JP5223406B2 - Blackout plan management system and blackout plan management method - Google Patents
[go: Go Back, main page]

JP5223406B2 - Blackout plan management system and blackout plan management method - Google Patents

Blackout plan management system and blackout plan management method Download PDF

Info

Publication number
JP5223406B2
JP5223406B2 JP2008074798A JP2008074798A JP5223406B2 JP 5223406 B2 JP5223406 B2 JP 5223406B2 JP 2008074798 A JP2008074798 A JP 2008074798A JP 2008074798 A JP2008074798 A JP 2008074798A JP 5223406 B2 JP5223406 B2 JP 5223406B2
Authority
JP
Japan
Prior art keywords
power outage
power
outage plan
plan
approval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008074798A
Other languages
Japanese (ja)
Other versions
JP2009230447A (en
Inventor
洋一 本坂
雅之 大川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Original Assignee
Meidensha Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp filed Critical Meidensha Corp
Priority to JP2008074798A priority Critical patent/JP5223406B2/en
Publication of JP2009230447A publication Critical patent/JP2009230447A/en
Application granted granted Critical
Publication of JP5223406B2 publication Critical patent/JP5223406B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、例えば電気設備の停電計画を管理する停電計画管理システムおよび停電計画管理方法に関する。   The present invention relates to a power failure plan management system and a power failure plan management method for managing, for example, a power failure plan for electrical equipment.

従来、電気設備の停電計画は、例えば図14に示す申請ルートに沿って回覧されるものであった。
(1)まず現業所、現業区の計画起案者が停電計画を起案し、その停電計画書(書類)を電力指令部に送る。
(2)次に電力指令部で事前チェックを行い、チェック後の停電計画書を現業所、現業区の主任が受け取る。
(3)そして主任が、上司である助役に停電計画書を渡して申請を行い、助役が停電計画書の承認を行って、該停電計画書を上司である所長、区長に渡す。そして所長、区長がその停電計画書を決済して達番号を採番し、その停電計画書を電力指令部へ送る。
(4)電力指令部では、前記達番号の付与された停電計画書を受け取り、その決済された停電計画を承認し、その際に承認番号を採番し、それを本社の電気部門へ送る。
(5)本社の電気部門では、受け取った停電計画書を担当者、課長および部長の順に渡すとともに承認を得る。そして本社の電気部門で承認を終えた停電計画書は担当者により印刷され、次に本社の総務部門に送られる。
(6)本社の総務部門では送られてきた停電計画書を運転報に掲載する。
Conventionally, a power outage plan for electrical equipment has been circulated along an application route shown in FIG. 14, for example.
(1) First, the plan maker of the current office and the current business district drafts a power outage plan, and sends the power outage plan (documents) to the power command department.
(2) Next, a preliminary check is performed at the power command department, and the post-check outage plan is received by the head of the current office and the current business district.
(3) Then, the supervisor gives the power outage plan to the assistant assistant, who is the supervisor, and the assistant approves the power outage plan, and gives the power outage plan to the manager and the ward manager. Then, the director and the ward chief settle the power outage plan, assign a serial number, and send the power outage plan to the power command department.
(4) The power command unit receives the power outage plan with the above-mentioned number, approves the settled power outage plan, assigns the approval number at that time, and sends it to the electrical department of the head office.
(5) In the electrical department of the head office, the received power outage plan is handed over in the order of the person in charge, the section manager, and the department manager, and approval is obtained. The power outage plan that has been approved by the electrical department at the head office is printed by the person in charge and then sent to the general affairs department at the head office.
(6) In the general affairs department of the head office, the power outage plan that has been sent is posted in the operation report.

尚、従来の電気設備の停電処理方式としては例えば特許文献1に記載のものが提案されている。また従来のワークフロー(電子決済回覧)システムとしては例えば特許文献2、3に記載のものが提案されている。
特開2000−198376号公報 特開2002−222297号公報 特開2003−58678号公報
In addition, as a conventional power failure processing method for electrical equipment, for example, the one described in Patent Document 1 has been proposed. As conventional workflow (electronic payment circulation) systems, for example, those described in Patent Documents 2 and 3 have been proposed.
JP 2000-198376 A JP 2002-222297 A JP 2003-58678 A

前記図14のルートに沿って停電計画を申請し、回覧し、承認する従来のワークフロー処理は、停電計画の申請、承認と電気設備の開閉器操作(すなわち停電制御)が連動していなかった。   In the conventional workflow processing for applying, circulating, and approving a power outage plan along the route of FIG. 14, the application and approval of the power outage plan and the switch operation (that is, power outage control) of the electrical equipment are not linked.

そのため、申請者は、停電計画の承認・決済を受け、その後承認が得られた日時と区間が停電となるように、電力指令部に向けて開閉器操作の予約登録を行い、発行された運転報に当該停電計画が記載されていることを目視確認してきた。   Therefore, the applicant receives the approval / settlement of the power outage plan, then makes a reservation registration for the switch operation to the power command department so that the date and time when the approval is obtained and the section will be outage, and the issued operation It has been visually confirmed that the power outage plan is described in the report.

このため、開閉器操作の予約登録を忘れたり、日時・区間を間違えるなど、人為的なミスが起こることがあり、これによって開閉器操作の信頼性が低下する。   For this reason, human error such as forgetting to register the reservation for the switch operation or making a mistake in the date and time may occur, thereby reducing the reliability of the switch operation.

また図14の停電計画申請フローでは、破線の矢印のように、停電計画の起案から運転報掲載までの各回覧は、書類の直接受け渡しもしくはFAX渡しに頼っている。   In the power outage plan application flow of FIG. 14, each circulation from the start of the power outage plan to the operation report publication depends on the direct delivery of documents or the delivery of fax as indicated by the broken arrows.

このため地理的に離れた地区を回覧するため、運転報に掲載されるまでに多くの時間が必要であった。   Therefore, in order to circulate geographically distant districts, it took a lot of time to appear in the driving report.

本発明は上記課題を解決するものであり、その目的は、電気設備の停電計画のワークフロー処理と停電制御(電気設備の開閉器操作)を連動させることができる停電計画管理システムおよび停電計画管理方法を提供することにある。   SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems, and its object is to provide a power failure plan management system and a power failure plan management method capable of linking the power failure plan workflow processing of an electrical facility and the power failure control (switching operation of the electrical facility). Is to provide.

上記課題を解決するための請求項1に記載の停電計画管理システムは、電気設備の制御を行う電力設備監視制御システムに電気設備の制御計画を与える電力指令部と、前記電力指令部に設けられ、電気設備の停電計画に関する電子データを管理する停電計画管理サーバーを備え、前記電気設備の停電計画を管理する停電計画管理システムであって、前記停電計画管理サーバーに設けられ、入力される前記電気設備の停電計画を電子化し、該電子データを所定の申請ルートに沿って承認担当者に回覧させる回覧制御手段と、前記停電計画管理サーバーに設けられ、前記回覧制御手段により回覧された電気設備の停電計画が承認担当者により承認されたことをもって、前記停電計画に基づく電気設備の開閉器操作の予約登録を行う予約登録手段と、前記予約登録手段により予約登録された停電計画に基づく電気設備の開閉器操作を実行する停電計画実行手段とを備え、前記回覧制御手段は、前記申請ルートを設定又は設定変更し、該設定変更時に承認担当者を変更する申請ルート決定手段を有し、前記予約登録手段は、複数の承認担当者のうち、いずれの承認担当者により承認されるかによって前記開閉器操作の予約登録の可・不可を設定する機能を有したことを特徴としている。 The power outage plan management system according to claim 1 for solving the above-described problem is provided in a power command unit that gives a control plan of an electric facility to a power facility monitoring control system that controls the electric facility, and the power command unit. A power outage plan management server for managing electronic data related to a power outage plan for electrical equipment, and a power outage plan management system for managing the power outage plan for the electrical equipment, wherein the electric power provided and input to the power outage plan management server The power outage plan of the facility is digitized and the electronic data is circulated by the power outage plan management server, which is provided in the power outage plan management server, and circulation control means for circulating the electronic data along a predetermined application route. Reservation registration means for performing reservation registration of the switch operation of the electrical equipment based on the power outage plan, when the power outage plan is approved by the person in charge of approval. And a power outage planning execution means for executing the switch operation of the electrical equipment based on the reservation registered outage planning by the reservation registration unit, said circulation control means the application root set or set to change, when the setting change An application route determining means for changing the person in charge of approval is provided, and the reservation registering means enables / disables reservation registration of the switch operation depending on which of the plurality of persons in charge of approval approves it. It is characterized by having a function for setting .

また請求項2に記載の停電計画管理システムは、請求項1における前記停電計画実行手段が、所定の通信回線を介して前記停電計画管理サーバーと接続されており、前記電気設備の開閉器制御盤とを結ぶ電気信号回線を備え、該電気信号回線を介して前記電気設備の開閉操作を実行することを特徴としている。   The power outage plan management system according to claim 2 is characterized in that the power outage plan execution means in claim 1 is connected to the power outage plan management server via a predetermined communication line, and the switch control panel of the electric equipment And an electric signal line that connects to the electric equipment, and the electric equipment is opened and closed through the electric signal line.

また請求項8に記載の停電計画管理方法は、電気設備の制御を行う電力設備監視制御システムに電気設備の制御計画を与える電力指令部と、前記電力指令部に設けられ、電気設備の停電計画に関する電子データを管理する停電計画管理サーバーを備え、前記電気設備の停電計画を管理する停電計画管理システムにおける停電計画管理方法であって、前記停電計画管理サーバーの回覧制御手段が、入力される前記電気設備の停電計画を電子化し、該電子データを所定の申請ルートに沿って承認担当者に回覧させる回覧制御ステップと、前記停電計画管理サーバーの予約登録手段が、前記回覧制御ステップにより回覧された電気設備の停電計画が承認担当者により承認されたことをもって、前記停電計画に基づく電気設備の開閉器操作の予約登録を行う予約登録ステップと、停電計画実行手段が、前記予約登録ステップにより予約登録された停電計画に基づく電気設備の開閉器操作を実行する停電計画実行ステップとを備え、前記回覧制御ステップは、前記申請ルートを設定又は設定変更し、該設定変更時に承認担当者を変更し、前記予約登録ステップは、複数の承認担当者のうち、いずれの承認担当者により承認されるかによって前記開閉器操作の予約登録の可・不可を設定することを特徴としている。 A power failure plan management method according to claim 8 is provided in a power command unit that gives a control plan of an electrical facility to a power facility monitoring and control system that controls the electrical facility, and the power command unit includes a power command plan. A power outage plan management method in a power outage plan management system for managing a power outage plan management server for managing electronic data relating to the power outage plan, wherein the circulation control means of the power outage plan management server is inputted. A circuit control step for digitizing a power outage plan for electrical equipment and circulating the electronic data to an approver along a predetermined application route, and a reservation registration means for the power outage plan management server were circulated by the circuit control step. Reservation registration of switch operation of electrical equipment based on the power outage plan with the approval of the power outage plan for electrical equipment by the person in charge of approval A reservation registration step of performing, outage planning run means, and a power outage planning execution step of executing the switch operation of the electrical equipment based on the reservation registered outage planning by the reservation registration step, the circulation control step, the applicant The route is set or changed, and the person in charge of approval is changed at the time of changing the setting. The reservation registering step reserves the operation of the switch depending on which one of the persons in charge of approval is approved by the person in charge of approval. It is characterized by setting whether registration is possible or not .

また請求項9に記載の停電計画管理方法は、請求項8の前記停電計画実行ステップにおいて、所定の通信回線を介して前記停電計画管理サーバーと接続されており、前記電気設備の開閉器制御盤とを結ぶ電気信号回線を介して前記電気設備の開閉操作を実行することを特徴としている。 The power outage plan management method according to claim 9 is connected to the power outage plan management server via a predetermined communication line in the power outage plan execution step according to claim 8, and the switch control panel of the electric equipment The electric equipment is opened and closed through an electric signal line connecting the two.

上記構成によれば、停電計画を申請し、回覧し、承認するワークフロー(電子決済回覧)処理と、停電計画に基づく電気設備の開閉器操作の実行を連動させることができる。   According to the above configuration, it is possible to link the workflow (electronic payment circulation) processing for applying, circulating, and approving a power outage plan with the execution of the switch operation of the electrical equipment based on the power outage plan.

また、電気設備の停電計画の申請ルートを任意に設定又は設定変更することができる。 In addition, it is possible to arbitrarily set or change the application route of the power outage plan for the electrical equipment.

また、請求項3に記載の停電計画管理システムは、請求項1又は2において、前記回覧制御手段が、電気設備の停電計画の申請に必要な事項の雛形画面を提示し、電気設備の停電計画の申請者が選択した前記雛形画面を受け付ける手段を備えていることを特徴としている。 Moreover, the power failure plan management system according to claim 3 is the power failure plan management system according to claim 1 or 2 , wherein the circulation control means presents a template screen of items necessary for the application of the power failure plan for the electrical equipment. Means for receiving the template screen selected by the applicant.

また請求項4に記載の停電計画管理システムは、請求項1ないし3のいずれか1項において、前記回覧制御手段が、前記承認担当者から入力される前記電気設備の停電計画の承認又は否認の決定を受け付ける手段を備えていることを特徴としている。 Further, the power failure plan management system according to claim 4 is the power failure plan management system according to any one of claims 1 to 3 , wherein the circulation control unit is configured to approve or reject the power failure plan of the electrical equipment input from the person in charge of approval. It is characterized by having means for accepting the decision.

また請求項5に記載の停電計画管理システムは、請求項1ないし4のいずれか1項において、前記回覧制御手段が、前記電気設備の停電計画の申請内容を編集するための画面を提示し、前記停電計画の申請者が前記画面を用いて入力した申請内容に沿って電気設備の停電計画の申請内容を編集する手段を備えていることを特徴としている。 The power failure plan management system according to claim 5 is the power failure plan management system according to any one of claims 1 to 4 , wherein the circulation control means presents a screen for editing application details of the power failure plan for the electrical equipment, According to the present invention, there is provided means for editing the application content of the power outage plan for the electrical equipment in accordance with the application content input by the applicant of the power outage plan using the screen.

上記構成によれば、電気設備の停電計画の申請、承認、編集を容易に行うことができる。
また、請求項6に記載の停電計画管理システムは、請求項1ないし5のいずれか1項において、前記回覧制御手段が、前記回覧の経過を記録する手段を備えていることを特徴としている。
According to the above configuration, it is possible to easily apply, approve, and edit a power outage plan for electrical equipment.
A power outage plan management system according to claim 6 is characterized in that, in any one of claims 1 to 5 , the circulation control means includes means for recording the progress of the circulation.

上記構成によれば、回覧の経過や回覧がどこまで進んでいるかを確認することができる。   According to the above configuration, it is possible to check the progress of circulation and how far the circulation has progressed.

また、請求項7に記載の停電計画管理システムは、請求項1ないし6のいずれか1項において、前記回覧制御手段が、所定の通信回線を介して前記停電計画管理サーバーに接続された申請部の端末装置により入力された電気設備の停電計画を前記電力指令部に送信する機能と、前記電力指令部で前記停電計画がチェックされた結果を前記申請部の端末装置に返信する機能と、前記申請部の承認担当者によって承認された電気設備の停電計画を前記電力指令部に送信する機能と、前記電力指令部の承認担当者によって承認された電気設備の停電計画を管理する管理部に送信する機能と、前記管理部の承認担当者によって承認された電気設備の停電計画を電気設備の運転報に掲載させる機能とを備えていることを特徴としている。 Furthermore, power outages plan management system according to claim 7, in any one of claims 1 to 6, wherein the circulation control means, application unit connected to the power outage planning management server via a predetermined communication line The function of transmitting the power outage plan of the electrical equipment input by the terminal device to the power command unit, the function of returning the result of checking the power outage plan in the power command unit to the terminal device of the application unit, The function of transmitting the power outage plan of the electric equipment approved by the person in charge of approval of the application department to the power command section, and the management section managing the power outage plan of the electric equipment approved by the person in charge of approval of the power command section And a function of causing a power outage plan of the electrical equipment approved by the person in charge of approval of the management unit to be posted in the operation report of the electrical equipment.

また請求項10に記載の停電計画管理方法は、請求項8又は9の前記回覧制御ステップにおいて、所定の通信回線を介して前記停電計画管理サーバーに接続された申請部の端末装置により入力された電気設備の停電計画を前記電力指令部に送信するステップと、前記電力指令部でチェックされた結果を前記申請部の端末装置に返信するステップと、前記申請部の承認担当者によって承認された電気設備の停電計画を前記電力指令部に送信するステップと、前記電力指令部の承認担当者によって承認された電気設備の停電計画を管理する管理部に送信するステップと、前記管理部の承認担当者によって承認された電気設備の停電計画を電気設備の運転報に掲載させるステップとを実行することを特徴としている。 The power outage plan management method according to claim 10 is inputted by the terminal device of the application unit connected to the power outage plan management server via a predetermined communication line in the circulation control step according to claim 8 or 9 . A step of transmitting a power outage plan of an electrical facility to the power command unit; a step of returning a result checked by the power command unit to a terminal device of the application unit; and an electric power approved by a person in charge of approval of the application unit. A step of transmitting a facility power outage plan to the power command unit, a step of transmitting to a management unit managing a power outage plan of the electrical facility approved by a person in charge of approval of the power command unit, and a person in charge of approval of the management unit And a step of posting the power outage plan of the electric equipment approved by the electric equipment operation report.

上記構成によれば、申請部の端末装置により入力された電気設備の停電計画を、申請部、電力指令部および管理部に存在する複数の承認担当者に自動的に回覧し、各々承認又は否認を受けることができる。   According to the above configuration, the power outage plan of the electrical facility input from the terminal device of the application unit is automatically circulated to a plurality of approval personnel existing in the application unit, the power command unit, and the management unit, and each is approved or rejected. Can receive.

(1)請求項1〜10に記載の発明によれば、停電計画を申請し、回覧し、承認するワークフロー(電子決済回覧)処理と、停電計画に基づく電気設備の開閉器操作の実行を連動させることができる。 (1) According to the inventions described in claims 1 to 10 , the workflow (electronic payment circulation) process for applying, circulating, and approving a power outage plan and the execution of the switch operation of the electrical equipment based on the power outage plan are linked. Can be made.

このためワークフロー処理にて承認・決済された案件のみ開閉器操作の自動実行の予約登録がなされるので、承認・決済を行った日時・区間のみを停電させるための開閉器操作が行われ、これによって、間違った日時・区間の開閉器操作の予約登録がされることは無くなり、人為的な登録操作のミスを防止することができる。   For this reason, automatic execution of switch operation reservation registration is made only for the projects approved and settled in the workflow process, so the switch operation is performed to power out only the date and time of the approval and settlement. Therefore, the reservation registration of the switch operation of the wrong date / time / section is not performed, and an artificial registration operation error can be prevented.

また、前記ワークフロー処理における承認・決済が一人でも欠けていると開閉器操作ができないので、関係部門へ周知されずに停電となる事態は避けられる。また、システム管理者は、電気設備の停電計画の申請ルートを任意に設定又は設定変更することができる。
(2)請求項3、4、5に記載の発明によれば、システムの利用者は、電気設備の停電計画の申請、承認、編集を容易に行うことができる。
(3)請求項6に記載の発明によれば、システムの利用者は、回覧の経過や回覧がどこまで進んでいるかを確認することができる。
(4)請求項7、10に記載の発明によれば、申請部の端末装置により入力された電気設備の停電計画を、申請部、電力指令部および管理部に存在する承認担当者に自動的に回覧し、各々承認又は否認を受けることができる。
In addition, if even one person lacks approval / settlement in the workflow process, the switch cannot be operated, so that a situation where a power failure occurs without being notified to the related departments can be avoided. In addition, the system administrator can arbitrarily set or change the application route of the power outage plan for the electrical equipment.
(2) According to the inventions described in claims 3 , 4, and 5 , the system user can easily apply, approve, and edit the power outage plan for the electrical equipment.
(3) According to the invention described in claim 6 , the user of the system can confirm the progress of the circulation and how far the circulation has progressed.
(4) According to the inventions described in claims 7 and 10 , the power outage plan of the electrical equipment input by the terminal unit of the application unit is automatically sent to the approval person in the application unit, the power command unit and the management unit. Can be circulated and each can be approved or rejected.

以下、図面を参照しながら本発明の実施の形態を説明するが、本発明は下記の実施形態例に限定されるものではない。図1は本発明の電気設備の停電計画管理システムの装置構成の一例を示している。尚、本実施例では便宜的に申請部を現業区、管理部を本社として説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings, but the present invention is not limited to the following embodiments. FIG. 1 shows an example of an apparatus configuration of a power outage plan management system for electrical equipment according to the present invention. In this embodiment, for convenience, the application department will be described as the current business district and the management department will be described as the head office.

図1において、1は鉄道会社の本社を示しており、電気部門Web端末10、総務部門Web端末11を備えている。2は現業区(又は現業所)を示しており、現業区Web端末20a〜20cを備えている。   In FIG. 1, reference numeral 1 denotes the head office of a railway company, which includes an electrical department Web terminal 10 and a general affairs department Web terminal 11. Reference numeral 2 denotes a current business district (or current business location), which includes current business district Web terminals 20a to 20c.

3は電力指令部を示しており、Webサーバー30(本発明の停電計画管理サーバー)、カラープリンタ31等を備えている。   Reference numeral 3 denotes a power command unit, which includes a Web server 30 (power failure plan management server of the present invention), a color printer 31 and the like.

32はWebサーバー30と所定の回線で接続された電力設備監視制御システムである。40は前記電力指令システム32により制御される遠方監視制御装置子局41、開閉器制御盤42、開閉器43a〜43n(開閉器1〜N)を備えた変電所等の電気設備である。   Reference numeral 32 denotes a power equipment monitoring and control system connected to the Web server 30 via a predetermined line. Reference numeral 40 denotes electrical equipment such as a substation equipped with a remote monitoring control device slave station 41, a switch control panel 42, and switches 43a to 43n (switches 1 to N) controlled by the power command system 32.

Webサーバー30は、電気設備40の停電計画に関する電子データを管理するサーバーであり、L3スイッチ33、インターネットVPN(Virtual Private Network:インターネット上の仮想的な専用回線)および各ハブを介して前記各Web端末10,11、20a〜20cに接続されている。   The Web server 30 is a server that manages electronic data related to the power outage plan of the electrical facility 40. Each of the Web servers 30 is provided via the L3 switch 33, the Internet VPN (Virtual Private Network) and each hub. It is connected to terminals 10, 11, 20a to 20c.

本実施例において、電気設備の停電計画は現業区Web端末20a〜20cのいずれかから入力される。   In the present embodiment, the power outage plan for the electrical equipment is input from any of the current business district Web terminals 20a to 20c.

前記Webサーバー30は、入力される電気設備40の停電計画を電子化し、該電子データを所定の申請ルートに沿って複数の承認担当者に回覧させる回覧制御機能(本発明の回覧制御手段)と、前記回覧された電気設備40の停電計画が承認担当者により承認されたことをもって、前記停電計画に基づく電気設備の開閉器(43a〜43n)の操作の予約登録を行う予約登録機能(本発明の予約登録手段)とを備えている。   The web server 30 digitizes the input power outage plan of the electrical equipment 40, and circulates the electronic data to a plurality of approval personnel along a predetermined application route (circulation control means of the present invention). A reservation registration function for performing reservation registration of operation of the electrical equipment switches (43a to 43n) based on the power outage plan when the power outage plan of the circulated electric equipment 40 is approved by an approval person (the present invention) Reservation registration means).

また前記停電計画が入力(申請)される現業区Web端末20a〜20cと電気設備40の開閉器制御盤42は、図示省略の電気信号回線により接続されており、前記予約登録された停電計画に基づく電気設備40の開閉器43a〜43nの操作は該電気信号回線を介して実行される。   In addition, the current business district Web terminals 20a to 20c to which the power outage plan is input (applied) and the switch control panel 42 of the electrical equipment 40 are connected by an electric signal line (not shown), and the reserved power outage plan is included in the reservation registered power outage plan. The operation of the switches 43a to 43n of the electrical equipment 40 based is performed via the electrical signal line.

次に上記のように構成されたシステムで行われる停電計画を申請し、回覧し、承認するワークフロー処理を図2とともに説明する。
(1)まず現業区2の「内申案入力」において停電計画について入力を行い、前記入力内容を電力指令部3のWebサーバー30に送信する。
(2)前記(1)の入力内容についてWebサーバー30で事前チェックを行い、入力内容の日時や設備による停電が問題ないか確認し、(1)の送信者に電力指令部3で入力内容の事前チェックが完了した旨を返信する。
(3)電力指令部3での事前チェックが完了した通知を現業区Web端末20a〜20cのいずれかにより前記(1)の入力者(実施例では主任)が受け取り、上司(実施例では助役)に停電計画の申請を行う。上司は、停電計画の内容を確認して承認を行うとともに承認内容を所長や区長などへ送信し、所長や区長などが決済したときに「達番号」を採番する。
(4)前記(3)で決済した停電計画を現業所の所長または現業区の区長は電力指令部3のWebサーバー30に送信し、受け取り側の電力指令部3は決済された停電計画を承認し、その際に「承認番号」を採番する。
(5)「承認番号」の採番後に、Webサーバー30から本社1の電気部門Web端末10に停電計画を送信して、本社1の電気部門の担当者、課長および部長の順に送信するとともに承認を得る。
(6)本社1の電気部門で承認を終えた停電計画は、本社1の他部門(総務部門)などを通じて運転報に掲載し、全社に停電計画が周知される。
Next, a workflow process for applying, circulating, and approving a power outage plan performed in the system configured as described above will be described with reference to FIG.
(1) First, an input about a power outage plan is performed in “internal proposal input” of the current business district 2, and the input content is transmitted to the Web server 30 of the power command unit 3.
(2) The Web server 30 performs a preliminary check on the input content of (1) above, confirms that there is no problem with the date and time of the input content and the power outage due to the equipment, and the power command unit 3 Reply that the pre-check is complete.
(3) The notification of completion of the advance check in the power command unit 3 is received by the input person (supervisor in the embodiment) of the above (1) by any of the current business district Web terminals 20a to 20c, and the supervisor (assistant in the embodiment) Apply for a blackout plan. The supervisor confirms the content of the power outage plan and approves it, sends the content of the approval to the director, the head of the ward, etc., and assigns the “achievement number” when the director or the head of the ward settles.
(4) The power plant plan settled in (3) above is sent to the Web server 30 of the power command unit 3 by the manager of the current office or the head of the current business district, and the power command unit 3 on the receiving side approves the settled power outage plan. At that time, an “approval number” is assigned.
(5) After the “approval number” is assigned, the power outage plan is transmitted from the Web server 30 to the electrical department Web terminal 10 of the head office 1, and is transmitted in the order of the person in charge of the electrical department of the head office 1, the section manager, and the general manager. Get.
(6) The power outage plan that has been approved by the electrical department of the head office 1 is posted in the operation report through other departments (general affairs department) of the head office 1, and the power outage plan is made known throughout the company.

尚、前記「達番号」、「承認番号」は、どの停電計画を決済したのか、または承認したのか判別できるように付与する番号である。   The “access number” and “approval number” are numbers that are assigned so that it is possible to determine which power failure plan has been settled or approved.

電気設備40の開閉器操作の予約登録は、通常の設定においては停電計画が承認、決済された案件のみ、予約登録が可能としている。ただし、ソフトウェアにて任意に設定できるため、例えば助役の承認で予約登録をすることも可能であり、また逆に部長の承認まで予約すら出来ないように設定することも可能である。   In the normal setting, the reservation registration for the switch operation of the electrical equipment 40 is possible only for the case where the power outage plan is approved and settled. However, since it can be arbitrarily set by software, for example, reservation registration can be performed with the approval of the assistant, and conversely, it is also possible to set so that even the approval of the general manager cannot be reserved.

次に本発明のシステムを利用した場合の停電計画の申請の流れを図3のフローチャートとともに説明する。まずステップS1において、現業区Web端末20a(20b、20c)にてシステム(電力指令部3のWebサーバー30)にログインする。このときのログイン画面は例えば図4のとおりである。   Next, the flow of application for a power outage plan when the system of the present invention is used will be described with reference to the flowchart of FIG. First, in step S1, the current business district Web terminal 20a (20b, 20c) logs in to the system (Web server 30 of the power command unit 3). The login screen at this time is, for example, as shown in FIG.

次にステップS2において、停電計画をシステムに入力する。この際、Webサーバー30から提示される例えば専用画面の雛形を選択して必要事項を記入するものであり、このとき選択された雛形の番号(内申パターン番号)をキーにして、電気設備40の開閉器操作を行う電力設備監視制御システム32に対して開閉器操作を自動実行するよう登録することができる。   Next, in step S2, a power outage plan is input to the system. At this time, for example, a dedicated screen template presented from the Web server 30 is selected and necessary items are entered, and the number of the selected template (introduction pattern number) is used as a key for the electrical equipment 40. It is possible to register the power facility monitoring control system 32 that performs the switch operation to automatically execute the switch operation.

このときWebサーバー30からは、例えば図5、図6に示すような停電計画の申請内容を編集するための画面を提供し、停電計画入力者がこれら画面を利用することで、申請内容が編集される。   At this time, the Web server 30 provides screens for editing application details of the power outage plan as shown in FIGS. 5 and 6, for example, and the application content is edited by the power outage plan input person using these screens. Is done.

次にステップS3において、入力した停電計画の送信操作を行って、図2で述べたワークフローの申請ルートに乗せる。このときWebサーバー30からは、図7に示すような停電申請書の一覧画面が提供され、停電計画入力者が「送信」ボタンをクリックすることでWebサーバー30に申請内容が記録される。   Next, in step S3, the input power outage plan transmission operation is performed, and the operation is put on the workflow application route described in FIG. At this time, the web server 30 provides a power failure application list screen as shown in FIG. 7, and the content of the application is recorded in the web server 30 when the power failure plan input person clicks the “Send” button.

次にステップS4においてシステムからログアウトする。   Next, in step S4, the user logs out from the system.

次に、本発明のシステムを利用した場合の停電計画の承認行為の流れを図8とともに説明する。   Next, the flow of a power failure plan approval action when the system of the present invention is used will be described with reference to FIG.

まずステップS11において、現業区Web端末20a(20b、20c)にてシステム(Webサーバー30)にログインする(ログイン画面は図4)。   First, in step S11, the current business district Web terminal 20a (20b, 20c) logs in to the system (Web server 30) (the login screen is shown in FIG. 4).

次にステップS12において、受信した停電計画の内容を図5、図6の画面で確認する。   Next, in step S12, the content of the received power outage plan is confirmed on the screens of FIGS.

次にステップS13において、図7の一覧画面の「承認」又は「否認」ボタンをクリックする。   Next, in step S13, the “Approve” or “Deny” button on the list screen of FIG. 7 is clicked.

次にステップS14においてシステムからログアウトする。   Next, in step S14, the user logs out from the system.

またWebサーバー30は、停電計画申請経路を変更するためのメンテナンス画面を例えば図9のように提示する機能を有している。この図9のメンテナンス画面では、「追加」ボタン、「削除」ボタンによって、申請経路変更時に停電計画の承認、決済の担当者も変更することができる。   Further, the Web server 30 has a function of presenting a maintenance screen for changing the power failure plan application route as shown in FIG. 9, for example. In the maintenance screen of FIG. 9, the person in charge of the power outage plan approval and settlement can be changed when the application route is changed by the “add” button and the “delete” button.

またWebサーバー30は図10に示すような、ユーザー情報を管理する画面を提示する機能を有している。   Further, the Web server 30 has a function of presenting a screen for managing user information as shown in FIG.

またWebサーバー30は、入力された停電計画を図2に示すような申請ルートで回覧する際の、回覧経過を記録する機能と、その記録を表示する画面を提示する機能を有している。   Further, the Web server 30 has a function for recording the progress of circulation when the inputted power outage plan is circulated by the application route as shown in FIG. 2 and a function for presenting a screen for displaying the record.

またWebサーバー30は、利用者の氏名/所属部署/権限などを定義、変更する画面を提示する機能を有している。   The Web server 30 also has a function of presenting a screen for defining and changing the user's name / affiliation / authority.

またWebサーバー30は、年月日を指定することにより、当該日の停電計画を一覧表示する機能を有している。   The Web server 30 has a function of displaying a list of power outage plans for the day by designating the date.

またWebサーバー30は、停電計画を例えば図11〜図13に示す書式で印刷する(申請内容を帳票出力する)機能を有している。   Further, the Web server 30 has a function of printing a power outage plan in the format shown in FIGS. 11 to 13 (outputting application contents in a form).

以上のように本実施例によれば、電気設備の停電計画申請を、紙媒体ではなく電子情報で回覧できるようにしたので、回覧の経過が自動で記録されるようになり、回覧がどこまで進んでいるかが申請者から確認できるようになった。また地理的に離れた地区を回覧するため、紙の場合はそれなりの日数をかけて回覧していたが、電子情報化したために日数が短縮された。   As described above, according to the present embodiment, the power outage plan application for the electrical equipment can be circulated not by paper medium but by electronic information, so the progress of the circulation is automatically recorded, and how far the circulation progresses. Applicants can now confirm whether or not Also, in order to circulate geographically distant districts, paper was circulated over a considerable number of days, but the number of days was shortened because it was converted to electronic information.

また、電気設備の停電計画申請者は、紙の申請書を提出するのではなく、専用画面の雛形を選択して必要事項を記入するので、選択した雛形の番号(内申パターン番号)をキーにして、電気設備の開閉器操作を行う装置(電力設備監視制御システム)に対して開閉器操作を自動実行するよう登録することができる。   In addition, the power outage plan applicant for electrical equipment does not submit a paper application form, but selects the template on the dedicated screen and fills in the necessary items. Therefore, the selected template number (introduction pattern number) is used as a key. Thus, it is possible to register the device for performing the switch operation of the electrical equipment (power equipment monitoring control system) to automatically execute the switch operation.

また、年月日を指定することにより、当該日の停電計画を一覧表示することができる。これにより、電気設備40を管理する鉄道会社社員(電力指令員)は、当日の業務計画を新たに作成する必要がない。   In addition, by designating the date, it is possible to display a list of blackout plans for that day. Thereby, the railway company employee (electric power commander) who manages the electrical equipment 40 does not need to create a new business plan for the day.

また本実施例によれば、ワークフロー処理と電気設備の開閉器操作が連動したシステムとなり、停電申請を行い承認・決済された案件のみ開閉器操作の予約登録がなされ、停電の電気設備が制御される。従って、複数人が承認・決済した日時・区間の停電制御が行われるので、人為的ミスによる停電日時・区間の間違いがなくなる。これによって開閉器操作の信頼性が向上する。   In addition, according to the present embodiment, the workflow processing and the switch operation of the electrical equipment are linked to each other, and the switch operation is reserved and registered only for the projects approved and settled by applying the power failure, and the electrical equipment of the power failure is controlled. The Accordingly, since the power failure control of the date / time and section approved and settled by a plurality of persons is performed, the error of the power failure date / time due to human error is eliminated. This improves the reliability of the switch operation.

本発明の一実施形態例のシステム構成図。1 is a system configuration diagram of an embodiment of the present invention. 本発明の一実施形態例のシステムで処理される停電計画の申請ルートを表すフロー図。The flowchart showing the application route of the power failure plan processed with the system of the example of one embodiment of the present invention. 本発明の一実施形態例のシステムで処理される停電計画申請の流れを示すフローチャート。The flowchart which shows the flow of the power failure plan application processed with the system of one embodiment of this invention. 本発明の一実施形態例における停電計画管理サーバーが提示するログイン画面の説明図。Explanatory drawing of the login screen which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例における停電計画管理サーバーが提示する停電計画申請書の内容編集画面の説明図。Explanatory drawing of the content edit screen of the power failure plan application form which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例における停電計画管理サーバーが提示する停電計画申請書の内容編集画面の説明図。Explanatory drawing of the content edit screen of the power failure plan application form which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例における停電計画管理サーバーが提示する停電計画申請書の一覧画面の説明図。Explanatory drawing of the list screen of the power failure plan application form which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例のシステムで処理される停電計画承認の流れを示すフローチャート。The flowchart which shows the flow of the power failure plan approval processed with the system of one embodiment of this invention. 本発明の一実施形態例における停電計画管理サーバーが提示する申請経路メンテナンス画面の説明図。Explanatory drawing of the application path | route maintenance screen which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例における停電計画管理サーバーが提示するユーザー情報管理画面の説明図。Explanatory drawing of the user information management screen which the power failure plan management server in one embodiment of this invention shows. 本発明の一実施形態例のシステム内に用意された帳票出力の一例である停電申請一覧表の説明図。Explanatory drawing of the power failure application list which is an example of the form output prepared in the system of the one embodiment of this invention. 本発明の一実施形態例のシステム内に用意された帳票出力の一例である停電申請書の説明図。Explanatory drawing of the power failure application which is an example of the form output prepared in the system of the one embodiment of this invention. 本発明の一実施形態例のシステム内に用意された帳票出力の一例である停電申請書の説明図。Explanatory drawing of the power failure application which is an example of the form output prepared in the system of the one embodiment of this invention. 従来の停電計画の申請ルートを表すフロー図。The flow figure showing the application route of the conventional blackout plan.

符号の説明Explanation of symbols

1…鉄道会社の本社、2…現業区、3…電力指令部、10…電気部門Web端末、11…総務部門Web端末、20a〜20c…現業区Web端末、30…Webサーバー、31…カラープリンタ、32…電力設備監視制御システム、33…L3スイッチ、40…電気設備、41…遠方監視制御装置の子局、42…開閉器制御盤、43a〜43n…開閉器。   DESCRIPTION OF SYMBOLS 1 ... Railway company headquarters, 2 ... Current business district, 3 ... Electric power command section, 10 ... Electric department web terminal, 11 ... General affairs department web terminal, 20a-20c ... Current business district web terminal, 30 ... Web server, 31 ... Color printer 32 ... Electric power equipment monitoring control system, 33 ... L3 switch, 40 ... Electrical equipment, 41 ... Remote station of remote monitoring control device, 42 ... Switch control panel, 43a-43n ... Switch.

Claims (10)

電気設備の制御を行う電力設備監視制御システムに電気設備の制御計画を与える電力指令部と、前記電力指令部に設けられ、電気設備の停電計画に関する電子データを管理する停電計画管理サーバーを備え、前記電気設備の停電計画を管理する停電計画管理システムであって、
前記停電計画管理サーバーに設けられ、入力される前記電気設備の停電計画を電子化し、該電子データを所定の申請ルートに沿って承認担当者に回覧させる回覧制御手段と、
前記停電計画管理サーバーに設けられ、前記回覧制御手段により回覧された電気設備の停電計画が承認担当者により承認されたことをもって、前記停電計画に基づく電気設備の開閉器操作の予約登録を行う予約登録手段と、
前記予約登録手段により予約登録された停電計画に基づく電気設備の開閉器操作を実行する停電計画実行手段とを備え、
前記回覧制御手段は、前記申請ルートを設定又は設定変更し、該設定変更時に承認担当者を変更する申請ルート決定手段を有し、
前記予約登録手段は、複数の承認担当者のうち、いずれの承認担当者により承認されるかによって前記開閉器操作の予約登録の可・不可を設定する機能を有したことを特徴とする停電計画管理システム。
A power command unit that gives a control plan of the electric facility to the power facility monitoring control system that controls the electric facility, and a power failure plan management server that is provided in the power command unit and manages electronic data related to the power failure plan of the electrical facility, A power outage plan management system for managing a power outage plan for the electrical equipment,
Circulation control means provided in the power outage plan management server, digitizing the input power outage plan of the electrical equipment, and circulating the electronic data to a person in charge of approval along a predetermined application route;
Reservation that is provided in the power outage plan management server and performs reservation registration of the switch operation of the electric equipment based on the power outage plan when the power outage plan of the electric equipment circulated by the circulation control means is approved by an approval person Registration means;
A power outage plan execution means for executing a switch operation of the electrical equipment based on the power outage plan reserved and registered by the reservation registration means ,
The circulation control means has application route determination means for setting or changing the application route, and changing the person in charge of approval when the setting is changed,
The reservation registration means has a function of setting whether or not reservation registration of the switch operation is permitted or not depending on which one of the plurality of approval persons approves the approval. Management system.
前記停電計画実行手段は、所定の通信回線を介して前記停電計画管理サーバーと接続されており、前記電気設備の開閉器制御盤とを結ぶ電気信号回線を備え、該電気信号回線を介して前記電気設備の開閉操作を実行することを特徴とする請求項1に記載の停電計画管理システム。   The power outage plan execution means is connected to the power outage plan management server via a predetermined communication line, and includes an electric signal line connecting the switch control panel of the electric equipment, and the electric signal line via the electric signal line The power outage plan management system according to claim 1, wherein the switching operation of the electrical equipment is executed. 前記回覧制御手段は、電気設備の停電計画の申請に必要な事項の雛形画面を提示し、電気設備の停電計画の申請者が選択した前記雛形画面を受け付ける手段を備えていることを特徴とする請求項1又は2に記載の停電計画管理システム。 The circulation control means includes means for presenting a template screen for matters necessary for an application for a power outage plan for an electrical facility and receiving the template screen selected by an applicant for a power outage plan for an electrical facility. The power failure plan management system according to claim 1 or 2 . 前記回覧制御手段は、前記承認担当者から入力される前記電気設備の停電計画の承認又は否認の決定を受け付ける手段を備えていることを特徴とする請求項1ないしのいずれか1項に記載の停電計画管理システム。 The said circulation control means is provided with a means to receive the determination of approval or denial of the power failure plan of the said electrical installation input from the said person in charge of approval, The any one of Claim 1 thru | or 3 characterized by the above-mentioned. Power outage plan management system. 前記回覧制御手段は、前記電気設備の停電計画の申請内容を編集するための画面を提示し、前記停電計画の申請者が前記画面を用いて入力した申請内容に沿って電気設備の停電計画の申請内容を編集する手段を備えていることを特徴とする請求項1ないしのいずれか1項に記載の停電計画管理システム。 The circulation control means presents a screen for editing the application details of the power outage plan for the electrical equipment, and the power outage plan for the electrical equipment is applied in accordance with the application content entered by the applicant of the power outage plan using the screen. The power outage plan management system according to any one of claims 1 to 4 , further comprising means for editing application contents. 前記回覧制御手段は、前記回覧の経過を記録する手段を備えていることを特徴とする請求項1ないしのいずれか1項に記載の停電計画管理システム。 The power failure plan management system according to any one of claims 1 to 5 , wherein the circulation control means includes means for recording the progress of the circulation. 前記回覧制御手段は、所定の通信回線を介して前記停電計画管理サーバーに接続された申請部の端末装置により入力された電気設備の停電計画を前記電力指令部に送信する機能と、前記電力指令部で前記停電計画がチェックされた結果を前記申請部の端末装置に返信する機能と、前記申請部の承認担当者によって承認された電気設備の停電計画を前記電力指令部に送信する機能と、前記電力指令部の承認担当者によって承認された電気設備の停電計画を管理する管理部に送信する機能と、前記管理部の承認担当者によって承認された電気設備の停電計画を運転報に掲載させる機能とを備えていることを特徴とする請求項1ないしのいずれか1項に記載の停電計画管理システム。 The circulation control means has a function of transmitting a power outage plan of electrical equipment inputted by a terminal device of an application unit connected to the power outage plan management server via a predetermined communication line to the power command unit, and the power command A function of returning the result of checking the power outage plan in the unit to the terminal device of the application unit, a function of transmitting the power outage plan of the electrical equipment approved by the approval person in the application unit to the power command unit, The function of transmitting to the management unit that manages the power outage plan of the electric equipment approved by the person in charge of approval of the power command unit, and the power outage plan of the electric equipment approved by the person in charge of approval of the management unit are posted in the operation report. The power failure plan management system according to any one of claims 1 to 6, further comprising a function. 電気設備の制御を行う電力設備監視制御システムに電気設備の制御計画を与える電力指令部と、前記電力指令部に設けられ、電気設備の停電計画に関する電子データを管理する停電計画管理サーバーを備え、前記電気設備の停電計画を管理する停電計画管理システムにおける停電計画管理方法であって、
前記停電計画管理サーバーの回覧制御手段が、入力される前記電気設備の停電計画を電子化し、該電子データを所定の申請ルートに沿って承認担当者に回覧させる回覧制御ステップと、
前記停電計画管理サーバーの予約登録手段が、前記回覧制御ステップにより回覧された電気設備の停電計画が承認担当者により承認されたことをもって、前記停電計画に基づく電気設備の開閉器操作の予約登録を行う予約登録ステップと、
停電計画実行手段が、前記予約登録ステップにより予約登録された停電計画に基づく電気設備の開閉器操作を実行する停電計画実行ステップとを備え、
前記回覧制御ステップは、前記申請ルートを設定又は設定変更し、該設定変更時に承認担当者を変更し、
前記予約登録ステップは、複数の承認担当者のうち、いずれの承認担当者により承認されるかによって前記開閉器操作の予約登録の可・不可を設定することを特徴とする停電計画管理方法。
A power command unit that gives a control plan of the electric facility to the power facility monitoring control system that controls the electric facility, and a power failure plan management server that is provided in the power command unit and manages electronic data related to the power failure plan of the electrical facility, A power outage plan management method in a power outage plan management system for managing a power outage plan of the electrical equipment,
Circulation control means of the power outage plan management server digitizes the input power outage plan of the electrical equipment, and the circulation control step for circulating the electronic data to a person in charge of approval along a predetermined application route;
Reservation registration means of the power outage plan management server performs reservation registration of the switch operation of the electric equipment based on the power outage plan when the power outage plan of the electric equipment circulated in the circulation control step is approved by the approver. A reservation registration step to be performed;
A power outage plan execution means includes a power outage plan execution step for executing a switch operation of the electrical equipment based on the power outage plan reserved and registered in the reservation registration step ,
The circulation control step sets or changes the application route, changes the person in charge of approval at the time of the setting change,
The reservation registration step sets whether to allow or disable reservation registration of the switch operation depending on which of the plurality of approval personnel approves .
前記停電計画実行ステップは、所定の通信回線を介して前記停電計画管理サーバーと接続されており、前記電気設備の開閉器制御盤とを結ぶ電気信号回線を介して前記電気設備の開閉操作を実行することを特徴とする請求項に記載の停電計画管理方法。 The power outage plan execution step is connected to the power outage plan management server via a predetermined communication line, and executes the opening / closing operation of the electric equipment via an electric signal line connecting the switch control panel of the electric equipment. The power outage plan management method according to claim 8 . 前記回覧制御ステップは、所定の通信回線を介して前記停電計画管理サーバーに接続された申請部の端末装置により入力された電気設備の停電計画を前記電力指令部に送信するステップと、前記電力指令部でチェックされた結果を前記申請部の端末装置に返信するステップと、前記申請部の承認担当者によって承認された電気設備の停電計画を前記電力指令部に送信するステップと、前記電力指令部の承認担当者によって承認された電気設備の停電計画を管理する管理部に送信するステップと、前記管理部の承認担当者によって承認された電気設備の停電計画を電気設備の運転報に掲載させるステップとを備えていることを特徴とする請求項8又は9に記載の停電計画管理方法。 The circulation control step includes a step of transmitting a power outage plan of electrical equipment input by a terminal device of an application unit connected to the power outage plan management server via a predetermined communication line to the power command unit, and the power command A step of returning the result checked at the application unit to the terminal device of the application unit, a step of transmitting a power outage plan of the electrical equipment approved by the approval person of the application unit to the power command unit, and the power command unit A step of transmitting a power outage plan for an electrical facility approved by a person in charge of approval to a management unit for managing the power outage plan for the electrical facility, and a step for causing the power outage plan for the electrical facility approved by the person in charge of the management to be posted in the operation report The power outage plan management method according to claim 8 or 9 , characterized by comprising:
JP2008074798A 2008-03-24 2008-03-24 Blackout plan management system and blackout plan management method Expired - Fee Related JP5223406B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008074798A JP5223406B2 (en) 2008-03-24 2008-03-24 Blackout plan management system and blackout plan management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008074798A JP5223406B2 (en) 2008-03-24 2008-03-24 Blackout plan management system and blackout plan management method

Publications (2)

Publication Number Publication Date
JP2009230447A JP2009230447A (en) 2009-10-08
JP5223406B2 true JP5223406B2 (en) 2013-06-26

Family

ID=41245756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008074798A Expired - Fee Related JP5223406B2 (en) 2008-03-24 2008-03-24 Blackout plan management system and blackout plan management method

Country Status (1)

Country Link
JP (1) JP5223406B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5627310B2 (en) * 2010-06-21 2014-11-19 アズビル株式会社 Energy usage management system
CN112149948A (en) * 2020-07-30 2020-12-29 中国南方电网有限责任公司 Integrated management method and equipment for whole-network maintenance
CN113675945B (en) * 2021-07-05 2023-07-14 中国长江电力股份有限公司 A method for anti-mislocking of the operation execution and maintenance process of the centralized control center of the hydropower station
CN113469555B (en) * 2021-07-19 2022-09-20 国网冀北电力有限公司唐山供电公司 AI technology-based power production management method
CN114118825A (en) * 2021-11-30 2022-03-01 国网黑龙江省电力有限公司黑河供电公司 Power distribution network power dispatching power failure management system
CN114462649B (en) * 2022-04-12 2022-07-22 泰豪软件股份有限公司 Power failure plan management method, system, readable storage medium and computer equipment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000090181A (en) * 1998-09-16 2000-03-31 Aitesu:Kk Document processing system and document processing method
JP2002041741A (en) * 2000-07-21 2002-02-08 At Work Corp Business process management system
JP4274992B2 (en) * 2004-03-31 2009-06-10 中国電力株式会社 Distribution automation system and power outage construction management method
JP4786346B2 (en) * 2006-01-12 2011-10-05 中国電力株式会社 Power system facility stop support system and method

Also Published As

Publication number Publication date
JP2009230447A (en) 2009-10-08

Similar Documents

Publication Publication Date Title
JP5223406B2 (en) Blackout plan management system and blackout plan management method
CN109416785B (en) Method and system for managing access to a shared database and audit trail of access
US20110029351A1 (en) Systems and Methods for Providing Compliance Functions in a Business Entity
US20080281727A1 (en) Method of applying to purchase or lease a unit in a multiunit building or building complex
WO2003093931A2 (en) System for managing real estate properties
CN107187985A (en) Method and system for monitoring elevator maintenance quality
JP2003162612A (en) Management method and management device for qualification information
KR20240149830A (en) Method and system for matching supervisor of construction
CN112991121A (en) Information-based construction management system and method for colleges and universities
US20040059583A1 (en) Temporary staff order and management system
CN115018461A (en) Financial data online reporting method, computer equipment and storage medium
JP6534141B2 (en) Budget control system, budget control method and budget control program
CN120387781A (en) Operation safety management system and equipment
CN108153621A (en) A kind of standby emergent handover management system of cloud calamity
Peiris et al. RE-engineered factory acceptance testing under the new normal
CN107886247B (en) Railway electronic operation system 46 system based on identity authentication
Ferraiolo et al. Guidelines for the authorization of personal identity verification card issuers (PCI) and derived PIV credential issuers (DPCI)
Syed Alwee et al. Comparative study of building information modeling–impacted provisions in the standard forms of construction contracts
CN120387782A (en) Method and device for generating work tickets based on work safety management system
Optimizing Organizational et al. raj
Al Bari A preview of compliance and quality control strategy in context of software as a service company, Therap Services
Xenakis et al. Lessons learned from the e-voting pilots in the United Kingdom
Azman et al. Property Management Software (PMS) Application Effect Toward Property Management Operation in Johor Bahru
KR100970691B1 (en) Control method of building management system equipped with MS system and building management system equipped with MS system
Ranjan et al. Office Management and HR Portal

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110111

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120704

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120710

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120907

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20120907

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130225

R150 Certificate of patent or registration of utility model

Ref document number: 5223406

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160322

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees