JP5282496B2 - Critical recovery work determination system, method and program - Google Patents
Critical recovery work determination system, method and program Download PDFInfo
- Publication number
- JP5282496B2 JP5282496B2 JP2008231428A JP2008231428A JP5282496B2 JP 5282496 B2 JP5282496 B2 JP 5282496B2 JP 2008231428 A JP2008231428 A JP 2008231428A JP 2008231428 A JP2008231428 A JP 2008231428A JP 5282496 B2 JP5282496 B2 JP 5282496B2
- Authority
- JP
- Japan
- Prior art keywords
- manufacturing process
- period
- production
- recovery
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 62
- 238000011084 recovery Methods 0.000 title claims description 416
- 238000004519 manufacturing process Methods 0.000 claims abstract description 988
- 230000000694 effects Effects 0.000 claims abstract description 199
- 238000004364 calculation method Methods 0.000 claims description 76
- 230000015556 catabolic process Effects 0.000 claims description 67
- 238000010586 diagram Methods 0.000 description 18
- 239000013067 intermediate product Substances 0.000 description 15
- 238000004891 communication Methods 0.000 description 11
- 230000005611 electricity Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 239000002994 raw material Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本発明は、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定システム、方法及びプログラムに関する。 In the present invention, when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, out of one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, the production activity of the production facility is resumed. The present invention relates to a critical recovery operation determination system, method, and program for determining which recovery operation is the critical recovery operation that most affects the time required for the recovery.
地震や水害等の災害等によって生産施設が損傷を被ると、その修繕費用のみならず、生産活動が停止することによる損失など、多大な損失を被ることになる。したがって、災害発生後は素早い生産活動の再開が望まれる。 If a production facility is damaged due to a disaster such as an earthquake or flood, not only the repair cost but also a loss due to the suspension of production activities will be incurred. Therefore, it is desirable to restart production activities quickly after a disaster occurs.
一方で、生産施設においては、複数の製造工程が組み合わされて生産が行われていることが多い。そして、それぞれの製造工程の生産活動を再開するための復旧作業には、速やかに完了できるものもあれば、長い期間を要するものもある。したがって、災害発生後から生産活動再開までの期間を最短化するためには、何れの復旧作業が復旧に時間を要し、生産活動再開までの期間に最も影響を与えるクリティカル復旧作業であるかを的確に把握することが重要である。 On the other hand, in production facilities, production is often performed by combining a plurality of manufacturing processes. In addition, some recovery operations for resuming the production activity of each manufacturing process can be completed quickly, and others can take a long time. Therefore, in order to minimize the period from the occurrence of a disaster to the resumption of production activities, which recovery work takes time to recover and is the critical recovery work that has the greatest impact on the period until production activities resume. It is important to understand accurately.
ところで、特許文献1には、地震による生産施設の損傷を評価するとともに、生産施設の復旧に要する日数や損失額を評価する技術が開示されている。しかし、この技術では、どの復旧作業が時間を要するか、どのような手順で行えば効率的に生産施設の復旧ができるかについては明らかにしていない。
本発明はかかる従来の課題に鑑みて成されたもので、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することを目的とする。 The present invention has been made in view of such conventional problems, and when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, one or more necessary for resuming the production activity of each manufacturing process It is an object of the present invention to determine which recovery work is the critical recovery work that has the greatest influence on the period required for resuming the production activity of the production facility.
かかる目的を達成するため、請求項1に示す発明は、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、前記各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、前記最初の復旧作業開始から前記生産施設の生産活動再開までに要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定システムであって、
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
前記各工程生産期間記憶部の記憶する前記製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶する必要な復旧作業を示す情報と、各復旧作業期間記憶部が記憶する前記各復旧作業に要する期間とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定部と、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出部と、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出部と、
前記第2製造工程再開期間算出部が算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出部と、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出部と、を備え、
前記クリティカル復旧作業判定部は、
前記第1製造工程再開期間算出部及び前記第2製造工程再開期間算出部が算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出部及び前記第4製造工程再開期間算出部が算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することを特徴とするクリティカル復旧作業判定システムである。
In order to achieve this object, the invention shown in
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
The period required for production in the manufacturing process stored in each process production period storage unit, information indicating the necessary recovery work stored in each recovery work content storage unit, and each of the recovery work period storage units stored A critical recovery operation determination unit that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of the production facility, based on the period required for the recovery operation ;
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process resumption period calculation unit that calculates a minimum period required for resuming the production activity of the first manufacturing process based on a period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculation unit that calculates a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration operation stored in the period storage unit;
A period required for resuming the production activity of the final manufacturing process calculated by the second manufacturing process restart period calculating unit, and a period required for production in the manufacturing process immediately before the final manufacturing process stored by each process production period storage unit; In order to avoid affecting the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculation unit for calculating a time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculation unit for calculating the latest time point that must be performed,
The critical recovery work determination unit
The period required for resuming the production activity of each manufacturing process calculated by the first manufacturing process resumption period calculation unit and the second manufacturing process resumption period calculation unit, the third manufacturing process resumption period calculation unit, and the fourth Based on the latest time point at which the production activity of each manufacturing process must be resumed calculated by the production process resumption period calculation unit, which critical recovery operation has the greatest impact on the period required to resume the production activity of the production facility. It is a critical recovery operation determination system characterized by determining whether it is a recovery operation.
請求項2に示す発明は、請求項1に記載のクリティカル復旧作業判定システムであって、
前記第1製造工程再開期間算出部は、前記第1番目の製造工程の復旧に必要な各復旧作業のうち最も期間を要する復旧作業の期間を前記第1番目の製造工程の生産活動再開に最低限要する期間として算出し、
前記第2製造工程再開期間算出部は、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、当該製造工程の復旧に必要な各復旧作業の期間とのうち最も長い期間を製造工程の生産活動再開に最低限要する期間として算出し、
前記第3製造工程再開期間算出部は、前記第2製造工程再開期間算出部が算出した前記最終製造工程の生産活動再開に要する期間から、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間を差し引くことにより、前記最終製造工程の直前の製造工程の生産活動を再開しなければならない最も遅い時点を算出し、
前記第4製造工程再開期間算出部は、前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点から、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間を差し引くことにより、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出することを特徴とするクリティカル復旧作業判定システムである。
The invention according to
The first manufacturing process resumption period calculating unit sets the period of the recovery work that requires the longest time among the recovery works necessary for the recovery of the first manufacturing process to the minimum for resuming the production activity of the first manufacturing process. Calculated as the time limit,
The second manufacturing process resumption period calculation unit is required for production in a period necessary for resuming the production activity of the manufacturing process immediately before the manufacturing process and a manufacturing process immediately before the manufacturing process stored in each process production period storage unit. Calculate the longest period of the sum of the period and the period of each restoration work required for the restoration of the manufacturing process as the minimum period required to resume the production activity of the manufacturing process,
The third manufacturing process restart period calculation unit is configured to store the final manufacturing process stored in each process production period storage unit from a period required for resuming the production activity of the final manufacturing process calculated by the second manufacturing process restart period calculation unit. By subtracting the period required for production in the manufacturing process immediately before, the latest time point at which the production activity of the manufacturing process immediately before the final manufacturing process must be resumed is calculated.
The fourth manufacturing process resumption period calculation unit must resume the production activity of the manufacturing process immediately after the manufacturing process in order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process. By subtracting the time required for production in the manufacturing process stored in the manufacturing process storage unit from each process from the latest time that must not be calculated, the latest time at which the production activity of the manufacturing process must be resumed is calculated. It is a critical recovery work judgment system.
請求項3に示す発明は、請求項1又は2に記載のクリティカル復旧作業判定システムであって、
前記クリティカル復旧作業判定部は、全ての製造工程についてそれぞれ、前記災害発生時点から前記第3製造工程再開期間算出部又は前記第4製造工程再開期間算出部が算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点までの期間から、第1製造工程再開期間算出部又は第2製造工程再開期間算出部が算出した前記各製造工程の生産活動再開に最低限要する期間を差し引いた差分が0である場合には、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、当該製造工程の復旧作業のうち最も期間を要するものがクリティカル復旧作業であると判定することを特徴とするクリティカル復旧作業判定システムである。
The invention shown in
The critical recovery work determination unit is configured to perform the production activity of each manufacturing process calculated by the third manufacturing process resumption period calculation unit or the fourth manufacturing process resumption period calculation unit from the time when the disaster occurred for each of the manufacturing processes. The difference obtained by subtracting the minimum period required for resuming the production activity of each manufacturing process calculated by the first manufacturing process resuming period calculating unit or the second manufacturing process resuming period calculating unit from the period until the latest time point that must be restarted Is 0, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process and the period required for production in the manufacturing process immediately before the manufacturing process stored in each process production period storage unit Critical recovery work characterized in that it is determined that the most time-consuming recovery work in the manufacturing process and critical period is the critical recovery work A constant system.
請求項4に示す発明は、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、前記各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、前記最初の復旧作業開始から前記生産施設の生産活動再開までに要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定システムであって、
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
前記各工程生産期間記憶部の記憶する前記製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶する必要な復旧作業を示す情報と、各復旧作業期間記憶部が記憶する前記各復旧作業に要する期間とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定部と、
前記クリティカル復旧作業判定部が判定したクリティカル復旧作業について災害対策を講じた場合の前記各復旧作業に要する期間の入力を受付ける入力受付部と、
を備え、
前記各復旧作業内容記憶部は、前記災害対策を講じた場合の前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を記憶し、
前記各復旧作業期間記憶部は、前記災害対策を講じた場合の前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶し、
前記クリティカル復旧作業判定部は、前記災害対策を講じた場合について、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することを特徴とするクリティカル復旧作業判定システムである。
In the invention shown in claim 4, when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, A critical recovery work determination system that determines which recovery work is the critical recovery work that most affects the period required from the start of the first recovery work to the restart of the production activity of the production facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
The period required for production in the manufacturing process stored in each process production period storage unit, information indicating the necessary recovery work stored in each recovery work content storage unit, and each of the recovery work period storage units stored A critical recovery operation determination unit that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of the production facility, based on the period required for the recovery operation;
An input receiving unit that receives an input of a period required for each recovery work when disaster countermeasures are taken for the critical recovery work determined by the critical recovery work determination unit ;
With
Each restoration work content storage unit stores information indicating necessary restoration work for each of the manufacturing steps when the disaster countermeasures are taken,
Each restoration work period storage unit stores a period required for each restoration work when the disaster countermeasure is taken in association with each restoration work,
The critical recovery operation determination unit determines which recovery operation is the critical recovery operation that most affects the period required for resuming the production activity of the production facility when the disaster countermeasure is taken. This is a critical recovery work determination system.
請求項5に示す発明は、請求項1〜3の何れかに記載のクリティカル復旧作業判定システムであって、
前記各製造工程の復旧に必要な各復旧作業の内訳作業を示す情報を前記各製造工程を示す情報に対応付けて記憶する各復旧作業内訳作業記憶部と、
前記各復旧作業の内訳作業に要する期間を前記内訳作業を示す情報に対応付けて記憶する内訳作業期間記憶部と、
前記各復旧作業内訳作業記憶部が記憶する前記各復旧作業の内訳作業を示す情報と、前記内訳作業期間記憶部が記憶する前記各復旧作業の内訳作業に要する期間とに基づいて、前記各復旧作業に要する期間を算出する各復旧作業期間算出部と、
を備え、
前記各復旧作業期間記憶部は、前記各復旧作業期間算出部が算出した前記各復旧作業に要する期間を記憶することを特徴とするクリティカル復旧作業判定システムである。
The invention shown in claim 5 is the critical recovery work determination system according to any one of
Each recovery work breakdown work storage unit that stores information indicating the breakdown work of each recovery work required for the recovery of each manufacturing process in association with the information indicating each manufacturing process;
A breakdown work period storage unit for storing a period required for the breakdown work of each recovery work in association with information indicating the breakdown work;
Based on the information indicating the breakdown work of each recovery work stored in each recovery work breakdown work storage unit and the period required for the breakdown work of each recovery work stored in the breakdown work period storage unit, Each restoration work period calculation unit for calculating the period required for work,
With
Each of the recovery work period storage units stores a period required for each of the recovery works calculated by each of the recovery work period calculation units.
請求項6に示す発明は、請求項5に記載のクリティカル復旧作業判定システムであって、
前記各復旧作業期間算出部は、前記各復旧作業の内訳作業に要する期間のうち最長の内訳作業の期間を前記各復旧作業に要する期間として算出することを特徴とするクリティカル復旧作業判定システムである。
The invention described in claim 6 is the critical recovery work determination system according to claim 5 ,
Each of the recovery work period calculation units is a critical recovery work determination system characterized in that the longest breakdown work period among the periods required for the breakdown work of each of the recovery works is calculated as a period required for each of the recovery works. .
請求項7に示す発明は、請求項5又は6に記載のクリティカル復旧作業判定システムであって、
前記クリティカル復旧作業判定部が判定したクリティカル復旧作業について災害対策を講じた場合の前記各復旧作業の内訳作業に要する期間の入力を受付ける入力受付部を備え、
前記各復旧作業内訳作業記憶部は、前記入力受付部が入力を受付けた前記所定の災害の対策を講じた場合の前記各復旧作業の内訳作業に要する期間を記憶し、
前記各復旧作業期間算出部、前記各製造工程復旧期間算出部、及び前記クリティカル復旧作業判定部は、前記所定の災害の対策を講じた場合について、算出又は判定することを特徴とするクリティカル復旧作業判定システムである。
The invention described in
An input receiving unit that receives an input of a period required for a breakdown work of each recovery work when a disaster countermeasure is taken for the critical recovery work determined by the critical recovery work determination unit;
Each restoration work breakdown work storage unit stores a period required for the breakdown work of each restoration work when the input accepting unit has taken measures against the predetermined disaster,
Each of the recovery work period calculation units, each of the manufacturing process recovery period calculation units, and the critical recovery operation determination unit calculates or determines when the predetermined disaster countermeasures are taken. Judgment system.
請求項8に示す発明は、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、前記各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、前記最初の復旧作業開始から前記生産施設の生産活動再開までに要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定方法であって、
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
を備えるコンピュータが、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出ステップと、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出ステップと、
前記第2製造工程再開期間算出ステップにて算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出ステップと、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出ステップと、
前記第1製造工程再開期間算出ステップ及び前記第2製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出ステップ及び前記第4製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するステップを含むことを特徴とするクリティカル復旧作業判定方法である。
In the invention shown in claim 8, when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among one or more restoration work necessary for resuming the production activity of each manufacturing process, A critical recovery work determination method for determining which recovery work is the critical recovery work that most affects the period required from the start of the first recovery work to the restart of the production activity of the production facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
A computer comprising
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process restart period calculating step for calculating a minimum period required for restarting the production activity of the first manufacturing process based on the period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculating step for calculating a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration work stored in the period storage unit;
The period required for resuming the production activity of the final manufacturing process calculated in the second manufacturing process restart period calculating step, and the period required for production in the manufacturing process immediately before the final manufacturing process stored in each process production period storage unit Based on the above, in order not to affect the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculating step for calculating a later time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculating step for calculating the latest time point that must be performed;
A period required for resuming the production activity of each manufacturing process calculated in the first manufacturing process resuming period calculating step and the second manufacturing process resuming period calculating step; a third manufacturing process resuming period calculating step; 4. Critical recovery work that most affects the time required for resuming the production activity of the production facility based on the latest point in time at which the production activity of each production process must be resumed, calculated in the production process resumption period calculation step. It is a critical recovery work determination method characterized by including the step which determines which recovery work is.
請求項9に示す発明は、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、前記各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、前記最初の復旧作業開始から前記生産施設の生産活動再開までに要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定プログラムであって、
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
を備えるコンピュータに、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出ステップと、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出ステップと、
前記第2製造工程再開期間算出ステップにて算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出ステップと、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出ステップと、
前記第1製造工程再開期間算出ステップ及び前記第2製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出ステップ及び前記第4製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するステップを実行させることを特徴とするクリティカル復旧作業判定プログラムである。
In the invention shown in claim 9, when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, A critical recovery work determination program that determines which recovery work is the critical recovery work that most affects the period required from the start of the first recovery work to the restart of the production activity of the production facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
On a computer with
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process restart period calculating step for calculating a minimum period required for restarting the production activity of the first manufacturing process based on the period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculating step for calculating a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration work stored in the period storage unit;
The period required for resuming the production activity of the final manufacturing process calculated in the second manufacturing process restart period calculating step, and the period required for production in the manufacturing process immediately before the final manufacturing process stored in each process production period storage unit Based on the above, in order not to affect the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculating step for calculating a later time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculating step for calculating the latest time point that must be performed;
A period required for resuming the production activity of each manufacturing process calculated in the first manufacturing process resuming period calculating step and the second manufacturing process resuming period calculating step; a third manufacturing process resuming period calculating step; 4. Critical recovery work that most affects the time required for resuming the production activity of the production facility based on the latest point in time at which the production activity of each production process must be resumed, calculated in the production process resumption period calculation step. It is a critical recovery work determination program that executes a step of determining which recovery work is a recovery work .
複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することができる。 When a production facility with multiple manufacturing processes is damaged by a specific disaster, out of one or more recovery operations required for resuming production activities in each manufacturing process, the period required for resuming production activities at the production facility It can be determined which recovery operation has the most critical critical recovery operation.
===第1実施形態===
複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定システム1は、例えば、災害発生後の生産活動の早期再開のための復旧作業の計画作成や、既存の生産施設の効果的な補強計画作成の支援に用いることができる。
=== First Embodiment ===
When a production facility with multiple manufacturing processes is damaged by a specific disaster, out of one or more recovery operations required for resuming production activities in each manufacturing process, the period required for resuming production activities at the production facility The critical recovery
図1は、第1実施形態のクリティカル復旧作業判定システム1を用いる対象となる生産施設の製造工程と、それぞれの製造工程の復旧に必要な復旧作業について説明するアローダイヤグラムである。
FIG. 1 is an arrow diagram for explaining a manufacturing process of a production facility that is a target for using the critical recovery
同図に示すように、この生産施設は、工程順に製造工程A〜Hの8つの製造工程からなる。
製造工程Aは、特許請求の範囲でいう「第1番目の製造工程」に相当し、原料の投入を受けて中間生成物Aを製造する工程である。製造工程Aには、原料及び所定の施設・機器の他、電気、通信、データのライフラインの供給が必要となっている。
製造工程Bは、第2番目の製造工程であり、中間生成物Aの投入を受けて中間生成物Bを製造する工程である。製造工程Bには、中間生成物A及び所定の施設・機器の供給の他、電気、ガス、水道、通信、データのライフラインの供給が必要となっている。
以下、同様に、各製造工程C〜Gは、直前の製造工程で製造される中間生成物を加工・移送等することにより、新たに中間生成物を製造する。また、各製造工程C〜Gには、中間生成物B〜Fの供給及び所定の施設・機器の他、電気、ガス、水道、通信、データ等のライフラインの供給がそれぞれ必要となっている。
製造工程Hは、最終の製造工程であり、中間生成物Gの投入を受けて完成品を製造する工程である。また、製造工程Hには、中間生成物Gの供給及び所定の施設・機器の他、電気、ガス、水道、通信、データのライフラインの供給が必要となっている。
As shown in the figure, this production facility comprises eight manufacturing processes, manufacturing processes A to H, in the order of processes.
The production process A corresponds to the “first production process” in the claims, and is a process for producing the intermediate product A upon receipt of raw materials. In the manufacturing process A, it is necessary to supply lifelines of electricity, communication and data in addition to raw materials and predetermined facilities / equipment.
The production process B is a second production process, and is a process for producing the intermediate product B upon receiving the input of the intermediate product A. In the manufacturing process B, in addition to the supply of the intermediate product A and predetermined facilities / equipment, it is necessary to supply the lifeline of electricity, gas, water, communication, and data.
Hereinafter, similarly, each manufacturing process C to G newly manufactures an intermediate product by processing / transferring the intermediate product manufactured in the immediately preceding manufacturing process. In addition, each manufacturing process C to G requires supply of intermediate products B to F and predetermined facilities / equipment, as well as supply of lifelines such as electricity, gas, water, communication, and data. .
The manufacturing process H is a final manufacturing process, and is a process for receiving the intermediate product G and manufacturing a finished product. In addition, in the manufacturing process H, in addition to the supply of the intermediate product G and predetermined facilities / equipment, it is necessary to supply the lifeline of electricity, gas, water, communication, and data.
以上のような製造工程A〜Hを有する生産施設が、地震等の災害が発生しそれぞれの製造工程が損失を被った場合には、同図に示すように生産活動を再開するために復旧作業X01〜X08、復旧作業X91〜X95が必要となる。 When a production facility having the manufacturing processes A to H described above has suffered a disaster such as an earthquake and suffered a loss in each manufacturing process, restoration work was resumed to resume production activities as shown in the figure. X01 to X08 and recovery operations X91 to X95 are required.
復旧作業X01〜X08は、同図に示すように地震等の災害が発生しそれぞれの製造工程が損失を被った場合に、それぞれの製造工程A〜Hに係る施設・機器等を復旧させるための復旧作業である。また、復旧作業X91〜X95は、電気(X91)、ガス(X92)、水道(X93)、通信(X94)、データ(X95)のライフラインについての復旧作業である。 Restoration work X01-X08 is for restoring facilities / equipment related to each manufacturing process A-H when disaster such as earthquake occurs and each manufacturing process suffers loss as shown in the figure It is a recovery work. The recovery operations X91 to X95 are recovery operations for the lifelines of electricity (X91), gas (X92), water supply (X93), communication (X94), and data (X95).
同図に示すように、製造工程Aの生産活動を再開するためには、復旧作業X01により製造工程Aの施設・機器等の復旧完了が必要となるだけでなく、復旧作業X91、復旧作業X94、復旧作業X95が完了し、電気、通信、データのライフラインの供給が確保されることが必要である。同様に、各製造工程B〜Hの生産活動を再開するためには、各復旧作業X02〜X08が必要となるだけでなく、復旧作業X91〜X95によりライフラインの供給が確保されることが必要である。 As shown in the figure, in order to resume the production activity of the manufacturing process A, not only the restoration of the facilities and equipment of the manufacturing process A is required by the recovery work X01, but also the recovery work X91 and the recovery work X94. Therefore, it is necessary that the restoration work X95 is completed and the supply of lifelines for electricity, communication, and data is secured. Similarly, in order to resume the production activities of the respective manufacturing processes B to H, not only the recovery operations X02 to X08 are required, but also the supply of the lifeline needs to be secured by the recovery operations X91 to X95. It is.
図2は、本発明の一実施形態であるクリティカル復旧作業判定システム1のハードウェア構成を示す図である。クリティカル復旧作業判定システム1は、PC(Personal Computer)やサーバ等のコンピュータと周辺機器とが接続されることにより構成され、CPU(Central Processing Unit)10、メモリ11、記憶手段12、記録媒体読取手段13、通信インターフェイス14、入力手段15、出力手段16等を備えている。
FIG. 2 is a diagram showing a hardware configuration of the critical recovery
CPU10は、記憶手段12に記憶されているプログラムをメモリ11に読み出して実行する。メモリ11は、例えばDRAM(Dynamic Random Access Memory)等である。記憶手段12は、例えばハードディスクドライブ等である。記録媒体読取手段13は、例えばCD−ROM(Compact Disc Read Only Memory)等の記録媒体17に記録されたプログラムやデータを読み取るドライブ装置である。通信インターフェイス14は、例えばNIC(Network Interface Card)等のネットワーク接続機器である。入力手段15は、例えばキーボードやマウス等である。出力手段16は、例えばディスプレイやプリンタ等である。
The
次に、第1実施形態のクリティカル復旧作業判定システム1のシステム構成について説明する。
Next, the system configuration of the critical recovery
図3は、第1実施形態のクリティカル復旧作業判定システム1の構成を示すブロック構成図である。同図に示すように、各工程生産期間記憶部40、各復旧作業内容記憶部42、各復旧作業期間記憶部44、第1製造工程再開期間算出部20、第2製造工程再開期間算出部22、第3製造工程再開期間算出部24、第4製造工程再開期間算出部26、クリティカル復旧作業判定部28、入力受付部32を備える。なお、各機能部20〜32は、CPU10が記憶手段12に記憶されたプログラムを読み出して実行することにより実現され、各記憶部40〜44は、記憶手段12上に構築される。
FIG. 3 is a block configuration diagram illustrating a configuration of the critical recovery
各工程生産期間記憶部40は、各製造工程A〜Hのそれぞれについて、製造工程において生産に要する期間を記憶する。例えば、製造工程Aにおいて生産に要する期間とは、生産活動を行える通常の状態(つまり、災害等によって損傷を受けていない状態)であるときに、原料が搬入されてから製造工程Aおいて製造される中間生成物Aが完成するまでの期間である。各製造工程B〜Hについても、同様に記憶されている。
Each process production period memory |
各復旧作業内容記憶部42は、各製造工程A〜Hのそれぞれについて、必要な復旧作業を示す情報を記憶する。図4は、各復旧作業内容記憶部42が記憶するデータの構成図である。例えば、製造工程Aについて生産活動を再開するためには、図1に示すように、製造工程Aの施設・機器等に係る復旧作業X01、電気復旧作業X91、通信復旧作業X94、データ復旧作業X95が必要であり、各復旧作業内容記憶部42は、製造工程A復旧作業X01、電気復旧作業X91、通信復旧作業X94、データ復旧作業X95を製造工程Aと対応付けて記憶する。各製造工程B〜Hについても、同様に記憶する。
Each restoration work
各復旧作業期間記憶部44は、各復旧作業X01〜X08、X91〜X95に要する期間を前記各復旧作業X01〜X08、X91〜X95に対応付けて記憶する。図5は、各復旧作業期間記憶部44が記憶するデータの構成図である。例えば、製造工程Eの施設・機器等に係る復旧作業X05の復旧作業開始から完了までに要する期間が30日であるとすると、30日を復旧作業X05に対応付けて記憶する。
Each restoration work
ところで、復旧作業に要する期間は、生産施設の損傷の度合いによって異なり、この損傷の度合いは、災害の規模によって異なる。ここでは、既存の災害被害評価システム、例えば、地震被害については各種地震被害予測システム(例えば、Quake Mapper(登録商標)等)を用いて、当該生産施設に関して予想される様々な災害(東海地震、南海地震、○○断層帯地震、○○川水害等)の災害規模と生産施設の損傷度合いを予め算出し、その算出結果を各復旧作業期間記憶部44においてそれらの災害と関連付けて記憶する。
By the way, the period required for the restoration work varies depending on the degree of damage to the production facility, and the degree of damage varies depending on the scale of the disaster. Here, using existing disaster damage assessment systems, for example, various earthquake damage prediction systems (for example, Quake Maper (registered trademark)) for earthquake damage, various disasters (Tokai earthquake, The disaster scale (Nankai earthquake, XX fault zone earthquake, XX river flood, etc.) and the damage level of the production facility are calculated in advance, and the calculation results are stored in association with those disasters in each restoration work
また、生産施設内において災害対策を講じた場合には、その対策の内容に応じて各復旧作業X01〜X08に要する期間は短縮される。したがって、この場合には、入力受付部32が、対策後の各復旧作業X01〜X08に要する期間の入力を受付け、各復旧作業期間記憶部44は、対策後の期間を改めて記憶する。
In addition, when disaster countermeasures are taken in the production facility, the period required for each restoration work X01 to X08 is shortened according to the contents of the countermeasures. Therefore, in this case, the
第1製造工程再開期間算出部20は、製造工程Aについて、各復旧作業内容記憶部42が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、各復旧作業期間記憶部44が記憶した各復旧作業に要する期間とに基づいて、製造工程Aの復旧に必要な復旧作業のうち最も期間を要する復旧作業の期間を製造工程Aの生産活動再開に最低限要する期間として算出する。具体的には、製造工程Aの復旧に必要な復旧作業である復旧作業X01、X91、X94、X95の期間のうち最も長い期間を製造工程Aの製造工程の生産活動再開に最低限要する期間として算出する。これは、製造工程Aの生産活動を再開するためには、復旧作業X01、X91、X94、X95の全てが完了していることが必要であるからである。
The first manufacturing process resumption
第2製造工程再開期間算出部22は、製造工程Bから製造工程Hまでの各製造工程について、製造工程Bから順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、各工程生産期間記憶部40が記憶した当該製造工程の直前の製造工程において生産に要する期間と、各復旧作業内容記憶部42が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、各復旧作業期間記憶部44が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する。具体的には、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と各工程生産期間記憶部40が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、当該製造工程の復旧に必要な各復旧作業の期間とのうち最も長い期間を製造工程の生産活動再開に最低限要する期間として算出する。例えば、製造工程Bの生産活動再開に最低限要する期間は、製造工程Aの生産活動再開に最低限要する期間と各工程生産期間記憶部40が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、製造工程Bの復旧に必要な復旧作業X02、X91、X92、X93、X94、X95の各期間とのうち最も長い期間を製造工程の生産活動再開に最低限要する期間として算出する。同様にして、各製造工程C〜Gの生産活動再開に最低限要する期間も順次算出する。
The second manufacturing process resumption
第3製造工程再開期間算出部24は、第2製造工程再開期間算出部22が算出した最終製造工程Hの生産活動再開に要する期間と、各工程生産期間記憶部40が記憶した最終製造工程Hの直前の製造工程Gにおいて生産に要する期間とに基づいて、最終製造工程Hの生産活動再開に影響を与えないようにするために、最終製造工程Hの直前の製造工程Gの生産活動を再開しなければならない最も遅い時点(災害発生時点から起算した最遅の製造工程Gの生産活動再開時点)を算出する。具体的には、第2製造工程再開期間算出部22が算出した最終製造工程Hの生産活動再開に要する期間から、各工程生産期間記憶部40が記憶した製造工程Gにおいて生産に要する期間を差し引くことにより、最遅の製造工程Gの生産活動再開時点を算出する。
The third manufacturing process resumption
第4製造工程再開期間算出部26は、最終製造工程Hの2つ手前の製造工程Fから前記第1番目の製造工程Aへの順に、当該製造工程の直後の製造工程の生産活動を再開しなければならない最遅の時点と、各工程生産期間記憶部40が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最遅の時点を算出する。具体的には、製造工程Fから前記第1番目の製造工程Aへの順に、当該製造工程の直後の製造工程の生産活動を再開しなければならない最遅の時点から、各工程生産期間記憶部40が記憶した当該製造工程において生産に要する期間を差し引くことにより、最遅の当該製造工程の生産活動再開時点を算出する。例えば、最遅の製造工程Fの生産活動再開時点は、第3製造工程再開期間算出部24で算出した製造工程Gの最遅の生産活動再開時点から、製造工程Fにおいて生産に要する期間を差し引くことにより算出する。また、最遅の製造工程Eの生産活動再開時点は、第4製造工程再開期間算出部26で算出した製造工程Fの最遅の生産活動再開時点から、製造工程Eにおいて生産に要する期間を差し引くことにより算出する。同様にして、各製造工程D〜Aの生産活動再開時点を順次算出する。
The fourth manufacturing process resumption
クリティカル復旧作業判定部28は、第1製造工程再開期間算出部20及び第2製造工程再開期間算出部22が算出した各製造工程の生産活動再開に最低限要する期間と、第3製造工程再開期間算出部24及び第4製造工程再開期間算出部26が算出した各製造工程の生産活動を再開しなければならない最遅の時点とに基づいて、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定する。具体的には、全ての製造工程についてそれぞれ、前記災害発生時点から第3製造工程再開期間算出部24又は第4製造工程再開期間算出部26が算出した製造工程A〜Gの製造工程の生産活動を再開しなければならない最遅の時点までの期間から、第1製造工程再開期間算出部20又は第2製造工程再開期間算出部22が算出した製造工程A〜Gの生産活動再開に最低限要する期間を差し引いた差分が0となる場合には、当該製造工程の復旧作業のうち最も期間を要するものがクリティカル復旧作業であると判定する。
The critical recovery
次に、クリティカル復旧作業判定システム1における処理フローについて説明する。図6は、クリティカル復旧作業判定システム1における処理フローを説明する図である。
Next, a processing flow in the critical recovery
また、図7は、図6に示される処理フローに従って行った処理結果を説明する図である。なお、各復旧作業X01〜X08、X91〜X95の横にある括弧内の数値は、各復旧作業X01〜X08、X91〜X95に要する期間を示す。また、N0は災害発生時点であって最初の復旧作業開始時点であり、特許請求の範囲でいう「最も遅い時点」の起算時点に相当する。また、N01は製造工程Aの開始時点を示し、N02は製造工程Aの終了時点であり製造工程Bの開始時点を示す。N03〜N09も、同様に、各製造工程B〜Hの開始時点及び終了時点を示す。さらに、N01〜N09の近傍に記載された「日」字型の枠内に示された数値は下記の処理によって算出された結果を示す。 FIG. 7 is a diagram for explaining the results of processing performed according to the processing flow shown in FIG. In addition, the numerical value in the parenthesis beside each restoration work X01-X08, X91-X95 shows the period which each restoration work X01-X08, X91-X95 requires. N 0 is the time of occurrence of the disaster and the time of starting the first recovery work, and corresponds to the time of calculation of the “latest time” in the claims. N 01 indicates the start time of the manufacturing process A, and N 02 indicates the end time of the manufacturing process A and indicates the start time of the manufacturing process B. Similarly, N 03 to N 09 indicate the start time and end time of each of the production steps B to H. Furthermore, the numerical values shown in the “day” -shaped frame written in the vicinity of N 01 to N 09 indicate the results calculated by the following processing.
まず、S602において、第1製造工程再開期間算出部20が製造工程Aの生産活動再開に最低限要する期間を算出する。製造工程Aの生産活動再開に必要な復旧作業X01、X91、X94、X95のうち、最も長い期間を要するのは復旧作業X01の30日であるので、製造工程Aの生産活動再開に最低限要する期間は30日と算出される。この数値は図7のN01近傍の「日」字型枠の上欄に示される通りである。
First, in S602, the first manufacturing process resumption
次に、S604において、製造工程B〜Hの生産活動再開に最低限要する期間を順次算出する。製造工程Bの生産活動再開に最低限要する期間は、製造工程Aの生産活動再開に最低限要する期間と製造工程Aにおいて生産に要する期間との和の期間と、製造工程Bの復旧に必要な復旧作業X02、X91、X92、X93、X94、X95の各期間とのうち最も長い期間である復旧作業X93の60日であるので、製造工程Bの生産活動再開に最低限要する期間は60日と算出される。 Next, in S604, the minimum period required for resuming the production activities of the manufacturing processes B to H is sequentially calculated. The minimum period required for resuming production activity in manufacturing process B is the sum of the minimum period required for resuming production activity in manufacturing process A and the period required for production in manufacturing process A, and is necessary for recovery of manufacturing process B. Since the recovery work X93, which is the longest period among the recovery work X02, X91, X92, X93, X94, and X95, is 60 days, the minimum period required for resuming production activities in the manufacturing process B is 60 days. Calculated.
また、製造工程Cの生産活動再開に最低限要する期間は、製造工程Bの生産活動再開に最低限要する期間と製造工程Bにおいて生産に要する期間との和の期間の61日であるので、製造工程Cの生産活動再開に最低限要する期間は61日と算出される。以下、同様に製造工程Dについては63日、製造工程Eについては65日、製造工程Fについては66日、製造工程Gについては90日、製造工程Hについては92日と算出される。 Further, the minimum period required for resuming the production activity in the manufacturing process C is 61 days, which is the sum of the minimum period required for resuming the production activity in the manufacturing process B and the period required for production in the manufacturing process B. The minimum period required for resuming the production activity in process C is calculated as 61 days. Similarly, it is calculated as 63 days for the manufacturing process D, 65 days for the manufacturing process E, 66 days for the manufacturing process F, 90 days for the manufacturing process G, and 92 days for the manufacturing process H.
S606において、製造工程Hの生産活動再開に最低限要する期間の92日(図7のN08近傍の「日」字型枠の下欄に示される)を起点として、製造工程Gの最遅の生産活動再開時点を算出する。製造工程Hの生産活動再開に要する期間の92日から、製造工程Gにおいて生産に要する期間の2日を差し引くこと90日後と算出される。この数値は図7のN07近傍の「日」字型枠の下欄に示される通りである。 In S606, the latest period of manufacturing process G starts from the 92nd day (shown in the lower column of the “day” frame near N08 in FIG. 7), which is the minimum period required for resuming production activities in manufacturing process H. Calculate when production activity resumes. It is calculated as 90 days after subtracting 2 days of the period required for production in the manufacturing process G from 92 days of the period required for resuming the production activity of the manufacturing process H. This numerical value is as shown in the lower column of the “day” shaped frame in the vicinity of N 07 in FIG.
S608において、製造工程F〜Aの最遅の生産活動再開時点を順次算出する。最遅の製造工程Fの生産活動再開時点は、製造工程Fの直後の製造工程Gの最遅の生産活動再開時点の90日後から、製造工程Fにおいて生産に要する期間の1日を差し引くことにより89日と算出される。以下、同様に製造工程Eについては88日、製造工程Dについては86日、製造工程Cについては84日、製造工程Bについては83日、製造工程Aについては82日と算出される。 In S608, the latest production activity resumption time of the manufacturing processes F to A is sequentially calculated. The production activity resumed at the latest manufacturing process F is 90 days after the latest production activity resumed at the manufacturing process G immediately after the manufacturing process F, by subtracting one day of the period required for production in the manufacturing process F. Calculated as 89 days. Hereinafter, similarly, it is calculated as 88 days for the manufacturing process E, 86 days for the manufacturing process D, 84 days for the manufacturing process C, 83 days for the manufacturing process B, and 82 days for the manufacturing process A.
S610において、クリティカル復旧作業が何れのであるかを判定する。N01〜N09の近傍に記載された「日」字型の枠内に示された下欄の数値から上欄の数値を差し引いて0となる製造工程は、製造工程G(N07)と製造工程H(N08)である。さらに、製造工程Gの復旧作業のうち最も長い期間を要する復旧作業は復旧作業X07の90日である。よって、復旧作業X07と製造工程Gと製造工程Hがクリティカル復旧作業であると判定される。 In S610, it is determined which is the critical recovery work. The manufacturing process which becomes 0 by subtracting the numerical value of the upper column from the numerical value of the lower column shown in the “day” -shaped frame described in the vicinity of N 01 to N 09 is the manufacturing process G (N 07 ) It is a manufacturing process H (N 08 ). Furthermore, the recovery work that requires the longest period of recovery work in the manufacturing process G is 90 days of the recovery work X07. Therefore, it is determined that the recovery operation X07, the manufacturing process G, and the manufacturing process H are critical recovery operations.
S610での判定結果に基づいて、クリティカル復旧作業に関係する箇所について対策を講じる場合(S612:YES)には、入力受付部32において、対策後の各復旧作業X01〜X08に要する期間の入力を受付ける(S614)。一方で、クリティカル復旧作業に関係する箇所について対策を講じない場合(S612:NO)には、終了する。
Based on the determination result in S610, when measures are taken for locations related to the critical recovery work (S612: YES), the
以上の通り、第1実施形態のクリティカル復旧作業判定システム1によれば、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することができる。また、クリティカル復旧作業判定システム1によれば、第2製造工程再開期間算出部22において、生産施設全体の生産活動再開に要する期間を算出することができる。
As described above, according to the critical recovery
このように、クリティカル復旧作業が何れであるかを判定できれば、生産施設のどの箇所を補修すればよいか等、効果的な災害対策の意思決定に役立てることができる。また、入力受付部32を設けることにより、クリティカル復旧作業に係る判定結果に基づいて生産施設について災害対策を講じた場合に、その災害対策によって短縮された復旧作業の期間を入力することができ、もって災害対策後のクリティカル復旧作業について更に判定することができる。また、災害対策後の生産施設全体の生産活動再開に要する期間も算出することができるので、災害対策前後の生産活動再開に要する期間を比較検討することにより災害対策の効果を定量的に把握することができる。
As described above, if it is possible to determine which critical recovery work is performed, it can be used for effective disaster countermeasure decision making such as which part of the production facility should be repaired. In addition, by providing the
===第2実施形態===
図8は、第2実施形態のクリティカル復旧作業判定システム2の構成を示すブロック構成図である。同図に示すように、クリティカル復旧作業判定システム1に加え、各復旧作業内訳作業記憶部46、内訳作業期間記憶部48、各復旧作業期間算出部30を更に備える。なお、各復旧作業期間算出部30は、CPU10が記憶手段12に記憶されたプログラムを読み出して実行することにより実現され、各記憶部46、48は、記憶手段12上に構築される。
=== Second Embodiment ===
FIG. 8 is a block configuration diagram illustrating a configuration of the critical recovery
各復旧作業内訳作業記憶部46は、各復旧作業X01〜X08の作業内容を更に細分化した作業内容(内訳作業)を記憶する。図9は、各復旧作業内訳作業記憶部46が記憶するデータの構成図である。例えば、復旧作業X01には、製造工程Aの建屋の修繕(内訳作業X01a)と製造工程Aに用いる機器の修繕(内訳作業X01b)という内訳作業がある。このように、各復旧作業内訳作業記憶部46は、各復旧作業X01〜X08と、各復旧作業X01〜X08の内訳作業をそれぞれ関連付けて記憶する。
Each restoration work breakdown
内訳作業期間記憶部48は、各内訳作業に要する期間を各内訳作業に関連付けて記憶する。例えば、内訳作業X01aの復旧作業開始から完了までに要する期間が7日であるとすると、7日を内訳作業X01aに対応付けて記憶する。
The breakdown work
ところで、内訳作業に要する期間は、生産施設の損傷の度合いによって異なり、この損傷の度合いは、災害の規模によって異なる。ここでは、既存の災害被害評価システム、例えば、地震被害については各種地震被害予測システム(例えば、Quake Mapper(登録商標)等)を用いて、当該生産施設に関して予想される様々な災害(東海地震、南海地震、○○断層帯地震、○○川水害等)の災害規模と生産施設の損傷度合いを予め算出し、その算出結果を内訳作業期間記憶部48においてそれらの災害と関連付けて記憶する。
By the way, the period required for the breakdown work varies depending on the degree of damage to the production facility, and the degree of damage varies depending on the scale of the disaster. Here, using existing disaster damage assessment systems, for example, various earthquake damage prediction systems (for example, Quake Maper (registered trademark)) for earthquake damage, various disasters (Tokai earthquake, The disaster scale of Nankai earthquake, XX fault zone earthquake, XX river flood, etc.) and the damage degree of the production facility are calculated in advance, and the calculation results are stored in the breakdown work
また、生産施設内において災害対策を講じた場合には、その対策の内容に応じて各内訳作業に要する期間は短縮される。したがって、この場合には、入力受付部32が、対策後の各内訳作業に要する期間の入力を受付け、内訳作業期間記憶部48は、対策後の期間を改めて記憶する。
In addition, when disaster countermeasures are taken in the production facility, the period required for each breakdown work is shortened according to the contents of the countermeasures. Therefore, in this case, the
各復旧作業期間算出部30は、各復旧作業内訳作業記憶部46が記憶する各復旧作業X01〜X08の内訳作業を示す情報と、内訳作業期間記憶部48が記憶する各復旧作業X01〜X08の内訳作業に要する期間とに基づいて、各復旧作業X01〜X08に要する期間を算出する。具体的には、各復旧作業X01〜X08の内訳作業に要する期間のうち最長の内訳作業の期間を各復旧作業X01〜X08に要する期間として算出する。例えば、復旧作業X01には、内訳作業X01aと内訳作業X01bの2つあり、それぞれ内訳作業X01aは7日、内訳作業X01bは30日要する場合には、最も長い期間を要する内訳作業は内訳作業X01bの30日であるので、復旧作業X01に要する期間は30日と算出される。
また、各復旧作業期間記憶部44は、各復旧作業期間算出部30が算出した各復旧作業X01〜X08に要する期間を記憶する。
Each restoration work
In addition, each recovery work
次に、クリティカル復旧作業判定システム2における処理フローについて説明する。図10は、クリティカル復旧作業判定システム2における処理フローを説明する図である。
Next, a processing flow in the critical recovery
まず、S1000において、復旧作業X01〜X08に要する期間をそれぞれ算出する。以降のS1002〜S1014の処理は、第1実施形態のS602〜S614と同様である。 First, in S1000, the periods required for the recovery operations X01 to X08 are calculated. The subsequent processes of S1002 to S1014 are the same as S602 to S614 of the first embodiment.
以上の通り、第2実施形態のクリティカル復旧作業判定システム2によっても、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することができる。
As described above, even in the critical recovery
さらに、第2実施形態のクリティカル復旧作業判定システム2によれば、各復旧作業内訳作業記憶部46と内訳作業期間記憶部48が各復旧作業X01〜X08の内訳作業を記憶しているので、復旧作業に要する期間についてより詳細に検討することができる。
Furthermore, according to the critical recovery
===第3実施形態===
図11は、第3実施形態において、クリティカル復旧作業判定システム1を用いる対象となる生産施設の製造工程と、それぞれの製造工程の復旧に必要な復旧作業について説明するアローダイヤグラムである。図7に示した第1実施形態での製造工程は、製造工程Aで製造された中間生成物Aを用いて製造工程Bの製造を行い、製造工程Bで製造された中間生成物Bを用いて製造工程Cの製造を行うというように単線的であったが、第3実施形態での製造工程は、図11に示す通り、一部(製造工程Cと製造工程D)において製造工程が同時並行的に進められるというように複線的である。このように、複線的な製造工程に対しても、クリティカル復旧作業判定システム1を用いることができる。
=== Third Embodiment ===
FIG. 11 is an arrow diagram for explaining a manufacturing process of a production facility that is a target for using the critical recovery
なお、図11のN13〜N14、N15〜N18、N13〜N16、N17〜N18をそれぞれ結ぶ破線矢印d1、d2、d3、d4は、N13〜N14、N15〜N18、N13〜N16、N17〜N18の前後関係を明示するためのものであって、作業期間は0である。すなわち、破線矢印d1、d2、d3、d4は、N13に到達しなければ(製造工程Bにおいて中間生成物Bの供給が再開されなければ)N14及びN16に到達できず(製造工程C及び製造工程Dの生産活動が再開されない)、N15に到達しかつN17に到達しなければ(製造工程Cにおいて中間生成物Cの供給が再開され、かつ製造工程Dにおいて中間生成物Dの供給が再開されなければ)N18に到達できない(製造工程Eの生産活動が再開されない)ことを示す。
Incidentally, N 13 ~N 14, N 15 ~N 18,
第3実施形態における具体的な処理フローは、図6を用いて説明した第1実施形態と同様である。 A specific processing flow in the third embodiment is the same as that in the first embodiment described with reference to FIG.
なお、複線的な製造工程となっている製造工程Cと製造工程Dについて、製造工程Cの直前の製造工程は製造工程Bであり、製造工程Dの直前の製造工程も製造工程Bである。また、製造工程Eの直前の製造工程は、製造工程Cと製造工程Dである。 In addition, regarding the manufacturing process C and the manufacturing process D, which are double-track manufacturing processes, the manufacturing process immediately before the manufacturing process C is the manufacturing process B, and the manufacturing process immediately before the manufacturing process D is also the manufacturing process B. The manufacturing processes immediately before the manufacturing process E are the manufacturing process C and the manufacturing process D.
第2製造工程再開期間算出部22は、例えば製造工程Eについて、直前の製造工程Cの生産活動再開に最低限要する期間と製造工程Cにおいて生産に要する期間との和の期間と、直前の製造工程Dの生産活動再開に最低限要する期間と製造工程Dにおいて生産に要する期間との和の期間と、当該製造工程の復旧に必要な各復旧作業の期間とのうち最も長い期間を製造工程の生産活動再開に最低限要する期間として算出する。
For example, for the manufacturing process E, the second manufacturing process resumption
また、第4製造工程再開期間算出部26は、例えば製造工程Bについて、製造工程Eの生産活動を再開しなければならない最も遅い時点から製造工程Cにおいて生産に要する期間を差し引くことにより算出される時点と、製造工程Eの生産活動を再開しなければならない最も遅い時点から製造工程Dにおいて生産に要する期間を差し引くことにより算出される時点とのうち早い方の時点を、製造工程Bの中間性生物Bの供給再開しなければならない最も遅い時点として算出する。そして、その算出した製造工程Bの中間性生物Bの供給再開しなければならない最も遅い時点から、各工程生産期間記憶部40が記憶した製造工程Bにおいて生産に要する期間を差し引くことにより、製造工程Bの生産活動を再開しなければならない最も遅い時点を算出する。
Further, the fourth manufacturing process restart
なお、第3実施形態においても、第2実施形態に示したように各復旧作業内訳作業記憶部46、内訳作業期間記憶部48、各復旧作業期間算出部30を更に備え、復旧作業に要する期間についてより詳細に検討してもよい。
In the third embodiment, as shown in the second embodiment, each recovery work breakdown
以上の通り、第3実施形態のような複線的な製造工程を有する生産施設においても、クリティカル復旧作業判定システム1によって、複数の製造工程を有する生産施設が所定の災害によって被害を受けた場合に、各製造工程の生産活動再開に必要な1又は2以上の復旧作業のうち、生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することができる。すなわち、クリティカル復旧作業判定システム1は、様々な形態の製造工程に用いることができる。
As described above, even in a production facility having a multi-track manufacturing process as in the third embodiment, when a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster by the critical recovery
なお、以上の第1から第3の実施形態の説明は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。本発明はその趣旨を逸脱することなく、変更、改良され得ると共に本発明にはその等価物が含まれることは勿論である。 The descriptions of the first to third embodiments described above are for facilitating the understanding of the present invention, and do not limit the present invention. It goes without saying that the present invention can be changed and improved without departing from the gist thereof, and that the present invention includes equivalents thereof.
1、2 クリティカル復旧作業判定システム
10 CPU
11 メモリ
12 記憶手段
13 記録媒体読取手段
14 通信インターフェイス
15 入力手段
16 出力手段
17 記録媒体
20 第1製造工程再開期間算出部
22 第2製造工程再開期間算出部
24 第3製造工程再開期間算出部
26 第4製造工程再開期間算出部
28 クリティカル復旧作業判定部
30 各復旧作業期間算出部
32 入力受付部
40 各工程生産期間記憶部
42 各復旧作業内容記憶部
44 各復旧作業期間記憶部
46 各復旧作業内訳作業記憶部
48 内訳作業期間記憶部
1, 2 Critical recovery
DESCRIPTION OF SYMBOLS 11
Claims (9)
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
前記各工程生産期間記憶部の記憶する前記製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶する必要な復旧作業を示す情報と、各復旧作業期間記憶部が記憶する前記各復旧作業に要する期間とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定部と、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出部と、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出部と、
前記第2製造工程再開期間算出部が算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出部と、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出部と、を備え、
前記クリティカル復旧作業判定部は、
前記第1製造工程再開期間算出部及び前記第2製造工程再開期間算出部が算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出部及び前記第4製造工程再開期間算出部が算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することを特徴とするクリティカル復旧作業判定システム。 When a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, the production from the start of the first recovery operation A critical recovery operation determination system that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of a facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
The period required for production in the manufacturing process stored in each process production period storage unit, information indicating the necessary recovery work stored in each recovery work content storage unit, and each of the recovery work period storage units stored A critical recovery operation determination unit that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of the production facility, based on the period required for the recovery operation ;
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process resumption period calculation unit that calculates a minimum period required for resuming the production activity of the first manufacturing process based on a period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculation unit that calculates a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration operation stored in the period storage unit;
A period required for resuming the production activity of the final manufacturing process calculated by the second manufacturing process restart period calculating unit, and a period required for production in the manufacturing process immediately before the final manufacturing process stored by each process production period storage unit; In order to avoid affecting the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculation unit for calculating a time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculation unit for calculating the latest time point that must be performed,
The critical recovery work determination unit
The period required for resuming the production activity of each manufacturing process calculated by the first manufacturing process resumption period calculation unit and the second manufacturing process resumption period calculation unit, the third manufacturing process resumption period calculation unit, and the fourth Based on the latest time point at which the production activity of each manufacturing process must be resumed calculated by the production process resumption period calculation unit, which critical recovery operation has the greatest impact on the period required to resume the production activity of the production facility. A critical recovery operation determination system characterized by determining whether the operation is a recovery operation.
前記第1製造工程再開期間算出部は、前記第1番目の製造工程の復旧に必要な各復旧作業のうち最も期間を要する復旧作業の期間を前記第1番目の製造工程の生産活動再開に最低限要する期間として算出し、
前記第2製造工程再開期間算出部は、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、当該製造工程の復旧に必要な各復旧作業の期間とのうち最も長い期間を製造工程の生産活動再開に最低限要する期間として算出し、
前記第3製造工程再開期間算出部は、前記第2製造工程再開期間算出部が算出した前記最終製造工程の生産活動再開に要する期間から、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間を差し引くことにより、前記最終製造工程の直前の製造工程の生産活動を再開しなければならない最も遅い時点を算出し、
前記第4製造工程再開期間算出部は、前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点から、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間を差し引くことにより、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出することを特徴とするクリティカル復旧作業判定システム。 The critical recovery work determination system according to claim 1 ,
The first manufacturing process resumption period calculating unit sets the period of the recovery work that requires the longest time among the recovery works necessary for the recovery of the first manufacturing process to the minimum for resuming the production activity of the first manufacturing process. Calculated as the time limit,
The second manufacturing process resumption period calculation unit is required for production in a period necessary for resuming the production activity of the manufacturing process immediately before the manufacturing process and a manufacturing process immediately before the manufacturing process stored in each process production period storage unit. Calculate the longest period of the sum of the period and the period of each restoration work required for the restoration of the manufacturing process as the minimum period required to resume the production activity of the manufacturing process,
The third manufacturing process restart period calculation unit is configured to store the final manufacturing process stored in each process production period storage unit from a period required for resuming the production activity of the final manufacturing process calculated by the second manufacturing process restart period calculation unit. By subtracting the period required for production in the manufacturing process immediately before, the latest time point at which the production activity of the manufacturing process immediately before the final manufacturing process must be resumed is calculated.
The fourth manufacturing process resumption period calculation unit must resume the production activity of the manufacturing process immediately after the manufacturing process in order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process. By subtracting the time required for production in the manufacturing process stored in the manufacturing process storage unit from each process from the latest time that must not be calculated, the latest time at which the production activity of the manufacturing process must be resumed is calculated. Critical recovery work judgment system.
前記クリティカル復旧作業判定部は、全ての製造工程についてそれぞれ、前記災害発生時点から前記第3製造工程再開期間算出部又は前記第4製造工程再開期間算出部が算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点までの期間から、第1製造工程再開期間算出部又は第2製造工程再開期間算出部が算出した前記各製造工程の生産活動再開に最低限要する期間を差し引いた差分が0である場合には、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間との和の期間と、当該製造工程の復旧作業のうち最も期間を要するものがクリティカル復旧作業であると判定することを特徴とするクリティカル復旧作業判定システム。 The critical recovery work determination system according to claim 1 or 2 ,
The critical recovery work determination unit is configured to perform the production activity of each manufacturing process calculated by the third manufacturing process resumption period calculation unit or the fourth manufacturing process resumption period calculation unit from the time when the disaster occurred for each of the manufacturing processes. The difference obtained by subtracting the minimum period required for resuming the production activity of each manufacturing process calculated by the first manufacturing process resuming period calculating unit or the second manufacturing process resuming period calculating unit from the period until the latest time point that must be restarted Is 0, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process and the period required for production in the manufacturing process immediately before the manufacturing process stored in each process production period storage unit Critical recovery work characterized in that it is determined that the most time-consuming recovery work in the manufacturing process and critical period is the critical recovery work Constant system.
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
前記各工程生産期間記憶部の記憶する前記製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶する必要な復旧作業を示す情報と、各復旧作業期間記憶部が記憶する前記各復旧作業に要する期間とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するクリティカル復旧作業判定部と、
前記クリティカル復旧作業判定部が判定したクリティカル復旧作業について災害対策を講じた場合の前記各復旧作業に要する期間の入力を受付ける入力受付部と、
を備え、
前記各復旧作業内容記憶部は、前記災害対策を講じた場合の前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を記憶し、
前記各復旧作業期間記憶部は、前記災害対策を講じた場合の前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶し、
前記クリティカル復旧作業判定部は、前記災害対策を講じた場合について、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定することを特徴とするクリティカル復旧作業判定システム。 When a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, the production from the start of the first recovery operation A critical recovery operation determination system that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of a facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
The period required for production in the manufacturing process stored in each process production period storage unit, information indicating the necessary recovery work stored in each recovery work content storage unit, and each of the recovery work period storage units stored A critical recovery operation determination unit that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of the production facility, based on the period required for the recovery operation;
An input receiving unit that receives an input of a period required for each recovery work when disaster countermeasures are taken for the critical recovery work determined by the critical recovery work determination unit ;
With
Each restoration work content storage unit stores information indicating necessary restoration work for each of the manufacturing steps when the disaster countermeasures are taken,
Each restoration work period storage unit stores a period required for each restoration work when the disaster countermeasure is taken in association with each restoration work,
The critical recovery operation determination unit determines which recovery operation is the critical recovery operation that most affects the period required for resuming the production activity of the production facility when the disaster countermeasure is taken. System for critical recovery work.
前記各製造工程の復旧に必要な各復旧作業の内訳作業を示す情報を前記各製造工程を示す情報に対応付けて記憶する各復旧作業内訳作業記憶部と、
前記各復旧作業の内訳作業に要する期間を前記内訳作業を示す情報に対応付けて記憶する内訳作業期間記憶部と、
前記各復旧作業内訳作業記憶部が記憶する前記各復旧作業の内訳作業を示す情報と、前記内訳作業期間記憶部が記憶する前記各復旧作業の内訳作業に要する期間とに基づいて、前記各復旧作業に要する期間を算出する各復旧作業期間算出部と、
を備え、
前記各復旧作業期間記憶部は、前記各復旧作業期間算出部が算出した前記各復旧作業に要する期間を記憶することを特徴とするクリティカル復旧作業判定システム。 The critical recovery work determination system according to any one of claims 1 to 3 ,
Each recovery work breakdown work storage unit that stores information indicating the breakdown work of each recovery work required for the recovery of each manufacturing process in association with the information indicating each manufacturing process;
A breakdown work period storage unit for storing a period required for the breakdown work of each recovery work in association with information indicating the breakdown work;
Based on the information indicating the breakdown work of each recovery work stored in each recovery work breakdown work storage unit and the period required for the breakdown work of each recovery work stored in the breakdown work period storage unit, Each restoration work period calculation unit for calculating the period required for work,
With
Each recovery work period storage unit stores a period required for each recovery work calculated by each recovery work period calculation unit.
前記各復旧作業期間算出部は、前記各復旧作業の内訳作業に要する期間のうち最長の内訳作業の期間を前記各復旧作業に要する期間として算出することを特徴とするクリティカル復旧作業判定システム。 The critical recovery work determination system according to claim 5 ,
Each of the recovery work period calculation units calculates the longest breakdown work period among the periods required for the breakdown work of each recovery work as a period required for each of the recovery works.
前記クリティカル復旧作業判定部が判定したクリティカル復旧作業について災害対策を講じた場合の前記各復旧作業の内訳作業に要する期間の入力を受付ける入力受付部を備え、
前記各復旧作業内訳作業記憶部は、前記入力受付部が入力を受付けた前記所定の災害の対策を講じた場合の前記各復旧作業の内訳作業に要する期間を記憶し、
前記各復旧作業期間算出部、前記各製造工程復旧期間算出部、及び前記クリティカル復旧作業判定部は、前記所定の災害の対策を講じた場合について、算出又は判定することを特徴とするクリティカル復旧作業判定システム。 The critical recovery work determination system according to claim 5 or 6 ,
An input receiving unit that receives an input of a period required for a breakdown work of each recovery work when a disaster countermeasure is taken for the critical recovery work determined by the critical recovery work determination unit;
Each restoration work breakdown work storage unit stores a period required for the breakdown work of each restoration work when the input accepting unit has taken measures against the predetermined disaster,
Each of the recovery work period calculation units, each of the manufacturing process recovery period calculation units, and the critical recovery operation determination unit calculates or determines when the predetermined disaster countermeasures are taken. Judgment system.
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
を備えるコンピュータが、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出ステップと、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出ステップと、
前記第2製造工程再開期間算出ステップにて算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出ステップと、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出ステップと、
前記第1製造工程再開期間算出ステップ及び前記第2製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出ステップ及び前記第4製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するステップを含むことを特徴とするクリティカル復旧作業判定方法。 When a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, the production from the start of the first recovery operation A critical recovery operation determination method for determining which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of a facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
A computer comprising
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process restart period calculating step for calculating a minimum period required for restarting the production activity of the first manufacturing process based on the period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculating step for calculating a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration work stored in the period storage unit;
The period required for resuming the production activity of the final manufacturing process calculated in the second manufacturing process restart period calculating step, and the period required for production in the manufacturing process immediately before the final manufacturing process stored in each process production period storage unit Based on the above, in order not to affect the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculating step for calculating a later time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculating step for calculating the latest time point that must be performed;
A period required for resuming the production activity of each manufacturing process calculated in the first manufacturing process resuming period calculating step and the second manufacturing process resuming period calculating step; a third manufacturing process resuming period calculating step; 4. Critical recovery work that most affects the time required for resuming the production activity of the production facility based on the latest point in time at which the production activity of each production process must be resumed, calculated in the production process resumption period calculation step. A critical recovery work determination method comprising the step of determining which recovery work is a recovery work.
前記各製造工程のそれぞれについて、前記製造工程において生産に要する期間を記憶する各工程生産期間記憶部と、
前記各製造工程のそれぞれについて、必要な復旧作業を示す情報を前記各製造工程に対応付けて記憶する各復旧作業内容記憶部と、
前記各復旧作業に要する期間を前記各復旧作業に対応付けて記憶する各復旧作業期間記憶部と、
を備えるコンピュータに、
第1番目の製造工程について、前記各復旧作業内容記憶部が記憶した前記第1番目の製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、前記第1番目の製造工程の生産活動再開に最低限要する期間を算出する第1製造工程再開期間算出ステップと、
第2番目の製造工程から最終の製造工程までの各製造工程について、第2番目の製造工程から順に、当該製造工程の直前の製造工程の生産活動再開に最低限要する期間と、前記各工程生産期間記憶部が記憶した当該製造工程の直前の製造工程において生産に要する期間と、前記各復旧作業内容記憶部が記憶した当該製造工程の復旧に必要な復旧作業を示す情報と、前記各復旧作業期間記憶部が記憶した各復旧作業に要する期間とに基づいて、当該製造工程の生産活動再開に最低限要する期間を算出する第2製造工程再開期間算出ステップと、
前記第2製造工程再開期間算出ステップにて算出した前記最終製造工程の生産活動再開に要する期間と、前記各工程生産期間記憶部が記憶した前記最終製造工程の直前の製造工程において生産に要する期間とに基づいて、前記最終製造工程の生産活動再開に影響を与えないようにするために前記最終製造工程の直前の製造工程の生産活動を再開しなければならない前記災害発生時点から起算して最も遅い時点を算出する第3製造工程再開期間算出ステップと、
前記最終製造工程の2つ手前の製造工程から前記第1番目の製造工程への順に、当該製造工程の2つ後ろの製造工程の生産活動再開に影響を与えないようにするために当該製造工程の直後の製造工程の生産活動を再開しなければならない最も遅い時点と、前記各工程生産期間記憶部が記憶した当該製造工程において生産に要する期間とに基づいて、当該製造工程の生産活動を再開しなければならない最も遅い時点を算出する第4製造工程再開期間算出ステップと、
前記第1製造工程再開期間算出ステップ及び前記第2製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動再開に最低限要する期間と、前記第3製造工程再開期間算出ステップ及び前記第4製造工程再開期間算出ステップにて算出した前記各製造工程の生産活動を再開しなければならない最も遅い時点とに基づいて、前記生産施設の生産活動再開に要する期間に最も影響を与えるクリティカル復旧作業が何れの復旧作業であるかを判定するステップを実行させることを特徴とするクリティカル復旧作業判定プログラム。 When a production facility having a plurality of manufacturing processes is damaged by a predetermined disaster, among the one or two or more recovery operations necessary for resuming the production activity of each manufacturing process, the production from the start of the first recovery operation A critical recovery operation determination program that determines which recovery operation is the critical recovery operation that most affects the period required to resume the production activity of the facility,
For each of the manufacturing processes, each process production period storage unit that stores a period required for production in the manufacturing process;
For each of the manufacturing processes, each recovery work content storage unit that stores information indicating a necessary recovery work in association with each manufacturing process;
Each recovery work period storage unit that stores the period required for each recovery work in association with each recovery work;
On a computer with
For the first manufacturing process, information indicating the recovery work necessary for recovery of the first manufacturing process stored in each recovery work content storage unit, and each recovery work stored in each recovery work period storage unit A first manufacturing process restart period calculating step for calculating a minimum period required for restarting the production activity of the first manufacturing process based on the period required for
For each manufacturing process from the second manufacturing process to the final manufacturing process, in order from the second manufacturing process, the minimum period required for resuming the production activity of the manufacturing process immediately before the manufacturing process, and the production of each process The period required for production in the manufacturing process immediately before the manufacturing process stored in the period storage unit, the information indicating the recovery work necessary for recovery of the manufacturing process stored in the recovery work content storage unit, and the recovery work A second manufacturing process resumption period calculating step for calculating a minimum period required for resuming the production activity of the manufacturing process based on the period required for each restoration work stored in the period storage unit;
The period required for resuming the production activity of the final manufacturing process calculated in the second manufacturing process restart period calculating step, and the period required for production in the manufacturing process immediately before the final manufacturing process stored in each process production period storage unit Based on the above, in order not to affect the resumption of the production activity of the final manufacturing process, the production activity of the manufacturing process immediately before the final manufacturing process must be resumed from the time of the disaster occurrence. A third manufacturing process resumption period calculating step for calculating a later time point;
In order from the manufacturing process two steps before the final manufacturing process to the first manufacturing process, the manufacturing process is performed so as not to affect the resumption of the production activity of the manufacturing process two steps after the manufacturing process. The production activity of the manufacturing process is resumed on the basis of the latest point in time at which the production activity of the manufacturing process must be resumed immediately after and the time required for production in the production process stored in each production period storage unit. A fourth manufacturing process resumption period calculating step for calculating the latest time point that must be performed;
A period required for resuming the production activity of each manufacturing process calculated in the first manufacturing process resuming period calculating step and the second manufacturing process resuming period calculating step; a third manufacturing process resuming period calculating step; 4. Critical recovery work that most affects the time required for resuming the production activity of the production facility based on the latest point in time at which the production activity of each production process must be resumed, calculated in the production process resumption period calculation step. A critical recovery work determination program that executes a step of determining which recovery work is a recovery work.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008231428A JP5282496B2 (en) | 2008-09-09 | 2008-09-09 | Critical recovery work determination system, method and program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008231428A JP5282496B2 (en) | 2008-09-09 | 2008-09-09 | Critical recovery work determination system, method and program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2010066924A JP2010066924A (en) | 2010-03-25 |
| JP5282496B2 true JP5282496B2 (en) | 2013-09-04 |
Family
ID=42192470
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008231428A Active JP5282496B2 (en) | 2008-09-09 | 2008-09-09 | Critical recovery work determination system, method and program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5282496B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113935568B (en) * | 2021-08-30 | 2024-11-01 | 国网江苏省电力有限公司物资分公司 | A decision-making aid for developing procurement strategies during the productivity recovery phase |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2004110564A (en) * | 2002-09-19 | 2004-04-08 | Mitsubishi Heavy Ind Ltd | Period of construction work and cost evaluation system |
| JP2006343987A (en) * | 2005-06-08 | 2006-12-21 | Nec Fielding Ltd | System, method and program for supporting maintenance of maintenance object |
| JP4884825B2 (en) * | 2006-04-27 | 2012-02-29 | 株式会社日立製作所 | Production quantity estimation device, production quantity estimation method, production quantity estimation program |
-
2008
- 2008-09-09 JP JP2008231428A patent/JP5282496B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2010066924A (en) | 2010-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Tang et al. | Assessment of the effect of memory page retirement on system RAS against hardware faults | |
| CN104966141B (en) | Method and system for updating a model used to generate an industrial asset health profile | |
| JP5088411B2 (en) | System operation management support program, method and apparatus | |
| JP4990988B2 (en) | Device deterioration evaluation support method and device deterioration evaluation support device | |
| JP2005182465A (en) | Maintenance support method and program | |
| KR20210049677A (en) | Failure detection system and failure detection method | |
| CN115657965B (en) | Method, device and medium for configuring metadata | |
| JP2013105221A (en) | Maintenance parts delivery support system, maintenance parts delivery support device and maintenance parts delivery support program | |
| CN118793603A (en) | Method and apparatus for predicting the remaining life of a hydraulic pump | |
| CN102890647A (en) | Method and device for storing and updating data | |
| CN101414273A (en) | Method for evaluating storage system RAID redundant data risk | |
| JP5282496B2 (en) | Critical recovery work determination system, method and program | |
| WO2016125248A1 (en) | Maintenance assistance system, maintenance assistance method, and maintenance assistance program | |
| CN120704958B (en) | RAID data processing method, device, chip, electronic equipment, storage medium and computer program product | |
| JP6811066B2 (en) | Risk evaluation device, risk change evaluation method and program | |
| CN110968456A (en) | Method and device for processing faulty disk in distributed storage system | |
| CN110309533B (en) | Normal unit life distribution parameter estimation method based on spare part guarantee data | |
| CN111597093B (en) | Exception handling method, device and equipment | |
| CN107886992A (en) | A kind of RAID method for detecting health status, system and relevant apparatus | |
| JP5543177B2 (en) | Fluctuation numerical prediction system and fluctuation numerical prediction method | |
| CN114662945B (en) | Method, device and computer equipment for eliminating key sensitive equipment in nuclear power plants | |
| JP2016224862A (en) | Maintenance work interval determination device | |
| CN112463321B (en) | Process concurrency number prediction method and device and process concurrency number control method and device | |
| CN116977114A (en) | Method, device, equipment and storage medium for managing change points of iron and steel enterprises | |
| JP4109527B2 (en) | Control model learning method, control model learning apparatus, computer program, and computer-readable storage medium |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20110819 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20121019 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121030 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121207 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130430 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130513 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5282496 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |