JP5243998B2 - Bridge superstructure and construction method of bridge superstructure - Google Patents
[go: Go Back, main page]

JP5243998B2 - Bridge superstructure and construction method of bridge superstructure - Google Patents

Bridge superstructure and construction method of bridge superstructure Download PDF

Info

Publication number
JP5243998B2
JP5243998B2 JP2009054698A JP2009054698A JP5243998B2 JP 5243998 B2 JP5243998 B2 JP 5243998B2 JP 2009054698 A JP2009054698 A JP 2009054698A JP 2009054698 A JP2009054698 A JP 2009054698A JP 5243998 B2 JP5243998 B2 JP 5243998B2
Authority
JP
Japan
Prior art keywords
bridge
main girder
girder
main
bridge axis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009054698A
Other languages
Japanese (ja)
Other versions
JP2010209542A (en
Inventor
良弘 田中
基幸 藤坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2009054698A priority Critical patent/JP5243998B2/en
Publication of JP2010209542A publication Critical patent/JP2010209542A/en
Application granted granted Critical
Publication of JP5243998B2 publication Critical patent/JP5243998B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋梁上部構造および橋梁上部構造の構築方法に関する。   The present invention relates to a bridge superstructure and a method for constructing a bridge superstructure.

特許文献1には、コンクリート製の橋梁上部構造であって、橋軸直角方向に並設された複数の主桁と、隣り合う主桁を繋ぐ横桁とを具備した橋梁上部構造が開示されている。この橋梁上部構造では、主桁の断面形状を中実なI型としているものの、高強度の繊維補強コンクリートを使用しているので、普通コンクリートを使用した場合よりも主桁の軽量化を図ることができる。   Patent Document 1 discloses a bridge upper structure made of concrete, which includes a plurality of main girders arranged in a direction perpendicular to the bridge axis and a horizontal girder connecting adjacent main girders. Yes. In this bridge superstructure, although the main girder has a solid I-shaped cross section, high-strength fiber reinforced concrete is used, so the main girder is lighter than when using ordinary concrete. Can do.

特許文献2には、断面逆U字状を呈するセグメントの開口部を底版で塞いで形成した箱型の主桁が開示されている。箱型の主桁を使用することでも、軽量化を図ることができる。   Patent Document 2 discloses a box-shaped main girder formed by closing an opening of a segment having an inverted U-shaped cross section with a bottom plate. The weight can also be reduced by using a box-shaped main girder.

特開2002−021023号公報JP 2002-021023 A 特開2008−285906号公報JP 2008-285906 A

主桁を箱型にすると、主桁の軽量化を図ることが可能になるものの、中空部を成形する内型枠がコンクリートに浮いた格好になるので、内型枠の浮き上がりを防ぐための対策を講じる必要がある。さらに、コンクリートの収縮に伴う拘束力が内型枠に作用するようになるので、脱型作業が困難になる虞もある。   Although the main girder can be made lighter, it is possible to reduce the weight of the main girder. However, the inner mold that forms the hollow part looks like it floats on the concrete, so measures to prevent the inner mold from lifting. It is necessary to take. Furthermore, since the restraining force accompanying the shrinkage of the concrete acts on the inner mold, there is a possibility that the demolding operation becomes difficult.

特許文献2に開示された箱型の主桁であれば、浮力や拘束力の問題は解消されるが、セグメントと底版とを組み合わせる作業が必要になるので、組立作業や接合作業に時間を要してしまう。   With the box-shaped main girder disclosed in Patent Document 2, the problem of buoyancy and restraint force is solved, but the work of combining the segment and the bottom slab is required, so that time is required for assembly work and joining work. Resulting in.

このような観点から、本発明は、複数のコンクリート製主桁を並設した形式の橋梁上部構造であって、箱型のコンクリート製主桁を使用せずとも軽量化を図ることが可能な橋梁上部構造を提供することを課題とし、さらには、その構築方法を提供することを課題とする。   From such a viewpoint, the present invention is a bridge superstructure of a type in which a plurality of concrete main girders are arranged side by side, and can be reduced in weight without using a box-shaped concrete main girder. It is an object to provide an upper structure, and further to provide a construction method thereof.

上記課題を解決する本発明に係る橋梁上部構造は、橋軸直角方向に並設された複数のコンクリート製主桁と、橋軸直角方向に隣り合う前記主桁同士を繋ぐ横桁とを具備した橋梁上部構造であって、前記主桁は、下向きに開口する開断面形状の溝形部を有前記溝形部は、橋軸直角方向に対向する一対のウェブと、前記ウェブの上端部同士を繋ぐ床版部とを備えている、ことを特徴とする。 A bridge superstructure according to the present invention that solves the above-described problems includes a plurality of concrete main girders arranged side by side in a direction perpendicular to the bridge axis, and a horizontal girder that connects the main girders adjacent in the direction perpendicular to the bridge axis. a bridge superstructure, the main girder is to have a groove shape of the open cross-sectional shape which opens downward, the interposition portion includes a pair of webs facing the bridge axis perpendicular, the upper end portion of the web It is characterized by having a floor slab part that connects each other .

本発明に係る橋梁上部構造では、コンクリート製主桁に開断面形状の溝形部を設けることで軽量化を実現している。本発明によれば、主桁の少なくとも一部を開断面形状にしているので、内型枠の設置・脱型作業を簡易迅速に行うことが可能となる。すなわち、本発明によれば、全長を閉断面形状とした箱型の主桁に比べて、主桁を簡易かつ迅速に製造することが可能となる。   In the bridge superstructure according to the present invention, weight reduction is realized by providing a groove-shaped portion having an open cross-sectional shape in a concrete main girder. According to the present invention, since at least a part of the main girder has an open cross-sectional shape, it is possible to simply and quickly perform the installation / demolding work of the inner mold. That is, according to the present invention, the main girder can be easily and quickly manufactured as compared with a box-type main girder whose entire length is a closed cross-sectional shape.

なお、橋軸直角方向の外力(例えば、地震力など)が主桁に作用すると、主桁を転倒(横倒れ)させようとする回転モーメント(以下、「転倒モーメント」と称する)が発生するが、本発明では、橋軸直角方向に隣り合う主桁同士を横桁で連結して一体にしているので、転倒モーメントに対する抵抗力を高めることができる。とくに、本発明では、前記溝形部の橋軸方向の端部に中実部を連設し、当該中実部に前記横桁を接続しているので、主桁と横桁とを一体化してなる構造体の剛性が高いものとなり、それ故、転倒モーメントに対する抵抗力をより一層高めることが可能になる。 In addition, when an external force (for example, seismic force) in the direction perpendicular to the bridge axis acts on the main girder, a rotation moment (hereinafter referred to as “falling moment”) that causes the main girder to fall (side down) is generated. In the present invention, since the main girders adjacent to each other in the direction perpendicular to the bridge axis are connected and integrated with each other with a horizontal girder, the resistance force against the overturning moment can be increased. In particular, in the present invention, since the solid portion is connected to the end of the groove portion in the bridge axis direction, and the cross beam is connected to the solid portion , the main beam and the cross beam are integrated. the rigidity of the structure formed Te Ri is Do and high, therefore, it is possible to further enhance the resistance to overturning moments.

中実部の位置や個数等に制限はないが、前記主桁の橋軸方向の両端部のそれぞれに前記中実部を設け、前記中実部の下側に支承を設置するとよい。   Although there is no restriction | limiting in the position, the number, etc. of a solid part, it is good to provide the said solid part in each of the both ends of the bridge axis direction of the said main girder, and to install a support below the said solid part.

前記横桁と前記中実部とを橋軸直角方向に貫通する横緊張材を設け、前記横緊張材に付与した緊張力により、前記横桁の橋軸直角方向の端面を前記中実部の側面に圧着してもよい。このようにすると、主桁と横桁とを強固に一体化することが可能になる。なお、横桁の端面を中実部の側面に直に圧着してもよいし、充填材やプレートなどを介して間接的に圧着してもよい。   A transverse tension member penetrating the cross beam and the solid portion in a direction perpendicular to the bridge axis is provided, and an end face of the transverse beam in the direction perpendicular to the bridge axis is formed by the tension applied to the transverse tension member. You may crimp on the side. If it does in this way, it will become possible to unify a main girder and a cross beam firmly. The end face of the cross beam may be directly crimped to the side surface of the solid part, or may be indirectly crimped via a filler or a plate.

前記主桁を橋軸方向に貫通する縦緊張材を設け、前記縦緊張材に付与した緊張力により、前記主桁にプレストレスを付与してもよい。このようにすると、主桁の長スパン化を図ることが可能になる。   A longitudinal tension material penetrating the main girder in the direction of the bridge axis may be provided, and prestress may be imparted to the main girder by a tension force imparted to the longitudinal tension material. In this way, it is possible to increase the span of the main girder.

前記溝形部の内部空間に、橋軸方向に間隔をあけて並ぶ複数の隔壁を設けてもよい。このようにすると、主桁の橋軸回りのねじり剛性が向上する。   A plurality of partition walls arranged at intervals in the bridge axis direction may be provided in the internal space of the groove-shaped portion. In this way, the torsional rigidity of the main girder around the bridge axis is improved.

なお、溝形部に隔壁を設けた場合には、前記各隔壁を貫くように前記縦緊張材を配索するとよい。このようにすると、複数の隔壁が縦緊張材の偏向部(デビエータ)になる。   In addition, when a partition is provided in the groove-shaped portion, the longitudinal tension member may be routed so as to penetrate each partition. If it does in this way, a some partition will become a deflection | deviation part (deviator) of a longitudinal tension material.

横桁の形状等に制限はないが、筒状を呈する横桁を使用すれば、橋梁上部構造の軽量化を一段と推し進めることが可能となる。   The shape of the cross beam is not limited, but if a cross beam having a tubular shape is used, it is possible to further reduce the weight of the bridge superstructure.

上記課題を解決する本発明に係る橋梁上部構造の構築方法は、橋軸直角方向に対向する一対のウェブと、前記ウェブの上端部同士を繋ぐ床版部とを備えて下向きに開口する開断面形状の溝形部を有するとともに、前記溝形部の橋軸方向の端部に連設された中実部を有するコンクリート製主桁を、橋軸方向に隣り合う二つの橋脚間に複数本並設した後に、前記橋脚上において、隣り合う前記主桁の前記中実部同士を横桁で繋ぐことを特徴とする。 The method for constructing a bridge superstructure according to the present invention that solves the above-described problem includes a pair of webs facing in a direction perpendicular to the bridge axis and a floor slab that connects the upper ends of the webs, and an open section that opens downward A plurality of concrete main girders having a groove portion having a shape and having a solid portion connected to an end portion in the bridge axis direction of the groove shape portion between two adjacent bridge piers in the bridge axis direction. After being installed, the solid portions of the adjacent main girders are connected with a horizontal girder on the pier.

要するに、本発明に係る橋梁上部構造の構築方法は、複数の主桁を個別に架設した後に、前記橋脚上において隣り合う主桁同士を横桁で繋ぐというものである。主桁と横桁とを一体化してなる構造体を一括して橋脚間に架設する場合には、広大な作業スペースや大型の重機が必要になるが、本発明によれば、広大な作業スペースや大型の重機を使用せずとも、橋梁上部構造を構築することが可能になる。   In short, the method for constructing the bridge superstructure according to the present invention is such that, after a plurality of main girders are individually installed, adjacent main girders on the bridge pier are connected with horizontal girders. When constructing a structure formed by integrating the main girder and the horizontal girder together between the piers, a vast work space and a large heavy machine are required. According to the present invention, a vast work space is required. It is possible to build the bridge superstructure without using heavy machinery or large heavy machinery.

本発明に係る橋梁上部構造によれば、箱型のコンクリート製主桁を使用せずとも軽量化を図ることが可能となる。
また、本発明に係る橋梁上部構造の構築方法によれば、広大な作業スペースや大型の重機を使用せずとも、橋梁上部構造を構築することが可能になる。
According to the bridge superstructure according to the present invention, it is possible to reduce the weight without using a box-shaped concrete main girder.
Moreover, according to the construction method of the bridge superstructure according to the present invention, it is possible to construct the bridge superstructure without using a large work space or a large heavy machine.

本発明の実施形態に係る橋梁上部構造を示す図であって、(a)は平面図、(b)は(a)の1B−1B断面図である。It is a figure which shows the bridge | bridging superstructure which concerns on embodiment of this invention, Comprising: (a) is a top view, (b) is 1B-1B sectional drawing of (a). (a)は図1(a)の2A−2A断面図、(b)は図1(b)の部分拡大図である。(A) is 2A-2A sectional drawing of Fig.1 (a), (b) is the elements on larger scale of FIG.1 (b). (a)は図1(b)の3A−3A断面図、(b)は同じく3B−3B断面図、(c)は同じく3C−3C断面図である。(A) is 3A-3A sectional drawing of FIG.1 (b), (b) is 3B-3B sectional drawing similarly, (c) is 3C-3C sectional drawing similarly. 橋梁上部構造を構築する際に使用する作業ヤードの模式図であって、(a)は平面図、(b)は端面図である。It is a schematic diagram of the work yard used when constructing a bridge superstructure, (a) is a top view and (b) is an end view. 橋梁上部構造を構築する際に使用する設備の模式図であって、(a)は平面図、(b)は端面図である。It is a schematic diagram of the equipment used when constructing a bridge superstructure, (a) is a top view and (b) is an end view. (a)〜(c)は本発明の実施形態に係る橋梁上部構造の構築手順を示す側面図である。(A)-(c) is a side view which shows the construction procedure of the bridge | bridging superstructure which concerns on embodiment of this invention. (a),(b)は図6の(c)に続く工程を示す平面図である。(A), (b) is a top view which shows the process following (c) of FIG. 本発明の実施形態に係る橋梁上部構造の利点を説明するための図であって、(a)は本発明の実施形態に係る橋梁上部構造の端面図、(b)は比較例に係る橋梁上部構造の端面図である。It is a figure for demonstrating the advantage of the bridge superstructure which concerns on embodiment of this invention, Comprising: (a) is an end elevation of the bridge superstructure which concerns on embodiment of this invention, (b) is the bridge upper part which concerns on a comparative example 1 is an end view of a structure.

図1に示すように、本発明の実施形態に係る橋梁上部構造Kは、跨座式モノレールの複線カーブ区間における軌道を構成するものであり、橋軸直角方向に並設された複数のコンクリート製主桁1,1と、各主桁1にプレストレスを付与する縦緊張材2,2,…と、橋軸直角方向に隣り合う主桁1,1を繋ぐ横桁3,3と、主桁1,1と横桁2とを緊結する横緊張材4,4,…と、を具備している。   As shown in FIG. 1, the bridge superstructure K according to the embodiment of the present invention constitutes a track in a double track curve section of a straddle-type monorail, and is made of a plurality of concrete arranged side by side in a direction perpendicular to the bridge axis. Main girder 1, 1 and longitudinal tension members 2, 2,... For applying prestress to each main girder 1, horizontal girder 3, 3 connecting main girder 1, 1 adjacent to each other in the direction perpendicular to the bridge axis, and main girder , 1, 1 and transverse girder 2 are connected to each other.

主桁1は、跨座式モノレールの軌道桁(走行桁)であり、カーブ区間の平面線形に合わせて緩やかに湾曲している。主桁1の幅寸法は、モノレール車両の走行輪の幅寸法等によって規定されているため、主桁1の断面二次モーメントを高めるためには、主桁1の幅寸法を一定に保ちつつ、主桁1の桁高を大きくする必要がある。本実施形態の主桁1は、支点間距離が20m以上に設定されている場合を想定したものであり、図3に示すように、幅寸法の3倍以上の桁高を具備している。   The main girder 1 is a straddle-type monorail track girder (running girder), which is gently curved in accordance with the planar alignment of the curve section. Since the width dimension of the main girder 1 is defined by the width dimension of the traveling wheel of the monorail vehicle, etc., in order to increase the cross-sectional secondary moment of the main girder 1, while keeping the width dimension of the main girder 1 constant, It is necessary to increase the height of the main girder 1. The main girder 1 of this embodiment assumes a case where the distance between fulcrums is set to 20 m or more, and has a girder height of three times or more the width dimension as shown in FIG.

ちなみに、主桁1の上面は、モノレール車両の走行輪が走行する走行面となる。主桁1の側面には、断面台形状の取付溝Dが橋軸方向に連続して形成されている。取付溝Dには、図示せぬ電車線(モノレール車両へ電力を供給するための架線)が取り付けられる。主桁1の側面のうち、取付溝Dの上側に位置する側面Uは、モノレール車両の案内輪(図示略)が走行する案内面となり、取付溝Dの下側に位置する側面Lは、モノレール車両の安定輪(図示略)が走行する安定面となる。   Incidentally, the upper surface of the main girder 1 is a traveling surface on which traveling wheels of a monorail vehicle travel. A mounting groove D having a trapezoidal cross section is formed continuously on the side surface of the main girder 1 in the bridge axis direction. An unillustrated train line (an overhead line for supplying electric power to the monorail vehicle) is attached to the attachment groove D. Of the side surfaces of the main girder 1, the side surface U positioned above the mounting groove D is a guide surface on which a guide wheel (not shown) of the monorail vehicle travels, and the side surface L positioned below the mounting groove D is a monorail. It becomes a stable surface on which a stable wheel (not shown) of the vehicle travels.

図1の(b)に示すように、主桁1は、下向きに開口する開断面形状の溝形部11と、溝形部11の橋軸方向の端部に連設された中実部12,12と、橋軸方向に間隔をあけて並設された複数の隔壁13,13,…とを具備している。   As shown in FIG. 1B, the main girder 1 includes a groove portion 11 having an open cross-sectional shape that opens downward, and a solid portion 12 that is connected to the end portion of the groove portion 11 in the bridge axis direction. , 12 and a plurality of partition walls 13, 13,... Arranged in parallel at intervals in the bridge axis direction.

溝形部11は、図3の(a)および(b)に示すように、橋軸直角方向に対向する一対のウェブ1a,1aと、ウェブ1a,1aの上端部同士を繋ぐ床版部1bと、を備えていて、断面逆U字状を呈している。ウェブ1aは、概ね平板状を呈している。床版部1bは、平板状を呈していて、左右のウェブ1a,1aと一体成形されている。   As shown in FIGS. 3A and 3B, the groove portion 11 includes a pair of webs 1a, 1a facing each other in the direction perpendicular to the bridge axis, and a floor slab portion 1b that connects the upper ends of the webs 1a, 1a. And has an inverted U-shaped cross section. The web 1a has a generally flat plate shape. The floor slab portion 1b has a flat plate shape and is integrally formed with the left and right webs 1a, 1a.

図1の(b)に示す中実部12は、ソリッドなブロック状を呈する部位であって、主桁1の橋軸方向の両端部のそれぞれに設けられている。本実施形態の中実部12は、橋脚Pに設置された支承Sに対応する位置(支承Sの真上)に形成されている。中実部12は、溝形部11と一体成形されている。   The solid part 12 shown in FIG. 1B is a part that exhibits a solid block shape, and is provided at each of both ends of the main girder 1 in the bridge axis direction. The solid part 12 of the present embodiment is formed at a position corresponding to the support S installed on the pier P (directly above the support S). The solid portion 12 is formed integrally with the groove portion 11.

中実部12には、図2の(b)および図3の(c)に示すように、複数の縦貫通孔1c,1c,…と、複数の横貫通孔1d,1d,…とが形成されている。   As shown in FIGS. 2B and 3C, the solid portion 12 is formed with a plurality of vertical through holes 1c, 1c,... And a plurality of horizontal through holes 1d, 1d,. Has been.

縦貫通孔1c,1c,…は、複数の縦緊張材2,2,…の数および配置に対応して設けられていて、中実部12を橋軸方向に貫通している。縦貫通孔1cには、縦緊張材2が挿通される。図3の(c)に示すように、本実施形態では、中実部12の上段部分に一つの縦貫通孔1cを形成するとともに、中実部12の中段部分および下段部分にそれぞれ二つずつ縦貫通孔1c,1cを形成しているが、縦貫通孔1cの位置や数を限定する趣旨ではない。   The vertical through holes 1c, 1c, ... are provided corresponding to the number and arrangement of the plurality of vertical tension members 2, 2, ..., and penetrate the solid portion 12 in the bridge axis direction. The vertical tension material 2 is inserted through the vertical through hole 1c. As shown in FIG. 3C, in the present embodiment, one vertical through hole 1c is formed in the upper part of the solid part 12, and two each in the middle part and the lower part of the solid part 12. Although the vertical through holes 1c and 1c are formed, the position and number of the vertical through holes 1c are not limited.

横貫通孔1d,1d,…は、複数の横緊張材4,4,…に対応して設けられていて、中実部12の下部を橋軸直角方向に貫通している。横貫通孔1dには、横緊張材4が挿通される。横貫通孔1dは、縦貫通孔1cと干渉しないように、縦貫通孔1cの上方または下方に形成されており、縦貫通孔1cと立体的に交差している。図2の(b)に示すように、本実施形態では、横桁3(図2の(a)参照)の断面形状に合わせて矩形枠状の領域に横貫通孔1d,1d,…を形成しているが、横貫通孔1dの位置や数を限定する趣旨でない。   The horizontal through holes 1d, 1d,... Are provided corresponding to the plurality of lateral tension members 4, 4,..., And penetrate the lower part of the solid portion 12 in the direction perpendicular to the bridge axis. The lateral tension member 4 is inserted into the lateral through hole 1d. The horizontal through hole 1d is formed above or below the vertical through hole 1c so as not to interfere with the vertical through hole 1c, and three-dimensionally intersects with the vertical through hole 1c. As shown in FIG. 2B, in the present embodiment, the horizontal through holes 1d, 1d,... Are formed in the rectangular frame region in accordance with the cross-sectional shape of the cross beam 3 (see FIG. 2A). However, it is not intended to limit the position and number of the horizontal through holes 1d.

図1の(b)に示す隔壁13は、溝形部11のねじり剛性を高めるとともに、縦緊張材2の偏向部(デビエータ)としても機能する平板状の壁体であり、溝形部11の溝状の内部空間を仕切るように配置されている。   A partition wall 13 shown in FIG. 1 (b) is a flat wall body that increases the torsional rigidity of the groove portion 11 and also functions as a deflecting portion (deviator) of the longitudinal tension member 2. It arrange | positions so that a groove-shaped internal space may be partitioned off.

隔壁13は、図3の(b)に示すように、溝形部11の内部空間において左右のウェブ1a,1aを繋いでいる。隔壁13には、複数の縦貫通孔1e,1e,…が形成されている。複数の縦貫通孔1e,1e,…は、複数の縦緊張材2,2,…に対応して設けられていて、図2の(b)にも示すように、隔壁13を橋軸方向(壁厚方向)に貫通している。貫通孔1eには、縦緊張材2が挿通される。   As shown in FIG. 3B, the partition wall 13 connects the left and right webs 1 a and 1 a in the internal space of the groove portion 11. The partition wall 13 is formed with a plurality of vertical through holes 1e, 1e,. The plurality of longitudinal through holes 1e, 1e,... Are provided corresponding to the plurality of longitudinal tension members 2, 2,..., And as shown in FIG. It penetrates in the wall thickness direction). The longitudinal tension material 2 is inserted through the through hole 1e.

隔壁13を適宜な間隔で配置すると、橋軸回りのねじり回転力に起因してウェブ1aと床版部1bとに作用するねじりせん断応力を、隔壁13を配置しない場合の1/5〜1/10に低減することが可能となる。   When the partition walls 13 are arranged at appropriate intervals, the torsional shear stress acting on the web 1a and the floor slab portion 1b due to the torsional rotational force around the bridge axis is reduced to 1/5 to 1 / It becomes possible to reduce to 10.

本実施形態の主桁1は、超高強度繊維補強コンクリートにて形成されている。
主桁1を形成する超高強度繊維補強コンクリートとしては、その硬化体の圧縮強度が150〜200N/mmの範囲にあり、曲げ引張強度が25〜45N/mmの範囲にあり、かつ、割裂引張強度が10〜25N/mmの範囲にあるものを用いることが望ましい。このような超高強度の超高強度繊維補強コンクリートは、通常の超高強度繊維補強コンクリートよりも弾性係数が高いことから(例えばE=50〜55kN/mm程度)、主桁1の断面積(断面二次モーメント)を大きくせずとも、曲げ剛性を高めることができる。また、混入した繊維により引張力に対する引張抵抗力を期待できるので、鉄筋を省略してウェブ1aや床版部1bの厚さを小さくすることができる。
The main girder 1 of this embodiment is formed of ultra high strength fiber reinforced concrete.
As the ultra high strength fiber reinforced concrete forming the main girder 1, the compression strength of the cured body is in the range of 150 to 200 N / mm 2 , the bending tensile strength is in the range of 25 to 45 N / mm 2 , and It is desirable to use one having a split tensile strength in the range of 10 to 25 N / mm 2 . Such an ultra-high-strength fiber reinforced concrete has a higher elastic modulus than a normal ultra-high-strength fiber reinforced concrete (for example, E = about 50 to 55 kN / mm 2 ), so that the cross-sectional area of the main girder 1 The bending rigidity can be increased without increasing the (second moment of section). Moreover, since the tensile resistance force with respect to the tensile force can be expected by the mixed fibers, the reinforcing bars can be omitted and the thickness of the web 1a and the floor slab portion 1b can be reduced.

なお、前記したような強度を有する超高強度繊維補強コンクリートは、例えば、セメントとポゾラン系反応粒子と最大粒径2.5mm以下の骨材とを含む紛体に高性能減水剤と水とを混入して得られるセメント系マトリックスに、直径が0.1〜0.3mmで長さが10〜30mmの形状を有する繊維を1〜4容積%混入することで得ることができる。ここで、ポゾラン系反応粒子とは、例えば、シリカフューム、フライアッシュ、高炉スラグのほか、カオリンの誘導体から選定した化合物、沈降シリカ、火山灰、シリカゾル等からなる粒子のことである。また、繊維の材質に特に制限はないが、コンクリートとの付着性や材料調達の容易さなどを勘案すると、鋼製とすることが望ましい。   The ultra-high-strength fiber reinforced concrete having the above-described strength is, for example, a high-performance water reducing agent and water mixed in a powder containing cement, a pozzolanic reaction particle, and an aggregate having a maximum particle size of 2.5 mm or less. It can be obtained by mixing 1 to 4% by volume of fibers having a shape with a diameter of 0.1 to 0.3 mm and a length of 10 to 30 mm in the cement matrix obtained. Here, the pozzolanic reaction particles are particles made of, for example, silica fume, fly ash, blast furnace slag, a compound selected from kaolin derivatives, precipitated silica, volcanic ash, silica sol, and the like. Moreover, although there is no restriction | limiting in particular in the material of a fiber, Considering the adhesiveness with concrete, the ease of material procurement, etc., it is desirable to use steel.

主桁1を製造するには、まず、前記した各種材料を混練してなるフレッシュな状態の超高強度繊維補強コンクリートを、主桁1の内面を成形する内型枠と外面を成形する外型枠との間に打設する。本実施形態においては、閉断面になっている部位(中空部)が存在していないので、内型枠と外型枠との間に超高強度繊維補強コンクリートを打設しても、内型枠に浮力が発生することがない。つまり、主桁1の溝形部11を開口させているので、その内側面を成形する内型枠が浮き型枠になることはなく、したがって、中空部が全長に亘って形成されている閉断面形状の箱桁を製造する場合に比べて、内型枠やこれを固定するための治具等を軽構造にすることが可能となる。   In order to manufacture the main girder 1, first, the above-described ultra-high-strength fiber reinforced concrete kneaded with various materials is used to form an inner mold frame for molding the inner surface of the main girder 1 and an outer mold for molding the outer surface. Place between the frame. In this embodiment, since there is no portion (hollow part) having a closed cross section, even if ultra high strength fiber reinforced concrete is placed between the inner mold frame and the outer mold frame, the inner mold There is no buoyancy in the frame. That is, since the groove 11 of the main girder 1 is opened, the inner mold that forms the inner surface of the main girder 1 does not become a floating mold, so that the hollow part is formed over the entire length. Compared with the case of manufacturing a box girder having a cross-sectional shape, it is possible to make the inner mold frame, a jig for fixing the inner frame, and the like light.

ちなみに、前記した超高強度繊維補強コンクリートは、自己充填性が高いので、バイブレータ等による締め固めを省略するか、あるいは、小規模なものにすることができる。バイブレータ等による締め固めが簡略化されれば、内型枠や外型枠にかかる負荷が小さなものになるので、主桁1に高い寸法精度が要求される場合であっても、内型枠や外型枠を軽構造にすることができ、ひいては、その製造コストの上昇を抑えることが可能となる。   Incidentally, the above-described ultra-high-strength fiber reinforced concrete has a high self-filling property, so that compaction by a vibrator or the like can be omitted or the scale can be reduced. If compaction by a vibrator or the like is simplified, the load applied to the inner mold frame and the outer mold frame becomes small. Therefore, even when the main girder 1 requires high dimensional accuracy, It is possible to make the outer mold frame light, and it is possible to suppress an increase in manufacturing cost.

内型枠と外型枠との間に打設した超高強度繊維補強コンクリートが脱型強度に達したら、内型枠と外型枠を脱型する。超高強度繊維補強コンクリートは、硬化する過程で自己収縮するので、中空部が全長に亘って形成された箱桁を製造する場合には、内型枠に作用する大きな拘束力によって、その脱型作業が困難なものになるが、本実施形態では、主桁1の溝形部11の下面を開口させているので、内型枠の脱型作業が容易になり、ひいては、内型枠を容易に使い回すことが可能となる。   When the ultra-high-strength fiber reinforced concrete cast between the inner mold frame and the outer mold frame reaches the demolding strength, the inner mold frame and the outer mold frame are demolded. Ultra-high-strength fiber reinforced concrete is self-shrinking in the process of curing, so when producing a box girder with a hollow part formed over its entire length, its demolding is caused by a large restraining force acting on the inner mold. Although the work is difficult, in this embodiment, since the lower surface of the groove 11 of the main girder 1 is opened, it is easy to remove the inner mold, and thus the inner mold is easy. It can be reused.

内型枠と外型枠を脱型したら、熱養生を行う。熱養生を行うと、セメント中の遊離石灰とポゾラン系反応粒子のシリカやアルミナが結合して安定的で硬い物質が早期に形成され、セメント系マトリックスの組織が緻密になるので、その後の乾燥収縮がなくなり、乾燥ひび割れ等が発生し難くなる。   After removing the inner and outer molds, heat curing is performed. When heat curing is performed, the free lime in the cement and the silica and alumina of the pozzolanic reaction particles combine to form a stable and hard substance at an early stage, and the cement matrix structure becomes denser. , And dry cracks are less likely to occur.

図1の(b)に示す縦緊張材2は、主桁1にプレストレスを付与するものである。プレストレスは、ポストテンション方式により導入される。縦緊張材2は、主桁1を橋軸方向に貫通していて、緊張力(引張力)が付与された状態で、主桁1の橋軸方向の端面(中実部12の端面)に定着されている。縦緊張材2は、例えば、PC鋼より線などのPC鋼材からなる。縦緊張材2は、いわゆる外ケーブルであり、図2の(b)に示すように、中実部12の縦貫通孔1cと隔壁13の縦貫通孔1eとに挿通されつつ、主桁1の溝形部11の内部空間に露出した状態で配索される。   A longitudinal tension member 2 shown in FIG. 1B gives prestress to the main girder 1. Prestress is introduced by a post-tension method. The longitudinal tension member 2 penetrates the main girder 1 in the bridge axis direction and is applied to the end surface (end surface of the solid portion 12) of the main girder 1 in the bridge axis direction in a state where tension (tensile force) is applied. It has been established. The longitudinal tension material 2 consists of PC steel materials, such as a strand from PC steel, for example. The vertical tension member 2 is a so-called external cable, and is inserted into the vertical through hole 1c of the solid portion 12 and the vertical through hole 1e of the partition wall 13 as shown in FIG. It is routed while being exposed in the internal space of the groove-shaped portion 11.

図1の(b)に示すように、縦緊張材2の縦断線形は、下に凸となるような形状であり、主桁1の長手方向の端部から中央部に向って下向きに傾斜し、主桁1の中央部において主桁1の下端縁と平行になっている。このようにすると、鉛直荷重に起因して主桁1に発生する縦曲げモーメントの分布に対応した態様でプレストレスを導入することができるので、主桁1の曲げ耐力が向上する。また、縦緊張材2の平面線形は、図示は省略するが、主桁1の中心軸の平面線形に沿うような形状になっている。このようにすると、縦緊張材2の緊張力に起因する横曲げモーメントの発生を抑制することができる。なお、複数の隔壁13,13,…が縦緊張材2の偏向部(デビエータ)として機能するので、縦緊張材2に緊張力を付与しても、図示の線形は維持される。   As shown in FIG. 1B, the longitudinal alignment of the longitudinal tension member 2 has a shape that protrudes downward, and is inclined downward from the longitudinal end of the main girder 1 toward the center. The central part of the main beam 1 is parallel to the lower edge of the main beam 1. In this way, since prestress can be introduced in a manner corresponding to the distribution of the longitudinal bending moment generated in the main girder 1 due to the vertical load, the bending strength of the main girder 1 is improved. In addition, the plane alignment of the longitudinal tension member 2 is not shown in the drawing, but has a shape along the plane alignment of the central axis of the main beam 1. If it does in this way, generation | occurrence | production of the lateral bending moment resulting from the tension | tensile_strength of the longitudinal tension material 2 can be suppressed. In addition, since several partition 13, 13, ... functions as a deflection | deviation part (deviator) of the longitudinal tension material 2, even if tension force is given to the longitudinal tension material 2, the linearity of illustration is maintained.

横桁3は、図1の(a)に示すように、主桁1,1の端部間に介設されている。本実施形態の横桁3は、橋脚Pの真上に配置されていて、図3の(c)に示すように、中実部12,12の下部同士を繋いでいる。図示は省略しているが、横桁3の端面と中実部12の側面との間には、セメント系の充填材を介在させている。充填材を省略し、横桁3の端面を中実部12の側面に直に当接させても差し支えない。   As shown in FIG. 1A, the cross beam 3 is interposed between the ends of the main beams 1 and 1. The cross girder 3 of this embodiment is arrange | positioned just above the bridge pier P, and has connected the lower parts of the solid parts 12 and 12, as shown to (c) of FIG. Although not shown, a cement-based filler is interposed between the end face of the cross beam 3 and the side face of the solid portion 12. The filler may be omitted, and the end face of the cross beam 3 may be brought into direct contact with the side face of the solid portion 12.

本実施形態の横桁3は、図2の(a)にも示すように、断面中空のコンクリート製部材であり、角筒状を呈している。なお、横桁3も、超高強度繊維補強コンクリートにて形成されている。横桁3の外殻部には、複数の横貫通孔3a,3a,…が形成されている。横貫通孔3a,3a,…は、複数の横緊張材4,4,…に対応して設けられていて、横桁3の外殻部を橋軸直角方向に貫通している。   As shown in FIG. 2A, the cross beam 3 of the present embodiment is a concrete member having a hollow cross section and has a rectangular tube shape. The cross beam 3 is also formed of ultra high strength fiber reinforced concrete. A plurality of lateral through holes 3a, 3a,... Are formed in the outer shell portion of the cross beam 3. The horizontal through holes 3a, 3a,... Are provided corresponding to the plurality of lateral tension members 4, 4,..., And penetrate the outer shell portion of the cross beam 3 in the direction perpendicular to the bridge axis.

横緊張材4は、図3の(c)に示すように、左右の主桁1,1および横桁3を橋軸直角方向に貫通していて、緊張力が付与された状態で、中実部12の外側の側面(横桁3が接続される側面の反対側の側面)に定着されている。本実施形態の横緊張材4は、例えば、PC鋼棒などのPC鋼材からなり、中実部12の横貫通孔1dと横桁3の横貫通孔3aとに挿通される。   As shown in FIG. 3 (c), the lateral tension member 4 passes through the left and right main girders 1, 1 and the lateral girder 3 in the direction perpendicular to the bridge axis, and is solid in a state where tension is applied. It is fixed to the outer side surface of the portion 12 (the side surface opposite to the side surface to which the cross beam 3 is connected). The lateral tension member 4 of the present embodiment is made of, for example, a PC steel material such as a PC steel rod, and is inserted into the lateral through hole 1d of the solid portion 12 and the lateral through hole 3a of the cross beam 3.

以上のように構成された橋梁上部構造Kを構築するには、図1の(a)に示すように、橋軸方向に隣り合う二つの橋脚P,P間に2本の主桁1,1を並設した後に、橋脚P上において、隣り合う主桁1,1を横桁3,3で繋げばよい。   In order to construct the bridge superstructure K configured as described above, as shown in FIG. 1 (a), two main girders 1, 1 are provided between two bridge piers P adjacent to each other in the bridge axis direction. Next, the adjacent main girders 1 and 1 may be connected by the horizontal girders 3 and 3 on the pier P.

より詳細には、まず、二つの橋脚P,P間に主桁1,1を架設するとともに、左右の主桁1,1の間に横桁3,3を配置する。主桁1および横桁3は、橋脚P上に設けた仮受部材(図示略)に仮置きし、主桁1の側面と横桁3の端面との間には、数センチ程度の隙間(図示略)を確保しておく。なお、縦緊張材2(図1の(b)参照)は、主桁1の製造工場や桟橋51上において主桁1に配索し、橋脚P,P間に主桁1を架設する前にプレストレスを導入しておく。   More specifically, first, the main girders 1 and 1 are installed between the two piers P and P, and the horizontal girders 3 and 3 are arranged between the left and right main girders 1 and 1. The main girder 1 and the horizontal girder 3 are temporarily placed on a temporary receiving member (not shown) provided on the bridge pier P, and a gap of about several centimeters (between the side surface of the main girder 1 and the end surface of the horizontal girder 3 ( (Not shown) is secured. Before the main girder 1 is installed between the piers P and P, the longitudinal tension member 2 (see FIG. 1B) is routed to the main girder 1 on the manufacturing factory of the main girder 1 or on the pier 51. Introduce pre-stress.

続いて、図3の(c)に示すように、左右の主桁1,1の中実部12,12と横桁3とに横緊張材4,4を貫設し、主桁1の側面と横桁3の端面との間に確保した隙間の周囲に型枠(図示略)を設置したうえで、当該隙間に充填材(例えば、セメント系充填材)を充填する。充填材が所定強度に硬化したら、横緊張材4,4に緊張力を付与し、主桁1,1と横桁3とを緊結する。その後、仮受部材に支持されていた主桁1と横桁3とを、橋脚P上に設けた支承Sに受け替えると、橋梁上部構造Kが完成する。   Subsequently, as shown in FIG. 3C, lateral tension members 4, 4 are provided through the solid portions 12, 12 of the left and right main girders 1, 1 and the transverse girder 3, A mold (not shown) is installed around the gap secured between the end of the cross beam 3 and a filler (for example, cement filler) is filled in the gap. When the filler has hardened to a predetermined strength, tension is applied to the transverse tension members 4 and 4, and the main girders 1 and 1 and the transverse girders 3 are connected. Thereafter, when the main girder 1 and the cross girder 3 supported by the temporary support member are replaced with the support S provided on the pier P, the bridge superstructure K is completed.

ここで、複数の橋梁上部構造K,K,…を連設する手順を、図4〜7を主に参照して詳細に説明する。   Here, the procedure for connecting a plurality of bridge superstructures K, K,... Will be described in detail with reference mainly to FIGS.

図4に示すように、まず、橋梁の建設予定位置に複数の橋脚P,P,…を構築するとともに、橋梁の建設予定位置に隣接した領域に、作業ヤードとなる桟橋51を構築する。また、クレーン52,52などの資機材を桟橋51上に設置する。   As shown in FIG. 4, first, a plurality of piers P, P,... Are constructed at a planned construction position of the bridge, and a pier 51 serving as a work yard is constructed in an area adjacent to the planned construction position of the bridge. In addition, materials and equipment such as cranes 52 and 52 are installed on the pier 51.

続いて、クレーン52,52を利用して、桟橋51に隣接した領域に、2スパン分の橋梁上部構造K,Kを構築する。なお、以下の説明においては、桟橋51脇に構築された橋梁上部構造Kを「既設の橋梁上部構造K」と称する場合がある。   Subsequently, the bridge upper structures K and K for two spans are constructed in an area adjacent to the pier 51 using the cranes 52 and 52. In the following description, the bridge upper structure K constructed on the side of the pier 51 may be referred to as “existing bridge upper structure K”.

その後、図5に示すように、既設の主桁1,1上に、台車6,6と、架設装置7とを設置する。台車6,6は、次工程において架設すべき主桁1’(以下、「新設の主桁1’」と称する場合がある)を架設装置7まで運搬するものであり、架設装置7は、新設の主桁1’を架設予定位置まで運搬するものである。   Thereafter, as shown in FIG. 5, the carts 6 and 6 and the erection device 7 are installed on the existing main girders 1 and 1. The trolleys 6 and 6 carry the main girder 1 ′ to be erected in the next process (hereinafter may be referred to as “new main girder 1 ′”) to the erection device 7, and the erection device 7 is newly installed. The main girder 1 'is transported to the planned installation position.

台車6の構成に制限はないが、図示のものは、既設の主桁1,1間に架設されていて、既設の主桁1,1上を橋軸方向に走行する。本実施形態の台車6は、既設の主桁1,1等に設けられた図示せぬ牽引手段に牽引されることで、主桁1,1上を走行する。なお、台車6にモータ等の動力源を搭載しておき、台車6を自走させてもよい。   Although there is no restriction | limiting in the structure of the trolley | bogie 6, what is illustrated is constructed between the existing main girders 1 and 1, and it travels on the existing main girders 1 and 1 in a bridge axis direction. The cart 6 of the present embodiment travels on the main girders 1 and 1 by being pulled by unillustrated pulling means provided on the existing main girders 1 and 1. Note that a power source such as a motor may be mounted on the cart 6 so that the cart 6 can be self-propelled.

架設装置7の構成にも制限はないが、図示のものは、左右一対の架設桁71,71と、架設桁71,71上を走行する橋型クレーン72,72と、架設桁71の下部に設けられた走行架台73(図5の(b)および図6の(a)参照)とを備えている。架設桁71は、2スパン分の長さを具備したトラス構造の桁であり、1スパン分の長さに対応する部分が既設の主桁1の上方に配置されるとともに、残り1スパン分の長さに対応する部分が新設の主桁1’の架設予定位置に沿って延出している。架設桁71の先端部は、橋脚Pに支持される(図6の(a)参照)。橋型クレーン72は、架設桁71,71間に架設されており、主桁1’を吊持した状態で、橋軸方向に走行する。本実施形態の架設装置7は、自らに搭載されたモータを動力源として既設の主桁1,1上を自走する。なお、既設の主桁1,1等に図示せぬ牽引手段を設け、架設装置7を牽引してもよい。   Although the construction of the erection device 7 is not limited, the illustrated one is a pair of left and right erection beams 71, 71, bridge cranes 72, 72 that run on the erection beams 71, 71, and a lower part of the erection beam 71. A traveling platform 73 (see FIG. 5B and FIG. 6A) is provided. The installation girder 71 is a truss structure girder having a length of two spans, and a portion corresponding to the length of one span is disposed above the existing main girder 1, and the remaining one span. The portion corresponding to the length extends along the planned construction position of the newly installed main girder 1 ′. The tip of the erection beam 71 is supported by the pier P (see FIG. 6A). The bridge-type crane 72 is installed between the installation girders 71 and 71, and travels in the direction of the bridge axis while the main girder 1 'is suspended. The erection device 7 of the present embodiment runs on the existing main girders 1 and 1 using a motor mounted on the erection device 7 as a power source. Note that traction means (not shown) may be provided on the existing main girders 1, 1 and the like, and the erection device 7 may be pulled.

続いて、クレーン52,52を利用して、台車6,6上に新設の主桁1’を載置する。その後、図6の(a)に示すように、主桁1’を架設装置7に向けて移動させる。図6の(b)に示すように、新設の主桁1’を架設装置7の内部まで移動させたら、主桁1’を橋型クレーン72,72に吊持させ、主桁1’を台車6,6(図5の(a)参照)の上方に持ち上げる。   Subsequently, the newly installed main girder 1 ′ is placed on the carts 6 and 6 using the cranes 52 and 52. Thereafter, as shown in FIG. 6A, the main girder 1 ′ is moved toward the construction device 7. As shown in FIG. 6 (b), when the newly installed main girder 1 'is moved to the inside of the erection device 7, the main girder 1' is suspended by the bridge cranes 72, 72, and the main girder 1 'is moved to the carriage. 6 and 6 (see FIG. 5 (a)).

続いて、橋型クレーン72,72を架設桁71の先端側に向けて移動させる。新設の主桁1’が架設予定位置の上方に到達したならば、図6の(c)に示すように、主桁1’を降下させ、架設予定位置に設けられた橋脚P,P間に主桁1’を仮置きする。主桁1’は、1スパン分の長さを具備しているので、主桁1’の中間部分を支持するベントなどは必要ない。   Subsequently, the bridge cranes 72 and 72 are moved toward the distal end side of the erection beam 71. When the new main girder 1 ′ reaches above the planned installation position, as shown in FIG. 6 (c), the main girder 1 ′ is lowered, and between the piers P and P provided at the planned installation position. Temporarily place the main beam 1 '. Since the main girder 1 'has a length corresponding to one span, a vent or the like for supporting an intermediate portion of the main girder 1' is not necessary.

その後、図7の(a)に示すように、新設の主桁1’を橋軸直角方向に移動させ、支承S(図1の(b)参照)上に設置する。なお、図7においては、架設装置7の図示を省略している。   Thereafter, as shown in FIG. 7A, the newly installed main girder 1 'is moved in the direction perpendicular to the bridge axis and installed on the support S (see FIG. 1B). In FIG. 7, illustration of the erection device 7 is omitted.

次に、図7の(b)に示すように、主桁1’の隣に他の主桁1’を架設する。二本目の主桁1’の架設手順も、上記の手順と同様である。その後、台車6を利用して、横桁3’,3’を橋脚P上に運搬し、橋梁P上において主桁1’,1’の端部同士を横桁3’,3’で連結すると、新設の橋梁上部構造K’が完成する。主桁1’,1’の端部同士のみを横桁3’で連結すればよいので、スパン中央部にベントや作業足場等を構築する必要はない。なお、橋脚P上に作業スペースを確保できないような場合には、橋脚Pに片持ち足場を付設すればよい。   Next, as shown in FIG. 7B, another main beam 1 'is installed next to the main beam 1'. The installation procedure of the second main girder 1 'is the same as that described above. After that, when the carriage 6 is used to transport the cross beams 3 'and 3' onto the bridge pier P and the ends of the main beams 1 'and 1' are connected to each other with the cross beams 3 'and 3' on the bridge P. The new bridge superstructure K 'is completed. Since only the ends of the main girders 1 'and 1' need only be connected by the cross beam 3 ', it is not necessary to construct a vent, a working scaffold or the like in the center of the span. If a work space cannot be secured on the pier P, a cantilevered scaffold may be attached to the pier P.

そして、以上のような作業を繰り返すと、複数の橋梁上部構造K,K,…を橋軸方向に連設することができる。   When the above operations are repeated, a plurality of bridge superstructures K, K,... Can be connected in the bridge axis direction.

以上説明したように、橋梁上部構造Kでは、主桁1に開断面形状の溝形部11を設けるとともに、横桁3を中空にすることで軽量化を実現している。橋梁上部構造Kが軽量になると、橋脚Pなどの橋梁下部構造に作用する荷重も小さくなるので、橋梁下部構造の規模を縮小することが可能となり、ひいては、橋梁工事の総工事費を削減することが可能になる。   As described above, in the bridge superstructure K, the main girder 1 is provided with the groove-shaped portion 11 having an open cross-sectional shape, and the horizontal girder 3 is hollowed to realize weight reduction. When the bridge superstructure K becomes lighter, the load acting on the bridge substructure such as the pier P becomes smaller, so it is possible to reduce the scale of the bridge substructure and thus reduce the total construction cost of the bridge work. Is possible.

しかも、本実施形態では、主桁1を、引張抵抗を期待できる超高強度の超高強度繊維補強コンクリート製とし、さらに、主桁1に配索する縦緊張材2を「外ケーブル」としたので、主桁1のウェブ1aに埋設される鉄筋やPC鋼材を省略または削減することが可能になる。鉄筋等を省略すると、かぶりを確保する必要がなくなるので、主桁1の薄肉化を図ることが可能になり、ひいては、橋梁上部構造Kの軽量化を一段と推し進めることが可能になる。   Moreover, in this embodiment, the main girder 1 is made of ultra-high-strength ultra-high-strength fiber reinforced concrete that can be expected to have tensile resistance, and the longitudinal tension member 2 routed to the main girder 1 is an “outer cable”. Therefore, it is possible to omit or reduce the reinforcing bars and PC steel materials embedded in the web 1a of the main beam 1. If the reinforcing bars are omitted, it is not necessary to secure the cover, so that the main girder 1 can be thinned, and the bridge superstructure K can be further reduced in weight.

また、橋梁上部構造Kによれば、主桁1の大部分を開断面形状にしているので、内型枠の設置・脱型作業を簡易迅速に行うことが可能になる。すなわち、主桁1によれば、全長を閉断面形状とした箱型の主桁に比べて、主桁1を簡易かつ迅速に製造することが可能となる。   Further, according to the bridge superstructure K, most of the main girder 1 has an open cross-sectional shape, so that it is possible to easily and quickly perform the installation / demolding work of the inner mold. That is, according to the main girder 1, the main girder 1 can be easily and quickly manufactured as compared with a box-shaped main girder whose entire length is a closed cross-sectional shape.

橋梁上部構造Kによれば、隔壁13を貫くように縦緊張材2を配索し、隔壁13を縦緊張材2の偏向部(デビエータ)として利用しているので、その他の位置に設ける偏向部を省略あるいは削減することが可能になる。なお、主桁1にプレストレスを付与しているので、主桁1の長スパン化を図ることが可能になる。   According to the bridge superstructure K, the longitudinal tension member 2 is routed so as to penetrate the partition wall 13, and the partition wall 13 is used as a deflection unit (deviator) of the longitudinal tension member 2. Can be omitted or reduced. In addition, since prestress is given to the main girder 1, it becomes possible to achieve a long span of the main girder 1.

橋梁上部構造Kによれば、横緊張材4に付与した緊張力により、横桁3の橋軸直角方向の端面を中実部12の側面に圧着しているので、主桁1と横桁3とが強固に一体化するようになる。   According to the bridge superstructure K, the end face in the direction perpendicular to the bridge axis of the cross beam 3 is crimped to the side surface of the solid part 12 by the tension applied to the horizontal tension member 4. And come to be firmly integrated.

なお、主桁1の長手方向の端部には、支点反力のほか、縦緊張材2および横緊張材4を定着したことに伴う支圧力などが作用することになるが、橋梁上部構造Kでは、主桁1の両端部にソリッドな中実部12,12を形成しているので、支点反力や支圧力を安定して受け止めることができる。   In addition to the fulcrum reaction force, the supporting force associated with fixing the longitudinal tension member 2 and the lateral tension member 4 acts on the end of the main girder 1 in the longitudinal direction. Then, since the solid solid parts 12 and 12 are formed at both ends of the main girder 1, the fulcrum reaction force and the support pressure can be stably received.

また、図8の(a)に示すように、主桁1,1に対して橋軸直角方向の外力Hが作用すると、主桁1に転倒モーメントが発生することになるが、橋梁上部構造Kでは、橋軸直角方向に隣り合う主桁1,1を横桁3で連結して一体にしているので、転倒モーメントに対する抵抗力を高めることができる。すなわち、図8の(b)に示すように、単独で架設された主桁100に対して外力Hが作用した場合には、支承Sに働く支点反力V1’,V2’で転倒モーメントに抵抗することになるが、支点反力V1’,V2’の離隔距離(抵抗モーメントのアーム長)が小さいことから、支点反力V1’,V2’が大きいものとなり、主桁100の自重を考慮しても、支承Sのアンカーボルトには大きな引抜力が作用するようになる。大きな引抜力に対向するには、支承Sを重厚且つ大規模なものにする必要があるが、経済的ではない。   In addition, as shown in FIG. 8A, when an external force H in the direction perpendicular to the bridge axis acts on the main girders 1 and 1, a tipping moment is generated in the main girder 1, but the bridge superstructure K Then, since the main girders 1 and 1 adjacent to each other in the direction perpendicular to the bridge axis are connected and integrated with the cross beam 3, the resistance force against the overturning moment can be increased. That is, as shown in FIG. 8B, when an external force H is applied to the main girder 100 erected independently, the fulcrum reaction forces V1 ′ and V2 ′ acting on the support S resist the overturning moment. However, since the separation distance (arm length of the resistance moment) of the fulcrum reaction forces V1 ′ and V2 ′ is small, the fulcrum reaction forces V1 ′ and V2 ′ are large, and the weight of the main girder 100 is taken into consideration. However, a large pulling force acts on the anchor bolt of the support S. In order to face a large pulling force, the support S needs to be heavy and large-scale, but it is not economical.

これに対し、主桁1,1を横桁3で繋いだ本実施形態に係る橋梁上部構造Kによれば、図8の(a)に示すように、一方の主桁1の支承Sに働く支点反力V1と他方の主桁1の支承Sに働く支点反力V2とで転倒モーメントに抵抗することになるが、支点反力V1,V2の離隔距離(抵抗モーメントのアーム長)が大きいことから、支点反力V1,V2が小さくなり、主桁1,1等の自重を考慮すると、支承Sのアンカーボルトに作用する引抜力は、ゼロになるか、もしくは極めて小さいものとなる。つまり、橋梁上部構造Kによれば、支承Sを軽構造且つ小規模なものにすることが可能となるので、コスト削減を図ることが可能になる。   On the other hand, according to the bridge superstructure K according to this embodiment in which the main girders 1 and 1 are connected by the horizontal girders 3, as shown in FIG. The fulcrum reaction force V1 and the fulcrum reaction force V2 acting on the support S of the other main girder 1 resist the overturning moment, but the separation distance (arm length of the resistance moment) of the fulcrum reaction forces V1 and V2 is large. Therefore, when the fulcrum reaction forces V1 and V2 are reduced and the weights of the main girders 1 and 1 are taken into consideration, the pulling force acting on the anchor bolt of the support S becomes zero or extremely small. That is, according to the bridge upper structure K, it is possible to make the support S light and have a small scale, so that it is possible to reduce the cost.

さらに、橋梁上部構造Kでは、緻密な組織が形成される超高強度繊維補強コンクリートで主桁1や横桁3を形成したので、塩害などが懸念される過酷な自然条件下においても、100年のオーダーで維持管理が不要となる。   Furthermore, in the bridge superstructure K, the main girder 1 and the cross girder 3 are formed of ultra-high strength fiber reinforced concrete with a dense structure, so even under severe natural conditions where salt damage is a concern, 100 years No maintenance is required for orders.

なお、跨座式モノレールの軌道桁においては、モノレール車両の走行輪が走行する走行面だけでなく、案内輪が走行する案内面や安定輪が走行する安定面に対しても、高い寸法精度と平滑度が要求されるところ、本実施形態のように、自己充填製の高い超高強度繊維補強コンクリートにより主桁1を形成する場合には、型枠の寸法精度よび平滑度を高めるだけで、走行面等の寸法精度および平滑度を高めることが可能となる。   In the straddle-type monorail track girder, not only the traveling surface on which the traveling wheels of the monorail vehicle travel, but also the guide surface on which the guide wheels travel and the stable surface on which the stable wheels travel have high dimensional accuracy. Where smoothness is required, as in the present embodiment, when the main girder 1 is formed from self-filling high ultra-high strength fiber reinforced concrete, simply increasing the dimensional accuracy and smoothness of the mold, It becomes possible to improve the dimensional accuracy and smoothness of the running surface and the like.

加えて、本実施形態においては、超高強度繊維補強コンクリートからなる主桁1の上面が走行面となるので、その摩擦係数を0.6以上にすることができ、したがって、モノレール車両のスリップに対する安全性が高いものとなる。   In addition, in the present embodiment, since the upper surface of the main girder 1 made of ultra-high-strength fiber reinforced concrete is the running surface, the friction coefficient can be made 0.6 or more, and therefore against the slip of a monorail vehicle Safety is high.

ちなみに、従前のプレストレストコンクリート製軌道桁では、支点間距離を概ね20m以下に設定する必要があったが、橋梁上部構造Kによれば、90〜100(m)程度まで拡張することができる。軌道桁の支点間距離を大きくすることができれば、橋脚Pの本数を削減することができるので、工期や工費を削減することが可能となる。   Incidentally, in the conventional prestressed concrete track girder, it was necessary to set the distance between fulcrums to about 20 m or less, but according to the bridge superstructure K, it can be expanded to about 90 to 100 (m). If the distance between the fulcrum of the track girder can be increased, the number of piers P can be reduced, so that the construction period and cost can be reduced.

また、本実施形態に係る橋梁上部構造Kの構築方法のように、複数の主桁1,1を個別に架設すると、広大な作業スペースや大型の重機を使用せずとも、橋梁上部構造Kを構築することが可能になる。しかも、本実施形態に係る橋梁上部構造Kの構築方法によれば、スパン中央部分にベントや作業足場等を構築する必要がないので、架設予定位置の下方を通過する既設交通路への交通規制等を小規模なものに止めることが可能になる。   Further, when the plurality of main girders 1 and 1 are individually installed as in the method for constructing the bridge superstructure K according to the present embodiment, the bridge superstructure K can be obtained without using a large work space and large heavy machinery. It becomes possible to build. In addition, according to the method for constructing the bridge superstructure K according to the present embodiment, it is not necessary to construct a vent, a work scaffold, or the like in the center portion of the span, so traffic regulation to the existing traffic road that passes below the planned construction position Etc. can be stopped on a small scale.

なお、コンクリート製の主桁1は、鋼製の主桁よりも座屈し難いので、主桁1,1の中間部に横桁3を配置せずとも、安定した構造になるが、例えば、主桁の平面線形がS字状を呈している場合や支点間距離が大きいような場合などにおいては、主桁1,1の中間部同士を横桁3で連結してもよい。   In addition, the concrete main girder 1 is less likely to buckle than the steel main girder, and thus a stable structure can be obtained without arranging the cross girder 3 in the middle of the main girder 1 and 1. In the case where the plane alignment of the girder has an S-shape or when the distance between the fulcrums is large, the intermediate portions of the main girders 1 and 1 may be connected by the horizontal girder 3.

また、本実施形態では、一体打設により一体成形された主桁1を例示したが、工場設備や輸送車両の制約により、1スパン分の長さを有する主桁1を一体成形できないような場合には、図示は省略するが、複数のセグメントに分割し、現場付近の作業ヤードにおいて一体化すればよい。一体化した後の手順は、図6,7に示した前記した手順と同様である。   Further, in the present embodiment, the main girder 1 integrally formed by integral driving is illustrated, but the main girder 1 having a length corresponding to one span cannot be integrally formed due to restrictions of factory equipment and transportation vehicles. Although not shown in the figure, it may be divided into a plurality of segments and integrated in a work yard near the site. The procedure after the integration is the same as the procedure shown in FIGS.

なお、複数のセグメントを一体化して主桁1を構築する場合、各セグメントは、マッチキャストにて製作することが好ましい。セグメントをマッチキャストにより製作した場合は、例えばドライジョイント方式やウェットジョイント方式といった接合方式により、セグメント同士を連結すればよい。ちなみに、ドライジョイント方式とは、セグメントの接合端面にエポキシ樹脂等を塗布したうえで他のセグメントの接合端面に密着させ、複数のセグメントを貫通するように配索した縦緊張材に対してポストテンション方式でプレストレスを導入することで、セグメント同士を接合する接合方式のことである。また、ウェットジョイント方式とは、数センチ程度の隙間をあけた状態で二つのセグメントを対向配置するとともに、各セグメントを貫通するように縦緊張材を配索しておき、隙間を取り囲むように設置した型枠内にセメント系充填材を充填し、当該充填材が所定強度に達した後に、ポストテンション方式でプレストレスを導入することで、セグメント同士を接合する接合方式のことである。   When the main girder 1 is constructed by integrating a plurality of segments, each segment is preferably manufactured by match casting. When the segments are manufactured by match casting, the segments may be connected by a joining method such as a dry joint method or a wet joint method. By the way, the dry joint method applies post tension to the longitudinal tension material that is routed so as to penetrate through multiple segments by applying epoxy resin etc. to the joint end surface of the segment and then sticking it to the joint end surface of other segments. It is a joining method that joins segments by introducing prestress in the method. In addition, the wet joint method has two segments facing each other with a gap of about several centimeters, and longitudinal tension members are routed so as to penetrate each segment. This is a joining method in which segments are joined by filling a cement-type filler in the mold form and introducing pre-stress by a post-tension method after the filler reaches a predetermined strength.

本実施形態では、跨座式モノレールの軌道として使用される橋梁上部構造Kを例示したが、一般的な鉄道橋や道路橋などに本発明に係る橋梁上部構造を適用しても勿論差し支えない。   In the present embodiment, the bridge superstructure K used as the track of the straddle-type monorail is illustrated, but it is needless to say that the bridge superstructure according to the present invention may be applied to a general railway bridge, a road bridge, and the like.

本実施形態では、橋軸方向に間隔をあけて配置された橋脚P,P間に架設される単純梁形式の橋梁上部構造Kを例示したが、本発明に係る橋梁上部構造の構造形式を限定する趣旨ではない。本発明は、例えば、三つ以上の橋脚(橋台)に架設され、連続梁として設計される橋梁上部構造にも適用することもできる。   In the present embodiment, the bridge superstructure K in the form of a simple beam constructed between the bridge piers P and P arranged at intervals in the bridge axis direction is exemplified, but the structure type of the bridge superstructure according to the present invention is limited. It is not the purpose. The present invention can also be applied to, for example, a bridge superstructure that is constructed on three or more piers (abutments) and designed as a continuous beam.

K 橋梁上部構造
1 主桁
11 溝形部
12 中実部
13 隔壁
2 縦緊張材
3 横桁
4 横緊張材
S 支承
P 橋脚
K Bridge superstructure 1 Main girder 11 Groove part 12 Solid part 13 Bulkhead 2 Longitudinal tension material 3 Lateral girder 4 Lateral tension material S Bearing P Pier

Claims (7)

橋軸直角方向に並設された複数のコンクリート製主桁と、橋軸直角方向に隣り合う前記主桁同士を繋ぐ横桁とを具備した橋梁上部構造であって、
前記主桁は、下向きに開口する開断面形状の溝形部と、前記溝形部の橋軸方向の端部に連設された中実部とを有し、
前記横桁が前記中実部に接続されており、
前記溝形部は、橋軸直角方向に対向する一対のウェブと、前記ウェブの上端部同士を繋ぐ床版部とを備えている、ことを特徴とする橋梁上部構造。
A bridge superstructure comprising a plurality of concrete main girders arranged side by side in a direction perpendicular to the bridge axis and a horizontal girder connecting the main girders adjacent in the direction perpendicular to the bridge axis,
The main girder has a groove portion having an open cross-sectional shape that opens downward, and a solid portion that is connected to an end portion of the groove portion in the bridge axis direction ,
The cross beam is connected to the solid part;
The said groove-shaped part is provided with a pair of web which opposes a bridge axis orthogonal direction, and the floor slab part which connects the upper end parts of the said web, The bridge superstructure characterized by the above-mentioned.
前記横桁と前記中実部とを橋軸直角方向に貫通する横緊張材を具備しており、
前記横緊張材に付与した緊張力により、前記横桁の橋軸直角方向の端面が前記中実部の側面に圧着されている、ことを特徴とする請求項に記載の橋梁上部構造。
It comprises a lateral tension material that penetrates the cross beam and the solid part in a direction perpendicular to the bridge axis,
2. The bridge superstructure according to claim 1 , wherein an end surface of the cross beam in a direction perpendicular to the bridge axis is crimped to a side surface of the solid portion by a tension force applied to the lateral tension member.
前記主桁の橋軸方向の両端部のそれぞれに前記中実部が設けられており、
前記中実部の下側に支承が設置されていることを特徴とする請求項または請求項に記載の橋梁上部構造。
The solid portion is provided at each of both ends in the bridge axis direction of the main girder,
The bridge superstructure according to claim 1 or 2 , wherein a support is installed below the solid part.
前記主桁を橋軸方向に貫通する縦緊張材を具備しており、
前記縦緊張材に付与した緊張力により、前記主桁にプレストレスが付与されていることを特徴とする請求項1乃至請求項のいずれか一項に記載の橋梁上部構造。
A longitudinal tension material penetrating the main girder in the direction of the bridge axis;
The bridge superstructure according to any one of claims 1 to 3 , wherein a prestress is applied to the main girder by a tension applied to the longitudinal tension member.
前記溝形部の内部空間に、橋軸方向に間隔をあけて並ぶ複数の隔壁が設けられており、
前記縦緊張材が、前記各隔壁を貫いており、
前記各隔壁が、前記縦緊張材の偏向部として機能していることを特徴とする請求項に記載の橋梁上部構造。
In the internal space of the groove-shaped part, a plurality of partition walls arranged at intervals in the bridge axis direction are provided,
The longitudinal tension material penetrates the partition walls,
The bridge superstructure according to claim 4 , wherein each partition wall functions as a deflection portion for the longitudinal tension member.
前記横桁は、筒状を呈することを特徴とする請求項1乃至請求項のいずれか一項に記載の橋梁上部構造。 The bridge superstructure according to any one of claims 1 to 5 , wherein the cross beam has a cylindrical shape. 橋軸直角方向に対向する一対のウェブと、前記ウェブの上端部同士を繋ぐ床版部とを備えて下向きに開口する開断面形状の溝形部を有するとともに、前記溝形部の橋軸方向の端部に連設された中実部を有するコンクリート製主桁を、橋軸方向に隣り合う二つの橋脚間に複数本並設した後に、前記橋脚上において、隣り合う前記主桁の前記中実部同士を横桁で繋ぐことを特徴とする橋梁上部構造の構築方法。 It has a groove-shaped portion having an open cross-sectional shape that opens downward with a pair of webs facing in a direction perpendicular to the bridge axis and a floor slab portion that connects the upper ends of the webs, and the bridge-axis direction of the groove-shaped portion After placing a plurality of concrete main girders having a solid part continuously provided at the end of the bridge between two adjacent piers in the bridge axis direction, the middle of the adjacent main girders on the pier A construction method of the bridge superstructure characterized by connecting the real parts with horizontal beams.
JP2009054698A 2009-03-09 2009-03-09 Bridge superstructure and construction method of bridge superstructure Active JP5243998B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009054698A JP5243998B2 (en) 2009-03-09 2009-03-09 Bridge superstructure and construction method of bridge superstructure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009054698A JP5243998B2 (en) 2009-03-09 2009-03-09 Bridge superstructure and construction method of bridge superstructure

Publications (2)

Publication Number Publication Date
JP2010209542A JP2010209542A (en) 2010-09-24
JP5243998B2 true JP5243998B2 (en) 2013-07-24

Family

ID=42969982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009054698A Active JP5243998B2 (en) 2009-03-09 2009-03-09 Bridge superstructure and construction method of bridge superstructure

Country Status (1)

Country Link
JP (1) JP5243998B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018046210A (en) 2016-09-15 2018-03-22 住友電工デバイス・イノベーション株式会社 Optical semiconductor device and method for controlling optical semiconductor device
CN108221509A (en) * 2018-02-09 2018-06-29 北京交通大学 A kind of cross-saddle single-track traffic pre-track beam of ribbed plate
JP7625393B2 (en) * 2019-10-31 2025-02-03 株式会社熊谷組 Pier construction method and bridge reconstruction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5872206U (en) * 1981-11-10 1983-05-16 堀口 隆幸 prefabricated bridge
JPH0634465Y2 (en) * 1990-10-18 1994-09-07 日開技研株式会社 Simple PC panel
JP4607785B2 (en) * 2006-02-13 2011-01-05 三井住友建設株式会社 Continuous viaduct
JP4939302B2 (en) * 2007-05-18 2012-05-23 東京モノレール株式会社 Bridge superstructure and construction method of bridge superstructure

Also Published As

Publication number Publication date
JP2010209542A (en) 2010-09-24

Similar Documents

Publication Publication Date Title
JP5149853B2 (en) Construction method of track girder, box girder and box girder for straddle type monorail
CN103485279B (en) For the wet seam of cross-saddle single-track traffic
CN103452052B (en) Movable mold hanging equipment for closing swivel bridges and closure section construction method
CN102704355B (en) Realization method of seamless rail for straddle-type monorail transportation
CN110029540B (en) High-speed magnetic levitation traffic double-line box girder and track structure
JP4403051B2 (en) Corrugated steel web bridge construction method
CN102002913B (en) Prefabricated T beam transferring trolley
JP4939302B2 (en) Bridge superstructure and construction method of bridge superstructure
CN102286935A (en) Brand-new construction method of cable-stayed bridge with hybrid composite beams
CN102182147A (en) Steel box girder erection method
CN103161101A (en) Straddle type monorail transportation rigid framework system
CN103437294A (en) Implementation method for multiple stress systems of beam bridge in straddle type monorail transport line
CN101210419A (en) Small radius curved concrete box girder construction machine with internal and external girder system and its construction method
CN101324055A (en) A hoisting device and hoisting method for a box girder integral steel frame
CN204343173U (en) A kind of Segmental assembling bridge-erecting machine
CN101787678A (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN113652948A (en) High-speed railway cable-stayed bridge with improved rigidity
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN113957793A (en) Construction method for prefabricating box girder support in complex urban environment
JP5243998B2 (en) Bridge superstructure and construction method of bridge superstructure
CN103437301A (en) Method for mounting construction hanging basket of suspended pouring section of single plane cable-stayed bridge
CN204982681U (en) Steel bow member integral translation device
CN113463494B (en) Track beam and construction method thereof
CN116770647A (en) Spliced track and construction method thereof
CN101649603A (en) 50-meter T-shaped beam prefabricated assembling process

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121112

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121120

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121228

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130301

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130326

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130405

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20190412

Year of fee payment: 6

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 5243998

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250