Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5226584B2 - Steel slit dam, its construction method and repair method - Google Patents
[go: Go Back, main page]

JP5226584B2 - Steel slit dam, its construction method and repair method - Google Patents

Steel slit dam, its construction method and repair method Download PDF

Info

Publication number
JP5226584B2
JP5226584B2 JP2009085224A JP2009085224A JP5226584B2 JP 5226584 B2 JP5226584 B2 JP 5226584B2 JP 2009085224 A JP2009085224 A JP 2009085224A JP 2009085224 A JP2009085224 A JP 2009085224A JP 5226584 B2 JP5226584 B2 JP 5226584B2
Authority
JP
Japan
Prior art keywords
sheath tube
peripheral surface
steel slit
gap
interposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009085224A
Other languages
Japanese (ja)
Other versions
JP2010236261A (en
Inventor
久 大隅
佐野  清
ひろし 國領
堀  謙吾
勝也 石田
一平 武田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel and Sumikin Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumikin Metal Products Co Ltd filed Critical Nippon Steel and Sumikin Metal Products Co Ltd
Priority to JP2009085224A priority Critical patent/JP5226584B2/en
Publication of JP2010236261A publication Critical patent/JP2010236261A/en
Application granted granted Critical
Publication of JP5226584B2 publication Critical patent/JP5226584B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Description

本発明は、河川の土石流、流木対策用等として好適に用いられる鋼製スリットダム及びその構築方法並びに補修方法に関するものである。   The present invention relates to a steel slit dam suitably used for debris flow in rivers, driftwood countermeasures, etc., a construction method thereof, and a repair method.

従来より、土石流発生時に河川を流れる巨礫や流木等の河川下流側への流出を防止するため、特許文献1、2に開示されたような鋼製スリットダムが提案されている。図13は、この鋼製スリットダム101の一つの実施形態を示す斜視図である。   Conventionally, steel slit dams as disclosed in Patent Documents 1 and 2 have been proposed in order to prevent outflow of boulders and driftwood flowing through the river when debris flows are generated to the downstream side of the river. FIG. 13 is a perspective view showing one embodiment of the steel slit dam 101.

この鋼製スリットダム101は、河川103の川幅方向に間隔を空けて構築されたコンクリート製の堤体105間においてその下端部が基礎コンクリート107に埋設して立設された複数の鋼管からなる支柱111と、堤体105内に埋め込まれた鞘管119と、端部115aが鞘管119内に挿入されて堤体105間に架設され支柱111に接続された複数の鋼管からなる横梁115とを備えている。   This steel slit dam 101 is a column composed of a plurality of steel pipes standing between concrete dykes 105 constructed with a gap in the river width direction of the river 103 and having their lower ends buried in the foundation concrete 107. 111, a sheath pipe 119 embedded in the bank body 105, and a cross beam 115 made of a plurality of steel pipes, the end portion 115a of which is inserted into the sheath pipe 119 and spanned between the bank body 105 and connected to the support column 111. I have.

図14は、この鞘管119内に挿入された横梁115の端部115aの構成を示す断面図である。この図14に示すように、鋼製スリットダム101は、その横梁115の端部115aが鞘管119内に単に挿入されているのみで、横梁115が鞘管119に対してボルト等で接合されておらず、横梁115と鞘管119との間に横梁115が鞘管119に対して相対移動するだけの余裕代としての間隙120が確保された構成となっている。   FIG. 14 is a cross-sectional view showing the configuration of the end 115a of the transverse beam 115 inserted into the sheath tube 119. As shown in FIG. As shown in FIG. 14, in the steel slit dam 101, the end 115a of the transverse beam 115 is simply inserted into the sheath tube 119, and the transverse beam 115 is joined to the sheath tube 119 with a bolt or the like. In other words, a gap 120 is provided between the cross beam 115 and the sheath tube 119 as a margin for the relative movement of the cross beam 115 relative to the sheath tube 119.

このため、鋼製スリットダム101の製作誤差、施工誤差があったとしても、この余裕代としての間隙120によってこれら製作誤差等を吸収し、施工性の向上を図ることが可能となっている。また、温度変化によって堤体105等を構成するコンクリートや横梁115等を構成する鋼材が伸縮した場合、横梁115の端部115aが鞘管119に対して固定されていると横梁115に温度応力が作用し、巨礫等の捕捉時に生じる静荷重や衝撃荷重等の荷重の他に過剰な応力が横梁115に作用することになるので、横梁115として大サイズ、高強度の部材が必要になってしまう。しかし、この鋼製スリットダム101においては、この余裕代としての間隙120によってコンクリート、鋼管の伸縮を吸収することができるので、温度変化による温度応力の影響を受けにくい構造となっている。   For this reason, even if there are manufacturing errors and construction errors of the steel slit dam 101, it is possible to absorb these manufacturing errors and the like by the gap 120 as a margin and improve workability. In addition, when the concrete constituting the dam body 105 or the steel material constituting the transverse beam 115 expands or contracts due to the temperature change, if the end 115a of the transverse beam 115 is fixed to the sheath tube 119, the thermal stress is applied to the transverse beam 115. In addition to excessive loads such as static loads and impact loads generated when trapping boulders and the like, excessive stress acts on the cross beam 115, so a large size and high strength member is required as the cross beam 115. . However, the steel slit dam 101 can absorb the expansion and contraction of the concrete and the steel pipe by the gap 120 as the allowance, so that the structure is not easily affected by temperature stress due to temperature change.

また、この鋼製スリットダム101は、支柱111や横梁115がそれぞれの長手方向に分割された複数の柱部材や梁部材をボルトナットによって接続して構成されている。このため、巨礫や流木等を支柱111、横梁115によって捕捉した後に、これら巨礫等の捕捉により損傷した横梁115の端部115aを交換する補修作業時において、ボルトナットを取り外して横梁115を複数の鋼管に分解して横梁115の端部115aを鞘管119内から抜き出すことによって、補修作業を容易に行うことが可能となっている。   Further, the steel slit dam 101 is configured by connecting a plurality of column members and beam members obtained by dividing the columns 111 and the horizontal beams 115 in the respective longitudinal directions by bolts and nuts. For this reason, after capturing boulders, driftwood, etc. by the columns 111 and the cross beams 115, and repairing the ends 115a of the cross beams 115 damaged by the capture of these boulders, etc., the bolts and nuts are removed to remove the cross beams 115 from the plurality of beams. By disassembling into a steel pipe and extracting the end 115a of the transverse beam 115 from the inside of the sheath pipe 119, repair work can be easily performed.

特開2007−277972号公報JP 2007-277972 A 特開2008−266981号公報JP 2008-266981 A

ところで、上述の鋼製スリットダム101は、以下に説明するような問題点を有していた。   By the way, the above-described steel slit dam 101 has the following problems.

図15(a)は、この鋼製スリットダム101の構成をモデル化した側面図である。この鋼製スリットダム101が巨礫や流木等を捕捉して、支柱111や横梁115に下流側に向けて大きな荷重が作用した場合、横梁115は、横梁115の端部115aと鞘管119との間に余裕代としての間隙120があることから、図15(b)に示すように、鞘管119に接触するまでその間隙120の分だけ下流側に移動することになる。   FIG. 15A is a side view modeling the structure of the steel slit dam 101. When the steel slit dam 101 captures boulders, driftwood, etc., and a large load acts on the support column 111 and the cross beam 115 toward the downstream side, the cross beam 115 is formed between the end portion 115a of the cross beam 115 and the sheath tube 119. Since there is a gap 120 as an allowance between them, as shown in FIG. 15B, the gap 120 moves to the downstream side until it comes into contact with the sheath tube 119.

ここで、横梁115に接続されている支柱111の変形挙動について着目すると、支柱111は、その下端部が基礎コンクリート107に埋設されていることから、横梁115が鞘管119に接触するまでは、下端側が固定端で上端側が自由端となった片持ち梁と同様の変形挙動を示すことになる。片持ち梁のような変形挙動を示す構造部材に対しては、図15(b)に示すような、固定端となっている部位近傍である支柱111の根元部111aに対して大きな曲げモーメントが作用することになる。このため、例えば、補修作業を容易に行う観点から横梁115の端部115aと鞘管119との間隙120を広めに調整した場合等においては、横梁115の下流側への変位量が大きくなる結果、支柱111の根元部111aに作用する曲げモーメントが支柱111の弾性範囲を超えて支柱111が降伏してしまう恐れがある。   Here, paying attention to the deformation behavior of the column 111 connected to the horizontal beam 115, the lower end of the column 111 is embedded in the foundation concrete 107, so that until the horizontal beam 115 contacts the sheath tube 119, Deformation behavior similar to that of a cantilever beam having a lower end side as a fixed end and an upper end side as a free end is exhibited. For a structural member that exhibits deformation behavior such as a cantilever beam, a large bending moment is applied to the root portion 111a of the column 111 in the vicinity of the fixed end as shown in FIG. Will work. For this reason, for example, when the gap 120 between the end 115a of the cross beam 115 and the sheath tube 119 is adjusted to be wide from the viewpoint of facilitating repair work, the amount of displacement of the cross beam 115 to the downstream side increases. The bending moment acting on the base portion 111a of the column 111 may exceed the elastic range of the column 111 and the column 111 may yield.

支柱111が降伏してしまうと、巨礫等の捕捉時に生じる荷重を、支柱111や横梁115を介して基礎コンクリート107と両側の堤体105とに伝達して抵抗していたものが、両側の堤体5のみにしか伝達できなくなってしまい、巨礫等を十分に捕捉できなくなってしまう恐れがある。   When the support column 111 yields, the load generated at the time of capturing boulders and the like is transmitted to the foundation concrete 107 and the embankments 105 on both sides via the support columns 111 and the cross beams 115 and resists. There is a risk that it can only be transmitted to the body 5 and the boulders cannot be captured sufficiently.

これを解決するための技術的手段として、モルタル等の経時硬化性充填材を横梁115の端部115aと鞘管119との間隙120に充填することによって横梁115の端部115aを鞘管119に対して強固に固定し、巨礫等の捕捉時において発生する支柱111の根元部111aの曲げモーメントを低減させることが考えられる。しかし、このように横梁115の端部115aを固定してしまうと、この横梁115の端部115aが鞘管119に対して相対移動するための余裕代としての間隙120がなくなってしまい、温度変化によりコンクリート、鋼材の伸縮が生じた際に温度応力が発生してしまう。また、この場合、補修作業時に横梁115を複数の鋼管に分解して横梁115の端部115aを鞘管119から抜き出すことが困難となって、補修作業時における作業性の低減を招いてしまう。   As a technical means for solving this, the end portion 115a of the transverse beam 115 is filled in the sheath tube 119 by filling a gap 120 between the end portion 115a of the transverse beam 115 and the sheath tube 119 with a curable filler such as mortar. On the other hand, it is conceivable that the bending moment of the base portion 111a of the support column 111 generated when capturing boulders or the like is firmly fixed. However, if the end portion 115a of the cross beam 115 is fixed in this way, the gap 120 as a margin for the end portion 115a of the cross beam 115 to move relative to the sheath tube 119 disappears, and the temperature changes. Due to this, when the concrete and steel materials expand and contract, temperature stress is generated. Further, in this case, it becomes difficult to disassemble the cross beam 115 into a plurality of steel pipes during the repair work and extract the end portion 115a of the cross beam 115 from the sheath pipe 119, leading to a reduction in workability during the repair work.

そこで、本発明は、上述した問題点に鑑みて案出されたものであり、その目的とするところは、鞘管内に横梁の端部を挿入する構造の鋼製スリットダムにおいて、温度変化による鋼材、コンクリートの伸縮を吸収して温度応力の発生を防止する機能を発揮しつつ、巨礫等との衝突時において支柱に作用する曲げモーメントを低減することができる鋼製スリットダム及びその構築方法並びに補修方法を提供することにある。   Therefore, the present invention has been devised in view of the above-described problems, and the object of the present invention is a steel slit dam having a structure in which an end portion of a transverse beam is inserted into a sheath tube, and a steel material due to temperature change. Steel slit dam, its construction method and repair, which can reduce the bending moment acting on the strut at the time of collision with boulders, etc. while exhibiting the function of absorbing the expansion and contraction of concrete and preventing the generation of temperature stress It is to provide a method.

本発明者は、上述した課題を解決するために、鋭意検討の末、下記の鋼製スリットダム及びその構築方法並びに補修方法を発明した。   In order to solve the above-mentioned problems, the inventor has invented the following steel slit dam, its construction method, and repair method after intensive studies.

第1の発明に係る鋼製スリットダムは、河川の川幅方向に間隔を空けて構築されたコンクリート製の堤体間に立設された支柱と、上記堤体内に埋め込まれた鞘管と、端部が上記鞘管内に挿入されて上記堤体間に架設され上記支柱に接続された横梁とを備えた鋼製スリットダムにおいて、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙に、当該鞘管の開口から抜き差し可能に介装された間隔保持部材を備えることを特徴とする。   A steel slit dam according to a first aspect of the present invention includes a column erected between concrete dam bodies constructed at intervals in the river width direction of a river, a sheath pipe embedded in the dam body, an end In a steel slit dam having a transverse beam inserted into the sheath pipe and spanned between the dam bodies and connected to the support column, a downstream outer peripheral surface of the transverse beam and a downstream inner peripheral surface of the sheath pipe And a gap maintaining member interposed so as to be inserted and removed from the opening of the sheath tube.

第2の発明に係る鋼製スリットダムは、第1の発明において、上記鞘管の下流側内周面に固着された位置決め部材を更に備え、上記間隔保持部材は、上記間隙において、少なくとも上記位置決め部材に支持されることによって介装されていることを特徴とする。   A steel slit dam according to a second invention further comprises a positioning member fixed to a downstream inner peripheral surface of the sheath tube in the first invention, and the spacing member is at least the positioning member in the gap. It is characterized by being interposed by being supported by a member.

第3の発明に係る鋼製スリットダムは、第2の発明において、上記鞘管の下流側内周面に固着された上下一対の位置決め部材を更に備え、上記間隔保持部材は、上記上下一対の位置決め部材間に介装されていることを特徴とする。   A steel slit dam according to a third aspect of the present invention is the second aspect of the invention, further comprising a pair of upper and lower positioning members fixed to the inner peripheral surface on the downstream side of the sheath tube, wherein the spacing member is the pair of upper and lower parts. It is characterized by being interposed between positioning members.

第4の発明に係る鋼製スリットダムは、第1〜第3の何れか一つの発明において、上記間隔保持部材は、上記横梁と上記鞘管との間隙に充填された弾性シール材で覆われた状態で介装されていることを特徴とする。   In a steel slit dam according to a fourth invention, in any one of the first to third inventions, the spacing member is covered with an elastic sealing material filled in a gap between the transverse beam and the sheath tube. It is characterized by being inserted in the state of being.

第5の発明に係る鋼製スリットダムは、第1〜第4の何れか一つの発明において、上記間隔保持部材は、上記鞘管の軸芯を通る水平面を間に挟んだ上下に少なくとも二つ介装されていることを特徴とする。   The steel slit dam according to a fifth invention is the steel slit dam according to any one of the first to fourth inventions, wherein the spacing member is at least two above and below sandwiching a horizontal plane passing through the axis of the sheath tube. It is characterized by being interposed.

第6の発明に係る鋼製スリットダムの構築方法は、第1〜第5の何れか一つの発明に係る鋼製スリットダムの構築方法であって、上記横梁の端部を上記鞘管内に挿入した後に、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装することを特徴とする。   The construction method of the steel slit dam according to the sixth invention is the construction method of the steel slit dam according to any one of the first to fifth inventions, wherein the end portion of the transverse beam is inserted into the sheath tube. After that, a spacing member is interposed in a gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube.

第7の発明に係る鋼製スリットダムの構築方法は、第6の発明において、上記横梁の一部を構成する端部梁部材を上記鞘管内に挿入し、上記支柱に接続した上記横梁の一部を構成する中間部梁部材に上記端部梁部材を接続した後に、上記端部梁部材の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装することを特徴とする。   According to a seventh aspect of the present invention, there is provided a method for constructing a steel slit dam according to the sixth aspect, wherein an end beam member constituting a part of the horizontal beam is inserted into the sheath tube and connected to the column. After connecting the end beam member to the intermediate beam member constituting the section, a spacing member is interposed in the gap between the downstream outer peripheral surface of the end beam member and the downstream inner peripheral surface of the sheath tube. It is characterized by that.

第8の発明に係る鋼製スリットダムの構築方法は、第6又は第7の発明において、予め準備された異なる厚みの複数の間隔保持部材から、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙の径方向長さに応じた厚みの間隔保持部材を介装することを特徴とする。   The construction method of the steel slit dam according to the eighth invention is the construction of the sixth or seventh invention, wherein the downstream outer peripheral surface of the transverse beam and the sheath tube are formed from a plurality of spacing members of different thicknesses prepared in advance. An interval holding member having a thickness corresponding to the radial length of the gap with the downstream inner peripheral surface is interposed.

第9の発明に係る鋼製スリットダムの補修方法は、第1〜第5の何れか一つの発明に係る鋼製スリットダムの損傷した横梁の端部を補修する鋼製スリットダムの補修方法であって、上記鞘管から既設の間隔保持部材を抜き出すとともに、当該鞘管から既設の横梁の端部を抜き出し、新設の横梁の端部を上記鞘管内に挿入した後に、当該横梁の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装することを特徴とする。   The steel slit dam repair method according to the ninth invention is a steel slit dam repair method for repairing the damaged beam end of the steel slit dam according to any one of the first to fifth inventions. The existing spacing member is extracted from the sheath tube, the end of the existing cross beam is extracted from the sheath tube, and the end of the new cross beam is inserted into the sheath tube, and then the outer periphery on the downstream side of the cross beam. A spacing member is interposed in the gap between the surface and the downstream inner peripheral surface of the sheath tube.

第10の発明に係る鋼製スリットダムの補修方法は、第9の発明において、上記鞘管から既設の間隔保持部材を抜き出すとともに、上記支柱に接続した上記横梁の一部を構成する既設の中間部梁部材から当該横梁の一部を構成する既設の端部梁部材を取り外して当該鞘管から抜き出し、新設の端部梁部材を上記鞘管内に挿入し、上記中間部梁部材に上記端部梁部材を接続した後に、上記端部梁部材の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装することを特徴とする。   A steel slit dam repair method according to a tenth aspect of the present invention is the ninth aspect of the present invention, in which the existing interval holding member is extracted from the sheath tube and part of the transverse beam connected to the support column is formed. Remove the existing end beam member that constitutes a part of the transverse beam from the beam member, extract it from the sheath tube, insert the new end beam member into the sheath tube, and insert the end beam member into the intermediate beam member After connecting the beam member, a spacing member is interposed in a gap between the downstream outer peripheral surface of the end beam member and the downstream inner peripheral surface of the sheath tube.

第11の発明に係る鋼製スリットダムの補修方法は、第9又は第10の発明において、予め準備された異なる厚みの間隔保持部材から、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙の径方向長さに応じた厚みの間隔保持部材を介装することを特徴とする。   A repair method for a steel slit dam according to an eleventh aspect of the invention is the ninth or tenth aspect of the invention, in which the downstream outer peripheral surface of the transverse beam and the downstream side of the sheath pipe are separated from a spacing member having different thicknesses prepared in advance. An interval holding member having a thickness corresponding to the radial length of the gap with the inner peripheral surface is interposed.

第1の発明によれば、横梁の下流側外周面と鞘管の下流側内周面との間隙に間隔保持部材が介装されているため、横梁の端部の下流側への変位量を低減することが可能となっており、これによって、支柱の根元部等に作用する曲げモーメントも抑えることが可能となる。また、本発明によれば、横梁の端部を鞘管に対して強固に固定しない構成としているため、温度変化による鋼材、コンクリートの伸縮時に、この伸縮を吸収することが可能となっている。また、本発明によれば、支柱や横梁の組み立て時においては間隔保持部材を介装しないこととして施工誤差等を吸収可能とし、組み立て後に間隔保持部材を介装することによってこれら支柱の根元部等に作用する曲げモーメントを抑えつつ温度変化による鋼材等の伸縮を吸収可能とする効果が発揮可能となる。   According to the first invention, since the spacing member is interposed in the gap between the downstream outer peripheral surface of the horizontal beam and the downstream inner peripheral surface of the sheath tube, the amount of displacement of the end portion of the horizontal beam to the downstream side is reduced. This makes it possible to reduce the bending moment acting on the base portion of the column. In addition, according to the present invention, since the end portion of the cross beam is not firmly fixed to the sheath tube, the expansion and contraction can be absorbed when the steel material and concrete expand and contract due to temperature change. In addition, according to the present invention, it is possible to absorb construction errors and the like by not interposing the spacing members when assembling the columns and cross beams, and by installing the spacing members after assembly, etc. The effect of making it possible to absorb the expansion and contraction of a steel material or the like due to a temperature change while suppressing the bending moment acting on the steel can be exhibited.

第3の発明によれば、上下の位置決め部材が間隔保持部材を正確に所定位置に介装されるように案内するガイドとして機能しているうえ、上側の間隔保持部材が、巨礫等との衝突時において間隔保持部材が浮き上がって下側の間隔保持部材から抜け落ちるのを防止する機能を発揮しており、施工性、構造信頼性の向上が図られている。   According to the third aspect of the invention, the upper and lower positioning members function as a guide for guiding the spacing member to be accurately inserted at a predetermined position, and the upper spacing member collides with a boulder or the like. At this time, the function of preventing the interval holding member from floating and falling off from the lower interval holding member is exhibited, and the workability and the structural reliability are improved.

第4の発明によれば、弾性シール材によって鞘管内に水が浸入することによる鞘管や横梁の端部の腐食を防止しつつ、間隔保持部材のずれ動きや抜け落ちをほぼ確実に防止することが可能となる。   According to the fourth aspect of the present invention, it is possible to almost certainly prevent the gap holding member from moving and falling off while preventing corrosion of the end portions of the sheath tube and the transverse beam due to water entering the sheath tube by the elastic sealing material. Is possible.

第5の発明によれば、横梁の端部の下流側への変位量を低減するとの効果を安定して発揮することが可能となる。   According to the fifth aspect, it is possible to stably exhibit the effect of reducing the amount of displacement of the end portion of the cross beam toward the downstream side.

本発明に係る鋼製スリットダムの構成を示す斜視図である。It is a perspective view which shows the structure of the steel slit dam which concerns on this invention. 本発明に係る鋼製スリットダムの構成を示す正面断面図である。It is front sectional drawing which shows the structure of the steel slit dam which concerns on this invention. 図2におけるS1部の拡大図である。It is an enlarged view of S1 part in FIG. 図3におけるA−A線断面図である。It is the sectional view on the AA line in FIG. (a)は図4におけるS2部の拡大図であり、(b)は図4におけるS3部の拡大図である。(A) is an enlarged view of S2 part in FIG. 4, (b) is an enlarged view of S3 part in FIG. 鞘管内に間隔保持部材や横梁を設ける前の状態を示す分解斜視図である。It is a disassembled perspective view which shows the state before providing a space | interval holding member and a cross beam in a sheath pipe. 本発明に係る鋼製スリットダムの構築方法の一例について説明するための正面断面図である。It is front sectional drawing for demonstrating an example of the construction method of the steel slit dam which concerns on this invention. 本発明に係る鋼製スリットダムの構築方法の一例について説明するための部分拡大図である。It is the elements on larger scale for demonstrating an example of the construction method of the steel slit dam which concerns on this invention. 本発明に係る鋼製スリットダムの構築方法において鞘管内に間隔保持部材を介装する際の手順について説明するための断面図である。It is sectional drawing for demonstrating the procedure at the time of inserting a space | interval holding member in a sheath pipe in the construction method of the steel slit dam which concerns on this invention. 本発明に係る鋼製スリットダムの補修方法について説明するための正面断面図である。It is front sectional drawing for demonstrating the repair method of the steel slit dam which concerns on this invention. (a)は本発明に係る鋼製スリットダムの第2実施形態を示す正面断面図であり、(b)は(a)のB−B線断面図である。(A) is front sectional drawing which shows 2nd Embodiment of the steel slit dam which concerns on this invention, (b) is BB sectional drawing of (a). 本発明に係る鋼製スリットダムの第3実施形態を示す断面図である。It is sectional drawing which shows 3rd Embodiment of the steel slit dam which concerns on this invention. 従来の鋼製スリットダムの構成を示す斜視図である。It is a perspective view which shows the structure of the conventional steel slit dam. 従来の鋼製スリットダムにおける鞘管内の横梁の構成を示す断面図である。It is sectional drawing which shows the structure of the cross beam in a sheath pipe in the conventional steel slit dam. 従来の鋼製スリットダムの構成をモデル化した側面図である。It is the side view which modeled the structure of the conventional steel slit dam.

以下、本発明を実施するための形態として、河川等に適用される鋼製スリットダム及びその構築方法並びに補修方法について、図面を参照しながら詳細に説明する。   Hereinafter, as a form for carrying out the present invention, a steel slit dam applied to a river or the like, a construction method thereof, and a repair method will be described in detail with reference to the drawings.

図1は、本発明に係る鋼製スリットダム1の構成を示す斜視図であり、図2は、その正面断面図であり、図3は、図2のS1部の拡大図である。   FIG. 1 is a perspective view showing a configuration of a steel slit dam 1 according to the present invention, FIG. 2 is a front sectional view thereof, and FIG. 3 is an enlarged view of a portion S1 in FIG.

本発明を適用した鋼製スリットダム1は、例えば、図1、図2に示すような河川3に適用されるものである。この河川3には、河床4上に基礎コンクリート7が構築され、更に、川幅方向に間隔を空けて複数のコンクリート製の堤体5が構築される。この河川3は、これらの複数の堤体5及び基礎コンクリート7で囲まれることによって形成された流路3aを水が上流から下流にかけて流れていくものである。   The steel slit dam 1 to which the present invention is applied is applied to a river 3 as shown in FIGS. 1 and 2, for example. In this river 3, foundation concrete 7 is constructed on the river bed 4, and a plurality of concrete dam bodies 5 are constructed at intervals in the river width direction. In the river 3, water flows from the upstream side to the downstream side in the flow path 3 a formed by being surrounded by the plurality of levee bodies 5 and the foundation concrete 7.

本発明を適用した鋼製スリットダム1は、複数の堤体5間において立設された支柱11と、堤体5内に埋め込まれた鞘管19と、両側の端部15aが鞘管19内に挿入されて複数の堤体5間に架設され支柱11に接続された横梁15とを備えている。   A steel slit dam 1 to which the present invention is applied includes a column 11 erected between a plurality of dam bodies 5, a sheath pipe 19 embedded in the dam body 5, and end portions 15a on both sides within the sheath pipe 19. And a horizontal beam 15 which is installed between the plurality of dam bodies 5 and connected to the support column 11.

支柱11は、河川3の川幅方向に間隔を空けて略鉛直に複数立設されている。各支柱11は、例えば、鋼管等からなる複数の柱部材12、13によって構成されるものであり、一つの支柱11は、本実施形態において、基礎コンクリート7に埋設された基礎部柱部材12と、基礎部柱部材12や横梁15に上下両側が接続された中間部柱部材13とから構成されている。本実施形態において支柱11は、河川3の川幅方向に三つ立設されている。   A plurality of pillars 11 are provided substantially vertically at intervals in the river width direction of the river 3. Each support | pillar 11 is comprised by the some pillar members 12 and 13 which consist of steel pipes etc., for example, and one support | pillar 11 is the base part pillar member 12 embed | buried in the foundation concrete 7 in this embodiment. The intermediate portion column member 13 is connected to the base portion column member 12 and the cross beam 15 on both upper and lower sides. In the present embodiment, three struts 11 are erected in the river width direction of the river 3.

横梁15は、高さ方向に間隔を空けて略水平に複数架設されている。各横梁15は、例えば、鋼管等からなる複数の梁部材16、17によって構成されるものであり、一つの横梁15は、本実施形態において、川幅方向両側の鞘管19に挿入された端部梁部材16と、川幅方向に間隔を空けた二つの端部梁部材16に左右両側が接続された中間部梁部材17とから構成されている。本実施形態において横梁15は、高さ方向に二つ架設されている。   A plurality of horizontal beams 15 are installed substantially horizontally at intervals in the height direction. Each transverse beam 15 is constituted by a plurality of beam members 16 and 17 made of, for example, steel pipes, and one transverse beam 15 is an end portion inserted into the sheath tube 19 on both sides in the river width direction in this embodiment. It consists of a beam member 16 and an intermediate beam member 17 whose left and right sides are connected to two end beam members 16 spaced in the river width direction. In the present embodiment, two horizontal beams 15 are installed in the height direction.

本実施形態における二つの中間部梁部材17には、T字状又は十字状に交差するように上下の一方又は両側に分枝された分枝管17aが間隔をおいて複数設けられている。支柱11を構成する各中間部柱部材13は、この中間部梁部材17の分枝管17aに接続されている。   The two intermediate beam members 17 in this embodiment are provided with a plurality of branch pipes 17a that are branched on one or both sides of the upper and lower sides so as to intersect in a T shape or a cross shape. Each intermediate column member 13 constituting the column 11 is connected to the branch pipe 17 a of the intermediate beam member 17.

支柱11や横梁15を構成する鋼管からなる各柱部材12、13、梁部材16、17、分枝管17aは、その一端又は両端にフランジ18が取り付けられており、そのフランジ18を互いに接続すべき他の部材におけるフランジ18に当接させて、これらフランジ18をボルト接合することによって着脱可能に互いに接続されている。なお、これら支柱11や横梁15を構成する部材間の接続方法は、フランジ18を用いた如何なる方法を適用してもよいし、フランジ18を形成しないこととして溶接等で接続することとしてもよいが、鋼製スリットダム1の構築作業、補修作業を容易に行う観点からボルト接合によって着脱可能に接続する方法を適用することが好ましい。   Each column member 12 and 13, the beam members 16 and 17, and the branch pipe 17a which consist of the steel pipe which comprises the support | pillar 11 and the cross beam 15 have the flange 18 attached to the one end or both ends, and connect the flange 18 mutually. The flanges 18 of the other members are brought into contact with the flanges 18 and bolted to the flanges 18 so as to be detachably connected to each other. In addition, as a connection method between the members constituting the support column 11 and the cross beam 15, any method using the flange 18 may be applied, or connection may be performed by welding or the like without forming the flange 18. From the viewpoint of facilitating construction work and repair work of the steel slit dam 1, it is preferable to apply a method of detachably connecting by bolt joining.

支柱11及び横梁15は、格子状構造をなすように接続されており、これによって、河川3を流れる巨礫や流木等を捕捉可能に構成されている。   The support column 11 and the cross beam 15 are connected so as to form a lattice-like structure, and thereby configured to be able to capture boulders, driftwood, and the like flowing in the river 3.

図4は、図3のA−A線断面図である。また、図5(a)は図4のS2部の拡大図であり、図5(b)は図4のS3部の拡大図である。また、図6は、鞘管19内に間隔保持部材21や横梁15を設ける前の状態を示す分解斜視図である。   4 is a cross-sectional view taken along line AA in FIG. 5A is an enlarged view of a portion S2 in FIG. 4, and FIG. 5B is an enlarged view of a portion S3 in FIG. FIG. 6 is an exploded perspective view showing a state before the spacing member 21 and the cross beam 15 are provided in the sheath tube 19.

本発明に係る鋼製スリットダム1は、図3、図4に示すように、横梁15の下流側外周面15bと鞘管19の下流側内周面19bとの間隙20に介装された間隔保持部材21と、鞘管19の下流側内周面19bに固着された上下一対の位置決め部材23、24とを更に備えている。   As shown in FIGS. 3 and 4, the steel slit dam 1 according to the present invention is disposed in a gap 20 between the downstream outer peripheral surface 15 b of the cross beam 15 and the downstream inner peripheral surface 19 b of the sheath tube 19. The holding member 21 and a pair of upper and lower positioning members 23 and 24 fixed to the downstream inner peripheral surface 19b of the sheath tube 19 are further provided.

鞘管19は、堤体5間の流路3aに向けて開口されるように堤体5内に埋め込まれており、例えば、鋼管等から構成される。鞘管19は、その内側に横梁15の端部15aが挿入されるものであり、本実施形態においては、横梁15の一部を構成する端部梁部材16が挿入されている。鞘管19内にその端部15aが挿入される横梁15は、支柱11によって支持されており、図3、図4に示すように鞘管19に対して径方向又は軸方向に接触していなくともよいし、一部で接触していてもよい。   The sheath pipe 19 is embedded in the bank body 5 so as to be opened toward the flow path 3a between the bank bodies 5, and is made of, for example, a steel pipe. The end portion 15a of the cross beam 15 is inserted inside the sheath tube 19, and in this embodiment, the end beam member 16 constituting a part of the cross beam 15 is inserted. The cross beam 15 into which the end portion 15a is inserted into the sheath tube 19 is supported by the column 11, and is not in contact with the sheath tube 19 in the radial direction or the axial direction as shown in FIGS. Or you may contact in part.

間隔保持部材21は、巨礫等を捕捉することによって横梁15が下流側に変位しようとした際に、その横梁15の端部15aの鞘管19に対する間隔が変位し過ぎないようこの間隔を保持するために介装されるものである。間隔保持部材21は、例えば、鋼板を切断して直方体状にした鋼製部材から構成されるものであるが、材質については、ある程度の強度、剛性が確保できれば特に限定するものではなく、例えば、鉄系金属、非鉄系金属、プラスチック、硬質ゴム、木材等から構成されていてもよい。また、間隔保持部材21の断面形状についても特に限定するものではない。   The spacing member 21 holds the spacing so that the spacing of the end 15a of the transverse beam 15 relative to the sheath tube 19 is not displaced too much when the transverse beam 15 is about to be displaced downstream by capturing boulders or the like. For the purpose. The spacing member 21 is composed of, for example, a steel member obtained by cutting a steel plate into a rectangular parallelepiped shape. However, the material is not particularly limited as long as a certain degree of strength and rigidity can be secured. You may be comprised from a ferrous metal, a nonferrous metal, a plastic, hard rubber, wood, etc. Further, the cross-sectional shape of the spacing member 21 is not particularly limited.

また、間隔保持部材21は、巨礫等の捕捉時に生じる横梁15への静荷重、衝撃荷重等の荷重をこの間隔保持部材21を介して堤体5へ伝達するものであるため、横梁15から下流側に向けて荷重が負荷された場合に横梁15より早期に座屈するのを防止するため、横梁15の圧縮強度と同程度又はこれ以上の圧縮強度があることが好ましい。例えば、横梁15を圧縮強度が200N/mmの鋼材から構成した場合、間隔保持部材21についてもこの圧縮強度と同程度の鋼材から構成すればよい。 Further, since the spacing member 21 transmits a load such as a static load or an impact load on the cross beam 15 generated when capturing boulders or the like to the dam body 5 via the spacing member 21, the spacing member 21 is downstream from the cross beam 15. In order to prevent buckling earlier than the lateral beam 15 when a load is applied toward the side, it is preferable that the compressive strength is equal to or higher than the compressive strength of the lateral beam 15. For example, when the cross beam 15 is made of a steel material having a compressive strength of 200 N / mm 2 , the spacing member 21 may be made of a steel material having the same degree as this compressive strength.

上下一対の位置決め部材23、24のうち下側の位置決め部材23は、その上に載置される間隔保持部材21が鞘管19と横梁15との間において落下するのを防止して、間隔保持部材21が所定位置に介装されるようにするために固着されるものである。間隔保持部材21は、この位置決め部材23や鞘管19又は横梁15に支持されることによって介装された状態となる。   The lower positioning member 23 of the pair of upper and lower positioning members 23, 24 prevents the interval holding member 21 placed thereon from falling between the sheath tube 19 and the cross beam 15, thereby holding the interval. The member 21 is fixed so as to be interposed at a predetermined position. The spacing member 21 is interposed by being supported by the positioning member 23, the sheath tube 19, or the cross beam 15.

本実施形態においては、一つの鞘管19内に二つの間隔保持部材21が介装されているが、この支持態様について図の例で説明すると、上側の間隔保持部材21は、図5(a)に示すように、下側の位置決め部材23及び横梁15に係合されてその位置決め部材23と横梁15との間から下側に抜け落ちないよう支持されている。また、下側の間隔保持部材21は、図5(b)に示すように下側の位置決め部材23及び鞘管19に係合されてその位置決め部材23と横梁15との間から下側に抜け落ちないよう支持されている。このように、間隔保持部材21は、少なくとも位置決め部材23に支持されることによって介装されていればよい。   In the present embodiment, two spacing members 21 are interposed in one sheath tube 19, but this support mode will be described with reference to the example of the drawing. The spacing member 21 on the upper side is shown in FIG. ), The lower positioning member 23 and the cross beam 15 are engaged with each other and supported so as not to fall down between the positioning member 23 and the cross beam 15. Further, as shown in FIG. 5 (b), the lower spacing member 21 is engaged with the lower positioning member 23 and the sheath tube 19, and falls down from between the positioning member 23 and the cross beam 15. It is supported not to. As described above, the spacing member 21 only needs to be interposed by being supported by at least the positioning member 23.

下側の位置決め部材23に支持されている間隔保持部材21は、その位置決め部材23に対して支承された状態となっており、鞘管19の開口19aから抜き差し可能な状態で介装されている。間隔保持部材21が介装される鞘管19内の軸方向での位置は、鞘管19の開口19aから容易に抜き差しする観点から、図3に示すように鞘管19内の開口19a寄りに介装されていることが好ましいが、特にこれに限定するものではない。   The spacing member 21 supported by the lower positioning member 23 is in a state of being supported with respect to the positioning member 23 and is interposed in a state where it can be inserted and removed from the opening 19 a of the sheath tube 19. . The position in the axial direction in the sheath tube 19 in which the spacing member 21 is interposed is close to the opening 19a in the sheath tube 19 as shown in FIG. Although it is preferable to be interposed, it is not limited to this.

また、間隔保持部材21の軸方向長さは特に限定するものではないが、あまりに短過ぎるとその位置が安定せず、あまりに長すぎると端部梁部材16と中間部梁部材17とを接続しているフランジ18が邪魔となって鞘管19の開口19aから抜き差しするのが困難となってしまう。このため、間隔保持部材21の軸方向長さは、このことを考慮したうえで適宜設定すればよく、例えば、50〜100mm程度とすることが好ましい。本実施形態においては、鞘管19の軸方向長さを1900mm程度とし、間隔保持部材21の軸方向長さを100mm程度としている。   The axial length of the spacing member 21 is not particularly limited, but if it is too short, the position thereof is not stable, and if it is too long, the end beam member 16 and the intermediate beam member 17 are connected. It becomes difficult to insert and remove from the opening 19a of the sheath tube 19 because the flange 18 is obstructed. For this reason, the axial length of the spacing member 21 may be appropriately set in consideration of this, and is preferably about 50 to 100 mm, for example. In the present embodiment, the axial length of the sheath tube 19 is about 1900 mm, and the axial length of the spacing member 21 is about 100 mm.

上側の位置決め部材24は、間隔保持部材21を鞘管19の開口19aから抜き差しするうえで、下側の位置決め部材23とともに間隔保持部材21が正確に所定位置に介装されるように案内するガイドとして機能しており、間隔保持部材21は、上下一対の位置決め部材23、24間に介装されることになる。また、上側の位置決め部材24は、支柱11や横梁15に巨礫等が衝突して衝撃荷重が間隔保持部材21まで伝達した際に、間隔保持部材21が浮き上がって下側の位置決め部材23から抜け落ちるのを防止する機能も発揮している。このように、上側の位置決め部材24を設けることによって、施工性、構造信頼性の向上が図れるが、これを設けることは必須とはならず、下側の位置決め部材23のみ設けることとしてもよい。   The upper positioning member 24 guides the spacing member 21 together with the lower positioning member 23 so that the spacing member 21 is accurately inserted at a predetermined position when the spacing member 21 is inserted into and removed from the opening 19a of the sheath tube 19. The interval holding member 21 is interposed between a pair of upper and lower positioning members 23 and 24. Further, when the boulder or the like collides with the support column 11 or the cross beam 15 and the impact load is transmitted to the interval holding member 21, the upper positioning member 24 floats and falls off the lower positioning member 23. It also has a function to prevent this. Thus, by providing the upper positioning member 24, it is possible to improve the workability and the structural reliability. However, it is not essential to provide this, and only the lower positioning member 23 may be provided.

鞘管19には、図3、図6に示すように、上下一対の位置決め部材23、24よりもその鞘管19の奥側にストッパ部材25が固着されている。このストッパ部材25は、板状部材等からなるものであり、一対の位置決め部材23、24間に間隔保持部材21を差し込む場合に、この差し込まれる間隔保持部材21と接触して鞘管19の奥側に過度に差し込まれるのを防止するものである。ストッパ部材25を設けることは、必須とはならない。   As shown in FIGS. 3 and 6, a stopper member 25 is fixed to the sheath tube 19 on the back side of the sheath tube 19 with respect to the pair of upper and lower positioning members 23 and 24. The stopper member 25 is composed of a plate-like member or the like. When the interval holding member 21 is inserted between the pair of positioning members 23 and 24, the stopper member 25 comes into contact with the inserted interval holding member 21 and the back of the sheath tube 19. It is intended to prevent excessive insertion into the side. Providing the stopper member 25 is not essential.

上下一対の位置決め部材23、24やストッパ部材25は、例えば、本実施形態のような鋼製の板状部材を鞘管19に対して溶接することによって固着されるものであるが、その断面形状、材質、固着方法については特に限定するものではない。   The pair of upper and lower positioning members 23 and 24 and the stopper member 25 are, for example, fixed by welding a steel plate-like member as in the present embodiment to the sheath tube 19, but its cross-sectional shape The material and the fixing method are not particularly limited.

上下一対の位置決め部材23、24やストッパ部材25は、横梁15の下流側外周面と鞘管19の下流側内周面19bとの間隙20において介装すべき間隔保持部材21の数に応じた数だけ鞘管19に固着されていればよく、鞘管19を施工現場に搬送する前段階から固着されていてもよいし、施工現場において固着するようにしてもよい。   The pair of upper and lower positioning members 23 and 24 and the stopper member 25 correspond to the number of spacing members 21 to be interposed in the gap 20 between the downstream outer peripheral surface of the cross beam 15 and the downstream inner peripheral surface 19b of the sheath tube 19. It is sufficient that the sheath tube 19 is fixed to the number of the sheath tube 19, and the sheath tube 19 may be fixed from the previous stage of transporting the sheath tube 19 to the construction site, or may be fixed on the construction site.

このような構成からなる本発明に係る鋼製スリットダム1の支柱11や横梁15によって、河川3を上流側から下流側にかけて流れる巨礫や流木等を捕捉した場合、巨礫等からの静荷重、衝撃荷重等の荷重を支柱11や横梁15を介して基礎コンクリート7や両側の堤体5に伝達することによってこの荷重に抵抗することになる。この場合に、巨礫等からの荷重が鞘管19を介して堤体5に伝達可能となるまで横梁15が下流側に移動しようとすることになる。   When boulders and driftwood flowing from the upstream side to the downstream side of the river 3 are captured by the struts 11 and the cross beams 15 of the steel slit dam 1 according to the present invention having such a configuration, static loads and impacts from the boulders etc. A load such as a load is transmitted to the foundation concrete 7 and the dam bodies 5 on both sides via the support 11 and the cross beam 15 to resist the load. In this case, the horizontal beam 15 tends to move downstream until a load from a boulder or the like can be transmitted to the levee body 5 through the sheath pipe 19.

ここで、本発明に係る鋼製スリットダム1は、横梁15の下流側外周面15bと鞘管19の下流側内周面19bとの間隙20において間隔保持部材21が介装されているため、横梁15の端部15aの下流側への変位量を低減することが可能となっており、これによって、横梁15に接続されている支柱11の下流側への変位量も低減することが可能となっている。このため、支柱11の根元部11a等に作用する曲げモーメントも抑えることができ、その結果、巨礫等を捕捉した場合でも支柱11が降伏する恐れを大幅に低減することが可能となる。   Here, in the steel slit dam 1 according to the present invention, the spacing member 21 is interposed in the gap 20 between the downstream outer peripheral surface 15b of the cross beam 15 and the downstream inner peripheral surface 19b of the sheath tube 19, It is possible to reduce the amount of displacement of the end portion 15a of the cross beam 15 to the downstream side, thereby reducing the amount of displacement of the column 11 connected to the cross beam 15 to the downstream side. It has become. For this reason, the bending moment which acts on the base part 11a etc. of the support | pillar 11 can also be suppressed, As a result, even when a boulder etc. are captured, the possibility that the support | pillar 11 yields can be reduced significantly.

また、本発明に係る鋼製スリットダム1は、横梁15と鞘管19との間隙のうち、横梁15の下流側外周面15bと鞘管19の下流側内周面19bとの間隙20に間隔保持部材21を介装する構成としており、横梁15の端部15aを鞘管19に対して強固に固定しない構成としているため、温度変化による鋼材、コンクリートの伸縮時において、例えば、横梁15の上流側外周面15cと鞘管19の上流側内周面19cとの間の間隙26や、横梁15の軸方向端部15dと鞘管19の奥端部19dとの間の間隙28等でこの伸縮を吸収することが可能となっている。このため、支柱11の根元部11a等に作用する曲げモーメントを抑えつつも、温度変化による鋼材、コンクリートの伸縮を吸収して温度応力の発生を防止する機能を発揮することが可能となっている。   Further, the steel slit dam 1 according to the present invention is spaced from the gap 20 between the transverse beam 15 and the sheath tube 19 to the gap 20 between the downstream outer peripheral surface 15b of the transverse beam 15 and the downstream inner peripheral surface 19b of the sheath tube 19. Since the holding member 21 is interposed and the end portion 15a of the cross beam 15 is not firmly fixed to the sheath tube 19, when the steel material or concrete expands or contracts due to temperature change, for example, upstream of the cross beam 15 This expansion / contraction is performed by a gap 26 between the side outer peripheral surface 15c and the upstream inner peripheral surface 19c of the sheath tube 19, a gap 28 between the axial end portion 15d of the cross beam 15 and the rear end portion 19d of the sheath tube 19, or the like. Can be absorbed. For this reason, while suppressing the bending moment which acts on the base part 11a etc. of the support | pillar 11, it is possible to exhibit the function which absorbs the expansion-contraction of the steel materials and concrete by a temperature change, and prevents generation | occurrence | production of a temperature stress. .

なお、一つの鞘管19につき間隔保持部材21が介装される数は、特段限定するものではなく、一つのみ介装されていてもよい。また、間隔保持部材21を二つ以上介装するうえでは、以下に説明する理由により、図4に示すように、横梁15の端部15aと鞘管19との間隙20において、鞘管19の軸芯Gを通る仮想的な水平面P1を間に挟んだ上下にそれぞれ少なくとも一つずつ介装されていることが好ましい。   In addition, the number of the interval holding members 21 interposed per one sheath tube 19 is not particularly limited, and only one may be interposed. Further, when two or more spacing members 21 are interposed, as shown in FIG. 4, the gap between the end portion 15 a of the cross beam 15 and the sheath tube 19 is formed in the sheath tube 19 for the reason described below. It is preferable that at least one piece is interposed above and below the virtual horizontal plane P1 passing through the axis G.

鞘管19に挿入されている横梁15に対して巨礫等が衝突する場合、これら巨礫等は横梁15に対して上流側の上下様々な位置から衝突する。このため、巨礫等との衝突によって衝突荷重が負荷された際に、下流側に向かう水平方向のみならず水平面に対して上下に傾斜した下流側に向かう様々な方向に横梁15の端部15aが鞘管19内で移動しようとすることになる。ここで、上述のような条件で二つの間隔保持部材21が介装されていれば、下流側に向かう様々な方向に移動しようとする横梁15の端部15aの変位量を低減するとの効果を安定して発揮することが可能となる。   When boulders or the like collide with the cross beam 15 inserted in the sheath tube 19, these boulders or the like collide with the cross beam 15 from various positions on the upstream side. For this reason, when a collision load is applied due to a collision with a boulder or the like, the end portions 15a of the cross beam 15 are not only in the horizontal direction toward the downstream side but also in various directions toward the downstream side inclined up and down with respect to the horizontal plane. An attempt is made to move within the sheath tube 19. Here, if the two spacing members 21 are interposed under the above-described conditions, the effect of reducing the amount of displacement of the end portion 15a of the cross beam 15 that is going to move in various directions toward the downstream side is achieved. It becomes possible to demonstrate stably.

また、間隔保持部材21は、この鞘管19の軸芯Gを通る水平面P1に対して、その軸芯Gを中心として上下両側に45°傾斜した仮想的な面を傾斜面P2、P3と定義した場合に、これら傾斜面P2、P3間の範囲内に含まれるように介装されていることが好ましい。この範囲を超えるような位置に間隔保持部材21が介装されていると、上述のような下流側に向かう様々な方向に移動しようとする横梁15の端部15aの変位量を安定して低減するとの効果を発揮しにくくなるためである。   In addition, the spacing member 21 defines, as inclined planes P2 and P3, virtual planes that are inclined at 45 ° upward and downward with respect to the horizontal plane P1 passing through the axis G of the sheath tube 19 around the axis G. In such a case, it is preferable to be interposed so as to be included in the range between the inclined surfaces P2 and P3. If the spacing member 21 is interposed at a position that exceeds this range, the amount of displacement of the end 15a of the cross beam 15 that attempts to move in various directions toward the downstream side as described above can be stably reduced. This is because it becomes difficult to exert the effect.

また、本発明における間隔保持部材21は、図5に示すように、その間隔保持部材21と横梁15や鞘管19との間において隙間27が形成されていてもよいが、この隙間27が小さければ小さいほど、横梁15の端部15aの下流側への変位を抑えることが可能となるので好ましい。なお、この隙間27が零となるように調整していてもよいのは勿論である。   Further, as shown in FIG. 5, the gap holding member 21 in the present invention may have a gap 27 between the gap holding member 21 and the cross beam 15 or the sheath tube 19, but the gap 27 may be small. The smaller it is, the more preferable it is possible to suppress the downstream displacement of the end 15a of the cross beam 15. Of course, the clearance 27 may be adjusted to be zero.

この隙間27の径方向長さL1は、巨礫等を捕捉して横梁15の端部15aが鞘管19内において下流側に変位しようとした場合に、横梁15に接続されている支柱11の変位量が弾性範囲内となるように調整されていればよい。この隙間27の径方向長さL1は、例えば、3mm以下となるように調整することが好ましく、これによって支柱11や横梁15の寸法、強度に依らず安定して支柱11の根元部11a等の降伏を防ぐことが可能となる。これは、本発明者らが行なった実験的な知見に基づくものである。   The radial length L1 of the gap 27 is the displacement of the column 11 connected to the horizontal beam 15 when the end 15a of the horizontal beam 15 is to be displaced downstream in the sheath pipe 19 by capturing boulders and the like. It is sufficient that the amount is adjusted to be within the elastic range. The radial length L1 of the gap 27 is preferably adjusted to be, for example, 3 mm or less, so that the base 11a and the like of the column 11 can be stably stabilized regardless of the size and strength of the column 11 and the cross beam 15. It is possible to prevent surrender. This is based on experimental findings made by the present inventors.

なお、この隙間27の径方向長さL1を調整するうえでは、鋼製スリットダム1の構築作業、補修作業時において、例えば3mmピッチのような所定ピッチで厚みの異なる複数の間隔保持部材21を予め準備しておくことが好ましい。これによって、この複数の間隔保持部材21から、鞘管19内に横梁15の端部15aを挿入した後に形成される鞘管19と横梁15の端部15aとの間隙20の径方向長さに応じて、この間隙20の径方向長さに最も近く、これよりも薄い間隔保持部材21を介装することにより、この隙間27の径方向長さL1を常に3mm以下のような一定値以下に抑えることが可能となる。   In adjusting the radial length L1 of the gap 27, when the steel slit dam 1 is constructed and repaired, a plurality of spacing members 21 having different thicknesses at a predetermined pitch such as 3 mm pitch are provided. It is preferable to prepare in advance. Accordingly, the radial length of the gap 20 between the sheath tube 19 and the end portion 15a of the cross beam 15 formed after the end portion 15a of the cross beam 15 is inserted into the sheath tube 19 from the plurality of spacing members 21. Correspondingly, by interposing a gap holding member 21 that is closest to the radial direction length of the gap 20 and is thinner than this, the radial length L1 of the gap 27 is always kept below a certain value such as 3 mm or less. It becomes possible to suppress.

また、高さ方向に複数架設されている横梁15で巨礫等を捕捉した場合、支柱11の根元部11aの曲げモーメントにその水平方向変位量が最も大きく影響しているのは、複数架設されている横梁15のうちの最も低位置にある横梁15となる。即ち、複数架設されている横梁15のうちのそれぞれのみが水平方向に一定量変位すると仮定すると、変位すると仮定したものが下側となるにつれて、支柱11の鉛直面に対する傾斜角が大きなものとなり、支柱11の根元部11aに作用する曲げモーメントが大きくなる。このため、高さ方向の低位置側にある横梁15の端部15aと鞘管19との間にのみ間隔保持部材21を介装し、高さ方向の高位置側にある横梁15の端部15aと鞘管19との間には間隔保持部材21を介装しないこととしてもよい。これによって、間隔保持部材21の介装に要する部材数、作業工程数を低減して、施工コスト、施工期間の低減を図ることが可能となる。   In addition, when boulders and the like are captured by a plurality of horizontal beams 15 installed in the height direction, the horizontal displacement amount has the greatest influence on the bending moment of the base portion 11a of the support column 11 because a plurality of installed beams are installed. It becomes the horizontal beam 15 in the lowest position among the horizontal beams 15 that are present. That is, if it is assumed that only each of the plurality of transverse beams 15 is displaced by a certain amount in the horizontal direction, the inclination angle with respect to the vertical surface of the column 11 becomes larger as the one assumed to be displaced becomes lower, The bending moment acting on the root portion 11a of the column 11 is increased. For this reason, the spacing member 21 is interposed only between the end portion 15a of the cross beam 15 on the low position side in the height direction and the sheath tube 19, and the end portion of the cross beam 15 on the high position side in the height direction. The spacing member 21 may not be interposed between 15a and the sheath tube 19. As a result, it is possible to reduce the number of members and the number of work steps required for interposing the interval holding member 21, thereby reducing the construction cost and the construction period.

また、間隔保持部材21を所定位置に介装した状態を保持できるようであれば、下側の位置決め部材23がなくともよい。   Further, the lower positioning member 23 may not be provided as long as the state in which the interval holding member 21 is interposed at a predetermined position can be held.

次に、このような構成からなる鋼製スリットダム1の構築方法の一例について説明する。図7はこの構築方法の手順について説明するための正面断面図であり、図8はこの構築方法の手順について説明するための部分拡大図であり、図9は鞘管19内に間隔保持部材21を介装する際の手順について説明するための断面図である。   Next, an example of a construction method of the steel slit dam 1 having such a configuration will be described. FIG. 7 is a front sectional view for explaining the procedure of this construction method, FIG. 8 is a partially enlarged view for explaining the procedure of this construction method, and FIG. It is sectional drawing for demonstrating the procedure at the time of interposing.

まず、鋼製スリットダム1を構築すべき用地において、河床4の床堀及び整地を行ない、その後に、図7(a)に示すように、河床4上にコンクリートを打設することによって基礎コンクリート7及び堤体5を構築する。基礎コンクリート7の構築時においては、支柱11を構成する基礎部柱部材12が所定位置に埋め込まれるようにコンクリートを打設し、堤体5の構築時においては、鞘管19が所定位置に埋め込まれるようにコンクリートを打設する。基礎コンクリート7や堤体5を構築する順序については特に限定するものではない。また、堤体5を構築するうえでは、予め立方格子状をなすように型鋼等を組んだ補強構造物を河床4上又は基礎コンクリート7上に設置し、補強構造物上に鞘管19を支持させた状態でコンクリートを打設するようにしてもよい。   First, in the site where the steel slit dam 1 is to be constructed, the floor moat and leveling of the river bed 4 are performed, and then the concrete is placed on the river bed 4 as shown in FIG. 7 (a). 7 and the bank 5 are constructed. When the foundation concrete 7 is constructed, the concrete is placed so that the foundation column member 12 constituting the column 11 is embedded in a predetermined position, and when the dam body 5 is constructed, the sheath pipe 19 is embedded in the predetermined position. Concrete is placed so that The order in which the foundation concrete 7 and the bank body 5 are constructed is not particularly limited. In constructing the levee body 5, a reinforced structure in which steel plates or the like are previously assembled in a cubic lattice shape is installed on the river bed 4 or the foundation concrete 7, and the sheath pipe 19 is supported on the reinforced structure. You may make it cast concrete in the state made to do.

続いて、図7(a)に示すように、構築された堤体5内に埋め込まれた鞘管19内に、その開口19aから横梁15の端部15aを挿入する。本実施形態においては、横梁15の一部を構成する端部梁部材16を鞘管19内に挿入することになる。   Subsequently, as shown in FIG. 7A, the end portion 15a of the cross beam 15 is inserted from the opening 19a into the sheath pipe 19 embedded in the constructed dyke body 5. In the present embodiment, the end beam member 16 constituting a part of the horizontal beam 15 is inserted into the sheath tube 19.

続いて、図7(b)において二点鎖線で示すような、支柱11の一部を構成する中間部柱部材13や横梁15の一部を構成する中間部梁部材17を基礎部柱部材12に対して順に接続して、支柱11や横梁15を組み立てていく。ここで、端部梁部材16は、その端部梁部材16と接続すべき中間部柱部材13が支柱11に接続された後にその中間部柱部材13に接続し、それまでは鞘管19との間に間隔保持部材21を介装せずに鞘管19内に載置させておく。これによって、鋼製スリットダム1の構築時に基礎コンクリート7や支柱11、横梁15等による施工誤差、製作誤差があったとしても、間隔保持部材21が介装されていない分だけ広めの余裕代としての間隙が鞘管19と横梁15の端部15aとの間にあり、この間隙によってこれら施工誤差等を吸収し、施工性の向上が図られる。   Subsequently, as shown by a two-dot chain line in FIG. 7 (b), the intermediate column member 13 constituting a part of the column 11 and the intermediate beam member 17 constituting a part of the cross beam 15 are replaced with the base column member 12. Are connected in order, and the column 11 and the cross beam 15 are assembled. Here, the end beam member 16 is connected to the intermediate column member 13 after the intermediate column member 13 to be connected to the end beam member 16 is connected to the column 11, and until that time, In the meantime, the gap holding member 21 is not interposed and is placed in the sheath tube 19. As a result, even if there is a construction error or manufacturing error due to the foundation concrete 7, the column 11, the cross beam 15 or the like when the steel slit dam 1 is constructed, the margin for the space is increased by the amount that the spacing member 21 is not interposed. The gap is between the sheath tube 19 and the end 15a of the cross beam 15, and this gap absorbs these construction errors and the like, thereby improving the workability.

支柱11や横梁15を組み立てた後は、図8に示すように、横梁15の端部15aと鞘管19との間隙20に間隔保持部材21を差し込んで介装する。この場合において、横梁15の端部15aと鞘管19との間隙20は、上述のように施工誤差等を吸収するために用いられているため、鞘管19への横梁15の端部15aの挿入状態によって、図4や図9(a)〜図9(c)に示すように、その径方向長さが変動することになる。なお、図9(a)〜図9(c)における二点鎖線Tが示す範囲は、図4における横梁15の位置と同じ位置を示している。   After assembling the support column 11 and the cross beam 15, as shown in FIG. 8, the gap holding member 21 is inserted into the gap 20 between the end portion 15 a of the cross beam 15 and the sheath tube 19. In this case, since the gap 20 between the end portion 15a of the cross beam 15 and the sheath tube 19 is used to absorb construction errors and the like as described above, the end portion 15a of the cross beam 15 to the sheath tube 19 is not provided. Depending on the insertion state, the radial length varies as shown in FIGS. 4 and 9A to 9C. In addition, the range which the dashed-two dotted line T in FIG.9 (a)-FIG.9 (c) shows has shown the same position as the position of the cross beam 15 in FIG.

このため、鞘管19への横梁15の端部15aの挿入状態に依らず安定して本発明所期の効果を発揮させるため、上述のように予め準備しておいた所定ピッチで厚みの異なる複数の間隔保持部材21から、鞘管19と横梁15の端部15aとの間隙20の径方向長さに応じた厚みの間隔保持部材21を介装することが好ましい。これによって、図5に示すような、間隔保持部材21と横梁15や鞘管19との間において形成される隙間27の径方向長さL1を常に一定値以下に抑えることが可能となる。   For this reason, in order to exhibit the effect of the present invention stably regardless of the insertion state of the end portion 15a of the cross beam 15 into the sheath tube 19, the thickness differs at a predetermined pitch prepared in advance as described above. It is preferable to interpose the spacing members 21 having a thickness corresponding to the radial length of the gap 20 between the sheath tube 19 and the end 15a of the cross beam 15 from the plurality of spacing members 21. As a result, the radial length L1 of the gap 27 formed between the spacing member 21 and the cross beam 15 or the sheath tube 19 as shown in FIG. 5 can always be kept below a certain value.

例えば、図9(a)に示すように、図4における横梁15の位置よりも下流側に横梁15が変位した位置に挿入された場合は、図4における間隔保持部材21よりも厚みの小さいものを用い、図9(b)に示すように、図4における横梁15の位置よりも上流側に横梁15が変位した位置に挿入された場合は、図4における間隔保持部材21よりも厚みの大きいものを用いればよい。   For example, as shown in FIG. 9A, when the horizontal beam 15 is inserted at a position downstream of the position of the horizontal beam 15 in FIG. 4, the thickness is smaller than that of the spacing member 21 in FIG. 9B, when the horizontal beam 15 is inserted at a position displaced upstream from the position of the horizontal beam 15 in FIG. 4, the thickness is larger than the spacing member 21 in FIG. What is necessary is just to use.

このように、複数の鞘管19それぞれについて必要に応じた厚みの間隔保持部材21を介装することによって、鋼製スリットダム1の構築作業が完了する。   In this way, the construction work of the steel slit dam 1 is completed by interposing the interval holding member 21 having a thickness as required for each of the plurality of sheath tubes 19.

なお、図9(c)に示すように、一つの鋼製スリットダム1につき鞘管19が複数あることから、鞘管19によっては、図4における横梁15の位置よりも下流側に横梁15が大きく変位し過ぎて、位置決め部材23、24に接触する程度まで変位してしまう場合がある。この場合は、そもそもこのような横梁15の端部15aは巨礫等の捕捉時においても下流側に大きく変位し得ないことから、間隔保持部材21を介装しないこととしてもよい。   As shown in FIG. 9 (c), since there are a plurality of sheath pipes 19 for one steel slit dam 1, depending on the sheath pipe 19, the lateral beam 15 is located downstream of the position of the lateral beam 15 in FIG. There is a case where it is displaced so much that it is displaced to the extent that it contacts the positioning members 23, 24. In this case, since the end portion 15a of such a cross beam 15 cannot be greatly displaced downstream even when a boulder or the like is captured, the interval holding member 21 may not be interposed.

このような構成からなる本発明に係る鋼製スリットダム1の構築方法によれば、支柱11や横梁15の組み立て時においては、鞘管19と横梁15の端部15aとの間隙20に間隔保持部材21を介装しないこととして、これによって、基礎コンクリート7や支柱11等による施工誤差、製作誤差等があったとしてもこれら施工誤差等をこの間隙20によって吸収することが可能となっている。また、支柱11や横梁15の組み立て後において、横梁15の端部15aと鞘管19との間隙20に間隔保持部材21を差し込んで介装することによって、上述のような温度変化による鋼材等の伸縮を吸収して温度応力の発生を防止する機能を発揮しつつ、支柱11の根元部11a等に作用する曲げモーメントを抑えるとの効果を発揮することが可能となっている。   According to the construction method of the steel slit dam 1 according to the present invention having such a configuration, the gap 20 between the sheath tube 19 and the end portion 15a of the cross beam 15 is maintained at the time of assembling the support column 11 and the cross beam 15. As a result of not interposing the member 21, it is possible to absorb the construction error and the like by the gap 20 even if there are construction errors and manufacturing errors due to the foundation concrete 7 and the columns 11. Further, after assembling the support column 11 and the cross beam 15, by inserting the gap holding member 21 into the gap 20 between the end 15 a of the cross beam 15 and the sheath tube 19, the steel material or the like caused by the temperature change as described above can be used. While exhibiting the function of absorbing expansion and contraction and preventing the generation of temperature stress, it is possible to exhibit the effect of suppressing the bending moment acting on the root portion 11a of the column 11 and the like.

次に、本発明に係る鋼製スリットダム1の補修方法の一例について説明する。図10はこの補修方法の手順について説明するための正面断面図である。   Next, an example of a repair method for the steel slit dam 1 according to the present invention will be described. FIG. 10 is a front sectional view for explaining the procedure of this repair method.

本発明に係る鋼製スリットダム1の支柱11や横梁15で巨礫等を捕捉することによって、支柱11や横梁15を構成する各柱部材12、13、梁部材16、17が損傷する場合がある。この場合、その損傷した部材を交換することになるが、鞘管19内に挿入されている横梁15の端部15aが損傷した場合は、その損傷した横梁15の端部15aを交換して補修するために横梁15の端部15aを鞘管19から抜き出す必要がある。   By capturing boulders and the like with the pillars 11 and the cross beams 15 of the steel slit dam 1 according to the present invention, the column members 12 and 13 and the beam members 16 and 17 constituting the pillars 11 and the cross beams 15 may be damaged. . In this case, the damaged member is replaced. When the end 15a of the cross beam 15 inserted into the sheath tube 19 is damaged, the end 15a of the damaged cross beam 15 is replaced and repaired. In order to do this, it is necessary to extract the end 15a of the cross beam 15 from the sheath tube 19.

この横梁15の端部15aの補修作業時には、まず、図10(a)、図10(b)に示すように、鞘管19内から既設の間隔保持部材21を抜き出すとともに、鞘管19内から既設の横梁15の端部15aを抜き出す。この場合に、既設の間隔保持部材21を先に抜き出してもよいし、既設の横梁15の端部15aを先に抜き出してもよい。既設の横梁15の端部15aには、通常、その上流側外周面15cと鞘管19の上流側内周面19cとの間等に間隙26が確保されているので、鞘管19内から既設の横梁15の端部15aを抜き出す作業を容易に行なうことが可能となっている。本実施形態においては、図10(a)に示すように、鞘管19内から既設の間隔保持部材21を抜き出したうえで、横梁15の一部を構成する既設の端部梁部材16Aを中間部梁部材17から取り外した後に、図10(b)に示すように、その横梁15の端部15aである端部梁部材16Aを鞘管19内から抜き出す。   At the time of repairing the end portion 15a of the horizontal beam 15, first, as shown in FIGS. 10 (a) and 10 (b), the existing spacing member 21 is extracted from the inside of the sheath tube 19, and from the inside of the sheath tube 19. The end 15a of the existing cross beam 15 is extracted. In this case, the existing spacing member 21 may be extracted first, or the end 15a of the existing cross beam 15 may be extracted first. The end portion 15a of the existing cross beam 15 is usually provided with a gap 26 between the upstream outer peripheral surface 15c thereof and the upstream inner peripheral surface 19c of the sheath tube 19, so It is possible to easily perform the operation of extracting the end 15a of the horizontal beam 15. In the present embodiment, as shown in FIG. 10A, after the existing spacing member 21 is extracted from the inside of the sheath tube 19, the existing end beam member 16A constituting a part of the cross beam 15 is placed in the middle. After removing from the beam member 17, the end beam member 16 </ b> A which is the end 15 a of the lateral beam 15 is extracted from the inside of the sheath tube 19 as shown in FIG. 10B.

続いて、図10(b)に示すように、新設の横梁15の端部15aを鞘管19内に挿入する。本実施形態においては、新設の端部梁部材16Bを鞘管19内に挿入する。   Subsequently, as shown in FIG. 10B, the end 15 a of the newly installed cross beam 15 is inserted into the sheath tube 19. In the present embodiment, the newly installed end beam member 16 </ b> B is inserted into the sheath tube 19.

続いて、図10(c)に示すように、横梁15の下流側外周面15bと鞘管19の下流側内周面19bとの間隙20に間隔保持部材21を差し込んで介装する。本実施形態においては、中間部梁部材17に端部梁部材16Bを接続した後に、間隔保持部材21を介装する。   Subsequently, as shown in FIG. 10 (c), a spacing member 21 is inserted and interposed in a gap 20 between the downstream outer peripheral surface 15 b of the cross beam 15 and the downstream inner peripheral surface 19 b of the sheath tube 19. In the present embodiment, after the end beam member 16B is connected to the intermediate beam member 17, the spacing member 21 is interposed.

このように、本発明に係る鋼製スリットダム1によれば、上述のような温度応力の発生を防止しつつ支柱11の根元部11a等に作用する曲げモーメントを抑えるとの効果を発揮しつつも、横梁15の端部15aの補修作業時においても横梁15の端部15aの交換を容易に行うことが可能となっており、補修作業時における作業性に優れたものとなっている。   Thus, according to the steel slit dam 1 according to the present invention, while exerting the effect of suppressing the bending moment acting on the root portion 11a and the like of the column 11 while preventing the generation of the temperature stress as described above. However, the end 15a of the cross beam 15 can be easily replaced even during the repair work of the end 15a of the cross beam 15, and the workability during the repair work is excellent.

なお、補修作業時において横梁15の端部15a以外の部材も損傷しているようであれば、横梁15の端部15aの交換とともに、その損傷した他部材も交換するようにしてもよい。   If members other than the end portion 15a of the cross beam 15 are damaged during repair work, the damaged other member may be replaced with the end portion 15a of the cross beam 15.

次に、本発明に係る鋼製スリットダム1の他の実施形態について説明する。   Next, another embodiment of the steel slit dam 1 according to the present invention will be described.

図11(a)は、本発明に係る鋼製スリットダム1の第2実施形態を示す正面断面図であり、図11(b)は図11(a)のB−B線断面図である。本実施形態においては、横梁15と鞘管19との間隙に弾性シール材31が充填されており、間隔保持部材21は、この弾性シール材31にその軸方向の一部が覆われた状態で介装されている。   Fig.11 (a) is front sectional drawing which shows 2nd Embodiment of the steel slit dam 1 which concerns on this invention, FIG.11 (b) is BB sectional drawing of Fig.11 (a). In this embodiment, the gap between the cross beam 15 and the sheath tube 19 is filled with the elastic sealing material 31, and the spacing member 21 is in a state where a part of the axial direction is covered with the elastic sealing material 31. It is intervened.

この弾性シール材31は、鞘管19内に水が浸入することによる鞘管19や横梁15の端部15aの腐食を防止すべく、鞘管19と横梁15との間隙の周方向全範囲に充填されるものである。また、間隔保持部材21はこの弾性シール材31に軸方向長さの半分ほどが覆われている状態となることによって、間隔保持部材21が介装されている位置からずれ動いたり抜け落ちたりすることを、ほぼ確実に防止することが可能となる。特に、温度変化によるコンクリート、鋼材の伸縮があっても、この弾性シール材31が弾性を有するものであることから、横梁15の端部15aと鞘管19とが互いに相対移動することが可能であり、この伸縮を吸収して温度応力の発生を防止する機能を発揮したままにすることができる。なお、間隔保持部材21が弾性シール材31に覆われる軸方向長さは特に限定するものではなく、間隔保持部材21の軸方向の全部が弾性シール材31によって覆われていてもよい。   This elastic sealing material 31 is provided over the entire circumferential range of the gap between the sheath tube 19 and the lateral beam 15 in order to prevent corrosion of the sheath tube 19 and the end portion 15a of the lateral beam 15 due to water entering the sheath tube 19. It is to be filled. In addition, the interval holding member 21 is shifted from the position where the interval holding member 21 is interposed or dropped off when the elastic sealing material 31 covers about half of the axial length. Can be prevented almost certainly. In particular, even if the concrete or steel material expands or contracts due to temperature changes, the elastic sealing material 31 has elasticity, so that the end 15a of the cross beam 15 and the sheath tube 19 can move relative to each other. Yes, this expansion and contraction can be absorbed and the function of preventing the generation of temperature stress can be exhibited. In addition, the axial direction length in which the space | interval holding member 21 is covered with the elastic sealing material 31 is not specifically limited, The whole axial direction of the space | interval holding member 21 may be covered with the elastic sealing material 31.

この弾性シール材31は、横梁15の端部15aの補修作業時にこれを容易に取り除くことができ、硬化後においても弾力性を有し、塗料による変質もなく耐久性のあるものであればよく、例えば、アクリル系、シリコン系、ウレタン系、ポリサルファイド系、油性系等の1成分型又は2成分型組成物を用いることが望ましい。また、腐食防止の観点からは少なくとも鞘管19の開口19a寄りに充填されていればよい。なお、この弾性シール材31内に埋設された間隔保持部材21は、この弾性シール材31を刃物で切りつける等すれば容易に鞘管19の開口19aから抜き差し可能となる。   The elastic sealing material 31 may be any material as long as it can be easily removed at the time of repairing the end portion 15a of the cross beam 15, has elasticity even after curing, and is durable without deterioration due to paint. For example, it is desirable to use one-component or two-component compositions such as acrylic, silicon, urethane, polysulfide, and oily. Further, from the viewpoint of preventing corrosion, it is sufficient that at least the opening 19a of the sheath tube 19 is filled. The spacing member 21 embedded in the elastic seal material 31 can be easily inserted and removed from the opening 19a of the sheath tube 19 by cutting the elastic seal material 31 with a blade.

図12は、本発明に係る鋼製スリットダム1の第3実施形態を示す断面図である。本実施形態における間隔保持部材21や上下一対の位置決め部材23、24は、断面円形の棒鋼から構成されている。このように、間隔保持部材21や上下一対の位置決め部材23、24は、その断面形状について特段限定するものではない。   FIG. 12 is a cross-sectional view showing a third embodiment of the steel slit dam 1 according to the present invention. The interval holding member 21 and the pair of upper and lower positioning members 23 and 24 in the present embodiment are made of steel bars having a circular cross section. Thus, the interval holding member 21 and the pair of upper and lower positioning members 23 and 24 are not particularly limited in cross-sectional shape.

以上、本発明の実施形態の例について詳細に説明したが、前述した実施形態は、何れも本発明を実施するにあたっての具体化の例を示したものに過ぎず、これらによって本発明の技術的範囲が限定的に解釈されてはならないものである。   As mentioned above, although the example of embodiment of this invention was demonstrated in detail, all the embodiment mentioned above showed only the example of actualization in implementing this invention, and these are the technical aspects of this invention. The range should not be construed as limiting.

例えば、本発明に係る鋼製スリットダム1の支柱11や横梁15は、河川3を流れる巨礫等を捕捉可能な格子状構造となるのであれば、これらを構成する部材の断面形状、大きさ、数、配置態様について、特に上述の実施形態に限定するものではない。このため、支柱11を構成する各柱部材12、13には、その柱部材12、13に対してT字状又は十字状に交差するように左右両側又は片側に分枝された分枝管が更に設けられていてもよい。また、鋼製スリットダム1は、複数の支柱11や横梁15によって構成される一の格子状構造よりも河川3の下流側に更に他の格子状構造を構成し、これらを他の部材によって接続するようにして構成されていてもよい。   For example, if the pillar 11 and the cross beam 15 of the steel slit dam 1 according to the present invention have a lattice-like structure capable of capturing boulders and the like flowing in the river 3, the cross-sectional shape and size of the members constituting them, The number and arrangement mode are not particularly limited to the above-described embodiment. For this reason, each column member 12, 13 constituting the column 11 has a branch pipe branched to the left and right sides or one side so as to intersect the column members 12, 13 in a T shape or a cross shape. Further, it may be provided. In addition, the steel slit dam 1 forms a further lattice-like structure downstream of the river 3 than one lattice-like structure constituted by a plurality of support columns 11 and cross beams 15, and these are connected by other members. It may be configured as described.

また、川幅方向の間隔を空けて三つ以上の堤体5を構築することによって二つ以上の流路3aを設け、各流路3aごとに上述のような鋼製スリットダム1を構築することとしてもよい。   Moreover, two or more flow paths 3a are provided by constructing three or more embankments 5 at intervals in the river width direction, and the steel slit dam 1 as described above is constructed for each flow path 3a. It is good.

1 :鋼製スリットダム
3 :河川
4 :河床
5 :堤体
7 :基礎コンクリート
11 :支柱
12 :基礎部柱部材
13 :中間部柱部材
15 :横梁
16 :端部梁部材
17 :中間部梁部材
18 :フランジ
19 :鞘管
20 :間隙
21 :間隔保持部材
23 :位置決め部材
24 :位置決め部材
25 :ストッパ部材
31 :弾性シール材
1: Steel slit dam 3: River 4: River bed 5: Embankment 7: Foundation concrete 11: Post 12: Foundation column member 13: Intermediate column member 15: Cross beam 16: End beam member 17: Intermediate beam member 18: flange 19: sheath tube 20: gap 21: spacing member 23: positioning member 24: positioning member 25: stopper member 31: elastic sealing material

Claims (11)

河川の川幅方向に間隔を空けて構築されたコンクリート製の堤体間に立設された支柱と、上記堤体内に埋め込まれた鞘管と、端部が上記鞘管内に挿入されて上記堤体間に架設され上記支柱に接続された横梁とを備える鋼製スリットダムにおいて、
上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙に、当該鞘管の開口から抜き差し可能に介装された間隔保持部材を備えること
を特徴とする鋼製スリットダム。
Columns erected between concrete dam bodies constructed at intervals in the river width direction of the river, a sheath pipe embedded in the dam body, and an end portion inserted into the scabbard and the dam body In a steel slit dam provided with a cross beam laid between and connected to the support column,
A steel slit dam characterized by comprising a spacing member interposed in the gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube so that it can be inserted and removed from the opening of the sheath tube.
上記鞘管の下流側内周面に固着された位置決め部材を更に備え、
上記間隔保持部材は、上記間隙において、少なくとも上記位置決め部材に支持されることによって介装されていること
を特徴とする請求項1記載の鋼製スリットダム。
A positioning member fixed to the inner peripheral surface on the downstream side of the sheath tube,
The steel slit dam according to claim 1, wherein the spacing member is interposed in the gap by being supported by at least the positioning member.
上記鞘管の下流側内周面に固着された上下一対の位置決め部材を更に備え、
上記間隔保持部材は、上記上下一対の位置決め部材間に介装されていること
を特徴とする請求項2記載の鋼製スリットダム。
Further comprising a pair of upper and lower positioning members fixed to the inner peripheral surface on the downstream side of the sheath tube,
The steel slit dam according to claim 2, wherein the spacing member is interposed between the pair of upper and lower positioning members.
上記間隔保持部材は、上記横梁と上記鞘管との間隙に充填された弾性シール材で覆われた状態で介装されていること
を特徴とする請求項1〜3の何れか1項記載の鋼製スリットダム。
The said space | interval holding member is interposed in the state covered with the elastic sealing material with which the gap | interval of the said horizontal beam and the said sheath pipe was filled, The any one of Claims 1-3 characterized by the above-mentioned. Steel slit dam.
上記間隔保持部材は、上記鞘管の軸芯を通る水平面を間に挟んだ上下に少なくとも二つ介装されていること
を特徴とする請求項1〜4の何れか1項記載の鋼製スリットダム。
The steel slit according to any one of claims 1 to 4, wherein at least two of the spacing members are interposed in the upper and lower sides sandwiching a horizontal plane passing through the axis of the sheath tube. dam.
請求項1〜5の何れか1項記載の鋼製スリットダムの構築方法であって、
上記横梁の端部を上記鞘管内に挿入した後に、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装すること
を特徴とする鋼製スリットダムの構築方法。
A construction method of a steel slit dam according to any one of claims 1 to 5,
After inserting the end portion of the transverse beam into the sheath tube, a spacing member is interposed in the gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube. How to build a dam.
上記横梁の一部を構成する端部梁部材を上記鞘管内に挿入し、上記支柱に接続した上記横梁の一部を構成する中間部梁部材に上記端部梁部材を接続した後に、上記端部梁部材の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装すること
を特徴とする請求項6記載の鋼製スリットダムの構築方法。
After the end beam member constituting a part of the transverse beam is inserted into the sheath tube and the end beam member is connected to the intermediate beam member constituting the part of the transverse beam connected to the support column, the end beam member is The method for constructing a steel slit dam according to claim 6, wherein a spacing member is interposed in a gap between the downstream outer peripheral surface of the beam member and the downstream inner peripheral surface of the sheath tube.
予め準備された異なる厚みの複数の間隔保持部材から、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙の径方向長さに応じた厚みの間隔保持部材を介装すること
を特徴とする請求項6又は7記載の鋼製スリットダムの構築方法。
An interval holding member having a thickness corresponding to the radial length of the gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube is provided from a plurality of interval holding members of different thicknesses prepared in advance. A construction method of a steel slit dam according to claim 6 or 7.
請求項1〜5の何れか1項記載の鋼製スリットダムの損傷した横梁の端部を補修する鋼製スリットダムの補修方法であって、
上記鞘管から既設の間隔保持部材を抜き出すとともに、当該鞘管から既設の横梁の端部を抜き出し、
新設の横梁の端部を上記鞘管内に挿入した後に、当該横梁の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装すること
を特徴とする鋼製スリットダムの補修方法。
A repair method of a steel slit dam for repairing an end portion of a damaged transverse beam of the steel slit dam according to any one of claims 1 to 5,
Withdrawing the existing spacing member from the sheath tube, withdrawing the end of the existing cross beam from the sheath tube,
After inserting the end portion of the newly installed transverse beam into the sheath tube, a spacing member is interposed in the gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube. How to repair slit dams.
上記鞘管から既設の間隔保持部材を抜き出すとともに、上記支柱に接続した上記横梁の一部を構成する既設の中間部梁部材から当該横梁の一部を構成する既設の端部梁部材を取り外して当該鞘管から抜き出し、
新設の端部梁部材を上記鞘管内に挿入し、上記中間部梁部材に上記端部梁部材を接続した後に、上記端部梁部材の下流側外周面と上記鞘管の下流側内周面との間隙に間隔保持部材を介装すること
を特徴とする請求項9記載の鋼製スリットダムの補修方法。
The existing spacing member is extracted from the sheath tube, and the existing end beam member constituting a part of the transverse beam is removed from the existing intermediate beam member constituting the part of the transverse beam connected to the support column. Extract from the sheath,
After inserting a new end beam member into the sheath tube and connecting the end beam member to the intermediate beam member, a downstream outer peripheral surface of the end beam member and a downstream inner peripheral surface of the sheath tube A method for repairing a steel slit dam according to claim 9, wherein a gap holding member is interposed in the gap between the steel slit dam and the steel slit dam.
予め準備された異なる厚みの間隔保持部材から、上記横梁の下流側外周面と上記鞘管の下流側内周面との間隙の径方向長さに応じた厚みの間隔保持部材を介装すること
を特徴とする請求項9又は10記載の鋼製スリットダムの補修方法。
An interval holding member having a thickness corresponding to the radial length of the gap between the downstream outer peripheral surface of the transverse beam and the downstream inner peripheral surface of the sheath tube is interposed from the interval holding members of different thicknesses prepared in advance. The repair method of the steel slit dam of Claim 9 or 10 characterized by these.
JP2009085224A 2009-03-31 2009-03-31 Steel slit dam, its construction method and repair method Active JP5226584B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009085224A JP5226584B2 (en) 2009-03-31 2009-03-31 Steel slit dam, its construction method and repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009085224A JP5226584B2 (en) 2009-03-31 2009-03-31 Steel slit dam, its construction method and repair method

Publications (2)

Publication Number Publication Date
JP2010236261A JP2010236261A (en) 2010-10-21
JP5226584B2 true JP5226584B2 (en) 2013-07-03

Family

ID=43090846

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009085224A Active JP5226584B2 (en) 2009-03-31 2009-03-31 Steel slit dam, its construction method and repair method

Country Status (1)

Country Link
JP (1) JP5226584B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5822499B2 (en) * 2011-03-29 2015-11-24 日鐵住金建材株式会社 Steel slit dam
WO2013042735A1 (en) * 2011-09-21 2013-03-28 日鐵住金建材株式会社 Steel slit dam
JP5917226B2 (en) * 2012-03-28 2016-05-11 日鐵住金建材株式会社 Transmission type sabo dam
JP6767179B2 (en) * 2016-06-22 2020-10-14 Jfe建材株式会社 How to repair the trap, the repair structure of the trap, the trap and the dam
JP6785089B2 (en) * 2016-08-09 2020-11-18 Jfe建材株式会社 Strut structure and tsunami barrier
JP7453034B2 (en) * 2020-03-30 2024-03-19 日鉄建材株式会社 Installation structure of driftwood trap
JP2022189707A (en) * 2021-06-11 2022-12-22 Jfe建材株式会社 Construction method of dam, and dam
JP2023121270A (en) * 2022-02-21 2023-08-31 Jfe建材株式会社 traps and dams

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06200566A (en) * 1992-12-29 1994-07-19 Sanritsu Tekko:Kk Tube body connection method and construction therefor
JP2975012B1 (en) * 1998-07-06 1999-11-10 株式会社クボタ Plug-in connection method for different diameter pipes
JP3998087B2 (en) * 1999-12-28 2007-10-24 日鐵住金建材株式会社 Driftwood prevention fence
JP4602200B2 (en) * 2005-08-23 2010-12-22 株式会社神戸製鋼所 Transmission type sabo dam and its sediment catching member
JP4787053B2 (en) * 2006-04-10 2011-10-05 日鐵住金建材株式会社 Sabo dam and its construction method

Also Published As

Publication number Publication date
JP2010236261A (en) 2010-10-21

Similar Documents

Publication Publication Date Title
JP5226584B2 (en) Steel slit dam, its construction method and repair method
JP5129977B2 (en) Steel slit dam
JP5162682B2 (en) Sabo dam and its construction method
JP5165455B2 (en) Steel slit dam and its construction method
JP4954097B2 (en) Repair method for steel slit dam
JP4680072B2 (en) Transmission type sabo dam
JP4912327B2 (en) Repair method for steel slit dam
JP5165505B2 (en) Steel slit dam and its repair method
JP4912348B2 (en) Sediment capture structure and sabo dam
JP5917226B2 (en) Transmission type sabo dam
JP4912346B2 (en) Steel slit dam
JP5161648B2 (en) Steel slit dam and its repair method
JP6585937B2 (en) Transmission type sabo dam tube material unit and transmission sabo dam
JP7001507B2 (en) Permeation type dam and its construction method
JP4787053B2 (en) Sabo dam and its construction method
JP6652799B2 (en) Steel slit dam
KR100543946B1 (en) Temporary bridge piers using circular pipe piles
JP6546399B2 (en) Sabo dam
JP2006274575A (en) Permeable debris dam
JP2005336802A (en) Horizontal beam type open dam
JP5315191B2 (en) Steel slit dam, gravel body capturing member used therefor, and method of attaching the same
JP7453058B2 (en) steel slit dam
KR100543948B1 (en) Capping device for temporary bridge piers using circular pipe pile
JP5180763B2 (en) Cross beam buttress-type open embankment
JP4685809B2 (en) Wall structure and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120119

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20120828

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130221

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130314

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5226584

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160322

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250