaping to the surrounding ground. and an object such soil reinforcing structure, and to provide a construction how the soil reinforcement structure.

上記の目的を達成するため、本発明は、地盤の補強構造であって、時間の経過とともに固化する充填材が通過できない素材で構成される袋体の開口した基端部からその内部に誘導棒を、前記充填材を注入するための注入ホースと共に挿入し、前記誘導棒によって前記袋体の閉塞されている側の先端部を地盤に形成された孔内へ押し込むことにより、前記袋体を前記孔内に設置し、前記誘導棒と共に前記注入ホースを前記孔内から引き抜きながら、前記注入ホースによって、前記袋体の内部に、前記充填材を流動状態で充填し、この充填材を固化させてなることを特徴とする。 In order to achieve the above-mentioned object, the present invention is a ground reinforcing structure, and a guide rod is inserted into the interior from the open base end of a bag body made of a material through which a filler that solidifies over time cannot pass. Is inserted together with an injection hose for injecting the filler, and the leading end on the closed side of the bag body is pushed into the hole formed in the ground by the guide rod, whereby the bag body is While being installed in the hole and pulling out the injection hose together with the guide rod from the hole, the filler is filled into the bag body in a fluid state by the injection hose, and the filler is solidified. it shall be the features of the made.

本発明の地盤補強構造によれば、袋体が、その内部に充填される充填材を地盤に逸散させることなく固化させて、補強構造を構築することができるので、特許文献1又は2に開示される地盤補強工法で構築される地盤補強構造と比べて、少量の充填材で地盤補強構造を構築でき、施工コストの低減及び施工時間の短縮化が図れる。   According to the ground reinforcement structure of the present invention, the bag body can be solidified without causing the filler filled therein to dissipate into the ground, so that a reinforcement structure can be constructed. Compared to the ground reinforcement structure constructed by the disclosed ground reinforcement construction method, the ground reinforcement structure can be constructed with a small amount of filler, and the construction cost can be reduced and the construction time can be shortened.

本発明において、前記袋体の素材は、前記充填材に含まれる水分のみを前記袋体外部の地盤に浸出させるような目の粗さを有する織布又は不織布、又は前記充填材に含まれる水分のみを前記袋体外部の地盤に浸出させるような微細な孔が設けられた不透水性材料で構成されていてもよいIn the onset Akira, material of the bag is included in the mesh size woven or nonwoven fabric having the above only moisture contained in the filling material to leach into the ground of the bag outside part, or the filling material You may be comprised with the water-impermeable material provided with the fine hole which allows only a water | moisture content to exude to the ground outside the said bag body.

本発明の地盤補強構造によれば、袋体に充填された充填材中の水分のみが地盤中に浸出して、袋体内の充填材の固化成分が濃集されるので、充填材の固化が促進される。   According to the ground reinforcing structure of the present invention, only the moisture in the filler filled in the bag body is leached into the ground, and the solidified component of the filler in the bag body is concentrated, so that the solidification of the filler is achieved. Promoted.

また、本発明は地盤補強構造の施工方法であって、時間の経過とともに固化する充填材が通過できない素材で構成される袋体の開口した基端部からその内部に誘導棒を、前記充填材を注入するための注入ホースと共に挿入し、前記誘導棒によって前記袋体の閉塞されている側の先端部を地盤に形成された孔内へ押し込むことにより、前記袋体前記孔内に設置し、前記誘導棒と共に前記注入ホースを前記孔内から引き抜きながら、前記注入ホースによって、前記袋体の内部に、前記充填材を流動状態で充填し、この充填材を固化させることを特徴とする。 Further, the present invention is a method for constructing a ground reinforcing structure , wherein a guide rod is inserted into the interior of the bag from an open base end portion of a bag body made of a material through which a filler that solidifies over time cannot pass. insert with injection hose for injecting, the leading end of the side which is closed of the bag by the induction bars by forcing into the hole formed in the ground, and placing the bag body in said bore The filler is filled into the bag body in a fluid state by the injection hose while the injection hose is pulled out from the hole together with the guide rod , and the filler is solidified.

本発明によれば、簡易な構成で、地盤に形成された孔に充填する充填材を、周辺地盤へ逸散させることなく固化させて構築することが可能な地盤補強構造、及びその地盤補強構造の施工方法を提供できる。 According to the present invention, with a simple configuration, a ground reinforcing structure that can be constructed by solidifying a filler filling a hole formed in the ground without being scattered to the surrounding ground, and the ground reinforcing structure thereof it is possible to provide a construction how.

以下、本発明の好ましい一実施形態について図面に基づき詳細に説明する。
図1は、本実施形態に係る地盤補強部材を示し、同図(a)は側面図、同図(b)は(a)のA−A断面図である。
Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the drawings.
1A and 1B show a ground reinforcing member according to the present embodiment, in which FIG. 1A is a side view and FIG. 1B is a cross-sectional view taken along line AA in FIG.

図1に示すように、地盤補強部材10は、例えば、柔軟性を有する筒状部材の先端部10aが閉塞されてなる細長い袋体であり、その基端部10bには注入口16が形成されている。地盤補強部材10は、後述するような地盤に屈曲形状に削孔された孔内に、その袋体内部が空の状態で設置され、その後注入口16からその袋体内部にコンクリートミルク等の充填材を充填して固化させることにより地盤補強構造が構築される。   As shown in FIG. 1, the ground reinforcing member 10 is, for example, an elongated bag body in which a distal end portion 10a of a flexible cylindrical member is closed, and an injection port 16 is formed at the base end portion 10b. ing. The ground reinforcing member 10 is installed in a hole cut in a bent shape in the ground as will be described later with the inside of the bag body empty, and then filled with concrete milk or the like from the inlet 16 into the bag body. A ground reinforcement structure is constructed by filling and solidifying the material.

袋体の構成材料としては、例えば、柔軟性及び耐摩耗性を有する麻や合成繊維等からなる織布又は不織布に、例えば、アラミド糸や炭素繊維等の引張り強度の大きい補強索体14を混入したものや、地盤補強部材10の周囲に複数の補強索体14を長手方向に沿って設けたもの等を用いることができる。なお、後者の場合、地盤補強部材10を用いて構築された地盤補強構造に対して、いずれの方向から曲げ荷重が作用しても、均一に曲げ荷重に抵抗させるべく、図1(b)に示すように補強索体14は袋体の周囲に等間隔で設けられることが好ましい。   As a constituent material of the bag body, for example, a reinforcing cord 14 having a high tensile strength such as aramid yarn or carbon fiber is mixed into a woven fabric or a nonwoven fabric made of hemp or synthetic fiber having flexibility and wear resistance. Or a structure in which a plurality of reinforcing cords 14 are provided along the longitudinal direction around the ground reinforcing member 10 can be used. In the latter case, in order to evenly resist the bending load regardless of the direction from which direction the bending load is applied to the ground reinforcing structure constructed using the ground reinforcing member 10, FIG. As shown, the reinforcing cords 14 are preferably provided at equal intervals around the bag.

地盤補強部材10には、例えば、地盤補強部材10に注入させる充填材の圧力(例えば、0.1〜1Mpa)に耐え得る強度が要求される。これは、例えば、消防ホースと同等の強度である。   The ground reinforcing member 10 is required to have a strength that can withstand the pressure (for example, 0.1 to 1 Mpa) of the filler injected into the ground reinforcing member 10. This is, for example, as strong as a fire hose.

また、地盤補強部材10は、その内部に充填される充填材に含まれる水分のみを袋体外部の地盤に浸出させるような目の粗さを有する織布又は不織布からなることが好ましい。なお、上記織布又は不織布に限らず、微細な孔が設けられた不透水性の膜を用いてもよい。   In addition, the ground reinforcing member 10 is preferably made of a woven fabric or a nonwoven fabric having such a roughness that only the moisture contained in the filler filled therein is leached into the ground outside the bag body. In addition, you may use the water-impermeable film | membrane provided with the fine hole not only the said woven fabric or a nonwoven fabric.

さらに、地盤補強部材10は、孔内に設置後その内部に充填材が充填された時に、孔壁と密着するように、袋体が、ある程度膨張するように伸縮可能であることが好ましい。   Furthermore, it is preferable that the ground reinforcing member 10 can be expanded and contracted so that the bag body expands to some extent so that the ground reinforcing member 10 is in close contact with the hole wall when the inside thereof is filled with a filler.

また、地盤補強部材10には、地盤補強構造の一部となった際に、曲げ荷重等によって地盤補強構造に生じる引張力に、充分に抵抗できる程度の引張強度を有するものを使用する。また、充填材には、地盤補強構造の一部となった際に、曲げ荷重等によって地盤補強構造に生じる圧縮力に、充分に抵抗できる程度の圧縮強度を有するもの使用する。   Further, as the ground reinforcing member 10, a member having a tensile strength that can sufficiently resist the tensile force generated in the ground reinforcing structure due to a bending load or the like when it becomes a part of the ground reinforcing structure is used. In addition, a filler having a compressive strength that can sufficiently resist the compressive force generated in the ground reinforcing structure due to a bending load or the like when it becomes a part of the ground reinforcing structure is used.

次に、このような地盤補強部材10を用いて、例えば、軟弱地盤上に構築される盛土20下の基礎を補強するべく、地盤補強構造を構築する手順について説明する。   Next, a procedure for constructing a ground reinforcement structure in order to reinforce a foundation under the embankment 20 constructed on a soft ground, for example, using such a ground reinforcement member 10 will be described.

図2は、地盤補強部材10を用いて地盤補強構造を構築する第一の工法の手順を説明するための説明図である。
図2に示すように、第一の工法は、屈曲孔の削孔工程S110と、地盤補強部材の設置工程S120と、充填材の充填工程S130からなる。
FIG. 2 is an explanatory diagram for explaining the procedure of the first construction method for constructing the ground reinforcing structure using the ground reinforcing member 10.
As shown in FIG. 2, the first construction method includes a bending hole drilling step S110, a ground reinforcing member installation step S120, and a filler filling step S130.

屈曲孔の削孔工程S110では、地表に構築される盛土20に隣接する地表位置から、補強する盛土20の下方の基礎地盤に向けて斜め方向に削孔を開始し、その孔の先端が盛土20の縁部の下方位置に到達した時点で削孔方向を水平方向に変更し(工程S111)、その後、所定長の水平部を有するような屈曲形状の孔(屈曲孔22)を削孔する(工程S112)。   In the drilling step S110 of the bent hole, drilling is started obliquely from the surface position adjacent to the embankment 20 constructed on the ground surface toward the foundation ground below the embankment 20 to be reinforced, and the tip of the hole is embankment. When reaching the lower position of the edge of 20, the drilling direction is changed to the horizontal direction (step S111), and then a bent hole (bent hole 22) having a horizontal portion of a predetermined length is drilled. (Step S112).

屈曲孔の削孔工程S110には、地盤中でその削孔方向を自由に変更することが可能な公知の誘導式自在ボーリング機械(例えば、テラ・ジェット工法やアーバンノーディック工法による削孔機)を用いておこなうことができる。なお、屈曲孔22の削孔後には、削孔に使用されたボーリング機械のドリルビット21やボーリングロッド23を引き抜いて回収する。   In the drilling step S110 of the bent hole, a known induction-type universal boring machine capable of freely changing the drilling direction in the ground (for example, a drilling machine using a terra-jet method or an urban nodic method) Can be used. In addition, after drilling the bending hole 22, the drill bit 21 and the boring rod 23 of the boring machine used for drilling are pulled out and collected.

地盤補強部材の設置工程S120では、屈曲可能であるともに弾性を有する、例えば金属ワイヤー等の誘導棒24を、地盤補強部材10の袋体の基端部の注入口からその内部に挿入(工程S121)して、閉塞されている側の先端部10aを、工程S110で削孔された屈曲孔22の先端まで押し込むことにより、袋体を屈曲孔22内に挿入する(工程S122)。ここで、誘導棒24を用いて地盤補強部材10を屈曲孔22に挿入する際には、誘導棒24の先端が地盤補強部材10を破損させないように、例えば、クッション等の保護部材を誘導棒24の先端に設ける等の対策を講じておく。なお、地盤補強部材10の設置後には、誘導棒24を孔内から引き抜いて回収する。   In the ground reinforcing member installation step S120, a guide rod 24, such as a metal wire, which is bendable and elastic, is inserted into the inside of the base end portion of the bag body of the ground reinforcing member 10 (step S121). Then, the bag body is inserted into the bent hole 22 by pushing the closed end portion 10a to the tip of the bent hole 22 drilled in step S110 (step S122). Here, when the ground reinforcing member 10 is inserted into the bending hole 22 using the guide rod 24, for example, a protective member such as a cushion is attached to the guide rod so that the tip of the guide rod 24 does not damage the ground reinforcing member 10. Take measures such as providing it at the tip of 24. In addition, after installation of the ground reinforcement member 10, the guide rod 24 is pulled out from the hole and collected.

充填材の充填工程S130では、工程S120で屈曲孔22内に設置された地盤補強部材10の内部に充填材26を充填し、固化させることによって、地盤補強構造40を構築する。充填材26は上述した注入口16を通じて充填される。なお、充填材26には、固化後のコンクリートの引張り強度を向上させるために、例えば、鋼繊維やガラス繊維等の補強繊維材を混入したものを用いることが好ましい。   In the filling material filling step S130, the ground reinforcing structure 40 is constructed by filling and solidifying the inside of the ground reinforcing member 10 installed in the bent hole 22 in the step S120. The filler 26 is filled through the inlet 16 described above. In addition, in order to improve the tensile strength of the concrete after solidification, it is preferable to use a filler mixed with a reinforcing fiber material such as steel fiber or glass fiber.

充填材26を注入する際には、その注入圧が0.1〜1Mpa程度になるまで加圧する。そして、注入が終了後にその内圧が保持されるように注入口16を密封する。これにより、この後地盤補強部材10に充填された充填材26中の水分が圧搾されて地盤中に浸出し、ある程度の地盤補強部材10内の充填材26の固化成分が濃集されて固化することによって、地盤補強構造40が構築される。   When injecting the filler 26, pressurization is performed until the injection pressure becomes about 0.1 to 1 MPa. Then, the injection port 16 is sealed so that the internal pressure is maintained after the injection is completed. Thereby, the water in the filler 26 filled in the ground reinforcing member 10 is squeezed and leached into the ground, and a certain amount of the solidified component of the filler 26 in the ground reinforcing member 10 is concentrated and solidified. Thus, the ground reinforcement structure 40 is constructed.

また、誘導棒24に、例えば注入ホースを沿わせておき、工程S120を実施する際に、地盤補強部材10の基端部10bから誘導棒24とともに注入ホースを挿入して、地盤補強部材10を屈曲孔22の先端まで押し込んで設置し、その後誘導棒24を孔内から引き抜きながら、注入ホースを介して充填材を袋体内に充填する Further , for example, when an injection hose is placed along the guide rod 24 and the step S120 is performed, the injection hose is inserted together with the guide rod 24 from the base end portion 10b of the ground reinforcement member 10, and the ground reinforcement member 10 is attached. placed in until the tip of the bent hole 22, while pulling the subsequent induction rod 24 from the hole, the filling material through the injection hose to fill the bag body.

これにより、地盤補強部材の設置工程S120と充填材の充填工程S130とを同時に実施できる。加えて、屈曲孔22の先端部10aから充填材を袋体内に充填していくため、未充填時に袋体内にある空気を先端部10aから基端部10bまで円滑に送り出すことができるので、袋体内に空気が残存することを回避し、信頼性の高い剛性を有する地盤補強構造40を構築できる。   Thereby, the installation process S120 of the ground reinforcing member and the filling process S130 of the filler can be performed simultaneously. In addition, since the filling material is filled into the bag body from the distal end portion 10a of the bent hole 22, the air in the bag body can be smoothly sent from the distal end portion 10a to the proximal end portion 10b when not filled. The ground reinforcement structure 40 having a highly reliable rigidity can be constructed by avoiding air remaining in the body.

上記説明した地盤補強部材の設置工程S120については、図3に示すような空気圧入による設置方法を用いてもよい。   About the installation process S120 of the ground reinforcement member demonstrated above, you may use the installation method by pneumatic insertion as shown in FIG.

図3に示すように、空気圧入による設置方法では、例えば、屈曲孔22の孔口付近に蛇腹状に折りたたまれ、その先端部10aが孔口から孔内に向かって設置された地盤補強部材10の内部に、注入口16から空気を圧入(工程S123)することにより、袋体に推進力を与え又は袋体を膨張させることによって地盤補強部材10を孔底へ挿入させる(工程S124)。   As shown in FIG. 3, in the installation method by air pressure insertion, for example, the ground reinforcing member 10 is folded in the vicinity of the hole of the bent hole 22 in a bellows shape, and the tip 10a is installed from the hole toward the inside of the hole. The ground reinforcing member 10 is inserted into the bottom of the hole by injecting air from the inlet 16 into the interior of the container (step S123), thereby applying a propulsive force to the bag body or expanding the bag body (step S124).

なお、空気圧入による設置方法の実施にあたっては、地盤補強部材10を孔内に挿入させる際に、地盤補強部材10より前方の孔内空気を大気中へ逃がすための空気抜きホース28を、その先端が孔先端付近まで達するように予め設置しておくことが好ましい。これにより、地盤補強部材10を円滑に孔底へ挿入させることができる。   In carrying out the installation method by air pressure insertion, when the ground reinforcing member 10 is inserted into the hole, an air vent hose 28 for releasing the air in the hole forward from the ground reinforcing member 10 into the atmosphere is provided at the tip thereof. It is preferable to install in advance to reach the vicinity of the hole tip. Thereby, the ground reinforcement member 10 can be smoothly inserted into the hole bottom.

また、空気圧入による設置方法では、地盤補強部材10内に空気を圧入する代わりに充填材26を圧入してもよい。これにより、地盤補強部材の設置工程S120と充填材の充填工程S130(図2参照)とを同時に実施することができる。   Moreover, in the installation method by air pressure insertion, you may press-fit the filler 26 instead of press-fitting air in the ground reinforcement member 10. FIG. Thereby, the installation step S120 of the ground reinforcing member and the filling step S130 (see FIG. 2) of the filler can be performed simultaneously.

図4は、地盤補強部材10を用いて地盤補強構造を構築する第二の工法の手順を説明するための説明図である。なお、図4において、図2と同様の部位を示すものについては、同様の符号を付してその説明を省略する。   FIG. 4 is an explanatory diagram for explaining the procedure of the second construction method for constructing the ground reinforcing structure using the ground reinforcing member 10. In FIG. 4, the same reference numerals are given to the same parts as those in FIG. 2, and the description thereof is omitted.

図4に示すように、第二の工法は、屈曲貫通孔の削孔工程S210と、地盤補強部材の設置工程S220と、充填材の充填工程S230からなる。   As shown in FIG. 4, the second construction method includes a bending through hole drilling step S210, a ground reinforcing member installation step S220, and a filler filling step S230.

屈曲貫通孔の削孔工程S210では、図2で説明した屈曲孔の削孔工程S110と同様にして、所定長の水平部を有する屈曲孔を削孔(工程S211)した後、さらに地表へ向けて削孔方向を変更して地表まで貫通させた屈曲貫通孔30を削孔する(工程S212)。   In the bent through hole drilling step S210, in the same manner as in the bent hole drilling step S110 described with reference to FIG. 2, a bent hole having a horizontal portion of a predetermined length is drilled (step S211), and further toward the ground surface. Then, the bent through hole 30 that has been drilled to the ground surface by changing the drilling direction is drilled (step S212).

なお、屈曲貫通孔30も、第一の工法と同様の誘導式自在ボーリング機械を用いて削孔する。   The bent through hole 30 is also drilled using the same induction type boring machine as in the first construction method.

地盤補強部材の設置工程S220では、前工程S210で盛土20の両側間の地盤を貫通する際に用いた誘導式自在ボーリング機械のボーリングロッド23の先端部付近に、地盤補強部材10の基端部10bを取り付け、当該ボーリングロッド23を引き抜くことにより、地盤補強部材10を屈曲貫通孔30内に引き込む。   In the ground reinforcing member installation step S220, the base end portion of the ground reinforcing member 10 is disposed in the vicinity of the distal end portion of the boring rod 23 of the induction-type universal boring machine used when penetrating the ground between both sides of the embankment 20 in the previous step S210. The ground reinforcing member 10 is pulled into the bent through hole 30 by attaching 10 b and pulling out the boring rod 23.

また、同図中では地盤補強部材10が屈曲貫通孔30の領域の一部(第一の工法と同様に中央の水平部と図中右側の傾斜部)に配置されているが、これに限らず、削孔された屈曲貫通孔30の全領域に設置してもよい。ここで前者のような屈曲貫通孔30の領域の一部に配置する場合には、地盤補強部材10が設置されない孔の部分30cについては、コンクリートや土砂等で埋め戻しておくことが好ましい。   Further, in the same figure, the ground reinforcing member 10 is arranged in a part of the region of the bent through hole 30 (the central horizontal portion and the inclined portion on the right side in the drawing as in the first method), but this is not the only case. Instead, it may be installed in the entire region of the bent through hole 30 that has been drilled. Here, when arranging in a part of the area of the bent through hole 30 as in the former, it is preferable to backfill the hole portion 30c where the ground reinforcing member 10 is not installed with concrete or earth and sand.

第二の工法で実施される充填材の充填工程S230は、第一の工法の充填材の充填工程S130と同様である。   The filler filling step S230 performed in the second method is the same as the filler filling step S130 in the first method.

以上説明した本実施形態の地盤補強構造40によれば、袋体である地盤補強部材10が、その内部に充填される充填材26の固化成分を地盤に逸散させることなく固化させて、補強構造を構築することができるので、少量の充填材26で地盤補強構造40を構築でき、施工コストの低減及び施工時間の短縮化が図れる。   According to the ground reinforcing structure 40 of the present embodiment described above, the ground reinforcing member 10 which is a bag body is solidified without causing the solidified component of the filler 26 filled therein to dissipate into the ground, thereby reinforcing Since the structure can be constructed, the ground reinforcement structure 40 can be constructed with a small amount of the filler 26, and the construction cost and the construction time can be shortened.

また、本実施形態の地盤補強構造40によれば、地盤補強部材10は、その内部に充填される充填材に含まれる水分のみを袋体外部の地盤に浸出させるような目の粗さを有する織布又は不織布からなることにより、地盤補強部材10に充填された充填材26中の水分が圧搾されて地盤中に浸出し、地盤補強部材10内の充填材26の固化成分が濃集されるので、充填材26の固化が促進される。   Further, according to the ground reinforcing structure 40 of the present embodiment, the ground reinforcing member 10 has such a coarseness that only the moisture contained in the filler filled therein is leached into the ground outside the bag body. By being made of woven or non-woven fabric, moisture in the filler 26 filled in the ground reinforcing member 10 is compressed and leached into the ground, and the solidified component of the filler 26 in the ground reinforcing member 10 is concentrated. Therefore, solidification of the filler 26 is promoted.

なお、本実施形態の地盤補強部材10は、内部に充填される充填材26のうち、水分のみが袋体外部の地盤に浸出するような目の粗さを有する織布や不織布、又は微細な孔が設けられた不透水性の膜を用いることとしたが、これに限らず、水分が浸出しない袋体を用いてもよい。この場合、充填材26として、水分を含有したままで固化可能な水硬性のコンクリート等を用いる。   In addition, the ground reinforcing member 10 of this embodiment is a woven or non-woven fabric having a fineness such that only water outflows into the ground outside the bag body among the fillers 26 filled therein, or a fine material. Although the water-impermeable film provided with holes is used, the present invention is not limited to this, and a bag body from which moisture does not leach may be used. In this case, hydraulic concrete or the like that can be solidified while containing moisture is used as the filler 26.

また、本実施形態では、地盤補強部材10を用いて盛土20下の軟弱地盤の補強する例を示したが、その他にも鉄道線路や道路等の直下を通過する土被りの浅いトンネルやシールドの補強に適用できる。   Moreover, in this embodiment, although the example which reinforces the soft ground under the embankment 20 using the ground reinforcement member 10 was shown, the tunnel of a shallow earth covering passing directly under a railroad track, a road, etc., or a shield Applicable for reinforcement.

図5は、鉄道線路と直交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図、同図(c)は縦断面図である。   FIG. 5 shows an installation example of a ground reinforcement structure on the upper ground of a tunnel or shield that crosses at right angles to the railroad track. FIG. 5 (a) is a plan view, FIG. 5 (b) is a cross-sectional view, FIG. c) is a longitudinal sectional view.

図5に示すように、地盤補強構造40は、上述した地盤補強工法によって、盛土20とトンネル又はシールド50との間の地盤に、トンネル又はシールド50の伸延方向と同じ方向、かつ水平に配置され(同図(c)参照)、トンネル又はシールド50の周囲に複数に亘って構築される(同図(a)及び同図(b)参照)。   As shown in FIG. 5, the ground reinforcing structure 40 is disposed on the ground between the embankment 20 and the tunnel or shield 50 in the same direction as the extending direction of the tunnel or shield 50 and horizontally by the ground reinforcing method described above. (Refer to (c) in the figure), a plurality of structures are constructed around the tunnel or shield 50 (see (a) and (b) in the same figure).

また、図6は、鉄道線路と斜交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図である。   FIG. 6 shows an example of ground reinforcement structure installed on the upper ground of the tunnel or shield crossing obliquely with the railway track. FIG. 6 (a) is a plan view and FIG. 6 (b) is a cross-sectional view. is there.

図6に示すように、地盤補強構造40は、上述した図5の場合と異なり、トンネル又はシールド50の伸延方向と直交する方向に配置され(同図(a)及び同図(b)参照)、トンネル又はシールド50の伸延方向に複数に亘って構築される(同図(a)参照)。   As shown in FIG. 6, unlike the case of FIG. 5 mentioned above, the ground reinforcement structure 40 is arrange | positioned in the direction orthogonal to the extending direction of the tunnel or the shield 50 (refer the figure (a) and the figure (b)). The tunnel or shield 50 is constructed in a plurality of extending directions (see FIG. 5A).

これは、図5のトンネル又はシールド50が鉄道線路と直交する場合と比べ、図6ではトンネル又はシールド50が鉄道線路と斜交するので、鉄道線路を横切る部分の距離が長くなるため、図5と同様の配置で地盤補強構造40を構築しようとすると、長距離の屈曲孔の削孔と、その屈曲孔への地盤補強部材10の設置が必要となり、施工コスト及び施工時間を要することになることを考慮したためである。   Compared to the case where the tunnel or shield 50 in FIG. 5 is orthogonal to the railroad track, the tunnel or shield 50 in FIG. 6 crosses the railroad track, and therefore the distance across the railroad track becomes longer. If it is going to construct the ground reinforcement structure 40 with the same arrangement | positioning, the drilling of a long distance bending hole and installation of the ground reinforcement member 10 to the bending hole will be needed, and construction cost and construction time will be needed. This is because of this.

また、本実施形態の地盤補強部材10は、屈曲形状の地盤補強構造40を補強することに用いたが、これに限らず、直線形状の地盤補強構造を補強することに用いてもよいことはいうまでもない。   In addition, the ground reinforcing member 10 of the present embodiment is used to reinforce the bent-shaped ground reinforcing structure 40, but is not limited thereto, and may be used to reinforce a linear ground reinforcing structure. Needless to say.

本実施形態に係る地盤補強部材を示し、同図(a)は側面図、同図(b)は(a)のA−A断面図である。The ground reinforcement member which concerns on this embodiment is shown, The figure (a) is a side view, The figure (b) is AA sectional drawing of (a). 地盤補強部材を用いて地盤補強構造を構築する第一の工法の手順を説明するための説明図である。It is explanatory drawing for demonstrating the procedure of the 1st construction method which builds a ground reinforcement structure using a ground reinforcement member. 地盤補強部材の空気圧入による設置方法を説明するための説明図である。It is explanatory drawing for demonstrating the installation method by the air pressure insertion of a ground reinforcement member. 地盤補強部材を用いて地盤補強構造を構築する第二の工法の手順を説明するための説明図である。It is explanatory drawing for demonstrating the procedure of the 2nd construction method which builds a ground reinforcement structure using a ground reinforcement member. 鉄道線路と直交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図、同図(c)は縦断面図である。The installation example of the ground reinforcement structure on the upper ground of the tunnel or shield crossing perpendicularly to the railway track is shown, (a) is a plan view, (b) is a cross-sectional view, and (c) is a longitudinal section. FIG. 鉄道線路と斜交して横切るトンネル又はシールドの上部地盤への地盤補強構造の設置例を示し、同図(a)は平面図、同図(b)は横断面図である。The example of installation of the ground reinforcement structure to the upper ground of the tunnel or shield crossing obliquely with the railroad track is shown, and the same figure (a) is a plan view and the same figure (b) is a cross-sectional view.

符号の説明Explanation of symbols

10 地盤補強部材 14 補強索体
16 注入口 20 盛土
22 屈曲孔 23 ボーリングロッド
24 誘導棒 26 充填材
28 空気抜きホース 30 屈曲貫通孔
40 地盤補強構造 50 トンネル又はシールド
10a 先端部 10b 基端部
S110 屈曲孔の削孔工程 S120 地盤補強部材の設置工程
S130 充填材の充填工程 S210 屈曲貫通孔の削孔工程
S220 地盤補強部材の設置工程 S230 充填材の充填工程
DESCRIPTION OF SYMBOLS 10 Ground reinforcement member 14 Reinforcement cord 16 Inlet 20 Filling 22 Bending hole 23 Boring rod 24 Guide rod 26 Filler 28 Air vent hose 30 Bending through-hole 40 Ground reinforcement structure 50 Tunnel or shield 10a Tip 10b Base end S110 Bending hole Drilling process S120 Ground reinforcement member installation process S130 Filling material filling process S210 Bending through hole drilling process S220 Ground reinforcement member installation process S230 Filling material filling process

Claims (3)

地盤の補強構造であって、
時間の経過とともに固化する充填材が通過できない素材で構成される袋体の開口した基端部からその内部に誘導棒を、前記充填材を注入するための注入ホースと共に挿入し、前記誘導棒によって前記袋体の閉塞されている側の先端部を地盤に形成された孔内へ押し込むことにより、前記袋体を前記孔内に設置し、
前記誘導棒と共に前記注入ホースを前記孔内から引き抜きながら、前記注入ホースによって、前記袋体の内部に、前記充填材を流動状態で充填し、この充填材を固化させてなることを特徴とする地盤補強構造。
It is a ground reinforcement structure,
A guide rod is inserted into the inside of the bag from the open base end portion of the bag made of a material that cannot pass through the filler that solidifies over time, together with an injection hose for injecting the filler, and the guide rod The bag body is installed in the hole by pushing the tip of the closed side of the bag body into the hole formed in the ground,
The filler is filled into the bag body in a fluid state by the injection hose while the injection hose is pulled out from the hole together with the guide rod, and the filler is solidified. Ground reinforcement structure.
前記袋体の素材は、前記充填材に含まれる水分のみを前記袋体外部の地盤に浸出させるような目の粗さを有する織布又は不織布、又は前記充填材に含まれる水分のみを前記袋体外部の地盤に浸出させるような微細な孔が設けられた不透水性材料で構成されることを特徴とする請求項1に記載の地盤補強構造。 The material of the bag body is a woven or non-woven fabric having a roughness that allows only the moisture contained in the filler to leached into the ground outside the bag body, or only the moisture contained in the filler. 2. The ground reinforcement structure according to claim 1, wherein the ground reinforcement structure is made of a water-impermeable material provided with fine holes that are leached into the ground outside the body. 地盤補強構造の施工方法であって、
時間の経過とともに固化する充填材が通過できない素材で構成される袋体の開口した基端部からその内部に誘導棒を、前記充填材を注入するための注入ホースと共に挿入し、前記誘導棒によって前記袋体の閉塞されている側の先端部を地盤に形成された孔内へ押し込むことにより、前記袋体を前記孔内に設置し、
前記誘導棒と共に前記注入ホースを前記孔内から引き抜きながら、前記注入ホースによって、前記袋体の内部に、前記充填材を流動状態で充填し、この充填材を固化させることを特徴とする地盤補強構造の施工方法。
It is a construction method of ground reinforcement structure,
A guide rod is inserted into the inside of the bag from the open base end portion of the bag made of a material that cannot pass through the filler that solidifies over time, together with an injection hose for injecting the filler, and the guide rod The bag body is installed in the hole by pushing the tip of the closed side of the bag body into the hole formed in the ground,
The ground reinforcement is characterized in that the filler is filled in the fluid state in the bag by the injection hose while the injection hose is pulled out from the hole together with the guide rod, and the filler is solidified. Construction method of structure.
JP2007112207A 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure Expired - Fee Related JP5217225B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007112207A JP5217225B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007112207A JP5217225B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2012123572A Division JP5333630B2 (en) 2012-05-30 2012-05-30 Ground reinforcement structure, construction method of ground reinforcement structure

Publications (2)

Publication Number Publication Date
JP2008267009A JP2008267009A (en) 2008-11-06
JP5217225B2 true JP5217225B2 (en) 2013-06-19

Family

ID=40046858

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007112207A Expired - Fee Related JP5217225B2 (en) 2007-04-20 2007-04-20 Ground reinforcement structure, construction method of ground reinforcement structure

Country Status (1)

Country Link
JP (1) JP5217225B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62273319A (en) * 1986-05-21 1987-11-27 Asahi Chem Ind Co Ltd Formation of pile using cloth cylinder
JPH11181752A (en) * 1997-12-19 1999-07-06 Tekken Constr Co Ltd Structure and method for reinforcing natural ground

Also Published As

Publication number Publication date
JP2008267009A (en) 2008-11-06

Similar Documents

Publication Publication Date Title
KR101665515B1 (en) Direct-boring pipe roof tunnel construction method and structure non-cutting natural ground
CN104603366B (en) The building method of nodiform in situ concrete pile and be equipped with the steel pipe excavating sword
JP7032242B2 (en) Inserting member for filling grout material used in micropile method and micropile method
JP5696687B2 (en) Ground reinforcement structure construction method
JP5145757B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
JP5217225B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
JP5333630B2 (en) Ground reinforcement structure, construction method of ground reinforcement structure
KR100991248B1 (en) Micro pile foundation method using a pack and pile assembly used therein
JP3681902B2 (en) Seismic ground reinforcement method
JP5119132B2 (en) Insert unit for ground reinforcement and ground reinforcement method using the same
JP7216230B2 (en) Gap blocker used in the micropile construction method
KR102288469B1 (en) Underground structure construction method with double concrete tube and underground structure constructed using the same
JP5124334B2 (en) Ground reinforcement method, ground reinforcement structure
JP4223337B2 (en) Ground reinforcement method and ground reinforcement structure by the method
JP5055186B2 (en) Ground reinforcement method, ground reinforcement structure
JP2019052510A (en) Wall body construction method and wall body
JPH0522771B2 (en)
JP2019148105A (en) Gap obturator used in micropile construction method and micropile construction method using the same
KR100914414B1 (en) Box capable of horizontal shift and method for forming underground contineous wall
JP4872561B2 (en) Construction method of ready-made piles
KR200325653Y1 (en) Earth anchor including a duplex grouting pipe
JP3801229B2 (en) Underground bending member and its construction method
JP2007262811A (en) Pile structure and its pile embedding method
JP5972141B2 (en) Reinforcement structure for underground structures
JP2006249773A (en) Mouth caulking device of pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110531

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110727

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120403

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130218

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160315

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees